US20200011752A1 - Method for testing switch in advance pneumatic detector - Google Patents
Method for testing switch in advance pneumatic detector Download PDFInfo
- Publication number
- US20200011752A1 US20200011752A1 US16/575,851 US201916575851A US2020011752A1 US 20200011752 A1 US20200011752 A1 US 20200011752A1 US 201916575851 A US201916575851 A US 201916575851A US 2020011752 A1 US2020011752 A1 US 2020011752A1
- Authority
- US
- United States
- Prior art keywords
- switch
- pressure tube
- pressure
- piston
- diaphragm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L9/00—Measuring steady of quasi-steady pressure of fluid or fluent solid material by electric or magnetic pressure-sensitive elements; Transmitting or indicating the displacement of mechanical pressure-sensitive elements, used to measure the steady or quasi-steady pressure of a fluid or fluent solid material, by electric or magnetic means
- G01L9/0041—Transmitting or indicating the displacement of flexible diaphragms
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L19/00—Details of, or accessories for, apparatus for measuring steady or quasi-steady pressure of a fluent medium insofar as such details or accessories are not special to particular types of pressure gauges
- G01L19/0007—Fluidic connecting means
- G01L19/0015—Fluidic connecting means using switching means
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L19/00—Details of, or accessories for, apparatus for measuring steady or quasi-steady pressure of a fluent medium insofar as such details or accessories are not special to particular types of pressure gauges
- G01L19/14—Housings
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B13/00—Burglar, theft or intruder alarms
- G08B13/20—Actuation by change of fluid pressure
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B17/00—Fire alarms; Alarms responsive to explosion
- G08B17/04—Hydraulic or pneumatic actuation of the alarm, e.g. by change of fluid pressure
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H37/00—Thermally-actuated switches
- H01H37/02—Details
- H01H37/32—Thermally-sensitive members
- H01H37/36—Thermally-sensitive members actuated due to expansion or contraction of a fluid with or without vaporisation
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H37/00—Thermally-actuated switches
- H01H37/02—Details
- H01H37/32—Thermally-sensitive members
- H01H37/36—Thermally-sensitive members actuated due to expansion or contraction of a fluid with or without vaporisation
- H01H37/40—Thermally-sensitive members actuated due to expansion or contraction of a fluid with or without vaporisation with diaphragm
Definitions
- the present disclosure relates to an advance pneumatic detector (“APD”).
- APD advance pneumatic detector
- the disclosure relates to an APD with a test feature for detecting the state of the APD.
- An APD is typically comprised of both an alarm switch and a fault switch.
- APDs can utilize a pressure tube that contains a gas that will expand as it is heated, thus increasing the pressure in the pressure tube.
- An alarm switch is used to indicate overheat or fire situations.
- An alarm switch includes a deformable diaphragm that is at a normal state when the system is at a normal pressure. As the pressure increases in the pressure tube, the diaphragm deforms and closes an electrical circuit, indicating that there is an alarm condition in the system.
- a fault switch is used to indicate whether there are leaks, disconnects, or other problems in the APD.
- a fault switch includes a deformable diaphragm that is deformed when the system is at a normal pressure. If the pressure drops below normal, the diaphragm of the fault switch resumes its normal state and opens an electrical circuit, indicating that there is a fault condition in the system.
- APDs utilizing both an alarm switch and a fault switch are used on aircraft to detect alarm and fault conditions.
- the pressure tubes for the alarm and fault switches can typically run anywhere from one foot long to fifty feet long, and can be placed in systems that are prone to overheating or fires.
- existing APDs used in aircraft applications such as in the engine or wing, there are no current designs that allow for in-situ testing to verify and confirm whether a switch of the APD is still functioning.
- the APD must be removed from the aircraft and subjected to high heat or extreme cold (e.g., liquid nitrogen bath) in order to reset the switch and/or provide indication for a low-pressure state or latent failure mode.
- An advance pneumatic detector to indicate pressure changes in an environment includes a switch, a pressure tube, an endcap, a piston, and a magnet.
- the pressure tube is connected to the switch.
- the endcap is disposed on an end of the pressure tube opposite from the switch.
- the piston is disposed within and forms a seal against the pressure tube.
- the piston is slidably engaged with the pressure tube.
- the magnet is slidably attached to and surrounds a portion of the pressure tube. The magnet is configured to control the positioning of the piston within the pressure tube.
- a method for testing a switch in an advance pneumatic detector with a pressure tube includes moving a piston within the pressure tube with a magnet. A pressure of a gas in a portion of the pressure tube is adjusted in response to moving the piston. A state of the switch is monitored.
- a method of assembling an advance pneumatic detector includes placing a piston within a pressure tube of a switch of the advance pneumatic detector.
- the switch is charged with gas.
- the switch is hermetically sealed.
- the advance pneumatic detector is calibrated.
- a magnet is positioned to surround a portion of the pressure tube such that the magnet is slidably engaged with the pressure tube.
- FIG. 1 is a side cross-sectional view of an APD with a switch, a pressure tube, and a piston.
- FIG. 1A is a side cross-sectional view of the APD of FIG. 1 with the switch in a first position.
- FIG. 1B is a side cross-sectional view of the APD of FIG. 1 with the switch in a second position.
- FIG. 1C is a side cross-sectional view of the APD of FIG. 1 with the switch in a third position.
- FIG. 2A is a side cross-sectional view of the APD of FIG. 1 with the piston in a first position.
- FIG. 2B is a side cross-sectional view of the APD of FIG. 1 with the piston in a second position.
- FIG. 2C is a side cross-sectional view of the APD of FIG. 1 with the piston in a third position.
- FIG. 3 is a flowchart illustrating a method of assembling the APD of FIG. 1 .
- the proposed APD incorporates a pressure tube with a magnetic piston element, the position of which is controlled by a magnet external to the pressure tube. Without needing to remove the APD from the aircraft, the magnet can be moved longitudinally along to the pressure tube in order to move the piston and change the pressure in the pressure tube thereby tripping the switch.
- the benefit of the proposed APD is the elimination of the requirement of removing the APD from the aircraft thereby saving large amounts of time during routine inspections of the aircraft.
- FIG. 1 shows a side cross-sectional view of APD 10 .
- APD 10 includes switch 12 , housing 14 (including first retainer portion 16 and second retainer portion 18 ), contact pin 20 , fault diaphragm 22 , alarm diaphragm 24 , insulator 26 , insulator 28 , cavity 30 , pressure tube 32 (including first chamber 34 , second chamber 36 , internal stops 38 , and external stops 40 ), endcap 42 , piston 44 (including passage 46 ), magnet 48 , power source 50 , and electronic controller 52 .
- APD 10 also includes path A, path B, path C, and path D. Similar configurations are disclosed in U.S. patent application Ser. Nos. 13/836,675, 14/287,969, and 14/515,886 by Applicant Kidde Technologies, Inc., which are incorporated herein by reference in their entirety.
- APD 10 is a linear thermal sensor with integrated alarm and fault switches.
- Switch 12 is a discrete pressure switch configured to detect changes in pressure within switch 12 due to temperature changes external to switch 12 .
- Housing 14 is a rigid casing that encloses switch 12 .
- First retainer portion 16 and second retainer portion 18 are portions of housing 14 .
- First retainer portion 16 and second retainer portion 18 are constructed out of a refractory metallic material that is capable of conducting an electrical signal. Refractory materials are used so that first retainer portion 16 and second retainer portion 18 can maintain their strength when first retainer portion 16 and second retainer portion 18 are subject to high temperatures.
- Contact pin 20 is a rod of solid, electrically conductive material. In one non-limiting embodiment, contact pin 20 is formed of metallic material.
- Fault diaphragm 22 and alarm diaphragm 24 are semi-rigid deformable sheets of solid electrically conductive material.
- Fault diaphragm 22 and alarm diaphragm 24 can be constructed out of refractory metallic materials.
- Fault diaphragm 22 and alarm diaphragm 24 can have any thickness that allows fault diaphragm 22 and alarm diaphragm 24 to deform.
- Fault diaphragm 22 has a smaller thickness in the embodiment shown so that it deforms at lower pressures than alarm diaphragm 24 . This allows switch 12 to be used to indicate different pressure levels corresponding to alarm and fault conditions.
- Insulator 26 and insulator 28 are pieces of solid material. Insulator 26 and insulator 28 can be made of any material that is capable of acting as an electrical insulator.
- Cavity 30 is a space within housing 14 that is in communication with pressure tube 32 .
- Pressure tube 32 is a tube of solid material containing an inert gas such as helium or hydrogen.
- pressure tube 32 includes a metallic material such as stainless steel 321.
- Pressure tube 32 can have a typical length between 0.305 meters (1 foot) and 15.24 meters (50 feet) depending on where APD 10 will be used.
- a diameter of pressure tube 32 can include approximately 0.063 inches (1.600 millimeters).
- First chamber 34 and second chamber 36 are hollow portions of pressure tube 32 on opposite sides of piston 44 .
- Internal stops 38 are pieces of solid material extending radially inward form pressure tube 32 .
- External stops 40 are pieces of solid material extending radially outward from pressure tube 32 .
- Endcap 42 is a cover including a solid material that seals the outer end of pressure tube 32 .
- Piston 44 is a disk or cylinder of solid material.
- piston 44 includes a material that is metallic and/or magnetized such as a permanent magnet or an electromagnet.
- Passage 46 is channel configured to communicate a fluid (the gas within pressure tube 32 ) between first chamber 34 and second chamber 36 .
- Magnet 48 is a piece of solid material that is magnetized and is longitudinally movable along the exterior of pressure tube 32 .
- Magnet 48 can include a permanent magnet or an electromagnet.
- magnet 48 includes a series or combination of permanent magnets and/or electromagnets disposed along pressure tube 32 .
- Magnet 48 can include a cuff or cylindrical shape.
- Power source 50 is any power source capable of supplying electric power to switch 12 .
- Electronic controller 52 is a controller for sending and receiving electrical signals. Electronic controller 52 is configured to alert the pilot of a thermal or fire condition.
- APD 10 is installed on an aircraft in one of the main landing gear wheel wells, the main engine, or the auxiliary power unit.
- Switch 12 includes housing 14 that is constructed of first retainer portion 16 and second retainer portion 18 .
- First retainer portion 16 and second retainer portion 18 are connected to one another with insulator 26 positioned between them so that retainer portions 16 and 18 are electrically isolated from one another.
- Housing 14 includes cavity 30 that is bound by first retainer portion 16 , second retainer portion 18 , and insulator 26 .
- First retainer portion 16 contains contact pin 20 with insulator 28 running between first retainer portion 16 and contact pin 20 .
- Second retainer portion 18 contains pressure tube 32 .
- Contact pin 20 is held in first retainer portion 16 with insulator 28 running between contact pin 20 and first retainer portion 16 .
- Fault diaphragm 22 and alarm diaphragm 24 are held between first retainer portion 16 and second retainer portion 18 in cavity 30 .
- Fault diaphragm 22 is held in switch 12 between insulator 26 and second retainer portion 18 .
- Alarm diaphragm 24 is held in switch 12 between first retainer portion 16 and insulator 26 .
- Insulator 26 is located between first retainer portion 16 and second retainer portion 18 to insulate the two portions and to prevent electrical signals from being passed between them.
- Insulator 28 is located between first retainer portion 16 and contact pin 20 to insulate them and to prevent electrical signals from being passed between them.
- Cavity 30 is positioned between first retainer portion 16 and second retainer portion 18 .
- Pressure tube 32 runs through second retainer portion 18 and fluidly connects to cavity 30 . Pressure tube 32 also extends into cavity 30 . Pressure tube 32 is capped on an end opposite from switch 12 by endcap 42 . First chamber 34 and second chamber 36 are located within pressure tube 32 and are separated by piston 44 . First chamber 34 and second chamber 36 are fluidly connected via passage 46 . First chamber 34 is fluidly connected to cavity 30 of switch 12 . First chamber 34 is disposed between housing 14 and piston 44 . Second chamber 36 is disposed between piston 44 and endcap 42 . Internal stops 38 are connected to an inner surface of pressure tube 32 and extend into a pathway of piston 44 . External stops 40 are connected to an external surface of pressure tube 32 and extend into a pathway of magnet 48 .
- external stops 40 can be integrally formed with pressure tube 32 . In another non-limiting embodiment, external stops 40 can be removably attached onto pressure tube 32 . Endcap 42 forms a mechanical and hermetic seal with an end of pressure tube 32 opposite from switch 12 .
- Piston 44 is disposed within and forms a seal against pressure tube 32 .
- Piston 44 is slidably engaged with pressure tube 32 .
- Piston 44 divides pressure tube 32 into first chamber 34 and second chamber 36 .
- Passage 46 extends through piston 44 and fluidly connects first chamber 34 and second chamber 36 of pressure tube 32 .
- Magnet 48 extends around at least a portion of pressure tube 32 .
- Magnet 48 is slidably attached to and surrounds a portion of pressure tube 32 .
- Magnet 48 is configured to control the positioning of piston 44 due to a magnetic field of magnet 48 interacting with piston 44 and applying a magnetic force, which causes piston 44 to move within pressure tube 32 .
- magnet 48 is attached to pressure tube 32 after APD 10 is installed onto the aircraft.
- magnet 48 is attached to pressure tube 32 before APD 10 is installed onto the aircraft.
- Power source 50 is connected to fault diaphragm 22 along path A.
- Electronic controller 52 is connected to alarm diaphragm 24 along path B and to contact pin 20 along path C.
- Path D exits electronic controller 52 to send a signal to an electronic component that will indicate what type of pressure conditions are present in switch 12 .
- These electronic components can include electrical equipment in the cockpit of an aircraft.
- Pressure tube 32 contains a gas that expands as it is heated, therefore as pressure tube 32 is heated the pressure in pressure tube 32 will increase. As the pressure in pressure tube 32 increases, the pressure in cavity 30 will also increase. The pressure in cavity 30 can cause fault diaphragm 22 and alarm diaphragm 24 to deform. In the embodiment shown in FIG. 1 , there is no pressure in switch 12 and fault diaphragm 22 and alarm diaphragm 24 are in their normal configuration (for example, occupying a convex shape towards pressure tube 32 ). Pressure tube 32 will be placed next to aircraft components that are capable of overheating or components where a fire could occur, such as the landing gear wheel well, the engine, or the auxiliary power unit.
- the state of switch 12 is tested by activating switch 12 due to a change in pressure in pressure tube 32 caused by movement of piston 44 by magnet 48 .
- magnet 48 As magnet 48 is moved in longitudinal direction (right to left in FIG. 1 ) relative to pressure tube 32 , the magnetic field of magnet 48 interacts with piston 44 . Movement of magnet 48 causes piston 44 to move linearly within pressure tube 32 .
- pressure of a gas within first chamber 34 of pressure tube 32 is adjusted in response moving piston 44 .
- the gas in first chamber 34 becomes compressed which in turn increases the pressure of the gas within first chamber 34 and cavity 30 .
- At least one of fault diaphragm 22 and alarm diaphragm 24 can be activated in response to the pressure adjustment of the gas in pressure tube 32 and cavity 30 .
- An electrical signal is activated to indicate the state of fault diaphragm 22 and alarm diaphragm 24 .
- Internal stops 38 protrude into the pathway of piston 44 and prevent piston 44 from moving too close to housing 14 . Internal stops 38 mechanically prevent piston 44 from moving past a certain point in pressure tube 32 . Likewise, external stops 40 protrude into the pathway of magnet 48 and prevent magnet 48 from moving too close to housing 14 . External stops 40 mechanically prevent magnet 48 from moving past a certain point along pressure tube 32 .
- piston 44 also moves towards housing 14 in response to the moving magnetic field of and corresponding change in magnet force from magnet 48 .
- the pressure within first chamber 34 and cavity 30 increases which deforms at least one of fault diaphragm 22 and alarm diaphragm 24 .
- piston 44 also moves away from housing 14 in response to the moving magnetic field of and corresponding change in magnet force from magnet 48 .
- the pressure within first chamber 34 and cavity 30 decreases which causes at least one of fault diaphragm 22 and alarm diaphragm 24 to form back into its original un-deformed convex shape.
- Passage 46 provides a restricted orifice, weep hole, or bleed passage, which allows the gas pressure within pressure tube 32 to equalize across piston 44 , for example as between first chamber 34 and second chamber 36 . Passage 46 acts as a pressure relief mechanism by permitting piston 44 to move and overcome the counter-acting pressure of cavity 30 . Passage 46 permits a time delay for testing to satisfy an alarm or fault persistence filter of electronic controller 52 . During operation of the aircraft, passage 46 allows a small amount of time during the change state of piston 44 so that the controller in the cockpit can observe the fault/alarm state of APD 10 .
- a first mechanic monitors an engine fire panel in the cockpit while a second mechanic activates piston 44 with magnet 48 and moves piston 44 to one of internal stops 38 .
- the pressure in cavity 30 increases or decreases as a step function, then decays as the seepage via passage 46 equalizes the pressure in pressure tube 32 on both sides of piston 44 .
- the first mechanic in the cockpit observes the engine fire panel alarm light go from OFF to ON to OFF, which indicates that switch 12 was activated into both states.
- the first mechanic tells the second mechanic to move piston 44 with magnet 48 to another stop and the process is repeated for to indicate an integrity or fault condition.
- Existing APDs require complete removal of the APD from the aircraft in order to assess the states of the diaphragms in the switch.
- Existing APDs must be removed completely from the aircraft and inserted into a high temperature oven or kiln to exercise the alarm switch and then introduced into dry ice or liquid nitrogen to lower the gas pressure sufficiently to exercise the fault switch. This process is undesirable for the aircraft service and maintenance due to the large amount of time it takes to remove the APD assembly from the aircraft.
- Piston 44 and magnet 48 provide a non-invasive means of going out onto the aircraft, opening up an area of the aircraft containing APD 10 , and charging the gas pressure in first chamber 34 of pressure tube 32 with piston 44 , and modulate the pressure in pressure tube 32 to activate switch 12 into different test, alarm, fault, or normal states. Additionally, pre-installing magnet 48 onto pressure tube 32 helps to limit the amount of ground support equipment necessary during servicing of the aircraft.
- FIG. 1A is a side cross-sectional view of switch 12 in system 40 at normal pressure conditions during operation of the aircraft.
- normal pressure conditions exist under normal operating temperatures.
- Normal operating temperatures exist between a pre-set fault temperature and a pre-set alarm temperature.
- the pre-set fault temperature defines a lower limit of the normal operating temperatures and is the point at which pressure conditions will drop below normal.
- Fault diaphragm 22 will deform when the temperature rises above the pre-set fault temperature.
- the pre-set alarm temperature defines an upper limit of the normal operating temperatures and is the point at which pressure conditions will rise above normal.
- Alarm diaphragm 24 will deform when the temperature rises above the pre-set alarm temperature.
- Normal pressure conditions thus exist between the pre-set fault temperature and the pre-set alarm temperature. At normal pressure conditions, fault diaphragm 22 deforms and comes into contact with alarm diaphragm 24 .
- switch 12 in pneumatic detectors is advantageous, as switch 12 can send a signal that indicates a system is at a steady state. This allows a user to verify that the pneumatic detector is operable and that the system is functioning normally.
- FIG. 1B is a side cross-sectional view of the integrated switch of FIG. 1A at a higher than normal pressure conditions during operation of the aircraft.
- normal pressure conditions exist at temperatures above the pre-set alarm temperature.
- the pre-set alarm temperature of the sensor is 316 degrees Celsius (600.00 degrees Fahrenheit). Temperatures above the pre-set alarm temperature of the sensor will cause above normal pressure conditions.
- the pre-set alarm temperature of the sensor can vary based on the thickness of alarm diaphragm 24 in switch 12 and the quantity of gas contained in pressure tube 32 .
- both fault diaphragm 22 and alarm diaphragm 24 will deform. This will cause fault diaphragm 22 to come into contact with alarm diaphragm 24 and it will cause alarm diaphragm 24 to come into contact with contact pin 20 .
- an electronic signal is being sent through fault diaphragm 22 from power source 50 .
- fault diaphragm 22 comes into contact with alarm diaphragm 24 under normal pressure conditions, an electrical circuit between the two is closed and the electrical signal from power source 50 will travel through fault diaphragm 22 to alarm diaphragm 24 .
- alarm diaphragm 24 comes into contact with contact pin 20 , an electrical circuit between them is closed and the electrical signal will travel through alarm diaphragm 24 to contact pin 20 .
- This electrical signal can then travel through contact pin 20 and along path C to electronic controller 52 .
- Electronic controller 52 will register this electrical signal and will send out a signal along path D indicating that there are above normal pressure conditions in switch 12 .
- Pressure tube 32 can run along these components. As the heat rises in or around the components, the pressure in pressure tube 32 will increase, which will increase the pressure in cavity 30 of switch 12 . If the temperatures get above the pre-set alarm temperature, the pressure will get high enough to cause alarm diaphragm 24 to deform and come into contact with contact pin 20 . This closes the circuit between alarm diaphragm 24 and contact pin 20 and causes an electrical signal to travel between the two. This signal will be sent to electronic controller 52 . Electronic controller 52 can then send a signal indicating that there is an alarm condition in switch 12 .
- FIG. 1C is a side cross-sectional view of the integrated switch of FIG. 1A at a lower than normal pressure condition during operation of the aircraft.
- the pre-set fault temperature of the sensor is ⁇ 54 degrees Celsius ( ⁇ 65 degrees Fahrenheit), which is the temperature at a lower limit of the normal operating temperatures. Temperatures below the pre-set fault temperature of the sensor will cause below normal pressure conditions.
- the pre-set fault temperature of the sensor can vary based on the thickness of fault diaphragm 22 in switch 12 . At below normal pressure conditions, both fault diaphragm 22 and alarm diaphragm 24 will be in their normal configuration and they will not be touching.
- an electronic signal is being sent through fault diaphragm 22 from power source 50 . Because fault diaphragm 22 is not in contact with alarm diaphragm 24 when there are below normal pressure conditions, an electrical circuit between the two is open. The electrical signal from power source 50 will not travel through fault diaphragm 22 and alarm diaphragm 24 to electronic controller 52 . Electronic controller 52 will register that there is no electrical signal coming in and will send out a signal along path D indicating that there are below normal pressure conditions in switch 12 .
- FIG. 2A shows a side cross-sectional view of APD 10 with piston 44 in a first position.
- FIG. 2A depicts switch 12 at normal pressure conditions with piston 44 in a first position.
- normal pressure conditions exist under normal operating temperatures.
- Normal operating temperatures exist between a pre-set fault temperature and a pre-set alarm temperature.
- the pre-set fault temperature defines a lower limit of the normal operating temperatures and is the point at which pressure conditions will drop below normal.
- Fault diaphragm 22 will deform when the temperature rises above the pre-set fault temperature.
- the pre-set alarm temperature defines an upper limit of the normal operating temperatures and is the point at which pressure conditions will rise above normal.
- Alarm diaphragm 24 will deform when the temperature rises above the pre-set alarm temperature.
- Normal pressure conditions thus exist between the pre-set fault temperature and the pre-set alarm temperature. At normal pressure conditions, fault diaphragm 22 deforms and comes into contact with alarm diaphragm 24 .
- piston 44 and magnet 48 are occupying positions along pressure tube 32 where piston 44 and magnet 48 were positioned when APD 10 was assembled. Under normal operating conditions, piston 44 and magnet 48 can remain un-moved along pressure tube 32 . Throughout the life cycle of the aircraft, piston 44 and/or magnet 48 may oscillate due to vibrations in APD 10 from the aircraft. As piston 44 oscillates or is jostled within pressure tube due to aircraft vibrations, passage 46 allows gas pressure to pass through passage 46 thereby equalizing a pressure differential between first chamber 34 and second chamber 36 , which prevents switch 12 from activating.
- passage 46 in piston 44 Without passage 46 in piston 44 , small oscillations of piston 44 could cause an abrupt pressure change within cavity 30 and potential activation of at least one of fault diaphragm 22 and alarm diaphragm 24 indicating a false fault or alarm condition. Passage 46 permits piston 44 to oscillate in small linear movements if one of internal stops 38 breaks. Therefore, by not having piston 44 be so reactive to the normal pressure fluctuations experienced during a typical flight cycle, the risk of false fire warnings or false failure indications is minimized.
- switch 12 can now send a signal that indicates which state switch 12 currently occupies without the need for completely removing APD 10 from the aircraft. This allows a user to verify that switch 12 is operable and that APD 10 is functioning normally.
- FIG. 2B shows a side cross-sectional view of APD 10 with piston 44 in a second position.
- Piston 44 has been moved towards housing 30 (to the left in FIG. 2B ) in response to moving magnet 48 towards housing 30 .
- the pressure of the gas within first chamber 34 and cavity 30 has increased.
- both fault diaphragm 22 and alarm diaphragm 24 will deform. This will cause fault diaphragm 22 to come into contact with alarm diaphragm 24 and it will cause alarm diaphragm 24 to come into contact with contact pin 20 .
- FIG. 2C shows a side cross-sectional view of APD 10 with piston 44 in a third position.
- Piston 44 has been moved away from housing 30 (to the right in FIG. 2B ) in response to moving magnet 48 away from housing 30 .
- the pressure of the gas within first chamber 34 and cavity 30 has decreased.
- both fault diaphragm 22 and alarm diaphragm 24 will form back into a non-deformed state. This will cause both fault diaphragm 22 and alarm diaphragm 24 to come back into in their normal non-deformed configuration and they will not be touching.
- an electrical signal is being sent through fault diaphragm 22 from power source 50 . Because fault diaphragm 22 is not in contact with alarm diaphragm 24 when piston 44 is moved away from housing 44 , an electrical circuit between the two is open. The electric signal from power source 50 will not travel through fault diaphragm 22 and alarm diaphragm 24 to electronic controller 52 . Electronic controller 52 will register that there is no electric signal coming in and will send out a signal along path D indicating that switch 12 occupies a second test phase, which under normal operating conditions would indicate an fault condition.
- FIGS. 2A-2C provide examples of a method of testing switch 12 in APD 10 .
- the method of testing switch 12 in APD 10 can include attaching magnet 48 to pressure tube 32 of APD 10 . Piston 44 is moved within pressure tube 32 with magnet 48 surrounding a portion of pressure tube 32 . A pressure of a gas in a portion of pressure tube 32 is adjusted in response to moving piston 44 . A state of switch 12 is monitored. Switch 12 is set in a test phase in response to the pressure adjustment of the gas in pressure tube 32 .
- Setting switch 12 in a test phase includes activating at least one of fault diaphragm 22 and alarm diaphragm 24 located in switch 12 in response to the pressure adjustment of the gas in pressure tube 32 .
- An electrical signal is activated to indicate the state of at least one of fault diaphragm 22 and alarm diaphragm 24 .
- Switch 12 is set into a normal operational phase.
- FIG. 3 shows a flowchart illustrating method 300 of assembling APD 10 .
- Method 300 includes steps 302 through 318 .
- Step 302 includes placing piston 44 within pressure tube 32 of switch 12 of APD 10 .
- Step 304 includes charging switch 12 with gas.
- Step 304 also includes step 306 of supplying an inert gas into switch 12 and pressure tube 32 .
- the inert gas can be supplied into switch 12 through at least one of
- Step 308 includes calibrating APD 10 .
- Calibrating APD 10 includes various additional steps. For example, computational fluid dynamics are used to model the engine of the aircraft. Functional hazard analysis of fire threats are completed in regions of the engine that need heat and/or fire protection. A fire threat is determined based on a maximum allowable temperature. The maximum allowable temperature is then cross-referenced with the design capabilities of APD 10 . Some additional steps can be performed including determining a maximum ambient safe operating temperature, determine the full length of the alarm that is needed to fit into the aircraft element being monitored, and determine which length of alarm provides adequate localized fire detection. These steps are used to determine the temperature threshold of APD 10 as well as a sufficient length of pressure tube 32 .
- a pressure of the inert gas inside switch 12 is adjusted (step 310 ) such that switch 12 is activated at temperatures matching the maximum ambient safe operating temperature of the location in the aircraft of pressure tube 32 .
- Calibrating APD 10 can also include setting fault diaphragm 22 and alarm diaphragm 24 at a predetermined distance from each other (or from contact pin 20 ) that corresponds to a distance of travel of fault diaphragm 22 and/or alarm diaphragm 24 when pressure tube 32 reaches a predetermined pressure.
- Step 312 includes hermetically sealing switch 12 by attaching endcap 42 onto the end of pressure tube 32 .
- Step 314 includes attaching magnet 48 to a portion of pressure tube 32 such that magnet 48 is slidably engaged with pressure tube 32 .
- Step 316 includes placing magnet 48 at an axial location of pressure tube 32 such that a portion of magnet 48 is axially aligned with a portion of piston 44 .
- Step 318 includes installing APD 10 onto an aircraft.
- Assembling APD 10 with method 300 allows APD 10 to function as discussed above and provides the benefits discussed above of being able to test the state switch 12 of APD 10 without needing to completely remove APD 10 from the aircraft.
- An advance pneumatic detector to indicate pressure changes in an environment includes a switch, a pressure tube, an endcap, a piston, and a magnet.
- the pressure tube is connected to the switch.
- the endcap is disposed on an end of the pressure tube opposite from the switch.
- the piston is disposed within and forms a seal against the pressure tube.
- the piston is slidably engaged with the pressure tube.
- the magnet is slidably attached to and surrounds a portion of the pressure tube. The magnet is configured to control the positioning of the piston within the pressure tube.
- the advance pneumatic detector of the preceding paragraph can optionally include, additionally and/or alternatively, any one or more of the following features, configurations and/or additional components.
- the switch can further comprise a housing with a cavity between a first retainer portion and/or a second retainer portion, wherein the cavity is in fluid communication with the pressure tube and the piston, a contact pin can be held in the first retainer portion, a fault diaphragm can be held in the cavity of the housing near the second retainer portion, and/or an alarm diaphragm can be held in the cavity of the housing near the first retainer portion.
- At least one of the piston and the magnet can comprise a permanent magnet and/or an electromagnet.
- the piston can comprise a passage that can extend through the piston.
- the piston can divide the pressure tube into a first chamber and/or a second chamber, the first chamber can be between the housing and the piston and the second chamber can be between the piston and the endcap, and the passage can fluidly connect the first chamber and the second chamber.
- a method for testing a switch in an advance pneumatic detector with a pressure tube can include moving a piston within the pressure tube with a magnet. A pressure of a gas in a portion of the pressure tube can be adjusted in response to moving the piston. A state of the switch can be monitored.
- the method of the preceding paragraph can optionally include, additionally and/or alternatively, any one or more of the following features, configurations and/or additional components.
- Monitoring the state of the switch can comprise setting the switch in a test phase in response to the pressure adjustment of the gas in the pressure tube
- Setting the switch in a test phase can comprise activating a diaphragm located in the switch in response to the pressure adjustment of the gas in the pressure tube.
- An electrical signal to indicate the state of the diaphragm can be activated.
- the switch can be set into a normal operational phase.
- the magnet can be attached to the pressure tube of the advance pneumatic detector.
- a method of assembling an advance pneumatic detector can include placing a piston within a pressure tube of a switch of the advance pneumatic detector.
- the switch can be charged with gas.
- the switch can be hermetically sealed.
- the advance pneumatic detector can be calibrated.
- a magnet can be positioned to surround a portion of the pressure tube such that the magnet can be slidably engaged with the pressure tube.
- the method of the preceding paragraph can optionally include, additionally and/or alternatively, any one or more of the following features, configurations and/or additional components.
- the advance pneumatic detector can be installed onto an aircraft.
- Calibrating the advance pneumatic detector can comprise adjusting a pressure of an inert gas inside the switch.
- Charging the switch can comprise inserting an inert gas into the switch and/or the pressure tube.
- Attaching the magnet can comprise placing the magnet at an axial location of the pressure tube such that a portion of the magnet can be axially aligned with a portion of the piston.
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Fluid Mechanics (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Measuring Fluid Pressure (AREA)
Abstract
A method for testing a switch in an advance pneumatic detector with a pressure tube includes moving a piston within the pressure tube with a magnet. A pressure of a gas in a portion of the pressure tube is adjusted in response to moving the piston. A state of the switch is monitored.
Description
- This application is a divisional of U.S. application Ser. No. 15/383,390 filed Dec. 19, 2016 for “IN-SITU FUNCTIONALITY TEST FEATURE FOR ADVANCE PNEUMATIC DETECTOR” by D. L. Seebaluck and A. S. Rogers.
- The present disclosure relates to an advance pneumatic detector (“APD”). In particular, the disclosure relates to an APD with a test feature for detecting the state of the APD.
- An APD is typically comprised of both an alarm switch and a fault switch. APDs can utilize a pressure tube that contains a gas that will expand as it is heated, thus increasing the pressure in the pressure tube. An alarm switch is used to indicate overheat or fire situations. An alarm switch includes a deformable diaphragm that is at a normal state when the system is at a normal pressure. As the pressure increases in the pressure tube, the diaphragm deforms and closes an electrical circuit, indicating that there is an alarm condition in the system. A fault switch is used to indicate whether there are leaks, disconnects, or other problems in the APD. A fault switch includes a deformable diaphragm that is deformed when the system is at a normal pressure. If the pressure drops below normal, the diaphragm of the fault switch resumes its normal state and opens an electrical circuit, indicating that there is a fault condition in the system.
- APDs utilizing both an alarm switch and a fault switch are used on aircraft to detect alarm and fault conditions. The pressure tubes for the alarm and fault switches can typically run anywhere from one foot long to fifty feet long, and can be placed in systems that are prone to overheating or fires. With existing APDs used in aircraft applications, such as in the engine or wing, there are no current designs that allow for in-situ testing to verify and confirm whether a switch of the APD is still functioning. Currently, to determine whether the APD is functional, the APD must be removed from the aircraft and subjected to high heat or extreme cold (e.g., liquid nitrogen bath) in order to reset the switch and/or provide indication for a low-pressure state or latent failure mode.
- An advance pneumatic detector to indicate pressure changes in an environment includes a switch, a pressure tube, an endcap, a piston, and a magnet. The pressure tube is connected to the switch. The endcap is disposed on an end of the pressure tube opposite from the switch. The piston is disposed within and forms a seal against the pressure tube. The piston is slidably engaged with the pressure tube. The magnet is slidably attached to and surrounds a portion of the pressure tube. The magnet is configured to control the positioning of the piston within the pressure tube.
- A method for testing a switch in an advance pneumatic detector with a pressure tube includes moving a piston within the pressure tube with a magnet. A pressure of a gas in a portion of the pressure tube is adjusted in response to moving the piston. A state of the switch is monitored.
- A method of assembling an advance pneumatic detector includes placing a piston within a pressure tube of a switch of the advance pneumatic detector. The switch is charged with gas. The switch is hermetically sealed. The advance pneumatic detector is calibrated. A magnet is positioned to surround a portion of the pressure tube such that the magnet is slidably engaged with the pressure tube.
-
FIG. 1 is a side cross-sectional view of an APD with a switch, a pressure tube, and a piston. -
FIG. 1A is a side cross-sectional view of the APD ofFIG. 1 with the switch in a first position. -
FIG. 1B is a side cross-sectional view of the APD ofFIG. 1 with the switch in a second position. -
FIG. 1C is a side cross-sectional view of the APD ofFIG. 1 with the switch in a third position. -
FIG. 2A is a side cross-sectional view of the APD ofFIG. 1 with the piston in a first position. -
FIG. 2B is a side cross-sectional view of the APD ofFIG. 1 with the piston in a second position. -
FIG. 2C is a side cross-sectional view of the APD ofFIG. 1 with the piston in a third position. -
FIG. 3 is a flowchart illustrating a method of assembling the APD ofFIG. 1 . - In general, the proposed APD incorporates a pressure tube with a magnetic piston element, the position of which is controlled by a magnet external to the pressure tube. Without needing to remove the APD from the aircraft, the magnet can be moved longitudinally along to the pressure tube in order to move the piston and change the pressure in the pressure tube thereby tripping the switch. The benefit of the proposed APD is the elimination of the requirement of removing the APD from the aircraft thereby saving large amounts of time during routine inspections of the aircraft.
-
FIG. 1 shows a side cross-sectional view ofAPD 10. APD 10 includesswitch 12, housing 14 (includingfirst retainer portion 16 and second retainer portion 18),contact pin 20,fault diaphragm 22,alarm diaphragm 24,insulator 26,insulator 28,cavity 30, pressure tube 32 (includingfirst chamber 34,second chamber 36,internal stops 38, and external stops 40),endcap 42, piston 44 (including passage 46),magnet 48,power source 50, andelectronic controller 52.APD 10 also includes path A, path B, path C, and path D. Similar configurations are disclosed in U.S. patent application Ser. Nos. 13/836,675, 14/287,969, and 14/515,886 by Applicant Kidde Technologies, Inc., which are incorporated herein by reference in their entirety. - APD 10 is a linear thermal sensor with integrated alarm and fault switches. Switch 12 is a discrete pressure switch configured to detect changes in pressure within
switch 12 due to temperature changes external to switch 12.Housing 14 is a rigid casing that enclosesswitch 12.First retainer portion 16 andsecond retainer portion 18 are portions ofhousing 14.First retainer portion 16 andsecond retainer portion 18 are constructed out of a refractory metallic material that is capable of conducting an electrical signal. Refractory materials are used so thatfirst retainer portion 16 andsecond retainer portion 18 can maintain their strength whenfirst retainer portion 16 andsecond retainer portion 18 are subject to high temperatures. Contactpin 20 is a rod of solid, electrically conductive material. In one non-limiting embodiment,contact pin 20 is formed of metallic material. -
Fault diaphragm 22 andalarm diaphragm 24 are semi-rigid deformable sheets of solid electrically conductive material.Fault diaphragm 22 andalarm diaphragm 24 can be constructed out of refractory metallic materials.Fault diaphragm 22 andalarm diaphragm 24 can have any thickness that allowsfault diaphragm 22 andalarm diaphragm 24 to deform.Fault diaphragm 22 has a smaller thickness in the embodiment shown so that it deforms at lower pressures thanalarm diaphragm 24. This allowsswitch 12 to be used to indicate different pressure levels corresponding to alarm and fault conditions.Insulator 26 andinsulator 28 are pieces of solid material.Insulator 26 andinsulator 28 can be made of any material that is capable of acting as an electrical insulator.Cavity 30 is a space withinhousing 14 that is in communication withpressure tube 32. -
Pressure tube 32 is a tube of solid material containing an inert gas such as helium or hydrogen. In one non-limiting embodiment,pressure tube 32 includes a metallic material such as stainless steel 321.Pressure tube 32 can have a typical length between 0.305 meters (1 foot) and 15.24 meters (50 feet) depending on whereAPD 10 will be used. A diameter ofpressure tube 32 can include approximately 0.063 inches (1.600 millimeters).First chamber 34 andsecond chamber 36 are hollow portions ofpressure tube 32 on opposite sides ofpiston 44. Internal stops 38 are pieces of solid material extending radially inwardform pressure tube 32. External stops 40 are pieces of solid material extending radially outward frompressure tube 32.Endcap 42 is a cover including a solid material that seals the outer end ofpressure tube 32. -
Piston 44 is a disk or cylinder of solid material. In one non-limiting embodiment,piston 44 includes a material that is metallic and/or magnetized such as a permanent magnet or an electromagnet.Passage 46 is channel configured to communicate a fluid (the gas within pressure tube 32) betweenfirst chamber 34 andsecond chamber 36.Magnet 48 is a piece of solid material that is magnetized and is longitudinally movable along the exterior ofpressure tube 32.Magnet 48 can include a permanent magnet or an electromagnet. In one non-limiting embodiment,magnet 48 includes a series or combination of permanent magnets and/or electromagnets disposed alongpressure tube 32.Magnet 48 can include a cuff or cylindrical shape.Power source 50 is any power source capable of supplying electric power to switch 12.Electronic controller 52 is a controller for sending and receiving electrical signals.Electronic controller 52 is configured to alert the pilot of a thermal or fire condition. - In one non-limiting embodiment,
APD 10 is installed on an aircraft in one of the main landing gear wheel wells, the main engine, or the auxiliary power unit.Switch 12 includeshousing 14 that is constructed offirst retainer portion 16 andsecond retainer portion 18.First retainer portion 16 andsecond retainer portion 18 are connected to one another withinsulator 26 positioned between them so thatretainer portions Housing 14 includescavity 30 that is bound byfirst retainer portion 16,second retainer portion 18, andinsulator 26.First retainer portion 16 containscontact pin 20 withinsulator 28 running betweenfirst retainer portion 16 andcontact pin 20.Second retainer portion 18 containspressure tube 32. -
Contact pin 20 is held infirst retainer portion 16 withinsulator 28 running betweencontact pin 20 andfirst retainer portion 16.Fault diaphragm 22 andalarm diaphragm 24 are held betweenfirst retainer portion 16 andsecond retainer portion 18 incavity 30.Fault diaphragm 22 is held inswitch 12 betweeninsulator 26 andsecond retainer portion 18.Alarm diaphragm 24 is held inswitch 12 betweenfirst retainer portion 16 andinsulator 26.Insulator 26 is located betweenfirst retainer portion 16 andsecond retainer portion 18 to insulate the two portions and to prevent electrical signals from being passed between them.Insulator 28 is located betweenfirst retainer portion 16 andcontact pin 20 to insulate them and to prevent electrical signals from being passed between them.Cavity 30 is positioned betweenfirst retainer portion 16 andsecond retainer portion 18. -
Pressure tube 32 runs throughsecond retainer portion 18 and fluidly connects tocavity 30.Pressure tube 32 also extends intocavity 30.Pressure tube 32 is capped on an end opposite fromswitch 12 byendcap 42.First chamber 34 andsecond chamber 36 are located withinpressure tube 32 and are separated bypiston 44.First chamber 34 andsecond chamber 36 are fluidly connected viapassage 46.First chamber 34 is fluidly connected tocavity 30 ofswitch 12.First chamber 34 is disposed betweenhousing 14 andpiston 44.Second chamber 36 is disposed betweenpiston 44 andendcap 42. Internal stops 38 are connected to an inner surface ofpressure tube 32 and extend into a pathway ofpiston 44. External stops 40 are connected to an external surface ofpressure tube 32 and extend into a pathway ofmagnet 48. In a non-limiting embodiment,external stops 40 can be integrally formed withpressure tube 32. In another non-limiting embodiment,external stops 40 can be removably attached ontopressure tube 32.Endcap 42 forms a mechanical and hermetic seal with an end ofpressure tube 32 opposite fromswitch 12. -
Piston 44 is disposed within and forms a seal againstpressure tube 32.Piston 44 is slidably engaged withpressure tube 32.Piston 44 dividespressure tube 32 intofirst chamber 34 andsecond chamber 36.Passage 46 extends throughpiston 44 and fluidly connectsfirst chamber 34 andsecond chamber 36 ofpressure tube 32.Magnet 48 extends around at least a portion ofpressure tube 32.Magnet 48 is slidably attached to and surrounds a portion ofpressure tube 32.Magnet 48 is configured to control the positioning ofpiston 44 due to a magnetic field ofmagnet 48 interacting withpiston 44 and applying a magnetic force, which causespiston 44 to move withinpressure tube 32. In one non-limiting embodiment,magnet 48 is attached to pressuretube 32 afterAPD 10 is installed onto the aircraft. In another non-limiting embodiment,magnet 48 is attached to pressuretube 32 beforeAPD 10 is installed onto the aircraft. -
Power source 50 is connected to faultdiaphragm 22 along pathA. Electronic controller 52 is connected to alarmdiaphragm 24 along path B and to contactpin 20 along path C. Path D exitselectronic controller 52 to send a signal to an electronic component that will indicate what type of pressure conditions are present inswitch 12. These electronic components can include electrical equipment in the cockpit of an aircraft. -
Pressure tube 32 contains a gas that expands as it is heated, therefore aspressure tube 32 is heated the pressure inpressure tube 32 will increase. As the pressure inpressure tube 32 increases, the pressure incavity 30 will also increase. The pressure incavity 30 can causefault diaphragm 22 andalarm diaphragm 24 to deform. In the embodiment shown inFIG. 1 , there is no pressure inswitch 12 andfault diaphragm 22 andalarm diaphragm 24 are in their normal configuration (for example, occupying a convex shape towards pressure tube 32).Pressure tube 32 will be placed next to aircraft components that are capable of overheating or components where a fire could occur, such as the landing gear wheel well, the engine, or the auxiliary power unit. - The state of
switch 12 is tested by activatingswitch 12 due to a change in pressure inpressure tube 32 caused by movement ofpiston 44 bymagnet 48. Asmagnet 48 is moved in longitudinal direction (right to left inFIG. 1 ) relative to pressuretube 32, the magnetic field ofmagnet 48 interacts withpiston 44. Movement ofmagnet 48 causespiston 44 to move linearly withinpressure tube 32. Aspiston 44 is moved, pressure of a gas withinfirst chamber 34 ofpressure tube 32 is adjusted inresponse moving piston 44. The gas infirst chamber 34 becomes compressed which in turn increases the pressure of the gas withinfirst chamber 34 andcavity 30. At least one offault diaphragm 22 andalarm diaphragm 24 can be activated in response to the pressure adjustment of the gas inpressure tube 32 andcavity 30. An electrical signal is activated to indicate the state offault diaphragm 22 andalarm diaphragm 24. - Internal stops 38 protrude into the pathway of
piston 44 and preventpiston 44 from moving too close tohousing 14. Internal stops 38 mechanically preventpiston 44 from moving past a certain point inpressure tube 32. Likewise,external stops 40 protrude into the pathway ofmagnet 48 and preventmagnet 48 from moving too close tohousing 14. External stops 40 mechanically preventmagnet 48 from moving past a certain point alongpressure tube 32. - For example, as
magnet 48 is moved towardshousing 14,piston 44 also moves towardshousing 14 in response to the moving magnetic field of and corresponding change in magnet force frommagnet 48. Aspiston 44 moves towardshousing 14, the pressure withinfirst chamber 34 andcavity 30 increases which deforms at least one offault diaphragm 22 andalarm diaphragm 24. Conversely, asmagnet 48 is moved away fromhousing 14,piston 44 also moves away fromhousing 14 in response to the moving magnetic field of and corresponding change in magnet force frommagnet 48. Aspiston 44 moves away fromhousing 14, the pressure withinfirst chamber 34 andcavity 30 decreases which causes at least one offault diaphragm 22 andalarm diaphragm 24 to form back into its original un-deformed convex shape. -
Passage 46 provides a restricted orifice, weep hole, or bleed passage, which allows the gas pressure withinpressure tube 32 to equalize acrosspiston 44, for example as betweenfirst chamber 34 andsecond chamber 36.Passage 46 acts as a pressure relief mechanism by permittingpiston 44 to move and overcome the counter-acting pressure ofcavity 30.Passage 46 permits a time delay for testing to satisfy an alarm or fault persistence filter ofelectronic controller 52. During operation of the aircraft,passage 46 allows a small amount of time during the change state ofpiston 44 so that the controller in the cockpit can observe the fault/alarm state ofAPD 10. - In one non-limiting embodiment, a first mechanic monitors an engine fire panel in the cockpit while a second mechanic activates
piston 44 withmagnet 48 and movespiston 44 to one of internal stops 38. Depending on the direction of activation (movement) ofpiston 44, the pressure incavity 30 increases or decreases as a step function, then decays as the seepage viapassage 46 equalizes the pressure inpressure tube 32 on both sides ofpiston 44. Thus, the first mechanic in the cockpit observes the engine fire panel alarm light go from OFF to ON to OFF, which indicates thatswitch 12 was activated into both states. The first mechanic then tells the second mechanic to movepiston 44 withmagnet 48 to another stop and the process is repeated for to indicate an integrity or fault condition. - With existing APDs, once they are bolted onto the aircraft they may never change state and can be attached to the aircraft for 25+ years with no means for checking the state of the switch. Existing APDs require complete removal of the APD from the aircraft in order to assess the states of the diaphragms in the switch. Existing APDs must be removed completely from the aircraft and inserted into a high temperature oven or kiln to exercise the alarm switch and then introduced into dry ice or liquid nitrogen to lower the gas pressure sufficiently to exercise the fault switch. This process is undesirable for the aircraft service and maintenance due to the large amount of time it takes to remove the APD assembly from the aircraft.
- With
piston 44 andmagnet 48, a state ofAPD 10 can be tested without the need for removingAPD 10 entirely from the aircraft.Piston 44 andmagnet 48 provide a non-invasive means of going out onto the aircraft, opening up an area of theaircraft containing APD 10, and charging the gas pressure infirst chamber 34 ofpressure tube 32 withpiston 44, and modulate the pressure inpressure tube 32 to activateswitch 12 into different test, alarm, fault, or normal states. Additionally, pre-installingmagnet 48 ontopressure tube 32 helps to limit the amount of ground support equipment necessary during servicing of the aircraft. -
FIG. 1A is a side cross-sectional view ofswitch 12 insystem 40 at normal pressure conditions during operation of the aircraft. In the embodiment shown, normal pressure conditions exist under normal operating temperatures. Normal operating temperatures exist between a pre-set fault temperature and a pre-set alarm temperature. The pre-set fault temperature defines a lower limit of the normal operating temperatures and is the point at which pressure conditions will drop below normal.Fault diaphragm 22 will deform when the temperature rises above the pre-set fault temperature. The pre-set alarm temperature defines an upper limit of the normal operating temperatures and is the point at which pressure conditions will rise above normal.Alarm diaphragm 24 will deform when the temperature rises above the pre-set alarm temperature. Normal pressure conditions thus exist between the pre-set fault temperature and the pre-set alarm temperature. At normal pressure conditions,fault diaphragm 22 deforms and comes into contact withalarm diaphragm 24. - Under normal pressure conditions, an electronic signal is being sent through
fault diaphragm 22 frompower source 50. Whenfault diaphragm 22 comes into contact withalarm diaphragm 24 under normal pressure conditions, an electrical circuit between the two is closed and the electrical signal frompower source 50 will travel throughfault diaphragm 22 to alarmdiaphragm 24. This electrical signal can then travel throughalarm diaphragm 24 and along path B toelectronic controller 52.Electronic controller 52 will register this electrical signal and will send out a signal along path D indicating that there are normal pressure conditions inswitch 12. - Utilizing
switch 12 in pneumatic detectors is advantageous, asswitch 12 can send a signal that indicates a system is at a steady state. This allows a user to verify that the pneumatic detector is operable and that the system is functioning normally. -
FIG. 1B is a side cross-sectional view of the integrated switch ofFIG. 1A at a higher than normal pressure conditions during operation of the aircraft. Above normal pressure conditions exist at temperatures above the pre-set alarm temperature. In the embodiment shown, the pre-set alarm temperature of the sensor is 316 degrees Celsius (600.00 degrees Fahrenheit). Temperatures above the pre-set alarm temperature of the sensor will cause above normal pressure conditions. In alternate non-limiting embodiments, the pre-set alarm temperature of the sensor can vary based on the thickness ofalarm diaphragm 24 inswitch 12 and the quantity of gas contained inpressure tube 32. At above normal pressure conditions, bothfault diaphragm 22 andalarm diaphragm 24 will deform. This will causefault diaphragm 22 to come into contact withalarm diaphragm 24 and it will causealarm diaphragm 24 to come into contact withcontact pin 20. - In operation, an electronic signal is being sent through
fault diaphragm 22 frompower source 50. Whenfault diaphragm 22 comes into contact withalarm diaphragm 24 under normal pressure conditions, an electrical circuit between the two is closed and the electrical signal frompower source 50 will travel throughfault diaphragm 22 to alarmdiaphragm 24. When alarm diaphragm 24 comes into contact withcontact pin 20, an electrical circuit between them is closed and the electrical signal will travel throughalarm diaphragm 24 to contactpin 20. This electrical signal can then travel throughcontact pin 20 and along path C toelectronic controller 52.Electronic controller 52 will register this electrical signal and will send out a signal along path D indicating that there are above normal pressure conditions inswitch 12. - Above normal pressure conditions can occur when there is a fire or overheat condition in a component, such as an engine, landing gear wheel well, or auxiliary power unit.
Pressure tube 32 can run along these components. As the heat rises in or around the components, the pressure inpressure tube 32 will increase, which will increase the pressure incavity 30 ofswitch 12. If the temperatures get above the pre-set alarm temperature, the pressure will get high enough to causealarm diaphragm 24 to deform and come into contact withcontact pin 20. This closes the circuit betweenalarm diaphragm 24 andcontact pin 20 and causes an electrical signal to travel between the two. This signal will be sent toelectronic controller 52.Electronic controller 52 can then send a signal indicating that there is an alarm condition inswitch 12. -
FIG. 1C is a side cross-sectional view of the integrated switch ofFIG. 1A at a lower than normal pressure condition during operation of the aircraft. Below normal pressure conditions exist at temperatures below the pre-set fault temperature of the sensor. In the embodiment shown, the pre-set fault temperature of the sensor is −54 degrees Celsius (−65 degrees Fahrenheit), which is the temperature at a lower limit of the normal operating temperatures. Temperatures below the pre-set fault temperature of the sensor will cause below normal pressure conditions. In alternate embodiments, the pre-set fault temperature of the sensor can vary based on the thickness offault diaphragm 22 inswitch 12. At below normal pressure conditions, bothfault diaphragm 22 andalarm diaphragm 24 will be in their normal configuration and they will not be touching. - In operation, an electronic signal is being sent through
fault diaphragm 22 frompower source 50. Becausefault diaphragm 22 is not in contact withalarm diaphragm 24 when there are below normal pressure conditions, an electrical circuit between the two is open. The electrical signal frompower source 50 will not travel throughfault diaphragm 22 andalarm diaphragm 24 toelectronic controller 52.Electronic controller 52 will register that there is no electrical signal coming in and will send out a signal along path D indicating that there are below normal pressure conditions inswitch 12. - Below normal pressure conditions can occur when there is a leak, disconnect, or other problem in
pressure tube 32 orswitch 12. If there is a leak or disconnect, the pressure inpressure tube 32 andcavity 30 ofswitch 12 will decrease. As the pressure decreases, bothalarm diaphragm 24 andfault diaphragm 22 will retain their normal configurations and will not be touching. This will open the circuit betweenalarm diaphragm 24 andfault diaphragm 22 and will prevent a signal from traveling along path B toelectronic controller 52. The lack of a signal enteringelectronic controller 52 will indicate that there is a fault condition in the system.Electronic controller 52 can then send a signal along path D indicating that there is a fault condition inswitch 12. -
FIG. 2A shows a side cross-sectional view ofAPD 10 withpiston 44 in a first position.FIG. 2A depictsswitch 12 at normal pressure conditions withpiston 44 in a first position. In the embodiment shown, normal pressure conditions exist under normal operating temperatures. Normal operating temperatures exist between a pre-set fault temperature and a pre-set alarm temperature. The pre-set fault temperature defines a lower limit of the normal operating temperatures and is the point at which pressure conditions will drop below normal.Fault diaphragm 22 will deform when the temperature rises above the pre-set fault temperature. The pre-set alarm temperature defines an upper limit of the normal operating temperatures and is the point at which pressure conditions will rise above normal.Alarm diaphragm 24 will deform when the temperature rises above the pre-set alarm temperature. Normal pressure conditions thus exist between the pre-set fault temperature and the pre-set alarm temperature. At normal pressure conditions,fault diaphragm 22 deforms and comes into contact withalarm diaphragm 24. - Under normal pressure conditions, electrical power is being sent to
fault diaphragm 22 frompower source 50. Whenfault diaphragm 22 comes into contact withalarm diaphragm 24 under normal pressure conditions, an electrical circuit between the two is closed and the electric signal frompower source 50 will travel throughfault diaphragm 22 to alarmdiaphragm 24. This electric signal can then travel throughalarm diaphragm 24 and along path B toelectronic controller 52.Electronic controller 52 will register this electric signal and will send out a signal along path D indicating that there are normal pressure conditions inswitch 12. - In
FIG. 2A ,piston 44 andmagnet 48 are occupying positions alongpressure tube 32 wherepiston 44 andmagnet 48 were positioned whenAPD 10 was assembled. Under normal operating conditions,piston 44 andmagnet 48 can remain un-moved alongpressure tube 32. Throughout the life cycle of the aircraft,piston 44 and/ormagnet 48 may oscillate due to vibrations inAPD 10 from the aircraft. Aspiston 44 oscillates or is jostled within pressure tube due to aircraft vibrations,passage 46 allows gas pressure to pass throughpassage 46 thereby equalizing a pressure differential betweenfirst chamber 34 andsecond chamber 36, which preventsswitch 12 from activating. Withoutpassage 46 inpiston 44, small oscillations ofpiston 44 could cause an abrupt pressure change withincavity 30 and potential activation of at least one offault diaphragm 22 andalarm diaphragm 24 indicating a false fault or alarm condition.Passage 46permits piston 44 to oscillate in small linear movements if one ofinternal stops 38 breaks. Therefore, by not havingpiston 44 be so reactive to the normal pressure fluctuations experienced during a typical flight cycle, the risk of false fire warnings or false failure indications is minimized. - Utilizing the combination of
piston 44 andmagnet 48 withpressure tube 32 inAPD 10 is advantageous becauseswitch 12 can now send a signal that indicates which state switch 12 currently occupies without the need for completely removingAPD 10 from the aircraft. This allows a user to verify thatswitch 12 is operable and that APD10 is functioning normally. -
FIG. 2B shows a side cross-sectional view ofAPD 10 withpiston 44 in a second position.Piston 44 has been moved towards housing 30 (to the left inFIG. 2B ) in response to movingmagnet 48 towardshousing 30. In response to movingpiston 44, the pressure of the gas withinfirst chamber 34 andcavity 30 has increased. In response the increased pressure of the gas infirst chamber 34 andcavity 30, bothfault diaphragm 22 andalarm diaphragm 24 will deform. This will causefault diaphragm 22 to come into contact withalarm diaphragm 24 and it will causealarm diaphragm 24 to come into contact withcontact pin 20. - In operation, electrical power is being sent through
fault diaphragm 22 frompower source 50. Whenfault diaphragm 22 comes into contact withalarm diaphragm 24 in response topiston 44 moving closer tohousing 14, an electrical circuit between the two is closed and the electric signal frompower source 50 will travel throughfault diaphragm 22 to alarmdiaphragm 24. When alarm diaphragm 24 comes into contact withcontact pin 20, an electrical circuit between them is closed and the electric signal will travel throughalarm diaphragm 24 to contactpin 20. This electric signal can then travel throughcontact pin 20 and along path C toelectronic controller 52.Electronic controller 52 will register this electric signal and will send out a signal along path D indicating thatswitch 12 occupies a first test phase, which under normal operating conditions would indicate an alarm condition. - As
piston 44 is moved closer tohousing 14, the pressure inpressure tube 32 will increase, which will increase the pressure incavity 30 ofintegrated switch 12. If the pressure gets above a pre-set alarm pressure ofswitch 12, the pressure will get high enough to causealarm diaphragm 24 to deform and come into contact withcontact pin 20. This closes the circuit betweenalarm diaphragm 24 andcontact pin 20 and causes an electric signal to travel between the two. This signal will be sent toelectronic controller 52.Electronic controller 52 can then send a signal indicating thatswitch 12 occupies the first test phase (e.g., an alarm condition). -
FIG. 2C shows a side cross-sectional view ofAPD 10 withpiston 44 in a third position.Piston 44 has been moved away from housing 30 (to the right inFIG. 2B ) in response to movingmagnet 48 away fromhousing 30. In response to movingpiston 44, the pressure of the gas withinfirst chamber 34 andcavity 30 has decreased. In response the decreased pressure of the gas infirst chamber 34 andcavity 30, bothfault diaphragm 22 andalarm diaphragm 24 will form back into a non-deformed state. This will cause bothfault diaphragm 22 andalarm diaphragm 24 to come back into in their normal non-deformed configuration and they will not be touching. - In operation, an electrical signal is being sent through
fault diaphragm 22 frompower source 50. Becausefault diaphragm 22 is not in contact withalarm diaphragm 24 whenpiston 44 is moved away fromhousing 44, an electrical circuit between the two is open. The electric signal frompower source 50 will not travel throughfault diaphragm 22 andalarm diaphragm 24 toelectronic controller 52.Electronic controller 52 will register that there is no electric signal coming in and will send out a signal along path D indicating thatswitch 12 occupies a second test phase, which under normal operating conditions would indicate an fault condition. - When
piston 44 is moved away fromhousing 14 and towardsendcap 42, the pressure infirst chamber 34 andcavity 30 ofintegrated switch 12 will decrease. As the pressure decreases infirst chamber 34 andcavity 30, bothalarm diaphragm 24 andfault diaphragm 22 will retain their normal configurations and will not be touching. This will open the circuit betweenalarm diaphragm 24 andfault diaphragm 22 and will prevent a signal from traveling along path B toelectronic controller 52. The lack of a signal enteringelectronic controller 52 will indicate thatswitch 12 occupies the second test phase (e.g., fault condition).Electronic controller 52 can then send a signal along path D indicating that there is a fault condition inintegrated switch 12. -
FIGS. 2A-2C provide examples of a method oftesting switch 12 inAPD 10. The method oftesting switch 12 inAPD 10 can include attachingmagnet 48 topressure tube 32 ofAPD 10.Piston 44 is moved withinpressure tube 32 withmagnet 48 surrounding a portion ofpressure tube 32. A pressure of a gas in a portion ofpressure tube 32 is adjusted in response to movingpiston 44. A state ofswitch 12 is monitored.Switch 12 is set in a test phase in response to the pressure adjustment of the gas inpressure tube 32. Settingswitch 12 in a test phase includes activating at least one offault diaphragm 22 andalarm diaphragm 24 located inswitch 12 in response to the pressure adjustment of the gas inpressure tube 32. An electrical signal is activated to indicate the state of at least one offault diaphragm 22 andalarm diaphragm 24.Switch 12 is set into a normal operational phase. -
FIG. 3 shows aflowchart illustrating method 300 of assemblingAPD 10.Method 300 includessteps 302 through 318. Step 302 includes placingpiston 44 withinpressure tube 32 ofswitch 12 ofAPD 10. Step 304 includes chargingswitch 12 with gas. Step 304 also includesstep 306 of supplying an inert gas intoswitch 12 andpressure tube 32. The inert gas can be supplied intoswitch 12 through at least one of - Step 308 includes calibrating
APD 10. CalibratingAPD 10 includes various additional steps. For example, computational fluid dynamics are used to model the engine of the aircraft. Functional hazard analysis of fire threats are completed in regions of the engine that need heat and/or fire protection. A fire threat is determined based on a maximum allowable temperature. The maximum allowable temperature is then cross-referenced with the design capabilities ofAPD 10. Some additional steps can be performed including determining a maximum ambient safe operating temperature, determine the full length of the alarm that is needed to fit into the aircraft element being monitored, and determine which length of alarm provides adequate localized fire detection. These steps are used to determine the temperature threshold ofAPD 10 as well as a sufficient length ofpressure tube 32. Once the temperature threshold and length ofpressure 32 are determined, a pressure of the inert gas insideswitch 12 is adjusted (step 310) such thatswitch 12 is activated at temperatures matching the maximum ambient safe operating temperature of the location in the aircraft ofpressure tube 32. CalibratingAPD 10 can also include settingfault diaphragm 22 andalarm diaphragm 24 at a predetermined distance from each other (or from contact pin 20) that corresponds to a distance of travel offault diaphragm 22 and/oralarm diaphragm 24 whenpressure tube 32 reaches a predetermined pressure. - Step 312 includes hermetically sealing
switch 12 by attachingendcap 42 onto the end ofpressure tube 32. Step 314 includes attachingmagnet 48 to a portion ofpressure tube 32 such thatmagnet 48 is slidably engaged withpressure tube 32. Step 316 includes placingmagnet 48 at an axial location ofpressure tube 32 such that a portion ofmagnet 48 is axially aligned with a portion ofpiston 44. Step 318 includes installingAPD 10 onto an aircraft. - Assembling
APD 10 withmethod 300 allowsAPD 10 to function as discussed above and provides the benefits discussed above of being able to test thestate switch 12 ofAPD 10 without needing to completely removeAPD 10 from the aircraft. - The following are non-exclusive descriptions of possible embodiments of the present invention.
- An advance pneumatic detector to indicate pressure changes in an environment includes a switch, a pressure tube, an endcap, a piston, and a magnet. The pressure tube is connected to the switch. The endcap is disposed on an end of the pressure tube opposite from the switch. The piston is disposed within and forms a seal against the pressure tube. The piston is slidably engaged with the pressure tube. The magnet is slidably attached to and surrounds a portion of the pressure tube. The magnet is configured to control the positioning of the piston within the pressure tube.
- The advance pneumatic detector of the preceding paragraph can optionally include, additionally and/or alternatively, any one or more of the following features, configurations and/or additional components.
- The switch can further comprise a housing with a cavity between a first retainer portion and/or a second retainer portion, wherein the cavity is in fluid communication with the pressure tube and the piston, a contact pin can be held in the first retainer portion, a fault diaphragm can be held in the cavity of the housing near the second retainer portion, and/or an alarm diaphragm can be held in the cavity of the housing near the first retainer portion.
- At least one of the piston and the magnet can comprise a permanent magnet and/or an electromagnet.
- The piston can comprise a passage that can extend through the piston.
- The piston can divide the pressure tube into a first chamber and/or a second chamber, the first chamber can be between the housing and the piston and the second chamber can be between the piston and the endcap, and the passage can fluidly connect the first chamber and the second chamber.
- A method for testing a switch in an advance pneumatic detector with a pressure tube can include moving a piston within the pressure tube with a magnet. A pressure of a gas in a portion of the pressure tube can be adjusted in response to moving the piston. A state of the switch can be monitored.
- The method of the preceding paragraph can optionally include, additionally and/or alternatively, any one or more of the following features, configurations and/or additional components.
- Monitoring the state of the switch can comprise setting the switch in a test phase in response to the pressure adjustment of the gas in the pressure tube
- Setting the switch in a test phase can comprise activating a diaphragm located in the switch in response to the pressure adjustment of the gas in the pressure tube.
- An electrical signal to indicate the state of the diaphragm can be activated.
- The switch can be set into a normal operational phase.
- The magnet can be attached to the pressure tube of the advance pneumatic detector.
- A method of assembling an advance pneumatic detector can include placing a piston within a pressure tube of a switch of the advance pneumatic detector. The switch can be charged with gas. The switch can be hermetically sealed. The advance pneumatic detector can be calibrated. A magnet can be positioned to surround a portion of the pressure tube such that the magnet can be slidably engaged with the pressure tube.
- The method of the preceding paragraph can optionally include, additionally and/or alternatively, any one or more of the following features, configurations and/or additional components.
- The advance pneumatic detector can be installed onto an aircraft.
- Calibrating the advance pneumatic detector can comprise adjusting a pressure of an inert gas inside the switch.
- Charging the switch can comprise inserting an inert gas into the switch and/or the pressure tube.
- Attaching the magnet can comprise placing the magnet at an axial location of the pressure tube such that a portion of the magnet can be axially aligned with a portion of the piston.
- While the invention has been described with reference to an exemplary embodiment(s), it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the invention without departing from the essential scope thereof. Therefore, it is intended that the invention not be limited to the particular embodiment(s) disclosed, but that the invention will include all embodiments falling within the scope of the appended claims.
Claims (11)
1. A method for testing a switch in an advance pneumatic detector with a pressure tube, the method comprising:
moving a piston within the pressure tube with a magnet;
adjusting a pressure of a gas in a portion of the pressure tube in response to moving the piston; and
monitoring a state of the switch.
2. The method of claim 1 , wherein monitoring the state of the switch comprises setting the switch in a test phase in response to the pressure adjustment of the gas in the pressure tube.
3. The method of claim 2 , wherein setting the switch in a test phase comprises activating a diaphragm located in the switch in response to the pressure adjustment of the gas in the pressure tube.
4. The method of claim 3 further comprising activating an electrical signal to indicate the state of the diaphragm.
5. The method of claim 1 further comprising setting the switch into a normal operational phase.
6. The method of claim 1 further comprising attaching the magnet to the pressure tube of the advance pneumatic detector.
7. A method of assembling an advance pneumatic detector, the method comprising:
placing a piston within a pressure tube of a switch of the advance pneumatic detector;
charging the switch with gas;
hermetically sealing the switch;
calibrating the advance pneumatic detector; and
attaching a magnet to a portion of the pressure tube, wherein the magnet is slidably engaged with the pressure tube.
8. The method of claim 7 further comprising installing the advance pneumatic detector onto an aircraft.
9. The method of claim 7 , wherein calibrating the advance pneumatic detector comprises adjusting a pressure of an inert gas inside the switch.
10. The method of claim 7 , wherein charging the switch comprises inserting an inert gas into the switch and the pressure tube.
11. The method of claim 7 , wherein attaching the magnet comprises placing the magnet at an axial location of the pressure tube such that a portion of the magnet is axially aligned with a portion of the piston.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/575,851 US20200011752A1 (en) | 2016-12-19 | 2019-09-19 | Method for testing switch in advance pneumatic detector |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/383,390 US10466124B2 (en) | 2016-12-19 | 2016-12-19 | In-situ functionality test feature for advance pneumatic detector |
US16/575,851 US20200011752A1 (en) | 2016-12-19 | 2019-09-19 | Method for testing switch in advance pneumatic detector |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/383,390 Division US10466124B2 (en) | 2016-12-19 | 2016-12-19 | In-situ functionality test feature for advance pneumatic detector |
Publications (1)
Publication Number | Publication Date |
---|---|
US20200011752A1 true US20200011752A1 (en) | 2020-01-09 |
Family
ID=60021887
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/383,390 Expired - Fee Related US10466124B2 (en) | 2016-12-19 | 2016-12-19 | In-situ functionality test feature for advance pneumatic detector |
US16/575,851 Abandoned US20200011752A1 (en) | 2016-12-19 | 2019-09-19 | Method for testing switch in advance pneumatic detector |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/383,390 Expired - Fee Related US10466124B2 (en) | 2016-12-19 | 2016-12-19 | In-situ functionality test feature for advance pneumatic detector |
Country Status (3)
Country | Link |
---|---|
US (2) | US10466124B2 (en) |
EP (1) | EP3336812B1 (en) |
CA (1) | CA2981930A1 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10210747B1 (en) * | 2018-05-25 | 2019-02-19 | Stephen David Ainsworth | Fire alarm testing device and method |
CN109559941A (en) * | 2018-11-09 | 2019-04-02 | 天津航空机电有限公司 | A kind of pneumatic type temperature relay |
CN110411891B (en) * | 2019-09-04 | 2024-07-23 | 上海乐研电气有限公司 | On-site detection device, system and method for realizing maintenance-free gas density relay |
CN110441679B (en) * | 2019-09-04 | 2024-08-09 | 上海乐研电气有限公司 | Electrical equipment, method and system for realizing maintenance-free density relay |
CN111017189A (en) * | 2019-12-05 | 2020-04-17 | 刘树臣 | A unmanned aerial vehicle device that reliability is high for shake back interim communication |
CN113405703B (en) * | 2021-06-16 | 2024-04-09 | 哲弗智能系统(上海)有限公司 | Optical sensor and fire alarm device |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3122728A (en) | 1959-05-25 | 1964-02-25 | Jr John E Lindberg | Heat detection |
GB2001464A (en) | 1977-06-22 | 1979-01-31 | Stoppani Sa | Emergency alarm installation |
GB2322449B (en) | 1997-01-30 | 2001-07-18 | David Laurence Melton | Detecting pressure changes |
JPH11339151A (en) | 1998-05-26 | 1999-12-10 | Naoyuki Okada | Testing device for pneumatic tube/distributing type fire sensor |
JP2003184826A (en) * | 2001-12-14 | 2003-07-03 | Smc Corp | Fluid pressure apparatus with position indicating mechanism |
US6880405B2 (en) * | 2002-12-30 | 2005-04-19 | Pti Technologies, Inc. | Electrical/visual differential pressure indicator with solid state sensor |
CN202267572U (en) | 2011-09-29 | 2012-06-06 | 辽宁省建筑材料科学研究所 | Pulse test device of pressure indicator of fire extinguisher |
GB2509153B (en) | 2012-12-21 | 2016-07-13 | Kidde Tech Inc | Heat detector with shape metal alloy element |
GB2511803B (en) | 2013-03-14 | 2015-07-29 | Kidde Tech Inc | Pneumatic sensing apparatus |
US9153400B2 (en) | 2013-03-15 | 2015-10-06 | Kidde Technologies, Inc. | Pneumatic detector integrated alarm and fault switch |
US9418527B2 (en) | 2013-10-03 | 2016-08-16 | Kidde Technologies, Inc. | Pneumatic detector switch having a single diaphragm for alarm and fault conditions |
US9135801B2 (en) | 2013-11-18 | 2015-09-15 | Firesys Ltd. | Fully mechanical pneumatic excessive heat or/and fire line-type detector, and system, methods, applications thereof |
US9208980B2 (en) | 2014-01-21 | 2015-12-08 | Kidde Technologies, Inc. | Pneumatic detector with integrated electrical contact |
US9728057B2 (en) | 2014-05-27 | 2017-08-08 | Kidde Technologies, Inc. | Pneumatic detection using a liquefied compressed gas |
US9342969B2 (en) | 2014-10-16 | 2016-05-17 | Kidde Technologies, Inc. | Pneumatic detector assembly with bellows |
-
2016
- 2016-12-19 US US15/383,390 patent/US10466124B2/en not_active Expired - Fee Related
-
2017
- 2017-09-26 EP EP17193260.1A patent/EP3336812B1/en not_active Not-in-force
- 2017-10-06 CA CA2981930A patent/CA2981930A1/en not_active Abandoned
-
2019
- 2019-09-19 US US16/575,851 patent/US20200011752A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
US20180172529A1 (en) | 2018-06-21 |
EP3336812B1 (en) | 2019-08-21 |
US10466124B2 (en) | 2019-11-05 |
EP3336812A1 (en) | 2018-06-20 |
CA2981930A1 (en) | 2018-06-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10466124B2 (en) | In-situ functionality test feature for advance pneumatic detector | |
EP2779125B1 (en) | Pneumatic detector integrated alarm and fault switch | |
US8708554B2 (en) | Leak detection apparatus for aircraft bleed air systems | |
CA2901857C (en) | Pneumatic detector assembly with bellows | |
CN107810388B (en) | Modular sealing device with fault detection unit | |
EP1621376B1 (en) | Refrigerant relief device | |
US8806917B2 (en) | Density monitor | |
US11101089B2 (en) | Independent pressure monitoring switch element | |
US5136278A (en) | Compact and lightweight pneumatic pressure detector for fire detection with integrity switch | |
CN107606491B (en) | Leakage detection method for indoor gas pipeline | |
CN104134575A (en) | Pneumatic pressure switch | |
AU2016201421B2 (en) | Hydraulic assembly for a mining system | |
EP3018642B1 (en) | Pneumatic pressure detector for a fire alarm system and method of insulating | |
US10077104B2 (en) | Proximity sensor for aircraft and having a hydraulic fuse | |
EP3113202B1 (en) | Detector utilizing an adjustment screw and a bellows | |
CN112535828A (en) | Fire extinguishing system | |
EP2858050B1 (en) | Pneumatic detector switch having a single diaphragm for alarm and fault conditions | |
JP2007514159A (en) | Inspection device for pressure of fluid flowing in liquid or duct stored in tank | |
CN112090009A (en) | Sprinkler bulb | |
JPH06129937A (en) | Abnormality detection apparatus of mechanical seal | |
ZA200708511B (en) | Safety and arming unit for the fuze of a projectile | |
WO2023048989A1 (en) | Pressure compensated bellows valve | |
KR100319406B1 (en) | Pressure sensing apparatus for insulating medium of electric power equipment | |
GB2322449A (en) | Detecting pressure changes | |
KR820000857B1 (en) | Temperature-dependent actrating mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: KIDDE TECHNOLOGIES, INC., NORTH CAROLINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SEEBALUCK, DHARMENDR LEN;ROGERS, AARON STANLEY;REEL/FRAME:050430/0979 Effective date: 20161215 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: APPLICATION DISPATCHED FROM PREEXAM, NOT YET DOCKETED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |