US20150260397A1 - Integrated smoke monitoring and control system for flaring operations - Google Patents

Integrated smoke monitoring and control system for flaring operations Download PDF

Info

Publication number
US20150260397A1
US20150260397A1 US14/215,866 US201414215866A US2015260397A1 US 20150260397 A1 US20150260397 A1 US 20150260397A1 US 201414215866 A US201414215866 A US 201414215866A US 2015260397 A1 US2015260397 A1 US 2015260397A1
Authority
US
United States
Prior art keywords
monitoring
flare
compressor
parameters
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/215,866
Inventor
Viswanath Talasila
Chinmaya Kar
Mohamed M. Ibrahim
Vijendran G. Venkoparao
Annemarie Diepenbroek
Bilal Abdallah
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honeywell International Inc
Original Assignee
Honeywell International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honeywell International Inc filed Critical Honeywell International Inc
Priority to US14/215,866 priority Critical patent/US20150260397A1/en
Assigned to HONEYWELL INTERNATIONAL INC. reassignment HONEYWELL INTERNATIONAL INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: KAR, CHINMAYA, Talasila, Viswanath, VENKOPARAO, VIJENDRAN G., DIEPENBROEK, ANNEMARIE, MOHIDEEN, MOHAMED IBRAHIM
Assigned to HONEYWELL INTERNATIONAL INC. reassignment HONEYWELL INTERNATIONAL INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ABDALLAH, BILAL
Publication of US20150260397A1 publication Critical patent/US20150260397A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N5/00Systems for controlling combustion
    • F23N5/24Preventing development of abnormal or undesired conditions, i.e. safety arrangements
    • F23N5/242Preventing development of abnormal or undesired conditions, i.e. safety arrangements using electronic means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G7/00Incinerators or other apparatus for consuming industrial waste, e.g. chemicals
    • F23G7/06Incinerators or other apparatus for consuming industrial waste, e.g. chemicals of waste gases or noxious gases, e.g. exhaust gases
    • F23G7/08Incinerators or other apparatus for consuming industrial waste, e.g. chemicals of waste gases or noxious gases, e.g. exhaust gases using flares, e.g. in stacks
    • F23G7/085Incinerators or other apparatus for consuming industrial waste, e.g. chemicals of waste gases or noxious gases, e.g. exhaust gases using flares, e.g. in stacks in stacks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N5/00Systems for controlling combustion
    • F23N5/003Systems for controlling combustion using detectors sensitive to combustion gas properties
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N5/00Systems for controlling combustion
    • F23N5/02Systems for controlling combustion using devices responsive to thermal changes or to thermal expansion of a medium
    • F23N5/022Systems for controlling combustion using devices responsive to thermal changes or to thermal expansion of a medium using electronic means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N5/00Systems for controlling combustion
    • F23N5/18Systems for controlling combustion using detectors sensitive to rate of flow of air or fuel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2207/00Control
    • F23G2207/10Arrangement of sensing devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2207/00Control
    • F23G2207/10Arrangement of sensing devices
    • F23G2207/112Arrangement of sensing devices for waste supply flowrate
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2208/00Safety aspects
    • F23G2208/10Preventing or abating fire or explosion, e.g. by purging
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2209/00Specific waste
    • F23G2209/14Gaseous waste or fumes
    • F23G2209/141Explosive gases
    • F23N2023/08
    • F23N2039/04
    • F23N2041/12
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N2223/00Signal processing; Details thereof
    • F23N2223/08Microprocessor; Microcomputer
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N2229/00Flame sensors
    • F23N2229/20Camera viewing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N2231/00Fail safe
    • F23N2231/10Fail safe for component failures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N2239/00Fuels
    • F23N2239/04Gaseous fuels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N2241/00Applications
    • F23N2241/12Stack-torches

Definitions

  • the present disclosure relates to the monitoring and controlling of flaring operations in industrial plants.
  • a flare is a pressure safety relief device used to ensure that emergencies occurring in a plant (e.g., process upsets, compressor failures, etc.) do not compromise the safety and integrity of the plant. Such emergencies may require disposal of large volumes of hydrocarbons, and flaring is the best and practically the only option in these situations. Furthermore, at times, as part of a refining process, more fuel gas (e.g., propane, butane) is produced than needed by the plants. Flaring eliminates this excess process gas by burning it off rather than venting potentially damaging hydrocarbons to the atmosphere.
  • fuel gas e.g., propane, butane
  • FIG. 1 is a block diagram of a root cause analysis for smoke formation in a flaring operation.
  • FIG. 2 is a block diagram illustrating a monitoring system and various monitoring parameters for flare monitoring, compressor monitoring, and gas composition monitoring.
  • FIG. 3 is a flowchart of a monitoring and control system for a flaring operation in an industrial plant.
  • the present disclosure presents a comprehensive solution for monitoring and controlling flaring operations.
  • a root cause analysis of various factors that necessitate flaring and the specific factors that cause extensive environmental damage is presented.
  • An embodiment reduces the effects of the variables (or sub systems) that are responsible for flaring and pollution.
  • the system can include a monitoring module, relating to at least health monitoring and asset monitoring.
  • the system can also include a machinery control system.
  • the system can further include a field advisor that can monitor the performance of various process and equipment parameters.
  • Such a control action is reactive in the sense that excess flaring or smoke is caused due to various processes/equipment behaving sub-optimally—and the smoke is the end result of complex failures in the plant or refinery.
  • the control system can react only after smoke detection. Consequently, there is a significant delay in control after the plant upsets, which usually renders control ineffective.
  • advanced monitoring techniques which can predict critical failures in industrial and refinery processes and equipment, and inform the control system of impending failures so that the control system can respond better.
  • one or more goals of one or more embodiments include that the smoke that is generated during flaring should be reduced and/or eliminated, compressor reliability should be improved, and compressor tripping should be capable of prediction so that lag time (usually about thirty minutes to an hour) between the compressor tripping and a standby compressor starting should be reduced. Addressing the issues of compressor reliability and trip prediction will also help in reducing the smoke problem. Further, one or more embodiments include that the gas composition monitoring be made online and included in the overall smoke control loop.
  • FIG. 1 is a block diagram for a root cause analysis for smoke formation during a flaring operation.
  • the analysis begins at 110 with the premise that there is a good deal of smoke and indeed too much smoke during flaring operations. This large amount of smoke during flaring can be contributed to and/or caused by at least three major causes.
  • Third, at 140 in systems that use steam/air injection, the quantity and quality of the steam/air could be insufficient, thereby leading to unacceptable levels of smoke.
  • the large amount of flare gas could be the result of a valve failure as indicated at 123 , or it could be the result of issues with a compressor at 125 .
  • the compressor issues at 125 could further be the result of compressor reliability issues at 127 , which in turn could be the result of a shaft failure ( 127 A), a bearing failure ( 127 B), a compressor blade failure ( 127 C), a surging failure ( 127 D), a motor failure ( 127 E), and/or a gear failure ( 127 F).
  • the compressor issues at 125 could also be the result of a time lag between a compressor tripping and the starting of a standby compressor, as indicated at 129 .
  • this lag time could be because a tripping prediction system is not in place. Additionally, as indicated at 129 B, there may be no automatic way of starting the standby compressor when there is tripping. That is, the standby compressor must be manually started.
  • the gas composition may not be monitored as indicated at 131 , and the heating value of the gas could reduce combustion efficiency as indicated at 132 . Both the gas composition and heating value of the gas can contribute to increased smoke during flaring.
  • the quantity and quality of the steam/air in an injection system could be insufficient.
  • the amount of steam or air that is provided may not be controlled in real time.
  • FIG. 1 The root cause analysis of FIG. 1 shows that there are at least three reasons for (excessive) smoke formation. First, and more specifically, there will likely be excessive smoke formation when large volumes of flare gas are suddenly vented to the flare stack due to plant upsets. Second, the composition of the flare gas or its heating value affects the amount of smoke formation. Third, the availability of sufficient control of steam/air flow affects the amount of smoke formation.
  • mmcfm 4-6 million cubic feet per minute
  • Compressor tripping can happen because of various individual component failures.
  • a compressor does trip, a standby compressor is started. Thereafter, it can take 30-60 minutes to reach steady state operating conditions. During this 30-60 minute period, the flaring can become very large.
  • the smoke becomes thicker and black.
  • the flare gas is comprised of gases of lower molecular weight, the smoke becomes white and thinner.
  • ethylene molecular weight- 18 28
  • butadiene molecular weight ⁇ 54
  • the gas composition changes the heating value of the gas, thereby affecting the combustion efficiency, resulting in higher levels of smoke creation.
  • the steam quality with dryness factor and temperature can also affect the quality of the smoke.
  • the quantity and/or quality of steam or air plays an important role in the formation of the smoke.
  • the failure of an air compressor or nozzle can cause excessive smoke formation.
  • An embodiment addresses the various factors that cause smoke and noise formation by integrating monitoring and control.
  • the monitoring part of the system there are several parameters of interest.
  • One technique uses an infrared (IR) sensor with appropriate filters for detecting spectral responses of various gases.
  • IR infrared
  • catalytic type combustible sensors are used.
  • Laser gas detection systems are another option for gas sensing.
  • solid state sensors can be used.
  • the monitoring involves monitoring steam quantity, steam quality, and air flow.
  • the monitoring involves flare and smoke monitoring.
  • the two standard approaches include using an IR sensor and a normal charge-coupled device (CCD) sensor.
  • FIG. 2 illustrates a monitoring system 202 A, 202 B and controlling parameters 204 for a flaring operation system 200 .
  • the monitoring system 202 A, 202 B includes flare monitoring 232 , compressor monitoring 234 , and gas composition monitoring 236 .
  • Data that are input into the monitoring system 202 A, 202 B, and in particular the flare monitoring 232 include flare images 210 , temperature at a liquid propane gas (LPG) discharge 211 , an LPG flowrate 212 , an air/steam injection rate 213 , a steam quality 214 , and a steam temperature 215 .
  • LPG liquid propane gas
  • Data that are input into the compressor monitoring 234 include vibration, noise, motor current, speed, and radar signal 216 , flow 217 , discharge pressure 218 , ambient pressure 219 , ambient air flow 219 A, discharge temperature 220 , and ambient temperature 221 .
  • Gas data 222 are input into gas composition monitoring 236 .
  • the various controlling parameters ( 251 - 258 ) are activated so as to control the smoke or flare. For example, if the pilot flame is visible (a blue color when LPG is used) during zero or low flaring, then the LPG flow rate ( 251 ) could be adjusted based on the requirement. Otherwise, the temperature of the pilot flame ( 211 ) (measured via thermocouples) can also be used for controlling the LPG flow rate. Similarly, if there is a large amount of smoke, then the steam/air quality ( 253 , 254 ) and quantity ( 252 ) can be varied.
  • the quality of air ( 253 ) can be controlled by providing an appropriate amount of oxygen or any other gas.
  • the composition of the gas can also be varied using similar methods ( 258 ).
  • the compressor control systems can be surge controlling, where the flow has to be varied using bleeding ( 256 ) or varying inlet guide vane (IGV) angle ( 255 ) or changing speed ( 257 ). Therefore, an embodiment using the integrated controls of FIG. 2 is effective for tackling various types of and reasons for smoke.
  • a computer processor 250 executes the monitoring and control functions.
  • the processor 250 receives input data from the monitoring system 202 A via a sensor 260 , and outputs control signals that affect the controlling parameters 204 .
  • the input data from the monitoring systems 202 A can be stored in a database 270 for future consideration and analysis, and the computer processor 250 can also output data, alarms, reports, and other information to output device 280 .
  • the monitored variables described above form the inputs to the control system.
  • the control system executes the control of some compressor failure modes like surge, the control of the flare smoke and noise (using the air/steam control system ( 252 , 253 , 254 )), and the control of steam/air quality ( 253 , 254 ).
  • FIG. 2 is a centralized control structure.
  • the monitoring and control system is a distributed structure, wherein for example the compressor control is local to the compressor location.
  • FIG. 3 is a flowchart of an example process 300 for monitoring and controlling a flaring operation.
  • FIG. 3 includes a number of process and feature blocks 305 - 360 . Though arranged serially in the example of FIG. 3 , other examples may reorder the blocks, omit one or more blocks, and/or execute two or more blocks in parallel using multiple processors or a single processor organized as two or more virtual machines or sub-processors. Moreover, still other examples can implement the blocks as one or more specific interconnected hardware or integrated circuit modules with related control and data signals communicated between and through the modules. Thus, any process flow is applicable to software, firmware, hardware, and hybrid implementations.
  • a computer processor monitors parameters affecting an amount of smoke generated during a flaring operation.
  • data relating to the parameters are received into the computer processor.
  • the computer processor analyzes the data relating to the parameters.
  • the computer processor uses the data analysis to predict an impending increase in the amount of smoke generated during the flaring operation.
  • the computer processor varies a value of one or more parameters to prevent or decrease the impending increase in the amount of smoke generated during the flaring operation.
  • the computer processor suggests preventative actions to eradicate or decrease the impending increase in the amount of smoke generated during the flaring operation.
  • the computer processor may report to output device 280 that a liquid propane gas flow rate ( 212 ) is either too low or two high, which may decrease the efficiency of the plant, which in turn may increase the smoke generated during flaring.
  • the prediction of an impending increase in the amount of smoke generated during the flaring operation is based on an identification of a valve failure or a compressor problem.
  • the identification of the compressor problem can include a shaft failure, a bearing failure, a blade failure, a surge failure, a motor failure, and/or a gear failure.
  • the compressor problem can include a time lag between the compressor problem and starting a standby compressor. In an embodiment, this lag time issue can be addressed by configuring a computer processor to cause a standby compressor to start immediately or substantially immediately after the identification of the compressor problem.
  • the flare monitoring and control system can monitor and control an industrial plant, and as indicated at 341 , the industrial plant can be an oil or gas refinery or an oil or gas separation plant.
  • Block 345 indicates that the monitoring of the parameters includes monitoring a composition of a flare gas, and that a computer processor causes an injection of one or more gases into the flare gas to modify the composition of the flare gas.
  • Block 350 indicates that the monitoring of the parameters includes monitoring steam/air injection quantity and quality, and that a computer processor causes a modifying of the steam/air injection quantity.
  • Block 355 indicates that the monitoring of the parameters includes a monitoring of a flare image, a temperature at a liquid propane gas (LPG) discharge, a LPG flow rate, an air/steam injection rate, an air/steam quality, and/or a steam temperature, and that the computer processor causes a modifying of one or more of the LPG flow rate, the air/steam injection rate, and the air/steam quality as a function of the monitoring.
  • LPG liquid propane gas
  • Block 360 indicates that the monitoring of the parameters includes a monitoring of a compressor.
  • the monitoring of the compressor includes the monitoring of one or more of vibration, noise, current, speed, radar signal, flow, discharge pressure, ambient pressure, discharge temperature, and ambient temperature.
  • the computer processor causes the modifying of one or more of a compressor inlet guide vane (IGV) angle, a compressor bleeding, and a compressor motor speed or frequency as a function of the monitoring.
  • IGV compressor inlet guide vane

Abstract

A flare monitoring and control system monitors parameters that affect the amount of smoke generated during a flaring operation. The system receives data relating to the parameters, and analyzes the data relating to the parameters. The system predicts an impending increase in the amount of smoke generated during the flaring operation, and varies a value of one or more parameters to prevent the impending increase in the amount of smoke generated during the flaring operation.

Description

    TECHNICAL FIELD
  • The present disclosure relates to the monitoring and controlling of flaring operations in industrial plants.
  • BACKGROUND
  • A flare is a pressure safety relief device used to ensure that emergencies occurring in a plant (e.g., process upsets, compressor failures, etc.) do not compromise the safety and integrity of the plant. Such emergencies may require disposal of large volumes of hydrocarbons, and flaring is the best and practically the only option in these situations. Furthermore, at times, as part of a refining process, more fuel gas (e.g., propane, butane) is produced than needed by the plants. Flaring eliminates this excess process gas by burning it off rather than venting potentially damaging hydrocarbons to the atmosphere.
  • In industry today, as far as it is possible, flaring is avoided to prevent loss of valuable hydrocarbons as well as to minimize environmental damage. The flaring process introduces two major sources of pollution—smoke and noise. These two pollutants are strictly monitored by various environmental agencies, and there is an economical and societal need to reduce this significantly through improved monitoring and control.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a block diagram of a root cause analysis for smoke formation in a flaring operation.
  • FIG. 2 is a block diagram illustrating a monitoring system and various monitoring parameters for flare monitoring, compressor monitoring, and gas composition monitoring.
  • FIG. 3 is a flowchart of a monitoring and control system for a flaring operation in an industrial plant.
  • DETAILED DESCRIPTION
  • In the following description, reference is made to the accompanying drawings that form a part hereof, and in which is shown by way of illustration specific embodiments which may be practiced. These embodiments are described in sufficient detail to enable those skilled in the art to practice the invention, and it is to be understood that other embodiments may be utilized and that structural, electrical, and optical changes may be made without departing from the scope of the present invention. The following description of example embodiments is, therefore, not to be taken in a limited sense, and the scope of the present invention is defined by the appended claims.
  • The present disclosure presents a comprehensive solution for monitoring and controlling flaring operations. A root cause analysis of various factors that necessitate flaring and the specific factors that cause extensive environmental damage is presented. An embodiment reduces the effects of the variables (or sub systems) that are responsible for flaring and pollution.
  • There are several issues that many industrial plants have to deal with today. One is the generation of heavy smoke during flaring operations. Because of this heavy smoke, many industrial plants are unable to meet strict environmental regulations. At least one cause of the heavy smoke is an ineffective smoke control system. Another issue is a lack of an automated monitoring solution for compressors, valves, etc. In an embodiment, compressors are monitored so as to prevent compressor failures, which will minimize flaring. Another issue is the lack of online gas composition estimation tools as part of the overall smoke control. In an embodiment, gas composition is monitored, and if the composition is detected as suboptimal (for good combustibility), an appropriate gas mixture is added. Another issue is the significant financial losses due to flaring and compressor problems.
  • In an embodiment, several modules can be integrated into a flare monitoring and control system. The system can include a monitoring module, relating to at least health monitoring and asset monitoring. The system can also include a machinery control system. The system can further include a field advisor that can monitor the performance of various process and equipment parameters.
  • In many industrial plants today, existing smoke control systems include steam injection. Such systems are automated, and the smoke detection is performed using infrared (IR) cameras. Some plants use air-assisted control. However, such control systems are not efficient for several reasons. One reason is that such systems do not take any inputs from other parts of the plant, for example, compressors, valves, etc. Also, for systems that use IR cameras, the control system takes input from the IR camera, which examines the flare (controller is tuned with a simple rule that large flares imply large smoke, and the converse), and releases an appropriate amount of steam. Such a control action is reactive in the sense that excess flaring or smoke is caused due to various processes/equipment behaving sub-optimally—and the smoke is the end result of complex failures in the plant or refinery. Also, the control system can react only after smoke detection. Consequently, there is a significant delay in control after the plant upsets, which usually renders control ineffective. Thus, there is a need for advanced monitoring techniques which can predict critical failures in industrial and refinery processes and equipment, and inform the control system of impending failures so that the control system can respond better.
  • Consequently, one or more goals of one or more embodiments include that the smoke that is generated during flaring should be reduced and/or eliminated, compressor reliability should be improved, and compressor tripping should be capable of prediction so that lag time (usually about thirty minutes to an hour) between the compressor tripping and a standby compressor starting should be reduced. Addressing the issues of compressor reliability and trip prediction will also help in reducing the smoke problem. Further, one or more embodiments include that the gas composition monitoring be made online and included in the overall smoke control loop.
  • A root cause analysis (with top-down approach) of smoke formation can be used to investigate the generation of smoke during flaring operations. The results of the root cause analysis can then be used to address the issues enumerated in the previous paragraph. FIG. 1 is a block diagram for a root cause analysis for smoke formation during a flaring operation.
  • Referring to FIG. 1, the analysis begins at 110 with the premise that there is a good deal of smoke and indeed too much smoke during flaring operations. This large amount of smoke during flaring can be contributed to and/or caused by at least three major causes. First, at 120, the amount of flare gas can be large. Of course, the more gas that there is to flare off, then the more smoke will be generated. Second, at 130, the composition of the particular gas that is being flared could create more or less smoke than other gases. Third, at 140, in systems that use steam/air injection, the quantity and quality of the steam/air could be insufficient, thereby leading to unacceptable levels of smoke.
  • There are several reasons the amount of flare gas could be large at 120. The large amount of flare gas could be the result of a valve failure as indicated at 123, or it could be the result of issues with a compressor at 125. The compressor issues at 125 could further be the result of compressor reliability issues at 127, which in turn could be the result of a shaft failure (127A), a bearing failure (127B), a compressor blade failure (127C), a surging failure (127D), a motor failure (127E), and/or a gear failure (127F). The compressor issues at 125 could also be the result of a time lag between a compressor tripping and the starting of a standby compressor, as indicated at 129. As illustrated at 129A, this lag time could be because a tripping prediction system is not in place. Additionally, as indicated at 129B, there may be no automatic way of starting the standby compressor when there is tripping. That is, the standby compressor must be manually started.
  • Regarding smoke creation from the gas composition at 130, the gas composition may not be monitored as indicated at 131, and the heating value of the gas could reduce combustion efficiency as indicated at 132. Both the gas composition and heating value of the gas can contribute to increased smoke during flaring.
  • Finally, the quantity and quality of the steam/air in an injection system could be insufficient. As illustrated at 142, the amount of steam or air that is provided may not be controlled in real time. Additionally, as indicated at 144, there may be reliability issues with an air compressor, a nozzle, or a valve.
  • The root cause analysis of FIG. 1 shows that there are at least three reasons for (excessive) smoke formation. First, and more specifically, there will likely be excessive smoke formation when large volumes of flare gas are suddenly vented to the flare stack due to plant upsets. Second, the composition of the flare gas or its heating value affects the amount of smoke formation. Third, the availability of sufficient control of steam/air flow affects the amount of smoke formation.
  • There are three typical flows to the flare system. First, there are emergency flows. Examples of an emergency flow include pressure relief flows and emergency depressurization. Second, there are episodic flows. Examples of episodic flows include venting that is required for maintenance, and venting that is required for regeneration and shutdown/startup operations. Third, there are continuous flows. Examples of continuous flow are a sweep gas that is put through the flare system piping, and pressure relief valve leakages. In any of these typical flows to the flare system, the amount of flare gas that is vented depends on the extent of valve failures, compressor failures, and/or process upsets. For example, if during normal conditions the flare gas flows at 4-6 million cubic feet per minute (mmcfm), and the compressor trips, the flare gas flow can increase to 150 mmcfm. This increase can cause excessive flaring and result in smoke and noise formation.
  • Compressor tripping can happen because of various individual component failures. When a compressor does trip, a standby compressor is started. Thereafter, it can take 30-60 minutes to reach steady state operating conditions. During this 30-60 minute period, the flaring can become very large.
  • When the flare gas is comprised of individual gases with high molecular weight, the smoke becomes thicker and black. However, when the flare gas is comprised of gases of lower molecular weight, the smoke becomes white and thinner. For example, ethylene (molecular weight-18 28) produces lighter smoke compared to butadiene (molecular weight˜54). Also, the gas composition changes the heating value of the gas, thereby affecting the combustion efficiency, resulting in higher levels of smoke creation. The steam quality with dryness factor and temperature can also affect the quality of the smoke.
  • The quantity and/or quality of steam or air plays an important role in the formation of the smoke. The failure of an air compressor or nozzle can cause excessive smoke formation.
  • An embodiment addresses the various factors that cause smoke and noise formation by integrating monitoring and control. In the monitoring part of the system, there are several parameters of interest. First, there is the reliability of the compressors. Compressor reliability is monitored by analyzing a compressor's vibration, noise, motor current, speed, performance parameters, etc. Second, there is the composition of the flare gas. There exist a few online techniques for detecting gas composition that are known to those of skill in the art. One technique uses an infrared (IR) sensor with appropriate filters for detecting spectral responses of various gases. In another embodiment, catalytic type combustible sensors are used. Laser gas detection systems are another option for gas sensing. Finally, solid state sensors can be used. Thus, there are a wide variety of options for online gas (composition) sensing in refineries and other industrial plants. Third, the monitoring involves monitoring steam quantity, steam quality, and air flow. Fourth, the monitoring involves flare and smoke monitoring. For smoke and/or flare detection, the two standard approaches include using an IR sensor and a normal charge-coupled device (CCD) sensor.
  • FIG. 2 illustrates a monitoring system 202A, 202B and controlling parameters 204 for a flaring operation system 200. The monitoring system 202A, 202B includes flare monitoring 232, compressor monitoring 234, and gas composition monitoring 236. Data that are input into the monitoring system 202A, 202B, and in particular the flare monitoring 232, include flare images 210, temperature at a liquid propane gas (LPG) discharge 211, an LPG flowrate 212, an air/steam injection rate 213, a steam quality 214, and a steam temperature 215. Data that are input into the compressor monitoring 234 include vibration, noise, motor current, speed, and radar signal 216, flow 217, discharge pressure 218, ambient pressure 219, ambient air flow 219A, discharge temperature 220, and ambient temperature 221. Gas data 222 are input into gas composition monitoring 236.
  • Based upon the data input into the monitoring system (210-222), and in particular, the amount of smoke or flaring (210), the various controlling parameters (251-258) are activated so as to control the smoke or flare. For example, if the pilot flame is visible (a blue color when LPG is used) during zero or low flaring, then the LPG flow rate (251) could be adjusted based on the requirement. Otherwise, the temperature of the pilot flame (211) (measured via thermocouples) can also be used for controlling the LPG flow rate. Similarly, if there is a large amount of smoke, then the steam/air quality (253, 254) and quantity (252) can be varied. The quality of air (253) can be controlled by providing an appropriate amount of oxygen or any other gas. The composition of the gas can also be varied using similar methods (258). The compressor control systems can be surge controlling, where the flow has to be varied using bleeding (256) or varying inlet guide vane (IGV) angle (255) or changing speed (257). Therefore, an embodiment using the integrated controls of FIG. 2 is effective for tackling various types of and reasons for smoke.
  • As further illustrated in FIG. 2, a computer processor 250 executes the monitoring and control functions. The processor 250 receives input data from the monitoring system 202A via a sensor 260, and outputs control signals that affect the controlling parameters 204. The input data from the monitoring systems 202A can be stored in a database 270 for future consideration and analysis, and the computer processor 250 can also output data, alarms, reports, and other information to output device 280.
  • In summary, in the control system, the monitored variables described above (210-222) form the inputs to the control system. The control system executes the control of some compressor failure modes like surge, the control of the flare smoke and noise (using the air/steam control system (252, 253, 254)), and the control of steam/air quality (253, 254). FIG. 2 is a centralized control structure. In another embodiment, the monitoring and control system is a distributed structure, wherein for example the compressor control is local to the compressor location.
  • FIG. 3 is a flowchart of an example process 300 for monitoring and controlling a flaring operation. FIG. 3 includes a number of process and feature blocks 305-360. Though arranged serially in the example of FIG. 3, other examples may reorder the blocks, omit one or more blocks, and/or execute two or more blocks in parallel using multiple processors or a single processor organized as two or more virtual machines or sub-processors. Moreover, still other examples can implement the blocks as one or more specific interconnected hardware or integrated circuit modules with related control and data signals communicated between and through the modules. Thus, any process flow is applicable to software, firmware, hardware, and hybrid implementations.
  • Referring to FIG. 3, at 305, a computer processor monitors parameters affecting an amount of smoke generated during a flaring operation. At 310, data relating to the parameters are received into the computer processor. At 315, the computer processor analyzes the data relating to the parameters. At 320, the computer processor uses the data analysis to predict an impending increase in the amount of smoke generated during the flaring operation. At 325, the computer processor varies a value of one or more parameters to prevent or decrease the impending increase in the amount of smoke generated during the flaring operation.
  • At 330, the computer processor suggests preventative actions to eradicate or decrease the impending increase in the amount of smoke generated during the flaring operation. The computer processor may report to output device 280 that a liquid propane gas flow rate (212) is either too low or two high, which may decrease the efficiency of the plant, which in turn may increase the smoke generated during flaring.
  • At 335, the prediction of an impending increase in the amount of smoke generated during the flaring operation is based on an identification of a valve failure or a compressor problem. As indicated at 336, the identification of the compressor problem can include a shaft failure, a bearing failure, a blade failure, a surge failure, a motor failure, and/or a gear failure. Additionally, as indicated at 337, the compressor problem can include a time lag between the compressor problem and starting a standby compressor. In an embodiment, this lag time issue can be addressed by configuring a computer processor to cause a standby compressor to start immediately or substantially immediately after the identification of the compressor problem.
  • As indicated at 340, the flare monitoring and control system can monitor and control an industrial plant, and as indicated at 341, the industrial plant can be an oil or gas refinery or an oil or gas separation plant.
  • Block 345 indicates that the monitoring of the parameters includes monitoring a composition of a flare gas, and that a computer processor causes an injection of one or more gases into the flare gas to modify the composition of the flare gas.
  • Block 350 indicates that the monitoring of the parameters includes monitoring steam/air injection quantity and quality, and that a computer processor causes a modifying of the steam/air injection quantity.
  • Block 355 indicates that the monitoring of the parameters includes a monitoring of a flare image, a temperature at a liquid propane gas (LPG) discharge, a LPG flow rate, an air/steam injection rate, an air/steam quality, and/or a steam temperature, and that the computer processor causes a modifying of one or more of the LPG flow rate, the air/steam injection rate, and the air/steam quality as a function of the monitoring.
  • Block 360 indicates that the monitoring of the parameters includes a monitoring of a compressor. Specifically, the monitoring of the compressor includes the monitoring of one or more of vibration, noise, current, speed, radar signal, flow, discharge pressure, ambient pressure, discharge temperature, and ambient temperature. The computer processor causes the modifying of one or more of a compressor inlet guide vane (IGV) angle, a compressor bleeding, and a compressor motor speed or frequency as a function of the monitoring.
  • It should be understood that there exist implementations of other variations and modifications of the invention and its various aspects, as may be readily apparent, for example, to those of ordinary skill in the art, and that the invention is not limited by specific embodiments described herein. Features and embodiments described above may be combined with each other in different combinations. It is therefore contemplated to cover any and all modifications, variations, combinations or equivalents that fall within the scope of the present invention.
  • The Abstract is provided to comply with 37 C.F.R. §1.72(b) and will allow the reader to quickly ascertain the nature and gist of the technical disclosure. It is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims.
  • In the foregoing description of the embodiments, various features are grouped together in a single embodiment for the purpose of streamlining the disclosure. This method of disclosure is not to be interpreted as reflecting that the claimed embodiments have more features than are expressly recited in each claim. Rather, as the following claims reflect, inventive subject matter lies in less than all features of a single disclosed embodiment. Thus the following claims are hereby incorporated into the Description of the Embodiments, with each claim standing on its own as a separate example embodiment.

Claims (20)

1. A flare monitoring and control system comprising:
a computer processor operable to:
monitor a plurality of parameters, the parameters affecting an amount of smoke generated during a flaring operation;
receive data relating to the plurality of parameters;
analyze the data relating to the plurality of parameters;
predict an impending increase in the amount of smoke generated during the flaring operation; and
vary a value of one or more parameters to prevent the impending increase in the amount of smoke generated during the flaring operation.
2. The flare monitoring and control system of claim 1, wherein the computer processor is operable to suggest preventative actions to eradicate or decrease the impending increase in the amount of smoke generated during the flaring operation.
3. The flare monitoring and control system of claim 1, wherein the prediction of the impending increase in the amount of smoke generated during the flaring operation is based on an identification of a valve failure, a compressor problem, or a suboptimal gas composition with respect to combustibility.
4. The flare monitoring and control system of claim 3, wherein the identification of the compressor problem comprises one or more of a shaft failure, a bearing failure, a blade failure, a surge failure, a motor failure, and a gear failure.
5. The flare monitoring and control system of claim 4, wherein the compressor problem comprises a time lag between the compressor problem and starting a standby compressor, and wherein the computer processor is configured to cause the standby compressor to start immediately after the identification of the compressor problem.
6. The flare monitoring and control system of claim 1, wherein the system monitors and controls an industrial plant.
7. The flare monitoring and control system of claim 6, wherein the industrial plant comprises an oil or gas refinery or an oil or gas separation plant.
8. The flare monitoring and control system of claim 1, wherein the monitoring of the plurality of parameters comprises monitoring a composition of a flare gas, and wherein the computer processor is configured to inject one or more gases into the flare gas to modify the composition of the flare gas.
9. The flare monitoring and control system of claim 1, wherein the monitoring of the plurality of parameters comprises monitoring steam/air injection quantity and quality, and wherein the computer processor is configured to modify the steam/air injection quantity.
10. The flare monitoring and control system of claim 1, wherein the monitoring of the plurality of parameters comprises a first monitoring of a flare image, a temperature at a liquid propane gas (LPG) discharge, a LPG flow rate, an air/steam injection rate, an air/steam quality, and a steam temperature; and wherein the computer processor is configured to modify one or more of the LPG flow rate, the air/steam injection rate, and the air/steam quality as a function of the first monitoring.
11. The flare monitoring and control system of claim 1, wherein the monitoring of the plurality of parameters comprises a second monitoring of a compressor; and wherein the second monitoring of the compressor involves one or more of vibration, noise, current, speed, radar signal, flow, discharge pressure, ambient pressure, discharge temperature, and ambient temperature; and wherein the computer processor is configured to modify one or more of a compressor inlet guide vane (IGV) angle, a compressor bleeding, and a compressor motor speed or frequency as a function of the second monitoring.
12. A flare monitoring and control process comprising:
monitoring a plurality of parameters, the parameters affecting an amount of smoke generated during a flaring operation;
receiving data relating to the plurality of parameters;
analyzing the data relating to the plurality of parameters;
predicting an impending increase in the amount of smoke generated during the flaring operation; and
varying a value of one or more parameters to prevent the impending increase in the amount of smoke generated during the flaring operation.
13. The flare monitoring and control process of claim 12, comprising suggesting preventative actions to eradicate or decrease the impending increase in the amount of smoke generated during the flaring operation.
14. The flare monitoring and control process of claim 12, wherein the predicting the impending increase in the amount of smoke generated during the flaring operation is based on an identification of a valve failure, a compressor problem, or a suboptimal gas composition with respect to combustibility; wherein the identification of the compressor problem comprises one or more of a shaft failure, a bearing failure, a blade failure, a surge failure, a motor failure, and a gear failure; and wherein the compressor problem comprises a time lag between the compressor problem and starting a standby compressor, and wherein the computer processor is configured to cause the standby compressor to start immediately after the identification of the compressor problem.
15. The flare monitoring and control process of claim 12, comprising monitoring and controlling an industrial plant; wherein the industrial plant comprises an oil or gas refinery or an oil or gas separation plant.
16. The flare monitoring and control process of claim 12, wherein the monitoring of the plurality of parameters comprises monitoring a composition of a flare gas, and comprising injecting one or more gases into the flare gas to modify the composition of the flare gas.
17. A computer readable medium comprising instructions to execute a flare monitoring and control process comprising:
monitoring a plurality of parameters, the parameters affecting an amount of smoke generated during a flaring operation;
receiving data relating to the plurality of parameters;
analyzing the data relating to the plurality of parameters;
predicting an impending increase in the amount of smoke generated during the flaring operation; and
varying a value of one or more parameters to prevent the impending increase in the amount of smoke generated during the flaring operation.
18. The computer readable medium of claim 17, comprising monitoring steam/air injection quantity and quality; and modifying the steam/air injection quantity.
19. The computer readable medium of claim 17, wherein the monitoring of the plurality of parameters comprises a first monitoring of a flare image, a temperature at a liquid propane gas (LPG) discharge, a LPG flow rate, an air/steam injection rate, an air/steam quality, and a steam temperature; and modifying one or more of the LPG flow rate, the air/steam injection rate, and the air/steam quality as a function of the first monitoring.
20. The computer readable medium of claim 17, wherein the monitoring of the plurality of parameters comprises a second monitoring of a compressor; and wherein the second monitoring of the compressor involves one or more of vibration, noise, current, speed, radar signal, flow, discharge pressure, ambient pressure, discharge temperature, and ambient temperature; and modifying one or more of a compressor inlet guide vane (IGV) angle, a compressor bleeding, and a compressor motor speed or frequency as a function of the second monitoring.
US14/215,866 2014-03-17 2014-03-17 Integrated smoke monitoring and control system for flaring operations Abandoned US20150260397A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/215,866 US20150260397A1 (en) 2014-03-17 2014-03-17 Integrated smoke monitoring and control system for flaring operations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US14/215,866 US20150260397A1 (en) 2014-03-17 2014-03-17 Integrated smoke monitoring and control system for flaring operations

Publications (1)

Publication Number Publication Date
US20150260397A1 true US20150260397A1 (en) 2015-09-17

Family

ID=54068487

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/215,866 Abandoned US20150260397A1 (en) 2014-03-17 2014-03-17 Integrated smoke monitoring and control system for flaring operations

Country Status (1)

Country Link
US (1) US20150260397A1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150293506A1 (en) * 2014-04-14 2015-10-15 Honeywell International Inc. Feedback control for reducing flaring process smoke and noise
US20190360688A1 (en) * 2017-09-15 2019-11-28 Honeywell International Inc. Staged steam waste gas flare
US10746400B2 (en) 2016-06-28 2020-08-18 General Electric Company Integrated flare combustion control
US10920982B2 (en) 2015-09-28 2021-02-16 Schlumberger Technology Corporation Burner monitoring and control systems
US20220179399A1 (en) * 2020-07-07 2022-06-09 Maillance SAS Method and System for Flare Stack Monitoring and Optimization
US11467039B2 (en) 2020-02-03 2022-10-11 Saudi Arabian Oil Company Systems and methods for real-time offshore flare monitoring in drilling ships
WO2022217208A1 (en) * 2021-04-05 2022-10-13 Baker Hughes Holdings Llc Emission monitoring and control of flare systems
US20220373176A1 (en) * 2021-05-18 2022-11-24 Saudi Arabian Oil Company Flare control at well sites
US20230096405A1 (en) * 2021-09-28 2023-03-30 Saudi Arabian Oil Company Flare system heating value monitoring meter
US11795810B2 (en) 2021-09-27 2023-10-24 Saudi Arabian Oil Company Flare systems analyzer
US11867394B2 (en) * 2020-10-08 2024-01-09 Saudi Arabian Oil Company Flare spill control system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3548761A (en) * 1968-12-26 1970-12-22 Solomon Zalman Anti-pollution incinerator
US6279870B1 (en) * 1998-03-27 2001-08-28 Maxon Corporation Intelligent valve actuator
US20070177983A1 (en) * 2006-02-01 2007-08-02 Ingersoll-Rand Company Airflow compressor control system and method
US20080102411A1 (en) * 2006-10-30 2008-05-01 Robert Longardner Apparatus and methods for conditioning combustion air
US20090162191A1 (en) * 2007-12-21 2009-06-25 Korea Aerospace Research Institute Real-time turbomachinery blade breakage monitoring unit and turbo-apparatus
US20100294374A1 (en) * 2008-12-15 2010-11-25 John Sears Seal leakage gas recovery system
US20110085030A1 (en) * 2009-10-07 2011-04-14 John Zink Company, Llc Image sensing system, software, apparatus and method for controlling combustion equipment
US20110244407A1 (en) * 2010-03-30 2011-10-06 Yamatake Corporation Combustion controlling device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3548761A (en) * 1968-12-26 1970-12-22 Solomon Zalman Anti-pollution incinerator
US6279870B1 (en) * 1998-03-27 2001-08-28 Maxon Corporation Intelligent valve actuator
US20070177983A1 (en) * 2006-02-01 2007-08-02 Ingersoll-Rand Company Airflow compressor control system and method
US20080102411A1 (en) * 2006-10-30 2008-05-01 Robert Longardner Apparatus and methods for conditioning combustion air
US20090162191A1 (en) * 2007-12-21 2009-06-25 Korea Aerospace Research Institute Real-time turbomachinery blade breakage monitoring unit and turbo-apparatus
US20100294374A1 (en) * 2008-12-15 2010-11-25 John Sears Seal leakage gas recovery system
US20110085030A1 (en) * 2009-10-07 2011-04-14 John Zink Company, Llc Image sensing system, software, apparatus and method for controlling combustion equipment
US20110244407A1 (en) * 2010-03-30 2011-10-06 Yamatake Corporation Combustion controlling device

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9594359B2 (en) * 2014-04-14 2017-03-14 Honeywell International Inc. Feedback control for reducing flaring process smoke and noise
US20150293506A1 (en) * 2014-04-14 2015-10-15 Honeywell International Inc. Feedback control for reducing flaring process smoke and noise
US10920982B2 (en) 2015-09-28 2021-02-16 Schlumberger Technology Corporation Burner monitoring and control systems
EP3356736B1 (en) * 2015-09-28 2022-08-10 Services Pétroliers Schlumberger Burner monitoring and control systems
US10746400B2 (en) 2016-06-28 2020-08-18 General Electric Company Integrated flare combustion control
US20190360688A1 (en) * 2017-09-15 2019-11-28 Honeywell International Inc. Staged steam waste gas flare
US11467039B2 (en) 2020-02-03 2022-10-11 Saudi Arabian Oil Company Systems and methods for real-time offshore flare monitoring in drilling ships
US20220179399A1 (en) * 2020-07-07 2022-06-09 Maillance SAS Method and System for Flare Stack Monitoring and Optimization
US11867394B2 (en) * 2020-10-08 2024-01-09 Saudi Arabian Oil Company Flare spill control system
WO2022217208A1 (en) * 2021-04-05 2022-10-13 Baker Hughes Holdings Llc Emission monitoring and control of flare systems
US20220373176A1 (en) * 2021-05-18 2022-11-24 Saudi Arabian Oil Company Flare control at well sites
US11859815B2 (en) * 2021-05-18 2024-01-02 Saudi Arabian Oil Company Flare control at well sites
US11795810B2 (en) 2021-09-27 2023-10-24 Saudi Arabian Oil Company Flare systems analyzer
US20230096405A1 (en) * 2021-09-28 2023-03-30 Saudi Arabian Oil Company Flare system heating value monitoring meter
US11747315B2 (en) * 2021-09-28 2023-09-05 Saudi Arabian Oil Company Flare system heating value monitoring meter

Similar Documents

Publication Publication Date Title
US20150260397A1 (en) Integrated smoke monitoring and control system for flaring operations
US7664590B2 (en) System for detecting ignition failure in a gas turbine engine
CN109661504B (en) Control system for gas turbine engine
US10037026B2 (en) Systems and methods for fault analysis
US20100089067A1 (en) Adaptive performance model and methods for system maintenance
US11808409B2 (en) Methane and emissions reduction system
EP3206006B1 (en) Automated system and method for generating engine test cell analytics and diagnostics
JP2018204604A (en) Systems and methods for icing detection of compressors
US20110282501A1 (en) Method of detecting a liquid fuel leak in a gas turbine
US20140277612A1 (en) Automatic generation of a dynamic pre-start checklist
EP3904660B1 (en) System and method for detecting a shaft event on a gas turbine engine
RU2451921C1 (en) Method of technical control of gas-turbine installation
US20210052999A1 (en) Method and system for monitoring a fluid system configured to operate with a filter
CN112664329A (en) Gas turbine fault monitoring system and method
US9696697B2 (en) Automatic switching of HMI screens based on process, task, and abnormal deviation in a power plant
JP6514725B2 (en) System and method for predicting physical parameters for a fuel combustion system
JP6894208B2 (en) Systems and methods for determining the risk of operating a turbomachine
US20230184166A1 (en) Methods and systems for operating an aircraft engine
RU2736228C2 (en) Method of gas turbine engine starting valve malfunction monitoring
RU2786513C1 (en) Automated system for control and regulation of flow rate of fuel gas of gas-pumping unit
US20230315077A1 (en) Abnormality response teaching system, abnormality factor estimation method, abnormality response teaching method, and program
AU2022324572A1 (en) Improved method for estimating and setting exhaust purge time in a combustion system and combustion system thereof
RU2432563C2 (en) Control method of gas-turbine unit technical condition
CN105973607A (en) Intelligent monitoring segmented voltage-regulating gas supply system for natural gas engine experiment table
JP2006105053A (en) Gas turbine monitoring device and gas turbine monitoring system

Legal Events

Date Code Title Description
AS Assignment

Owner name: HONEYWELL INTERNATIONAL INC., NEW JERSEY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:TALASILA, VISWANATH;KAR, CHINMAYA;MOHIDEEN, MOHAMED IBRAHIM;AND OTHERS;SIGNING DATES FROM 20140211 TO 20140217;REEL/FRAME:032455/0536

AS Assignment

Owner name: HONEYWELL INTERNATIONAL INC., NEW JERSEY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:ABDALLAH, BILAL;REEL/FRAME:035257/0277

Effective date: 20150325

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION