US20200230728A1 - Ceramic-aluminum assembly with bonding trenches - Google Patents

Ceramic-aluminum assembly with bonding trenches Download PDF

Info

Publication number
US20200230728A1
US20200230728A1 US16/805,952 US202016805952A US2020230728A1 US 20200230728 A1 US20200230728 A1 US 20200230728A1 US 202016805952 A US202016805952 A US 202016805952A US 2020230728 A1 US2020230728 A1 US 2020230728A1
Authority
US
United States
Prior art keywords
assembly
aluminum material
trench
solid aluminum
preparing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US16/805,952
Inventor
Patrick Margavio
Kurt ENGLISH
Jacob Wilson
Miranda Pizzella
Todd Brooke
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Watlow Electric Manufacturing Co
Original Assignee
Watlow Electric Manufacturing Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Watlow Electric Manufacturing Co filed Critical Watlow Electric Manufacturing Co
Priority to US16/805,952 priority Critical patent/US20200230728A1/en
Assigned to WATLOW ELECTRIC MANUFACTURING COMPANY reassignment WATLOW ELECTRIC MANUFACTURING COMPANY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: PIZZELLA, MIRANDA, BROOKE, TODD, MARGAVIO, Patrick, WILSON, JACOB, ENGLISH, KURT
Publication of US20200230728A1 publication Critical patent/US20200230728A1/en
Assigned to BANK OF MONTREAL, AS ADMINISTRATIVE AGENT reassignment BANK OF MONTREAL, AS ADMINISTRATIVE AGENT PATENT SECURITY AGREEMENT (SHORT FORM) Assignors: WATLOW ELECTRIC MANUFACTURING COMPANY
Abandoned legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B37/00Joining burned ceramic articles with other burned ceramic articles or other articles by heating
    • C04B37/003Joining burned ceramic articles with other burned ceramic articles or other articles by heating by means of an interlayer consisting of a combination of materials selected from glass, or ceramic material with metals, metal oxides or metal salts
    • C04B37/006Joining burned ceramic articles with other burned ceramic articles or other articles by heating by means of an interlayer consisting of a combination of materials selected from glass, or ceramic material with metals, metal oxides or metal salts consisting of metals or metal salts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K1/00Soldering, e.g. brazing, or unsoldering
    • B23K1/19Soldering, e.g. brazing, or unsoldering taking account of the properties of the materials to be soldered
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B35/00Shaped ceramic products characterised by their composition; Ceramics compositions; Processing powders of inorganic compounds preparatory to the manufacturing of ceramic products
    • C04B35/622Forming processes; Processing powders of inorganic compounds preparatory to the manufacturing of ceramic products
    • C04B35/64Burning or sintering processes
    • C04B35/645Pressure sintering
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B37/00Joining burned ceramic articles with other burned ceramic articles or other articles by heating
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/683Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for supporting or gripping
    • H01L21/6831Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for supporting or gripping using electrostatic chucks
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2235/00Aspects relating to ceramic starting mixtures or sintered ceramic products
    • C04B2235/70Aspects relating to sintered or melt-casted ceramic products
    • C04B2235/94Products characterised by their shape
    • C04B2235/945Products containing grooves, cuts, recesses or protusions
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2235/00Aspects relating to ceramic starting mixtures or sintered ceramic products
    • C04B2235/70Aspects relating to sintered or melt-casted ceramic products
    • C04B2235/96Properties of ceramic products, e.g. mechanical properties such as strength, toughness, wear resistance
    • C04B2235/963Surface properties, e.g. surface roughness
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2237/00Aspects relating to ceramic laminates or to joining of ceramic articles with other articles by heating
    • C04B2237/02Aspects relating to interlayers, e.g. used to join ceramic articles with other articles by heating
    • C04B2237/12Metallic interlayers
    • C04B2237/121Metallic interlayers based on aluminium
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2237/00Aspects relating to ceramic laminates or to joining of ceramic articles with other articles by heating
    • C04B2237/30Composition of layers of ceramic laminates or of ceramic or metallic articles to be joined by heating, e.g. Si substrates
    • C04B2237/32Ceramic
    • C04B2237/34Oxidic
    • C04B2237/343Alumina or aluminates
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2237/00Aspects relating to ceramic laminates or to joining of ceramic articles with other articles by heating
    • C04B2237/30Composition of layers of ceramic laminates or of ceramic or metallic articles to be joined by heating, e.g. Si substrates
    • C04B2237/32Ceramic
    • C04B2237/34Oxidic
    • C04B2237/345Refractory metal oxides
    • C04B2237/348Zirconia, hafnia, zirconates or hafnates
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2237/00Aspects relating to ceramic laminates or to joining of ceramic articles with other articles by heating
    • C04B2237/30Composition of layers of ceramic laminates or of ceramic or metallic articles to be joined by heating, e.g. Si substrates
    • C04B2237/32Ceramic
    • C04B2237/36Non-oxidic
    • C04B2237/365Silicon carbide
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2237/00Aspects relating to ceramic laminates or to joining of ceramic articles with other articles by heating
    • C04B2237/30Composition of layers of ceramic laminates or of ceramic or metallic articles to be joined by heating, e.g. Si substrates
    • C04B2237/32Ceramic
    • C04B2237/36Non-oxidic
    • C04B2237/366Aluminium nitride
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2237/00Aspects relating to ceramic laminates or to joining of ceramic articles with other articles by heating
    • C04B2237/50Processing aspects relating to ceramic laminates or to the joining of ceramic articles with other articles by heating
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2237/00Aspects relating to ceramic laminates or to joining of ceramic articles with other articles by heating
    • C04B2237/50Processing aspects relating to ceramic laminates or to the joining of ceramic articles with other articles by heating
    • C04B2237/59Aspects relating to the structure of the interlayer
    • C04B2237/592Aspects relating to the structure of the interlayer whereby the interlayer is not continuous, e.g. not the whole surface of the smallest substrate is covered by the interlayer
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2237/00Aspects relating to ceramic laminates or to joining of ceramic articles with other articles by heating
    • C04B2237/50Processing aspects relating to ceramic laminates or to the joining of ceramic articles with other articles by heating
    • C04B2237/64Forming laminates or joined articles comprising grooves or cuts

Definitions

  • the present disclosure relates generally to methods of joining objects, and more particularly to methods of joining ceramic materials and the resulting joined assemblies.
  • a support pedestal typically includes a plate member for supporting a wafer thereon and a tubular shaft disposed under the plate member.
  • the plate member may include a ceramic substrate and a plurality of functional elements, such as a heating element, embedded in the ceramic substrate.
  • the ceramic substrate may be formed by hot pressing.
  • Hot pressing is a high-pressure, low-strain process to enhance densification of powder or compacted preform at high temperature.
  • the powder or the compacted preform is put into a mold, and high temperatures and pressure are applied for densification and sintering.
  • the functional elements that are embedded in the ceramic substrate must withstand high heat and high pressure in the hot pressing process. Therefore, the materials for forming the functional elements are limited. Moreover, hot pressing requires high temperature and high pressure equipment, thereby increasing manufacturing costs.
  • two or more ceramic substrates may be bonded together by brazing.
  • the brazed joint is not without problems due to poor wettability of the ceramic materials as well as the incompatible coefficient of thermal expansion (CTE) between the brazing metals and the ceramic materials. Cracks or delamination may occur between the brazing metals and the ceramic substrates at elevated temperatures due to their significantly different thermal expansions.
  • CTE coefficient of thermal expansion
  • a method of joining comprises preparing a first member, preparing a second member, and forming at least one trench in at least one of the first member and the second member.
  • the method further comprises placing a strip of solid aluminum material between the first member and the second member across the trench, bringing the first member and the second member together to contact the solid aluminum material and to form an assembly, and applying a force and heat to the assembly above a melting point of the solid aluminum material such that the solid aluminum material flows into the trench.
  • the method further includes applying additional heat to the assembly at or above a wetting temperature of the member in which the trench is formed to bond the first member to the second member along adjacent faces and cooling the assembly, wherein a spacing between the first member and the second member along the adjacent faces is less than 5 ⁇ m.
  • preparing the first and second member comprises creating a surface roughness of the adjacent faces of the first and second members between 5 ⁇ m and 100 nanometers.
  • the first member and the second member are selected from the group consisting of aluminum nitride (AlN), alumina, zirconia, and silicon carbide (SiC).
  • each of the first member and the second member are each aluminum nitride (AlN).
  • the wetting temperature is above 850° C.
  • a purity of the strip of solid aluminum material is greater than or equal to about 97% and the assembly is heated to a temperature above about 800° C., and the force applied to the assembly is between about 0.1 MPa to 6.5 MPa.
  • applying additional heat to the assembly comprises heating the assembly to 1100° C. under a vacuum condition of approximately 10 ⁇ 3 Torr.
  • applying additional heat to the assembly comprises heating the assembly to 800° C. under a vacuum condition of approximately 10 ⁇ 6 Torr.
  • the solid aluminum material is aluminum foil.
  • the solid aluminum material is applied by a physical vapor deposition (PVD) process.
  • PVD physical vapor deposition
  • At least one trench is formed with a depth and a width, and the width of the trench is between 5 and 20 times the depth of the trench.
  • each of the first member and the second member are each a flat plate.
  • the first member is a flat plate and the second member is a hollow shaft.
  • Other forms of this method further comprise forming a plurality of trenches that are spaced a distance apart less than 2 mm.
  • a method of joining comprises preparing a first member, preparing a second member, and forming a plurality of trenches spaced a distance apart less than 2 mm in at least one of the first member and the second member.
  • the method further comprises placing a strip of solid aluminum material between the first member and the second member across the trench, bringing the first member and the second member together to contact the solid aluminum material and to form an assembly, and applying a force and heat to the assembly above a melting point of the solid aluminum material such that the solid aluminum material flows into the trench.
  • the method further comprises applying additional heat to the assembly at or above a wetting temperature of the member in which the trench is formed to bond the first member to the second member along adjacent faces and cooling the assembly, wherein a spacing between the first member and the second member along the adjacent faces is less than 5 ⁇ m.
  • preparing the first and second member comprises creating a surface roughness of the adjacent faces of the first and second members between 5 ⁇ m and 100 nanometers.
  • the first member and the second member are selected from the group consisting of aluminum nitride (AlN), alumina, zirconia, and silicon carbide (SiC).
  • each of the first member and the second member are each aluminum nitride (AlN).
  • the solid aluminum material is aluminum foil.
  • the solid aluminum material is applied by a physical vapor deposition (PVD) process.
  • PVD physical vapor deposition
  • FIG. 1 is a cross-sectional view of a joined assembly constructed in accordance with the teachings of the present disclosure
  • FIG. 2 is a side view of a second member of the joined assembly of FIG. 1 ;
  • FIG. 3 is an enlarged view of portion A of FIG. 2 ;
  • FIG. 4 is a flow diagram of a method of bonding materials in accordance with the teachings of the present disclosure
  • FIGS. 5A to 5E depict the steps of bonding materials using the method of FIG. 4 , wherein:
  • FIG. 5A depicts a step of placing a solid aluminum material between a first member and a second member
  • FIG. 5B depicts a step of melting solid aluminum material and causing the molten aluminum material to flow into trenches of the second member
  • FIG. 5C depicts a step of pressing the first member and the second member against each other to reduce the spacing therebetween;
  • FIG. 5D depicts a step of heating the assembly to a temperature above a wetting temperature so that the molten aluminum material conforms to the geometry of the trenches;
  • FIG. 5E is an enlarged view of portion B of FIG. 5D ;
  • FIG. 6 is a schematic view of a variant of a joined assembly constructed in accordance with the teachings of the present disclosure.
  • FIG. 7 is a schematic view of another variant of a joined assembly constructed in accordance with the teachings of the present disclosure.
  • a joined assembly 10 constructed in accordance with the teachings of the present disclosure includes a first member 12 and a second member 14 bonded by aluminum material 16 along a periphery of the first and second members 12 and 14 .
  • the first member 12 and the second member 14 may be made of ceramic materials, such as aluminum nitride (AlN), alumina, zirconia, and silicon carbide (SiC).
  • AlN aluminum nitride
  • SiC silicon carbide
  • both the first member 12 and the second member 14 may be made of aluminum nitride (AlN) and functional layers (not shown) may be disposed at the interface between the first and second members 12 , 14 .
  • the first and second members 12 , 14 in this form each have a plate configuration and define adjacent faces 18 facing each other.
  • the adjacent faces 18 have a surface flatness of less than 5 ⁇ m, and a surface roughness of less than 3 ⁇ m.
  • the surface roughness of the adjacent faces 18 may be in the range between 100 nm and 5 ⁇ m.
  • a spacing between the first member 12 and the second member 14 along the adjacent faces is less than 5 ⁇ m in one form of the present disclosure.
  • first and second members 12 and 14 define a bonding feature 20 along its periphery and on the adjacent face 18 .
  • the bonding feature 20 may be in the form of one or more trenches 22 as shown.
  • the aluminum material 16 is filled in the trenches 22 as described in greater detail below.
  • One of the trenches 22 that is closer to a center of the second member 14 may be deeper than the other trenches 22 .
  • the bonding feature 20 can have any number of trenches and can be formed in the first member 12 and/or the second member 14 without departing from the scope of the present disclosure.
  • the trenches 22 may take any path along each of the first and/or second members 12 / 14 depending on application requirements, which may be circular, sinuous, or linear, among other paths.
  • the solid aluminum material 16 is depicted to show the position of the solid aluminum material 16 relative to the trenches 22 when the solid aluminum material 16 is placed between the first member 12 and the second member 14 .
  • the solid aluminum material 16 is placed to overlap the two outermost trenches 22 .
  • the deepest trench that is closer to the center of the second member 12 functions to restrict the molten aluminum material from flowing toward the center and outside the bonding area.
  • the plurality of trenches 22 may be configured parallel to each other and are spaced at a distance apart less than 2 mm. Making the trenches 22 closer to each other can reduce the size of the bonding area to less than 2 mm.
  • a smaller bonding area has the advantages of reducing the area that needs to be heated to the wetting temperature and achieving uniform heating in the bonding area during the bonding process, which will be described in more detail below. Moreover, the smaller bonding area reduces the risk of aluminum flowing into adjacent area where functional elements such as vias, routing circuits, terminations, among others, are disposed.
  • the trenches 22 are also configured limit the flow of aluminum, or other bonding material that may be used besides aluminum, in the bonding area.
  • the number of the trenches 22 is at least three or at least five.
  • the aspect ratio (i.e., the width/depth) of each of the trenches 22 is between 5 to 20. In other words, the width of each trench is between 5 and 20 times the depth of each trench 22 .
  • a shallower trench 22 contributes to a desired hermeticity of less than 10 ⁇ 9 mbar-l/sec.
  • the width of the bonding area may be less than 3 mm.
  • the depth of the trenches 22 is less than 50 ⁇ m, and in one form less than 20 ⁇ m to reduce thermal stress due to differences in thermal expansion between the bonding material (i.e., aluminum) and the ceramic member (i.e., AlN). When a deeper trench (e.g., larger than 100 ⁇ m) is used, the trench 22 should be made wider in order to achieve the required hermeticity.
  • the plurality of trenches 22 are configured to have an annular shape along the periphery of the first and second members 12 , 14 .
  • the shape (or path) of the trenches 22 may vary according to application requirements and may further be of a varying width (rather than a constant width as illustrated herein) while remaining within the scope of the present disclosure.
  • a method 50 of joining materials, particularly ceramic materials, to make the joined assembly 10 of FIG. 1 starts with preparing a first member 12 and a second member 14 with a predetermined surface roughness in adjacent faces 18 in step 52 .
  • the first member 12 and the second member 14 may be made of aluminum nitride (AlN), alumina, zirconia, and silicon carbide (SiC).
  • the adjacent faces 18 of the first and second members each have a surface roughness between 100 nm and 5 ⁇ m.
  • At least one trench 22 is formed in the adjacent face 18 of at least one of the first and second members 12 , 14 in step 54 .
  • the first member 12 and the second member 14 are disposed adjacent each other with a solid aluminum material disposed therebetween in step 56 .
  • the solid aluminum material may be an aluminum foil and disposed adjacent to the at least one trench 22 . This step is performed at room temperature.
  • the aluminum material may be sputtered into the at least one trench 22 , such as by physical vapor deposition (PVD).
  • step 58 force and heat is applied to the assembly of the first and second members 12 , 14 and the solid aluminum material above a melting point of the solid aluminum material in step 58 .
  • the melting point of the solid aluminum material is approximately 660° C.
  • the force is applied on the first and second members 12 , 14 to press the first and second members against each other.
  • the solid aluminum material is melted and the molten aluminum material flows into the trenches 22 as shown in FIG. 5B .
  • the spacing between the first and second members 12 and 14 is reduced until most of the molten aluminum material is disposed in the trenches 22 .
  • FIG. 5B As shown in FIG.
  • the molten aluminum material balls up and does not conform to the geometry of the trench wall due to poor wettability of the ceramic material of the first or second members 12 , 14 .
  • a spacing between the first member 12 and the second member 14 along the adjacent faces 18 is less than 5 ⁇ m.
  • the heat can be applied locally to the bonding area of the first and second members 12 , 14 to reduce the risks of damaging the functional elements disposed at other areas of the first and second members 12 , 14 .
  • a wetting temperature of the first member 12 or second member 14 where the trench 22 is formed to bond the first member 12 to the second member 14 along adjacent faces 18 in step 60 is above 850° C.
  • alumina native oxide is broken in order to achieve wettability of the ceramic material. Wettability of the ceramics can be achieved when a purity of aluminum is greater than or equal to about 97%, the temperature is above about 800° C., the pressure is about 0.1 MPa to 6.5 MPa and a vacuum condition is approximately 10 ⁇ 3 Torr and below a vacuum level. Vacuum level and temperature are balanced to achieve wettability according to the teachings of the present disclosure.
  • Wettability can be achieved at 10 ⁇ 3 Torr and at temperature of 1100° C., or at 10 ⁇ 6 Torr and at a temperature of 800° C.
  • the thermal process is performed between 1 to 10 hours, the aluminum begins to diffuse into the aluminum nitride to conform to the geometry of the aluminum nitride. Therefore, the molten aluminum material is shaped to conform to the geometry of the trenches 22 as shown in FIG. 5D , even on a micro-scale, due to wetting between the molten aluminum material and the trench wall of the first member 12 or the second member 14 .
  • the additional heat can be applied locally to the bonding area, rather than the entire assembly, to reduce the risks of damaging the functional elements disposed at other areas of the first and second members 12 , 14 .
  • molten aluminum material has good wettability so that aluminum can be used to bond two ceramic materials, particularly aluminum nitride (AlN) together to create a hermetic bonding therebetween.
  • AlN aluminum nitride
  • step 62 After the first member 12 is bonded to the second member 14 , the assembly is cooled in step 62 .
  • a variant of a bonded assembly 70 constructed in accordance with the teachings of the present disclosure may include a first member 72 and a second member 74 bonded by an aluminum material 76 via direct surface to surface bonding without forming any trench in the first member 72 or the second member 74 .
  • the first and second members 72 , 74 are temporarily spaced apart by shims 78 in this form prior to bonding, and the aluminum material 76 has a width greater than 2 mm to achieve hermeticity.
  • a joined member 90 constructed in accordance with the teachings of the present disclosure may include a first member 92 , a second member 94 , and an aluminum material 96 filled in a single trench of one of the first and second member 92 , 94 .
  • the trench should have a width larger than 6 mm and the depth larger than 20 ⁇ m in order to achieve hermeticity.
  • the trenches may take on any shape other than those illustrated herein, including by way of example, tapered (inwardly or outwardly), dovetail, or polygonal, among other shapes.
  • the “width” of the trench as used and claimed herein refers to the maximum dimension across the trench for any given geometrical shape of the trench, such as the arcuate shape in FIG. 7 .
  • the trenches may further include corner radii at an intersection with a surface of the member in which the trench is formed while remaining within the scope of the present disclosure.
  • the various functional layers may be formed on a plurality of ceramic members and then joined together by aluminum materials to form the heating plate. Accordingly, high temperature and high pressure equipment for a hot pressing operation may not be needed to form a monolith substrate, thereby reducing the manufacturing costs.
  • the bonding methods according to the present disclosure involve relatively lower temperatures and relatively lower pressures.
  • a wider selection of materials is available for forming the various functional layers in the ceramic substrate.
  • a layered heater formed by a thick film, thin film, thermal spray, or sol-gel process may be applied on one of the first and second members before the first and second members are bonded together using the bonding method of the present disclosure.
  • TiNiHf termination braze, Nickel termination plating, or Aremco® anchor paste may be applied on the first member and/or the second member before the first and second members are bonded using the method of the present disclosure.
  • the bonding methods can also be used to bond a heating plate to a tubular shaft of the support pedestal to provide thermocouple pocket isolation.
  • the bonding method can be used to manufacture a thin (thickness between 10 and 50 mm) flat (surface roughness less than 10 ⁇ m) AlN heater assembly in a variety of applications including AlN electrostatic chuck assembly.
  • a support pedestal manufactured by the bonding methods of the present disclosure allows for repair and replacement of the heating plate, thereby increasing the life of the support pedestal.

Abstract

A method of joining is provided. the method includes preparing a first member, preparing a second member, and forming at least one trench in at least one of the first member and the second member. The method further includes placing a strip of solid aluminum material between the first member and the second member across the trench, bringing the first member and the second member together to contact the solid aluminum material and to form an assembly, and applying a force and heat to the assembly above a melting point of the solid aluminum material such that the solid aluminum material flows into the trench. Additionally, the method further includes applying additional heat to the assembly at or above a wetting temperature of the member in which the trench is formed to bond the first member to the second member along adjacent faces and cooling the assembly.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application is a divisional of U.S. application Ser. No. 15/955,431, filed on Apr. 17, 2018. The disclosure of the above application is incorporated herein by reference.
  • FIELD
  • The present disclosure relates generally to methods of joining objects, and more particularly to methods of joining ceramic materials and the resulting joined assemblies.
  • BACKGROUND
  • The statements in this section merely provide background information related to the present disclosure and may not constitute prior art.
  • Support pedestals are often used in semiconductor processing. A support pedestal typically includes a plate member for supporting a wafer thereon and a tubular shaft disposed under the plate member. The plate member may include a ceramic substrate and a plurality of functional elements, such as a heating element, embedded in the ceramic substrate.
  • The ceramic substrate may be formed by hot pressing. Hot pressing is a high-pressure, low-strain process to enhance densification of powder or compacted preform at high temperature. Typically, the powder or the compacted preform is put into a mold, and high temperatures and pressure are applied for densification and sintering.
  • The functional elements that are embedded in the ceramic substrate must withstand high heat and high pressure in the hot pressing process. Therefore, the materials for forming the functional elements are limited. Moreover, hot pressing requires high temperature and high pressure equipment, thereby increasing manufacturing costs.
  • In some cases, two or more ceramic substrates may be bonded together by brazing. However, the brazed joint is not without problems due to poor wettability of the ceramic materials as well as the incompatible coefficient of thermal expansion (CTE) between the brazing metals and the ceramic materials. Cracks or delamination may occur between the brazing metals and the ceramic substrates at elevated temperatures due to their significantly different thermal expansions.
  • These challenges, among other challenges, in manufacturing ceramic support pedestals are addressed by the present disclosure.
  • SUMMARY
  • In one form of the present disclosure, a method of joining is provided. The method comprises preparing a first member, preparing a second member, and forming at least one trench in at least one of the first member and the second member. The method further comprises placing a strip of solid aluminum material between the first member and the second member across the trench, bringing the first member and the second member together to contact the solid aluminum material and to form an assembly, and applying a force and heat to the assembly above a melting point of the solid aluminum material such that the solid aluminum material flows into the trench. Additionally, the method further includes applying additional heat to the assembly at or above a wetting temperature of the member in which the trench is formed to bond the first member to the second member along adjacent faces and cooling the assembly, wherein a spacing between the first member and the second member along the adjacent faces is less than 5 μm.
  • In another form of this method, preparing the first and second member comprises creating a surface roughness of the adjacent faces of the first and second members between 5 μm and 100 nanometers.
  • In yet another form of this method, the first member and the second member are selected from the group consisting of aluminum nitride (AlN), alumina, zirconia, and silicon carbide (SiC).
  • In at least one form of this method, each of the first member and the second member are each aluminum nitride (AlN). In variations of this method, the wetting temperature is above 850° C.
  • In other forms of this method, a purity of the strip of solid aluminum material is greater than or equal to about 97% and the assembly is heated to a temperature above about 800° C., and the force applied to the assembly is between about 0.1 MPa to 6.5 MPa.
  • In another form of this method, applying additional heat to the assembly comprises heating the assembly to 1100° C. under a vacuum condition of approximately 10−3 Torr.
  • In numerous forms of this method, applying additional heat to the assembly comprises heating the assembly to 800° C. under a vacuum condition of approximately 10−6 Torr.
  • In at least one form of this method, the solid aluminum material is aluminum foil.
  • In some forms of this method, the solid aluminum material is applied by a physical vapor deposition (PVD) process.
  • In still another form of this method, at least one trench is formed with a depth and a width, and the width of the trench is between 5 and 20 times the depth of the trench.
  • In numerous forms of this method, each of the first member and the second member are each a flat plate.
  • In a form of this method, the first member is a flat plate and the second member is a hollow shaft.
  • Other forms of this method further comprise forming a plurality of trenches that are spaced a distance apart less than 2 mm.
  • In another form of the present disclosure, a method of joining is provided. The method comprises preparing a first member, preparing a second member, and forming a plurality of trenches spaced a distance apart less than 2 mm in at least one of the first member and the second member. The method further comprises placing a strip of solid aluminum material between the first member and the second member across the trench, bringing the first member and the second member together to contact the solid aluminum material and to form an assembly, and applying a force and heat to the assembly above a melting point of the solid aluminum material such that the solid aluminum material flows into the trench. Additionally, the method further comprises applying additional heat to the assembly at or above a wetting temperature of the member in which the trench is formed to bond the first member to the second member along adjacent faces and cooling the assembly, wherein a spacing between the first member and the second member along the adjacent faces is less than 5 μm.
  • In at least one form of this method, preparing the first and second member comprises creating a surface roughness of the adjacent faces of the first and second members between 5 μm and 100 nanometers.
  • Additionally, in other forms of this method, the first member and the second member are selected from the group consisting of aluminum nitride (AlN), alumina, zirconia, and silicon carbide (SiC).
  • In some forms of this method, each of the first member and the second member are each aluminum nitride (AlN).
  • In yet another form of this method, the solid aluminum material is aluminum foil.
  • Alternatively, in another form of this method, the solid aluminum material is applied by a physical vapor deposition (PVD) process.
  • Further areas of applicability will become apparent from the description provided herein. It should be understood that the description and specific examples are intended for purposes of illustration only and are not intended to limit the scope of the present disclosure.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The present disclosure will become more fully understood from the detailed description and the accompanying drawings, wherein:
  • FIG. 1 is a cross-sectional view of a joined assembly constructed in accordance with the teachings of the present disclosure;
  • FIG. 2 is a side view of a second member of the joined assembly of FIG. 1;
  • FIG. 3 is an enlarged view of portion A of FIG. 2;
  • FIG. 4 is a flow diagram of a method of bonding materials in accordance with the teachings of the present disclosure;
  • FIGS. 5A to 5E depict the steps of bonding materials using the method of FIG. 4, wherein:
  • FIG. 5A depicts a step of placing a solid aluminum material between a first member and a second member;
  • FIG. 5B depicts a step of melting solid aluminum material and causing the molten aluminum material to flow into trenches of the second member;
  • FIG. 5C depicts a step of pressing the first member and the second member against each other to reduce the spacing therebetween;
  • FIG. 5D depicts a step of heating the assembly to a temperature above a wetting temperature so that the molten aluminum material conforms to the geometry of the trenches;
  • FIG. 5E is an enlarged view of portion B of FIG. 5D;
  • FIG. 6 is a schematic view of a variant of a joined assembly constructed in accordance with the teachings of the present disclosure; and
  • FIG. 7 is a schematic view of another variant of a joined assembly constructed in accordance with the teachings of the present disclosure.
  • Corresponding reference numerals indicate corresponding parts throughout the several views of the drawings.
  • DETAILED DESCRIPTION
  • The following description is merely exemplary in nature and is not intended to limit the present disclosure, application, or uses.
  • Referring to FIG. 1, a joined assembly 10 constructed in accordance with the teachings of the present disclosure includes a first member 12 and a second member 14 bonded by aluminum material 16 along a periphery of the first and second members 12 and 14. The first member 12 and the second member 14 may be made of ceramic materials, such as aluminum nitride (AlN), alumina, zirconia, and silicon carbide (SiC). When the joined assembly 10 is used to form a support pedestal in semiconductor processing, both the first member 12 and the second member 14 may be made of aluminum nitride (AlN) and functional layers (not shown) may be disposed at the interface between the first and second members 12, 14.
  • The first and second members 12, 14 in this form each have a plate configuration and define adjacent faces 18 facing each other. In one form, the adjacent faces 18 have a surface flatness of less than 5 μm, and a surface roughness of less than 3 μm. In one application, the surface roughness of the adjacent faces 18 may be in the range between 100 nm and 5 μm. A spacing between the first member 12 and the second member 14 along the adjacent faces is less than 5 μm in one form of the present disclosure.
  • Referring to FIGS. 2 and 3, at least one of the first and second members 12 and 14 define a bonding feature 20 along its periphery and on the adjacent face 18. The bonding feature 20 may be in the form of one or more trenches 22 as shown. The aluminum material 16 is filled in the trenches 22 as described in greater detail below. One of the trenches 22 that is closer to a center of the second member 14 may be deeper than the other trenches 22. While a total of four trenches 22 are shown in the second member 14 in the illustrated form, the bonding feature 20 can have any number of trenches and can be formed in the first member 12 and/or the second member 14 without departing from the scope of the present disclosure. Further, the trenches 22 may take any path along each of the first and/or second members 12/14 depending on application requirements, which may be circular, sinuous, or linear, among other paths.
  • In FIG. 3, the solid aluminum material 16 is depicted to show the position of the solid aluminum material 16 relative to the trenches 22 when the solid aluminum material 16 is placed between the first member 12 and the second member 14. In this form, the solid aluminum material 16 is placed to overlap the two outermost trenches 22. In this form, the deepest trench that is closer to the center of the second member 12 functions to restrict the molten aluminum material from flowing toward the center and outside the bonding area.
  • When a plurality of trenches 22 are formed, the plurality of trenches 22 may be configured parallel to each other and are spaced at a distance apart less than 2 mm. Making the trenches 22 closer to each other can reduce the size of the bonding area to less than 2 mm. A smaller bonding area has the advantages of reducing the area that needs to be heated to the wetting temperature and achieving uniform heating in the bonding area during the bonding process, which will be described in more detail below. Moreover, the smaller bonding area reduces the risk of aluminum flowing into adjacent area where functional elements such as vias, routing circuits, terminations, among others, are disposed. The trenches 22 are also configured limit the flow of aluminum, or other bonding material that may be used besides aluminum, in the bonding area.
  • In one form, the number of the trenches 22 is at least three or at least five. The aspect ratio (i.e., the width/depth) of each of the trenches 22 is between 5 to 20. In other words, the width of each trench is between 5 and 20 times the depth of each trench 22. A shallower trench 22 contributes to a desired hermeticity of less than 10−9 mbar-l/sec. The width of the bonding area may be less than 3 mm. The depth of the trenches 22 is less than 50 μm, and in one form less than 20 μm to reduce thermal stress due to differences in thermal expansion between the bonding material (i.e., aluminum) and the ceramic member (i.e., AlN). When a deeper trench (e.g., larger than 100 μm) is used, the trench 22 should be made wider in order to achieve the required hermeticity.
  • When the first and second members 12, 14 are circular members, the plurality of trenches 22 are configured to have an annular shape along the periphery of the first and second members 12, 14. However, the shape (or path) of the trenches 22 may vary according to application requirements and may further be of a varying width (rather than a constant width as illustrated herein) while remaining within the scope of the present disclosure.
  • Referring now to FIG. 4, a method 50 of joining materials, particularly ceramic materials, to make the joined assembly 10 of FIG. 1 starts with preparing a first member 12 and a second member 14 with a predetermined surface roughness in adjacent faces 18 in step 52. The first member 12 and the second member 14 may be made of aluminum nitride (AlN), alumina, zirconia, and silicon carbide (SiC). The adjacent faces 18 of the first and second members each have a surface roughness between 100 nm and 5 μm.
  • Next, at least one trench 22 is formed in the adjacent face 18 of at least one of the first and second members 12, 14 in step 54. Referring to FIG. 5A, the first member 12 and the second member 14 are disposed adjacent each other with a solid aluminum material disposed therebetween in step 56. The solid aluminum material may be an aluminum foil and disposed adjacent to the at least one trench 22. This step is performed at room temperature. Alternatively, the aluminum material may be sputtered into the at least one trench 22, such as by physical vapor deposition (PVD).
  • Thereafter, force and heat is applied to the assembly of the first and second members 12, 14 and the solid aluminum material above a melting point of the solid aluminum material in step 58. The melting point of the solid aluminum material is approximately 660° C. The force is applied on the first and second members 12, 14 to press the first and second members against each other. In this step, the solid aluminum material is melted and the molten aluminum material flows into the trenches 22 as shown in FIG. 5B. As force continues to be applied on the first and second members 12 and 14, the spacing between the first and second members 12 and 14 is reduced until most of the molten aluminum material is disposed in the trenches 22. However, as shown in FIG. 5C, the molten aluminum material balls up and does not conform to the geometry of the trench wall due to poor wettability of the ceramic material of the first or second members 12, 14. In one form, a spacing between the first member 12 and the second member 14 along the adjacent faces 18 is less than 5 μm.
  • The heat can be applied locally to the bonding area of the first and second members 12, 14 to reduce the risks of damaging the functional elements disposed at other areas of the first and second members 12, 14.
  • Next, additional heat is applied to the assembly at or above a wetting temperature of the first member 12 or second member 14 where the trench 22 is formed to bond the first member 12 to the second member 14 along adjacent faces 18 in step 60. For aluminum nitride, the wetting temperature is above 850° C. In this step, alumina native oxide is broken in order to achieve wettability of the ceramic material. Wettability of the ceramics can be achieved when a purity of aluminum is greater than or equal to about 97%, the temperature is above about 800° C., the pressure is about 0.1 MPa to 6.5 MPa and a vacuum condition is approximately 10−3 Torr and below a vacuum level. Vacuum level and temperature are balanced to achieve wettability according to the teachings of the present disclosure. Wettability can be achieved at 10−3 Torr and at temperature of 1100° C., or at 10−6 Torr and at a temperature of 800° C. When the thermal process is performed between 1 to 10 hours, the aluminum begins to diffuse into the aluminum nitride to conform to the geometry of the aluminum nitride. Therefore, the molten aluminum material is shaped to conform to the geometry of the trenches 22 as shown in FIG. 5D, even on a micro-scale, due to wetting between the molten aluminum material and the trench wall of the first member 12 or the second member 14.
  • Similarly, the additional heat can be applied locally to the bonding area, rather than the entire assembly, to reduce the risks of damaging the functional elements disposed at other areas of the first and second members 12, 14.
  • As shown in FIG. 5E, molten aluminum material has good wettability so that aluminum can be used to bond two ceramic materials, particularly aluminum nitride (AlN) together to create a hermetic bonding therebetween.
  • After the first member 12 is bonded to the second member 14, the assembly is cooled in step 62.
  • Referring to FIG. 6, a variant of a bonded assembly 70 constructed in accordance with the teachings of the present disclosure may include a first member 72 and a second member 74 bonded by an aluminum material 76 via direct surface to surface bonding without forming any trench in the first member 72 or the second member 74. The first and second members 72, 74 are temporarily spaced apart by shims 78 in this form prior to bonding, and the aluminum material 76 has a width greater than 2 mm to achieve hermeticity.
  • Referring to FIG. 7, another variant of a joined member 90 constructed in accordance with the teachings of the present disclosure may include a first member 92, a second member 94, and an aluminum material 96 filled in a single trench of one of the first and second member 92, 94. When one single trench is used, which is arcuate in this form, the trench should have a width larger than 6 mm and the depth larger than 20 μm in order to achieve hermeticity.
  • It should be understood that the trenches may take on any shape other than those illustrated herein, including by way of example, tapered (inwardly or outwardly), dovetail, or polygonal, among other shapes. Also, the “width” of the trench as used and claimed herein refers to the maximum dimension across the trench for any given geometrical shape of the trench, such as the arcuate shape in FIG. 7. Further, the trenches may further include corner radii at an intersection with a surface of the member in which the trench is formed while remaining within the scope of the present disclosure.
  • With the bonding method of the present disclosure, ceramic materials can be relatively easily bonded. This method can be used to manufacture a ceramic pedestal in semiconductor processing, however, other applications are contemplated according to the teachings of the present disclosure. Therefore, the various functional layers may be formed on a plurality of ceramic members and then joined together by aluminum materials to form the heating plate. Accordingly, high temperature and high pressure equipment for a hot pressing operation may not be needed to form a monolith substrate, thereby reducing the manufacturing costs.
  • Moreover, the bonding methods according to the present disclosure involve relatively lower temperatures and relatively lower pressures. As a result, a wider selection of materials is available for forming the various functional layers in the ceramic substrate. For example, a layered heater formed by a thick film, thin film, thermal spray, or sol-gel process may be applied on one of the first and second members before the first and second members are bonded together using the bonding method of the present disclosure. TiNiHf termination braze, Nickel termination plating, or Aremco® anchor paste may be applied on the first member and/or the second member before the first and second members are bonded using the method of the present disclosure.
  • The bonding methods can also be used to bond a heating plate to a tubular shaft of the support pedestal to provide thermocouple pocket isolation. The bonding method can be used to manufacture a thin (thickness between 10 and 50 mm) flat (surface roughness less than 10 μm) AlN heater assembly in a variety of applications including AlN electrostatic chuck assembly.
  • Further, a support pedestal manufactured by the bonding methods of the present disclosure allows for repair and replacement of the heating plate, thereby increasing the life of the support pedestal.
  • It should be noted that the disclosure is not limited to the form described and illustrated as examples. A large variety of modifications have been described and more are part of the knowledge of the person skilled in the art. These and further modifications as well as any replacement by technical equivalents may be added to the description and figures, without leaving the scope of the protection of the disclosure and of the present patent.

Claims (20)

What is claimed is:
1. A method of joining comprising:
preparing a first member;
preparing a second member;
forming at least one trench in at least one of the first member and the second member;
placing a strip of solid aluminum material between the first member and the second member across the trench;
bringing the first member and the second member together to contact the solid aluminum material and to form an assembly;
applying a force and heat to the assembly above a melting point of the solid aluminum material such that the solid aluminum material flows into the trench;
applying additional heat to the assembly at or above a wetting temperature of the member in which the trench is formed to bond the first member to the second member along adjacent faces; and
cooling the assembly,
wherein a spacing between the first member and the second member along the adjacent faces is less than 5 μm.
2. The method according to claim 1, wherein preparing the first and second member comprises creating a surface roughness of the adjacent faces of the first and second members between 5 μm and 100 nanometers.
3. The method according to claim 1, wherein the first member and the second member are selected from the group consisting of aluminum nitride (AlN), alumina, zirconia, and silicon carbide (SiC).
4. The method according to claim 1, wherein each of the first member and the second member are each aluminum nitride (AlN).
5. The method according to claim 4, wherein the wetting temperature is above 850° C.
6. The method according to claim 1, wherein a purity of the strip of solid aluminum material is greater than or equal to about 97% and the assembly is heated to a temperature above about 800° C., and the force applied to the assembly is between about 0.1 MPa to 6.5 MPa.
7. The method according to claim 1, wherein the applying additional heat to the assembly comprises heating the assembly to 1100° C. under a vacuum condition of approximately 10−3 Torr.
8. The method according to claim 1, wherein applying additional heat to the assembly comprises heating the assembly to 800° C. under a vacuum condition of approximately 10−6 Torr.
9. The method according to claim 1, wherein the solid aluminum material is aluminum foil.
10. The method according to claim 1, wherein the solid aluminum material is applied by a physical vapor deposition (PVD) process.
11. The method according to claim 1, wherein at least one trench is formed with a depth and a width, and the width of the trench is between 5 and 20 times the depth of the trench.
12. The method according to claim 1, wherein each of the first member and the second member are each a flat plate.
13. The method according to claim 1, wherein the first member is a flat plate and the second member is a hollow shaft.
14. The method according to claim 1 further comprising forming a plurality of trenches that are spaced a distance apart less than 2 mm.
15. A method of joining comprising:
preparing a first member;
preparing a second member;
forming a plurality of trenches spaced a distance apart less than 2 mm in at least one of the first member and the second member,
placing a strip of solid aluminum material between the first member and the second member across the trench;
bringing the first member and the second member together to contact the solid aluminum material and to form an assembly;
applying a force and heat to the assembly above a melting point of the solid aluminum material such that the solid aluminum material flows into the trench;
applying additional heat to the assembly at or above a wetting temperature of the member in which the trench is formed to bond the first member to the second member along adjacent faces; and
cooling the assembly,
wherein a spacing between the first member and the second member along the adjacent faces is less than 5 μm.
16. The method according to claim 15, wherein preparing the first and second member comprises creating a surface roughness of the adjacent faces of the first and second members between 5 μm and 100 nanometers.
17. The method according to claim 15, wherein the first member and the second member are selected from the group consisting of aluminum nitride (AlN), alumina, zirconia, and silicon carbide (SiC).
18. The method according to claim 15, wherein each of the first member and the second member are each aluminum nitride (AlN).
19. The method according to claim 15, wherein the solid aluminum material is aluminum foil.
20. The method according to claim 15, wherein the solid aluminum material is applied by a physical vapor deposition (PVD) process.
US16/805,952 2018-04-17 2020-03-02 Ceramic-aluminum assembly with bonding trenches Abandoned US20200230728A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US16/805,952 US20200230728A1 (en) 2018-04-17 2020-03-02 Ceramic-aluminum assembly with bonding trenches

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US15/955,431 US10882130B2 (en) 2018-04-17 2018-04-17 Ceramic-aluminum assembly with bonding trenches
US16/805,952 US20200230728A1 (en) 2018-04-17 2020-03-02 Ceramic-aluminum assembly with bonding trenches

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US15/955,431 Division US10882130B2 (en) 2018-04-17 2018-04-17 Ceramic-aluminum assembly with bonding trenches

Publications (1)

Publication Number Publication Date
US20200230728A1 true US20200230728A1 (en) 2020-07-23

Family

ID=66248706

Family Applications (3)

Application Number Title Priority Date Filing Date
US15/955,431 Active 2038-07-11 US10882130B2 (en) 2018-04-17 2018-04-17 Ceramic-aluminum assembly with bonding trenches
US16/805,952 Abandoned US20200230728A1 (en) 2018-04-17 2020-03-02 Ceramic-aluminum assembly with bonding trenches
US17/092,529 Abandoned US20210078092A1 (en) 2018-04-17 2020-11-09 Ceramic-aluminum assembly with bonding trenches

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US15/955,431 Active 2038-07-11 US10882130B2 (en) 2018-04-17 2018-04-17 Ceramic-aluminum assembly with bonding trenches

Family Applications After (1)

Application Number Title Priority Date Filing Date
US17/092,529 Abandoned US20210078092A1 (en) 2018-04-17 2020-11-09 Ceramic-aluminum assembly with bonding trenches

Country Status (7)

Country Link
US (3) US10882130B2 (en)
JP (2) JP6924910B2 (en)
KR (3) KR102343816B1 (en)
CN (1) CN112135806A (en)
DE (1) DE112019002005B4 (en)
TW (1) TWI709547B (en)
WO (1) WO2019204050A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10793772B1 (en) 2020-03-13 2020-10-06 Accelovant Technologies Corporation Monolithic phosphor composite for sensing systems
US11359976B2 (en) 2020-10-23 2022-06-14 Accelovant Technologies Corporation Multipoint surface temperature measurement system and method thereof
CA3137183C (en) 2020-11-05 2024-02-20 Accelovant Technologies Corporation Optoelectronic transducer module for thermographic temperature measurements
CN113828954B (en) * 2021-10-22 2022-11-01 中国科学院空天信息创新研究院 Metal-ceramic sealing method and metal-ceramic composite structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150203412A1 (en) * 2012-07-18 2015-07-23 Herakles Method for brazing parts made from a composite material, with anchoring of the brazed joint

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0788262B2 (en) 1985-04-01 1995-09-27 株式会社日立製作所 Method for joining silicon nitride and metal
US5234152A (en) 1992-01-07 1993-08-10 Regents Of The University Of California Transient liquid phase ceramic bonding
US5240671A (en) 1992-06-01 1993-08-31 Microelectronics And Computer Technology Corporation Method of forming recessed patterns in insulating substrates
JP3813654B2 (en) * 1995-02-09 2006-08-23 日本碍子株式会社 Ceramic bonding structure and manufacturing method thereof
AT405039B (en) * 1996-02-08 1999-04-26 Electrovac COMPOSITE COMPONENT
US6315188B1 (en) 2000-06-28 2001-11-13 Sandia Corporation Surface preparation for high purity alumina ceramics enabling direct brazing in hydrogen atmospheres
US7195693B2 (en) 2002-06-05 2007-03-27 Advanced Thermal Sciences Lateral temperature equalizing system for large area surfaces during processing
US6644394B1 (en) 2002-06-25 2003-11-11 Brazeway, Inc. Braze alloy flow-barrier
DE10239416B4 (en) 2002-08-28 2005-03-03 Robert Bosch Gmbh Process for the preparation of a ceramic layer composite body
JP3935037B2 (en) 2002-09-30 2007-06-20 Dowaホールディングス株式会社 Method for manufacturing aluminum-ceramic bonding substrate
US7488543B2 (en) * 2003-06-13 2009-02-10 Tokuyama Corporation Aluminum nitride conjugate body and method of producing the same
JP2005022966A (en) * 2003-06-13 2005-01-27 Tokuyama Corp Aluminum nitride joined body and its producing method
KR20110124372A (en) 2004-04-05 2011-11-16 미쓰비시 마테리알 가부시키가이샤 Al/aln joint material, base plate for power module, power module and process for producing al/aln joint material
US20080314320A1 (en) 2005-02-04 2008-12-25 Component Re-Engineering Company, Inc. Chamber Mount for High Temperature Application of AIN Heaters
TW200633947A (en) 2005-02-16 2006-10-01 Ngk Insulators Ltd Joined body and manufacturing method for the same
US20100177454A1 (en) 2009-01-09 2010-07-15 Component Re-Engineering Company, Inc. Electrostatic chuck with dielectric inserts
JP5841329B2 (en) 2009-12-25 2016-01-13 株式会社日本セラテック Manufacturing method of ceramic joined body
CN102906051A (en) 2010-05-21 2013-01-30 塞拉麦泰克股份有限公司 Ceramic to ceramic joint and associated methods
US8932680B2 (en) 2011-07-29 2015-01-13 Nike, Inc. Method of manufacturing a golf ball including a blend of highly neutralized acid polymers
US9624137B2 (en) 2011-11-30 2017-04-18 Component Re-Engineering Company, Inc. Low temperature method for hermetically joining non-diffusing ceramic materials
US20130189022A1 (en) 2011-11-30 2013-07-25 Component Re-Engineering Company, Inc. Hermetically Joined Plate And Shaft Devices
US8932690B2 (en) 2011-11-30 2015-01-13 Component Re-Engineering Company, Inc. Plate and shaft device
US20130250471A1 (en) 2012-03-22 2013-09-26 Component Re-Engineering Company, Inc. Compressible conductive element for use in current-carrying structure
US9984866B2 (en) 2012-06-12 2018-05-29 Component Re-Engineering Company, Inc. Multiple zone heater
US20140014710A1 (en) 2012-06-12 2014-01-16 Component Re-Engineering Compnay, Inc. Method For Hermetically Joining Ceramic Materials Using Brazing Of Pre-Metallized Regions
US10471531B2 (en) 2014-12-31 2019-11-12 Component Re-Engineering Company, Inc. High temperature resistant silicon joint for the joining of ceramics
US9999947B2 (en) 2015-05-01 2018-06-19 Component Re-Engineering Company, Inc. Method for repairing heaters and chucks used in semiconductor processing
EP3371881B1 (en) 2015-11-02 2023-02-15 Watlow Electric Manufacturing Company Electrostatic chuck for clamping in high temperature semiconductor processing and method of making the same
CN110785837A (en) 2017-06-23 2020-02-11 沃特洛电气制造公司 High-temperature hot plate base

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150203412A1 (en) * 2012-07-18 2015-07-23 Herakles Method for brazing parts made from a composite material, with anchoring of the brazed joint

Also Published As

Publication number Publication date
WO2019204050A1 (en) 2019-10-24
JP2021512845A (en) 2021-05-20
DE112019002005T5 (en) 2021-02-25
TW201943680A (en) 2019-11-16
TWI709547B (en) 2020-11-11
KR20210023818A (en) 2021-03-04
KR20210158426A (en) 2021-12-30
US20210078092A1 (en) 2021-03-18
KR102343816B1 (en) 2021-12-28
KR20220098293A (en) 2022-07-11
KR102417020B1 (en) 2022-07-05
KR102519075B1 (en) 2023-04-11
CN112135806A (en) 2020-12-25
DE112019002005B4 (en) 2022-03-10
US10882130B2 (en) 2021-01-05
JP2021185123A (en) 2021-12-09
US20190314918A1 (en) 2019-10-17
JP6924910B2 (en) 2021-08-25

Similar Documents

Publication Publication Date Title
US20200230728A1 (en) Ceramic-aluminum assembly with bonding trenches
US10991616B2 (en) High speed low temperature method for manufacturing and repairing semiconductor processing equipment and equipment produced using same
US10213858B2 (en) Multi-layer plate device
US20180277352A1 (en) Multiple Zone Heater
US11091397B2 (en) Low temperature method for hermetically joining non-diffusing ceramic materials in multi-layer plate devices
JP4614868B2 (en) CONNECTED BODY AND METHOD FOR PRODUCING THE SAME
EP2973659A1 (en) Multiple zone heater
TW201739551A (en) Method for producing a heat spreader plate, heat spreader plate, method for producing a semiconductor module and semiconductor module
EP4029351B1 (en) Ceramic heater and method of forming using transient liquid phase bonding
KR20230111430A (en) Ceramic heater and method of fabricating the same
TW202343958A (en) Low-temperature electrostatic chuck
KR20230111429A (en) Ceramic heating apparutus and method of fabricating the same

Legal Events

Date Code Title Description
STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

AS Assignment

Owner name: WATLOW ELECTRIC MANUFACTURING COMPANY, MISSOURI

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ENGLISH, KURT;WILSON, JACOB;PIZZELLA, MIRANDA;AND OTHERS;SIGNING DATES FROM 20180412 TO 20180529;REEL/FRAME:052812/0148

AS Assignment

Owner name: BANK OF MONTREAL, AS ADMINISTRATIVE AGENT, ILLINOIS

Free format text: PATENT SECURITY AGREEMENT (SHORT FORM);ASSIGNOR:WATLOW ELECTRIC MANUFACTURING COMPANY;REEL/FRAME:055479/0708

Effective date: 20210302

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION