US20200262314A1 - Control method and system of neutral section passing of multi-locomotive short broke trains - Google Patents

Control method and system of neutral section passing of multi-locomotive short broke trains Download PDF

Info

Publication number
US20200262314A1
US20200262314A1 US16/652,010 US201716652010A US2020262314A1 US 20200262314 A1 US20200262314 A1 US 20200262314A1 US 201716652010 A US201716652010 A US 201716652010A US 2020262314 A1 US2020262314 A1 US 2020262314A1
Authority
US
United States
Prior art keywords
multiple unit
neutral section
section passing
controller
neutral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US16/652,010
Other versions
US11766954B2 (en
Inventor
Yunxin FAN
Ande ZHOU
Aijun CHEN
Lili MA
Jianlin Chen
Xining Li
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Zhuzhou Locomotive Co Ltd
Original Assignee
CRRC Zhuzhou Locomotive Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Zhuzhou Locomotive Co Ltd filed Critical CRRC Zhuzhou Locomotive Co Ltd
Assigned to CRRC ZHUZHOU LOCOMOTIVE CO., LTD. reassignment CRRC ZHUZHOU LOCOMOTIVE CO., LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: CHEN, AIJUN, CHEN, JIANLIN, FAN, Yunxin, LI, Xining, MA, LILI, ZHOU, Ande
Publication of US20200262314A1 publication Critical patent/US20200262314A1/en
Application granted granted Critical
Publication of US11766954B2 publication Critical patent/US11766954B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M3/00Feeding power to supply lines in contact with collector on vehicles; Arrangements for consuming regenerative power
    • B60M3/04Arrangements for cutting in and out of individual track sections
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • B60L3/0023Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L9/00Electric propulsion with power supply external to the vehicle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M1/00Power supply lines for contact with collector on vehicle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M3/00Feeding power to supply lines in contact with collector on vehicles; Arrangements for consuming regenerative power
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2200/00Type of vehicles
    • B60L2200/26Rail vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/10Vehicle control parameters
    • B60L2240/12Speed

Definitions

  • the present invention relates to the field of control method neutral section passing of railway vehicles, and in particular to a control method and system of neutral section passing of multi-locomotive short broke trains.
  • a traction contact network uses a single-phase power frequency AC power supply manner.
  • an electrified railway contact network adopts a segmented phase commutation power supply manner.
  • the adjacent phases are separated by air or an insulator, which is called “neutral section insulation”.
  • neutral section insulation There is a power supply dead zone every 20 km-25 km on the domestic contact network, which is called “neutral section”.
  • the typical neutral section of the contact network is six-spanning anchoring section joint neutral section with a “non-electricity zone” of which is about 22 m long and a “neutral zone” of which is about 190 m long.
  • Pantograph enters and exits the neutral section in the absence of current under automatic neutral section passing control or manual neutral section passing control in existing EMUs, thereby ensuring the service lives of the pantograph and the contact network.
  • the multi-locomotive short broke trains operate with double-raised pantographs, if the distance between the two pantographs is shorter than the length of a neutral zone of the neutral section and longer than the length of a no-electricity zone of the neutral section, when the two pantographs pass through the neutral sections, the two pantographs will span two neutral sections and generate an interphase short circuit.
  • the technical problem to be solved by the present invention is to provide a control method and system of neutral section passing of multi-locomotive short broke trains in response to the shortcomings of the prior art, in order to solve the problem that when the multi-locomotive short broke trains operate with double-raised pantographs, if the distance between the two pantographs is shorter than the length of a neutral zone of a neutral section and longer than the length of a no-electricity zone of the neutral section, when the two pantographs pass through the neutral sections, the two pantographs will span the two neutral sections and generate an interphase short circuit, thereby improve safety of EMU when it passing neutral section and ensure that the EMU can reliably pass through the neutral section with double-raised pantographs.
  • a control method of neutral section passing of multi-locomotive short broke trains which comprising the following steps:
  • a neutral section passing device of a primary multiple unit collects a neutral section passing instruction signal, and sends the neutral section passing instruction signal to a controller of the primary multiple unit and a controller of a secondary multiple unit, wherein the neutral section passing instruction signal comprises a neutral section passing start signal and a neutral section passing end signal;
  • the controller of the primary multiple unit controls the primary multiple unit to unload a traction force and turn off a main breaker
  • the controller of the secondary multiple unit controls the secondary multiple unit to unload the traction force, turn off the main breaker and lower a pantograph
  • the controller of the primary multiple unit controls the primary multiple unit to turn on the main breaker according to the neutral section passing end signal
  • the controller of the primary multiple unit obtains a current speed signal of the multiple unit, and starting to calculate a distance traveled by the train in real time;
  • the controller of the primary multiple unit when the distance traveled by the train is longer than the length of a neutral zone, the controller of the primary multiple unit sends a primary multiple unit neutral section passing completion command to the secondary multiple unit;
  • the controller of the secondary multiple unit controls the secondary multiple unit to raise the pantograph and turn on the main breaker according to the primary multiple unit neutral section passing completion command, so as to complete a neutral section passing operation;
  • the neutral section passing device includes an ATP (train automatic protection system) control instruction neutral section passing device, a magnetic steel control instruction neutral section passing device or a manual neutral section passing device.
  • ATP train automatic protection system
  • step 4 when the controller of the primary multiple unit obtains the current speed of the multiple unit from a shaft-end speed sensor, the speed signal sent by a non-power shaft speed sensor is preferentially used, and when the non-power shaft speed sensor is faulty, the speed signal sent by a power shaft speed sensor is used; when the main breaker of the primary multiple unit is closed, the controller of the primary multiple unit starts to calculate the distance traveled by the train, and the calculation period of the distance traveled by the train is 32 ms, and the distance traveled by the train equals to the current speed of the multiple unit times the running time of the train. A reliable calculation result is ensured, and the calculation process is simple.
  • control system of neutral section passing of multi-locomotive short broke trains comprising:
  • a neutral section passing device of a primary multiple unit configured to collect a neutral section passing instruction signal, and send the neutral section passing instruction signal to a controller of the primary multiple unit and a controller of a secondary multiple unit, wherein the neutral section passing instruction signal includes a neutral section passing start signal and a neutral section passing end signal;
  • the controller of the primary multiple unit configured to control the primary multiple unit to unload a traction force and turn off a main breaker according to the neutral section passing start signal; and control the secondary multiple unit to turn on the main breaker according to the neutral section passing end signal; and obtain a current speed signal of the multiple unit, start to calculate a distance traveled by the train in real time, and when the distance traveled by the train is longer than the length of a neutral zone, send a primary multiple unit neutral section passing completion command to the secondary multiple unit; and
  • controller of the secondary multiple unit configured to control the secondary multiple unit to unload the traction force, turn off the main breaker and lower a pantograph according to the neutral section passing start signal; and control the secondary multiple unit to raise the pantograph and turn on the main breaker according to the primary multiple unit neutral section passing completion command.
  • the present invention has the beneficial effects that:the distance traveled by the train after the primary multiple unit enters the neutral section is calculated in real time, so that the neutral section passing procedure of the secondary multiple unit is effectively controlled, thereby solving the problem that when the multi-locomotive short broke trains operate with double-raised pantographs, if the distance between the two pantographs is shorter than the length of a neutral zone of a neutral section and longer than the length of a no-electricity zone of the neutral section, when the two pantographs pass through the neutral sections, the two pantographs will span the two neutral sections and generate an interphase short circuit.
  • the present invention improves safety of the EMU when it passing neutral section and ensure that the EMU can reliably pass through the neutral section with double-raised pantographs.
  • the present invention has the advantages of being safe, reliable, easy to implement and convenient to promote and apply.
  • FIG. 1 is a schematic diagram of six-spanning anchoring section joint neutral section
  • FIG. 2 is a relationship schematic diagram 1 between the distance of a pantograph and the neutral section
  • FIG. 3 is a relationship schematic diagram 2 between the distance of the pantograph and the neutral section
  • FIG. 4 is a relationship schematic diagram 3 between the distance of the pantograph and the neutral section
  • FIG. 5 is a schematic diagram of implementation flow of a control method of neutral section passing of multi-locomotive short broke trains in the present invention.
  • FIG. 1 is a schematic diagram of six-spanning anchoring section joint neutral section, including a transition line, a phase A, a phase B, a neutral zone and a no-electricity zone.
  • FIG. 2 is a relationship schematic diagram 1 between the distance of a pantograph and the neutral section, in this figure, the distance between two pantographs is shorter than the length of the neutral zone and is longer than the length of the no-electricity zone, that is, when the two pantographs span two neutral sections, the phase A and the phase B are short-circuited.
  • the two phase neutral sections can be safely passed by using the control method of neutral section passing in the present invention.
  • FIG. 3 is a relationship schematic diagram 2 between the distance of the pantograph and the neutral section, in this figure, the distance between two pantographs is shorter than the length of the no-electricity zone, and the phase A and the phase B are not short-circuited, and thus there is no problem passing the neutral section.
  • FIG. 4 is a relationship schematic diagram 3 between the distance of the pantograph and the neutral section, in this figure, the distance between two pantographs is shorter than the length of the neutral zone, and the phase A and the phase B are not short-circuited, and thus there is no problem passing the neutral section.
  • FIG. 5 shows the implementation flow of the control method of neutral section passing of multi-locomotive short broke trains provided by an embodiment of the present invention, which is detailed as follows:
  • Step S 101 a neutral section passing device of a primary multiple unit collects a phase neutral section passing signal, and sends the same to a controller of the primary multiple unit and the controller of a secondary multiple unit.
  • the neutral section passing device includes an ATP control instruction neutral section passing device, a magnetic steel control instruction neutral section passing device or a manual neutral section passing device, and the like.
  • the ATP control instruction neutral section passing device can collect an ATP neutral section passing instruction; the magnetic steel control instruction neutral section passing device collect a magnetic steel control neutral section passing instruction; and when the ATP control instruction neutral section passing device and the magnetic steel control instruction neutral section passing device are faulty, a driver can trigger the manual neutral section passing device to generate a manual neutral section passing instruction.
  • the neutral section passing device of the primary multiple unit collects the neutral section passing instruction signal, and sends the neutral section passing instruction signal to the controller of the primary multiple unit through a remote input and output module, and the controller of the primary multiple unit sends the neutral section passing instruction signal to the controller of the secondary multiple unit through a train bus or wireless or other manners.
  • Step S 102 triggered by the neutral section passing start signal, the control of the controller of the primary multiple unit controls the primary multiple unit to unload a traction force and turn off a main breaker, and the control of the controller of the secondary multiple unit controls the secondary multiple unit to unload the traction force, turn off the main breaker and lower a pantograph.
  • the controller of the primary multiple unit controls the primary multiple unit to unload the traction force and turn off the main breaker
  • the controller of the secondary multiple unit controls the secondary multiple unit to unload the traction force, turn off the main breaker and lower the pantograph
  • Step S 103 the controller of the primary multiple unit controls the primary multiple unit to turn on the main breaker according to a neutral section passing end signal.
  • the controller of the primary multiple unit detects a transition process of the network voltage of the primary multiple unit developing from nothing, and the controller of the primary multiple unit sends a main breaker turn-on command to stably restore the currently set traction force. If the network voltage jump is not detected correctly or the neutral section passing end signal is lost, the driver can complete a main breaker turn-on operation by operating a main breaker control switch.
  • Step S 104 the controller of the primary multiple unit obtains a current speed signal of the multiple unit, and starts to calculate a distance traveled by the train in real time.
  • the controller of the primary multiple unit obtains the current speed of the multiple unit from a shaft-end speed sensor, the speed signal sent by a non-power shaft speed sensor is preferentially used, and when the non-power shaft speed sensor is faulty, the speed signal sent by a power shaft speed sensor is used.
  • the controller of the primary multiple unit starts to calculate the distance traveled by the train, the calculation period of the distance traveled by the train is 32 ms, and the calculation formula is: the distance traveled by the train equals to the current speed of the multiple unit times the running time of the train.
  • Step S 105 when the distance traveled by the train is longer than the length of a neutral zone, the controller of the primary multiple unit sends a primary multiple unit neutral section passing completion command to the secondary multiple unit.
  • the controller of the primary multiple unit when the distance traveled by the train is longer than the length of the neutral zone, the controller of the primary multiple unit sends the primary multiple unit neutral section passing completion command to the secondary multiple unit through the train bus or wired manner.
  • Step S 106 the controller of the secondary multiple unit controls the secondary multiple unit to raise the pantograph and turn on the main breaker according to a primary multiple unit neutral section passing completion signal.
  • the controller of the secondary multiple unit when the controller of the secondary multiple unit receives a neutral section passing completion instruction, the controller of the secondary multiple unit controls the secondary multiple unit to raise the pantograph, after the controller of the secondary multiple unit detects that the network voltage of the secondary multiple unit is normal, the controller of the secondary multiple unit sends a secondary multiple unit main breaker turn-on command to stably restore the currently set traction force, so as to complete the neutral section passing operation.
  • Step S 107 the primary multiple unit and the secondary multiple unit exit the neutral section passing procedure.
  • the short broke trains includes a single-form electric multiple unit, a two-form electric multiple unit, a three-form electric multiple unit, a four-form electric multiple unit, a five-form electric multiple unit, a six-form electric multiple unit and the like; and the multi-locomotive includes double-locomotive multiple units, triple-locomotive multiple units, quadruple-locomotive multiple units, and the like.
  • the double-pantograph raising operation includes double-pantograph raising operation of a single multiple unit and double-pantograph raising operation of a multi-locomotive multiple unit.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

A control method and system of neutral section passing of multi-locomotive short broke trains. Distance traveled by a train after a primary multiple unit enters a neutral section is calculated in real time, so that a neutral section passing procedure of a secondary multiple unit is effectively controlled, thereby solving the problem that when the multi-locomotive short broke trains operate with double-raised pantographs, if the distance between the two pantographs is shorter than the length of a neutral zone of a neutral section and longer than the length of a no-electricity zone of the neutral section, when the two pantographs pass through the neutral sections, the two pantographs will span the two neutral sections and generate an interphase short circuit. The method improves safety of the EMU when it passing neutral section and ensure that the EMU can reliably pass through the neutral section with double-raised pantographs. The present invention has the advantages of being safe, reliable, easy to implement and convenient to promote and apply.

Description

    FIELD OF THE INVENTION
  • The present invention relates to the field of control method neutral section passing of railway vehicles, and in particular to a control method and system of neutral section passing of multi-locomotive short broke trains.
  • BACKGROUND OF THE INVENTION
  • At an electrified traction section, a traction contact network uses a single-phase power frequency AC power supply manner. In order to balance the three-phase load of the power system and improve the utilization rate of the power grid, it is required that an electrified railway contact network adopts a segmented phase commutation power supply manner. In order to prevent an interphase short circuit, the adjacent phases are separated by air or an insulator, which is called “neutral section insulation”. There is a power supply dead zone every 20 km-25 km on the domestic contact network, which is called “neutral section”. The typical neutral section of the contact network is six-spanning anchoring section joint neutral section with a “non-electricity zone” of which is about 22 m long and a “neutral zone” of which is about 190 m long.
  • Pantograph enters and exits the neutral section in the absence of current under automatic neutral section passing control or manual neutral section passing control in existing EMUs, thereby ensuring the service lives of the pantograph and the contact network. However, it is not considered in the prior art that, when the multi-locomotive short broke trains operate with double-raised pantographs, if the distance between the two pantographs is shorter than the length of a neutral zone of the neutral section and longer than the length of a no-electricity zone of the neutral section, when the two pantographs pass through the neutral sections, the two pantographs will span two neutral sections and generate an interphase short circuit.
  • SUMMARY OF THE INVENTION
  • The technical problem to be solved by the present invention is to provide a control method and system of neutral section passing of multi-locomotive short broke trains in response to the shortcomings of the prior art, in order to solve the problem that when the multi-locomotive short broke trains operate with double-raised pantographs, if the distance between the two pantographs is shorter than the length of a neutral zone of a neutral section and longer than the length of a no-electricity zone of the neutral section, when the two pantographs pass through the neutral sections, the two pantographs will span the two neutral sections and generate an interphase short circuit, thereby improve safety of EMU when it passing neutral section and ensure that the EMU can reliably pass through the neutral section with double-raised pantographs.
  • In order to solve the above technical problems, the technical solution adopted by the present invention is as follows: a control method of neutral section passing of multi-locomotive short broke trains, which comprising the following steps:
  • 1) A neutral section passing device of a primary multiple unit collects a neutral section passing instruction signal, and sends the neutral section passing instruction signal to a controller of the primary multiple unit and a controller of a secondary multiple unit, wherein the neutral section passing instruction signal comprises a neutral section passing start signal and a neutral section passing end signal;
  • 2) triggered by the neutral section passing start signal, the controller of the primary multiple unit controls the primary multiple unit to unload a traction force and turn off a main breaker, and the controller of the secondary multiple unit controls the secondary multiple unit to unload the traction force, turn off the main breaker and lower a pantograph;
  • 3) the controller of the primary multiple unit controls the primary multiple unit to turn on the main breaker according to the neutral section passing end signal;
  • 4) the controller of the primary multiple unit obtains a current speed signal of the multiple unit, and starting to calculate a distance traveled by the train in real time;
  • 5) when the distance traveled by the train is longer than the length of a neutral zone, the controller of the primary multiple unit sends a primary multiple unit neutral section passing completion command to the secondary multiple unit;
  • 6) the controller of the secondary multiple unit controls the secondary multiple unit to raise the pantograph and turn on the main breaker according to the primary multiple unit neutral section passing completion command, so as to complete a neutral section passing operation; and
  • 7) ending.
  • In the step 1), the neutral section passing device includes an ATP (train automatic protection system) control instruction neutral section passing device, a magnetic steel control instruction neutral section passing device or a manual neutral section passing device.
  • In the step 4), when the controller of the primary multiple unit obtains the current speed of the multiple unit from a shaft-end speed sensor, the speed signal sent by a non-power shaft speed sensor is preferentially used, and when the non-power shaft speed sensor is faulty, the speed signal sent by a power shaft speed sensor is used; when the main breaker of the primary multiple unit is closed, the controller of the primary multiple unit starts to calculate the distance traveled by the train, and the calculation period of the distance traveled by the train is 32 ms, and the distance traveled by the train equals to the current speed of the multiple unit times the running time of the train. A reliable calculation result is ensured, and the calculation process is simple.
  • Correspondingly, the present invention further provides a control system of neutral section passing of multi-locomotive short broke trains, comprising:
  • a neutral section passing device of a primary multiple unit, configured to collect a neutral section passing instruction signal, and send the neutral section passing instruction signal to a controller of the primary multiple unit and a controller of a secondary multiple unit, wherein the neutral section passing instruction signal includes a neutral section passing start signal and a neutral section passing end signal;
  • the controller of the primary multiple unit, configured to control the primary multiple unit to unload a traction force and turn off a main breaker according to the neutral section passing start signal; and control the secondary multiple unit to turn on the main breaker according to the neutral section passing end signal; and obtain a current speed signal of the multiple unit, start to calculate a distance traveled by the train in real time, and when the distance traveled by the train is longer than the length of a neutral zone, send a primary multiple unit neutral section passing completion command to the secondary multiple unit; and
  • the controller of the secondary multiple unit, configured to control the secondary multiple unit to unload the traction force, turn off the main breaker and lower a pantograph according to the neutral section passing start signal; and control the secondary multiple unit to raise the pantograph and turn on the main breaker according to the primary multiple unit neutral section passing completion command.
  • Compared with the prior art, the present invention has the beneficial effects that:the distance traveled by the train after the primary multiple unit enters the neutral section is calculated in real time, so that the neutral section passing procedure of the secondary multiple unit is effectively controlled, thereby solving the problem that when the multi-locomotive short broke trains operate with double-raised pantographs, if the distance between the two pantographs is shorter than the length of a neutral zone of a neutral section and longer than the length of a no-electricity zone of the neutral section, when the two pantographs pass through the neutral sections, the two pantographs will span the two neutral sections and generate an interphase short circuit. The present invention improves safety of the EMU when it passing neutral section and ensure that the EMU can reliably pass through the neutral section with double-raised pantographs. The present invention has the advantages of being safe, reliable, easy to implement and convenient to promote and apply.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a schematic diagram of six-spanning anchoring section joint neutral section;
  • FIG. 2 is a relationship schematic diagram 1 between the distance of a pantograph and the neutral section;
  • FIG. 3 is a relationship schematic diagram 2 between the distance of the pantograph and the neutral section;
  • FIG. 4 is a relationship schematic diagram 3 between the distance of the pantograph and the neutral section;
  • FIG. 5 is a schematic diagram of implementation flow of a control method of neutral section passing of multi-locomotive short broke trains in the present invention.
  • DETAILED DESCRIPTION OF THE EMBODIMENTS
  • FIG. 1 is a schematic diagram of six-spanning anchoring section joint neutral section, including a transition line, a phase A, a phase B, a neutral zone and a no-electricity zone.
  • FIG. 2 is a relationship schematic diagram 1 between the distance of a pantograph and the neutral section, in this figure, the distance between two pantographs is shorter than the length of the neutral zone and is longer than the length of the no-electricity zone, that is, when the two pantographs span two neutral sections, the phase A and the phase B are short-circuited. In order to avoid the occurrence of the short circuit of the phase A and the phase B, the two phase neutral sections can be safely passed by using the control method of neutral section passing in the present invention.
  • FIG. 3 is a relationship schematic diagram 2 between the distance of the pantograph and the neutral section, in this figure, the distance between two pantographs is shorter than the length of the no-electricity zone, and the phase A and the phase B are not short-circuited, and thus there is no problem passing the neutral section.
  • FIG. 4 is a relationship schematic diagram 3 between the distance of the pantograph and the neutral section, in this figure, the distance between two pantographs is shorter than the length of the neutral zone, and the phase A and the phase B are not short-circuited, and thus there is no problem passing the neutral section.
  • FIG. 5 shows the implementation flow of the control method of neutral section passing of multi-locomotive short broke trains provided by an embodiment of the present invention, which is detailed as follows:
  • Step S101: a neutral section passing device of a primary multiple unit collects a phase neutral section passing signal, and sends the same to a controller of the primary multiple unit and the controller of a secondary multiple unit.
  • In the embodiment of the present invention, the neutral section passing device includes an ATP control instruction neutral section passing device, a magnetic steel control instruction neutral section passing device or a manual neutral section passing device, and the like. The ATP control instruction neutral section passing device can collect an ATP neutral section passing instruction; the magnetic steel control instruction neutral section passing device collect a magnetic steel control neutral section passing instruction; and when the ATP control instruction neutral section passing device and the magnetic steel control instruction neutral section passing device are faulty, a driver can trigger the manual neutral section passing device to generate a manual neutral section passing instruction.
  • The neutral section passing device of the primary multiple unit collects the neutral section passing instruction signal, and sends the neutral section passing instruction signal to the controller of the primary multiple unit through a remote input and output module, and the controller of the primary multiple unit sends the neutral section passing instruction signal to the controller of the secondary multiple unit through a train bus or wireless or other manners.
  • Step S102: triggered by the neutral section passing start signal, the control of the controller of the primary multiple unit controls the primary multiple unit to unload a traction force and turn off a main breaker, and the control of the controller of the secondary multiple unit controls the secondary multiple unit to unload the traction force, turn off the main breaker and lower a pantograph.
  • In the embodiment of the present invention, when the neutral section passing device collects the neutral section passing start signal, the controller of the primary multiple unit controls the primary multiple unit to unload the traction force and turn off the main breaker, and the controller of the secondary multiple unit controls the secondary multiple unit to unload the traction force, turn off the main breaker and lower the pantograph.
  • Step S103: the controller of the primary multiple unit controls the primary multiple unit to turn on the main breaker according to a neutral section passing end signal.
  • In the embodiment of the present invention, when the neutral section passing device collects the neutral section passing end signal, the controller of the primary multiple unit detects a transition process of the network voltage of the primary multiple unit developing from nothing, and the controller of the primary multiple unit sends a main breaker turn-on command to stably restore the currently set traction force. If the network voltage jump is not detected correctly or the neutral section passing end signal is lost, the driver can complete a main breaker turn-on operation by operating a main breaker control switch.
  • Step S104: the controller of the primary multiple unit obtains a current speed signal of the multiple unit, and starts to calculate a distance traveled by the train in real time.
  • In the embodiment of the present invention, the controller of the primary multiple unit obtains the current speed of the multiple unit from a shaft-end speed sensor, the speed signal sent by a non-power shaft speed sensor is preferentially used, and when the non-power shaft speed sensor is faulty, the speed signal sent by a power shaft speed sensor is used. When the main breaker of the primary multiple unit is closed, the controller of the primary multiple unit starts to calculate the distance traveled by the train, the calculation period of the distance traveled by the train is 32 ms, and the calculation formula is: the distance traveled by the train equals to the current speed of the multiple unit times the running time of the train.
  • Step S105: when the distance traveled by the train is longer than the length of a neutral zone, the controller of the primary multiple unit sends a primary multiple unit neutral section passing completion command to the secondary multiple unit.
  • In the embodiment of the present invention, when the distance traveled by the train is longer than the length of the neutral zone, the controller of the primary multiple unit sends the primary multiple unit neutral section passing completion command to the secondary multiple unit through the train bus or wired manner.
  • Step S106: the controller of the secondary multiple unit controls the secondary multiple unit to raise the pantograph and turn on the main breaker according to a primary multiple unit neutral section passing completion signal.
  • In the embodiment of the present invention, when the controller of the secondary multiple unit receives a neutral section passing completion instruction, the controller of the secondary multiple unit controls the secondary multiple unit to raise the pantograph, after the controller of the secondary multiple unit detects that the network voltage of the secondary multiple unit is normal, the controller of the secondary multiple unit sends a secondary multiple unit main breaker turn-on command to stably restore the currently set traction force, so as to complete the neutral section passing operation.
  • Step S107: the primary multiple unit and the secondary multiple unit exit the neutral section passing procedure.
  • In the present invention, the short broke trains includes a single-form electric multiple unit, a two-form electric multiple unit, a three-form electric multiple unit, a four-form electric multiple unit, a five-form electric multiple unit, a six-form electric multiple unit and the like; and the multi-locomotive includes double-locomotive multiple units, triple-locomotive multiple units, quadruple-locomotive multiple units, and the like. The double-pantograph raising operation includes double-pantograph raising operation of a single multiple unit and double-pantograph raising operation of a multi-locomotive multiple unit.

Claims (9)

1. A control method of neutral section passing of multi-locomotive short broke trains, the method comprising:
collecting, with a neutral section passing device of a primary multiple unit, a neutral section passing instruction signal, and sending the neutral section passing instruction signal to a controller of the primary multiple unit and a controller of a secondary multiple unit, wherein the neutral section passing instruction signal comprises a neutral section passing start signal and a neutral section passing end signal;
in response to the neutral section passing start signal, controlling, with the controller of the primary multiple unit, the primary multiple unit to unload a traction force and turn off a main breaker, and controlling, with the controller of the secondary multiple unit, the secondary multiple unit to unload the traction force, turn off the main breaker and lower a pantograph;
controlling, with the controller of the primary multiple unit, the primary multiple unit to turn on the main breaker according to the neutral section passing end signal;
obtaining, with the controller of the primary multiple unit, a current speed signal of the multiple unit, and starting to calculate a distance traveled by the train in real time;
when the distance traveled by the train is longer than the length of a neutral zone, sending, with the controller of the primary multiple unit, a primary multiple unit neutral section passing completion command to the secondary multiple unit; and
controlling, with the controller of the secondary multiple unit, the secondary multiple unit to raise the pantograph and turn on the main breaker according to the primary multiple unit neutral section passing completion command to complete a neutral section passing operation.
2. The method of claim 1, wherein, in the collecting a neutral section passing instruction signal, and sending the neutral section passing instruction signal to a controller of the primary multiple unit and a controller of a secondary multiple unit, the neutral section passing device comprises at least one of an automatic train protection (ATP) control instruction neutral section passing device, a magnetic steel control instruction neutral section passing device or a manual neutral section passing device.
3. The method of claim 1, wherein, in the controlling the primary multiple unit to turn on the main breaker according to the neutral section passing end signal, the neutral section passing end signal causes the controller of the primary multiple unit to perform:
detecting a transition process of the network voltage of the primary multiple unit developing from nothing, and sending a main breaker turn-on command to stably restore the currently set traction force; and
if the network voltage jump is not detected correctly or the neutral section passing end signal is lost, operating a main breaker control switch to complete a main breaker turn-on operation.
4. The method claim 1, wherein, in the obtaining and starting to calculate a distance traveled by the train in real time, when the controller of the primary multiple unit obtains the current speed of the multiple unit from a shaft-end speed sensor, the speed signal sent by a non-power shaft speed sensor is used, and when the non-power shaft speed sensor is faulty, the speed signal sent by a power shaft speed sensor is used; and when the main breaker of the primary multiple unit is closed, the controller of the primary multiple unit starts to calculate the distance traveled by the train.
5. The method of claim 4, wherein the calculation period of the distance traveled by the train is 32 ms.
6. The method of claim 1, wherein the distance traveled by the train equals to the current speed of the multiple unit times the running time of the train.
7. The control method of neutral section passing of multi-locomotive short broke trains according to claim 1, wherein, in the controlling the secondary multiple unit to raise the pantograph and turn on the main breaker according to the primary multiple unit neutral section passing completion command to complete a neutral section passing operation, the controller of the secondary multiple unit performs:
controlling the secondary multiple unit to raise the pantograph, and
after the controller of the secondary multiple unit detects that the network voltage of the secondary multiple unit is normal, sending a secondary multiple unit main breaker turn-on command to stably restore the currently set traction force to complete the neutral section passing operation.
8. A control system of neutral section passing of multi-locomotive short broke trains, the system comprising:
a primary multiple unit and a secondary multiple unit,
wherein a neutral section passing device of the primary multiple unit, configured to collect a neutral section passing instruction signal, and send the neutral section passing instruction signal to a controller of the primary multiple unit and a controller of a secondary multiple unit, the neutral section passing instruction signal including a neutral section passing start signal and a neutral section passing end signal;
the controller of the primary multiple unit, configured to control the primary multiple unit to unload a traction force and turn off a main breaker according to the neutral section passing start signal; and control the secondary multiple unit to turn on the main breaker according to the neutral section passing end signal; and obtain a current speed signal of the multiple unit, start to calculate a distance traveled by the train in real time, and when the distance traveled by the train is longer than the length of a neutral zone, send a primary multiple unit neutral section passing completion command to the secondary multiple unit; and
the controller of the secondary multiple unit, configured to control the secondary multiple unit to unload the traction force, turn off the main breaker and lower a pantograph according to the neutral section passing start signal; and control the secondary multiple unit to raise the pantograph and turn on the main breaker according to the primary multiple unit neutral section passing completion command.
9. The system of claim 8, wherein the neutral section passing device comprises an ATP control instruction neutral section passing device, a magnetic steel control instruction neutral section passing device or a manual neutral section passing device.
US16/652,010 2017-09-29 2017-12-25 Control method and system of neutral section passing of multi-locomotive short broke trains Active 2040-04-23 US11766954B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201710909923.2A CN107745658A (en) 2017-09-29 2017-09-29 A kind of short marshalling electric EMU joins method for controlling passing neutral section and system again
CN201710909923.2 2017-09-29
PCT/CN2017/118288 WO2019061894A1 (en) 2017-09-29 2017-12-25 Short-form electric multiple unit double heading phase separation passage control method and system

Publications (2)

Publication Number Publication Date
US20200262314A1 true US20200262314A1 (en) 2020-08-20
US11766954B2 US11766954B2 (en) 2023-09-26

Family

ID=61255214

Family Applications (1)

Application Number Title Priority Date Filing Date
US16/652,010 Active 2040-04-23 US11766954B2 (en) 2017-09-29 2017-12-25 Control method and system of neutral section passing of multi-locomotive short broke trains

Country Status (4)

Country Link
US (1) US11766954B2 (en)
EP (1) EP3689668A4 (en)
CN (1) CN107745658A (en)
WO (1) WO2019061894A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113135124A (en) * 2021-04-23 2021-07-20 重庆中车长客轨道车辆有限公司 Power supply switching system of railway vehicle
CN113771700A (en) * 2021-08-04 2021-12-10 中铁电气化勘测设计研究院有限公司 Electric phase splitting equipment for long-distance rail transit high-speed overhead rigid contact network

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111025952B (en) * 2018-10-10 2022-12-09 株洲中车时代电气股份有限公司 Method, device and equipment for controlling automatic neutral section passing network of train ATP
CN109484193B (en) * 2018-12-03 2022-08-16 中车长春轨道客车股份有限公司 Pantograph selection control system for multiple-connection four-unit intercity marshalling motor train unit
CN110588451B (en) * 2019-09-25 2021-05-07 中车大连机车车辆有限公司 Passing phase control method for electric multiple unit
CN112550087B (en) * 2019-09-26 2022-08-02 株洲中车时代电气股份有限公司 Switching method, passing phase separation method, switching device and passing phase separation device for train passing phase separation switch assembly
CN111186342B (en) * 2019-12-20 2023-03-14 青岛四方庞巴迪铁路运输设备有限公司 Control method for automatic passing neutral section of multi-grouping motor train unit
CN111845471A (en) * 2020-08-07 2020-10-30 中车大连机车车辆有限公司 Power-concentrated motor train unit
CN113002372B (en) * 2021-03-24 2022-09-13 重庆市铁路(集团)有限公司 Transition area contact net and transition area system based on double-flow system rail vehicle operation
CN114179628A (en) * 2021-12-06 2022-03-15 中铁工程机械研究设计院有限公司 Method and device for suspension type rail vehicle to pass through turnout dead zone
CN115366945B (en) * 2022-09-06 2023-10-13 长沙南睿轨道交通电气设备有限公司 Heavy-duty train and automatic passing neutral section stable control method and system thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201998825U (en) * 2010-12-21 2011-10-05 中国神华能源股份有限公司 Auto-passing phase-splitting control device and passing phase-splitting control system for multi-locomotive

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3733906B2 (en) * 2001-12-28 2006-01-11 三菱電機株式会社 Train section over prevention device
US7162337B2 (en) * 2004-04-26 2007-01-09 General Electric Company Automatic neutral section control system
US7340329B2 (en) * 2004-11-24 2008-03-04 New York Air Brake Corporation System and method for controlling an electrified vehicle
CN101559732B (en) 2008-12-08 2011-04-06 深圳市丰泰瑞达实业有限公司 Automatic neutral section passover control method of electric locomotive, device thereof, and electric locomotive
CN101434206B (en) * 2008-12-24 2010-11-10 西南交通大学 Automatic power-passing phase-splitting method of AC drive electric locomotive
CN101486349B (en) * 2009-02-26 2011-02-09 温应群 Double computer hot standby automatic passing neutral section device
CN101746285B (en) * 2009-12-31 2011-04-27 华南理工大学 Electrical locomotive auto-passing neutral section control system and method
CN101811451B (en) * 2010-04-16 2011-11-09 南车株洲电力机车有限公司 Method for controlling passing neutral section of locomotive
KR20110116811A (en) * 2010-04-20 2011-10-26 한국철도기술연구원 Contactless and automatic power switching system in dead section and method thereof
EP2724885B1 (en) * 2011-06-23 2017-07-26 Mitsubishi Electric Corporation Train information management device and train information management method
KR20150127945A (en) 2014-05-07 2015-11-18 한국철도기술연구원 Variable power supply control apparatus based on position of train
CN107462850B (en) 2016-06-02 2020-09-22 上海联影医疗科技有限公司 Gradient coil assembly
CN106627257B (en) 2016-11-16 2020-02-18 中国神华能源股份有限公司 Method and device for assisting in generating locomotive passing split-phase signal

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201998825U (en) * 2010-12-21 2011-10-05 中国神华能源股份有限公司 Auto-passing phase-splitting control device and passing phase-splitting control system for multi-locomotive

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113135124A (en) * 2021-04-23 2021-07-20 重庆中车长客轨道车辆有限公司 Power supply switching system of railway vehicle
CN113771700A (en) * 2021-08-04 2021-12-10 中铁电气化勘测设计研究院有限公司 Electric phase splitting equipment for long-distance rail transit high-speed overhead rigid contact network

Also Published As

Publication number Publication date
US11766954B2 (en) 2023-09-26
WO2019061894A1 (en) 2019-04-04
CN107745658A (en) 2018-03-02
EP3689668A4 (en) 2021-06-23
EP3689668A1 (en) 2020-08-05

Similar Documents

Publication Publication Date Title
US11766954B2 (en) Control method and system of neutral section passing of multi-locomotive short broke trains
JP6813674B2 (en) Automatic phase separation passage system for section posts of electrified railways and its control method
CN107351730B (en) Automatic neutral section passing system without power failure of electrified railway train and operation method thereof
EP3321125A1 (en) Intelligent electric phase splitting device for alternating-current electrified railway
CN104065154A (en) Frequency changer emergency power supply system
CN105313723B (en) A kind of electric EMU automatically by phase-separating section control method
CN105932769B (en) A kind of electric railway traction substation power supply seamless switching device and method
CN105292141A (en) Automatic passing neutral section control system and method for electric motor train unit
CN110667439B (en) Method and system for controlling automatic passing neutral section of train
CN110116634A (en) Train control method and device for ground automatic passing over of neutral section
CN110091766B (en) Intelligent ground automatic passing neutral section method and device
JP5578972B2 (en) AC train converter controller
CN103625310A (en) Subsection split phase automatic-passing system of electric railway and split phase automatic-passing method thereof
CN112238792B (en) Running a rail vehicle through a split in a vehicle external current supply device
CN111267676A (en) Train power supply network and traction system for automatic passing through neutral section of subarea thereof
CN109327073A (en) A kind of double dynamical power supply system
CN105128704A (en) Intelligent automatic neutral section passing system
CN103042951B (en) Method, system, rectifier and controller for automatically controlling locomotive to pass through separating phase
CN111186342B (en) Control method for automatic passing neutral section of multi-grouping motor train unit
CN101767540B (en) Switch-free switching auto-passing neutral section device for the electric railway
CN205990153U (en) A kind of elevator cab door opening/shutting controller
CN116424163A (en) Railway track engineering vehicle operation passing neutral section control method and control system
CN103633720A (en) Motor driving device of double-source electric vehicle
CN203850904U (en) Motor driver of double-source electric car
CN109733252B (en) Ground automatic neutral section passing circuit and control method, control device and control system thereof

Legal Events

Date Code Title Description
FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

AS Assignment

Owner name: CRRC ZHUZHOU LOCOMOTIVE CO., LTD., CHINA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:FAN, YUNXIN;ZHOU, ANDE;CHEN, AIJUN;AND OTHERS;REEL/FRAME:052417/0152

Effective date: 20200413

STPP Information on status: patent application and granting procedure in general

Free format text: APPLICATION DISPATCHED FROM PREEXAM, NOT YET DOCKETED

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED

STCF Information on status: patent grant

Free format text: PATENTED CASE