US20130319299A1 - Boiler - Google Patents
Boiler Download PDFInfo
- Publication number
- US20130319299A1 US20130319299A1 US13/903,502 US201313903502A US2013319299A1 US 20130319299 A1 US20130319299 A1 US 20130319299A1 US 201313903502 A US201313903502 A US 201313903502A US 2013319299 A1 US2013319299 A1 US 2013319299A1
- Authority
- US
- United States
- Prior art keywords
- air
- exhaust gas
- duct
- flow regulator
- thermometer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23L—SUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
- F23L15/00—Heating of air supplied for combustion
- F23L15/04—Arrangements of recuperators
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23L—SUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
- F23L9/00—Passages or apertures for delivering secondary air for completing combustion of fuel
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23D—BURNERS
- F23D1/00—Burners for combustion of pulverulent fuel
- F23D1/005—Burners for combustion of pulverulent fuel burning a mixture of pulverulent fuel delivered as a slurry, i.e. comprising a carrying liquid
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23K—FEEDING FUEL TO COMBUSTION APPARATUS
- F23K1/00—Preparation of lump or pulverulent fuel in readiness for delivery to combustion apparatus
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23L—SUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
- F23L15/00—Heating of air supplied for combustion
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23N—REGULATING OR CONTROLLING COMBUSTION
- F23N3/00—Regulating air supply or draught
- F23N3/002—Regulating air supply or draught using electronic means
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/34—Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery
Definitions
- the present invention relates to a boiler and, more particularly, to a boiler in which fuel is burned to generate high-temperature steam for driving a steam-turbine power generation facility and which is suitably applicable to thermal power generation.
- a means for recovering heat from the exhaust gas discharged from the boiler is used to improve thermal efficiency.
- thermal power generation plants where coal is used as fuel
- a technique is widely used in which an air heater is provided on a gas duct coupled to the boiler outlet, combustion air is heated using the heat of exhaust gas, and the heated combustion air is supplied to the boiler to promote burning of fuel so as to improve thermal efficiency of the boiler.
- Patent Literature 1 JP-A No. 2008-145007
- a technique is disclosed in which a boiler includes a temperature detector for detecting the temperature of primary air, a primary air temperature adjusting means for adjusting the temperature of primary air, and a control device for controlling the primary air temperature adjusting means based on the temperature detected by the temperature detector so as to keep the temperature of the primary air at a predetermined level and in which the ignitability and combustibility of coal is stabilized by adjusting the combustion air temperature according to the quality of coal.
- Patent Literature 2 International Publication No. WO 94/027864
- a device which allows gases of different temperatures to flow through two systems of flow paths without leaking and which allows flow path switching.
- the device described as being applied to a boiler includes two fixed chambers which are coupled to each other via a partition wall and which are provided in two systems of flow paths whose flow directions are fixed.
- exhaust gas from the boiler is, after being introduced into a downstream changeover chamber, made to enter a fixed chamber to be heated by heat storage material therein and is subsequently guided to the upstream side.
- Patent Literature 2 no gas leakage occurs between the two systems of flow paths and the device with a simple construction enables flow path switching at high speed. This makes it possible to improve the performance of an air heater to thereby improve the thermal efficiency of the whole plant.
- Patent Literature 2 International Publication No. WO 94/02784
- air is fed to a boiler through two systems, i.e. a primary air system for feeding fuel and a secondary air system for promoting fuel combustion.
- the primary air is fed with an excess air ratio smaller than 1 and undergoes primary combustion on a rich fuel side. This is to prevent the nitrogen compound generated by thermal decomposition from being converted into nitrogen oxide and to promote, using the secondary air, burning of unburned coal components and decomposition of nitrogen compound.
- the primary and the secondary air are heated, using the heat of exhaust gas from a boiler 1 , at an air heater 2 provided at the exhaust gas outlet of the boiler 1 .
- the exhaust gas temperature is set to about 350° C. on the air heater 2 inlet side and to about 130° C. on the air heater 2 outlet side.
- a downstream flow path portion for exhaust gas i.e. a portion around an economizer 16 , a primary superheater 17 and a primary reheater 20 shown in a right-hand part of FIG. 1
- the partitioned flow path formed on each side of the partition wall 6 is provided, at a downstream part thereof, with a damper 7 for adjusting the exhaust gas flow through the partitioned flow path so as to eventually adjust the heat collection of the primary reheater 20 and the final reheater 21 .
- This configuration is generally designed such that the exhaust gas temperatures at around the outlets of the respective flow paths are equal.
- the secondary air is heated to a higher temperature.
- the secondary air temperature is set to about 330° C.
- the exhaust gas temperature at the outlet of an existing type of boiler 1 is about 350° C.
- the temperature to which air can be heated by the air heater 2 is about 330° C. at the highest.
- the heat transfer area of heat exchangers such as the economizer 16 , primary superheater 17 , and primary reheater 20 provided in an exhaust gas downstream portion are adjusted.
- Reducing the heat transfer area of the primary superheater 17 or the economizer 16 provided in the exhaust gas downstream portion causes the exhaust gas temperature to rise on the right side of the partition wall 6 , shown in FIG. 1 , resulting in generating a large temperature difference between the two sides of the partition wall 6 .
- the exhaust gas temperature at around the flow path outlet on the left side of the partition wall 6 is comparable to that in an existing type of boiler, the exhaust gas temperature at around the flow path outlet on the main steam side (on the right side of the partition wall 6 ) becomes about 500° C.
- An object of the present invention is to provide a boiler in which the secondary air temperature can be efficiently increased for higher thermal efficiency by appropriately reducing the heat transfer area of the boiler while maintaining the heat collection of steam in the whole boiler.
- a boiler includes: a furnace for burning solid fuel; a fuel mill for pulverizing the solid fuel; a solid fuel feeding pipe for conveying the solid fuel from the fuel mill to the furnace; a burner for igniting the solid fuel; an air port for introducing air into the furnace; an air heater for recovering heat from exhaust gas and heating primary air and secondary air to be supplied to the furnace; a primary combustion air supply duct for introducing the primary air from the air heater to the fuel mill; a secondary combustion air supply duct for introducing the secondary air from the air heater into the burner and the air port; an air duct for introducing air into the air heater; an exhaust gas duct for introducing exhaust gas into the air heater; a partition wall for partitioning a downstream portion of a flow path for exhaust gas discharged from the furnace; and a plurality of heat exchangers which are provided in the flow paths formed on both sides of the partition wall, recover heat from the exhaust gases flowing through the flow paths and heat steam using the recovered heat.
- the heat exchanger provided in the flow path on a first side of the partition wall has a smaller total heat transfer area than the heat exchanger provided in the flow path on a second side of the partition wall; the exhaust gases discharged from the flow paths to outside the boiler are introduced, without being mixed, into the air heater downstream of the boiler; and the heat of the exhaust gases is transferred to the primary air and the secondary air in the air heater so as to heat combustion air.
- the secondary air temperature can be efficiently increased by appropriately reducing the heat transfer area of the boiler while maintaining the heat collection of steam in the whole boiler. This makes it possible to burn unburned components to improve the thermal efficiency of the boiler.
- FIG. 1 is a diagram showing the configuration of an existing type of boiler.
- FIG. 2 is a diagram showing the configuration of a coal-fired boiler according to a first embodiment of the present invention.
- FIG. 3 is a diagram schematically showing a rotary heat storage material type heat exchanger used as an air heater in the first embodiment of the boiler according to the present invention.
- FIG. 4 is a diagram showing the configuration of a coal-fired boiler according to a second embodiment of the present invention.
- FIG. 5 is a diagram showing the configuration of a coal-fired boiler according to a third embodiment of the present invention.
- FIG. 6 is a diagram showing the configuration of a coal-fired boiler according to a fourth embodiment of the present invention.
- FIG. 2 shows the configuration of a coal-fired boiler according to a first embodiment of the present invention.
- a coal-fired boiler 1 broadly includes: a furnace 23 to burn coal, i.e. solid fuel; a fuel mill, i.e. a coal mill 10 , to pulverize coal; a solid fuel feeding pipe, i.e.
- a coal feeding pipe 12 used to feed coal from the coal mill 10 to the furnace 23 ; plural burners 4 used to ignite the coal in the furnace 23 ; air ports 5 for introducing air into the furnace 23 ; an air heater 2 which recovers heat from exhaust gas and heats the primary and secondary air to be supplied to the furnace 23 ; a primary combustion air supply duct 8 to introduce the primary air from the air heater 2 into the coal mill 10 ; a secondary combustion air supply duct 9 to introduce the secondary air from the air heater 2 into the burners 4 and air ports 5 ; air ducts 3 b 1 and 3 b 2 to introduce air into the air heater 2 ; exhaust gas ducts 3 a 1 and 3 a 2 to introduce exhaust gas into the air heater 2 ; a partition wall 6 partitioning a downstream portion of a flow path for the exhaust gas discharged from the furnace 23 ; and heat exchangers which, being provided in the flow paths formed on both sides of the partition wall 6 , recover heat from the exhaust gases flowing through the flow paths and heat steam, the heat exchangers
- Fuel coal is supplied to the coal mill 10 to be pulverized into particles sized to be suitable for burning in the boiler 1 .
- the air (primary air) heated by the air heater 2 is supplied through the primary combustion air supply duct 8 .
- the primary air dries the pulverized coal and carries the pulverized coal to outside the coal mill 10 .
- the pulverized coal is conveyed, together with the primary air, to the burners 4 through the coal feeding pipe 12 to be ignited and to be then fed into the boiler 1 .
- the boiler 1 also has the secondary air supplied from the air heater 2 through the secondary combustion air supply duct 9 and via the burners 4 and air ports 5 .
- Burning the pulverized coal using the air heated by the air heater 2 using exhaust gas as described above causes high-temperature combustion gas to be generated in the boiler 1 .
- the heat of the combustion gas is transferred to water or steam at a group of heat exchangers (secondary superheater 18 , final superheater 19 , final reheater 21 , primary superheater 17 , economizer 16 , primary reheater 20 ) installed in the boiler 1 to generate high-temperature, high-pressure steam.
- the high-temperature, high-pressure steam is fed, through a steam pipe (not shown), to a steam turbine power generation facility (not shown) to have the energy of the steam converted into electricity therein.
- the flow path for the exhaust gas is, in a downward portion thereof, partitioned into two parts by the partition wall 6 .
- the primary reheater 20 is installed on the left side of the partition wall 6
- the economizer 16 and the primary superheater 17 are installed on the right side of the partition wall 6 .
- the primary reheater 20 having a heat transfer area comparable with that in an existing type of boiler, reducing the total heat transfer area(s) of one or both of the economizer 16 and the primary superheater 17 (for example, making the economizer 16 and/or the primary superheater 17 smaller shortens the heat transfer pipe correspondingly reducing the total heat transfer area) results in a higher exhaust gas temperature in the right-side flow path whereas the exhaust gas temperature in the left-side flow path remains about the same as in an existing type of boiler. If, for example, the heat transfer area is reduced by an area equivalent to the whole area of the economizer 16 in the present state, the temperature of the exhaust gas near the damper 7 in the right-side flow path becomes about 550° C.
- the low-temperature exhaust gas flowing through the left-side flow path and the high-temperature exhaust gas flowing through the right-side flow path are introduced into the air heater 2 via separate exhaust gas ducts 3 a 1 and 3 a 2 , respectively.
- FIG. 3 schematically shows, as an exemplary configuration of the preferred air heater 2 of the present embodiment, a rotary heat storage material type heat exchanger widely used in coal-fired boilers.
- ducts i.e. two each on the exhaust gas side and on the air side, are arranged, as shown in FIG. 3 , along the rotary direction of the heat storage material.
- the rotary heat storage material first passes the exhaust gas flow path (exhaust gas duct 3 a 1 ) on the low-temperature side to be heated by the low-temperature exhaust gas; next passes the exhaust gas flow path (exhaust gas duct 3 a 2 ) to be further heated by the high-temperature exhaust gas; and subsequently passes the secondary air flow path (air duct 3 b 1 ) and the primary air flow path (air duct 3 b 2 ) in this order to release the stored heat while passing the air ducts.
- the above-described configuration of the present embodiment makes it possible to heat the secondary air up to about 500° C. so as to reduce the unburned components of coal. This improves thermal efficiency of the boiler 1 .
- FIG. 4 shows the configuration of a coal-fired boiler according to a second embodiment of the present invention.
- the boiler of the second embodiment includes many parts identical in operation to those used in the first embodiment.
- the boiler of the second embodiment will be described only with regard to what it differs from the boiler of the first embodiment.
- the parts of the boiler not described in the following are identical in operation and effects to those used in the first embodiment.
- the heat of the exhaust gas, whose temperature is about the same as in existing types of boilers, flowing through the left-side flow path downstream of the boiler is recovered by a low-temperature air heater 2 a and is used to heat the primary air.
- the heat of the high-temperature exhaust gas flowing through the right-side flow path is recovered by a high-temperature air heater 2 b and is used to heat the secondary air.
- the above-described configuration of the present embodiment also makes it possible to obtain the advantageous effects of the foregoing first embodiment. Furthermore, in the present embodiment, with the two separate air heaters, i.e. the low-temperature air heater 2 a and the high-temperature air heater 2 b, provided, it is easy to maintain high heat-exchange efficiency, so that the secondary air can be stably maintained at high temperature.
- FIG. 5 shows the configuration of a coal-fired boiler according to a third embodiment of the present invention.
- the boiler of the third embodiment includes many parts identical in operation to those used in the second embodiment.
- the boiler of the third embodiment will be described only with regard to what it differs from the boiler of the second embodiment.
- the parts of the boiler not described in the following are identical in operation and effects to those used in the second embodiment.
- a first difference is that, in the present embodiment, the exhaust gas flowing through the exhaust gas flow path on the low-temperature side (exhaust gas duct 3 a 1 ) where a heat exchanger having a large heat transfer area is installed is introduced into the low-temperature air heater 2 a via a de-NOx device 15 for removing nitrogen oxide contained in the exhaust gas.
- a second difference is that, after passing through the low-temperature air heater 2 a used to heat the primary air, the secondary air is, for further heating, made to flow through the high-temperature air heater 2 b along with the high-temperature exhaust gas.
- the exhaust gas flowing through the exhaust gas duct 3 a 1 on the low-temperature side where a heat exchanger having a large heat transfer area is installed passes, before entering the low-temperature air heater 2 a, the de-NOx device 15 for removing nitrogen oxide contained in the exhaust gas.
- the secondary air enters, after being heated in the low-temperature air heater 2 a, the high-temperature air heater 2 b to be heated therein by the exhaust gas flowing through the exhaust gas duct 3 a 2 in which a heat exchanger having a small heat transfer area is installed.
- the exhaust gas flowing through the exhaust gas duct 3 a 2 in which a heat exchanger having a small heat transfer area is installed enters the high-temperature air heater 2 b and, after being heat-exchanged therein, enters the de-NOx device 15 .
- the exhaust gas, along with the exhaust gas flowing through the exhaust gas duct 3 a 1 in which a heat exchanger having a large heat transfer area is installed has nitrogen oxide removed from it to be then introduced into the low-temperature air heater 2 a.
- the de-NOx device 15 used in the present embodiment is for removing nitrogen oxide contained in exhaust gas.
- the catalyst de-NOx device of an ammonia spray type capable of efficiently removing nitrogen oxide operates optimally at about 350° C. and is normally installed on the upstream side of an air heater.
- the outlet temperature of the boiler 1 becomes 400° C. or higher
- the location where the de-NOx device is installed in the present embodiment is appropriate. Namely, using the configuration of the present embodiment makes it possible not only to obtain advantageous effects similar to those obtained in the foregoing second embodiment but also to maintain high performance for nitrogen oxide removal.
- FIG. 6 shows the configuration of a coal-fired boiler according to a fourth embodiment of the present invention.
- the boiler of the fourth embodiment includes many parts identical in operation to those used in the second embodiment.
- the low-temperature air heater 2 a and the high-temperature air heater 2 b are provided as in the second embodiment.
- the present embodiment differs from the second embodiment as follows: an air flow regulator 11 a is coupled to the air duct 3 b 1 ; an air flow regulator 11 b is coupled to the air duct 3 b 2 ; an air flow regulator 11 c is coupled to an air communication duct 3 b 3 intercoupling the air duct 3 b 1 and the air duct 3 b 2 ; an exhaust gas flow regulator 13 a is coupled to the exhaust gas duct 3 a 1 , an exhaust gas flow regulator 13 b is coupled to the exhaust gas duct 3 a 2 ; an exhaust gas flow regulator 13 c is coupled to an exhaust gas communication duct 3 a 3 intercoupling the exhaust gas duct 3 a 1 and the exhaust gas duct 3 a 2 ; and an air thermometer 22 is coupled to the primary combustion air supply duct 8 .
- the air flow regulators 11 a, 11 b and 11 c and the exhaust gas flow regulators 13 a, 13 b and 13 c function to adjust the respective air flows and exhaust gas flows based on the output of the air thermometer 22 so as to keep the temperature measured by the air thermometer 22 of the primary combustion air passing through the primary combustion air supply duct 8 at a desired level.
- the present embodiment also makes it possible to obtain the advantageous effects of the foregoing second embodiment. Furthermore, the present embodiment in which the air flow regulators 11 a, 11 b and 11 c, the exhaust gas flow regulators 13 a, 13 b and 13 c, and the air thermometer 22 are provided so as to keep the temperature of the primary air at a desired level can be flexibly applied to boilers using diversified kinds of coal.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Air Supply (AREA)
Abstract
In a boiler, a heat exchanger provided in one of two flow paths formed by partitioning a downstream portion of a flow path for exhaust gas discharged from a furnace has a smaller total heat transfer area than a heat exchanger provided in the other of the two flow paths; the exhaust gases discharged from the flow paths to outside the boiler are introduced, without being mixed, into an air heater downstream of the boiler; and, in the air heater, the heat of the exhaust gases is transferred to the primary air and the secondary air so as to heat combustion air.
Description
- The present application claims priority from Japanese Patent application serial No. 2012-121630, filed on May 29, 2012, the content of which is hereby incorporated by reference into this application.
- The present invention relates to a boiler and, more particularly, to a boiler in which fuel is burned to generate high-temperature steam for driving a steam-turbine power generation facility and which is suitably applicable to thermal power generation.
- Generally, at a thermal power generation plant where fuel is burned to generate steam using a boiler, a means for recovering heat from the exhaust gas discharged from the boiler is used to improve thermal efficiency.
- Among thermal power generation plants where coal is used as fuel, in particular, a technique is widely used in which an air heater is provided on a gas duct coupled to the boiler outlet, combustion air is heated using the heat of exhaust gas, and the heated combustion air is supplied to the boiler to promote burning of fuel so as to improve thermal efficiency of the boiler.
- In Patent Literature 1 (JP-A No. 2008-145007), for example, a technique is disclosed in which a boiler includes a temperature detector for detecting the temperature of primary air, a primary air temperature adjusting means for adjusting the temperature of primary air, and a control device for controlling the primary air temperature adjusting means based on the temperature detected by the temperature detector so as to keep the temperature of the primary air at a predetermined level and in which the ignitability and combustibility of coal is stabilized by adjusting the combustion air temperature according to the quality of coal.
- In Patent Literature 2 (International Publication No. WO 94/02784), a device is disclosed which allows gases of different temperatures to flow through two systems of flow paths without leaking and which allows flow path switching. The device described as being applied to a boiler includes two fixed chambers which are coupled to each other via a partition wall and which are provided in two systems of flow paths whose flow directions are fixed. In this configuration, exhaust gas from the boiler is, after being introduced into a downstream changeover chamber, made to enter a fixed chamber to be heated by heat storage material therein and is subsequently guided to the upstream side.
- According to
Patent Literature 2, no gas leakage occurs between the two systems of flow paths and the device with a simple construction enables flow path switching at high speed. This makes it possible to improve the performance of an air heater to thereby improve the thermal efficiency of the whole plant. - [Patent Literature 1] JP-A No. 2008-145007
- [Patent Literature 2] International Publication No. WO 94/02784
- The problem to be solved by the present invention will be described below with reference to
FIG. 1 . - Generally, for existing types of coal-fired boilers used in thermal power generation plants, a two-staged combustion method is used to suppress the generation of nitrogen oxide caused when coal is burned.
- In the two-staged combustion method, air is fed to a boiler through two systems, i.e. a primary air system for feeding fuel and a secondary air system for promoting fuel combustion. The primary air is fed with an excess air ratio smaller than 1 and undergoes primary combustion on a rich fuel side. This is to prevent the nitrogen compound generated by thermal decomposition from being converted into nitrogen oxide and to promote, using the secondary air, burning of unburned coal components and decomposition of nitrogen compound.
- As shown in
FIG. 1 , the primary and the secondary air are heated, using the heat of exhaust gas from aboiler 1, at anair heater 2 provided at the exhaust gas outlet of theboiler 1. Generally, the exhaust gas temperature is set to about 350° C. on theair heater 2 inlet side and to about 130° C. on theair heater 2 outlet side. - Also, in many cases, to keep the reheat steam temperature at a desired level, a downstream flow path portion for exhaust gas (i.e. a portion around an
economizer 16, aprimary superheater 17 and aprimary reheater 20 shown in a right-hand part ofFIG. 1 ) is partitioned by apartition wall 6; the partitioned flow path formed on each side of thepartition wall 6 is provided, at a downstream part thereof, with adamper 7 for adjusting the exhaust gas flow through the partitioned flow path so as to eventually adjust the heat collection of theprimary reheater 20 and thefinal reheater 21. This configuration is generally designed such that the exhaust gas temperatures at around the outlets of the respective flow paths are equal. - In recent years, in attempts to further improve the thermal efficiency of power generation systems, various measures are adopted. In one of such measures, for example, the secondary air is heated to a higher temperature. Generally, the secondary air temperature is set to about 330° C. By further raising the secondary air temperature, unburned components can be further reduced to improve the thermal efficiency of the
boiler 1. - As described in the foregoing, however, the exhaust gas temperature at the outlet of an existing type of
boiler 1 is about 350° C., whereas the temperature to which air can be heated by theair heater 2 is about 330° C. at the highest. To further raise the air temperature, it is necessary to raise the exhaust gas temperature by appropriately reducing the heat transfer area of theboiler 1 while maintaining the heat collection of steam in the whole boiler. Generally, to adjust the heat transfer area of the boiler, the heat transfer area of heat exchangers such as theeconomizer 16,primary superheater 17, andprimary reheater 20 provided in an exhaust gas downstream portion are adjusted. - Reducing the heat transfer area of the
primary superheater 17 or theeconomizer 16 provided in the exhaust gas downstream portion causes the exhaust gas temperature to rise on the right side of thepartition wall 6, shown inFIG. 1 , resulting in generating a large temperature difference between the two sides of thepartition wall 6. Namely, whereas the exhaust gas temperature at around the flow path outlet on the left side of thepartition wall 6 is comparable to that in an existing type of boiler, the exhaust gas temperature at around the flow path outlet on the main steam side (on the right side of the partition wall 6) becomes about 500° C. - Hence, when the exhaust gases from both flow paths are mixed as they are, the resultant exhaust gas temperature becomes about 420° C. Thus, in existing types of boilers, the secondary air temperature cannot be largely increased.
- An object of the present invention is to provide a boiler in which the secondary air temperature can be efficiently increased for higher thermal efficiency by appropriately reducing the heat transfer area of the boiler while maintaining the heat collection of steam in the whole boiler.
- To achieve the above object, a boiler according to the present invention includes: a furnace for burning solid fuel; a fuel mill for pulverizing the solid fuel; a solid fuel feeding pipe for conveying the solid fuel from the fuel mill to the furnace; a burner for igniting the solid fuel; an air port for introducing air into the furnace; an air heater for recovering heat from exhaust gas and heating primary air and secondary air to be supplied to the furnace; a primary combustion air supply duct for introducing the primary air from the air heater to the fuel mill; a secondary combustion air supply duct for introducing the secondary air from the air heater into the burner and the air port; an air duct for introducing air into the air heater; an exhaust gas duct for introducing exhaust gas into the air heater; a partition wall for partitioning a downstream portion of a flow path for exhaust gas discharged from the furnace; and a plurality of heat exchangers which are provided in the flow paths formed on both sides of the partition wall, recover heat from the exhaust gases flowing through the flow paths and heat steam using the recovered heat. In the boiler: the heat exchanger provided in the flow path on a first side of the partition wall has a smaller total heat transfer area than the heat exchanger provided in the flow path on a second side of the partition wall; the exhaust gases discharged from the flow paths to outside the boiler are introduced, without being mixed, into the air heater downstream of the boiler; and the heat of the exhaust gases is transferred to the primary air and the secondary air in the air heater so as to heat combustion air.
- In a boiler according to the present invention, the secondary air temperature can be efficiently increased by appropriately reducing the heat transfer area of the boiler while maintaining the heat collection of steam in the whole boiler. This makes it possible to burn unburned components to improve the thermal efficiency of the boiler.
-
FIG. 1 is a diagram showing the configuration of an existing type of boiler. -
FIG. 2 is a diagram showing the configuration of a coal-fired boiler according to a first embodiment of the present invention. -
FIG. 3 is a diagram schematically showing a rotary heat storage material type heat exchanger used as an air heater in the first embodiment of the boiler according to the present invention. -
FIG. 4 is a diagram showing the configuration of a coal-fired boiler according to a second embodiment of the present invention. -
FIG. 5 is a diagram showing the configuration of a coal-fired boiler according to a third embodiment of the present invention. -
FIG. 6 is a diagram showing the configuration of a coal-fired boiler according to a fourth embodiment of the present invention. - A boiler according to the present invention will be described below based on illustrated embodiments. In the drawings referred to in the following description, parts identical to those shown in
FIG. 1 representing the configuration of an existing type of boiler are denoted by reference numerals identical to those used inFIG. 1 . -
FIG. 2 shows the configuration of a coal-fired boiler according to a first embodiment of the present invention. - As shown in
FIG. 2 , a coal-firedboiler 1 according to the present embodiment broadly includes: afurnace 23 to burn coal, i.e. solid fuel; a fuel mill, i.e. acoal mill 10, to pulverize coal; a solid fuel feeding pipe, i.e. acoal feeding pipe 12, used to feed coal from thecoal mill 10 to thefurnace 23;plural burners 4 used to ignite the coal in thefurnace 23;air ports 5 for introducing air into thefurnace 23; anair heater 2 which recovers heat from exhaust gas and heats the primary and secondary air to be supplied to thefurnace 23; a primary combustionair supply duct 8 to introduce the primary air from theair heater 2 into thecoal mill 10; a secondary combustionair supply duct 9 to introduce the secondary air from theair heater 2 into theburners 4 andair ports 5; air ducts 3b 1 and 3b 2 to introduce air into theair heater 2; exhaust gas ducts 3 a 1 and 3 a 2 to introduce exhaust gas into theair heater 2; apartition wall 6 partitioning a downstream portion of a flow path for the exhaust gas discharged from thefurnace 23; and heat exchangers which, being provided in the flow paths formed on both sides of thepartition wall 6, recover heat from the exhaust gases flowing through the flow paths and heat steam, the heat exchangers including aneconomizer 16, aprimary superheater 17, asecondary superheater 18, afinal superheater 19, aprimary reheater 20, and afinal reheater 21. - Fuel coal is supplied to the
coal mill 10 to be pulverized into particles sized to be suitable for burning in theboiler 1. To thecoal mill 10, the air (primary air) heated by theair heater 2 is supplied through the primary combustionair supply duct 8. The primary air dries the pulverized coal and carries the pulverized coal to outside thecoal mill 10. - The pulverized coal is conveyed, together with the primary air, to the
burners 4 through thecoal feeding pipe 12 to be ignited and to be then fed into theboiler 1. Theboiler 1 also has the secondary air supplied from theair heater 2 through the secondary combustionair supply duct 9 and via theburners 4 andair ports 5. - Burning the pulverized coal using the air heated by the
air heater 2 using exhaust gas as described above causes high-temperature combustion gas to be generated in theboiler 1. The heat of the combustion gas is transferred to water or steam at a group of heat exchangers (secondary superheater 18,final superheater 19,final reheater 21,primary superheater 17,economizer 16, primary reheater 20) installed in theboiler 1 to generate high-temperature, high-pressure steam. The high-temperature, high-pressure steam is fed, through a steam pipe (not shown), to a steam turbine power generation facility (not shown) to have the energy of the steam converted into electricity therein. - The flow path for the exhaust gas is, in a downward portion thereof, partitioned into two parts by the
partition wall 6. InFIG. 2 , theprimary reheater 20 is installed on the left side of thepartition wall 6, whereas theeconomizer 16 and theprimary superheater 17 are installed on the right side of thepartition wall 6. With theprimary reheater 20 having a heat transfer area comparable with that in an existing type of boiler, reducing the total heat transfer area(s) of one or both of theeconomizer 16 and the primary superheater 17 (for example, making theeconomizer 16 and/or theprimary superheater 17 smaller shortens the heat transfer pipe correspondingly reducing the total heat transfer area) results in a higher exhaust gas temperature in the right-side flow path whereas the exhaust gas temperature in the left-side flow path remains about the same as in an existing type of boiler. If, for example, the heat transfer area is reduced by an area equivalent to the whole area of theeconomizer 16 in the present state, the temperature of the exhaust gas near thedamper 7 in the right-side flow path becomes about 550° C. - In the present embodiment, the low-temperature exhaust gas flowing through the left-side flow path and the high-temperature exhaust gas flowing through the right-side flow path are introduced into the
air heater 2 via separate exhaust gas ducts 3 a 1 and 3 a 2, respectively. -
FIG. 3 schematically shows, as an exemplary configuration of thepreferred air heater 2 of the present embodiment, a rotary heat storage material type heat exchanger widely used in coal-fired boilers. - In the present embodiment, to achieve efficient heat exchange, four separate gas flow paths (ducts), i.e. two each on the exhaust gas side and on the air side, are arranged, as shown in
FIG. 3 , along the rotary direction of the heat storage material. - Namely, the rotary heat storage material first passes the exhaust gas flow path (exhaust gas duct 3 a 1) on the low-temperature side to be heated by the low-temperature exhaust gas; next passes the exhaust gas flow path (exhaust gas duct 3 a 2) to be further heated by the high-temperature exhaust gas; and subsequently passes the secondary air flow path (air duct 3 b 1) and the primary air flow path (air duct 3 b 2) in this order to release the stored heat while passing the air ducts.
- The above-described configuration of the present embodiment makes it possible to heat the secondary air up to about 500° C. so as to reduce the unburned components of coal. This improves thermal efficiency of the
boiler 1. - As the secondary air heated to a high temperature improves the combustion efficiency of coal, heat collection by the
boiler 1 in its upstream gas flow portion increases. Therefore, even when the heat transfer area of one or both of theeconomizer 16 and theprimary superheater 17 is reduced to be smaller than in existing types of boilers as mentioned above, heat collection by the boiler as a whole can be secured. When necessary to secure adequate heat collection by theboiler 1, the heat transfer area of thesecondary superheater 18 orfinal superheater 19 may be increased. -
FIG. 4 shows the configuration of a coal-fired boiler according to a second embodiment of the present invention. - The boiler of the second embodiment includes many parts identical in operation to those used in the first embodiment. In the following, the boiler of the second embodiment will be described only with regard to what it differs from the boiler of the first embodiment. The parts of the boiler not described in the following are identical in operation and effects to those used in the first embodiment.
- In the second embodiment, unlike in the first embodiment, two air heaters are used as shown in
FIG. 4 . Namely, the heat of the exhaust gas, whose temperature is about the same as in existing types of boilers, flowing through the left-side flow path downstream of the boiler is recovered by a low-temperature air heater 2 a and is used to heat the primary air. The heat of the high-temperature exhaust gas flowing through the right-side flow path, on the other hand, is recovered by a high-temperature air heater 2 b and is used to heat the secondary air. - The above-described configuration of the present embodiment also makes it possible to obtain the advantageous effects of the foregoing first embodiment. Furthermore, in the present embodiment, with the two separate air heaters, i.e. the low-
temperature air heater 2 a and the high-temperature air heater 2 b, provided, it is easy to maintain high heat-exchange efficiency, so that the secondary air can be stably maintained at high temperature. - It is feared that a heat exchanger of a rotary heat storage material type involves leakage between flowing gases. In the present embodiment, however, leakage occurs neither between the low-temperature and the high-temperature exhaust gas nor between the primary and the secondary air, so that stable heat exchange is realized.
-
FIG. 5 shows the configuration of a coal-fired boiler according to a third embodiment of the present invention. - The boiler of the third embodiment includes many parts identical in operation to those used in the second embodiment. In the following, the boiler of the third embodiment will be described only with regard to what it differs from the boiler of the second embodiment. The parts of the boiler not described in the following are identical in operation and effects to those used in the second embodiment.
- There are two differences between the present embodiment shown in
FIG. 5 and the second embodiment. A first difference is that, in the present embodiment, the exhaust gas flowing through the exhaust gas flow path on the low-temperature side (exhaust gas duct 3 a 1) where a heat exchanger having a large heat transfer area is installed is introduced into the low-temperature air heater 2 a via ade-NOx device 15 for removing nitrogen oxide contained in the exhaust gas. A second difference is that, after passing through the low-temperature air heater 2 a used to heat the primary air, the secondary air is, for further heating, made to flow through the high-temperature air heater 2 b along with the high-temperature exhaust gas. - Namely, the exhaust gas flowing through the exhaust gas duct 3 a 1 on the low-temperature side where a heat exchanger having a large heat transfer area is installed passes, before entering the low-
temperature air heater 2 a, thede-NOx device 15 for removing nitrogen oxide contained in the exhaust gas. At the same time, the secondary air enters, after being heated in the low-temperature air heater 2 a, the high-temperature air heater 2 b to be heated therein by the exhaust gas flowing through the exhaust gas duct 3 a 2 in which a heat exchanger having a small heat transfer area is installed. - The exhaust gas flowing through the exhaust gas duct 3 a 2 in which a heat exchanger having a small heat transfer area is installed enters the high-
temperature air heater 2 b and, after being heat-exchanged therein, enters thede-NOx device 15. In thede-NOx device 15, the exhaust gas, along with the exhaust gas flowing through the exhaust gas duct 3 a 1 in which a heat exchanger having a large heat transfer area is installed, has nitrogen oxide removed from it to be then introduced into the low-temperature air heater 2 a. - The
de-NOx device 15 used in the present embodiment is for removing nitrogen oxide contained in exhaust gas. The catalyst de-NOx device of an ammonia spray type capable of efficiently removing nitrogen oxide operates optimally at about 350° C. and is normally installed on the upstream side of an air heater. - In cases where, as assumed in the present embodiment, the outlet temperature of the
boiler 1 becomes 400° C. or higher, the location where the de-NOx device is installed in the present embodiment is appropriate. Namely, using the configuration of the present embodiment makes it possible not only to obtain advantageous effects similar to those obtained in the foregoing second embodiment but also to maintain high performance for nitrogen oxide removal. -
FIG. 6 shows the configuration of a coal-fired boiler according to a fourth embodiment of the present invention. - The boiler of the fourth embodiment includes many parts identical in operation to those used in the second embodiment.
- In the following, the boiler of the fourth embodiment will be described only with regard to what it differs from the boiler of the second embodiment. The parts of the boiler not described in the following are identical in operation and effects to those used in the second and third embodiments.
- In the present embodiment shown in
FIG. 6 , the low-temperature air heater 2 a and the high-temperature air heater 2 b are provided as in the second embodiment. The present embodiment, however, differs from the second embodiment as follows: anair flow regulator 11 a is coupled to the air duct 3b 1; anair flow regulator 11 b is coupled to the air duct 3b 2; anair flow regulator 11 c is coupled to an air communication duct 3 b 3 intercoupling the air duct 3 b 1 and the air duct 3b 2; an exhaustgas flow regulator 13 a is coupled to the exhaust gas duct 3 a 1, an exhaustgas flow regulator 13 b is coupled to the exhaust gas duct 3 a 2; an exhaustgas flow regulator 13 c is coupled to an exhaust gas communication duct 3 a 3 intercoupling the exhaust gas duct 3 a 1 and the exhaust gas duct 3 a 2; and anair thermometer 22 is coupled to the primary combustionair supply duct 8. - In the present embodiment, the
air flow regulators gas flow regulators air thermometer 22 so as to keep the temperature measured by theair thermometer 22 of the primary combustion air passing through the primary combustionair supply duct 8 at a desired level. - The above-described configuration of the present embodiment also makes it possible to obtain the advantageous effects of the foregoing second embodiment. Furthermore, the present embodiment in which the
air flow regulators gas flow regulators air thermometer 22 are provided so as to keep the temperature of the primary air at a desired level can be flexibly applied to boilers using diversified kinds of coal. - While the present invention has been described with reference to its preferred embodiments, it is to be understood that the invention is not limited thereto but may be otherwise variously embodied within the scope of the invention. Typically, the embodiments have been described in detail so as to illustrate the present invention clearly, and the present invention is not limited to ones including all the described configurations. Substitution of part of a configuration of one embodiment with a configuration of another embodiment is possible; and addition of a configuration of one embodiment to a configuration of another embodiment is also possible. Additions, deletions, and substitutions of part of a configuration of an embodiment with or by another configuration can also be made.
-
- 1 . . . Boiler
- 2 . . . Air heater
- 2 a Low-temperature air heater
- 2 b High-temperature air heater
- 3 a 1, 3 a 2 Exhaust gas duct
- 3 a 3 Exhaust gas communication duct
- 3
b 1, 3b 2 Air duct - 3 b 3 Air communication duct
- 4 Burner
- 5 Air port
- 6 Partition wall
- 7 Damper
- 8 Primary combustion air supply duct
- 9 Secondary combustion air supply duct
- 10 Coal mill
- 11 a, 11 b, 11 c Air flow regulator
- 12 Coal feeding pipe
- 13 a, 13 b, 13 c Exhaust gas flow regulator
- 15 De-NOx device
- 16 Economizer
- 17 Primary superheater
- 18 Secondary superheater
- 19 Final superheater
- 20 Primary reheater
- 21 Final reheater
- 22 Air thermometer
- 23 Furnace
Claims (16)
1. A boiler comprising: a furnace for burning solid fuel; a fuel mill for pulverizing the solid fuel; a solid fuel feeding pipe for conveying the solid fuel from the fuel mill to the furnace; a burner for igniting the solid fuel; an air port for introducing air into the furnace; an air heater for recovering heat from exhaust gas and heating primary air and secondary air to be supplied to the furnace; a primary combustion air supply duct for introducing the primary air from the air heater to the fuel mill; a secondary combustion air supply duct for introducing the secondary air from the air heater into the burner and the air port; an air duct for introducing air into the air heater; an exhaust gas duct for introducing exhaust gas into the air heater; a partition wall for partitioning a downstream portion of a flow path for exhaust gas discharged from the furnace; and a plurality of heat exchangers which are provided in the flow paths formed on both sides of the partition wall, recover heat from the exhaust gases flowing through the flow paths and heat steam using the recovered heat,
wherein the heat exchanger provided in the flow path on a first side of the partition wall has a smaller total heat transfer area than the heat exchanger provided in the flow path on a second side of the partition wall; wherein the exhaust gases discharged from the flow paths to outside the boiler are introduced, without being mixed, into the air heater downstream of the boiler; and wherein, in the air heater, the heat of the exhaust gases is transferred to the primary air and the secondary air so as to heat combustion air.
2. The boiler according to claim 1 ,
wherein the air heater comprises a low-temperature air heater which is provided downstream of the heat exchanger having a larger heat transfer area and which heats the primary air and a high-temperature air heater which is provided downstream of the heat exchanger having a smaller heat transfer area and which heats the secondary air.
3. The boiler according to claim 1 ,
wherein the heat exchanger having a larger heat transfer area is used to heat reheat steam and the heat exchanger having a smaller heat transfer area is used to heat main steam.
4. The boiler according to claim 2 ,
wherein the heat exchanger having a larger heat transfer area is used to heat reheat steam and the heat exchanger having a smaller heat transfer area is used to heat main steam.
5. The boiler according to claim 2 , further comprising a de-NOx device which the exhaust gas flowing through the flow path provided with the heat exchanger having a larger heat transfer area enters before passing through the low-temperature air heater and which removes nitrogen oxide contained in the exhaust gas,
wherein the secondary air enters, after being heated by the low-temperature air heater, the high-temperature air heater to be heated therein by the exhaust gas flowing through the flow path provided with the heat exchanger having a smaller heat transfer area.
6. The boiler according to claim 4 , further comprising a de-NOx device which the exhaust gas flowing through the flow path provided with the heat exchanger having a larger heat transfer area enters before passing through the low-temperature air heater and which removes nitrogen oxide contained in the exhaust gas,
wherein the secondary air enters, after being heated by the low-temperature air heater, the high-temperature air heater to be heated therein by the exhaust gas flowing through the flow path provided with the heat exchanger having a smaller heat transfer area.
7. The boiler according to claim 5 ,
wherein, after entering the high-temperature air heater and being heat-exchanged therein, the exhaust gas flowing through the flow path provided with the heat exchanger having a smaller heat transfer area enters the de-NOx device and, along with the exhaust gas flowing through the flow path provided with the heat exchanger having a larger heat transfer area, has nitrogen oxide removed therein before entering the low-temperature air heater.
8. The boiler according to claim 6 ,
wherein, after entering the high-temperature air heater and being heat-exchanged therein, the exhaust gas flowing through the flow path provided with the heat exchanger having a smaller heat transfer area enters the de-NOx device and, along with the exhaust gas flowing through the flow path provided with the heat exchanger having a larger heat transfer area, has nitrogen oxide removed therein before entering the low-temperature air heater.
9. The boiler according to claim 1 ,
wherein the air duct is provided with an air flow regulator, the exhaust gas duct is provided with an exhaust gas flow regulator, and the primary combustion air supply duct is, at an intermediate portion thereof, provided with an air thermometer; and
wherein the air flow regulator and the exhaust gas flow regulator operate to adjust an air flow and an exhaust gas flow based on the output of the air thermometer so as to keep the temperature measured by the air thermometer of the primary combustion air flowing through the primary combustion air supply duct at a desired level.
10. The boiler according to claim 2 ,
wherein the air duct is provided with an air flow regulator, the exhaust gas duct is provided with an exhaust gas flow regulator, and the primary combustion air supply duct is, at an intermediate portion thereof, provided with an air thermometer; and
wherein the air flow regulator and the exhaust gas flow regulator operate to adjust an air flow and an exhaust gas flow based on the output of the air thermometer so as to keep the temperature measured by the air thermometer of the primary combustion air flowing through the primary combustion air supply duct at a desired level.
11. The boiler according to claim 3 ,
wherein the air duct is provided with an air flow regulator, the exhaust gas duct is provided with an exhaust gas flow regulator, and the primary combustion air supply duct is, at an intermediate portion thereof, provided with an air thermometer; and
wherein the air flow regulator and the exhaust gas flow regulator operate to adjust an air flow and an exhaust gas flow based on the output of the air thermometer so as to keep the temperature measured by the air thermometer of the primary combustion air flowing through the primary combustion air supply duct at a desired level.
12. The boiler according to claim 4 ,
wherein the air duct is provided with an air flow regulator, the exhaust gas duct is provided with an exhaust gas flow regulator, and the primary combustion air supply duct is, at an intermediate portion thereof, provided with an air thermometer; and
wherein the air flow regulator and the exhaust gas flow regulator operate to adjust an air flow and an exhaust gas flow based on the output of the air thermometer so as to keep the temperature measured by the air thermometer of the primary combustion air flowing through the primary combustion air supply duct at a desired level.
13. The boiler according to claim 5 ,
wherein the air duct is provided with an air flow regulator, the exhaust gas duct is provided with an exhaust gas flow regulator, and the primary combustion air supply duct is, at an intermediate portion thereof, provided with an air thermometer; and
wherein the air flow regulator and the exhaust gas flow regulator operate to adjust an air flow and an exhaust gas flow based on the output of the air thermometer so as to keep the temperature measured by the air thermometer of the primary combustion air flowing through the primary combustion air supply duct at a desired level.
14. The boiler according to claim 6 ,
wherein the air duct is provided with an air flow regulator, the exhaust gas duct is provided with an exhaust gas flow regulator, and the primary combustion air supply duct is, at an intermediate portion thereof, provided with an air thermometer; and
wherein the air flow regulator and the exhaust gas flow regulator operate to adjust an air flow and an exhaust gas flow based on the output of the air thermometer so as to keep the temperature measured by the air thermometer of the primary combustion air flowing through the primary combustion air supply duct at a desired level.
15. The boiler according to claim 7 ,
wherein the air duct is provided with an air flow regulator, the exhaust gas duct is provided with an exhaust gas flow regulator, and the primary combustion air supply duct is, at an intermediate portion thereof, provided with an air thermometer; and
wherein the air flow regulator and the exhaust gas flow regulator operate to adjust an air flow and an exhaust gas flow based on the output of the air thermometer so as to keep the temperature measured by the air thermometer of the primary combustion air flowing through the primary combustion air supply duct at a desired level.
16. The boiler according to claim 8 ,
wherein the air duct is provided with an air flow regulator, the exhaust gas duct is provided with an exhaust gas flow regulator, and the primary combustion air supply duct is, at an intermediate portion thereof, provided with an air thermometer; and
wherein the air flow regulator and the exhaust gas flow regulator operate to adjust an air flow and an exhaust gas flow based on the output of the air thermometer so as to keep the temperature measured by the air thermometer of the primary combustion air flowing through the primary combustion air supply duct at a desired level.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012-121630 | 2012-05-29 | ||
JP2012121630A JP2013245905A (en) | 2012-05-29 | 2012-05-29 | Boiler |
Publications (1)
Publication Number | Publication Date |
---|---|
US20130319299A1 true US20130319299A1 (en) | 2013-12-05 |
Family
ID=48534253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/903,502 Abandoned US20130319299A1 (en) | 2012-05-29 | 2013-05-28 | Boiler |
Country Status (4)
Country | Link |
---|---|
US (1) | US20130319299A1 (en) |
EP (1) | EP2669576A2 (en) |
JP (1) | JP2013245905A (en) |
CN (1) | CN103453540A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8955764B1 (en) * | 2013-10-24 | 2015-02-17 | Ahmd Abdallah Al-Jassem Qanaei | Building heat exchange system |
CN108800111A (en) * | 2018-05-15 | 2018-11-13 | 许昌龙岗发电有限责任公司 | A kind of energy-efficient low nitrogen combustion apparatus of boiler |
CN110486747A (en) * | 2018-05-15 | 2019-11-22 | 合肥硕森科技有限公司 | A kind of Secondary Air blowing system of the biomass boiler based on numerical control |
CN113847621A (en) * | 2021-10-22 | 2021-12-28 | 西安热工研究院有限公司 | Cold-state starting system and method for boiler |
US20230151964A1 (en) * | 2021-11-12 | 2023-05-18 | Orlando Utilities Commission | Coal-fired power generation system and air heat with recirculation path and related method |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW227597B (en) | 1992-07-22 | 1994-08-01 | Nippon Nesyoro Kogyo Kk | |
JP2008145007A (en) * | 2006-12-07 | 2008-06-26 | Ihi Corp | Coal burning boiler |
CA2762128A1 (en) * | 2009-05-27 | 2010-12-01 | Jean-Xavier Morin | Method for the adjustable gas-tight transfer of solids to chambers having a different gas atmosphere |
CN201909334U (en) * | 2010-11-22 | 2011-07-27 | 章礼道 | Asymmetric quarter-sector rotary air preheater |
CN201992680U (en) * | 2011-02-21 | 2011-09-28 | 孙海波 | Dredge type air leakage control device with sealing brushes for Junker type air preheater |
CN102221218A (en) * | 2011-05-25 | 2011-10-19 | 无锡华光锅炉股份有限公司 | Air preheater arrangement structure of boiler |
-
2012
- 2012-05-29 JP JP2012121630A patent/JP2013245905A/en active Pending
-
2013
- 2013-05-28 US US13/903,502 patent/US20130319299A1/en not_active Abandoned
- 2013-05-28 CN CN201310204418XA patent/CN103453540A/en active Pending
- 2013-05-29 EP EP13169761.7A patent/EP2669576A2/en not_active Withdrawn
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8955764B1 (en) * | 2013-10-24 | 2015-02-17 | Ahmd Abdallah Al-Jassem Qanaei | Building heat exchange system |
CN108800111A (en) * | 2018-05-15 | 2018-11-13 | 许昌龙岗发电有限责任公司 | A kind of energy-efficient low nitrogen combustion apparatus of boiler |
CN110486747A (en) * | 2018-05-15 | 2019-11-22 | 合肥硕森科技有限公司 | A kind of Secondary Air blowing system of the biomass boiler based on numerical control |
CN113847621A (en) * | 2021-10-22 | 2021-12-28 | 西安热工研究院有限公司 | Cold-state starting system and method for boiler |
US20230151964A1 (en) * | 2021-11-12 | 2023-05-18 | Orlando Utilities Commission | Coal-fired power generation system and air heat with recirculation path and related method |
US12038173B2 (en) * | 2021-11-12 | 2024-07-16 | Orlando Utilities Commission | Coal-fired power generation system and air heat with recirculation path and related method |
Also Published As
Publication number | Publication date |
---|---|
JP2013245905A (en) | 2013-12-09 |
EP2669576A2 (en) | 2013-12-04 |
CN103453540A (en) | 2013-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2511610B1 (en) | Solar boiler system | |
US20130319299A1 (en) | Boiler | |
US20120222591A1 (en) | Method of and Apparatus for Selective Catalytic NOx Reduction in a Power Boiler | |
KR101530807B1 (en) | Exhaust heat recovery boiler and electricity generation plant | |
US20100062301A1 (en) | System having high-temperature fuel cells | |
CN103486566A (en) | Waste heat utilization system capable of guaranteeing lignite boiler dry output and SCR safe flue gas temperature | |
CN107420933B (en) | Exhaust-heat primary air heat exchanger system for hot air powder feeding system of ball mill | |
CN110094725B (en) | Ultralow nitrogen combustion method for coal-fired power generating unit | |
CN103438418A (en) | Double-n-shaped boiler | |
CN211502850U (en) | Boiler system | |
CA2962125C (en) | A heat recovery unit and power plant | |
JP2015117844A (en) | Superheater and boiler | |
JP4842007B2 (en) | Waste heat recovery boiler | |
WO2015083253A1 (en) | Boiler | |
CN116642170B (en) | Coal-fired thermal power heat storage system for realizing cascade storage and utilization of steam energy | |
CN220567209U (en) | Self-cooling type after-combustion structure of burner flue of waste heat boiler of gas turbine | |
KR101816179B1 (en) | Thermal power generation system comprising a pellet drying section | |
KR102222427B1 (en) | Combustion device and power generation system able to internal flue gas recirculation | |
CN117628482A (en) | Boiler system with tail flue communicated with flue gas outlet of combustion device | |
EP3203149B1 (en) | Combined-cycle co-generation process and installation | |
RU2062331C1 (en) | Thermal power station unit | |
Huang et al. | Control strategy for main steam pressure of combustion system of pulverized coal boiler | |
KR20220099120A (en) | Steam generators, plants and methods of controlling steam generators | |
CN117167713A (en) | Quick start system and method for coal-fired boiler heated by using coal mill of temporary furnace | |
KR20210023007A (en) | Combustion System Combined with Pressurized Oxygen Combustion and Pulverized Coal Fuel Combustion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: HITACHI, LTD., JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HANDA, MASATO;HAYASHI, YOSHIHARU;SHIBATA, TSUYOSHI;SIGNING DATES FROM 20130529 TO 20130530;REEL/FRAME:030609/0879 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |