US20200015389A1 - Control and optimization of indirect evaporative cooling units for data center cooling - Google Patents

Control and optimization of indirect evaporative cooling units for data center cooling Download PDF

Info

Publication number
US20200015389A1
US20200015389A1 US16/028,341 US201816028341A US2020015389A1 US 20200015389 A1 US20200015389 A1 US 20200015389A1 US 201816028341 A US201816028341 A US 201816028341A US 2020015389 A1 US2020015389 A1 US 2020015389A1
Authority
US
United States
Prior art keywords
room
temperature
cold air
pressure
data center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US16/028,341
Other versions
US10820452B2 (en
Inventor
Tianyi Gao
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baidu USA LLC
Original Assignee
Baidu USA LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baidu USA LLC filed Critical Baidu USA LLC
Priority to US16/028,341 priority Critical patent/US10820452B2/en
Assigned to BAIDU USA LLC reassignment BAIDU USA LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GAO, TIANYI
Priority to CN201910523605.1A priority patent/CN110691491B/en
Publication of US20200015389A1 publication Critical patent/US20200015389A1/en
Application granted granted Critical
Publication of US10820452B2 publication Critical patent/US10820452B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/20Modifications to facilitate cooling, ventilating, or heating
    • H05K7/20709Modifications to facilitate cooling, ventilating, or heating for server racks or cabinets; for data centers, e.g. 19-inch computer racks
    • H05K7/20718Forced ventilation of a gaseous coolant
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
    • F24F3/044Systems in which all treatment is given in the central station, i.e. all-air systems
    • F24F3/048Systems in which all treatment is given in the central station, i.e. all-air systems with temperature control at constant rate of air-flow
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F5/00Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
    • F24F5/0007Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater cooling apparatus specially adapted for use in air-conditioning
    • F24F5/0035Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater cooling apparatus specially adapted for use in air-conditioning using evaporation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B25/00Machines, plants or systems, using a combination of modes of operation covered by two or more of the groups F25B1/00 - F25B23/00
    • F25B25/005Machines, plants or systems, using a combination of modes of operation covered by two or more of the groups F25B1/00 - F25B23/00 using primary and secondary systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B39/00Evaporators; Condensers
    • F25B39/02Evaporators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/14Mounting supporting structure in casing or on frame or rack
    • H05K7/1485Servers; Data center rooms, e.g. 19-inch computer racks
    • H05K7/1488Cabinets therefor, e.g. chassis or racks or mechanical interfaces between blades and support structures
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/20Modifications to facilitate cooling, ventilating, or heating
    • H05K7/20709Modifications to facilitate cooling, ventilating, or heating for server racks or cabinets; for data centers, e.g. 19-inch computer racks
    • H05K7/20718Forced ventilation of a gaseous coolant
    • H05K7/20745Forced ventilation of a gaseous coolant within rooms for removing heat from cabinets, e.g. by air conditioning device
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/20Modifications to facilitate cooling, ventilating, or heating
    • H05K7/20709Modifications to facilitate cooling, ventilating, or heating for server racks or cabinets; for data centers, e.g. 19-inch computer racks
    • H05K7/208Liquid cooling with phase change
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/20Modifications to facilitate cooling, ventilating, or heating
    • H05K7/20709Modifications to facilitate cooling, ventilating, or heating for server racks or cabinets; for data centers, e.g. 19-inch computer racks
    • H05K7/208Liquid cooling with phase change
    • H05K7/20827Liquid cooling with phase change within rooms for removing heat from cabinets, e.g. air conditioning devices
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/20Modifications to facilitate cooling, ventilating, or heating
    • H05K7/20709Modifications to facilitate cooling, ventilating, or heating for server racks or cabinets; for data centers, e.g. 19-inch computer racks
    • H05K7/20836Thermal management, e.g. server temperature control
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/08Air-flow control members, e.g. louvres, grilles, flaps or guide plates
    • F24F13/10Air-flow control members, e.g. louvres, grilles, flaps or guide plates movable, e.g. dampers
    • F24F13/14Air-flow control members, e.g. louvres, grilles, flaps or guide plates movable, e.g. dampers built up of tilting members, e.g. louvre
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/40Pressure, e.g. wind pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2339/00Details of evaporators; Details of condensers
    • F25B2339/02Details of evaporators
    • F25B2339/021Evaporators in which refrigerant is sprayed on a surface to be cooled
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/54Free-cooling systems

Definitions

  • Embodiments of the present invention relate generally to data centers. More particularly, embodiments of the invention relate to controlling and optimizing indirect evaporative cooling units for data centers.
  • Heat removal is a prominent factor in computer system and data center design.
  • the number of servers deployed within a data center has steadily increased as server performance has improved, thereby increasing the amount of heat generated during the regular operation of the servers.
  • the reliability of servers used within a data center decreases if the environment in which they operate is permitted to increase in temperature over time.
  • a significant portion of the data center's power is used for removing the heat generated by the electronics packaged within the server.
  • a greater portion of the power is commensurately consumed by the data center to cool electronic components within the servers.
  • Indirect evaporative cooling/cooler is one of the popular cooling solutions for data centers. It can be understood as an economization solution which uses outside air or liquid to cool the data center air through air-to-air or liquid-to-air heat exchangers.
  • IDEC uses evaporative cooling when the outside air dry-bulb temperature is not sufficiently low, in which it turns into a wet-blub temperature running mode.
  • Direct expansion (DX) cooling is used during extreme ambient temperature conditions, such as hot summer days.
  • the control of an IDEC unit is critical for both cooling system and data center system reliability and energy efficiency.
  • the automation involves the controlling of an internal blower/fans speed, an external blower/fans speed, an evaporative pump (e.g., on and off, speed), and DX operating condition.
  • a control system is to adjust the operating conditions of the IDEC unit to maintain proper thermal environment in the data center information technology (IT) room.
  • the data center IT room is under dynamic conditions most of the time.
  • the thermal environment includes supply air temperature, supply air humidity, supply air flow rate/velocity and supply air quality. Maintaining these parameters within proper envelops are critical for server and IT normal operating and long-term reliability. The control becomes more critical when there are multiple IDEC units used in the system.
  • FIG. 1 shows a perspective view of a data center system according to one embodiment.
  • FIGS. 2A-2B shows a top view of a data center system according to certain embodiments.
  • FIG. 3 shows a top view of a data center system according to another embodiment.
  • FIG. 4 shows an example of a data center room configuration according to one embodiment.
  • FIG. 5 shows an example of a data center configuration according to another embodiment.
  • FIG. 6 is a block diagram illustrating an example of a control system according to one embodiment.
  • FIG. 7 is a flow diagram illustrating a thermal management process of a data center system according to one embodiment.
  • FIG. 8 is a flow diagram illustrating a thermal management process of a data center system according to another embodiment.
  • FIG. 9 is a flow diagram illustrating a thermal management process of a data center system according to another embodiment.
  • FIG. 10 shows examples of operating modes of an IDEC system according to one embodiment.
  • FIG. 11 is a flow diagram illustrating a thermal management process of a data center system according to another embodiment.
  • Embodiments of the present invention provide control solutions for data center thermal management using an IDEC system.
  • the data center is arranged in a cold air room wall supply and hot air room wall return configuration.
  • the sensors such as temperature sensors and/or pressure sensors, are utilized to measure and record thermal data.
  • the data is then processed and used to control the IDEC system to adjust operating conditions to satisfy dynamic thermal requirements of the data center.
  • the control functions include: 1) controlling the IDEC system to adjust operating conditions as needed to maintain proper data center thermal environment; and 2) identifying different optimal operating conditions and parameters for the IT room and IDEC system.
  • the thermal management operations and optimization include monitoring and controlling cold air room (supply) thermal conditions and hot air room (return) thermal conditions, using cold air room and/or hot air room thermal data as control signals for the IDC systems; reducing the impact of variations in the IDEC system on the cooling air conditions supplied to the IT room; proper control design for the actual application scenarios; operating conditions optimization of the IDEC system; and reducing the impacts of hot air recirculation, operator activities on the room dynamics.
  • a data center system includes an IT room to contain a number of electronic racks.
  • Each electronic rack may contain a number of server blades and each server blade may contain one or more IT components (e.g., processors, memory, storage devices) that may generate heat during the operations.
  • the data center system further includes a cold air room and a hot air room connected to the IT room.
  • the cold air room is configured to receive cold air of an internal airflow from an IDEC unit and to distribute the cold air to the electronic racks of the IT room to exchange heat generated from the IT components of the electronic racks.
  • the cold air room includes a first set of one or more temperature sensors to sense and measure the temperature of the cold air room.
  • the hot air room is configured to receive hot air carrying the exchanged heat from the IT room and to return the hot air back to the IDEC unit.
  • the cold air room and the hot air room may be located on opposite sides of the IT room to allow the internal airflow to flow from one side to the opposite side, traveling through the airspace of the electronic racks.
  • the data center system further includes a control system communicatively coupled to the cold air room, the hot air room, and/or the IT room, as well as the first set of temperature sensors.
  • the control system In response to sensor data received from the temperature sensors of the first set, the control system is configured to analyze the sensor data based on a first set of thermal management rules.
  • the control system transmits one or more control signals to the IDEC unit to modify one or more operating parameters of the IDEC unit based on the analysis to provide an optimal thermal environment for operating the IT components of the electronic racks.
  • the control system may configure the IDEC to operate in one of the operating modes, such as, a dry air cooling mode, an evaporative cooling mode, and/or a DX (or air conditioning) mode.
  • the control system may further adjust one or more operating parameters in each of the operating modes such as fans speed, volume of mist of liquid drops, and/or condenser and evaporator settings.
  • the hot air room further includes a second set of temperature sensors to sense and measure the temperature of the hot air room.
  • the control signals may be generated based on the sensor data of both the first set and the second set of temperature sensors.
  • the IDEC may be controlled or adjusted based on the average temperatures measured by the temperature sensors or the temperature difference between the cold air room and the hot air room.
  • the data center further includes a set of pressure sensors disposed at least within the cold air room or between the interface between the cold air room and the IT room to sense and measure the air pressure of the cold air entering the IT room.
  • the control system may adjust the opening ratio of the louvers (e.g., windows, doors) between the cold air room and the IT room to control the airflow volume entering the IT room, which in turn adjusts the temperature of the IT room.
  • a set of pressure sensors may also be disposed within the hot air room or on the interface between the IT room and the hot air room for similar purposes. Based on the temperature information and/or the air pressure information, the control system can control the IDEC unit to operate in different operating modes by adjusting the operating parameters of the IDEC unit, such that the IT room can operate in an optimized thermal environment.
  • a data center system includes an IT room to contain a number of electronic racks. Each electronic rack can contain a number of server blades and each server blade can contain one or more IT components operating therein.
  • the data center system further includes a cold air room near a first side of the IT room and a hot air room near a second side of the IT room.
  • the cold air room is configured to receive cold air from an IDEC unit and to distribute the cold air to the electronic racks via one or more louvers of airflow windows disposed on a wall between the cold air room and the IT room, to exchange heat generated from IT components of the electronic racks.
  • the hot air room is configured to receive hot or warmer air carrying the exchanged heat from the IT room and return the hot/warmer air back to the IDEC unit.
  • the data center system further includes a first set of one or more pressure sensors disposed near the cold air room or between the cold air room and the IT room (e.g., near the louvers) to sense and measure the air pressure of the internal airflow entering the IT room from the cold air room.
  • the data center system further includes a control system coupled to the cold air room, the IT room, the hot air room, and the pressure sensors.
  • control system In response to sensor data received from the pressure sensors, the control system is configured to analyze the sensor data based on a set of thermal management rules or algorithms and to adjust an opening ratio of at least one of the louvers interfacing the cold air room and the IT room based on the analysis to adjust a cold airflow volume entering the IT room through at least one of the louvers, which in turn adjusts the thermal conditions of the IT room.
  • a second set of one or more pressure sensors may be disposed near the hot air room or between the hot air room and the IT room (near the airflow opening on a wall between the IT and hot air rooms).
  • the control system is to control the opening ratio of the louvers further based on the sensor data obtained from the second set of pressure sensors.
  • the pressure sensor data of the second set may also be utilized to control the opening ratio of louvers disposed between the IT room and the hot air room.
  • the opening ratios of the louvers may be adjusted based on the averaged air pressures measured by the pressure sensors or the pressure difference between the cold air room and the hot air room.
  • the purpose of adjusting the louvers is to ensure uniform air flow rate delivery to the room from the walls.
  • an optimization process may be performed to determine an optimal setting of an IDEC unit for a data center system, such that the electronic racks can operate in an optimal thermal environment, and at the same time, using minimum cooling power.
  • the optimization process is an iterative process using a set of thermal setting candidates of the IDEC.
  • an optimal partial power usage effectiveness (PPUE) is configured as an initial PPUE value.
  • An optimal set of parameters of an IDEC unit is set to an initial set of parameters.
  • the IDEC unit is configured based on a set of parameters associated with the current operating condition candidate.
  • the pressure sensor data is collected from the pressure sensors disposed at various locations within a cold air room connected to an IT room having a number of electronic racks.
  • Each electronic rack contains a number of IT components.
  • the pressure sensors are configured to measure the air pressure of the cold air received from the IDEC unit (e.g., internal airflow).
  • the cold air is to be distributed to the electronic racks to exchange heat generated from the IT components and transformed into hot/warmer air.
  • the hot air is then received by the hot air room and returned back to the IDEC unit from the hot air room.
  • the temperature sensor data is collected from the temperature sensors disposed at various locations near the cold air room.
  • a current thermal condition e.g., temperature, air pressure
  • a current PPUE of the data center system is calculated and compared with the optimal PPUE. If the current PPUE is lower than the optimal PPUE value, the optimal PPUE value is replaced by the current PPUE value.
  • the set of parameters of the IDEC unit is designated as the optimal set of the parameters for the IDEC unit. After all of the operating condition candidates of the IDEC unit have been processed, the IDEC unit is then configured base on the optimal set of parameters, such that the IT room is to operate in an optimal thermal condition, for the current IT workload (heat load) condition.
  • FIG. 1 shows a perspective view of a data center system according to one embodiment.
  • data center system 100 includes an IT room 101 , a cold air room 102 , and a hot air room 103 .
  • IT room 101 includes a number of electronic racks such as electronic racks 111 - 112 .
  • Each electronic rack contains one or more IT components arranged in a stack.
  • An IT component can be a computer server providing data services to clients.
  • an IT component can be a peripheral device or a network appliance device such as cloud storage systems.
  • Each IT component may include one or more processors, memory, and/or a storage device that may generate heat during operations.
  • the electronic racks are arranged in a number of rows of electronic racks, in this example, rows 104 - 105 of electronic racks.
  • the rows of electronic racks are arranged spaced apart to form one or more cold aisles and one or more hot aisles.
  • each row of electronic racks is positioned or sandwiched between a cold aisle and a hot aisle.
  • row 104 and row 105 are positioned apart from each other to form cold aisle 114 A, hot aisle 115 , and cold aisle 114 B.
  • Hot aisle 115 is formed between row 104 and row 105 .
  • Row 104 is positioned or sandwiched between cold aisle 114 A and hot aisle 115
  • row 105 is positioned or sandwiched between cold aisle 114 B and hot aisle 115 .
  • hot aisle 115 is contained or enclosed by hot aisle containment (or container or other enclosures).
  • the cold aisles are contained in a containment environment instead of the hot aisles.
  • both hot aisles and cold aisles are contained in an enclosed environment.
  • the backend of the electronic racks of rows 104 - 105 are facing hot aisle 115
  • the frontends of the electronic racks are facing cold aisle 114 A or cold aisle 114 B and away from hot aisle 115 .
  • cold air room 102 is located and adjacent to a first side of IT room 101
  • hot air room 103 is located and adjacent to a second side of IT room 101
  • the first side and the second side are opposite sides of IT room 101
  • Cold air room 102 is configured to receive cold air or cool air via one or more inlet ports from a cold air source such as cold air source 180 .
  • the cold air is allowed to enter IT room 101 from cold air room 102 via one or more openings disposed on the wall between cold air room and IT room 101 (not shown).
  • the cold air entering IT room 101 to form cold aisles 114 A- 114 B.
  • Hot air room 103 is configured to exhaust the hot air from hot aisle 115 and return the hot air or warmer air back to the cold air source 180 for heat exchange.
  • cold air source 180 can include a heat exchanger or chiller.
  • cold air source 180 can be an IDEC system or device, which can operate in a number of different operating modes (e.g., air cooling mode, evaporative cooling mode, and DX cooling mode).
  • cold air source 115 can simply be the natural ambient air outside of the data center system 100 .
  • An evaporative cooler is a device that cools air through the evaporation of water.
  • Evaporative cooling differs from typical air conditioning systems, which use vapor compression or absorption refrigeration cycles. Evaporative cooling works by exploiting water's large enthalpy of vaporization. The temperature of dry air can be dropped significantly through the phase transition of liquid water to water vapor (evaporation). Direct evaporative cooling is used to lower the temperature and increase the humidity of air by using latent heat of evaporation, changing liquid water to water vapor. In this process, the energy in the air does not change. Warm dry air is changed to cool moist air. The heat of the outside air is used to evaporate water.
  • Indirect evaporative cooling is a cooling process that uses direct evaporative cooling in addition to some type of heat exchanger to transfer the cool energy to the supply air.
  • the cooled moist air from the direct evaporative cooling process never comes in direct contact with the conditioned supply air.
  • the cold air is received from one or more inlets or inlet ports disposed on a wall of cold air room 102 , where the wall is substantially parallel with a third side of IT room 101 .
  • the third side of IT room 101 is substantially perpendicular to the first side and the second side, while the first side and the second side are substantially parallel to each other.
  • the hot air is exhausted from hot air room 103 to the external environment or back to cold air source 180 via one or more outlets or outlet ports disposed on a wall of hot air room 102 , where the wall is substantially parallel with the third side of IT room 101 .
  • hot aisle 115 is enclosed or contained within hot aisle containment 120 , such that the hot air cannot escape or spill from hot aisle 115 into other areas of IT room 101 such as cold aisles 114 A- 114 B.
  • the hot aisle enters hot air room 103 from hot aisle via one or more openings (e.g., windows, doors) disposed on a wall between hot aisle 115 and hot air room 103 .
  • the openings allow an operator or a user to enter hot aisle 115 from hot air room 103 to access the backend of the electronic racks, for example for maintenance services. Doors are needed on the 102 and 103 , for operators to be able to enter cold air room 102 and hot air room 103 .
  • the openings disposed on the wall between cold air room 102 and IT room 101 may include one or more doors to allow an operator or user to enter cold aisles 114 A- 114 B from cold air room 102 .
  • entering or leaving cold aisles or hot aisles would not have a significant impact on the cold air distribution and hot air exhaustion. That is, entering or leaving hot aisle 115 would not alter cold air distribution for cold aisles 114 A- 114 B, because hot aisle 115 is separated from cold aisles 114 A- 114 B and the rest of IT room 101 by hot aisle containment 120 .
  • entering or leaving cold aisles 114 A- 114 B would not affect hot air exhaustion of hot aisle 115 , since opening a door for a user to enter or leave would not mix the cold air and the hot air.
  • FIG. 2A shows a top view of a data center system according to one embodiment.
  • the data center system can represent a top view of data center 100 of FIG. 1 .
  • the electronic racks are arranged into a number of rows similar to rows 104 - 105 of FIG. 1 .
  • the rows of electronic racks are positioned and spaced apart from each other to form cold aisles 114 A- 114 C (collectively referred to as cold aisles 114 ) and hot aisles 115 A- 115 D (collectively referred to as hot aisles).
  • Hot aisles 115 A- 115 D are each enclosed or contained in a hot aisle containment structure.
  • Cold air room 102 is positioned adjacent to a first side of IT room 101 .
  • Hot air room 103 is positioned adjacent to a second side of IT room 101 .
  • the first side and the second side of the IT room 101 are opposite sides.
  • the cold air is received from an external cold air source such as an IDEC system via one or more inlet or intake ports 201 into cold air room 102 .
  • the cold air then enters IT room 101 via one or more openings (e.g., windows, doors with louvers) 211 - 213 and enter cold aisles 114 A- 114 C.
  • the cold air then enters from the frontends of the electronic racks, travels through the airspace of the electronic racks, and enters hot aisles 115 A- 115 D.
  • hot aisles 115 are configured as an enclosed or contained environment that can receive the air flows from cold aisles through the airspace of the electronic racks.
  • the hot air is prevented from spilling into other areas of IT room 101 .
  • the hot air can only exit IT room 101 and enter into hot air room 103 via openings 221 - 224 .
  • At least one of the openings 211 - 213 disposed on a wall between cold air room 102 and IT room 102 includes a door to allow an operator or user to enter IT room 101 and cold aisles to access the electronic racks such as frontends of the electronic racks for maintenance services.
  • each of openings 221 - 224 (no doors) allows an operator or user to enter the corresponding hot aisle to access the backend of the electronic racks adjacent to the hot aisle.
  • the cold air enters into cold air room 102 via inlet 201 from the third side (e.g., the right hand side) of IT room 101 .
  • the hot air leaves hot air room via outlet 202 of IT room 101 from the third side.
  • the third side is different from the first side adjacent to cold air room 102 and the second side adjacent to hot air room 103 .
  • the first side and the second side are substantially parallel to each other.
  • the third side is substantially perpendicular to the first side and/or the second side.
  • the cold air enters cold air room 102 from a side parallel to the first side.
  • the hot air leaves hot air room 103 from a side parallel to the second side.
  • cold air room 102 and hot air room 103 are coupled to a cooling system such as an IDEC unit for heat exchange via respective airflow channels coupling the IDEC unit with the cold air room 102 and hot air room 103 .
  • the external cooling system may be configured as a modular system that can be coupled to cold air room 102 and hot air room 103 , where the cooling system may be provided by a third party entity that is different than an entity providing or maintaining the data center system.
  • cold air room 102 and/or hot air room 103 may be configured as a modular module, which can be provided by a third party entity.
  • Cold air room 102 , hot air room 103 , and/or cooling system 401 may be provided by the same or different vendors or organizations.
  • FIG. 3 is a block diagram illustrating a top view of a data center system according to one embodiment.
  • the configuration of IT room 101 , cold air room 102 , and hot air room 103 is similar to the one as shown in FIG. 2A .
  • an IDEC unit 310 is coupled to cold air room 102 and hot air room 103 , where IDEC unit 310 may represent the cooling system 180 of FIG. 1 .
  • IDEC unit 310 provides cold air to cold air room 102 via a cold air channel and receives hot air from hot air room 103 via a hot air channel, forming an internal airflow that is circulated through cold air room 102 , IT room 101 , and hot air room 103 .
  • a number of sensors such as sensors 301 A- 301 D (collectively referred to as sensors 301 ) may be disposed at various locations.
  • Sensors 301 may include temperature sensors and/or pressure sensors.
  • the temperature sensors are configured to monitor and measure the temperatures of the airflow
  • the pressure sensors are configured to monitor and measure the air pressure of the internal air flow.
  • a first set of sensors such as sensors 301 A- 301 B are disposed on a wall between cold air room 102 and IT room 101 .
  • the sensors may be disposed on the opening such as airflow windows or doors.
  • the sensors may be disposed on the louvers mounted on the wall between cold air room 102 and IT room 101 , as shown in FIG. 4 .
  • a second set of sensors such as sensors 301 C and 301 D may be disposed on the wall or louvers between IT room 101 and hot air room 103 .
  • control system 300 is communicatively coupled to IT room 101 , cold air room 102 , hot air room 103 , sensors 301 , and IDEC unit 310 .
  • control system 300 receives sensor data or signals 305 from sensors 301 and performs an analysis on the sensor data to determine the current thermal environment or condition of the data center. Based on the analysis, control system 300 transmits one or more control commands or signals 306 A- 306 B (collectively referred to as control signals or commands 306 ) to control or adjust certain operating parameters or settings of the data center unit (e.g., IT room 101 , cold air room 102 , and hot air room 103 ) and IDEC unit 310 .
  • the data center unit e.g., IT room 101 , cold air room 102 , and hot air room 103
  • the control system 300 is to maintain proper and stable thermal conditions in the cold air room 102 and hot air room 103 .
  • a stable thermal environment of cold air room 102 and hot air room 103 ensures a stable thermal environment in the IT room 101 .
  • another goal is to improve energy efficiency of the IDEC system 310 by optimizing the operating conditions of IDEC system 310 .
  • FIG. 5 is a block diagram illustrating an example of an IDEC system according to one embodiment.
  • a typical IDEC unit can operate in a number of operating modes, including 1) an air cooling mode; 2) an evaporative cooling mode; and 3) a DX mode similar to air conditioning. Any one or more of these operating modes can be activated or deactivated individually and/or simultaneously.
  • IDEC 300 operates in an air cooling mode, one or more external fans 501 are utilized to circulate and exhaust external airflow 512 out, while one or more internal fans 504 circulates the internal air flow 511 across the chamber of IDEC 300 without directly contacting external airflow 512 for heat exchange.
  • the fans speed of fans 501 and 504 can be controlled and adjusted by control system 300 .
  • IDEC 310 When IDEC 310 operates in an evaporative cooling mode, one or more evaporative pumps 502 are utilized to pump and spray mist of liquid drops onto the external airflow 512 to reduce the temperature of the external airflow 512 , which the heat carried by external airflow 512 may cause the mist of liquid drops to evaporate, which in turn lowers the temperature of the external airflow.
  • IDEC unit 310 When IDEC unit 310 operates in a DX mode, the DX system 503 is invoked to reduce the temperature of external airflow 512 and/or internal airflow 511 .
  • the control system 300 can turn on or turn off any one or more of the cooling modes based on the sensor data received from various temperature sensors and/or pressure sensors according to a set of thermal management rules or algorithms.
  • FIG. 6 is a block diagram illustrating an example of a control system according to one embodiment.
  • control system 300 includes, but is not limited to, analysis module 601 , louver controller 602 , internal fans controller 603 , external fans controller 604 , evaporative pump controller 605 , and DX controller 606 .
  • Modules 601 - 606 may be implemented in software, hardware, or a combination thereof. For example, modules 601 - 606 may be loaded into a memory and executed by one or more processors to perform various operations. Note that some or all of modules 601 - 606 may be integrated into fewer modules or a single module.
  • Analysis module 601 is configured to monitor and receive sensor data from most or all of the sensors of the data center system, and to perform an analysis on the sensor data to determine the current thermal conditions or environment of the data center. Analysis module 601 may perform the analysis based on a set of one or more thermal management rules or algorithms 610 to determine a set of one or more actions to configure and mange IDEC unit 310 , for example, by invoking specific modules 602 - 606 .
  • Louver controller 602 is configured to control the louvers (e.g., intake louvers) between the cold air room 102 and IT room such as louvers 211 - 213 , as well as the louvers (e.g., exhaust louvers) disposed between IT room 101 and hot air room 103 if there is any.
  • a louver can be controlled by louver controller 602 to be more opened, closed, or different opening angles, etc. By adjusting the opening and/or angle of a louver, the volume of the airflow flowing through the louver can be controlled.
  • analysis module 601 determines a set of one or more controlling parameters and invokes louver controller 602 to adjust an opening ratio of a particular louver.
  • louvers 211 - 213 there are various pressure sensors disposed on different locations of different louvers 211 - 213 .
  • the air pressures on different louvers may be different, which may represent different volumes of the airflow flowing through the corresponding louvers. For example, if the air pressure detected by pressure sensor 301 A is higher than the air pressure detected by pressure sensor 301 B, it may indicate that the airflow volume flowing through louver 211 is higher than the airflow volume flowing through louver 212 .
  • the opening ratio of louver 211 may need to be adjusted lower (e.g., to be closed) to allow less air flowing through louver 211 , and more air flowing through louver 212 .
  • the goal of managing louvers 211 - 213 is to provide relatively even airflow volumes flowing through all louvers.
  • analysis module 601 receives the pressure sensor data from most or all pressure sensors disposed on louvers 211 - 213 and determines the air pressures measured by the pressure sensors. Analysis module 601 calculates an average air pressure (P ave ) based on the measured air pressures as follows:
  • P n represents an individual air pressure measured by a particular one of the pressure sensors.
  • the opening ratio of the corresponding louver can be adjusted based on the difference between the individually measured air pressure and the average air pressure:
  • the corresponding louvers will be controlled to either increase the opening ratio (low pressure) or decrease the opening ratio (high pressure).
  • the pressure difference ⁇ P is positive, it means the local air pressure is relatively high compared to the average air pressure and the corresponding louver needs to be opened less to reduce the air pressure.
  • An opening ratio of a louver refers to the opening angle percentage of the louver.
  • An opening ratio of 0 means the louver is fully closed, in which an airflow moving path is fully blocked.
  • An opening ratio of 100% means the louver is fully open, in which the airflow can pass through the louver with the minimum flow resistance.
  • a louver can be considered as an airflow valve, similar as liquid fluid valve opening ratio.
  • the ⁇ P is calculated to capture how much is the difference among each individual P n , by comparing to the Pa.
  • a predetermined tolerance range for difference e.g., +/ ⁇ 0.01 pounds per square inch or PSI
  • PSI pounds per square inch
  • the air pressure of that particular louver may be calculated based on the average of the pressure readings from the pressure sensors associated with the louvers.
  • the air pressure drop across each louver may be calculated and used for controlling the louver opening ratio, similar principle as using the static pressure.
  • FIG. 7 is a flow diagram illustrating a process of controlling louvers based on sensor data according to one embodiment.
  • Process 700 may be performed by processing logic which may include software, hardware, or a combination thereof.
  • processing logic which may include software, hardware, or a combination thereof.
  • process 700 may be performed by control system 300 .
  • one or more pressure sensors are utilized to monitor and measure air pressures of the louvers.
  • an average air pressure Pa is calculated based on the pressure readings form the pressure sensors.
  • ⁇ P it is determined whether the pressure difference ⁇ P is within a predetermined range (e.g., an acceptable range such as +/ ⁇ 0.01 PSI). If so, it means the air pressure of the louver is normal. Otherwise, if the pressure difference ⁇ P is outside of the predetermined range, in operation 705 , it is determined whether the pressure difference ⁇ P is greater than either the upper limit of the range or less than the lower limit of the range (e.g., ⁇ 0.01). If ⁇ P is greater than the upper limit of the range, in operation 706 , the opening ratio of the louver is decreased. If ⁇ P is lower than the lower limit of the range (e.g., ⁇ 0.01), the opening ratio of the louver is increased in operation 707 .
  • a predetermined range e.g., an acceptable range such as +/ ⁇ 0.01 PSI.
  • process 700 may be performed further in view of temperature sensor data obtained from the temperature sensors disposed in the cold air room, the hot air room, and/or the IT room. That is, the louvers may be controlled and adjusted further based on the temperature sensor data representing the temperature of the cold air room and/or hot air room.
  • the pressure sensor data can also be utilized to control the fans speed of the internal fans such as fans 504 of FIG. 5 .
  • the air pressure of the internal airflow is proportionally related to the temperature in the IT room 101 .
  • the temperature of the IT room can be derived.
  • the speed of the internal fans 504 can be adjust, which in turn adjust the thermal condition of the IT room 101 .
  • FIG. 8 is a flow diagram illustrating a process of controlling an internal airflow according to one embodiment.
  • Process 800 may be performed by processing logic which may include software, hardware, or a combination thereof.
  • process 800 may be performed by control system 300 .
  • pressure sensor data is collected from the pressure sensors disposed at the cold air room 102 and hot air room 103 .
  • operation 802 the air pressure of the cold air room and the air pressure of the hot air room are determined, and the difference between the cold air room air pressure and the hot air room air pressure is calculated.
  • the pressure difference is not within the predetermined range, in operation 804 , it is determined whether the air pressure of the cold air room is higher than a first predetermined set point. If the air pressure of the cold air room is below the first predetermined set point, in operation 805 , it is determined whether the pressure difference between the cold air room and the hot air room is below a second predetermined set point (e.g., upper limit or lower limit of the range). If so (e.g., below a lower limit of the range), in operation 806 , the internal fans speed is increased; otherwise (e.g., above an upper limit of the range), the internal fans speed is decreased in operation 807 .
  • the first and second predetermined set points may the same or different.
  • process 800 may be performed further in view of temperature sensor data obtained from the temperature sensors disposed in the cold air room, the hot air room, and/or the IT room. That is, the internal fans may be controlled and adjusted further based on the temperature of the cold air room and/or hot air room.
  • supply air temperature data at the cold air room 102 are recorded and used as a part of the control signals of IDEC operating conditions and modes.
  • the cold air room temperatures can be considered as the cold aisle temperatures, as well as the supply air inlet temperatures of the servers.
  • This control includes the IDEC external blower such as fans or blowers 501 , different operating modes including dry-blub operating, wet-bulb operating and DX cooling mode.
  • the data center supply air temperature is predefined.
  • ASHRAE American Society of Heating, Refrigerating, and Air-Conditioning Engineers thermal guidelines for data centers.
  • T max is the maximum temperature value collected.
  • the required ranges are the acceptable temperature ranges for allowing the cold air room temperature to stay at. Since there are multiple operating modes can be adjusted on IDEC 300 to adjust cooling capacity, including changing IDEC external blower speed, evaporative pump speed, and DX operating mode. Such actions can be selectively performed or in parallel in response to the sensor data collected from the temperature sensors.
  • analysis module 601 in response to temperature sensor data received from the temperature sensors, analysis module 601 is configured to analyze the temperature sensor data and to invoke external fans controller 604 to adjust the fans speed of fans or blowers 501 to control the volume or speed of external airflow 512 .
  • FIG. 9 is a flow diagram illustrating a process of controlling fans for an external airflow based on temperature sensor data according to one embodiment.
  • Process 900 may be performed by processing logic which may include software, hardware, or a combination thereof.
  • process 800 may be performed by control system 300 .
  • the internal fans of an IDEC unit is set to an initial speed and the server blades of the IT rooms start to operate in operation 902 .
  • the temperature of the cold air room is determined based on temperature sensor data obtained from the temperature sensors disposed near or within the cold air room.
  • the temperature sensor data is analyzed, including calculating the average temperature of the temperature sensors, etc.
  • operation 905 it is determined whether the temperature (e.g., the average temperature) of the cold air room is within a predetermined range. If the temperature is outside of the predetermined range, in operation 906 , it is determined whether the temperature is higher than a predetermined set point (e.g., an upper limit of the range). If so, in operation 907 , the external fans speed is increased. In addition, the evaporative pumps 502 and/or DX system 503 may be activated. Otherwise if the temperature is lower than a predetermined set point (e.g., a lower limit of the range), in operation 908 , the external fans speed may be decreased, and the evaporative pumps 502 and/or DX system 503 may be deactivated.
  • a predetermined set point e.g., an upper limit of the range
  • an IDEC unit can operate in a number of operating modes, including an air cooling mode, an evaporative cooling mode, and a DX mode. Each of these operating modes can be individually activated or deactivated, in sequence or in parallel as shown in FIG. 10 .
  • the specific operating parameters such as fans speed, mist liquid drop volume, and the settings of the condenser and evaporator of the DX system may also be individually configured.
  • the operating modes and operating parameters of these subsystems of an IDEC unit can be configured to find an optimal thermal environment or condition specifically tailored to a particular data center system given the specific configuration of the data center system, such as workload and layout. Note that process 900 may be performed further in view of pressure sensor data obtained from the pressure sensors disposed in the cold air room, the hot air room, and/or the IT room.
  • analysis module 601 can perform an iterative process to find a set of operating parameters or operating modes for the IDEC unit 310 that provides an optimal thermal operating environment for the IT room 101 . For example, during the iteratively process, in response sensor data received from the sensors, analysis module 601 performs an analysis on the sensor data to determine the current thermal condition of the IT room 101 . Analysis module 601 then invoke internal fans controller 603 , external fans controller 604 , evaporative pump controller 605 , and DX controller 606 to control and adjust the respective operating parameters of the air cooling subsystem, the evaporative cooling subsystem, and the DX subsystem of IDEC unit 310 .
  • Such an optimization process is iteratively performed until all of the combinations of the operating modes and parameters have been processed.
  • One of the combination settings of the subsystems is then selected that can satisfy the required thermal condition (e.g., lowest temperature) to IT room, and at the same time, minimize the water and electrical consumption.
  • FIG. 11 is a flow diagram illustrating an optimization process for determining an optimal cooling unit operating conditions for a data center at certain IT workload condition according to one embodiment.
  • Process 1100 may be performed by processing logic which may include software, hardware, or a combination thereof.
  • process 1100 may be performed by control system 300 .
  • an IDEC unit is configured according to the initial settings and the electronic racks are turned on in operation 1102 .
  • the sensor data is collected from the sensors such as temperature sensors and pressure sensors.
  • the sensor data is analyzed to determine the operating environment of the data center such as temperature and power consumption, etc.
  • a partial power usage effectiveness (PPUE) value is set to an initial optimal PPUE value.
  • Operation 1105 is to designed for safety operating. Before the system optimization process, it needs to be ensured that the IT room thermal environment requirement is satisfied.
  • Power usage effectiveness is a ratio that describes how efficiently a computer data center uses energy; specifically, how much energy is used by the computing equipment (in contrast to cooling and other overhead).
  • An ideal PUE is 1.0. Anything that is not considered a computing device in a data center (i.e. lighting, cooling, etc.) falls into the category of facility energy consumption.
  • the thermal conditions satisfy the IT room requirement, where the predetermined condition may be compatible with the industry standard for a particular type of data center or a particular IT workload condition. If the thermal condition does not satisfy the IT requirement, in operation 1106 , the IDEC unit is configured to be set to the maximum cooling capacity condition (e.g., the thermal environment with the lowest possible temperature), and the above operations 1103 - 1105 are iteratively performed.
  • the maximum cooling capacity condition e.g., the thermal environment with the lowest possible temperature
  • the IDEC unit operating conditions are adjusted in operation 1107 for each of the operating condition candidates in operation 1108 (e.g., condition candidates as shown in FIG. 10 ).
  • operation 1109 it is determined whether the IT thermal condition is still satisfied. If not, a next operating condition or a next set of operating parameters of the IDEC unit is selected and the above operations 1107 - 1108 are iteratively performed. If the IT thermal condition has been satisfied in operation 1109 , the new or current PPUE value is calculated based on the current settings of the IDEC unit in operation 1110 . In operation 1111 , it is determined whether the current PPUE value is lower than the optimal PPUE value.
  • the optimal PPUE value is updated and set to the current PPUE value of the current iteration.
  • the current set of operating modes or operating parameters of the IDEC unit are designated as an optimal set of operating modes or operating parameters for the IDEC unit, which may be stored in a persistent storage device such as a hard disk of control system 300 .
  • the above operations are iteratively performed until all of the operating mode/parameter candidates (e.g., candidates as shown in FIG. 10 ) have been processed in operation 1113 .
  • process 1100 may be performed periodically (e.g., during initial start or reboot of the data center) to find the optimal set of operating parameters at the point in time, as the operating environment of the data center, such as the workload, may change from time to time.
  • PPUE which is a metrics for cooling energy consumption are considered as the criteria for the optimal process
  • water usage effectiveness, or combined water usage effectiveness and PPUE can be used as alternative criterias.
  • Embodiments of the disclosure also relate to an apparatus for performing the operations herein.
  • a computer program is stored in a non-transitory computer readable medium.
  • a machine-readable medium includes any mechanism for storing information in a form readable by a machine (e.g., a computer).
  • a machine-readable (e.g., computer-readable) medium includes a machine (e.g., a computer) readable storage medium (e.g., read only memory (“ROM”), random access memory (“RAM”), magnetic disk storage media, optical storage media, flash memory devices).
  • processing logic that comprises hardware (e.g. circuitry, dedicated logic, etc.), software (e.g., embodied on a non-transitory computer readable medium), or a combination of both.
  • processing logic comprises hardware (e.g. circuitry, dedicated logic, etc.), software (e.g., embodied on a non-transitory computer readable medium), or a combination of both.
  • Embodiments of the present disclosure are not described with reference to any particular programming language. It will be appreciated that a variety of programming languages may be used to implement the teachings of embodiments of the disclosure as described herein.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Computer Hardware Design (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Signal Processing (AREA)
  • Mathematical Physics (AREA)
  • Fuzzy Systems (AREA)
  • Air Conditioning Control Device (AREA)
  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

Embodiments of the present invention provide control solutions for data center thermal management and control using an IDEC system. The data center is arranged in a cold air room wall supply and hot air room wall return configuration. The sensors, such as temperature sensors and/or pressure sensors, are utilized to measure and record thermal data. The data is then processed and used to control the IDEC system to adjust operating conditions to satisfy dynamic thermal requirements of the data center. The control functions include: 1) controlling the IDEC system to adjust cooling modes and operating conditions as needed to maintain proper data center thermal environment; and 2) identifying different optimal operating conditions and parameters for the IT room and IDEC system.

Description

    FIELD OF THE INVENTION
  • Embodiments of the present invention relate generally to data centers. More particularly, embodiments of the invention relate to controlling and optimizing indirect evaporative cooling units for data centers.
  • BACKGROUND
  • Heat removal is a prominent factor in computer system and data center design. The number of servers deployed within a data center has steadily increased as server performance has improved, thereby increasing the amount of heat generated during the regular operation of the servers. The reliability of servers used within a data center decreases if the environment in which they operate is permitted to increase in temperature over time. A significant portion of the data center's power is used for removing the heat generated by the electronics packaged within the server. As the number of servers within a data center increase, a greater portion of the power is commensurately consumed by the data center to cool electronic components within the servers.
  • Indirect evaporative cooling/cooler (IDEC) is one of the popular cooling solutions for data centers. It can be understood as an economization solution which uses outside air or liquid to cool the data center air through air-to-air or liquid-to-air heat exchangers. In addition, IDEC uses evaporative cooling when the outside air dry-bulb temperature is not sufficiently low, in which it turns into a wet-blub temperature running mode. Direct expansion (DX) cooling is used during extreme ambient temperature conditions, such as hot summer days.
  • The control of an IDEC unit is critical for both cooling system and data center system reliability and energy efficiency. For IDEC unit, the automation involves the controlling of an internal blower/fans speed, an external blower/fans speed, an evaporative pump (e.g., on and off, speed), and DX operating condition. A control system is to adjust the operating conditions of the IDEC unit to maintain proper thermal environment in the data center information technology (IT) room. The data center IT room is under dynamic conditions most of the time. The thermal environment includes supply air temperature, supply air humidity, supply air flow rate/velocity and supply air quality. Maintaining these parameters within proper envelops are critical for server and IT normal operating and long-term reliability. The control becomes more critical when there are multiple IDEC units used in the system.
  • Most of existing solutions may not applicable to the actual data center building and room. The actual data center and building design are different from case to case. The function of the control system is maintaining and ensuring the thermal conditions including air temperature and air flow rate satisfying the requirements. Variations in any of these conditions may result in an impact on the other. The conventional solutions may not be a reliable and efficient one for the case described in this document.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Embodiments of the invention are illustrated by way of example and not limitation in the figures of the accompanying drawings in which like references indicate similar elements.
  • FIG. 1 shows a perspective view of a data center system according to one embodiment.
  • FIGS. 2A-2B shows a top view of a data center system according to certain embodiments.
  • FIG. 3 shows a top view of a data center system according to another embodiment.
  • FIG. 4 shows an example of a data center room configuration according to one embodiment.
  • FIG. 5 shows an example of a data center configuration according to another embodiment.
  • FIG. 6 is a block diagram illustrating an example of a control system according to one embodiment.
  • FIG. 7 is a flow diagram illustrating a thermal management process of a data center system according to one embodiment.
  • FIG. 8 is a flow diagram illustrating a thermal management process of a data center system according to another embodiment.
  • FIG. 9 is a flow diagram illustrating a thermal management process of a data center system according to another embodiment.
  • FIG. 10 shows examples of operating modes of an IDEC system according to one embodiment.
  • FIG. 11 is a flow diagram illustrating a thermal management process of a data center system according to another embodiment.
  • DETAILED DESCRIPTION
  • Various embodiments and aspects of the inventions will be described with reference to details discussed below, and the accompanying drawings will illustrate the various embodiments. The following description and drawings are illustrative of the invention and are not to be construed as limiting the invention. Numerous specific details are described to provide a thorough understanding of various embodiments of the present invention. However, in certain instances, well-known or conventional details are not described in order to provide a concise discussion of embodiments of the present inventions.
  • Reference in the specification to “one embodiment” or “an embodiment” means that a particular feature, structure, or characteristic described in conjunction with the embodiment can be included in at least one embodiment of the invention. The appearances of the phrase “in one embodiment” in various places in the specification do not necessarily all refer to the same embodiment.
  • Embodiments of the present invention provide control solutions for data center thermal management using an IDEC system. The data center is arranged in a cold air room wall supply and hot air room wall return configuration. The sensors, such as temperature sensors and/or pressure sensors, are utilized to measure and record thermal data. The data is then processed and used to control the IDEC system to adjust operating conditions to satisfy dynamic thermal requirements of the data center. The control functions include: 1) controlling the IDEC system to adjust operating conditions as needed to maintain proper data center thermal environment; and 2) identifying different optimal operating conditions and parameters for the IT room and IDEC system. The thermal management operations and optimization include monitoring and controlling cold air room (supply) thermal conditions and hot air room (return) thermal conditions, using cold air room and/or hot air room thermal data as control signals for the IDC systems; reducing the impact of variations in the IDEC system on the cooling air conditions supplied to the IT room; proper control design for the actual application scenarios; operating conditions optimization of the IDEC system; and reducing the impacts of hot air recirculation, operator activities on the room dynamics.
  • According to one aspect of the invention, a data center system includes an IT room to contain a number of electronic racks. Each electronic rack may contain a number of server blades and each server blade may contain one or more IT components (e.g., processors, memory, storage devices) that may generate heat during the operations. The data center system further includes a cold air room and a hot air room connected to the IT room. The cold air room is configured to receive cold air of an internal airflow from an IDEC unit and to distribute the cold air to the electronic racks of the IT room to exchange heat generated from the IT components of the electronic racks. The cold air room includes a first set of one or more temperature sensors to sense and measure the temperature of the cold air room. The hot air room is configured to receive hot air carrying the exchanged heat from the IT room and to return the hot air back to the IDEC unit. The cold air room and the hot air room may be located on opposite sides of the IT room to allow the internal airflow to flow from one side to the opposite side, traveling through the airspace of the electronic racks.
  • The data center system further includes a control system communicatively coupled to the cold air room, the hot air room, and/or the IT room, as well as the first set of temperature sensors. In response to sensor data received from the temperature sensors of the first set, the control system is configured to analyze the sensor data based on a first set of thermal management rules. The control system transmits one or more control signals to the IDEC unit to modify one or more operating parameters of the IDEC unit based on the analysis to provide an optimal thermal environment for operating the IT components of the electronic racks. For example, the control system may configure the IDEC to operate in one of the operating modes, such as, a dry air cooling mode, an evaporative cooling mode, and/or a DX (or air conditioning) mode.
  • The control system may further adjust one or more operating parameters in each of the operating modes such as fans speed, volume of mist of liquid drops, and/or condenser and evaporator settings. In one embodiment, the hot air room further includes a second set of temperature sensors to sense and measure the temperature of the hot air room. The control signals may be generated based on the sensor data of both the first set and the second set of temperature sensors. The IDEC may be controlled or adjusted based on the average temperatures measured by the temperature sensors or the temperature difference between the cold air room and the hot air room.
  • According to one embodiment, the data center further includes a set of pressure sensors disposed at least within the cold air room or between the interface between the cold air room and the IT room to sense and measure the air pressure of the cold air entering the IT room. Based on the temperature sensor data, the control system may adjust the opening ratio of the louvers (e.g., windows, doors) between the cold air room and the IT room to control the airflow volume entering the IT room, which in turn adjusts the temperature of the IT room. Similarly, a set of pressure sensors may also be disposed within the hot air room or on the interface between the IT room and the hot air room for similar purposes. Based on the temperature information and/or the air pressure information, the control system can control the IDEC unit to operate in different operating modes by adjusting the operating parameters of the IDEC unit, such that the IT room can operate in an optimized thermal environment.
  • According to another aspect of the invention, a data center system includes an IT room to contain a number of electronic racks. Each electronic rack can contain a number of server blades and each server blade can contain one or more IT components operating therein. The data center system further includes a cold air room near a first side of the IT room and a hot air room near a second side of the IT room. The cold air room is configured to receive cold air from an IDEC unit and to distribute the cold air to the electronic racks via one or more louvers of airflow windows disposed on a wall between the cold air room and the IT room, to exchange heat generated from IT components of the electronic racks. The hot air room is configured to receive hot or warmer air carrying the exchanged heat from the IT room and return the hot/warmer air back to the IDEC unit.
  • The data center system further includes a first set of one or more pressure sensors disposed near the cold air room or between the cold air room and the IT room (e.g., near the louvers) to sense and measure the air pressure of the internal airflow entering the IT room from the cold air room. The data center system further includes a control system coupled to the cold air room, the IT room, the hot air room, and the pressure sensors. In response to sensor data received from the pressure sensors, the control system is configured to analyze the sensor data based on a set of thermal management rules or algorithms and to adjust an opening ratio of at least one of the louvers interfacing the cold air room and the IT room based on the analysis to adjust a cold airflow volume entering the IT room through at least one of the louvers, which in turn adjusts the thermal conditions of the IT room.
  • According to one embodiment, a second set of one or more pressure sensors may be disposed near the hot air room or between the hot air room and the IT room (near the airflow opening on a wall between the IT and hot air rooms). The control system is to control the opening ratio of the louvers further based on the sensor data obtained from the second set of pressure sensors. The pressure sensor data of the second set may also be utilized to control the opening ratio of louvers disposed between the IT room and the hot air room. The opening ratios of the louvers may be adjusted based on the averaged air pressures measured by the pressure sensors or the pressure difference between the cold air room and the hot air room. The purpose of adjusting the louvers is to ensure uniform air flow rate delivery to the room from the walls.
  • According to a further aspect of the invention, an optimization process may be performed to determine an optimal setting of an IDEC unit for a data center system, such that the electronic racks can operate in an optimal thermal environment, and at the same time, using minimum cooling power. The optimization process is an iterative process using a set of thermal setting candidates of the IDEC. Initially, an optimal partial power usage effectiveness (PPUE) is configured as an initial PPUE value. An optimal set of parameters of an IDEC unit is set to an initial set of parameters. For each of the operating condition candidates of IDEC unit, the IDEC unit is configured based on a set of parameters associated with the current operating condition candidate. The pressure sensor data is collected from the pressure sensors disposed at various locations within a cold air room connected to an IT room having a number of electronic racks. Each electronic rack contains a number of IT components. The pressure sensors are configured to measure the air pressure of the cold air received from the IDEC unit (e.g., internal airflow). The cold air is to be distributed to the electronic racks to exchange heat generated from the IT components and transformed into hot/warmer air. The hot air is then received by the hot air room and returned back to the IDEC unit from the hot air room.
  • In addition, according to one embodiment, the temperature sensor data is collected from the temperature sensors disposed at various locations near the cold air room. A current thermal condition (e.g., temperature, air pressure) of the IT room is determined based on the pressure sensor data and temperature sensor data. It is then determined whether the current thermal condition satisfies a predetermined thermal condition associated with the IT room. A current PPUE of the data center system is calculated and compared with the optimal PPUE. If the current PPUE is lower than the optimal PPUE value, the optimal PPUE value is replaced by the current PPUE value. The set of parameters of the IDEC unit is designated as the optimal set of the parameters for the IDEC unit. After all of the operating condition candidates of the IDEC unit have been processed, the IDEC unit is then configured base on the optimal set of parameters, such that the IT room is to operate in an optimal thermal condition, for the current IT workload (heat load) condition.
  • FIG. 1 shows a perspective view of a data center system according to one embodiment. Referring to FIG. 1, data center system 100 includes an IT room 101, a cold air room 102, and a hot air room 103. IT room 101 includes a number of electronic racks such as electronic racks 111-112. Each electronic rack contains one or more IT components arranged in a stack. An IT component can be a computer server providing data services to clients. Alternatively an IT component can be a peripheral device or a network appliance device such as cloud storage systems. Each IT component may include one or more processors, memory, and/or a storage device that may generate heat during operations. The electronic racks are arranged in a number of rows of electronic racks, in this example, rows 104-105 of electronic racks. The rows of electronic racks are arranged spaced apart to form one or more cold aisles and one or more hot aisles. In this embodiment, although there are only two rows 104-105 of electronic racks shown, there can be more rows to be contained in IT room 101.
  • In one embodiment, each row of electronic racks is positioned or sandwiched between a cold aisle and a hot aisle. In this example, row 104 and row 105 are positioned apart from each other to form cold aisle 114A, hot aisle 115, and cold aisle 114B. Hot aisle 115 is formed between row 104 and row 105. Row 104 is positioned or sandwiched between cold aisle 114A and hot aisle 115, while row 105 is positioned or sandwiched between cold aisle 114B and hot aisle 115. In one embodiment, hot aisle 115 is contained or enclosed by hot aisle containment (or container or other enclosures). In another embodiment, the cold aisles are contained in a containment environment instead of the hot aisles. In a further embodiment, both hot aisles and cold aisles are contained in an enclosed environment. In one embodiment, the backend of the electronic racks of rows 104-105 are facing hot aisle 115, while the frontends of the electronic racks are facing cold aisle 114A or cold aisle 114B and away from hot aisle 115.
  • In one embodiment, cold air room 102 is located and adjacent to a first side of IT room 101, while hot air room 103 is located and adjacent to a second side of IT room 101. In this example, the first side and the second side are opposite sides of IT room 101. Cold air room 102 is configured to receive cold air or cool air via one or more inlet ports from a cold air source such as cold air source 180. The cold air is allowed to enter IT room 101 from cold air room 102 via one or more openings disposed on the wall between cold air room and IT room 101 (not shown). The cold air entering IT room 101 to form cold aisles 114A-114B.
  • Hot air room 103 is configured to exhaust the hot air from hot aisle 115 and return the hot air or warmer air back to the cold air source 180 for heat exchange. Note that cold air source 180 can include a heat exchanger or chiller. For example, cold air source 180 can be an IDEC system or device, which can operate in a number of different operating modes (e.g., air cooling mode, evaporative cooling mode, and DX cooling mode). Alternatively, cold air source 115 can simply be the natural ambient air outside of the data center system 100.
  • An evaporative cooler is a device that cools air through the evaporation of water. Evaporative cooling differs from typical air conditioning systems, which use vapor compression or absorption refrigeration cycles. Evaporative cooling works by exploiting water's large enthalpy of vaporization. The temperature of dry air can be dropped significantly through the phase transition of liquid water to water vapor (evaporation). Direct evaporative cooling is used to lower the temperature and increase the humidity of air by using latent heat of evaporation, changing liquid water to water vapor. In this process, the energy in the air does not change. Warm dry air is changed to cool moist air. The heat of the outside air is used to evaporate water. Indirect evaporative cooling is a cooling process that uses direct evaporative cooling in addition to some type of heat exchanger to transfer the cool energy to the supply air. The cooled moist air from the direct evaporative cooling process never comes in direct contact with the conditioned supply air.
  • Referring back to FIG. 1, in this example, the cold air is received from one or more inlets or inlet ports disposed on a wall of cold air room 102, where the wall is substantially parallel with a third side of IT room 101. The third side of IT room 101 is substantially perpendicular to the first side and the second side, while the first side and the second side are substantially parallel to each other. Similarly, the hot air is exhausted from hot air room 103 to the external environment or back to cold air source 180 via one or more outlets or outlet ports disposed on a wall of hot air room 102, where the wall is substantially parallel with the third side of IT room 101.
  • According to one embodiment, hot aisle 115 is enclosed or contained within hot aisle containment 120, such that the hot air cannot escape or spill from hot aisle 115 into other areas of IT room 101 such as cold aisles 114A-114B. Instead, the hot aisle enters hot air room 103 from hot aisle via one or more openings (e.g., windows, doors) disposed on a wall between hot aisle 115 and hot air room 103. In one embodiment, the openings allow an operator or a user to enter hot aisle 115 from hot air room 103 to access the backend of the electronic racks, for example for maintenance services. Doors are needed on the 102 and 103, for operators to be able to enter cold air room 102 and hot air room 103. And no door is needed on hot aisle 115, and doors are needed on the walls between cold air room 102 and IT room 101, according to some embodiments. Similarly, the openings disposed on the wall between cold air room 102 and IT room 101 may include one or more doors to allow an operator or user to enter cold aisles 114A-114B from cold air room 102. As a result, entering or leaving cold aisles or hot aisles would not have a significant impact on the cold air distribution and hot air exhaustion. That is, entering or leaving hot aisle 115 would not alter cold air distribution for cold aisles 114A-114B, because hot aisle 115 is separated from cold aisles 114A-114B and the rest of IT room 101 by hot aisle containment 120. Similarly, entering or leaving cold aisles 114A-114B would not affect hot air exhaustion of hot aisle 115, since opening a door for a user to enter or leave would not mix the cold air and the hot air.
  • FIG. 2A shows a top view of a data center system according to one embodiment. The data center system can represent a top view of data center 100 of FIG. 1. Referring to FIG. 2A, the electronic racks are arranged into a number of rows similar to rows 104-105 of FIG. 1. The rows of electronic racks are positioned and spaced apart from each other to form cold aisles 114A-114C (collectively referred to as cold aisles 114) and hot aisles 115A-115D (collectively referred to as hot aisles). Hot aisles 115A-115D are each enclosed or contained in a hot aisle containment structure. Cold air room 102 is positioned adjacent to a first side of IT room 101. Hot air room 103 is positioned adjacent to a second side of IT room 101.
  • In this example, the first side and the second side of the IT room 101 are opposite sides. The cold air is received from an external cold air source such as an IDEC system via one or more inlet or intake ports 201 into cold air room 102. The cold air then enters IT room 101 via one or more openings (e.g., windows, doors with louvers) 211-213 and enter cold aisles 114A-114C. The cold air then enters from the frontends of the electronic racks, travels through the airspace of the electronic racks, and enters hot aisles 115A-115D. As described above, hot aisles 115 are configured as an enclosed or contained environment that can receive the air flows from cold aisles through the airspace of the electronic racks. The hot air is prevented from spilling into other areas of IT room 101. The hot air can only exit IT room 101 and enter into hot air room 103 via openings 221-224.
  • In one embodiment, at least one of the openings 211-213 disposed on a wall between cold air room 102 and IT room 102 includes a door to allow an operator or user to enter IT room 101 and cold aisles to access the electronic racks such as frontends of the electronic racks for maintenance services. Similarly, each of openings 221-224 (no doors) allows an operator or user to enter the corresponding hot aisle to access the backend of the electronic racks adjacent to the hot aisle.
  • In this embodiment, the cold air enters into cold air room 102 via inlet 201 from the third side (e.g., the right hand side) of IT room 101. The hot air leaves hot air room via outlet 202 of IT room 101 from the third side. The third side is different from the first side adjacent to cold air room 102 and the second side adjacent to hot air room 103. In one embodiment, the first side and the second side are substantially parallel to each other. The third side is substantially perpendicular to the first side and/or the second side. Alternatively, according to another embodiment as shown in FIG. 2B, the cold air enters cold air room 102 from a side parallel to the first side. The hot air leaves hot air room 103 from a side parallel to the second side.
  • In the configurations as shown in FIGS. 2A-2B, the cold air is directly injected into cold air room 102 from external ambient environment with filtering. The hot air is exhausted from hot air room 103 back to the external environment. According to another embodiment, cold air room 102 and hot air room 103 are coupled to a cooling system such as an IDEC unit for heat exchange via respective airflow channels coupling the IDEC unit with the cold air room 102 and hot air room 103. The external cooling system may be configured as a modular system that can be coupled to cold air room 102 and hot air room 103, where the cooling system may be provided by a third party entity that is different than an entity providing or maintaining the data center system. Similarly, cold air room 102 and/or hot air room 103 may be configured as a modular module, which can be provided by a third party entity. Cold air room 102, hot air room 103, and/or cooling system 401 may be provided by the same or different vendors or organizations.
  • FIG. 3 is a block diagram illustrating a top view of a data center system according to one embodiment. Referring to FIG. 3, the configuration of IT room 101, cold air room 102, and hot air room 103 is similar to the one as shown in FIG. 2A. In addition, an IDEC unit 310 is coupled to cold air room 102 and hot air room 103, where IDEC unit 310 may represent the cooling system 180 of FIG. 1. In this embodiment, IDEC unit 310 provides cold air to cold air room 102 via a cold air channel and receives hot air from hot air room 103 via a hot air channel, forming an internal airflow that is circulated through cold air room 102, IT room 101, and hot air room 103.
  • In addition, according to one embodiment, a number of sensors such as sensors 301A-301D (collectively referred to as sensors 301) may be disposed at various locations. Sensors 301 may include temperature sensors and/or pressure sensors. The temperature sensors are configured to monitor and measure the temperatures of the airflow, while the pressure sensors are configured to monitor and measure the air pressure of the internal air flow. In this embodiment, a first set of sensors such as sensors 301A-301B are disposed on a wall between cold air room 102 and IT room 101. For example, the sensors may be disposed on the opening such as airflow windows or doors. In one embodiment, the sensors may be disposed on the louvers mounted on the wall between cold air room 102 and IT room 101, as shown in FIG. 4. Similarly a second set of sensors such as sensors 301C and 301D may be disposed on the wall or louvers between IT room 101 and hot air room 103.
  • Furthermore, a control system 300 is communicatively coupled to IT room 101, cold air room 102, hot air room 103, sensors 301, and IDEC unit 310. According to one embodiment, control system 300 receives sensor data or signals 305 from sensors 301 and performs an analysis on the sensor data to determine the current thermal environment or condition of the data center. Based on the analysis, control system 300 transmits one or more control commands or signals 306A-306B (collectively referred to as control signals or commands 306) to control or adjust certain operating parameters or settings of the data center unit (e.g., IT room 101, cold air room 102, and hot air room 103) and IDEC unit 310. The control system 300 is to maintain proper and stable thermal conditions in the cold air room 102 and hot air room 103. A stable thermal environment of cold air room 102 and hot air room 103 ensures a stable thermal environment in the IT room 101. In addition, another goal is to improve energy efficiency of the IDEC system 310 by optimizing the operating conditions of IDEC system 310.
  • FIG. 5 is a block diagram illustrating an example of an IDEC system according to one embodiment. Referring to FIG. 5, a typical IDEC unit can operate in a number of operating modes, including 1) an air cooling mode; 2) an evaporative cooling mode; and 3) a DX mode similar to air conditioning. Any one or more of these operating modes can be activated or deactivated individually and/or simultaneously. When IDEC 300 operates in an air cooling mode, one or more external fans 501 are utilized to circulate and exhaust external airflow 512 out, while one or more internal fans 504 circulates the internal air flow 511 across the chamber of IDEC 300 without directly contacting external airflow 512 for heat exchange. The fans speed of fans 501 and 504 can be controlled and adjusted by control system 300. When IDEC 310 operates in an evaporative cooling mode, one or more evaporative pumps 502 are utilized to pump and spray mist of liquid drops onto the external airflow 512 to reduce the temperature of the external airflow 512, which the heat carried by external airflow 512 may cause the mist of liquid drops to evaporate, which in turn lowers the temperature of the external airflow. When IDEC unit 310 operates in a DX mode, the DX system 503 is invoked to reduce the temperature of external airflow 512 and/or internal airflow 511. The control system 300 can turn on or turn off any one or more of the cooling modes based on the sensor data received from various temperature sensors and/or pressure sensors according to a set of thermal management rules or algorithms.
  • FIG. 6 is a block diagram illustrating an example of a control system according to one embodiment. Referring to FIG. 6, control system 300 includes, but is not limited to, analysis module 601, louver controller 602, internal fans controller 603, external fans controller 604, evaporative pump controller 605, and DX controller 606. Modules 601-606 may be implemented in software, hardware, or a combination thereof. For example, modules 601-606 may be loaded into a memory and executed by one or more processors to perform various operations. Note that some or all of modules 601-606 may be integrated into fewer modules or a single module.
  • Analysis module 601 is configured to monitor and receive sensor data from most or all of the sensors of the data center system, and to perform an analysis on the sensor data to determine the current thermal conditions or environment of the data center. Analysis module 601 may perform the analysis based on a set of one or more thermal management rules or algorithms 610 to determine a set of one or more actions to configure and mange IDEC unit 310, for example, by invoking specific modules 602-606.
  • Louver controller 602 is configured to control the louvers (e.g., intake louvers) between the cold air room 102 and IT room such as louvers 211-213, as well as the louvers (e.g., exhaust louvers) disposed between IT room 101 and hot air room 103 if there is any. A louver can be controlled by louver controller 602 to be more opened, closed, or different opening angles, etc. By adjusting the opening and/or angle of a louver, the volume of the airflow flowing through the louver can be controlled. In one embodiment, based on the analysis, analysis module 601 determines a set of one or more controlling parameters and invokes louver controller 602 to adjust an opening ratio of a particular louver.
  • Referring back to FIG. 4, there are various pressure sensors disposed on different locations of different louvers 211-213. Depend upon the direction of the internal airflow, the air pressures on different louvers may be different, which may represent different volumes of the airflow flowing through the corresponding louvers. For example, if the air pressure detected by pressure sensor 301A is higher than the air pressure detected by pressure sensor 301B, it may indicate that the airflow volume flowing through louver 211 is higher than the airflow volume flowing through louver 212. As a result, the opening ratio of louver 211 may need to be adjusted lower (e.g., to be closed) to allow less air flowing through louver 211, and more air flowing through louver 212. The goal of managing louvers 211-213 is to provide relatively even airflow volumes flowing through all louvers.
  • According to one embodiment, analysis module 601 receives the pressure sensor data from most or all pressure sensors disposed on louvers 211-213 and determines the air pressures measured by the pressure sensors. Analysis module 601 calculates an average air pressure (Pave) based on the measured air pressures as follows:
  • P ave = 1 n 1 n P n
  • where Pn represents an individual air pressure measured by a particular one of the pressure sensors. The opening ratio of the corresponding louver can be adjusted based on the difference between the individually measured air pressure and the average air pressure:

  • ΔP=P n −P ave
  • In the cases that the static air pressure within the cold air room is in difference, the corresponding louvers will be controlled to either increase the opening ratio (low pressure) or decrease the opening ratio (high pressure). Thus, if the pressure difference ΔP is positive, it means the local air pressure is relatively high compared to the average air pressure and the corresponding louver needs to be opened less to reduce the air pressure.
  • An opening ratio of a louver refers to the opening angle percentage of the louver. An opening ratio of 0 means the louver is fully closed, in which an airflow moving path is fully blocked. An opening ratio of 100% means the louver is fully open, in which the airflow can pass through the louver with the minimum flow resistance. A louver can be considered as an airflow valve, similar as liquid fluid valve opening ratio.
  • The ΔP is calculated to capture how much is the difference among each individual Pn, by comparing to the Pa. In addition, a predetermined tolerance range for difference (e.g., +/−0.01 pounds per square inch or PSI) is utilized. If the ΔP is within the acceptable range (e.g., +/−0.01 PSI), there is no need to take any action. If ΔP>+range (e.g., 0.01 PSI), this means the corresponding local location static pressure is high. This means the louver needs to introduce more resistance by reducing the opening ratio to make the value lower. This means less air flow flowing through. Similarly, if ΔP<−range (e.g., −0.01 PSI), the opening ratio needs to be increased.
  • For example, there a total of five sensors, data collected are 1.2, 1.3, 1.5, 1.2, and 1.3 PSI. Then the averaged value Pave is 1.3. If +/−0.1 is the acceptable range, then the value 1.5 is out of the acceptable range. The other four are within the range. Then ΔP=1.5−1.3>0.1 (acceptable range), the louver open ratio should be decreased. When louver is decreased, more resistance is introduced, the pressure drop becomes larger, then the static pressure reading value will be decreased as a result.
  • In one embodiment, if there are multiple pressure sensors disposed on a particular louver, the air pressure of that particular louver may be calculated based on the average of the pressure readings from the pressure sensors associated with the louvers.
  • In one embodiment, if there are multiple pressure sensors disposed on both the supply and return sides of each louver, the air pressure drop across each louver may be calculated and used for controlling the louver opening ratio, similar principle as using the static pressure.
  • FIG. 7 is a flow diagram illustrating a process of controlling louvers based on sensor data according to one embodiment. Process 700 may be performed by processing logic which may include software, hardware, or a combination thereof. For example, process 700 may be performed by control system 300. Referring to FIG. 7, in operation 701, one or more pressure sensors are utilized to monitor and measure air pressures of the louvers. In operation 702, an average air pressure Pa is calculated based on the pressure readings form the pressure sensors. For each of the louvers, in operation 703, a pressure difference ΔP between the air pressure of the louver Pn and the average pressure Pa, is calculated, i.e., ΔP=Pn−Pave.
  • In operation 704, it is determined whether the pressure difference ΔP is within a predetermined range (e.g., an acceptable range such as +/−0.01 PSI). If so, it means the air pressure of the louver is normal. Otherwise, if the pressure difference ΔP is outside of the predetermined range, in operation 705, it is determined whether the pressure difference ΔP is greater than either the upper limit of the range or less than the lower limit of the range (e.g., −0.01). If ΔP is greater than the upper limit of the range, in operation 706, the opening ratio of the louver is decreased. If ΔP is lower than the lower limit of the range (e.g., −0.01), the opening ratio of the louver is increased in operation 707. Note that process 700 may be performed further in view of temperature sensor data obtained from the temperature sensors disposed in the cold air room, the hot air room, and/or the IT room. That is, the louvers may be controlled and adjusted further based on the temperature sensor data representing the temperature of the cold air room and/or hot air room.
  • According to another aspect of the invention, the pressure sensor data can also be utilized to control the fans speed of the internal fans such as fans 504 of FIG. 5. For example, the air pressure of the internal airflow is proportionally related to the temperature in the IT room 101. By measuring the air pressure of the internal airflow, the temperature of the IT room can be derived. Thus, based on the air pressure of the internal airflow, the speed of the internal fans 504 can be adjust, which in turn adjust the thermal condition of the IT room 101.
  • FIG. 8 is a flow diagram illustrating a process of controlling an internal airflow according to one embodiment. Process 800 may be performed by processing logic which may include software, hardware, or a combination thereof. For example, process 800 may be performed by control system 300. Referring to FIG. 8, in operation 801, pressure sensor data is collected from the pressure sensors disposed at the cold air room 102 and hot air room 103. In operation 802, the air pressure of the cold air room and the air pressure of the hot air room are determined, and the difference between the cold air room air pressure and the hot air room air pressure is calculated. In operation 803, it is determined whether the pressure difference is within a predetermined range. If the pressure difference is not within the predetermined range, in operation 804, it is determined whether the air pressure of the cold air room is higher than a first predetermined set point. If the air pressure of the cold air room is below the first predetermined set point, in operation 805, it is determined whether the pressure difference between the cold air room and the hot air room is below a second predetermined set point (e.g., upper limit or lower limit of the range). If so (e.g., below a lower limit of the range), in operation 806, the internal fans speed is increased; otherwise (e.g., above an upper limit of the range), the internal fans speed is decreased in operation 807. The first and second predetermined set points may the same or different. Note that process 800 may be performed further in view of temperature sensor data obtained from the temperature sensors disposed in the cold air room, the hot air room, and/or the IT room. That is, the internal fans may be controlled and adjusted further based on the temperature of the cold air room and/or hot air room.
  • According to a further aspect, supply air temperature data at the cold air room 102 are recorded and used as a part of the control signals of IDEC operating conditions and modes. The cold air room temperatures can be considered as the cold aisle temperatures, as well as the supply air inlet temperatures of the servers. This control includes the IDEC external blower such as fans or blowers 501, different operating modes including dry-blub operating, wet-bulb operating and DX cooling mode. Normally, the data center supply air temperature is predefined. There are also industry guidelines for setting data center cold aisle air temperature, such as ASHRAE (American Society of Heating, Refrigerating, and Air-Conditioning Engineers) thermal guidelines for data centers. Tmax is the maximum temperature value collected. The required ranges are the acceptable temperature ranges for allowing the cold air room temperature to stay at. Since there are multiple operating modes can be adjusted on IDEC 300 to adjust cooling capacity, including changing IDEC external blower speed, evaporative pump speed, and DX operating mode. Such actions can be selectively performed or in parallel in response to the sensor data collected from the temperature sensors.
  • Referring back to FIG. 6, according to one embodiment, in response to temperature sensor data received from the temperature sensors, analysis module 601 is configured to analyze the temperature sensor data and to invoke external fans controller 604 to adjust the fans speed of fans or blowers 501 to control the volume or speed of external airflow 512.
  • FIG. 9 is a flow diagram illustrating a process of controlling fans for an external airflow based on temperature sensor data according to one embodiment. Process 900 may be performed by processing logic which may include software, hardware, or a combination thereof. For example, process 800 may be performed by control system 300. Referring to FIG. 9, in operation 901, the internal fans of an IDEC unit is set to an initial speed and the server blades of the IT rooms start to operate in operation 902. In operation 903, the temperature of the cold air room is determined based on temperature sensor data obtained from the temperature sensors disposed near or within the cold air room. In operation 904, the temperature sensor data is analyzed, including calculating the average temperature of the temperature sensors, etc. In operation 905, it is determined whether the temperature (e.g., the average temperature) of the cold air room is within a predetermined range. If the temperature is outside of the predetermined range, in operation 906, it is determined whether the temperature is higher than a predetermined set point (e.g., an upper limit of the range). If so, in operation 907, the external fans speed is increased. In addition, the evaporative pumps 502 and/or DX system 503 may be activated. Otherwise if the temperature is lower than a predetermined set point (e.g., a lower limit of the range), in operation 908, the external fans speed may be decreased, and the evaporative pumps 502 and/or DX system 503 may be deactivated.
  • As described above, an IDEC unit can operate in a number of operating modes, including an air cooling mode, an evaporative cooling mode, and a DX mode. Each of these operating modes can be individually activated or deactivated, in sequence or in parallel as shown in FIG. 10. In addition, the specific operating parameters such as fans speed, mist liquid drop volume, and the settings of the condenser and evaporator of the DX system may also be individually configured. According to another aspect, the operating modes and operating parameters of these subsystems of an IDEC unit can be configured to find an optimal thermal environment or condition specifically tailored to a particular data center system given the specific configuration of the data center system, such as workload and layout. Note that process 900 may be performed further in view of pressure sensor data obtained from the pressure sensors disposed in the cold air room, the hot air room, and/or the IT room.
  • Referring back to FIG. 6, analysis module 601 can perform an iterative process to find a set of operating parameters or operating modes for the IDEC unit 310 that provides an optimal thermal operating environment for the IT room 101. For example, during the iteratively process, in response sensor data received from the sensors, analysis module 601 performs an analysis on the sensor data to determine the current thermal condition of the IT room 101. Analysis module 601 then invoke internal fans controller 603, external fans controller 604, evaporative pump controller 605, and DX controller 606 to control and adjust the respective operating parameters of the air cooling subsystem, the evaporative cooling subsystem, and the DX subsystem of IDEC unit 310. Such an optimization process is iteratively performed until all of the combinations of the operating modes and parameters have been processed. One of the combination settings of the subsystems is then selected that can satisfy the required thermal condition (e.g., lowest temperature) to IT room, and at the same time, minimize the water and electrical consumption.
  • FIG. 11 is a flow diagram illustrating an optimization process for determining an optimal cooling unit operating conditions for a data center at certain IT workload condition according to one embodiment. Process 1100 may be performed by processing logic which may include software, hardware, or a combination thereof. For example, process 1100 may be performed by control system 300. Referring to FIG. 11, in operation 1101, an IDEC unit is configured according to the initial settings and the electronic racks are turned on in operation 1102. In operation 1103, the sensor data is collected from the sensors such as temperature sensors and pressure sensors. In operation 1104, the sensor data is analyzed to determine the operating environment of the data center such as temperature and power consumption, etc. A partial power usage effectiveness (PPUE) value is set to an initial optimal PPUE value. Operation 1105 is to designed for safety operating. Before the system optimization process, it needs to be ensured that the IT room thermal environment requirement is satisfied.
  • Power usage effectiveness (PUE) is a ratio that describes how efficiently a computer data center uses energy; specifically, how much energy is used by the computing equipment (in contrast to cooling and other overhead). An ideal PUE is 1.0. Anything that is not considered a computing device in a data center (i.e. lighting, cooling, etc.) falls into the category of facility energy consumption.
  • Referring back to FIG. 11, in operation 1105, it is determined whether the thermal conditions satisfy the IT room requirement, where the predetermined condition may be compatible with the industry standard for a particular type of data center or a particular IT workload condition. If the thermal condition does not satisfy the IT requirement, in operation 1106, the IDEC unit is configured to be set to the maximum cooling capacity condition (e.g., the thermal environment with the lowest possible temperature), and the above operations 1103-1105 are iteratively performed. The rationale behind is that we would ensure the data center is operating in an acceptable thermal environment before optimizing the operating parameters of the IDEC unit.
  • Once the IT thermal condition has been satisfied in operation 1105, the IDEC unit operating conditions are adjusted in operation 1107 for each of the operating condition candidates in operation 1108 (e.g., condition candidates as shown in FIG. 10). In operation 1109, it is determined whether the IT thermal condition is still satisfied. If not, a next operating condition or a next set of operating parameters of the IDEC unit is selected and the above operations 1107-1108 are iteratively performed. If the IT thermal condition has been satisfied in operation 1109, the new or current PPUE value is calculated based on the current settings of the IDEC unit in operation 1110. In operation 1111, it is determined whether the current PPUE value is lower than the optimal PPUE value. If so, in operation 1112, the optimal PPUE value is updated and set to the current PPUE value of the current iteration. In addition, the current set of operating modes or operating parameters of the IDEC unit are designated as an optimal set of operating modes or operating parameters for the IDEC unit, which may be stored in a persistent storage device such as a hard disk of control system 300. The above operations are iteratively performed until all of the operating mode/parameter candidates (e.g., candidates as shown in FIG. 10) have been processed in operation 1113.
  • Once the optimal set of operating parameters of the IDEC unit has been determined via the above iterative processes, the IDEC unit can then be configured according to the optimal set of operating parameters. In one embodiment, process 1100 may be performed periodically (e.g., during initial start or reboot of the data center) to find the optimal set of operating parameters at the point in time, as the operating environment of the data center, such as the workload, may change from time to time.
  • In this design, PPUE which is a metrics for cooling energy consumption are considered as the criteria for the optimal process, in another embodiment, water usage effectiveness, or combined water usage effectiveness and PPUE can be used as alternative criterias.
  • Some portions of the preceding detailed descriptions have been presented in terms of algorithms and symbolic representations of operations on data bits within a computer memory. These algorithmic descriptions and representations are the ways used by those skilled in the data processing arts to most effectively convey the substance of their work to others skilled in the art. An algorithm is here, and generally, conceived to be a self-consistent sequence of operations leading to a desired result. The operations are those requiring physical manipulations of physical quantities.
  • It should be borne in mind, however, that all of these and similar terms are to be associated with the appropriate physical quantities and are merely convenient labels applied to these quantities. Unless specifically stated otherwise as apparent from the above discussion, it is appreciated that throughout the description, discussions utilizing terms such as those set forth in the claims below, refer to the action and processes of a computer system, or similar electronic computing device, that manipulates and transforms data represented as physical (electronic) quantities within the computer system's registers and memories into other data similarly represented as physical quantities within the computer system memories or registers or other such information storage, transmission or display devices.
  • Embodiments of the disclosure also relate to an apparatus for performing the operations herein. Such a computer program is stored in a non-transitory computer readable medium. A machine-readable medium includes any mechanism for storing information in a form readable by a machine (e.g., a computer). For example, a machine-readable (e.g., computer-readable) medium includes a machine (e.g., a computer) readable storage medium (e.g., read only memory (“ROM”), random access memory (“RAM”), magnetic disk storage media, optical storage media, flash memory devices).
  • The processes or methods depicted in the preceding figures may be performed by processing logic that comprises hardware (e.g. circuitry, dedicated logic, etc.), software (e.g., embodied on a non-transitory computer readable medium), or a combination of both. Although the processes or methods are described above in terms of some sequential operations, it should be appreciated that some of the operations described may be performed in a different order. Moreover, some operations may be performed in parallel rather than sequentially.
  • Embodiments of the present disclosure are not described with reference to any particular programming language. It will be appreciated that a variety of programming languages may be used to implement the teachings of embodiments of the disclosure as described herein.
  • In the foregoing specification, embodiments of the invention have been described with reference to specific exemplary embodiments thereof. It will be evident that various modifications may be made thereto without departing from the broader spirit and scope of the invention as set forth in the following claims. The specification and drawings are, accordingly, to be regarded in an illustrative sense rather than a restrictive sense.

Claims (22)

What is claimed is:
1. A data center system, comprising:
an information technology (IT) room to contain a plurality of electronic racks, each electronic rack having a plurality of IT components therein;
a cold air room adjacent to a first side of the IT room to receive cold air of an internal airflow from an indirect evaporative cooling (IDEC) unit and to distribute the cold air to the electronic racks to exchange heat generated from the IT components, wherein the cold air room includes a first set of one or more temperature sensors to sense a temperature of the cold air room;
a hot air room disposed adjacent to a second side of the IT room to receive hot air carrying the heat exchanged from the electronic racks and to return the hot air to the IDEC unit; and
a control system coupled to at least a portion of the temperature sensors of the first set, wherein the control system is configured to
in response to sensor data from the temperature sensors of the first set, analyze the sensor data based on a first set of thermal management rules, and
transmit one or more control signals to the IDEC unit to modify one or more operating parameters of the IDEC unit based on the analysis to provide an optimal thermal environment for operating the IT components of the electronic racks.
2. The data center system of claim 1, wherein the hot air room comprises a second set of temperature sensors to sense a temperature of the hot air room, wherein the control system is configured to analyze sensor data received from the temperature sensors of the second set, and wherein the one or more control signals are generated further base on the analysis on the second set of temperature sensors.
3. The data center system of claim 1, wherein in analyzing the sensor data, the control system is configured to
calculate an average temperature of the cold air room based on temperature data obtained from the temperature sensors of the first set,
compare the average temperature with a first predetermine temperature threshold, and
in response to determining that the average temperature is greater than the first predetermined temperature threshold, the control system is configured to increase a fans speed of a first set of one or more fans of the IDEC unit responsible for circulating an external airflow to exchange heat with the internal airflow received from the hot air room.
4. The data center system of claim 3, wherein the control system is further configured to activate an evaporative pump of the IDEC unit to spray liquid onto the external air to lower a temperature of the external airflow.
5. The data center system of claim 3, wherein the control system is further configured to activate a direct expansion (DX) system of the IDEC unit to lower a temperature of the external air flow.
6. The data center system of claim 3, wherein the control system is further configured to
compare the average temperature with a second predetermined temperature threshold, and
decrease the fans speed of the one or more fans of the first set, in response to determining that the average temperature is below the second predetermined temperature threshold.
7. The data center system of claim 6, wherein the control system is further configured to deactivate an evaporative pump of the IDEC unit to stop spraying liquid onto the external air.
8. The data center system of claim 6, wherein the control system is further configured to deactivate a direct expansion (DX) system of the IDEC unit.
9. The data center system of claim 1, wherein the cold air room further comprises a first set of one or more pressure sensors to sense an air pressure of the internal airflow near the cold air room, and wherein the control system is configured to adjust a distribution of the internal airflow entering the IT room from the cold air room based on air pressure data obtained from the pressure sensors of the first set.
10. The data center system of claim 9, wherein the hot air room further comprises a second set of pressure sensors to sense an air pressure of the internal airflow near the hot air room, and wherein the distribution of the internal airflow is adjusted further based on air pressure data obtained from the pressure sensors of the second set.
11. The data center system of claim 10, wherein the control system is configured to modify a fans speed of a second set of one or more fans of the IDEC unit to adjust a flow volume of the internal airflow based on the air pressure data obtained from the first set and second set of pressure sensors.
12. The data center system of claim 9, wherein the control system is configured to
calculate an average pressure of the internal airflow based on pressure data obtained from the pressure sensors,
compare the average pressure against a predetermined pressure threshold, and
adjust an opening ratio of a louver interfacing the cold air room and the IT room to adjust a flow volume of the internal airflow entering the IT room based on the comparison.
13. The data center system of claim 12, wherein the louver comprises a plurality of louvers and the first set of pressure sensors comprises a plurality of subsets of pressure sensors, each of the subsets of pressure sensors being associated with one of the louvers, wherein each subset of pressure sensors is utilized to measure a flow volume of the internal airflow flowing through a corresponding louver.
14. A method of thermal management of a data center system, the method comprising:
receiving, by a control system, sensor data from a plurality of temperature sensors disposed within a cold air room adjacent to an information technology (IT) room of a data center system, the IT room including a plurality of electronic racks, wherein the cold air room is configured to receive cold air from an indirect evaporative cooling (IDEC) unit and to distribute the cold air to travel through an airspace of the electronic racks to exchange heat generated from the electronic racks to reach an hot air room adjacent to the IT room, wherein the hot air room is configured to return hot air carrying the exchanged heat back to the IDEC unit;
performing an analysis on the sensor data based on a first set of thermal management rules, and
transmitting one or more control signals to the IDEC unit to modify one or more operating parameters of the IDEC unit based on the analysis to provide an optimal thermal environment for operating IT components of the electronic racks.
15. The method of claim 14, wherein the hot air room comprises a second set of temperature sensors to sense a temperature of the hot air room, wherein the control system is configured to analyze sensor data received from the temperature sensors of the second set, and wherein the one or more control signals are generated further base on the analysis on the second set of temperature sensors.
16. The method of claim 14, wherein performing an analysis on the sensor data comprises:
calculating an average temperature of the cold air room based on temperature data obtained from the temperature sensors of the first set;
comparing the average temperature with a first predetermine temperature threshold; and
increasing a fans speed of a first set of one or more fans of the IDEC unit responsible for circulating an external airflow to exchange heat with the internal airflow received from the hot air room, in response to determining that the average temperature is greater than the first predetermined temperature threshold.
17. A method for optimizing thermal conditions of a data center system, the method comprising:
setting an optimal partial power usage effectiveness (PPUE) to an initial PPUE value;
setting an optimal set of parameters of an indirect evaporative cooling (IDEC) unit to an initial set of parameters;
for each of a plurality of operating condition candidates of IDEC unit, iteratively performing following operations:
configuring the IDEC unit based on a set of parameters associated with the operating condition candidate,
collecting pressure sensor data from a plurality of pressure sensors disposed at various locations within a cold air room adjacent to an information technology (IT) room having a plurality of electronic racks, each of the electronic racks containing a plurality of IT components, wherein the pressure sensors are configured to measure air pressure of cold air received from the IDEC unit, wherein the cold air is to be distributed to the electronic racks to exchange heat generated from the IT components and transformed into hot air, and wherein the hot air is received by a hot air room and returned back to the IDEC unit from the hot air room,
collecting temperature sensor data from a plurality of temperature sensors disposed at various locations within the cold air room,
determining a current thermal condition of the IT room based on the pressure sensor data and the temperature sensor data,
determining whether the current thermal condition satisfies a predetermined thermal condition associated with the IT room,
calculating a current PPUE of the data center system and comparing the current PPUE with the optimal PPUE,
assigning the current PPUE to the optimal PPUE, in response to determining that the current PPUE is lower than the optimal PPUE, and
designating the set of parameters of the IDEC unit as the optimal set of parameters for the IDEC unit; and
after the iterative operations, configuring the IDEC unit based on the optimal set of parameters, such that the IT room is to operate in an optimal thermal condition.
18. The method of claim 17, wherein the set of parameters includes a combination of activating an air cooling system, an evaporative pump, or a direct expansion (DX) system of the IDEC unit.
19. The method of claim 17, wherein determining a current thermal condition of the IT room comprises:
determining whether an operating temperature of the IT room based on the temperature sensor data falls within a predetermined temperature range; and
determining whether a pressure difference between the cold air room and the hot air room is below a predetermined pressure threshold.
20. A data center system, comprising:
an information technology (IT) room to contain a plurality of electronic racks, each electronic rack having a plurality of IT components therein;
a cold air room adjacent to a first side of the IT room to receive cold air of an internal airflow from an indirect evaporative cooling (IDEC) unit and to distribute the cold air, via one or more louvers of airflow windows disposed on a wall between the cold air room and the IT room, to the electronic racks to exchange heat generated from the IT components;
a hot air room disposed adjacent to a second side of the IT room to receive hot air carrying the heat exchanged from the electronic racks and to return the hot air to the IDEC unit;
a first set of one or more pressure sensors disposed near the one or more louvers to sense and measure an air pressure of the cold air room; and
a control system coupled to at least a portion of the pressure sensors of the first set, wherein the control system is configured to
in response to sensor data from the pressure sensors of the first set, analyze the sensor data based on a first set of thermal management rules, and
adjust an opening ratio of at least one of the louvers based on the analysis to adjust an airflow volume of the cold air entering the IT room through the at least one of the louvers, which in turn adjusts a temperature of the IT room.
21. The data center system of claim 20, wherein the hot air room comprises a second set of pressure sensors to sense a pressure of the hot air room, wherein the control system is configured to analyze sensor data received from the pressure sensors of the second set, and wherein the opening ratio of at least one louver is adjusted further based on the analysis of the sensor data of the pressure sensors of the second set.
22. The data center system of claim 21, wherein the control system is configured to
calculating a first averaged air pressure based on the pressure data obtained from the first set of pressure sensors;
calculating a second averaged air pressure based on the pressure data obtained from the second set of pressure sensors; and
adjusting a fans speed of one or more fans taking in and exhausting out the internal airflow flowing into the IT room.
US16/028,341 2018-07-05 2018-07-05 Control and optimization of indirect evaporative cooling units for data center cooling Active 2038-08-21 US10820452B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US16/028,341 US10820452B2 (en) 2018-07-05 2018-07-05 Control and optimization of indirect evaporative cooling units for data center cooling
CN201910523605.1A CN110691491B (en) 2018-07-05 2019-06-17 Controlling and optimizing indirect evaporative cooling units for data center cooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US16/028,341 US10820452B2 (en) 2018-07-05 2018-07-05 Control and optimization of indirect evaporative cooling units for data center cooling

Publications (2)

Publication Number Publication Date
US20200015389A1 true US20200015389A1 (en) 2020-01-09
US10820452B2 US10820452B2 (en) 2020-10-27

Family

ID=69102703

Family Applications (1)

Application Number Title Priority Date Filing Date
US16/028,341 Active 2038-08-21 US10820452B2 (en) 2018-07-05 2018-07-05 Control and optimization of indirect evaporative cooling units for data center cooling

Country Status (2)

Country Link
US (1) US10820452B2 (en)
CN (1) CN110691491B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190150327A1 (en) * 2015-11-05 2019-05-16 Fujitsu Limited Data center system, control method of data center system, and recording medium recording control program of data center system
CN111442478A (en) * 2020-03-10 2020-07-24 珠海派诺科技股份有限公司 Air conditioning system optimization control method, intelligent terminal and storage device
US20210092874A1 (en) * 2019-09-24 2021-03-25 Baidu Usa Llc Design for data center cooling capacity dispatching and management
US11039551B1 (en) * 2020-01-15 2021-06-15 Dell Products, L.P. Data center that regulates supply air to multiple compartments
CN113175715A (en) * 2021-04-30 2021-07-27 西藏宁算科技集团有限公司 Control method and related device for evaporative cooling and waste heat recovery unit of data center
CN113757835A (en) * 2020-05-29 2021-12-07 河北秦淮数据有限公司 Intelligent refrigeration control system and data center machine room
US20220004475A1 (en) * 2018-11-28 2022-01-06 3M Innovative Properties Company Data center infrastructure optimization method based on causal learning
CN114126350A (en) * 2021-10-28 2022-03-01 北京世纪互联宽带数据中心有限公司 Control method and device of indirect evaporative cooling system and electronic equipment
WO2022206180A1 (en) * 2021-04-02 2022-10-06 广东美的制冷设备有限公司 Electric control cooling method for air conditioner, apparatus, air conditioner, and computer-readable storage medium
US20230205662A1 (en) * 2020-02-26 2023-06-29 Oracle International Corporation Pattern-recognition enabled autonomous configuration optimization for data centers

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111795488B (en) * 2020-07-10 2021-11-02 哈尔滨工程大学 Intelligent temperature regulation and control system and method for distributed machine room
CN113220099B (en) * 2021-04-25 2023-01-10 山东英信计算机技术有限公司 Intelligent heat dissipation method, system and medium

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090088873A1 (en) * 2007-09-27 2009-04-02 At&T Knowledge Ventures, L.P. Apparatus and method for thermal management of electronic devices
US20110189936A1 (en) * 2010-02-01 2011-08-04 Dataxenter Ip B.V Modular datacenter element and modular datacenter cooling element
EP2354378A1 (en) * 2010-02-01 2011-08-10 Dataxenter IP B.V. Modular datacenter element and modular datacenter cooling element
US9237681B2 (en) * 2013-01-09 2016-01-12 Io Data Centers, Llc Modular data center
GB2513147A (en) * 2013-04-17 2014-10-22 Ibm Energy efficient data center
EP3751974A1 (en) * 2014-12-30 2020-12-16 Kenneth Choi Data center heat removal systems and methods
NL2016901B1 (en) * 2016-06-06 2017-12-13 Switch Datacenter Group B V Data center and method for cooling such a data center
CN106793681A (en) * 2016-12-05 2017-05-31 郑州云海信息技术有限公司 The container data center of cooling overhead heat exchange and its method for heat exchange

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190150327A1 (en) * 2015-11-05 2019-05-16 Fujitsu Limited Data center system, control method of data center system, and recording medium recording control program of data center system
US10993354B2 (en) * 2015-11-05 2021-04-27 Fujitsu Limited Data center system, control method of data center system, and recording medium recording control program of data center system
US20220004475A1 (en) * 2018-11-28 2022-01-06 3M Innovative Properties Company Data center infrastructure optimization method based on causal learning
US20210092874A1 (en) * 2019-09-24 2021-03-25 Baidu Usa Llc Design for data center cooling capacity dispatching and management
US11039551B1 (en) * 2020-01-15 2021-06-15 Dell Products, L.P. Data center that regulates supply air to multiple compartments
US20230205662A1 (en) * 2020-02-26 2023-06-29 Oracle International Corporation Pattern-recognition enabled autonomous configuration optimization for data centers
CN111442478A (en) * 2020-03-10 2020-07-24 珠海派诺科技股份有限公司 Air conditioning system optimization control method, intelligent terminal and storage device
CN113757835A (en) * 2020-05-29 2021-12-07 河北秦淮数据有限公司 Intelligent refrigeration control system and data center machine room
WO2022206180A1 (en) * 2021-04-02 2022-10-06 广东美的制冷设备有限公司 Electric control cooling method for air conditioner, apparatus, air conditioner, and computer-readable storage medium
CN113175715A (en) * 2021-04-30 2021-07-27 西藏宁算科技集团有限公司 Control method and related device for evaporative cooling and waste heat recovery unit of data center
CN114126350A (en) * 2021-10-28 2022-03-01 北京世纪互联宽带数据中心有限公司 Control method and device of indirect evaporative cooling system and electronic equipment

Also Published As

Publication number Publication date
CN110691491A (en) 2020-01-14
CN110691491B (en) 2021-10-08
US10820452B2 (en) 2020-10-27

Similar Documents

Publication Publication Date Title
US10820452B2 (en) Control and optimization of indirect evaporative cooling units for data center cooling
US9894808B2 (en) Compressed air cooling system for data center
EP1627559B1 (en) Air re-circulation index
US9943011B2 (en) Cooling control for data centers with cold aisle containment systems
US7315448B1 (en) Air-cooled heat generating device airflow control system
US7031154B2 (en) Louvered rack
US9420725B2 (en) Air conditioning apparatus and air conditioning control method
EP2916083B1 (en) Modular data center and control method therefor
US8427830B2 (en) Cooling system
EP1792530B1 (en) Crac unit control based on re-circulation index
US9243809B2 (en) Cooling system and method of cooling an interior space
US7730731B1 (en) Refrigeration system with serial evaporators
US9326431B2 (en) Server cooling system
US8462496B2 (en) System and method for a modular fluid handling system with modes in a modular data center
WO2013145219A1 (en) Modular datacenter and method for controlling same
EP2604941A1 (en) Apparatus for operation of cooling system in abnormal state
CN110418546B (en) Airflow management system for thermal control of a data center
JP5492716B2 (en) Air conditioning system for data center
Kumar et al. Data center air handling unit fan speed optimization using machine learning techniques
CN114413358B (en) Indirect evaporative cooling air conditioner, control method thereof, storage medium and control equipment

Legal Events

Date Code Title Description
AS Assignment

Owner name: BAIDU USA LLC, CALIFORNIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:GAO, TIANYI;REEL/FRAME:046274/0728

Effective date: 20180703

FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: AWAITING TC RESP., ISSUE FEE NOT PAID

STCF Information on status: patent grant

Free format text: PATENTED CASE

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4