US20170323239A1 - Constrained time computing control system to simulate and optimize aircraft operations with dynamic thermodynamic state and asset utilization attainment - Google Patents

Constrained time computing control system to simulate and optimize aircraft operations with dynamic thermodynamic state and asset utilization attainment Download PDF

Info

Publication number
US20170323239A1
US20170323239A1 US15/346,585 US201615346585A US2017323239A1 US 20170323239 A1 US20170323239 A1 US 20170323239A1 US 201615346585 A US201615346585 A US 201615346585A US 2017323239 A1 US2017323239 A1 US 2017323239A1
Authority
US
United States
Prior art keywords
aircraft
operations
engine
flight
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US15/346,585
Inventor
Christopher Donald Johnson
Ilkin Onur Dulgeroglu
David S. Toledano
Adam Rasheed
Aristotelis E. Thanos
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Co
Original Assignee
General Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Electric Co filed Critical General Electric Co
Priority to US15/346,585 priority Critical patent/US20170323239A1/en
Assigned to GENERAL ELECTRIC COMPANY reassignment GENERAL ELECTRIC COMPANY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: JOHNSON, CHRISTOPHER DONALD, RASHEED, ADAM, THANOS, ARISTOTELIS E., TOLEDANO, DAVID S., DULGEROGLU, ILKIN ONUR
Publication of US20170323239A1 publication Critical patent/US20170323239A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06314Calendaring for a resource
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/067Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1093Calendar-based scheduling for persons or groups
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/018Certifying business or products
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/14Travel agencies
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C5/00Registering or indicating the working of vehicles
    • G07C5/08Registering or indicating performance data other than driving, working, idle, or waiting time, with or without registering driving, working, idle or waiting time
    • G07C5/0841Registering performance data
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G5/00Traffic control systems for aircraft, e.g. air-traffic control [ATC]
    • G08G5/003Flight plan management
    • G08G5/0034Assembly of a flight plan
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Definitions

  • This application relates generally to the field of aircraft operational control and, in one specific embodiment, to a control system for computing the dynamic optimization of the aircraft engine system in the present and over a configurable time interval to achieve constrained stale estimation objectives or constraints of an operator or original equipment manufacturer (OEM).
  • OEM operator or original equipment manufacturer
  • optimizing such factors for an enterprise is typically ad hoc in nature as well as time-consuming.
  • FIGS. 1A-1G are framework diagrams illustrating the relationships of choices and operational paths associated with an example industrial system
  • FIG. 2 is a framework diagram of life assumptions as they relate to risk transfer and component state in one or multiple time horizons used to transfer risk between an asset operator and service provider;
  • FIG. 3 is a block diagram of an example architecture for implementation of the simulator/optimizer of FIG. 2 ;
  • FIG. 4 is a flow chart of an example method of optimizing operations using a digital twin system
  • FIG. 5 is a block diagram depicting data and analytical system relationships for asset and operations state control
  • FIG. 6 is a block diagram depicting one or more concurrent physical and business system state control optimizations and centralized simulation based orchestration
  • FIG. 7 is a graph depicting stakeholder risk and return preference and an available pareto frontier at one or more intervals of time
  • FIGS. 8A-8C are flow diagrams of local and global control points of an example industrial system
  • FIG. 9 is a relationship diagram depicting physical and business optimization of an example industrial system
  • FIG. 10 is a graphical representation of an example decision support interface for co-optimization of design and operations
  • FIG. 11 is a block diagram of a machine in the example form of a processing system within which may be executed a set of instructions for causing the machine to perform any one or more of the methodologies discussed herein;
  • FIG. 12 is a block diagram of an assumptions schema for the constrained computational system
  • FIG. 13 is a block diagram of a constrained and unconstrained computational control system schema for estimation of thermodynamic performance and asset utilization
  • FIG. 14 is a block diagram of a constrained cash service system with inner optimizing feedback loops for repair parts stocking, state estimation feedback precision attainment and flight schedule assignment;
  • FIG. 15 is a block diagram of a computational control system's feedback loop structure
  • a large, complex industrial system such as, for example, one or more aircraft engines and the aircraft and service systems which interface with them, may be viewed as both a physical system and a business system that can be dynamically controlled to achieve a specified physical state at any chosen point in time, over one or many components in one or more assets, such as a fleet, an aircraft or an engine or its subsystems, and for a plurality of assets.
  • the targeted physical state being controlled for may be automatically and dynamically adjusted to achieve one or more key performance outcomes of one or more stakeholders over one or more time intervals.
  • balancing these interests involves adjusting various aspects of the industrial system, such as, for example, the operational assignments, placement of new or repaired apparatus as a function of cost and technical capabilities of the components of the system, the configuration of those components, the real time physical control settings of engine fuel and air, the specific operations or control of the business system or network, such as scheduling spare parts stocking level and location placement, scheduling the type of parts to be stocked such as new parts or rebuilt parts or certified used parts that may not have had a repair, deriving the schedule for maintenance operations applied to the engines and their work scope determination, the costs and risks of service, and myriad other factors.
  • a method of providing a first set of computer systems with access to a recommendation pertaining to operation of one aircraft in one or more fleets of aircraft is disclosed.
  • Operations data is collected at the first set of computer systems.
  • the operations data pertains to operations of the one or more fleets of aircraft over a time period.
  • the operations data is stored in one or more databases of a second set of computer systems.
  • the operations data includes values corresponding to fields in the one or more databases.
  • the fields represent at least one of policy data pertaining to one or more operations policies, flight schedule data pertaining to one or more flight schedules, and operating cost data pertaining to operating costs associated with the one or more fleets of aircraft.
  • Assumptions of control input values are derived for use by the first set of computer systems based on the operations data.
  • a cost savings analysis is performed with a simulation system for at least one aircraft of the one or more fleets of aircraft, the cost savings analysis including identifying a modification of at least one of the control input values.
  • An estimated reduction of operating costs is computed for the aircraft over one or more time periods. The computing is based on comparisons of a first subset of the operations data with a second subset of the operations data.
  • asset lifting state changes are computed in response to a directed duty cycle that differentially degrades engine performance according to those duty cycles and sets the allocation of shop capacity in terms of stocking levels of components, component type, component repair and scheduling of machine work stations, subject to cash objectives at one or more instances of time at a given confidence interval, said statistical confidence being a derived virtual control signal used in an optimization loop to stratify a fleet of assets and schedule physical inspection.
  • a flight schedule of an aircraft may be beneficially changed to reduce fuel and service costs while meeting airline asset utilization criteria associated with operating the aircraft, and the operating limits of inventory scheduling are concurrently attained by stocking, production scheduling and forecast precision—with the control points based upon the disclosed computing state control system and comparisons of operations data collected from databases of multiple external computer systems corresponding to multiple fleets of aircraft associated with one or multiple customers and shop capacity control systems.
  • the assignment and operation of the subject assets or their states of readiness and/or thermodynamic or operational performance may be governed by a regulation, and/or a contract and/or a maintenance guide.
  • the computing control system controls the industrial system configuration dataflow, the assignment of the industrial system according to a duty, the maintenance of the assets and the consumption of resources in their repair. For various operating schedules and policies, the computing control system calculates either or both of the operator's performance metrics and the service providers.
  • An airline may manage revenue per seat or airline passenger miles or on time departure or other metric as a measure of how efficiently their asset utilization is.
  • Another financial metric may include return on assets in which case the assets may be aircraft, their engine spares and service shops.
  • the present computational control system dynamically and optimally assigns assets to duty cycles, schedules specific maintenance work scope and timing, subject to the constraints of regulation, contract terms and asset or capital structure which sets the number and types of assets and spares—all by setting the assignment duty cycles and maintenance to control the physical states of the assets, monitoring and estimating the states in the current and future intervals of time and dynamically changing the assignments and repair workscopes of the one or more assets.
  • engine state estimation (e.g., including damage state estimation) is determined using cumulative damage models (CDMs) over historical, current, and future time horizons using historical data.
  • CDMs cumulative damage models
  • the basis for these damage models may be historical observation of engine operations and resultant repairs to create probabilities of life such as Weibull distributions.
  • Physics based first principle engineering models are derived with, for example, thermodynamics, chemical and metallurgical analysis.
  • the historical data may be aggregated from a plurality of sources, such as engine sensors, service shops, lab tests (image, chemical, physical measures), airline schedules and weather services, and stored in a structured data environment to create assumptions (e.g., for life cycling of specific parts, specific clustering of parts or subsystems as a function of how they jointly fail, or calculating probabilities of failure for specific parts).
  • the data may be used for the setting of life limits (e.g., in cycles independently or in conjunction with metal temperatures or in conjunction with operating patterns or control patterns) and Weibull failure estimations of clustered parts or subsystems, or a cumulative damage model (or other state estimation of the current damage of that part or system at a specific point in time) of specific parts and subsystems.
  • each part or subsystem has a unique part identifier that the system tracks in a translational way through operating (e.g., as part of one engine for its lifecycle or as a component that existed in multiple engines over one or more repair cycles).
  • a specific history or schedule of operations of the engine asset at the asset serial number may be derministically established.
  • the asset's subcomponents may be a set of parts that change during repair or service events, which are tracked by discrete serial number and enabled to emulate physical state estimations, suggest operational decisions, such as repairs and route and engine assignments, and calculate stakeholder finances for an emulated period.
  • combinations of engine assets are determined
  • the determinations may include jointly optimizing multiple operations for multiple stakeholders, deciding to change one of the engines, or matching how the aircraft is going to be scheduled (duty or location of operations or on-wing maintenance activities or operating parameters).
  • joint optimization is enabled with respect to work scope and assignment of engine assets (e.g., including the parts that are selected to be a component of the engine asset) to an aircraft across a portfolio of assets, such as operating engines on in-service aircraft, engines in repair, rotable engines in waiting, or repaired part or subsystem components in inventory.
  • engine assets e.g., including the parts that are selected to be a component of the engine asset
  • assets such as operating engines on in-service aircraft, engines in repair, rotable engines in waiting, or repaired part or subsystem components in inventory.
  • maintenance cost optimization is enabled to, for example, minimize the total service cost and negative free cash flow variance from an operating plan or a deferred balance, over a specified time interval such as a contract period or as a function of asset membership in the portfolio where the portfolio has an economic life forecast such as when engines will be retired from service or sub-component of an engine will be repaired, placed, or retired.
  • operating cost optimization is enabled to minimize fuel consumption and/or the opportunity costs of reliability (e.g., such that one or more engine assets and their component parts are assigned to a route and have a specified state of repair and/or efficiency so as to fly routes whose schedule is informed by the efficiency and/or reliability of the assigned one or more aircraft engine(s) on said aircraft).
  • operating cost optimization is included, such as, for example, where the portfolio of assets (aircraft and/or engines and/or parts) are jointly repaired and assigned, so as to lower the fuel consumption, and the un-reliability opportunity cost for a portfolio, in the instant or over a prescribed forecast interval.
  • the interval is randomly selected or determined as a function of one or more service contract intervals covering that portfolio or forecasts of that portfolio's operating life factoring in retirements.
  • assignments are derived and then optimally controlled by the disclosed computing system to achieve the enterprise risk/return preferences for the physical-business system such as an airline, an investor, or an OEM.
  • the physical-business system such as an airline, an investor, or an OEM.
  • Examples include the quantity and type of aircraft and aircraft engines, the physical features of the engine, control and service levels, cost and risk, including an investor's economic return and risk when making investments into the aircraft physical-business system, and an OEM's performance-based service contract terms, price, management and risk, and the contractual service agreement (CSA)/maintenance service agreement (MSA) target ratio.
  • CSA contractual service agreement
  • MSA maintenance service agreement
  • the risk of service cost in a contractual service agreement is estimated and priced, such as, for example, where maintenance cost and/or operating cost and/or reliability is to be guaranteed.
  • the estimating and pricing uses average estimates derived for many historical observations, such as Weibull distributions, and life limited settings for one or more engines in the agreement.
  • specific historical data is used to create a reliability characterization, such as those historical data that represents a certain operating mode and that that probability distribution is thus used for more specific forecasting by virtue of its basis more closely matching that of a given current engine's life.
  • orchestration of the forecasts in a discrete event and agent based simulation is included as a core component of the disclosed control system.
  • the orchestration logic implements subsystem decision support such as assignment optimization, spares utilization assignments, leased engine scheduling, flight operations policy and control set points, ground operations scheduling, parts forecasting, control preference, and work scope specification as directed by the discrete event simulation code.
  • the orchestration may be directed by an agent based simulation or hybrid of continuous, agent and discrete event.
  • An outer loop optmizer solves individual decision support preferences (e.g., from, pricing, work scope, assignment, rotables management, retirement estimation, portfolio membership, and so on) to optimize the ratio of risk and return to one or both of the preferences of an aircraft fleet owner whose assets are under contract or the offeror of the service contract or operation s optimization decision support, such as an OEM or third party service provider.
  • decision support preferences e.g., from, pricing, work scope, assignment, rotables management, retirement estimation, portfolio membership, and so on
  • Other optimization objectives enabled by the disclosed computing control system include cash consumption, inventory, spares, turnaround time (TAT).
  • a physics-based approach is accepted in addition to data driven methods into the simulation.
  • CDMs are used to estimate the state of the aircraft engine to optimize various operations, such as work scope, spares parts stocking, TAT, maintenance, and contractual service agreements' cost exposure for a given service level.
  • the damage/life degradation of tracked subsystems in an asset or the asset in whole will be estimated using one or more CDMs in a selectable interval of time, including a future time where the duty cycles of the asset are controlled by a simulation or are being utilized according to a schedule.
  • Joint optimization of industrial assets may be used for a combination of work scope scheduling, inventory planning, route assignment, asset assignment to a higher level system (e.g., a certain aircraft engine to a certain aircraft) design modification, dynamical control, financing, service contract underwriting, or service contract operations management.
  • a higher level system e.g., a certain aircraft engine to a certain aircraft
  • Scenario planning and purposed orchestration is incorporated to achieve desired states of the physical assets and the operations that use and consume those assets (e.g., using an agent-based and/or discrete event simulation approach).
  • operating histories of parts and assets including life experiences (e.g., location, exogenous factors, controls signals, sensor signals, repair activity inspection results, events manufacturing data, and so on) are stored and used for life cycle control of the state of physical and operations systems, including orchestration of tracked parts (e.g., an engine shroud), asset systems (e.g., an engine), higher level systems (e.g., an aircraft), portfolios of higher level systems (e g., aircraft types and clusters of aircraft), scheduled location, exogenous factors (e.g., temperature, humidity, pressure, suspended chemicals, or aerosols) at locations (e.g., city pairs or geo-spatial coordinates), resources that are used, conveyed, or processed (e.g., ground operations, fuel, passengers, crew, cargo, and so on) by higher level
  • digital twins of asset entities and operation entities are created and maintained within the system for use in operations simulation.
  • the digital twin is a digital representation of an actual state of an asset or operations model as it can best be approximated at a particular time period based on data inputs and statistical analysis.
  • the data inputs may include an observed state of the asset at a particular time point and historical data pertaining to states of similar assets over time.
  • a Digital Twin is a continuously tuned, serial-number specific digital representation available in a scalable manner so that every piece of equipment in a set of assets (e.g., a fleet of aircraft, the engines assigned to the aircraft, or the subsystems within the engines) is individually modeled with respect to its state estimation, including life and efficiency states.
  • Digital Twin Operations Optimization is a logical extension that models the operations with the intent to optimize the rate of state change caused by the purposed operations of the assets and the business systems which support their use and consumption processes so as to improve financial and operating key performance indicator (KPI) objectives.
  • KPIs and functional objectives may collide where a local optimal may detract from a system wide benefit—and a means is created to optimally manage the dynamical business-physical system's impact on, for example, customer asset utilization, fuel consumption, shop cost, capacity and inventory, safe risk adjusted CSA/MSA growth and cash flow from operations.
  • a discrete-event simulation models the provider-customer ecosystem in order to understand the impact of different operating decisions to both the provider and the customer in a consistent modeling framework and set of assumptions, in example embodiments, this capability has the core discrete-event simulation engine in the background on a parallelized, high-performance computing environment, serving multiple light-weight applications.
  • Each light-weight application is designed to address a specific question of interest by interacting with the core simulation, the simulation assumptions data base or in-memory arrays, post-processing the output, interacting with the post-processed database(s) or computer(s) memory and reporting the results from the simulation, memory or data store in a relevant format that may itself be configurable by the user for the user to make a decision one or multiple times on an ongoing basis.
  • these models can be used to understand the actual performance of the equipment in its operating environment, ultimately providing better forecasts for performance degradation, maintenance workscopes, scheduling, and spare parts.
  • these models can be integrated and used to provide a fleet-wide perspective to identify system-level efficiencies and strategic planning.
  • a logical extension of Digital Twin is to model the actual customer and provider operations used to generate desired business outcomes and, ideally, optimize the processes to improve either or both customer and provider financial objectives.
  • a DTOO model of customer operations may call and/or incorporate the digital twins of the equipment and business system the customer is operating to either explore potential future scenarios (as a human-driven sensitivity/what-if tool), or in a more advanced form, actually suggest optimal asset or process modification, assignment, control limits and setpoints, repairs and support services deployment recommendations for in support of the equipment (closed-loop optimization).
  • Applications built on top of the DTOO analytic framework may then serve the provider's internal customers, such as CPMs, shop planners, finance and new engine commercial operations, and may also be used to deliver customer-facing tools and new service offerings as well.
  • the DTOO capability fits within an overall decision support structure that centers around modules focused on analytics-based removals (ABR), analytics-based workscope (ABW), operations efficiency and customer productivity.
  • ABR analytics-based removals
  • ABW analytics-based workscope
  • the DTOO capability fits within operations efficiency module, but pulls information from tools developed within the ABR and ABW modules.
  • the DTOO drives customer productivity.
  • engine operating data, contract data, and environment data are outputs from the customer productivity module that are received as inputs at the productivity module for optimizing asset availability (e.g., engine time on wing), cumulative damage modules and configuration data are outputs from the ABR module that are received as inputs at the ABW module for optimizing cost through asset lifecycles; cost accumulation and material mix/demand capacity data are outputs from the ABW module that are received as inputs at the operations efficiency module to drive speed and productivity, data pertaining to fleet optimization, productivity, upsell opportunities, and featured customer applications are outputs from the operations efficiency module that are received at the customer productivity module to deliver monetized value.
  • asset availability e.g., engine time on wing
  • cumulative damage modules and configuration data are outputs from the ABR module that are received as inputs at the ABW module for optimizing cost through asset lifecycles
  • cost accumulation and material mix/demand capacity data are outputs from the ABW module that are received as inputs at the operations efficiency module to drive speed and productivity
  • a discrete-event simulation models the provider-customer ecosystem in order to understand the impact of different operating decisions to both the provider and the airline/customer in a consistent modeling framework and set of assumptions. For example decision support if an airline were to expand its routes to include city-pairs with known harsher conditions, what quantitative effects would that have to the number of shop visits, and ultimately to CSA profitability given the specific CSA terms and conditions for that customer? Or, in another scenario: if the provider were to make a derate recommendation to a customer for a particular flight route, what potential side-effects would we see in fuel burn or engine degradation or shop visit cost or services cash flow from operations?
  • the model is intended to simulate the ecosystem on the time-scale of months to years to understand the aggregate impact of operating decisions overtime; it is not intended to represent day-to-day operations which might include flight routing through airspace, or operational recovery from unplanned events, though those elements are callable by the system's simulation-optimization and vice-versa.
  • a core simulation engine sits in the background on a parallelized, high-performance computing environment, serving multiple light-weight apps.
  • the core simulation is a discrete event simulation that models some or all of the provider-customer ecosystem, from airline flights to maintenance and parts management. Depending on the inputs, the simulation can be used to analyze the impact of different potential future scenarios, or can be used to conduct sensitivity analysis on parameters of interest.
  • This holistic modeling capability allows a user to configure the simulation to address specific questions to identify win-win recommendations for the provider and customers. In this manner, each light-weight app is designed to address a specific question of interest by interacting with the core simulation, post-processing the output and reporting the results in a relevant format for the user to make a decision.
  • the simulation includes an orchestration of business-physical subsystems that are called within the application as subroutines or as services that exercise kernels, command line applications on one or distributed computing environments.
  • the core simulator-optimizer builds at runtime from configuration tables so as to allow easy incorporation of changes from asset state inspections/determinations, actual operations, business process updates, CDM upgrades and additions, operating policy and maintenance service or supply chain status.
  • the disclosed computing system's ability to simulate the provider-customer ecosystem in a single consistent modeling framework and set of assumptions brings a new capability that serve numerous users.
  • a use case is planning and scheduling engine removals and specific on-wing maintenance to minimize CSA costs for specific contract fleets.
  • Interacting applications include shop visit (SV) & Workscope Planner, Engine Removal Heat Map, Spares Forecaster, Lease Forecaster, and Inspection Manager applications.
  • shop planners the general use case includes determining shop demand functions under different scenarios and assisting with shop-loading via engine assignments to different shops.
  • Applications may include Shop Slot Tool and WSA Planner applications, for the provider's material planners, the general use case may include determining short, medium, and long-term parts demands under different scenarios (e.g., via a Pans Forecaster application). For the provider's customer advisors, the general use case includes identifying win-win policies or operational changes for airlines. Applications include Airline Scheduling, Schedule Recovery, Waterwash-Fuel Burn Tradeoff, Single Engine Taxi, and Derate Sensitivity applications. For customers, the general use case may include quantifying impact of operational policies on fuel burn and maintenance burden. In example embodiments, users will interact with the system simulation via the apps for their specific use-case.
  • the framework includes an “app generato” function designed to answer a specific question with a computing system control that can be generated quickly (e.g., in one day or less), whereas other more complex apps would require custom design and development.
  • Applications types may include (1) a detailed scenario analysis application, which enables a user to create a scenario and produce multiple detailed output view of the results in the form of graphs, heat maps, and aggregated values, (2) a comparator application, which allows a user to define a limited number of (e.g., two-three) scenarios and generate graphs comparing key metrics between the scenarios, and (3) a sensitivity application, which allows the user to perform sweeps of up a subset of (e.g., up to three) parameters to perform a sensitivity analysis or trade-off study for which results are output (e.g., on a graph with the third parameter represented as contours).
  • a detailed scenario analysis application which enables a user to create a scenario and produce multiple detailed output view of the results in the form of graphs, heat maps, and aggregate
  • described technologies may be used to store the operating history of parts and assets, life experiences (e.g., location, exogenous factors, control signals, sensor signals, repair activity, inspection results, events, manufacturing data, and so on) towards life cycle control of the state of physical and operational systems.
  • life experiences e.g., location, exogenous factors, control signals, sensor signals, repair activity, inspection results, events, manufacturing data, and so on
  • a method for financially valuing and co-optimizing the design and operating policy choices of a complex industrial system, such as a power asset, thereby achieving multiple objectives beyond financial value creation and/or risk reduction.
  • complex engineered systems used in industrial processes may have a business context, such as contractual service agreements, capital financing terms and covenants, interconnect policy, regulatory policy, and competitive substitutes in their served markets.
  • Optimizing an industrial ecosystem without consideration of the multitude of objectives and constraints or considering the ecosystem's many existing constraints for the purposes of asset design and operating policy may trap economic or other aspects of value.
  • the method considers aspects and silos of economic value for subsets of choices within complex engineered industrial systems and the surrounding business processes and structures.
  • the disclosed system allows for the discovery and control of system design and operating constraints, the co-optimization of multiple objectives that can be achieved with design or operational decision support over an economic or operational interval.
  • the method allows for the resulting financial risk and returns from the various design and operating policies to be used, or candidates to be used, for specific discount cash flow valuations associated with those investments and operating policies—and therefore, facilitating the allocation of risks and returns to the sponsors of various incremental investments in the industrial system and for responsible stakeholders who chose not to make certain investments or operating policies.
  • the computing control system's capability to am the virtualized system, its various state estimations for degradation and performance while calculating the interactions of the design and operations choices provides the mechanism for calculating the real option value of those choices. It provides precise sources of and contribution to variation, and identifying and proactively managing system level sensitivity and performance or financial risk abatement.
  • the method enables the disaggregation of risks such that the discount rates may be replaced by simulated and replicated operational and design scenarios which thusly enumerate the probable financial outcomes, thereby obsoleting the need for gross or average discounting of future cash flows and instead is able to place specific discounts for future uncertainties according to the system level variation that results from a given design or operating choice.
  • the system co-optimizes use of assets (e.g., aircraft engines and the aircraft which use them), contractual services (e.g., service agreements for aircraft engine repairs), and servicing of the assets for both a customer and a service provider (or “SP” or “provider”).
  • assets e.g., aircraft engines and the aircraft which use them
  • contractual services e.g., service agreements for aircraft engine repairs
  • servicing of the assets for both a customer and a service provider (or “SP” or “provider”.
  • Cumulative damage models for the assets are orchestrated through time-based simulations and engineering models. The system goes back into history to determine exactly how aircraft engines (e.g., by serial number) have been flown.
  • Engineering models are generated and fed data pertaining to surface temperature, local oxidation, stress, strain, cracks, and other data needed to estimate the physical state of key components/sub-systems of the engines at a point in time. After the current point in time, simulations play out multiple possible futures.
  • the analysis is constrained based on contractual term limitations pertaining to the asset.
  • the estimated demand may be used as a demand function for shop scheduling automation, making it possible to automatically make choices about parts inventory and cost calculations pertaining to the engine maintenance (e.g., comparing costs of using a new part vs. using a rebuilt part).
  • adjusting a risk and return corresponding to one aspect may require a trade off for another risk and return corresponding to another aspect.
  • something might be economically optimal for a given engine, but suboptimal for service shop operations.
  • a service provider changes something on the engine, such as a part or workscope or sequence of activities, to make the shop operations more efficient, it could be the case that the customer is impaired in some way (e.g., constraining how the customer may schedule flight operations).
  • a customer may be flying an engine with less efficiency or an impairment that would make the engine more appropriate for assignment to a different route or route sequence.
  • Coordination with the service provider for engine assignment or a different service schedule may allow efficiencies to be realized by both the provider and the customer, in example embodiments, the efficiencies are discovered through modeling of combinations of factors (e.g., engines, parts, schedules, and so on) based on historical and observed data.
  • factors e.g., engines, parts, schedules, and so on
  • the risk of an asset e.g., an aircraft engine reaching a maintenance interval with sufficient remaining life or utility of the apparatus is traditionally embedded in the discount rate of an NPV calculation.
  • the risk is not deterministic; instead, the disclosed system control changes the industrial system's operation variation which is further transformed into financial variation. It is recognized that the very actions taken with the asset, such as how, where or when it can be operated, add to or take away from the risk of getting to the desired outage time and scope.
  • the disclosed embodiments do not necessarily assume that the asset will be operated as it has historically been; instead, it contemplates that the operation of the asset can be dynamically scheduled, operated, maintained, modified and assigned, differently to control the targeted variation and to cause a state (degradation level and/or operating efficiency) to occur on a created schedule.
  • any combination of settings or parameters, such as remaining life, operations, maintenance tasks, scope on those tasks, and timing decision variables to be co-optimized, along with other factors spanning revenue from different duty cycles, regulatory limits, service contract limits, market dynamics, may be included in the physical, operational or financial risk calculation.
  • Industrial systems are comprised of many subsystems or sets of assets.
  • the overall performance relies on the sub systems interactions, which example embodiments control, flow these subsystems can fail together is calculated and their probability.
  • the current asset's joint probability estimate of a failure occurring is updated, instead of depending on observations of joint failure that are observable, recorded, and thus available.
  • the systems within the industrial and business ecosystem are simulated, exposing them to usage which is made a component of the decision space and tracking the life consumption and probabilities by subsystem so that both the duty cycle of the ecosystem and the repair scope and repair timing are made to be endogenous choices.
  • the practical reality is considered of changed duty cycles that occur in an industrial system's economic life resulting from competitive forces, regulations, and comparative changes in fuel costs.
  • an ongoing simulation is used to test an asset's current design, operating line ups, maintenance activity, control set-points and variable generating costs against service contract, interconnect, and financial and regulatory dynamic limits for the purposes of dynamically changing the physical design and/or operations policy from a past and current state to a desired future state, in time.
  • system parameter sensitivities are quantified (e.g., a coefficient for such parameters need not be specified) and the scope of subsystem and stakeholder interests are optimized for (e.g., it is not assumed the future operations will be as the past has been or that there are no constraints from service contracts, financing covenants, grid interconnect or regulatory or competitive dynamics).
  • Neither the design nor the duty cycle and asset configuration is assumed, to be fixed (e.g., “static”).
  • the system seeks to bring these endogenously into the decision space at both the design of the asset and during its life so as to beneficially change its design or line-up or configuration or its load profile.
  • Constraints may be imposed by a governing service contract on one or more assets comprising the engineered industrial system, including regulatory or interconnect or capital constraints
  • the terms of operation are modeled within the digital twin operations optimization.
  • the risk threshold is not a deterministic level with no guidance as to its proper set point or comparative relationship to the potential returns at the said risk limit.
  • the level of risk is informed as a comparative value with respect to returns on one or more dimensions of value.
  • “Risk” may also be treated as an event or a string of events not taking place, such as, for example, a risk that an outage will not occur at a scheduled time.
  • a means for adjusting the timing and work scope of an outage is provided, as is a change in operations activities, so as to achieve a duty that degrades the system on such a path that the disclosed control system enables an outage to occur per the created schedule and that the reliability risk of the apparatus does not cross a risk/return objective, should that objective be set as a binding constraint.
  • sub system models are orchestrated through simulation time, exposing said simulated system to exogenous factors, operational choices, contracted services terms, capital structure covenants and calculating probabilistic responses for physical, financial and other metrics of value, such as emissions with a temporal consistency, that enforces the lifecycle performance and operating paths resulting from decisions made at any point of the simulated life.
  • the disclosed system optimizes over multiple periods so as to comply with a risk/return preference for one or more period in such a way as to facilitate the migration of the system from one risk/return preference to another, subject to physical, financial and regulatory constraints.
  • the calculation of optionality is enabled so as to switch objectives and/or design or operating paths over the simulation period and allow for probabilistic analysis as necessary for robust design, financial, or operational risk management.
  • a given power asset and its subsystems are focused on, and not a portfolio of assets, though the methods and systems disclosed herein may be used in a meta model or portfolio or higher order systems of various assets with an overarching financial objective.
  • a discrete event simulation and replications are used to build probability density functions of interactions, not Bayesian methods.
  • the currently disclosed systems and methods may overcome many inaccuracies introduced into analysis by including the ability to change how the assets would be operated, dispatched, or modified over multiple time periods.
  • a service provider may enable or provide a customer with modules for deployment in a client machine, the modules configuring one or more client machines to access modelling tools described herein (e.g., deployed on a server system or on-board control) and present information pertaining to the modelling in user interfaces on the one or more client machines.
  • modelling tools described herein e.g., deployed on a server system or on-board control
  • the customers may be able to experiment with what-if scenarios pertaining to operations of industrial assets (e.g., based on historical data stored by the provider on server machines and simulations, as described herein).
  • the customer may pay a license fee to the provider in order to access the disclosed system's data and tools used in the forecasting and dynamical optimization of designs, operating policies, schedules, workscopes, and so on.
  • a provider may use forecasts generated by the tools described herein to underwrite or reunderwrite performance-based contracts (e.g., between the provider and customer's). Based, on forecasts of asset operations and maintenance, a provider may identify under-rewarded risk. For example, a provider may be able to focus on data pertaining specific engines in order to de-risk existing contracts that are based on average engine assumptions (e.g, average flight-hours, average locations, average service-shop costs, average duty cycle seventies, and so on) across multiple types of engines. In example embodiments, calculations pertaining to underwriting and risk for a contract will depend on particular terms in the contract pertaining to use of the engines.
  • the engines have a certain repair service and work scope rate on average
  • a customer may have a fleet of 20 such aircraft and put three of those 20 on one-hour city hops, exposing the engines to frequent high temperature excursions which differentially consume life vs average life, whereas the customer may put the other aircraft on transatlantic flights, where the ratio of metal temperature excursions are low per flight hour; extending the life of those engines beyond the average.
  • a contract may be generated for a customer that includes terms pertaining to the risks associated with the most important identified variables pertaining to a specific use of a particular asset or particular subsystem of the asset.
  • a portfolio of such contracts between a provider and a contractor would not be based on averages, but instead on modelling of each individual asset based on planned uses and active control of that asset and industrial eco-system with the disclosed system.
  • a provider may forecast economic consequences of purchasing new engines or upgrading a set of existing engines.
  • a prospective customer may be able to determine, for example, based on an asset portfolio of 100 aircraft, 200 engines, and 15 spare engines, that a particular upgrade (e.g., changing high-pressure nozzles on 25 engines) over a certain percentage of the assets would give an economic benefit (e.g., enable the aircraft to handle a more profitable schedule more efficiently) over the lifetime of the assets.
  • a first case is that the only data pertaining to maintenance of a first asset manufactured or serviced by a first provider makes up the average data and that the data pertaining to a second asset manufactured or serviced by a second provider is specific historical data pertaining to the specific asset and the planned use of that specific asset by the customer (e.g., flights of 100 aircraft between specific city pairs).
  • the actual usage of the engine by the customer is simulated over the lifetime of the asset, including all service shop visits and service repairs, based on specific data pertaining to the planned use of the asset, including operation policies of the engines, weather through which the engines will be flying, and so on.
  • the second case beneficially draws upon the realized results of the first case and uses asset and duty specific wear.
  • the operations and service risks that may be forecasted using empirical evidence and first principal models using observed data as a basis for assumptions that the customer doesn't wish to manage may be moved over to the provider's balance sheet in exchange for compensation in the contract to mitigate those risks.
  • the precision of the analysis possible with the first case with respect to the second asset allows the provider of the second asset to provably demonstrate an increase in the net present value and/or real option value of the customer's operations, or a reduction in risk, that exceeds any option that the first provider may be able to demonstrate to the customer with respect to the first asset.
  • the cost of capital associated with the purchase may be reduced based on the increased precision in the risk calculation and thus the enablement of lower risk capital provisions.
  • FIGS. 1A-1G are framework diagrams illustrating the relationships of the system's control points and operational paths associated with an example industrial system. Such relationships may include, for example, relationships between asset duty assignment, resultant system and sub-component life consumption state, system and sub-component reliability and their effects on service timing, work scope and service operations, and so on.
  • the framework may be implemented as a distributed multi-agent physical system control to dynamically optimize risk and value for one or more stakeholders with simulation and optimization.
  • operational paths are actively controlled to create different physical states of a plurality of components, assets, and operations associated with a one or more assets comprising an industrial system, so as to achieve the multiple criteria of operators, service providers and investors over a specified time interval, above a specified probability of the one or more outcomes.
  • the framework 100 depicts, at FIG. 1F , a first operational path 120 and a second operational path 125 , such as actual operations or a simulated scenario or replication over time 105 for operating an industrial system, such as aircraft, their engines and the key subsystems there-in.
  • a first operational path 120 and a second operational path 125 such as actual operations or a simulated scenario or replication over time 105 for operating an industrial system, such as aircraft, their engines and the key subsystems there-in.
  • an alternate life consumption 140 path arises from a different use as compared to the second, operational path 125 .
  • the scenario path 120 may be an average life consumption path, such as for a single or plurality or portfolio of assets, or it may be a reference design or operating path used to characterize expected asset design performance and operations service levels.
  • industrial assets may be exposed to unique duty cycles or purposefully operated by the disclosed system to have a non-standard operation so as to cause one or more of the assets' subsystems to achieve a desired physical or operational state probability at one or more points in time and thus a unique path through their economic life.
  • component parts and subsystems of the example industrial system may operate over time such that the useful life of those components is consumed during that time. Accordingly, the industrial system needs maintenance from time to time to replace or rebuild the component parts or the entirety of the industrial system. How the industrial system is operated with respect to the temperatures, pressures, chemistries and stresses resulting from the chosen operations and/or control settings will impact the remaining useful life at a given probability and/or reliability 120 , 125 , 140 and through time 115 up to the asset or a subsystem's useful life. It is beneficially not limited in operation to folly consume useful life, but certain maintenance events and operating control choices can be made at any point 105 in time to benefit one or more objectives of one or more stakeholders at one or more intervals of time.
  • the first operational path 120 depicted therein represents a steady-state operation of the asset for a design or assigned load at a constant work output 112 (e.g., in thrust per unit of time, in megawatts produced per unit of time, etc.) and standardized or non-variant exogenous conditions 109 , 165 and a defined duty cycle.
  • Exogenous conditions are, for example, those input factors the industrial system is exposed to which cannot be directly controlled by the system in a given design configuration such as, for example relative humidity, barometric pressure, temperature, air pollutants or suspended aerosols.
  • a duty cycle is, for example, a changed rate of work output, starts and stops of an asset, a location and rate of change of location.
  • the operational path 120 may also be a base case plan to which other plans of operating the industrial system may be compared to. Consequently, the asset and/or its subsystems 175 will reach a particular reliability level 162 with a corresponding maintenance outage point in time 105 and associated maintenance time and wort scope 108 at a specified reliability probability 160 (e.g., probability of remaining useful life) for the specified subsystems 175 that are employed for system operation at that time.
  • a specified reliability probability 160 e.g., probability of remaining useful life
  • the second operational path 125 results in a variable power output rate 112 over time 105 , with periods of operation matching a load point whose power output rate 112 is the plan or design operating point for the physical system, a steady-state rate segment 131 during which the system consumes differentially less useful life 115 , and a rate segment 126 which consumes differentially more useful life rate and a shut off rate 130 during which the system does not consume any useful life 115 of the overall asset or for a targeted subsystem 175 , such as a life-limiting apparatus or subsystem component(s) of the asset.
  • the design and controlled point of physical state may be at a subsystem of the asset, such as one or more of the pans and subsystems of the asset or at a higher level(s) than the asset such as, for example, the aircraft and fleets or subsets of a fleet of aircraft.
  • the useful life consumption path 120 , 125 , 140 represents the life consumption for the entire system resulting from the limiting subsystem or part within the system 175 , for example, an engine's combtistor.
  • subsystems 175 of the system or asset may be controlled so that the useful life 115 of each subsystem 175 may be managed by identifying upgrades, performing asset configurations (e.g. “lineups”), scheduling operations and scoping maintenance.
  • Life consumption of an industrial system is typically nonlinear as a function of work input or output outside of a “normal” or nearly always outside of a design operations point or range.
  • some compensation for physical stress avoidance can be made, such as by setting a control configuration that preserves life of the asset but sacrifices efficiency or life consumption, such as during useful life segment 146 .
  • Such configurations, as well as other operations, control, maintenance work scope, and other physical and business aspects of the asset may help manage economic aspects or other aspects of value related to the engine or its use. For example, managing operations, control, and maintenance work scope so that the useful life segment 146 is at a desired reliability probability 160 at a certain time 105 is probabilistically accomplished.
  • This control accounts for the historical path 157 up to the present time 161 and calculate the physical states of the tracked and managed subsystems of digital twin state estimation 141 , 142 and then be simulated through candidate operating scenarios 130 , 140 , 143 to a future time 163 at which point the control system is seeking to achieve a physical state of the entire asset or one or more of its subsystems or parts of digital twin 142 to be at a specified damage, life or efficiency or reliability state 115 at that time 158 .
  • the targeted states in time may be set by the system to achieve desired operations points such as asset utilization, parts inventory, cash position, as operations examples.
  • the state condition refers to one or more of physical apparatus damage, remaining useful life, efficiency, reliability, shape, surface roughness measurement, crack length or depth or other physical aspect of an industrial system in whole or in part.
  • the state at any interval of time 105 between time zero 106 to the present 161 or future time 163 , 165 or any incremental segment of time (e.g., 161 to 163 , 161 to 165 , or 163 to 165 ) that is of interest to control other aspects of the system such as, for example, service shop demand for repair services 135 , operating costs of the assets 151 and the higher level systems the assets are a part of (e.g., an aircraft) or to synchronize the concurrent state condition between a number of assets (e.g., two engines on a given aircraft) or to manage a portfolio of assets to a state condition (e.g., the engines assigned to a region, the engines on a given service or performance based contract or in a given financing contract or the cohort of engines that are targeted for retirement at a
  • the emulation and simulation system is used to calculate the current 157 , future 158 , or any interval of time 159 state condition for any aspect of the system from a specific part 128 or subsystem 122 of a given asset or to the specific asset 121 as a whole or to classes of assets such as, for example, an engine type that is defined as having certain parts or vintage or service history or service contract or other type classification.
  • the emulation and simulation based control system 100 is used to calculate the state of plane types, specific states of assets 121 assigned 124 to a specific higher level asset 117 such as a given aircraft.
  • the emulation and simulation system is used to calculate and orchestrate the assignment 123 of specific higher level systems 117 such as a plane, which has specific engines 121 which are comprised of specific subsystems 122 and parts 128 that are in turn operated 127 in a determined way by the optimizer 154 for efficiency and/or life consumption—with a duty or schedule 116 such as a route or sequence of routes with specified operations parameter s such as allowed rate of power output.
  • the asset 121 is controlled 127 in a determined manner to achieve the change in stale 141 , 142 at a point or interval of time 105 .
  • certain exogenous conditions/factors 104 at those points affect the rate of change of the physical state of the asset 134 and its subsystems 171 , 174 , 168 .
  • These one or more degradations (or repairs) are calculated for each increment of time 105 for each tracked subsystem 122 and part 128 for one or more life consumption mode via one or more state estimation engine(s) 134 , 171 , 174 which accumulate 110 , 115 the specified state conditions and through time 141 , 142 .
  • the actual state estimation causal factors and exogenous conditions are sequenced through time intervals either continuously or in discrete time segments or by event triggers.
  • the exogenous factors 109 , 165 are first simulated in a random walk and then, as the system simulator indexes through future time, value 113 for these damage factors are written to the inputs of the one or more state estimation engines 134 , 171 , 174 , 173 , 176 , the state change is calculated and then accumulated 115 (shown, for example, as useful life).
  • Historical events 111 such as, for example maintenance work, inspections, damage and so on are also managed by the emulator-simulator and consumed into the state estimations 134 .
  • events may be caused to happen as a function of a schedule (e.g., annual inspection), a policy (e.g., change oil at x miles, inspect at this airport), an estimated state condition and its triggering policy 141 , 142 (e.g., a life limited cycle count, an efficiency level, a prognosticated, failure point and etc.).
  • a schedule e.g., annual inspection
  • a policy e.g., change oil at x miles, inspect at this airport
  • an estimated state condition and its triggering policy 141 , 142 e.g., a life limited cycle count, an efficiency level, a prognosticated, failure point and etc.
  • the states may be represented as numerical values or in one embodiment as a color, for example red, yellow and green. Numeric values can be the result of engineering and data driven state estimation outputs as expressed as hours of or cycles of remaining life or hours or cycles used up to a given point in time, a physical measure such as BTU/kWHr, a given scale to characterize damage such as a Blade Damage Report a dimensional measure, a sensor scale such as PSI or Temperature or a percent of a metric that connotes the state of the asset, its subsystem or parts.
  • the managed subsystems of assets 141 , 142 are represented as boxes with cross-hatching representing the state condition of each subsystem relative to a plurality of state threshold values (e.g., green, yellow, or red threshold values representing a need for maintenance of each subsystem).
  • a “red” indicator may suggest that the customer will have to bring the engine into the shop earlier than planned.
  • the graph of FIG. 1F including the digital twins 141 and 142 , may be presented in a user interface such that a customer may experiment with what-if scenarios pertaining to engine assignment, operations, and maintenance schedules, including cost and efficiency calculations.
  • the vertical there is some rate of work 110 (e.g., power output) that we're asking the engine to produce.
  • the dotted lines represent the possible life plans for the engine.
  • the digital twins 141 and 142 represent the application of cumulative damage models to determine the states of different parts or subsystems within the engine at different points in time. The connotation is that if a customer doesn't stress the engine, the customer is on the lower curve (e.g., the customer is not consuming the available life over time that the customer had planned). If the customer stresses the engine (e.g., overtures it or runs it in a harsh environment more often), the customer is consuming more life than planned at one or more points in time.
  • the customer is going to hit a reliability (e.g., that the customer or provider can predetermine based on thresholds) at which the customer will want to bring the engine into the service provider shop for service.
  • a reliability e.g., that the customer or provider can predetermine based on thresholds
  • the system adjusts duty patterns or maintenance events or work scope to achieve an objective other than maximum life.
  • a simulation incorporating the digital twins 141 and 142 wraps the cumulative data models to orchestrate where the engines are being flown, how the engines are being flown, how they're coupled to a particular aircraft, the weather conditions in which the engines are to be flown, aspects of how the engines are being controlled, and so on.
  • the information is fed into the cumulative damage models for each subsystem, which drives the changing in state over time of the estimated state of the subsystems within each digital twin.
  • Time may be an important element in some embodiments.
  • the physical state estimations are made, for example by one or more cumulative damage models 134 , through time, as a function of how the assets were utilized 157 , and how they will be used in the future as the system is simulated forward 158 or any combination of past and future 159 .
  • the individual parts and subsystems may be tracked individually, such as by part serial number or a subsystem clustering of parts or the asset in its entirety.
  • the asset in its entirety may be characterized by logic which consumes as an input the individual state estimations of the tracked parts and subsystems.
  • states are dynamic through time as a function of the operating choices made in actual operations and by those choices which are automatically made by the logic of the disclosed control system such as, for example scheduling the asset to a location 103 and subjecting it to local ambient conditions, necessary power output and so on, assigning events to occur 114 such as maintenance, assigning rates of change of power output through time such as for various duty cycles 123 and assigning assets to other assets 124 .
  • These states may trigger responses for the asset in its totality, such as a schedule 103 or for a 127 subsystem 122 or part 128 .
  • These states may trigger responses directly or be biased or controlled by the physical-business system multi-stakeholder, multi-criteria, multi-preferences optimizer 154 .
  • Airlines or customers may have operating policies 101 , such as taxiing out on the runway using one engine to save fuel, using a certain percentage of engine thrust at takeoff, d-rate (e.g., running an engine at 90% is a 10% d-rate) at takeoff, climb, cruise, or other action, routing between departure and destination points, and so on.
  • d-rate e.g., running an engine at 90% is a 10% d-rate
  • the modeling and simulation methods described herein may allow an operator to optimize such operating policies.
  • Events are controlled to happen in future time according to triggering rules/policies that are orchestrated by the simulator and its optimization logic 154 in response to the simulated state of physical system and its subcomponents for more than one asset and in the context of other assets, for example the two aircraft engines on a single plane or a fleet of aircraft engines on multiple planes with respect to the one or more objectives of the system.
  • Assignments 123 to routes may be controlled to happen in future time according to routines for scheduling that are called.
  • Assets may be assigned 124 to higher level systems such as an engine(s) to a given aircraft Asset internal operation, control settings and subsystem assignments may be controlled 127 by the simulator and its system optimizer 154 .
  • Candidate operating points and physical design may be orchestrated by the simulation in a design of experiments or full enumeration mode so as to calculate comparative performance between candidate design, operations or control policy.
  • the physical and business system is emulated, simulated and optimized in this measurement and control system, for example, a service contract's terms, price, risk may be tested 199 and optimized 154 .
  • other operational aspects such as the number of operating spares, inventory stocking, operating cost or cash flow is enabled.
  • a given system 121 , 119 , 118 or subsystem 122 , 128 may be optimized 154 for a set of preferences 155 over one or more objectives 153 .
  • the simulation also allocates risk, returns and calculates balances by stakeholders 199 related to the operations of assets and their subsystems.
  • FIG. 1C depicts two of many possible stakeholders: customer or airline 190 and service provider 191 .
  • Each stakeholder has its own objectives 153 .
  • the objectives may be shared, independent or compete against one another.
  • service provider 191 wants to maximize its service revenue, whereas customer 190 wants to minimize the service provider's revenues. Given these independent objectives, the system probabilistically calculates at higher-level system optimizations that may benefit both stakeholders.
  • Each stakeholder may assign its own conditions or weight to each objective 153 .
  • Objective 1 may have conditions or weightings assigned by customer 190 as well as different conditions or weightings assigned by provider 191 .
  • Customer costs 151 and service provider costs 152 are identified and provided as inputs into the optimizer 154 .
  • the service provider 191 may acknowledge that a particular customer 190 , such as an airline, makes its money flying passengers and thus is focused on keeping operating costs, including fool costs, low. Thus, for example, weightings assigned to operating costs by customer 190 may be higher than ratings assigned to other costs by the customer.
  • the customer 190 may acknowledge that service provider 191 makes it money by providing hardware (e.g., engines) and services (e.g., maintenance of engines).
  • the optimizer 154 looks for an economic operating point at which both stakeholders 190 and 191 can benefit.
  • the system uses simulations to analyze risk and return preferences 149 and generate a comparison of net present value against variance of the cash flows creating the net present value on an absolute basis or with respect to a plan.
  • Multiple inputs of the system are orchestrated into the simulation and calculations, for example, the customer's flight schedule 102 , exogenous factors 104 , physical part data 134 , and so on.
  • the system is configured to determine that, for a chosen set of aircraft, with specific engines, and flown these specific engines with particular loading of the aircraft, running at specific work rates (or changes in rates per unit time), at specific locations, running at specific temperatures in particular weather conditions, how the each specific engine will degrade over time, or burn more fuel, or become more unreliable is calculated.
  • the service provider can thus use the simulation calculations to assist the customer in using the customer's assets more optimally or take on and manage operational risk directly.
  • the system may recommend an intervention in scheduling. For example, assume a customer has an engine that is less efficient (on average) in a fleet of engines, each having different remaining useful lifes.
  • Such engines may each have multiple (e.g., 33) subsystems, each of which requires maintenance and may potentially cause an aircraft to be removed from service.
  • Both the service provider and the customer may have an economic interest in keeping the least efficient engines (e.g., those that burn more fuel) on particular routes that are best suited for the engines.
  • the routes that are best suited may be those that wear the engines in a particular way such that their fuel burn is minimized and their need for service is more predictable and can be preplanned or coordinated with the service provider's maintenance shops to minimize maintenance costs for both the service provider and the customer.
  • the service provider may better predict when an engine is coming for maintenance, and what kind, of maintenance will need to be performed (e.g., including whether to a part will need to be replaced with a new or serviceable used part) or cause said visits to occur and define the work scope.
  • the service provider's shops may have more advance notice of maintenance needs of each of the specific assets of its customers, allowing it to streamline its capacity use or inventory, such as inventory of expensive (e.g., multi-million dollar) parts (e.g., engine repair kits).
  • the optimizer 154 may identify that a 757 (e.g., with a particular tail number) having two particular engines is currently assigned to repeatedly fly a short (e.g., one-hour flight) back and forth between two points.
  • the optimizer 154 may identify particular costs (e.g., costs associated with maintenance requirements of a particular wear pattern in the engines, fuel burn, and so on) based on simulations of all of the subsystems of the engines.
  • the optimizer 154 may identify that a better use for the 757 would be to have it fly across an intercontinental route (e.g., from New York to London), then short cycle the flight for 15 hops, and then fly it back across the intercontinental route.
  • the system may then recommend the better use (e.g., via a user interface), including reasons for the recommendation (e.g., in the context of weighted objectives of either the airline, the service provider, or both).
  • projected savings of customer costs 151 may be presented in support of the recommendation
  • a projected savings of provider costs e.g., in streamlined inventory processes, such as minimizing an amount of expensive inventory items that must be kept in stock, or minimizing a number of maintenance visits that are required under a contractual agreement, and so on.
  • the provider costs associated with airline maintenance may be coordinated and optimized at a particular shop, such that, for example, parts having longer useful lifes in one aircraft engine are swapped with parts in another aircraft engine such that the useful lifes of both engines are maximized.
  • a service shop may be mixing and matching engine parts, repairing parts, and installing new parts.
  • the service provider may have a limited amount of time (e.g., 60 days) to perform maintenance or repairs on an aircraft engine when it arrives in the shop (e.g., based on contractual agreements between the service provider and customer and/or to achieve a certain number of engine spares). If a proper inventory of serviceable used or repaired parts is not available for swapping into an engine (e.g., to service a subsystem of the engine), the service provider may need to use a new part. The cost difference between using a used and new part may be significant. Thus, the service provider may have a strongly weighted objective of having appropriate used or repaired parts available in inventory when an engine arrives in a shop.
  • a service provider has five years remaining under a contractual agreement to service a customer's engine.
  • the service provider would incur significant unnecessary costs if it had to use a new part with a useful of 20 years to perform its maintenance duties on such on engine.
  • An appropriate part to use in this case would be a part having a remaining useful life that corresponds with the remaining useful life of the engine as a whole.
  • the optimizer may identify various factors that affect service provider cost 152 with respect to its contractual obligations to a particular customer or a group of customers. Such factors may include flight schedules, asset utilization, inventory, and so on, as depicted in FIGS. 1A-1G .
  • the optimizer can thus provide guidance for getting the right material into the right asset at the right time as a function of the service that the provider is obligated to provide to the customer or group of customers.
  • Operating scenarios calculated by the disclosed computing system change performance from changes in design and/or control points in the business-physical system—which in turn generate more cashflow when the computing control is beneficially configured and operated to do so.
  • the graph depicted pertaining to risk and return preferences 149 shows that such optimizations enable the reduction of risk for each level of operating performance improvement (shifting the “New” range to the left in comparison to the “As Is” range) and/or increasing NPV (shifting the “New” range up in comparison to the “As K” range) for each unit of risk.
  • Such a graph may be presented in a user interface to demonstrate the result of the analyzing of all of the factors depicted in FIGS. 1A-1G , including simulations of engines through possible flight paths using CDMs.
  • the optimizer can demonstrate with a certain probability the economic benefit to the customer and/or the service provider of implementing the suggested changes of the optimizer.
  • the “New” range may be realized by a customer adjusting flight paths or asset utilization according to the recommendations of the optimizer, which may, in turn, improve maintenance scheduling so as to have a lower impact on flight scheduling.
  • the service provider may realize the “New” range by being able to minimize an amount of expensive inventory that must be kept in various shops and by having more control over the load levels at particular shops based on better improved forecasting of upcoming maintenance tasks.
  • the pareto frontier represents, for every risk level (or variance), the best economic choice that can be made given particular inputs.
  • the “As Is” frontier relies on data inputs, such as customer proprietary data points, that are less complete that the data inputs relied upon for the “New” frontier, which includes simulations using CDMs. Points B and C in the graph shown in FIG. 1C are depicted as not currently being on a pareto frontier, and are thus suboptimal.
  • these and other aspects of the asset may be managed concurrently, such as commercial operations, lineups, maintenance, service work scopes, upgrades, and control points.
  • An example system described in greater detail below in conjunction with FIG. 2 , may determine such managed aspects to enhance the economic value of the asset.
  • FIG. 1F graphically depicts the relationship between the asset, for example an aircraft engine, system rate of power output 110 , time 105 , and useful life 115 consumption and system reliability probability 160 for the one or more operational paths 120 , 125 , 140 (one that to a current time has be actually realized and other paths which are candidate scenarios that are simulated by the system) and its associated subsystems.
  • the life paths may be for either a new unit or a repaired unit whose state is known certain at a point in time such as when new or from specific inspection or maintenance for any subsystem 175 being tracked.
  • the physical state probabilistic estimations of one or more parts and subsystems are updated with these assessment points and activities.
  • the corresponding life consumption may be extremely high, yet may be reduced by a control setting which lowers system efficiency, such as allowing more internal airflow or reduced surface temperatures and thus increased specific fuel consumption, in exchange for a reduced 131 life consumption rate for the same power output or less power output but longer duty cycle or other tradeoff.
  • the “system-of-systems” simulation and optimization based planning and control that is disclosed utilizes cumulative life consumption, as depicted in FIGS. 1A-1G , based upon the current cumulative state of the asset, maintenance timing and scope to adjust service duty, control settings, maintenance, lineups, and commercial operations, to compare various operating scenarios and automatically select 154 the tradeoffs of operating efficiency vs life consumption vs. asset assignment for revenue duty, according to the risk and value management preferences of one or more stakeholders 131 .
  • the operational segment 126 described may also, under other beneficial embodiments, serve as an example of how interaction between operations, maintenance, design, and various business considerations may be employed to automatically change the design parameters and operating characteristics 133 of parts and subsystems to achieve physical states through time that enables the resulting useful life segment 131 to be lower than it otherwise would have been under the same circumstances.
  • a scenario may be investigated that beneficially takes advantage of, for example, a peak demand pricing opportunity and specifies the commercial market schedule for the associated extra load 112 .
  • the simulator may then optimally 154 dispatch 103 the simulated asset(s) at a probability that the offer for dispatched revenue service was accepted, may simulate the asset as differentially consuming life according to the load or duty 103 , may set the remaining useful life point 166 as a function of reliability and/or repair work scope to the subsystems of the asset, and may trade off the costs and scope of a changed configuration, maintenance scope and feel purchase according to one or more stakeholder 131 risk and return preferences in the instant or through one or more intervals of time.
  • the system may also execute a different set of scenario runs using, for example, a catalog of available design modifications, updates, and operational decision policy changes. Consequently, the scenarios which install a certain control system upgrade which allowed the useful life segment 131 to be reduced, even though subsequently causing more feel to be consumed, may provide a higher return on investment over the simulated economic lifecycle than other alternatives.
  • the simulation/optimization system described herein may identify a design modification to the industrial system that would achieve optimum or at least enhanced economic risk and/or return preferences and/or other metrics of value.
  • the simulation/optimization system may also adjust repair work scope 135 and/or the policy terms 199 for all assets in general or a specific asset-by-asset digger for the maintenance timing along with operations alternatives 123 .
  • a possible base-case scenario 120 is that the asset employs the first operational path 120 to arrive at a specified maintenance event scheduled for time 108 with remaining useful life (RUL) 172 , which represents a chosen reliability probability (e.g., probability of remaining useful life 160 ).
  • the simulator/optimizer may track the subsystems 175 to develop or determine the overall useful life 115 and reliability of the asset.
  • the simulator/optimizer may then determine that moving the outage point from time 108 to time 150 by consuming the life of the asset using the second, operational path 125 is more beneficial from the perspective of economic value (or some other metric of value) compared to the base-case scenario of the first operational path 120 .
  • the risk and return preferences 149 of one or more stakeholders 131 are automatically optimized 154 .
  • the service support may consist of one or more repair shops and within those shops are operations (such as assigning assets to available capacity, setting work scope, ordering parts), tooling, people and sequencing a plurality of demand streams, such as, for example, the services activities for multiple airlines or the extent of specified maintenance in a given service event.
  • the shop capacity 136 is modeled 137 with respect to its operations 139 capacity overtime 159 .
  • the shop demand (quantity of assets and extent of work scopes) may be highly variable and thus prone to periods of underutilization and over subscription, Underutilization squanders variable expense, Too much demand, creates overtime and service level delays in operations which are governed by performance based services contracts, there are typically clauses that govern turnaround, time or service level or asset utilization or availability and thus it is highly beneficial to control the demand function, service TAT, Service Level Agreement guarantees (SLA) and shop cost.
  • SLA Service Level Agreement guarantees
  • the disclosed system simulates the use of assets to estimate the asset life of efficiency and enables asset sequencing to be optimally set to maximize the benefit of asset use and control the sequence of the shop demand 150 as a function of operations and time and orchestrates shop operations model 137 such as, for example, a discrete event simulation and scheduler 139 so that some or all assets can be assigned 135 by the optimization 154 in such a way as to co-optimize the end user's costs 151 and service providers cost 152 or other stake holder 131 or objective's preference 155 .
  • An example objective is to lower total customer and service provider cost.
  • a stakeholder 131 may be an airline 151 , a service provider 152 or an investor with a financial stake in an aspect of the system.
  • parts ordering 138 is optimized over the forecast interval 159 to minimize inventory count and carrying value.
  • the assigned 135 shop 148 is optimally controlled 154 with respect to available machine capacity 139 or skill or used or new inventory or consumables 145 at the one or more repair facilities in the repair value chain.
  • the simulator/optimizer calculates possible operations and/or control of the asset to seek superior risk/return or other metrics of value for one or more stakeholders 131 , 151 , 152 and may be set to cease calculation when global objectives are met and input assumptions are not changing.
  • asset operation segments along second operational path 125 may be bid, dispatched, and/or controlled so that the asset may arrive at time 108 at a specified reliability probability 160 (e.g., the probability of a physical impairment or failure of the asset or subsystem) and/or efficiency while providing an optimized return on investment for a given stakeholder.
  • a specified reliability probability 160 e.g., the probability of a physical impairment or failure of the asset or subsystem
  • the design of the physical system may be changed 133 such as with an available modification and the optimization routine re-run through 127 , 120 , 130 , 126 , 132 , 125 , 108 , 160 , 150 , 125 .
  • a stakeholder 131 may be a service provider 132 with a contract that specifies a performance level for another stakeholder such as an operator 151 and the provider requires an upgrade or repair to be made which needs an expenditure to be mad now 161 so as to achieve a risk and return through a time interval 159 of point in future time 163 .
  • the requisite investment is made now at 161 by a stakeholder that specifies a certain return and risk level at one or more points of time 105 .
  • the system 100 incorporates that investor's preferences in the optimization objective function 154 such that by operations optimization choices 103 , 114 , 123 , 124 , 127 , 199 , 183 , 135 , 138 the cash flows from operations, subject to the performance contract terms, are more assured (lower risk) return are provide via the deliberately controlled attainment of physical and operational states through time for one or more assets.
  • even the current state of the asset may not be known with absolute certainty.
  • the last physical inspection of an asset or part or subsystem of the asset may already be in the past.
  • a first layer may be a distribution around the real condition of the engine at T Now 161 ;
  • a second one may be a prediction of the events to which the engine is actually subjected to in the future.
  • the length tail of the T Now distribution may affect when a customer should schedule an inspection of the asset (e.g., to decrease the level of uncertainty regarding the asset's current state to improve forecasts to be within an acceptable threshold or margin of error for a particular time period).
  • the simulations may thus not only aid customer's and providers in determine how to optimize operation of the asset, but also inspections (e.g., horoscope inspections) of the asset.
  • images are taken of various parts of the engine, such as the blades.
  • the images are captured and scored, against certain engineering criteria and compared with CDMs simulations (e.g., to refine the CDMs).
  • the scores may represent the significance of detected surface cracking, root cracking, spallation, dirt, pits, and so on).
  • the simulation data may be confirmed with a certain percentage of accuracy and the CDMs may be updated to account for any differences in actual state versus predicted state at the time of the inspection.
  • a causal driver of shop repair delays may be the availability of certain inventory.
  • the pre-order planning 196 control receives component 122 , 128 state information 142 , 146 for specific engines 121 and provides the quantity of components in various stages of remaining usefesl life, through time 105 to the service shop 136 supply chain 197 for their production 198 estimation purposes with respect to time to produce finished goods which can be made available to the service shop 136 inventory replenishment 145 by part type 147 .
  • the pre-order planning 196 may contain the supply chain production model 198 that in turn may optionally contain current production quantities such as through an MES or ERP system. Said model of the supplier production process may be unable to provide finished goods inventory 197 to replenish service shop inventory 145 for a forecasted demand 135 .
  • the airline operations may be biased 123 such that certain engines which would otherwise require shop services be operated via assignment 123 or control set point 195 to lower the rate of life consumption and thus delay the service event 132 time 150 to match the part availability. Additionally, the extent of repairs to an asset may be dynamically set to match the available service capacity and/or to produce more spare assets but at a reduced RUL than an original or average plan or more RUL than an original plan.
  • the simulator/optimizer may alter the operating risk compared amongst operational paths 120 , 125 , 140 to achieve the economics or other aspects of risk and value at one time or over an interval.
  • Path 140 is an example of a higher physical damage risk than 120 at time 150 , yet may result in lower cost risk 154 vs. 156 when more aggressive bid, dispatch, and operations, despite the added risk of arriving at outage schedule at a higher risk point 166 , are differentially compensated for over the economic time interval being simulated and optimized.
  • the simulator/optimizer may manage interactions between the useful life 115 , reliability probability 160 , subsystems 175 , and repair work scope of the asset. For example, the simulator/optimizer may estimate system level reliability probability 160 at a point in time 105 by looking up the value of the reliability probability 160 at that point in time 105 along the useful life consumption path 140 .
  • the reliability probability 160 may be derived or simulated from engineering models and observation of fielded units, and corrected for climates, load cycles, transient dynamics, repair cycles, subcomponent vendor sources, metal temperatures, and other indicators and drivers that characterize the RUL 172 .
  • the simulator/optimizer may retrieve the cumulative state information (e.g., operational paths 120 and 125 , and useful life consumption path 140 ) from either a control system of the asset, an asset data store, or a remote data store of the operational history of the asset.
  • cumulative state information e.g., operational paths 120 and 125 , and useful life consumption path 140
  • the reliability probability 160 of the entire asset or system may be based on the RUL 172 of each of the subsystems 175 of the asset, and may be developed by one or more methods, such as, for example, cumulative damage models comprised of thermodynamic and materials engineering models, statistical regression, machine learning or subsystem models that are probabilistic and aggregated with techniques, such as Monte Carlo simulation. Variation in RUL 172 forecasts may result from many factors, operations hours being one such causal variable as depicted in graph 100 .
  • the simulator/optimizer may track other causal factors, such as component shutdowns, trips and starts, air cleanliness with respect to particles and chemical concentration, and metal temperature, from direct measure and/or virtual sensing of these factors as the asset is operated. Additional factors indicative of RUL 172 , such as repair records, original equipment manufacturer (OEM) manufacturing and inspection data, or OEM or supplier lot, may be operationally tracked and employed in the simulation or its post processing.
  • component shutdowns trips and starts
  • OEM original equipment manufacturer
  • OEM or supplier lot may be operationally tracked and employed in the simulation or its post processing.
  • RUL 172 expressed as a probability 177 of two subsystems 173 and 176 , is depicted in graph 100 . As illustrated therein, for all RUL 172 estimates, the subsystem 176 is less reliable that subsystem 173 , and thus the subsystem 176 is most likely to be the limiting component in the probability of life (reliability probability 160 ) for the overall asset.
  • the simulation based state control system 100 is centered on the physical asset as the asset is dispatched and serviced throughout its economic life 106 , 108 .
  • the physical asset is comprised of subsystems and parts which accumulate wear, as depicted in FIG. 2 , and thus experience service costs as a byproduct of their degraded physical stale from having been operated 120 , 125 or 140 .
  • the physical degradation is a function of the operation of the asset and the factors it was exposed to during those operations, for example temperatures, pressures, humidity, suspended aerosols in the ambient air, percent of foil load, temperature of metal surfaces, chemistries in ambient air, repair history, inspection results, cycles and rates of change of work output by the asset and other causal factors 113 .
  • the simulation hosts 134 one or more damage models for one or more subsystems 122 and parts 128 in the physical asset 121 .
  • the source of these hosted, damage models can be from any method which relates the conditions of and how the asset is operated with the resultant impact to the physical state change of the asset and/or repair to the asset.
  • a component “Fan Disk” 168 when exposed to Ambient Temperature, Fuel Heating Value and a number of other factors “n” for a period of time and cycles does lose, for example, available material dimensionality and material strength.
  • degradations may be explained with engineering models, data driven models that use historical observations to train over, accelerated life testing, designs of experiments and regressions of the resultant data, rules, arithmetic relationships or other analytical means as may exist or be conceived.
  • the only requirement is that the system simulator is able to host the algorithm or lookup table or rules which describe degradation and can pass the assumption data to them for an interval of time such as the simulation clock increment and that those assumption data exist in the historical record and can be emulated 157 to replay a part or asset system's operating life experience and that the future 158 simulation is able to calculate and then pass the life model(s) 134 assumptions.
  • Failure or degradation state change is calculated by one or more models describing one or more failure modes 174 .
  • the means to aggregate wear or failure or performance models may, for example, be from logical rules, joint Monte-Carlo simulation or a use of a rate of change that is most severe over a time interval or weighted average or draw from a stratified life characterization such as a Weibull distribution or any other means as may be available in the art to correlate exposure to degradation 171 , 168 .
  • the threshold of reliability risk from point 164 (e.g., no risk or below threshold risk) to point 167 (e.g., near-certain impairment) is a parameter employed in the simulator/optimizer.
  • the simulator/optimizer may determine a set point (e.g., particular outage level 162 ) as the impairment risk limit and thus may request unit repair at approximately time 150 when the remaining useful lift value 148 occurring along useful life segment 146 is attained.
  • This set point (e.g., particular outage level 162 ) may have been another point 166 along the reliability probability 160 if the economics or other metrics of value warranted operations with that risk level for the greater overall asset-level performance.
  • a comparison 156 over a forecast interval of physical state or operating performance resulting from differential usage, service, and design or operating policy is compared over a time interval 159 and an economic difference between the two scenarios is calculated.
  • a service provider 152 such as an OEM of the industrial system
  • the present value or net present value or real option value of a design and/or operating policy effect on the resulting Free Cash Flows FCF of the industrial system and the governing contract between a customer and service provider will most likely be different depending upon the scenario of design and operations.
  • the resulting FCF of a user 151 of the assets do change depending upon the change in the system's efficiency, reliability, and service outage time, workscope flexibility to be dispatched or scheduled or used in any other way.
  • the FCF is probabilistic and is calculated by the simulation system for a scenario (design and operations) and then replicated to account for exogenous condition variability 165 , 109 , 113 . Changes in FCF and investments are netted to Present Values PV to calculate NPV using one or a number of discount rates. Variances of the absolute value of cash flows or differences of cash flows to business plans or absolute values are also tabulated for scenarios and replications.
  • NPV and variances 149 are related and different stakeholders in the industrial system's performance have different preferences for the relationship between risk (variance) and return (IRR, NPV, PV, or real option value).
  • Multiple objectives 155 may be present and solved for 154 by the simulation-optimization based control system being disclosed.
  • the control tradeoffs to achieve a physical state at a point in time is achieved by jointly changing the operating decisions related to scheduling the duty pattern or schedule of assets 103 , managing intervention events such as maintenance and inspections 114 , assigning higher level assets to a duty 123 such as an aircraft to a schedule, assigning assets to higher level assets such as engines to an aircraft 124 , Triggering control set points and maintenance 127 of a system and its subcomponent pans and subsystems, changing the design or configuration 133 of industrial systems, assigning services 135 , ordering service inventory 138 arrivals, setting or modifying the commercial contract terms or price for services 199 .
  • the simulator/optimizer may beneficially estimate the value of a subsystem upgrade and/or repair by simulating the asset under conditions with life-limiting components, such as subsystem 176 of FIGS. 1A-1G , with alternate available RUL 172 probabilities 177 . Should the cost of upgrade or repair work scope of the subsystem 176 be adequately compensated by the economic gain produced at the asset level, the simulator/optimizer may provide a recommendation for the upgrade or specified repair work scope. Further, the simulator/optimizer may assess any number of candidate work scopes with or without replications in providing such a recommendation.
  • the cumulative work 110 corresponding to an output through time of an aircraft engine, such as thrust.
  • the asset is on planned line 120 at time 107 , there is no probability of engine disruption based on useful life degradation (i.e., at time 107 , the dashed line doesn't overlap with (the graph of) a probability of failure 164 ).
  • an engine might be exposed to factors that differentially consume life such as a certain set of dirty air, relative humidity, or temperature, but, in the specific (e.g., out of a fleet of 100 aircraft), specific engines may be running through more harsh environments or operated at a full power takeoff, full power climb, etc.
  • a specific engine may be off of the planned line 120 and on the specific life path 140 .
  • new instructions have been provided by the computing control system and implemented for operations of the engine based on recommendations of the optimizer. For example, the aircraft has been moved from a short hop biased route structure to a transocean route bias, is flying with less takeoff power, is flying through less harsh environments, is using runways more efficiently.
  • the engine is scheduled to come in for service; however, after time 163 , the engine is below the planned line 120 .
  • the operating instructions may be changed again for the engine, and it is deployed in conditions in which its useful life is degraded more quickly.
  • it is purposely operated such that its probability of failure may reach point 162 by time 150 .
  • Another specific engine path 130 shows that an engine has been operating well below is planned line 120 .
  • the system may recommend the swapping of the engine on specific life paths 140 , 143 , 144 , 146 , with the engine on specific life paths 130 , 125 , 126 , 131 , 132 .
  • both engines may be utilized more optimally with respect to their useful lifes and maintenance schedules.
  • the determinations of engine swaps may be made by the system such that the average specific life paths of engines across a fleet of aircraft come closer to planned line 120 .
  • decision may be made at 125 , 126 , 131 , 132 by the customer to increase utilization of the engine (and thus increase availability of the fleet) such that the useful life of the engine comes closer to planned line 120 , particularly with respect to specific pre-planned maintenance points.
  • the probabilistic distributions 173 , 176 , 168 represent the probability of failure of one or more subsystems or components 175 within an engine, such as a combustion subsystem.
  • Each subsystem may be represented by multiple (e.g., hundreds) of parts.
  • each subsystem may have its own probabilistic failure distribution (e.g., based on simulations and CDMs).
  • the failure distributions for each subsystem are aggregated and rolled, up into distribution 160 .
  • Monitoring failure modes 171 , 174 of various subsystems may allow incorporation of replacement or new parts into a subsystems so as to change the shape of the component failure distribution 133 , which, in turn, changes the shape of the engine failure distribution 160 .
  • part swapping within subsystems may allow optimization of the maintenance of the whole engine system (e.g., with respect to obligations of the service provider under a service contract).
  • a business system or contract portfolio of a service provider 191 and other stakeholders such as investors 131 who are investing through the service provider 191 are beneficially improved with the disclosed computing control system with respect to the management of the physical system's impact to risk to return ratio at the enterprise level with a diversity of service contract terms 160 , such as for example, contractual agreements for parts, parts and services, services alone, or certain performance outcomes of the customer 190 . Should there be model risk or operations risk or exogenous factors that reduce performance outcomes, such as for example high fuel prices or a recession, a number of less correlated contracts will typically limit the maximum financial loss.
  • the target ratio of parts maintenance service agreement (MSA) to contractual services agreement (CSA) is dynamically optimized 193 .
  • the hypothetical operating margin 192 per contract for a CSA decreases as more service costs are realized, given the example term and condition which provides for required parts and repair services to keep aircraft engines 121 , for example, available and efficient.
  • the example contract may have its revenue set as a function of operating hours or cycles, independent of the totality of factors which degrade life faster 126 than planed life 120 .
  • the hypothetical operating margin for a MSA increases as services are required given its exemplary terms and conditions which provide for parts and services on an “as needed” basis, costing terms agreed to a priori, such as, for example a discount to list price.
  • the cumulative portfolio risk for example, the variance in operating margin change with shop visit rate is compared to the expected operating margin of a given portfolio 194 .
  • the cumulative portfolio risk is comparatively high with one hundred percent CSA terms given their exemplary condition that ties revenue to asset usage but with more productive services, the shop rate (cost) may comparatively decrease—which is an objective of the presently disclosed system.
  • a 100% MSA portfolio will not expose the service provider 191 to margin risk given that the parts and services provided under the example terms simply transact as needed and the provider 191 makes an incremental operating margin on each transaction.
  • CSA/MSA ratios between 0 and 1 the ratios of risk and margin change.
  • a provider may desire a certain ratio of this risk and return, and the disclosed system enables the scheduling and assignment of physical states through time to achieve that ratio as an objective 153 in the system optimization 154 .
  • the ratio of CSA/MSA may be set independently of the lifecycle economic optimizer 154 by the CSA/MSA optimizer 193 .
  • the CSA/MSA targeted ratio 106 informs the shaping of service contracts 160 .
  • the system controller via its optimizer 154 , reduces variance of cost cash flows.
  • Diversity of contract terms between CSA and MSA enable operating margins to be supported in lower service rate scenarios and higher service rate scenarios, according to the preferences of the service provider 191 or investor 131 .
  • parts come into a service shop (e.g., a supply chain) of a service provider under CSA, MSA, or on a transactional basis (e.g., for purchase of a particular pan or for a complicated repair).
  • Running a service shop requires the provider to have (sometimes very expensive) parts on hand.
  • the risk that has been transferred to the provider is the maintenance risk in example embodiments but can be any agreed upon performance aspect.
  • the provider ideally would be able to put a used serviceable spare part into the engine instead of a new part.
  • the provider ideally would like to be able to put a new part into the engine.
  • Spares can be specific capital assets such as a rotor or an entire unit such as an engine. Spares can be owned by the service provider 191 or customer 190 or a stakeholder 131 such as a financing organization such as a bank or investor or other service provider that leases parts or entire engines.
  • the ratio of spares, engine leases and use of specific assets from said spares or pools of assets is derived by simulating the operations of an airline and service provider to calculate the costs 151 , 152 and their variances (risk) to optimally 154 inform 182 the ratios of parts and engines 183 .
  • the use of these assets 181 is controlled, by the system optimizer 154 to achieve the financial payoffs of stakeholders 131 , 190 , 191 .
  • the number of engine spares is controlled for by adjusting work scope and timing of a service event as a function of available service capacity.
  • FIG. 3 starts from the generation of the flight schedule and aircraft-to-route assignment.
  • the flight schedule and aircraft-to-route assignment is provided as an input, in this manner, the simulation can be used as a scenario-based “what-if” tool where different flight schedules are provided as inputs.
  • the simulation then “flies” the schedule using “flight ops policies” and “environment issues”.
  • the flight ops policies include takeoff derate, climb derate and single engine taxi policy per city-pair route.
  • each of these inputs is provided a probability distribution such as a mean and a standard deviation in a normal distribution which is sampled from during the simulation.
  • the simulation will sample from a distribution to allow the derate to vary, representing pilot's making operational decisions that might vary from the policy.
  • the environment module defines the winds-aloft ambient temperature at departure city and PM10 (or coarse aerosols) at departure city. Randomness is introduced by defining a mean and a distribution which is sampled from during the simulation. The flight schedule is then “flown”, with variation induced by the statistical sampling. A key simplifying assumption is that the flights are assumed to occur as listed in the flight schedule inputs, with no operational deviations (such as delays, recovery from unplanned events, etc).
  • the Mixed Mode Aggregator (MMA) module applies damage to the engine components using the different damage model paradigms, including weibulls, CDMS, cycles, and custom damage analytics.
  • the MMA competes these different component damage models in a consistent framework to understand which component will drive a shop visit (and when).
  • the component damage (which will ultimately drive a shop visit) also contributes to overall engine performance degradation which is captured via the “Engine Performance Degradation Index” (EPDI) which is a degradation factor applied to the fuel-bum calculation.
  • EPDI Engine Performance Degradation Index
  • the Operational Decision module then performs the logic that represents the decisions that either service provider or the airline customer could make depending on the states of the aircraft or engine as calculated from the MMA and fuel-burn modules. These decisions are limited to engine maintenance, and specifically four actions as shown in the diagram. The first is to do nothing and simply fly the next flight the second is to perform on-wing maintenance (such as waterwash), the third is to perform an inspection, and the fourth is to perform an engine removal. Also is that one of the operational decisions could be to modify the flight schedule and aircraft-to-route assignments.
  • next flight is simply flown without any actions.
  • the on-wing maintenance is performed (and appropriate positive adjustments are made to engine damage state or performance) and then the next flight is flown.
  • the inspection is performed which results in additional information that results in a subsequent operational decision.
  • the engine is removed for a shop visit, with the workscope, turn-around-time, and costs being identified, before being returned to the spares pool.
  • the aircraft is immediately assigned another engine from the spares or lease pools and proceeds to its next flight. The simulation is completed when all the flights in the flight schedule have been processed.
  • a simulation framework includes some input “knobs” (e.g., assumptions, scenarios) that are controlled by the provider (e.g., shop workscope), others by the customers (e.g., derate, single-engine taxi policy), others by both (e.g., removals and on-wing maintenance), and others by neither (e.g., weather).
  • the key outputs are metrics of interest to both the provider and the airline customer. For the provider, these metrics might include shop visit forecasts, workscopes, CSA operating margins, parts forecasts. For the airline, these metrics might include fuel costs, number and timing of shop visits, number of engine spares and impact of flight policies on their operating costs or airline passenger miles resulting from asset utilization.
  • the simulation framework may be deliberately constructed to represent an end-to-end ecosystem, starting with an airline's flight schedule and working through to the maintenance cycle of the engines through shops and into the spares pool.
  • the list of input “knobs” may include, for example, knobs taken from various modules, including knobs taken from a Flight Schedule module (e.g., a Flight Leg knob), a Flight Ops Policy Module (e.g., Takeoff Derate, Climb Derate, and Single Engine Taxi knobs), an Environment module (e.g , Head Wind Speed, Ambient Temperature, Coarse Aersols knobs), an On-WingMX module (e.g., Waterwash Interval, Waterwash Threshold, Waterwash Effectiveness, and Waterwash Retention knobs), and a Workscope module (e.g., Workscope definitions knobs).
  • a Flight Schedule module e.g., a Flight Leg knob
  • a Flight Ops Policy Module e.g., Takeoff Derate, Climb Derate, and Single Engine Taxi knobs
  • an Environment module e.g , Head Wind Speed, Ambient Temperature, Coarse Aersols knobs
  • an On-WingMX module e
  • the Flight leg, TakeoffDerate, Climb Derate, Single Engine Taxi, Waterwash Interval, and Waterwash Threshold knobs may be under operational control of the airline, whereas the Workscope Definitions knob may be under Operational Control of the provider.
  • the input knobs may organized into various groupings of input data.
  • the groupings of input data may include groupings for simControl (Specifies key parameters such as Start and End dates, number of replications to run the simulation), Airports (Lists the airports and airport-specific information), Appairs (lists information specific to airport-pairs), acweType (Lists the aircraft and engine configurations), AengineType (Lists the engine types and specific information), acInstances (Lists each aircraft in the simulation by tail number), AengineInstance (Lists each engine in the simulation by ESN, as well as initial states (installation, cycles, SV, etc)) , LLPperEngine (lists the LLP parts and initial cycle counts for each ESN), flightSched (Lists the sequential flight schedule including departure, arrival, time and aircraft tail number), acweTRouteOps (lists route-specific parameters for each city-pair flown by each specific acweType), EngineEDPIFuelEff (Specifies the mapping between EPD
  • SpecificLLPEngineType (Lists the LLP parts for each engine type), DamageModel(Lists the damage models (CDMs) used for each engine type), Workscope (Lists the workscopes and key parameters (TAT, cost)), WorkscopeFailureMap (Map indicating which failure modes drive which workscopes), WorkscopeResetMap (Map indicating which failure modes get reset when a specific workscope is completed), WSAParameter (Specifies the WSA-specific parameters needed to run WS), WSASimulatorDriverMap (Map indicating how the simulation-native failure modes map into the WSA failure modes), WSAWorkscopeFailureMap (Map indicating which WSA failure modes drive which WSA workscopes).
  • Some of the challenges in running the simulation may include gathering, cleaning and formatting the input data.
  • Some data may be obtained from a forensics database maintained by the provider.
  • Other data may be obtained from separate data sources accessible by the provider.
  • Such data sources may provide data pertaining to fleet Weibulls, list of aircraft (e.g., by ESN in contract), current ESN-aircraft assignments, current ESN cycles since shop visit, engine configuration (e.g., to select appropriate Weibull by ESN), historical flight routes by aircraft, severity formulas (e.g., derate, temperature, other severity data, to modify Weibulis), list of uninstalled engines in contract (e.g., spare or in shop), LLP data by ESN (e.g., cycles limits), historical flight parameters by ESN and route (e.g., derate, temperature, and so on), planned AC/ESN entry or retirement, past work done by ESN on module level (e.g., what was repaired or what wasn't repaired), planned maintenance action (e.g., SB removal
  • outputs generated by the simulation may include SV & workscopes, spares count, lease days, ESN removal probability, SV cost, fuel burn, CSA profitability, shop loading, and parts/inventory needs.
  • all of these outputs, except fuel burn, may be primary interest to the provider, whereas only SV & workscope, ESN removal probability, and fuel burn, may be of primary interest to the airline.
  • the raw output from the simulation may include data items organized into files labeled by replication number of a particular simulation run. This structure allows the post-processing scripts to easily read all the files (e.g., for all the replications for a given scenario) and then analyze to provide statistical outputs.
  • Such files may include an “engine state change” file that sequentially lists each engine-related event that occurs during the simulation (e.g., including an engine instance identifier, a date and time of the engine state change, the new state of the engine (e.g., “mounted, off,” “in repair,” “in spares pool,”, and extended information (e.g., “water wash applied at 10,000 cycles when the EPDI was 3504.308,” “current aircraft set to null,” “installed to aircraft (B-319[47]),” “finished repairs,” and so on).
  • This output file can be used to analyze when engines are installed/removed from aircraft, repaired and moved into the spares pool, undergo waterwash and other similar events.
  • the files may include a “shop visit” file that provides details specific to engine shop visits, including rows corresponding to a shop visit such that an engine with multiple shop visits appears multiple times.
  • each row corresponds to a shop visit indicating which engine entered/exited the shop, the workscope performed and some other parameters (e.g., ECSV, ETSV) when entering the shop. This information can be post-processed to understand shop utilization, workscopes performed and shop costs.
  • Columns may include an engine instance identifier, a number of shop visits, a number of repairs, an enter service date, an exist service date, service reasons (e.g., “soft removal data,” “Weibull: HPT S1 Blade,” “Weibull: HPT S1 Nozzle”), workscope (e.g., HOC fix, BNC early, BGP teardown), ECSV, ETSV, and severity factor.
  • service reasons e.g., “soft removal data,” “Weibull: HPT S1 Blade,” “Weibull: HPT S1 Nozzle”
  • workscope e.g., HOC fix, BNC early, BGP teardown
  • ECSV e.g., ETSV, and severity factor.
  • the files may include a “fuel consumed” file that includes information pertaining to fuel burn, in example embodiments, each row corresponds to a flight and displays the fuel burned (e.g., in lbs.) for each segment of the flight.
  • This data can be processed to determine fuel costs, impact of specific policies on fuel-burn in a particular flight phase (such as single-engine taxi on fuel-burn during taxi), or aircraft-to-aircraft variation in fuel-burn on specific city-pairs.
  • the columns may include an engine instance identifier, a flight number, a date/time, fuel at taxi (pre), fuel at takeoff fuel at climb, fuel at cruise, fuel at descent, fuel at landing, fuel at taxi (post).
  • the raw simulation outputs described above provide flexibility for post-processing to provide meaningful graphs, heat maps and statistically aggregated values.
  • the vision is for the core simulation engine to provide the standardized raw outputs, which are then post-processed by app-specific scripts (e.g., R-scripts) to produce the desired output visualizations.
  • Example scripts include the following: (1) SystemSimPostProcess_vX.R—a wrapper-R-script that sets the file paths, filenames, and calls the remainder scripts, (2) System SimpostProcessESNRemoval_vX.R—processes the engine state change files to produce a master table that lists, per engine, the total probability of removal, as well as probability of each failure mode occurring; additionally, it provides the data table needed to produce a heat-map showing the increased probability of removal for each engine over time, (3) SystemSimPostProcessShopVisits_vX.R—processes the shop visit files to produce plots of number of shop visits vs.
  • System SimPostProcessSpares_vX.R processes the engine state change files to produce plots of spares level vs. time
  • SystemSimPostProcessLeasedEngines_vX.R processes the engine state change files to produce plost of number of leased engines vs. time, as well as a histogram of number of lease days required.
  • Modules in the system simulation include the following:
  • Aircraft-Engine Route Assignment module Assigns aircraft-engines to routes or recommends aircraft-engine-route assignments.
  • Aircraft-Engine Assignment module Assigns aircraft to engine. In example embodiments, initial assignment is given as input. Within simulation, at shop visit events, engine may assigned to aircraft from spares pool (e.g., as FIFO or using advanced logic).
  • Flight Schedule module lists specific flights (e.g., by date, time, aircraft-engine, city-pairs) that are flown in the simulation.
  • flights are user defined with a schedule provided as input with “severity” of each flight determined in pre-processing.
  • dynamic schedules can be updated within the simulation based on operational decisions.
  • Environment module Determines weather and environmental factors that impact performance.
  • historical data may be used to generate average annual temperature and coarse aerosols at takeoff airport, as well as distributions of headwinds (e.g., by city-pair).
  • official Aviation environmental models are incorporated and called from within the simulation.
  • Flight Operations module Determines flight operations policies defined by the airline.
  • historical data is used to generate distributions (e.g., per city-pair) for various policies, such as derate and single-engine-taxi.
  • additional flight operations policies including ones not specific to the engine, are incorporated.
  • Pilot Decision module Models pilot decisions in implementing the policies. In example embodiments, decisions are sampled from distributions for decisions pertaining to Derate and Single Engine Taxi. In example embodiments, more advanced logic than sampling is used.
  • Flights module Flies each of the flights in the schedule. Sequentially processes each flight. Derate and single engine taxi are used per Pilot Decision. Temperature and coarse aerosols are lookup via environment table. Headwinds are sampled from distribution. A severity (e.g., pre-processed) for this flight is applied to engines.
  • UER module Estimates frequency and cause of unexpected removals.
  • Mode Aggregator module Determines shop visit driver by considering available damage models/plans for engine removal. Modes may include CDMs, Weibulls, LLPs, softtime, calendar date limits, simple damage models.
  • Engine Performance Degradation module Determines loss of fuel efficiency based on usage.
  • degradation is modeled as a multiplier on the cumulative severity using a proxy parameter (EPDI) or an approved degradation model.
  • EPDI proxy parameter
  • Fuel Burn module Calculates fuel-burn per flight. Historical city-pair data used to generate distributions of fuel-bum per flight phase. Each flight sampled from distribution and adjusted for derate and duration (due to headwinds). In example embodiments, aircraft digital twin and gas path tracking filters are incorporated.
  • Operational Decisions module Represents actions that can be taken after each flight. In example embodiments, there may be four possible actions: 1—do nothing; 2—on-wing maintenance (waterwash); 3—inspection; 4—engine removal. In example embodiments, operational decisions include aircraft-related decisions, as well as ability to modify flight schedule.
  • On-Wing MX module Maintenance that can be performed without missing the next flight. Waterwash implemented with user-specified, interval, degradation threshold. May include other On-Wing or On-Tarrnac maintenance activities.
  • Inspection module Triggers an inspection and possibly a new operational decision based on inspection results.
  • Removal, Workscope and Shop-Related modules Block of modules representing the assignment and processing of engines as they flow through the shops.
  • SV Scheduling may be simplified to assume no constraints (can always be serviced within TAT).
  • Workscope module has two options: 1—a simulation native version; 2—calls WSA. Simplified models for SV Cost, TAT and workscope based performance update via EPDI. Incorporates shop capacity constraints, dynamic scheduling, and more advanced models.
  • Spares and Lease Pools module Represent the spares and lease pools available for installation to aircraft. Queue of repaired engines (FIFO) and option to lease engines when no spares available (max number of lease engines is user input).
  • This block includes an aircraft-engine to route allocation module, an aircraft tail number module, and engine serial number module, a planned aircraft maintenance schedule module, and a flight routes module.
  • This module is used to assign the aircraft-engine to routes and flights in the flight schedule.
  • a static user input provided by the airline or generated during pre-processing. The user is able to generate different assignments and run them through the simulation as different scenarios to understand the impact of route assignments.
  • this module optimally and dynamically makes aircraft-to-route assignments.
  • This module is configured to manage a list all the available aircraft (E.G., by tail number) at the start of the simulation.
  • each tail number may be matched to a predefined tail type.
  • Tins module is configured manage a list of available engines (e.g., by serial number), including spare engines. In addition, it may maintain lists of engine specific initialization information. In example embodiments, for each engine, the installed aircraft is specified, as well as its mounted position. In addition, ECSV, ETSV, the SV count, and Weibull modeset the engine is presently using are specified. Columns may be included to indicate whether the engine is installed, a future expected delivery, a spare, or in the shop at the start of the simulation. For engines in the shop, the shop exit date may also be indicated.
  • PLANNED AIRCRAFT MAINTENANCE SCHEDULE MODULE This module is configured to manage a list of planned letter checks for the airframes which would serve as constraints on allocations of the aircraft to the flight schedule. In example embodiments, this module is not used if the flight schedule with allocated aircraft tail numbers is statically generated in pre-processing.
  • FLIGHT ROUTES MODULE This module is configured to manage lists of the flight routes for the simulation period without the aircraft tail numbers assigned. This module is used to specify parameters that are relevant for the city-pair such as the distance, typical derate used, as well as the pre-processed Weibull severity for the flight. In example embodiments, these parameters are specified for a particular aircraft type, as the same flight route flown by different aircraft types would be operated differently.
  • the daily flight schedule module specifies flights that will be flown during the simulation.
  • a user provides a schedule which covers all flights over the desired simulation start to end date, and include all aircraft to be simulated.
  • the flight schedule lists all flights, including: Departure date and time, departure and arrival city, assigned, aircraft tail number.
  • this flight schedule would be the actual historical flights flown. If performing a forecast simulation, then the flight schedule must be generated. It could either be provided by the airline directly, or it could be generated based on historical flight schedules with some subject matter expertise input into future growth or modifications to the schedule. For example, consider that an airline is looking to potentially expand its route network to more harsh environment. In absence of specific information from the airline directly, a notional future schedule is generated by using past year's flights as a basis, and making adjustments to deploy aircraft to these new routes.
  • columns include departure aircraft code, arrival airport code, aircraft, type, distance, departure taxi PE Bits, arrival Taxi PE Bits, To derate mean, to derate halfrange, CI Derate mean CI Derate Halfrang, WeibullServerityf1, WeibullSeverityf2, WeibullServertiyf3.
  • the flight schedule may be treated as a static user input.
  • the flight schedule is generated or dynamically modified (e.g., city-pairs, frequencies, or tail-number assignments) so that optimizations can be performed.
  • a projected flight schedule may be generated in pre-processing.
  • the historical flight schedule is retrieved from the provider's databases and examined. Part of this examination includes data cleaning, as well as identifying a suitable time period which seems representative of the airline's most recent flight patterns. The selected time period is then replicated multiple times to generate the future flight schedule for the desired number of forecast years.
  • the future flight schedule is generated as a pre-processing step by running a specially developed script, such as a script having the following pseudo code: (1) read in the input files; Rename columns in the historical flight data; (2) perform initial flight cleanup; order the flights by tail number and timestamp; (3) Scan through the flight list and attempt to rectify any missing airport codes, (3a) if arrival airport is missing for a particular row, substitute the next following departure airport for the same tail number, (3b) if departure airport is missing, substitute previous arrival airport for same tail number; (4) delete any rows with missing departure or arrival airport data, (5) create lists of all aircraft, airports, and routes (e.g., city pair plus aircraft type), (5a) classify each aircraft by type; may need this for route ops, (5b) compute average departure temperature by airport, ignoring NA's, (5c) computer average derate by route and aircraft type, ignoring NA's, (5d) computer flight leg time by route and aircraft type based on distance and air speed; (6) generate alternate schedule for aircraft which lack flight
  • the environment module is used, to simulate environmental factors that are beyond the control of either the airline or the provider.
  • the intent is to incorporate a global weather model (likely based, on historical data) to provide realistic environment operating conditions when simulating future flights.
  • environmental factors may include ambient temperature at takeoff, coarse aerosols, and head-winds.
  • the ambient temperature at takeoff may be a key parameter for estimating engine damage and is used in severity models for ICAM shop visit forecasting, as well as pricing of CSA contracts.
  • Coarse aerosols may also have a severe impact to engine damage, particularly in environments with significant quantities of sand, such as the Middle East or the Gobi Desert.
  • the impact of coarse aerosol may be included into severity models using special-purpose analytics to improve estimates for shop visits and time-on-wing.
  • the head-winds (specifically, wind velocity) primarily impact fuel-burn with little impact to engine damage.
  • the temperature and coarse aerosols are inputted as historical annual average values at each airport, and the head-winds are inputted as average values per city-pair.
  • the environment module is limited to considering ambient temperature and coarse aerosols at the takeoff airport, as well as the headwind velocity between city pairs to focus primarily on engine-related issues. In other embodiments, the environment module incorporates more detailed weather models which would impact overall aircraft-level dynamics.
  • the flight ops policy module is used to simulate airline operating policies that are in the control of the airline. Some of these policies might arise as technical directives directly from the flight manual and others might be the specific airline best practices. These are policies that the provider might influence provided the value story makes sense to the airline. Operating policies may include, for example, takeoff derate, climb derate and single engine taxi. The takeoff derate may be a key parameter in estimating damage to the engine and may be used as one of the main inputs into the severity models for ICAM, as well as for commercial pricing of the provider's CSA contracts. Climb derate may also be a key parameter in understanding engine damage and incorporated into severity and/or pricing models.
  • the single engine taxi is known to provide fuel-burn benefits which would be balanced with any excessive damage the non-operating engine would suffer due to lack of a warm-up time when spooled-up just prior to takeoff.
  • the takeoff and climb derates are provided as uniform distributions (with a mean and halft-width) based on historical data per city-pair for the specific airline.
  • the single-engine-taxi is inputted as a code (per city-pair) indicating whether no engines, left engine or right engine is used during taxi.
  • example embodiments refer to a few policies, the vision is to incorporate all relevant flight policies used by the specific airline into the simulation models. Additionally, although example embodiments focus on policies that primarily impact the engine, the framework is intended to be able to handle any policy dial impacts aircraft-level operations.
  • the pilot decision module is intended to replicate the pilot's decision making process when implementing the airlines flight operations policies. This module is intended to introduce randomness into the simulation replications that is reflective of real-world operations as each pilot operates his/her flight.
  • the pilot's decisions include takeoff derate, climb derate and single-engine-taxi.
  • the takeoff and climb derates are sampled from the uniform distribution (with mean and half-width specified in the inputs based on historical data for the city-pair).
  • the single-engine-taxi may be a binary flag and no choice may be given to the pilot (e.g., if the inputs specify that a single-engine taxi should be performed on a city-pair, then it is always performed).
  • randomness is introduced by sampling from a historical distribution, and also indicating which engine (left or right) is used.
  • the focus is on the engine, however, pilot decisions that are related to the overall aircraft may also be included (e.g., based on incorporation of an aircraft digital twin).
  • FLIGHTS MODULE This module is the core of the fly-forward capability as it sequentially goes through each flight specified in the flight schedule applying the appropriate environmental factors and pilot decisions regarding flight operations policies. Each replication of the simulation is unique depending on the random sampling performed on the inputs. For the proof-of-concept, the random sampling is limited to wind, takeoff derate and climb derate. All other input factors are deterministic (single-value) inputs such as average annual temperature.
  • the simulation logic will fly every flight regardless of locational inconsistencies (such as departing from other than the previous arrival airport). Also, every flight is flown as scheduled. There is no attempt to model delays and subsequent recovery. For the proof-of-concept, “flying a flight” simply entails incrementing the cycles and time on the airframe and associated engines.
  • the wait process includes determining whether a calendar date removal is triggered. The removal includes removing the engine for SV (shop visit), processing the SV, entering the spares pool, getting assigned to new aircraft, and determining next potential cycles to failure as min(Weibull,LLP). If the aircraft is fit to fly after the waiting period or after being confirmed as fit to fly, the aircraft is flown on its flight.
  • the operational decision includes (1) determine whether any CDM threshold is reached, (2) determining whether any Weibull cycles have been reached, (3) determining whether any LLP cycles have been reached, and (4) determine whether a calendar date removal has been reached. If any threshold has been reached, the engine is removed for SV. Otherwise, a check is performed on whether the engine reached cycles for on-wing MX. If the engine has reached cycles for on-wing MX, the on-wing MX is performed. Finally, the information for the next flight is obtained and the process is restarted for the next flight.
  • the normal situation is that the next flight is to occur in the future, and the aircraft waits for the appointed time. While waiting, a calendar date removal might occur, in which ease, the aircraft is sent to have an engine removed, prior to flying the next flight. At the appointed flight time, a check is made to make sure the aircraft is “fit-to-fly”. In example embodiments, this determination may simply include checking that engines are installed, however, in other embodiments, this determination may include more complex logic.
  • the flight is then flown and the damage models are used to update the damage states of the engine components as the part of the MMA module.
  • the next step is part of the Operational Decision module where the engine is evaluated to decide what to do next.
  • the analytic/CDM damage states are checked to see if any thresholds have been missed, second is to see if any Weibull cycle limits have been met, third is to check if any LLP cycle limits have been met, and finally, the calendar date removal is checked. If any of these are triggered, then the engine is removed for a shop visit.
  • the order is of particular importance, because if multiple damage modes are triggered on the same flight, only the first one is used to determine the workscope. Furthermore, if multiple damage modes of a given type (for example, multiple Weibulls) are triggered on the same flight, then the order in which they appear in the input sheet determines the workscope.
  • the engine is removed, it is sent to the shop, then the spares pool, and then ultimately gets reinstalled on a new aircraft.
  • the random draw from the Weibulls is made, along with a comparison of the Life Limited Paris (LLPs) cycles to determine the potential cycles to next shop visit. If the engine is not removed, then a check is made to see if on-wing maintenance is due, otherwise the aircraft is cleared for the next flight in the schedule.
  • LLPs Life Limited Paris
  • next flight is a missed flight from the past then the aircraft immediately attempts to fly the next flight.
  • a check is made to insure the aircraft is “fit-to-fly”, and if so, then the flight is immediately processed (without waiting (or a particular time in the simulation). It is possible, that if an aircraft is grounded for an extended, time period, there may actually be a backlog of missed flights. These are all processed in sequence as soon as the aircraft is “fit-to-fly”. These delayed flights have consequences on the simulation, particularly in regards to engine removals, shop visits and interactions with other aircraft. For example, if an aircraft is grounded from January to July, then on July 1st, it will begin processing the 6 months of missed flights.
  • the scenario of a missed flight from the past may be an abnormal situation with the present simulation setup and can only occur due to illogical inputs. For example, if the inputs are setup in such a manner that an aircraft is specified to have a flight before its delivery date. Another scenario would be if the headwinds on a flight are so strong that the flight takes too long. As an extreme example, if the headwinds are specified as 10000 mph, then a flight that should only take a few hours could take months, resulting in many months of missed flights. In general, a missed flight can occur any time engines are not installed on the aircraft at the specified flight time (and this is the only check that is made to see if an aircraft is fit to fly). This could, in principle, occur if there is an engine removal with no spare engines or leased engines available. A lease engine cap may be introduced which results in aircraft-on-ground situations.
  • the simulation may actually simulate the trajectory of the flight itself (e.g., via the incorporation an Aircraft Digital Twin that can model the performance of the entire aircraft throughout the flight using typical aircraft performance methods (e.g., using L/D, T/W, drag polars, and so on). In this way, the aircraft digital twin will enable the ability to consider scenarios “beyond the engine.”
  • the Unexpected Engine Removal module incorporates models that reflect actual unexpected engine removal rates observed in the field. These models may or may not have granularity down to the level of the component that caused, the removal, in example embodiments, these models may be based on historical data.
  • the mixed mode aggregator module competes the different damage models that exist to identify which component will drive a shop visit (and when). Instead of considering all flights for every aircraft to be an “average flight” (average flight leg, utilization and derate), which gives no ability to distinguish deterioration on aircraft/engines flying one route vs another (e.g., a harsh route with a lot of dust exposure would cause more engine damage than a gentle route), and instead of considering only Weibull and life-limited-parts (LLP) damage paradigms, in contrast, the MMA module flies each aircraft on unique flights per the flight schedule, accumulating usage/damage accordingly, and the MMA incorporates soft-times (e,g, cycle based), calendar-date removals, Weibulls, LLPs, CDMs, and any other custom analytic.
  • soft-times e,g, cycle based
  • FIG. 2 is a framework diagram of life assumptions as they relate to risk transfer via physically sensing and optimally controlling component state(s) in one or multiple time horizons for one or more assets and subsystems used to transfer operating performance and/or financial risk between an asset operator and service provider; said risk informing the physical state being controlled for in an example industrial system.
  • the depicted probabilistic remaining useful life curves are the expected maintenance need which brings the asset into the maintenance and repair operation (MRO) when run to the limit.
  • MRO maintenance and repair operation
  • component 255 will cause a service event before the subsystem characterized by 240 .
  • FIG. 10 illustrates exemplary cos; modeling of a CSA contract with terms that stipulate certain engine states be maintained in whole 121 or in part such as at a subsystem 122 or part 128 level. This illustration shows the beneficial means to which a contract can be modeled, underwritten, priced and managed by the disclosed system simulator and optimization.
  • FIG. 2 describes the philosophy of how the mixed mode aggregator competes the different damage models to forecast when an engine will be removed.
  • Some of the models are deterministic (in a specific date) and others are probabilistic. In the example, there are multiple Weibulls 235 , 240 , 245 , 250 , and 255 and 2 LLPs 260 and 265 .
  • ESN engine
  • a timeline is setup for each of the damage models.
  • the deterministic damage modes may be straightforward as their removal dates may be fixed and known in advance. When running multiple replications of the simulation, those removal dates will always be the same for a given engine.
  • the probabilistic modes are sampled from the distributions resulting in different removal dales in each replication.
  • the MMA philosophy can, therefore, accommodate any damage modeling paradigm that expresses itself either as a fixed or probabilistic removal.
  • Different damage model paradigms that can be hosted by the mixed mode aggregator include, for example, (1) a soil-time removal paradigm—preventive measure to remove engine from service at certain number of cycles; in the MMA approach, cycles are converted to fixed date using known flight schedule for the engine; (2) calendar date paradigm—schedule maintenance for engine, in the MMA approach, fixed removal dates may be input and known at start of simulation: (3) Weibull paradigm—failure distributions for each major component on the engine adjusted for average severity, in the MMA approach, random draws from flight-schedule specific severity-adjusted Weibull; (4) LLP paradigm—life limited parts with certified life to a certain number of cycles; in the MMA approach, cycles are converted to fixed date using known flight schedule for the engine; CDM/DRM or custom analytic approach—accumulation of flight-by
  • a timeline 205 originating at a meaningful point To 215 such as the beginning of an assets life or the beginning of a contract or the start of an interval of interest such as “then” 220 , “now” 225 and “future” 227 establishes the temporal relationship of contractual activities and obligations.
  • Degradations to asset performance may be caused by many factors, such as for example ambient conditions, temperature and stress cycles.
  • the present disclosure accounts for the specific causal factors of degradation as computed by the cumulative damage models 134 , however, contracts do not necessarily have to have these factors in the contractual language or terms but instead can use higher level metrics leading to life consumption such as cycles or hours of use 210 .
  • engine flight hours are used to describe one embodiment.
  • An industrial asset such as an aircraft engine is characterized by subsystems 122 and certain parts 128 such as life limited parts 260 , 265 which are tracked by regulatory and contractual specification which, for example, may require a certain maintenance action or replacement when its proxy metric for life consumption 210 is reached.
  • Subsystems 230 are a set of components such as a combustion system or an auxiliary system such as related to fuel or air. These subsystems are characterized, for example, by Weibull failure rates 160 , 173 , 176 , 235 , 240 , 245 each subsystem having its failure or degradation realized by operation of the asset.
  • the operations are measured at a high level, such as flight hours or cycles 210 while in another embodiment, the operations are measured at a precise low level such as local atmosphere, power output, fuel type or maintenance activity as disclosed with the aid of FIGS. 1A-1G .
  • the contractual cost to the provider 152 , 191 is the sum of repairs for subsystem 230 service plus specific parts 260 , 265 service.
  • the repair policy is such that if one subsystem causes a service intervention, that the other system will be inspected and repaired up to a new remaining useful life level.
  • the expected average 120 plan life of an exemplar subsystem 245 is made more precise in terms of the statistical probabilities of life consumption based upon the granular modeling afforded with the cumulative damage model(s) 134 being exposed to actual or scenario operations 103 , 109 , 111 , 116 , 124 , 127 .
  • the probabilities of life consumption achieve a narrower forecast interval such as, for example from the original Weibull shape and location parameters 245 to then 250 and then 255 as more model 135 precision is attained and more operations factors are considered.
  • the present value change of free cash flow 149 resulting from the increased precision as life consumption (and service costs) is more accurately modeled for individual assets, their subsystems and parts can be viewed as the option value of implementing the disclosed system for contract underwriting, pricing and management.
  • This change in NPV for a given asset can be aggregated for a portfolio of assets.
  • the terms of a performance based contract may be valued by calculating provider costs 152 of specific life paths 125 , 140 versus an average life 120 .
  • the operations control policy related to location, duty, service interval and scope, asset control and assignment may be valued by calculating the comparative costs of resulting specific life paths 125 , 140 .
  • the customer's costs 151 can be calculated for the terms and operations of a contract/asset/fleet.
  • benefits to stakeholders other than the service provider and customer may be realized.
  • One example of such an additional stakeholder may be an investor.
  • a customer may decide to upgrade an engine in a particular way (e.g., add a new control system or a higher temperature rating turbine, and so on, to more optimally modify an engine for higher efficiency in the way the customer wants to use it or as it is scheduled with the disclosed system).
  • the models may allow an investor to make the economic investment into the engine according to that investor's risk/return preference.
  • the digital twin state estimation models when exposed to simulated futures, pricing, assignments, bidding and dispatch, enable calculations of how to achieve a financial preference under a given operating mode that enables payment of the investor back according to the contractual obligations.
  • the revenue model 302 may be configured to provide criteria regarding the monetary aspects of operating an industrial asset, including the revenue generated by the asset, the costs of fuel that may be used to operate the asset, dispatch and trade parameters, power generation capability and grid stability expectations, and so on.
  • the revenue model 302 may provide possible terms of power purchase agreements, possible ways of generating revenue from waste beat and/or other byproducts of the asset, electricity spot pricing, desired profit margins, and the like.
  • the design/CM&U model 304 may be configured to provide particular design options, such as alternatives regarding the particular subsystems (e.g., gas turbines) and components of the power asset 205 .
  • the design/CM&U model 304 may also be configured to suggest custom modifications and upgrades to a pre-existing design of the power asset 205 that may result in enhanced return on investment or other aspects of value. Further, slack values are calculated by relaxing constraints which are characterized by system design or operating policy points.
  • the operations model 306 may be configured to provide one or more sets of policies or rules regarding operation of the power asset 205 .
  • policies may be set based on information received at the operations model 306 from the physics-based model 225 and/or the data model 230 of the asset condition analyzer 220 .
  • the physics-based model 225 and/or the data model 230 of the asset condition analyzer 220 may serve as the operations model 306 within the asset condition analyzer 220 , as opposed to being located within the criteria module 255 .
  • Example policies may include circumstances under which the asset 205 may exceed its normal steady-state ranges (and for how long), circumstances under which the asset 205 should be shut down, weather conditions under which certain components (e.g., an inlet chiller) should be employed, and so on.
  • certain components e.g., an inlet chiller
  • the control system model 308 may be configured to provide parameters, limitations, and the like regarding the operation of particular subsystems (e.g., gas turbine) or components of the power asset 205 .
  • the control system model 308 may provide information regarding allowable inlet schedules and other parameters for ramp up of a component in response to increasing load, how much remaining useful life may be consumed by over firing a component by a specific period of time, and so forth. Such information may be useful in determining whether operating the component in such a manner may be useful in generating additional revenue.
  • the service model 310 may be configured to determine various parameters and limitations regarding the servicing, repair, and/or replacement of the various components and subsystems of the power asset 205 .
  • Such parameters may include the particular types of repair to be performed on a particular component based on the amount of use of the component, limitations regarding the use of the component that may invalidate a service contract or warranty, the length of time associated with the repair and/or replacement of the component, and the like.
  • the costs of different potential service contracts and their various terms may also be provided.
  • the financial model 312 may be configured to provide different scenarios regarding various financial aspects of the power asset 205 that may be considered.
  • the financial model 312 may provide different scenarios regarding capitalization of the asset 205 , such as whether the various components of the asset 205 , or the asset 205 in general, may be purchased using presently available funds, whether outside investors may be pursued, whether financing should be employed, and so on.
  • the financial model 312 may further analyze cash inflows and outflows based on initial investments, repair and/or replacement of components, cost of fuel consumed, expected revenues based on market pricing for output of the asset 205 , and the like.
  • the financial model 312 may provide indications of equity risk/return preferences of the owners and/or operator's of the asset 205 , as well as the lifecycle economic dispatch, modification, operations, and services that may achieve such preferences, subject to various capital structure constraints.
  • Soft-time removals refer to the idea of driving a shop visit based on the number of cycles flown. This is used when a decision is made (either via a service bulletin, provider recommendation, or airline operations decision) to remove an engine as a preventive measure on a periodic basis for maintenance.
  • the soft-time removals are implemented using a “Weibull Soft Time” with a large shape parameter (to approximate a delta function) and the timescale indicating the number of cycles.
  • These soft-time removals are not engine specific and can only be based on cycles since last shop visit (ECSV) consistent with how all other Weibull-based failure modes are treated. Since the exact flight schedule is already known, the cycles can be converted to a deterministic calendar date which remains the same for each replication of the simulation.
  • Calendar date removals are used when specific engines (per ESN) are known to be scheduled for a shop visit on specific dates. For example, this can be used in situations where there is a scheduled removal plan to address a service bulletin.
  • calendar-date removals may handled via the inputs where a user lists the specific ESNs and their removal dates. These dates are treated as deterministic and the engine will always be removed on that date.
  • a calendar date removals input table may allow different categories of removals (for example, Service Bulletin #1, and Service Bulletin #2, etc.).
  • WEIBULLS MODULE Failure forecasting may be largely based on Weibull distributions (based on engine cycles) generated, from historical failure data for each engine component of interest. These Weibulls may be maintained by teams of analysts, updated regularly and used extensively across the provider's systems. The Weibulls may be one of the main inputs in order to forecast shop visits to manage contracts, forecast contract profitability and understand potential pressure points.
  • a Weibull failure mode is a distribution specified by three parameters. Shape (>0; higher numbers indicates “narrower” distributions approaching a delta function), Timescale (in cycles, which approximates the mean time to failure for the weibull), Offset (in cycles, positive numbers push the mode farther into the future and delay the onset of the mode).
  • each engine platform may have one or more sets of Weibull failure modes defined. Each set reflects either a particular configuration of the engine (such as whether or not the engine has received a specific fix or upgrade), or the number of shop visits experienced by the engine so far. In example embodiments, there are two Weibull sets (0 and 1), and Weibulls are defined for each subcomponent for each set.
  • any components afflicted, by the workscope belonging to set 0 will be incremented to set 1 to determine the failure cycles of the next shop visit, whereas any components already at set 1 will remain at set 1.
  • the engine cycles since last shop visit are specified as an input. This information is provided at the engine level or engine subcomponent level.
  • the Weibulls are reset by setting the ECSV to 0 only for the specific components repaired (based on the workscope) and the Weibull set is incremented as described earlier (e.g., only for the repaired components).
  • the engine is then sent to the spares pool until needed.
  • the engines flight schedule is known. The severity for the aircraft's specific flight schedule is calculated and applied to each of the Weibulls. A draw is then made from the severity-adjusted distributions for each of the Weibulls, and the minimum cycles to failure (across all subcomponents) is used (along with the minimum cycles remaining across LLP parts) to determine the next potential shop visit.
  • Weibulls generated by historical failures across a global fleet for each subcomponent may be used. Since each engine is operated differently and experiences different environment conditions, adjustments must be made to the base Weibulls when making forecasts. This is done by multiplying the base Weibull (e.g., eta and beta) for each failure mode by a severity factor determined using a severity calculator with flight leg, derate, utilization, ambient temperature and coarse aerosols as the inputs.
  • the severity calculators are developed for each engine platform by (e.g , by the provider's engineering teams) and are intended to adjust the Weibulls (e.g., either reduce or extend the expected cycles to failure) based on actual operating conditions.
  • each subcomponent Weibull can be multiplied by a different severity factor (e.g., for the same operating conditions) since one can easily understand that cold section components are affected differently than hot gas path components.
  • the provider may create a limited set of (e.g., at most 3) different severity factors to be applied to the different engine components. This mapping is defined (e.g, which severity factors to multiply against which components) and is specified in the inputs.
  • each engine is flying a different flight schedule, with different flights legs, derates, etc.
  • the severity adjustment is handled via pre-processing during the generation of the flight schedule.
  • the flight leg (FL) utilization UTIL
  • ambient temperature TEMP
  • takeoff derate DER
  • coarse aerosol counts CA are used with predetermined severity calculators to calculate the severity for each flight. This severity is included as part of the inputs.
  • the severity factor is applied to the Weibull upon engine installation to the aircraft in order to make the random draw for its next shop visit.
  • the simulation would look-forward at the next 10000 flights for the given aircraft and average the severity parameter's directly. These average values would then be used as inputs to the Java severity calculator as follows:
  • Severity Factor SeverityCalc(avg(FL),avg(UTIL),avg(TEMP),avg(DER),avg(CA)
  • This severity factor would then be multiplied by the Weibull parameters in order to conduct the random draw to assign the next shop visit date.
  • LIFE-LIMITED PARTS. Life limited parts are engine-critical components that have been certified to fly for a specific number of cycles based on extensive engineering design and testing during the certification process. These components are typically high-value parts (such as the turbine disk) and can drive a shop visit if their replacement becomes due. For the proof-of-concept, since the flight schedule is known in advance, the cycles can be converted to a calendar date with remains fixed, across all the replications of the simulation.
  • the LLP specification for each part has inputs which are identical to those used in ICAM:
  • LLP Buffer typical number of cycles remaining at which the part will cause a shop visit
  • MinBuild minimum cycles which must remain on this part when the engine leaves the shop (for an unrelated repair)
  • an input list of all the life-limited parts for the engine platform is received.
  • the input of values for the LLP parameters is specified, per engine serial number for the simulation.
  • CDMS Code Division Multiple Access
  • DRMS DRMS AND CUSTOM ANALYTICS.
  • any physics or data-driven analytic that is used to forecast engine component damage may received as input.
  • CDMs and DRMs generated by the provider may be specific cases of custom analytics that can be inserted. In order to be useful, these analytics must be independently validated by comparing the analytical predictions of damage with inspection data for a large number of engines. The simulation may simply use the analytics, and may not be able to in itself make better predictions and compensate if the underlying analytic is a poor predictor of damage.
  • the analytic must provide an initial damage state (via pre-processing and specified in input table), and then be able to calculate the incremental damage per flight as a function of the flight-specific operating parameters in the flight schedule. If the damage model is based on engine parameters such as T3 or T49, then there must be a mechanism provided to forecast those values.
  • the analytic definition should include conditional logic that triggers an event. The conditional logic could be as simple as a threshold, or could be more complex such as slope-based or something else entirely. Additionally, the analytic should specify what event should occur when the conditional logic is triggered.
  • damage analytics are incorporated in the simulation and an input table is used to specify which ones should be used in the simulation.
  • two analytics specific to the CF34-10 e.g., LPT shroud drop and first stage nozzle cooling holes blockage
  • the LPT shroud drop is used to drive an engine removal (shop visit), however, the nozzle cooling hole blockage analytic is simply reported as having crossed the threshold (without driving a shop visit) since the analytic itself is still under validation.
  • the simulator platform infrastructure enables the simulation to call (e.g., within a replication, after each flight) the analytic, which may be hosted in a scalable and language-agnostic environment.
  • CDMs/DRMs may be used to estimate the engine health using historical flights to the present day. This information may then be used to assess whether an engine should be brought in for inspection.
  • the engine fuel-burn performance degradation over time is modeled in the simulation as a multiplier against the fuel-burn.
  • the engine degradation is captured in an “Engine Performance Degradation Index” (EPDI), which is a non-physical number that is simply incremented every flight.
  • EPDI Engine Performance Degradation Index
  • This cumulative index is calculated, based on the severity calculated, for each flight. As the flights occur, the cumulative EPDI for the engine is incremented by the EPDI for the flight. The cumulative EPDI is then related to the fuel-burn multiplier (1/fuel efficiency ratio).
  • the fuel-burn module is used to estimate the actual fuel-burn for the specific flight in specific weather conditions by the specific aircraft tail-number. Ideally, the fuel-burn estimate is made at the aircraft performance level, taking into account the drag characteristics of the specific tail number, as well as the actual degraded engine performance.
  • the vision for the fuel-burn module is to incorporate actual aircraft and engine models to properly estimate fuel burn.
  • the fuel-burn for a given flight can be estimated purely based on a tail-number specific aircraft performance model (e.g., via the Aircraft Digital Twin).
  • any fuel-burn degradation between the airframe and the engine is disaggregated, which requires a serial number specific engine-model.
  • the fuel-burn is estimated using a lookup table obtained from historical data in the provider's database systems.
  • the fuel-flow (in lb/hr) is provided per city-pair per each phase of flight. This information is provided for different aircraft-engine combinations since two different aircraft types flying the same city-pair are likely to have different performance.
  • the takeoff and climb fuel-flow rates may be corrected for the derate used on that particular historical flight using, for example:
  • the values provided as inputs may represent the notional 0% derate fuel-flow. Similar data may also provided for the time duration of each flight phase.
  • the duration of the cruise phase may not be provided in the lookup table, but rather the cruise speed may be provided instead.
  • the cruise duration may be calculated from the ground-speed (cruise speed—headwind speed), both of which are provided as inputs per city-pair. This is one example of linking an environmental factor (headwind speed) to an outcome important to the airline customer (fuel-burn). In this manner, the ground-speed is also replication-specific, and the duration is calculated using the city-pair distance.
  • Cruise Duration (Great Circle Distance Between CityPairs)/(Cruise Airspeed-Headwind speed).
  • the standard deviation of the fuel-flow and durations may also provided, so that randomness can be introduced into the simulation by sampling from the respective distributions.
  • a unique (or rather, replication-specific) fuel-burn is determined for each flight.
  • the engine performance degradation correction is also used to adjust the fuel flow, so that the total fuel burn for a single flight is calculated.
  • the Operational Decision module is intended to replicate the logic behind the operational decisions available to both the provider and the airline customer after each flight. In principle, this module would incorporate logic that could any impact of either the provider's or the airline customer's operations. This would include the airframe, the engine, flight schedules, or even ancillary services such as catering.
  • the focus may be on an engine with one of three operational decisions being made with respect to the engine after each flight.
  • the first is to do nothing and fly the next flight.
  • the second is to perform an on-wing maintenance action (e.g., waterwash) based on some OEM-recommended or airline policy, prior to the next flight.
  • the third is to remove the engine for a shop visit.
  • a replacement engine may be immediately pulled from the spares pool or lease engine pool so the aircraft can fly the next flight.
  • the removed engine is then processed in the shops to determine the workscope, shop costs, and turn around time (TAT) prior to being reintroduced into the spares pool. Additionally, a decision to perform an inspection may be made and a subsequent operational chain that occurs if the inspection is passed or failed may be incorporated.
  • TAT turn around time
  • Maintain Existing Schedule module This module essentially represents the status-quo behavior which is to proceed with the next flight without any intervention.
  • On-Wing Maintenance Module This module is used to represent any engine-specific on-wing maintenance that can be performed and its impact to either engine damage state or performance. Note that, in principle, this module should be expanded to include any “tarmac-based” aircraft maintenance as well.
  • An example of on-wing maintenance includes an engine waterwash.
  • the implementation is straightforward with two triggers: 1—cycles-based, and 2—engine degradation-based (e.g., EPDI crosses a threshold).
  • the impact of the waterwash is to improve the EPDI by a user-specified number of points, and as such its only impact is to improve fuel-bum, without any impact to the damage state of the engine.
  • a retention period must be specified, which indicates the duration (in cycles) of the effectiveness of the waterwash, with the performance (e.g., EPDI) degrading linearly back to the pre-wash degradation curve.
  • EGT increases as the engine degrades over time with some portion of the degradation being recoverable via waterwash and the rest requiring a shop visit.
  • the impact of the waterwash improving the performance may be visualized as a step function, which then linearly returns back to the pre-wash performance over a certain number of cycles (the retention period). This behavior may be modeled and incorporated into the simulation.
  • the on-wing maintenance module may similarly incorporate any additional on-wing maintenance actions that can, for example, either extend the life of components or impact fuel-burn.
  • the inspection module is used to represent the process of performing an inspection on a part per a prescribed inspection policy, and returning the results of the inspection.
  • the results of the inspection then drive another operational decision which could be to any of the actions described earlier (e.g., fly next flight, on-wing maintenance, removal, or even another inspection).
  • one of the outputs of the inspection module might be to “true-up” the CDM for a particular damage mode. Modeling the results of the inspection may be based on historical data to generate a distribution on the results of the inspection.
  • Removal, Workscope, and Shop-Related Modules simulate the process of the shop visit logistics. This includes determining which shop to visit, scheduling a slot within the selected shop, and identifying the appropriate workscope to perform. In particular, for the latter, identifying the workscope also specifies how long it takes, how much it costs, and what is the impact of the shop visit on the engine.
  • the workscope module is configured to model the process of deciding the extent of the repair work performed during a shop visit.
  • one of two methods to model the workscope selection process may be selected. The first is a rules-based model developed and run natively within the simulation framework, and the second is to invoke the Workscope Analyzer algorithm (WSA) as an external module. Both are described below.
  • WSA Workscope Analyzer algorithm
  • the rules-based, simulation-native implementation consists of a series of lookup tables developed in consultation with CPMs. Each of these tables is presented as an input values to the simulation.
  • the Workscope table defines the available workscopes for a particular engine model. Each workscope is defined with a name, a turn-around-time (TAT), a non-CSA customer price, and a CSA cost.
  • the WorkscopeFailureMap table which lists all the damage modes (weibull, LLP, CDM, calendar removal, etc.) that could cause an engine removal and identifies the workscope (from the Workscopes table) that is subsequently triggered.
  • the WorkscopeResetMap table specifies which Weibulls are reset when a particular workscope is completed and the engine leaves the shop. The Weibull for a component is reset by setting the ECSV for the component to 0.
  • the flow of how the tables are used in a simulation is as follows. First, an engine shop visit is triggered by a particular damage mode. This damage mode is used to identify the workscope to be completed (using the WorkscopeFailureMap). The turn-around-time and cost for the shop visit are specified (using the Workscopes table) and the engine remains in the shop for the specified TAT duration. Upon leaving the shop (into the spares pool), the appropriate weibulls are reset (using the WorkscopesResetMap).
  • WORKSCOPE ANALYZER APPROACH.
  • the WSA implementation involves defining mappings between the native rules-based approach input tables and required WSA inputs, and then calling WSA as an external module.
  • the WSA approach may have a large set of predefined workscopes (e.g., that were determined by the WSA team in consultation with the shops) that are maintained in a database (e.g., along with the average costs and turn-around-time for each of those workscopes) that is called from the WSA algorithm.
  • workscopes are often more extensive in number than those that might be defined by a CPM, and are specified via input tables.
  • the WSA algorithm relies on groupings of the failure modes (rather than considering each individual weibull or LLP) to determine the workscope to be performed. This requires a mapping between the damage modes to those “grouped damaged modes” that are used by WSA.
  • the WSAParameter input table that defines the WSA run-time parameters that are passed to the WSA module during the external call. These parameters are required by WSA and define how the WSA algorithm is run and how it behaves.
  • the Workscopes table may be completed with the additional workscopes defined by WSA (and the flag is set to TRUE, indicating it is used by WSA, and not the native rules-based approach). Only the workscopes flagged TRUE are passed to WSA. This table is provided by the WSA team for the specific engine platform.
  • the WSAWorkscopeFailure map lists the WSA damage modes that could cause an engine removal and identifies the WSA-specific workscope that is subsequently triggered. This is the analog to the WorkscopeFailureMap. The WSA algorithm may interpret this as the minimum workscope that will be considered, and it is likely to propose additional workscopes as part of the optimization.
  • the WSASimulatorDriverMap table defines the mapping between the individual damage modes to the “WSA damage modes”. Some of the modes map 1-to-1 (for example, the “Weibull Combustor” mode maps to the WSA “Combustor” mode), while others are grouped (for example, the “LLP Booster Spool”, “Fan Forward Shaft”, and “Fan Rotor” all map to the WSA “LLP Fan” grouped damage mode). This mapping must be provided by the WSA team and is necessary since, as described earlier, the WSA algorithm uses groupings of damage modes defined specifically for WSA.
  • the WorkscopeResetMap table is populated with the WSA specific information. The table is used in the same manner as described earlier to determine which WSA damage modes need to be reset.
  • the flow of how the tables are used in a simulation is as follows. First, an engine shop visit is triggered by a particular damage mode. This damage mode is used to identify the workscope to be completed (using the WorkscopeFailureMap). The turn-around-time and cost for the shop visit are specified (using the Workscopes table) and the engine remains in the shop for the specified TAT duration. Upon leaving the shop (into the spares pool), the appropriate Weibulls are reset (using the WorkscopesResetMap).
  • the flow of how WSA is used when integrated into the simulation is as follows. First, an engine shop visit is triggered by a specific damage mode. This damage mode is mapped to the appropriate WSA-specific damage mode (using the WSASimulatorDriverMap) and the WSA inputs are passed to the WSA algorithm. WSA is called externally, and returns the workscope that should be performed. The turn-around-time and cost for the shop visit are specified (using the Workscopes table) and the engine remains in the shop for the specified TAT duration. Upon leaving the shop (into the spares pool), the WSA-specific damage modes that need to be reset are specified (using the WorkscopesResetMap). These are then mapped back to the base Weibulls that need to be reset (using the WSASimulatorDriverMap).
  • the shop visit schedule module is intended to model the situation where an engine can be sent to multiple shops, and there is a desire to level-load engine maintenance across the shops, or to identify potential bottlenecks that would delay an engine servicing. In example embodiments, it may be assumed that the engine being removed can be immediately processed by the shops. This module is agnostic to whether the rules-based or WSA approach is used, to determine the workscope.
  • SHOP VISIT COST MODULE This module is intended to model the costs associated with the specific shop visit so that total costs can be accumulated over the lift of the simulation.
  • input values for each workscope are specified.
  • the module determines the cost value for a specific shop determines the different shops available with a cost multiplier to complete the same workscope completed at each shop. This allows more accurate assessment of the costs of the shop visits for contracts where the engines might end up in different shops around the world.
  • the TAT module is intended to model the wing-to-spares-pool time (e.g., the elapsed time, in days, it takes to remove an engine from the aircraft to its subsequent placement in the spares pool). This module is heavily influenced by the shop visit schedules and any potential bottlenecks occurring.
  • the simulation defines the turn-around-time for each different workscope instead of an “average” shop-visit turn-around time for all workscopes. Similar to the shop costs, the intent is to allow the user to specify a multiplier on the turn-around-time for each shop in order to take into account different transportation times and shop productivities.
  • WORKSCOPE-BASED PERFORMANCE UPDATE MODULE This module is configured to update the engine fuel-burn performance based on the workscope completed.
  • SPARES POOL MODULE This module represents the spares pool of engines that is typically contractually maintained under a CSA agreement. These engines are used to replace engines that are coming off-wing in-order for the aircraft to continue flying. In practice, if there are no more spare engines available, then provider may be obligated to procure a lease engine from the market to install on the aircraft.
  • the spares pool is essentially a first-in, first-out queue with engines coming into the spares pool from the shops (as they are repaired) and then assigned to the next aircraft requiring an engine.
  • more advanced logic intelligently assigns engines to aircraft based on engine-pairing, anticipated future flights, or other logic.
  • the lease pool module represents the market availability of lease engines for use in-case the spares pool is exhausted. If an aircraft requires an engine, and the spares pool is exhausted, then a leased engine is installed on the aircraft. The simulation keeps track of the number of leased, engines, as well as the leased engine days so that lease costs can be calculated. In example embodiments, a maximum size to the lease pool is provided. In this case, aircraft will remain grounded if the lease pool is exhausted. Logic is introduced to manage the lease pool, as well as the impact to the flight schedule with grounded aircraft.
  • the system 300 depicts the criteria module 355 as deployed in a networked system 330 .
  • the networked system 330 may provide server-side functionality, via a network 301 (e.g., the internet or Wide Area Network (WAN)) to one or more clients.
  • FIG. 3 illustrates, for example, one or more client machine(s) 320 .
  • the one or more client machine(s) 320 may each execute one or more client application(s) 322 , such as a web client (e.g., a browser, such as the Internet Explorer browser developed by Microsoft Corporation of Redmond, Wash.) or a programmatic client.
  • Each of the one or more client applications may include one or more modules (e.g., a plug-in, add-in, or macro) that adds a specific service or feature to a larger system.
  • one or more servers are coupled to, and provide programmatic or web interfaces respectively to, one or more application server(s) 340 .
  • the application servers 340 may host one or more applications or modules, such as the criteria module 355 described herein.
  • the application servers 340 are, in turn, shown to be coupled to one or more databases servers 360 that facilitate access to one or more databases or NoSQL or non-relational data stores 365 .
  • system 300 shown in FIG. 3 employs a client-server architecture
  • various embodiments are, of course, not limited to such an architecture, and could equally well find application in a distributed, or peer-to-peer, architecture system, for example.
  • the various applications could also be implemented as standalone software programs, which do not necessarily have computer networking capabilities.
  • machines 320 and 330 as well as client applications 320 and server applications may be coupled to multiple additional networked systems.
  • FIG. 4 is a flowchart of an example method 400 for computing operations optimization
  • a service provider 191 achieves optimization gains in internal operations such as, for example, CSA risk reduction, CSA cost reduction, CSA revenue price setting and enhancement, especially with respect to risk and the identification of new product introduction opportunities for design as well as for selling modifications and uprates to a customer.
  • the gains include more reliable and profitable assignment of assets to certain duty cycles or routes, best assets to keep in the operating portfolio versus being scrapped, sold, parted out and the optimal dynamic in service control and asset operation.
  • states of engines are estimated (e.g., based on simulations, including digital twin modeling, as described herein).
  • a joint optimization of a combination of engine assets is performed.
  • a joint optimization of workscope and assignment of engine assets is performed.
  • maintenance cost optimizations are identified (e.g., based on application of the models and joint optimizations).
  • operating cost optimizations are identified.
  • price risk of service cost is estimated (e.g., for calculation of terms of a contractual service agreement).
  • forecasts pertaining to the optimizations are included in a discrete event and agent-based simulation, as described herein.
  • various models are employed in identifying the optimizations and performing the joint optimizations, including customer key performance indicator model, customer operations model, customer financial model, service-provider contractual model, service-provider risk/return model, and design and operations co-optimization models, as described herein.
  • FIG. 5 is a block diagram depicting data and analytical system relationships for asset and operations state control.
  • digital twins are created and maintained within the system corresponding to state estimation 504 , operations 505 and prognostics or anomaly detection 503 .
  • asset optimizations and operations optimizations may be identified. Where the states of assets 504 are purposefully controlled by and for the benefit of operations 505 .
  • FIG. 6 is a block diagram depicting one or more concurrent physical and business system state control optimizations and centralized simulation based orchestration.
  • FIG. 7 is a stakeholder risk and return preference and an available pareto frontier at one or more intervals of time to which the control system is optimally causing state changes of physical assets to achieve. It includes a framework illustrating the performance of an industrial system relative to system one or more stakeholder preferences with respect to the ratio of financial or operational risk and return relationships or other relationships such as an operations result with respect to the system's variance of that performance indicator.
  • the risk and value management framework displays aspects of the performance of an industrial system relative to the preferences of the system owners and the entitlement of those industrial systems to change their risk and return relationships.
  • Two dimensions are displayed in the graph 700 .
  • a first dimension represents the net present value (NPV) 705 of the free cash flows (FCFs) discounted at a risk-free interest rate over the economic optimization forecast interval. This NPV 705 is calculated via a pro forma whose assumptions are being provided by the system of systems simulation.
  • the second dimension is variation 710 . This variation 710 represents the periodic differences of the free cash flows of the industrial system.
  • a first curve describes the “as-is” or base case 720 Pareto frontier of risk and return relationships for the given industrial system as it is currently designed, operated, or constrained.
  • the second curve signifies the “could be” or “to be” 725 Pareto frontier, whose improved capacity to generate higher economic returns at a given level of risk than the base case 720 is enabled with new design and operations capability, as determined by the simulation and optimization operations described above, such as those associated with the simulator/optimizer 200 of FIG. 2 .
  • a Pareto frontier may identify a set or range of parameter values representing an optimized result (e.g., in this case, NPV 705 ) for a given set of constraints.
  • Point A is the economic return, and the risk to achieving that return, of the original industrial system justification.
  • Point B denotes a current state of the system which, in the example illustrated has a lower NPV than the justified system and incurs more variation or risk associated with this state, and thus is not as economically vital as the system is capable of being.
  • Such higher risk and/or lower return may be a result of an exogenous condition, such as a competitor or a technology substitute or perhaps as a result of its design and operation in the current or forecasted exogenous conditions or as a result of the operators of the industrial system not running the industrial system to its designated policy.
  • This diminished state may also exist because the industrial system has not been beneficially re-engineered and optimized, as is possible via the simulator/optimizer 200 of FIG. 2 .
  • Point C is a new economic operating point dial is perhaps achievable without the disclosed system, if there were manual co-optimization.
  • Point D represents a beneficial change to the system that is compatible with the owner's risk/return preference that may be achievable via the ability of the simulator/optimizer 200 to find optimal design and operating policy points.
  • Point E is a point of risk and return available for owners that are willing to experience periodic cash flow swings resulting from taking on more operational risk.
  • the incremental resulting NPV creation may be a means to create a surplus that may then be invested into the system in a given operating period or over a sequence of operating periods spanning years. Alternatively, financing or cash outlay may be employed to migrate the system to higher returns for a given level of risk.
  • Point F is a theoretical point which is established as a cap to loss. The simulator/optimizer 200 may enable this point's Put Option value to be calculated.
  • a beneficial aspect of the simulator/optimizer 200 may be that a single customer may experience excessive risk and is willing to hedge that risk, while the OEM offering services solutions and controlling for their contracted performance outcome using the disclosed method and system may pool this risk amongst a portfolio of assets, thus providing a real option value to up-rate the assets in some way to reduce risk.
  • FIG. 8A provides a local and global control point representation 800 of the Digital Twin Operations Optimization system, depicted in its industrial state control computing system 805 embodiment, using exemplars in the Aviation and Power domains.
  • Local asset assignment and scheduling operating decisions 810 are optimally calculated 805 by the disclosed system.
  • the physical states of the industrial system components that are being measured, automatically estimated and adaptively controlled through time 850 by assigning their operations will enable the achievement of desired life, reliability, maintenance workscope that is a function of life or as a function of higher level KPIs that are optimized for objectives such as shop and production control, fulfilment, used serviceable inventory repair and stocking.
  • the interaction effects of the system 805 reach into the thousands and cannot be computed, or traded off by humans or current analytical methods of the prior art such as spreadsheets, mathematical packages, Enterprise Resource Planners.
  • FIG. 8B is a representation 800 of optimized maintenance factors 820 which are enabled by controlling the states of the industrial system with the disclosed system 805 .
  • These planning and optimized aspects are individually and jointly Simulated to calculate the interaction effects and then optimized over with replications by the Digital Twin Operations Optimization computing control system.
  • These planning and optimizations have dynamic and temporal interdependencies which are now computed 805 . For example, the tradeoffs through time of certain duty assignments in the present against a combination of service scope, timing, environmental operating limits, local and central inventory stocking by type or remaining useful life in a given part or system.
  • the combinations of factors and interactions are not calculable by humans or the business tools of the prior art.
  • FIG. 8C is a representation 800 of local and global control points in the computing control system 805 .
  • Interacting dynamical workscope specification 850 calculated with discrete event simulation controlled automated decision support interacts with agent based simulation 860 and performance risked based contract terms.
  • the human-machine interaction tiles of the system 805 may be configurable so that particular key process indicators of the industrial system and its operating and service processes may be presented and easily understood.
  • the changes which are available to be made in the industrial system result in no change to the key process indicators from the base case to the optimal new case.
  • the industrial system may be improved wherein the base case is dominated by a new case or scenario that the simulator/optimizer 805 has discovered via simulating a virtual version of the industrial system physics based and data derived models and its many sub-processes and their decision support.
  • FIG. 9 is relationship diagram depicting physical and business optimization of an example industrial system.
  • the optimizations may relate to one or more of a physical design, an operational policy, and a control.
  • Operations simulations using digital twins may identify operations optimizations that benefit both the service provider and the customer.
  • the disclosed simulation based computing control jointly seeks both provider and customer benefits.
  • FIG. 10 is a graphical representation of the computing control engine for co-optimization of design and operations.
  • An “as-is” estimation of the example embodiment in the aviation domain calculates fuel consumption.
  • a work output is sensed or empirically observed or simulated to achieve, for example, a certain routing schedule or operate in a weather condition which is exogenous to the system's ability to directly control.
  • a virtualized efficiency is calculated for a set of flight and maintenance events and prospective policies that are promulgated by the disclosed system. It can be appreciated that thousands of combinations of schedules, policies, events and contingencies are computed for the purpose of determining the dominant design and operation set points.
  • factors being calculated and sought by the system or to which the system must be limited by or achieved are called bidirectionally by the computing control system 805 , such as, for example variable fuel, fuel cost, service agreement cost, maintenance planning and the like.
  • An actual 1001 may be compared to a calculated “entitlement” (eg, best possible or other operating objective) 1003 for a ratio of realized vs potential possible.
  • the state of life or damage is informed to and dynamically controlled 1002 by the system.
  • Asset scheduling and assignment activities 1004 are controlled by the system 805 to achieve a certain physical state or an operational objective.
  • One mode is an automated control.
  • Another is a means to assure a minimum performance threshold is met.
  • Part and inventory 1005 stocking location, time and remaining useful life are calculated by the system 805 as a function of damage estimation 1002 in one mode and in another mode, the available parts and capacity limits inform the on-wing maintenance or flight policy control points.
  • Financial calculations determine service revenue, risk, price and billing or other cash management means 1006 . These are a component of system level optimization transfer functions or are themselves an objective that the state control system dynamically seeks with operating and maintenance assignments and policies.
  • Shop schedules by aircraft engine and scope 1007 are calculated by the system 805 to control cashflows 1006 , operating factors 1004 , flight and maintenance factors 1020 and schedules (severity and duration) in one embodiment.
  • the operations and maintenance schedules may be automatically constrained by available capacity 1005 or parts or performance.
  • Routes (duty through time) may be assigned 1008 to achieve fuel consumption and rate of degradation.
  • System level tradeoffs 1009 are calculated to shape service demand to optimally use shop capacity, schedules, inventory trade off, for example.
  • FIG. 11 depicts a block diagram of a machine in the example form of a processing system 1000 within which may be executed a set of instructions 1024 for causing the machine to perform any one or more of the methodologies discussed herein.
  • the machine operates as a standalone device or may be connected (e.g., networked) to other machines (e.g., in a cluster).
  • the machine may operate in the capacity of a server or a client machine in a server-client network environment, or as a peer machine in a peer-to-peer (or distributed) network environment.
  • the machine is capable of executing a set of instructions 1024 (sequential or otherwise) that specify actions to be taken by that machine. Further, while only a single machine is illustrated, the term “machine” shall also be taken to include any collection of machines that individually or jointly execute a set (or multiple sets) of instructions to perform any one or more of the methodologies discussed herein.
  • the example of the processing system 1000 includes a processor 1002 (e.g., a central processing unit (CPU), a graphics processing unit (GPU), or both), a main memory 1004 (e.g , random access memory), and static memory 1006 (e.g., static random-access memory), which communicate with each other via bus 1008 .
  • the processing system 1000 may further include video display unit 1010 (e.g., a plasma display, a liquid crystal display (LCD), or a cathode ray tube (CRT)).
  • video display unit 1010 e.g., a plasma display, a liquid crystal display (LCD), or a cathode ray tube (CRT)
  • the processing system 1000 also includes an alphanumeric input device 1012 (e.g., a keyboard), a user interface (UI) navigation device 1014 (e.g., a mouse), a disk drive unit 1016 , a signal generation device 1018 (e.g., a speaker), and a network interface device 1020 .
  • an alphanumeric input device 1012 e.g., a keyboard
  • UI user interface
  • disk drive unit 1016 e.g., a disk drive unit
  • signal generation device 1018 e.g., a speaker
  • network interface device 1020 e.g., a network interface device
  • the disk drive unit 1016 (a type of non-volatile memory storage) includes a machine-readable medium 1022 on which is stored one or more sets of data structures and instructions 1024 (e.g., software) embodying or utilized by any one or more of the methodologies or functions described herein.
  • the data structures and instructions 1024 may also reside, completely or at least partially, within the main memory 1004 , the static memory 1006 , and/or the processor 1002 during execution thereof by processing system 1000 , with the main memory 1004 , the static memory 1006 , and the processor 1002 also constituting machine-readable, tangible media.
  • the data structures and instructions 1024 may further be transmitted or received over a computer network 1050 via network interface device 1020 utilizing any one of a number of well-known transfer protocols (e.g., Hypertext Transfer Protocol (HTTP)).
  • HTTP Hypertext Transfer Protocol
  • Modules may constitute either software modules (e.g., code embodied on a machine-readable medium or in a transmission signal) or hardware modules.
  • a hardware module is a tangible unit capable of performing certain operations and may be configured or arranged in a certain manner.
  • one or more computer systems e.g., the processing system 1000
  • one or more hardware modules of a computer system e.g., a processor 1002 or a group of processors
  • software e.g., an application or application portion
  • a hardware module may be implemented mechanically or electronically.
  • a hardware module may include dedicated circuitry or logic that is permanently configured (for example, as a special-purpose processor, such as a field-programmable gate array (FPGA) or an application-specific integrated circuit (ASIC)) to perform certain operations.
  • a hardware module may also include programmable logic or circuitry (for example, as encompassed within a general-purpose processor 1002 or other programmable processor) that is temporarily configured by software to perform certain operations. It will be appreciated that the decision to implement a hardware module mechanically, in dedicated and permanently configured circuitry, or in temporarily configured circuitry (for example, configured by software) may be driven by cost and time considerations.
  • the term “hardware module” should be understood to encompass a tangible entity, be that an entity that is physically constructed, permanently configured (e.g., hardwired) or temporarily configured (e.g., programmed) to operate in a certain manner and/or to perform certain operations described herein.
  • hardware modules are temporarily configured (e.g., programmed)
  • each of the hardware modules need not be configured or instantiated at any one instance in time.
  • the hardware modules include a general-purpose processor 1002 that is configured using software
  • the general-purpose processor 1002 may be configured as respective different hardware modules at different times.
  • Software may accordingly configure the processor 1002 , for example, to constitute a particular hardware module at one instance of time and to constitute a different hardware module at a different instance of time.
  • Modules can provide information to, and receive information from, other modules.
  • the described modules may be regarded as being communicatively coupled.
  • communications may be achieved through signal transmissions (such as, for example, over appropriate circuits and buses that connect the modules).
  • communications between such modules may be achieved, for example, through the storage and retrieval of information in memory structures to which the multiple modules have access.
  • one module may perform an operation and store the output of that operation in a memory device to which it is communicatively coupled.
  • a further module may then, at a later time, access the memory device to retrieve and process the stored output.
  • Modules may also initiate communications with input or output devices, and can operate on a resource (for example, a collection of information).
  • processors 1002 may be temporarily configured (e.g., by software) or permanently configured to perform the relevant operations. Whether temporarily or permanently configured, such processors 1002 may constitute processor-implemented modules that operate to perform one or more operations or functions.
  • the modules referred to herein may, in some example embodiments, include processor-implemented modules.
  • the methods described herein may be at least partially processor-implemented. For example, at least some of the operations of a method may be performed by one or more processors 1002 or processor-implemented modules. The performance of certain of the operations may be distributed among the one or more processors 1002 , not only residing within a single machine but deployed across a number of machines. In some example embodiments, the processors 1002 may be located in a single location (e.g., within a home environment, within an office environment, or as a server farm), while in other embodiments, the processors 1002 may be distributed across a number of locations.
  • FIG. 12 is a block diagram of an assumptions schema for the constrained computational system.
  • the computing control system which receives certain physical system sensing, simulates configurations, duty, assignments and schedules is outlined 1200 in a format to expand upon the data related to the control of the computing system with respect to the required specificity of control and the time constants for action.
  • a second view 1300 will provide the logical control schema for the system computing.
  • An industrial system such as a fleet of aircraft or an aircraft 1202 are comprised of subsystems such as its engines 1204 which in turn is comprised 1206 of subsystems such as components of the turbine 1208 , for example combustors, stage 1 compressor blades, shrouds and other key components of the engine that most affect thermodynamic performance and asset availability and reliability. These components themselves may have subcomponents such as blades.
  • a section of the engine 1208 is detailed 1210 with respect to specific bill of materials, serial numbers, manufacturing record, operating life configuration data such as what engine a given serial numbered part was flown in as a part of the engines from its original manufacture date to a first engine, to repair, to a second engine, to the next repair and so on.
  • ESN engine serial numbers
  • Sensor data 1224 is time series in nature. Some engine component temperatures and pressures are not directly measured, but instead are reconciled using a model that represents the thermodynamic or operational physics of the industrial apparatus 1226 . These models may be first principles in nature such as a heat balance or may be a surrogate model such as a neural net. The actual sensed data 1224 is used in conjunction with the model 1226 to determine what the non-directly sensed temperatures and pressures must be in order for the observed signals to be realized. Those calculated “virtual sensed” data 1228 is recorded for the purposes of physics based state estimation, for example, oxidation and degradation of a metal part at a certain temperature and atmospheric condition for a certain duration and load.
  • the time steps of data acquisition or virtual sensing are configurable and are limited by communications rate 1220 or setting of the system, such as to record only changes in sensed values or to record at a time interval as a function of the rate of change of the sensed signals (record at shorter time differentials in the presence of dynamical transients).
  • the record interval is set by the change in decision variable change which is meaningful for a given operation control change (where more precision or decision point sensitivity, more data at lower time intervals is needed).
  • a heuristic may be used to set the data capture rates or a ROC with respect to a decision, as will be disclosed by 1300 .
  • the ambient conditions that the assets and their subcomponents are exposed to are recorded 1230 .
  • the temperatures and pressures that the engine and its parts have been exposed to are used for duty cycle analysis 1250 and state change estimation.
  • Event data of actual realized observations and simulated future dispositions 1240 is recorded for the purposes of assumptions accuracy and for control point settings that the computing control provides.
  • An example of a control point setting is one which is computed that optimizes one or more key process indicators, the optimized setting being computed from an enumeration of scenarios (apparatus design and operation) and replication of scenarios so as to determine the KPIs and confidence interval which is most robust to changing exogenous factors such as the weather at a given airport or airline schedule for a given set of assets.
  • the duty cycle of the physical assets 1250 in the presently disclosed control system are comprised of observed and simulated forward ambient conditions, settings such as thrust and calculated parameters such as efficiency and events.
  • the assets whose states are being controlled by the disclosed computing control system are exposed to this historical single profile that was realized as well as scenarios and replications of those scenarios for future potential operations. A most optimal future will be selected.
  • the configuration 1252 of what component and part serial numbers are in what engines at a point in time is used in conjunction with a duty cycle scenario by the simulator and optimizer 1255 to compute candidate future duty assignments, service scopes, parts needs, contract management, airline performance with respect to asset utilization and variable expense such as fuel.
  • the optimization seeks to achieve the operating goals 1258 as set forth by the user of the computing control system and the solutions are limited by the constraints imposed 1260 such as capital expense, schedule fulfillment, regulations and repair or operations policy.
  • the operations simulation model and the state estimation models are compared with the sensed 1254 data and variation from the expected level vs actual (A/E Ratio or A/E) and the rate of change of those A/E cause control logic to alarm a drift or error in one embodiment and in another embodiment, are used to specify specific inspections to make on specific assets so as to true up the forecasted states and models with actual results. In this way, the computing control system does not propagate error and learns.
  • the system provides an assignment 1262 control point to which the actual physical world then implements and thus consumes life and variable costs such as fuel.
  • the then future physical system response to the state control is compared, an error signal is derived and the system adapts to achieve the KPI goals for that point in time.
  • the computing control system may sense and derive operational optimization however, the computing time or computing resources may not be unlimited and thus, at times, a beneficial feature of the system is to match the time requirements and accuracy of the control action by dynamically managing the computing processes of the control system.
  • FIG. 13 is a block diagram of a constrained and unconstrained computational control system schema for estimation of thermodynamic performance and asset utilization.
  • the system to manage time and specificity for the operational decision optimization 1300 is disclosed.
  • Two modes of computation are enabled—an unconstrained 1302 method and a constrained mechanism 1310 .
  • An unconstrained compute of scenarios and their replication has no time or computing resource limits on attaining specificity in a confidence interval over one or more future times.
  • a KPI threshold 1304 is met for a given time future 1306 by running scenarios and replications 1332 until the return on the next computed scenario provides no added analytical value. There are few actual operations that benefit from a marginal specificity past some point, in which the decision or control provided by the system would not change with that added accuracy.
  • a beneficial feature of example embodiments is to automatically control the number of scenarios and confidence intervals for the range of operational decisions to be effected over one or more time horizons.
  • the constraints imposed by time to effect the control action from the current time so that states of assets of the industrial system or the KPIs those states influence can be caused to occur within the time interval needed to make the change in the system. For example—if a schedule of a fleet of aircraft must be changed so as to assign certain aircraft (and their engines) to certain routes so that certain wear or life consumption patterns occur that benefit aspects of the industrial system such as maintenance or fuel consumption, spares level or asset utilization occur—and the window of effecting those assignments is, for example, 17 minutes from the present, the control points must be computed by that time interval. Scenarios evaluated and/or the confidence intervals at one or more future times of the apparatus states or the KPI outcomes may be constrained.
  • ROC curve which is building as compute cycles occur for the system simulation and optimization.
  • the threshold system performance is adjustable 1322 by the computing control system or the analyst using it.
  • Forward time estimates of the one or more KPIs have an upper value 1320 and lower value 1314 forecast at a given probability, and an expected value 1316 at time T 1 , T 2 or another time 1318 .
  • the probability density function of the forecasts may or may not be a normal distribution, and, given the nature of the coupled dynamic system being controlled, uses a simulation based approach for forecasting.
  • a confidence interval 1320 is derived for times t.
  • Adjustable parameters 1324 of CI attainment, threshold ROC achieved and compute time duration from now from which the decision is required 1338 do control the number and granularity of the scenarios and their replications for a decision or control 1340 .
  • the computing control algorithms and processor(s) 1332 , 1256 feed the operation decision time required from current 1334 and confidence interval 1334 for given tirne(s) 1318 future.
  • the ROC improvement is comparative to a base case 1360 .
  • Presented scenarios for a forecast interval are provided to the simulation and optimization engine 1322 . These are conditional and may be specified by the control logic 1342 , according to the probability of meeting specificity, time duration and threshold set points.
  • the available time from the current by which a control action is required 1334 is compared to the remaining compute time 1336 (which is set by the time to compute a scenario and replication 1356 ) is compared.
  • the compute must converge on both threshold and confidence in this time interval 1352 .
  • the rate of change of the KPI outcome and state estimation confidence interval 1344 must meet the remaining available tune 1352 .
  • a rate of change in CI 1346 derived by the change in KPI or state change rate 1310 , is compared with the operational decision specificity 1348 for KPI outcomes such as fuel consumption and asset utilization assignment control.
  • the rate of change of CI over the required CI 1350 is compared to the required convergence time 1352 and if adequate, additional scenarios and replications are released to the simulator-optimizer 1342 , 1356 . If the rate of thresholding is met 1322 , 1310 , then the compute resources are focused on reducing the CI 1320 at the specified time intervals 1318 . Similarly, should the rate of threshold attainment not meet the convergence time allocated 1352 , then replications are reduced and scenarios are evaluated instead. It can be appreciated that the sample durations and time steps of the simulation are similarly controlled.
  • fuel consumption and asset lifting state changes are computed in response to a candidate duty cycle that differentially degrades engine performance according to those duty cycles.
  • a flight schedule of an aircraft may be beneficially changed to reduce fuel costs and increase asset utilization associated with operating the aircraft, the recommendation based upon the disclosed computing state control system and comparisons of operations data collected from databases of multiple external computer systems corresponding to multiple fleets of aircraft associated with one or multiple customers.
  • a computing control system beneficially simulates a set of physical apparatus through one or more time intervals and interacts with the service systems that interface with them, providing the historical duty cycles, routes, sensor signals, component and configuration identification, maintenance works cope, and other parameters of the system that result in enhanced operations for the owner or operator.
  • a beneficial aspect of the computing control system is to manage the states of the in-service and repair apparatuses that comprise the industrial systems such that a balance between available spare parts, subsystems, primary systems, and ecosystems is achieved.
  • the computing control system determines when its forecast error exceeds a threshold that is insufficient to schedule repair parts and achieve the financial objectives of the maintenance and repair operations or contracted, performance level in one or more time intervals. Upon detecting an indeterminate operating regime, specific physical inspections are identified that reduce the forecast error of asset damage in one or more time intervals. An example embodiment of this is depicted as control loops in FIG. 14 and FIG. 15 .
  • the computing control system 1400 computes life consumption 1410 as a function of both 1402 actual past operating history 1404 and candidate future operations 1408 .
  • the routes 1406 have city pairs, which, due to their different ambient conditions and characteristics of operations, such as the load, on the aircraft or length of runway or ability to do on-wing activities, thus create differential life consumption of the engine subsystems. For example a hot and sandy environment consumes more life than cooler airports with particulate free air and lower passenger and/or fuel loads or longer runways.
  • the allocation of aircraft to routes 1405 can be made in such a way as to cause the wear or remaining life of the engine to take a certain duration with respect to other engines in a fleet in such a way as to change the service work scope 1412 at one or more points in time so that available capacity 1418 (as computed by a shop scheduling module) in the service operations can be slotted or reserved 1414 .
  • available capacity 1418 as computed by a shop scheduling module
  • the lack of engine performance with respect to its efficiency as calculated by a fuel consumption model 1416 may also create the need for repair. Whether the repairs are for one or both of physical damage or thermodynamic efficiency the engines and their work scopes are evaluated 1414 singularly and amongst the other engines for assigning to a service opening or slot.
  • the work scopes 1412 may be modified so that shop network capacity 1418 is configured for a shorter repair turnaround time, stocking certain inventory 1420 , 1422 to avoid delay and thus placing more engines into the spares pool.
  • repair parts and shop work station repair resources that must be consumed to affect a repair.
  • a complicated and lengthy process of materials ordering would ensue and the engine would not be available for revenue service by nature of it being in the shop.
  • repair components such that, no matter the repair, parts are available and repair resources are at the ready, on demand.
  • the former instance has a high opportunity cost for assets not being in service.
  • the latter is expensive to support the inventory carrying value of.
  • the control system computes work scope, time, parts assignments in advance of the repair so as to balance out turnaround time and inventory carrying cost.
  • an estimate of used serviceable spares 1422 and new materials 1420 is made. Typically a repaired part or used part is lower cost than a new part.
  • the inventory of used and new parts is assessed. A used part was once a new part 1424 which was exposed to operating service 1426 that in turn experienced repairs 1428 .
  • the level of available repaired parts 1422 is a decision choice in the control system. The state of the available repaired parts is likewise a choice. For example an unrepaired or refurbished part may be stocked or a fully restored part may be stocked.
  • the parts selection 1430 is a function of the existing damage, contracted work scope and duty cycle between the current shop visit and a future shop visit. The amount of capital tied up in inventory, be it new or repaired, is compared to a limit 1432 .
  • Used parts may be stocked “as-is” or repaired 1442 so as to have a portfolio of materials that have been computed to be robust to the range of inbound work scopes 1412 for one or more time periods.
  • the rationalization of that mix is achieved with a flexible repairs optimizer 1444 which balances the mix of states and their quantity with a carrying cost constraint.
  • a common outcome is that used parts are repaired to a state suitable for most prospective duty cycles 1408 , 1410 as the marginal cost of holding fewer, highly flexible parts is lower than holding an exactly matching portfolio of different states.
  • the flexible repairs optimizer is run on an ongoing basis with changes in forecast confidence interval 1470 or parts selection changes 1430 .
  • the parts are placed into the most likely to be assigned repair operation 1446 ; said repair location being one location in a network of shops.
  • the used parts are stocked for the proposed demand and if demand is satisfied, no new parts are required. If there are not sufficient used parts available, new parts 1420 are assigned. These new make parts 1433 are scheduled into the new make production system controller 1435 .
  • the calculation loop 1401 iterates until the lowest cost, feasible stocking mix is attained.
  • a conundrum for enterprises which operate expensive capital assets and those that service those assets may be balancing the number of in service units, spares and service shop inventory and capacity to reduce turnaround time (and thus reduce the number of operating spare assets).
  • the control system is able to optimally control the shop repair capacity for one or multiple intervals of time as a function of constraints and objectives related to cash forecast 1490 , cash requirements 1492 , financial ratios 1494 , ready operating spares 1471 , revenue service 1402 and confidence intervals related to life consumption 1470 , which are actively controlled.
  • the system computes a confidence interval broad enough 1400 - 1 as to make the assignment of repair parts, part type 1440 , 1442 .
  • a targeted physical inspection 1452 is scheduled to establish the state of the assets in the system and their forecast accuracy.
  • a useful benefit of the system is the capability to calculate free cash flows through time with replications and thus a financial ratio such as risk (variation in NPV from the replication) vs. return is calculable and may be used as a system objective to which the parts stocking and revenue asset count is controlled to attain.
  • Other ratios 1494 may include return on equity, real option value of added service capacity or number of ready spare assets, the value of turn around time and inspection cost for precision improvement.
  • a method of computing the confidence interval begins with a realized and candidate revenue asset schedule 1402 that damage models 1410 estimate remaining life from and work scope models 1412 then estimate parts and repair requirements from. This can be thought of as the service demand 1413 to which the available repair capacity (parts, people and tooling) is scheduled against.
  • the service capacity is computed as parts 1420 , 1422 and physical capacity 1450 .
  • Physical capacity is the machinery needed to effect a specified repair.
  • a candidate shop slot and work package 1434 which is a set of repairs and the parts required, is simulated against the repair network's prior scheduled demand 1418 , 1414 to determine where the candidate asset can be scheduled or slotted 1450 .
  • the computing control system will iterate until the service demand is satisfied by the parts stocking and shop capacity, subject to constraints and goals such as financial risk and return preferences.
  • the computing system controls the state estimation accuracy of the models used in the scheduling optimizations.
  • an inspection of the asset is made 1452 with, for example, dye penetrant, x-ray, eddie current, electronic tests, thermal performance tests—according to the determined work scope 1414 for that service event.
  • a refinement in work scope is made 1454 with the results of the now extremely accurate state determination and the service assets are optimally assigned 1455 .
  • the actual states of the asset and its subsystems are compared to the expected 1456 inbound forecasted work scope 1434 .
  • the damage models 1410 are updated with learnings 1457 from the actual vs expected error so as to create a learning and adaptive system over time and many observations.
  • the computing system Upon detection of an actual vs expected error that is sufficient to make the work scope or parts stocking drive the financial variation 1490 above a threshold, such as a ratio of preferred risk vs return 1494 , the computing system executes a fleet of asset stratification 1458 that clusters 1458 the assets according to their labeled descriptive attributes, last state determination and duty cycle and asset configuration so that similarly degrading assets are fitted into a cohort from which randomized inspections 1460 are made to determine state. As the inspection results no longer add precision to the state determination, the state estimate is inferred onto the other assets in the cohort 1462 .
  • a threshold such as a ratio of preferred risk vs return 1494
  • the computing control orchestrates the clustering and inspection state inference on one or more cluster definitions which can be configured with labels such as city pairs, flight duration, operator, operating policy or any other such factor and the system will iterate on the stratification/clustering/inspect process 1460 , 1403 through different cohorts until the rate of change of the confidence intervals 1470 with respect to the expected value diminishes and is reflected in objective satisfaction 1432 , and decision support stability 1456 , 1433 , 1435 , 1446 , 1470 , 1458 in one or multiple time horizons 1472 .
  • State estimation 1410 forecast error 1456 will propagate 1400 - 1 in the computing control system such that part quantity and type, maintenance and repair operational capacity assignment, part production planning and state estimation cohort change with each replication of a simulation scenario that the system is computing. This error is detected at the actual vs. expected 1456 step and in the system's monitoring of the stocking and assignment decisions being controlled by the disclosed computing control.
  • inspections 1460 are called and the state estimations of other assets and their subsystems in like cohorts are updated 1462 .
  • the update 1462 may alternatively be in a shadow mode 1463 , different than the primary state estimation 1410 and the asset assignments, stocking levels and work scopes may also likewise be in a shadow mode where the primary assignment is made with alternative possibilities derived from the shadow results.
  • an airline operation 1500 comprised of flying assets (aircraft and its engines) 1501 that are scheduled for revenue service and a network of one or more repair operations 1510 such as a service shop(s) with stocked repair components 1515 , 1520 (which may also consume considerable capital) and machinery.
  • a minimal turnaround time in the repair activity will increase the number of assets in revenue service or said differently, capital expense tied up in protective capacity may be avoided if the shop repair cycle is shorter. It is therefore desirable that the cycle time of repairs is low and that the cost to serve, such as the inventory carrying value ICV is also low.
  • a coupled dynamic business-physical system 1500 is thus formed, that if purposefully controlled, can optimally minimize the number of assets to serve the primary revenue demand service (aircraft and its engines scheduled to fly passengers), and stock the repair parts required for service so that delays are avoided waiting for components in the repair process, but minimize all other spare components and systems.
  • the coupled system approaches its entitlement with respect to primary assets, spare assets and repair components.
  • the coupled system's limiting cycle times and ICV for repairs and the variation of scheduled, service with respect to life consumption theoretically limit the system's performance with respect to asset count.
  • the control system optimally assigns repair assets such as parts 1510 to a given repair operation for the services of a fleet 1501 , subject to capital constraints or cash flow or net income objectives 1505 , to the limits of forecasting confidence intervals over one or more time horizons 1535 —which the system is actively both controlling the accuracy of by virtue of physical state estimation inspections on certain assets that are then used to true up the confidence on other state estimation models and by assigning assets to duty cycles that consume life in such a way as to make the service event timing and work scope more certain so that the right repair parts and services can be scheduled, which thus lowers ICV and shop cost.
  • repair assets such as parts 1510 to a given repair operation for the services of a fleet 1501 , subject to capital constraints or cash flow or net income objectives 1505 , to the limits of forecasting confidence intervals over one or more time horizons 1535 —which the system is actively both controlling the accuracy of by virtue of physical state estimation inspections on certain assets that are then used to true up the confidence on other state estimation models and by assigning assets
  • the computing control system has at least three control loops implemented in the example embodiment: a negative feedback loop computed 1525 to limit the rate of life consumption in a set of given in-service assets 1501 according to the pattern of work scope/parts requirements that may be constrained in their count by a limit in inventory as imposed by a financial constraint 1505 ; a second computed loop 1540 which feeds back the available work scopes that are possible for a given set of stocked repaired pans or shop costs, which may be limited by a capital constraint 1505 or physical availability of a part such as, from a production capacity limit, and a third loop is computed 1550 that increases the precision of damage estimation over one or more time horizons 1535 such that the assigned schedule of the revenue generating assets is met (or modified to meet) and the ICV limit vs repair parts on hand is satisfied.
  • the simulation—optimization system is instructed to compute these loops at least as fast as a change in the revenue service physical states changes sufficient to change the repair parts stocking and shop capacity allocation.
  • the type of part which is stocked in one or more of the repair network locations may be a newly produced part 1520 or a restored used part 1515 .
  • various levels of restoration may be specified by the disclosed system that span from “do nothing, just stock this used serviceable repair part” to specifying a specific set of repairs to said part.
  • the system computes the damage estimation 1502 from a given schedule assignment at given loads and exposures and operating policies 1501 and calculates the one or more work scopes 1503 for one or more removal dates for the one or more desired repaired physical states of a complete apparatus (e.g., an aircraft engine certified to have a certain thermodynamic performance and operating life until the next service event).
  • a complete apparatus e.g., an aircraft engine certified to have a certain thermodynamic performance and operating life until the next service event.
  • a requisite level of parts required 1510 through time a bill of material BOM designator.
  • the states of the required parts even though the same part number, may be one or more states (e.g., surface finish, tolerance, fatigue, repair type, etc.) and these stocking requirements may change over time when more than one time interval is considered in the optimization computation.
  • the system assigns the repair of and stocking of a used spare. If the quantity of spare stock is not available, per the time horizon considered, a new part is scheduled.
  • the parts 1515 , 1520 schedule thus includes quantity, timing and state of repair and location such that financial constraints or objectives 1505 are met, at a given confidence interval 1535 , for a one or more set of operating scenarios 1501 .
  • the cash objective 1505 for one or more time periods can be, in one embodiment, the free cash flow of one or more of the stakeholders (e.g., service provider/shop, financial nsk holder/service contract, operating entity/airline).
  • the capital structure for said stakeholder is reflected in their financial statements and a financial model computes the multiple period free cash flow of revenues and operating costs for the derivation of present value PV against which the costs of repair components are applied to calculate net present value NPV.
  • One or more discount factors may be used.
  • a marginal cost of capital discount may be used for the purposes of calculating a range of NPVs and the shift between scenarios of one or more decision choices calculated is used to calculate the real option value of the choice being considered.
  • a traditional pro-forma NPV analysis is enabled. No matter the financial valuation technique deployed, which the present system enables the computation of, the dynamic links are accurately attained in the computing control system by the coupling of asset assignment, work scope, parts and confidence interval management.
  • a financial estimate of one or more periods may be accompanied by a confidence interval which is attained by computing replications of a given scenario with the computing control system.
  • the span of the confidence interval may be so great at one or more time horizons that the system cannot converge on an optimal stocking schedule for parts.
  • One source of the forecast error will be the state estimation models which compute life consumption for a given duty, the said duty being an actually flown route or a simulated future route, subject to one or more operating policies.
  • a fleet of assets such as an airline's fleet, there is a mix of flights that have been flown and a schedule for future operations and thus the state estimations for fuel efficiency and reliability are a mix of actually flown flights and simulated future flights.
  • the system when the confidence interval 1535 cannot discriminate the parts stocking assignments 1510 , 1515 , 1520 , beneficially alerts the operationally responsible persons that the computing control system is in an indeterminate state and informs a schedule of on-wing/in-situ physical inspections into the operating fleet 1501 for the purposes of maximally decreasing the forecast error leading to high confidence intervals at the cause of the indeterminism of the computing control.
  • the partial differential of confidence interval with respect to work scope change is in one example embodiment, the mechanism by which the targeted assets are identified to receive the physical inspection for the purposes of trueing up the actual physical state with the estimated state.
  • the trued up state(s) are inferred to other assets which have experienced similar schedule assignments.
  • the stratification of the in service assets is thus made by similarity to past or simulated future duty assignment for the purposes of reducing the confidence interval so that the assigned parts schedule is determined and the resulting cash flow variation (from simulated replications) is reduced.
  • Image, chemical, sensor and virtually sensed data is specified by the computing control system, using a physical state characterization model of the assets, subsystems and parts with an inspection system that organizes the requisite configuration, historical measures and past estimation results.

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

A method of providing a first set of computer systems with access to a recommendation pertaining to operation of one aircraft in one or more fleets of aircraft is disclosed. Operations data is collected at the first set of computer systems. The operations data pertains to operations of the one or more fleets of aircraft over a time period. The operations data is stored in one or more databases of a second set of computer systems. The operations data includes values corresponding to fields in the one or more databases. The fields represent at least one of policy data pertaining to one or more operations policies, flight schedule data pertaining to one or more flight schedules, and operating cost data pertaining to operating costs associated with the one or more fleets of aircraft. Assumptions of control input values are derived for use by the first set of computer systems based on the operations data. A cost savings analysis is performed with a simulation system for at least one aircraft of the one or more fleets of aircraft, the cost savings analysis including identifying a modification of at least one of the control input values. An estimated reduction of operating costs is computed for the aircraft over one or more time periods. The computing is based on comparisons of a first subset of the operations data with a second subset of the operations data.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application claims the benefit of U.S. Provisional Application No. 62/333,097, filed May 6, 2016, which is incorporated by reference herein in its entirely.
  • TECHNICAL FIELD
  • This application relates generally to the field of aircraft operational control and, in one specific embodiment, to a control system for computing the dynamic optimization of the aircraft engine system in the present and over a configurable time interval to achieve constrained stale estimation objectives or constraints of an operator or original equipment manufacturer (OEM).
  • BACKGROUND
  • Given the potential number of factors to manage the operations associated with a large, complex industrial system, such as, for example, one or more aircraft and their associated apparatuses, such as engines, optimizing such factors for an enterprise (e.g., for asset utilization, fuel cost reduction, physical inspection, physical damage state assessment, workscope, and shop service capacity) is typically ad hoc in nature as well as time-consuming.
  • BRIEF DESCRIPTION OF DRAWINGS
  • The present disclosure is illustrated by way of example and not limitation in the figures of the accompanying drawings, in which like references indicate similar elements and in which:
  • FIGS. 1A-1G are framework diagrams illustrating the relationships of choices and operational paths associated with an example industrial system;
  • FIG. 2 is a framework diagram of life assumptions as they relate to risk transfer and component state in one or multiple time horizons used to transfer risk between an asset operator and service provider;
  • FIG. 3 is a block diagram of an example architecture for implementation of the simulator/optimizer of FIG. 2;
  • FIG. 4 is a flow chart of an example method of optimizing operations using a digital twin system;
  • FIG. 5 is a block diagram depicting data and analytical system relationships for asset and operations state control;
  • FIG. 6 is a block diagram depicting one or more concurrent physical and business system state control optimizations and centralized simulation based orchestration;
  • FIG. 7 is a graph depicting stakeholder risk and return preference and an available pareto frontier at one or more intervals of time;
  • FIGS. 8A-8C are flow diagrams of local and global control points of an example industrial system;
  • FIG. 9 is a relationship diagram depicting physical and business optimization of an example industrial system;
  • FIG. 10 is a graphical representation of an example decision support interface for co-optimization of design and operations;
  • FIG. 11 is a block diagram of a machine in the example form of a processing system within which may be executed a set of instructions for causing the machine to perform any one or more of the methodologies discussed herein;
  • FIG. 12 is a block diagram of an assumptions schema for the constrained computational system;
  • FIG. 13 is a block diagram of a constrained and unconstrained computational control system schema for estimation of thermodynamic performance and asset utilization;
  • FIG. 14 is a block diagram of a constrained cash service system with inner optimizing feedback loops for repair parts stocking, state estimation feedback precision attainment and flight schedule assignment;
  • FIG. 15 is a block diagram of a computational control system's feedback loop structure; and
  • DETAILED DESCRIPTION
  • The description that follows includes illustrative systems, methods, techniques, instruction sequences, and computing machine program products that exemplify illustrative embodiments.
  • A large, complex industrial system, such as, for example, one or more aircraft engines and the aircraft and service systems which interface with them, may be viewed as both a physical system and a business system that can be dynamically controlled to achieve a specified physical state at any chosen point in time, over one or many components in one or more assets, such as a fleet, an aircraft or an engine or its subsystems, and for a plurality of assets. The targeted physical state being controlled for may be automatically and dynamically adjusted to achieve one or more key performance outcomes of one or more stakeholders over one or more time intervals. Often, balancing these interests involves adjusting various aspects of the industrial system, such as, for example, the operational assignments, placement of new or repaired apparatus as a function of cost and technical capabilities of the components of the system, the configuration of those components, the real time physical control settings of engine fuel and air, the specific operations or control of the business system or network, such as scheduling spare parts stocking level and location placement, scheduling the type of parts to be stocked such as new parts or rebuilt parts or certified used parts that may not have had a repair, deriving the schedule for maintenance operations applied to the engines and their work scope determination, the costs and risks of service, and myriad other factors. In addition, other factors that are not within the direct control of the system owner or operator, such as the weather, the cost of fuel consumed by the system, the market price of the commodity generated by the system, the actions of a competitor, the introduction of a new technology and so on, may also effect the overall operations, reliability, produced physical benefit, and resulting profitability of the system.
  • In example embodiments, a method of providing a first set of computer systems with access to a recommendation pertaining to operation of one aircraft in one or more fleets of aircraft is disclosed. Operations data is collected at the first set of computer systems. The operations data pertains to operations of the one or more fleets of aircraft over a time period. The operations data is stored in one or more databases of a second set of computer systems. The operations data includes values corresponding to fields in the one or more databases. The fields represent at least one of policy data pertaining to one or more operations policies, flight schedule data pertaining to one or more flight schedules, and operating cost data pertaining to operating costs associated with the one or more fleets of aircraft. Assumptions of control input values are derived for use by the first set of computer systems based on the operations data. A cost savings analysis is performed with a simulation system for at least one aircraft of the one or more fleets of aircraft, the cost savings analysis including identifying a modification of at least one of the control input values. An estimated reduction of operating costs is computed for the aircraft over one or more time periods. The computing is based on comparisons of a first subset of the operations data with a second subset of the operations data.
  • In example embodiments, asset lifting state changes are computed in response to a directed duty cycle that differentially degrades engine performance according to those duty cycles and sets the allocation of shop capacity in terms of stocking levels of components, component type, component repair and scheduling of machine work stations, subject to cash objectives at one or more instances of time at a given confidence interval, said statistical confidence being a derived virtual control signal used in an optimization loop to stratify a fleet of assets and schedule physical inspection. A flight schedule of an aircraft may be beneficially changed to reduce fuel and service costs while meeting airline asset utilization criteria associated with operating the aircraft, and the operating limits of inventory scheduling are concurrently attained by stocking, production scheduling and forecast precision—with the control points based upon the disclosed computing state control system and comparisons of operations data collected from databases of multiple external computer systems corresponding to multiple fleets of aircraft associated with one or multiple customers and shop capacity control systems.
  • The schedules of asset utilization, duty cycles and operating policies, such as thrust limits, in situ maintenance, and so on, which are each directed by the computational control system determine how the operators of the assets attain revenue service from their usage and how variable costs such as fuel expense are realized in operations. The assignment and operation of the subject assets or their states of readiness and/or thermodynamic or operational performance may be governed by a regulation, and/or a contract and/or a maintenance guide. The computing control system controls the industrial system configuration dataflow, the assignment of the industrial system according to a duty, the maintenance of the assets and the consumption of resources in their repair. For various operating schedules and policies, the computing control system calculates either or both of the operator's performance metrics and the service providers. An airline, for example, may manage revenue per seat or airline passenger miles or on time departure or other metric as a measure of how efficiently their asset utilization is. Another financial metric may include return on assets in which case the assets may be aircraft, their engine spares and service shops. These business metrics result from the optimal scheduling, operational control of and maintenance of assets. The result is more asset utilization with enough forecast confidence that operational scheduling can assign assets to the most profitable duty, minimize the inefficiency effects of, for example, comparatively poor thermodynamics of the assets which result in higher fuel consumption than otherwise would have occurred in an ideal assignment of assets and maintenance. The present computational control system dynamically and optimally assigns assets to duty cycles, schedules specific maintenance work scope and timing, subject to the constraints of regulation, contract terms and asset or capital structure which sets the number and types of assets and spares—all by setting the assignment duty cycles and maintenance to control the physical states of the assets, monitoring and estimating the states in the current and future intervals of time and dynamically changing the assignments and repair workscopes of the one or more assets.
  • In example embodiments, engine state estimation (e.g., including damage state estimation) is determined using cumulative damage models (CDMs) over historical, current, and future time horizons using historical data. The basis for these damage models may be historical observation of engine operations and resultant repairs to create probabilities of life such as Weibull distributions. In other instances. Physics based first principle engineering models are derived with, for example, thermodynamics, chemical and metallurgical analysis. The historical data may be aggregated from a plurality of sources, such as engine sensors, service shops, lab tests (image, chemical, physical measures), airline schedules and weather services, and stored in a structured data environment to create assumptions (e.g., for life cycling of specific parts, specific clustering of parts or subsystems as a function of how they jointly fail, or calculating probabilities of failure for specific parts). The data may be used for the setting of life limits (e.g., in cycles independently or in conjunction with metal temperatures or in conjunction with operating patterns or control patterns) and Weibull failure estimations of clustered parts or subsystems, or a cumulative damage model (or other state estimation of the current damage of that part or system at a specific point in time) of specific parts and subsystems. In example embodiments, each part or subsystem has a unique part identifier that the system tracks in a translational way through operating (e.g., as part of one engine for its lifecycle or as a component that existed in multiple engines over one or more repair cycles).
  • In example embodiments, a specific history or schedule of operations of the engine asset at the asset serial number may be derministically established. The asset's subcomponents may be a set of parts that change during repair or service events, which are tracked by discrete serial number and enabled to emulate physical state estimations, suggest operational decisions, such as repairs and route and engine assignments, and calculate stakeholder finances for an emulated period.
  • In example embodiments, combinations of engine assets (such as an engine pair on a given aircraft) are determined The determinations may include jointly optimizing multiple operations for multiple stakeholders, deciding to change one of the engines, or matching how the aircraft is going to be scheduled (duty or location of operations or on-wing maintenance activities or operating parameters).
  • In example embodiments, joint optimization is enabled with respect to work scope and assignment of engine assets (e.g., including the parts that are selected to be a component of the engine asset) to an aircraft across a portfolio of assets, such as operating engines on in-service aircraft, engines in repair, rotable engines in waiting, or repaired part or subsystem components in inventory.
  • In example embodiments, maintenance cost optimization is enabled to, for example, minimize the total service cost and negative free cash flow variance from an operating plan or a deferred balance, over a specified time interval such as a contract period or as a function of asset membership in the portfolio where the portfolio has an economic life forecast such as when engines will be retired from service or sub-component of an engine will be repaired, placed, or retired.
  • In example embodiments, operating cost optimization is enabled to minimize fuel consumption and/or the opportunity costs of reliability (e.g., such that one or more engine assets and their component parts are assigned to a route and have a specified state of repair and/or efficiency so as to fly routes whose schedule is informed by the efficiency and/or reliability of the assigned one or more aircraft engine(s) on said aircraft).
  • In example embodiments, operating cost optimization is included, such as, for example, where the portfolio of assets (aircraft and/or engines and/or parts) are jointly repaired and assigned, so as to lower the fuel consumption, and the un-reliability opportunity cost for a portfolio, in the instant or over a prescribed forecast interval. In example embodiments, the interval is randomly selected or determined as a function of one or more service contract intervals covering that portfolio or forecasts of that portfolio's operating life factoring in retirements.
  • In example embodiments, assignments are derived and then optimally controlled by the disclosed computing system to achieve the enterprise risk/return preferences for the physical-business system such as an airline, an investor, or an OEM. Examples include the quantity and type of aircraft and aircraft engines, the physical features of the engine, control and service levels, cost and risk, including an investor's economic return and risk when making investments into the aircraft physical-business system, and an OEM's performance-based service contract terms, price, management and risk, and the contractual service agreement (CSA)/maintenance service agreement (MSA) target ratio.
  • In example embodiments, the risk of service cost in a contractual service agreement is estimated and priced, such as, for example, where maintenance cost and/or operating cost and/or reliability is to be guaranteed. In various embodiments, the estimating and pricing uses average estimates derived for many historical observations, such as Weibull distributions, and life limited settings for one or more engines in the agreement. In other embodiments, specific historical data is used to create a reliability characterization, such as those historical data that represents a certain operating mode and that that probability distribution is thus used for more specific forecasting by virtue of its basis more closely matching that of a given current engine's life. In example embodiments, as cumulative damage state changes are calculated for the specific engines, and the confidence interval of t+n in multiple penods are forecasted and actual state is within those forecast intervals (e.g., dynamic set points which are determined by one or more of the optimizations above), average assumptions are replaced with the CDM change forecasts (e.g., for the purposes of contract margin management, work scope and requested change to asset operations via control settings, or asset assignment).
  • In example embodiments, orchestration of the forecasts in a discrete event and agent based simulation is included as a core component of the disclosed control system. The orchestration logic implements subsystem decision support such as assignment optimization, spares utilization assignments, leased engine scheduling, flight operations policy and control set points, ground operations scheduling, parts forecasting, control preference, and work scope specification as directed by the discrete event simulation code. Alternatively, the orchestration may be directed by an agent based simulation or hybrid of continuous, agent and discrete event. An outer loop optmizer (e.g., stochastic, full enumeration, or foil enumeration with logical cuts) solves individual decision support preferences (e.g., from, pricing, work scope, assignment, rotables management, retirement estimation, portfolio membership, and so on) to optimize the ratio of risk and return to one or both of the preferences of an aircraft fleet owner whose assets are under contract or the offeror of the service contract or operation s optimization decision support, such as an OEM or third party service provider. Other optimization objectives enabled by the disclosed computing control system include cash consumption, inventory, spares, turnaround time (TAT).
  • In example embodiments, a physics-based approach is accepted in addition to data driven methods into the simulation. CDMs are used to estimate the state of the aircraft engine to optimize various operations, such as work scope, spares parts stocking, TAT, maintenance, and contractual service agreements' cost exposure for a given service level. The damage/life degradation of tracked subsystems in an asset or the asset in whole will be estimated using one or more CDMs in a selectable interval of time, including a future time where the duty cycles of the asset are controlled by a simulation or are being utilized according to a schedule.
  • Joint optimization of industrial assets may be used for a combination of work scope scheduling, inventory planning, route assignment, asset assignment to a higher level system (e.g., a certain aircraft engine to a certain aircraft) design modification, dynamical control, financing, service contract underwriting, or service contract operations management.
  • Scenario planning and purposed orchestration is incorporated to achieve desired states of the physical assets and the operations that use and consume those assets (e.g., using an agent-based and/or discrete event simulation approach). In example embodiments, operating histories of parts and assets, including life experiences (e.g., location, exogenous factors, controls signals, sensor signals, repair activity inspection results, events manufacturing data, and so on) are stored and used for life cycle control of the state of physical and operations systems, including orchestration of tracked parts (e.g., an engine shroud), asset systems (e.g., an engine), higher level systems (e.g., an aircraft), portfolios of higher level systems (e g., aircraft types and clusters of aircraft), scheduled location, exogenous factors (e.g., temperature, humidity, pressure, suspended chemicals, or aerosols) at locations (e.g., city pairs or geo-spatial coordinates), resources that are used, conveyed, or processed (e.g., ground operations, fuel, passengers, crew, cargo, and so on) by higher level systems, service operations (e.g., capacity), inventory, inventory type (e.g., used, new, remaining useful life).
  • In example embodiments, digital twins of asset entities and operation entities are created and maintained within the system for use in operations simulation. The digital twin is a digital representation of an actual state of an asset or operations model as it can best be approximated at a particular time period based on data inputs and statistical analysis. In example embodiments, the data inputs may include an observed state of the asset at a particular time point and historical data pertaining to states of similar assets over time.
  • In example embodiments, a Digital Twin is a continuously tuned, serial-number specific digital representation available in a scalable manner so that every piece of equipment in a set of assets (e.g., a fleet of aircraft, the engines assigned to the aircraft, or the subsystems within the engines) is individually modeled with respect to its state estimation, including life and efficiency states. Digital Twin Operations Optimization (DTOO) is a logical extension that models the operations with the intent to optimize the rate of state change caused by the purposed operations of the assets and the business systems which support their use and consumption processes so as to improve financial and operating key performance indicator (KPI) objectives. KPIs and functional objectives may collide where a local optimal may detract from a system wide benefit—and a means is created to optimally manage the dynamical business-physical system's impact on, for example, customer asset utilization, fuel consumption, shop cost, capacity and inventory, safe risk adjusted CSA/MSA growth and cash flow from operations. To demonstrate the methodological approach for operations optimizations, a discrete-event simulation models the provider-customer ecosystem in order to understand the impact of different operating decisions to both the provider and the customer in a consistent modeling framework and set of assumptions, in example embodiments, this capability has the core discrete-event simulation engine in the background on a parallelized, high-performance computing environment, serving multiple light-weight applications. Each light-weight application is designed to address a specific question of interest by interacting with the core simulation, the simulation assumptions data base or in-memory arrays, post-processing the output, interacting with the post-processed database(s) or computer(s) memory and reporting the results from the simulation, memory or data store in a relevant format that may itself be configurable by the user for the user to make a decision one or multiple times on an ongoing basis.
  • Individually, these models can be used to understand the actual performance of the equipment in its operating environment, ultimately providing better forecasts for performance degradation, maintenance workscopes, scheduling, and spare parts. When done at scale (e.g., in aviation context), these models can be integrated and used to provide a fleet-wide perspective to identify system-level efficiencies and strategic planning. A logical extension of Digital Twin is to model the actual customer and provider operations used to generate desired business outcomes and, ideally, optimize the processes to improve either or both customer and provider financial objectives. A DTOO model of customer operations may call and/or incorporate the digital twins of the equipment and business system the customer is operating to either explore potential future scenarios (as a human-driven sensitivity/what-if tool), or in a more advanced form, actually suggest optimal asset or process modification, assignment, control limits and setpoints, repairs and support services deployment recommendations for in support of the equipment (closed-loop optimization). Applications built on top of the DTOO analytic framework may then serve the provider's internal customers, such as CPMs, shop planners, finance and new engine commercial operations, and may also be used to deliver customer-facing tools and new service offerings as well.
  • In example embodiments, the DTOO capability fits within an overall decision support structure that centers around modules focused on analytics-based removals (ABR), analytics-based workscope (ABW), operations efficiency and customer productivity. In example embodiments, the DTOO capability fits within operations efficiency module, but pulls information from tools developed within the ABR and ABW modules. In various embodiments, the DTOO drives customer productivity. In various embodiments, engine operating data, contract data, and environment data are outputs from the customer productivity module that are received as inputs at the productivity module for optimizing asset availability (e.g., engine time on wing), cumulative damage modules and configuration data are outputs from the ABR module that are received as inputs at the ABW module for optimizing cost through asset lifecycles; cost accumulation and material mix/demand capacity data are outputs from the ABW module that are received as inputs at the operations efficiency module to drive speed and productivity, data pertaining to fleet optimization, productivity, upsell opportunities, and featured customer applications are outputs from the operations efficiency module that are received at the customer productivity module to deliver monetized value.
  • In example embodiments, in the aviation services context, a discrete-event simulation models the provider-customer ecosystem in order to understand the impact of different operating decisions to both the provider and the airline/customer in a consistent modeling framework and set of assumptions. For example decision support if an airline were to expand its routes to include city-pairs with known harsher conditions, what quantitative effects would that have to the number of shop visits, and ultimately to CSA profitability given the specific CSA terms and conditions for that customer? Or, in another scenario: if the provider were to make a derate recommendation to a customer for a particular flight route, what potential side-effects would we see in fuel burn or engine degradation or shop visit cost or services cash flow from operations? Such a holistic modeling capability is used to identify and then control the unintended side-effects of operational decisions, explore interventions to mitigate negative consequences, or proactiveiy identify win-win recommendations to airline customers in both operations and new engine sales and/or service campaigns. In example embodiments, the model is intended to simulate the ecosystem on the time-scale of months to years to understand the aggregate impact of operating decisions overtime; it is not intended to represent day-to-day operations which might include flight routing through airspace, or operational recovery from unplanned events, though those elements are callable by the system's simulation-optimization and vice-versa.
  • In example embodiments, a core simulation engine sits in the background on a parallelized, high-performance computing environment, serving multiple light-weight apps. The core simulation is a discrete event simulation that models some or all of the provider-customer ecosystem, from airline flights to maintenance and parts management. Depending on the inputs, the simulation can be used to analyze the impact of different potential future scenarios, or can be used to conduct sensitivity analysis on parameters of interest. This holistic modeling capability allows a user to configure the simulation to address specific questions to identify win-win recommendations for the provider and customers. In this manner, each light-weight app is designed to address a specific question of interest by interacting with the core simulation, post-processing the output and reporting the results in a relevant format for the user to make a decision.
  • In example embodiments, the simulation includes an orchestration of business-physical subsystems that are called within the application as subroutines or as services that exercise kernels, command line applications on one or distributed computing environments. The core simulator-optimizer builds at runtime from configuration tables so as to allow easy incorporation of changes from asset state inspections/determinations, actual operations, business process updates, CDM upgrades and additions, operating policy and maintenance service or supply chain status.
  • The disclosed computing system's ability to simulate the provider-customer ecosystem in a single consistent modeling framework and set of assumptions brings a new capability that serve numerous users. For the provider's Customer Team, a use case is planning and scheduling engine removals and specific on-wing maintenance to minimize CSA costs for specific contract fleets. Interacting applications include shop visit (SV) & Workscope Planner, Engine Removal Heat Map, Spares Forecaster, Lease Forecaster, and Inspection Manager applications. For the provider's shop planners, the general use case includes determining shop demand functions under different scenarios and assisting with shop-loading via engine assignments to different shops. Applications may include Shop Slot Tool and WSA Planner applications, for the provider's material planners, the general use case may include determining short, medium, and long-term parts demands under different scenarios (e.g., via a Pans Forecaster application). For the provider's customer advisors, the general use case includes identifying win-win policies or operational changes for airlines. Applications include Airline Scheduling, Schedule Recovery, Waterwash-Fuel Burn Tradeoff, Single Engine Taxi, and Derate Sensitivity applications. For customers, the general use case may include quantifying impact of operational policies on fuel burn and maintenance burden. In example embodiments, users will interact with the system simulation via the apps for their specific use-case.
  • In example embodiments, the framework includes an “app generato” function designed to answer a specific question with a computing system control that can be generated quickly (e.g., in one day or less), whereas other more complex apps would require custom design and development. Applications types may include (1) a detailed scenario analysis application, which enables a user to create a scenario and produce multiple detailed output view of the results in the form of graphs, heat maps, and aggregated values, (2) a comparator application, which allows a user to define a limited number of (e.g., two-three) scenarios and generate graphs comparing key metrics between the scenarios, and (3) a sensitivity application, which allows the user to perform sweeps of up a subset of (e.g., up to three) parameters to perform a sensitivity analysis or trade-off study for which results are output (e.g., on a graph with the third parameter represented as contours).
  • In example embodiments, described technologies may be used to store the operating history of parts and assets, life experiences (e.g., location, exogenous factors, control signals, sensor signals, repair activity, inspection results, events, manufacturing data, and so on) towards life cycle control of the state of physical and operational systems.
  • In example embodiments, a method is disclosed for financially valuing and co-optimizing the design and operating policy choices of a complex industrial system, such as a power asset, thereby achieving multiple objectives beyond financial value creation and/or risk reduction. In practice, complex engineered systems used in industrial processes may have a business context, such as contractual service agreements, capital financing terms and covenants, interconnect policy, regulatory policy, and competitive substitutes in their served markets. Optimizing an industrial ecosystem without consideration of the multitude of objectives and constraints or considering the ecosystem's many existing constraints for the purposes of asset design and operating policy may trap economic or other aspects of value.
  • The example embodiments, the method considers aspects and silos of economic value for subsets of choices within complex engineered industrial systems and the surrounding business processes and structures. The disclosed system allows for the discovery and control of system design and operating constraints, the co-optimization of multiple objectives that can be achieved with design or operational decision support over an economic or operational interval. Further, the method allows for the resulting financial risk and returns from the various design and operating policies to be used, or candidates to be used, for specific discount cash flow valuations associated with those investments and operating policies—and therefore, facilitating the allocation of risks and returns to the sponsors of various incremental investments in the industrial system and for responsible stakeholders who chose not to make certain investments or operating policies.
  • The computing control system's capability to am the virtualized system, its various state estimations for degradation and performance while calculating the interactions of the design and operations choices provides the mechanism for calculating the real option value of those choices. It provides precise sources of and contribution to variation, and identifying and proactively managing system level sensitivity and performance or financial risk abatement. The method enables the disaggregation of risks such that the discount rates may be replaced by simulated and replicated operational and design scenarios which thusly enumerate the probable financial outcomes, thereby obsoleting the need for gross or average discounting of future cash flows and instead is able to place specific discounts for future uncertainties according to the system level variation that results from a given design or operating choice. Similarly, given the ability to vary any aspect of assumption, design feature or operating policy and then simulate the industrial system's operating and financial performance—specific causality of choice to performance is enabled for the purposes of allocating cash flow. The delivery of the cash flows amongst stakeholders is certainly enabled with traditional debits and credits into financial accounts and may be implemented with crypto-currency mechanisms whose core logic is informed by precise allocation of cashflows.
  • In example embodiments, the system co-optimizes use of assets (e.g., aircraft engines and the aircraft which use them), contractual services (e.g., service agreements for aircraft engine repairs), and servicing of the assets for both a customer and a service provider (or “SP” or “provider”). Cumulative damage models for the assets are orchestrated through time-based simulations and engineering models. The system goes back into history to determine exactly how aircraft engines (e.g., by serial number) have been flown. Engineering models are generated and fed data pertaining to surface temperature, local oxidation, stress, strain, cracks, and other data needed to estimate the physical state of key components/sub-systems of the engines at a point in time. After the current point in time, simulations play out multiple possible futures. Different possible scenarios are enumerated for relevant parameters, including flight schedules, engine assignments, service work scopes, demand for worn-out parts, and so on. In example embodiments, the analysis is constrained based on contractual term limitations pertaining to the asset. The estimated demand may be used as a demand function for shop scheduling automation, making it possible to automatically make choices about parts inventory and cost calculations pertaining to the engine maintenance (e.g., comparing costs of using a new part vs. using a rebuilt part).
  • In this complex system, adjusting a risk and return corresponding to one aspect may require a trade off for another risk and return corresponding to another aspect. For example, something might be economically optimal for a given engine, but suboptimal for service shop operations. And if a service provider changes something on the engine, such as a part or workscope or sequence of activities, to make the shop operations more efficient, it could be the case that the customer is impaired in some way (e.g., constraining how the customer may schedule flight operations). As another example, a customer may be flying an engine with less efficiency or an impairment that would make the engine more appropriate for assignment to a different route or route sequence. Coordination with the service provider for engine assignment or a different service schedule may allow efficiencies to be realized by both the provider and the customer, in example embodiments, the efficiencies are discovered through modeling of combinations of factors (e.g., engines, parts, schedules, and so on) based on historical and observed data.
  • The following sections describe some of the benefits and features of the described system. In example embodiments, these benefits are in areas including services scope, life cycle cost, design, system modeling, and asset operations decision support.
  • Services Scope
  • In example embodiments, we select the scope, timing, or risk level of maintenance activities.
  • The risk of an asset (e.g., an aircraft engine) reaching a maintenance interval with sufficient remaining life or utility of the apparatus is traditionally embedded in the discount rate of an NPV calculation. The risk is not deterministic; instead, the disclosed system control changes the industrial system's operation variation which is further transformed into financial variation. It is recognized that the very actions taken with the asset, such as how, where or when it can be operated, add to or take away from the risk of getting to the desired outage time and scope. The disclosed embodiments do not necessarily assume that the asset will be operated as it has historically been; instead, it contemplates that the operation of the asset can be dynamically scheduled, operated, maintained, modified and assigned, differently to control the targeted variation and to cause a state (degradation level and/or operating efficiency) to occur on a created schedule. In various embodiment, any combination of settings or parameters, such as remaining life, operations, maintenance tasks, scope on those tasks, and timing decision variables to be co-optimized, along with other factors spanning revenue from different duty cycles, regulatory limits, service contract limits, market dynamics, may be included in the physical, operational or financial risk calculation.
  • Industrial systems are comprised of many subsystems or sets of assets. The overall performance relies on the sub systems interactions, which example embodiments control, flow these subsystems can fail together is calculated and their probability. The current asset's joint probability estimate of a failure occurring is updated, instead of depending on observations of joint failure that are observable, recorded, and thus available. In example embodiments, the systems within the industrial and business ecosystem are simulated, exposing them to usage which is made a component of the decision space and tracking the life consumption and probabilities by subsystem so that both the duty cycle of the ecosystem and the repair scope and repair timing are made to be endogenous choices.
  • Life Cycle Cost
  • In example embodiments, the practical reality is considered of changed duty cycles that occur in an industrial system's economic life resulting from competitive forces, regulations, and comparative changes in fuel costs. In example embodiments, instead of doing a one-time design optimization for the purposes of asset construction (cost bidding that uses a discount rate whose intent is to account for all unknowns), an ongoing simulation is used to test an asset's current design, operating line ups, maintenance activity, control set-points and variable generating costs against service contract, interconnect, and financial and regulatory dynamic limits for the purposes of dynamically changing the physical design and/or operations policy from a past and current state to a desired future state, in time.
  • Modeling
  • In example embodiments, system parameter sensitivities are quantified (e.g., a coefficient for such parameters need not be specified) and the scope of subsystem and stakeholder interests are optimized for (e.g., it is not assumed the future operations will be as the past has been or that there are no constraints from service contracts, financing covenants, grid interconnect or regulatory or competitive dynamics).
  • Neither the design nor the duty cycle and asset configuration is assumed, to be fixed (e.g., “static”). The system seeks to bring these endogenously into the decision space at both the design of the asset and during its life so as to beneficially change its design or line-up or configuration or its load profile.
  • Constraints may be imposed by a governing service contract on one or more assets comprising the engineered industrial system, including regulatory or interconnect or capital constraints The terms of operation are modeled within the digital twin operations optimization.
  • Instead of treating risk as the inevitable result of a changed instrument reading or exogenous factor, or considered that the risk threshold is a fixed value or that the only risk considered is financial, negative variances in other dimensions of the risk calculation are enabled with the control system. For example, the risk threshold is not a deterministic level with no guidance as to its proper set point or comparative relationship to the potential returns at the said risk limit. In various embodiments, the level of risk is informed as a comparative value with respect to returns on one or more dimensions of value.
  • “Risk” may also be treated as an event or a string of events not taking place, such as, for example, a risk that an outage will not occur at a scheduled time. In example embodiments, a means for adjusting the timing and work scope of an outage is provided, as is a change in operations activities, so as to achieve a duty that degrades the system on such a path that the disclosed control system enables an outage to occur per the created schedule and that the reliability risk of the apparatus does not cross a risk/return objective, should that objective be set as a binding constraint.
  • In example embodiments, sub system models are orchestrated through simulation time, exposing said simulated system to exogenous factors, operational choices, contracted services terms, capital structure covenants and calculating probabilistic responses for physical, financial and other metrics of value, such as emissions with a temporal consistency, that enforces the lifecycle performance and operating paths resulting from decisions made at any point of the simulated life. Further, the disclosed system optimizes over multiple periods so as to comply with a risk/return preference for one or more period in such a way as to facilitate the migration of the system from one risk/return preference to another, subject to physical, financial and regulatory constraints.
  • In example embodiments, the calculation of optionality is enabled so as to switch objectives and/or design or operating paths over the simulation period and allow for probabilistic analysis as necessary for robust design, financial, or operational risk management.
  • In example embodiments a given power asset and its subsystems are focused on, and not a portfolio of assets, though the methods and systems disclosed herein may be used in a meta model or portfolio or higher order systems of various assets with an overarching financial objective. In example embodiments, a discrete event simulation and replications are used to build probability density functions of interactions, not Bayesian methods. The currently disclosed systems and methods may overcome many inaccuracies introduced into analysis by including the ability to change how the assets would be operated, dispatched, or modified over multiple time periods.
  • In example embodiments, a service provider may enable or provide a customer with modules for deployment in a client machine, the modules configuring one or more client machines to access modelling tools described herein (e.g., deployed on a server system or on-board control) and present information pertaining to the modelling in user interfaces on the one or more client machines. Using the client tools, the customers may be able to experiment with what-if scenarios pertaining to operations of industrial assets (e.g., based on historical data stored by the provider on server machines and simulations, as described herein). In example embodiments, the customer may pay a license fee to the provider in order to access the disclosed system's data and tools used in the forecasting and dynamical optimization of designs, operating policies, schedules, workscopes, and so on.
  • In example embodiments, a provider may use forecasts generated by the tools described herein to underwrite or reunderwrite performance-based contracts (e.g., between the provider and customer's). Based, on forecasts of asset operations and maintenance, a provider may identify under-rewarded risk. For example, a provider may be able to focus on data pertaining specific engines in order to de-risk existing contracts that are based on average engine assumptions (e.g, average flight-hours, average locations, average service-shop costs, average duty cycle seventies, and so on) across multiple types of engines. In example embodiments, calculations pertaining to underwriting and risk for a contract will depend on particular terms in the contract pertaining to use of the engines. For example, for a certain engine platform (e.g., a GE 90 on a 777 aircraft), the engines have a certain repair service and work scope rate on average However, a customer may have a fleet of 20 such aircraft and put three of those 20 on one-hour city hops, exposing the engines to frequent high temperature excursions which differentially consume life vs average life, whereas the customer may put the other aircraft on transatlantic flights, where the ratio of metal temperature excursions are low per flight hour; extending the life of those engines beyond the average. A contract may be generated for a customer that includes terms pertaining to the risks associated with the most important identified variables pertaining to a specific use of a particular asset or particular subsystem of the asset. Thus, a portfolio of such contracts between a provider and a contractor would not be based on averages, but instead on modelling of each individual asset based on planned uses and active control of that asset and industrial eco-system with the disclosed system.
  • In example embodiments, a provider may forecast economic consequences of purchasing new engines or upgrading a set of existing engines. Using the modelling tools, a prospective customer may be able to determine, for example, based on an asset portfolio of 100 aircraft, 200 engines, and 15 spare engines, that a particular upgrade (e.g., changing high-pressure nozzles on 25 engines) over a certain percentage of the assets would give an economic benefit (e.g., enable the aircraft to handle a more profitable schedule more efficiently) over the lifetime of the assets. In example embodiments, we consider two cases wherein a first case is that the only data pertaining to maintenance of a first asset manufactured or serviced by a first provider makes up the average data and that the data pertaining to a second asset manufactured or serviced by a second provider is specific historical data pertaining to the specific asset and the planned use of that specific asset by the customer (e.g., flights of 100 aircraft between specific city pairs). For the second asset, the actual usage of the engine by the customer is simulated over the lifetime of the asset, including all service shop visits and service repairs, based on specific data pertaining to the planned use of the asset, including operation policies of the engines, weather through which the engines will be flying, and so on. The second case beneficially draws upon the realized results of the first case and uses asset and duty specific wear. The operations and service risks that may be forecasted using empirical evidence and first principal models using observed data as a basis for assumptions that the customer doesn't wish to manage may be moved over to the provider's balance sheet in exchange for compensation in the contract to mitigate those risks. The precision of the analysis possible with the first case with respect to the second asset allows the provider of the second asset to provably demonstrate an increase in the net present value and/or real option value of the customer's operations, or a reduction in risk, that exceeds any option that the first provider may be able to demonstrate to the customer with respect to the first asset. Thus, not only would a customer be more likely to purchase an asset from the second provider, but also the cost of capital associated with the purchase may be reduced based on the increased precision in the risk calculation and thus the enablement of lower risk capital provisions.
  • FIGS. 1A-1G are framework diagrams illustrating the relationships of the system's control points and operational paths associated with an example industrial system. Such relationships may include, for example, relationships between asset duty assignment, resultant system and sub-component life consumption state, system and sub-component reliability and their effects on service timing, work scope and service operations, and so on. In various embodiments, the framework may be implemented as a distributed multi-agent physical system control to dynamically optimize risk and value for one or more stakeholders with simulation and optimization. In example embodiments, operational paths are actively controlled to create different physical states of a plurality of components, assets, and operations associated with a one or more assets comprising an industrial system, so as to achieve the multiple criteria of operators, service providers and investors over a specified time interval, above a specified probability of the one or more outcomes.
  • In particular, the framework 100 depicts, at FIG. 1F, a first operational path 120 and a second operational path 125, such as actual operations or a simulated scenario or replication over time 105 for operating an industrial system, such as aircraft, their engines and the key subsystems there-in. In addition, an alternate life consumption 140 path arises from a different use as compared to the second, operational path 125.
  • The scenario path 120 may be an average life consumption path, such as for a single or plurality or portfolio of assets, or it may be a reference design or operating path used to characterize expected asset design performance and operations service levels. In reality, industrial assets may be exposed to unique duty cycles or purposefully operated by the disclosed system to have a non-standard operation so as to cause one or more of the assets' subsystems to achieve a desired physical or operational state probability at one or more points in time and thus a unique path through their economic life.
  • Generally, component parts and subsystems of the example industrial system may operate over time such that the useful life of those components is consumed during that time. Accordingly, the industrial system needs maintenance from time to time to replace or rebuild the component parts or the entirety of the industrial system. How the industrial system is operated with respect to the temperatures, pressures, chemistries and stresses resulting from the chosen operations and/or control settings will impact the remaining useful life at a given probability and/or reliability 120, 125, 140 and through time 115 up to the asset or a subsystem's useful life. It is beneficially not limited in operation to folly consume useful life, but certain maintenance events and operating control choices can be made at any point 105 in time to benefit one or more objectives of one or more stakeholders at one or more intervals of time.
  • More specifically with respect to FIG. 1F, the first operational path 120 depicted therein represents a steady-state operation of the asset for a design or assigned load at a constant work output 112 (e.g., in thrust per unit of time, in megawatts produced per unit of time, etc.) and standardized or non-variant exogenous conditions 109, 165 and a defined duty cycle. Exogenous conditions are, for example, those input factors the industrial system is exposed to which cannot be directly controlled by the system in a given design configuration such as, for example relative humidity, barometric pressure, temperature, air pollutants or suspended aerosols. A duty cycle is, for example, a changed rate of work output, starts and stops of an asset, a location and rate of change of location.
  • In some embodiments the operational path 120 may also be a base case plan to which other plans of operating the industrial system may be compared to. Consequently, the asset and/or its subsystems 175 will reach a particular reliability level 162 with a corresponding maintenance outage point in time 105 and associated maintenance time and wort scope 108 at a specified reliability probability 160 (e.g., probability of remaining useful life) for the specified subsystems 175 that are employed for system operation at that time.
  • Relative to the first operational path 120, the second operational path 125 results in a variable power output rate 112 over time 105, with periods of operation matching a load point whose power output rate 112 is the plan or design operating point for the physical system, a steady-state rate segment 131 during which the system consumes differentially less useful life 115, and a rate segment 126 which consumes differentially more useful life rate and a shut off rate 130 during which the system does not consume any useful life 115 of the overall asset or for a targeted subsystem 175, such as a life-limiting apparatus or subsystem component(s) of the asset.
  • The design and controlled point of physical state may be at a subsystem of the asset, such as one or more of the pans and subsystems of the asset or at a higher level(s) than the asset such as, for example, the aircraft and fleets or subsets of a fleet of aircraft.
  • The useful life consumption path 120, 125, 140 represents the life consumption for the entire system resulting from the limiting subsystem or part within the system 175, for example, an engine's combtistor. In some examples, subsystems 175 of the system or asset may be controlled so that the useful life 115 of each subsystem 175 may be managed by identifying upgrades, performing asset configurations (e.g. “lineups”), scheduling operations and scoping maintenance.
  • Life consumption of an industrial system is typically nonlinear as a function of work input or output outside of a “normal” or nearly always outside of a design operations point or range. At the system level, some compensation for physical stress avoidance can be made, such as by setting a control configuration that preserves life of the asset but sacrifices efficiency or life consumption, such as during useful life segment 146. Such configurations, as well as other operations, control, maintenance work scope, and other physical and business aspects of the asset, may help manage economic aspects or other aspects of value related to the engine or its use. For example, managing operations, control, and maintenance work scope so that the useful life segment 146 is at a desired reliability probability 160 at a certain time 105 is probabilistically accomplished. This control accounts for the historical path 157 up to the present time 161 and calculate the physical states of the tracked and managed subsystems of digital twin state estimation 141, 142 and then be simulated through candidate operating scenarios 130, 140, 143 to a future time 163 at which point the control system is seeking to achieve a physical state of the entire asset or one or more of its subsystems or parts of digital twin 142 to be at a specified damage, life or efficiency or reliability state 115 at that time 158. The targeted states in time may be set by the system to achieve desired operations points such as asset utilization, parts inventory, cash position, as operations examples.
  • The state condition refers to one or more of physical apparatus damage, remaining useful life, efficiency, reliability, shape, surface roughness measurement, crack length or depth or other physical aspect of an industrial system in whole or in part. The state at any interval of time 105 between time zero 106 to the present 161 or future time 163, 165 or any incremental segment of time (e.g., 161 to 163, 161 to 165, or 163 to 165) that is of interest to control other aspects of the system such as, for example, service shop demand for repair services 135, operating costs of the assets 151 and the higher level systems the assets are a part of (e.g., an aircraft) or to synchronize the concurrent state condition between a number of assets (e.g., two engines on a given aircraft) or to manage a portfolio of assets to a state condition (e.g., the engines assigned to a region, the engines on a given service or performance based contract or in a given financing contract or the cohort of engines that are targeted for retirement at a certain time or state condition or whose totality or certain components of are being financed by a stakeholder whose risk and return preferences 153, 149 are being controlled for via the operation or control or service scope of an asset or component of an asset or a higher level system that is using/consuming the asset.
  • The emulation and simulation system is used to calculate the current 157, future 158, or any interval of time 159 state condition for any aspect of the system from a specific part 128 or subsystem 122 of a given asset or to the specific asset 121 as a whole or to classes of assets such as, for example, an engine type that is defined as having certain parts or vintage or service history or service contract or other type classification.
  • The emulation and simulation based control system 100 is used to calculate the state of plane types, specific states of assets 121 assigned 124 to a specific higher level asset 117 such as a given aircraft.
  • The emulation and simulation system is used to calculate and orchestrate the assignment 123 of specific higher level systems 117 such as a plane, which has specific engines 121 which are comprised of specific subsystems 122 and parts 128 that are in turn operated 127 in a determined way by the optimizer 154 for efficiency and/or life consumption—with a duty or schedule 116 such as a route or sequence of routes with specified operations parameter s such as allowed rate of power output. At each operation or dispatch or assignment, the asset 121 is controlled 127 in a determined manner to achieve the change in stale 141, 142 at a point or interval of time 105. At the location of assignment 116 or between locations or cycle waypoints or dispatch points 102 or operating points 112, certain exogenous conditions/factors 104 at those points affect the rate of change of the physical state of the asset 134 and its subsystems 171, 174, 168. These one or more degradations (or repairs) are calculated for each increment of time 105 for each tracked subsystem 122 and part 128 for one or more life consumption mode via one or more state estimation engine(s) 134, 171, 174 which accumulate 110, 115 the specified state conditions and through time 141, 142.
  • In the historical emulated 157 mode, the actual state estimation causal factors and exogenous conditions are sequenced through time intervals either continuously or in discrete time segments or by event triggers. To simulate the state estimation into the future 158 or over an interval of time 159 that may include operations not physically occurring as yet 163, the exogenous factors 109, 165, in example embodiments, are first simulated in a random walk and then, as the system simulator indexes through future time, value 113 for these damage factors are written to the inputs of the one or more state estimation engines 134, 171, 174, 173, 176, the state change is calculated and then accumulated 115 (shown, for example, as useful life).
  • Historical events 111 such as, for example maintenance work, inspections, damage and so on are also managed by the emulator-simulator and consumed into the state estimations 134. In future time 158, events may be caused to happen as a function of a schedule (e.g., annual inspection), a policy (e.g., change oil at x miles, inspect at this airport), an estimated state condition and its triggering policy 141, 142 (e.g., a life limited cycle count, an efficiency level, a prognosticated, failure point and etc.).
  • Returning to the state estimations of the asset and its parts and subsystems 141, 142, the states may be represented as numerical values or in one embodiment as a color, for example red, yellow and green. Numeric values can be the result of engineering and data driven state estimation outputs as expressed as hours of or cycles of remaining life or hours or cycles used up to a given point in time, a physical measure such as BTU/kWHr, a given scale to characterize damage such as a Blade Damage Report a dimensional measure, a sensor scale such as PSI or Temperature or a percent of a metric that connotes the state of the asset, its subsystem or parts. Other indicators may be used such as colors or a change in comparative shape so as to enable the system operators to visually understand the state of the physical asset. These visual indicators are set via threshold logic such as, for example, that at 100 percent of system state, say when new, down to say 75% life remaining (or any other state indicator)—that subsystem is labeled “green”. From 74% to 20% is labeled yellow and below 20% is red. In FIG. 1F, the managed subsystems of assets 141, 142 are represented as boxes with cross-hatching representing the state condition of each subsystem relative to a plurality of state threshold values (e.g., green, yellow, or red threshold values representing a need for maintenance of each subsystem). In example embodiments, a “red” indicator may suggest that the customer will have to bring the engine into the shop earlier than planned. In various embodiments, the graph of FIG. 1F, including the digital twins 141 and 142, may be presented in a user interface such that a customer may experiment with what-if scenarios pertaining to engine assignment, operations, and maintenance schedules, including cost and efficiency calculations.
  • Depending upon the measures or bounds of state estimation such as described R-Y-G in three summary states, other logic is enabled which consumes one or more of the system state estimations and triggers control actions in response. For example, a shop visit would be called if five or more of certain subsystem or parts states transitioned from a yellow state summary to a red state summary. The logical combinations of numerical values, summary states, different aspects and subcomponents of the assets may be as simple or complex as is needed for the triggering control of the system.
  • In example embodiments, on the vertical, there is some rate of work 110 (e.g., power output) that we're asking the engine to produce. Along the horizontal is time. The dotted lines represent the possible life plans for the engine. The digital twins 141 and 142 represent the application of cumulative damage models to determine the states of different parts or subsystems within the engine at different points in time. The connotation is that if a customer doesn't stress the engine, the customer is on the lower curve (e.g., the customer is not consuming the available life over time that the customer had planned). If the customer stresses the engine (e.g., overtures it or runs it in a harsh environment more often), the customer is consuming more life than planned at one or more points in time. At some point, the customer is going to hit a reliability (e.g., that the customer or provider can predetermine based on thresholds) at which the customer will want to bring the engine into the service provider shop for service. Alternatively, the system adjusts duty patterns or maintenance events or work scope to achieve an objective other than maximum life.
  • In example embodiments, a simulation incorporating the digital twins 141 and 142 wraps the cumulative data models to orchestrate where the engines are being flown, how the engines are being flown, how they're coupled to a particular aircraft, the weather conditions in which the engines are to be flown, aspects of how the engines are being controlled, and so on. The information is fed into the cumulative damage models for each subsystem, which drives the changing in state over time of the estimated state of the subsystems within each digital twin.
  • Time may be an important element in some embodiments. The physical state estimations are made, for example by one or more cumulative damage models 134, through time, as a function of how the assets were utilized 157, and how they will be used in the future as the system is simulated forward 158 or any combination of past and future 159. The individual parts and subsystems may be tracked individually, such as by part serial number or a subsystem clustering of parts or the asset in its entirety. The asset in its entirety may be characterized by logic which consumes as an input the individual state estimations of the tracked parts and subsystems. These states are dynamic through time as a function of the operating choices made in actual operations and by those choices which are automatically made by the logic of the disclosed control system such as, for example scheduling the asset to a location 103 and subjecting it to local ambient conditions, necessary power output and so on, assigning events to occur 114 such as maintenance, assigning rates of change of power output through time such as for various duty cycles 123 and assigning assets to other assets 124. These states may trigger responses for the asset in its totality, such as a schedule 103 or for a 127 subsystem 122 or part 128. These states may trigger responses directly or be biased or controlled by the physical-business system multi-stakeholder, multi-criteria, multi-preferences optimizer 154. Airlines or customers may have operating policies 101, such as taxiing out on the runway using one engine to save fuel, using a certain percentage of engine thrust at takeoff, d-rate (e.g., running an engine at 90% is a 10% d-rate) at takeoff, climb, cruise, or other action, routing between departure and destination points, and so on. In example embodiments, the modeling and simulation methods described herein may allow an operator to optimize such operating policies.
  • Events are controlled to happen in future time according to triggering rules/policies that are orchestrated by the simulator and its optimization logic 154 in response to the simulated state of physical system and its subcomponents for more than one asset and in the context of other assets, for example the two aircraft engines on a single plane or a fleet of aircraft engines on multiple planes with respect to the one or more objectives of the system. Assignments 123 to routes may be controlled to happen in future time according to routines for scheduling that are called. Assets may be assigned 124 to higher level systems such as an engine(s) to a given aircraft Asset internal operation, control settings and subsystem assignments may be controlled 127 by the simulator and its system optimizer 154. Candidate operating points and physical design may be orchestrated by the simulation in a design of experiments or full enumeration mode so as to calculate comparative performance between candidate design, operations or control policy.
  • The physical and business system is emulated, simulated and optimized in this measurement and control system, for example, a service contract's terms, price, risk may be tested 199 and optimized 154. Similarly, other operational aspects such as the number of operating spares, inventory stocking, operating cost or cash flow is enabled. A given system 121, 119, 118 or subsystem 122, 128 may be optimized 154 for a set of preferences 155 over one or more objectives 153. The simulation also allocates risk, returns and calculates balances by stakeholders 199 related to the operations of assets and their subsystems.
  • FIG. 1C depicts two of many possible stakeholders: customer or airline 190 and service provider 191. Each stakeholder has its own objectives 153. The objectives may be shared, independent or compete against one another. For example, service provider 191 wants to maximize its service revenue, whereas customer 190 wants to minimize the service provider's revenues. Given these independent objectives, the system probabilistically calculates at higher-level system optimizations that may benefit both stakeholders. Each stakeholder may assign its own conditions or weight to each objective 153. Thus, for example, Objective 1 may have conditions or weightings assigned by customer 190 as well as different conditions or weightings assigned by provider 191. Customer costs 151 and service provider costs 152 are identified and provided as inputs into the optimizer 154. For example, the service provider 191 may acknowledge that a particular customer 190, such as an airline, makes its money flying passengers and thus is focused on keeping operating costs, including fool costs, low. Thus, for example, weightings assigned to operating costs by customer 190 may be higher than ratings assigned to other costs by the customer. The customer 190 may acknowledge that service provider 191 makes it money by providing hardware (e.g., engines) and services (e.g., maintenance of engines).
  • The optimizer 154 looks for an economic operating point at which both stakeholders 190 and 191 can benefit. In example embodiments, the system uses simulations to analyze risk and return preferences 149 and generate a comparison of net present value against variance of the cash flows creating the net present value on an absolute basis or with respect to a plan. Multiple inputs of the system are orchestrated into the simulation and calculations, for example, the customer's flight schedule 102, exogenous factors 104, physical part data 134, and so on. Thus, for example, the system is configured to determine that, for a chosen set of aircraft, with specific engines, and flown these specific engines with particular loading of the aircraft, running at specific work rates (or changes in rates per unit time), at specific locations, running at specific temperatures in particular weather conditions, how the each specific engine will degrade over time, or burn more fuel, or become more unreliable is calculated. The service provider can thus use the simulation calculations to assist the customer in using the customer's assets more optimally or take on and manage operational risk directly. The system may recommend an intervention in scheduling. For example, assume a customer has an engine that is less efficient (on average) in a fleet of engines, each having different remaining useful lifes. Such engines may each have multiple (e.g., 33) subsystems, each of which requires maintenance and may potentially cause an aircraft to be removed from service. Both the service provider and the customer may have an economic interest in keeping the least efficient engines (e.g., those that burn more fuel) on particular routes that are best suited for the engines. The routes that are best suited may be those that wear the engines in a particular way such that their fuel burn is minimized and their need for service is more predictable and can be preplanned or coordinated with the service provider's maintenance shops to minimize maintenance costs for both the service provider and the customer. Based on simulations, the service provider may better predict when an engine is coming for maintenance, and what kind, of maintenance will need to be performed (e.g., including whether to a part will need to be replaced with a new or serviceable used part) or cause said visits to occur and define the work scope. Thus, based on the simulations, the service provider's shops may have more advance notice of maintenance needs of each of the specific assets of its customers, allowing it to streamline its capacity use or inventory, such as inventory of expensive (e.g., multi-million dollar) parts (e.g., engine repair kits).
  • For example, the optimizer 154 may identify that a 757 (e.g., with a particular tail number) having two particular engines is currently assigned to repeatedly fly a short (e.g., one-hour flight) back and forth between two points. The optimizer 154 may identify particular costs (e.g., costs associated with maintenance requirements of a particular wear pattern in the engines, fuel burn, and so on) based on simulations of all of the subsystems of the engines. Based on the identification of the costs and an analysis of the flight schedules of a fleet of aircraft of the customer, the optimizer 154 may identify that a better use for the 757 would be to have it fly across an intercontinental route (e.g., from New York to London), then short cycle the flight for 15 hops, and then fly it back across the intercontinental route. The system may then recommend the better use (e.g., via a user interface), including reasons for the recommendation (e.g., in the context of weighted objectives of either the airline, the service provider, or both). For example, projected savings of customer costs 151 (e.g., amount of fuel saved, an increased percentage of asset utilization, a savings in maintenance costs, and so on) may be presented in support of the recommendation Similarly, a projected savings of provider costs (e.g., in streamlined inventory processes, such as minimizing an amount of expensive inventory items that must be kept in stock, or minimizing a number of maintenance visits that are required under a contractual agreement, and so on). Additionally, by coordinating airline schedules across multiple customers, the provider costs associated with airline maintenance may be coordinated and optimized at a particular shop, such that, for example, parts having longer useful lifes in one aircraft engine are swapped with parts in another aircraft engine such that the useful lifes of both engines are maximized.
  • In example embodiments, a service shop may be mixing and matching engine parts, repairing parts, and installing new parts. The service provider may have a limited amount of time (e.g., 60 days) to perform maintenance or repairs on an aircraft engine when it arrives in the shop (e.g., based on contractual agreements between the service provider and customer and/or to achieve a certain number of engine spares). If a proper inventory of serviceable used or repaired parts is not available for swapping into an engine (e.g., to service a subsystem of the engine), the service provider may need to use a new part. The cost difference between using a used and new part may be significant. Thus, the service provider may have a strongly weighted objective of having appropriate used or repaired parts available in inventory when an engine arrives in a shop. Suppose a service provider has five years remaining under a contractual agreement to service a customer's engine. The service provider would incur significant unnecessary costs if it had to use a new part with a useful of 20 years to perform its maintenance duties on such on engine. An appropriate part to use in this case would be a part having a remaining useful life that corresponds with the remaining useful life of the engine as a whole.
  • Thus, in example embodiments, the optimizer may identify various factors that affect service provider cost 152 with respect to its contractual obligations to a particular customer or a group of customers. Such factors may include flight schedules, asset utilization, inventory, and so on, as depicted in FIGS. 1A-1G. The optimizer can thus provide guidance for getting the right material into the right asset at the right time as a function of the service that the provider is obligated to provide to the customer or group of customers.
  • Operating scenarios calculated by the disclosed computing system change performance from changes in design and/or control points in the business-physical system—which in turn generate more cashflow when the computing control is beneficially configured and operated to do so. The graph depicted pertaining to risk and return preferences 149 shows that such optimizations enable the reduction of risk for each level of operating performance improvement (shifting the “New” range to the left in comparison to the “As Is” range) and/or increasing NPV (shifting the “New” range up in comparison to the “As K” range) for each unit of risk. Such a graph may be presented in a user interface to demonstrate the result of the analyzing of all of the factors depicted in FIGS. 1A-1G, including simulations of engines through possible flight paths using CDMs. Thus, the optimizer can demonstrate with a certain probability the economic benefit to the customer and/or the service provider of implementing the suggested changes of the optimizer. Thus, for example, the “New” range may be realized by a customer adjusting flight paths or asset utilization according to the recommendations of the optimizer, which may, in turn, improve maintenance scheduling so as to have a lower impact on flight scheduling. As another example, the service provider may realize the “New” range by being able to minimize an amount of expensive inventory that must be kept in various shops and by having more control over the load levels at particular shops based on better improved forecasting of upcoming maintenance tasks. In various embodiments, the pareto frontier represents, for every risk level (or variance), the best economic choice that can be made given particular inputs. The “As Is” frontier relies on data inputs, such as customer proprietary data points, that are less complete that the data inputs relied upon for the “New” frontier, which includes simulations using CDMs. Points B and C in the graph shown in FIG. 1C are depicted as not currently being on a pareto frontier, and are thus suboptimal.
  • In at least some embodiments, these and other aspects of the asset may be managed concurrently, such as commercial operations, lineups, maintenance, service work scopes, upgrades, and control points. An example system, described in greater detail below in conjunction with FIG. 2, may determine such managed aspects to enhance the economic value of the asset.
  • FIG. 1F graphically depicts the relationship between the asset, for example an aircraft engine, system rate of power output 110, time 105, and useful life 115 consumption and system reliability probability 160 for the one or more operational paths 120, 125, 140 (one that to a current time has be actually realized and other paths which are candidate scenarios that are simulated by the system) and its associated subsystems. The life paths may be for either a new unit or a repaired unit whose state is known certain at a point in time such as when new or from specific inspection or maintenance for any subsystem 175 being tracked. The physical state probabilistic estimations of one or more parts and subsystems are updated with these assessment points and activities.
  • At an operational segment 126, the corresponding life consumption may be extremely high, yet may be reduced by a control setting which lowers system efficiency, such as allowing more internal airflow or reduced surface temperatures and thus increased specific fuel consumption, in exchange for a reduced 131 life consumption rate for the same power output or less power output but longer duty cycle or other tradeoff. The “system-of-systems” simulation and optimization based planning and control that is disclosed utilizes cumulative life consumption, as depicted in FIGS. 1A-1G, based upon the current cumulative state of the asset, maintenance timing and scope to adjust service duty, control settings, maintenance, lineups, and commercial operations, to compare various operating scenarios and automatically select 154 the tradeoffs of operating efficiency vs life consumption vs. asset assignment for revenue duty, according to the risk and value management preferences of one or more stakeholders 131.
  • The operational segment 126 described may also, under other beneficial embodiments, serve as an example of how interaction between operations, maintenance, design, and various business considerations may be employed to automatically change the design parameters and operating characteristics 133 of parts and subsystems to achieve physical states through time that enables the resulting useful life segment 131 to be lower than it otherwise would have been under the same circumstances.
  • In the industrial system or specific asset being simulated, a scenario may be investigated that beneficially takes advantage of, for example, a peak demand pricing opportunity and specifies the commercial market schedule for the associated extra load 112. The simulator may then optimally 154 dispatch 103 the simulated asset(s) at a probability that the offer for dispatched revenue service was accepted, may simulate the asset as differentially consuming life according to the load or duty 103, may set the remaining useful life point 166 as a function of reliability and/or repair work scope to the subsystems of the asset, and may trade off the costs and scope of a changed configuration, maintenance scope and feel purchase according to one or more stakeholder 131 risk and return preferences in the instant or through one or more intervals of time. The system may also execute a different set of scenario runs using, for example, a catalog of available design modifications, updates, and operational decision policy changes. Consequently, the scenarios which install a certain control system upgrade which allowed the useful life segment 131 to be reduced, even though subsequently causing more feel to be consumed, may provide a higher return on investment over the simulated economic lifecycle than other alternatives. Thus, the simulation/optimization system described herein may identify a design modification to the industrial system that would achieve optimum or at least enhanced economic risk and/or return preferences and/or other metrics of value.
  • In example embodiments, similar to the identification of a valuable upgrade 133 to a subsystem of the industrial system, as provided above, the simulation/optimization system may also adjust repair work scope 135 and/or the policy terms 199 for all assets in general or a specific asset-by-asset digger for the maintenance timing along with operations alternatives 123. A possible base-case scenario 120 is that the asset employs the first operational path 120 to arrive at a specified maintenance event scheduled for time 108 with remaining useful life (RUL) 172, which represents a chosen reliability probability (e.g., probability of remaining useful life 160). The simulator/optimizer may track the subsystems 175 to develop or determine the overall useful life 115 and reliability of the asset. The simulator/optimizer may then determine that moving the outage point from time 108 to time 150 by consuming the life of the asset using the second, operational path 125 is more beneficial from the perspective of economic value (or some other metric of value) compared to the base-case scenario of the first operational path 120. As in all tradeoffs being described as examples of the system, the risk and return preferences 149 of one or more stakeholders 131 are automatically optimized 154.
  • Similarly, the service support may consist of one or more repair shops and within those shops are operations (such as assigning assets to available capacity, setting work scope, ordering parts), tooling, people and sequencing a plurality of demand streams, such as, for example, the services activities for multiple airlines or the extent of specified maintenance in a given service event. The shop capacity 136 is modeled 137 with respect to its operations 139 capacity overtime 159. Left uncontrolled by the disclosed system, the shop demand (quantity of assets and extent of work scopes) may be highly variable and thus prone to periods of underutilization and over subscription, Underutilization squanders variable expense, Too much demand, creates overtime and service level delays in operations which are governed by performance based services contracts, there are typically clauses that govern turnaround, time or service level or asset utilization or availability and thus it is highly beneficial to control the demand function, service TAT, Service Level Agreement guarantees (SLA) and shop cost. The disclosed system simulates the use of assets to estimate the asset life of efficiency and enables asset sequencing to be optimally set to maximize the benefit of asset use and control the sequence of the shop demand 150 as a function of operations and time and orchestrates shop operations model 137 such as, for example, a discrete event simulation and scheduler 139 so that some or all assets can be assigned 135 by the optimization 154 in such a way as to co-optimize the end user's costs 151 and service providers cost 152 or other stake holder 131 or objective's preference 155. An example objective is to lower total customer and service provider cost. A stakeholder 131 may be an airline 151, a service provider 152 or an investor with a financial stake in an aspect of the system.
  • Repair inventory 145 on hand to maintain industrial assets consumes capital when stocked. As the shop demand 135 is controlled, parts ordering 138 is optimized over the forecast interval 159 to minimize inventory count and carrying value.
  • Which parts are used for repairs is also beneficially controlled by the disclosed. As an example, if it is known that an asset will have an assigned duty cycle 103, 112 whose operations will control a given life consumption 173, 176 according to a controlled assignment 114, 123, 127 over an interval of time 105, for example a contracted time period, then the ordered 138 parts 147 may be differentiated by their cost and life estimation so as to lower the service producers cost 1 52 without exceeding their or other stakeholder preferences 131, 151 and objectives 155 with respect to risk and return 149.
  • The assigned 135 shop 148 is optimally controlled 154 with respect to available machine capacity 139 or skill or used or new inventory or consumables 145 at the one or more repair facilities in the repair value chain.
  • In example embodiments, presuming the maintenance timing is fixed at time 108, as is the RUL 172, for a specified reliability probability 160 for the set of subsystems 175, the simulator/optimizer calculates possible operations and/or control of the asset to seek superior risk/return or other metrics of value for one or more stakeholders 131, 151, 152 and may be set to cease calculation when global objectives are met and input assumptions are not changing. Accordingly, asset operation segments (indicated by reference numbers 127, 131, 130, 126, and 132) along second operational path 125 may be bid, dispatched, and/or controlled so that the asset may arrive at time 108 at a specified reliability probability 160 (e.g., the probability of a physical impairment or failure of the asset or subsystem) and/or efficiency while providing an optimized return on investment for a given stakeholder. Further, that if it is infeasible to meet operations 125, outage timing 150, 180 or repair or uprate work scope that impacts useful life on a component 175, at a reliability 160, that also results in a set of cash flows or other metrics of value as defined by a stakeholder of the industrial system, that is acceptable, then the available choices (operations, timing, repair scope, reliability, efficiency, design, lineups) are sequentially relaxed parametrically and/or concurrently in order to calculate the opportunity cost of that choice element, which is treated as a system constraint(s) which the decision maker may decide to relax or the financial optimizer may choose to relax.
  • In example embodiments, the design of the physical system may be changed 133 such as with an available modification and the optimization routine re-run through 127, 120, 130, 126, 132, 125, 108, 160, 150, 125. A stakeholder 131 may be a service provider 132 with a contract that specifies a performance level for another stakeholder such as an operator 151 and the provider requires an upgrade or repair to be made which needs an expenditure to be mad now 161 so as to achieve a risk and return through a time interval 159 of point in future time 163. The requisite investment is made now at 161 by a stakeholder that specifies a certain return and risk level at one or more points of time 105. The system 100 incorporates that investor's preferences in the optimization objective function 154 such that by operations optimization choices 103, 114, 123, 124, 127, 199, 183, 135, 138 the cash flows from operations, subject to the performance contract terms, are more assured (lower risk) return are provide via the deliberately controlled attainment of physical and operational states through time for one or more assets.
  • In example embodiments, even the current state of the asset (e.g., at T Now 161) may not be known with absolute certainty. For example, the last physical inspection of an asset or part or subsystem of the asset may already be in the past. Thus, there may be multiple layers or dimensions of stochasticity. For example, a first layer may be a distribution around the real condition of the engine at T Now 161; a second one may be a prediction of the events to which the engine is actually subjected to in the future. Thus, the length tail of the T Now distribution may affect when a customer should schedule an inspection of the asset (e.g., to decrease the level of uncertainty regarding the asset's current state to improve forecasts to be within an acceptable threshold or margin of error for a particular time period). The simulations may thus not only aid customer's and providers in determine how to optimize operation of the asset, but also inspections (e.g., horoscope inspections) of the asset. In example embodiments, images are taken of various parts of the engine, such as the blades. The images are captured and scored, against certain engineering criteria and compared with CDMs simulations (e.g., to refine the CDMs). The scores may represent the significance of detected surface cracking, root cracking, spallation, dirt, pits, and so on). Thus, upon physical inspection, the simulation data may be confirmed with a certain percentage of accuracy and the CDMs may be updated to account for any differences in actual state versus predicted state at the time of the inspection.
  • A causal driver of shop repair delays may be the availability of certain inventory. The pre-order planning 196 control receives component 122, 128 state information 142, 146 for specific engines 121 and provides the quantity of components in various stages of remaining usefesl life, through time 105 to the service shop 136 supply chain 197 for their production 198 estimation purposes with respect to time to produce finished goods which can be made available to the service shop 136 inventory replenishment 145 by part type 147.
  • The pre-order planning 196 may contain the supply chain production model 198 that in turn may optionally contain current production quantities such as through an MES or ERP system. Said model of the supplier production process may be unable to provide finished goods inventory 197 to replenish service shop inventory 145 for a forecasted demand 135. The airline operations may be biased 123 such that certain engines which would otherwise require shop services be operated via assignment 123 or control set point 195 to lower the rate of life consumption and thus delay the service event 132 time 150 to match the part availability. Additionally, the extent of repairs to an asset may be dynamically set to match the available service capacity and/or to produce more spare assets but at a reduced RUL than an original or average plan or more RUL than an original plan.
  • Generally, as described above, the simulator/optimizer may alter the operating risk compared amongst operational paths 120, 125, 140 to achieve the economics or other aspects of risk and value at one time or over an interval. Path 140 is an example of a higher physical damage risk than 120 at time 150, yet may result in lower cost risk 154 vs. 156 when more aggressive bid, dispatch, and operations, despite the added risk of arriving at outage schedule at a higher risk point 166, are differentially compensated for over the economic time interval being simulated and optimized.
  • In example embodiments, the simulator/optimizer may manage interactions between the useful life 115, reliability probability 160, subsystems 175, and repair work scope of the asset. For example, the simulator/optimizer may estimate system level reliability probability 160 at a point in time 105 by looking up the value of the reliability probability 160 at that point in time 105 along the useful life consumption path 140. The reliability probability 160 may be derived or simulated from engineering models and observation of fielded units, and corrected for climates, load cycles, transient dynamics, repair cycles, subcomponent vendor sources, metal temperatures, and other indicators and drivers that characterize the RUL 172. In various examples, the simulator/optimizer may retrieve the cumulative state information (e.g., operational paths 120 and 125, and useful life consumption path 140) from either a control system of the asset, an asset data store, or a remote data store of the operational history of the asset.
  • Further, as depicted in FIGS. 1A-1G, the reliability probability 160 of the entire asset or system may be based on the RUL 172 of each of the subsystems 175 of the asset, and may be developed by one or more methods, such as, for example, cumulative damage models comprised of thermodynamic and materials engineering models, statistical regression, machine learning or subsystem models that are probabilistic and aggregated with techniques, such as Monte Carlo simulation. Variation in RUL 172 forecasts may result from many factors, operations hours being one such causal variable as depicted in graph 100. In like framework, the simulator/optimizer may track other causal factors, such as component shutdowns, trips and starts, air cleanliness with respect to particles and chemical concentration, and metal temperature, from direct measure and/or virtual sensing of these factors as the asset is operated. Additional factors indicative of RUL 172, such as repair records, original equipment manufacturer (OEM) manufacturing and inspection data, or OEM or supplier lot, may be operationally tracked and employed in the simulation or its post processing.
  • Each major subsystem 175 that is important to the overall asset or system reliability or efficiency probability 160 may be monitored and tracked. RUL 172, expressed as a probability 177 of two subsystems 173 and 176, is depicted in graph 100. As illustrated therein, for all RUL 172 estimates, the subsystem 176 is less reliable that subsystem 173, and thus the subsystem 176 is most likely to be the limiting component in the probability of life (reliability probability 160) for the overall asset.
  • The simulation based state control system 100 is centered on the physical asset as the asset is dispatched and serviced throughout its economic life 106, 108. The physical asset is comprised of subsystems and parts which accumulate wear, as depicted in FIG. 2, and thus experience service costs as a byproduct of their degraded physical stale from having been operated 120, 125 or 140. The physical degradation is a function of the operation of the asset and the factors it was exposed to during those operations, for example temperatures, pressures, humidity, suspended aerosols in the ambient air, percent of foil load, temperature of metal surfaces, chemistries in ambient air, repair history, inspection results, cycles and rates of change of work output by the asset and other causal factors 113. The simulation hosts 134 one or more damage models for one or more subsystems 122 and parts 128 in the physical asset 121. The source of these hosted, damage models can be from any method which relates the conditions of and how the asset is operated with the resultant impact to the physical state change of the asset and/or repair to the asset. As an example, a component “Fan Disk” 168, when exposed to Ambient Temperature, Fuel Heating Value and a number of other factors “n” for a period of time and cycles does lose, for example, available material dimensionality and material strength. These degradations may be explained with engineering models, data driven models that use historical observations to train over, accelerated life testing, designs of experiments and regressions of the resultant data, rules, arithmetic relationships or other analytical means as may exist or be conceived. The only requirement is that the system simulator is able to host the algorithm or lookup table or rules which describe degradation and can pass the assumption data to them for an interval of time such as the simulation clock increment and that those assumption data exist in the historical record and can be emulated 157 to replay a part or asset system's operating life experience and that the future 158 simulation is able to calculate and then pass the life model(s) 134 assumptions. For industrial systems, such as, for example, aircraft engines, power turbines, reciprocating engines and common industrial assets—these life consuming causes are well known and the exogenous elements 165, 109, 113 (temperature, humidity, and so on) are able to be simulated along with the specific operating scenarios such as flight schedules 102, plant dispatch 116, loads, torque, maintenance scope, topologies, duty cycles and other aspects of their—operations. The state of components within the asset 141, 142 are thus updated through emulated or simulated time as exposure and duty occurs. The state of subcomponents 168 and the resultant reliability 173, 176 are determined by one or more hosted model 176. Failure or degradation state change is calculated by one or more models describing one or more failure modes 174. The means to aggregate wear or failure or performance models may, for example, be from logical rules, joint Monte-Carlo simulation or a use of a rate of change that is most severe over a time interval or weighted average or draw from a stratified life characterization such as a Weibull distribution or any other means as may be available in the art to correlate exposure to degradation 171, 168.
  • The threshold of reliability risk from point 164 (e.g., no risk or below threshold risk) to point 167 (e.g., near-certain impairment) is a parameter employed in the simulator/optimizer. In the illustrative example of FIGS. 1A-1G, the simulator/optimizer may determine a set point (e.g., particular outage level 162) as the impairment risk limit and thus may request unit repair at approximately time 150 when the remaining useful lift value 148 occurring along useful life segment 146 is attained. This set point (e.g., particular outage level 162) may have been another point 166 along the reliability probability 160 if the economics or other metrics of value warranted operations with that risk level for the greater overall asset-level performance.
  • A comparison 156 over a forecast interval of physical state or operating performance resulting from differential usage, service, and design or operating policy is compared over a time interval 159 and an economic difference between the two scenarios is calculated. For a service provider 152, such as an OEM of the industrial system, the present value or net present value or real option value of a design and/or operating policy effect on the resulting Free Cash Flows FCF of the industrial system and the governing contract between a customer and service provider will most likely be different depending upon the scenario of design and operations. In a similar way, the resulting FCF of a user 151 of the assets such as an airline or power generation or rail locomotion customer do change depending upon the change in the system's efficiency, reliability, and service outage time, workscope flexibility to be dispatched or scheduled or used in any other way. The FCF is probabilistic and is calculated by the simulation system for a scenario (design and operations) and then replicated to account for exogenous condition variability 165, 109, 113. Changes in FCF and investments are netted to Present Values PV to calculate NPV using one or a number of discount rates. Variances of the absolute value of cash flows or differences of cash flows to business plans or absolute values are also tabulated for scenarios and replications. NPV and variances 149 are related and different stakeholders in the industrial system's performance have different preferences for the relationship between risk (variance) and return (IRR, NPV, PV, or real option value). Multiple objectives 155 may be present and solved for 154 by the simulation-optimization based control system being disclosed. The control tradeoffs to achieve a physical state at a point in time is achieved by jointly changing the operating decisions related to scheduling the duty pattern or schedule of assets 103, managing intervention events such as maintenance and inspections 114, assigning higher level assets to a duty 123 such as an aircraft to a schedule, assigning assets to higher level assets such as engines to an aircraft 124, Triggering control set points and maintenance 127 of a system and its subcomponent pans and subsystems, changing the design or configuration 133 of industrial systems, assigning services 135, ordering service inventory 138 arrivals, setting or modifying the commercial contract terms or price for services 199.
  • Moreover, the simulator/optimizer may beneficially estimate the value of a subsystem upgrade and/or repair by simulating the asset under conditions with life-limiting components, such as subsystem 176 of FIGS. 1A-1G, with alternate available RUL 172 probabilities 177. Should the cost of upgrade or repair work scope of the subsystem 176 be adequately compensated by the economic gain produced at the asset level, the simulator/optimizer may provide a recommendation for the upgrade or specified repair work scope. Further, the simulator/optimizer may assess any number of candidate work scopes with or without replications in providing such a recommendation.
  • As an example, consider the cumulative work 110 corresponding to an output through time of an aircraft engine, such as thrust. The plan 120 rate of work and cumulative work for operating an engine at an amount of thrust over time, subject to the average planned severity of an average flight where the engine will be flown, and within specified operating policies, there is a probability of failure 160. For example, if the asset is on planned line 120 at time 107, there is no probability of engine disruption based on useful life degradation (i.e., at time 107, the dashed line doesn't overlap with (the graph of) a probability of failure 164). However, when the asset is on 120 at time 150, there is a probability of failure, which rises as time progresses and the asset is utilized such that the operating plan 120 to time 108 to intersection point 148, where the probability of failure is represented at point 162.
  • On average, an engine might be exposed to factors that differentially consume life such as a certain set of dirty air, relative humidity, or temperature, but, in the specific (e.g., out of a fleet of 100 aircraft), specific engines may be running through more harsh environments or operated at a full power takeoff, full power climb, etc. Thus, for example, a specific engine may be off of the planned line 120 and on the specific life path 140. At specific life path 143, new instructions have been provided by the computing control system and implemented for operations of the engine based on recommendations of the optimizer. For example, the aircraft has been moved from a short hop biased route structure to a transocean route bias, is flying with less takeoff power, is flying through less harsh environments, is using runways more efficiently. At 150, the engine is scheduled to come in for service; however, after time 163, the engine is below the planned line 120. Thus, at 144, the operating instructions may be changed again for the engine, and it is deployed in conditions in which its useful life is degraded more quickly. Thus, based on the simulation based control system, it is purposely operated such that its probability of failure may reach point 162 by time 150.
  • Another specific engine path 130 shows that an engine has been operating well below is planned line 120. Given this data, at particular points in time, the system may recommend the swapping of the engine on specific life paths 140, 143, 144, 146, with the engine on specific life paths 130, 125, 126, 131, 132. Thus, both engines may be utilized more optimally with respect to their useful lifes and maintenance schedules. The determinations of engine swaps may be made by the system such that the average specific life paths of engines across a fleet of aircraft come closer to planned line 120. For example, given the maintenance plan for the engine on specific life path 130, decision may be made at 125, 126, 131, 132 by the customer to increase utilization of the engine (and thus increase availability of the fleet) such that the useful life of the engine comes closer to planned line 120, particularly with respect to specific pre-planned maintenance points.
  • The probabilistic distributions 173, 176, 168 (in the example form of Weibull distributions) represent the probability of failure of one or more subsystems or components 175 within an engine, such as a combustion subsystem. Each subsystem may be represented by multiple (e.g., hundreds) of parts. And each subsystem may have its own probabilistic failure distribution (e.g., based on simulations and CDMs). The failure distributions for each subsystem are aggregated and rolled, up into distribution 160. Monitoring failure modes 171, 174 of various subsystems may allow incorporation of replacement or new parts into a subsystems so as to change the shape of the component failure distribution 133, which, in turn, changes the shape of the engine failure distribution 160. Thus, through coordination of shop visits for multiple engines across fleets of engines for customers or groups of customers, part swapping within subsystems may allow optimization of the maintenance of the whole engine system (e.g., with respect to obligations of the service provider under a service contract).
  • A business system or contract portfolio of a service provider 191 and other stakeholders such as investors 131 who are investing through the service provider 191 are beneficially improved with the disclosed computing control system with respect to the management of the physical system's impact to risk to return ratio at the enterprise level with a diversity of service contract terms 160, such as for example, contractual agreements for parts, parts and services, services alone, or certain performance outcomes of the customer 190. Should there be model risk or operations risk or exogenous factors that reduce performance outcomes, such as for example high fuel prices or a recession, a number of less correlated contracts will typically limit the maximum financial loss. In an example embodiment, the target ratio of parts maintenance service agreement (MSA) to contractual services agreement (CSA) is dynamically optimized 193.
  • The hypothetical operating margin 192 per contract for a CSA decreases as more service costs are realized, given the example term and condition which provides for required parts and repair services to keep aircraft engines 121, for example, available and efficient. The example contract may have its revenue set as a function of operating hours or cycles, independent of the totality of factors which degrade life faster 126 than planed life 120. The hypothetical operating margin for a MSA increases as services are required given its exemplary terms and conditions which provide for parts and services on an “as needed” basis, costing terms agreed to a priori, such as, for example a discount to list price. The cumulative portfolio risk, for example, the variance in operating margin change with shop visit rate is compared to the expected operating margin of a given portfolio 194. The cumulative portfolio risk is comparatively high with one hundred percent CSA terms given their exemplary condition that ties revenue to asset usage but with more productive services, the shop rate (cost) may comparatively decrease—which is an objective of the presently disclosed system. A 100% MSA portfolio will not expose the service provider 191 to margin risk given that the parts and services provided under the example terms simply transact as needed and the provider 191 makes an incremental operating margin on each transaction. At CSA/MSA ratios between 0 and 1, the ratios of risk and margin change. A provider may desire a certain ratio of this risk and return, and the disclosed system enables the scheduling and assignment of physical states through time to achieve that ratio as an objective 153 in the system optimization 154. In concert or separately, the ratio of CSA/MSA may be set independently of the lifecycle economic optimizer 154 by the CSA/MSA optimizer 193. In this latter embodiment, the CSA/MSA targeted ratio 106 informs the shaping of service contracts 160. Thus, with a certain ratio of contracts optimized 193 that establish the revenues, the system controller via its optimizer 154, reduces variance of cost cash flows. Diversity of contract terms between CSA and MSA enable operating margins to be supported in lower service rate scenarios and higher service rate scenarios, according to the preferences of the service provider 191 or investor 131.
  • In example embodiments, parts come into a service shop (e.g., a supply chain) of a service provider under CSA, MSA, or on a transactional basis (e.g., for purchase of a particular pan or for a complicated repair). Running a service shop requires the provider to have (sometimes very expensive) parts on hand. For engines that are under CSA, the risk that has been transferred to the provider is the maintenance risk in example embodiments but can be any agreed upon performance aspect. In this case, the provider ideally would be able to put a used serviceable spare part into the engine instead of a new part. For engines that are under transactional basis, the provider ideally would like to be able to put a new part into the engine. For engines coming under MSA, whether a new or used part is most ideal for the provider would depend on the pre-negotiated discount for the part that is specified in the contract. The service demand is superimposed onto the service shops, and the service shops superimpose supply-chain demand over factories, including provider factories and supply-chain factories. Conversely, should service capacity or parts be limited, the workscope may be change or timing of the service event. And parts consumption with labor is used to calculate cash flow and/or cash consumption, which may be an object or constraint in the optimization that controls the asset's schedule, dispatch and assignment of loads. The modelling described herein enables the interests and operations of the various stakeholders to be cooptimized with respect to relevant factors, including customer operations (e.g., airline policies, including flight routes and traversal of airspace), service operations, supply-chain operations, and contractual operations.
  • Another structural target to attain which facilitates the system being able to produce the risks and returns for its stakeholders is the scheduling of spares with respect to location, quantity and type. Spares can be specific capital assets such as a rotor or an entire unit such as an engine. Spares can be owned by the service provider 191 or customer 190 or a stakeholder 131 such as a financing organization such as a bank or investor or other service provider that leases parts or entire engines. The ratio of spares, engine leases and use of specific assets from said spares or pools of assets is derived by simulating the operations of an airline and service provider to calculate the costs 151, 152 and their variances (risk) to optimally 154 inform 182 the ratios of parts and engines 183. Once attained, the use of these assets 181 is controlled, by the system optimizer 154 to achieve the financial payoffs of stakeholders 131, 190, 191. In one example embodiment, the number of engine spares is controlled for by adjusting work scope and timing of a service event as a function of available service capacity.
  • FIG. 3 starts from the generation of the flight schedule and aircraft-to-route assignment. The flight schedule and aircraft-to-route assignment is provided as an input, in this manner, the simulation can be used as a scenario-based “what-if” tool where different flight schedules are provided as inputs. The simulation then “flies” the schedule using “flight ops policies” and “environment issues”. Specifically, the flight ops policies include takeoff derate, climb derate and single engine taxi policy per city-pair route. In order to introduce stochasticity in the model, each of these inputs is provided a probability distribution such as a mean and a standard deviation in a normal distribution which is sampled from during the simulation. Therefore, although a specific city-pair route might have a takeoff derate policy of 10%, the simulation will sample from a distribution to allow the derate to vary, representing pilot's making operational decisions that might vary from the policy. Similarly, the environment module defines the winds-aloft ambient temperature at departure city and PM10 (or coarse aerosols) at departure city. Randomness is introduced by defining a mean and a distribution which is sampled from during the simulation. The flight schedule is then “flown”, with variation induced by the statistical sampling. A key simplifying assumption is that the flights are assumed to occur as listed in the flight schedule inputs, with no operational deviations (such as delays, recovery from unplanned events, etc).
  • The Mixed Mode Aggregator (MMA) module applies damage to the engine components using the different damage model paradigms, including weibulls, CDMS, cycles, and custom damage analytics. The MMA competes these different component damage models in a consistent framework to understand which component will drive a shop visit (and when). The component damage (which will ultimately drive a shop visit) also contributes to overall engine performance degradation which is captured via the “Engine Performance Degradation Index” (EPDI) which is a degradation factor applied to the fuel-bum calculation.
  • The Operational Decision module then performs the logic that represents the decisions that either service provider or the airline customer could make depending on the states of the aircraft or engine as calculated from the MMA and fuel-burn modules. These decisions are limited to engine maintenance, and specifically four actions as shown in the diagram. The first is to do nothing and simply fly the next flight the second is to perform on-wing maintenance (such as waterwash), the third is to perform an inspection, and the fourth is to perform an engine removal. Also is that one of the operational decisions could be to modify the flight schedule and aircraft-to-route assignments.
  • In the first case, the next flight is simply flown without any actions. For the second, the on-wing maintenance is performed (and appropriate positive adjustments are made to engine damage state or performance) and then the next flight is flown. For the third, the inspection is performed which results in additional information that results in a subsequent operational decision. Finally, in the last case, the engine is removed for a shop visit, with the workscope, turn-around-time, and costs being identified, before being returned to the spares pool. The aircraft is immediately assigned another engine from the spares or lease pools and proceeds to its next flight. The simulation is completed when all the flights in the flight schedule have been processed.
  • In example embodiments, a simulation framework includes some input “knobs” (e.g., assumptions, scenarios) that are controlled by the provider (e.g., shop workscope), others by the customers (e.g., derate, single-engine taxi policy), others by both (e.g., removals and on-wing maintenance), and others by neither (e.g., weather). The key outputs are metrics of interest to both the provider and the airline customer. For the provider, these metrics might include shop visit forecasts, workscopes, CSA operating margins, parts forecasts. For the airline, these metrics might include fuel costs, number and timing of shop visits, number of engine spares and impact of flight policies on their operating costs or airline passenger miles resulting from asset utilization. For example, a particular use may focus on shop visit forecasts, spares forecasts and lease forecasts. The simulation framework may be deliberately constructed to represent an end-to-end ecosystem, starting with an airline's flight schedule and working through to the maintenance cycle of the engines through shops and into the spares pool.
  • The list of input “knobs” may include, for example, knobs taken from various modules, including knobs taken from a Flight Schedule module (e.g., a Flight Leg knob), a Flight Ops Policy Module (e.g., Takeoff Derate, Climb Derate, and Single Engine Taxi knobs), an Environment module (e.g , Head Wind Speed, Ambient Temperature, Coarse Aersols knobs), an On-WingMX module (e.g., Waterwash Interval, Waterwash Threshold, Waterwash Effectiveness, and Waterwash Retention knobs), and a Workscope module (e.g., Workscope definitions knobs). In example embodiments, the Flight leg, TakeoffDerate, Climb Derate, Single Engine Taxi, Waterwash Interval, and Waterwash Threshold knobs may be under operational control of the airline, whereas the Workscope Definitions knob may be under Operational Control of the provider.
  • The input knobs may organized into various groupings of input data. The groupings of input data may include groupings for simControl (Specifies key parameters such as Start and End dates, number of replications to run the simulation), Airports (Lists the airports and airport-specific information), Appairs (lists information specific to airport-pairs), acweType (Lists the aircraft and engine configurations), AengineType (Lists the engine types and specific information), acInstances (Lists each aircraft in the simulation by tail number), AengineInstance (Lists each engine in the simulation by ESN, as well as initial states (installation, cycles, SV, etc)) , LLPperEngine (lists the LLP parts and initial cycle counts for each ESN), flightSched (Lists the sequential flight schedule including departure, arrival, time and aircraft tail number), acweTRouteOps (lists route-specific parameters for each city-pair flown by each specific acweType), EngineEDPIFuelEff (Specifies the mapping between EPDI and the fuel-burn multiplier), acweEffMult (lists the fuel-burn multipliers for single engine taxi scenarios), CalendarDaieRemovals (Lists any scheduled removals known in advance (per ESN)), WeibullMode (Lists the Weibull modes (and parameters) for each engine type). SpecificLLPEngineType (Lists the LLP parts for each engine type), DamageModel(Lists the damage models (CDMs) used for each engine type), Workscope (Lists the workscopes and key parameters (TAT, cost)), WorkscopeFailureMap (Map indicating which failure modes drive which workscopes), WorkscopeResetMap (Map indicating which failure modes get reset when a specific workscope is completed), WSAParameter (Specifies the WSA-specific parameters needed to run WS), WSASimulatorDriverMap (Map indicating how the simulation-native failure modes map into the WSA failure modes), WSAWorkscopeFailureMap (Map indicating which WSA failure modes drive which WSA workscopes).
  • Some of the challenges in running the simulation may include gathering, cleaning and formatting the input data. Some data may be obtained from a forensics database maintained by the provider. Other data may be obtained from separate data sources accessible by the provider. Such data sources may provide data pertaining to fleet Weibulls, list of aircraft (e.g., by ESN in contract), current ESN-aircraft assignments, current ESN cycles since shop visit, engine configuration (e.g., to select appropriate Weibull by ESN), historical flight routes by aircraft, severity formulas (e.g., derate, temperature, other severity data, to modify Weibulis), list of uninstalled engines in contract (e.g., spare or in shop), LLP data by ESN (e.g., cycles limits), historical flight parameters by ESN and route (e.g., derate, temperature, and so on), planned AC/ESN entry or retirement, past work done by ESN on module level (e.g., what was repaired or what wasn't repaired), planned maintenance action (e.g., SB removals), shop workscope options and triggers, status of engines in shop (e.g., expected return date), CDM/DRM models and status by ESN.
  • In example embodiments, outputs generated by the simulation may include SV & workscopes, spares count, lease days, ESN removal probability, SV cost, fuel burn, CSA profitability, shop loading, and parts/inventory needs. In example embodiments, all of these outputs, except fuel burn, may be primary interest to the provider, whereas only SV & workscope, ESN removal probability, and fuel burn, may be of primary interest to the airline.
  • The raw output from the simulation may include data items organized into files labeled by replication number of a particular simulation run. This structure allows the post-processing scripts to easily read all the files (e.g., for all the replications for a given scenario) and then analyze to provide statistical outputs. Such files may include an “engine state change” file that sequentially lists each engine-related event that occurs during the simulation (e.g., including an engine instance identifier, a date and time of the engine state change, the new state of the engine (e.g., “mounted, off,” “in repair,” “in spares pool,”, and extended information (e.g., “water wash applied at 10,000 cycles when the EPDI was 3504.308,” “current aircraft set to null,” “installed to aircraft (B-319[47]),” “finished repairs,” and so on). This output file can be used to analyze when engines are installed/removed from aircraft, repaired and moved into the spares pool, undergo waterwash and other similar events.
  • The files may include a “shop visit” file that provides details specific to engine shop visits, including rows corresponding to a shop visit such that an engine with multiple shop visits appears multiple times. In example embodiments, each row corresponds to a shop visit indicating which engine entered/exited the shop, the workscope performed and some other parameters (e.g., ECSV, ETSV) when entering the shop. This information can be post-processed to understand shop utilization, workscopes performed and shop costs. Columns may include an engine instance identifier, a number of shop visits, a number of repairs, an enter service date, an exist service date, service reasons (e.g., “soft removal data,” “Weibull: HPT S1 Blade,” “Weibull: HPT S1 Nozzle”), workscope (e.g., HOC fix, BNC early, BGP teardown), ECSV, ETSV, and severity factor.
  • The files may include a “fuel consumed” file that includes information pertaining to fuel burn, in example embodiments, each row corresponds to a flight and displays the fuel burned (e.g., in lbs.) for each segment of the flight. This data can be processed to determine fuel costs, impact of specific policies on fuel-burn in a particular flight phase (such as single-engine taxi on fuel-burn during taxi), or aircraft-to-aircraft variation in fuel-burn on specific city-pairs. The columns may include an engine instance identifier, a flight number, a date/time, fuel at taxi (pre), fuel at takeoff fuel at climb, fuel at cruise, fuel at descent, fuel at landing, fuel at taxi (post).
  • The raw simulation outputs described above provide flexibility for post-processing to provide meaningful graphs, heat maps and statistically aggregated values. The vision is for the core simulation engine to provide the standardized raw outputs, which are then post-processed by app-specific scripts (e.g., R-scripts) to produce the desired output visualizations. Example scripts include the following: (1) SystemSimPostProcess_vX.R—a wrapper-R-script that sets the file paths, filenames, and calls the remainder scripts, (2) System SimpostProcessESNRemoval_vX.R—processes the engine state change files to produce a master table that lists, per engine, the total probability of removal, as well as probability of each failure mode occurring; additionally, it provides the data table needed to produce a heat-map showing the increased probability of removal for each engine over time, (3) SystemSimPostProcessShopVisits_vX.R—processes the shop visit files to produce plots of number of shop visits vs. time, as well as bar charts showing breakdown of workscopes per month; the output includes counts of all shop visits, as well as counts of only the next shop visit (e.g., in case an engine has more than one shop visit within the simulation), (4) System SimPostProcessSpares_vX.R—processes the engine state change files to produce plots of spares level vs. time, (5) SystemSimPostProcessLeasedEngines_vX.R—processes the engine state change files to produce plost of number of leased engines vs. time, as well as a histogram of number of lease days required.
  • Simulation Modules
  • Modules in the system simulation include the following:
  • Aircraft-Engine Route Assignment module: Assigns aircraft-engines to routes or recommends aircraft-engine-route assignments.
  • Aircraft-Engine Assignment module: Assigns aircraft to engine. In example embodiments, initial assignment is given as input. Within simulation, at shop visit events, engine may assigned to aircraft from spares pool (e.g., as FIFO or using advanced logic).
  • Flight Schedule module: lists specific flights (e.g., by date, time, aircraft-engine, city-pairs) that are flown in the simulation. In example embodiments, the flights are user defined with a schedule provided as input with “severity” of each flight determined in pre-processing. In example embodiments, dynamic schedules can be updated within the simulation based on operational decisions.
  • Environment module: Determines weather and environmental factors that impact performance. In example embodiments, historical data may be used to generate average annual temperature and coarse aerosols at takeoff airport, as well as distributions of headwinds (e.g., by city-pair). In example embodiments, official Aviation environmental models are incorporated and called from within the simulation.
  • Flight Operations module: Determines flight operations policies defined by the airline. In example embodiments, historical data is used to generate distributions (e.g., per city-pair) for various policies, such as derate and single-engine-taxi. In example embodiments, additional flight operations policies, including ones not specific to the engine, are incorporated.
  • Pilot Decision module: Models pilot decisions in implementing the policies. In example embodiments, decisions are sampled from distributions for decisions pertaining to Derate and Single Engine Taxi. In example embodiments, more advanced logic than sampling is used.
  • Flights module: Flies each of the flights in the schedule. Sequentially processes each flight. Derate and single engine taxi are used per Pilot Decision. Temperature and coarse aerosols are lookup via environment table. Headwinds are sampled from distribution. A severity (e.g., pre-processed) for this flight is applied to engines.
  • UER module Estimates frequency and cause of unexpected removals.
  • Mixed Mode Aggregator module: Determines shop visit driver by considering available damage models/plans for engine removal. Modes may include CDMs, Weibulls, LLPs, softtime, calendar date limits, simple damage models.
  • Engine Performance Degradation module: Determines loss of fuel efficiency based on usage. In example embodiments, degradation is modeled as a multiplier on the cumulative severity using a proxy parameter (EPDI) or an approved degradation model.
  • Fuel Burn module: Calculates fuel-burn per flight. Historical city-pair data used to generate distributions of fuel-bum per flight phase. Each flight sampled from distribution and adjusted for derate and duration (due to headwinds). In example embodiments, aircraft digital twin and gas path tracking filters are incorporated.
  • Operational Decisions module: Represents actions that can be taken after each flight. In example embodiments, there may be four possible actions: 1—do nothing; 2—on-wing maintenance (waterwash); 3—inspection; 4—engine removal. In example embodiments, operational decisions include aircraft-related decisions, as well as ability to modify flight schedule.
  • On-Wing MX module: Maintenance that can be performed without missing the next flight. Waterwash implemented with user-specified, interval, degradation threshold. May include other On-Wing or On-Tarrnac maintenance activities.
  • Inspection module: Triggers an inspection and possibly a new operational decision based on inspection results.
  • Removal, Workscope and Shop-Related modules: Block of modules representing the assignment and processing of engines as they flow through the shops. In example embodiments, SV Scheduling may be simplified to assume no constraints (can always be serviced within TAT). Workscope module has two options: 1—a simulation native version; 2—calls WSA. Simplified models for SV Cost, TAT and workscope based performance update via EPDI. Incorporates shop capacity constraints, dynamic scheduling, and more advanced models.
  • Spares and Lease Pools module: Represent the spares and lease pools available for installation to aircraft. Queue of repaired engines (FIFO) and option to lease engines when no spares available (max number of lease engines is user input).
  • AIRCRAFT-ENGINE TO ROUTE ALLOCATION BLOCK. This block includes an aircraft-engine to route allocation module, an aircraft tail number module, and engine serial number module, a planned aircraft maintenance schedule module, and a flight routes module.
  • AIRCRAFT-ENGINE TO ROUTE ALLOCATION MODULE. This module is used to assign the aircraft-engine to routes and flights in the flight schedule. In example embodiments, a static user input provided by the airline or generated during pre-processing. The user is able to generate different assignments and run them through the simulation as different scenarios to understand the impact of route assignments. In example embodiments, this module optimally and dynamically makes aircraft-to-route assignments.
  • AIRCRAFT TAIL NUMBER MODULE. This module is configured to manage a list all the available aircraft (E.G., by tail number) at the start of the simulation. In example embodiments, each tail number may be matched to a predefined tail type.
  • ENGINE SERIAL NUMBER MODULE. Tins module is configured manage a list of available engines (e.g., by serial number), including spare engines. In addition, it may maintain lists of engine specific initialization information. In example embodiments, for each engine, the installed aircraft is specified, as well as its mounted position. In addition, ECSV, ETSV, the SV count, and Weibull modeset the engine is presently using are specified. Columns may be included to indicate whether the engine is installed, a future expected delivery, a spare, or in the shop at the start of the simulation. For engines in the shop, the shop exit date may also be indicated.
  • PLANNED AIRCRAFT MAINTENANCE SCHEDULE MODULE. This module is configured to manage a list of planned letter checks for the airframes which would serve as constraints on allocations of the aircraft to the flight schedule. In example embodiments, this module is not used if the flight schedule with allocated aircraft tail numbers is statically generated in pre-processing.
  • FLIGHT ROUTES MODULE. This module is configured to manage lists of the flight routes for the simulation period without the aircraft tail numbers assigned. This module is used to specify parameters that are relevant for the city-pair such as the distance, typical derate used, as well as the pre-processed Weibull severity for the flight. In example embodiments, these parameters are specified for a particular aircraft type, as the same flight route flown by different aircraft types would be operated differently.
  • FLIGHT SCHEDULE MODULE. The daily flight schedule module specifies flights that will be flown during the simulation. In example embodiments, a user provides a schedule which covers all flights over the desired simulation start to end date, and include all aircraft to be simulated. The flight schedule lists all flights, including: Departure date and time, departure and arrival city, assigned, aircraft tail number.
  • If replicating a historical time-period, this flight schedule would be the actual historical flights flown. If performing a forecast simulation, then the flight schedule must be generated. It could either be provided by the airline directly, or it could be generated based on historical flight schedules with some subject matter expertise input into future growth or modifications to the schedule. For example, consider that an airline is looking to potentially expand its route network to more harsh environment. In absence of specific information from the airline directly, a notional future schedule is generated by using past year's flights as a basis, and making adjustments to deploy aircraft to these new routes. In example embodiments, columns include departure aircraft code, arrival airport code, aircraft, type, distance, departure taxi PE Bits, arrival Taxi PE Bits, To derate mean, to derate halfrange, CI Derate mean CI Derate Halfrang, WeibullServerityf1, WeibullSeverityf2, WeibullServertiyf3.
  • In example embodiments, the flight schedule may be treated as a static user input. In other embodiments, the flight schedule is generated or dynamically modified (e.g., city-pairs, frequencies, or tail-number assignments) so that optimizations can be performed.
  • A projected flight schedule may be generated in pre-processing. First, the historical flight schedule is retrieved from the provider's databases and examined. Part of this examination includes data cleaning, as well as identifying a suitable time period which seems representative of the airline's most recent flight patterns. The selected time period is then replicated multiple times to generate the future flight schedule for the desired number of forecast years.
  • In example embodiments, the future flight schedule is generated as a pre-processing step by running a specially developed script, such as a script having the following pseudo code: (1) read in the input files; Rename columns in the historical flight data; (2) perform initial flight cleanup; order the flights by tail number and timestamp; (3) Scan through the flight list and attempt to rectify any missing airport codes, (3a) if arrival airport is missing for a particular row, substitute the next following departure airport for the same tail number, (3b) if departure airport is missing, substitute previous arrival airport for same tail number; (4) delete any rows with missing departure or arrival airport data, (5) create lists of all aircraft, airports, and routes (e.g., city pair plus aircraft type), (5a) classify each aircraft by type; may need this for route ops, (5b) compute average departure temperature by airport, ignoring NA's, (5c) computer average derate by route and aircraft type, ignoring NA's, (5d) computer flight leg time by route and aircraft type based on distance and air speed; (6) generate alternate schedule for aircraft which lack flight data across the entire historical time range, (6a) for each aircraft, determine the date of its earliest flight and subtract the first flight data across all aircraft—this indicates the delay before this aircraft began flying (within this historical time range), (6b) classify each aircraft as to whether its delay to first flight is more or less than a parameter defining the maximum—if its delay is less than the parameter, classify the aircraft as having a valid flight schedule, if delay is greater or equal, classify the aircraft as having an invalid flight schedule, (6c) for each aircraft with an invalid schedule, replace its list of flights with a copy randomly selected from valid aircraft of same type—at this point, optionally save a copy of the “cleaned up” flight list: (7) create the projected schedule, (7a) create a “schedule block” consisting of all necessary columns, (7b), starting from the data indicated in parameter file, copy the schedule block with incremented dates, (7c) repeat until the desired end date is reached and delete any flight beyond the end date, (8) save the schedule (e.g., into separate files for aircraft, airports, and routes).
  • ENVIRONMENT MODULE. The environment module is used, to simulate environmental factors that are beyond the control of either the airline or the provider. The intent is to incorporate a global weather model (likely based, on historical data) to provide realistic environment operating conditions when simulating future flights. Such environmental factors may include ambient temperature at takeoff, coarse aerosols, and head-winds. The ambient temperature at takeoff may be a key parameter for estimating engine damage and is used in severity models for ICAM shop visit forecasting, as well as pricing of CSA contracts. Coarse aerosols may also have a severe impact to engine damage, particularly in environments with significant quantities of sand, such as the Middle East or the Gobi Desert. The impact of coarse aerosol (or equivalently, PM10) may be included into severity models using special-purpose analytics to improve estimates for shop visits and time-on-wing. The head-winds (specifically, wind velocity) primarily impact fuel-burn with little impact to engine damage. In example embodiments, the temperature and coarse aerosols are inputted as historical annual average values at each airport, and the head-winds are inputted as average values per city-pair.
  • In example embodiments, the environment module is limited to considering ambient temperature and coarse aerosols at the takeoff airport, as well as the headwind velocity between city pairs to focus primarily on engine-related issues. In other embodiments, the environment module incorporates more detailed weather models which would impact overall aircraft-level dynamics.
  • FLIGHT OPERATIONS POLICIES. The flight ops policy module is used to simulate airline operating policies that are in the control of the airline. Some of these policies might arise as technical directives directly from the flight manual and others might be the specific airline best practices. These are policies that the provider might influence provided the value story makes sense to the airline. Operating policies may include, for example, takeoff derate, climb derate and single engine taxi. The takeoff derate may be a key parameter in estimating damage to the engine and may be used as one of the main inputs into the severity models for ICAM, as well as for commercial pricing of the provider's CSA contracts. Climb derate may also be a key parameter in understanding engine damage and incorporated into severity and/or pricing models. The single engine taxi is known to provide fuel-burn benefits which would be balanced with any excessive damage the non-operating engine would suffer due to lack of a warm-up time when spooled-up just prior to takeoff. In example embodiments, the takeoff and climb derates are provided as uniform distributions (with a mean and halft-width) based on historical data per city-pair for the specific airline. The single-engine-taxi is inputted as a code (per city-pair) indicating whether no engines, left engine or right engine is used during taxi.
  • Although example embodiments refer to a few policies, the vision is to incorporate all relevant flight policies used by the specific airline into the simulation models. Additionally, although example embodiments focus on policies that primarily impact the engine, the framework is intended to be able to handle any policy dial impacts aircraft-level operations.
  • PILOT DECISION MODULE. The pilot decision module is intended to replicate the pilot's decision making process when implementing the airlines flight operations policies. This module is intended to introduce randomness into the simulation replications that is reflective of real-world operations as each pilot operates his/her flight. In example embodiments, the pilot's decisions include takeoff derate, climb derate and single-engine-taxi. The takeoff and climb derates are sampled from the uniform distribution (with mean and half-width specified in the inputs based on historical data for the city-pair). The single-engine-taxi may be a binary flag and no choice may be given to the pilot (e.g., if the inputs specify that a single-engine taxi should be performed on a city-pair, then it is always performed). In example embodiments, randomness is introduced by sampling from a historical distribution, and also indicating which engine (left or right) is used. In example embodiments, the focus is on the engine, however, pilot decisions that are related to the overall aircraft may also be included (e.g., based on incorporation of an aircraft digital twin).
  • FLIGHTS MODULE. This module is the core of the fly-forward capability as it sequentially goes through each flight specified in the flight schedule applying the appropriate environmental factors and pilot decisions regarding flight operations policies. Each replication of the simulation is unique depending on the random sampling performed on the inputs. For the proof-of-concept, the random sampling is limited to wind, takeoff derate and climb derate. All other input factors are deterministic (single-value) inputs such as average annual temperature.
  • The simulation logic will fly every flight regardless of locational inconsistencies (such as departing from other than the previous arrival airport). Also, every flight is flown as scheduled. There is no attempt to model delays and subsequent recovery. For the proof-of-concept, “flying a flight” simply entails incrementing the cycles and time on the airframe and associated engines.
  • For a given aircraft tail number, the next flight in the schedule is obtained and compared against the simulation time to see if its a future flight, or a missed flight from the past. If it's from the past, the flight backlog is caught up with and an immediate check of whether the aircraft is fit to fly is performed. If it's not fit to fly, or if the flight is a future flight, a wait process begins. The wait process includes determining whether a calendar date removal is triggered. The removal includes removing the engine for SV (shop visit), processing the SV, entering the spares pool, getting assigned to new aircraft, and determining next potential cycles to failure as min(Weibull,LLP). If the aircraft is fit to fly after the waiting period or after being confirmed as fit to fly, the aircraft is flown on its flight. Then the CDMs are updated (e.g., via the mixed mode aggregator module). An operational decision is then made (e.g., via the operational decisional module). The operational decision includes (1) determine whether any CDM threshold is reached, (2) determining whether any Weibull cycles have been reached, (3) determining whether any LLP cycles have been reached, and (4) determine whether a calendar date removal has been reached. If any threshold has been reached, the engine is removed for SV. Otherwise, a check is performed on whether the engine reached cycles for on-wing MX. If the engine has reached cycles for on-wing MX, the on-wing MX is performed. Finally, the information for the next flight is obtained and the process is restarted for the next flight.
  • The normal situation is that the next flight is to occur in the future, and the aircraft waits for the appointed time. While waiting, a calendar date removal might occur, in which ease, the aircraft is sent to have an engine removed, prior to flying the next flight. At the appointed flight time, a check is made to make sure the aircraft is “fit-to-fly”. In example embodiments, this determination may simply include checking that engines are installed, however, in other embodiments, this determination may include more complex logic. The flight is then flown and the damage models are used to update the damage states of the engine components as the part of the MMA module. The next step is part of the Operational Decision module where the engine is evaluated to decide what to do next. First, the analytic/CDM damage states are checked to see if any thresholds have been missed, second is to see if any Weibull cycle limits have been met, third is to check if any LLP cycle limits have been met, and finally, the calendar date removal is checked. If any of these are triggered, then the engine is removed for a shop visit. The order is of particular importance, because if multiple damage modes are triggered on the same flight, only the first one is used to determine the workscope. Furthermore, if multiple damage modes of a given type (for example, multiple Weibulls) are triggered on the same flight, then the order in which they appear in the input sheet determines the workscope. If the engine is removed, it is sent to the shop, then the spares pool, and then ultimately gets reinstalled on a new aircraft. At the time of reinstallation, the random draw from the Weibulls is made, along with a comparison of the Life Limited Paris (LLPs) cycles to determine the potential cycles to next shop visit. If the engine is not removed, then a check is made to see if on-wing maintenance is due, otherwise the aircraft is cleared for the next flight in the schedule.
  • If it is found that the next flight is a missed flight from the past then the aircraft immediately attempts to fly the next flight. First, a check is made to insure the aircraft is “fit-to-fly”, and if so, then the flight is immediately processed (without waiting (or a particular time in the simulation). It is possible, that if an aircraft is grounded for an extended, time period, there may actually be a backlog of missed flights. These are all processed in sequence as soon as the aircraft is “fit-to-fly”. These delayed flights have consequences on the simulation, particularly in regards to engine removals, shop visits and interactions with other aircraft. For example, if an aircraft is grounded from January to July, then on July 1st, it will begin processing the 6 months of missed flights. If under the original flight schedule, a LLP component would have met its cycle limit sometime in February, that LLP shop visit event will now occur in August (e.g., a 6 month delay). This delayed LLP shop visit would have subsequent ripple effects on the shop visit scheduling, availability of spares engines, and determination of which engine serial numbers get installed, on other aircraft. In essence, this one aircraft is flying its entire flight manifest 6 months late. Since missed flights are processed immediately in the simulation (as opposed to waiting for a specific flight time), there is the possibility that the aircraft's flights could catch-up to the simulation (since it will be flying flights 24/7, at night, when all other aircraft are dormant). This logic is primarily geared towards maintaining the schedule for flights that are minimally delayed due to headwinds, however, it breaks down with unforeseen consequences if an aircraft is grounded for extended time periods.
  • It should be noted that the scenario of a missed flight from the past may be an abnormal situation with the present simulation setup and can only occur due to illogical inputs. For example, if the inputs are setup in such a manner that an aircraft is specified to have a flight before its delivery date. Another scenario would be if the headwinds on a flight are so strong that the flight takes too long. As an extreme example, if the headwinds are specified as 10000 mph, then a flight that should only take a few hours could take months, resulting in many months of missed flights. In general, a missed flight can occur any time engines are not installed on the aircraft at the specified flight time (and this is the only check that is made to see if an aircraft is fit to fly). This could, in principle, occur if there is an engine removal with no spare engines or leased engines available. A lease engine cap may be introduced which results in aircraft-on-ground situations.
  • In example embodiments, the simulation may actually simulate the trajectory of the flight itself (e.g., via the incorporation an Aircraft Digital Twin that can model the performance of the entire aircraft throughout the flight using typical aircraft performance methods (e.g., using L/D, T/W, drag polars, and so on). In this way, the aircraft digital twin will enable the ability to consider scenarios “beyond the engine.”
  • UER MODULE. The Unexpected Engine Removal module incorporates models that reflect actual unexpected engine removal rates observed in the field. These models may or may not have granularity down to the level of the component that caused, the removal, in example embodiments, these models may be based on historical data.
  • MIXED MODE AGGREGATOR MODULE. The mixed mode aggregator module competes the different damage models that exist to identify which component will drive a shop visit (and when). Instead of considering all flights for every aircraft to be an “average flight” (average flight leg, utilization and derate), which gives no ability to distinguish deterioration on aircraft/engines flying one route vs another (e.g., a harsh route with a lot of dust exposure would cause more engine damage than a gentle route), and instead of considering only Weibull and life-limited-parts (LLP) damage paradigms, in contrast, the MMA module flies each aircraft on unique flights per the flight schedule, accumulating usage/damage accordingly, and the MMA incorporates soft-times (e,g, cycle based), calendar-date removals, Weibulls, LLPs, CDMs, and any other custom analytic.
  • FIG. 2 is a framework diagram of life assumptions as they relate to risk transfer via physically sensing and optimally controlling component state(s) in one or multiple time horizons for one or more assets and subsystems used to transfer operating performance and/or financial risk between an asset operator and service provider; said risk informing the physical state being controlled for in an example industrial system. The depicted probabilistic remaining useful life curves are the expected maintenance need which brings the asset into the maintenance and repair operation (MRO) when run to the limit. As an example, component 255 will cause a service event before the subsystem characterized by 240. Because the components differentially wear as a function of exposed conditions, the asset is controlled in one embodiment to enable an optimized schedule that wears several components at a rate that makes the service visit more complete in its workscope—for example, a schedule of repairs done once rather than two service visits. FIG. 10, discussed below, illustrates exemplary cos; modeling of a CSA contract with terms that stipulate certain engine states be maintained in whole 121 or in part such as at a subsystem 122 or part 128 level. This illustration shows the beneficial means to which a contract can be modeled, underwritten, priced and managed by the disclosed system simulator and optimization.
  • FIG. 2 describes the philosophy of how the mixed mode aggregator competes the different damage models to forecast when an engine will be removed. Some of the models are deterministic (in a specific date) and others are probabilistic. In the example, there are multiple Weibulls 235, 240, 245, 250, and 255 and 2 LLPs 260 and 265. For a given engine (ESN), a timeline is setup for each of the damage models. Conceptually, the deterministic damage modes may be straightforward as their removal dates may be fixed and known in advance. When running multiple replications of the simulation, those removal dates will always be the same for a given engine. The probabilistic modes, however, are sampled from the distributions resulting in different removal dales in each replication. The earliest removal date across all the damage models is then used as the driver for an engine removal. The MMA philosophy can, therefore, accommodate any damage modeling paradigm that expresses itself either as a fixed or probabilistic removal. Different damage model paradigms that can be hosted by the mixed mode aggregator include, for example, (1) a soil-time removal paradigm—preventive measure to remove engine from service at certain number of cycles; in the MMA approach, cycles are converted to fixed date using known flight schedule for the engine; (2) calendar date paradigm—schedule maintenance for engine, in the MMA approach, fixed removal dates may be input and known at start of simulation: (3) Weibull paradigm—failure distributions for each major component on the engine adjusted for average severity, in the MMA approach, random draws from flight-schedule specific severity-adjusted Weibull; (4) LLP paradigm—life limited parts with certified life to a certain number of cycles; in the MMA approach, cycles are converted to fixed date using known flight schedule for the engine; CDM/DRM or custom analytic approach—accumulation of flight-by-flight damage with specified threshold for inspection or removal; in the MMA approach, each parameter used to calculate the CDM/DRM is forecast for the given flight schedule and the CDM/DRM is updated after each flight.
  • A timeline 205 originating at a meaningful point To 215 such as the beginning of an assets life or the beginning of a contract or the start of an interval of interest such as “then” 220, “now” 225 and “future” 227 establishes the temporal relationship of contractual activities and obligations.
  • Degradations to asset performance may be caused by many factors, such as for example ambient conditions, temperature and stress cycles. The present disclosure accounts for the specific causal factors of degradation as computed by the cumulative damage models 134, however, contracts do not necessarily have to have these factors in the contractual language or terms but instead can use higher level metrics leading to life consumption such as cycles or hours of use 210. For illustrative purposes, engine flight hours are used to describe one embodiment.
  • An industrial asset such as an aircraft engine is characterized by subsystems 122 and certain parts 128 such as life limited parts 260, 265 which are tracked by regulatory and contractual specification which, for example, may require a certain maintenance action or replacement when its proxy metric for life consumption 210 is reached. Subsystems 230 are a set of components such as a combustion system or an auxiliary system such as related to fuel or air. These subsystems are characterized, for example, by Weibull failure rates 160, 173, 176, 235, 240, 245 each subsystem having its failure or degradation realized by operation of the asset. In example embodiments, the operations are measured at a high level, such as flight hours or cycles 210 while in another embodiment, the operations are measured at a precise low level such as local atmosphere, power output, fuel type or maintenance activity as disclosed with the aid of FIGS. 1A-1G.
  • In one embodiment, the contractual cost to the provider 152, 191 is the sum of repairs for subsystem 230 service plus specific parts 260, 265 service. In one embodiment, the repair policy is such that if one subsystem causes a service intervention, that the other system will be inspected and repaired up to a new remaining useful life level.
  • In example embodiments, the expected average 120 plan life of an exemplar subsystem 245 is made more precise in terms of the statistical probabilities of life consumption based upon the granular modeling afforded with the cumulative damage model(s) 134 being exposed to actual or scenario operations 103, 109, 111, 116, 124, 127. As the specific degradation of a subsystem is modeled as a function of that asset's specific operations, the probabilities of life consumption achieve a narrower forecast interval such as, for example from the original Weibull shape and location parameters 245 to then 250 and then 255 as more model 135 precision is attained and more operations factors are considered. The present value change of free cash flow 149 resulting from the increased precision as life consumption (and service costs) is more accurately modeled for individual assets, their subsystems and parts can be viewed as the option value of implementing the disclosed system for contract underwriting, pricing and management. This change in NPV for a given asset can be aggregated for a portfolio of assets. The terms of a performance based contract may be valued by calculating provider costs 152 of specific life paths 125, 140 versus an average life 120. The operations control policy related to location, duty, service interval and scope, asset control and assignment may be valued by calculating the comparative costs of resulting specific life paths 125, 140. Similarly, the customer's costs 151 can be calculated for the terms and operations of a contract/asset/fleet.
  • In example embodiments, although not depicted in FIG. 1C, benefits to stakeholders other than the service provider and customer (e.g., airline) may be realized. One example of such an additional stakeholder may be an investor. For example, through a simulation involving the digital twin and an analysis of a future life plan of an asset (e.g., based on conditions in which aircraft using the assets will be flown), a customer may decide to upgrade an engine in a particular way (e.g., add a new control system or a higher temperature rating turbine, and so on, to more optimally modify an engine for higher efficiency in the way the customer wants to use it or as it is scheduled with the disclosed system). The models may allow an investor to make the economic investment into the engine according to that investor's risk/return preference. Through the subsequent use of the engine and the change in its cash flows, the digital twin state estimation models, when exposed to simulated futures, pricing, assignments, bidding and dispatch, enable calculations of how to achieve a financial preference under a given operating mode that enables payment of the investor back according to the contractual obligations.
  • Referring to FIG. 3, the revenue model 302 may be configured to provide criteria regarding the monetary aspects of operating an industrial asset, including the revenue generated by the asset, the costs of fuel that may be used to operate the asset, dispatch and trade parameters, power generation capability and grid stability expectations, and so on. For example, the revenue model 302 may provide possible terms of power purchase agreements, possible ways of generating revenue from waste beat and/or other byproducts of the asset, electricity spot pricing, desired profit margins, and the like.
  • The design/CM&U model 304 may be configured to provide particular design options, such as alternatives regarding the particular subsystems (e.g., gas turbines) and components of the power asset 205. The design/CM&U model 304 may also be configured to suggest custom modifications and upgrades to a pre-existing design of the power asset 205 that may result in enhanced return on investment or other aspects of value. Further, slack values are calculated by relaxing constraints which are characterized by system design or operating policy points.
  • The operations model 306 may be configured to provide one or more sets of policies or rules regarding operation of the power asset 205. In one example, such policies may be set based on information received at the operations model 306 from the physics-based model 225 and/or the data model 230 of the asset condition analyzer 220. In other embodiments, the physics-based model 225 and/or the data model 230 of the asset condition analyzer 220 may serve as the operations model 306 within the asset condition analyzer 220, as opposed to being located within the criteria module 255. Example policies may include circumstances under which the asset 205 may exceed its normal steady-state ranges (and for how long), circumstances under which the asset 205 should be shut down, weather conditions under which certain components (e.g., an inlet chiller) should be employed, and so on.
  • The control system model 308 may be configured to provide parameters, limitations, and the like regarding the operation of particular subsystems (e.g., gas turbine) or components of the power asset 205. For example, the control system model 308 may provide information regarding allowable inlet schedules and other parameters for ramp up of a component in response to increasing load, how much remaining useful life may be consumed by over firing a component by a specific period of time, and so forth. Such information may be useful in determining whether operating the component in such a manner may be useful in generating additional revenue.
  • The service model 310 may be configured to determine various parameters and limitations regarding the servicing, repair, and/or replacement of the various components and subsystems of the power asset 205. Such parameters may include the particular types of repair to be performed on a particular component based on the amount of use of the component, limitations regarding the use of the component that may invalidate a service contract or warranty, the length of time associated with the repair and/or replacement of the component, and the like. The costs of different potential service contracts and their various terms may also be provided.
  • The financial model 312 may be configured to provide different scenarios regarding various financial aspects of the power asset 205 that may be considered. In some examples, the financial model 312 may provide different scenarios regarding capitalization of the asset 205, such as whether the various components of the asset 205, or the asset 205 in general, may be purchased using presently available funds, whether outside investors may be pursued, whether financing should be employed, and so on. The financial model 312 may further analyze cash inflows and outflows based on initial investments, repair and/or replacement of components, cost of fuel consumed, expected revenues based on market pricing for output of the asset 205, and the like. Moreover, the financial model 312 may provide indications of equity risk/return preferences of the owners and/or operator's of the asset 205, as well as the lifecycle economic dispatch, modification, operations, and services that may achieve such preferences, subject to various capital structure constraints.
  • SOFT TIME REMOVALS MODULE. Soft-time removals refer to the idea of driving a shop visit based on the number of cycles flown. This is used when a decision is made (either via a service bulletin, provider recommendation, or airline operations decision) to remove an engine as a preventive measure on a periodic basis for maintenance. For the proof-of-concept, the soft-time removals are implemented using a “Weibull Soft Time” with a large shape parameter (to approximate a delta function) and the timescale indicating the number of cycles. These soft-time removals are not engine specific and can only be based on cycles since last shop visit (ECSV) consistent with how all other Weibull-based failure modes are treated. Since the exact flight schedule is already known, the cycles can be converted to a deterministic calendar date which remains the same for each replication of the simulation.
  • CALENDAR-DATE REMOVALS MODULE. Calendar date removals are used when specific engines (per ESN) are known to be scheduled for a shop visit on specific dates. For example, this can be used in situations where there is a scheduled removal plan to address a service bulletin. For the proof-of-concept, calendar-date removals may handled via the inputs where a user lists the specific ESNs and their removal dates. These dates are treated as deterministic and the engine will always be removed on that date. A calendar date removals input table may allow different categories of removals (for example, Service Bulletin #1, and Service Bulletin #2, etc.).
  • WEIBULLS MODULE. Failure forecasting may be largely based on Weibull distributions (based on engine cycles) generated, from historical failure data for each engine component of interest. These Weibulls may be maintained by teams of analysts, updated regularly and used extensively across the provider's systems. The Weibulls may be one of the main inputs in order to forecast shop visits to manage contracts, forecast contract profitability and understand potential pressure points. A Weibull failure mode is a distribution specified by three parameters. Shape (>0; higher numbers indicates “narrower” distributions approaching a delta function), Timescale (in cycles, which approximates the mean time to failure for the weibull), Offset (in cycles, positive numbers push the mode farther into the future and delay the onset of the mode).
  • In general, the provider may specify one Weibull per component of interest. On occasion, however, there might be multiple Weibulls for the same component (representing different damage modes), or there might be a Weibull that isn't specific to particular component (such as an EGT Weibull). In addition, each engine platform may have one or more sets of Weibull failure modes defined. Each set reflects either a particular configuration of the engine (such as whether or not the engine has received a specific fix or upgrade), or the number of shop visits experienced by the engine so far. In example embodiments, there are two Weibull sets (0 and 1), and Weibulls are defined for each subcomponent for each set. In example embodiments, if an engine cornes in for a shop visit, any components afflicted, by the workscope belonging to set 0 will be incremented to set 1 to determine the failure cycles of the next shop visit, whereas any components already at set 1 will remain at set 1.
  • When sampling from a Weibull distribution, it is important to correctly account for the conditional probability based on the number of cycles already flown (e.g., component survival to current cycle count). This is relevant at the start of the simulation when engines are initialized (and most engines have cycles of use on them), as well as when an engine comes out of the shop and the components which were not affected by workscope are the existing parts with cycles of use on them.
  • At the start of the simulation, the engine cycles since last shop visit (ECSV) are specified as an input. This information is provided at the engine level or engine subcomponent level. After a shop visit, the Weibulls are reset by setting the ECSV to 0 only for the specific components repaired (based on the workscope) and the Weibull set is incremented as described earlier (e.g., only for the repaired components). The engine is then sent to the spares pool until needed. Upon installation to an aircraft, the engines flight schedule is known. The severity for the aircraft's specific flight schedule is calculated and applied to each of the Weibulls. A draw is then made from the severity-adjusted distributions for each of the Weibulls, and the minimum cycles to failure (across all subcomponents) is used (along with the minimum cycles remaining across LLP parts) to determine the next potential shop visit.
  • SEVERITY ADJUSTMENT. To forecast failures, Weibulls generated by historical failures across a global fleet for each subcomponent may be used. Since each engine is operated differently and experiences different environment conditions, adjustments must be made to the base Weibulls when making forecasts. This is done by multiplying the base Weibull (e.g., eta and beta) for each failure mode by a severity factor determined using a severity calculator with flight leg, derate, utilization, ambient temperature and coarse aerosols as the inputs. The severity calculators are developed for each engine platform by (e.g , by the provider's engineering teams) and are intended to adjust the Weibulls (e.g., either reduce or extend the expected cycles to failure) based on actual operating conditions. Additionally, each subcomponent Weibull can be multiplied by a different severity factor (e.g., for the same operating conditions) since one can easily understand that cold section components are affected differently than hot gas path components. In practice, for a given engine platform, the provider may create a limited set of (e.g., at most 3) different severity factors to be applied to the different engine components. This mapping is defined (e.g, which severity factors to multiply against which components) and is specified in the inputs. In example embodiments, for a single platform (e.g., the CF34 platform), there may be only one severity factor, so all the Weibulls are multiplied by Severity Set 1.
  • Instead of using the weibulls to treat every engine as flying the same average flight with constant operating parameters, and therefore the same severity factors for all flights, in example embodiments, each engine is flying a different flight schedule, with different flights legs, derates, etc.
  • In example embodiments, the severity adjustment is handled via pre-processing during the generation of the flight schedule. At that time, the flight leg (FL) utilization (UTIL), ambient temperature (TEMP), takeoff derate (DER), and coarse aerosol counts (CA) are used with predetermined severity calculators to calculate the severity for each flight. This severity is included as part of the inputs.
  • As described earlier, the severity factor is applied to the Weibull upon engine installation to the aircraft in order to make the random draw for its next shop visit. When an engine is installed on an aircraft, the simulation would look-forward at the next 10000 flights for the given aircraft and average the severity parameter's directly. These average values would then be used as inputs to the Java severity calculator as follows:
  • Severity Factor=SeverityCalc(avg(FL),avg(UTIL),avg(TEMP),avg(DER),avg(CA)
  • This severity factor would then be multiplied by the Weibull parameters in order to conduct the random draw to assign the next shop visit date.
  • LIFE-LIMITED PARTS. Life limited parts (LLP) are engine-critical components that have been certified to fly for a specific number of cycles based on extensive engineering design and testing during the certification process. These components are typically high-value parts (such as the turbine disk) and can drive a shop visit if their replacement becomes due. For the proof-of-concept, since the flight schedule is known in advance, the cycles can be converted to a calendar date with remains fixed, across all the replications of the simulation. The LLP specification for each part has inputs which are identical to those used in ICAM:
  • Life Limit: maximum number of cycles prior to replacement being required
  • LLP Buffer: typical number of cycles remaining at which the part will cause a shop visit
  • MinBuild: minimum cycles which must remain on this part when the engine leaves the shop (for an unrelated repair)
  • It is easiest to explain the meaning of these parameters with an example. Consider a life-limited part X with: Life Limit=25,000 cycles, LLP Buffer=100 cycles, and MinBuild=6,000 cycles. Current cycle count (ECSV)=18,000 cycles. The following scenarios could occur:
  • If the engine does not experience any other reasons for removal, LLP part X will cause a shop visit at (25,000−100)=24,900 cycles.
  • If the engine goes into the shop for some reason right now (at 18,000 cycles), LLP part X will not be replaced at that time because it has (25,000−6,000)=7,000 cycles remaining, which is less than MinBuild.
  • If engine goes into shop for some reason after 19,000 cycles, LLP part X will be replaced at that time because it will have less than 6,000 cycles remaining (less than MinBuild cycles)
  • In example embodiments, an input list of all the life-limited parts for the engine platform is received. The input of values for the LLP parameters (described above) is specified, per engine serial number for the simulation.
  • CDMS, DRMS AND CUSTOM ANALYTICS. In example embodiments, any physics or data-driven analytic that is used to forecast engine component damage may received as input. CDMs and DRMs generated by the provider may be specific cases of custom analytics that can be inserted. In order to be useful, these analytics must be independently validated by comparing the analytical predictions of damage with inspection data for a large number of engines. The simulation may simply use the analytics, and may not be able to in itself make better predictions and compensate if the underlying analytic is a poor predictor of damage. In example embodiments, the analytic must provide an initial damage state (via pre-processing and specified in input table), and then be able to calculate the incremental damage per flight as a function of the flight-specific operating parameters in the flight schedule. If the damage model is based on engine parameters such as T3 or T49, then there must be a mechanism provided to forecast those values. In addition, the analytic definition should include conditional logic that triggers an event. The conditional logic could be as simple as a threshold, or could be more complex such as slope-based or something else entirely. Additionally, the analytic should specify what event should occur when the conditional logic is triggered.
  • In example embodiments, damage analytics are incorporated in the simulation and an input table is used to specify which ones should be used in the simulation. For example, two analytics specific to the CF34-10 (e.g., LPT shroud drop and first stage nozzle cooling holes blockage) may be incorporated into the simulation model. The LPT shroud drop is used to drive an engine removal (shop visit), however, the nozzle cooling hole blockage analytic is simply reported as having crossed the threshold (without driving a shop visit) since the analytic itself is still under validation. In example embodiments, the simulator platform infrastructure enables the simulation to call (e.g., within a replication, after each flight) the analytic, which may be hosted in a scalable and language-agnostic environment.
  • In example embodiments, CDMs/DRMs may be used to estimate the engine health using historical flights to the present day. This information may then be used to assess whether an engine should be brought in for inspection.
  • Engine Performance Degradation Module. In example embodiments, the engine fuel-burn performance degradation over time is modeled in the simulation as a multiplier against the fuel-burn. The engine degradation is captured in an “Engine Performance Degradation Index” (EPDI), which is a non-physical number that is simply incremented every flight. This cumulative index is calculated, based on the severity calculated, for each flight. As the flights occur, the cumulative EPDI for the engine is incremented by the EPDI for the flight. The cumulative EPDI is then related to the fuel-burn multiplier (1/fuel efficiency ratio).
  • As an example, if a particular engine has flown 300 flights, and the cumulative EPDI for that engine is calculated to be 1200, then the engine is deemed to be 98% efficient, so the fuel burn multiplier used on the next flight would be 1/0.98=1.04. In example embodiments, this method is replaced with EGT margin degradation curves (or other similar methods) developed by the provider for the different engine platforms.
  • FUEL BURN MODULE. The fuel-burn module is used to estimate the actual fuel-burn for the specific flight in specific weather conditions by the specific aircraft tail-number. Ideally, the fuel-burn estimate is made at the aircraft performance level, taking into account the drag characteristics of the specific tail number, as well as the actual degraded engine performance. The vision for the fuel-burn module is to incorporate actual aircraft and engine models to properly estimate fuel burn. At a high-level, for the purposes of the simulation, the fuel-burn for a given flight can be estimated purely based on a tail-number specific aircraft performance model (e.g., via the Aircraft Digital Twin). In example embodiments, any fuel-burn degradation between the airframe and the engine is disaggregated, which requires a serial number specific engine-model. In example embodiments, the fuel-burn is estimated using a lookup table obtained from historical data in the provider's database systems.
  • In example embodiments, the fuel-flow (in lb/hr) is provided per city-pair per each phase of flight. This information is provided for different aircraft-engine combinations since two different aircraft types flying the same city-pair are likely to have different performance. During the pre-processing generation of the inputs, the takeoff and climb fuel-flow rates may be corrected for the derate used on that particular historical flight using, for example:
  • Takeoff (or Climb) Fuel Flow=(Actual Fuel Flow)/Derate
  • As such, the values provided as inputs may represent the notional 0% derate fuel-flow. Similar data may also provided for the time duration of each flight phase.
  • The duration of the cruise phase may not be provided in the lookup table, but rather the cruise speed may be provided instead. The cruise duration may be calculated from the ground-speed (cruise speed—headwind speed), both of which are provided as inputs per city-pair. This is one example of linking an environmental factor (headwind speed) to an outcome important to the airline customer (fuel-burn). In this manner, the ground-speed is also replication-specific, and the duration is calculated using the city-pair distance.
  • Cruise Duration=(Great Circle Distance Between CityPairs)/(Cruise Airspeed-Headwind speed).
  • The standard deviation of the fuel-flow and durations may also provided, so that randomness can be introduced into the simulation by sampling from the respective distributions. By multiplying the statistically sampled fuel-flow rate with the statistically sampled duration, a unique (or rather, replication-specific) fuel-burn is determined for each flight. Additionally, the engine performance degradation correction is also used to adjust the fuel flow, so that the total fuel burn for a single flight is calculated.
  • Operational Decision Module. The Operational Decision module is intended to replicate the logic behind the operational decisions available to both the provider and the airline customer after each flight. In principle, this module would incorporate logic that could any impact of either the provider's or the airline customer's operations. This would include the airframe, the engine, flight schedules, or even ancillary services such as catering.
  • As a simple example, the focus may be on an engine with one of three operational decisions being made with respect to the engine after each flight. The first is to do nothing and fly the next flight. The second is to perform an on-wing maintenance action (e.g., waterwash) based on some OEM-recommended or airline policy, prior to the next flight. The third is to remove the engine for a shop visit. A replacement engine may be immediately pulled from the spares pool or lease engine pool so the aircraft can fly the next flight. The removed engine is then processed in the shops to determine the workscope, shop costs, and turn around time (TAT) prior to being reintroduced into the spares pool. Additionally, a decision to perform an inspection may be made and a subsequent operational chain that occurs if the inspection is passed or failed may be incorporated.
  • Maintain Existing Schedule module. This module essentially represents the status-quo behavior which is to proceed with the next flight without any intervention.
  • On-Wing Maintenance Module. This module is used to represent any engine-specific on-wing maintenance that can be performed and its impact to either engine damage state or performance. Note that, in principle, this module should be expanded to include any “tarmac-based” aircraft maintenance as well.
  • An example of on-wing maintenance includes an engine waterwash. The implementation is straightforward with two triggers: 1—cycles-based, and 2—engine degradation-based (e.g., EPDI crosses a threshold). The impact of the waterwash is to improve the EPDI by a user-specified number of points, and as such its only impact is to improve fuel-bum, without any impact to the damage state of the engine. In addition, a retention period must be specified, which indicates the duration (in cycles) of the effectiveness of the waterwash, with the performance (e.g., EPDI) degrading linearly back to the pre-wash degradation curve. EGT increases as the engine degrades over time with some portion of the degradation being recoverable via waterwash and the rest requiring a shop visit. The impact of the waterwash improving the performance may be visualized as a step function, which then linearly returns back to the pre-wash performance over a certain number of cycles (the retention period). This behavior may be modeled and incorporated into the simulation.
  • If the inputs result in a second waterwash to occur during the retention period (e.g., the inputs specify cycles between waterwash to be less than the retention period), then the second waterwash is postponed to immediately after the retention period. The on-wing maintenance module may similarly incorporate any additional on-wing maintenance actions that can, for example, either extend the life of components or impact fuel-burn.
  • Inspection Module. The inspection module is used to represent the process of performing an inspection on a part per a prescribed inspection policy, and returning the results of the inspection. The results of the inspection then drive another operational decision which could be to any of the actions described earlier (e.g., fly next flight, on-wing maintenance, removal, or even another inspection). Additionally, with the incorporation of CDMs, one of the outputs of the inspection module might be to “true-up” the CDM for a particular damage mode. Modeling the results of the inspection may be based on historical data to generate a distribution on the results of the inspection.
  • Removal, Workscope, and Shop-Related Modules. Once the decision has been made to remove an engine, then these modules simulate the process of the shop visit logistics. This includes determining which shop to visit, scheduling a slot within the selected shop, and identifying the appropriate workscope to perform. In particular, for the latter, identifying the workscope also specifies how long it takes, how much it costs, and what is the impact of the shop visit on the engine.
  • The workscope module is configured to model the process of deciding the extent of the repair work performed during a shop visit. In example embodiments, one of two methods to model the workscope selection process may be selected. The first is a rules-based model developed and run natively within the simulation framework, and the second is to invoke the Workscope Analyzer algorithm (WSA) as an external module. Both are described below.
  • The rules-based, simulation-native implementation consists of a series of lookup tables developed in consultation with CPMs. Each of these tables is presented as an input values to the simulation. The Workscope table defines the available workscopes for a particular engine model. Each workscope is defined with a name, a turn-around-time (TAT), a non-CSA customer price, and a CSA cost. The WorkscopeFailureMap table which lists all the damage modes (weibull, LLP, CDM, calendar removal, etc.) that could cause an engine removal and identifies the workscope (from the Workscopes table) that is subsequently triggered. The WorkscopeResetMap table specifies which Weibulls are reset when a particular workscope is completed and the engine leaves the shop. The Weibull for a component is reset by setting the ECSV for the component to 0.
  • The flow of how the tables are used in a simulation is as follows. First, an engine shop visit is triggered by a particular damage mode. This damage mode is used to identify the workscope to be completed (using the WorkscopeFailureMap). The turn-around-time and cost for the shop visit are specified (using the Workscopes table) and the engine remains in the shop for the specified TAT duration. Upon leaving the shop (into the spares pool), the appropriate weibulls are reset (using the WorkscopesResetMap).
  • WORKSCOPE ANALYZER (WSA) APPROACH. The WSA implementation involves defining mappings between the native rules-based approach input tables and required WSA inputs, and then calling WSA as an external module. The WSA approach may have a large set of predefined workscopes (e.g., that were determined by the WSA team in consultation with the shops) that are maintained in a database (e.g., along with the average costs and turn-around-time for each of those workscopes) that is called from the WSA algorithm. These workscopes are often more extensive in number than those that might be defined by a CPM, and are specified via input tables. In addition, in order to reduce the problem size, the WSA algorithm relies on groupings of the failure modes (rather than considering each individual weibull or LLP) to determine the workscope to be performed. This requires a mapping between the damage modes to those “grouped damaged modes” that are used by WSA. During the simulation, as an engine failure occurs, it creates the necessary WSA inputs, runs the WSA as an external module, and then receives the recommended workscope from the WSA algorithm. The simulation then processes the shop visit (using the recommended workscope) in the same manner as any other shop visit.
  • The WSAParameter input table that defines the WSA run-time parameters that are passed to the WSA module during the external call. These parameters are required by WSA and define how the WSA algorithm is run and how it behaves. The Workscopes table may be completed with the additional workscopes defined by WSA (and the flag is set to TRUE, indicating it is used by WSA, and not the native rules-based approach). Only the workscopes flagged TRUE are passed to WSA. This table is provided by the WSA team for the specific engine platform. The WSAWorkscopeFailure map lists the WSA damage modes that could cause an engine removal and identifies the WSA-specific workscope that is subsequently triggered. This is the analog to the WorkscopeFailureMap. The WSA algorithm may interpret this as the minimum workscope that will be considered, and it is likely to propose additional workscopes as part of the optimization.
  • The WSASimulatorDriverMap table defines the mapping between the individual damage modes to the “WSA damage modes”. Some of the modes map 1-to-1 (for example, the “Weibull Combustor” mode maps to the WSA “Combustor” mode), while others are grouped (for example, the “LLP Booster Spool”, “Fan Forward Shaft”, and “Fan Rotor” all map to the WSA “LLP Fan” grouped damage mode). This mapping must be provided by the WSA team and is necessary since, as described earlier, the WSA algorithm uses groupings of damage modes defined specifically for WSA. The WorkscopeResetMap table is populated with the WSA specific information. The table is used in the same manner as described earlier to determine which WSA damage modes need to be reset.
  • In example embodiments, the flow of how the tables are used in a simulation is as follows. First, an engine shop visit is triggered by a particular damage mode. This damage mode is used to identify the workscope to be completed (using the WorkscopeFailureMap). The turn-around-time and cost for the shop visit are specified (using the Workscopes table) and the engine remains in the shop for the specified TAT duration. Upon leaving the shop (into the spares pool), the appropriate Weibulls are reset (using the WorkscopesResetMap).
  • In example embodiments, the flow of how WSA is used when integrated into the simulation is as follows. First, an engine shop visit is triggered by a specific damage mode. This damage mode is mapped to the appropriate WSA-specific damage mode (using the WSASimulatorDriverMap) and the WSA inputs are passed to the WSA algorithm. WSA is called externally, and returns the workscope that should be performed. The turn-around-time and cost for the shop visit are specified (using the Workscopes table) and the engine remains in the shop for the specified TAT duration. Upon leaving the shop (into the spares pool), the WSA-specific damage modes that need to be reset are specified (using the WorkscopesResetMap). These are then mapped back to the base Weibulls that need to be reset (using the WSASimulatorDriverMap).
  • SHOP VISIT SCHEDULE MODULE. The shop visit schedule module is intended to model the situation where an engine can be sent to multiple shops, and there is a desire to level-load engine maintenance across the shops, or to identify potential bottlenecks that would delay an engine servicing. In example embodiments, it may be assumed that the engine being removed can be immediately processed by the shops. This module is agnostic to whether the rules-based or WSA approach is used, to determine the workscope.
  • SHOP VISIT COST MODULE. This module is intended to model the costs associated with the specific shop visit so that total costs can be accumulated over the lift of the simulation. In example embodiments, input values for each workscope are specified. The module determines the cost value for a specific shop determines the different shops available with a cost multiplier to complete the same workscope completed at each shop. This allows more accurate assessment of the costs of the shop visits for contracts where the engines might end up in different shops around the world.
  • TURN-AROUND-TIME (TAT) MODULE. The TAT module is intended to model the wing-to-spares-pool time (e.g., the elapsed time, in days, it takes to remove an engine from the aircraft to its subsequent placement in the spares pool). This module is heavily influenced by the shop visit schedules and any potential bottlenecks occurring. In example embodiments, the simulation defines the turn-around-time for each different workscope instead of an “average” shop-visit turn-around time for all workscopes. Similar to the shop costs, the intent is to allow the user to specify a multiplier on the turn-around-time for each shop in order to take into account different transportation times and shop productivities.
  • WORKSCOPE-BASED PERFORMANCE UPDATE MODULE. This module is configured to update the engine fuel-burn performance based on the workscope completed.
  • SPARES POOL MODULE. This module represents the spares pool of engines that is typically contractually maintained under a CSA agreement. These engines are used to replace engines that are coming off-wing in-order for the aircraft to continue flying. In practice, if there are no more spare engines available, then provider may be obligated to procure a lease engine from the market to install on the aircraft. In example embodiments, the spares pool is essentially a first-in, first-out queue with engines coming into the spares pool from the shops (as they are repaired) and then assigned to the next aircraft requiring an engine. In example embodiments, more advanced logic intelligently assigns engines to aircraft based on engine-pairing, anticipated future flights, or other logic.
  • LEASE POOL MODULE. The lease pool module represents the market availability of lease engines for use in-case the spares pool is exhausted. If an aircraft requires an engine, and the spares pool is exhausted, then a leased engine is installed on the aircraft. The simulation keeps track of the number of leased, engines, as well as the leased engine days so that lease costs can be calculated. In example embodiments, a maximum size to the lease pool is provided. In this case, aircraft will remain grounded if the lease pool is exhausted. Logic is introduced to manage the lease pool, as well as the impact to the flight schedule with grounded aircraft.
  • As depicted in FIG. 3, the system 300 depicts the criteria module 355 as deployed in a networked system 330. The networked system 330 may provide server-side functionality, via a network 301 (e.g., the internet or Wide Area Network (WAN)) to one or more clients. FIG. 3 illustrates, for example, one or more client machine(s) 320. The one or more client machine(s) 320 may each execute one or more client application(s) 322, such as a web client (e.g., a browser, such as the Internet Explorer browser developed by Microsoft Corporation of Redmond, Wash.) or a programmatic client. Each of the one or more client applications may include one or more modules (e.g., a plug-in, add-in, or macro) that adds a specific service or feature to a larger system.
  • Within the networked system 330, one or more servers (e.g., an API server or a web server) are coupled to, and provide programmatic or web interfaces respectively to, one or more application server(s) 340. The application servers 340 may host one or more applications or modules, such as the criteria module 355 described herein. The application servers 340 are, in turn, shown to be coupled to one or more databases servers 360 that facilitate access to one or more databases or NoSQL or non-relational data stores 365.
  • While the system 300 shown in FIG. 3 employs a client-server architecture, various embodiments are, of course, not limited to such an architecture, and could equally well find application in a distributed, or peer-to-peer, architecture system, for example. The various applications could also be implemented as standalone software programs, which do not necessarily have computer networking capabilities. Additionally, it will be readily apparent to one skilled in the art that machines 320 and 330, as well as client applications 320 and server applications may be coupled to multiple additional networked systems.
  • FIG. 4 is a flowchart of an example method 400 for computing operations optimization A service provider 191 achieves optimization gains in internal operations such as, for example, CSA risk reduction, CSA cost reduction, CSA revenue price setting and enhancement, especially with respect to risk and the identification of new product introduction opportunities for design as well as for selling modifications and uprates to a customer. For a customer 190, the gains include more reliable and profitable assignment of assets to certain duty cycles or routes, best assets to keep in the operating portfolio versus being scrapped, sold, parted out and the optimal dynamic in service control and asset operation. At operation 402, states of engines are estimated (e.g., based on simulations, including digital twin modeling, as described herein). At operation 404, a joint optimization of a combination of engine assets is performed. At operation 406, a joint optimization of workscope and assignment of engine assets is performed. At operation 408, maintenance cost optimizations are identified (e.g., based on application of the models and joint optimizations). As operation 410, operating cost optimizations are identified. At operation 412, price risk of service cost is estimated (e.g., for calculation of terms of a contractual service agreement). At operation 414, forecasts pertaining to the optimizations are included in a discrete event and agent-based simulation, as described herein. In example embodiments, various models are employed in identifying the optimizations and performing the joint optimizations, including customer key performance indicator model, customer operations model, customer financial model, service-provider contractual model, service-provider risk/return model, and design and operations co-optimization models, as described herein.
  • FIG. 5 is a block diagram depicting data and analytical system relationships for asset and operations state control. As depicted, digital twins are created and maintained within the system corresponding to state estimation 504, operations 505 and prognostics or anomaly detection 503. Through simulation of operations of assets over time periods using the digital twins, as described, herein, asset optimizations and operations optimizations may be identified. Where the states of assets 504 are purposefully controlled by and for the benefit of operations 505.
  • FIG. 6 is a block diagram depicting one or more concurrent physical and business system state control optimizations and centralized simulation based orchestration.
  • FIG. 7 is a stakeholder risk and return preference and an available pareto frontier at one or more intervals of time to which the control system is optimally causing state changes of physical assets to achieve. It includes a framework illustrating the performance of an industrial system relative to system one or more stakeholder preferences with respect to the ratio of financial or operational risk and return relationships or other relationships such as an operations result with respect to the system's variance of that performance indicator. The risk and value management framework displays aspects of the performance of an industrial system relative to the preferences of the system owners and the entitlement of those industrial systems to change their risk and return relationships. Two dimensions are displayed in the graph 700. A first dimension represents the net present value (NPV) 705 of the free cash flows (FCFs) discounted at a risk-free interest rate over the economic optimization forecast interval. This NPV 705 is calculated via a pro forma whose assumptions are being provided by the system of systems simulation. The second dimension is variation 710. This variation 710 represents the periodic differences of the free cash flows of the industrial system.
  • In the graph 700, two curves are depicted that describe or frame the financial entitlement that may be enabled by aspects of the disclosed inventive subject matter. A first curve describes the “as-is” or base case 720 Pareto frontier of risk and return relationships for the given industrial system as it is currently designed, operated, or constrained. The second curve signifies the “could be” or “to be” 725 Pareto frontier, whose improved capacity to generate higher economic returns at a given level of risk than the base case 720 is enabled with new design and operations capability, as determined by the simulation and optimization operations described above, such as those associated with the simulator/optimizer 200 of FIG. 2. Generally, a Pareto frontier may identify a set or range of parameter values representing an optimized result (e.g., in this case, NPV 705) for a given set of constraints.
  • Overall, six different risk-and-return relationships are plotted in FIG. 7, although more or fewer such relationships may be plotted in other examples. These relationships are significant indicator points with respect to achieving the financial objectives and risk tolerances of the owners of the industrial assets. Point A is the economic return, and the risk to achieving that return, of the original industrial system justification. Point B denotes a current state of the system which, in the example illustrated has a lower NPV than the justified system and incurs more variation or risk associated with this state, and thus is not as economically vital as the system is capable of being. Such higher risk and/or lower return may be a result of an exogenous condition, such as a competitor or a technology substitute or perhaps as a result of its design and operation in the current or forecasted exogenous conditions or as a result of the operators of the industrial system not running the industrial system to its designated policy. This diminished state may also exist because the industrial system has not been beneficially re-engineered and optimized, as is possible via the simulator/optimizer 200 of FIG. 2. Point C is a new economic operating point dial is perhaps achievable without the disclosed system, if there were manual co-optimization. Point D represents a beneficial change to the system that is compatible with the owner's risk/return preference that may be achievable via the ability of the simulator/optimizer 200 to find optimal design and operating policy points. Point E is a point of risk and return available for owners that are willing to experience periodic cash flow swings resulting from taking on more operational risk. The incremental resulting NPV creation may be a means to create a surplus that may then be invested into the system in a given operating period or over a sequence of operating periods spanning years. Alternatively, financing or cash outlay may be employed to migrate the system to higher returns for a given level of risk. Point F is a theoretical point which is established as a cap to loss. The simulator/optimizer 200 may enable this point's Put Option value to be calculated. A beneficial aspect of the simulator/optimizer 200 may be that a single customer may experience excessive risk and is willing to hedge that risk, while the OEM offering services solutions and controlling for their contracted performance outcome using the disclosed method and system may pool this risk amongst a portfolio of assets, thus providing a real option value to up-rate the assets in some way to reduce risk.
  • FIG. 8A provides a local and global control point representation 800 of the Digital Twin Operations Optimization system, depicted in its industrial state control computing system 805 embodiment, using exemplars in the Aviation and Power domains. Local asset assignment and scheduling operating decisions 810 are optimally calculated 805 by the disclosed system. The physical states of the industrial system components that are being measured, automatically estimated and adaptively controlled through time 850 by assigning their operations will enable the achievement of desired life, reliability, maintenance workscope that is a function of life or as a function of higher level KPIs that are optimized for objectives such as shop and production control, fulfilment, used serviceable inventory repair and stocking. The interaction effects of the system 805 reach into the thousands and cannot be computed, or traded off by humans or current analytical methods of the prior art such as spreadsheets, mathematical packages, Enterprise Resource Planners.
  • FIG. 8B is a representation 800 of optimized maintenance factors 820 which are enabled by controlling the states of the industrial system with the disclosed system 805. These planning and optimized aspects are individually and jointly Simulated to calculate the interaction effects and then optimized over with replications by the Digital Twin Operations Optimization computing control system. These planning and optimizations have dynamic and temporal interdependencies which are now computed 805. For example, the tradeoffs through time of certain duty assignments in the present against a combination of service scope, timing, environmental operating limits, local and central inventory stocking by type or remaining useful life in a given part or system. The combinations of factors and interactions are not calculable by humans or the business tools of the prior art.
  • FIG. 8C is a representation 800 of local and global control points in the computing control system 805. Interacting dynamical workscope specification 850 calculated with discrete event simulation controlled automated decision support interacts with agent based simulation 860 and performance risked based contract terms.
  • In some examples, the human-machine interaction tiles of the system 805 may be configurable so that particular key process indicators of the industrial system and its operating and service processes may be presented and easily understood. In some instances, the changes which are available to be made in the industrial system result in no change to the key process indicators from the base case to the optimal new case. Along other dimensions, the industrial system may be improved wherein the base case is dominated by a new case or scenario that the simulator/optimizer 805 has discovered via simulating a virtual version of the industrial system physics based and data derived models and its many sub-processes and their decision support.
  • FIG. 9 is relationship diagram depicting physical and business optimization of an example industrial system. In example embodiments, the optimizations may relate to one or more of a physical design, an operational policy, and a control. Operations simulations using digital twins may identify operations optimizations that benefit both the service provider and the customer. The disclosed simulation based computing control jointly seeks both provider and customer benefits.
  • FIG. 10 is a graphical representation of the computing control engine for co-optimization of design and operations. An “as-is” estimation of the example embodiment in the aviation domain calculates fuel consumption. A work output is sensed or empirically observed or simulated to achieve, for example, a certain routing schedule or operate in a weather condition which is exogenous to the system's ability to directly control. A virtualized efficiency is calculated for a set of flight and maintenance events and prospective policies that are promulgated by the disclosed system. It can be appreciated that thousands of combinations of schedules, policies, events and contingencies are computed for the purpose of determining the dominant design and operation set points. In the example embodiment, factors being calculated and sought by the system or to which the system must be limited by or achieved are called bidirectionally by the computing control system 805, such as, for example variable fuel, fuel cost, service agreement cost, maintenance planning and the like. An actual 1001 may be compared to a calculated “entitlement” (eg, best possible or other operating objective) 1003 for a ratio of realized vs potential possible. The state of life or damage is informed to and dynamically controlled 1002 by the system. Asset scheduling and assignment activities 1004 are controlled by the system 805 to achieve a certain physical state or an operational objective. One mode is an automated control. Another is a means to assure a minimum performance threshold is met. Part and inventory 1005 stocking location, time and remaining useful life are calculated by the system 805 as a function of damage estimation 1002 in one mode and in another mode, the available parts and capacity limits inform the on-wing maintenance or flight policy control points. Financial calculations determine service revenue, risk, price and billing or other cash management means 1006. These are a component of system level optimization transfer functions or are themselves an objective that the state control system dynamically seeks with operating and maintenance assignments and policies.
  • Shop schedules by aircraft engine and scope 1007 are calculated by the system 805 to control cashflows 1006, operating factors 1004, flight and maintenance factors 1020 and schedules (severity and duration) in one embodiment. Alternatively, the operations and maintenance schedules may be automatically constrained by available capacity 1005 or parts or performance. Routes (duty through time) may be assigned 1008 to achieve fuel consumption and rate of degradation. System level tradeoffs 1009 are calculated to shape service demand to optimally use shop capacity, schedules, inventory trade off, for example.
  • FIG. 11 depicts a block diagram of a machine in the example form of a processing system 1000 within which may be executed a set of instructions 1024 for causing the machine to perform any one or more of the methodologies discussed herein. In alternative embodiments, the machine operates as a standalone device or may be connected (e.g., networked) to other machines (e.g., in a cluster). In a networked deployment, the machine may operate in the capacity of a server or a client machine in a server-client network environment, or as a peer machine in a peer-to-peer (or distributed) network environment.
  • The machine is capable of executing a set of instructions 1024 (sequential or otherwise) that specify actions to be taken by that machine. Further, while only a single machine is illustrated, the term “machine” shall also be taken to include any collection of machines that individually or jointly execute a set (or multiple sets) of instructions to perform any one or more of the methodologies discussed herein.
  • The example of the processing system 1000 includes a processor 1002 (e.g., a central processing unit (CPU), a graphics processing unit (GPU), or both), a main memory 1004 (e.g , random access memory), and static memory 1006 (e.g., static random-access memory), which communicate with each other via bus 1008. The processing system 1000 may further include video display unit 1010 (e.g., a plasma display, a liquid crystal display (LCD), or a cathode ray tube (CRT)). The processing system 1000 also includes an alphanumeric input device 1012 (e.g., a keyboard), a user interface (UI) navigation device 1014 (e.g., a mouse), a disk drive unit 1016, a signal generation device 1018 (e.g., a speaker), and a network interface device 1020.
  • The disk drive unit 1016 (a type of non-volatile memory storage) includes a machine-readable medium 1022 on which is stored one or more sets of data structures and instructions 1024 (e.g., software) embodying or utilized by any one or more of the methodologies or functions described herein. The data structures and instructions 1024 may also reside, completely or at least partially, within the main memory 1004, the static memory 1006, and/or the processor 1002 during execution thereof by processing system 1000, with the main memory 1004, the static memory 1006, and the processor 1002 also constituting machine-readable, tangible media.
  • The data structures and instructions 1024 may further be transmitted or received over a computer network 1050 via network interface device 1020 utilizing any one of a number of well-known transfer protocols (e.g., Hypertext Transfer Protocol (HTTP)).
  • Certain embodiments are described herein as including logic or a number of components, modules, or mechanisms. Modules may constitute either software modules (e.g., code embodied on a machine-readable medium or in a transmission signal) or hardware modules. A hardware module is a tangible unit capable of performing certain operations and may be configured or arranged in a certain manner. In example embodiments, one or more computer systems (e.g., the processing system 1000) or one or more hardware modules of a computer system (e.g., a processor 1002 or a group of processors) may be configured by software (e.g., an application or application portion) as a hardware module that operates to perform certain operations as described herein.
  • In various embodiments, a hardware module may be implemented mechanically or electronically. For example, a hardware module may include dedicated circuitry or logic that is permanently configured (for example, as a special-purpose processor, such as a field-programmable gate array (FPGA) or an application-specific integrated circuit (ASIC)) to perform certain operations. A hardware module may also include programmable logic or circuitry (for example, as encompassed within a general-purpose processor 1002 or other programmable processor) that is temporarily configured by software to perform certain operations. It will be appreciated that the decision to implement a hardware module mechanically, in dedicated and permanently configured circuitry, or in temporarily configured circuitry (for example, configured by software) may be driven by cost and time considerations.
  • Accordingly, the term “hardware module” should be understood to encompass a tangible entity, be that an entity that is physically constructed, permanently configured (e.g., hardwired) or temporarily configured (e.g., programmed) to operate in a certain manner and/or to perform certain operations described herein. Considering embodiments in which hardware modules are temporarily configured (e.g., programmed), each of the hardware modules need not be configured or instantiated at any one instance in time. For example, where the hardware modules include a general-purpose processor 1002 that is configured using software, the general-purpose processor 1002 may be configured as respective different hardware modules at different times. Software may accordingly configure the processor 1002, for example, to constitute a particular hardware module at one instance of time and to constitute a different hardware module at a different instance of time.
  • Modules can provide information to, and receive information from, other modules. For example, the described modules may be regarded as being communicatively coupled. Where multiples of such hardware modules exist contemporaneously, communications may be achieved through signal transmissions (such as, for example, over appropriate circuits and buses that connect the modules). In embodiments in which multiple modules are configured or instantiated at different times, communications between such modules may be achieved, for example, through the storage and retrieval of information in memory structures to which the multiple modules have access. For example, one module may perform an operation and store the output of that operation in a memory device to which it is communicatively coupled. A further module may then, at a later time, access the memory device to retrieve and process the stored output. Modules may also initiate communications with input or output devices, and can operate on a resource (for example, a collection of information).
  • The various operations of example methods described herein may be performed, at least partially, by one or more processors 1002 that are temporarily configured (e.g., by software) or permanently configured to perform the relevant operations. Whether temporarily or permanently configured, such processors 1002 may constitute processor-implemented modules that operate to perform one or more operations or functions. The modules referred to herein may, in some example embodiments, include processor-implemented modules.
  • Similarly, the methods described herein may be at least partially processor-implemented. For example, at least some of the operations of a method may be performed by one or more processors 1002 or processor-implemented modules. The performance of certain of the operations may be distributed among the one or more processors 1002, not only residing within a single machine but deployed across a number of machines. In some example embodiments, the processors 1002 may be located in a single location (e.g., within a home environment, within an office environment, or as a server farm), while in other embodiments, the processors 1002 may be distributed across a number of locations.
  • FIG. 12 is a block diagram of an assumptions schema for the constrained computational system. The computing control system, which receives certain physical system sensing, simulates configurations, duty, assignments and schedules is outlined 1200 in a format to expand upon the data related to the control of the computing system with respect to the required specificity of control and the time constants for action. A second view 1300 will provide the logical control schema for the system computing.
  • An industrial system, such as a fleet of aircraft or an aircraft 1202 are comprised of subsystems such as its engines 1204 which in turn is comprised 1206 of subsystems such as components of the turbine 1208, for example combustors, stage 1 compressor blades, shrouds and other key components of the engine that most affect thermodynamic performance and asset availability and reliability. These components themselves may have subcomponents such as blades. A section of the engine 1208 is detailed 1210 with respect to specific bill of materials, serial numbers, manufacturing record, operating life configuration data such as what engine a given serial numbered part was flown in as a part of the engines from its original manufacture date to a first engine, to repair, to a second engine, to the next repair and so on. Related to those engine serial numbers (ESN), will be the actual realized flight data and quantitative damage. As the engine 1206 is operated, certain instrumented readings are communicated 1220 from the engine to a data store 1222 for processing in near real time and for longer cycle analysis.
  • Sensor data 1224 is time series in nature. Some engine component temperatures and pressures are not directly measured, but instead are reconciled using a model that represents the thermodynamic or operational physics of the industrial apparatus 1226. These models may be first principles in nature such as a heat balance or may be a surrogate model such as a neural net. The actual sensed data 1224 is used in conjunction with the model 1226 to determine what the non-directly sensed temperatures and pressures must be in order for the observed signals to be realized. Those calculated “virtual sensed” data 1228 is recorded for the purposes of physics based state estimation, for example, oxidation and degradation of a metal part at a certain temperature and atmospheric condition for a certain duration and load. The time steps of data acquisition or virtual sensing are configurable and are limited by communications rate 1220 or setting of the system, such as to record only changes in sensed values or to record at a time interval as a function of the rate of change of the sensed signals (record at shorter time differentials in the presence of dynamical transients). The record interval is set by the change in decision variable change which is meaningful for a given operation control change (where more precision or decision point sensitivity, more data at lower time intervals is needed). A heuristic may be used to set the data capture rates or a ROC with respect to a decision, as will be disclosed by 1300.
  • The ambient conditions that the assets and their subcomponents are exposed to are recorded 1230. For example, the temperatures and pressures that the engine and its parts have been exposed to. These data are used for duty cycle analysis 1250 and state change estimation.
  • Event data of actual realized observations and simulated future dispositions 1240 is recorded for the purposes of assumptions accuracy and for control point settings that the computing control provides. An example of a control point setting is one which is computed that optimizes one or more key process indicators, the optimized setting being computed from an enumeration of scenarios (apparatus design and operation) and replication of scenarios so as to determine the KPIs and confidence interval which is most robust to changing exogenous factors such as the weather at a given airport or airline schedule for a given set of assets.
  • The duty cycle of the physical assets 1250, in the presently disclosed control system are comprised of observed and simulated forward ambient conditions, settings such as thrust and calculated parameters such as efficiency and events. The assets whose states are being controlled by the disclosed computing control system are exposed to this historical single profile that was realized as well as scenarios and replications of those scenarios for future potential operations. A most optimal future will be selected. The configuration 1252 of what component and part serial numbers are in what engines at a point in time is used in conjunction with a duty cycle scenario by the simulator and optimizer 1255 to compute candidate future duty assignments, service scopes, parts needs, contract management, airline performance with respect to asset utilization and variable expense such as fuel. The optimization seeks to achieve the operating goals 1258 as set forth by the user of the computing control system and the solutions are limited by the constraints imposed 1260 such as capital expense, schedule fulfillment, regulations and repair or operations policy. The operations simulation model and the state estimation models are compared with the sensed 1254 data and variation from the expected level vs actual (A/E Ratio or A/E) and the rate of change of those A/E cause control logic to alarm a drift or error in one embodiment and in another embodiment, are used to specify specific inspections to make on specific assets so as to true up the forecasted states and models with actual results. In this way, the computing control system does not propagate error and learns.
  • Ultimately the system provides an assignment 1262 control point to which the actual physical world then implements and thus consumes life and variable costs such as fuel. The then future physical system response to the state control is compared, an error signal is derived and the system adapts to achieve the KPI goals for that point in time.
  • The computing control system may sense and derive operational optimization however, the computing time or computing resources may not be unlimited and thus, at times, a beneficial feature of the system is to match the time requirements and accuracy of the control action by dynamically managing the computing processes of the control system.
  • FIG. 13 is a block diagram of a constrained and unconstrained computational control system schema for estimation of thermodynamic performance and asset utilization. The system to manage time and specificity for the operational decision optimization 1300 is disclosed. Two modes of computation are enabled—an unconstrained 1302 method and a constrained mechanism 1310. An unconstrained compute of scenarios and their replication has no time or computing resource limits on attaining specificity in a confidence interval over one or more future times. A KPI threshold 1304 is met for a given time future 1306 by running scenarios and replications 1332 until the return on the next computed scenario provides no added analytical value. There are few actual operations that benefit from a marginal specificity past some point, in which the decision or control provided by the system would not change with that added accuracy.
  • A beneficial feature of example embodiments is to automatically control the number of scenarios and confidence intervals for the range of operational decisions to be effected over one or more time horizons. The constraints imposed by time to effect the control action from the current time so that states of assets of the industrial system or the KPIs those states influence can be caused to occur within the time interval needed to make the change in the system. For example—if a schedule of a fleet of aircraft must be changed so as to assign certain aircraft (and their engines) to certain routes so that certain wear or life consumption patterns occur that benefit aspects of the industrial system such as maintenance or fuel consumption, spares level or asset utilization occur—and the window of effecting those assignments is, for example, 17 minutes from the present, the control points must be computed by that time interval. Scenarios evaluated and/or the confidence intervals at one or more future times of the apparatus states or the KPI outcomes may be constrained.
  • Consider a Relative Operating Characteristic (Receiver Operating Characteristic) ROC curve which is building as compute cycles occur for the system simulation and optimization. At a present time “now” 1318, the desired performance threshold of the system 1322 has not yet been attained. The threshold system performance is adjustable 1322 by the computing control system or the analyst using it. Forward time estimates of the one or more KPIs have an upper value 1320 and lower value 1314 forecast at a given probability, and an expected value 1316 at time T1, T2 or another time 1318. The probability density function of the forecasts may or may not be a normal distribution, and, given the nature of the coupled dynamic system being controlled, uses a simulation based approach for forecasting. A confidence interval 1320 is derived for times t. Adjustable parameters 1324 of CI attainment, threshold ROC achieved and compute time duration from now from which the decision is required 1338 do control the number and granularity of the scenarios and their replications for a decision or control 1340.
  • The computing control algorithms and processor(s) 1332, 1256 feed the operation decision time required from current 1334 and confidence interval 1334 for given tirne(s) 1318 future. The ROC improvement is comparative to a base case 1360. The simulation and optimization 1332, 1256 computing result from candidate scenarios and replications 1358 whose confidence interval goal, current compute time for a scenario replication, and compute time estimate for a set of scenarios and replications is stored in memory 1356. Presented scenarios for a forecast interval are provided to the simulation and optimization engine 1322. These are conditional and may be specified by the control logic 1342, according to the probability of meeting specificity, time duration and threshold set points.
  • The available time from the current by which a control action is required 1334 is compared to the remaining compute time 1336 (which is set by the time to compute a scenario and replication 1356) is compared. The compute must converge on both threshold and confidence in this time interval 1352.
  • The rate of change of the KPI outcome and state estimation confidence interval 1344 must meet the remaining available tune 1352. A rate of change in CI 1346, derived by the change in KPI or state change rate 1310, is compared with the operational decision specificity 1348 for KPI outcomes such as fuel consumption and asset utilization assignment control. The rate of change of CI over the required CI 1350 is compared to the required convergence time 1352 and if adequate, additional scenarios and replications are released to the simulator- optimizer 1342, 1356. If the rate of thresholding is met 1322, 1310, then the compute resources are focused on reducing the CI 1320 at the specified time intervals 1318. Similarly, should the rate of threshold attainment not meet the convergence time allocated 1352, then replications are reduced and scenarios are evaluated instead. It can be appreciated that the sample durations and time steps of the simulation are similarly controlled.
  • Thus, in example embodiments, fuel consumption and asset lifting state changes are computed in response to a candidate duty cycle that differentially degrades engine performance according to those duty cycles. A flight schedule of an aircraft may be beneficially changed to reduce fuel costs and increase asset utilization associated with operating the aircraft, the recommendation based upon the disclosed computing state control system and comparisons of operations data collected from databases of multiple external computer systems corresponding to multiple fleets of aircraft associated with one or multiple customers. A computing control system beneficially simulates a set of physical apparatus through one or more time intervals and interacts with the service systems that interface with them, providing the historical duty cycles, routes, sensor signals, component and configuration identification, maintenance works cope, and other parameters of the system that result in enhanced operations for the owner or operator.
  • Operationally, in revenue service, it may be desirable to have a sufficient number of assets reliably available so that missions for which those assets exist to achieve can be fulfilled for the available demand. For example, it may be desirable for an airline to have sufficient aircraft available to serve its schedule. Yet these complicated industrial systems require maintenance and repair. And, in the case of machines with tight physical tolerances, high performance metals, a large number of parts and ancillary systems—maintenance and repair can require extensive shop activity with exacting and time consuming processes to bring complicated parts back into the desired physical state. For example, high performance metal parts may be cleaned, inspected and, if damage is found, either repaired or replaced. If these parts, which may be comprised of high performance alloys, do require repair, exacting and time consuming techniques may be used for metal addition, machining and testing. While these complex industrial systems are being maintained, they are not in service and spare assets must be used in order to keep the rest of the ecosystem in service. For example, spare engines can replace an engine being serviced. These spares may be capital intensive and thus may be limited in number for the enterprise to attain its profitability.
  • A beneficial aspect of the computing control system is to manage the states of the in-service and repair apparatuses that comprise the industrial systems such that a balance between available spare parts, subsystems, primary systems, and ecosystems is achieved.
  • The computing control system determines when its forecast error exceeds a threshold that is insufficient to schedule repair parts and achieve the financial objectives of the maintenance and repair operations or contracted, performance level in one or more time intervals. Upon detecting an indeterminate operating regime, specific physical inspections are identified that reduce the forecast error of asset damage in one or more time intervals. An example embodiment of this is depicted as control loops in FIG. 14 and FIG. 15.
  • The computing control system 1400 computes life consumption 1410 as a function of both 1402 actual past operating history 1404 and candidate future operations 1408. In the example embodiment of an aircraft engine asset as a component of an aircraft asset, the routes 1406 have city pairs, which, due to their different ambient conditions and characteristics of operations, such as the load, on the aircraft or length of runway or ability to do on-wing activities, thus create differential life consumption of the engine subsystems. For example a hot and sandy environment consumes more life than cooler airports with particulate free air and lower passenger and/or fuel loads or longer runways. The allocation of aircraft to routes 1405 can be made in such a way as to cause the wear or remaining life of the engine to take a certain duration with respect to other engines in a fleet in such a way as to change the service work scope 1412 at one or more points in time so that available capacity 1418 (as computed by a shop scheduling module) in the service operations can be slotted or reserved 1414. The lack of engine performance with respect to its efficiency as calculated by a fuel consumption model 1416 may also create the need for repair. Whether the repairs are for one or both of physical damage or thermodynamic efficiency the engines and their work scopes are evaluated 1414 singularly and amongst the other engines for assigning to a service opening or slot. Alternatively, to achieve a KPI such as having engine spares 1471, the work scopes 1412 may be modified so that shop network capacity 1418 is configured for a shorter repair turnaround time, stocking certain inventory 1420, 1422 to avoid delay and thus placing more engines into the spares pool.
  • Associated with a given work scope and shop slot are requisite repair parts and shop work station repair resources that must be consumed to affect a repair. On one extreme, with no inventory held in advance of the repair, a complicated and lengthy process of materials ordering would ensue and the engine would not be available for revenue service by nature of it being in the shop. On another extreme is holding every possible repair component such that, no matter the repair, parts are available and repair resources are at the ready, on demand. The former instance has a high opportunity cost for assets not being in service. The latter is expensive to support the inventory carrying value of. In example embodiments, the control system computes work scope, time, parts assignments in advance of the repair so as to balance out turnaround time and inventory carrying cost.
  • For each candidate engine and engine repair, an estimate of used serviceable spares 1422 and new materials 1420 is made. Typically a repaired part or used part is lower cost than a new part. For each time interval of potential service demand 1414, the inventory of used and new parts is assessed. A used part was once a new part 1424 which was exposed to operating service 1426 that in turn experienced repairs 1428. The level of available repaired parts 1422 is a decision choice in the control system. The state of the available repaired parts is likewise a choice. For example an unrepaired or refurbished part may be stocked or a fully restored part may be stocked. The parts selection 1430 is a function of the existing damage, contracted work scope and duty cycle between the current shop visit and a future shop visit. The amount of capital tied up in inventory, be it new or repaired, is compared to a limit 1432.
  • According to the parts required 1430, and subject to the carrying cost limits 1432, used parts and their state of repair requirements 1440 are made. Used parts may be stocked “as-is” or repaired 1442 so as to have a portfolio of materials that have been computed to be robust to the range of inbound work scopes 1412 for one or more time periods. The rationalization of that mix is achieved with a flexible repairs optimizer 1444 which balances the mix of states and their quantity with a carrying cost constraint. A common outcome is that used parts are repaired to a state suitable for most prospective duty cycles 1408, 1410 as the marginal cost of holding fewer, highly flexible parts is lower than holding an exactly matching portfolio of different states. The flexible repairs optimizer is run on an ongoing basis with changes in forecast confidence interval 1470 or parts selection changes 1430. The parts are placed into the most likely to be assigned repair operation 1446; said repair location being one location in a network of shops. The used parts are stocked for the proposed demand and if demand is satisfied, no new parts are required. If there are not sufficient used parts available, new parts 1420 are assigned. These new make parts 1433 are scheduled into the new make production system controller 1435. The calculation loop 1401 iterates until the lowest cost, feasible stocking mix is attained.
  • A conundrum for enterprises which operate expensive capital assets and those that service those assets may be balancing the number of in service units, spares and service shop inventory and capacity to reduce turnaround time (and thus reduce the number of operating spare assets). In example embodiments, the control system is able to optimally control the shop repair capacity for one or multiple intervals of time as a function of constraints and objectives related to cash forecast 1490, cash requirements 1492, financial ratios 1494, ready operating spares 1471, revenue service 1402 and confidence intervals related to life consumption 1470, which are actively controlled. Where the system computes a confidence interval broad enough 1400-1 as to make the assignment of repair parts, part type 1440, 1442. 1446, 1422, 1420, 1433 and capacity 1418, 1446 at one or more time intervals 1472 indeterminate or where the financial objectives or limits cannot be met, a targeted physical inspection 1452 is scheduled to establish the state of the assets in the system and their forecast accuracy.
  • As the computing control system causes the reduction of forecast confidence interval, other constraints may be activated by the system, such as the cash limits or objectives in the current 1492 or through time 1490. A useful benefit of the system is the capability to calculate free cash flows through time with replications and thus a financial ratio such as risk (variation in NPV from the replication) vs. return is calculable and may be used as a system objective to which the parts stocking and revenue asset count is controlled to attain. Other ratios 1494 may include return on equity, real option value of added service capacity or number of ready spare assets, the value of turn around time and inspection cost for precision improvement.
  • A method of computing the confidence interval begins with a realized and candidate revenue asset schedule 1402 that damage models 1410 estimate remaining life from and work scope models 1412 then estimate parts and repair requirements from. This can be thought of as the service demand 1413 to which the available repair capacity (parts, people and tooling) is scheduled against. The service capacity is computed as parts 1420, 1422 and physical capacity 1450. Physical capacity is the machinery needed to effect a specified repair. A candidate shop slot and work package 1434, which is a set of repairs and the parts required, is simulated against the repair network's prior scheduled demand 1418, 1414 to determine where the candidate asset can be scheduled or slotted 1450. The computing control system will iterate until the service demand is satisfied by the parts stocking and shop capacity, subject to constraints and goals such as financial risk and return preferences.
  • The computing system controls the state estimation accuracy of the models used in the scheduling optimizations. Once an engine is inducted into a shop for repairs, an inspection of the asset is made 1452 with, for example, dye penetrant, x-ray, eddie current, electronic tests, thermal performance tests—according to the determined work scope 1414 for that service event. A refinement in work scope is made 1454 with the results of the now extremely accurate state determination and the service assets are optimally assigned 1455. The actual states of the asset and its subsystems are compared to the expected 1456 inbound forecasted work scope 1434. The damage models 1410 are updated with learnings 1457 from the actual vs expected error so as to create a learning and adaptive system over time and many observations.
  • Upon detection of an actual vs expected error that is sufficient to make the work scope or parts stocking drive the financial variation 1490 above a threshold, such as a ratio of preferred risk vs return 1494, the computing system executes a fleet of asset stratification 1458 that clusters 1458 the assets according to their labeled descriptive attributes, last state determination and duty cycle and asset configuration so that similarly degrading assets are fitted into a cohort from which randomized inspections 1460 are made to determine state. As the inspection results no longer add precision to the state determination, the state estimate is inferred onto the other assets in the cohort 1462. The computing control orchestrates the clustering and inspection state inference on one or more cluster definitions which can be configured with labels such as city pairs, flight duration, operator, operating policy or any other such factor and the system will iterate on the stratification/clustering/inspect process 1460, 1403 through different cohorts until the rate of change of the confidence intervals 1470 with respect to the expected value diminishes and is reflected in objective satisfaction 1432, and decision support stability 1456, 1433, 1435, 1446, 1470, 1458 in one or multiple time horizons 1472.
  • State estimation 1410 forecast error 1456 will propagate 1400-1 in the computing control system such that part quantity and type, maintenance and repair operational capacity assignment, part production planning and state estimation cohort change with each replication of a simulation scenario that the system is computing. This error is detected at the actual vs. expected 1456 step and in the system's monitoring of the stocking and assignment decisions being controlled by the disclosed computing control. Upon detection, for each level of confidence 1474 for each time horizon 1472, inspections 1460 are called and the state estimations of other assets and their subsystems in like cohorts are updated 1462. The update 1462 may alternatively be in a shadow mode 1463, different than the primary state estimation 1410 and the asset assignments, stocking levels and work scopes may also likewise be in a shadow mode where the primary assignment is made with alternative possibilities derived from the shadow results.
  • Referring to FIG. 15, consider an example embodiment of an airline operation 1500 comprised of flying assets (aircraft and its engines) 1501 that are scheduled for revenue service and a network of one or more repair operations 1510 such as a service shop(s) with stocked repair components 1515, 1520 (which may also consume considerable capital) and machinery. A minimal turnaround time in the repair activity will increase the number of assets in revenue service or said differently, capital expense tied up in protective capacity may be avoided if the shop repair cycle is shorter. It is therefore desirable that the cycle time of repairs is low and that the cost to serve, such as the inventory carrying value ICV is also low.
  • A coupled dynamic business-physical system 1500 is thus formed, that if purposefully controlled, can optimally minimize the number of assets to serve the primary revenue demand service (aircraft and its engines scheduled to fly passengers), and stock the repair parts required for service so that delays are avoided waiting for components in the repair process, but minimize all other spare components and systems. As the accuracy of repair work scope increases, such as measured by the confidence interval 1535 for state estimation that leads to work scope and parts forecasting operational decisions, the coupled system approaches its entitlement with respect to primary assets, spare assets and repair components. The coupled system's limiting cycle times and ICV for repairs and the variation of scheduled, service with respect to life consumption theoretically limit the system's performance with respect to asset count.
  • In example embodiments, the control system optimally assigns repair assets such as parts 1510 to a given repair operation for the services of a fleet 1501, subject to capital constraints or cash flow or net income objectives 1505, to the limits of forecasting confidence intervals over one or more time horizons 1535—which the system is actively both controlling the accuracy of by virtue of physical state estimation inspections on certain assets that are then used to true up the confidence on other state estimation models and by assigning assets to duty cycles that consume life in such a way as to make the service event timing and work scope more certain so that the right repair parts and services can be scheduled, which thus lowers ICV and shop cost.
  • The computing control system has at least three control loops implemented in the example embodiment: a negative feedback loop computed 1525 to limit the rate of life consumption in a set of given in-service assets 1501 according to the pattern of work scope/parts requirements that may be constrained in their count by a limit in inventory as imposed by a financial constraint 1505; a second computed loop 1540 which feeds back the available work scopes that are possible for a given set of stocked repaired pans or shop costs, which may be limited by a capital constraint 1505 or physical availability of a part such as, from a production capacity limit, and a third loop is computed 1550 that increases the precision of damage estimation over one or more time horizons 1535 such that the assigned schedule of the revenue generating assets is met (or modified to meet) and the ICV limit vs repair parts on hand is satisfied. The simulation—optimization system is instructed to compute these loops at least as fast as a change in the revenue service physical states changes sufficient to change the repair parts stocking and shop capacity allocation.
  • An additional benefit is achieved by the disclosed to further reduce the capital consumption and relax the new-make production requirements of parts—such as when new part production processes are assigned to produce other components. The type of part which is stocked in one or more of the repair network locations may be a newly produced part 1520 or a restored used part 1515. For a restored used part, various levels of restoration may be specified by the disclosed system that span from “do nothing, just stock this used serviceable repair part” to specifying a specific set of repairs to said part.
  • The system computes the damage estimation 1502 from a given schedule assignment at given loads and exposures and operating policies 1501 and calculates the one or more work scopes 1503 for one or more removal dates for the one or more desired repaired physical states of a complete apparatus (e.g., an aircraft engine certified to have a certain thermodynamic performance and operating life until the next service event). Against that array of demand for service work scopes 1503 is a requisite level of parts required 1510 through time. The required parts are specified by a bill of material BOM designator. The states of the required parts, even though the same part number, may be one or more states (e.g., surface finish, tolerance, fatigue, repair type, etc.) and these stocking requirements may change over time when more than one time interval is considered in the optimization computation. Should the ICV and repair expense of a used serviceable spare 1515 part be less than the cost and ICV of a newly manufactured part 1520, and meet the requirements of the scheduled service 1501, the system assigns the repair of and stocking of a used spare. If the quantity of spare stock is not available, per the time horizon considered, a new part is scheduled. The parts 1515, 1520 schedule thus includes quantity, timing and state of repair and location such that financial constraints or objectives 1505 are met, at a given confidence interval 1535, for a one or more set of operating scenarios 1501.
  • The cash objective 1505 for one or more time periods can be, in one embodiment, the free cash flow of one or more of the stakeholders (e.g., service provider/shop, financial nsk holder/service contract, operating entity/airline). The capital structure for said stakeholder is reflected in their financial statements and a financial model computes the multiple period free cash flow of revenues and operating costs for the derivation of present value PV against which the costs of repair components are applied to calculate net present value NPV. One or more discount factors may be used. A marginal cost of capital discount may be used for the purposes of calculating a range of NPVs and the shift between scenarios of one or more decision choices calculated is used to calculate the real option value of the choice being considered. Or a traditional pro-forma NPV analysis is enabled. No matter the financial valuation technique deployed, which the present system enables the computation of, the dynamic links are accurately attained in the computing control system by the coupling of asset assignment, work scope, parts and confidence interval management.
  • A financial estimate of one or more periods may be accompanied by a confidence interval which is attained by computing replications of a given scenario with the computing control system. The span of the confidence interval may be so great at one or more time horizons that the system cannot converge on an optimal stocking schedule for parts. One source of the forecast error will be the state estimation models which compute life consumption for a given duty, the said duty being an actually flown route or a simulated future route, subject to one or more operating policies. In the case of a fleet of assets, such as an airline's fleet, there is a mix of flights that have been flown and a schedule for future operations and thus the state estimations for fuel efficiency and reliability are a mix of actually flown flights and simulated future flights. The system, when the confidence interval 1535 cannot discriminate the parts stocking assignments 1510, 1515, 1520, beneficially alerts the operationally responsible persons that the computing control system is in an indeterminate state and informs a schedule of on-wing/in-situ physical inspections into the operating fleet 1501 for the purposes of maximally decreasing the forecast error leading to high confidence intervals at the cause of the indeterminism of the computing control. The partial differential of confidence interval with respect to work scope change is in one example embodiment, the mechanism by which the targeted assets are identified to receive the physical inspection for the purposes of trueing up the actual physical state with the estimated state. The trued up state(s) are inferred to other assets which have experienced similar schedule assignments. The stratification of the in service assets is thus made by similarity to past or simulated future duty assignment for the purposes of reducing the confidence interval so that the assigned parts schedule is determined and the resulting cash flow variation (from simulated replications) is reduced.
  • In example embodiments, physical state estimation orchestrates control, which attains the specific configuration and inspection inputs for controlling the accuracy of simulation based state estimation in one or more future time intervals. Image, chemical, sensor and virtually sensed data is specified by the computing control system, using a physical state characterization model of the assets, subsystems and parts with an inspection system that organizes the requisite configuration, historical measures and past estimation results.
  • While the embodiments are described with reference to various implementations and exploitations, it will be understood that these embodiments are illustrative and that the scope of claims provided below is not limited to the embodiments described herein. In general, the techniques described herein may be implemented with facilities consistent with any hardware system or hardware systems defined herein. Many variations, modifications, additions, and improvements are possible.
  • Plural instances may be provided for components, operations, or structures described herein as a single instance. Finally, boundaries between various components, operations, and data stores are somewhat arbitrary, and particular operations are illustrated in the context of specific illustrative configurations. Other allocations of functionality are envisioned and may fall within the scope of the claims. In general, structures and functionality presented as separate components in the exemplary configurations may be implemented as a combined structure or component. Similarly, structures and functionality presented as a single component may be implemented as separate components. These and other variations, modifications, additions, and improvements fall within the scope of the claims and their equivalents.
  • This written description uses examples to disclose various embodiments, including the best mode thereof and also to enable any person skilled in the art to practice the embodiments, including making and using any devices or systems and performing any incorporated methods. The patentable scope of the embodiments is defined by the claims, and may include other examples that occur to those skilled in the art. Such other examples are intended to be within the scope of the claims if those examples include structural elements that do not differ from the literal language of the claims, or if the examples include equivalent structural elements with insubstantial differences from the literal language of the claims.

Claims (20)

What is claimed is:
1. A method comprising:
at a first set of computer systems, the first set of computer system deployed in an aircraft service provider cluster, the first set of computer systems communicatively coupled to a second set of computer systems, the second set of computer systems deployed in each of a plurality of aircraft services customer clusters, incorporating one or more optimization modules, the one or more optimization modules configuring one or more processors of the first set of computer systems to perform control operations, the control operations including:
collecting operations data pertaining to operations of one or more fleets of aircraft over a time period, the operations data stored in one or more databases of the second set of computer systems, the operations data including values corresponding to fields in the one or more databases, the fields representing at least one of policy data pertaining to one or more operations policies, flight schedule data pertaining to one or more flight schedules, and operating cost data pertaining to operating costs associated with the one or more fleets of aircraft;
deriving assumptions of control input values for use by the first set of computer systems based on the operations data;
performing a cost savings analysis with a simulation system for at least one aircraft of the one or more fleets of aircraft, the cost savings analysis including identifying a modification of at least one of the control input values;
computing an estimated reduction of operating costs for the aircraft over one or more time periods, the computing based on comparisons of a first subset of the operations data with a second subset of the operations data, the first subset of the operations data pertaining to the one aircraft and the second subset of the operations data pertaining to another aircraft in the one or more fleets of aircraft; and
providing the first set of computer systems with access to a recommendation pertaining to operation of the one aircraft, the recommendation including a specification of the modification.
2. The method of claim 1, wherein the one or more operations policies include a plurality of flight operations policies, the plurality of flight operations policies including a maximum percentage of engine thrust to be used at takeoff, climbing, or cruising for each aircraft in each fleet of aircraft, computed through simulated future time and replicated, said replications being at least one of a specified quantity of computing cycles through the simulated future events or set to replicate until such time as the rate of statistical confidence increases to a designated level.
3. The method of claim 2, wherein a computing capability of the first set of computer systems is dynamically allocated to more than one processor according to an estimate of attainment of a specific confidence so as to compute in a specified duration.
4. The method of claim 1, wherein the operating costs include at least one of fuel costs and maintenance costs and the cost savings analysis includes associating the one or more flight schedules and the one or more operations policies with the at least one of the fuel costs and maintenance costs, comparing said fuel and maintenance costs to one or more system control goals, and dynamically reducing or increasing a granularity of a simulated time step, an input assumption value, or a number of processors.
5. The method of claim 1, wherein the providing of the at least one of the aircraft customer computer systems with access to the recommendation is based on an aircraft service customer entering into a maintenance contract with an aircraft service provider with respect to maintenance of the one aircraft.
6. The method of claim 1, wherein the performing of the cost savings analysis further includes identifying the modification based on a reduction of maintenance costs for the aircraft over the time period.
7. The method of claim 5, wherein the maintenance costs include inventory costs to be borne solely by an aircraft services provider pursuant to a maintenance contract between the aircraft service provider and the aircraft service customer and the operations costs include costs that are to be borne solely by the aircraft service customer pursuant to the maintenance contract.
8. The method of claim 1, wherein the providing of the at least one of the aircraft service customer computer system with access to the recommendation does not include providing the aircraft service customer computer system with access to a subset of the operations data that was collected from fleets of aircraft for which the aircraft service customer does not have an ownership interest.
9. The method of claim 1, wherein:
the identifying of the modification includes calculating an estimated state of one or more subsystems of the one aircraft as a function of a subset of the operations data and a subset of maintenance data corresponding to the one aircraft over the time period; and
the recommendation pertains to changing at least one of a sequence of duty, a maintenance scope, or an operating policy to achieve a probability of a future state of the one or more subsystems.
10. A system comprising
a first set of computer systems, the first set of computer system deployed in an aircraft service provider cluster, the first set of computer systems communicatively coupled to a second set of computer systems, the second set of computer systems deployed in each of a plurality of aircraft services customer clusters, incorporating one or more optimization modules;
one or more optimization modules incorporated into the first set of computer systems, the one or more optimization modules configuring one or more processors of the first set of computer systems to perform control operations, the control operations including:
collecting operations data pertaining to operations of one or more fleets of aircraft over a time period, the operations data stored in one or more databases of the second set of computer systems, the operations data including values corresponding to fields in the one or more databases, the fields representing at least one of policy data pertaining to one or more operations policies, flight schedule data pertaining to one or more flight schedules, and operating cost data pertaining to operating costs associated with the one or more fleets of aircraft;
deriving assumptions of control input values for use by the first set of computer systems based on the operations data;
performing a cost savings analysis with a simulation system for at least one aircraft of the one or more fleets of aircraft, the cost savings analysis including identifying a modification of at least one of the control input values;
computing an estimated reduction of operating costs for the aircraft over one or more time periods, the computing based on comparisons of a first subset of the operations data with a second subset of the operations data, the first subset of the operations data pertaining to the one aircraft and the second subset of the operations data pertaining to another aircraft in the one or more fleets of aircraft, and
providing the first set of computer systems with access to a recommendation pertaining to operation of the one aircraft, the recommendation including a specification of the modification.
11. The system of claim 10, wherein the one or more operations policies include a plurality of flight operations policies, the plurality of flight operations policies including a maximum percentage of engine thrust to be used at takeoff, climbing, or cruising for each aircraft in each fleet of aircraft, computed through simulated future time and replicated, said replications being at least one of a specified quantity of computing cycles through the simulated future events or set to replicate until such time as the rate of statistical confidence increases to a designated level.
12. The system of claim 11, wherein a computing capability of the first set of computer systems is dynamically allocated to more than one processor according to an estimate of attainment of a specific confidence so as to compute in a specified duration.
13. The system of claim 10, wherein the operating costs include at least one of fuel costs and maintenance costs and the cost savings analysis includes associating the one or more flight schedules and the one or more operations policies with the at least one of the fuel costs and maintenance costs, comparing said fuel and maintenance costs to one or more system control goals, and dynamically reducing or increasing a granularity of a simulated time step, an input assumption value, or a number of processors.
14. The system of claim 10, wherein the providing of the at least one of the aircraft customer computer systems with access to the recommendation is based on an aircraft service customer entering into a maintenance contract with an aircraft service provider with respect to maintenance of the one aircraft.
15. The system of claim 10, wherein the performing of the cost savings analysis further includes identifying the modification based on a reduction of maintenance costs for the aircraft over the time period.
16. The system of claim 15, wherein the maintenance costs include inventory costs to be borne solely by an aircraft services provider pursuant to a maintenance contract between the aircraft service provider and the aircraft service customer and the operations costs include costs that are to be borne solely by the aircraft service customer pursuant to the maintenance contract.
17. The system of claim 10, wherein the providing of the at least one of the aircraft service customer computer system with access to the recommendation does not include providing the aircraft service customer computer system with access to a subset of the operations data that was collected from fleets of aircraft for which the aircraft service customer does not have an ownership interest.
18. The system of claim 10, wherein:
the identifying of the modification includes calculating an estimated state of one or more subsystems of the one aircraft as a function of a subset of the operations data and a subset of maintenance data corresponding to the one aircraft over the time period; and
the recommendation pertains to changing at least one of a sequence of duty, a maintenance scope, or an operating policy to achieve a probability of a future state of the one or more subsystems.
19. A non-transitory machine readable medium embodying a set of instructions that, when executed by one or more processors, cause the processors to perform operations, the operations comprising:
collecting operations data a first set of computer systems, the operations data pertaining to operations of one or more fleets of aircraft over a time period, the operations data stored in one or more databases of a second set of computer systems, the operations data stored in one or more databases of a second set of computer systems, the operations data including values corresponding to fields in the one or more databases, the fields representing at least one of policy data pertaining to one or more operations policies, flight schedule data pertaining to one or more flight schedules, and operating cost data pertaining to operating costs associated with the one or more fleets of aircraft;
deriving assumptions of control input values for use by the first set of computer systems based on the operations data;
performing a cost savings analysis with a simulation system for at least one aircraft of the one or more fleets of aircraft, the cost savings analysis including identifying a modification of at least one of the control input values;
computing an estimated reduction of operating costs for the aircraft over one or more time periods, the computing based on comparisons of a first subset of the operations data with a second subset of the operations data, the first subset of the operations data pertaining to the one aircraft and the second subset of the operations data pertaining to another aircraft in the one or more fleets of aircraft; and
providing the first set of computer systems with access to a recommendation pertaining to operation of the one aircraft, the recommendation including a specification of the modification.
20. The non-transitory machine readable medium of claim 19, wherein:
the identifying of the modification includes calculating an estimated state of one or more subsystems of the one aircraft as a function of a subset of the operations data and a subset of maintenance data corresponding to the one aircraft over the time period; and
the recommendation pertains to changing at least one of a sequence of duty, a maintenance scope, or an operating policy to achieve a probability of a future state of the one or more subsystems.
US15/346,585 2016-05-06 2016-11-08 Constrained time computing control system to simulate and optimize aircraft operations with dynamic thermodynamic state and asset utilization attainment Abandoned US20170323239A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US15/346,585 US20170323239A1 (en) 2016-05-06 2016-11-08 Constrained time computing control system to simulate and optimize aircraft operations with dynamic thermodynamic state and asset utilization attainment

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201662333097P 2016-05-06 2016-05-06
US15/346,585 US20170323239A1 (en) 2016-05-06 2016-11-08 Constrained time computing control system to simulate and optimize aircraft operations with dynamic thermodynamic state and asset utilization attainment

Publications (1)

Publication Number Publication Date
US20170323239A1 true US20170323239A1 (en) 2017-11-09

Family

ID=60242552

Family Applications (4)

Application Number Title Priority Date Filing Date
US15/346,605 Active 2037-07-22 US10318904B2 (en) 2016-05-06 2016-11-08 Computing system to control the use of physical state attainment of assets to meet temporal performance criteria
US15/346,595 Active 2037-07-26 US10318903B2 (en) 2016-05-06 2016-11-08 Constrained cash computing system to optimally schedule aircraft repair capacity with closed loop dynamic physical state and asset utilization attainment control
US15/346,585 Abandoned US20170323239A1 (en) 2016-05-06 2016-11-08 Constrained time computing control system to simulate and optimize aircraft operations with dynamic thermodynamic state and asset utilization attainment
US15/346,610 Abandoned US20170323240A1 (en) 2016-05-06 2016-11-08 Computing system to control the use of physical state attainment with inspection

Family Applications Before (2)

Application Number Title Priority Date Filing Date
US15/346,605 Active 2037-07-22 US10318904B2 (en) 2016-05-06 2016-11-08 Computing system to control the use of physical state attainment of assets to meet temporal performance criteria
US15/346,595 Active 2037-07-26 US10318903B2 (en) 2016-05-06 2016-11-08 Constrained cash computing system to optimally schedule aircraft repair capacity with closed loop dynamic physical state and asset utilization attainment control

Family Applications After (1)

Application Number Title Priority Date Filing Date
US15/346,610 Abandoned US20170323240A1 (en) 2016-05-06 2016-11-08 Computing system to control the use of physical state attainment with inspection

Country Status (1)

Country Link
US (4) US10318904B2 (en)

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180300971A1 (en) * 2017-03-10 2018-10-18 Qt Technologies Electronic aircraft data capture for refueling
US10318904B2 (en) 2016-05-06 2019-06-11 General Electric Company Computing system to control the use of physical state attainment of assets to meet temporal performance criteria
CN111352352A (en) * 2018-12-21 2020-06-30 Abb瑞士股份有限公司 Method and system for determining system settings of an industrial system
US10902163B2 (en) * 2015-09-07 2021-01-26 Shoreline As Simulation method and system
US10935964B2 (en) 2018-12-04 2021-03-02 General Electric Company Method and system for optimizing a manufacturing process based on a surrogate model of a part
WO2021007421A3 (en) * 2019-07-10 2021-04-01 Vibrant Corporation Digital twin model inversion for testing
US10974851B2 (en) 2018-11-09 2021-04-13 Textron Innovations Inc. System and method for maintaining and configuring rotorcraft
US11074532B1 (en) * 2017-11-06 2021-07-27 Wells Fargo Bank, N.A. Monitoring and analyzing risk data and risk dispositions
US11074819B2 (en) 2019-04-02 2021-07-27 Honeywell International Inc. Method and system for enabling computations to estimate and predict costs with a cost index by an operating cost app with an operating cost integrator interface for displaying gate to gate flight costs
US11151512B2 (en) 2018-12-14 2021-10-19 The Boeing Company Interlocking blockchains for aircraft part history and current aircraft configuration
WO2021211957A1 (en) * 2020-04-16 2021-10-21 QuantumID Technologies Inc Artificial intelligence system for estimating excess non-sapient payload capacity on mixed-payload aeronautic excursions
CN113625666A (en) * 2020-05-08 2021-11-09 通用电气公司 Operation optimization distribution control system with coupled subsystem model and digital twinning
CN114223002A (en) * 2019-08-07 2022-03-22 普雷科格奈兹公司 Method and system for improving asset operation based on identifying significant changes in sensor combinations in related events
US11308431B2 (en) * 2020-07-07 2022-04-19 Intuit Inc. Hierarchical optimization for processing objectives sequentially and/or iteratively
US11315369B2 (en) 2018-03-23 2022-04-26 The Boeing Company Blockchain configuration history for vehicle maintenance, modification, and activity tracking
US11403554B2 (en) * 2018-01-31 2022-08-02 The Johns Hopkins University Method and apparatus for providing efficient testing of systems by using artificial intelligence tools
US11410058B2 (en) 2019-03-29 2022-08-09 QuantumiD Technologies Inc. Artificial intelligence system for estimating excess non-sapient payload capacity on mixed-payload aeronautic excursions
US20220383757A1 (en) * 2019-03-29 2022-12-01 QuantumiD Technologies Inc. Artificial intelligence system for estimating excess non-sapient payload capacity on mixed-payload aeronautic excursions
US11567481B2 (en) 2019-06-14 2023-01-31 General Electric Company Additive manufacturing-coupled digital twin ecosystem based on multi-variant distribution model of performance
US20230099025A1 (en) * 2021-09-30 2023-03-30 Abb Power Grids Switzerland Ag Resource-constrained, multi-period scheduling model for asset investment planning
US11631060B2 (en) 2019-06-14 2023-04-18 General Electric Company Additive manufacturing-coupled digital twin ecosystem based on a surrogate model of measurement
US11636412B2 (en) 2020-01-24 2023-04-25 General Electric Company System and method for prognostic analytics of an asset
EP4235537A1 (en) * 2022-02-24 2023-08-30 Honeywell International Inc. Customized asset performance optimization and marketplace
US20230297930A1 (en) * 2022-03-21 2023-09-21 Infosys Limited Method and system for building actionable knowledge based intelligent enterprise system
CN116993329A (en) * 2023-09-27 2023-11-03 深圳百沃彰世科技有限公司 Communication equipment operation maintenance decision management system based on data analysis
US20230359963A1 (en) * 2022-05-05 2023-11-09 The Boeing Company Validation of cost-optimal minimum turn times
US11921872B2 (en) 2020-12-16 2024-03-05 International Business Machines Corporation Access control for a data object including data with different access requirements
US12039494B2 (en) 2021-03-22 2024-07-16 International Business Machines Corporation Glue-contracts for digital corollaries in blockchain networks
US12118627B2 (en) 2016-05-20 2024-10-15 Moog Inc. Secure and traceable manufactured parts

Families Citing this family (97)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200348662A1 (en) * 2016-05-09 2020-11-05 Strong Force Iot Portfolio 2016, Llc Platform for facilitating development of intelligence in an industrial internet of things system
US10692035B2 (en) * 2016-07-26 2020-06-23 Mitchell Repair Information Company, Llc Methods and systems for tracking labor efficiency
JP6622156B2 (en) * 2016-08-24 2019-12-18 株式会社東芝 Information processing apparatus, information processing method, and program
US10540619B2 (en) * 2016-10-31 2020-01-21 Aryzta, Llc System and method for resource-aware pastry customization
CN108454879B (en) * 2016-12-12 2022-08-02 中国国际航空股份有限公司 Airplane fault processing system and method and computer equipment
US11132633B2 (en) * 2016-12-16 2021-09-28 Conduent Business Services, Llc Method and system for controlling key performance indicator parameters of a transportation system
US10726388B2 (en) * 2017-02-09 2020-07-28 Accenture Global Solutions Limited Component tracking method and system
US11994833B2 (en) 2017-02-10 2024-05-28 Johnson Controls Technology Company Building smart entity system with agent based data ingestion and entity creation using time series data
US20190095518A1 (en) * 2017-09-27 2019-03-28 Johnson Controls Technology Company Web services for smart entity creation and maintenance using time series data
US10781763B2 (en) * 2017-04-27 2020-09-22 Ge Global Sourcing Llc Vehicle control system
US20180336579A1 (en) * 2017-05-18 2018-11-22 Microsoft Technology Licensing, Llc Systems and methods for scheduling datacenter buildouts
US11169507B2 (en) 2017-06-08 2021-11-09 Rockwell Automation Technologies, Inc. Scalable industrial analytics platform
US11333578B2 (en) * 2017-09-19 2022-05-17 Raytheon Technologies Corporation Method for online service policy tracking using optimal asset controller
US10776530B2 (en) * 2017-10-19 2020-09-15 The Boeing Company Methods and apparatus to generate an aircraft system model using a standardized architecture
US10949813B2 (en) * 2017-11-10 2021-03-16 General Electric Company Methods and apparatus to generate an asset workscope operation
US10796018B2 (en) * 2017-11-10 2020-10-06 General Electric Company Methods and apparatus to generate an optimized workscope
US11334854B2 (en) * 2017-11-10 2022-05-17 General Electric Company Systems and methods to generate an asset workscope
CN107992526B (en) * 2017-11-10 2021-03-23 广州虎牙信息科技有限公司 Anchor recommendation method, storage device and computer device
US11354615B2 (en) 2017-11-21 2022-06-07 International Business Machines Corporation Blockchain-implemented digital agreement management for digital twin assets
US11676098B2 (en) * 2017-11-21 2023-06-13 International Business Machines Corporation Digital twin management in IoT systems
US11348120B2 (en) 2017-11-21 2022-05-31 International Business Machines Corporation Digital agreement management on digital twin ownership change
KR102149529B1 (en) * 2017-12-12 2020-08-31 한국전자통신연구원 Industrial communication system and method
DE102017222964A1 (en) * 2017-12-15 2019-06-19 Zf Friedrichshafen Ag Method and system for damage detection of a component
JP6971331B2 (en) * 2018-01-23 2021-11-24 株式会社Nttドコモ Information processing equipment and information processing method
US10822112B2 (en) * 2018-02-14 2020-11-03 General Electric Company Slope-based event detection for turbine engines
US20190266682A1 (en) * 2018-02-27 2019-08-29 United States Of America As Represented By The Secretary Of The Army Calculating value of inspection information
RU2699056C1 (en) * 2018-03-20 2019-09-03 Федеральное государственное казенное военное образовательное учреждение высшего образования "Военная академия войсковой противовоздушной обороны Вооруженных Сил Российской Федерации имени Маршала Советского Союза А.М. Василевского" Министерства обороны Российской Федерации Method of providing reliability of computer systems with different redundancy architectures
CN108460536A (en) * 2018-03-22 2018-08-28 惠州市倍思特尔精密模具有限公司 A kind of data statistics system of machine tooling
CN110516892A (en) * 2018-05-21 2019-11-29 红塔烟草(集团)有限责任公司 A kind of spare part life cycle statistical method based on the twin body of apparatus figure
US11755791B2 (en) * 2018-07-03 2023-09-12 Rtx Corporation Aircraft component qualification system and process
CN109064252B (en) * 2018-07-05 2022-02-25 上海大学 Method and system for determining address and service relation model in capacity variable environment
CN108960669B (en) * 2018-07-18 2021-07-06 北京航空航天大学 Reliability degradation-oriented equipment maintenance and process control combined strategy optimization method
US20210255157A1 (en) * 2018-07-20 2021-08-19 Schlumberger Technology Corporation Optimized multi-stage intermittent fugitive emission detection
US20200042919A1 (en) * 2018-08-03 2020-02-06 The Boeing Company Aircraft component demand forecasting
EP3617824B1 (en) * 2018-08-28 2023-11-01 Siemens Aktiengesellschaft System, apparatus and method of managing an asset using an asset model
US20200125078A1 (en) * 2018-10-19 2020-04-23 General Electric Company Method and system for engineer-to-order planning and materials flow control and optimization
US11397134B2 (en) * 2018-12-03 2022-07-26 Raytheon Technologies Corporation Intelligent learning device for part state detection and identification
US10928809B2 (en) 2018-12-04 2021-02-23 General Electric Company As-designed, as-manufactured, as-tested, as-operated and as-serviced coupled digital twin ecosystem
US20200192989A1 (en) * 2018-12-18 2020-06-18 Loon Llc Large scale simulator for airborne objects
JP7051724B2 (en) * 2019-01-21 2022-04-11 株式会社日立製作所 How to present useful information to achieve the purpose of the computer system and the target.
WO2020159468A1 (en) * 2019-01-28 2020-08-06 Siemens Aktiengesellschaft Sensitivity and risk analysis of digital twin
US11403541B2 (en) * 2019-02-14 2022-08-02 Rockwell Automation Technologies, Inc. AI extensions and intelligent model validation for an industrial digital twin
CN109919332B (en) * 2019-02-27 2023-07-07 威海众成信息科技股份有限公司 Management method for making engine maintenance decision according to cost economic point
EP3938930A4 (en) * 2019-03-15 2023-01-11 3M Innovative Properties Company Determining causal models for controlling environments
US11447271B2 (en) * 2019-04-05 2022-09-20 Raytheon Technologies Corporation Aircraft component repair scheduling system and process
CN110046963A (en) * 2019-04-12 2019-07-23 携程旅游网络技术(上海)有限公司 The recommended method and recommender system of related product based on air ticket order
US11086298B2 (en) 2019-04-15 2021-08-10 Rockwell Automation Technologies, Inc. Smart gateway platform for industrial internet of things
CN109933035A (en) * 2019-04-24 2019-06-25 中国科学院重庆绿色智能技术研究院 A kind of production line control system, method and the production system twin based on number
US11367157B2 (en) * 2019-06-04 2022-06-21 The Boeing Company Aircraft dispatch reliability rate
CN113906387A (en) * 2019-06-07 2022-01-07 日本电信电话株式会社 Digital twin operation device, digital twin operation method, program, and data structure
EP3757703A1 (en) * 2019-06-27 2020-12-30 Siemens Aktiengesellschaft System, apparatus and method of condition based management of one or more electro-mechanical systems
CN110309979A (en) * 2019-07-09 2019-10-08 南方电网科学研究院有限责任公司 Power load prediction method, device and equipment based on echo state network
US10839621B1 (en) * 2019-07-24 2020-11-17 Toyota Motor Engineering & Manufacturing North America, Inc. Altering a vehicle based on driving pattern comparison
EP3796109A1 (en) * 2019-09-18 2021-03-24 Siemens Aktiengesellschaft System, apparatus and method for predicting attributes of an asset
CN110782550B (en) * 2019-09-20 2021-08-31 腾讯科技(深圳)有限公司 Data acquisition method, device and equipment
US12093158B2 (en) 2019-09-30 2024-09-17 International Business Machines Corporation Digital twin maturation tracking
US11435726B2 (en) 2019-09-30 2022-09-06 Rockwell Automation Technologies, Inc. Contextualization of industrial data at the device level
US11841699B2 (en) 2019-09-30 2023-12-12 Rockwell Automation Technologies, Inc. Artificial intelligence channel for industrial automation
US11119882B2 (en) 2019-10-09 2021-09-14 International Business Machines Corporation Digital twin workflow simulation
US11379921B1 (en) 2019-10-24 2022-07-05 Cigna Intellectual Property, Inc. System and interface for developing and processing simulations of modeled medical contracts
US20210133670A1 (en) * 2019-11-05 2021-05-06 Strong Force Vcn Portfolio 2019, Llc Control tower and enterprise management platform with a machine learning/artificial intelligence managing sensor and the camera feeds into digital twin
US12061845B2 (en) 2019-11-11 2024-08-13 Rockwell Automation Technologies, Inc. Creation of a digital twin from a mechanical model
US11318616B2 (en) 2019-11-11 2022-05-03 Rockwell Automation Technologies, Inc. Robotic digital twin control with industrial context simulation
FR3103210B1 (en) * 2019-11-14 2021-12-03 Safran Aircraft Engines Device and method for managing a fleet of information communication devices for updating a digital twin of a turbomachine
US11249462B2 (en) 2020-01-06 2022-02-15 Rockwell Automation Technologies, Inc. Industrial data services platform
WO2021160260A1 (en) 2020-02-12 2021-08-19 Swiss Reinsurance Company Ltd. Digital platform using cyber-physical twin structures providing an evolving digital representation of a risk-related real world asset for quantifying risk measurements, and method thereof
US11526159B2 (en) 2020-02-14 2022-12-13 Rockwell Automation Technologies, Inc. Augmented reality human machine interface testing
US11238417B2 (en) * 2020-02-28 2022-02-01 The Boeing Company Adjusting maintenance intervals for individual platforms based on observable conditions
KR20230007422A (en) * 2020-04-28 2023-01-12 스트롱 포스 티피 포트폴리오 2022, 엘엘씨 Digital twin systems and methods for transportation systems
WO2021222439A1 (en) * 2020-04-28 2021-11-04 Rex Peter L Smart service routing using machine learning
JP7437235B2 (en) * 2020-05-25 2024-02-22 株式会社日立製作所 Plan coordination device and plan coordination method
US11726459B2 (en) 2020-06-18 2023-08-15 Rockwell Automation Technologies, Inc. Industrial automation control program generation from computer-aided design
EP4176398A4 (en) * 2020-07-06 2024-06-26 Purdue Research Foundation Material dataflow extraction and simulation system
US11675936B2 (en) * 2020-09-28 2023-06-13 Rockwell Automation Technologies, Inc. Unifying multiple simulation models
CN112287484B (en) * 2020-10-29 2021-12-07 复旦大学 Complex engineering system reliability design method based on vector agent model
US12021997B2 (en) * 2020-12-18 2024-06-25 VeriTX Corp. Blockchain tokenization of aircraft and other complex machinery
US20220198404A1 (en) * 2020-12-23 2022-06-23 International Business Machines Corporation Asset health score based on digital twin resources
US12056671B2 (en) * 2020-12-29 2024-08-06 VisualK Method for calculating a maintenance asset health index (MAHI) for industrial equipment
CN112668905B (en) * 2020-12-31 2022-10-25 广东电网有限责任公司广州供电局 Multi-parameter power distribution cable health state evaluation method and device, computer equipment and storage medium
US11635060B2 (en) * 2021-01-20 2023-04-25 General Electric Company System for operating a wind turbine using cumulative load histograms based on actual operation thereof
US11893523B2 (en) 2021-01-20 2024-02-06 Ge Aviation Systems Llc Methods and systems for generating holistic airline schedule recovery solutions accounting for operations, crew, and passengers
US20220253768A1 (en) * 2021-02-09 2022-08-11 Simmonds Precision Products, Inc. Method for improving the operational availability of an aircraft fleet
JP7516298B2 (en) * 2021-03-15 2024-07-16 株式会社日立製作所 Work risk assessment system, model creation device, work risk assessment method, and work risk assessment program
US12034755B2 (en) * 2021-03-18 2024-07-09 International Business Machines Corporation Computationally assessing and remediating security threats
US12087107B2 (en) * 2021-04-08 2024-09-10 Eaton Intelligent Power Limited Aircraft ground refueling management system
US20220396376A1 (en) * 2021-06-11 2022-12-15 Rockwell Collins, Inc. Aircraft selection for dispatch optimizer
US11694570B2 (en) 2021-06-16 2023-07-04 Beta Air, Llc Methods and systems for simulated operation of an electric vertical take-off and landing (EVTOL) aircraft
WO2023023042A1 (en) * 2021-08-17 2023-02-23 Honeywell International Inc. Real-time generation of digital twins based on input data captured by user device
CN113408764B (en) * 2021-08-17 2023-01-13 能科科技股份有限公司 Product online technical state management and control system based on digital twins
CN114186738A (en) * 2021-12-10 2022-03-15 北京百度网讯科技有限公司 Fault early warning method and device, electronic equipment and storage medium
US20230260055A1 (en) * 2022-02-16 2023-08-17 International Business Machines Corporation Artificial intelligence enabled air quality control
US11995577B2 (en) * 2022-03-03 2024-05-28 Caterpillar Inc. System and method for estimating a machine's potential usage, profitability, and cost of ownership based on machine's value and mechanical state
WO2023191767A1 (en) * 2022-03-28 2023-10-05 Hitachi America, Ltd. Method for optimized decision recommendation for operations in asset recovery
US12039362B2 (en) * 2022-05-17 2024-07-16 Nvidia Corporation Processing interrupt requests for autonomous systems and applications
CN115331488B (en) * 2022-10-13 2022-12-27 湖南省通用航空发展有限公司 Data processing method of general aircraft
US20240280946A1 (en) * 2023-02-22 2024-08-22 Geminus.AI, Inc. Fast surrogate-based optimization
US12009660B1 (en) 2023-07-11 2024-06-11 T-Mobile Usa, Inc. Predicting space, power, and cooling capacity of a facility to optimize energy usage

Family Cites Families (1082)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1002565A (en) 1908-07-25 1911-09-05 William C Coryell Reinforcing-bar for concrete and similar structures.
US1004958A (en) 1909-06-08 1911-10-03 Cornelius John Allen Mop-wringer.
US1000922A (en) 1910-10-18 1911-08-15 Max Kiblbeck Shaft-governor.
US3823898A (en) 1968-12-09 1974-07-16 K Eickmann Hydraulically controlled fluidstream-driven aircraft
US3911438A (en) 1966-08-31 1975-10-07 Us Navy Proximity sensing device
GB1227424A (en) 1968-03-14 1971-04-07
US3609750A (en) 1968-05-13 1971-09-28 Sperry Rand Corp Gas discharge bearing distance heading indicator
SE331427B (en) 1968-06-19 1970-12-21 Saab Scania Ab
US3598215A (en) 1968-08-28 1971-08-10 Garrett Corp Inflatable escape slide
US3572611A (en) 1968-11-22 1971-03-30 Robert F Oulton Sea-going vessels with separable modules
US3589379A (en) 1969-02-17 1971-06-29 Mc Donnell Douglas Corp Inlet duct
US3614401A (en) 1969-04-01 1971-10-19 Rosemount Eng Co Ltd Redundant system
US3612837A (en) 1969-04-30 1971-10-12 Bendix Corp Aircraft strike assurance system
US3589651A (en) 1969-06-09 1971-06-29 Gulf & Western Ind Prod Co Aircraft arresting device
US3559929A (en) 1969-06-10 1971-02-02 David B Lindsay Jr Ordnance actuation controls within the range of vision of a pilot looking forward from a cockpit
US3916410A (en) 1969-06-16 1975-10-28 Albert A Elwood Method of and system for locating a position
US3981464A (en) 1969-08-18 1976-09-21 Richard M. Tracey Airport terminal
US4486850A (en) 1974-11-11 1984-12-04 Hyatt Gilbert P Incremental digital filter
US3686639A (en) 1969-12-11 1972-08-22 Modicon Corp Digital computer-industrial controller system and apparatus
US3656163A (en) 1970-01-06 1972-04-11 William C Rogers Antenna tensioning unit
US3679956A (en) 1970-02-02 1972-07-25 Ltv Electrosystems Inc Multiple servomotor actuator
US3779129A (en) 1970-03-03 1973-12-18 M Lauro Electrical monitoring and management system for airborne ordnance
US3617020A (en) 1970-04-27 1971-11-02 Boeing Co Vibration control system
US3670464A (en) 1970-05-06 1972-06-20 Robert C Cutter Aircraft hangars
US3692238A (en) 1970-07-30 1972-09-19 George M Boyd Navigation aid
US3713159A (en) 1970-08-14 1973-01-23 Itt Aircraft landing systems
US3714651A (en) 1970-08-14 1973-01-30 Itt Non cooperative collision avoidance system
US3757337A (en) 1970-09-11 1973-09-04 G Litchford Aircraft instrument landing system
US3739376A (en) 1970-10-12 1973-06-12 Trodyne Corp Remote monitor and indicating system
US3679157A (en) 1970-10-16 1972-07-25 Us Navy Aircrew recovery system
US3768427A (en) 1970-10-30 1973-10-30 R Stephens Icebreaker oil tankers
US3707270A (en) 1970-11-30 1972-12-26 Blh Electronics Wear sleeve-transducer combination for aircraft landing gear
US3680230A (en) 1970-12-14 1972-08-01 Philip H Thompson Practice device
US3738597A (en) 1971-01-04 1973-06-12 Textron Inc Aircraft undercarriage
US3691987A (en) 1971-01-14 1972-09-19 Sperry Rand Corp Indicator mechanism for navigation instruments
US3674987A (en) 1971-06-16 1972-07-04 Nunzio P Addabbo Aircraft navigational calculator
US3771747A (en) 1971-07-01 1973-11-13 L Mednikow Aircraft-landing strip device
US3746279A (en) 1971-08-02 1973-07-17 United Aircraft Corp Multi lift aircraft control system
US3810689A (en) 1971-08-23 1974-05-14 Polaroid Corp Device for varying light transmission employing roller-cable mechanism
US3833138A (en) 1971-08-27 1974-09-03 C Dean Means and method for storing aircraft
US3793662A (en) 1972-03-01 1974-02-26 Foremark Corp Aircraft loading bridge
US3790938A (en) 1972-05-25 1974-02-05 Cygned Inc Moving target indicator system and apparatus
US3830951A (en) 1972-06-28 1974-08-20 M Rumstein Traffic controller training aid
GB1443333A (en) 1972-08-12 1976-07-21 Mtu Muenchen Gmbh Aircraft having apparatus for augmenting the lift of the aircraft
US3781888A (en) 1972-10-30 1973-12-25 Narco Scientific Ind Digital distance ranging system
US3819135A (en) 1972-12-15 1974-06-25 Bendix Corp System for augmenting aircraft attitude stability using vertical vane type sensors
US3906643A (en) 1972-12-19 1975-09-23 L D M Inc VOR instruction device
US3921146A (en) 1973-01-05 1975-11-18 Gen Electric Programmable data processor and controller system
US3858172A (en) 1973-03-05 1974-12-31 R Henry Altitude detecting instrument
US3897861A (en) 1973-08-13 1975-08-05 Garrett Corp Inflatable evacuation slide intermediate release system
US3906308A (en) 1973-09-27 1975-09-16 Mc Donnell Douglas Corp Aircraft lightning protection system
US3950058A (en) 1973-11-05 1976-04-13 Lockheed Aircraft Corporation Programmable wiring system and junction box for use therein
US3860921A (en) 1973-11-15 1975-01-14 Nasa Simultaneous acquisition of tracking data from two stations
US3997131A (en) 1973-12-12 1976-12-14 Alberto Kling Rotor means for an aircraft
US3917193A (en) 1974-01-21 1975-11-04 Boeing Co Boundary layer control and anti-icing apparatus for an aircraft wing
US3885761A (en) 1974-03-05 1975-05-27 Jet Research Center Aircraft emergency egress system
US3935754A (en) 1974-06-14 1976-02-03 The Boeing Company Failure detector and indicator for aircraft flap actuation system
US4326263A (en) 1974-07-03 1982-04-20 General Electric Company Method and apparatus for controlling a plurality of like equipments
GB1523887A (en) 1974-10-22 1978-09-06 Basov N G Aircraft take-off and landing system and method for using same
US3958107A (en) 1974-12-09 1976-05-18 Edelson Andrew C Fuel management computer
US4018422A (en) 1975-09-09 1977-04-19 Lindsey Manufacturing Company Bundle conductor stringing block with rotary threading gate
US4259658A (en) 1975-10-15 1981-03-31 Basov Nikolai G Aircraft carrier take-off and landing system and method for using same
US4392338A (en) 1976-03-15 1983-07-12 Molins Limited Packets and the manufacture thereof
US5488372A (en) 1976-04-09 1996-01-30 Fischer; Kenneth E. Electronic avoidance configurations
US4137531A (en) 1976-05-13 1979-01-30 Plessey Handel Und Investments Ag Radar selective interrogation system
US4137062A (en) 1976-12-20 1979-01-30 Great Circle Associates Filtration with a compostable filter medium
JPS5845750B2 (en) 1976-12-29 1983-10-12 ロ−レルバンクマシン株式会社 Coin counting machine error handling method
DE2713997C2 (en) 1977-03-30 1986-05-28 Wilhelm Hegenscheidt Gmbh, 5140 Erkelenz Tool carriers for wheel set lathes
US4413140A (en) 1977-04-26 1983-11-01 Phillips Petroleum Company Liquid extraction of diacetoxybutane with halogenated paraffins
US4322651A (en) 1977-05-09 1982-03-30 Murata Manufacturing Co., Ltd. Acoustic surface wave device
AU499558B1 (en) 1977-06-18 1979-04-26 Fuji Dia Co. Ltd. Diamond tool manufacture
JPS5440537A (en) 1977-09-07 1979-03-30 Hitachi Ltd Pipeline control system
US4259035A (en) 1977-09-13 1981-03-31 Sperry Corporation Agricultural bale accumulator
JPS5451342A (en) 1977-09-29 1979-04-23 Nec Corp Channel device for real-time signal processing
US4529017A (en) 1982-08-21 1985-07-16 Kabushiki Kaisha Toyoda Jidoshokki Seisakusho Apparatus for measuring the length of weft yarn for a loom
US4247066A (en) 1978-02-21 1981-01-27 General Dynamics Corporation Airfoil variable cambering device and method
AT363120B (en) 1978-03-03 1981-07-10 Voest Alpine Ag ROAD ROLLER
US4565244A (en) 1978-03-27 1986-01-21 Peerless Of America, Inc. Tubular articles of manufacture and method of making same
DE2911909C2 (en) 1978-03-29 1984-03-15 British Broadcasting Corp., London Digital data processing device
US4212440A (en) 1978-05-01 1980-07-15 Ferris Carlisle K Camouflaged and deceptive distorted vehicle and method of assembling such vehicles
JPS54145546A (en) 1978-05-08 1979-11-13 Ricoh Co Ltd Control system of electrophotographic copier
DE2919166C2 (en) 1978-05-12 1986-01-02 Nippon Electric Co., Ltd., Tokio/Tokyo Storage device
JPS5756318Y2 (en) 1978-05-15 1982-12-03
JPS54155128A (en) 1978-05-29 1979-12-06 Nippon Steel Corp Hot dipping apparatus
US4305093A (en) 1978-06-22 1981-12-08 International Electronic Photo Process Laboratory Co., Ltd. Method of producing multiple images in a scanning apparatus
US4284847A (en) 1978-06-30 1981-08-18 Richard Besserman Audiometric testing, analyzing, and recording apparatus and method
FR2431060A1 (en) 1978-07-13 1980-02-08 Itw De France WATERPROOF AND REUSABLE FIXING PART
US4262703A (en) 1978-08-08 1981-04-21 Custom Cable Company Impact resistant control line
US4330177A (en) 1978-09-27 1982-05-18 Wilson Sales Company, Inc. Curtain for shrouding welding operations
US4259930A (en) 1978-11-22 1981-04-07 Volkswagenwerk Aktiengesellschaft Device for starting a stationary unit
FR2443283A1 (en) 1978-12-08 1980-07-04 Degremont PROCESS FOR IMPROVING THE TREATMENT OF FLUIDS CONTAINING SUSPENSION PARTICLES ON BEDS OF GRANULAR MATERIALS FOR THE REMOVAL OF CLOGGING
US4300628A (en) 1978-12-18 1981-11-17 Mccord Corporation Heat exchanger assembly
US4332068A (en) 1978-12-18 1982-06-01 Mccord Corporation Heat exchanger assembly
FR2445629A1 (en) 1978-12-27 1980-07-25 Thomson Csf COMMON ANTENNA FOR PRIMARY RADAR AND SECONDARY RADAR
US4296897A (en) 1979-01-22 1981-10-27 The Boeing Company Brake torque limiter
US4264788A (en) 1979-01-31 1981-04-28 Princo Instruments, Inc. Damped ultrasonic detection unit
US4263911A (en) 1979-02-08 1981-04-28 Emergency Medical Devices, Inc. Hand actuated medical suction apparatus
DE2914411A1 (en) 1979-04-10 1980-10-16 Audi Nsu Auto Union Ag DEVICE FOR MEASURING THE BRAKE TIME OF A MOTOR VEHICLE WITH ANTI-BLOCKING DEVICE
US4521114A (en) 1979-05-11 1985-06-04 Tre Semiconductor Equipment Corporation Single lens repeater
FR2457521B1 (en) 1979-05-23 1985-12-27 Thomson Csf MULTIPROCESSOR SIGNAL PROCESSING SYSTEM
US4332032A (en) 1979-05-24 1982-05-25 Lockheed Corporation Adaptive hybrid antenna system
JPS55161785A (en) 1979-05-31 1980-12-16 Asahi Malleable Iron Co Ltd Speed shifter for sheet winch
JPS55162167A (en) 1979-06-05 1980-12-17 Canon Inc Electronic program computer
US4295643A (en) 1979-06-13 1981-10-20 Vega Alejandro J De Apparatus and method for handling jackets of printed matter
US4259838A (en) 1979-06-26 1981-04-07 Rockwell International Corporation Throttle tracking in multiengine aircraft
US4274096A (en) 1979-07-09 1981-06-16 Dennison Terry A Aircraft proximity monitoring system
US4294122A (en) 1979-07-12 1981-10-13 General Dynamics Corporation Fastener incorporating ultrasonic transducer
US4279248A (en) 1979-07-20 1981-07-21 Shlomo Gabbay Sternum closure device and procedure for using same
JPS5617401A (en) 1979-07-23 1981-02-19 Omron Tateisi Electronics Co Sequence controller
US4364309A (en) 1979-07-30 1982-12-21 Gorbatov Vasily M Sausage production line
US4261486A (en) 1979-08-06 1981-04-14 Sunbeam Plastics Corporation One-piece dispensing closure with lid hold-open feature
US4293920A (en) 1979-09-04 1981-10-06 Merola Pasquale A Two-dimensional transform processor
FR2465328A1 (en) 1979-09-07 1981-03-20 Thomson Csf AIR FOR PRIMARY RADAR AND SECONDARY RADAR
US4297869A (en) 1979-09-10 1981-11-03 U.S. Industries, Inc. Apparatus for fabricating pulley rims
US4316921A (en) 1979-10-04 1982-02-23 The United States Of America As Represented By The United States Department Of Energy High temperature lubricating process
FR2469015A1 (en) 1979-10-26 1981-05-08 Thomson Csf RADAR ANTENNA COMPRISING ELEMENTS RADIATING A PSEUDO-OMNIDIRECTIONAL DIAGRAM
US5579011A (en) 1979-11-02 1996-11-26 Grumman Aerospace Corporation Simultaneous triple aperture radar
US4298177A (en) 1979-11-09 1981-11-03 Berlongieri John J Aircraft safety apparatus
US4441377A (en) 1979-12-05 1984-04-10 International Paper Company Linkage for actuating a carton erecting apparatus
US4331435A (en) 1979-12-05 1982-05-25 International Paper Company Method and apparatus for erecting a carton
US4254439A (en) 1979-12-26 1981-03-03 International Business Machines Corporation Facsimile mid-page restart
JPS5692567A (en) 1979-12-27 1981-07-27 Nippon Musical Instruments Mfg Electronic musical instrument
US4317177A (en) 1980-01-14 1982-02-23 Martin P. Miller Power priority control system for aircraft and test apparatus therefor
US4296281A (en) 1980-01-28 1981-10-20 Northern Telecom Limited Static, solid state originating register compatible with an electromechanical telephone cross-bar switching system
US4566831A (en) 1980-02-01 1986-01-28 Andersen Corporation Shock absorbent dunnage device
US4371925A (en) 1980-02-11 1983-02-01 Data General Corporation Data processing system having unique bus control operation
US4293932A (en) 1980-02-11 1981-10-06 Texas Instruments Incorporated Refresh operations for semiconductor memory
US4252300A (en) 1980-02-19 1981-02-24 Prab Conveyors, Inc. Burner control system
US4358907A (en) 1980-03-12 1982-11-16 Moreau Claude R M Compact manufacturing system for forming soft goods mainly toys
ZA811931B (en) 1980-03-31 1982-05-26 African Oxygen Ltd Process and apparatus for the separation of gaseous mixture
US4354345A (en) 1980-04-29 1982-10-19 United Technologies Corporation Fuel heating system for gas turbine engine
US4477895A (en) 1980-05-02 1984-10-16 Harris Corporation Synchronized protection switching arrangement
US4325990A (en) 1980-05-12 1982-04-20 Macdermid Incorporated Electroless copper deposition solutions with hypophosphite reducing agent
US4457387A (en) 1980-05-19 1984-07-03 Vickers, Incorporated Hydraulic steering system for full-track vehicles
JPS5723110A (en) 1980-07-18 1982-02-06 Hitachi Ltd Sequence controller
US4419448A (en) 1980-08-21 1983-12-06 Process Engineering Company Sa Continuous fermentation in series of main vessels with auxiliary vessel provided
CA1139466A (en) 1980-08-22 1983-01-11 Donald R. Weir Removal of arsenic from aqueous solutions
US4327713A (en) 1980-09-24 1982-05-04 Kabushikigaisha Omco Multi therapeutic device for use in dynamic therapy
US4408834A (en) 1980-10-27 1983-10-11 Miller Charles G Curtain for shrouding welding operations
US4359319A (en) 1980-10-27 1982-11-16 Loral Corporation Visual instruction systems for printed circuit boards
US4331834A (en) 1980-10-29 1982-05-25 Siemens Corporation Modular telecommunication system
US4561817A (en) 1980-10-30 1985-12-31 Gerber Products Company Retort crate loader and unloader
US4554545A (en) 1980-10-30 1985-11-19 Mcdonnell Douglas Corporation Conformal head-up display
US4436470A (en) 1980-10-30 1984-03-13 Gerber Products Company Retort crate loader and unloader
US4440361A (en) 1980-11-18 1984-04-03 Mcgann Rodney Aircraft structure
US4407562A (en) 1980-11-24 1983-10-04 Bell Telephone Laboratories, Incorporated Optical fiber switch
US4531925A (en) 1981-01-08 1985-07-30 Moreau Claude R M Compact manufacturing system for forming soft goods, mainly toys
FR2497958A1 (en) 1981-01-09 1982-07-16 Thomson Csf DEVICE FOR DETERMINING THE PULSE ARRIVAL TIME, USE IN DISTANCE MEASURING EQUIPMENT AND MEASURING EQUIPMENT COMPRISING SUCH A DEVICE
US4399505A (en) 1981-02-06 1983-08-16 Data General Corporaton External microcode operation in a multi-level microprocessor
US4424017A (en) 1981-02-13 1984-01-03 Hitachi Shipbuilding & Engineering Company Limited System and method for burning liquefied gases
US4631823A (en) 1981-02-19 1986-12-30 Burndy Corporation Electrical harness manufacturing method and apparatus
JPS57141709A (en) 1981-02-27 1982-09-02 Nissan Motor Co Ltd Operation processor for sequence controller
US4346869A (en) 1981-03-12 1982-08-31 Macneill Robert L Tube clamp
DE3209085C2 (en) 1981-03-17 1986-03-27 Canon K.K., Tokio/Tokyo Paper feed mechanism
US4399517A (en) 1981-03-19 1983-08-16 Texas Instruments Incorporated Multiple-input binary adder
US4415044A (en) 1981-04-09 1983-11-15 Westinghouse Electric Corp. Weatherproof terminal cover
EP0063010B1 (en) 1981-04-15 1985-08-21 Imperial Chemical Industries Plc Determining valve position
FR2504670A1 (en) 1981-04-23 1982-10-29 Lacroix E HIGH POWER PYROTECHNIC LIGHTING
US4406485A (en) 1981-04-27 1983-09-27 Arrowhead Continental Tubular connector
IT1142775B (en) 1981-05-22 1986-10-15 Alitalia Spa HYDRO-PNEUMATIC POSITIONER FOR THE CHANGE OF WING AIRCRAFT ENGINES TO SIMILAR
US4627656A (en) 1981-08-26 1986-12-09 Mazda Motor Corporation Seat for automobile
JPS6056648B2 (en) 1981-09-01 1985-12-11 マツダ株式会社 car seat
US4548025A (en) 1981-10-09 1985-10-22 Heisler Raymond A Tray erecting apparatus with adjusting capability
US4371095A (en) 1981-11-02 1983-02-01 Sunbeam Plastics Corporation One-piece child resistant closure
JPS5884305A (en) 1981-11-12 1983-05-20 Mitsubishi Electric Corp Simulation device
FR2519430A1 (en) 1981-12-31 1983-07-08 Thomson Csf HYPERFREQUENCY LANDING SYSTEM WITH PROTECTION AGAINST INTERFERENCE
JPS58105672A (en) 1981-12-17 1983-06-23 Fuji Photo Film Co Ltd Semiconductor image pickup device
US4480894A (en) 1982-01-20 1984-11-06 Wilson Sales Co., Inc. Curtain for shrouding welding operations
US4464120A (en) 1982-02-05 1984-08-07 Kaj Jensen Simulator systems for interactive simulation of complex dynamic systems
DE3205228C2 (en) 1982-02-13 1999-04-01 Bosch Gmbh Robert Multi-circuit pressure medium brake system
FR2521716B1 (en) 1982-02-17 1987-01-02 Lacroix E Tous Artifices MULTI-LOAD ELECTROMAGNETIC LURE LAUNCHER CARTRIDGE
JPS58144985A (en) 1982-02-23 1983-08-29 Kawai Musical Instr Mfg Co Ltd Card operation indicator for magnetic card device
US4463355A (en) 1982-02-26 1984-07-31 Rockwell International Corporation Solid state mach/air speed indicator
US4482805A (en) 1982-03-15 1984-11-13 General Dynamics, Pomona Division Fiber optic matrix multiplier
GB2122973B (en) 1982-04-22 1986-04-09 Fuji Xerox Co Ltd Sheet supplying device for two-sided copying
US4456830A (en) 1982-04-22 1984-06-26 Lockheed Corporation AC Motor-starting for aircraft engines using APU free turbine driven generators
US4480211A (en) 1982-05-10 1984-10-30 Federal Signal Corporation Flash lamp and circuitry for use with an incandescent light
US4484272A (en) 1982-07-14 1984-11-20 Burroughs Corporation Digital computer for executing multiple instruction sets in a simultaneous-interleaved fashion
US4580234A (en) 1982-08-02 1986-04-01 Nippon Business Consultant Co., Ltd. Measurement system of enhanced reliability
US4622632A (en) 1982-08-18 1986-11-11 Board Of Regents, University Of Washington Data processing system having a pyramidal array of processors
US4507656A (en) 1982-09-13 1985-03-26 Rockwell International Corporation Character/vector controller for stroke written CRT displays
FR2532910A1 (en) 1982-09-13 1984-03-16 Aerospatiale DEVICES FOR MANEUVERING HELICOPTERS ON THE BRIDGE OF A SHIP
FR2533127A1 (en) 1982-09-17 1984-03-23 Cavex France Sarl AUTOMATIC DENTAL MIXER OF DENTAL AMALGAMES
US4425499A (en) 1982-09-23 1984-01-10 Wisconsin Electric Power Co. Decision tree graphical computer
US4532330A (en) 1982-09-30 1985-07-30 Great Lakes Chemical Corporation Process for producing densified halogenated dimethylhydantoins
US4461077A (en) 1982-10-04 1984-07-24 General Electric Ceramics, Inc. Method for preparing ceramic articles having raised, selectively metallized electrical contact points
AT376401B (en) 1982-10-20 1984-11-26 Semperit Ag VEHICLE AIR TIRE WITH A RADIAL CARCASE, METHOD FOR THE PRODUCTION OF SUCH A TIRE AND METHOD AND DEVICE FOR THE PRODUCTION OF A TIRE PART FOR SUCH A TIRE
US4509777A (en) 1982-11-01 1985-04-09 Dril-Quip Inc. Weld-on casing connector
JPS59121691A (en) 1982-12-01 1984-07-13 Fujitsu Ltd Dynamic type semiconductor storage device
FR2537347B1 (en) 1982-12-03 1985-09-27 Trt Telecom Radio Electr DUAL DIRECTIVE ANTENNA FOR THIN STRUCTURE MICROWAVE
JPH07118159B2 (en) 1982-12-06 1995-12-18 ソニー株式会社 PCM signal recording method
JPS6029863B2 (en) 1982-12-10 1985-07-12 工業技術院長 solar heat utilization plant
JPS59132492A (en) 1982-12-22 1984-07-30 Fujitsu Ltd Semiconductor storage device
FR2538354B1 (en) 1982-12-22 1987-10-02 Manurhin VEHICLE FOR HANDLING PARTS, PARTICULARLY CONTINUOUS; METHOD AND DEVICE IMPLEMENTING IT FOR THE INSERTION OF A PART INTO A HOUSING OF AN OBJECT
US4517698A (en) 1983-01-05 1985-05-21 Lamp L Thomas A Cargo handling ramp
US4474701A (en) 1983-03-10 1984-10-02 Veb Jenapharm Jena Process for the separation of 4-androsten-3,17-dione and 1,4-androstadien-3,17-dione
US4575757A (en) 1983-04-22 1986-03-11 Rca Corporation PAL offset generator
FR2545312B1 (en) 1983-04-29 1986-05-30 Thomson Csf ELECTRONIC COMPONENT FIXING SUPPORT PIN FOR PRINTED CIRCUIT AND SUPPORT COMPRISING SUCH SPOTS
US4502279A (en) 1983-05-09 1985-03-05 General Motors Corporation Torque converter attachment and method
US4524485A (en) 1983-05-27 1985-06-25 The Boeing Company Hinge structure with controlled translation of hinge axis
JPS59226391A (en) 1983-06-08 1984-12-19 ヤマハ株式会社 Electronic musical apparatus
US4524665A (en) 1983-06-17 1985-06-25 The Marmon Group, Inc. Dynamic controller for sampling channels in an electronic organ having multiplexed keying
FR2549321B1 (en) 1983-06-21 1986-04-11 Thomson Csf METHOD FOR INCREASING THE RANGE, AND IN PARTICULAR PROTECTION AGAINST INTERFERENCE, OF AN MLS TYPE LANDING ASSISTANCE SYSTEM, AND DEVICES FOR IMPLEMENTING SUCH A METHOD
US4510689A (en) 1983-06-23 1985-04-16 Modern Machine And Grinding, Inc. Side trimmer knife
CH663336A5 (en) 1983-07-05 1987-12-15 Schneider & Co Ag W BOX.
US4534538A (en) 1983-07-08 1985-08-13 The United States Of America As Represented By The Secretary Of The Air Force Modular air shut-off valve
US4559110A (en) 1983-07-11 1985-12-17 The Dow Chemical Company Acetophenone recovery and purification
US4518135A (en) 1983-08-05 1985-05-21 Minnesota Mining And Manufacturing Company Slack limiter for a magnetic tape cassette
US4621333A (en) 1983-08-31 1986-11-04 Mitsubishi Denki Kabushiki Kaisha Method and apparatus for controlling a robot to perform weaving-like motion
US4528057A (en) 1983-09-08 1985-07-09 The Taylor-Winfield Corporation Adhesive spot curing press and method for metallic parts
US4500948A (en) 1983-10-07 1985-02-19 Gte Products Corporation One-piece frame for an electric lamp
FR2554210B1 (en) 1983-11-02 1986-01-24 Aerospatiale FLEXIBLE BEAM WITH HIGH ENERGY ABSORPTION, AND LANDING GEARS AND REAR STAND OF AERODYNE EQUIPPED WITH SUCH A POWDER
US4675823A (en) 1983-12-09 1987-06-23 Sundstrand Data Control, Inc. Ground proximity warning system geographic area determination
JPS60167069A (en) 1984-02-09 1985-08-30 Omron Tateisi Electronics Co Pattern recognizer
US4935885A (en) 1984-02-10 1990-06-19 Aldis Consultants Inc. Method and apparatus for determining weight and center of gravity of a vehicle
US4664155A (en) 1984-03-23 1987-05-12 The Boeing Company Apparatus for centralized pressurization and depressurization of aircraft hydraulic reservoirs
US4580982A (en) 1984-06-07 1986-04-08 Ruppert Robert W Ejection seat simulator
US4627085A (en) 1984-06-29 1986-12-02 Applied Micro Circuits Corporation Flip-flop control circuit
US4736910A (en) 1984-08-10 1988-04-12 Flight Concepts Limited Partnership Aircraft with interchangeable fuselage
US4555777A (en) 1984-08-14 1985-11-26 Texas Instruments Incorporated Sense amplifier circuit for dynamic read/write memory
JPS6174963A (en) 1984-09-17 1986-04-17 Daikin Mfg Co Ltd Power transmission equipped with torque converter
JPS6194295A (en) 1984-10-16 1986-05-13 Fujitsu Ltd Semiconductor memory
US4674711A (en) 1984-11-21 1987-06-23 Gulf & Western Manufacturing Company Portable aircraft arresting apparatus
FR2574946B1 (en) 1984-12-14 1987-01-30 Thomson Csf METHOD FOR RADIOELECTRIC SYNCHRONIZATION OF SLAVE STATIONS BY A MASTER STATION, PARTICULARLY FOR AN MLS LANDING ASSISTANCE SYSTEM, AND DEVICES FOR IMPLEMENTING SUCH A METHOD
US4623774A (en) 1984-12-17 1986-11-18 Sciaky Bros., Inc. Method and apparatus for the welding of a ball and rod assembly
US4579009A (en) 1984-12-21 1986-04-01 Maplehurst Ova Transplants, Inc. Coupling for use with micromanipulator
US4613102A (en) 1985-02-21 1986-09-23 The B. F. Goodrich Company Pneumatic deicers with template
US4657228A (en) 1985-02-25 1987-04-14 Lautzenhiser John L Gas-actuated shock absorber for aircraft
FR2579308B1 (en) 1985-03-21 1989-07-21 Valeo FLUID BOX FOR HEAT EXCHANGER, PARTICULARLY FOR A MOTOR VEHICLE, AND ITS QUICK CONNECTION DEVICE TO A FLUID CIRCUIT
JPS61221626A (en) 1985-03-27 1986-10-02 Suga Shikenki Kk Color comparing and displaying method
US4628380A (en) 1985-04-17 1986-12-09 Computer Memories, Inc. Encoder output phase selection system for magnetic disk memory
US4579159A (en) 1985-04-25 1986-04-01 Champion International Corporation Apparatus for peeling small logs
US4632347A (en) 1985-05-03 1986-12-30 Donald Jurgich Holder for kitchen utensils and complementing stand
US4608782A (en) 1985-05-17 1986-09-02 The Gillette Company Method and apparatus for sharpening razor blades
US5563601A (en) 1985-08-16 1996-10-08 Northrop Grumman Corporation. Two-port synthetic aperature radar system for radar detection of targets
US4723732A (en) 1985-09-12 1988-02-09 The Boeing Company Movable seating system for aircraft
US4787042A (en) 1985-11-18 1988-11-22 Rockwell International Corporation Limiting aircraft vertical acceleration response
US5233252A (en) 1985-11-20 1993-08-03 Allied-Signal Motor having integral detent
EP0225112B1 (en) 1985-11-27 1992-08-12 AT&T Corp. Optical logic element
JPS62149458A (en) 1985-12-24 1987-07-03 Tokyo Electric Co Ltd Dot matrix printer
US4789259A (en) 1986-01-13 1988-12-06 Canon Kabushiki Kaisha Cut sheet feed apparatus
JPS62192820A (en) 1986-02-20 1987-08-24 Mitsubishi Electric Corp Man-machine interface control system
US4882702A (en) 1986-03-31 1989-11-21 Allen-Bradley Company, Inc. Programmable controller with I/O expansion module located in one of I/O module positions for communication with outside I/O modules
DE3714928C2 (en) 1986-05-07 1995-08-17 Mitsubishi Electric Corp Heat exchanger
US4855722A (en) 1986-08-01 1989-08-08 Intersil, Inc. Alternating current power loss detector
US4839573A (en) 1986-08-18 1989-06-13 Wise William L Method and apparatus for feedback control loop bandwidth and phase margin regulation
US4779181A (en) 1986-08-18 1988-10-18 Almond Instruments Company, Inc. Multiphase low harmonic distortion transformer
US4765776A (en) 1986-11-17 1988-08-23 Mcdermott Incorporated Convertible barge
JPS63148315A (en) 1986-12-12 1988-06-21 Fanuc Ltd Servo motor controller
US4860097A (en) 1986-12-13 1989-08-22 Deutsche Thomson-Brandt Gmbh Transformation circuit
US4908767A (en) 1987-01-16 1990-03-13 Valentine Research, Inc. Acceleration measuring system
US4829596A (en) 1987-02-09 1989-05-09 Allen-Bradley Company, Inc. Programmable controller with fiber optic input/output module
US4826106A (en) 1987-02-18 1989-05-02 Grumman Aerospace Corporation Advanced composite aircraft cowl
IT1206265B (en) 1987-02-27 1989-04-14 Texas Instruments Italia Spa DOUBLE DOOR RAM MEMORY COMPLEX WITH USER-BASED VARIABLE ORGANIZATION
USH500H (en) 1987-02-27 1988-08-02 The United States Of America As Represented By The Secretary Of The Air Force Exhaust nozzle flap assembly
FR2611953B1 (en) 1987-02-27 1989-05-05 Smh Alcatel ELECTRONIC POSTAGE MACHINE WITH OPERATING MODE SELECTION
JPS63217763A (en) 1987-03-06 1988-09-09 Hitachi Ltd Optical printer
JPS63220334A (en) 1987-03-10 1988-09-13 Sharp Corp Data processor
US4811793A (en) 1987-04-03 1989-03-14 Oddvin Lokken Fire damage control system for aircraft
US4765404A (en) 1987-04-13 1988-08-23 Drilex Systems, Inc. Whipstock packer assembly
US5406488A (en) 1987-05-06 1995-04-11 The Secretary Of State For Defence In Her Britannic Majesty's Government Of The United Kingdom Of Great Britain And Northern Ireland Correction of errors in autopilots
GB2304249B (en) 1987-05-21 1997-06-18 Gec Avionics Continous wave radar altimeter
EP0383761A1 (en) 1987-06-05 1990-08-29 The Secretary of State for Defence in Her Britannic Majesty's Government of the United Kingdom of Great Britain and Method and apparatus for processing synthetic aperture aerial signals
GB2206452B (en) 1987-06-23 1991-01-09 Burr Brown Ltd Printed circuit board topography for high speed intelligent industrial controller
US4827248A (en) 1987-06-30 1989-05-02 The Boeing Company Proximity sensor with automatic gap control
US4809334A (en) 1987-07-09 1989-02-28 Communications Satellite Corporation Method for detection and correction of errors in speech pitch period estimates
JPS6421788A (en) 1987-07-16 1989-01-25 Nec Corp Semiconductor memory device
FR2619441B1 (en) 1987-08-14 1993-05-07 Thomson Brandt Armements HIGH PERFORATION ANTIPISTE BOMB
DE3885883D1 (en) 1987-09-16 1994-01-05 Deutsche Aerospace DEVICE FOR SETPOINT CONTROL AND / OR STABILIZATION OF MOVABLE BODIES WITH STORED TWIST.
AU602996B2 (en) 1987-10-23 1990-11-01 Mitsubishi Jukogyo Kabushiki Kaisha Control systems of an industrial robot
US4802355A (en) 1987-10-29 1989-02-07 Nelson Ezell Flange-forming tool
GB2212468B (en) 1987-11-20 1992-06-10 Sony Corp Automatic assembly apparatus
US4811172A (en) 1987-11-23 1989-03-07 General Electric Company Lighting systems employing optical fibers
USRE34318E (en) 1987-11-23 1993-07-20 General Electric Company Lighting systems employing optical fibers
US4873210A (en) 1987-12-02 1989-10-10 Gte Products Corporation Sialon containing high content of alpha prime phase
JPH01166632A (en) 1987-12-22 1989-06-30 Mitsubishi Electric Corp Method and circuit for digital signal decoding
US5123615A (en) 1988-02-03 1992-06-23 Indal Technologies Inc. System and components useful in landing airborne craft
JP2524512B2 (en) 1988-02-10 1996-08-14 富士写真フイルム株式会社 Image reading method
US4792192A (en) 1988-02-11 1988-12-20 The Boeing Company Automatic brake source select system
US4870347A (en) 1988-02-22 1989-09-26 Arnold Cicerone Universal master breakout unit for testing avionic systems
JP2751186B2 (en) 1988-03-15 1998-05-18 日本電気株式会社 Digital-to-analog conversion circuit
JP2771172B2 (en) 1988-04-01 1998-07-02 日本電気株式会社 Vertical field-effect transistor
GB2222937B (en) 1988-04-05 1991-11-20 Israel Aircraft Ind Ltd Integrated energy-attenuating vehicle passenger seat
US4913000A (en) 1988-04-13 1990-04-03 Honeywell Inc. Three and four degree of freedom hand controllers
US5015188A (en) 1988-05-03 1991-05-14 The United States Of America As Represented By The Secretary Of The Air Force Three dimensional tactical element situation (3DTES) display
GB8810538D0 (en) 1988-05-04 1988-06-08 Dowty Rotol Ltd Hydraulic shock absorber
US5348595A (en) 1988-05-13 1994-09-20 Nippon Steel Corporation Process for the preaparation of a Ti-Al intermetallic compound
FR2631868B1 (en) 1988-05-25 1990-09-21 Framatome Sa DEVICE AND METHOD FOR SCREWING AND SCREWING A NUT ONTO A CONNECTING ELEMENT
US5249267A (en) 1988-06-30 1993-09-28 Kabushiki Kaisha Toshiba Image processing apparatus and method
JPH0235511A (en) 1988-07-25 1990-02-06 Konica Corp Storage device
JPH0614759Y2 (en) 1988-08-11 1994-04-20 伊藤超短波株式会社 Low frequency therapy device
US4996666A (en) 1988-08-12 1991-02-26 Duluk Jr Jerome F Content-addressable memory system capable of fully parallel magnitude comparisons
FR2635561B1 (en) 1988-08-16 1990-10-12 Alsthom Gec STEAM TURBINE INSTALLATION WITH ADJUSTED FILLING
JP2644844B2 (en) 1988-09-20 1997-08-25 株式会社日立製作所 Distributed image recognition system
EP0360280B1 (en) 1988-09-22 1996-07-10 Canon Kabushiki Kaisha Thermal transfer recording method and recording apparatus using the method
US4980835A (en) 1988-10-13 1990-12-25 United Technologies Corporation Control law system for X-Wing aircraft
US4841831A (en) 1988-10-24 1989-06-27 Bender Walter W Indexing reloader of cartridges
US4953795A (en) 1988-10-24 1990-09-04 Beloit Corporation Wood chip cracking apparatus
US4979700A (en) 1988-10-28 1990-12-25 Curtiss Wright Flight Systems, Inc. Rotary actuator for leading edge flap of aircraft
US4862341A (en) 1988-11-02 1989-08-29 Sundstrand Corporation Filter for variable speed, constant frequency electrical system
FR2638766B1 (en) 1988-11-09 1990-12-14 Atochem CONTINUOUS PROCESS FOR THE MANUFACTURE OF ALKALINE METAL PERCHLORATE
US4923039A (en) 1988-11-10 1990-05-08 Sundstrand Corporation Interactive dual shaft input signal timing mechanism
US5050081A (en) 1988-11-14 1991-09-17 The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration Method and system for monitoring and displaying engine performance parameters
JPH02202604A (en) 1989-02-01 1990-08-10 Fanuc Ltd External part extending type programmable controller
DE59001450D1 (en) 1989-02-23 1993-06-17 Zahnradfabrik Friedrichshafen DRIVE DEVICE WITH VARIABLE TORQUE LIMITING SYSTEM.
US5182902A (en) 1989-03-17 1993-02-02 Murata Kikai Kabushiki Kaisha Processing robot for a two-for-one-one twister
US4897816A (en) 1989-04-03 1990-01-30 Tektronix, Inc. Serial dynamic memory shift register
US4993919A (en) 1989-04-11 1991-02-19 United Technologies Corporation Discrete (on-off) feather signal to govern propeller overspeed
US5012423A (en) 1989-04-17 1991-04-30 Mcdonnell Douglas Corporation Back-up fly by wire control system
US6581045B1 (en) 1989-05-12 2003-06-17 Building Technology Associates, Inc. Asset management system for analyzing the condition of assets and evaluating repair/replacement options
DE3917255A1 (en) 1989-05-26 1990-11-29 Schopf Masch METHOD AND DEVICE FOR RECEIVING AN AIRCRAFT UNDERCARRIAGE BY AN AIRPLANE TRACTOR
JPH0337715A (en) 1989-07-05 1991-02-19 Fujitsu Ltd Bit order inverting circuit
EP0484391B1 (en) 1989-07-25 1995-09-20 Dunlop Limited Manufacture of carbon fibre preform
JPH0375827A (en) 1989-08-18 1991-03-29 Toshiba Corp Copy prevention device
JP2940828B2 (en) 1989-09-11 1999-08-25 パイオニア株式会社 Multiple disc storage selection performance device
US4945938A (en) 1989-09-22 1990-08-07 Otis Engineering Corporation Reels and carriers therefor
DE4031421C2 (en) 1989-10-05 1995-08-24 Ricoh Kk Pattern matching system for a speech recognition device
US5085117A (en) 1989-10-06 1992-02-04 Casio Computer Co., Ltd. Electronic musical instrument with any key play mode
JP2814116B2 (en) 1989-10-09 1998-10-22 富士写真フイルム株式会社 Image reading device
US4957034A (en) 1989-12-15 1990-09-18 The United States Of America As Represented By The Secretary Of The Army Candy cane configuration for modular armor unit
JP2985137B2 (en) 1989-12-28 1999-11-29 東芝機械株式会社 Driving control data output device for die casting machine mold
JPH03202903A (en) 1989-12-28 1991-09-04 Sumitomo Chem Co Ltd Sequence generation method for industry process
US5083727A (en) 1990-01-02 1992-01-28 The Boeing Company Aircraft cabin system for selectivley locating interior units
US5086821A (en) 1990-01-23 1992-02-11 The B. F. Goodrich Company Aircraft wheel
JPH04212799A (en) 1990-01-31 1992-08-04 Nec Ic Microcomput Syst Ltd Semiconductor memory built in test circuit
US5343540A (en) 1990-02-07 1994-08-30 Fuji Photo Film Co., Ltd. Method for detecting positions of consecutive bits set to predetermined codes
US5044822A (en) 1990-02-20 1991-09-03 Kathyleen A. Dabic Moss Open bottom pit seal
EP0444358B1 (en) 1990-02-27 1998-08-19 Oracle Corporation Dynamic optimization of a single relation access
US5299255A (en) 1990-03-12 1994-03-29 Fujitsu Limited Electronic mail system for transmitting information via communication network
US5087824A (en) 1990-04-09 1992-02-11 Bill Nelson Power plant for generation of electrical power and pneumatic pressure
US5222699A (en) 1990-04-16 1993-06-29 Ltv Aerospace And Defense Company Variable control aircraft control surface
US5056647A (en) 1990-04-16 1991-10-15 London & Egazarian Associates, Inc. High-speed conveyor baggage handling system
JP2865807B2 (en) 1990-05-28 1999-03-08 株式会社東芝 Semiconductor storage system
US5189420A (en) 1990-06-08 1993-02-23 The Mitre Corporation Method and apparatus for direct analog to formatted digital number conversion
US5839690A (en) 1990-06-11 1998-11-24 Blanchette; David John Inertial acceleration aircraft
US5065630A (en) 1990-06-12 1991-11-19 Grumman Aerospace Corporation Integrated system for aircraft crack detection
US5272558A (en) 1990-06-14 1993-12-21 Lightwave Communications, Inc. Two level fiber optic communication from three-value electronic signal source
JPH0455778A (en) 1990-06-26 1992-02-24 Toshiba Corp Testing method for semiconductor device
US5166681A (en) 1990-07-30 1992-11-24 Bottesch H Werner Passive vehicle presence detection system
JPH0491966A (en) 1990-08-08 1992-03-25 Canon Inc Printer
GB2248014B (en) 1990-09-20 1994-03-16 Marconi Gec Ltd Wiper mechanisms
US5529126A (en) 1990-10-03 1996-06-25 Expro North Sea Limited Valve control apparatus
EP0592436A1 (en) 1990-10-09 1994-04-20 PILLEY, Harold R. Airport control/management system
US5209661A (en) 1990-10-29 1993-05-11 Systems Control Technology, Inc. Motor control desired dynamic load of a simulating system and method
JPH04184191A (en) 1990-11-19 1992-07-01 Casio Comput Co Ltd Small-sized electronic equipment
JPH04199473A (en) 1990-11-29 1992-07-20 Fujitsu Ltd Logic drawing editing editor
IL96886A (en) 1991-01-06 1994-08-26 Israel Aircraft Ind Ltd Apparatus for separating relatively more dense particulate matter from a relatively less dense fluid flow
US5174719A (en) 1991-02-06 1992-12-29 Sundstrand Corporation Method and apparatus for deploying ram air turbine and lubricating gear drive therefrom
US5745101A (en) 1991-02-14 1998-04-28 Canon Kabushiki Kaisha Method and apparatus for controlling image display
JP2766082B2 (en) 1991-02-15 1998-06-18 シャープ株式会社 Semiconductor storage device
FR2675921B1 (en) 1991-04-24 1993-08-20 Hewlett Packard Co METHOD AND DEVICE FOR TESTING A CARD OF A COMPUTER SYSTEM.
US5367873A (en) 1991-06-24 1994-11-29 United Technologies Corporation One-piece flameholder
US5295227A (en) 1991-07-09 1994-03-15 Fujitsu Limited Neural network learning system
JPH0528637A (en) 1991-07-18 1993-02-05 Victor Co Of Japan Ltd Information recording disk device
ATE213697T1 (en) 1991-07-30 2002-03-15 Canon Kk APPARATUS AND METHOD FOR INK JET PRINTING
US6007174A (en) 1991-07-30 1999-12-28 Canon Kabushiki Kaisha Ink jet recording apparatus and method
US5143326A (en) 1991-08-05 1992-09-01 The United States Of America As Represented By The Secretary Of The Army Vehicle air lift rig
US5200582A (en) 1991-08-29 1993-04-06 Tennessee Gas Pipeline Company Passive muffler for low pass frequencies
FR2682905B1 (en) 1991-10-28 1995-12-01 Commissariat Energie Atomique PATH GENERATION METHOD FOR A ROBOTIZED SYSTEM.
US5370340A (en) 1991-11-04 1994-12-06 General Electric Company Active control of aircraft engine noise using vibrational inputs
JP3164617B2 (en) 1991-11-07 2001-05-08 株式会社日立製作所 Apparatus and method for deforming character / graphics
JPH05143148A (en) 1991-11-25 1993-06-11 Fanuc Ltd Die machining dnc system
US5258945A (en) 1991-12-23 1993-11-02 Amdahl Corporation Method and apparatus for generating multiples of BCD number
CA2086891A1 (en) 1992-01-09 1993-07-10 Vivian Geoffrey Power Method and apparatus for determining the weight and center of gravity of a vehicle, particularly an aircraft
JPH05244526A (en) 1992-02-26 1993-09-21 Mitsubishi Electric Corp Input device
US7113780B2 (en) 1992-03-06 2006-09-26 Aircell, Inc. System for integrating an airborne wireless cellular network with terrestrial wireless cellular networks and the public switched telephone network
US7062268B2 (en) 1992-03-06 2006-06-13 Aircell, Inc. Overlapping spectrum cellular communication networks
US6650898B2 (en) 1992-03-06 2003-11-18 Aircell, Inc. Signal translating repeater for enabling a terrestrial mobile subscriber station to be operable in a non-terrestrial environment
US6408180B1 (en) 1992-03-06 2002-06-18 Aircell, Inc. Ubiquitous mobile subscriber station
US8914022B2 (en) 1992-03-06 2014-12-16 Gogo Llc System for providing high speed communications service in an airborne wireless cellular network
US6725035B2 (en) 1992-03-06 2004-04-20 Aircell Inc. Signal translating repeater for enabling a terrestrial mobile subscriber station to be operable in a non-terrestrial environment
US5640596A (en) 1992-03-10 1997-06-17 Hitachi, Ltd. Input output control system for transferring control programs collectively as one transfer unit designated by plurality of input output requests to be executed
US5368257A (en) 1992-03-27 1994-11-29 Novinger; Harry E. Variable one way airport
US5242131A (en) 1992-04-08 1993-09-07 The Boeing Company Steerable landing gear
US5318248A (en) 1992-04-24 1994-06-07 Zielonka Richard H Vertical lift aircraft
US5261012A (en) 1992-05-11 1993-11-09 General Electric Company Method and system for thinning images
US5392424A (en) 1992-06-11 1995-02-21 Allen-Bradley Company, Inc. Apparatus for detecting parity errors among asynchronous digital signals
US5229538A (en) 1992-06-19 1993-07-20 M. Technologies, Inc. Multiple smart weapons employment mechanism
FR2693317B1 (en) 1992-07-03 1994-08-26 Thomson Csf Secondary radar antenna operating in S mode.
IT1256123B (en) 1992-07-22 1995-11-29 AUTOMATIC LIGHTS CONTROL SYSTEM OF A SERIES CIRCUIT LIGHTING SYSTEM, IN PARTICULAR FOR AIRPORT SIGNAL LAMPS.
JPH0651738A (en) 1992-07-27 1994-02-25 Canon Inc Information display device of computer system
US5377109A (en) 1992-07-31 1994-12-27 Lear Astronics Corp. Failsafe digital bus to analog protocol converter system
US5312925A (en) 1992-09-01 1994-05-17 Pfizer Inc. Monohydrate of 5-(2-(4-(1,2-benzisothiazol-3-yl)-1-piperazinyl)-ethyl)-6-chloro-1,3-dihydro-2H-indol-2-one-hydrochloride
JP3364990B2 (en) 1992-08-28 2003-01-08 株式会社デンソー Anti-skid device
US5896138A (en) 1992-10-05 1999-04-20 Fisher Controls International, Inc. Process control with graphical attribute interface
EP0593799B1 (en) 1992-10-19 1996-01-03 ZEPPELIN-Metallwerke GmbH Method of and device for shaping a blank of sheet
JPH06131009A (en) 1992-10-20 1994-05-13 Fujitsu Ltd Feedback controller
US5295212A (en) 1992-10-29 1994-03-15 Eldec Corporation System for transmitting signals between optical transceivers
GB9223716D0 (en) 1992-11-12 1992-12-23 British Aerospace An aircraft landing gear trolley
JP3186866B2 (en) 1992-11-20 2001-07-11 株式会社東芝 Method and apparatus for predicting deterioration / damage of structural member
US5572694A (en) 1992-11-25 1996-11-05 Fujitsu Limited Virtual system for detecting access paths belonging to same group from plurality of access paths to reach device designated by command with reference to table
JP3056353B2 (en) 1992-12-04 2000-06-26 矢崎総業株式会社 Wire harness set type manufacturing method and manufacturing apparatus
US5441217A (en) 1993-01-13 1995-08-15 Novinger; Harry E. Variable one way airport
JPH06237432A (en) 1993-02-09 1994-08-23 Mitsubishi Electric Corp Method and device for intermittent recording
GB2275308B (en) 1993-02-20 1997-02-26 Rolls Royce Plc A mounting for coupling a turbofan gas turbine engine to an aircraft structure
US5548293A (en) 1993-03-24 1996-08-20 Leland Stanford Junior University System and method for generating attitude determinations using GPS
US5528528A (en) 1993-03-29 1996-06-18 Intel Corporation Method, apparatus, and system for transforming signals
NL9300554A (en) 1993-03-29 1994-10-17 Doctro A V V Assembly of filter device and a replaceable filter; as well as filter device and filter for use therein.
US5334987A (en) 1993-04-01 1994-08-02 Spectra-Physics Laserplane, Inc. Agricultural aircraft control system using the global positioning system
GB9306890D0 (en) 1993-04-01 1993-06-02 Bmw Rolls Royce Gmbh A gas turbine engine with bearing chambers and barrier air chambers
US5351097A (en) 1993-04-08 1994-09-27 Hughes Training, Inc. Target image rendering with color transparencies
US5477597A (en) 1993-04-14 1995-12-26 Gemcor Engineering Corp. Apparatus for positioning tooling
US5420588A (en) 1993-04-14 1995-05-30 Bushman; Boyd B. Wave attenuation
FR2704201B1 (en) 1993-04-22 1995-07-13 Elf Antar France FUEL SYSTEM FOR AN AIRCRAFT.
US5485151A (en) 1993-05-06 1996-01-16 Adb-Alnaco, Inc. Airfield lighting system
FR2705733B1 (en) 1993-05-25 1995-06-30 Snecma Device for depressurizing the lubrication chambers surrounding the bearings of a turbomachine.
US5684534A (en) 1993-05-26 1997-11-04 Intel Corporation Task-splitting dual-processor system for motion estimation processing
US5469208A (en) 1993-05-26 1995-11-21 Intel Corporation Dequantization using decrements and multiply
US5446839A (en) 1993-05-26 1995-08-29 Intel Corporation Method for controlling dataflow between a plurality of circular buffers
US5592399A (en) 1993-05-26 1997-01-07 Intel Corporation Pipelined video encoder architecture
JP3544685B2 (en) 1993-06-14 2004-07-21 株式会社東芝 Arithmetic element connection network
US5530643A (en) 1993-08-24 1996-06-25 Allen-Bradley Company, Inc. Method of programming industrial controllers with highly distributed processing
US5452201A (en) 1993-08-24 1995-09-19 Allen-Bradley Company, Inc. Industrial controller with highly distributed processing
JP3446256B2 (en) 1993-09-03 2003-09-16 株式会社日立製作所 Control method and apparatus for FA system
US5552984A (en) 1993-09-16 1996-09-03 Trw Inc. Diagnostic system for complex systems using virtual components
US5375972A (en) 1993-09-16 1994-12-27 The United States Of America As Represented By The Secretary Of The Air Force Turbine stator vane structure
US5402965A (en) 1993-09-20 1995-04-04 Rockwell International Corporation Reusable flyback satellite
US5381506A (en) 1993-10-18 1995-01-10 Mcdonnell Douglas Corporation Flat to spiral polymer light waveguide
US5644487A (en) 1993-10-19 1997-07-01 Moore Products Co. Monitoring and control system and method
JP2606102B2 (en) 1993-11-02 1997-04-30 日本電気株式会社 Tracking control device for mobile antenna
US5504902A (en) 1993-12-01 1996-04-02 Patriot Sensors And Controls Corporation Multi-language generation of control program for an industrial controller
US5537119A (en) 1993-12-21 1996-07-16 Colorado State University Research Foundation Method and system for tracking multiple regional objects by multi-dimensional relaxation
IL108177A (en) 1993-12-24 1996-11-14 Inflight Financial Services Lt Vehicle mounted cash dispensing machine
US5535964A (en) 1994-01-12 1996-07-16 Spectrum Aeromed, Inc. Medical transport apparatus
US5765783A (en) 1994-03-04 1998-06-16 The Boeing Company Vertically launchable and recoverable winged aircraft
JPH07250069A (en) 1994-03-08 1995-09-26 Nikon Corp Controller provided with bi-directional serial communication function and adaptor for serial port
US5577733A (en) 1994-04-08 1996-11-26 Downing; Dennis L. Targeting system
US5444608A (en) 1994-04-14 1995-08-22 Northern Telecom Limited High frequency power distribution system
FR2718875B1 (en) 1994-04-15 1996-05-15 Sextant Avionique Landing assistance device.
US5497156A (en) 1994-04-15 1996-03-05 Lockheed Corporation Towed target
US5593114A (en) 1994-04-19 1997-01-14 Mcdonnell Douglas Corporation Synthetic vision automatic landing system
US5450136A (en) 1994-05-13 1995-09-12 The United States Of America As Represented By The Secretary Of The Navy Decoder circuit for generating a system clock signal phase locked to a range tone signal
JPH07321990A (en) 1994-05-24 1995-12-08 Fujitsu Ltd Facsimile modem
US5513350A (en) 1994-05-27 1996-04-30 At&T Corp. Update constraints in transactions which may abort
US5566073A (en) 1994-07-11 1996-10-15 Margolin; Jed Pilot aid using a synthetic environment
DE19500477C1 (en) 1994-08-08 1995-11-23 Amrona Ag Fire extinguisher with container esp. for forest fires
KR0138316B1 (en) 1994-08-13 1998-05-15 윤종용 Disk carrier and its control method
JPH0866893A (en) 1994-08-24 1996-03-12 Fanuc Ltd Collision detecting method
US5465862A (en) 1994-08-25 1995-11-14 Dabico, Inc. Aircraft servicing pit lid with lift control
US5921629A (en) 1994-09-12 1999-07-13 Aircraft Modular Products, Inc. Aircraft divan
JP2616712B2 (en) 1994-09-22 1997-06-04 日本電気株式会社 Semiconductor storage device
US6009454A (en) 1994-09-30 1999-12-28 Allen-Bradley Company, Llc Multi-tasking operation system for industrial controller
FR2725438A1 (en) 1994-10-11 1996-04-12 Aerospatiale HYDRAULIC EQUIPMENT DRAIN Bench
US5551478A (en) 1994-10-21 1996-09-03 United Technologies Corporation Multiplexing hydraulic control network with latching valves
US5612934A (en) 1994-10-28 1997-03-18 International Business Machines Corporation Record media library accessing using a common accessing mechanism for a plurality of independent media libraries
US5745580A (en) 1994-11-04 1998-04-28 Lord Corporation Reduction of computational burden of adaptively updating control filter(s) in active systems
US5828397A (en) 1994-11-04 1998-10-27 Minolta Co. Ltd. Image forming method and apparatus
US5590743A (en) 1994-11-07 1997-01-07 Aircraft Braking Systems Corporation, Inc. Pre-load device for reducing aircraft brake vibration
US5488522A (en) 1994-11-14 1996-01-30 Combyte, Inc. Ejection apparatus for ejecting storage media positioned in a computer mass storage media drive
US5493461A (en) 1994-11-14 1996-02-20 Combyte, Inc. Storage media lockout device for a computer mass storage media drive
US5582390A (en) 1994-11-17 1996-12-10 Sundstrand Corporation Drive apparatus with primary and secondary no-back features
JPH08149130A (en) 1994-11-25 1996-06-07 Canon Inc Video communication system
FR2727477A1 (en) 1994-11-28 1996-05-31 Aerospatiale CONICAL ROTARY CYLINDER AND ITS APPLICATION TO THE CONTROL OF AN AIRCRAFT GOVERNOR
MY129681A (en) 1994-12-22 2007-04-30 Sony Corp Recording medium and apparatus for protecting copyrighted digital data
US5709532A (en) 1994-12-29 1998-01-20 The B.F. Goodrich Company Propeller ice protection system and method providing reduced sliding contact maintenance
JPH08191951A (en) 1995-01-17 1996-07-30 Sony Corp Game machine and its repeater
US5678052A (en) 1995-01-19 1997-10-14 International Business Machines Corporation Methods and system for converting a text-based grammar to a compressed syntax diagram
US5647111A (en) 1995-02-09 1997-07-15 Gemcor Engineering Corp. Automatic sealant application apparatus and method
US5784696A (en) 1995-02-24 1998-07-21 Melnikoff; Meyer Methods and apparatus for evaluating portfolios based on investment risk
US5651513A (en) 1995-03-01 1997-07-29 Northrop Grumman Corporation Linear flap drive system
US5610822A (en) 1995-03-03 1997-03-11 Trimble Navigation, Ltd. Position-related multi-media presentation system
GB2299000B (en) 1995-03-14 1999-10-27 Marconi Gec Ltd A communications system
JP3668275B2 (en) 1995-03-15 2005-07-06 シャープ株式会社 Digital information recording method, decoding method and decoding device
GB9508043D0 (en) 1995-04-20 1995-06-07 British Aerospace Environmental control system
US5764866A (en) 1995-05-26 1998-06-09 Ricoh Company, Ltd. Scanner, network scanner system, and method for network scanner system
US6405132B1 (en) 1997-10-22 2002-06-11 Intelligent Technologies International, Inc. Accident avoidance system
US5586615A (en) 1995-06-07 1996-12-24 Simula Inc. Vacuum packaged escape slide
US5959637A (en) 1995-06-23 1999-09-28 Cirrus Logic, Inc. Method and apparatus for executing a raster operation in a graphics controller circuit
JP3132637B2 (en) 1995-06-29 2001-02-05 日本電気株式会社 Nonvolatile semiconductor memory device
US5654851A (en) 1995-07-21 1997-08-05 Read-Rite Corporation Head arm assembly having an integral arm with a portion encased in a rigid molded material
JPH0951324A (en) 1995-08-09 1997-02-18 Nec Corp Wavelength multiplex optical transmitting system
US5793647A (en) 1995-08-15 1998-08-11 Diffracto, Ltd. System and method for graphical image data acquistion, storage, and retrieval
US5953241A (en) 1995-08-16 1999-09-14 Microunity Engeering Systems, Inc. Multiplier array processing system with enhanced utilization at lower precision for group multiply and sum instruction
US5788191A (en) 1995-08-18 1998-08-04 Sikorsky Aircraft Corporation Half-plow vortex generators for rotor blades for reducing blade-vortex interaction noise
US5785282A (en) 1995-08-18 1998-07-28 Sikorsky Aircraft Corporation Half-plow vortex generators for rotorcraft blades for reducing blade-vortex interaction noise
US5554990A (en) 1995-08-22 1996-09-10 Northrop Grumman Corporation Airspace management system and method
US5680325A (en) 1995-08-24 1997-10-21 Bell Atlantic Network Services, Inc. Network capacity creation for video dial tone network
CN1169217A (en) 1995-09-08 1997-12-31 菲利浦电子有限公司 A/D conversion with folding and interpolation
US5732384A (en) 1995-09-08 1998-03-24 Hughes Aircraft Graphical user interface for air traffic control flight data management
FR2738796B1 (en) 1995-09-15 1997-12-05 Aerospatiale METHOD AND DEVICE FOR CONTROLLING THE STEERING GOVERNOR OF AN AIRCRAFT
KR0163922B1 (en) 1995-09-19 1999-01-15 김광호 Method & apparatus for detecting movement vector of camera image
US5774689A (en) 1995-09-22 1998-06-30 Bell Atlantic Network Services, Inc. Network configuration management system for digital communication networks
US5624264A (en) 1995-09-29 1997-04-29 The United States Of America As Represented By The Secretary Of The Navy Missile launch simulator
AT402389B (en) 1995-10-04 1997-04-25 Fischer Adv Components Gmbh SAFETY DEVICE FOR CONTAINERS INSTALLED IN THE AIRCRAFT INTERIOR AND CONTAINERS FOR THE AVIATION INDUSTRY
US5790137A (en) 1995-10-05 1998-08-04 Apple Computer, Inc. System and method for using a frame buffer in cached mode to increase bus utilization during graphics operations
KR0176212B1 (en) 1995-10-26 1999-05-15 이형도 Method and apparatus of self diagnosis for an air/fuel ratio sensor
US5654859A (en) 1995-11-14 1997-08-05 The Boeing Company Fault tolerant power distribution system
US5732387A (en) 1995-12-04 1998-03-24 Motorola Method and apparatus for call establishment in a satellite communication system
US5676334A (en) 1995-12-21 1997-10-14 Sikorsky Aircraft Corporation Cyclic minimizer through alignment of the center of gravity and direction of flight vectors
US5955887A (en) 1995-12-22 1999-09-21 The B. F. Goodrich Company Impedance type ice detector
KR0156863B1 (en) 1995-12-30 1998-11-16 김광호 Method of call handling of cordless phone that uses spread spectrum communication system
US6041959A (en) 1996-01-16 2000-03-28 Domanico; Edward J. Chemical waste collection and disposal apparatus
US5679135A (en) 1996-02-08 1997-10-21 The United States Of America As Represented By The United States Department Of Energy Process for off-gas particulate removal and apparatus therefor
FR2745260B1 (en) 1996-02-28 1998-04-03 Airbus Ind SYSTEM AND METHOD FOR RAPID AND REVERSIBLE CONVERSION OF AN AIRCRAFT BETWEEN A PASSENGER CONFIGURATION AND A FREIGHT CONFIGURATION
JP3742454B2 (en) 1996-03-07 2006-02-01 サンデン株式会社 Clean water supply device
US6183388B1 (en) 1996-03-12 2001-02-06 Allison Engine Company, Inc. Epicyclic face gear reduction gearbox particularly for a gas turbine engine
EP0795469A1 (en) 1996-03-15 1997-09-17 DaimlerChrysler Aerospace Airbus Gesellschaft mit beschränkter Haftung Evacuation and guidance lightning system for the occupants of an aircraft cabin
US5737227A (en) 1996-03-19 1998-04-07 Consulex Corporation Software planning program for coatings
US5745780A (en) 1996-03-27 1998-04-28 International Business Machines Corporation Method and apparatus for source lookup within a central processing unit
US7277010B2 (en) 1996-03-27 2007-10-02 Raymond Anthony Joao Monitoring apparatus and method
JP3709239B2 (en) 1996-04-26 2005-10-26 ファナック株式会社 Magnetic saturation correction method for AC servo motor
US6258758B1 (en) 1996-04-26 2001-07-10 Platinum Research Organization Llc Catalyzed surface composition altering and surface coating formulations and methods
DE19617915C2 (en) 1996-05-03 2001-11-08 Eads Airbus Gmbh Power distribution arrangement in an aircraft
US5710731A (en) 1996-05-07 1998-01-20 International Business Machines Corporation Combined adder and decoder digital circuit
US5805828A (en) 1996-05-14 1998-09-08 The Boeing Company Method and apparatus for an avionics system utilizing both ARINC 429 and ARINC 629 compliant systems
US6112140A (en) 1996-05-14 2000-08-29 The Boeing Company Flight management system providing for automatic control display unit backup utilizing structured data routing
US6003814A (en) 1996-06-17 1999-12-21 Seniors Flexonics Inc. Stainless Steel Products Division Double-walled duct assembly for aircraft anti-icing conduit systems
JPH103509A (en) 1996-06-17 1998-01-06 Olympus Optical Co Ltd Device for recording information and method therefor
US5847673A (en) 1996-07-11 1998-12-08 Northrop Grumman Corporation System and method for determining a position of an object using output from a radar system
US5801460A (en) 1996-07-18 1998-09-01 Sundstrand Corporation Electrical power transmitting system with reduced feeder size and method of operation
US5784238A (en) 1996-08-01 1998-07-21 Applied Materials, Inc. Coordinated cluster tool energy delivery system
US6002778A (en) 1996-08-07 1999-12-14 Lord Corporation Active structural control system and method including active vibration absorbers (AVAS)
US5737196A (en) 1996-08-12 1998-04-07 Sundstrand Corporation Electrical power generating system producing alternating and direct current
US5810117A (en) 1996-08-12 1998-09-22 Wood; Russell Automated work product lift assembly
US5770834A (en) 1996-08-14 1998-06-23 Abb Flexible Automation, Inc. Robot control system and method for TIG welding
DE19633469C1 (en) 1996-08-20 1997-09-04 Daimler Benz Aerospace Airbus Device for holding overhead baggage compartments in aircraft passenger cabins
US5768286A (en) 1996-08-28 1998-06-16 Acer Peripherals, Inc. Method and apparatus for testing the reading reliability of CD-ROM player
US5916314A (en) 1996-09-11 1999-06-29 Sequent Computer Systems, Inc. Method and apparatus for cache tag mirroring
US5796609A (en) 1996-09-13 1998-08-18 Honeywell-Measurex Corporation Method and apparatus for internal model control using a state variable feedback signal
US5862062A (en) 1996-09-13 1999-01-19 New York Air Brake Corporation Parallel programming of a plurality of nodes in a communication network
SE511553C2 (en) 1996-09-18 1999-10-18 Saab Dynamics Ab Device for real-time simulation of an object's position in a three-dimensional coordinate system
US6437805B1 (en) 1996-09-23 2002-08-20 National Instruments Corporation System and method for accessing object capabilities in a graphical program
JPH10116500A (en) 1996-10-11 1998-05-06 Sony Corp Logic ic with memory built-in
US6474927B1 (en) 1996-10-11 2002-11-05 Federal Express Corporation Freight container, system, and method for shipping freight
US6406249B1 (en) 1996-10-11 2002-06-18 Federal Express Corporation Freight container, system, and method for shipping freight
US5845236A (en) 1996-10-16 1998-12-01 Lord Corporation Hybrid active-passive noise and vibration control system for aircraft
US5726663A (en) 1996-10-22 1998-03-10 Motorola, Inc. Survival radio interrogator
US5937349A (en) 1996-10-29 1999-08-10 Motorola, Inc. Method and system of tracking dynamic communication parameters during a link interruption
US5786995A (en) 1996-11-14 1998-07-28 Teledyne Industries, Inc. Avionics system having access through hinged display and control panel
US5966442A (en) 1996-11-15 1999-10-12 Worldspace, Inc. Real-time information delivery system for aircraft
US6074984A (en) 1996-11-18 2000-06-13 Bulldog Technologies U.S.A., Inc. SOx Additive systems based upon use of multiple particle species
US5905989A (en) 1996-11-27 1999-05-18 Bently Nevada Corporation Knowledge manager relying on a hierarchical default expert system: apparatus and method
FR2756323B1 (en) 1996-11-28 1998-12-31 Hispano Suiza Sa DEVICE FOR CONNECTING A DRIVE INVERTER TO A TURBOMOTOR
US5948101A (en) 1996-12-02 1999-09-07 The Foxboro Company Methods and systems for booting a computer in a distributed computing system
JP3891623B2 (en) 1996-12-17 2007-03-14 株式会社Shoei Helmet shield plate mounting mechanism
US5966126A (en) 1996-12-23 1999-10-12 Szabo; Andrew J. Graphic user interface for database system
US5845530A (en) 1996-12-30 1998-12-08 The Boeing Company Cam and roller overcenter handle mechanism
DE19701403C1 (en) 1997-01-17 1998-02-26 Eurocopter Deutschland Impact jointless multi-blade rotor for helicopter
US5933099A (en) 1997-02-19 1999-08-03 Mahon; James Collision avoidance system
US5842668A (en) 1997-02-27 1998-12-01 Hexcel Corporation Quick fit overhead stowage compartment
JPH10255487A (en) 1997-03-10 1998-09-25 Fujitsu Ltd Semiconductor memory
US6335445B1 (en) 1997-03-24 2002-01-01 Societe De Conseils De Recherches Et D'applications Scientifiques (S.C.R.A.S.) Derivatives of 2-(iminomethyl)amino-phenyl, their preparation, their use as medicaments and the pharmaceutical compositions containing them
FR2761766B1 (en) 1997-04-03 1999-05-14 Giat Ind Sa SYSTEM FOR ADJUSTING THE WEBSITE AND THE SITE OF A CARRIER MOUNTED ARMING SUPPORT
JP3992781B2 (en) 1997-04-15 2007-10-17 富士通株式会社 Semiconductor memory device
KR100265934B1 (en) 1997-04-18 2000-09-15 윤종용 Apparatus and method for checking video bios of computer
US5995833A (en) 1997-04-21 1999-11-30 Gte Mobilnet Service Corp. Control of telecommunication services for subscriber-provided radio communication devices residing in a miniature cellular environment
AU6949298A (en) 1997-04-21 1998-11-13 James W. Early Laser ignition
KR100211581B1 (en) 1997-05-10 1999-08-02 윤종용 Method for sending page data in paging systems simultaneously using a delay ciriuit of the reference clock signal from gps
DE19720274C2 (en) 1997-05-14 1999-12-16 Ericsson Telefon Ab L M Communication system, method and processing device for switching calls over a transmission network arranged between two local area networks
US6129026A (en) 1997-05-16 2000-10-10 Jervis B. Webb Company Dual mode cargo transport apparatus and method of using same
JPH10319095A (en) 1997-05-22 1998-12-04 Mitsubishi Electric Corp Semiconductor testing device
US6011510A (en) 1997-06-17 2000-01-04 Motorola, Inc. GPS based search and rescue transceiver
GB9713209D0 (en) 1997-06-20 1997-08-27 British Aerospace Friction welding metal components
DE19726418A1 (en) 1997-06-23 1999-01-28 Daimler Benz Aerospace Airbus Heating conductor connection system
DE19726419A1 (en) 1997-06-23 1999-01-28 Daimler Benz Aerospace Airbus Heating conductor connection system in an aircraft
IL121164A (en) 1997-06-26 2002-03-10 Univ Ramot Airfoil with dynamic stall control by oscillatory forcing
US5966532A (en) 1997-07-10 1999-10-12 National Instruments Corporation Graphical code generation wizard for automatically creating graphical programs
FR2765916B1 (en) 1997-07-10 1999-08-20 Hispano Suiza Sa PUSH INVERTER WITH IMPROVED IMPACT RESISTANCE
US5846035A (en) 1997-07-11 1998-12-08 General Electric Company Damage resistant drill
JP3176324B2 (en) 1997-07-29 2001-06-18 日本電気アイシーマイコンシステム株式会社 Semiconductor integrated circuit
US6347302B1 (en) 1997-07-31 2002-02-12 Raymond Anthony Joao Apparatus and method for processing lease insurance information
US6008813A (en) 1997-08-01 1999-12-28 Mitsubishi Electric Information Technology Center America, Inc. (Ita) Real-time PC based volume rendering system
US6292830B1 (en) 1997-08-08 2001-09-18 Iterations Llc System for optimizing interaction among agents acting on multiple levels
US6971066B2 (en) 1997-08-18 2005-11-29 National Instruments Corporation System and method for deploying a graphical program on an image acquisition device
US6802053B1 (en) 1997-08-18 2004-10-05 National Instruments Corporation Graphical programming system with distributed block diagram execution and front panel display
US6608638B1 (en) 2000-02-07 2003-08-19 National Instruments Corporation System and method for configuring a programmable hardware instrument to perform measurement functions utilizing estimation of the hardware implentation and management of hardware resources
US6173438B1 (en) 1997-08-18 2001-01-09 National Instruments Corporation Embedded graphical programming system
US6219628B1 (en) 1997-08-18 2001-04-17 National Instruments Corporation System and method for configuring an instrument to perform measurement functions utilizing conversion of graphical programs into hardware implementations
KR100261904B1 (en) 1997-08-29 2000-07-15 윤종용 Headphone sound output apparatus
US5988200A (en) 1997-09-16 1999-11-23 Custom Metalcraft, Inc. Repetitive stamped valve guard
US6002929A (en) 1997-09-29 1999-12-14 Mototrola, Inc. Exchange which extends SIM based authentication and method therefor
US6052604A (en) 1997-10-03 2000-04-18 Motorola, Inc. Exchange which controls M SIMs and N transceivers and method therefor
US5912627A (en) 1997-10-17 1999-06-15 Alexander; William J. Device and method for indicating if an airplane is operating within operating limits
US5916181A (en) 1997-10-24 1999-06-29 Creative Sports Designs, Inc. Head gear for detecting head motion and providing an indication of head movement
JPH11134197A (en) 1997-10-29 1999-05-21 Fujitsu Ltd Device and method for compilation for vliw system computer and storage medium stored with compilation executing program
US20020194099A1 (en) 1997-10-30 2002-12-19 Weiss Allan N. Proxy asset system and method
US6290179B1 (en) 1997-11-05 2001-09-18 Alfred P. Kerns Airplane kites and method
DE19753758A1 (en) 1997-12-04 1999-06-10 Henkel Kgaa Process for the preparation of cationic layer compounds
US5974525A (en) 1997-12-05 1999-10-26 Intel Corporation System for allowing multiple instructions to use the same logical registers by remapping them to separate physical segment registers when the first is being utilized
US6220543B1 (en) 1997-12-22 2001-04-24 Alexander Uskolovsky Safe and secure commercial air transportation
US6094163A (en) 1998-01-21 2000-07-25 Min-I James Chang Ins alignment method using a doppler sensor and a GPS/HVINS
US5971274A (en) 1998-01-28 1999-10-26 Inflight Financial Services Ltd. Apparatus and methods for providing financial services
US6204805B1 (en) 1998-02-06 2001-03-20 Honeywell Inc. Dual target tracking altimeter
US5875994A (en) 1998-02-11 1999-03-02 Mccrory; Leonard Landing gear operator
US6286876B1 (en) 1998-02-13 2001-09-11 Flexfab Horizons International, Inc. Insulated flexible duct for aircraft applications
US6035394A (en) 1998-02-17 2000-03-07 International Business Machines Corporation System for providing high performance speculative processing of complex load/store instructions by generating primitive instructions in the load/store unit and sequencer in parallel
WO1999044887A1 (en) 1998-03-06 1999-09-10 Batcho Paul F Method and apparatus for mitigating junction flows
JPH11269585A (en) 1998-03-23 1999-10-05 Horikawa Inc Titanium-vanadium-aluminum superelastic alloy and its production
US6163583A (en) 1998-03-25 2000-12-19 Sony Corporation Of Japan Dynamic clocking apparatus and system for reducing power dissipation
US6128072A (en) 1998-04-23 2000-10-03 Nova Gas Transmission Ltd. Optical flow meter integrally mounted to a rigid plate with direct optical access to the interior of a pipe
US6097382A (en) 1998-05-12 2000-08-01 Silverstream Software, Inc. Method and apparatus for building an application interface
DE69916360T3 (en) 1998-05-21 2008-06-05 Mcdonnell Douglas Corp. airfoil
US6008758A (en) 1998-05-26 1999-12-28 Rockwell International Corporation Method and apparatus for Doppler compensation in a satellite communications system
US6285878B1 (en) 1998-06-12 2001-09-04 Joseph Lai Broadband wireless communication systems provided by commercial airlines
FR2782307B1 (en) 1998-08-17 2000-10-13 Onera (Off Nat Aerospatiale) PROCESS FOR REDUCING THE NOISE OF INTERACTION OF BLADES-WHIRLS GENERATED BY A TURNING WING
US6211809B1 (en) 1998-09-01 2001-04-03 Trw Inc. Surface-based passive millimeter-wave landing aid
US6760778B1 (en) 1998-09-09 2004-07-06 At&T Wireless Services, Inc. System and method for communication between airborne and ground-based entities
US6100739A (en) 1998-09-09 2000-08-08 Cypress Semiconductor Corp. Self-timed synchronous pulse generator with test mode
US6385434B1 (en) 1998-09-16 2002-05-07 Motorola, Inc. Wireless access unit utilizing adaptive spectrum exploitation
US5975464A (en) 1998-09-22 1999-11-02 Scaled Composites, Inc. Aircraft with removable structural payload module
US6042052A (en) 1998-09-25 2000-03-28 Smith; Donald E. Retractable step fairing for amphibian airplane
US6219466B1 (en) 1998-10-05 2001-04-17 Nec Corporation Apparatus for implementing pixel data propagation using a linear processor array
DE19845892C1 (en) 1998-10-06 2000-07-06 Daimler Chrysler Aerospace Portable bridge
US6370371B1 (en) 1998-10-21 2002-04-09 Parkervision, Inc. Applications of universal frequency translation
JP4587500B2 (en) 1998-11-11 2010-11-24 ルネサスエレクトロニクス株式会社 Semiconductor integrated circuit, memory module, storage medium, and semiconductor integrated circuit relief method
US6122569A (en) 1998-11-13 2000-09-19 Mcdonnell Douglas Corporation Store interface apparatus
FR2785981B1 (en) 1998-11-13 2001-02-09 Pascal Doe SELF-PROPELLED REACTION INFRARED RADIATION TARGET
US6104190A (en) 1998-11-17 2000-08-15 The United States Of America As Represented By The Secretary Of The Navy Nuclear quadrupole resonance (NQR) method and apparatus for detecting a nitramine explosive
KR100318171B1 (en) 1998-11-17 2002-04-22 설승기 Common-Mode Voltage Pulse Removal in Three-Phase Pulse-Width Converter Converters
US7702550B2 (en) 1999-03-31 2010-04-20 New Market Solutions, Llc Multiple computer system supporting a private constant-dollar financial product
US6385513B1 (en) 1998-12-08 2002-05-07 Honeywell International, Inc. Satellite emergency voice/data downlink
US6341287B1 (en) 1998-12-18 2002-01-22 Alternative Systems, Inc. Integrated change management unit
US20010011222A1 (en) 1998-12-24 2001-08-02 Andrew W. Mclauchlin Integrated procurement management system using public computer network
US6459411B2 (en) 1998-12-30 2002-10-01 L-3 Communications Corporation Close/intra-formation positioning collision avoidance system and method
US6267329B1 (en) 1999-01-14 2001-07-31 Loral Aerospace Corp. Medium earth orbit communications satellite system
US6067486A (en) 1999-02-01 2000-05-23 General Electric Company Method and system for planning repair of an aircraft engine
US6314362B1 (en) 1999-02-02 2001-11-06 The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration Method and system for an automated tool for en route traffic controllers
US6282699B1 (en) 1999-02-23 2001-08-28 National Instruments Corporation Code node for a graphical programming system which invokes execution of textual code
NL1014299C2 (en) 1999-02-24 2001-03-26 Inst Francais Du Petrole Hydrocracking process with a catalyst containing an IM-5 zeolite and catalyst containing an IM-5 zeolite and a promoter element.
GB9906621D0 (en) 1999-03-23 1999-05-19 British Aerospace Vehicle propulsion systems
JP3565783B2 (en) 1999-03-24 2004-09-15 三菱電機株式会社 Airport information automatic transmission device
US6222480B1 (en) 1999-03-24 2001-04-24 Alliedsignal Multifunction aircraft transponder
US6474604B1 (en) 1999-04-12 2002-11-05 Jerry E. Carlow Mobius-like joining structure for fluid dynamic foils
US6721714B1 (en) 1999-04-16 2004-04-13 R. Michael Baiada Method and system for tactical airline management
AU4242300A (en) 1999-04-19 2000-11-02 David N. Brotherston Apparatus and method for providing products and services in a transport vehicle using a network of computers
US6161800A (en) 1999-05-04 2000-12-19 The Boeing Company Pivoting spanwise-flow redirector for tiltrotor aircraft
US6505106B1 (en) * 1999-05-06 2003-01-07 International Business Machines Corporation Analysis and profiling of vehicle fleet data
US6380869B1 (en) 1999-05-19 2002-04-30 Potomac Aviation Technology Corporation Automated air-traffic advisory system and method
US6499421B1 (en) 1999-05-19 2002-12-31 Richard F. Honigsbaum Tactiovisual distance-to-exit exit-finding system
GB2350402A (en) 1999-05-24 2000-11-29 Flight Refueling Ltd Stores ejection system
US6134500A (en) * 1999-06-03 2000-10-17 United Air Lines, Inc. System and method for generating optimal flight plans for airline operations control
US7149713B2 (en) 1999-06-09 2006-12-12 The Vanguard Group, Inc. System and method for automating investment planning
AU6118800A (en) 1999-07-23 2001-02-13 Netfolio, Inc. System and method for selecting and purchasing stocks via a global computer network
US6314361B1 (en) * 1999-07-30 2001-11-06 Caleb Technologies Corp. Optimization engine for flight assignment, scheduling and routing of aircraft in response to irregular operations
US6662194B1 (en) 1999-07-31 2003-12-09 Raymond Anthony Joao Apparatus and method for providing recruitment information
US6220545B1 (en) 1999-08-06 2001-04-24 Bell Helicopter Textron Inc. Method and apparatus for sensing preload in a tilt rotor downstop
US6328256B1 (en) 1999-09-29 2001-12-11 Bell Helicopter Textron Inc. Low-height tunable tilt rotor downstop
US6382559B1 (en) 1999-08-13 2002-05-07 Rolls-Royce Corporation Thrust vectoring mechanism
US6453303B1 (en) 1999-08-16 2002-09-17 Westport Financial Llc Automated analysis for financial assets
US7340684B2 (en) 1999-08-19 2008-03-04 National Instruments Corporation System and method for programmatically generating a second graphical program based on a first graphical program
US7783507B2 (en) 1999-08-23 2010-08-24 General Electric Company System and method for managing a fleet of remote assets
US6834159B1 (en) 1999-09-10 2004-12-21 Goodrich Corporation Aircraft heated floor panel
US6439751B1 (en) 1999-09-17 2002-08-27 Lockheed Martin Corporation Method and system for providing a reliable and durable light source
US6371681B1 (en) 1999-09-20 2002-04-16 Bell Helicopter Textron Inc. Anti-rotation clip
US6269349B1 (en) 1999-09-21 2001-07-31 A6B2, Inc. Systems and methods for protecting private information
US6268853B1 (en) 1999-09-30 2001-07-31 Rockwell Technologies, L.L.C. Data structure for use in enterprise controls
US6353794B1 (en) 1999-10-19 2002-03-05 Ar Group, Inc. Air travel information and computer data compilation, retrieval and display method and system
US6651034B1 (en) 1999-10-28 2003-11-18 General Electric Company Apparatus and method for performance and fault data analysis
US20020077944A1 (en) 1999-11-16 2002-06-20 Bly J. Aaron System and method for disposing of assets
US20020082966A1 (en) 1999-11-16 2002-06-27 Dana Commercial Credit Corporation System and method for benchmarking asset characteristics
US20050131729A1 (en) 1999-11-16 2005-06-16 Melby John M. Apparatus and method for tracking and managing physical assets
US7395275B1 (en) 1999-11-16 2008-07-01 Dana Automotive Systems Group, Llc System and method for disposing of assets
US6952680B1 (en) 1999-11-16 2005-10-04 Dana Corporation Apparatus and method for tracking and managing physical assets
US6317659B1 (en) 1999-12-09 2001-11-13 Honeywell International Inc. Layered subsystem architecture for a flight management system
US7346518B1 (en) 1999-12-30 2008-03-18 At&T Bls Intellectual Property, Inc. System and method for determining the marketability of intellectual property assets
US7801830B1 (en) 1999-12-30 2010-09-21 At&T Intellectual Property I, L.P. System and method for marketing, managing, and maintaining intellectual property
US6889197B2 (en) 2000-01-12 2005-05-03 Isuppli Inc. Supply chain architecture
US6335694B1 (en) 2000-02-01 2002-01-01 Rockwell Collins, Inc. Airborne audio flight information system
US6584601B1 (en) 2000-02-07 2003-06-24 National Instruments Corporation System and method for converting graphical programs into hardware implementations which utilize probe insertion
US6421571B1 (en) 2000-02-29 2002-07-16 Bently Nevada Corporation Industrial plant asset management system: apparatus and method
DE10011238B4 (en) 2000-03-08 2007-10-25 Airbus Deutschland Gmbh High-performance air conditioning system with redundant and stepped recirculation air mixing for a commercial aircraft
US6971021B1 (en) 2000-03-08 2005-11-29 Rainbow Technologies, Inc. Non-wire contact device application for cryptographic module interfaces
EP1208453A2 (en) * 2000-03-17 2002-05-29 Siemens Ag Plant maintenance technology architecture
US6748597B1 (en) 2000-04-07 2004-06-08 Live Tv, Inc. Upgradable aircraft in-flight entertainment system and associated upgrading methods
DE10018389C2 (en) 2000-04-13 2003-12-18 Airbus Gmbh Device and method for reducing wake behind aircraft on approach
DE10019187C1 (en) 2000-04-17 2002-01-03 Airbus Gmbh Pressure control for a sinker
WO2001081945A1 (en) 2000-04-25 2001-11-01 Honeywell International Inc. Aircraft communication frequency nomination
US6728610B1 (en) 2000-04-27 2004-04-27 General Electric Co. Methods and systems for performing maintenance services on aircraft engines
US6347567B1 (en) 2000-05-04 2002-02-19 Donald B. Eckstein Covert aerial encapsulated munition ejection system
US6690981B1 (en) 2000-05-04 2004-02-10 National Instruments Corporation System and method for encapsulating user interface code for a graphical program
US7024631B1 (en) 2000-05-12 2006-04-04 National Instruments Corporation System and method for enabling graphical program polymorphism
US6799154B1 (en) * 2000-05-25 2004-09-28 General Electric Comapny System and method for predicting the timing of future service events of a product
US6763515B1 (en) 2000-06-05 2004-07-13 National Instruments Corporation System and method for automatically generating a graphical program to perform an image processing algorithm
US6609036B1 (en) 2000-06-09 2003-08-19 Randall L. Bickford Surveillance system and method having parameter estimation and operating mode partitioning
US6874148B1 (en) 2000-06-14 2005-03-29 National Instruments Corporation System and method for exporting a graphical program to a shared library
JP2002049668A (en) 2000-08-01 2002-02-15 Cynomix Corp Apparatus of commerce, system thereof, method thereof, information record medium and program products
US6520452B1 (en) 2000-08-18 2003-02-18 The B. F. Goodrich Company Deicer for aircraft
US7003481B2 (en) 2000-08-25 2006-02-21 Flatrock Ii, Inc. Method and apparatus for providing network dependent application services
US20020038424A1 (en) 2000-09-22 2002-03-28 Joao Raymond Anthony Apparatus and method for providing security for electronic signatures
US6343815B1 (en) 2000-10-04 2002-02-05 Hartwell Corporation Cinch-up latch
US7370009B1 (en) 2000-10-05 2008-05-06 I2 Technologies Us, Inc. Extreme capacity management in an electronic marketplace environment
US8068829B2 (en) 2000-10-11 2011-11-29 Gogo Llc System for customizing electronic services for delivery to a passenger in an airborne wireless cellular network
US7069093B2 (en) 2000-12-07 2006-06-27 Thackston James D System and process for facilitating efficient communication of specifications for parts and assemblies with a mechanism for assigning responsibility selection
US20020077949A1 (en) 2000-12-19 2002-06-20 Qasem Bashar M. System and method of investment screening for shari' ah-based compliance
US7213207B2 (en) 2000-12-20 2007-05-01 National Instruments Corporation System and method for accessing registers of a hardware device in a graphical program
US7913170B2 (en) 2000-12-20 2011-03-22 National Instruments Corporation System and method for performing type checking for hardware device nodes in a graphical program
US7908304B2 (en) 2001-03-15 2011-03-15 Versata Development Group, Inc. Method and system for managing distributor information
US6567729B2 (en) * 2001-03-28 2003-05-20 Pt Holdings Ltd. System and method of analyzing aircraft removal data for preventative maintenance
FR2823541B1 (en) 2001-04-11 2003-05-23 Christian Hugues CYLINDRICAL WING END WITH HELICOID SLOT
US7669133B2 (en) 2001-04-16 2010-02-23 Wellogix Technology Licensing, Llc System and method for developing rules utilized in a knowledge management system
US6735596B2 (en) * 2001-06-07 2004-05-11 Guy Charles Corynen Computer method and user interface for decision analysis and for global system optimization
FR2827055B1 (en) 2001-07-05 2005-02-04 Airbus Ind METHOD FOR STRUTURING AND MANAGING THE CONFIGURATION OF INDUSTRIAL PRODUCTS, IN PARTICULAR AIRCRAFT
US7194529B2 (en) 2001-07-12 2007-03-20 Abb Inc. Method and apparatus for the delivery and integration of an asset management system into an existing enterprise network
US8417360B2 (en) 2001-08-10 2013-04-09 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US7797062B2 (en) 2001-08-10 2010-09-14 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US8914300B2 (en) 2001-08-10 2014-12-16 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US9729639B2 (en) 2001-08-10 2017-08-08 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US6819960B1 (en) 2001-08-13 2004-11-16 Rockwell Software Inc. Industrial controller automation interface
US7302675B2 (en) 2001-08-14 2007-11-27 National Instruments Corporation System and method for analyzing a graphical program using debugging graphical programs
US6876368B2 (en) 2001-08-14 2005-04-05 National Instruments Corporation System and method for deploying a graphical program to a PDA device
US6527227B1 (en) 2001-08-16 2003-03-04 The Boeing Company Storage compartment with universal mounting capability
US8266066B1 (en) * 2001-09-04 2012-09-11 Accenture Global Services Limited Maintenance, repair and overhaul management
US7308410B2 (en) 2001-09-28 2007-12-11 Oracle International Corporation Method and system for instantiating entitlements into contracts
US7008357B2 (en) 2001-10-18 2006-03-07 The Boeing Company Seat exercise device
US7134086B2 (en) 2001-10-23 2006-11-07 National Instruments Corporation System and method for associating a block diagram with a user interface element
US8571911B1 (en) 2001-11-16 2013-10-29 Westinghouse Electric Company Llc Facility life management method
US7200448B2 (en) 2001-11-27 2007-04-03 Rockwell Automation Technologies, Inc. System and method for function block execution order generation
US20030135441A1 (en) 2001-12-17 2003-07-17 Cfph, L.L.C. Systems and methods for durable goods futures market
US20030125965A1 (en) 2001-12-21 2003-07-03 Falso Edward D. Method and system for managing contractual risk
US7076411B2 (en) 2002-01-15 2006-07-11 National Instruments Corporation System and method for performing a hardware-in-the-loop simulation using a plurality of graphical programs that share a single graphical user interface
US7043696B2 (en) 2002-01-15 2006-05-09 National Instruments Corporation Graphical program system having a single graphical user interface shared by a plurality of graphical programs
US7076740B2 (en) 2002-01-15 2006-07-11 National Instruments Corporation System and method for performing rapid control prototyping using a plurality of graphical programs that share a single graphical user interface
US6448907B1 (en) 2002-01-18 2002-09-10 Nicholas J. Naclerio Airline passenger management system
US6944536B2 (en) 2002-02-01 2005-09-13 Medaire, Inc. Method and system for identifying medical facilities along a travel route
US20090112698A1 (en) 2007-10-31 2009-04-30 Ryan Steelberg System and method for brand affinity content distribution and optimization
US20090112715A1 (en) 2007-10-31 2009-04-30 Ryan Steelberg Engine, system and method for generation of brand affinity content
US20090112692A1 (en) 2007-10-31 2009-04-30 Ryan Steelberg Engine, system and method for generation of brand affinity content
US20090228354A1 (en) 2008-03-05 2009-09-10 Ryan Steelberg Engine, system and method for generation of brand affinity content
US7216099B2 (en) 2002-03-05 2007-05-08 Ibbotson Associates Automatically allocating and rebalancing discretionary portfolios
US8200561B1 (en) 2002-03-29 2012-06-12 Financial Engines, Inc. Tax-aware asset allocation
US8244549B1 (en) 2002-04-11 2012-08-14 SJS Holdings, LLC Method and system for providing and managing a fractional aircraft ownership program
US8074201B2 (en) 2002-07-10 2011-12-06 National Instruments Corporation Deployment and execution of a program on an embedded device
US7185287B2 (en) 2002-07-03 2007-02-27 National Instruments Corporation Wireless deployment / distributed execution of graphical programs to smart sensors
US7168072B2 (en) 2002-07-18 2007-01-23 National Instruments Corporation Wizard for programmatically analyzing and modifying time-critical graphical programs
US7383218B1 (en) 2002-07-31 2008-06-03 Charles Schwab & Co., Inc. Method and system for integrating investment advice with financial account statement information
US7484200B2 (en) 2002-08-14 2009-01-27 National Instruments Corporation Automatically analyzing and modifying a graphical program
WO2004029648A1 (en) 2002-09-25 2004-04-08 John Fagan Laas navigation system
US9009084B2 (en) 2002-10-21 2015-04-14 Rockwell Automation Technologies, Inc. System and methodology providing automation security analysis and network intrusion protection in an industrial environment
US8909926B2 (en) 2002-10-21 2014-12-09 Rockwell Automation Technologies, Inc. System and methodology providing automation security analysis, validation, and learning in an industrial controller environment
WO2004049189A1 (en) 2002-11-22 2004-06-10 United States Postal Service Surface air management systems and methods
US8554624B2 (en) 2003-01-23 2013-10-08 International Business Machines Corporation System and method for advertising and negotiating services for commercial and general aviation
US20040225618A1 (en) 2003-02-04 2004-11-11 Thackston James D. Process and system for executing and agreement between a consumer and a provider of services using digital signatures
US7624422B2 (en) 2003-02-14 2009-11-24 Preventsys, Inc. System and method for security information normalization
US7913232B2 (en) 2003-02-21 2011-03-22 The Math Works, Inc. Certifying software for safety-critical systems
US8032135B1 (en) 2003-03-03 2011-10-04 Gte Wireless Incorporated System for transmitting wireless high-speed data signals between a terrestrial-based antenna and an aircraft
US6904377B2 (en) 2003-03-17 2005-06-07 Northrop Grumman Corporation Method for measuring force-dependent gyroscope sensitivity
US7647562B2 (en) 2003-04-03 2010-01-12 National Instruments Corporation Deployment and execution of a graphical program on an embedded device from a PDA
US7383239B2 (en) 2003-04-30 2008-06-03 Genworth Financial, Inc. System and process for a fusion classification for insurance underwriting suitable for use by an automated system
ATE382158T1 (en) 2003-05-12 2008-01-15 Abb Inc ASSET LIFECYCLE MANAGEMENT METHOD AND APPARATUS
US20040236587A1 (en) 2003-05-23 2004-11-25 General Electric Company Lifecycle profitability tool for leasable assets
US20150046344A1 (en) 2003-07-10 2015-02-12 Omar B. Hakim Method of creating value from intangible assets
US20050050346A1 (en) 2003-08-28 2005-03-03 Felactu Odessa John Dynamic comprehensive global enterprise defensive security system
DE602004004233T2 (en) 2003-11-24 2007-10-25 Black & Decker Inc., Newark Wireless surveillance and security system for goods
FR2865052B1 (en) 2004-01-09 2006-03-31 Airbus France METHOD FOR PRODUCING AN ELECTRICAL CABLE SCHEMA
US8036987B1 (en) 2004-01-30 2011-10-11 Intuit Inc. Method and system for accounts payable prioritization and management
US7440926B2 (en) 2004-02-06 2008-10-21 Optnow Real Estate Corporation Rights establishing system and method
US7657124B2 (en) 2004-02-27 2010-02-02 The Boeing Company Multiple image data source information processing systems and methods
EP1787252A2 (en) 2004-03-05 2007-05-23 The National Research Exchange, Inc. Data structure with experience descriptors
US8046464B2 (en) 2004-03-10 2011-10-25 The Boeing Company Quality of service resource management apparatus and method for middleware services
US8201257B1 (en) 2004-03-31 2012-06-12 Mcafee, Inc. System and method of managing network security risks
US7575197B2 (en) 2004-05-17 2009-08-18 The Boeing Company Mobile transporter servicing unit for an operational ground support system
US7275715B2 (en) 2004-05-17 2007-10-02 The Boeing Company Operational ground support system
US7614585B2 (en) 2004-05-17 2009-11-10 The Boeing Company Multi-servicing and retractable bridge for an operational ground support system
US7578469B2 (en) 2004-05-17 2009-08-25 The Boeing Company Terminal docking port for an operational ground support system
US20050253021A1 (en) 2004-05-17 2005-11-17 Mccoskey William R Operational ground support system
US20060010152A1 (en) 2004-07-12 2006-01-12 Snecma Services System and method for managing machine servicing including workscope generation
US8442889B2 (en) 2004-07-12 2013-05-14 Darrin B. Farrow Asset allocation based system for individual investor portfolio selection
US7840607B2 (en) 2004-08-06 2010-11-23 Siemens Aktiengesellschaft Data mart generation and use in association with an operations intelligence platform
US7730041B2 (en) 2004-08-25 2010-06-01 Microsoft Corporation Data abstraction based serialization
FR2875916B1 (en) 2004-09-28 2015-06-26 Eurocopter France METHOD AND DEVICE FOR AIDING THE STEERING OF A ROTATING SAILBOAT AIRCRAFT IN THE VICINITY OF A POSITION OR TAKE-OFF POINT
US8224725B2 (en) 2004-10-14 2012-07-17 Google Inc. Escrowing digital property in a secure information vault
US20060095156A1 (en) 2004-10-20 2006-05-04 Baiada R M Method and system for tactical airline system management
US20060100958A1 (en) 2004-11-09 2006-05-11 Feng Cheng Method and apparatus for operational risk assessment and mitigation
US7865385B2 (en) * 2004-11-15 2011-01-04 The Boeing Company Methods and systems for modeling processes in airlines and other industries, and for simulating and valuing the effects of various products and services on those processes
AU2005314729A1 (en) 2004-12-13 2006-06-22 Lori A. Frantzve Critically/vulnerability/risk logic analysis methodology for business enterprise and cyber security
US20060149687A1 (en) 2005-01-05 2006-07-06 Houseraising, Inc. System and method for automated management of custom home design and build projects
US7898153B2 (en) 2005-01-25 2011-03-01 Ronald Martin Barrett Actuator
US7356383B2 (en) 2005-02-10 2008-04-08 General Electric Company Methods and apparatus for optimizing combined cycle/combined process facilities
US20060190280A1 (en) 2005-02-22 2006-08-24 Lockheed Martin Corporation Method and apparatus for management for use in fleet service and logistics
US20060218116A1 (en) 2005-03-28 2006-09-28 O'hearn James E Pass-through interface queries to populate a class-based model
US8700559B2 (en) 2005-03-28 2014-04-15 Siemens Aktiengesellschaft Interface chaining to populate a class-based model
US20050216826A1 (en) 2005-05-09 2005-09-29 Matrikon Inc. Method of providing a concurrent overview and detailed display of industrial production facilities
US20070219831A1 (en) 2005-08-15 2007-09-20 Ne Meth Louis G Flight risk management system
US20080226421A1 (en) 2005-08-16 2008-09-18 Dickory Rudduck Locking Assembly
US7457786B2 (en) * 2005-08-23 2008-11-25 General Electric Company Performance enhancement of optimization processes
US7647179B2 (en) 2005-08-31 2010-01-12 Hilton Goldstein System and method for coordinate mapping onto airport diagrams
US8166506B2 (en) 2005-09-12 2012-04-24 The Boeing Company Simplified cabin services system for an aircraft
US7930369B2 (en) 2005-10-19 2011-04-19 Apple Inc. Remotely configured media device
US8255112B2 (en) 2005-10-28 2012-08-28 The Boeing Company Remote aircraft maintenance in a networked environment
US20070106549A1 (en) 2005-11-04 2007-05-10 Stocking Christine A Turnkey aviation budget management
US7689493B1 (en) 2005-11-15 2010-03-30 Merrill Lynch Co., Inc. Methods for asset index tracking
US7761200B2 (en) * 2005-11-16 2010-07-20 The Boeing Company Centralized management of maintenance and materials for commercial aircraft fleets with access to real-time information
US20070112487A1 (en) * 2005-11-16 2007-05-17 Avery Robert L Integrated maintenance and materials service for fleet aircraft and system for determining pricing thereof
US8229791B2 (en) * 2005-11-29 2012-07-24 The Boeing Company Methods, systems, and computer integrated program products for supply chain management
US20070156496A1 (en) * 2005-12-02 2007-07-05 Avery Robert L Methods and systems for managing aircraft maintenance and material supply
US8341298B2 (en) 2005-12-02 2012-12-25 The Boeing Company Scalable on-board open data network architecture
US8136767B2 (en) 2006-01-03 2012-03-20 General Electric Company Method and system for flow control with arrays of dual bimorph synthetic jet fluidic actuators
US8131656B2 (en) * 2006-01-31 2012-03-06 The Board Of Trustees Of The University Of Illinois Adaptive optimization methods
KR100736366B1 (en) 2006-02-02 2007-07-06 삼성전자주식회사 Apparatus and method for processing video signal
US8676654B2 (en) 2006-02-07 2014-03-18 Ebiz Industries, Inc. Method and system for facilitating a purchase process
US7328128B2 (en) 2006-02-22 2008-02-05 General Electric Company Method, system, and computer program product for performing prognosis and asset management services
US8019777B2 (en) 2006-03-16 2011-09-13 Nexify, Inc. Digital content personalization method and system
US7650267B1 (en) 2006-03-31 2010-01-19 Rockwell Automation Technologies, Inc. Distribution of DES replications in a simulation
US20070244709A1 (en) 2006-04-17 2007-10-18 Earthworks Systems, Llc Methods of producing and recycling plastic cards
US20080015880A1 (en) 2006-05-12 2008-01-17 Bearingpoint, Inc. System, Method, and Software for a Business Acquisition Management Solution
JP5405298B2 (en) 2006-05-30 2014-02-05 コーニンクレッカ フィリップス エヌ ヴェ System, apparatus and method for indicating preferred access points and service providers
US7478352B2 (en) 2006-06-22 2009-01-13 The Boeing Company Method for creating box level groupings of components and connections in a dynamic layout system
US20080010107A1 (en) 2006-07-10 2008-01-10 Small Gregory J Methods and systems for providing a global view of airline operations
US8401726B2 (en) * 2006-07-20 2013-03-19 The Boeing Company Maintenance interval determination and optimization tool and method
US20100262442A1 (en) 2006-07-20 2010-10-14 Standard Aero, Inc. System and method of projecting aircraft maintenance costs
US20080033786A1 (en) 2006-08-04 2008-02-07 General Electric Company Power generation mix forecasting modeling method
US20080144432A1 (en) 2006-09-18 2008-06-19 Gideon Samid MIXFIX: fine-tuned graded mixing/entropic alphabet for chemical and visual encoding, efficient processing, and decorative painting
US20080077448A1 (en) 2006-09-22 2008-03-27 Marc Diamond Financial insurance product
US8565943B2 (en) * 2006-09-25 2013-10-22 Appereo Systems, LLC Fleet operations quality management system
US7715930B2 (en) 2006-09-27 2010-05-11 Rockwell Automation Technologies, Inc. Aggregating audit information with field conditions
US20080077617A1 (en) 2006-09-27 2008-03-27 Rockwell Automation Technologies, Inc. Universal, hierarchical layout of assets in a facility
US20170185594A1 (en) 2006-09-27 2017-06-29 Rockwell Automation Technologies, Inc. Universal, hierarchical layout of assets in a facility
US8370224B2 (en) 2006-09-27 2013-02-05 Rockwell Automation Technologies, Inc. Graphical interface for display of assets in an asset management system
US20090037302A1 (en) 2006-09-27 2009-02-05 Rockwell Automation Technologies, Inc. Programmatically scheduled verification
US8782249B1 (en) 2006-09-28 2014-07-15 Rockwell Automation Technologies, Inc. Message engine
US8509140B2 (en) 2006-11-21 2013-08-13 Honeywell International Inc. System and method for transmitting information using aircraft as transmission relays
US8620714B2 (en) * 2006-11-28 2013-12-31 The Boeing Company Prognostic condition assessment decision aid
US8340854B2 (en) * 2006-12-19 2012-12-25 The Boeing Company Methods and systems for centrally managed maintenance program for aircraft fleets
US9037317B2 (en) 2006-12-21 2015-05-19 The Boeing Company System and method for automatic dependent surveillance collection and analysis
US8645148B2 (en) 2006-12-29 2014-02-04 The Boeing Company Methods and apparatus providing an E-enabled ground architecture
US8380548B2 (en) 2007-02-15 2013-02-19 So-ling Carmen Ng Method for managing intellectual property
US8290827B2 (en) 2007-03-23 2012-10-16 At&T Intellectual Property I, L.P. Method, medium, and system of presenting assets related to media content
US7891250B2 (en) 2007-04-04 2011-02-22 American Air Liquide, Inc. Method and apparatus to digitize pressure gauge information
US8050998B2 (en) 2007-04-26 2011-11-01 Ebay Inc. Flexible asset and search recommendation engines
US8560376B2 (en) * 2007-05-31 2013-10-15 Airbus Operations S.A.S. Method, system, and computer program product for a maintenance optimization model
FR2916842B1 (en) * 2007-06-01 2010-02-26 Thales Sa METHOD OF OPTIMIZING A FLIGHT PLAN
US8038881B2 (en) 2007-06-12 2011-10-18 Biological Petroleum Cleaning Ltd. Wastewater treatment
US20090112714A1 (en) 2007-10-31 2009-04-30 Ryan Steelberg Engine, system and method for generation of brand affinity content
US20100114701A1 (en) 2007-09-07 2010-05-06 Brand Affinity Technologies, Inc. System and method for brand affinity content distribution and optimization with charitable organizations
US20090076873A1 (en) 2007-09-19 2009-03-19 General Electric Company Method and system to improve engineered system decisions and transfer risk
US9064284B1 (en) 2007-09-27 2015-06-23 United Services Automobile Association (Usaa) System and method of providing a financial investment recommendation using a portfolio planner
US8443336B2 (en) 2007-10-03 2013-05-14 Siemens Corporation System and method for applying model-based testing to train control systems
US8510707B1 (en) 2007-10-12 2013-08-13 The Pnc Financial Services Group, Inc. Mainframe-based web service development accelerator
US9715670B2 (en) 2007-10-12 2017-07-25 Oracle International Corporation Industrial identify encoding and decoding language
US8615384B2 (en) * 2007-10-31 2013-12-24 The Boeing Company Method and apparatus for simulating aircraft data processing systems
AT504028B1 (en) 2007-11-02 2009-03-15 Avl List Gmbh METHOD FOR THE DAMAGE PRESENTATION OF COMPONENTS OF A MOTOR VEHICLE
US20090119177A1 (en) 2007-11-05 2009-05-07 John Thomas K Outdoor and out of home advertising method and system
US8943539B2 (en) 2007-11-21 2015-01-27 Rovi Guides, Inc. Enabling a friend to remotely modify user data
US8856833B2 (en) 2007-11-21 2014-10-07 United Video Properties, Inc. Maintaining a user profile based on dynamic data
US7983809B2 (en) * 2007-12-21 2011-07-19 Sikorsky Aircraft Corporation Aircraft integrated support system (ISS)
FR2925595B1 (en) 2007-12-21 2014-06-13 Snecma Services METHOD AND SYSTEM FOR CHARACTERIZING AND COUNTING A THRESHOLD EXCEEDS BY AN OPERATING PARAMETER OF AN AIRCRAFT ENGINE
US7962050B2 (en) 2008-04-11 2011-06-14 Xerox Corporation System and method for controlling ordering of printing supplies based on a service contract
EP2279465B1 (en) 2008-04-17 2014-04-02 Siemens Aktiengesellschaft Method and system for cyber security management of industrial control systems
US8251317B2 (en) 2008-04-18 2012-08-28 The Boeing Company System and method for varying the porosity of an aerodynamic surface
DE102008029511A1 (en) 2008-06-21 2010-02-11 Airbus Deutschland Gmbh Reading or spot light
US8510778B2 (en) 2008-06-27 2013-08-13 Rovi Guides, Inc. Systems and methods for ranking assets relative to a group of viewers
US8665731B1 (en) 2008-06-30 2014-03-04 The Boeing Company Reliability estimation methods for large networked systems
US8121042B2 (en) 2008-06-30 2012-02-21 The Boeing Company Reliability estimation methods for large networked systems
US8207867B2 (en) 2008-07-01 2012-06-26 George Mason Intellectual Properties, Inc. Method and device for landing aircraft dependent on runway occupancy time
US8886571B2 (en) 2008-08-19 2014-11-11 Oracle America, Inc. System and method for service virtualization in a service governance framework
US9256425B2 (en) 2008-09-09 2016-02-09 Serena Software, Inc. Versioning and refactoring of business mashups in on-demand environments
US9658271B2 (en) 2008-09-11 2017-05-23 The Boeing Company Wire fault illumination and display
US8768892B2 (en) 2008-09-29 2014-07-01 Microsoft Corporation Analyzing data and providing recommendations
US8478613B2 (en) 2008-10-02 2013-07-02 Hartford Fire Insurance Company System and method for providing and displaying dynamic coverage recommendations
US8195535B2 (en) 2008-10-22 2012-06-05 Sinex Aviation Technologies Aircraft MRO manager
US8732047B2 (en) 2008-10-24 2014-05-20 Sciquest, Inc. System and method for contract execution against expressive contracts
DE102008053320B4 (en) 2008-10-27 2010-12-02 Airbus Deutschland Gmbh Method and system for controlling an aircraft air conditioning system with optimized fuel consumption
US8239526B2 (en) 2008-11-14 2012-08-07 Oracle International Corporation System and method for performance data collection in a virtual environment
US8476844B2 (en) 2008-11-21 2013-07-02 B/E Aerospace, Inc. Light emitting diode (LED) lighting system providing precise color control
DE102008059424B4 (en) 2008-11-27 2023-01-19 IAD Gesellschaft für Informatik, Automatisierung und Datenverarbeitung mbH Secondary radar system with dynamic sectorization of the space to be monitored using multi-antenna arrangements and methods for this
US8566855B2 (en) 2008-12-02 2013-10-22 Sony Corporation Audiovisual user interface based on learned user preferences
US8509990B2 (en) * 2008-12-15 2013-08-13 Panasonic Avionics Corporation System and method for performing real-time data analysis
US20100211302A1 (en) 2008-12-30 2010-08-19 Thales-Raytheon Systems Company Llc Airspace Deconfliction System
US20100198630A1 (en) 2009-01-30 2010-08-05 Bank Of America Corporation Supplier risk evaluation
FR2942456B1 (en) 2009-02-25 2012-12-07 Sicma Aero Seat MODULE FOR AIRCRAFT CABIN AND ASSOCIATED AIRCRAFT CABIN.
US20100332373A1 (en) 2009-02-26 2010-12-30 Jason Crabtree System and method for participation in energy-related markets
DE102009010889A1 (en) 2009-02-27 2010-09-09 Siemens Aktiengesellschaft Method and computer system for developing or providing computer-assisted tasks for medical task flows
JP5336902B2 (en) * 2009-03-30 2013-11-06 株式会社日本総合研究所 CHARGE CONTROL DEVICE, BATTERY PACK, VEHICLE, AND CHARGE CONTROL METHOD
US9172482B2 (en) 2009-03-31 2015-10-27 At&T Intellectual Property I, L.P. Content recommendations based on personal preferences
US8117564B2 (en) 2009-04-10 2012-02-14 United Video Properties, Inc. Systems and methods for generating a media guidance application with multiple perspective views
US20110010189A1 (en) 2009-04-22 2011-01-13 Tom Dean Healthcare Accounts Receiveable Data Valuator
US8660924B2 (en) 2009-04-30 2014-02-25 Navera, Inc. Configurable interactive assistant
US9177273B2 (en) 2009-05-12 2015-11-03 Infosys Limited Framework for developing enterprise service architecture
US8489090B2 (en) 2009-05-26 2013-07-16 Centurylink Intellectual Property Llc Aircraft wireless communication system
US9460092B2 (en) 2009-06-16 2016-10-04 Rovi Technologies Corporation Media asset recommendation service
US20110173127A1 (en) 2010-01-08 2011-07-14 Albert Ho System and method used for configuration of an inspection compliance tool with machine readable tags and their associations to inspected components
US8332084B1 (en) 2009-06-23 2012-12-11 The Boeing Company Four-dimensional weather predictor based on aircraft trajectory
US20100332269A1 (en) 2009-06-26 2010-12-30 General Electric Company Method and system for modeling the financial requirements of an industrial machine
FR2947925B1 (en) 2009-07-08 2012-04-27 Airbus Operations Sas AUTOMATIC CABLING SIMULATION CREATION METHOD
FR2947932B1 (en) 2009-07-08 2013-03-01 Airbus Operations Sas METHOD FOR CREATING A LIBRARY OF ALGORITHMIC REPRESENTATIONS OF ELECTRONIC EQUIPMENT
US8448070B2 (en) 2009-07-16 2013-05-21 Harris Corporation Grapical user interface method and apparatus for communication assets and information in a dispatch environment
JP2011048688A (en) 2009-08-27 2011-03-10 Hitachi Ltd Plant life cycle evaluation device and method
GB0917527D0 (en) 2009-10-07 2009-11-25 Optimized Systems And Solution Asset management system
US8788367B2 (en) 2009-10-14 2014-07-22 Rockwell Collins, Inc. Trip quote system and method
WO2011063269A1 (en) 2009-11-20 2011-05-26 Alert Enterprise, Inc. Method and apparatus for risk visualization and remediation
DE102010005400A1 (en) 2010-01-22 2011-07-28 Airbus Operations GmbH, 21129 Apparatus and method for controlling the humidity of a fuel cell
US7793850B1 (en) 2010-03-14 2010-09-14 Kd Secure Llc System and method used for configuration of an inspection compliance tool with machine readable tags and their associations to inspected components
US9446748B2 (en) 2010-04-16 2016-09-20 Gregory A Ward Portable antilock brake system
DE102010028263A1 (en) 2010-04-27 2011-10-27 Airbus Operations Gmbh Method and device for identifying an assignment of control loops to at least one control device
US9230224B2 (en) 2010-05-11 2016-01-05 Salesforce.Com, Inc. Providing a timeline control in a multi-tenant database environment
US8650558B2 (en) 2010-05-27 2014-02-11 Rightware, Inc. Online marketplace for pre-installed software and online services
US20110296330A1 (en) 2010-05-27 2011-12-01 Yokogawa Electric Corporation Method and apparatus for providing industrial plant information
US20110298579A1 (en) 2010-06-08 2011-12-08 Cedes Safety & Automation Ag Dynamically adaptable safety zones
US20110313826A1 (en) 2010-06-22 2011-12-22 Livetv Llc Personal electronic device (ped) operating as a commerce device onboard an aircraft and associated methods
EP2585884B1 (en) 2010-06-24 2018-11-21 ABB Schweiz AG Method and tool for automatic distribution of control code in a safety system
US8189305B2 (en) 2010-07-19 2012-05-29 Robert Charles Newman Auxiliary battery system
US20120022901A1 (en) 2010-07-20 2012-01-26 Continental Airlines, Inc. Preference Seating System
CN103097973B (en) 2010-07-26 2016-08-03 Abb股份有限公司 In the security system for method and the reader of causality matrix
IT1401483B1 (en) 2010-07-29 2013-07-26 I Agenzia Spaziale Italiana As PROCESS OF MANUFACTURING OF ELEMENTS FOR HOUSING AND / OR INDUSTRIAL STRUCTURES ON THE LUNAR AND / OR MARTIAL SOIL
US8254738B2 (en) 2010-08-27 2012-08-28 Ksaria Corporation Methods and systems for efficient installation of cables in watercraft
DE102010035814B3 (en) 2010-08-30 2011-12-29 Grenzebach Maschinenbau Gmbh Device and method for operating a flight simulator with a special appearance of reality
FR2965063B1 (en) 2010-09-21 2012-10-12 Thales Sa METHOD FOR EXTENDING THE TIME OF ILLUMINATION OF TARGETS BY SECONDARY RADAR
US20120078805A1 (en) 2010-09-29 2012-03-29 Siemans Enterprise Communications GmbH & Co., KG Method and Apparatus for Foreign Trade and Export Control
US20120089434A1 (en) 2010-10-06 2012-04-12 Schlitt John A Method and apparatus for chemical data repository
US8447675B2 (en) 2010-10-26 2013-05-21 Gold Innovations, Llc Methods and apparatus for recording legal tender decomposition of accounting system entries
US8626891B2 (en) 2010-11-03 2014-01-07 International Business Machines Corporation Configured management-as-a-service connect process based on tenant requirements
FR2967972B1 (en) 2010-11-25 2013-05-17 Eurocopter France METHOD FOR CONTROLLING AN AIRCRAFT FLOATING SYSTEM AND FLOATING SYSTEM USING THE SAME, AND AIRCRAFT
PL2458467T3 (en) 2010-11-26 2014-03-31 Abb Research Ltd Method and system for monitoring an industrial system
US20120297461A1 (en) 2010-12-02 2012-11-22 Stephen Pineau System and method for reducing cyber crime in industrial control systems
US8648708B2 (en) 2010-12-03 2014-02-11 Rockwell Automation Technologies, Inc. Method and apparatus for redefining electrical power system wiring
US8621637B2 (en) 2011-01-10 2013-12-31 Saudi Arabian Oil Company Systems, program product and methods for performing a risk assessment workflow process for plant networks and systems
US20120185772A1 (en) 2011-01-19 2012-07-19 Christopher Alexis Kotelly System and method for video generation
US20120188248A1 (en) 2011-01-26 2012-07-26 The Boeing Company Image Management and Presentation
US20120233068A1 (en) 2011-03-11 2012-09-13 Athenahealth, Inc. Methods and apparatus for healthcare payment processing
US9069930B1 (en) 2011-03-29 2015-06-30 Emc Corporation Security information and event management system employing security business objects and workflows
FR2973340B1 (en) 2011-03-30 2013-04-12 Eurocopter France METHOD, DEVICE FOR AIDING THE CONTROL OF AN AIRCRAFT, AND AIRCRAFT
US8972067B2 (en) 2011-05-11 2015-03-03 General Electric Company System and method for optimizing plant operations
US8774795B2 (en) 2011-05-20 2014-07-08 Honeywell International Inc. Reconfigurable satcom avionics radio
US20130006686A1 (en) 2011-06-29 2013-01-03 International Business Machines Corporation Managing Organizational Computing Resources in Accordance with Computing Environment Entitlement Contracts
US20120053984A1 (en) * 2011-08-03 2012-03-01 Kamal Mannar Risk management system for use with service agreements
US20130068878A1 (en) 2011-09-21 2013-03-21 Bell Helicopter Textron Inc. Self-Healing Reservoir Coating System
DE102011114378A1 (en) 2011-09-23 2013-03-28 Eads Deutschland Gmbh Access control to a jointly exclusively usable transmission medium
DE102011115244A1 (en) 2011-09-28 2013-03-28 Airbus Operations Gmbh Method and system for monitoring the operating state of a pump
US8755207B2 (en) 2011-10-12 2014-06-17 Honeywell International, Inc. Composite AC-to-DC power converter using midpoint method
US8572404B2 (en) 2011-11-04 2013-10-29 Honeywell International Inc. Security and safety manager implementation in a multi-core processor
US9536264B2 (en) 2011-11-14 2017-01-03 Microsoft Technology Licensing, Llc Host agnostic messaging in a continuation based runtime
US8909641B2 (en) 2011-11-16 2014-12-09 Ptc Inc. Method for analyzing time series activity streams and devices thereof
US9104760B2 (en) 2011-12-21 2015-08-11 The Boeing Company Panoptic visualization document database management
US9524342B2 (en) 2011-12-21 2016-12-20 The Boeing Company Panoptic visualization document navigation
US9792644B1 (en) 2012-01-19 2017-10-17 Jet Advisors, LLC System and method of supporting aircraft sales
US8887193B2 (en) 2012-01-27 2014-11-11 Sony Corporation System, method, and infrastructure for real-time live streaming content
US8862984B1 (en) 2012-02-01 2014-10-14 Amazon Technologies, Inc. Data contracts for network page generation code
EP2628574B1 (en) 2012-02-17 2023-04-12 Siemens Aktiengesellschaft Method for simulating a processing machine
US20140372289A1 (en) * 2012-02-23 2014-12-18 Snecma Process, system and computer program product for asset maintenance
US20160125518A1 (en) * 2012-02-23 2016-05-05 Snecma Process, system and computer program product for asset maintenance
FR2988849B1 (en) 2012-03-29 2015-01-09 Thales Sa SYSTEM AND METHOD FOR LASER ANEMOMETRY
US20130264420A1 (en) 2012-04-09 2013-10-10 Michael Bickelmeyer Adaptable airport system with industrial zones and clean energy generation
US9002530B2 (en) 2012-04-23 2015-04-07 General Electric Company Power plant operation enhancement
US20130282190A1 (en) 2012-04-24 2013-10-24 General Electric Company System and method for configuration and management of power plant assets
US8898694B2 (en) 2012-04-27 2014-11-25 United Video Properties, Inc. Systems and methods for indicating media asset access conflicts using a time bar
GB201207525D0 (en) 2012-04-30 2012-06-13 Airbus Operations Ltd Morphing aerofoil
US10380275B2 (en) 2012-05-09 2019-08-13 Dassault Systemes Simulia Corp. Tolerances on simulated behavior
US9256846B2 (en) 2012-05-16 2016-02-09 Honeywell International Inc. System and method for performance monitoring of a population of equipment
US9129132B2 (en) 2012-05-23 2015-09-08 Wal-Mart Stores, Inc. Reporting and management of computer systems and data sources
KR20130139622A (en) 2012-06-13 2013-12-23 한국전자통신연구원 Convergence security control system and method thereof
US10460331B2 (en) 2012-07-06 2019-10-29 Oracle International Corporation Method, medium, and system for service design and order fulfillment with technical catalog
US9825910B2 (en) 2012-08-17 2017-11-21 Gogo Llc System for providing temporary internet access from a restricted local area network environment
US9411326B2 (en) 2012-08-21 2016-08-09 General Electric Company Plant control optimization system including visual risk display
WO2014030141A2 (en) 2012-08-22 2014-02-27 White Lion S.A. Method, system and software product for managing people, goods and services using automatic identification technology
US20140075506A1 (en) 2012-09-13 2014-03-13 iJet Technologies, Inc. Extensible and Scalable Distributed Computing and Communication Remote Services Platform for Telemetry Collection Adaptive Data Driven Application Hosting, and Control Services
US10275428B2 (en) 2012-09-25 2019-04-30 The Boeing Company Panoptic visualization document differencing
US9092415B2 (en) 2012-09-25 2015-07-28 Rovi Guides, Inc. Systems and methods for automatic program recommendations based on user interactions
US9493248B1 (en) 2012-09-28 2016-11-15 Rockwell Collins, Inc. Remote display of flight deck information from a legacy display system
US20140096018A1 (en) 2012-09-28 2014-04-03 Interactive Memories, Inc. Methods for Recognizing Digital Images of Persons known to a Customer Creating an Image-Based Project through an Electronic Interface
US9215144B2 (en) 2012-10-18 2015-12-15 International Business Machines Corporation Recommending a policy for an IT asset
US9875220B2 (en) 2012-11-09 2018-01-23 The Boeing Company Panoptic visualization document printing
US20160243432A1 (en) 2012-11-30 2016-08-25 Paul R. Juhasz Build, License, and Litigate - A Game of Patent Strategy
US8903358B2 (en) 2012-12-17 2014-12-02 Sap Se Mobile service primary subscriber with secondary subscribers
US20140176328A1 (en) 2012-12-21 2014-06-26 Kadari SubbaRao Sudeendra Thirtha Koushik Passenger Management system
US9734625B2 (en) 2013-01-28 2017-08-15 The Boeing Company Panoptic visualization of a three-dimensional representation of a complex system
US9665557B2 (en) 2013-01-28 2017-05-30 The Boeing Company Panoptic visualization of elements of a complex system using localization of a point on a physical instance of the complex system
US9858245B2 (en) 2013-01-28 2018-01-02 The Boeing Company Panoptic visualization of elements of a complex system using a model viewer
FR3001714B1 (en) 2013-02-05 2016-08-26 Astrium Sas DEVICE FOR SUPPORTING AND MAINTAINING CRYOGENIC RESERVOIRS
US9292405B2 (en) 2013-03-08 2016-03-22 Sap Se HANA based multiple scenario simulation enabling automated decision making for complex business processes
US9274521B1 (en) 2015-02-02 2016-03-01 Rockwell Collins, Inc. Employing local, opportunistic automatic dependent surveillance-broadcast (ADS-B) information processed by an unmanned aerial vehicle ground control station to augment other source “knowledge” of local aircraft position information for improving situational awareness
US9911163B2 (en) 2013-03-15 2018-03-06 Rockwell Automation Technologies, Inc. Systems and methods for determining energy information using an organizational model of an industrial automation system
US20140280964A1 (en) 2013-03-15 2014-09-18 Gravitant, Inc. Systems, methods and computer readable mediums for implementing cloud service brokerage platform functionalities
US20140278617A1 (en) 2013-03-15 2014-09-18 Rockwell Automation Technologies, Inc. Systems and methods for updating confidence values for energy information associated with an industrial automation system
US9501804B2 (en) 2013-03-15 2016-11-22 Rockwell Automation Technologies, Inc. Multi-core processor for performing energy-related operations in an industrial automation system using energy information determined with an organizational model of the industrial automation system
US9842372B2 (en) 2013-03-15 2017-12-12 Rockwell Automation Technologies, Inc. Systems and methods for controlling assets using energy information determined with an organizational model of an industrial automation system
US9709978B2 (en) 2013-05-09 2017-07-18 Rockwell Automation Technologies, Inc. Using cloud-based data for virtualization of an industrial automation environment with information overlays
US20140337277A1 (en) 2013-05-09 2014-11-13 Rockwell Automation Technologies, Inc. Industrial device and system attestation in a cloud platform
US20140336791A1 (en) 2013-05-09 2014-11-13 Rockwell Automation Technologies, Inc. Predictive maintenance for industrial products using big data
US9786197B2 (en) 2013-05-09 2017-10-10 Rockwell Automation Technologies, Inc. Using cloud-based data to facilitate enhancing performance in connection with an industrial automation system
US20140336795A1 (en) 2013-05-09 2014-11-13 Rockwell Automation Technologies, Inc. Remote assistance via a cloud platform for industrial automation
US9703902B2 (en) 2013-05-09 2017-07-11 Rockwell Automation Technologies, Inc. Using cloud-based data for industrial simulation
US9989958B2 (en) 2013-05-09 2018-06-05 Rockwell Automation Technologies, Inc. Using cloud-based data for virtualization of an industrial automation environment
US10026049B2 (en) 2013-05-09 2018-07-17 Rockwell Automation Technologies, Inc. Risk assessment for industrial systems using big data
US9270694B2 (en) 2013-05-21 2016-02-23 Rapid7, Llc Systems and methods for assessing security for a network of assets and providing recommendations
US9904356B2 (en) 2013-05-28 2018-02-27 The Boeing Company Tracking a user to support tasks performed on complex-system components
US9235395B2 (en) 2013-05-30 2016-01-12 National Instruments Corporation Graphical development and deployment of parallel floating-point math functionality on a system with heterogeneous hardware components
US11055450B2 (en) 2013-06-10 2021-07-06 Abb Power Grids Switzerland Ag Industrial asset health model update
US10535025B2 (en) 2013-06-10 2020-01-14 Abb Research Ltd. Criticality profile for industrial asset
US9378772B2 (en) 2013-06-27 2016-06-28 Rovi Guides, Inc. Systems and methods for visualizing storage availability of a DVR
US10009228B2 (en) 2013-06-28 2018-06-26 International Business Machines Corporation Automated validation of contract-based policies by operational data of managed IT services
US9245284B2 (en) 2013-07-31 2016-01-26 Ryan Hardin Application of dynamic tokens
US9549224B2 (en) 2013-08-07 2017-01-17 Rovi Guides, Inc. Methods and systems for presenting supplemental content in media assets
US9355567B2 (en) 2013-08-08 2016-05-31 Honeywell International Inc. System and method for highlighting an area encompassing an aircraft that is free of hazards
US9135670B2 (en) 2013-08-14 2015-09-15 Us Airways, Inc. Operational reliability systems and methods
US20150058183A1 (en) 2013-08-21 2015-02-26 Synergy Aviation Services, Inc. System and Method for Identifying Taxable Events for Mobile Property
US20150057783A1 (en) 2013-08-23 2015-02-26 Sergio Javier Rossi Manufacturing and Asset Maintenance
US20150066696A1 (en) 2013-09-04 2015-03-05 Verizon Deutschland Gmbh Coordination of business systems
US20150074749A1 (en) 2013-09-10 2015-03-12 Rockwell Automation Technologies, Inc. Remote asset management services for industrial assets
US9569525B2 (en) 2013-09-17 2017-02-14 International Business Machines Corporation Techniques for entity-level technology recommendation
DE102014114315A1 (en) 2013-10-07 2015-04-16 Schott Ag Night vision compatible LED lighting device
SG2013075338A (en) 2013-10-08 2015-05-28 K One Ind Pte Ltd Set meal preparation system
US9247279B2 (en) 2013-11-22 2016-01-26 Thales Avionics, Inc. Portable vehicle entertainment systems with wireless communication of entertainment content
GB2521368A (en) 2013-12-17 2015-06-24 Intellisense Io Ltd System and method for optimizing an efficency of an asset and an overall system in a facility
US9507686B2 (en) 2013-12-20 2016-11-29 Netapp, Inc. System, method, and computer program product for monitoring health of computer system assets
US9712482B2 (en) 2014-02-18 2017-07-18 Veveo, Inc. Methods and systems for recommending concept clusters based on availability
US20150242182A1 (en) 2014-02-24 2015-08-27 Honeywell International Inc. Voice augmentation for industrial operator consoles
US9625928B2 (en) 2014-02-24 2017-04-18 General Electric Company Systems and methods for error monitoring and handling in control systems
US20150293530A1 (en) 2014-02-28 2015-10-15 Invensys Systems, Inc. Manufacturing execution system authorization
US9424693B2 (en) * 2014-03-10 2016-08-23 Embraer S.A. Maintenance planning optimization for repairable items based on prognostics and health monitoring data
US20150262126A1 (en) 2014-03-14 2015-09-17 Poplicus Inc. Method and system for aggregating records for a project from disparate databases
EP2925025B1 (en) 2014-03-27 2016-03-23 dSPACE digital signal processing and control engineering GmbH Computer implemented method for implementing a Car2x application
WO2015147871A1 (en) 2014-03-28 2015-10-01 Sicpa Security Inks & Systems Usa, Inc. Global management for oil gas assets
EA201591359A1 (en) 2014-04-04 2016-04-29 СИКПА СЕКЬЮРИТИ ИНКС ЭНД СИСТЕМЗ ЮЭсЭй, ИНК. INTERFACE FOR CREATING DATA COMPATIBLE WITH THE EXTERNAL SYSTEM IN THE SUPPLY CHAIN OF OIL AND GAS RESOURCES
US9327841B1 (en) 2014-05-09 2016-05-03 Rockwell Collins, Inc. Event driven vehicle position reporting methods and systems
US10068173B2 (en) 2014-05-22 2018-09-04 Invuity, Inc. Medical device featuring cladded waveguide
BR112015016131A2 (en) 2014-06-09 2017-08-22 Sicpa Security Inks & Systems Usa Inc INTEGRITY MANAGEMENT SYSTEM MANAGING OPERATION AND CONTROL BETWEEN AT LEAST ONE ENTITY IN AN OIL SUPPLY CHAIN AND CONTROL BETWEEN AT LEAST ONE ENTITY IN AN OIL AND GAS SUPPLY CHAIN.
US20150371190A1 (en) 2014-06-23 2015-12-24 General Electric Company Systems and methods for provisioning a fleet of industrial assets as a computing-cloud
US9678982B2 (en) 2014-07-09 2017-06-13 International Business Machines Corporation Accessibility advisement system for digital assets
US20160010628A1 (en) * 2014-07-10 2016-01-14 General Electric Company System and method for determining life of a wind turbine
US10375087B2 (en) 2014-07-21 2019-08-06 Honeywell International Inc. Security architecture for the connected aircraft
US9692499B2 (en) 2014-10-06 2017-06-27 Harris Corporation Terrestrial based air-to-ground communications system and related methods
EA201691185A1 (en) 2014-10-14 2016-11-30 Сикпа Холдинг Са INTERFACE WITH A PROTECTED INTERMEDIATE PLATFORM FOR CREATING DATA COMPATIBLE WITH THE EXTERNAL SYSTEM IN THE SUPPLY CHAIN OF OIL AND GAS RESOURCES
US10372107B2 (en) 2014-10-15 2019-08-06 Rockwell Automation Technologies, Inc. Custom properties in an application environment
US9760635B2 (en) 2014-11-07 2017-09-12 Rockwell Automation Technologies, Inc. Dynamic search engine for an industrial environment
US10417076B2 (en) 2014-12-01 2019-09-17 Uptake Technologies, Inc. Asset health score
US20160188675A1 (en) 2014-12-29 2016-06-30 Ge Aviation Systems Llc Network for digital emulation and repository
US9984580B2 (en) 2015-01-09 2018-05-29 General Electric Company Method and system for robust network planning optimization of airline flight operations
US10049583B2 (en) 2015-02-01 2018-08-14 Clearag, Inc. Flight condition evaluation and protection for unmanned aerial vehicles and remotely-piloted vehicles
US20160231716A1 (en) 2015-02-10 2016-08-11 General Electric Company System of systems optimizing control for achieving performance and risk outcomes in physical and business operations of connected and interrelated industrial systems
US9740896B1 (en) 2015-02-15 2017-08-22 Plataine Ltd. Method and system for managing an efficient production floor, via the internet of things
US10762475B2 (en) * 2015-02-25 2020-09-01 Siemens Schweiz Ag Digital twins for energy efficient asset maintenance
US9960598B2 (en) 2015-03-03 2018-05-01 General Electric Company Methods and systems for enhancing control of power plant generating units
EP3065076A1 (en) 2015-03-04 2016-09-07 Secure-Nok AS System and method for responding to a cyber-attack-related incident against an industrial control system
WO2016141138A1 (en) * 2015-03-05 2016-09-09 Sikorsky Aircraft Corporation Fleet analytic services toolset
WO2016144297A1 (en) 2015-03-06 2016-09-15 General Electric Company Automatic deployment of control code
US11513477B2 (en) 2015-03-16 2022-11-29 Rockwell Automation Technologies, Inc. Cloud-based industrial controller
US11243505B2 (en) 2015-03-16 2022-02-08 Rockwell Automation Technologies, Inc. Cloud-based analytics for industrial automation
US11042131B2 (en) 2015-03-16 2021-06-22 Rockwell Automation Technologies, Inc. Backup of an industrial automation plant in the cloud
US10496061B2 (en) 2015-03-16 2019-12-03 Rockwell Automation Technologies, Inc. Modeling of an industrial automation environment in the cloud
US10943195B2 (en) 2015-03-20 2021-03-09 Schneider Electric Systems Usa, Inc. Asset management in a process control system
US9325793B1 (en) 2015-04-30 2016-04-26 Smartsky Networks LLC Smart aviation dynamic cookie
US10132295B2 (en) * 2015-05-15 2018-11-20 General Electric Company Digital system and method for managing a wind farm having plurality of wind turbines coupled to power grid
WO2016186694A1 (en) * 2015-05-15 2016-11-24 General Electric Company Condition-based validation of performance updates
US11232415B2 (en) 2015-05-28 2022-01-25 OX Labs Inc. Method for cryptographically managing title transactions
ES2764255T3 (en) 2015-06-01 2020-06-02 Sita Information Networking Computing Uk Ltd Procedure and system to monitor the status of an aircraft
US9485537B1 (en) 2015-06-05 2016-11-01 Canoe Ventures, Llc Asset recommendations in a VOD system with asset effectiveness determinations
US9996600B1 (en) 2015-06-25 2018-06-12 Amazon Technologies, Inc. Asynchronous communication of transaction data to clients
US9871694B1 (en) 2015-06-25 2018-01-16 Amazon Technologies, Inc. Parallel processing for transaction data generation
US9767483B2 (en) 2015-07-22 2017-09-19 Adobe Systems Incorporated Enabling access to third-party digital assets for systems that market content to target audiences
US9830829B1 (en) 2015-08-17 2017-11-28 Rockwell Collins, Inc. Management system and methods for implementing aircraft intentions harmonization
US20170076235A1 (en) 2015-09-15 2017-03-16 General Electric Company System and method for scheduling software updates for industrial assets based on forecasted operating data
US9865156B2 (en) 2015-09-23 2018-01-09 Schneider Electric Systems Usa, Inc. System for contextualizing and resolving alerts
US11196621B2 (en) 2015-10-02 2021-12-07 Delta Energy & Communications, Inc. Supplemental and alternative digital data delivery and receipt mesh net work realized through the placement of enhanced transformer mounted monitoring devices
JP6769700B2 (en) 2015-10-19 2020-10-14 三菱航空機株式会社 Aircraft landing gear handling dolly and how to install and remove the landing gear using it
US10198718B2 (en) 2015-10-28 2019-02-05 Rubicon Global Holdings, Llc Waste management system having vendor opportunity platform
US20170124675A1 (en) 2015-10-28 2017-05-04 Nicholas E. Bruce System and method for quantifying fraudulent overcharges and penalties in a claim statement
US9962956B2 (en) * 2015-11-05 2018-05-08 Northrop Grumman Systems Corporation System and method for onboard data tracking
US20170192957A1 (en) 2015-12-30 2017-07-06 International Business Machines Corporation Methods and analytics systems having an ontology-guided graphical user interface for analytics models
US10156842B2 (en) 2015-12-31 2018-12-18 General Electric Company Device enrollment in a cloud service using an authenticated application
US9838832B2 (en) 2016-01-05 2017-12-05 Rockwell Automation Technologies, Inc. Wireless communication device linking in an industrial automation environment
US10097585B2 (en) 2016-01-22 2018-10-09 Rockwell Automation Technologies, Inc. Model-based security policy configuration and enforcement in an industrial automation system
US20170220334A1 (en) 2016-01-29 2017-08-03 General Electric Company Mobile management of industrial assets
US10397331B2 (en) 2016-01-29 2019-08-27 General Electric Company Development platform for industrial internet applications
US20170242555A1 (en) 2016-02-19 2017-08-24 General Electric Company User interface component for browsing industrial assets
CA3054546C (en) 2016-02-24 2022-10-11 Delta Energy & Communications, Inc. Distributed 802.11s mesh network using transformer module hardware for the capture and transmission of data
US20170257353A1 (en) 2016-03-07 2017-09-07 Ricoh Company, Ltd. System For Using Login Information And Historical Data To Determine Processing For Data Received From Various Data Sources
US20170302649A1 (en) 2016-04-19 2017-10-19 General Electric Company Systems and methods for segmenting industrial asset services
US20170308802A1 (en) 2016-04-21 2017-10-26 Arundo Analytics, Inc. Systems and methods for failure prediction in industrial environments
US10228915B2 (en) 2016-04-21 2019-03-12 Schneider Electric Software, Llc Object configuration utilities
US10318904B2 (en) 2016-05-06 2019-06-11 General Electric Company Computing system to control the use of physical state attainment of assets to meet temporal performance criteria
US10417614B2 (en) 2016-05-06 2019-09-17 General Electric Company Controlling aircraft operations and aircraft engine components assignment
US10591970B2 (en) 2016-05-18 2020-03-17 Abb Schweiz Ag Industrial asset management systems and methods thereof
US20170357928A1 (en) 2016-06-08 2017-12-14 Honeywell International Inc. System and method for industrial process control and automation system operator evaluation and training
US10444724B2 (en) 2016-06-20 2019-10-15 General Electric Company Interface method and apparatus
US10534328B2 (en) 2016-06-21 2020-01-14 General Electric Company Methods and systems for enhancing control of power plant generating units
US11605037B2 (en) 2016-07-20 2023-03-14 Fisher-Rosemount Systems, Inc. Fleet management system for portable maintenance tools
US20180039249A1 (en) 2016-08-02 2018-02-08 General Electric Company Automated dynamical control of operations and design of physical systems through time
US20180039956A1 (en) 2016-08-08 2018-02-08 Uptake Technologies, Inc. Computer Architecture and Method for Recommending Asset Repairs
US9613233B1 (en) 2016-08-08 2017-04-04 Marking Services Incorporated Interactive industrial maintenance, testing, and operation procedures
US10489752B2 (en) 2016-08-26 2019-11-26 General Electric Company Failure mode ranking in an asset management system
EP3291147A1 (en) 2016-08-30 2018-03-07 Hitachi, Ltd. System, method and server apparatus for distribution of service requests associated with maintenance services required for maintenance of industrial assets
US10380899B2 (en) 2016-09-13 2019-08-13 Honeywell International Inc. Ground direction of aircraft datalinks
US10606254B2 (en) 2016-09-14 2020-03-31 Emerson Process Management Power & Water Solutions, Inc. Method for improving process/equipment fault diagnosis
US20180089637A1 (en) 2016-09-26 2018-03-29 General Electric Company Framework for industrial asset repair recommendations
US20180137219A1 (en) 2016-11-14 2018-05-17 General Electric Company Feature selection and feature synthesis methods for predictive modeling in a twinned physical system
US11144683B2 (en) 2016-12-06 2021-10-12 General Electric Company Real-time adaptation of system high fidelity model in feature space
US10594555B2 (en) 2016-12-16 2020-03-17 Intelligent Platforms, Llc Cloud-enabled testing of control systems
US10902381B2 (en) 2016-12-19 2021-01-26 General Electric Company Methods and systems for providing improved data access framework
US20180189701A1 (en) 2016-12-29 2018-07-05 General Electric Company Distributed cache cleanup for analytic instance runs processing operating data from industrial assets
US10414510B2 (en) 2016-12-30 2019-09-17 Safran Landing Systems Canada Inc. Landing gear with threadless cardan joint
US10394770B2 (en) 2016-12-30 2019-08-27 General Electric Company Methods and systems for implementing a data reconciliation framework
US9914548B1 (en) 2017-02-22 2018-03-13 Imagik International Corporation USB power management and load distribution system

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10902163B2 (en) * 2015-09-07 2021-01-26 Shoreline As Simulation method and system
US10318904B2 (en) 2016-05-06 2019-06-11 General Electric Company Computing system to control the use of physical state attainment of assets to meet temporal performance criteria
US10318903B2 (en) 2016-05-06 2019-06-11 General Electric Company Constrained cash computing system to optimally schedule aircraft repair capacity with closed loop dynamic physical state and asset utilization attainment control
US12118627B2 (en) 2016-05-20 2024-10-15 Moog Inc. Secure and traceable manufactured parts
US20180300971A1 (en) * 2017-03-10 2018-10-18 Qt Technologies Electronic aircraft data capture for refueling
US11074532B1 (en) * 2017-11-06 2021-07-27 Wells Fargo Bank, N.A. Monitoring and analyzing risk data and risk dispositions
US11687861B1 (en) * 2017-11-06 2023-06-27 Wells Fargo Bank, N.A. Monitoring and analyzing risk data and risk dispositions
US11403554B2 (en) * 2018-01-31 2022-08-02 The Johns Hopkins University Method and apparatus for providing efficient testing of systems by using artificial intelligence tools
US11393266B2 (en) 2018-03-23 2022-07-19 The Boeing Company Blockchain configuration history for aircraft maintenance, modification, and activity tracking
US11315369B2 (en) 2018-03-23 2022-04-26 The Boeing Company Blockchain configuration history for vehicle maintenance, modification, and activity tracking
US10974851B2 (en) 2018-11-09 2021-04-13 Textron Innovations Inc. System and method for maintaining and configuring rotorcraft
US11794926B2 (en) 2018-11-09 2023-10-24 Textron Innovations Inc. System and method for maintaining and configuring rotorcraft
US10935964B2 (en) 2018-12-04 2021-03-02 General Electric Company Method and system for optimizing a manufacturing process based on a surrogate model of a part
US11151512B2 (en) 2018-12-14 2021-10-19 The Boeing Company Interlocking blockchains for aircraft part history and current aircraft configuration
CN111352352A (en) * 2018-12-21 2020-06-30 Abb瑞士股份有限公司 Method and system for determining system settings of an industrial system
US20220383757A1 (en) * 2019-03-29 2022-12-01 QuantumiD Technologies Inc. Artificial intelligence system for estimating excess non-sapient payload capacity on mixed-payload aeronautic excursions
US11410058B2 (en) 2019-03-29 2022-08-09 QuantumiD Technologies Inc. Artificial intelligence system for estimating excess non-sapient payload capacity on mixed-payload aeronautic excursions
US11651696B2 (en) 2019-04-02 2023-05-16 Honeywell International Inc. Method and system for monitoring fuel usage and data
US11074819B2 (en) 2019-04-02 2021-07-27 Honeywell International Inc. Method and system for enabling computations to estimate and predict costs with a cost index by an operating cost app with an operating cost integrator interface for displaying gate to gate flight costs
US11631060B2 (en) 2019-06-14 2023-04-18 General Electric Company Additive manufacturing-coupled digital twin ecosystem based on a surrogate model of measurement
US11567481B2 (en) 2019-06-14 2023-01-31 General Electric Company Additive manufacturing-coupled digital twin ecosystem based on multi-variant distribution model of performance
US11371965B2 (en) 2019-07-10 2022-06-28 Vibrant Corporation Digital twin model inversion for testing
US11371966B1 (en) 2019-07-10 2022-06-28 Vibrant Corporation Digital twin model inversion for testing
US11499945B2 (en) 2019-07-10 2022-11-15 Vibrant Corporation Digital twin model inversion for testing
WO2021007421A3 (en) * 2019-07-10 2021-04-01 Vibrant Corporation Digital twin model inversion for testing
CN114223002A (en) * 2019-08-07 2022-03-22 普雷科格奈兹公司 Method and system for improving asset operation based on identifying significant changes in sensor combinations in related events
US11636412B2 (en) 2020-01-24 2023-04-25 General Electric Company System and method for prognostic analytics of an asset
WO2021211957A1 (en) * 2020-04-16 2021-10-21 QuantumID Technologies Inc Artificial intelligence system for estimating excess non-sapient payload capacity on mixed-payload aeronautic excursions
US20210350294A1 (en) * 2020-05-08 2021-11-11 General Electric Company Operations optimization assignment control system with coupled subsystem models and digital twins
CN113625666A (en) * 2020-05-08 2021-11-09 通用电气公司 Operation optimization distribution control system with coupled subsystem model and digital twinning
US11308431B2 (en) * 2020-07-07 2022-04-19 Intuit Inc. Hierarchical optimization for processing objectives sequentially and/or iteratively
US11921872B2 (en) 2020-12-16 2024-03-05 International Business Machines Corporation Access control for a data object including data with different access requirements
US12039494B2 (en) 2021-03-22 2024-07-16 International Business Machines Corporation Glue-contracts for digital corollaries in blockchain networks
US20230099025A1 (en) * 2021-09-30 2023-03-30 Abb Power Grids Switzerland Ag Resource-constrained, multi-period scheduling model for asset investment planning
EP4235537A1 (en) * 2022-02-24 2023-08-30 Honeywell International Inc. Customized asset performance optimization and marketplace
US20230297930A1 (en) * 2022-03-21 2023-09-21 Infosys Limited Method and system for building actionable knowledge based intelligent enterprise system
US20230359963A1 (en) * 2022-05-05 2023-11-09 The Boeing Company Validation of cost-optimal minimum turn times
CN116993329A (en) * 2023-09-27 2023-11-03 深圳百沃彰世科技有限公司 Communication equipment operation maintenance decision management system based on data analysis

Also Published As

Publication number Publication date
US20170323240A1 (en) 2017-11-09
US20170323231A1 (en) 2017-11-09
US10318903B2 (en) 2019-06-11
US20170323403A1 (en) 2017-11-09
US10318904B2 (en) 2019-06-11

Similar Documents

Publication Publication Date Title
US10318904B2 (en) Computing system to control the use of physical state attainment of assets to meet temporal performance criteria
US10417614B2 (en) Controlling aircraft operations and aircraft engine components assignment
CN110046716B (en) System, method, and storage medium to generate an asset working range
US10287988B2 (en) Methods and systems for enhancing operation of power plant generating units and systems
US20160231716A1 (en) System of systems optimizing control for achieving performance and risk outcomes in physical and business operations of connected and interrelated industrial systems
US20160147204A1 (en) Methods and systems for enhancing control of power plant generating units
Rosskopf et al. Economic–environmental trade-offs in long-term airline fleet planning
Fritzsche et al. Optimal prognostic distance to minimize total maintenance cost: The case of the airline industry
US20140372289A1 (en) Process, system and computer program product for asset maintenance
Saravanan et al. An integrated approach for lead time reduction of military aircraft major overhaul: A case of ABC Company
US20160125518A1 (en) Process, system and computer program product for asset maintenance
Eickemeyer et al. Reliable capacity planning despite uncertain disassembly, regeneration and reassembly workloads by using statistical and mathematical approaches–Validation in subsidiaries of a global MRO company with operations in Asia, Europe and North America
Wikstén et al. Maintenance and reliability with focus on aircraft maintenance and spares provisioning
Mathaisel et al. Engineering for sustainability
Leonard GAO Cost estimating and assessment guide: Best practices for developing and managing capital program costs
Rees et al. Know, predict, control: A case study in services management
Goncalves et al. Collaborative product–service approach to aviation maintenance, repair, and overhaul. Part I: Quantitative model
Justin et al. Option-based approach to value engine maintenance cost guarantees and engine maintenance contracts
Keller et al. The business case for SHM
Ulu Data Analytics Methods Used for the Issues of Civil Aviation Maintenance Repair and Overhaul Industry-a Literature Review
Block et al. Using Monte Carlo simulation as support for decision making while negotiating a PBL contract
Kumar The Role of Technological Forecasting in the Effective Implementation of Supply Chain Management in the Helicopter Market
Rianti Comparative Analysis of AHP Method and Applied ON/OFF Method in Choosing Engineering, Procurement, and Construction Contractors
Wibowo Decision support method for contracting of non-original equipment manufacturer aero engine maintenance repair and overhaul service providers.
Eddy Leveraging Operational Use Data to Inform the Systems Engineering Process of Fielded Aerospace Defense Systems

Legal Events

Date Code Title Description
AS Assignment

Owner name: GENERAL ELECTRIC COMPANY, NEW YORK

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:JOHNSON, CHRISTOPHER DONALD;DULGEROGLU, ILKIN ONUR;TOLEDANO, DAVID S.;AND OTHERS;SIGNING DATES FROM 20170201 TO 20170206;REEL/FRAME:041194/0252

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION