- US20190017745A1 US20190017745A1 US16/025,230 US201816025230A US2019017745A1 US 20190017745 A1 US20190017745 A1 US 20190017745A1 US 201816025230 A US201816025230 A US 201816025230A US 2019017745 A1 US2019017745 A1 US 2019017745A1
- Authority
- US
- United States
- Prior art keywords
- pellets
- conveyor
- burners
- furnace
- preheater
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000008188 pellet Substances 0.000 title claims abstract description 209
- 238000000034 method Methods 0.000 title claims description 47
- 238000002844 melting Methods 0.000 claims abstract description 51
- 230000008018 melting Effects 0.000 claims abstract description 51
- 239000002184 metal Substances 0.000 claims abstract description 30
- 229910052751 metal Inorganic materials 0.000 claims abstract description 30
- 238000007600 charging Methods 0.000 claims abstract description 18
- 238000007599 discharging Methods 0.000 claims abstract description 16
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 claims description 30
- 239000001301 oxygen Substances 0.000 claims description 30
- 229910052760 oxygen Inorganic materials 0.000 claims description 30
- 239000000446 fuel Substances 0.000 claims description 29
- 238000010304 firing Methods 0.000 claims description 24
- 239000003546 flue gas Substances 0.000 claims description 21
- 239000007789 gas Substances 0.000 claims description 20
- 230000001590 oxidative effect Effects 0.000 claims description 18
- 230000008569 process Effects 0.000 claims description 15
- 238000011144 upstream manufacturing Methods 0.000 claims description 13
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical group [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 claims description 12
- 239000000567 combustion gas Substances 0.000 claims description 9
- 239000007788 liquid Substances 0.000 claims description 9
- 238000007254 oxidation reaction Methods 0.000 claims description 9
- 239000012530 fluid Substances 0.000 claims description 8
- 230000003647 oxidation Effects 0.000 claims description 8
- 238000001816 cooling Methods 0.000 claims description 6
- 239000011261 inert gas Substances 0.000 claims description 6
- 230000001629 suppression Effects 0.000 claims description 4
- 230000007246 mechanism Effects 0.000 claims description 3
- 238000002485 combustion reaction Methods 0.000 description 17
- 238000010438 heat treatment Methods 0.000 description 15
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 13
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 12
- 229910000831 Steel Inorganic materials 0.000 description 11
- 239000010959 steel Substances 0.000 description 11
- 239000000463 material Substances 0.000 description 7
- 239000003345 natural gas Substances 0.000 description 6
- 229910052742 iron Inorganic materials 0.000 description 5
- 239000000203 mixture Substances 0.000 description 5
- XKRFYHLGVUSROY-UHFFFAOYSA-N Argon Chemical compound [Ar] XKRFYHLGVUSROY-UHFFFAOYSA-N 0.000 description 4
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 4
- 238000009845 electric arc furnace steelmaking Methods 0.000 description 4
- 239000007800 oxidant agent Substances 0.000 description 4
- 238000003860 storage Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 238000010891 electric arc Methods 0.000 description 3
- 238000003384 imaging method Methods 0.000 description 3
- ATUOYWHBWRKTHZ-UHFFFAOYSA-N Propane Chemical compound CCC ATUOYWHBWRKTHZ-UHFFFAOYSA-N 0.000 description 2
- 229910052786 argon Inorganic materials 0.000 description 2
- 238000009844 basic oxygen steelmaking Methods 0.000 description 2
- 238000010923 batch production Methods 0.000 description 2
- 229910052799 carbon Inorganic materials 0.000 description 2
- 239000003245 coal Substances 0.000 description 2
- 238000000576 coating method Methods 0.000 description 2
- SZVJSHCCFOBDDC-UHFFFAOYSA-N ferrosoferric oxide Chemical compound O=[Fe]O[Fe]O[Fe]=O SZVJSHCCFOBDDC-UHFFFAOYSA-N 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 229910052757 nitrogen Inorganic materials 0.000 description 2
- 238000013021 overheating Methods 0.000 description 2
- 230000005855 radiation Effects 0.000 description 2
- 238000009628 steelmaking Methods 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- YBJANOUTWRTBDK-UHFFFAOYSA-N 2,4-diamino-6-[n-(2',5'-dimethoxybenzyl)-n-methylamino]quinazoline Chemical compound COC1=CC=C(OC)C(CN(C)C=2C=C3C(N)=NC(N)=NC3=CC=2)=C1 YBJANOUTWRTBDK-UHFFFAOYSA-N 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 238000010924 continuous production Methods 0.000 description 1
- 238000005261 decarburization Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000008187 granular material Substances 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- UQSXHKLRYXJYBZ-UHFFFAOYSA-N iron oxide Inorganic materials [Fe]=O UQSXHKLRYXJYBZ-UHFFFAOYSA-N 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 239000001294 propane Substances 0.000 description 1
- 238000003303 reheating Methods 0.000 description 1
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B13/00—Making spongy iron or liquid steel, by direct processes
- C21B13/0006—Making spongy iron or liquid steel, by direct processes obtaining iron or steel in a molten state
- C21B13/0026—Making spongy iron or liquid steel, by direct processes obtaining iron or steel in a molten state introduction of iron oxide in the flame of a burner or a hot gas stream
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D13/00—Apparatus for preheating charges; Arrangements for preheating charges
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B13/00—Making spongy iron or liquid steel, by direct processes
- C21B13/0086—Conditioning, transformation of reduced iron ores
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C5/00—Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
- C21C5/52—Manufacture of steel in electric furnaces
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C5/00—Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
- C21C5/52—Manufacture of steel in electric furnaces
- C21C5/527—Charging of the electric furnace
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B1/00—Preliminary treatment of ores or scrap
- C22B1/02—Roasting processes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B3/00—Hearth-type furnaces, e.g. of reverberatory type; Electric arc furnaces ; Tank furnaces
- F27B3/08—Hearth-type furnaces, e.g. of reverberatory type; Electric arc furnaces ; Tank furnaces heated electrically, with or without any other source of heat
- F27B3/085—Arc furnaces
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D3/00—Charging; Discharging; Manipulation of charge
- F27D3/0033—Charging; Discharging; Manipulation of charge charging of particulate material
Definitions
- DRI direct reduced iron
- HBI hot briquetted iron
- DRI Direct Reduced Iron
- HBI Hot Briquetted Iron
- DRI plants are also fast replacing traditional forms of iron ore processing such as blast furnaces because of higher usage of natural gas in DRI making process. Natural gas is preferred because it is a lower-carbon containing, more economically available fuel source compared to coal. DRI plants are usually located closer to mining operations and/or where natural gas is economical, and are not necessarily close to steel mill operations. As a result, a majority of the DRI produced today is transported cold to steel mills, before being stored and eventually charged cold into steel making operations.
- a direct flame impingement system for preheating metal pellets before charging into a melting furnace, wherein the pellets are transported by a conveyor belt to a chute discharging into the melting furnace comprising: a refractory-lined preheater hood including a chute hood covering the chute and a conveyor hood covering at least a portion of the conveyor belt, the preheater hood having an entrance end through which pellets enter and an exit end through which pellets exit toward the melting furnace; and at least one bank of burners each containing at least one burner disposed in the hood positioned to direct flames into contact with the pellets being transported to preheat the pellets prior to discharge into the melting furnace.
- Aspect 2 The direct flame impingement system of Aspect 1, wherein the at least one bank of burners includes a chute bank of burners disposed in the chute hood containing at least one burner positioned to direct flames into contact with the pellets being transported through the chute.
- Aspect 3 The direct flame impingement system of Aspect 1 or 2, wherein the at least one bank of burners includes a first conveyor bank of burners disposed in the conveyor hood containing at least one burner positioned to direct flames into contact with pellets being transported on a first section of the conveyor belt.
- Aspect 4 The direct flame impingement system of Aspect 3, wherein the at least one bank of burners further includes a second conveyor bank of burners containing at least one burner disposed in the conveyor hood positioned to direct flames into contact with the pellets on a second section the conveyor belt.
- Aspect 5 The direct flame impingement system of Aspect 4, wherein at any particular time, one of the first and second banks of conveyor burners is controlled to be fuel-rich so as to create a reducing zone and the other of the first and second banks of conveyor burners is controlled to be oxygen-rich so as to create an oxidizing zone; and wherein the reducing zone is near the exit end of the conveyor cover and the oxidizing zone is near the entrance end of the conveyor cover.
- Aspect 6 The direct flame impingement system of any one of Aspects 1-5, further comprising a bank of inert fluid nozzles positioned along the conveyor cover for injecting inert fluid toward the conveyor to enable rapid cooling and/or fire suppression of the pellets, wherein the inert fluid is selected from the group consisting of an inert gas, an inert liquid, and a combination of an inert gas and an inert liquid.
- Aspect 7 The direct flame impingement system of any one of claims Aspects 1-6, further comprising a flue at the entrance end of the preheater hood to induct hot flue gases to flow from the melting furnace, under the preheater hood and over the pellets in the chute and on the conveyor, to enhance convective heat transfer to the pellets.
- Aspect 8 The direct flame impingement system of any one of Aspects 1-7, further comprising one or more ploughs along the conveyor belt to mix the pellets for enhanced contact of the flames with the pellets.
- Aspect 9 The direct flame impingement system of any one of Aspects 1-8, wherein the burners combust fuel with one or more of air, oxygen-enriched air having greater than 23% molecular O2, and industrial-grade oxygen having at least 70% molecular O2.
- Aspect 10 The direct flame impingement system of any one of Aspects 1-9, further comprising: at least one sensor to detect a process condition; and a controller programmed to operate the burners based on the process condition; wherein when the at least one sensor is a flue gas sensor positioned at the entrance end of the preheater hood to measure the concentration of one or more gases in the flue gas, the controller is programmed to adjust operation of the burners based on a measure concentration of one or more gases in the flue gas; wherein when the at least one sensor is a temperature sensor positioned in the conveyor hood for measuring one or more of gas temperature, pellet temperature, and belt temperature the controller is programmed to adjust operation of the burners based on one or more of a measured gas temperature, a measured pellet temperature, and a measured belt temperature; and wherein when the at least one sensor is configured and arranged to detect a safety condition, the controller is programmed to shut down the burners in the event a safety condition is detected.
- a method of preheating metal pellets upstream of a melting furnace, wherein the pellets transported by a conveyor belt and to a chute discharging into the melting furnace comprising: operating at least one bank of burners each containing at least one burner to direct flames into contact with the pellets being transported to preheat the pellets prior to discharge into the melting furnace.
- a preheating system for preheating metal-containing pellets before charging into a melting furnace comprising: a refractory-lined preheater furnace having an inlet end wall, an exit end wall opposite the inlet end wall, and a substantially cylindrical side wall defined by an axis of the furnace and extending from the inlet end wall to the exit end wall, the inlet end wall having a door or opening for receiving unheated pellets, the exit end wall having a door or opening for discharging heated pellets toward the melting furnace; at least one burner for firing into the preheater furnace to impart heat to the pellets; and a flue for exhausting combustion gases produced by the burner from the preheater furnace; wherein the preheater furnace rotatable and is arranged to rotate about its axis.
- Aspect 13 The preheater system of Aspect 12, further comprising: a controller programmed to control operation of the at least one burner so as to produce a non-oxidizing atmosphere over the pellets to inhibit oxidation of the pellets.
- Aspect 14 The preheater system of Aspect 12, further comprising a mechanism in the furnace configured and arranged urge the pellets to move from the inlet end to the exit end.
- a direct flame impingement system for preheating metal pellets before charging into a melting furnace, wherein the pellets transported by a conveyor belt to a chute discharging into the melting furnace, including a refractory-lined conveyor hood covering at least a portion of the conveyor belt, the conveyor hood having an entrance end through which pellets enter and an exit end through which pellets exit toward the chute; and a first bank of conveyor burners containing at least one burner disposed in the conveyor hood positioned to direct flames into contact with the pellets on a first section of the covered portion of the conveyor belt.
- the direct flame impingement system may also include a flue connection at the entrance end of the conveyor hood to induct hot flue gases to flow from the melting furnace and preheating section over the unheated pellets, to enhance convective heat transfer to the pellets.
- the direct flame impingement system may also include one or more ploughs along the conveyor belt to mix the pellets for enhanced contact of the flames with the pellets.
- the direct flame impingement system may also include a refractory-lined chute hood covering the chute, and a bank of chute burners containing at least one burner disposed in the chute hood positioned to direct flames into contact with the pellets being discharged via the chute into the furnace.
- the direct flame impingement system may also include a second bank of conveyor burners containing at least one burner disposed in the conveyor hood positioned to direct flames into contact with the pellets on a second section of the covered portion of the conveyor belt.
- the direct flame impingement system may, at any particular time, be controlled such that one of the first and second banks of conveyor burners is fuel-rich so as to create a reducing zone and the other of the first and second banks of conveyor burners is oxygen-rich so as to create an oxidizing zone.
- the reducing zone is near the exit end of the conveyor cover and the oxidizing zone is near the entrance end of the conveyor cover.
- the burners may combust fuel with one or more of air, oxygen-enriched air having greater than 23% molecular O2, and industrial-grade oxygen having at least 70% molecular O2.
- the direct flame impingement system may also include at least one flue gas sensor positioned in the conveyor hood for measuring the concentration of one or more gases in the flue gas.
- the direct flame impingement system may also include at least one temperature or imaging sensor positioned in the conveyor hood for measuring one or more of gas temperature, pellet temperature, and belt temperature.
- the direct flame impingement system may also include a controller programmed to operate the burners.
- the controller may be programmed to shut down the burners in the event of a conveyor belt failure, conveyor belt overheating, or other safety condition.
- the controller may also be programmed to adjust operation of the burners based on a measure concentration of one or more gases in the flue gas.
- the controller may also be programmed to adjust operation of the burners based on one or more of a measured gas temperature, a measured pellet temperature, and a measured belt temperature.
- the direct flame impingement system may also include a bank of inert fluid nozzles positioned along the conveyor cover for injecting inert fluid (gas, liquid, or combination thereof) toward the conveyor to enable rapid cooling and/or fire suppression of the pellets.
- a method of preheating metal pellets upstream of a melting furnace is also disclosed, wherein the pellets transported by a conveyor belt and to a chute discharging into the melting furnace, including covering a first portion of the conveyor belt in a refractory-lined conveyor hood; and operating a first bank of conveyor burners containing at least one burner to direct flames into contact with the pellets on the first portion of the conveyor belt.
- the method of preheating metal pellets may also include operating a bank of chute burners containing at least one burner to direct flames into contact with the pellets being discharged via the chute into the furnace.
- the method of preheating metal pellets may also include covering a second portion of the conveyor belt in the refractory-lined conveyor hood; and operating second bank of conveyor burners containing at least one burner to direct flames into contact with the pellets on a second portion of the conveyor belt.
- the method of preheating metal pellets wherein at any particular time, firing one of the first and second banks of conveyor burners to create a heated zone and refraining from firing the other of the first and second banks of conveyor burners to create an unheated zone.
- the method of preheating metal pellets wherein at any particular time, controlling one of the first and second banks of conveyor burners to be fuel-rich to create a reducing zone and controlling the other of the first and second banks of conveyor burners to be oxygen-rich to create an oxidizing zone.
- the method of preheating metal pellets may also include measuring the concentration of one or more gases in the conveyor hood.
- the method of preheating metal pellets may also include measuring one or more of gas temperature, pellet temperature, and belt temperature in the conveyor hood.
- the method of preheating metal pellets may also include shutting down the burners in the event of a conveyor belt failure, conveyor belt overheating, or other safety condition.
- the method of preheating metal pellets may also include adjusting operation of the burners based on a measure concentration of one or more gases in the conveyor hood.
- the method of preheating metal pellets may also include adjusting operation of the burners based on one or more of a measured gas temperature, a measured pellet temperature, and a measured belt temperature.
- the method of preheating metal pellets may also include injecting inert gas and/or inert liquid toward the conveyor to enable rapid cooling and/or fire suppression of the pellets.
- a preheating system for preheating metal-containing pellets before charging into a melting furnace, comprising: a refractory-lined preheater furnace having an inlet end wall, an exit end wall opposite the inlet end wall, and a substantially cylindrical side wall defined by an axis of the furnace and extending from the inlet end wall to the exit end wall, the inlet end wall having a door or opening for receiving unheated pellets, the exit end wall having a door or opening for discharging heated pellets toward the melting furnace; at least one burner for firing into the preheater furnace to impart heat to the pellets; and a flue for exhausting combustion gases produced by the burner from the preheater furnace.
- the preheater furnace may be rotatable and arranged to rotate about its axis.
- the at least one burner may be positioned in the inlet end wall of the preheater furnace.
- the at least one burner may be positioned in the exit end wall of the preheater furnace.
- the flue may be positioned in the exit end wall of the furnace.
- the flue may be positioned in the inlet end wall of the furnace.
- the preheater system may include a controller programmed to control operation of the at least one burner so as to produce a non-oxidizing atmosphere over the pellets to inhibit oxidation of the pellets.
- the at least one burner may comprise two burners each arranged to fire into a different section of the preheater furnace, and the controller may be programmed to control the relative firing rates and stoichiometries of the two burners to produce the non-oxidizing atmosphere.
- the controller may be programmed to operate the burner at an equivalence ratio from 1 to 1.3 (i.e., fuel-rich, or having insufficient oxygen to fully combust the fuel).
- the controller may be programmed to operate the at least one burner, wherein the controller is programmed to adjust operation of the at least one burner based on one or more of a measured gas temperature, a measured pellet temperature, a measured flue gas concentration, and another measured process parameter.
- the preheater system may further include at least one baffle on at least a portion of the substantially cylindrical side wall to function urge the pellets to move from the inlet end to the exit end.
- the at least one baffle is a helical baffle may be configured to function as a screw conveyor.
- the axis of the preheater furnace may be angled with respect to horizontal such that the inlet end is at least slightly higher than the exit end to encourage movement of the pellets from the inlet end to the exit end and to facilitate discharge of the pellets from the exit end.
- the preheater furnace may be arranged to be tilted so that the axis is at any angle from horizontal to vertical.
- the at least one burner in the preheater may be an oxy-fuel burner operated with an oxidant having one or more of oxygen-enriched air having greater than 23% molecular O2 and industrial-grade oxygen having at least 70% molecular O2.
- Another embodiment of a method for preheating metal-containing pellets upstream of a melting furnace, comprising: charging unheated pellets into an inlet end of refractory-lined preheater furnace; heating the pellets by: firing at least one burner into the preheater furnace to impart heat to the pellets; exhausting combustion gases produced by the at least one burner from the preheater furnace; and discharging heated pellets from an exit end of the preheater furnace, wherein the exit end is opposite the inlet end.
- the method of preheating metal-containing pellets may also include rotating the preheater furnace about its axis to enhance mixing of the pellets and heat transfer from the side wall to the pellets.
- the method may be operated in a batch mode by: first charging an amount of the unheated pellets into the inlet end of the preheater furnace; after charging, then heating the pellets until a predetermined condition is attained; and after heating, then discharging the amount of heated pellets from the exit end of the preheater furnace; wherein the predetermined condition is defined by one or more of an elapsed amount of time, a temperature, or another measured or predetermined process parameter.
- the method may be operated in a semi-continuous mode by: simultaneously charging unheated pellets into inlet end of the preheater furnace at a feed rate, heating the pellets, and discharging heated pellets from the preheater furnace at a discharge rate; and continuously causing the pellets to move from the inlet end toward the exit end during the simultaneous charging, heating, and discharging; wherein the feed rate is at least as great as the discharge rate, except in the event of a disruption of the charging of unheated pellets; and wherein one of more of the actions of charging and discharging in the simultaneously charging step may be occasionally disrupted.
- the method may also include causing the pellets to move by inclining the axis of the preheater furnace downward from the inlet end to the exit end while rotating the preheater furnace about its axis.
- the method may also include causing the pellets to move by contacting the pellets with at least one baffle on the substantially cylindrical side wall while rotating the preheater furnace about its axis.
- the method may also include causing the pellets to move by contacting the pellets with a screw conveyor positioned within the preheater furnace.
- the method may also include firing the burner with a slightly fuel-rich equivalence ratio ranging from 1 to 1.3 to inhibit oxidation of the pellets.
- the method may also include firing the burner from the inlet end of the preheater furnace and exhausting the combustion gases from the exit end of the furnace.
- the method may also include firing the burner from the inlet end of the preheater furnace and exhausting the combustion gases from the inlet end of the furnace.
- the method may also include firing the burner from the exit end of the preheater furnace and exhausting the combustion gases from the exit end of the furnace.
- the method may also include firing the burner from the exit end of the preheater furnace and exhausting the combustion gases from the inlet end of the furnace.
- the method may also include operating the at least one burner with an oxidant having one or more of oxygen-enriched air having greater than 23% molecular O2 and industrial-grade oxygen having at least 70% molecular O2.
- the method may also include controlling operation of the at least one burner based on one or more of a measured gas temperature, a measured pellet temperature, a measured flue gas concentration, and another measured process parameter.
- FIG. 1 is a schematic side view showing an arrangement of a system for charging metal pellets into a furnace including a preheater.
- FIG. 2 is a schematic side view of an embodiment of a preheating system showing a fully covered refractory hood preheater using strategically positioned direct flame impingement (DFI) burners over the chute only.
- DFI direct flame impingement
- FIG. 3 is a schematic side view of an embodiment of a preheating system showing a fully covered refractory hood preheater using strategically positioned DFI burners over the chute and the conveyor (including heated and unheated zones).
- FIG. 4 is a schematic side view of an embodiment of a preheating system showing a partially covered refractory hood preheater using strategically positioned DFI burners over the chute and a portion of the conveyor.
- FIG. 5 is a schematic side view of an embodiment of a preheating system showing a fully covered refractory hood preheater using strategically positioned DFI burners to create oxygen-rich and fuel-rich zones over the conveyor.
- FIG. 6 is a schematic side view of an embodiment of a preheater system showing a fully covered refractory hood preheater using strategically positioned DFI burners in the chute only, with oxidizing and reducing zones.
- FIG. 7 is a graph showing pellet temperature vs. time when put under DFI burner at different firing rates.
- FIG. 8 is a graph showing pellet heat up rate vs. time when put under DFI burner at different firing rates.
- FIG. 9 is a schematic side view showing a first arrangement of a system with a rotary furnace configured for DRI preheating.
- FIG. 10 is a schematic side view showing a second arrangement of a system with a rotary furnace configured for DRI preheating.
- FIG. 11 is a schematic side view showing a third arrangement of a system with a rotary furnace configured for DRI preheating.
- the present inventors propose a system and method of preheating the cold DRI/HBI as it is being transported or conveyed from (local) storage at a steel mill to be charged into steel operations such as EAFs (and other relevant processes).
- Use of a preheater furnace, and preferably a rotary type preheater furnace, is expected to provide higher heat transfer efficiency and reduced firing rate requirements (due to increased residence time) as compared to inline heating.
- Direct Reduced Iron (DRI) and/or Hot Briquetted Iron (HBI) are being increasingly used as the charge material into steel operations such as EAFs (and BOFs), in some cases as much as 30-50% of the charge.
- DRI plants are also fast replacing traditional forms of iron ore processing such as blast furnaces because of higher usage of natural gas in DRI making process. Natural gas is preferred because it is a lower-carbon containing, more economically available fuel source compared to coal.
- DRI plants are usually located closer to mining operations and not close to steel mill operations. As a result, a majority of the DRI produced today is transported cold to steel mills, before being stored and eventually charged cold into steel making operations.
- the present inventors propose a system and method of preheating the cold DRI/HBI as it is being transported or conveyed from (local) storage at a steel mill to be charged into steel operations such as EAFs (and other relevant processes).
- Use of direct flame impingement (DFI) is expected to be relatively less capitally intensive and less wasteful in energy practices.
- the time required to increase the temperature of the pellets can be optimized using firing rate modulations, engaging and disengaging different banks of burners; so as to heat the pellets in shortest amount of time possible to reduce any oxidation.
- the terms “pellets” and “metal pellets” are understood to include DRI pellets as well as HBI briquettes or metal-containing granules or other unitized elements of metal-containing materials.
- a conveyor belt 42 transports pelleted metal-containing materials 99 from a storage location (not shown) and then down a chute 28 into a melting furnace 90 .
- the conveyor belt 42 may be flat or sloped upward toward the chute 28 , but typically includes an upward sloped portion 43 that feeds the chute 48 .
- a refractory-lined chute hood 20 positioned above the chute 28 partially or completely covers the chute 28 .
- the chute 28 itself may also be refractory-lined to aid in resisting the heat of combustion generated by the melting furnace 90 and the preheater system 10 .
- the chute 28 and chute hood 20 together form a passage 24 that serves to exhaust some of the hot flue gases from the melting furnace 90 .
- a preheater 12 is configured to provide combustion heating to the pellets 99 before the pellets 99 are charged into the furnace 90 . As shown in FIGS. 2-4 and 7-8 , the preheater 12 includes both the chute hood 20 and a refractory-lined conveyor hood 40 .
- the conveyor hood 40 is positioned above the conveyor 42 and partially or fully covers at least a lengthwise portion of the conveyor 42 .
- the conveyor 42 and conveyor hood 40 together form a passage 46 for the exhaust gases that leave the melting furnace 90 and flow through the passage 24 formed by the chute 28 and chute hood 20 .
- the orientation of the conveyor 42 , conveyor hood 40 , and/or passage 46 may be described as having an entrance end 44 where the pellets 99 enter and an exit end 48 where the pellets 99 exit to the chute 28 .
- a flow P of the pellets 99 moves from the entrance end 44 to the exit end 48
- a flow F of gaseous exhaust or combustion products moves in generally the opposite direction, from the exit end 48 toward the entrance end 44 .
- a flue duct 60 is located at or near the entrance end 44 of the conveyor hood 40 to exhaust combustion products (flue gases) either out of the building, toward the canopy, or elsewhere as determined by local requirements.
- One or more banks 50 of burners 52 are housed at one or more locations in the chute hood 20 and/or the conveyor hood 40 .
- the burners 52 in each bank 50 are positioned strategically along the length and width of the conveyer 42 and emits a flame 54 that impinges the pellets 99 .
- the hoods 20 and 40 will be heated by the burners 52 and radiation from the hoods 20 and 40 will assist efficient heating.
- the preheater 12 utilizes hot flue gases F flowing in a direction that is countercurrent with respect to a direction of the flow P of pellets 99 , thereby assisting with preheating in the same manner as a counterflow heat exchanger.
- the preheater 12 is lined with special refractory coatings to reflect and re-radiate energy back to the pellets 99 .
- the pellets 99 may be mixed by positioning one or more ploughs (not shown) or other mechanism for bringing pellets from the bottom to the top along the length of the belt so that heat may be able to contact all pellets.
- the DFI burners 52 can use oxidizers from 20.9% (all air) to 100% (all oxygen) oxygen-content-in-oxidizer and any fuel including natural gas, propane, COG, BFG, or the like.
- the burners are oxy-fuel burners that use an oxidant having at least 23% molecular O2, more preferable at least 30% molecular O2, and still more preferably industrial-grade oxygen having at least 70% molecular O2.
- the DFI burners 52 positioned along the length of a portion or entirety of conveyor belt 42 or over multiple belts for heating (cold or warm) DRI pellets to be charged continuously into any process including a melting furnace 90 such as an electric arc furnace.
- the DFI burner position, height from the conveyor belt, spacing, angle relative to vertical, flame shape, number of and intensity may be adjusted based on pellet density (e.g., pellet depth, width, height), type of pellet, and speed of the conveyor belt.
- Belt material and shape may be modified to accommodate burner.
- a high temperature belt material is used.
- a belt type that enables maximum surface exposure of DRI pellets to the heat is used, e.g., a belt that provides for a shallow and broad distribution of the pellets.
- FIGS. 2-6 Various embodiments of the preheater 12 are shown in FIGS. 2-6 .
- a burner bank 50 including at least one burner 52 , and preferably a plurality of burners 52 , is positioned in the chute hood 20 over the chute 28 .
- the pellets 90 tumble through the flames 54 emanating from the burners 52 .
- the embodiments of FIGS. 3-6 also use a bank 50 of burners 52 in the chute hood 2 . This configuration enables individual and intimate contact between the flames 54 and each pellet 99 for enhancement of preheating.
- the burners 42 in the chute hood 20 can be configured to deliver intense heat, enabling a high heat-up rate of the pellets 99 so that the pellets 99 can take on significant heat in the chute 28 just before they fall into the melting furnace 90 .
- hot combustion products from the burners 52 in the chute hood 29 are routed upstream through the conveyor hood 40 , over at least a portion of the conveyor 42 and the pellets 99 being transported toward the chute 28 , so as to transfer some of the residual heat in those combustion products to the pellets 99 before they reach the chute 28 .
- the chute 40 is lined with refractory as described herein, that refractory can help capture most of the heat from the burners 52 and reradiate some of that heat onto the pellets 99 while also preventing any damage to the surrounding structure.
- Non-fired zones can be accomplished either by the absence of burners 52 or can be accomplished periodically as needed by selectively turning on and off banks 50 of burners 52 or even individual burners 52 .
- a burner bank 50 is positioned in the chute hood 20 as in the embodiment of FIG. 2 , and in addition, another burner bank 50 is positioned in a downstream portion 30 of the conveyor hood 40 , while an upstream portion 32 of the conveyor hood 40 is devoid of a burner bank 50 (or has a burner bank 50 that is turned off.
- the bank 50 of burners 52 in the downstream portion 30 forms a heated zone
- the absence of a burners 52 in the upstream portion 32 forms an unheated zone.
- the conveyor hood 40 can be shortened to only cover an upstream portion of the conveyor 42 , with a burner bank 50 in the conveyor hood, so that only the covered portion becomes a heated zone.
- upstream and downstream are with reference to the flow P of pellets 99 .
- DRI and other metal-containing pellets 99 may be prone to oxidization, so in some embodiments it may be beneficial to create fuel-rich and/or oxygen-rich zones along the length of the preheating furnace.
- a further burner bank 50 is positioned in the upstream portion 32 of the conveyor hood 40 .
- the preheater 12 can be configured and operated such that the burner bank 50 in the upstream portion 32 farther from the furnace 90 operates oxygen-rich (i.e., more oxygen than is stoichiometrically necessary to full combustion the fuel) so as to create an oxygen-rich or oxidizing zone, while the burner bank 50 in the downstream portion 30 nearer the furnace 90 operates fuel-rich (i.e., with insufficient oxygen to fully combust the fuel) so as to create a fuel-rich or reducing zone.
- oxygen-rich i.e., more oxygen than is stoichiometrically necessary to full combustion the fuel
- the burner bank 50 in the downstream portion 30 nearer the furnace 90 operates fuel-rich (i.e., with insufficient oxygen to fully combust the fuel) so as to create a fuel-rich or reducing zone.
- oxygen lances 84 can be used to create an oxygen-rich or oxidizing zone 33 over the conveyor 42 farther upstream from furnace 90 , while a burner bank 50 in the chute hood 20 (or in a conveyor hood 40 nearer the furnace, not shown) can be operated fuel-rich to create a fuel-rich or reducing zone in the chute 20 .
- a benefit of a downstream fuel-rich zone as the pellets 99 increase in temperature is that exposing the pellets 99 to a reducing environment will reduce decarburization and protecting the pellets 99 from oxidation (FeO, Fe 3 O 4 , Fe 2 O 3 and the like).
- a benefit of an upstream oxygen-rich zone closer to the combustion products exhaust where the pellets 99 are cooler is that the oxidizing environment can consume undesired CO and extract additional energy release from the combustion process prior to exhaust.
- Operation of the burner banks 50 and individual burners 52 is controlled based on requirement to achieve a target average heat content/temperature of the pellets 99 being charged into the furnace 90 .
- Strategically located sensors 82 in the preheater 12 in conjunction with a controller (not shown) can be used to facilitate this control.
- the sensors 82 may be or may include composition sensors to measure composition of combustion products or flue gases along the length of the conveyor hood 40 and at the exit of the preheater 19 (i.e., at the flue duct 60 ) to modify and control operation of the burner banks 50 to create of desired atmospheres in different zones.
- the sensors 82 may be or may include temperature and imaging sensors (at the same or different locations as the composition sensors 82 ) can be used to measure temperature along the length of the conveyor hood 40 and at the flue duct 60 to control the energy input rates from the various burner banks 50 .
- FIG. 7 shows increase in temperature of a pellet with time for three different firing rates. It is observed that the slope of the curve becomes more steep with increasing firing rate suggesting increase in heat-up rate.
- FIG. 8 shows heat-up rate as a function of different firing rates.
- the firing rate is increased by 3 times the heat up rate is increased by ⁇ 2 times.
- DFI burners can be used to heat the pellets in very short durations (e.g., approximately 8-10 seconds.)
- the burner banks 50 or individual burners 52 can be shut down instantaneously should the conveyor belt 42 fail or for other safety critical reasons. Additionally, an emergency inert cooling system (using an inert gas as nitrogen or argon and/or an inert liquid such as liquid nitrogen or liquid argon) can be installed along the length of the conveyor hood 40 and in-between the burners 52 should quick cooling of the pellets 99 be necessary (for example, if there is a belt stoppage), to alleviate the risk of fire or harm to equipment.
- an emergency inert cooling system using an inert gas as nitrogen or argon and/or an inert liquid such as liquid nitrogen or liquid argon
- FIGS. 9-11 Various other arrangements of a DRI preheater 110 are shown in FIGS. 9-11 .
- a conveyor transports pelleted DRI/HBI (or other metal-containing pellets) from a storage location (not shown) up a ramped portion and into a preheater furnace.
- a preheater furnace any other known supply apparatus for transporting the pellets may be used, such as a hopper or vessel moved by an overhead crane.
- a burner or in some cases multiple burners, are fired to provide heating of the pellets, and a flue exhaust combustion products of the burner or burners from the furnace.
- preheated DRI pellets are supplied to a melting furnace (such as an electric arc furnace or EAF).
- the preheater furnace 120 is a refractory-lined substantially cylindrical furnace defined by an axis (extending lengthwise) and having two end walls 122 and 124 , each end wall having an opening or door through at least a portion thereof.
- An inlet end wall 122 corresponds to the end of the furnace through which the DRI pellets 99 enter the furnace 120
- an exit end wall 124 corresponds to the end of the furnace 120 through which the DRI pellets exit the preheating furnace 120 .
- the inlet wall 122 is opposite the exit wall 124 .
- a substantially cylindrical side wall 126 joins the inlet end wall 122 and the exit end wall 124 , and a central axis is defined by the cylindrical side wall 126 .
- the preheater furnace 120 is mounted so that it can be rotated on its axis. Preferably, the speed of rotation can be controlled. Preferably, the preheater furnace 120 is lined with one or more special refractory coatings to reflect and re-radiate energy back to the DRI pellets 99 . Flue gases will be directed either out of the building, toward the canopy, or elsewhere as determined by local requirements.
- Preheating the DRI pellets requires at least one burner 130 to supply heat to the furnace 120 and at least one flue 160 to exhaust combustion products from the furnace 120 .
- at least one burner 130 is mounted in the inlet end wall 122 of the furnace 120 and a flue 160 is mounted in the exit end wall 124 of the furnace 120 ; this embodiment results in a single-pass co-flow arrangement.
- At least one burner 130 is mounted in the exit end wall 124 of the furnace 120 , and a flue 160 is also mounted in the exit end wall 124 ; this embodiment results in a double-pass arrangement that is initially counter-flow.
- At least one burner 130 is mounted in the inlet end wall 122 of the furnace 120 , and a flue 160 is also mounted in the inlet end wall 122 ; this embodiment results in a double-pass arrangement that is initially co-flow.
- At least one burner 130 is mounted in the exit end wall 124 of the furnace 120 and a flue 160 is mounted in the inlet end wall 122 of the furnace 120 ; this embodiment results in a single-pass counter-flow arrangement.
- the pellets 99 on the moving conveyor 42 are inputted into the preheater furnace 120 through an opening in the inlet end 122 or door of the furnace 120 and discharged from the preheater furnace 120 through an opening in the exit end 124 or door.
- the process can operate in a batch mode or semi-continuous mode.
- pellets e.g., when the inlet feed cannot be stopped but the melting furnace is not capable of immediately receiving heated pellets
- disperse pellets e.g., when the inlet feed is stopped, whether by plan or unintentionally, and it is desired to continue charging the melting furnace.
- a preheater furnace is superior to merely heating on a continuous conveyor due to the added buffering capacity.
- a predetermined amount of pellets are loaded in the preheater furnace (e.g., by mass or volume or quantity of pellets) and are heated for a period of time, or until a desired average pellet temperature is reached, or until some other parameter or criteria is attained, and then the pellets are discharged as a batch into the melting furnace.
- the pellets can be heated to any desired temperature that is less than their melting temperature.
- pellets are loaded from the moving conveyor into the preheater furnace at a feed rate and are heated as they move axially through the preheater furnace. Heated pellets are discharged from the preheater furnace at a discharge rate into the melting furnace.
- the feed rate of the pellets is at least as large as the discharge rate, and preferably the feed rate is somewhat greater than discharge rate so as to ensure a sufficient residence time of the pellets in the preheater furnace and to ensure a substantially continuous stream of pellets being discharged from the furnace.
- There is expected to be a rough correlation of the feed rate and the discharge rate such that adjusting the feed rate will, with a time lag, cause a resultant adjustment in the discharge rate.
- the pellets are contained in the furnace for a residence time on the order of minutes.
- the exit opening through which pellets are discharged from the preheater furnace into the melting furnace is preferably located at the opposite end of the preheater furnace from the inlet opening through which pellets are fed into the preheater furnace.
- the at least one burner and the inlet opening can be located on the same end or on opposite ends of the preheater furnace.
- a screw conveyor arrangement could be placed inside the furnace to efficiently mix the pellets and to ensure substantially uniform exposure of the pellets to the radiation and hot combustion gases produced by the at least one burner.
- at least one baffle may be positioned on at least a portion of the substantially cylindrical side wall to function to urge the pellets to move from the inlet end to the exit end.
- the at least one baffle is a helical baffle configured to function as a screw conveyor on the interior of the preheater furnace side wall.
- a screw conveyor may be positioned within the preheater furnace for urging or compelling the pellets to move from the inlet end to the exit end.
- the preheater furnace may be a tilted furnace or capable of tilting to help better contain the charge material while batch process as well as accomplishing input and discharge of pellets.
- the preheater furnace may be mounted at a fixed angle a with respect to horizontal, with the inlet end higher than the exit end.
- the preheater furnace may be pivotable so that it can move to any angle a from horizontal to near vertical during charging, heating, and/or discharging, as required by the process.
- the inlet and outlet can be through the same end of the furnace and tilting can be used to facilitate both holding the pellets in the furnace and discharge.
- the inlet and exit are preferably at opposite ends, but a modest tilt angle a through the operation can still assist in both retaining pellets and encouraging a flow from feed to discharge.
- a controller may be used to operate the at least one burner, for example to control the heating profile in the furnace, the atmosphere in the furnace, and/or the discharge temperature of the pellets.
- a single burner is utilized.
- two or more burners are used in order to control the amount of heat provided to one or more zones or regions in the furnace.
- the burner firing rate and residence time in preheater furnace can be controlled based on requirement to achieve an aim average heat content/temperature of the charged pellets using sensors in the preheater furnace. Further, as noted above, the preheater furnace can serve as a buffer so that pellets an continue to be fed into the melting furnace for a period of time even if is a stoppage of the input conveyor belt.
- DRI pellets tend to oxidize, so in some embodiments it may be beneficial to control the atmosphere in the furnace to be slightly fuel rich (an equivalence ratio of 1 to 1.3, or preferably an equivalence ratio of 1 to 1.1).
- Equivalence ratio indicates the amount of fuel provided as compared with the amount of fuel that would be completely combusted to CO 2 and H 2 O by the available oxygen).
- equivalence ratio is the inverse of stoichiometry, wherein stoichiometric combustion uses the theoretical amount of oxygen required to completely combust the fuel, super-stoichiometric or fuel-lean (equivalence ratio less than 1) uses excess oxygen, and sub-stoichiometric or fuel-rich (equivalence ratio greater than 1) uses insufficient oxygen.
- flue gas sensors could be used to measure composition of flue gases along the length and at the exit of the preheater to modify and control the generation of desired atmospheres.
- temperature and imaging sensors could be used to measure temperature along the length and at the exit of the preheater to control the energy input.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Organic Chemistry (AREA)
- Manufacturing & Machinery (AREA)
- Metallurgy (AREA)
- Materials Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Furnace Details (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
- Tunnel Furnaces (AREA)
- Manufacture Of Iron (AREA)
- Manufacture And Refinement Of Metals (AREA)
- Vertical, Hearth, Or Arc Furnaces (AREA)
Abstract
Description
- This application claims priority from U.S. Provisional Application No. 62/531,019 filed Jul. 11, 2017 and U.S. Provisional Application No. 62/621,754 filed Jan. 25, 2018, each of which is incorporated by reference herein in its entirety.
- To the best of the inventors' knowledge, reheating of direct reduced iron (DRI) or hot briquetted iron (HBI) is not currently practiced. However, DRI is sometimes produced onsite at the steel mill and transferred hot into an electric arc furnace (EAF) for melting. This practice has resulted in good electrical energy savings (and other operational benefits) in the EAF (20 kWh per ton of DRI charged for every 100° C. temperature increase). It may be possible to preheat DRI using conventional indirect combustion methodologies, but those would require large capital investments and wasteful energy practices. Additionally, longer exposure to uncontrolled combustion atmospheres can lead to unwanted oxidation of the DRI surface. The systems and methods described herein have the objective of overcoming the lower energy efficiencies in melting of DRI relative to preheated or hot-charged DRI/HBI.
- Direct Reduced Iron (DRI) and/or Hot Briquetted Iron (HBI) are being increasingly used as the charge material into steel operations such as EAFs (and BOFs), in some cases as much as 30-50% of the charge. DRI or HBI are typically provided in a pelleted form which are sometimes referred to herein as metal-containing pellets.
- DRI plants are also fast replacing traditional forms of iron ore processing such as blast furnaces because of higher usage of natural gas in DRI making process. Natural gas is preferred because it is a lower-carbon containing, more economically available fuel source compared to coal. DRI plants are usually located closer to mining operations and/or where natural gas is economical, and are not necessarily close to steel mill operations. As a result, a majority of the DRI produced today is transported cold to steel mills, before being stored and eventually charged cold into steel making operations.
- Aspect 1. A direct flame impingement system for preheating metal pellets before charging into a melting furnace, wherein the pellets are transported by a conveyor belt to a chute discharging into the melting furnace, comprising: a refractory-lined preheater hood including a chute hood covering the chute and a conveyor hood covering at least a portion of the conveyor belt, the preheater hood having an entrance end through which pellets enter and an exit end through which pellets exit toward the melting furnace; and at least one bank of burners each containing at least one burner disposed in the hood positioned to direct flames into contact with the pellets being transported to preheat the pellets prior to discharge into the melting furnace.
- Aspect 2. The direct flame impingement system of Aspect 1, wherein the at least one bank of burners includes a chute bank of burners disposed in the chute hood containing at least one burner positioned to direct flames into contact with the pellets being transported through the chute.
- Aspect 3. The direct flame impingement system of Aspect 1 or 2, wherein the at least one bank of burners includes a first conveyor bank of burners disposed in the conveyor hood containing at least one burner positioned to direct flames into contact with pellets being transported on a first section of the conveyor belt.
- Aspect 4. The direct flame impingement system of Aspect 3, wherein the at least one bank of burners further includes a second conveyor bank of burners containing at least one burner disposed in the conveyor hood positioned to direct flames into contact with the pellets on a second section the conveyor belt.
- Aspect 5. The direct flame impingement system of Aspect 4, wherein at any particular time, one of the first and second banks of conveyor burners is controlled to be fuel-rich so as to create a reducing zone and the other of the first and second banks of conveyor burners is controlled to be oxygen-rich so as to create an oxidizing zone; and wherein the reducing zone is near the exit end of the conveyor cover and the oxidizing zone is near the entrance end of the conveyor cover.
- Aspect 6. The direct flame impingement system of any one of Aspects 1-5, further comprising a bank of inert fluid nozzles positioned along the conveyor cover for injecting inert fluid toward the conveyor to enable rapid cooling and/or fire suppression of the pellets, wherein the inert fluid is selected from the group consisting of an inert gas, an inert liquid, and a combination of an inert gas and an inert liquid.
- Aspect 7. The direct flame impingement system of any one of claims Aspects 1-6, further comprising a flue at the entrance end of the preheater hood to induct hot flue gases to flow from the melting furnace, under the preheater hood and over the pellets in the chute and on the conveyor, to enhance convective heat transfer to the pellets.
-
Aspect 8. The direct flame impingement system of any one of Aspects 1-7, further comprising one or more ploughs along the conveyor belt to mix the pellets for enhanced contact of the flames with the pellets. - Aspect 9. The direct flame impingement system of any one of Aspects 1-8, wherein the burners combust fuel with one or more of air, oxygen-enriched air having greater than 23% molecular O2, and industrial-grade oxygen having at least 70% molecular O2.
-
Aspect 10. The direct flame impingement system of any one of Aspects 1-9, further comprising: at least one sensor to detect a process condition; and a controller programmed to operate the burners based on the process condition; wherein when the at least one sensor is a flue gas sensor positioned at the entrance end of the preheater hood to measure the concentration of one or more gases in the flue gas, the controller is programmed to adjust operation of the burners based on a measure concentration of one or more gases in the flue gas; wherein when the at least one sensor is a temperature sensor positioned in the conveyor hood for measuring one or more of gas temperature, pellet temperature, and belt temperature the controller is programmed to adjust operation of the burners based on one or more of a measured gas temperature, a measured pellet temperature, and a measured belt temperature; and wherein when the at least one sensor is configured and arranged to detect a safety condition, the controller is programmed to shut down the burners in the event a safety condition is detected. - Aspect 11. A method of preheating metal pellets upstream of a melting furnace, wherein the pellets transported by a conveyor belt and to a chute discharging into the melting furnace, comprising: operating at least one bank of burners each containing at least one burner to direct flames into contact with the pellets being transported to preheat the pellets prior to discharge into the melting furnace.
-
Aspect 12. A preheating system for preheating metal-containing pellets before charging into a melting furnace, comprising: a refractory-lined preheater furnace having an inlet end wall, an exit end wall opposite the inlet end wall, and a substantially cylindrical side wall defined by an axis of the furnace and extending from the inlet end wall to the exit end wall, the inlet end wall having a door or opening for receiving unheated pellets, the exit end wall having a door or opening for discharging heated pellets toward the melting furnace; at least one burner for firing into the preheater furnace to impart heat to the pellets; and a flue for exhausting combustion gases produced by the burner from the preheater furnace; wherein the preheater furnace rotatable and is arranged to rotate about its axis. - Aspect 13. The preheater system of
Aspect 12, further comprising: a controller programmed to control operation of the at least one burner so as to produce a non-oxidizing atmosphere over the pellets to inhibit oxidation of the pellets. - Aspect 14. The preheater system of
Aspect 12, further comprising a mechanism in the furnace configured and arranged urge the pellets to move from the inlet end to the exit end. - A direct flame impingement system disclosed for preheating metal pellets before charging into a melting furnace, wherein the pellets transported by a conveyor belt to a chute discharging into the melting furnace, including a refractory-lined conveyor hood covering at least a portion of the conveyor belt, the conveyor hood having an entrance end through which pellets enter and an exit end through which pellets exit toward the chute; and a first bank of conveyor burners containing at least one burner disposed in the conveyor hood positioned to direct flames into contact with the pellets on a first section of the covered portion of the conveyor belt.
- The direct flame impingement system may also include a flue connection at the entrance end of the conveyor hood to induct hot flue gases to flow from the melting furnace and preheating section over the unheated pellets, to enhance convective heat transfer to the pellets.
- The direct flame impingement system may also include one or more ploughs along the conveyor belt to mix the pellets for enhanced contact of the flames with the pellets.
- The direct flame impingement system may also include a refractory-lined chute hood covering the chute, and a bank of chute burners containing at least one burner disposed in the chute hood positioned to direct flames into contact with the pellets being discharged via the chute into the furnace.
- The direct flame impingement system may also include a second bank of conveyor burners containing at least one burner disposed in the conveyor hood positioned to direct flames into contact with the pellets on a second section of the covered portion of the conveyor belt.
- The direct flame impingement system may, at any particular time, be controlled such that one of the first and second banks of conveyor burners is fuel-rich so as to create a reducing zone and the other of the first and second banks of conveyor burners is oxygen-rich so as to create an oxidizing zone. The reducing zone is near the exit end of the conveyor cover and the oxidizing zone is near the entrance end of the conveyor cover.
- In the direct flame impingement system, the burners may combust fuel with one or more of air, oxygen-enriched air having greater than 23% molecular O2, and industrial-grade oxygen having at least 70% molecular O2.
- The direct flame impingement system may also include at least one flue gas sensor positioned in the conveyor hood for measuring the concentration of one or more gases in the flue gas.
- The direct flame impingement system may also include at least one temperature or imaging sensor positioned in the conveyor hood for measuring one or more of gas temperature, pellet temperature, and belt temperature.
- The direct flame impingement system may also include a controller programmed to operate the burners. The controller may be programmed to shut down the burners in the event of a conveyor belt failure, conveyor belt overheating, or other safety condition. The controller may also be programmed to adjust operation of the burners based on a measure concentration of one or more gases in the flue gas. The controller may also be programmed to adjust operation of the burners based on one or more of a measured gas temperature, a measured pellet temperature, and a measured belt temperature.
- The direct flame impingement system may also include a bank of inert fluid nozzles positioned along the conveyor cover for injecting inert fluid (gas, liquid, or combination thereof) toward the conveyor to enable rapid cooling and/or fire suppression of the pellets.
- A method of preheating metal pellets upstream of a melting furnace is also disclosed, wherein the pellets transported by a conveyor belt and to a chute discharging into the melting furnace, including covering a first portion of the conveyor belt in a refractory-lined conveyor hood; and operating a first bank of conveyor burners containing at least one burner to direct flames into contact with the pellets on the first portion of the conveyor belt.
- The method of preheating metal pellets may also include operating a bank of chute burners containing at least one burner to direct flames into contact with the pellets being discharged via the chute into the furnace.
- The method of preheating metal pellets may also include covering a second portion of the conveyor belt in the refractory-lined conveyor hood; and operating second bank of conveyor burners containing at least one burner to direct flames into contact with the pellets on a second portion of the conveyor belt.
- The method of preheating metal pellets, wherein at any particular time, firing one of the first and second banks of conveyor burners to create a heated zone and refraining from firing the other of the first and second banks of conveyor burners to create an unheated zone.
- The method of preheating metal pellets, wherein at any particular time, controlling one of the first and second banks of conveyor burners to be fuel-rich to create a reducing zone and controlling the other of the first and second banks of conveyor burners to be oxygen-rich to create an oxidizing zone.
- The method of preheating metal pellets may also include measuring the concentration of one or more gases in the conveyor hood.
- The method of preheating metal pellets may also include measuring one or more of gas temperature, pellet temperature, and belt temperature in the conveyor hood.
- The method of preheating metal pellets may also include shutting down the burners in the event of a conveyor belt failure, conveyor belt overheating, or other safety condition.
- The method of preheating metal pellets may also include adjusting operation of the burners based on a measure concentration of one or more gases in the conveyor hood.
- The method of preheating metal pellets may also include adjusting operation of the burners based on one or more of a measured gas temperature, a measured pellet temperature, and a measured belt temperature.
- The method of preheating metal pellets may also include injecting inert gas and/or inert liquid toward the conveyor to enable rapid cooling and/or fire suppression of the pellets.
- In another embodiment, a preheating system is disclosed for preheating metal-containing pellets before charging into a melting furnace, comprising: a refractory-lined preheater furnace having an inlet end wall, an exit end wall opposite the inlet end wall, and a substantially cylindrical side wall defined by an axis of the furnace and extending from the inlet end wall to the exit end wall, the inlet end wall having a door or opening for receiving unheated pellets, the exit end wall having a door or opening for discharging heated pellets toward the melting furnace; at least one burner for firing into the preheater furnace to impart heat to the pellets; and a flue for exhausting combustion gases produced by the burner from the preheater furnace.
- In the preheating system, the preheater furnace may be rotatable and arranged to rotate about its axis.
- In the preheating system, the at least one burner may be positioned in the inlet end wall of the preheater furnace. Alternative, the at least one burner may be positioned in the exit end wall of the preheater furnace. The flue may be positioned in the exit end wall of the furnace. Alternatively, the flue may be positioned in the inlet end wall of the furnace.
- The preheater system may include a controller programmed to control operation of the at least one burner so as to produce a non-oxidizing atmosphere over the pellets to inhibit oxidation of the pellets.
- In the preheating system, the at least one burner may comprise two burners each arranged to fire into a different section of the preheater furnace, and the controller may be programmed to control the relative firing rates and stoichiometries of the two burners to produce the non-oxidizing atmosphere.
- The controller may be programmed to operate the burner at an equivalence ratio from 1 to 1.3 (i.e., fuel-rich, or having insufficient oxygen to fully combust the fuel).
- The controller may be programmed to operate the at least one burner, wherein the controller is programmed to adjust operation of the at least one burner based on one or more of a measured gas temperature, a measured pellet temperature, a measured flue gas concentration, and another measured process parameter.
- The preheater system may further include at least one baffle on at least a portion of the substantially cylindrical side wall to function urge the pellets to move from the inlet end to the exit end. The at least one baffle is a helical baffle may be configured to function as a screw conveyor.
- The axis of the preheater furnace may be angled with respect to horizontal such that the inlet end is at least slightly higher than the exit end to encourage movement of the pellets from the inlet end to the exit end and to facilitate discharge of the pellets from the exit end.
- The preheater furnace may be arranged to be tilted so that the axis is at any angle from horizontal to vertical.
- The at least one burner in the preheater may be an oxy-fuel burner operated with an oxidant having one or more of oxygen-enriched air having greater than 23% molecular O2 and industrial-grade oxygen having at least 70% molecular O2.
- Another embodiment of a method is disclosed for preheating metal-containing pellets upstream of a melting furnace, comprising: charging unheated pellets into an inlet end of refractory-lined preheater furnace; heating the pellets by: firing at least one burner into the preheater furnace to impart heat to the pellets; exhausting combustion gases produced by the at least one burner from the preheater furnace; and discharging heated pellets from an exit end of the preheater furnace, wherein the exit end is opposite the inlet end.
- The method of preheating metal-containing pellets, wherein the preheater furnace has a substantially cylindrical side wall defined by an axis of the furnace and being bounded by an inlet wall at the inlet end and an exit wall at the exit end, may also include rotating the preheater furnace about its axis to enhance mixing of the pellets and heat transfer from the side wall to the pellets.
- The method may be operated in a batch mode by: first charging an amount of the unheated pellets into the inlet end of the preheater furnace; after charging, then heating the pellets until a predetermined condition is attained; and after heating, then discharging the amount of heated pellets from the exit end of the preheater furnace; wherein the predetermined condition is defined by one or more of an elapsed amount of time, a temperature, or another measured or predetermined process parameter.
- The method may be operated in a semi-continuous mode by: simultaneously charging unheated pellets into inlet end of the preheater furnace at a feed rate, heating the pellets, and discharging heated pellets from the preheater furnace at a discharge rate; and continuously causing the pellets to move from the inlet end toward the exit end during the simultaneous charging, heating, and discharging; wherein the feed rate is at least as great as the discharge rate, except in the event of a disruption of the charging of unheated pellets; and wherein one of more of the actions of charging and discharging in the simultaneously charging step may be occasionally disrupted.
- The method may also include causing the pellets to move by inclining the axis of the preheater furnace downward from the inlet end to the exit end while rotating the preheater furnace about its axis.
- The method may also include causing the pellets to move by contacting the pellets with at least one baffle on the substantially cylindrical side wall while rotating the preheater furnace about its axis.
- The method may also include causing the pellets to move by contacting the pellets with a screw conveyor positioned within the preheater furnace.
- The method may also include firing the burner with a slightly fuel-rich equivalence ratio ranging from 1 to 1.3 to inhibit oxidation of the pellets.
- The method may also include firing the burner from the inlet end of the preheater furnace and exhausting the combustion gases from the exit end of the furnace.
- The method may also include firing the burner from the inlet end of the preheater furnace and exhausting the combustion gases from the inlet end of the furnace.
- The method may also include firing the burner from the exit end of the preheater furnace and exhausting the combustion gases from the exit end of the furnace.
- The method may also include firing the burner from the exit end of the preheater furnace and exhausting the combustion gases from the inlet end of the furnace.
- The method may also include operating the at least one burner with an oxidant having one or more of oxygen-enriched air having greater than 23% molecular O2 and industrial-grade oxygen having at least 70% molecular O2.
- The method may also include controlling operation of the at least one burner based on one or more of a measured gas temperature, a measured pellet temperature, a measured flue gas concentration, and another measured process parameter.
- The present invention will hereinafter be described in conjunction with the appended figures wherein like numerals denote like elements:
-
FIG. 1 is a schematic side view showing an arrangement of a system for charging metal pellets into a furnace including a preheater. -
FIG. 2 is a schematic side view of an embodiment of a preheating system showing a fully covered refractory hood preheater using strategically positioned direct flame impingement (DFI) burners over the chute only. -
FIG. 3 is a schematic side view of an embodiment of a preheating system showing a fully covered refractory hood preheater using strategically positioned DFI burners over the chute and the conveyor (including heated and unheated zones). -
FIG. 4 is a schematic side view of an embodiment of a preheating system showing a partially covered refractory hood preheater using strategically positioned DFI burners over the chute and a portion of the conveyor. -
FIG. 5 is a schematic side view of an embodiment of a preheating system showing a fully covered refractory hood preheater using strategically positioned DFI burners to create oxygen-rich and fuel-rich zones over the conveyor. -
FIG. 6 is a schematic side view of an embodiment of a preheater system showing a fully covered refractory hood preheater using strategically positioned DFI burners in the chute only, with oxidizing and reducing zones. -
FIG. 7 is a graph showing pellet temperature vs. time when put under DFI burner at different firing rates. -
FIG. 8 is a graph showing pellet heat up rate vs. time when put under DFI burner at different firing rates. -
FIG. 9 is a schematic side view showing a first arrangement of a system with a rotary furnace configured for DRI preheating. -
FIG. 10 is a schematic side view showing a second arrangement of a system with a rotary furnace configured for DRI preheating. -
FIG. 11 is a schematic side view showing a third arrangement of a system with a rotary furnace configured for DRI preheating. - The present inventors propose a system and method of preheating the cold DRI/HBI as it is being transported or conveyed from (local) storage at a steel mill to be charged into steel operations such as EAFs (and other relevant processes). Use of a preheater furnace, and preferably a rotary type preheater furnace, is expected to provide higher heat transfer efficiency and reduced firing rate requirements (due to increased residence time) as compared to inline heating.
- Two important factors when heating DRI are heat transfer efficiency and atmosphere control to avoid oxidation of the pellets.
- Direct Reduced Iron (DRI) and/or Hot Briquetted Iron (HBI) are being increasingly used as the charge material into steel operations such as EAFs (and BOFs), in some cases as much as 30-50% of the charge. DRI plants are also fast replacing traditional forms of iron ore processing such as blast furnaces because of higher usage of natural gas in DRI making process. Natural gas is preferred because it is a lower-carbon containing, more economically available fuel source compared to coal. DRI plants are usually located closer to mining operations and not close to steel mill operations. As a result, a majority of the DRI produced today is transported cold to steel mills, before being stored and eventually charged cold into steel making operations.
- The present inventors propose a system and method of preheating the cold DRI/HBI as it is being transported or conveyed from (local) storage at a steel mill to be charged into steel operations such as EAFs (and other relevant processes). Use of direct flame impingement (DFI) is expected to be relatively less capitally intensive and less wasteful in energy practices. The time required to increase the temperature of the pellets can be optimized using firing rate modulations, engaging and disengaging different banks of burners; so as to heat the pellets in shortest amount of time possible to reduce any oxidation. As used herein, the terms “pellets” and “metal pellets” are understood to include DRI pellets as well as HBI briquettes or metal-containing granules or other unitized elements of metal-containing materials.
- An arrangement for a
DRI preheater system 10 is shown inFIG. 1 , and various specific embodiments of the arrangement are shown inFIGS. 2-4 and 7-8 (discussed in detail below). Aconveyor belt 42 transports pelleted metal-containingmaterials 99 from a storage location (not shown) and then down achute 28 into a meltingfurnace 90. Theconveyor belt 42 may be flat or sloped upward toward thechute 28, but typically includes an upward sloped portion 43 that feeds thechute 48. A refractory-linedchute hood 20 positioned above thechute 28 partially or completely covers thechute 28. Thechute 28 itself may also be refractory-lined to aid in resisting the heat of combustion generated by the meltingfurnace 90 and thepreheater system 10. Thechute 28 andchute hood 20 together form apassage 24 that serves to exhaust some of the hot flue gases from the meltingfurnace 90. - A
preheater 12 is configured to provide combustion heating to thepellets 99 before thepellets 99 are charged into thefurnace 90. As shown inFIGS. 2-4 and 7-8 , thepreheater 12 includes both thechute hood 20 and a refractory-linedconveyor hood 40. - The
conveyor hood 40 is positioned above theconveyor 42 and partially or fully covers at least a lengthwise portion of theconveyor 42. Theconveyor 42 andconveyor hood 40 together form apassage 46 for the exhaust gases that leave themelting furnace 90 and flow through thepassage 24 formed by thechute 28 andchute hood 20. - For reference purposes, the orientation of the
conveyor 42,conveyor hood 40, and/orpassage 46 may be described as having anentrance end 44 where thepellets 99 enter and anexit end 48 where thepellets 99 exit to thechute 28. A flow P of thepellets 99 moves from theentrance end 44 to theexit end 48, while a flow F of gaseous exhaust or combustion products moves in generally the opposite direction, from theexit end 48 toward theentrance end 44. - A
flue duct 60 is located at or near theentrance end 44 of theconveyor hood 40 to exhaust combustion products (flue gases) either out of the building, toward the canopy, or elsewhere as determined by local requirements. - One or
more banks 50 ofburners 52 are housed at one or more locations in thechute hood 20 and/or theconveyor hood 40. Theburners 52 in eachbank 50 are positioned strategically along the length and width of theconveyer 42 and emits aflame 54 that impinges thepellets 99. Additionally, thehoods burners 52 and radiation from thehoods - The
preheater 12 utilizes hot flue gases F flowing in a direction that is countercurrent with respect to a direction of the flow P ofpellets 99, thereby assisting with preheating in the same manner as a counterflow heat exchanger. - Preferably, the
preheater 12 is lined with special refractory coatings to reflect and re-radiate energy back to thepellets 99. - The
pellets 99 may be mixed by positioning one or more ploughs (not shown) or other mechanism for bringing pellets from the bottom to the top along the length of the belt so that heat may be able to contact all pellets. - The DFI burners 52 can use oxidizers from 20.9% (all air) to 100% (all oxygen) oxygen-content-in-oxidizer and any fuel including natural gas, propane, COG, BFG, or the like. Preferably, the burners are oxy-fuel burners that use an oxidant having at least 23% molecular O2, more preferable at least 30% molecular O2, and still more preferably industrial-grade oxygen having at least 70% molecular O2.
- The DFI burners 52, positioned along the length of a portion or entirety of
conveyor belt 42 or over multiple belts for heating (cold or warm) DRI pellets to be charged continuously into any process including amelting furnace 90 such as an electric arc furnace. The DFI burner position, height from the conveyor belt, spacing, angle relative to vertical, flame shape, number of and intensity may be adjusted based on pellet density (e.g., pellet depth, width, height), type of pellet, and speed of the conveyor belt. Belt material and shape may be modified to accommodate burner. Preferably a high temperature belt material is used. Preferably a belt type that enables maximum surface exposure of DRI pellets to the heat is used, e.g., a belt that provides for a shallow and broad distribution of the pellets. - Various embodiments of the
preheater 12 are shown inFIGS. 2-6 . In the embodiment ofFIG. 2 , aburner bank 50 including at least oneburner 52, and preferably a plurality ofburners 52, is positioned in thechute hood 20 over thechute 28. Just prior to dropping the heated DRI pellets into the desired process (e.g., melting furnace 90), thepellets 90 tumble through theflames 54 emanating from theburners 52. The embodiments ofFIGS. 3-6 also use abank 50 ofburners 52 in the chute hood 2. This configuration enables individual and intimate contact between theflames 54 and eachpellet 99 for enhancement of preheating. - Limiting a zone of direct combustion heating to the
chute 28 that carries thepellets 99 fromconveyor 42 to the meltingfurnace 90, alleviates the need for an expensive high temperature conveyor belt and any damage that may be caused by interaction of flames and hot combustion products with the belt. Theburners 42 in thechute hood 20 can be configured to deliver intense heat, enabling a high heat-up rate of thepellets 99 so that thepellets 99 can take on significant heat in thechute 28 just before they fall into the meltingfurnace 90. Additionally, hot combustion products from theburners 52 in the chute hood 29 are routed upstream through theconveyor hood 40, over at least a portion of theconveyor 42 and thepellets 99 being transported toward thechute 28, so as to transfer some of the residual heat in those combustion products to thepellets 99 before they reach thechute 28. And if thechute 40 is lined with refractory as described herein, that refractory can help capture most of the heat from theburners 52 and reradiate some of that heat onto thepellets 99 while also preventing any damage to the surrounding structure. - In some embodiments, it may be beneficial to use a combination of fired zones and non-fired zones to control rate of preheating. Non-fired zones can be accomplished either by the absence of
burners 52 or can be accomplished periodically as needed by selectively turning on and offbanks 50 ofburners 52 or evenindividual burners 52. - In the embodiment of
FIG. 3 , aburner bank 50 is positioned in thechute hood 20 as in the embodiment ofFIG. 2 , and in addition, anotherburner bank 50 is positioned in adownstream portion 30 of theconveyor hood 40, while anupstream portion 32 of theconveyor hood 40 is devoid of a burner bank 50 (or has aburner bank 50 that is turned off. Thus, thebank 50 ofburners 52 in thedownstream portion 30 forms a heated zone, while the absence of aburners 52 in theupstream portion 32 forms an unheated zone. In the embodiment ofFIG. 4 , theconveyor hood 40 can be shortened to only cover an upstream portion of theconveyor 42, with aburner bank 50 in the conveyor hood, so that only the covered portion becomes a heated zone. As used herein, the terms “upstream” and “downstream” are with reference to the flow P ofpellets 99. - DRI and other metal-containing
pellets 99 may be prone to oxidization, so in some embodiments it may be beneficial to create fuel-rich and/or oxygen-rich zones along the length of the preheating furnace. - In the embodiment of
FIG. 5 , in addition to aburner bank 50 in thechute hood 20 and aburner bank 50 in thedownstream portion 30 of theconveyor hood 40, afurther burner bank 50 is positioned in theupstream portion 32 of theconveyor hood 40. With this arrangement, thepreheater 12 can be configured and operated such that theburner bank 50 in theupstream portion 32 farther from thefurnace 90 operates oxygen-rich (i.e., more oxygen than is stoichiometrically necessary to full combustion the fuel) so as to create an oxygen-rich or oxidizing zone, while theburner bank 50 in thedownstream portion 30 nearer thefurnace 90 operates fuel-rich (i.e., with insufficient oxygen to fully combust the fuel) so as to create a fuel-rich or reducing zone. - Similarly, in the embodiment of
FIG. 6 , oxygen lances 84 can be used to create an oxygen-rich or oxidizingzone 33 over theconveyor 42 farther upstream fromfurnace 90, while aburner bank 50 in the chute hood 20 (or in aconveyor hood 40 nearer the furnace, not shown) can be operated fuel-rich to create a fuel-rich or reducing zone in thechute 20. - A benefit of a downstream fuel-rich zone as the
pellets 99 increase in temperature is that exposing thepellets 99 to a reducing environment will reduce decarburization and protecting thepellets 99 from oxidation (FeO, Fe3O4, Fe2O3 and the like). A benefit of an upstream oxygen-rich zone closer to the combustion products exhaust where thepellets 99 are cooler is that the oxidizing environment can consume undesired CO and extract additional energy release from the combustion process prior to exhaust. - Operation of the
burner banks 50 andindividual burners 52, including such parameters as firing rate, number of burners operating and sequence of firing, and stoichiometry of the burners, is controlled based on requirement to achieve a target average heat content/temperature of thepellets 99 being charged into thefurnace 90. Strategically locatedsensors 82 in thepreheater 12, in conjunction with a controller (not shown) can be used to facilitate this control. - For example, the
sensors 82 may be or may include composition sensors to measure composition of combustion products or flue gases along the length of theconveyor hood 40 and at the exit of the preheater 19 (i.e., at the flue duct 60) to modify and control operation of theburner banks 50 to create of desired atmospheres in different zones. In addition, or alternatively, thesensors 82 may be or may include temperature and imaging sensors (at the same or different locations as the composition sensors 82) can be used to measure temperature along the length of theconveyor hood 40 and at theflue duct 60 to control the energy input rates from thevarious burner banks 50. -
FIG. 7 shows increase in temperature of a pellet with time for three different firing rates. It is observed that the slope of the curve becomes more steep with increasing firing rate suggesting increase in heat-up rate. -
FIG. 8 shows heat-up rate as a function of different firing rates. When the firing rate is increased by 3 times the heat up rate is increased by ˜2 times. Thus, DFI burners can be used to heat the pellets in very short durations (e.g., approximately 8-10 seconds.) - The
burner banks 50 orindividual burners 52 can be shut down instantaneously should theconveyor belt 42 fail or for other safety critical reasons. Additionally, an emergency inert cooling system (using an inert gas as nitrogen or argon and/or an inert liquid such as liquid nitrogen or liquid argon) can be installed along the length of theconveyor hood 40 and in-between theburners 52 should quick cooling of thepellets 99 be necessary (for example, if there is a belt stoppage), to alleviate the risk of fire or harm to equipment. - Various other arrangements of a
DRI preheater 110 are shown inFIGS. 9-11 . - Each arrangement has some common elements or features.
- In the depicted embodiments of
FIGS. 9-11 , a conveyor transports pelleted DRI/HBI (or other metal-containing pellets) from a storage location (not shown) up a ramped portion and into a preheater furnace. It is understood that any other known supply apparatus for transporting the pellets may be used, such as a hopper or vessel moved by an overhead crane. In the preheater furnace, a burner, or in some cases multiple burners, are fired to provide heating of the pellets, and a flue exhaust combustion products of the burner or burners from the furnace. From the preheater furnace, preheated DRI pellets are supplied to a melting furnace (such as an electric arc furnace or EAF). - As shown in
FIGS. 9-11 , thepreheater furnace 120 is a refractory-lined substantially cylindrical furnace defined by an axis (extending lengthwise) and having twoend walls inlet end wall 122 corresponds to the end of the furnace through which theDRI pellets 99 enter thefurnace 120, and anexit end wall 124 corresponds to the end of thefurnace 120 through which the DRI pellets exit the preheatingfurnace 120. Theinlet wall 122 is opposite theexit wall 124. A substantiallycylindrical side wall 126 joins theinlet end wall 122 and theexit end wall 124, and a central axis is defined by thecylindrical side wall 126. Thepreheater furnace 120 is mounted so that it can be rotated on its axis. Preferably, the speed of rotation can be controlled. Preferably, thepreheater furnace 120 is lined with one or more special refractory coatings to reflect and re-radiate energy back to theDRI pellets 99. Flue gases will be directed either out of the building, toward the canopy, or elsewhere as determined by local requirements. - Preheating the DRI pellets requires at least one
burner 130 to supply heat to thefurnace 120 and at least oneflue 160 to exhaust combustion products from thefurnace 120. In a first embodiment (FIG. 9 ), at least oneburner 130 is mounted in theinlet end wall 122 of thefurnace 120 and aflue 160 is mounted in theexit end wall 124 of thefurnace 120; this embodiment results in a single-pass co-flow arrangement. - Alternatively, in a second embodiment (
FIG. 10 ), at least oneburner 130 is mounted in theexit end wall 124 of thefurnace 120, and aflue 160 is also mounted in theexit end wall 124; this embodiment results in a double-pass arrangement that is initially counter-flow. - Alternatively, in a third embodiment (
FIG. 11 ), at least oneburner 130 is mounted in theinlet end wall 122 of thefurnace 120, and aflue 160 is also mounted in theinlet end wall 122; this embodiment results in a double-pass arrangement that is initially co-flow. - In a fourth embodiment (not shown), at least one
burner 130 is mounted in theexit end wall 124 of thefurnace 120 and aflue 160 is mounted in theinlet end wall 122 of thefurnace 120; this embodiment results in a single-pass counter-flow arrangement. - The
pellets 99 on the movingconveyor 42 are inputted into thepreheater furnace 120 through an opening in theinlet end 122 or door of thefurnace 120 and discharged from thepreheater furnace 120 through an opening in theexit end 124 or door. The process can operate in a batch mode or semi-continuous mode. The term “semi-continuous” is used to denote: (i) a mode that could be operated continuously, in which the feed rate through the inlet end is nominally equal to the discharge rate through the exit end, for an indefinite period of time, or for as long as necessary to charge the melting furnace; and/or (ii) a mode in which there are disruptions of flow at one end or the other, and in which the preheater furnace serves as a buffer to either accumulate pellets (e.g., when the inlet feed cannot be stopped but the melting furnace is not capable of immediately receiving heated pellets) or disperse pellets (e.g., when the inlet feed is stopped, whether by plan or unintentionally, and it is desired to continue charging the melting furnace). In this way, a preheater furnace is superior to merely heating on a continuous conveyor due to the added buffering capacity. - In a batch mode, a predetermined amount of pellets are loaded in the preheater furnace (e.g., by mass or volume or quantity of pellets) and are heated for a period of time, or until a desired average pellet temperature is reached, or until some other parameter or criteria is attained, and then the pellets are discharged as a batch into the melting furnace. The pellets can be heated to any desired temperature that is less than their melting temperature.
- In a semi-continuous operation, pellets are loaded from the moving conveyor into the preheater furnace at a feed rate and are heated as they move axially through the preheater furnace. Heated pellets are discharged from the preheater furnace at a discharge rate into the melting furnace. The feed rate of the pellets is at least as large as the discharge rate, and preferably the feed rate is somewhat greater than discharge rate so as to ensure a sufficient residence time of the pellets in the preheater furnace and to ensure a substantially continuous stream of pellets being discharged from the furnace. There is expected to be a rough correlation of the feed rate and the discharge rate such that adjusting the feed rate will, with a time lag, cause a resultant adjustment in the discharge rate. In the semi-continuous operation mode, the pellets are contained in the furnace for a residence time on the order of minutes. Particularly in the semi-continuous mode, the exit opening through which pellets are discharged from the preheater furnace into the melting furnace is preferably located at the opposite end of the preheater furnace from the inlet opening through which pellets are fed into the preheater furnace The at least one burner and the inlet opening can be located on the same end or on opposite ends of the preheater furnace.
- The pellets are mixed thoroughly by the rotating motion of the furnace. In addition, a screw conveyor arrangement could be placed inside the furnace to efficiently mix the pellets and to ensure substantially uniform exposure of the pellets to the radiation and hot combustion gases produced by the at least one burner. Alternatively, or in addition, at least one baffle may be positioned on at least a portion of the substantially cylindrical side wall to function to urge the pellets to move from the inlet end to the exit end. In one embodiment, the at least one baffle is a helical baffle configured to function as a screw conveyor on the interior of the preheater furnace side wall. In addition to or separately from the at least one baffle, a screw conveyor may be positioned within the preheater furnace for urging or compelling the pellets to move from the inlet end to the exit end.
- Alternatively, or in addition to a screw conveyor or baffles, the preheater furnace may be a tilted furnace or capable of tilting to help better contain the charge material while batch process as well as accomplishing input and discharge of pellets. The preheater furnace may be mounted at a fixed angle a with respect to horizontal, with the inlet end higher than the exit end. In addition, or alternative, the preheater furnace may be pivotable so that it can move to any angle a from horizontal to near vertical during charging, heating, and/or discharging, as required by the process. For a batch process, the inlet and outlet can be through the same end of the furnace and tilting can be used to facilitate both holding the pellets in the furnace and discharge. For a continuous process, the inlet and exit are preferably at opposite ends, but a modest tilt angle a through the operation can still assist in both retaining pellets and encouraging a flow from feed to discharge.
- A controller may be used to operate the at least one burner, for example to control the heating profile in the furnace, the atmosphere in the furnace, and/or the discharge temperature of the pellets. In some embodiments, a single burner is utilized. In other embodiments, two or more burners are used in order to control the amount of heat provided to one or more zones or regions in the furnace.
- The burner firing rate and residence time in preheater furnace can be controlled based on requirement to achieve an aim average heat content/temperature of the charged pellets using sensors in the preheater furnace. Further, as noted above, the preheater furnace can serve as a buffer so that pellets an continue to be fed into the melting furnace for a period of time even if is a stoppage of the input conveyor belt.
- In some embodiments, it may be beneficial to modulate the firing rate of the burner to control the preheating temperature if needed.
- DRI pellets tend to oxidize, so in some embodiments it may be beneficial to control the atmosphere in the furnace to be slightly fuel rich (an equivalence ratio of 1 to 1.3, or preferably an equivalence ratio of 1 to 1.1). Equivalence ratio indicates the amount of fuel provided as compared with the amount of fuel that would be completely combusted to CO2 and H2O by the available oxygen). A skilled person would understand that equivalence ratio is the inverse of stoichiometry, wherein stoichiometric combustion uses the theoretical amount of oxygen required to completely combust the fuel, super-stoichiometric or fuel-lean (equivalence ratio less than 1) uses excess oxygen, and sub-stoichiometric or fuel-rich (equivalence ratio greater than 1) uses insufficient oxygen. In addition, flue gas sensors could be used to measure composition of flue gases along the length and at the exit of the preheater to modify and control the generation of desired atmospheres. In addition, or alternatively, temperature and imaging sensors could be used to measure temperature along the length and at the exit of the preheater to control the energy input.
- While the principles of the invention have been described above in connection with preferred embodiments, it is to be clearly understood that this description is made only by way of example and not as a limitation of the scope of the invention.
Claims (14)
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/025,230 US20190017745A1 (en) | 2017-07-11 | 2018-07-02 | Systems and Methods for Preheating Metal-Containing Pellets |
TR2018/09735A TR201809735A2 (en) | 2017-07-11 | 2018-07-09 | Systems and methods of pre-heating application to metal containing pellets. |
MX2018008481A MX2018008481A (en) | 2017-07-11 | 2018-07-09 | Systems and methods for preheating metal-containing pellets. |
CA3010841A CA3010841C (en) | 2017-07-11 | 2018-07-09 | Systems and methods for preheating metal-containing pellets |
BR102018014006-0A BR102018014006B1 (en) | 2017-07-11 | 2018-07-10 | SYSTEMS AND METHODS FOR PREHEATING METAL-CONTAINING PELLETS |
CN201810758587.0A CN109234485B (en) | 2017-07-11 | 2018-07-11 | System and method for preheating metal-containing pellets |
US17/397,021 US12305926B2 (en) | 2017-07-11 | 2021-08-09 | Methods for preheating metal-containing pellets |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201762531019P | 2017-07-11 | 2017-07-11 | |
US201862621754P | 2018-01-25 | 2018-01-25 | |
US16/025,230 US20190017745A1 (en) | 2017-07-11 | 2018-07-02 | Systems and Methods for Preheating Metal-Containing Pellets |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/397,021 Division US12305926B2 (en) | 2017-07-11 | 2021-08-09 | Methods for preheating metal-containing pellets |
Publications (1)
Publication Number | Publication Date |
---|---|
US20190017745A1 true US20190017745A1 (en) | 2019-01-17 |
Family
ID=65000114
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/025,230 Abandoned US20190017745A1 (en) | 2017-07-11 | 2018-07-02 | Systems and Methods for Preheating Metal-Containing Pellets |
US17/397,021 Active 2041-02-11 US12305926B2 (en) | 2017-07-11 | 2021-08-09 | Methods for preheating metal-containing pellets |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/397,021 Active 2041-02-11 US12305926B2 (en) | 2017-07-11 | 2021-08-09 | Methods for preheating metal-containing pellets |
Country Status (5)
Country | Link |
---|---|
US (2) | US20190017745A1 (en) |
CN (1) | CN109234485B (en) |
CA (1) | CA3010841C (en) |
MX (1) | MX2018008481A (en) |
TR (1) | TR201809735A2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11060792B2 (en) | 2018-03-23 | 2021-07-13 | Air Products And Chemicals, Inc. | Oxy-fuel combustion system and method for melting a pelleted charge material |
EP4127573A4 (en) * | 2020-03-24 | 2024-06-05 | Midrex Technologies, Inc. | A method and system for heating direct reduced iron (dri) between a dri source and processing equipment for the dri |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111148335A (en) * | 2020-01-13 | 2020-05-12 | 内蒙古赛思普科技有限公司 | Plasma preheating pre-reduction spray gun for smelting reduction furnace, reduction furnace and application |
JPWO2024185210A1 (en) * | 2023-03-07 | 2024-09-12 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3837791A (en) * | 1972-07-06 | 1974-09-24 | Sulzer Ag | Apparatus and process for preheating scrap iron |
US4609400A (en) * | 1984-08-02 | 1986-09-02 | Intersteel Technology, Inc. | Method and apparatus for preheating charge materials for continuous steelmaking |
US6155333A (en) * | 1999-02-23 | 2000-12-05 | Techint Compagnia Tecnica Internazionale | Continuous electric steelmaking with charge preheating, melting, refining and casting |
US20030061909A1 (en) * | 1996-03-15 | 2003-04-03 | Kabushiki Kaisha Kobe Seiko Sho | Method and apparatus for making metallic iron |
US20050077658A1 (en) * | 2003-10-10 | 2005-04-14 | Glen Zdolshek | Fume treatment system and method |
US20150218666A1 (en) * | 2012-09-20 | 2015-08-06 | Mitsubishi Heavy Industries, Ltd. | Blast furnace installation |
Family Cites Families (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU422152B2 (en) | 1968-02-16 | 1972-03-07 | Monzino Riotinto Of Australia Limited | Method and apparatus for refining metals |
US3615353A (en) | 1968-03-15 | 1971-10-26 | Harold A Mahoney | Apparatus and process of smelting scrap |
JPS4817563B1 (en) * | 1969-06-14 | 1973-05-30 | ||
US3632099A (en) * | 1969-08-14 | 1972-01-04 | Westinghouse Electric Corp | Molten metal supplying apparatus |
US3620519A (en) * | 1969-11-24 | 1971-11-16 | Dravo Corp | Traveling grate apparatus and method |
US4457777A (en) | 1981-09-07 | 1984-07-03 | British Steel Corporation | Steelmaking |
US4359209A (en) | 1982-01-06 | 1982-11-16 | Bloom Engineering Co., Inc. | Hot air ladle preheat station and method |
TW265286B (en) | 1993-06-23 | 1995-12-11 | Gas Res Inst | |
US6296756B1 (en) | 1999-09-09 | 2001-10-02 | H20 Technologies, Ltd. | Hand portable water purification system |
US8137654B2 (en) * | 2005-10-05 | 2012-03-20 | Jfe Material Co., Ltd. | Method of roasting material containing at least one of V, Mo and Ni and rotary kiln for roasting the same |
SE530124C2 (en) * | 2005-11-08 | 2008-03-04 | Morphic Technologies Ab Publ | Arrangement and method of heating metal objects |
SE529299C2 (en) | 2005-12-27 | 2007-06-26 | Aga Ab | A method of adjusting the hardness of a sheet-like metal product |
DE102006005063A1 (en) | 2006-02-03 | 2007-08-09 | Linde Ag | Process for the heat treatment of steel strip |
SE531512C2 (en) | 2007-09-14 | 2009-05-05 | Aga Ab | Apparatus and method for heating a metal material |
SE534565C2 (en) | 2009-06-23 | 2011-10-04 | Linde Ag | Annealing of cold rolled metal strips |
JP5400553B2 (en) * | 2009-10-08 | 2014-01-29 | 株式会社神戸製鋼所 | Molten metal production equipment |
SE534718C2 (en) | 2010-04-06 | 2011-11-29 | Linde Ag | Method and apparatus for processing continuous or discrete metal products |
IT1401116B1 (en) | 2010-07-14 | 2013-07-12 | Tenova Spa | LOADING SYSTEM CONTINUES TO A FUSION OVEN OF PRE-HEATED METALLIC MATERIAL IN CONTINUOUS FORM, ENHANCED AND COMBINED. |
KR101220554B1 (en) * | 2010-12-28 | 2013-01-10 | 주식회사 포스코 | Apparatus for Manufacturing Molten Iron and Method for Manufacturing Molten Iron Using the Apparatus |
JP5957348B2 (en) * | 2012-09-21 | 2016-07-27 | Primetals Technologies Japan株式会社 | Partially reduced iron production equipment |
US20150275326A1 (en) | 2012-10-05 | 2015-10-01 | Linde Aktiengesellschaft | Preheating and annealing of cold rolled metal strip |
CN103276278B (en) * | 2013-06-04 | 2015-10-21 | 罕王实业集团有限公司 | A kind of fusion reducing furnace for smelting laterite-nickel ores |
US9976806B2 (en) * | 2013-10-30 | 2018-05-22 | Posco | Burning apparatus and method for manufacturing reduced iron using the same |
CN104232826B (en) * | 2014-10-21 | 2016-10-05 | 郭瑛 | With method and the equipment thereof of Low-grade and hard-to-separate iron ore ironmaking |
JP2016160473A (en) * | 2015-02-27 | 2016-09-05 | 三菱重工業株式会社 | Partially reduced iron production device and method |
CN205223318U (en) * | 2015-12-08 | 2016-05-11 | 杨博文 | Ore pelletizing preparation facilities of burn -ining |
CN207121618U (en) * | 2017-09-11 | 2018-03-20 | 刘成军 | A kind of iron-contained material continuous steelmaking device |
-
2018
- 2018-07-02 US US16/025,230 patent/US20190017745A1/en not_active Abandoned
- 2018-07-09 MX MX2018008481A patent/MX2018008481A/en unknown
- 2018-07-09 TR TR2018/09735A patent/TR201809735A2/en unknown
- 2018-07-09 CA CA3010841A patent/CA3010841C/en active Active
- 2018-07-11 CN CN201810758587.0A patent/CN109234485B/en active Active
-
2021
- 2021-08-09 US US17/397,021 patent/US12305926B2/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3837791A (en) * | 1972-07-06 | 1974-09-24 | Sulzer Ag | Apparatus and process for preheating scrap iron |
US4609400A (en) * | 1984-08-02 | 1986-09-02 | Intersteel Technology, Inc. | Method and apparatus for preheating charge materials for continuous steelmaking |
US20030061909A1 (en) * | 1996-03-15 | 2003-04-03 | Kabushiki Kaisha Kobe Seiko Sho | Method and apparatus for making metallic iron |
US6155333A (en) * | 1999-02-23 | 2000-12-05 | Techint Compagnia Tecnica Internazionale | Continuous electric steelmaking with charge preheating, melting, refining and casting |
US20050077658A1 (en) * | 2003-10-10 | 2005-04-14 | Glen Zdolshek | Fume treatment system and method |
US20150218666A1 (en) * | 2012-09-20 | 2015-08-06 | Mitsubishi Heavy Industries, Ltd. | Blast furnace installation |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11060792B2 (en) | 2018-03-23 | 2021-07-13 | Air Products And Chemicals, Inc. | Oxy-fuel combustion system and method for melting a pelleted charge material |
EP4127573A4 (en) * | 2020-03-24 | 2024-06-05 | Midrex Technologies, Inc. | A method and system for heating direct reduced iron (dri) between a dri source and processing equipment for the dri |
Also Published As
Publication number | Publication date |
---|---|
CA3010841C (en) | 2020-07-21 |
CA3010841A1 (en) | 2019-01-11 |
US20210364237A1 (en) | 2021-11-25 |
BR102018014006A2 (en) | 2019-01-29 |
CN109234485A (en) | 2019-01-18 |
CN109234485B (en) | 2021-04-23 |
MX2018008481A (en) | 2019-02-08 |
US12305926B2 (en) | 2025-05-20 |
TR201809735A2 (en) | 2019-05-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US12305926B2 (en) | Methods for preheating metal-containing pellets | |
PL174544B1 (en) | Method of and system for continuously preheating metallurgical furnace charge materials | |
CN101473048B (en) | Direct smelting plant with waste heat recovery unit | |
US7377773B2 (en) | Method of reducing NOx emissions in rotary preheater mineral kilns | |
CN101660866A (en) | Rotary hearth furnace for treating metal oxide materials | |
US11060792B2 (en) | Oxy-fuel combustion system and method for melting a pelleted charge material | |
US8034283B2 (en) | Rotary hearth furnace and method of operating the same | |
KR100654478B1 (en) | Method and apparatus for reducing feedstock in rotary hearth furnace | |
EP2107327B1 (en) | Thermal gas flow control system in the electric arc furnace | |
BR102018014006B1 (en) | SYSTEMS AND METHODS FOR PREHEATING METAL-CONTAINING PELLETS | |
BG62940B1 (en) | Method for metal reduction and smelting | |
AU755217B2 (en) | Induction furnace for a metal reduction and melting process | |
US20070137436A1 (en) | Method for the thermal treatment of raw materials and a device for carrying out said method | |
WO2009119843A1 (en) | Raw material introduction apparatus for molten iron making and method for introducing raw material for molten iron making | |
WO2009034544A2 (en) | Static slope reduction furnace | |
ES2806548T3 (en) | Method to reduce the use of salt in aluminum recycling | |
RU2407805C2 (en) | Procedure for melting steel in arc steel melting furnace and device for implementation of this procedure | |
AU2005215826B2 (en) | Direct smelting plant and process | |
SU606068A1 (en) | Shaft furnace | |
US1094802A (en) | Metallizing-furnace. | |
MXPA01003080A (en) | Method for producing directly reduced metal in a multi-tiered furnace | |
MXPA01000339A (en) | Induction furnace for a metal reduction and melting process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: AIR PRODUCTS AND CHEMICALS, INC., PENNSYLVANIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BURAGINO, GREGORY J.;SANE, ANUP VASANT;GANGOLI, SHAILESH PRADEEP;AND OTHERS;SIGNING DATES FROM 20180731 TO 20180816;REEL/FRAME:046911/0544 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: EXPRESSLY ABANDONED -- DURING EXAMINATION |