US20160168972A1 - Mitigating hydrate formation during a shutdown of a deep water fpso - Google Patents
Mitigating hydrate formation during a shutdown of a deep water fpso Download PDFInfo
- Publication number
 - US20160168972A1 US20160168972A1 US14/567,560 US201414567560A US2016168972A1 US 20160168972 A1 US20160168972 A1 US 20160168972A1 US 201414567560 A US201414567560 A US 201414567560A US 2016168972 A1 US2016168972 A1 US 2016168972A1
 - Authority
 - US
 - United States
 - Prior art keywords
 - production
 - flow loop
 - production flow
 - fluids
 - shutdown
 - Prior art date
 - Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
 - Abandoned
 
Links
- 230000015572 biosynthetic process Effects 0.000 title claims abstract description 9
 - XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 9
 - 230000000116 mitigating effect Effects 0.000 title description 2
 - 238000004519 manufacturing process Methods 0.000 claims abstract description 101
 - 239000012530 fluid Substances 0.000 claims abstract description 96
 - 238000000034 method Methods 0.000 claims abstract description 27
 - 229930195733 hydrocarbon Natural products 0.000 claims description 43
 - 150000002430 hydrocarbons Chemical class 0.000 claims description 43
 - 239000004215 Carbon black (E152) Substances 0.000 claims description 42
 - 238000006073 displacement reaction Methods 0.000 claims description 30
 - 239000003921 oil Substances 0.000 claims description 19
 - 150000004677 hydrates Chemical class 0.000 claims description 15
 - 238000012545 processing Methods 0.000 claims description 10
 - 239000010779 crude oil Substances 0.000 claims description 8
 - 238000007872 degassing Methods 0.000 claims description 7
 - 239000007788 liquid Substances 0.000 claims description 7
 - 239000007789 gas Substances 0.000 claims description 5
 - 239000012071 phase Substances 0.000 claims description 5
 - 238000000926 separation method Methods 0.000 claims description 3
 - 239000003381 stabilizer Substances 0.000 claims description 3
 - 239000008346 aqueous phase Substances 0.000 claims description 2
 - 239000007792 gaseous phase Substances 0.000 claims description 2
 - 239000000463 material Substances 0.000 claims description 2
 - 238000012546 transfer Methods 0.000 claims description 2
 - 238000005086 pumping Methods 0.000 claims 1
 - 238000013459 approach Methods 0.000 description 4
 - OKKJLVBELUTLKV-UHFFFAOYSA-N Methanol Chemical compound OC OKKJLVBELUTLKV-UHFFFAOYSA-N 0.000 description 3
 - 238000012986 modification Methods 0.000 description 2
 - 230000004048 modification Effects 0.000 description 2
 - 239000013078 crystal Substances 0.000 description 1
 - 238000005485 electric heating Methods 0.000 description 1
 - 230000008014 freezing Effects 0.000 description 1
 - 238000007710 freezing Methods 0.000 description 1
 - 238000009434 installation Methods 0.000 description 1
 - 238000005067 remediation Methods 0.000 description 1
 
Images
Classifications
- 
        
- E—FIXED CONSTRUCTIONS
 - E21—EARTH OR ROCK DRILLING; MINING
 - E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
 - E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
 - E21B43/34—Arrangements for separating materials produced by the well
 - E21B43/36—Underwater separating arrangements
 
 - 
        
- E—FIXED CONSTRUCTIONS
 - E21—EARTH OR ROCK DRILLING; MINING
 - E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
 - E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
 - E21B43/34—Arrangements for separating materials produced by the well
 
 - 
        
- E—FIXED CONSTRUCTIONS
 - E21—EARTH OR ROCK DRILLING; MINING
 - E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
 - E21B37/00—Methods or apparatus for cleaning boreholes or wells
 - E21B37/06—Methods or apparatus for cleaning boreholes or wells using chemical means for preventing or limiting, e.g. eliminating, the deposition of paraffins or like substances
 
 
Definitions
- Embodiments disclosed herein relate to methods and systems for mitigating hydrate formation during a shutdown of a deep-water floating production, storage and offloading unit with long distance tie backs.
 - FPSO Deep-water floating production, storage and offloading
 - hydrates may tend to form in the presence of CH4 and H2O in a low temperature and/or high pressure environment. Once formed these hydrates may cause significant problems. For example, since the hydrates are ice-like crystals they will often hinder and/or completely block the production flow loop. Once this occurs costly and complicated remediation efforts to unplug the production flow lines to resume production are usually necessary.
 - the system comprises a production flow loop configured to deliver produced fluids from one or more remote subsea production wells with a long distance tieback (LTDB) to an offshore production facility.
 - the offshore production facility comprises a floating production, storage and offloading (FPSO) unit with (1) top side equipment comprising at least one separation unit for separating oil, gas, and water in the produced fluids and (2) a hull comprising one or more wash tanks and one or more cargo tanks configured for storage of crude oil.
 - FPSO floating production, storage and offloading
 - the system is configured such that during a shutdown at least a portion of fluids in the production flow loop are delivered to the one or more wash tanks in the hull under conditions such that a minimal amount of hydrates form in the production flow loop.
 - the invention in another embodiment relates to a method for managing hydrates in a subsea production system during a shutdown.
 - the method comprises first producing hydrocarbon fluids from one or more remote subsea production wells through a production flow loop to an FPSO.
 - the FPSO comprises top-side equipment and a hull comprising a wash tank and a crude oil cargo tank.
 - a displacement fluid is then pumped from or using the topside equipment, the hull, or both into the production flow loop to transfer at least a portion of the hydrocarbon fluids in the production flow loop to the top-side equipment, the wash tank, or both.
 - FIG. 1 depicts embodiments pertaining to handling of displaced hydrocarbon fluids during a shutdown with flash drum/oil treater oversized by two to three times.
 - FIG. 2 depicts embodiments pertaining to handling of displaced hydrocarbon fluids during a shutdown without oversizing the flash drum/oil treater.
 - the present invention pertains in one embodiment to a method for managing hydrates in a subsea production system during a shutdown.
 - the method comprises first producing hydrocarbon fluids from one or more remote subsea production wells through a production flow loop.
 - remote subsea production well is meant a subsea well that has a long distance tie-back (LDTB) to the offshore production facility.
 - LDTB long distance tie-back
 - Such remote wells may often be more than 5000 feet deep and/or more than 20 miles from an offshore production facility, e.g., one comprising one or more FPSO units, and thus the configuration may be referred to as a long distance tie-back.
 - the remote wells may be more than 40 miles from an offshore production facility.
 - the initial production of hydrocarbon fluids may be typical to what is ordinarily done in that hydrocarbon fluids from one, two, three, four, or even more remote wells flow through a production flow loop to, for example, an FPSO unit for processing.
 - the FPSO unit will typically comprise top-side equipment and a hull.
 - the top side equipment may include any units that are useful for processing the hydrocarbon fluids. Such units will vary depending upon, for example, the type of well, composition of fluids, and desired processing. Typically, the top side equipment comprises at least one separation unit for separating oil, gas, and water in the produced fluids. Useful equipment is described in for example, US2011/0309040; WO2005/100512; and US2012/0031621 which for U.S. purposes are incorporated herein by reference. In some instances, the top side equipment may comprise one or more of a high pressure separator, a low pressure separator, a flash drum/oil treater, and a stabilizer.
 - the hull of the FPSO unit may be any useful hull that provides the required stability and, of course, its specific configuration may vary depending upon its location, desired functionality, and the top-side equipment that it must support.
 - the hull comprises a number of tanks that are useful for storage and/or processing of hydrocarbon fluids.
 - the hull comprises one or more wash tanks and one or more cargo tanks which may be configured for storage of crude oil.
 - the present method interrupts the production of hydrocarbon fluids from the one or more remote subsea production wells through the production flow loop.
 - Such interruption may be by any convenient manner and may vary depending upon the specifics of the equipment involved, the composition of the fluids, as well as, the length of shutdown or other disturbance.
 - the interruption may be accomplished via valves, regulators, controllers or other devices within or adjacent the production flow loop.
 - displacement fluids are pumped into the production flow loop.
 - the displacement fluid may be any fluid which is capable of pushing, i.e., transferring, at least the portion of the hydrocarbon fluids in the production flow loop that are potentially subject to hydrate formation out of the production flow loop.
 - the specific type of displacement fluid may vary depending upon the application, equipment, flow loop distance, and hydrocarbon fluids but is typically a fluid that is not amenable to hydrate formation.
 - Suitable displacement fluids may comprise, for example, a degassed oil sometimes referred to as dead oil.
 - Such dead oil may come from the topside equipment, the hull, or both and act to push the hydrocarbon fluids in the production flow loop to the top-side equipment, the wash tank, or both.
 - crude oil in the cargo tank may be used for at least a portion of the displacement fluid and additionally or alternatively dehydrated and degassed produced hydrocarbon fluids from the wash tank or top-side equipment may be used for at least another portion of the displacement fluid.
 - the wash tank in the hull, or both the fluids may be dehydrated and/or degassed as desired.
 - dehydrating and/or degassing would generally occur in one or more of a high pressure separator, a low pressure separator, a flash drum/oil treater, and a stabilizer.
 - additional aqueous phase and gaseous phase material may be separated from the liquid hydrocarbon phase at a reduced pressure as necessary and then further dehydrating and degassing of the liquid hydrocarbon phase may occur in a wash tank or other holding vessel.
 - the transferred hydrocarbon fluids are maintained at a temperature in the range from about 25° C.
 - these dehydrated and/or degassed fluids may then be employed to push additional hydrocarbon fluids in the production flow loop to the top-side equipment, the wash tank, or both.
 - the displacement fluid or fluids are supplied to the production flow loop under conditions such that only a minimal amount of hydrates can form in the production flow loop.
 - a minimal amount of hydrates means preferably no hydrates but certainly less than an amount that hinders flow in the production flow loop.
 - the conditions are such that the hydrate level in the loop does not increase.
 - Conditions may vary but usually the displacement fluid is supplied to the production flow loop before any hydrate formation at a displacement fluid temperature of greater than 20° C., preferably at a temperature of from about 40° C. to about 70° C.
 - the process of circulating the displacement fluid e.g., dead oil, is initiated preferably not more than 4 hours after interrupting the production of hydrocarbon fluids.
 - any convenient manner may be employed to deliver the displacement fluids
 - convenient systems and methods may use one or more properly configured circulation pumps to deliver displacement fluids from the FPSO to the production flow loop during a shutdown or other interruption.
 - the specific type of the one or more circulation pumps is not particularly critical and the proper number type and number of circulation pumps may change depending upon the equipment, application, and installation.
 - the top side equipment is oversized relative to the production and fluid processing rates associated with the production flow loop and one or more remote subsea production wells. In this manner, the top-side equipment can handle a large volume of displaced hydrocarbon fluids from the production flow loop during the shutdown of the long distance tie back.
 - the top side equipment size is smaller relative to the production and fluid processing rates associated with the production flow loop and one or more remote subsea production wells.
 - the top side equipment size can be made smaller because the system is configured such that during a shutdown at least a portion of produced fluids are delivered to one or more wash tanks in the hull instead of being delivered to top side equipment. In this manner, top-side equipment does not have to be sized to handle the majority to all of the displaced hydrocarbon fluids during shutdown.
 - the system may be configured such that fluids in the production flow loop that are delivered to the one or more wash tanks in the hull during shutdown comprise a gas to liquid ratio that is lower than that of fluids in the production flow loop delivered topside during normal operation. In this manner, displacement fluids may be made suitable to be sent directly to the hull wash tank even though production fluids during normal operation are not suitable.
 - hydrocarbon fluids from the production flow loop 10 are pushed by a displacement fluid such as dead oil to a top-side low pressure separator 30 which is followed by a top-side flash drum/oil treater 40 .
 - a displacement fluid such as dead oil
 - a top-side low pressure separator 30 which is followed by a top-side flash drum/oil treater 40 .
 - the treated hydrocarbon fluids are transferred to slop tanks 50 in the hull.
 - fluid processing rates during shutdown may be from about 2 to about 3 times higher compared to normal processing rates. Therefore, the low pressure separator 20 and flash drum/oil treater 40 are sized from about 2 to about 3 times higher to handle this excess capacity.
 - hydrocarbon fluids from the production flow loop 10 are pushed by a displacement fluid such as dead oil to a top-side low pressure separator 30 and/or a wash tank 60 in the hull.
 - the hydrocarbon fluids may be treated in the wash tank to generate additional dead oil for use as displacement fluid. In this manner, top-side equipment does not have to be increased in size to handle additional capacity.
 
Landscapes
- Geology (AREA)
 - Life Sciences & Earth Sciences (AREA)
 - Engineering & Computer Science (AREA)
 - Mining & Mineral Resources (AREA)
 - Environmental & Geological Engineering (AREA)
 - Fluid Mechanics (AREA)
 - Physics & Mathematics (AREA)
 - General Life Sciences & Earth Sciences (AREA)
 - Geochemistry & Mineralogy (AREA)
 - Chemical & Material Sciences (AREA)
 - Chemical Kinetics & Catalysis (AREA)
 - General Chemical & Material Sciences (AREA)
 - Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
 
Abstract
The present invention relates to a system and method for avoiding hydrate formation during a shutdown of a deep-water floating production, storage and offloading unit with a long distance tie back. In one embodiment the system is configured such that during a shutdown at least a portion of fluids in the production flow loop are delivered to the one or more wash tanks in the hull. Advantageously, this may allow one to avoid having to oversize the expensive top-side equipment.
  Description
-  Embodiments disclosed herein relate to methods and systems for mitigating hydrate formation during a shutdown of a deep-water floating production, storage and offloading unit with long distance tie backs.
 -  Deep-water floating production, storage and offloading (FPSO) units are frequently used in offshore production to process hydrocarbons and store oil until it can be offloaded to a tanker or in some cases transported through a pipeline. In many instances one FPSO unit may be connected to multiple subsea production wells some of which are very remote and some of which may be in very deep water. In such cases the production flow loops connecting the wells and FPSO units may be quite long and are therefore referred to as long distance tie-backs.
 -  Long distance tie-backs present a number of technical challenges. One challenge is that during a decrease in flow and/or during a complete shut-down of flow in the production flow loop, hydrates may tend to form in the presence of CH4 and H2O in a low temperature and/or high pressure environment. Once formed these hydrates may cause significant problems. For example, since the hydrates are ice-like crystals they will often hinder and/or completely block the production flow loop. Once this occurs costly and complicated remediation efforts to unplug the production flow lines to resume production are usually necessary.
 -  There are different approaches that have been developed to mitigate hydrate formation or avoid hydrate formation. One approach is to employ a fluid such as methanol which mixes with water and assists in preventing freezing. Another approach is to employ electric heating in appropriate portions of the system. Unfortunately, in addition to other disadvantages such approaches are often complex, expensive, or both. What is needed are new, less complex, less expensive methods and systems which assist in managing hydrates during shutdowns. It would be desirable if such new methods and systems could employ conventionally available equipment to solve the hydrate problems encountered in long distance tie-back and other situations when production is disrupted during, for example, a shutdown.
 -  Advantageously, new subsea production systems and methods for managing hydrates during a shutdown have been discovered which solve many of the prior problems and use conventionally available equipment. In one embodiment the system comprises a production flow loop configured to deliver produced fluids from one or more remote subsea production wells with a long distance tieback (LTDB) to an offshore production facility. The offshore production facility comprises a floating production, storage and offloading (FPSO) unit with (1) top side equipment comprising at least one separation unit for separating oil, gas, and water in the produced fluids and (2) a hull comprising one or more wash tanks and one or more cargo tanks configured for storage of crude oil. The system is configured such that during a shutdown at least a portion of fluids in the production flow loop are delivered to the one or more wash tanks in the hull under conditions such that a minimal amount of hydrates form in the production flow loop.
 -  In another embodiment the invention relates to a method for managing hydrates in a subsea production system during a shutdown. The method comprises first producing hydrocarbon fluids from one or more remote subsea production wells through a production flow loop to an FPSO. The FPSO comprises top-side equipment and a hull comprising a wash tank and a crude oil cargo tank. Next, the production of hydrocarbon fluids from the one or more remote subsea production wells through the production flow loop is interrupted. A displacement fluid is then pumped from or using the topside equipment, the hull, or both into the production flow loop to transfer at least a portion of the hydrocarbon fluids in the production flow loop to the top-side equipment, the wash tank, or both. This is usually accomplished by the hydrocarbon fluids in the production flow loop being replaced by the displacement fluid such that subsea production flow loop fluids are pushed to the top-side equipment, the wash tank, or both. At least a portion of the transferred hydrocarbon fluids are then dehydrated and degassed in the top-side equipment, the wash tank, or both.
 -  
FIG. 1 depicts embodiments pertaining to handling of displaced hydrocarbon fluids during a shutdown with flash drum/oil treater oversized by two to three times. -  
FIG. 2 depicts embodiments pertaining to handling of displaced hydrocarbon fluids during a shutdown without oversizing the flash drum/oil treater. -  The present invention pertains in one embodiment to a method for managing hydrates in a subsea production system during a shutdown. The method comprises first producing hydrocarbon fluids from one or more remote subsea production wells through a production flow loop. By remote subsea production well is meant a subsea well that has a long distance tie-back (LDTB) to the offshore production facility. Such remote wells may often be more than 5000 feet deep and/or more than 20 miles from an offshore production facility, e.g., one comprising one or more FPSO units, and thus the configuration may be referred to as a long distance tie-back. In some example embodiments, the remote wells may be more than 40 miles from an offshore production facility.
 -  The initial production of hydrocarbon fluids may be typical to what is ordinarily done in that hydrocarbon fluids from one, two, three, four, or even more remote wells flow through a production flow loop to, for example, an FPSO unit for processing. The FPSO unit will typically comprise top-side equipment and a hull.
 -  The top side equipment may include any units that are useful for processing the hydrocarbon fluids. Such units will vary depending upon, for example, the type of well, composition of fluids, and desired processing. Typically, the top side equipment comprises at least one separation unit for separating oil, gas, and water in the produced fluids. Useful equipment is described in for example, US2011/0309040; WO2005/100512; and US2012/0031621 which for U.S. purposes are incorporated herein by reference. In some instances, the top side equipment may comprise one or more of a high pressure separator, a low pressure separator, a flash drum/oil treater, and a stabilizer.
 -  The hull of the FPSO unit may be any useful hull that provides the required stability and, of course, its specific configuration may vary depending upon its location, desired functionality, and the top-side equipment that it must support. Typically, the hull comprises a number of tanks that are useful for storage and/or processing of hydrocarbon fluids. In one embodiment herein, the hull comprises one or more wash tanks and one or more cargo tanks which may be configured for storage of crude oil.
 -  During a shutdown or other disturbance the present method interrupts the production of hydrocarbon fluids from the one or more remote subsea production wells through the production flow loop. Such interruption may be by any convenient manner and may vary depending upon the specifics of the equipment involved, the composition of the fluids, as well as, the length of shutdown or other disturbance. Typically, the interruption may be accomplished via valves, regulators, controllers or other devices within or adjacent the production flow loop.
 -  Once the production of hydrocarbon fluids is interrupted and after the expiration of any no touch time period, displacement fluids are pumped into the production flow loop. The displacement fluid may be any fluid which is capable of pushing, i.e., transferring, at least the portion of the hydrocarbon fluids in the production flow loop that are potentially subject to hydrate formation out of the production flow loop. The specific type of displacement fluid may vary depending upon the application, equipment, flow loop distance, and hydrocarbon fluids but is typically a fluid that is not amenable to hydrate formation. Suitable displacement fluids may comprise, for example, a degassed oil sometimes referred to as dead oil. Such dead oil may come from the topside equipment, the hull, or both and act to push the hydrocarbon fluids in the production flow loop to the top-side equipment, the wash tank, or both. In one embodiment, crude oil in the cargo tank may be used for at least a portion of the displacement fluid and additionally or alternatively dehydrated and degassed produced hydrocarbon fluids from the wash tank or top-side equipment may be used for at least another portion of the displacement fluid.
 -  Once the hydrocarbon fluids in the production flow loop have been pushed to the top-side equipment, the wash tank in the hull, or both the fluids may be dehydrated and/or degassed as desired. In the top-side equipment such dehydrating and/or degassing would generally occur in one or more of a high pressure separator, a low pressure separator, a flash drum/oil treater, and a stabilizer. Additionally or alternatively, additional aqueous phase and gaseous phase material may be separated from the liquid hydrocarbon phase at a reduced pressure as necessary and then further dehydrating and degassing of the liquid hydrocarbon phase may occur in a wash tank or other holding vessel. In one particular embodiment, the transferred hydrocarbon fluids are maintained at a temperature in the range from about 25° C. to about 50° C. and for a period of up to 24 hours in the wash tank or other holding vessel for dehydrating and degassing. If necessary or desired, these dehydrated and/or degassed fluids may then be employed to push additional hydrocarbon fluids in the production flow loop to the top-side equipment, the wash tank, or both.
 -  Generally, the displacement fluid or fluids are supplied to the production flow loop under conditions such that only a minimal amount of hydrates can form in the production flow loop. A minimal amount of hydrates means preferably no hydrates but certainly less than an amount that hinders flow in the production flow loop. Typically, the conditions are such that the hydrate level in the loop does not increase. Conditions may vary but usually the displacement fluid is supplied to the production flow loop before any hydrate formation at a displacement fluid temperature of greater than 20° C., preferably at a temperature of from about 40° C. to about 70° C. Generally, the process of circulating the displacement fluid, e.g., dead oil, is initiated preferably not more than 4 hours after interrupting the production of hydrocarbon fluids.
 -  While any convenient manner may be employed to deliver the displacement fluids, convenient systems and methods may use one or more properly configured circulation pumps to deliver displacement fluids from the FPSO to the production flow loop during a shutdown or other interruption. The specific type of the one or more circulation pumps is not particularly critical and the proper number type and number of circulation pumps may change depending upon the equipment, application, and installation.
 -  The above described systems and methods may be sized appropriately depending upon the equipment and configuration. In one embodiment, the top side equipment is oversized relative to the production and fluid processing rates associated with the production flow loop and one or more remote subsea production wells. In this manner, the top-side equipment can handle a large volume of displaced hydrocarbon fluids from the production flow loop during the shutdown of the long distance tie back. In another embodiment, the top side equipment size is smaller relative to the production and fluid processing rates associated with the production flow loop and one or more remote subsea production wells. Advantageously, the top side equipment size can be made smaller because the system is configured such that during a shutdown at least a portion of produced fluids are delivered to one or more wash tanks in the hull instead of being delivered to top side equipment. In this manner, top-side equipment does not have to be sized to handle the majority to all of the displaced hydrocarbon fluids during shutdown.
 -  Generally, the system may be configured such that fluids in the production flow loop that are delivered to the one or more wash tanks in the hull during shutdown comprise a gas to liquid ratio that is lower than that of fluids in the production flow loop delivered topside during normal operation. In this manner, displacement fluids may be made suitable to be sent directly to the hull wash tank even though production fluids during normal operation are not suitable.
 -  Exemplary embodiments of the present disclosure is further illustrated by the following examples which should not be construed as limiting. The contents of all references, patents and published patent applications cited throughout this application, as well as the Figures and Tables are incorporated herein by reference.
 -  With reference to
FIG. 1 , as option 1 during a shutdown hydrocarbon fluids from theproduction flow loop 10 are pushed by a displacement fluid such as dead oil to a top-sidelow pressure separator 30 which is followed by a top-side flash drum/oil treater 40. Once treated, the treated hydrocarbon fluids are transferred toslop tanks 50 in the hull. In this embodiment, fluid processing rates during shutdown may be from about 2 to about 3 times higher compared to normal processing rates. Therefore, thelow pressure separator 20 and flash drum/oil treater 40 are sized from about 2 to about 3 times higher to handle this excess capacity. -  A shown in
FIG. 2 , as option 2 during a shutdown hydrocarbon fluids from theproduction flow loop 10 are pushed by a displacement fluid such as dead oil to a top-sidelow pressure separator 30 and/or awash tank 60 in the hull. The hydrocarbon fluids may be treated in the wash tank to generate additional dead oil for use as displacement fluid. In this manner, top-side equipment does not have to be increased in size to handle additional capacity. -  The claimed subject matter is not to be limited in scope by the specific embodiments described herein. Indeed, various modifications of the invention in addition to those described herein will become apparent to those skilled in the art from the foregoing description. Such modifications are intended to fall within the scope of the appended claims.
 
Claims (19)
 1. A subsea production system for managing hydrates during a shutdown, the system comprising:
    a production flow loop configured to deliver produced fluids from one or more remote subsea production wells with a long distance tie-back (LTDB) to an offshore production facility;
 an offshore production facility comprising a floating production, storage and offloading (FPSO) unit;
 wherein the FPSO unit comprises (1) top side equipment comprising at least one separation unit for separating oil, gas, and water in the produced fluids and (2) a hull comprising one or more wash tanks and one or more cargo tanks configured for storage of crude oil;
 wherein the system is configured such that during a shutdown at least a portion of fluids in the production flow loop are delivered to the one or more wash tanks in the hull under conditions such that a minimal amount of hydrates form in the production flow loop.
  2. The system of claim 1 , further comprising one or more circulation pumps configured to deliver one or more displacement fluids from the FPSO to the production flow loop during a shutdown.
     3. The system of claim 1 , wherein said displacement fluid comprise a degassed oil.
     4. The system of claim 1 , wherein the top side equipment comprises one or more of a high pressure separator, a low pressure separator, a flash drum/oil treater, and a stabilizer.
     5. The system of claim 4 , wherein the top side equipment is oversized relative to the production and fluid processing rates associated with the production flow loop and one or more remote subsea production wells.
     6. The system of claim 4 , wherein the top side equipment size is smaller relative to the production and fluid processing rates associated with the production flow loop and one or more remote subsea production wells and wherein said top side equipment size is made smaller because the system is configured such that during a shutdown at least a portion of produced fluids are delivered to one or more wash tanks in the hull instead of being delivered to top side equipment.
     7. The system of claim 1 , wherein the system is configured such that fluids in the production flow loop that are delivered to the one or more wash tanks in the hull during shutdown comprise a gas to liquid ratio that is lower than that of fluids in the production flow loop delivered topside during normal operation.
     8. A method for managing hydrates in a subsea production system during a shutdown wherein said method comprises:
    producing hydrocarbon fluids from one or more remote subsea production wells through a production flow loop to an FPSO comprising top-side equipment and a hull comprising a wash tank and a crude oil cargo tank;
 interrupting the production of hydrocarbon fluids from the one or more remote subsea production wells through the production flow loop;
 pumping a displacement fluid from the topside equipment, the hull, or both into the production flow loop to transfer at least a portion of the hydrocarbon fluids in the production flow loop to the top-side equipment, the wash tank, or both;
 dehydrating and degassing at least a portion of the transferred hydrocarbon fluids in the top-side equipment, the wash tank, or both.
  9. The method of claim 8 , wherein the step of dehydrating and degassing the liquid hydrocarbon phase during shutdown comprises:
    separating additional aqueous phase and gaseous phase material from the liquid hydrocarbon phase at a reduced pressure;
 further dehydrating and degassing the liquid hydrocarbon phase in a holding vessel.
  10. The method of claim 8 , further comprising using at least a portion of the dehydrated and degassed produced hydrocarbon fluids as at least a portion of the displacement fluid.
     11. The method of claim 8 , further comprising using crude oil in the cargo tank as at least a portion of the displacement fluid.
     12. The method of claim 8 , further comprising using crude oil in the cargo tank as at least a portion of the displacement fluid and using at least a portion of the dehydrated and degassed produced hydrocarbon fluids as at least a portion of the displacement fluid.
     13. The method of claim 9 , wherein the holding vessel is the wash tank in the hull of the FPSO.
     14. The method of claim 8 , wherein the displacement fluid is supplied to the production flow loop under conditions such that a minimal amount of hydrates form in the production flow loop.
     15. The method of claim 8 , wherein the transferred hydrocarbon fluids are maintained at a temperature in the range from about 25° C. to about 50° C. and for a period of up to 24 hours in a wash tank for dehydrating and degassing.
     16. The method of claim 8 , wherein the displacement fluid is supplied to the production flow loop at a temperature of greater than 20° C.
     17. The method of claim 8 , wherein the displacement fluid is supplied to the production flow loop at a temperature of from about 40° C. to about 70° C.
     18. The method of claim 8 , wherein after interrupting the production of hydrocarbon fluids the displacement fluid is supplied to the production flow loop before hydrate formation.
     19. The method of claim 8 , wherein the displacement fluid is supplied to the production flow within no more than about 4 hours after interrupting the production of hydrocarbon fluids.
    Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title | 
|---|---|---|---|
| US14/567,560 US20160168972A1 (en) | 2014-12-11 | 2014-12-11 | Mitigating hydrate formation during a shutdown of a deep water fpso | 
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title | 
|---|---|---|---|
| US14/567,560 US20160168972A1 (en) | 2014-12-11 | 2014-12-11 | Mitigating hydrate formation during a shutdown of a deep water fpso | 
Publications (1)
| Publication Number | Publication Date | 
|---|---|
| US20160168972A1 true US20160168972A1 (en) | 2016-06-16 | 
Family
ID=56110675
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date | 
|---|---|---|---|
| US14/567,560 Abandoned US20160168972A1 (en) | 2014-12-11 | 2014-12-11 | Mitigating hydrate formation during a shutdown of a deep water fpso | 
Country Status (1)
| Country | Link | 
|---|---|
| US (1) | US20160168972A1 (en) | 
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| US6390114B1 (en) * | 1999-11-08 | 2002-05-21 | Shell Oil Company | Method and apparatus for suppressing and controlling slugflow in a multi-phase fluid stream | 
| US6772840B2 (en) * | 2001-09-21 | 2004-08-10 | Halliburton Energy Services, Inc. | Methods and apparatus for a subsea tie back | 
| US20050205261A1 (en) * | 2004-03-19 | 2005-09-22 | Andersen David B | System and method for remediating pipeline blockage | 
| US20080053659A1 (en) * | 2004-09-09 | 2008-03-06 | Statoil Asa | Method of Inhibiting Hydrate Formation | 
| US7721807B2 (en) * | 2004-09-13 | 2010-05-25 | Exxonmobil Upstream Research Company | Method for managing hydrates in subsea production line | 
| WO2011057369A1 (en) * | 2009-11-16 | 2011-05-19 | Paula Luize Facre Rodrigues | Depressurisation system for subsea lines and equipment, and hydrate removal method | 
| US20110308625A1 (en) * | 2010-03-05 | 2011-12-22 | Stoisits Richard F | System and Method for Transporting Hydrocarbons | 
| US20120031621A1 (en) * | 2007-02-21 | 2012-02-09 | Fowler Tracy A | Method and System For Flow Assurance Management In Subsea Single Production Flowline | 
| US8186442B2 (en) * | 2006-07-06 | 2012-05-29 | Compressed Energy Technology As | System, vessel and method for production of oil and heavier gas fractions from a reservoir below the seabed | 
| US8430169B2 (en) * | 2007-09-25 | 2013-04-30 | Exxonmobil Upstream Research Company | Method for managing hydrates in subsea production line | 
- 
        2014
        
- 2014-12-11 US US14/567,560 patent/US20160168972A1/en not_active Abandoned
 
 
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| US6390114B1 (en) * | 1999-11-08 | 2002-05-21 | Shell Oil Company | Method and apparatus for suppressing and controlling slugflow in a multi-phase fluid stream | 
| US6772840B2 (en) * | 2001-09-21 | 2004-08-10 | Halliburton Energy Services, Inc. | Methods and apparatus for a subsea tie back | 
| US20050205261A1 (en) * | 2004-03-19 | 2005-09-22 | Andersen David B | System and method for remediating pipeline blockage | 
| US20080053659A1 (en) * | 2004-09-09 | 2008-03-06 | Statoil Asa | Method of Inhibiting Hydrate Formation | 
| US7721807B2 (en) * | 2004-09-13 | 2010-05-25 | Exxonmobil Upstream Research Company | Method for managing hydrates in subsea production line | 
| US8186442B2 (en) * | 2006-07-06 | 2012-05-29 | Compressed Energy Technology As | System, vessel and method for production of oil and heavier gas fractions from a reservoir below the seabed | 
| US20120031621A1 (en) * | 2007-02-21 | 2012-02-09 | Fowler Tracy A | Method and System For Flow Assurance Management In Subsea Single Production Flowline | 
| US8430169B2 (en) * | 2007-09-25 | 2013-04-30 | Exxonmobil Upstream Research Company | Method for managing hydrates in subsea production line | 
| US8469101B2 (en) * | 2007-09-25 | 2013-06-25 | Exxonmobil Upstream Research Company | Method and apparatus for flow assurance management in subsea single production flowline | 
| WO2011057369A1 (en) * | 2009-11-16 | 2011-05-19 | Paula Luize Facre Rodrigues | Depressurisation system for subsea lines and equipment, and hydrate removal method | 
| US20110308625A1 (en) * | 2010-03-05 | 2011-12-22 | Stoisits Richard F | System and Method for Transporting Hydrocarbons | 
Similar Documents
| Publication | Publication Date | Title | 
|---|---|---|
| Zhang et al. | A unified Lagrangian formulation for solid and fluid dynamics and its possibility for modelling submarine landslides and their consequences | |
| KR101238629B1 (en) | A subsea petroleum processing and storage system | |
| US11549352B2 (en) | System and method for offshore hydrocarbon production and storage | |
| RU2436936C2 (en) | System, vessel and procedure for extraction of oil and heavy fractions from collectors under sea bottom | |
| JP5624612B2 (en) | Method for producing a mixed gas hydrocarbon component stream and a plurality of liquid hydrocarbon component streams, and apparatus therefor | |
| AU2016324895B2 (en) | Method and system for processing a fluid produced from a well | |
| US10456740B2 (en) | Systems and methods for improved column operation in offshore environments | |
| MY203460A (en) | A high-performance seafloor flexible oil storage system | |
| KR101959877B1 (en) | Gas boosting and lifting system for high productivity of undersea plant | |
| US20160168972A1 (en) | Mitigating hydrate formation during a shutdown of a deep water fpso | |
| US20170016309A1 (en) | Long offset gas condensate production systems | |
| US20150128840A1 (en) | Frontier Field Development System for Large Riser Count and High Pressures for Harsh Environments | |
| AU2015330970A1 (en) | System and method for subsea cooling a wellhead gas to produce a single phase dew-pointed gas | |
| AU2014275020B2 (en) | Jumper line configurations for hydrate inhibition | |
| NO340075B1 (en) | A MEG storage system and a method for storing MEG | |
| Park et al. | Dynamic analysis of SLWR subjected to internal slug flow conditions | |
| KR20170031279A (en) | Slug separation equipment | |
| KR20150133008A (en) | A gas-liquid seperating system | |
| US20150210915A1 (en) | Self-lubricated water-crude oil hydrate slurry pipelines | |
| US20180328541A1 (en) | Heating Systems for Film Growth Inhibition for Cold Flow | |
| CN203743856U (en) | System for solving pigging slug of long-distance seabed mixture transportation pipeline | |
| KR101507226B1 (en) | Dual pipe system for high productivity of undersea plant | |
| CN211170590U (en) | Coal tar distillation device | |
| Gupta et al. | Produced Water Separation at Unmanned Offshore Wellhead Platform: A Concept Report | |
| US20220056346A1 (en) | A method for desalting produced hydrocarbons | 
Legal Events
| Date | Code | Title | Description | 
|---|---|---|---|
| AS | Assignment | 
             Owner name: CHEVRON U.S.A. INC., CALIFORNIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:LIU, EDWARD KOU-SHAN;VERMA, AKSHAY;JOHNSON, STEVEN EDWARD;AND OTHERS;SIGNING DATES FROM 20141209 TO 20141211;REEL/FRAME:034487/0564  | 
        |
| STCB | Information on status: application discontinuation | 
             Free format text: ABANDONED -- FAILURE TO PAY ISSUE FEE  |