US20130276397A1 - Leak Locating Shingle - Google Patents

Leak Locating Shingle Download PDF

Info

Publication number
US20130276397A1
US20130276397A1 US13/452,833 US201213452833A US2013276397A1 US 20130276397 A1 US20130276397 A1 US 20130276397A1 US 201213452833 A US201213452833 A US 201213452833A US 2013276397 A1 US2013276397 A1 US 2013276397A1
Authority
US
United States
Prior art keywords
water
shingle
shingles
leak
body portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/452,833
Inventor
Cesario Gomez Campos
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US13/452,833 priority Critical patent/US20130276397A1/en
Publication of US20130276397A1 publication Critical patent/US20130276397A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/26Strip-shaped roofing elements simulating a repetitive pattern, e.g. appearing as a row of shingles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/29Means for connecting or fastening adjacent roofing elements
    • E04D1/2907Means for connecting or fastening adjacent roofing elements by interfitted sections
    • E04D1/2949Means for connecting or fastening adjacent roofing elements by interfitted sections having joints with fluid-handling feature, e.g. a fluid channel for draining

Definitions

  • the present invention relates to shingle tiles for roofing.
  • Roofers commonly utilize an asphalt shingle to protect a roof from weather and water damage.
  • shingles available in the prior art are three-tab shingles, in which a long shingle body has three tabs extending from a lower edge of the shingle. In installation, these shingles are placed side by side along a lower edge of a roof. After this lower row is installed, another row is installed above the lower row, with the tabs of the shingles in the upper row overlapping the shingles in the lower row. This process is completed until the entire roof is covered.
  • a leak locating shingle comprises a body portion of the shingle with three tabs extending from a lower edge of the shingle. The upper corners of the body portion are trimmed at approximately a 22.5° angle.
  • these shingles are placed side by side along a lower edge of a roof. After this lower row is installed, another row is installed above the lower row, with the tabs of the shingles in the upper row overlapping the shingles in the lower row. This process is completed until the entire roof is covered.
  • any water overflow occurs at the bottom of the water-trapping groove, causing the water to run over the top of the shingles. This limits the range of the water trail, and allows roof repair workers to more easily locate and repair the leak.
  • FIG. 1 depicts a three tab shingle of the prior art.
  • FIG. 2 depicts an example of an installation pattern of three tab shingles of the prior art, with a water trail extending from a leak source.
  • FIG. 3 depicts a leak locating shingle of the present invention.
  • FIG. 4 depicts an example of an installation pattern of leak locating shingles, with a water trail extending from a leak source.
  • FIG. 5 depicts the various layers of a cross-sectional view of a leak locating shingle.
  • each layer of a leak locating shingle 30 has a body portion 32 , typically thirty-six inches (91.4 cm) in length and seven inches (17.8 cm) in height.
  • Three tabs 34 extend from downward from the lower edge of the body portion 32 .
  • Each tab 34 is approximately twelve inches (30.5 cm) long and five inches (12.7 cm) in height, with a small gap 36 between each tab 34 .
  • the upper corners of the body portion 32 are trimmed at approximately a 22.5° angle, at a depth of one to three inches (2.5-7.6 cm), and a width of one half to one and one half inches (1.3-3.8 cm). These angled edges form a water-trapping groove 38 when the leak locating shingle 30 is placed adjacent to another leak locating shingle 30 .
  • a leak locating shingle 30 typically comprises three or more layers.
  • a first layer is typically a glass fiber reinforcing mat 50 , comprising fiberglass bonded with resin.
  • a second layer is typically an asphalt layer 52 .
  • a final layer typically comprises mineral or ceramic granules 54 .
  • leak locating shingles 30 are installed in an overlapping pattern, as shown. Leak locating shingles 30 are placed side by side along a lower edge of a roof to create a lower row. A next row of leak locating shingles 30 is then placed slightly approximately 5.5 inches (14.0 cm) higher and offset laterally approximately six inches (15.2 cm) to stagger the rows such that the tabs 34 of higher leak locating shingles 30 slightly cover the gaps 36 between the tabs 34 of lower leak locating shingles 30 . This process is repeated until the roof is substantially covered by leak locating shingles 30 .
  • This arrangement allows the trimmed corners of the body portion 32 of the leak locating shingles 30 to form a water-trapping grove 38 .
  • water passes through a leak source 20 and travels under a row of leak locating shingles 30 .
  • a water trail 22 travels from the leak source 20 along the top edge of the body portion 32 of the leak locating shingle 30 .
  • the water trail 22 stops its lateral movement as it pools in the water-trapping groove 38 .
  • the water begins to pass out of the water-trapping groove 38 near the bottom of the water-trapping groove 38 where the two adjacent leak locating shingles 30 meet.
  • the water trail 22 passes out of the water-trapping groove 38 over the leak locating shingles 30 and runs off the surface of the roof. In rare cases, however, the water trail 22 may pass out of the water-trapping groove 38 under the leak locating shingle 30 . In this case, the water trail 22 travels along the top edge of the body portion 32 of a leak locating shingle 30 beneath the first leak locating shingle 30 until it encounters a water-trapping groove 38 , as described above.
  • workers may be able to find the lateral location of the leak source 20 more easily with the leak locating shingle 30 .
  • the expulsion of the water trail 22 over the leak locating shingle 30 at the water-trapping groove 38 allows workers to quickly ascertain the lateral location of the leak source 20 within the length of one or two leak locating shingles 30 .
  • Quickly finding the location of the leak source 20 allows the workers to save labor hours in locating the leak source 20 and refrain from removing a significant number of leak locating shingles 30 when such removal would be unnecessary to repair the leak source 20 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

A leak locating shingle comprises a body portion of the shingle with three tabs extending from a lower edge of the shingle. The upper corners of the body portion are trimmed at an angle. When two leak locating shingles are placed side by side, a water-trapping groove is created where the trimmed upper corners meet. If a leak occurs, water runs along the top edge of a shingle, until it encounters a water-trapping groove where the flow of the water trail is interrupted, due to the loss of a continuous path along the upper edge of the shingles. As water accumulates in the water-trapping groove, any water overflow occurs at the bottom of the water-trapping groove, causing the water to run over the top of the shingles. This limits the range of the water trail, and allows roof repair workers to more easily locate and repair the leak.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • Not Applicable
  • STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT
  • Not Applicable
  • REFERENCE TO SEQUENCE LISTING, A TABLE, OR A COMPUTER PROGRAM LISTING COMPACT DISC APPENDIX
  • Not Applicable
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • The present invention relates to shingle tiles for roofing.
  • 2. Description of the Related Art
  • Roofers commonly utilize an asphalt shingle to protect a roof from weather and water damage. Among the various types of shingles available in the prior art are three-tab shingles, in which a long shingle body has three tabs extending from a lower edge of the shingle. In installation, these shingles are placed side by side along a lower edge of a roof. After this lower row is installed, another row is installed above the lower row, with the tabs of the shingles in the upper row overlapping the shingles in the lower row. This process is completed until the entire roof is covered.
  • Problems in this design arise when a leak forms in a shingle. Water will leak through the leak source and run along the top edge of a row of shingles. This water trail may extend for a considerable length of the roof. When roof repair workers attempt to find the source, this water trail may extend for dozens of feet in either direction from the leak source. This often creates a need to remove shingles along the entire length of the water trail in an attempt to locate the leak source. This frequently results in a loss of an excessive amount of labor and materials spent removing and replacing serviceable shingles.
  • A solution is needed to address one or more of these shortcomings in the prior art.
  • BRIEF SUMMARY OF THE INVENTION
  • A leak locating shingle comprises a body portion of the shingle with three tabs extending from a lower edge of the shingle. The upper corners of the body portion are trimmed at approximately a 22.5° angle.
  • During installation, these shingles are placed side by side along a lower edge of a roof. After this lower row is installed, another row is installed above the lower row, with the tabs of the shingles in the upper row overlapping the shingles in the lower row. This process is completed until the entire roof is covered.
  • When two leak locating shingles are placed side by side, a water-trapping groove is created where the trimmed upper corners meet. When a leak occurs, water runs along the top edge of a shingle. When the water trail encounters a water-trapping groove, the flow of the water trail is interrupted, due to the loss of a continuous path along the upper edge of the row of shingles.
  • As water begins to accumulate in the water-trapping groove, any water overflow occurs at the bottom of the water-trapping groove, causing the water to run over the top of the shingles. This limits the range of the water trail, and allows roof repair workers to more easily locate and repair the leak.
  • It should be understood that while this disclosure references three tab shingles, the system may likewise be used with dimensional shingles, architectural shingles, T-Lock shingles shingles, or other shingle type wherein the shingles are aligned with the top edge of the shingles in a row.
  • BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWING
  • FIG. 1 depicts a three tab shingle of the prior art.
  • FIG. 2 depicts an example of an installation pattern of three tab shingles of the prior art, with a water trail extending from a leak source.
  • FIG. 3 depicts a leak locating shingle of the present invention.
  • FIG. 4 depicts an example of an installation pattern of leak locating shingles, with a water trail extending from a leak source.
  • FIG. 5 depicts the various layers of a cross-sectional view of a leak locating shingle.
  • DETAILED DESCRIPTION OF THE INVENTION
  • Referring now to the drawings, a leak locating shingle 30 is constructed in layers. Referring to FIG. 3, each layer of a leak locating shingle 30 has a body portion 32, typically thirty-six inches (91.4 cm) in length and seven inches (17.8 cm) in height. Three tabs 34 extend from downward from the lower edge of the body portion 32. Each tab 34 is approximately twelve inches (30.5 cm) long and five inches (12.7 cm) in height, with a small gap 36 between each tab 34. The upper corners of the body portion 32 are trimmed at approximately a 22.5° angle, at a depth of one to three inches (2.5-7.6 cm), and a width of one half to one and one half inches (1.3-3.8 cm). These angled edges form a water-trapping groove 38 when the leak locating shingle 30 is placed adjacent to another leak locating shingle 30.
  • Referring now to FIG. 5, a leak locating shingle 30 typically comprises three or more layers. A first layer is typically a glass fiber reinforcing mat 50, comprising fiberglass bonded with resin. A second layer is typically an asphalt layer 52. A final layer typically comprises mineral or ceramic granules 54.
  • Referring now to FIG. 4, leak locating shingles 30 are installed in an overlapping pattern, as shown. Leak locating shingles 30 are placed side by side along a lower edge of a roof to create a lower row. A next row of leak locating shingles 30 is then placed slightly approximately 5.5 inches (14.0 cm) higher and offset laterally approximately six inches (15.2 cm) to stagger the rows such that the tabs 34 of higher leak locating shingles 30 slightly cover the gaps 36 between the tabs 34 of lower leak locating shingles 30. This process is repeated until the roof is substantially covered by leak locating shingles 30.
  • This arrangement allows the trimmed corners of the body portion 32 of the leak locating shingles 30 to form a water-trapping grove 38. In the event that a leak occurs, water passes through a leak source 20 and travels under a row of leak locating shingles 30. A water trail 22 travels from the leak source 20 along the top edge of the body portion 32 of the leak locating shingle 30. When the water trail 22 encounters a water-trapping groove 38, the water trail 22 stops its lateral movement as it pools in the water-trapping groove 38.
  • Once a sufficient amount of the water trail 22 has pooled in the water-trapping groove 38, the water begins to pass out of the water-trapping groove 38 near the bottom of the water-trapping groove 38 where the two adjacent leak locating shingles 30 meet.
  • Ideally, the water trail 22 passes out of the water-trapping groove 38 over the leak locating shingles 30 and runs off the surface of the roof. In rare cases, however, the water trail 22 may pass out of the water-trapping groove 38 under the leak locating shingle 30. In this case, the water trail 22 travels along the top edge of the body portion 32 of a leak locating shingle 30 beneath the first leak locating shingle 30 until it encounters a water-trapping groove 38, as described above.
  • In repairing a leak source 20, workers find the water trail 22 and attempt to follow the water trail 22 to the leak source 20. Referring to roof shingles 10 of the prior art, as depicted in FIG. 1, workers would have no way to locate the lateral location of the leak source 20, as depicted in FIG. 2. Workers typically would have to remove all roof shingles 10 along the lateral row of the leak source 20 until the leak source 20 was found.
  • Referring now to FIG. 4, workers may be able to find the lateral location of the leak source 20 more easily with the leak locating shingle 30. The expulsion of the water trail 22 over the leak locating shingle 30 at the water-trapping groove 38 allows workers to quickly ascertain the lateral location of the leak source 20 within the length of one or two leak locating shingles 30. Quickly finding the location of the leak source 20 allows the workers to save labor hours in locating the leak source 20 and refrain from removing a significant number of leak locating shingles 30 when such removal would be unnecessary to repair the leak source 20.
  • It should be understood that while this disclosure references three tab shingles, the system may likewise be used with dimensional shingles, architectural shingles, or T-Lock shingles, or other shingle type wherein the shingles are aligned with the top edge of the shingles in a row.

Claims (10)

I claim:
1. A shingle for roofing, comprising:
(A) a body portion; and
(B) at least one angled channel situated between a top edge and a side edge of the body portion.
2. The shingle of claim 1, wherein the body portion comprises three tabs extending downward from an upper portion of the body portion.
3. The shingle of claim 1, wherein the shingle is constructed of two or more layers.
4. The shingle of claim 3, wherein the layers comprise:
(A) at least one glass fiber reinforcing mat;
(B) at least one asphalt layer; and
(C) granules of either mineral or ceramic composition.
5. The shingle of claim 4, wherein the body portion comprises three tabs extending downward from an upper portion of the body portion.
6. A method of shingling a roof, comprising:
(A) providing shingles, the shingles comprising:
(i) a body portion, and
(ii) at least one angled channel situated between a top edge and a side edge of the body portion;
(B) affixing the shingles to a roof in multiple rows, the shingles being adjacent to each other in each row, wherein the tab of shingles in higher rows rest on top of the shingles in lower rows.
7. The method of claim 6 wherein the body portion comprises three tabs extending downward from an upper portion of the body portion.
8. The method of claim 6, wherein the shingle is constructed of two or more layers.
9. The shingle of claim 8, wherein the layers comprise:
(A) at least one glass fiber reinforcing mat;
(B) at least one asphalt layer; and
(C) granules of either mineral or ceramic composition.
10. The shingle of claim 9, wherein the body portion comprises three tabs extending downward from an upper portion of the body portion.
US13/452,833 2012-04-21 2012-04-21 Leak Locating Shingle Abandoned US20130276397A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/452,833 US20130276397A1 (en) 2012-04-21 2012-04-21 Leak Locating Shingle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US13/452,833 US20130276397A1 (en) 2012-04-21 2012-04-21 Leak Locating Shingle

Publications (1)

Publication Number Publication Date
US20130276397A1 true US20130276397A1 (en) 2013-10-24

Family

ID=49378816

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/452,833 Abandoned US20130276397A1 (en) 2012-04-21 2012-04-21 Leak Locating Shingle

Country Status (1)

Country Link
US (1) US20130276397A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441538A (en) * 2019-01-17 2020-07-24 田岛如福株式会社 Roof finishing material and roof reconstruction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441538A (en) * 2019-01-17 2020-07-24 田岛如福株式会社 Roof finishing material and roof reconstruction method

Similar Documents

Publication Publication Date Title
US9605432B1 (en) Interlocking roof shingle and roofing system
US9404260B2 (en) Roofing shingle system and shingles for use therein
CA2891787C (en) Roofing shingle system and shingles for use therein
CA2912880C (en) Roofing shingle system and shingles for use therein
US20080141609A1 (en) Pre-assembled shingle set and installation system
US8122649B2 (en) Interlocking tiles employing adjustable rain lock
CA1210559A (en) Roofing systems
US20130276397A1 (en) Leak Locating Shingle
US20190301160A1 (en) Multi-layer roofing shingles and methods for installing them
US20210270041A1 (en) Systems and Methods Related to Liquid Drainage
KR102228867B1 (en) Rooftop steel waterproofing system
US8869462B2 (en) Termination pocket for deck
EP2949829B1 (en) A device for inhibiting water ingress in a roof
US20200256056A1 (en) Interlocking Roofing Panels
US10801209B2 (en) Short penetration flashing, flashing systems and methods for installing them
SE439513B (en) CEILING
US11124967B2 (en) Reroofing shingle
US20040128929A1 (en) Roof ridge cover system
US20190301161A1 (en) Reduced weight, multi-layer roofing shingles and methods for installing them
JP5626979B2 (en) Roof structure
CN104863311A (en) Waterproofing treatment construction method for metal roof trepanning
KR101654781B1 (en) Moisture exhaust induction waterproof system and method of the structure
KR20130001581A (en) Water proof execution method of the construction structure
US11097311B2 (en) Hybrid layered structure, method and system including same
US11927014B2 (en) Bituminous tile with sealing engagement devices delimiting positioning areas of the anchoring nails

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION