US20130315677A1 - Lift/Boarding Vessel - Google Patents

Lift/Boarding Vessel Download PDF

Info

Publication number
US20130315677A1
US20130315677A1 US13/875,077 US201313875077A US2013315677A1 US 20130315677 A1 US20130315677 A1 US 20130315677A1 US 201313875077 A US201313875077 A US 201313875077A US 2013315677 A1 US2013315677 A1 US 2013315677A1
Authority
US
United States
Prior art keywords
vessel
buoyant
action
sea
units
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/875,077
Inventor
Herman Joseph Schellstede
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US13/875,077 priority Critical patent/US20130315677A1/en
Publication of US20130315677A1 publication Critical patent/US20130315677A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B39/00Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/021Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/04Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
    • E02B17/08Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/04Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
    • E02B17/08Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
    • E02B17/0836Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations

Definitions

  • the boarding of fixed structures in offshore waters is the subject of this invention.
  • Offshore platforms of all types and uses must be boarded in harsh weather conditions.
  • the invention teaches a method to board fixed, stable offshore structures in harsh conditions which exceed the standard safety guidelines.
  • Attending vessels are employed in the boarding operations at this time in the oil and gas industry as well as in offshore wind power facilities.
  • the requirement to board is very critical and must be provided or financial losses can be realized.
  • boarding of fixed platforms relating to the oil and gas industry is different in specific areas.
  • the North Sea is very active in the production of oil and gas.
  • the average number of days in which boarding is not possible can reach 75 days per year. In other oil and gas areas having a less harsh environment, 10-50 days per year can be lost with relation to the inability to board the vessel.
  • both harsh and less harsh downtime conditions of oil and gas operation are not acceptable.
  • Wind farms are also very sensitive to downtime, due to boarding of the platform.
  • the invention provides a method to reduce the days of
  • the ability to provide a safe and efficient means of boarding offshore platforms is the basis of this invention.
  • Safety at sea is the most important factor in offshore operations.
  • the invention teaches a method, which allows the boarding vessel to be stable and static. Hence, both the platform to be boarded and the boarding vessel are static (no relative motion).
  • This invention is novel because all other ocean boarding vessels have a condition in which one item (platform) is static.
  • the boarding vessel is dynamic.
  • FIG. 3 illustrates a plan view of the invention.
  • Three buoyant units are shown and connected to the main body via a structural frame.
  • the main vessel body is located between the three buoyant units.
  • the main body ( 4 ) of the vessel contains the prime movers, hydraulic pump, quarters and crew accommodations.
  • Above the buoyant units is a bearing and gear box housing ( 7 ).
  • a leg jacking tower ( 8 ) is located above the buoyant unit ( 6 c )
  • FIG. 2 illustrates the main vessel body ( 4 ) elevated above the seal level ( 4 ).
  • the “air gap” or elevation distance is shown in FIG. 2 or 14 .
  • the elevation of the master body is accomplished by the extension legs ( 2 ).
  • the buoyant units 6 a, 6 b and 6 c remain in place at sea level ( 11 ).
  • FIG. 3 The illustration shows a plan view of the vessel ( 1 ).
  • the plan view shows three independent buoyant units 6 a, 6 b, 6 c and joined to the main vessel body ( 4 ) by structural members 9 and 12 .
  • the task of lifting the vessel from the ocean surface is simplified if the buoyant units are positioned heading into the seas, experiencing only a heave action.
  • the ability of the vessel to change the heading of the buoyant unit provides a manner which allows employees to board vessels in a proper boarding manner.
  • FIG. 6 illustrates a sectional drawing of the buoyant unit.
  • FIG. 6 illustrates the general arrangement of the buoyant units.
  • the buoyant units ( 6 a, 6 b and 6 c ) are equipped with a bearing assembly ( 17 , 18 , 22 , and 23 ).
  • the bearing assembly supports the buoyant units to move about the jacking assembly ( 8 ) and the jacking legs ( 1 ).
  • the buoyant units are controlled by a powered yaw system ( 15 ).
  • a gear ( 16 ) causes the movement of the buoyant units as per central command.
  • the lower section of the leg is equal with a concave section ( 20 ) designed to fit onto the mud-line driven pile.
  • Each of the buoyant units ( 6 a, 6 b, 6 c ) area equipped with the identical equipment.
  • the control of the buoyant unit is a decision in which the vessel captain employs due to the sea action.
  • the arrangement of the pilot house ( 3 ) is illustrated.
  • FIG. 9 illustrates the structural member which attaches the buoyant units ( 6 a, 6 b and 6 c ).
  • the structural member is of sufficient size to allow human access to all areas of the vessel.
  • the invention teaches a method of offshore operation which provides a safe and efficient method to board offshore fixed platforms.
  • the ability to board the platform is paramount.
  • the invention can provide the vessel captain a greater ability to operate the lift vessel in harsh seas.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

In order to board a fixed structure, ocean conditions must be within a reasonable state that allows personnel to board in a safe manner. Due to the specific weather conditions, the boarding of fixed structures cannot be conducted. Both oil and gas and wind platforms must be boarded for maintenance and repair purposes. The invention allows boarding of fixed structures employing three buoyant vessels that can be adjusted to always be heading into the wind direction. Landing piles are pre-driven adjacent to the fixed structure and terminate at the ocean bottom. The invention has three deployable legs that extend through the buoyant vessel to the ocean bottom. The placement of the driven supports employs the same dimensions as the spacing of the vessel's extension legs. The vessel operator adjusts the heading of the three buoyant vessels to the wave heading. The legs are extended to the ocean bottom.

Description

  • CROSS REFERENCE TO RELATED APPLICATIONS
  • The application is a non-provisional, and claims priority benefit, of U.S. Patent Application Ser. No. 61/687,770 filed May 1, 2012, which is incorporated herein by specific reference.
  • STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT
  • Not applicable.
  • NAMES OF PARTIES TO A JOINT RESEARCH AGREEMENT
  • Not applicable.
  • REFERENCE TO APPENDIX
  • Not applicable.
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • The boarding of fixed structures in offshore waters is the subject of this invention. Offshore platforms of all types and uses must be boarded in harsh weather conditions. The invention teaches a method to board fixed, stable offshore structures in harsh conditions which exceed the standard safety guidelines. Attending vessels are employed in the boarding operations at this time in the oil and gas industry as well as in offshore wind power facilities. The requirement to board is very critical and must be provided or financial losses can be realized. For example, boarding of fixed platforms relating to the oil and gas industry is different in specific areas. The North Sea is very active in the production of oil and gas. The average number of days in which boarding is not possible can reach 75 days per year. In other oil and gas areas having a less harsh environment, 10-50 days per year can be lost with relation to the inability to board the vessel. In all cases, both harsh and less harsh downtime conditions of oil and gas operation are not acceptable. Wind farms are also very sensitive to downtime, due to boarding of the platform. The invention provides a method to reduce the days of downtime.
  • In a harsh environment, the present percentage of downtime may be as great as 21%. In areas that have a less harsh environment, the percentage may be as great as 3%. The invention can reduce the platform downtime due to boarding problems to 5% in harsh conditions and less than 1% in less harsh conditions. The invention's most permanent advantage is the ability to provide a safe and stable platform for the transfer of workers. The financial rewards of the use of this invention is very great both in the oil and wind industry.
  • 2. Description of the Related Art
  • U.S. Patent Application Publication No. 61/687,770 discloses a harsh environment lift boat.
  • The invention disclosed and taught herein is directed towards a major improvement of wind systems to be used onshore or offshore.
  • BRIEF SUMMARY OF THE INVENTION
  • The ability to provide a safe and efficient means of boarding offshore platforms is the basis of this invention. Safety at sea is the most important factor in offshore operations. The invention teaches a method, which allows the boarding vessel to be stable and static. Hence, both the platform to be boarded and the boarding vessel are static (no relative motion). This invention is novel because all other ocean boarding vessels have a condition in which one item (platform) is static. The boarding vessel is dynamic.
  • It is understood by offshore managers, workers and seamen that the only method to provide a safe means of boarding an offshore platform is that both platform and vessel must be in a static condition. The invention teaches the method and procedure.
  • The underwater pre-driven ocean bottom piles provide a landing area, which allows predictable results and the pre-loading procedures or “punch through” are non-existent. The ocean bottom and structure have different strengths. The support legs of typical lift boats can lose footing due to “punch through”. By use of the invention, “punch thrus” are non-existent. The offshore platforms that require boarding in water depths from 10′ through 300′ can be boarded via this invention.
  • BRIEF DESCRIPTION OF SEVERAL VIEWS OF THE DRAWINGS
  • FIG. 1 illustrates a profile view of the offshore boarding vessel. The profile illustrates the buoyant vessels, the extension legs and the main vessel body.
  • FIG. 2 illustrates a view of the main vessel body in an elevated mode showing the air gap between the bottom of the vessel body and the surface of the water.
  • FIG. 3 illustrates a plan view of the invention. Three buoyant units are shown and connected to the main body via a structural frame. The main vessel body is located between the three buoyant units.
  • FIG. 4 illustrates the three buoyant units located within a triangle equidistant from each other.
  • FIG. 5 illustrates a singular buoyant unit. The illustration is a plan view of the unit. The main connection area is illustrated.
  • FIG. 6 illustrates a profile sectional view of the buoyant unit. Bearings, lifting legs and vessel body are shown.
  • FIG. 7 illustrates the invention shown in front profile. The main body, buoyant units and structural connection members are shown.
  • FIG. 8 illustrates the structural connection members to two of the three buoyant units.
  • FIG. 9 illustrates the invention in an elevated mode. The pre-driven mud line piles are shown. The invention created is seen mounted above the pre-driven piles. The invention is in an elevated mode. The elevation can be adjusted upon command.
  • DETAILED DESCRIPTION OF THE INVENTION
  • Referring to FIG. 1 illustrates the invention (1) shown from a profile view.
  • The vessel has support legs (2) which extend above the vessel to a specific height. The lower extremity of the leg sections is connected to the buoyant units 6 a-6 b-6 c. A control unit (3) is mounted above the vessel allowing for full viewing of the overall operation.
  • The main body (4) of the vessel contains the prime movers, hydraulic pump, quarters and crew accommodations. Above the buoyant units is a bearing and gear box housing (7). A leg jacking tower (8) is located above the buoyant unit (6 c)
  • A structural bridge (9) connects the buoyant units 6 a, 6 b and 6 c. Each buoyant unit is fitted with a propulsion unit (10). The propulsion unit is controlled from the pilot house (3).
  • The buoyant units have a specific draft allowing a freeboard above the sea level (11).
  • FIG. 2 illustrates the main vessel body (4) elevated above the seal level (4). The “air gap” or elevation distance is shown in FIG. 2 or 14. The elevation of the master body is accomplished by the extension legs (2). The buoyant units 6 a, 6 b and 6 c remain in place at sea level (11).
  • The invention is illustrated in FIG. 3, Item 1. The illustration shows a plan view of the vessel (1). The plan view shows three independent buoyant units 6 a, 6 b, 6 c and joined to the main vessel body (4) by structural members 9 and 12.
  • The main vessel body supports the pilot house (3) which controls the overall functions of the vessel (1). The main vessel body (4) contains the prime mover (5). The prime mover (5) is a diesel electric system which provides power to the buoyant units (6 a, 6 b and 6 c) and other requirements of the vessel. The pilot house (3) has full command of the motion of the vessel (1), i.e. forward/reverse movement. Port and starboard movement and lifting of the main body above the ocean level.
  • General operation of the vessel (1) in a transit mode requires that the buoyant units are located bow/stern positions. To guide the vessel (1), the operator located in the pilot house, rotates the buoyant units (6 a, 6 b, 6 c) either to the port or starboard direction. Each buoyant unit (6 a, 6 b, 6 c) can be positioned separately to reach the desired location. The vessel (1) can be positioned to meet the demands of platform boarding and to place the vessel above and onto the driven mudline-located support pilings.
  • In sea conditions which are not aligned with the platform, the buoyant units can be positioned in such a fashion to maintain heading into the sea action at all times. In harsh seas, the vessel captain located in the pilot house (3) can position the vessel above the driven pile supports (29) as seen in FIG. 9.
  • The vessel captain will employ side beam sonar to locate the driven piles (29). The captain will “land” one of the three jacking legs onto the driven pile once a load is placed onto the leg created from the partial weight of the vessel. The two other support legs are positioned above the two remaining driven piles. Once the location is correct, the vessel is lifted to provide an air gap (14) between the bottom of the vessel and the ocean surface.
  • The task of lifting the vessel from the ocean surface is simplified if the buoyant units are positioned heading into the seas, experiencing only a heave action.
  • This factor is very important to simplify the location and elevation of the vessel out of the sea action.
  • The ability of the vessel to change the heading of the buoyant unit provides a manner which allows employees to board vessels in a proper boarding manner.
  • The spacing of the buoyant units is illustrated in FIG. 4. Each unit has its own jet drive (1) which is controlled separately. The spacing of the buoyant units is critical to meet the size and shape of the driven piling (29). The buoyant units (6 a, 6 b and 6 c) are equipped with a special yawing device which is powered and controlled by the vessel captain. See FIG. 5.
  • The jet drive (10) is driven via an electrical drive (19). The buoyant units (6 a, 6 b and 6 c) are equipped with a radial bearing (7) and gear drive (8). The pod can be rotated about the lifting leg (2). The buoyant units can be rotated 360 degrees with respect to the bow/stern centerline.
  • FIG. 6 illustrates a sectional drawing of the buoyant unit. FIG. 6 illustrates the general arrangement of the buoyant units. The buoyant units (6 a, 6 b and 6 c) are equipped with a bearing assembly (17, 18, 22, and 23). The bearing assembly supports the buoyant units to move about the jacking assembly (8) and the jacking legs (1). The buoyant units are controlled by a powered yaw system (15). A gear (16) causes the movement of the buoyant units as per central command.
  • The lower section of the leg is equal with a concave section (20) designed to fit onto the mud-line driven pile. Each of the buoyant units (6 a, 6 b, 6 c) area equipped with the identical equipment. The control of the buoyant unit is a decision in which the vessel captain employs due to the sea action.
  • On the vessel near the platform, the captain determines the sea heading. The captain adjusts the buoyant units (6 a, 6 b and 6 c) into the sea to avoid any lateral motion of the vessel. Only heave is being experienced by the vessel.
  • The captain then positions the vessel above the pre-driven support piles to conduct the mounting process.
  • The vessel is considered to be a tripod unit providing equally-spaced buoyant units. FIG. 7 illustrates a frontal view of the vessel showing two of the three buoyant units (6 a and 6 b).
  • The arrangement of the pilot house (3) is illustrated. The lifting system shown: Bearing assembly (7), jacking tower (8) and jacking leg (2) is seen in the arrangement.
  • The captain has visual contact with all components of the boarding vessel. The prime mover (15) is within the area in which the captain performs the control operation.
  • FIG. 9 illustrates the structural member which attaches the buoyant units (6 a, 6 b and 6 c). The structural member is of sufficient size to allow human access to all areas of the vessel.
  • The basic purpose of the vessel allows a stabilized platform to board a fixed offshore platform.
  • FIG. 9 illustrates the invention in an operational mode. The advantages of this vessel are as follows:
  • Provide stable platform to perform boarding and general offshore operations without the effect of the sea action.
  • Provide buoyant units which allow the vessel to experience only a heave motion.
  • Lifting legs are provided to raise the vessel above the sea action wherein the vessel is mounted onto stable pre-driven piles.
  • Typical operations require that a lift boat be pre-loaded prior to operation. This procedure allows a test which indicates that the vessel can be operated considering that the structural strength of the soils can withstand the load. The invention avoids this process allowing a greater cost efficiency of the process.
  • The invention teaches a method of offshore operation which provides a safe and efficient method to board offshore fixed platforms. The ability to board the platform is paramount. The invention can provide the vessel captain a greater ability to operate the lift vessel in harsh seas.

Claims (7)

What is claimed is:
1. A downhole drilling system for drilling micro-holes in earth formations comprising:
a surface control unit which programs the action of the downhole tool and provides high-pressure fluid pressure to the downhole tool which in turn, by robotic action, parts the casing and drills a micro-hole to a general location, which is pre-programmed from the surface for the enhancement of oil and gas production.
a. A marine vessel which can provide a method to operate offshore in a harsh weather condition comprising of:
b. A vessel which provides a stable work platform without the effect of sea action.
c. A vessel which can control the vessel when in the sea action which allows only a heave action to be subjected to the vessel.
2. To provide a method in which the vessel can be placed into operation without costly pre-loading.
3. A vessel of claim 1 which provides buoyant units which all fully operate to adjust the basic principles of the vessel employing the adjustment system which is controlled by the vessel captain.
4. The vessel of claim 1 to provide jacking legs which are mounted through the buoyant units and upon command, the captain can lift the vessel from the sea level.
5. The vessel of claim 1 allows the operation of the vessel when underway to operate as a standard marine vessel with respect to navigation, docking and other standard marine operation procedures.
6. The vessel of claim 1 provides a central prime mover service which provides power to the three buoyant, adjustable units.
7. The invention is a marine vessel which can provide certain qualities which are used in the offshore operations in a harsh sea state allowing the vessel captain to depart a safe harbor traveling to the offshore location, adjusting the buoyant units to remain yawing of the vessel, providing only a heave action, docking the vessel onto pre-driven support units and lifting the vessel without pre-loading to the desired work height above the sea action providing a static platform to perform operations.
US13/875,077 2012-05-01 2013-05-01 Lift/Boarding Vessel Abandoned US20130315677A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/875,077 US20130315677A1 (en) 2012-05-01 2013-05-01 Lift/Boarding Vessel

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201261687770P 2012-05-01 2012-05-01
US13/875,077 US20130315677A1 (en) 2012-05-01 2013-05-01 Lift/Boarding Vessel

Publications (1)

Publication Number Publication Date
US20130315677A1 true US20130315677A1 (en) 2013-11-28

Family

ID=49621726

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/875,077 Abandoned US20130315677A1 (en) 2012-05-01 2013-05-01 Lift/Boarding Vessel

Country Status (1)

Country Link
US (1) US20130315677A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104554638A (en) * 2015-01-07 2015-04-29 无锡德林船舶设备有限公司 Bridge device
CN104627321A (en) * 2015-01-07 2015-05-20 无锡德林船舶设备有限公司 Cab of intermediate device
CN105568949A (en) * 2016-03-07 2016-05-11 上海尚鉴机械工程有限公司 Leveling method for self-elevating offshore platform
US20170002534A1 (en) * 2015-06-23 2017-01-05 Bennett Offshore System and Method for Improving A Jack Up Platform with Asymmetric Cleats
CN106988291A (en) * 2017-03-29 2017-07-28 中国海洋石油总公司 The method that jacket is repaired at sea

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3872679A (en) * 1973-12-21 1975-03-25 Chevron Res Apparatus and method for reducing the forces on extendible legs of a floating vessel
US6499914B1 (en) * 1998-11-23 2002-12-31 Philip J. Patout Movable self-elevating artificial work island with modular hull
US20040237871A1 (en) * 1999-11-12 2004-12-02 Moise Benjamin Clay Lift boat
US20130189038A1 (en) * 2010-03-19 2013-07-25 National Oilwell Varco, L.P. Jack-Up Rig with Leg-Supported Ballast Loads
US20130322969A1 (en) * 2010-06-29 2013-12-05 Fugro Seacore Limited Fast transit self-elevating platforms

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3872679A (en) * 1973-12-21 1975-03-25 Chevron Res Apparatus and method for reducing the forces on extendible legs of a floating vessel
US6499914B1 (en) * 1998-11-23 2002-12-31 Philip J. Patout Movable self-elevating artificial work island with modular hull
US20040237871A1 (en) * 1999-11-12 2004-12-02 Moise Benjamin Clay Lift boat
US20130189038A1 (en) * 2010-03-19 2013-07-25 National Oilwell Varco, L.P. Jack-Up Rig with Leg-Supported Ballast Loads
US20130322969A1 (en) * 2010-06-29 2013-12-05 Fugro Seacore Limited Fast transit self-elevating platforms

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104554638A (en) * 2015-01-07 2015-04-29 无锡德林船舶设备有限公司 Bridge device
CN104627321A (en) * 2015-01-07 2015-05-20 无锡德林船舶设备有限公司 Cab of intermediate device
US20170002534A1 (en) * 2015-06-23 2017-01-05 Bennett Offshore System and Method for Improving A Jack Up Platform with Asymmetric Cleats
US9903084B2 (en) * 2015-06-23 2018-02-27 Bennett Offshore, L.L.C. System and method for improving a jack up platform with asymmetric cleats
CN105568949A (en) * 2016-03-07 2016-05-11 上海尚鉴机械工程有限公司 Leveling method for self-elevating offshore platform
CN106988291A (en) * 2017-03-29 2017-07-28 中国海洋石油总公司 The method that jacket is repaired at sea

Similar Documents

Publication Publication Date Title
US20100067989A1 (en) Vessel for transporting wind turbines and methods thereof
US8689720B2 (en) Offshore equipment deploying and retrieving vessel
US20130315677A1 (en) Lift/Boarding Vessel
US20080247827A1 (en) Work-over rig assembly and methods thereof
CN102292261B (en) A vessel for transporting wind turbines and methods thereof
KR20100071070A (en) Vessels with roll damping mechanism
US9359047B2 (en) Mobile barge and method of operation of mobile barge
US20230392584A1 (en) Installation of a wind turbine on a floating foundation
WO2008152516A2 (en) Elevating support vessel and methods thereof
US20080237174A1 (en) Crane support apparatus and methods thereof
WO2013123383A1 (en) Stationary positioned offshore windpower plant (owp) and the methods and means for its assembling,transportation, installation and servicing
US11034417B2 (en) Floating catamaran production platform
RU2601086C2 (en) Method for mooring vessel and device for implementing this method
US20190276121A1 (en) Floating catamaran production platform
JP2020172872A (en) Semi-sub floating body and method for installing wind mill on ocean using semi-sub floating body
GB2474374A (en) Vessel with a motion-compensated platform for transferring personnel or equipment
WO2017204656A1 (en) A vessel and method of employing a vessel, e.g. in a process of maintaining or assembling an offshore windmill, and a related assembly
CA2837613C (en) Submersible apparatus and methods of installing anchoring equipment
WO2017141177A1 (en) Barge system
KR101267994B1 (en) Arrangement structure of bridge for offshore wind turbine installation vessel
KR20190043975A (en) Floating structure for salvage
Kim et al. A design of windmill turbine installation vessel using jack-up system
US9469384B2 (en) Variable stable drilling barge for shallow water service (inland and offshore)
US20220355907A1 (en) Systems and methods for a rack structure for a transport vessel adapted for use with an offshore self-elevating vessel
DK3255211T3 (en) Jack-bridge structure

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION