US20140338329A1 - Installation for storing thermal energy - Google Patents

Installation for storing thermal energy Download PDF

Info

Publication number
US20140338329A1
US20140338329A1 US14/346,729 US201214346729A US2014338329A1 US 20140338329 A1 US20140338329 A1 US 20140338329A1 US 201214346729 A US201214346729 A US 201214346729A US 2014338329 A1 US2014338329 A1 US 2014338329A1
Authority
US
United States
Prior art keywords
fluid energy
energy machine
thermal fluid
working gas
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/346,729
Inventor
Daniel Reznik
Henrik Stiesdal
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Assigned to SIEMENS AKTIENGESELLSCHAFT reassignment SIEMENS AKTIENGESELLSCHAFT ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: REZNIK, DANIEL
Assigned to SIEMENS WIND POWER A/S reassignment SIEMENS WIND POWER A/S ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: STIESDAL, HENRIK
Assigned to SIEMENS AKTIENGESELLSCHAFT reassignment SIEMENS AKTIENGESELLSCHAFT ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: SIEMENS WIND POWER A/S
Publication of US20140338329A1 publication Critical patent/US20140338329A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K3/00Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein
    • F01K3/12Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein having two or more accumulators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K21/00Steam engine plants not otherwise provided for
    • F01K21/04Steam engine plants not otherwise provided for using mixtures of steam and gas; Plants generating or heating steam by bringing water or steam into direct contact with hot gas

Definitions

  • thermal fluid energy machine is an umbrella term for machines that can extract thermal energy from a working fluid, in the context of this application a working gas, or supply thermal energy to said working fluid.
  • Thermal energy is to be understood to mean both heat energy and also cold energy.
  • Thermal fluid energy machines (also referred to hereinafter for short as fluid energy machines) may for example be designed as piston-type machines. It is preferably also possible for use to be made of hydrodynamic thermal fluid energy machines whose rotors permit a continuous flow of the working gas. Use is preferably made of axially acting turbines and compressors.
  • the hot humidified air exiting the second fluid energy machine can be utilized for supplying heat into the water used in the humidification unit, such that said energy is not lost from the process as a whole.
  • the efficiency of the installation according to the invention can be advantageously increased.
  • the circuit of the installation according to aspects of the invention for storing thermal energy serves, with its humidification unit, to convert the energy stored in the heat accumulator and cold accumulator into mechanical energy by the second thermal fluid energy machine.
  • Said mechanical energy may for example be used for driving an electrical generator.
  • the stored thermal energy is used for the provision of said electrical energy by the installation.
  • the installation for storing thermal energy may be used for converting the electrical energy for example into mechanical energy by an electric motor and into thermal energy by the fluid energy machines.
  • the humidification column is not used during the reverse process. Said humidification column must thus be bypassed, for example by suitable bypass lines.
  • Another possibility includes providing a separate circuit in the installation for the charging process of the cold accumulator and of the heat accumulator. Said separate circuit may also be equipped with additional fluid energy machines.
  • bypass lines these must be suitable for connecting the first thermal fluid energy machine and the second thermal fluid energy machine such that the heat accumulator is situated upstream of the cold accumulator in the throughflow direction of the working gas. This may be achieved by a reversal of the flow direction in the line system.
  • Another possibility includes the bypass lines issuing into the circuit in each case directly upstream and downstream of the heat accumulator and cold accumulator such that the flow direction of the working gas is reversed only within the thermal accumulators.
  • the reversal of the flow direction in the thermal accumulators is of importance in order that, during the charging and discharging of the thermal accumulator, the cold-hot front in the storage medium of the thermal accumulator is moved in the opposite direction in each case.
  • an additional circuit is used for the charging of the thermal accumulators, said additional circuit likewise passes through the same heat accumulator and cold accumulator.
  • suitable valve mechanisms it is ensured that in each case only the circuit for charging or the circuit for discharging is connected to the thermal accumulators.
  • Another possibility includes the thermal accumulators comprising in each case two line systems for two circuits. In this case, a switchover is not necessary, and it is even possible in principle to realize simultaneous charging and discharging of the thermal accumulators.
  • a heat exchanger is provided in the line downstream of the second thermal fluid energy machine, with water for the humidification unit being fed as coolant to said heat exchanger.
  • water for the humidification unit being fed as coolant to said heat exchanger.
  • FIGS. 2 and 3 show, on the basis of further circuit diagrams, another exemplary embodiment of the installation according to the invention with separate circuits for the charging and discharging of the thermal accumulators.
  • the first and second fluid energy machines 13 and 15 are mechanically coupled to one another via a shaft 21 and are driven by an electric motor M which is powered by a wind turbine 22 for as long as the electrical energy generated is not demanded in the electrical grid.
  • the heat accumulator 14 and the cold accumulator 16 are charged, as will be explained in more detail further below, and the installation is traversed by flow through the line 11 , wherein flow passes through the units in the above-stated sequence.
  • the working gas passes at 1 bar and 20° C. into a (hitherto charged) auxiliary heat accumulator 12 and exits the latter at a temperature of 80° C.
  • Compression by the third fluid energy machine 34 which operates as a compressor, results in a pressure increase to 15 bar and, as a result, also to a temperature increase to 540° C. Said calculation is based on the following formula:
  • an auxiliary circuit is realized by an auxiliary line 30 , by which auxiliary circuit the auxiliary heat accumulator 12 can be charged. It must therefore be possible for the auxiliary heat accumulator 12 to be connected both to the circuit of the second line 31 and also to the circuit of the auxiliary line 30 .
  • a connection to the second line 31 is realized by the valves I, whereas a connection to the auxiliary line 30 is ensured by opening the valves K.
  • the air is initially conducted through a fifth fluid energy machine 36 , which operates as a compressor.
  • a water separator 29 is provided in the auxiliary line 30 that connects the two stages 37 a , 37 b , which water separator functions in exactly the same way as that which is situated in the second line 31 .
  • said air After expansion of the air by the sixth fluid energy machine 37 , said air is at a temperature of ⁇ 56° C. at ambient pressure (1 bar).
  • a heat exchanger 17 c it is therefore necessary for a heat exchanger 17 c to be provided in order that the air can be heated from ⁇ 56° C. to 20° C. by release of heat to the environment.
  • auxiliary heat accumulator 12 which can be fed through separate line systems for the second line 31 and the auxiliary line 30 .
  • the auxiliary heat accumulator 12 it would be possible for the auxiliary heat accumulator 12 to be charged and discharged simultaneously.
  • Simultaneous operation of the motors M 1 , M 2 is therefore also conceivable in this case.
  • This operating regime has two advantages. Firstly, even relatively large overcapacities of the wind turbine 22 can be captured through simultaneous operation of the motors M 1 , M 2 , resulting in greater flexibility of the system. Furthermore, through simultaneous operation of both motors, it would be possible to ensure that the three thermal accumulators 12 , 14 , 16 are always charged simultaneously and not in succession. The charging process can thus be stopped at any time, with full operational capability of the discharging process, when there are no longer overcapacities in the electrical grid and, instead, there is a demand for additional electrical energy.
  • FIG. 3 serves for illustrating the discharging cycle of the heat accumulator 14 and of the cold accumulator 16 , wherein electrical energy is generated at the generator G.
  • the first fluid energy machine 13 and the second fluid energy machine 15 which were not used in the above-described charging processes (see FIG. 2 ), are available for the discharging cycle. This permits an optimization of the efficiency of the fluid energy machines but also leads to higher investment costs for the acquisition of the installation. It is therefore necessary to weigh up the higher investment outlay for the use of additional fluid energy machines versus the gain in efficiency achieved by virtue of the fact that, if four fluid energy machines are used, each can be optimized for the corresponding operating state.

Abstract

An installation for storing thermal energy which can be obtained, for example, at times of overcapacities, from regenerative energy and then be stored is provided. The energy stored in a heat accumulator, a cold accumulator and in an additional heat accumulator can be, when needed, reconverted into electrical energy by circuits via a generator (G) while using a compressor and a turbine. The working gas is humidified by a humidification column, ideally until saturation, whereby, advantageously, a greater mass flow can be obtained at a lower volume flow. For this reason, more economical components can be used while simultaneously a high yield of the installation is achieved.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This application is the US National Stage of International Application No. PCT/EP2012/068858 filed Sep. 25, 2012, and claims the benefit thereof. The International Application claims the benefit of European Application No. EP11183267 filed Sep. 29, 2011. All of the applications are incorporated by reference herein in their entirety.
  • FIELD OF INVENTION
  • The invention relates to an installation for storing thermal energy, the installation having a circuit for a working gas. The circuit may be of open configuration such that it draws in air from the environment as working gas and discharges said air into the environment again; that is to say the environment forms part of the circuit. A closed circuit is also possible in which any desired working gas (including air) may be used. In the circuit, the following units are connected to one another in the stated sequence by a line for the working gas: a cold accumulator, a first thermal fluid energy machine, a heat accumulator and a second thermal fluid energy machine. Here, as viewed in the throughflow direction of the working gas from the cold accumulator to the heat accumulator, the first thermal fluid energy machine is positioned as work machine and the second thermal fluid energy machine is positioned as prime mover.
  • BACKGROUND OF INVENTION
  • The expressions “prime mover” and “work machine” are used within the context of this application with the following meanings: a work machine absorbs mechanical work in order to perform its task. A thermal fluid energy machine that is used as a work machine is thus operated as a compressor. By contrast, a prime mover performs work, wherein a thermal fluid energy machine for performing work converts the thermal energy that is available in the working gas. In this case, the thermal fluid energy is thus operated as a motor.
  • The expression “thermal fluid energy machine” is an umbrella term for machines that can extract thermal energy from a working fluid, in the context of this application a working gas, or supply thermal energy to said working fluid. Thermal energy is to be understood to mean both heat energy and also cold energy. Thermal fluid energy machines (also referred to hereinafter for short as fluid energy machines) may for example be designed as piston-type machines. It is preferably also possible for use to be made of hydrodynamic thermal fluid energy machines whose rotors permit a continuous flow of the working gas. Use is preferably made of axially acting turbines and compressors.
  • The principle specified in the introduction is described for example in US 2010/0257862 A1. In said document, piston-type machines are used to perform the method described above. Moreover, it is known from U.S. Pat. No. 5,436,508 that, by the installations specified in the introduction for storing thermal energy, overcapacities in the case of the utilization of wind energy for producing electrical current can be temporarily stored in order to be drawn upon again if required.
  • SUMMARY OF INVENTION
  • It is an object of the invention to specify an installation for storing thermal energy of the type specified in the introduction (for example conversion of mechanical energy into thermal energy with subsequent storage or conversion of the stored thermal energy into mechanical energy) in which high efficiency can be achieved with simultaneously reasonable expenditure for the structural units that are used.
  • With the installation, specified in the introduction, this object is achieved according to aspects of the invention in that a humidification unit for the working gas is provided in the line between the first thermal fluid energy machine and the heat accumulator. In the context of this invention, a humidification unit is to be understood to mean a device through which the working gas can flow and in which water vapor is supplied to the working gas. Here, the air should be humidified with water vapor up to at most the saturation limit. The use of humidification of the working gas (for example air) has the advantage that the power output at the fluid energy machine that operates as work machine can be increased while maintaining the same structural size. For a demanded power output, it is thus possible to use smaller and thus cheaper components for the installation. Furthermore, it is possible for the hot humidified air exiting the second fluid energy machine to be utilized for supplying heat into the water used in the humidification unit, such that said energy is not lost from the process as a whole. In this way, the efficiency of the installation according to the invention can be advantageously increased.
  • The circuit of the installation according to aspects of the invention for storing thermal energy serves, with its humidification unit, to convert the energy stored in the heat accumulator and cold accumulator into mechanical energy by the second thermal fluid energy machine. Said mechanical energy may for example be used for driving an electrical generator. Then, in times of high demand for electrical energy, the stored thermal energy is used for the provision of said electrical energy by the installation.
  • Owing to the increased use of regenerative energy, a situation may however also arise in which the total current produced is not demanded at the time of production. In this case, the installation for storing thermal energy may be used for converting the electrical energy for example into mechanical energy by an electric motor and into thermal energy by the fluid energy machines. It should however be noted that the humidification column is not used during the reverse process. Said humidification column must thus be bypassed, for example by suitable bypass lines. Another possibility includes providing a separate circuit in the installation for the charging process of the cold accumulator and of the heat accumulator. Said separate circuit may also be equipped with additional fluid energy machines.
  • If the installation is provided with bypass lines, these must be suitable for connecting the first thermal fluid energy machine and the second thermal fluid energy machine such that the heat accumulator is situated upstream of the cold accumulator in the throughflow direction of the working gas. This may be achieved by a reversal of the flow direction in the line system. Another possibility includes the bypass lines issuing into the circuit in each case directly upstream and downstream of the heat accumulator and cold accumulator such that the flow direction of the working gas is reversed only within the thermal accumulators. The reversal of the flow direction in the thermal accumulators (cold accumulator and heat accumulator) is of importance in order that, during the charging and discharging of the thermal accumulator, the cold-hot front in the storage medium of the thermal accumulator is moved in the opposite direction in each case.
  • If an additional circuit is used for the charging of the thermal accumulators, said additional circuit likewise passes through the same heat accumulator and cold accumulator. By suitable valve mechanisms, it is ensured that in each case only the circuit for charging or the circuit for discharging is connected to the thermal accumulators. Another possibility includes the thermal accumulators comprising in each case two line systems for two circuits. In this case, a switchover is not necessary, and it is even possible in principle to realize simultaneous charging and discharging of the thermal accumulators.
  • In one situation, however, the charging of the heat accumulator and of the cold accumulator in the installation is achieved in that the heat accumulator can be connected between a third thermal fluid energy machine and a fourth thermal fluid energy machine by a second line, wherein, as viewed in the throughflow direction of the working gas from the third thermal fluid energy machine to the fourth thermal fluid energy machine, the third thermal fluid energy machine is positioned as work machine and the fourth thermal fluid energy machine is positioned as prime mover. This permits, in the manner already described, the charging of the heat accumulator when the working gas flows through the second line in the stated throughflow direction. Furthermore, the cold accumulator may be provided in the second line downstream of the fourth thermal fluid energy machine, which cold accumulator is then fed with the working gas exiting the fourth fluid energy machine and can absorb the cold energy stored in the working gas.
  • In a further refinement of the invention, it is provided that a water separator is arranged in the line downstream of the second thermal fluid energy machine. Owing to expansion and cooling of the working gas, the absorption capacity thereof for water vapor also decreases, such that said water vapor condenses. Said water vapor can then be captured in said water separator, wherein the separated-off water is still at a temperature of approximately 50° C. Said temperature level is thus still higher than ambient temperature, such that the thermal energy stored in the captured water can be supplied back to the process. If the water vapor were discharged into the environment and, instead, feed water from the environment were used for the humidification column, said thermal energy would be lost from the process. The water separator thus serves to increase the efficiency of the process realized by the installation according to the invention. In order for the water from the water separator to be provided back to the process, it is advantageously provided that the water separator is connected to the humidification unit via a feed line.
  • In another refinement of the installation according to aspects of the invention, it may be provided that the line leading away from the second fluid energy machine leads through a first heat exchanger situated in the evaporator. The working gas exiting the second fluid energy machine is at temperatures of approximately 200° C. Said heat can be utilized for providing heat energy to the humidification column, which heat energy is required for the evaporation of the water situated in the humidification column. Said heat energy is thus advantageously provided back to the process and thus does not escape unused into the environment. This advantageously increases the efficiency of the process realized by the installation. Furthermore, owing to the cooling of the working gas that has taken place in the humidification column, a water separator connected downstream thereof can operate more effectively, because the water can be separated off more easily from the cooled working gas.
  • Yet another refinement of the invention provides that an auxiliary heat accumulator is provided in a branch line, wherein the branch line that leads away from the auxiliary heat accumulator leads through a heat exchanger situated in the evaporator. The energy stored in the auxiliary heat accumulator can thus additionally assist the process of evaporation of the water in the humidification unit. The introduction of thermal energy, which takes place indirectly via the auxiliary heat accumulator, thus advantageously leads to a further increase in air humidity in the humidification unit. This leads to the already-described increase in efficiency of the process realized by the installation according to the invention.
  • The auxiliary heat accumulator, like the heat accumulator and the cold accumulator, may be fed from external heat and cold sources. Here, use may expediently be made of district heat from a power plant, for example. It is however particularly advantageous for the auxiliary heat accumulator and the heat accumulator and the cold accumulator to be charged by separate heat pump processes. For this purpose, it is advantageously possible for the auxiliary heat accumulator to be connected between a fifth thermal fluid energy machine and a sixth thermal fluid energy machine by an auxiliary line, wherein, as viewed in the throughflow direction of the working gas from the fifth thermal fluid energy machine to the sixth thermal fluid energy machine, the fifth thermal fluid energy machine is positioned as work machine and the sixth thermal fluid energy machine is positioned as prime mover. A separate heat pump circuit is thus advantageously made available for the charging of the auxiliary heat accumulator, wherein the fifth and sixth fluid energy machines can be optimized for the temperatures to be generated in the auxiliary heat accumulator. It is self-evidently also possible for the auxiliary heat accumulator to be charged by the first or by the third fluid energy machine if suitable interconnection by lines and/or bypass lines is permitted. Here, it is always necessary to weigh up the outlay for components versus the increase in efficiency for the individual processes. Economical considerations are of primary importance in said weighing-up process.
  • The working gas may optionally be conducted in a closed or an open circuit. An open circuit always uses the ambient air as working gas. Said ambient air is drawn in from the environment and is also discharged again into the environment at the end of the process, such that the environment closes the open circuit. A closed circuit also permits the use of a working gas other than ambient air. Said working gas is conducted in the closed circuit. Since an expansion into the environment with simultaneous adoption of ambient pressure and ambient temperature is omitted, it is necessary in the case of a closed circuit for the working gas to be conducted through a heat exchanger which permits a dissipation of heat from the working gas to the environment.
  • It may for example be provided that the circuit for the storage of the thermal energy in the cold accumulator and the heat accumulator is in the form of an open circuit, and the thermal fluid energy machine that operates therein as prime mover is constructed from two stages, with a water separator for the working gas being provided between the stages. Here, allowance is made for the fact that air moisture is contained in the ambient air. An expansion of the working gas in a single stage can have the effect that, owing to the intense cooling of the working gas to −100° C., for example, the air moisture freezes and, in the process, damages the thermal fluid energy machine. In particular, turbine blades can be permanently damaged owing to icing. An expansion of the working gas in two stages however makes it possible for condensed water to be separated off, for example at 5° C., in a water separator downstream of the first stage, such that, upon further cooling of the working gas in the second turbine stage, said water has already been removed and ice formation can be prevented or at least reduced. The risk of damage to the second fluid energy machine is advantageously reduced in this way.
  • If a closed circuit is used and, as already described, a heat exchanger is installed into the circuit, the use of a water separator and of a two-stage fluid energy machine as prime mover can then be omitted. In this case, too, it is possible for dehumidified ambient air to be used as working gas, the humidification of which is prevented by the closed nature of the circuit. Other working gases may however also be used.
  • For the thermal charging of the heat accumulator and of the cold accumulator, it is advantageous if the working gas flows through the auxiliary heat accumulator before flowing through the first or third (depending on configuration) fluid energy machine. That is to say that the working gas is fed into the first fluid energy machine having been heated by the auxiliary heat accumulator. In this way, the auxiliary heat accumulator can perform a further task in addition to the heating of the humidification unit. The use of the auxiliary heat accumulator has the following advantages. If the installation is used for the storage of thermal energy, the flow passes through the auxiliary heat accumulator before passing through the first/third fluid energy machine that operates in this case as work machine (compressor). In this way, the working gas is already heated to a temperature higher than ambient temperature. This has the advantage that the work machine does not need to absorb as much power to achieve the demanded temperature of the working gas. Specifically, the heat accumulator should be heated to over 500° C., wherein, following the preheating of the working gas, this can advantageously be realized even by commercially available thermodynamic compressors which permit a compression of the working gas to 15 bar. It is therefore advantageously possible, for the structural units of the installation, to resort to components that are commercially available without expensive modifications. It is advantageously possible for the working gas to be heated to a temperature between 60° C. and 100° C., particularly advantageously to a temperature of 80° C., in the auxiliary heat accumulator. By contrast, for the supply of heat into the humidification column, heating of the working gas to approximately 190° C. is particularly advantageous.
  • As already mentioned, the working gas can be compressed to 15 bar in the circuit of the heat accumulator and of the cold accumulator, whereby temperatures of the working gas of up to 550° C. can be achieved.
  • Finally, according to one particular embodiment of the invention, it may be provided that a heat exchanger is provided in the line downstream of the second thermal fluid energy machine, with water for the humidification unit being fed as coolant to said heat exchanger. In this way, an even greater amount of heat energy can be extracted from the working gas flowing through the line, which heat energy is used to preheat the feed water for the humidification unit. In this way, said energy is also provided back to the process, whereby the efficiency of said process is advantageously further increased. In particular in the case of the provision of an open circuit, the humidification unit requires a relatively large amount of feed water, because the water is at least partially discharged back into the environment after passing through the circuit. Even in the case of a closed circuit, however, leaks in the circuit and drying of the ducts in the heat accumulator and the cold accumulator in the event of a switchover from discharging operation to charging operation can have the effect that new feed water must be introduced into the humidification unit.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Further details of the invention will be described below on the basis of the drawing. Identical or corresponding elements in the drawing are in this case denoted by the same reference signs in each case, and will be explained multiple times only where differences exist between the individual figures. In the drawing:
  • FIG. 1 shows, in the form of a circuit diagram, an exemplary embodiment of the installation according to the invention with bypass lines, and
  • FIGS. 2 and 3 show, on the basis of further circuit diagrams, another exemplary embodiment of the installation according to the invention with separate circuits for the charging and discharging of the thermal accumulators.
  • DETAILED DESCRIPTION OF INVENTION
  • An installation for the storage of thermal energy as per FIG. 1 has a line 11 by which multiple units are connected to one another such that a working gas can flow through them in an open circuit. The working gas is drawn in from the environment via a valve A and flows through a first thermal fluid energy machine 13 which is in the form of a hydrodynamic compressor. Furthermore, the line then leads via a valve B to a heat accumulator 14. The latter is connected by the line 11 and via a valve C to a second thermal fluid energy machine 15, which is in the form of a hydrodynamic turbine. From the turbine, the line 11 leads via a valve D to a cold accumulator 16. From the cold accumulator 16, the line opens into the environment. In the operating state described, the valves A to D are thus open. Valves E to H are closed (more in this regard below).
  • The first and second fluid energy machines 13 and 15 are mechanically coupled to one another via a shaft 21 and are driven by an electric motor M which is powered by a wind turbine 22 for as long as the electrical energy generated is not demanded in the electrical grid. During said operating state, the heat accumulator 14 and the cold accumulator 16 are charged, as will be explained in more detail further below, and the installation is traversed by flow through the line 11, wherein flow passes through the units in the above-stated sequence.
  • If the demand for electrical energy is greater than the amount of electrical energy presently being generated, then the current generated by the wind turbine 22 is fed directly into the grid. Furthermore, the installation, in another operating state, assists the generation of electricity by virtue of the heat accumulator 14 and the cold accumulator 16 being discharged and a generator G being driven by the fluid energy machines 18 and 19 via the shaft 21. For this purpose, the valves A to D are closed, and instead, the valves E to H are opened. As a result, flow no longer passes through regions of the line 11, and instead the bypass lines 19 thereof are opened, which change the flow of the working gas.
  • The working gas flows through the cold accumulator 16 and passes via a bypass line 19 and via the valve E to the first fluid energy machine (compressor). After exiting the compressor, the working gas is conducted via a valve F through a humidification unit 18, which is provided in a further bypass line 19 and which leads to the heat accumulator 14. The heat accumulator 14 is thus already fed with humidified air, which exits the heat accumulator 14 via the bypass line 19 through a valve G and is supplied to the second fluid energy machine 15 (turbine). The mechanical energy for driving the first fluid energy machine 13 (compressor) and the generator is gained here. The working gas passes back into the environment via the bypass line 19 and through a valve H, wherein prior to that, the working gas is dehumidified by a water separator 17. The water which is separated off and which is at approximately 50° C. is supplied by a feed pump 23 a to the humidification unit 18. It is additionally possible, for example, for heat derived from a power plant as district heat to be introduced into the humidification unit. This is indicated in FIG. 1 by a heat exchanger 33 a.
  • In the installation in FIG. 1, the heat accumulator 14 and the cold accumulator 16 (and also the auxiliary heat accumulator as per FIG. 3) are in each case of identical construction, said construction being illustrated in more detail by way of an enlarged detail based on the cold accumulator 16. A tank is provided, the wall 24 of which is provided with an insulation material 25 which has large pores 26. In the interior of the container there is provided concrete 27 which functions as a heat accumulator or cold accumulator. Pipes 28 are laid, so as to run parallel, within the concrete 27, through which pipes the working gas flows, releasing heat or absorbing heat in the process (depending on the operating mode and accumulator type).
  • The thermal charging and discharging process will be explained in more detail on the basis of the installation as shown in FIGS. 2 and 3. FIG. 2 firstly illustrates a two-stage charging process which functions on the basis of the principle of a heat pump. The illustration in FIGS. 2 and 3 shows an open circuit which could however be closed, as indicated by dash-dotted lines, through the use of an optionally provided heat exchanger 17 a, 17 b. The states of the working gas, which in the exemplary embodiment of FIGS. 2 and 3 is composed of air, are presented in each case in circles at the lines 30, 31, 32. The pressure in bar is indicated at the top left. The enthalpy in kJ/kg is indicated at the top right. The temperature in ° C. is indicated at the bottom left, and the mass flow rate in kg/s is indicated at the bottom right. The flow direction of the gas is indicated by arrows in the respective line.
  • In the model calculation for the charging circuit of the second line 31 as per FIG. 2, the working gas passes at 1 bar and 20° C. into a (hitherto charged) auxiliary heat accumulator 12 and exits the latter at a temperature of 80° C. Compression by the third fluid energy machine 34, which operates as a compressor, results in a pressure increase to 15 bar and, as a result, also to a temperature increase to 540° C. Said calculation is based on the following formula:

  • T 2 =T 1+(T 2s −T 1)/ηc ; T 2s =T 1π(K−1)/K,
  • where
      • T2 is the temperature at the compressor outlet,
      • T1 is the temperature at the compressor inlet,
      • ηc is the isentropic efficiency of the compressor,
      • π is the pressure ratio (in this case 15:1), and
      • K is the compressibility, which is 1.4 in the case of air.
  • The isentropic efficiency ηc may be assumed to be 0.85 for a compressor.
  • The heated working gas now passes through the heat accumulator 14, where the major part of the available thermal energy is stored. During the storage process, the working gas cools to 20° C., whereas the pressure is maintained at 15 bar (aside from flow-induced pressure losses). Subsequently, the working gas is expanded in two series-connected stages 35 a, 35 b of a fourth fluid energy machine 35, such that said working gas arrives at a pressure level of 1 bar. In the process, the working gas cools to 5° C. after the first stage and to −100° C. after the second stage. The formula specified above serves as a basis for this calculation too.
  • In the part of the line 31 that connects the two stages of the fourth fluid energy machine 35 a, 35 b in the form of a high-pressure turbine and a low-pressure turbine, there is additionally provided a water separator 29. Said water separator makes it possible for the air to be dried after a first expansion, such that the air moisture contained in said air does not lead to icing of the turbine blades in the second stage 35 b of the fourth fluid energy machine 35.
  • In the further course of the process, the expanded and thus cooled working gas extracts heat from the cold accumulator 16 and is thereby heated to 0° C. In this way, cold energy is stored in the cold accumulator 16, which cold energy can be utilized for subsequent energy production. Comparing the temperature of the working gas at the outlet of the cold accumulator 16 and at the inlet of the auxiliary heat accumulator 12, it is clear why the heat exchanger 17 b must be provided in the case of a closed circuit. Here, the working gas can be heated to ambient temperature of 20° C. again, whereby heat is extracted from the environment, said heat being provided to the process. Such a measure may self-evidently be omitted if the working gas is drawn in directly from the environment, because said working gas is then already at ambient temperature.
  • In order that preheating can be realized by the auxiliary heat accumulator 12 in the cycle of the circuit of the first line 31, an auxiliary circuit is realized by an auxiliary line 30, by which auxiliary circuit the auxiliary heat accumulator 12 can be charged. It must therefore be possible for the auxiliary heat accumulator 12 to be connected both to the circuit of the second line 31 and also to the circuit of the auxiliary line 30. A connection to the second line 31 is realized by the valves I, whereas a connection to the auxiliary line 30 is ensured by opening the valves K. In the cycle of the auxiliary line 30, the air is initially conducted through a fifth fluid energy machine 36, which operates as a compressor. The compressed air is conducted through the auxiliary heat exchanger 12, wherein the throughflow direction is, corresponding to the indicated arrows, the exact opposite of that in the circuit formed by the second line 31. After the air has been raised from ambient pressure (1 bar) and ambient temperature (20° C.) to 4 bar and a temperature of 188° C. by the compressor, the air is cooled again to 20° C. by the auxiliary heat accumulator 12. The air is subsequently expanded in two stages by the stages 37 a, 37 b of a sixth fluid energy machine 37, which operates as a turbine. Here, too, a water separator 29 is provided in the auxiliary line 30 that connects the two stages 37 a, 37 b, which water separator functions in exactly the same way as that which is situated in the second line 31. After expansion of the air by the sixth fluid energy machine 37, said air is at a temperature of −56° C. at ambient pressure (1 bar). If the circuit of the auxiliary line 30 is of closed design, as illustrated by the dashed-dotted line, it is therefore necessary for a heat exchanger 17 c to be provided in order that the air can be heated from −56° C. to 20° C. by release of heat to the environment.
  • The circuits of the second line 31 and of the auxiliary line 30 are set in operation independently of one another. The third and fourth fluid energy machines are thus mechanically coupled via the shaft 21 to a motor M1, and the fifth and sixth fluid energy machines are mechanically coupled via the other shaft 21 to a motor M2. In the event of overcapacities of the wind turbine 22, the electrical energy can initially drive the motor M2 in order to charge the auxiliary heat accumulator 12. Subsequently, by operation of the motor M1 and simultaneous discharging of the auxiliary heat accumulator 12, the heat accumulator 14 and the cold accumulator 16 can be charged. Subsequently, by operation of the motor M2, the auxiliary heat exchanger 12 can also be recharged. When all the accumulators are fully charged, an effective discharging cycle for the production of electrical energy can be initiated (cf. FIG. 3). However, if the overcapacity of the wind turbine 22 comes to an end without it having been possible for the auxiliary heat accumulator 12 to be charged, the energy provided therein can also be replaced by other heat sources (cf. FIG. 3).
  • Also conceivable is an auxiliary heat accumulator 12 which can be fed through separate line systems for the second line 31 and the auxiliary line 30. This would yield two independent circuits without the use of valves I and K. In this way, it would be possible for the auxiliary heat accumulator 12 to be charged and discharged simultaneously. Simultaneous operation of the motors M1, M2 is therefore also conceivable in this case. This operating regime has two advantages. Firstly, even relatively large overcapacities of the wind turbine 22 can be captured through simultaneous operation of the motors M1, M2, resulting in greater flexibility of the system. Furthermore, through simultaneous operation of both motors, it would be possible to ensure that the three thermal accumulators 12, 14, 16 are always charged simultaneously and not in succession. The charging process can thus be stopped at any time, with full operational capability of the discharging process, when there are no longer overcapacities in the electrical grid and, instead, there is a demand for additional electrical energy.
  • FIG. 3 serves for illustrating the discharging cycle of the heat accumulator 14 and of the cold accumulator 16, wherein electrical energy is generated at the generator G. The first fluid energy machine 13 and the second fluid energy machine 15, which were not used in the above-described charging processes (see FIG. 2), are available for the discharging cycle. This permits an optimization of the efficiency of the fluid energy machines but also leads to higher investment costs for the acquisition of the installation. It is therefore necessary to weigh up the higher investment outlay for the use of additional fluid energy machines versus the gain in efficiency achieved by virtue of the fact that, if four fluid energy machines are used, each can be optimized for the corresponding operating state. The heat accumulator 14, the cold accumulator 16 and the auxiliary heat accumulator 12 are the same as in FIG. 2, and are merely traversed by flow in the opposite direction. FIGS. 2 and 3 thus illustrate the same installation, wherein, for clarity, the illustrations show in each case only those system components and lines which are involved in the process taking place. Furthermore, the alternative of a closed circuit is illustrated by means of dash-dotted lines.
  • The working gas is conducted through the cold accumulator 16. In the process, it is cooled from 20° C. to −100° C. This measure serves to reduce the power consumption for operating the first fluid energy machine that operates as a compressor. The power consumption is reduced by a factor corresponding to the temperature difference in Kelvin, that is to say 293K/173K=1.69. In the example, the compressor compresses the working gas to 10 bar. Here, the temperature rises to 89° C. A compression of up to 15 bar would also be technically feasible. The compressed working gas flows initially through the humidification unit 18 and then through the heat accumulator 14, and is thereby heated to 145° C. in the humidification unit and to 530° C. in the heat accumulator 14. The working gas is subsequently expanded by the second fluid energy machine 15, which thus operates as a turbine in this operating state. An expansion to 1 bar takes place, wherein a temperature of 201° C. still prevails in the working gas at the outlet of the first fluid energy machine. It is therefore possible for the working gas to be additionally conducted through a heat exchanger 33 b in the evaporation unit in order to release heat therein for the evaporation of the water. As a result of the further cooling of the working gas, it is possible for at least a part of the air moisture to be separated off by the water separator 17. The separated-off water is still at a temperature of approximately 50° C. and is pumped back into the humidification unit by a feed pump 23 b. The dehumidified air exits the circuit and is discharged into the environment. It may alternatively be provided that, as indicated by dash-dotted lines, a closed circuit is realized by the line 32. In this case, a heat exchanger 17 a serves for cooling the working gas, which is still at a temperature of 50° C., to ambient temperature (20° C.). The heat exchanger may also be used for heating fresh water that can be pumped into the humidification unit by a feed pump 23 c.
  • Heat is required in the humidification unit to effect the evaporation of the feed water. To provide an additional energy source here, it is possible, as already indicated in FIG. 1, for the heat exchanger 33 a to be connected to an external heat source. Said external heat source may for example be district heat. It is however also advantageous to utilize the charged auxiliary heat accumulator 12. For this purpose, a branch line 38 is provided which branches off from the line 32 upstream of the cold accumulator 16. Said branch line runs through the auxiliary heat accumulator 12 and subsequently through a heat exchanger 33 c in the humidification unit, such that the heat energy stored in the auxiliary heat accumulator 12 can likewise be supplied to the humidification unit. Downstream of the heat exchanger 33 c, the branch line 38 issues into line 32 downstream of the heat exchanger 33 b. The mass flow of the working gas is thus split up at the branch line 38, wherein 8.3 kg/s is conducted through the branch line 38 and 4.8 kg/s is conducted through the cold accumulator 16, humidification unit 18 and heat accumulator 14.

Claims (10)

1. An installation for storing thermal energy, comprising:
a circuit for a working gas, wherein, in the circuit, the following units are connected to one another in the stated sequence by a line for the working gas:
a cold accumulator,
a first thermal fluid energy machine,
a heat accumulator and
a second thermal fluid energy machine,
wherein, as viewed in a throughflow direction of the working gas from the cold accumulator to the heat accumulator, the first thermal fluid energy machine is positioned as work machine and the second thermal fluid energy machine is positioned as prime mover,
wherein a humidification unit for the working gas is provided in the line between the first thermal fluid energy machine and the heat accumulator.
2. The installation as claimed in claim 1, wherein a water separator is arranged in the line downstream of the second thermal fluid energy machine.
3. The installation as claimed in claim 2, wherein the water separator is connected to the humidification unit via a feed line.
4. The installation as claimed in claim 1, wherein the line leading away from the second thermal fluid energy machine leads through a heat exchanger situated in the humidification unit.
5. The installation as claimed in claim 1, wherein an auxiliary heat accumulator is provided in a branch line, wherein the branch line that leads away from the auxiliary heat accumulator leads through a heat exchanger situated in the humidification unit.
6. The installation as claimed in claim 1, wherein a heat exchanger is provided in the line downstream of the second thermal fluid energy machine, with water for the humidification unit being fed as coolant to said heat exchanger.
7. The installation as claimed in claim 1,
wherein the heat accumulator is connected between a third thermal fluid energy machine and a fourth thermal fluid energy machine by a second line,
wherein, as viewed in the throughflow direction of the working gas from the third thermal fluid energy machine to the fourth thermal fluid energy machine, the third thermal fluid energy machine is positioned as a work machine and the fourth thermal fluid energy machine is positioned as a prime mover.
8. The installation as claimed in claim 7, wherein the cold accumulator is connected downstream of the fourth fluid energy machine as viewed in the throughflow direction as per claim 7 by the second line.
9. The installation as claimed in claim 1, wherein an auxiliary heat accumulator is connected between a fifth thermal fluid energy machine and a sixth thermal fluid energy machine by an auxiliary line,
wherein, as viewed in the throughflow direction of the working gas from the fifth thermal fluid energy machine to the sixth thermal fluid energy machine, the fifth thermal fluid energy machine is positioned as a work machine and the sixth thermal fluid energy machine is positioned as a prime mover.
10. The installation as claimed in claim 1, wherein the first thermal fluid energy machine and the second thermal fluid energy machine are, by bypass lines, connected such that the heat accumulator is situated upstream of the cold accumulator in the throughflow direction of a working fluid.
US14/346,729 2011-09-29 2012-09-25 Installation for storing thermal energy Abandoned US20140338329A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP11183267.1 2011-09-29
EP11183267A EP2574738A1 (en) 2011-09-29 2011-09-29 Assembly for storing thermal energy
PCT/EP2012/068858 WO2013045437A1 (en) 2011-09-29 2012-09-25 Installation for storing electrical energy

Publications (1)

Publication Number Publication Date
US20140338329A1 true US20140338329A1 (en) 2014-11-20

Family

ID=46980931

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/346,729 Abandoned US20140338329A1 (en) 2011-09-29 2012-09-25 Installation for storing thermal energy

Country Status (4)

Country Link
US (1) US20140338329A1 (en)
EP (2) EP2574738A1 (en)
CN (1) CN103842623A (en)
WO (1) WO2013045437A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019104156A1 (en) 2017-11-21 2019-05-31 Aestus Energy Storage, LLC Thermal storage system charging

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106256995A (en) * 2015-06-16 2016-12-28 熵零股份有限公司 A kind of energy-storage system
IT201900015770A1 (en) * 2019-09-06 2021-03-06 Ivar Spa NEW SEOL COMBINED CYCLE
KR20220062023A (en) * 2019-09-06 2022-05-13 이바르 에스피에이 Combined thermodynamic cycle with high heat recovery
IT201900015776A1 (en) * 2019-09-06 2021-03-06 Ivar Spa Thermal machine configured to carry out thermal cycles and method for carrying out thermal cycles

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4492085A (en) * 1982-08-09 1985-01-08 General Electric Company Gas turbine power plant
US4523432A (en) * 1981-11-16 1985-06-18 Bbc Brown, Boveri & Company, Limited Air storage power station
US20030070415A1 (en) * 2000-01-21 2003-04-17 Hitachi, Ltd. Gas turbins electric power generation equipment and air humidifier
US20050072154A1 (en) * 2002-03-14 2005-04-07 Frutschi Hans Ulrich Thermal power process
US7062914B2 (en) * 2000-05-30 2006-06-20 Commonwealth Scientific And Industrial Research Organization Heat engines and associated methods of producing mechanical energy and their application to vehicles
US20100218500A1 (en) * 2007-10-19 2010-09-02 Saipem S.A. Installation and Methods for Storing and Methods for Storing and Restoring Electrical Energy Using a Piston-Type Gas Compression and Expansion Unit
US20100251711A1 (en) * 2007-10-03 2010-10-07 Isentropic Limited Energy Storage
US20100301614A1 (en) * 2007-05-11 2010-12-02 Saipem S.A Installation and Method for Storing and Returning Electrical Energy
US20110100611A1 (en) * 2008-07-16 2011-05-05 Abb Research Ltd Thermoelectric energy storage system and method for storing thermoelectric energy
US20120312496A1 (en) * 2010-02-24 2012-12-13 Isentropic Limited Heat Storage System

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK23391D0 (en) 1991-02-12 1991-02-12 Soerensen Jens Richard WINDOW FOR SELF-SUPPLY AND STORAGE OF ENERGY
WO2007029680A1 (en) * 2005-09-05 2007-03-15 The Tokyo Electric Power Company, Incorporated Vapor generation system
EP2157317B2 (en) * 2008-08-19 2019-07-24 ABB Research LTD Thermoelectric energy storage system and method for storing thermoelectric energy
US8176724B2 (en) * 2008-09-18 2012-05-15 Smith Douglas W P Hybrid Brayton cycle with solid fuel firing

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4523432A (en) * 1981-11-16 1985-06-18 Bbc Brown, Boveri & Company, Limited Air storage power station
US4492085A (en) * 1982-08-09 1985-01-08 General Electric Company Gas turbine power plant
US20030070415A1 (en) * 2000-01-21 2003-04-17 Hitachi, Ltd. Gas turbins electric power generation equipment and air humidifier
US7062914B2 (en) * 2000-05-30 2006-06-20 Commonwealth Scientific And Industrial Research Organization Heat engines and associated methods of producing mechanical energy and their application to vehicles
US20050072154A1 (en) * 2002-03-14 2005-04-07 Frutschi Hans Ulrich Thermal power process
US20100301614A1 (en) * 2007-05-11 2010-12-02 Saipem S.A Installation and Method for Storing and Returning Electrical Energy
US20100251711A1 (en) * 2007-10-03 2010-10-07 Isentropic Limited Energy Storage
US20100218500A1 (en) * 2007-10-19 2010-09-02 Saipem S.A. Installation and Methods for Storing and Methods for Storing and Restoring Electrical Energy Using a Piston-Type Gas Compression and Expansion Unit
US20110100611A1 (en) * 2008-07-16 2011-05-05 Abb Research Ltd Thermoelectric energy storage system and method for storing thermoelectric energy
US20120312496A1 (en) * 2010-02-24 2012-12-13 Isentropic Limited Heat Storage System

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019104156A1 (en) 2017-11-21 2019-05-31 Aestus Energy Storage, LLC Thermal storage system charging
EP3714222A4 (en) * 2017-11-21 2021-11-03 Aestus Energy Storage, LLC Thermal storage system charging

Also Published As

Publication number Publication date
EP2748435A1 (en) 2014-07-02
CN103842623A (en) 2014-06-04
EP2574738A1 (en) 2013-04-03
WO2013045437A1 (en) 2013-04-04

Similar Documents

Publication Publication Date Title
US9829254B2 (en) Installation for storing thermal energy
US20140352295A1 (en) Installation for storing thermal energy and method for the operation thereof
JP3178961B2 (en) Compressed air energy storage method and system
CN108506110B (en) A kind of cooling heating and power generation system
CN111075671B (en) Coupling integrated solar energy, supercritical carbon dioxide and compressed air energy storage power generation system
US10358975B2 (en) Compressed air energy storage and power generation device
US20130232974A1 (en) Advanced adiabatic compressed air energy storage system
US20110094231A1 (en) Adiabatic compressed air energy storage system with multi-stage thermal energy storage
US20150059342A1 (en) System for storing and outputting thermal energy and method for operating said system
US9322297B2 (en) Energy storage installation with open charging circuit for storing seasonally occurring excess electrical energy
US20150218969A1 (en) Method for charging and discharging a heat accumulator and system for storing and releasing thermal energy suitable for said method
WO2015185891A1 (en) Hybrid electricity storage and power generation system and method of operating such a system
US20140338329A1 (en) Installation for storing thermal energy
CN112880451A (en) CO based on supplemental external energy2Gas-liquid phase change energy storage device and method
US20140223910A1 (en) Energy-storing device and method for storing energy
JP6571491B2 (en) heat pump
CN109340066A (en) A kind of supercritical carbon dioxide solar power generation energy storage integrated system
WO2016181884A1 (en) Compressed air energy storage and power generation device
CN109826682A (en) A kind of integrated-type energy supplying system of achievable supply of cooling, heating and electrical powers
US20150136351A1 (en) System for storing and outputting thermal energy having a heat accumulator and a cold accumulator and metho for the operation thereof
JP2017172334A (en) Compressed air storage power generation device
CN113153449A (en) Cogeneration system based on high-low temperature heat storage medium
JP5747309B2 (en) CAES system and power plant having the same
CN106194299A (en) A kind of carbon trapping and supercritical CO2the electricity generation system of Brayton cycle coupling
CN103256081B (en) Energy comprehensive utilization method based on supercritical air

Legal Events

Date Code Title Description
AS Assignment

Owner name: SIEMENS AKTIENGESELLSCHAFT, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:REZNIK, DANIEL;REEL/FRAME:032774/0250

Effective date: 20140304

Owner name: SIEMENS AKTIENGESELLSCHAFT, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SIEMENS WIND POWER A/S;REEL/FRAME:032774/0318

Effective date: 20140411

Owner name: SIEMENS WIND POWER A/S, DENMARK

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:STIESDAL, HENRIK;REEL/FRAME:032774/0286

Effective date: 20140310

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION