US20170044644A1 - Process of extracting gold and silver from ores and mining by-products - Google Patents

Process of extracting gold and silver from ores and mining by-products Download PDF

Info

Publication number
US20170044644A1
US20170044644A1 US15/307,520 US201515307520A US2017044644A1 US 20170044644 A1 US20170044644 A1 US 20170044644A1 US 201515307520 A US201515307520 A US 201515307520A US 2017044644 A1 US2017044644 A1 US 2017044644A1
Authority
US
United States
Prior art keywords
ppm
gold
silver
mining
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US15/307,520
Inventor
Jack Goldstein
Liana Rozica Osanu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Assigned to FLOREAN, VICTOR reassignment FLOREAN, VICTOR ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GOLDSTEIN, JACK, OSANU, LIANA ROZICA
Publication of US20170044644A1 publication Critical patent/US20170044644A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B11/00Obtaining noble metals
    • C22B11/04Obtaining noble metals by wet processes
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B3/00Extraction of metal compounds from ores or concentrates by wet processes
    • C22B3/04Extraction of metal compounds from ores or concentrates by wet processes by leaching
    • C22B3/12Extraction of metal compounds from ores or concentrates by wet processes by leaching in inorganic alkaline solutions
    • C22B3/14Extraction of metal compounds from ores or concentrates by wet processes by leaching in inorganic alkaline solutions containing ammonia or ammonium salts
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B3/00Extraction of metal compounds from ores or concentrates by wet processes
    • C22B3/20Treatment or purification of solutions, e.g. obtained by leaching
    • C22B3/22Treatment or purification of solutions, e.g. obtained by leaching by physical processes, e.g. by filtration, by magnetic means, or by thermal decomposition
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B3/00Extraction of metal compounds from ores or concentrates by wet processes
    • C22B3/20Treatment or purification of solutions, e.g. obtained by leaching
    • C22B3/44Treatment or purification of solutions, e.g. obtained by leaching by chemical processes
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B9/00General processes of refining or remelting of metals; Apparatus for electroslag or arc remelting of metals
    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25CPROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
    • C25C1/00Electrolytic production, recovery or refining of metals by electrolysis of solutions
    • C25C1/20Electrolytic production, recovery or refining of metals by electrolysis of solutions of noble metals
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Definitions

  • the invention relates to a process for the extraction of gold and silver from ores or mining by-products consisting of pyrite concentrates, flotation tailings and metallurgical slags, chemically, using as reagent a solution of ammonium thiosulphate in an alkaline medium and a catalyst consisting of an amine of copper, provided the reagents are recirculated in the leaching process.
  • Processes are known for the preparation of gold and silver by solubilizing ores and pyrite concentrates in sodium thiosulphate solution, after having been oxidized in advance, in an autoclave under a pressure of oxygen, in an acid or alkaline environment, by oxidation reactions with chlorine or chlorites, by direct dissolution of the sodium thiosulphate solution in the presence of copper or nickel.
  • the extraction of the gold and silver solubilized in thiosulphate solution is carried out by adsorption on ion exchange or adsorption on active carbon, electrochemically, by cementation on copper, zinc and aluminum, by precipitation with sodium sulphide.
  • the ore containing 6 ppm Au is oxidized in an alkaline medium, under a pressure of oxygen, at 210-220° C.
  • the solubilization of gold in ores is carried out with a solution of 0.1 m ammonium thiosulfate and 0.5 g/l Cu 2+ , and extraction of metals gold, silver and copper from the solution is carried out by absorption on ion exchange resins—IRA 93, IRA 400.
  • the concentration of gold in the resin may increase to 9 kg/t resin.
  • the solubilization of gold and silver from an ore containing 1.7 ppm Au is carried out with a solution containing 50-60 g/l Na 2 S 2 O 3 .5H 2 O, 3-4 g/l Cu, 5-7 g/l (NH 4 ) 2 SO 4 , and 3 g/l of NH 3 at a solid:liquid ratio of 1:1 . . . 1:1.5, at a temperature of 15-25° C. for 2-4 hours.
  • the suspension is filtered and the solution is recycled in the leaching system up to reaching a concentration of less than 10 ppm Au, which is then subjected to electrolysis with insoluble electrodes.
  • the cement of copper, gold and silver separated to cathode is filtered separately and subjected to a leaching in sulphuric acid.
  • the solution with 50-60 g/l Na 2 S 2 O 3 .5H 2 O is adjusted to 3-4 g/l Cu and recycled in the ore leaching process.
  • the gold and silver cement is melted in an alkaline-reducing medium to 1,200° C., obtaining the Au—Ag alloy.
  • the yield of the process is 78-82% for gold and 76-81% for silver, provided the content of noble metals in the ore.
  • the technical problem solved by the invention as claimed is to recover gold and silver from ores, by-products and mining tailings with low noble metals content (less than 0.5 ppm Au), in terms of use of non-toxic reagents in a relatively low concentration, namely all reagents recirculation.
  • the present invention solves the technical problem by the fact that, removing the aforegoing disadvantages, and allowing to obtain gold and silver from ores and mining residues with a content of at least 0.5 ppm Au, presents the following technological steps:
  • the process according to the invention consists in treating the raw material with a minimum of 0.5 ppm under stirring with a solution resulted from the electrolytic separation of gold, silver and copper, which contains 10 to 25 g/l (NH 4 ) 2 S 2 O 3 ; 0.1 to 1.0 g/l Cu; 0.3-0.4 g/l NH 4 OH; 5-15 ppm Au and 1-100 ppm Ag, at a solid:liquid ratio of 1:1 . . . 1:1.5 under stirring and air bubbling for 2 to 4 hours at a temperature of 15-25° C.
  • the resulting suspension is filtered and the residue is washed with water and becomes raw material, when contains common metals or becomes construction filler material, when the basic component is a silicate.
  • the filtered solution both with washing water is subjected to an electrochemical extraction with insoluble anodes, the electric current density being of 200-250 A/m2, when is formed a copper cement containing 1 . . . 5% Au and 1 . . . 20% Ag.
  • the circulation speed of the electrolyte is set such that the output from the electrolysis cell contains: 10-25 g/l (NH 4 ) 2 S 2 O 3 ; 5-15 ppm Au; 1-100 ppm Ag and 0.1 to 1.0 g/l Cu.
  • This solution after correcting the content of copper to 0.12 1.2 g/l, is recycled to the leaching of the raw material.
  • the copper cement containing gold and silver is solubilized with ammoniacal water to a concentration of 20% NH 3 at a solid:liquid ratio of 1:5-1:10 under stirring, at a temperature of 15-25° C., for 3-5 hours.
  • the suspension is filtered and the copper tetrammine filtrate is recycled to the leaching operation of the raw material, in order to correct the copper content and the pH.
  • the residue resulting after washing and drying at a temperature of 105° C. is melted in a alkaline-reducing medium, to obtain the Au—Ag alloy—the doré alloy. Separation of gold and silver from the doré alloy is achieved by electrochemical refining, obtaining give gold and silver with a purity of 99.9%.
  • the suspension was stirred for 4 hours with air bubbling 30 m 3 /h, and filtered on a vacuum rotary drum filter with a filter area of 1 m 2 .
  • the filtered solution with a volume of 1.5-1.6 m 3 which contains 10 to 25 g/l (NH 4 ) 2 S 2 O 3 , 13.2-15.5 ppm Au, 51-65 ppm Ag and 0.12 to 0.15 g/l Cu (pH 10-11) is subjected to electrolysis with anodes made of high-alloy steel, the electric current density of 200-250 A/m 2 .
  • the electrolytical cell having a capacity of 2 m 3 , is equipped with two electrodes of equal surfaces of 1 m 2 .
  • the electrolyte is internally recycled at a rate of 2 m 3 /h.
  • the operation takes about 2 hours and is considered finished when the electrolyte that leaves the cell contains 13.0 to 15.0 ppm Au, 50-60 ppm Ag and 0.10 to 0.12 g/l Cu.
  • the cementum separated in the conical part of the cell in an amount of 1.0-1.5 kg, with a content of 0.9 to 1.0% Au, 17-19% Ag and 35-45% Cu, is filtered and washed with water.
  • the leaching of the copper cementum in the filtrate is carried out in a reactor made of enamelled iron of 100 litres, ammonia water having a concentration of 20% NH 3 at a solid:liquid ratio of 1:3 . . .
  • Example 2 Under similar operations as in Example 1, with the difference that the raw material is a pyrite concentrate refractive to the dissolution in an alkaline cyanide solution, containing 12 ppm Au, 50 ppm Ag, and after dissolving results a pyrite with 0.95 ppm Au and 2.5 ppm Ag.
  • the overall yield of the operation pyrite concentrates—metal is 86.2% to 89.7% for Au and Ag.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention relates to a process for the extraction of gold and silver from ores and mining by-products. The process according to invention consists in treating ores and mining residues having a content of 0.5 . . . 12 ppm Au with a solution of ammonium thiosulphate, recycled at a temperature of 15-25° C.; the filtrate resulting after solubilization is subjected to an electrolytic extraction with high-alloy electrodes with a current density of 200 . . . 250 A/m2, until the electrolyte reach a concentration of 5-15 ppm Au, 1-100 ppm Ag and 0.1-1.0 g/1 Cu; afterwards, the separated cement is filtered off and dissolved in aqueous ammonia, dried at a temperature of 105° C. and melted at a temperature of 1200° C., resulting a Au-Ag alloy, which is processed by electrochemical and thermal refining operations, from which there are obtained Au and Ag of high purity.

Description

  • The invention relates to a process for the extraction of gold and silver from ores or mining by-products consisting of pyrite concentrates, flotation tailings and metallurgical slags, chemically, using as reagent a solution of ammonium thiosulphate in an alkaline medium and a catalyst consisting of an amine of copper, provided the reagents are recirculated in the leaching process.
  • Processes are known for the preparation of gold and silver by solubilizing ores and pyrite concentrates in sodium thiosulphate solution, after having been oxidized in advance, in an autoclave under a pressure of oxygen, in an acid or alkaline environment, by oxidation reactions with chlorine or chlorites, by direct dissolution of the sodium thiosulphate solution in the presence of copper or nickel. The extraction of the gold and silver solubilized in thiosulphate solution is carried out by adsorption on ion exchange or adsorption on active carbon, electrochemically, by cementation on copper, zinc and aluminum, by precipitation with sodium sulphide.
  • For example, in the patent no. CA 220955911997, the ore containing 6 ppm Au is oxidized in an alkaline medium, under a pressure of oxygen, at 210-220° C. The obtained suspension is basified with ammonia to pH=9, and gold and silver are solubilized with a solution containing 14.7 g/l ammonium thiosulfate and 1 g/l copper, with a yield of 80% and the final separation of the noble metals in the solution is obtained by cementation on copper, zinc or aluminum.
  • According to the patent no. US 2003/0051581, the solubilization of gold in ores is carried out with a solution of 0.1 m ammonium thiosulfate and 0.5 g/l Cu2+, and extraction of metals gold, silver and copper from the solution is carried out by absorption on ion exchange resins—IRA 93, IRA 400.The concentration of gold in the resin may increase to 9 kg/t resin.
  • In the patent application no. WO 2007/098603, the solubilisation of an ore with a content of 17 ppm Au is carried out with a solution of 0.2 m ammonium thiosulfate, which contains 0.3 g/l CuSO4.5H2O, basified to 0.9 m NH4OH. The leaching process had a duration of 24 hours and has a yield of 90.7%. Leached gold is retained on ion exchange resin of the type Dowex 21K. The method has a high consumption, of ammonium thiosulfate 17.8 kg per tonne of ore.
  • In the patent RO 12648061/2012, the solubilization of gold and silver from an ore containing 1.7 ppm Au is carried out with a solution containing 50-60 g/l Na2S2O3.5H2O, 3-4 g/l Cu, 5-7 g/l (NH4)2SO4, and 3 g/l of NH3 at a solid:liquid ratio of 1:1 . . . 1:1.5, at a temperature of 15-25° C. for 2-4 hours. The suspension is filtered and the solution is recycled in the leaching system up to reaching a concentration of less than 10 ppm Au, which is then subjected to electrolysis with insoluble electrodes. The cement of copper, gold and silver separated to cathode is filtered separately and subjected to a leaching in sulphuric acid. The solution with 50-60 g/l Na2S2O3.5H2O is adjusted to 3-4 g/l Cu and recycled in the ore leaching process. The gold and silver cement is melted in an alkaline-reducing medium to 1,200° C., obtaining the Au—Ag alloy. The yield of the process is 78-82% for gold and 76-81% for silver, provided the content of noble metals in the ore.
  • These processes have the following disadvantages:
  • they not allow the extraction of gold from ores, by-products and residues with a content less than 1 ppm;
    they subject, during the first stage, the raw material to an oxidation in autoclaves at elevated temperatures and pressures;
    have a high consumption of reagents;
    are energy-intensive.
  • The technical problem solved by the invention as claimed is to recover gold and silver from ores, by-products and mining tailings with low noble metals content (less than 0.5 ppm Au), in terms of use of non-toxic reagents in a relatively low concentration, namely all reagents recirculation.
  • The present invention solves the technical problem by the fact that, removing the aforegoing disadvantages, and allowing to obtain gold and silver from ores and mining residues with a content of at least 0.5 ppm Au, presents the following technological steps:
  • solubilizing of raw material in a solution of ammonium thiosulphate, recycled to the process containing 10-25 g/l (NH4)2S2O3; 0.1 . . . 1.0 g/l Cu; 0.3 to 0.4 g/l NH4OH; 5-15 ppm Au and 1-100 ppm Ag with a solid: liquid ratio of 1:1 . . . 1:1.5, at a temperature of 15-25° C., under stirring and air bubbling for 2 . . . 4 hours;
    filtering the suspension and washing the residue to yield a sterile or a metal concentrate with a maximum of 10% H2O;
    separation of gold, silver and copper from the filtrate in an electrolyser with the anode and the cathode made of high-alloy steel, for an electric current density of 200-250 A/m2, a temperature of 15-25° C., with the input content of electrolyte of 10 to 25 g/l (NH4)2S2O3; 6-20 ppm Au; 2-150 ppm of Ag; 0.12 to 1.2 g/l Cu; 0.3 to 0.4 g/l NH4OH to a pH of 10-11, with the output content of 10 to 25 g/l (NH4)2S2O3; 5-15 ppm Au; 1-100 ppm Ag; 0.10-1.00 g/l Cu;
    recycling of the thiosulphate solution after the electrolysis operation of the raw material leaching, including the correction in advance of the reagents content;
    dissolving copper and copper compounds out of the Cu—Au—Ag cement, separately during the electrolytic process in aqueous ammonia having a concentration of 20% NH3 at a solid:liquid ratio of 1:5 . . . 1:10, recycling of the copper amine formed in the leaching process of raw material containing gold and silver, namely melting the residue resulted from the ammonia leaching in an alkaline-reducing medium to obtain an alloy of gold and silver;
    electrolytic refining of the gold and silver alloy, known per se, to obtain gold and silver with a purity of 99.9%.
  • The process for the extraction of gold and silver by raw materials leaching in the ammonium thiosulfate solution, according to the invention, has the following advantages:
  • it is non-toxic, does not generate wastewater or toxic gas emissions;
    the process has applicability into obtain gold and silver from poor ores, refractory pyrite concentrates and metallurgical tailings with contents up to 0.5 ppm Au, ensuring the recycling of all reagents during the raw material leaching process.
  • There are disclosed hereinafter two embodiments of the process according to the invention.
  • The process according to the invention consists in treating the raw material with a minimum of 0.5 ppm under stirring with a solution resulted from the electrolytic separation of gold, silver and copper, which contains 10 to 25 g/l (NH4)2S2O3; 0.1 to 1.0 g/l Cu; 0.3-0.4 g/l NH4OH; 5-15 ppm Au and 1-100 ppm Ag, at a solid:liquid ratio of 1:1 . . . 1:1.5 under stirring and air bubbling for 2 to 4 hours at a temperature of 15-25° C. The resulting suspension is filtered and the residue is washed with water and becomes raw material, when contains common metals or becomes construction filler material, when the basic component is a silicate. The filtered solution both with washing water is subjected to an electrochemical extraction with insoluble anodes, the electric current density being of 200-250 A/m2, when is formed a copper cement containing 1 . . . 5% Au and 1 . . . 20% Ag. The circulation speed of the electrolyte is set such that the output from the electrolysis cell contains: 10-25 g/l (NH4)2S2O3; 5-15 ppm Au; 1-100 ppm Ag and 0.1 to 1.0 g/l Cu. This solution, after correcting the content of copper to 0.12 1.2 g/l, is recycled to the leaching of the raw material. The copper cement containing gold and silver is solubilized with ammoniacal water to a concentration of 20% NH3 at a solid:liquid ratio of 1:5-1:10 under stirring, at a temperature of 15-25° C., for 3-5 hours. The suspension is filtered and the copper tetrammine filtrate is recycled to the leaching operation of the raw material, in order to correct the copper content and the pH. The residue resulting after washing and drying at a temperature of 105° C. is melted in a alkaline-reducing medium, to obtain the Au—Ag alloy—the doré alloy. Separation of gold and silver from the doré alloy is achieved by electrochemical refining, obtaining give gold and silver with a purity of 99.9%.
  • The reactions occurring in the process are as follows:

  • ½O2→½O2−+2e

  • Cu(NH3)2 2++H2O+e→Cu(NH3)++NH4OH

  • Cu(NH3)++2S2O3 2−+H2O→Cu(S2O3)2 3−+NH4OH

  • Cu(S2O3)2 3−+Au→Au(S2O3)2 3−+Cu

  • Cu(S2O3)2 3−+Ag→Ag(S2O3)2 3−+Cu

  • Au(S2O3)2 3− −e→Au+(S2O3)2 2−

  • Ag(S2O3)2 3− −e→Ag+(S2O3)2 2−

  • Cu+Au+Ag+2NH4OH→Cu(NH3)2 2++Au+Ag+H2O

  • 3CuO+6NH4OH→3Cu(NH3)2 2+3H2O+6OH

  • 3Cu(OH)2+6NH4OH→3Cu(NH3)2 2++6OH+6H2O
  • EXAMPLE 1
  • In a reactor made of alloy steel or enamelled cast iron with a capacity of 2 m3, equipped with a stirring system, are introduced 1.5 m3 of solution from the alkaline electrolysis operation, comprising: 10 to 25 g/l (NH4)2S2O3; 13-15 ppm Au; 50-60 ppm Ag; 0.1 to 0.12 g/l Cu, adjusted to 0.12-0.15 g/l Cu, by addition of copper ammine, derived from the dissolution of the Cu—Au—Ag cementum in aqueous ammonia at pH 10-11 and 1,500 kg of silica residue resulting from the flotation of complex ores, containing 0.7 ppm Au and 10.5 ppm Ag. The suspension was stirred for 4 hours with air bubbling 30 m3/h, and filtered on a vacuum rotary drum filter with a filter area of 1 m2. The slurry resulting after filtering—a quartz residue—is washed with 100-150 litres of water, is free of impurities, has a moisture content of 8-10% and can be used as a construction filler material. The filtered solution with a volume of 1.5-1.6 m3, which contains 10 to 25 g/l (NH4)2S2O3, 13.2-15.5 ppm Au, 51-65 ppm Ag and 0.12 to 0.15 g/l Cu (pH 10-11) is subjected to electrolysis with anodes made of high-alloy steel, the electric current density of 200-250 A/m2. The electrolytical cell, having a capacity of 2 m3, is equipped with two electrodes of equal surfaces of 1 m2. The electrolyte is internally recycled at a rate of 2 m3/h. The operation takes about 2 hours and is considered finished when the electrolyte that leaves the cell contains 13.0 to 15.0 ppm Au, 50-60 ppm Ag and 0.10 to 0.12 g/l Cu. After a total of about 20 cycles of electrolysis, the cementum separated in the conical part of the cell, in an amount of 1.0-1.5 kg, with a content of 0.9 to 1.0% Au, 17-19% Ag and 35-45% Cu, is filtered and washed with water. The leaching of the copper cementum in the filtrate is carried out in a reactor made of enamelled iron of 100 litres, ammonia water having a concentration of 20% NH3 at a solid:liquid ratio of 1:3 . . . 1:5, under stirring, with the absorption of ammonia removed from the reactor into a tower with packing, sprayed with water. The operation takes 3-5 hours.The suspension is filtered on a nuce filter under vacuum. Decoppered cement, after washing with water, with a content of maximum 5% Cu, 3-3.5% Au and 50-60% Ag is dried, mixed with sodium carbonate and carbon at a ratio of 1:3:0.5 is melted in a graphite crucible, at a temperature of 1200° C. The Au—Ag alloy—the doré alloy—is cast into anodes and subjected to known-per-se operations of electrochemical and thermal refining, in order to obtain pure gold and silver. The slag obtained by smelting cementum is ground and recycled to the leaching operation of the raw material. The overall yield of the operation ore—metal is 70% to 86% for Au and Ag.
  • EXAMPLE 2
  • Under similar operations as in Example 1, with the difference that the raw material is a pyrite concentrate refractive to the dissolution in an alkaline cyanide solution, containing 12 ppm Au, 50 ppm Ag, and after dissolving results a pyrite with 0.95 ppm Au and 2.5 ppm Ag. The overall yield of the operation pyrite concentrates—metal is 86.2% to 89.7% for Au and Ag.

Claims (1)

1. Process of extracting gold and silver from gold ores and mining by-products, which comprises treating gold ores, pyrite concentrates or mining by-products consisting of mining and metallurgical residues, characterized in that:
solubilizing the raw material in a solution of ammonium thiosulphate, recycled from the process, with a content of 10 to 25 g/l (NH4)2S2O3; 0.1 to 1.0 g/l Cu; 0.3 to 0.4 g/l NH4OH at a solid:liquid ratio of 1:1 . . . 1:1.5, at a temperature of 15-25° C. for 2-4 hours;
the filtrate obtained after dissolution, with a content of 10 to 25 g/l (NH4)2S2O3, 6-20 ppm Au, 2-150 ppm Ag, 0.12-1,2 g/l Cu, 0.3-0.4 g/l NH4OH, is subjected to an electrolysis with high-alloy steel electrodes with a current density of 200-250 A/m2, until the electrolyte has a concentration of 5-15 ppm Au, 1-100 ppm Ag and 0.1-1.0 g/l Cu;
the cementum separated in electrolysis cells, after a total of 20 cycles, is filtered off and dissolved in aqueous ammonia having a concentration of 20% NH 3 at a solid:liquid ratio of 1:5
1:10 for 3-5 hours; after which it is filtered, washed with water, dried at a temperature of 105° C. and melted in a alkaline-reducing medium at a temperature of 1,200° C., resulting a Au—Ag alloy, from which, by electrochemical and thermal refining, there are obtained gold and silver 99.9%, and the filtered solution copper ammine—is recycled to process, in order to correct the copper content of the electrolyte used in the leaching of raw materials.
US15/307,520 2014-04-30 2015-04-24 Process of extracting gold and silver from ores and mining by-products Abandoned US20170044644A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
ROA2014/00335 2014-04-30
ROA201400335A RO129874B1 (en) 2014-04-30 2014-04-30 Process for extraction of gold and silver from ores and mining by-products
PCT/RO2015/000008 WO2015171010A1 (en) 2014-04-30 2015-04-24 Process of extracting gold and silver from ores and mining by-products

Publications (1)

Publication Number Publication Date
US20170044644A1 true US20170044644A1 (en) 2017-02-16

Family

ID=51945587

Family Applications (1)

Application Number Title Priority Date Filing Date
US15/307,520 Abandoned US20170044644A1 (en) 2014-04-30 2015-04-24 Process of extracting gold and silver from ores and mining by-products

Country Status (5)

Country Link
US (1) US20170044644A1 (en)
EP (1) EP3155135A1 (en)
CA (1) CA2947480A1 (en)
RO (1) RO129874B1 (en)
WO (1) WO2015171010A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
LU102054B1 (en) * 2020-07-27 2022-01-27 Centuro Ag Process for extracting gold and silver from raw materials
WO2022022987A1 (en) * 2020-07-27 2022-02-03 Centuro Ag Method for obtaining gold and silver from raw materials
US11319613B2 (en) * 2020-08-18 2022-05-03 Enviro Metals, LLC Metal refinement

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4369061A (en) * 1979-12-28 1983-01-18 Kerley Jr Bernard J Recovery of precious metals from difficult ores
US20030154822A1 (en) * 1999-12-09 2003-08-21 John Hall Recovery of precious metals
US20040115108A1 (en) * 2002-11-15 2004-06-17 Hackl Ralph Peter Method for thiosulfate leaching of precious metal-containing materials
WO2012141607A1 (en) * 2011-03-09 2012-10-18 Malusel Viorel Alexandru Gold and silver extraction technology
CN102943180A (en) * 2012-07-20 2013-02-27 北京科技大学 Method for recycling gold and silver from silver separating residues of copper anode slime
US20130326850A1 (en) * 2011-03-11 2013-12-12 Kaihua XU Burning-free and non-cyanide method for recycling waste printed circuit board

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4369061A (en) * 1979-12-28 1983-01-18 Kerley Jr Bernard J Recovery of precious metals from difficult ores
US20030154822A1 (en) * 1999-12-09 2003-08-21 John Hall Recovery of precious metals
US20040115108A1 (en) * 2002-11-15 2004-06-17 Hackl Ralph Peter Method for thiosulfate leaching of precious metal-containing materials
WO2012141607A1 (en) * 2011-03-09 2012-10-18 Malusel Viorel Alexandru Gold and silver extraction technology
US20130326850A1 (en) * 2011-03-11 2013-12-12 Kaihua XU Burning-free and non-cyanide method for recycling waste printed circuit board
CN102943180A (en) * 2012-07-20 2013-02-27 北京科技大学 Method for recycling gold and silver from silver separating residues of copper anode slime

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
LU102054B1 (en) * 2020-07-27 2022-01-27 Centuro Ag Process for extracting gold and silver from raw materials
WO2022022987A1 (en) * 2020-07-27 2022-02-03 Centuro Ag Method for obtaining gold and silver from raw materials
US11319613B2 (en) * 2020-08-18 2022-05-03 Enviro Metals, LLC Metal refinement
US11578386B2 (en) 2020-08-18 2023-02-14 Enviro Metals, LLC Metal refinement

Also Published As

Publication number Publication date
EP3155135A1 (en) 2017-04-19
RO129874A0 (en) 2014-11-28
CA2947480A1 (en) 2015-11-12
RO129874B1 (en) 2018-05-30
WO2015171010A1 (en) 2015-11-12

Similar Documents

Publication Publication Date Title
EP1434893B1 (en) Zinc recovery process
CA2636122C (en) Process of leaching gold
AU669906B2 (en) Production of metals from minerals
CN102994747B (en) Technology for recovering metallic copper from high-lead copper matte
US7479262B2 (en) Method for separating platinum group element
FI60237B (en) ADJUSTMENT OF THE MANUFACTURING AUTHORITY OF THE AUTHORITY
CA2829663C (en) Gold and silver extraction technology
CN100497674C (en) Method for processing cunico
CN106967884B (en) A kind of method of silver separating residue of copper anode slime step by step arithmetic
US20040144208A1 (en) Process for refining raw copper material containing copper sulfide mineral
EP3172348A1 (en) Recovery of zinc and manganese from pyrometallurgy sludge or residues
JP2011195878A (en) Method for recovering copper from copper sulfide
US20170044644A1 (en) Process of extracting gold and silver from ores and mining by-products
FI20060726A (en) A process for making metal powder
US20210292927A1 (en) Method for refining bismuth
JP5200588B2 (en) Method for producing high purity silver
JP6233478B2 (en) Purification method of bismuth
JP2004285368A (en) Method for refining cobalt aqueous solution
JP6943141B2 (en) Leaching method of mixed sulfide containing nickel and cobalt
JP6750454B2 (en) Method for removing impurities from bismuth electrolyte
JP2019189891A (en) Method for separating selenium and tellurium from mixture containing selenium and tellurium
JP2003277067A (en) Method for manufacturing nickel sulfide with excellent oxidation resistance
FI107455B (en) Process for producing copper
RO125168A0 (en) Process for recovering gold and silver
PL111091B1 (en) Process for recovering the high purity copper from diluted ammonia solution

Legal Events

Date Code Title Description
AS Assignment

Owner name: FLOREAN, VICTOR, ROMANIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GOLDSTEIN, JACK;OSANU, LIANA ROZICA;REEL/FRAME:040160/0139

Effective date: 20161027

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION