US20130212972A1 - Tower and wind turbine generator - Google Patents

Tower and wind turbine generator Download PDF

Info

Publication number
US20130212972A1
US20130212972A1 US13/398,941 US201213398941A US2013212972A1 US 20130212972 A1 US20130212972 A1 US 20130212972A1 US 201213398941 A US201213398941 A US 201213398941A US 2013212972 A1 US2013212972 A1 US 2013212972A1
Authority
US
United States
Prior art keywords
tower
connecting member
section
tower section
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/398,941
Inventor
Minoru Kawabata
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to US13/398,941 priority Critical patent/US20130212972A1/en
Assigned to MITSUBISHI HEAVY INDUSTRIES, LTD. reassignment MITSUBISHI HEAVY INDUSTRIES, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: KAWABATA, MINORU
Publication of US20130212972A1 publication Critical patent/US20130212972A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • E04H12/085Details of flanges for tubular masts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/18Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic
    • E04H12/185Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic with identical elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/91Mounting on supporting structures or systems on a stationary structure
    • F05B2240/912Mounting on supporting structures or systems on a stationary structure on a tower
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Definitions

  • the present invention relates to a tower and a wind turbine generator provide with the tower.
  • a tower in a wind turbine generator is constructed by stacking and connecting a plurality of tubular tower sections in the vertical direction on a construction site. This is because a tower having several tens of meters in length is used for such as a wind turbine generator, and thus it is difficult to transport a completed tower to a construction site. For this reason, the tower is transported to the construction site in a state in which the tower is divided into the tower sections of transportable sizes.
  • Patent Literature 1 an axial end of each tower section has a flange, and a tower is constructed by joining the flanges.
  • Patent Literature 1 connection of the tower sections by flange joint as disclosed in Patent Literature 1 has the following problem.
  • Patent Literature 1 proposes connection of the tower sections by frictional joint.
  • a high assembling accuracy is required to vertically install the vertical tower by directly connecting wall surfaces constituting the outer shape of the tower sections to each other.
  • the cylindrical tower section is molded by rounding and joining a steel plate. According to the manufacturing method, it is difficult to make the cross section a perfect circle.
  • the upper and lower tower sections having the cross section of non-perfect circle are butted each other, a misalignment between the tower sections is easy to be generated.
  • a high manufacturing accuracy is required to sufficiently reduce the misalignment. That is, implementation of the invention described in Patent Literature 2 leads to an increase in manufacturing costs.
  • Patent Literature 3 discloses a configuration in which vertical frames and horizontal frames provided on wall surfaces of the tower sections, in place of the walls surfaces of the tower sections, are frictionally joined to each other.
  • Patent Literature 3 discloses a configuration in which vertical frames and horizontal frames provided on wall surfaces of the tower sections, in place of the walls surfaces of the tower sections, are frictionally joined to each other.
  • temporary assembling needs to be performed in a factory to ensure the assembling accuracy on the construction site, disadvantageously leading to an increase in manufacturing costs.
  • the present invention is made in consideration of the above-mentioned situation and intends to provide a tower that includes a junction having a sufficient yield strength and that can easily ensure the accuracy of tower sections to be used, as well as to provide a wind turbine generator having the tower.
  • the present invention adopts the following solutions.
  • a tower according to the present invention is a tower configured by stacking a plurality of tower sections in a vertical direction and connecting the tower sections to each other.
  • the tower includes a connecting member arranged in the tower section, the connecting member dividing an inside of the tower section into a plurality of regions in a horizontal plane, and having one end connected to an inner wall of the tower section and the other end connected to the inner wall of the tower section or another connecting member, and a frictional joint part for connecting by frictional joint the connecting member to another connecting member connected to another adjacent tower section.
  • the connecting members provided in the respective tower sections are restricted each other by use of the frictional joint part for performing connection by frictional joint, the connecting operation using the frictional joint part can be performed in the inside of the tower. For this reason, the amount of operations at high elevations requiring, for example, scaffolding in the outside of the tower can be reduced, thereby increasing safety.
  • the connecting member is provided so as to divide the inner region of the tower section into the plurality of regions, the section modulus of the tower section can be increased, and thus the rigidity of the tower section itself can be improved.
  • the connecting members connected to each other by frictional joint denote the connecting member provided in each of the two adjacent upper and lower tower sections 2 .
  • a splice plate installed in contact with the connecting member and a fastening bolt are generally used.
  • the connecting member is in a shape of a flat plate.
  • the connecting member in the shape of a flat plate, a higher manufacturing accuracy than that of the cylindrical outer wall surface of the tower section can be ensured. This can reduce a misalignment between the connecting members in position in connecting the tower section to each other.
  • the connecting member in the shape of a flat plate the splice plate in close contact with the connecting member can be in a shape of a flat plate, thereby easily ensuring a sufficiently high manufacturing accuracy.
  • an operating manhole is formed in the connecting member.
  • the connecting member is in the shape of a flat plate, by forming the operating manhole in the connecting member, the operator and so on can pass through the connecting member even in operations in the tower section divided by the connecting member, which improves the workability.
  • the connecting member may extend to a position other than a centroid of a horizontal cross section of the tower section.
  • a central region containing the centroid of the cross section of the tower section can be made a vacant region.
  • an elevator for transporting the operator and equipment necessary for operating the facility at maintenance or the like can be installed in this space, and when the tower is applied to the wind turbine generator, the wind turbine generator can be operated more easily.
  • the tower sections on the lower side of the tower may be connected to each other by use of the connecting members, and the tower sections on the upper side of the tower may be connected to each other by use of flanges provided at respective ends.
  • a bending moment generated in the tower due to effect of the wind force and so on becomes larger as it is closer to the lower side of the tower, that is, the foundation part.
  • the yield strength as a force necessary for keeping connection between the tower sections becomes larger.
  • connection using the connecting members according to the present invention is suitable, and at the junction between the tower sections, which is relatively close to the top of the tower, the bending moment becomes relatively small. For this reason, a force necessary for maintaining connection between the tower sections becomes smaller.
  • the tower sections may be connected to each other by use of the flanges provided at respective ends as conventional.
  • the bolts are arranged along the outer periphery of the tower, the number of installed bolts can be minimized. Further, when the connecting member and the splice plate are not used, the weight of the upper portion of the tower can be reduced and the thickness of the wall surface of the tower can be minimized.
  • the connecting member may be arranged to be in a shape of a cross when viewing the tower section in the horizontal plane (in a horizontal cross sectional view).
  • the connecting member may include a plurality of connecting members that extend in one direction to have both ends connected to the inner wall of the tower section and that are in parallel to each other.
  • the connecting member may include a first connecting member that extends in one direction to have both ends connected to the inner wall of the tower section, and a second connecting member may have one end connected to the inner wall of the tower section and the other end connected to a substantially midpoint of the first connecting member to form a substantially right angle with the first connecting member.
  • the connecting member may include a plurality of connecting members that each extend in one direction to have one end connected to the inner wall of the tower section, and that have the other ends, respectively, connected to each other.
  • the connecting member may be a plurality of connecting members that extend in one direction to have both ends connected to the inner wall of the tower section, and the plurality of connecting members may be arranged to form a polygonal shape in contact with the inner wall of the tower section when viewing the tower section in a horizontal plane (in a horizontal cross sectional view).
  • the present invention may be a wind turbine generator having the above-mentioned tower.
  • the junction has a sufficient yield strength, and the accuracy of the used tower sections can be easily ensured. As a result, it is possible to realize a large-sized wind turbine generator requiring a large yield strength at the junction between the tower sections, and to reduce costs necessary for construction of the wind turbine generator.
  • FIG. 1 is a side view showing a schematic configuration of the whole of the wind turbine generator
  • FIG. 2 is a perspective view showing an upper portion of a tower section of the wind turbine generator in accordance with an embodiment of the present invention
  • FIG. 3 is a side view showing a junction between the tower sections shown in FIG. 2 ;
  • FIG. 4 is a plan view showing the tower section shown in FIG. 2 ;
  • FIG. 5 is a plan view showing a tower section in accordance with first Modified Example
  • FIG. 6 is a plan view showing a tower section in accordance with second Modified Example
  • FIG. 7 is a plan view showing a tower section in accordance with third Modified Example.
  • FIG. 8 is a plan view showing a tower section in accordance with fourth Modified Example.
  • FIG. 9 is a plan view showing a tower section in accordance with fifth Modified Example.
  • FIG. 10 is a plan view showing a tower section in accordance with sixth Modified Example.
  • FIG. 11 is a plan view showing a tower section in accordance with seventh Modified Example.
  • FIG. 12 is a plan view showing a junction to which a connecting beam in place of the connecting wall shown in FIG. 3 is applied.
  • the wind turbine generator 1 includes a tower 3 vertically installed on a foundation B, a nacelle 6 installed at an upper end of the tower 3 and a rotor head 4 provided at the nacelle 6 so as to be rotatable about a substantially parallel axis.
  • a plurality of (for example, three) rotational blades 5 are radially attached to the rotor head 4 about the rotational axis. Thereby the force of the wind on the rotational blades 5 from the rotational axis of the rotor head 4 is converted into power for rotating the rotor head 4 about the rotational axis.
  • the tower 3 is configured by stacking a plurality of cylindrical tower sections 2 in the vertical direction and connecting the tower sections 2 to each other.
  • connecting walls (connecting members) 20 in the shapes of flat plates, having side ends fixedly attached to an inner periphery of the tower section 2 by welding are provided.
  • the connecting walls 20 are arranged so as to divide the inside of the tower section 2 into a plurality of regions on a horizontal plane.
  • the connecting walls 20 are provided so that the tower section 2 is in a shape of a cross viewed in a horizontal cross sectional, and thus the inside of the tower section 2 is divided into four spaces.
  • the vertically adjacent tower sections 2 are connected to each other by frictional joint. Specifically, the tower sections 2 are fastened by use of high-tensile bolts (frictional joint part) 24 so that splice plates (frictional joint part) 22 extending over the connecting walls 20 provided in the vertically adjacent tower sections 2 are brought into close contact with the connecting walls 20 from both the surfaces thereof and pressed onto the connecting walls 20 to cause a frictional force.
  • the connecting walls 20 are provided on a lower end side and an upper end side of each tower section 2 .
  • a stage 30 formed of a circular planar member is provided below the connecting walls 20 provided in the lower tower section 2 in contact with the junction.
  • An outer edge of the stage 30 is fixed to an inner wall of the tower section 2 by welding.
  • the stage 30 is provided with an opening that passes a ladder (not shown) or an elevator (not shown) in a tower 3 therethrough. For this reason, the workability is improved, but movement of persons and objects in the tower is not interfered.
  • An operating manhole 32 is formed in a lower portion of the connecting wall 20 . Thereby, in operations within the tower sections 2 divided by the connecting walls 20 , operator can pass through the connecting walls 20 , improving the workability.
  • Flanges 34 are provided at both upper and lower ends on the outer wall surface of the tower section 2 .
  • the flanges 34 can receive a load caused in stacking the tower sections 2 .
  • an elastic body such as rubber and resin not shown may be inserted into the gap between the tower sections 2 or may apply a calking agent to the gap.
  • the flanges 34 may be omitted.
  • a thickness of the splice plate 22 is, for example, about 50% of a thickness of the wall surface of the tower section 2 .
  • the thickness of the wall surface of the tower section 2 becomes larger as it is closer to the bottom of the tower 3 , and the thickness of the wall surface in the vicinity of the junction between the lowermost tower sections 2 is about 50 mm.
  • the thickness of the splice plate 22 used in this junction is about several tens of mm (for example, 15 mm).
  • a height of the splice plate 22 can be adjusted according to an installation area of the high-tensile bolts 24 required to obtain the frictional force corresponding to the bending force generated in the tower 3 . Since the degree of freedom in installing the high-tensile bolts 24 is high as described above, the number of bolts can be appropriately adjusted and widely circulated and low-cost bolts such as M16 and M20 can be used. Although a hexagonal bolt is generally used as the high-tensile bolt 24 , a torque shear type bolt may be used in place of the hexagonal bolt. By using the torque shear type bolt, the construction performance can be further improved.
  • the fastening operation of the high-tensile bolts 24 can be performed within the tower section 2 . For this reason, the fastening operation of the high-tensile bolts 24 in the outside of the tower 3 can be prevented, and touch-up coating of the externally exposed high-tensile bolts 24 can be omitted. This can reduce the amount of the operator's operations at high elevations.
  • the connecting walls 20 Since members in the shapes of flat plates are used as the connecting walls 20 , it is possible to reduce a misalignment between the connecting walls 20 butted in connecting the tower sections 2 to each other. Further, by using the members in the shapes of flat plates as the connecting walls 20 , the splice plates 22 brought into close contact with the connecting walls 20 can have the shapes of flat plates, and therefore the operation of bringing the connecting walls 20 into close contact with the splice plates 22 is also easily performed, which is excellent in workability. As a result, construction costs can be reduced.
  • the connecting walls 20 are provided so as to divide the region in the tower section 2 into a plurality of regions, the section modulus of the tower section 2 can be increased, thereby increasing the rigidity of the tower section 2 itself.
  • the bending moment generated in the tower 3 due to the effect of the wind force and so on becomes larger as it is closer to the lower side of the tower 3 , that is, the foundation B.
  • a force necessary for maintaining connection between the tower sections 2 becomes larger.
  • connection using the connecting walls 20 is suitable, and at the junction between the tower sections 2 a and 2 b, which is relatively close to the top of the tower 3 , the bending moment becomes relatively small. As a result, the force necessary for maintaining connection between the tower sections 2 becomes small.
  • the tower sections 2 may be connected to each other only by conventional flange joint.
  • the bolts are arranged along the outer periphery of the tower 3 , the number of bolts installed bolts can be minimized.
  • the connecting walls 20 and the splice plates 22 are not used, the weight of the upper portion of the tower 3 can be reduced and the thickness of the wall surface of the tower 3 can be minimized.
  • the present invention is not limited to connection between the tower sections only by flange joint or only by frictional joint, and flange joint and frictional joint may be used in combination as needed.
  • Positions of the connecting walls 20 may be changed as follows.
  • connecting walls 20 that extend in one direction to have both ends connected to the inner wall of the tower section 2 are arranged in parallel to one another.
  • the connecting walls 20 By arranging the connecting walls 20 in this manner, the rigidity of the junction between the tower sections 2 in a certain direction can be improved. Further, using one connecting walls 20 as a reference, another connecting walls 20 can be positioned.
  • one connecting wall 20 upon connecting between the tower sections 2 , a misalignment caused in butting the connecting walls 20 can be minimized.
  • the tower can be easily configured.
  • the connecting wall 20 orthogonal to the three connecting walls 20 arranged in parallel may be provided.
  • the fourth connecting wall 20 it is possible to increase the rigidity of the junction between the tower sections 2 also in the direction orthogonal to the direction in which the rigidity of the junction is improved by the other three connecting walls 20 .
  • a first connecting wall (first connecting member) 20 that passes the center of the cross section of the tower section 2 in a horizontal plane and that has both ends connected to the inner wall of the tower section 2 is arranged.
  • Another second connecting wall (second connecting member) 20 connected to the substantially midpoint of the first connecting wall 20 so as to form a substantially right angle with the first connecting wall 20 is further arranged in the tower section 2 .
  • the inner region of the tower section 2 is divided into two by the diameter and no connecting wall 20 exists in one of the divided regions, a relatively large space in the tower section 2 can be ensured. That is, since a large vertically-penetrating space can be ensured, the elevator for transporting the operator and equipment necessary for operating the facility at maintenance or the like can be installed in this space, and when the tower is applied to the wind turbine generator, the wind turbine generator can be operated more easily.
  • three connecting walls 20 are arranged so as to divide the inner region in the tower section 2 into three substantially equally in a horizontal plane.
  • One end of each of the three connecting walls 20 is connected to the inner wall of the tower section 2 .
  • the other ends of the three connecting walls 20 are connected to one another at the center of the cross section of the tower section 20 .
  • the connecting walls 20 By arranging the connecting walls 20 in this manner, the shape of the connecting walls 20 can be made uniform, thereby reducing manufacturing costs.
  • the connecting walls 20 are arranged as in second Modified Example (refer to FIG. 6 ), but this example is different from second Modified Example in that the connecting walls 20 do not pass the center (centroid) O of the cross section of the tower section 2 .
  • first connecting wall (first connecting member) 20 a extending in the vertical direction in this figure and a second connecting wall (second connecting member) 20 b extending in the horizontal direction in this figure so as to be orthogonal to the first connecting wall 20 a are provided.
  • the second connecting wall 20 b is offset from the center O toward the first connecting wall 20 a.
  • an elevator for transporting the operator and equipment necessary for operating the facility at maintenance or the like can be installed, and when the tower is applied to the wind turbine generator, the wind turbine generator can be operated more easily.
  • the connecting walls 20 are arranged as in third Modified Example (refer to FIG. 7 ), but this example is different from third Modified Example in that the three connecting walls 20 are connected to one another at a point other than the center of the cross section of the tower section 2 .
  • a connecting wall 20 c extending in the vertical direction in this figure and connecting walls 20 d and 20 e that are connected to an end (lower end in this figure) of the connecting wall 20 c and extend in diagonal directions in this figure are provided.
  • a connection point of these connecting walls 20 c, 20 d, and 20 e is offset from the center O toward the connecting walls 20 c.
  • the connecting walls 20 are arranged so as to form a rectangle (polygon) in contact with the inner surface of the tower section 2 .
  • the connecting walls 20 are arranged so as to form a triangle (polygon) in contact with the inner surface of the tower section 2 .
  • the rectangle is used in sixth Modified Example and the triangle is used in seventh Modified Example, a polygon of pentagon or more can be similarly adopted.
  • the length of sides of the polygon is not necessarily uniform and may be appropriately changed.
  • the connecting wall 20 may be arranged at any position parallel to any side of the polygons.
  • the tower applied to the wind turbine generator has been described in the above-mentioned embodiment and Modified Examples, the tower according to the present invention is not necessarily applied to the wind turbine generator.
  • the tower according to the present invention can be preferably applied to tower-like structures such as a lighthouse and a radio tower.
  • the connecting member is described as the connecting wall in the shape of a flat plate in this embodiment, the connecting member is not necessarily limited to a flat plate.
  • the connecting member can be in a shape of a member such as a beam that is lower than the above-mentioned connecting wall in height, or a plate having curvature or irregularity.
  • a horizontally long connecting beam 21 that is lower than the connecting wall 20 in FIG. 3 in height may be used.
  • the tower according to the present invention and the wind turbine generator having the tower are not limited to the above-mentioned embodiment and may be appropriately changed so as not to deviate from the subject matter.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Sustainable Energy (AREA)
  • Structural Engineering (AREA)
  • Sustainable Development (AREA)
  • Civil Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Wind Motors (AREA)

Abstract

A tower that includes a junction having a sufficient yield strength and can easily ensure the accuracy of used tower sections, and a wind turbine generator having the tower, are provided. The tower configured by stacking a plurality of tower sections in a vertical direction and connecting the tower sections to each other includes a connecting member arranged in the tower section, the connecting member dividing an inside of the tower section into a plurality of regions in a horizontal plane, and having at least one end connected to an inner wall of the tower section, and a frictional joint part for connecting by frictional joint the connecting member to another connecting member connected to another adjacent tower section.

Description

    BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • The present invention relates to a tower and a wind turbine generator provide with the tower.
  • 2. Description of Related Art
  • Generally, a tower in a wind turbine generator is constructed by stacking and connecting a plurality of tubular tower sections in the vertical direction on a construction site. This is because a tower having several tens of meters in length is used for such as a wind turbine generator, and thus it is difficult to transport a completed tower to a construction site. For this reason, the tower is transported to the construction site in a state in which the tower is divided into the tower sections of transportable sizes.
  • Generally, as disclosed in PCT International Publication No. WO 2009/028092 A1 (hereinafter referred to as “Patent Literature 1”), an axial end of each tower section has a flange, and a tower is constructed by joining the flanges.
  • BRIEF SUMMARY OF THE INVENTION
  • However, the connection of the tower sections by flange joint as disclosed in Patent Literature 1 has the following problem.
  • When receiving a wind force, the tower is bent, applying a load on a member that keeps binding at the junction between the tower sections. Although the yield strength required to address the load increases with an increase in size of the wind turbine generator, it is difficult to make the outer diameter of the tower larger than the existing size due to limitation upon transport. Under such a situation, in the case of a flange joint as disclosed in Patent Literature 1, the outer diameter of the flange is also limited by the outer diameter of the tower having limitation upon transport, and thus it is difficult to increase the number of bolts arranged at the flange. As a result, further improvement in the yield strength of the flange junction cannot be expected, and it has become difficult to meet a required yield strength.
  • Specification of U.S. Patent Application Publication No. US 2010/0071275 A1 (hereinafter referred to as “Patent Literature 1”) proposes connection of the tower sections by frictional joint. However, a high assembling accuracy is required to vertically install the vertical tower by directly connecting wall surfaces constituting the outer shape of the tower sections to each other. Further, the cylindrical tower section is molded by rounding and joining a steel plate. According to the manufacturing method, it is difficult to make the cross section a perfect circle. When the upper and lower tower sections having the cross section of non-perfect circle are butted each other, a misalignment between the tower sections is easy to be generated. A high manufacturing accuracy is required to sufficiently reduce the misalignment. That is, implementation of the invention described in Patent Literature 2 leads to an increase in manufacturing costs.
  • Specification of U.S. Patent Application Publication No. US 2011/0138729 A1 (hereinafter referred to as “Patent Literature 3”) discloses a configuration in which vertical frames and horizontal frames provided on wall surfaces of the tower sections, in place of the walls surfaces of the tower sections, are frictionally joined to each other. However, with the complicated configuration having a lot of junctions, temporary assembling needs to be performed in a factory to ensure the assembling accuracy on the construction site, disadvantageously leading to an increase in manufacturing costs.
  • Thus, in achieving an increase in the wind turbine generator in size without causing a substantial increase in costs, there is a demand for a connection structure for the tower sections having yield strength necessary for the junction of the tower sections.
  • The present invention is made in consideration of the above-mentioned situation and intends to provide a tower that includes a junction having a sufficient yield strength and that can easily ensure the accuracy of tower sections to be used, as well as to provide a wind turbine generator having the tower.
  • To solve the above-mentioned problems, the present invention adopts the following solutions.
  • A tower according to the present invention is a tower configured by stacking a plurality of tower sections in a vertical direction and connecting the tower sections to each other. The tower includes a connecting member arranged in the tower section, the connecting member dividing an inside of the tower section into a plurality of regions in a horizontal plane, and having one end connected to an inner wall of the tower section and the other end connected to the inner wall of the tower section or another connecting member, and a frictional joint part for connecting by frictional joint the connecting member to another connecting member connected to another adjacent tower section.
  • According to the present invention, in connecting the adjacent tower sections, since the connecting members provided in the respective tower sections are restricted each other by use of the frictional joint part for performing connection by frictional joint, the connecting operation using the frictional joint part can be performed in the inside of the tower. For this reason, the amount of operations at high elevations requiring, for example, scaffolding in the outside of the tower can be reduced, thereby increasing safety.
  • When outer wall surfaces constituting the outer shape of the plurality of tower sections need to be butted and directly connected to each other, it is required to match the shapes of the outer wall surfaces of the tower sections with each other at a high accuracy. On the contrary, according to the present invention, since the tower sections are connected to each other via the connecting members provided in the tower sections, the tower sections can be connected to each other without requiring a high accuracy so much. This is because it is no need to match the shapes of the outer wall surfaces of the tower sections with each other throughout their circumferences, positions of the connecting members of the upper and lower tower sections only need to match to the extent that the connecting members can be connected to each other.
  • Since the connecting member is provided so as to divide the inner region of the tower section into the plurality of regions, the section modulus of the tower section can be increased, and thus the rigidity of the tower section itself can be improved.
  • In the case where the frictional joint part is exposed external of the tower, in order to improve weather resistance, treatment such as touch-up coating may be needed. However, according to the present invention, since the frictional joint part exists within the tower, the treatment for improving the weather resistance of the frictional joint part can be omitted.
  • At a junction between the vertically stacked tower sections, the connecting members connected to each other by frictional joint denote the connecting member provided in each of the two adjacent upper and lower tower sections 2. As the frictional joint part, a splice plate installed in contact with the connecting member and a fastening bolt are generally used.
  • In the above-mentioned invention, it is preferred that the connecting member is in a shape of a flat plate.
  • By making the connecting member in the shape of a flat plate, a higher manufacturing accuracy than that of the cylindrical outer wall surface of the tower section can be ensured. This can reduce a misalignment between the connecting members in position in connecting the tower section to each other. In addition, by adopting the connecting member in the shape of a flat plate, the splice plate in close contact with the connecting member can be in a shape of a flat plate, thereby easily ensuring a sufficiently high manufacturing accuracy.
  • In the above-mentioned invention, it is preferred that an operating manhole is formed in the connecting member.
  • Even when the connecting member is in the shape of a flat plate, by forming the operating manhole in the connecting member, the operator and so on can pass through the connecting member even in operations in the tower section divided by the connecting member, which improves the workability.
  • In the above-mentioned invention, the connecting member may extend to a position other than a centroid of a horizontal cross section of the tower section.
  • Since the connecting member extends on the position other than the centroid (center in the case of the circular cross section) of the horizontal cross section of the tower section, as compared to the case where the connecting member extends on the centroid of the cross section of the tower section, a central region containing the centroid of the cross section of the tower section can be made a vacant region.
  • By providing a space vertically penetrating the tower, which corresponds to this vacant region, an elevator for transporting the operator and equipment necessary for operating the facility at maintenance or the like can be installed in this space, and when the tower is applied to the wind turbine generator, the wind turbine generator can be operated more easily.
  • In the above-mentioned invention, the tower sections on the lower side of the tower may be connected to each other by use of the connecting members, and the tower sections on the upper side of the tower may be connected to each other by use of flanges provided at respective ends.
  • A bending moment generated in the tower due to effect of the wind force and so on becomes larger as it is closer to the lower side of the tower, that is, the foundation part. As this bending moment is larger, the yield strength as a force necessary for keeping connection between the tower sections becomes larger. At the junction between the tower sections, which is relatively close to the foundation part of the tower, connection using the connecting members according to the present invention is suitable, and at the junction between the tower sections, which is relatively close to the top of the tower, the bending moment becomes relatively small. For this reason, a force necessary for maintaining connection between the tower sections becomes smaller. Thus, at the junction between the tower sections, which is relatively close to the top of the tower, for example, the tower sections may be connected to each other by use of the flanges provided at respective ends as conventional. With such a configuration, since the bolts are arranged along the outer periphery of the tower, the number of installed bolts can be minimized. Further, when the connecting member and the splice plate are not used, the weight of the upper portion of the tower can be reduced and the thickness of the wall surface of the tower can be minimized.
  • In the above-mentioned invention, the connecting member may be arranged to be in a shape of a cross when viewing the tower section in the horizontal plane (in a horizontal cross sectional view).
  • Alternatively, the connecting member may include a plurality of connecting members that extend in one direction to have both ends connected to the inner wall of the tower section and that are in parallel to each other.
  • Alternatively, the connecting member may include a first connecting member that extends in one direction to have both ends connected to the inner wall of the tower section, and a second connecting member may have one end connected to the inner wall of the tower section and the other end connected to a substantially midpoint of the first connecting member to form a substantially right angle with the first connecting member.
  • Alternatively, the connecting member may include a plurality of connecting members that each extend in one direction to have one end connected to the inner wall of the tower section, and that have the other ends, respectively, connected to each other.
  • Alternatively, the connecting member may be a plurality of connecting members that extend in one direction to have both ends connected to the inner wall of the tower section, and the plurality of connecting members may be arranged to form a polygonal shape in contact with the inner wall of the tower section when viewing the tower section in a horizontal plane (in a horizontal cross sectional view).
  • The present invention may be a wind turbine generator having the above-mentioned tower.
  • By providing the tower, the junction has a sufficient yield strength, and the accuracy of the used tower sections can be easily ensured. As a result, it is possible to realize a large-sized wind turbine generator requiring a large yield strength at the junction between the tower sections, and to reduce costs necessary for construction of the wind turbine generator.
  • BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
  • FIG. 1 is a side view showing a schematic configuration of the whole of the wind turbine generator;
  • FIG. 2 is a perspective view showing an upper portion of a tower section of the wind turbine generator in accordance with an embodiment of the present invention;
  • FIG. 3 is a side view showing a junction between the tower sections shown in FIG. 2;
  • FIG. 4 is a plan view showing the tower section shown in FIG. 2;
  • FIG. 5 is a plan view showing a tower section in accordance with first Modified Example;
  • FIG. 6 is a plan view showing a tower section in accordance with second Modified Example;
  • FIG. 7 is a plan view showing a tower section in accordance with third Modified Example;
  • FIG. 8 is a plan view showing a tower section in accordance with fourth Modified Example;
  • FIG. 9 is a plan view showing a tower section in accordance with fifth Modified Example;
  • FIG. 10 is a plan view showing a tower section in accordance with sixth Modified Example;
  • FIG. 11 is a plan view showing a tower section in accordance with seventh Modified Example; and
  • FIG. 12 is a plan view showing a junction to which a connecting beam in place of the connecting wall shown in FIG. 3 is applied.
  • DETAILED DESCRIPTION OF THE INVENTION
  • An embodiment of a tower in a wind turbine generator according to the present invention will be described below with reference to the drawings.
  • As shown in FIG. 1, the wind turbine generator 1 includes a tower 3 vertically installed on a foundation B, a nacelle 6 installed at an upper end of the tower 3 and a rotor head 4 provided at the nacelle 6 so as to be rotatable about a substantially parallel axis. A plurality of (for example, three) rotational blades 5 are radially attached to the rotor head 4 about the rotational axis. Thereby the force of the wind on the rotational blades 5 from the rotational axis of the rotor head 4 is converted into power for rotating the rotor head 4 about the rotational axis.
  • The tower 3 is configured by stacking a plurality of cylindrical tower sections 2 in the vertical direction and connecting the tower sections 2 to each other.
  • As shown in FIG. 2, in the tower section 2, connecting walls (connecting members) 20, in the shapes of flat plates, having side ends fixedly attached to an inner periphery of the tower section 2 by welding are provided. The connecting walls 20 are arranged so as to divide the inside of the tower section 2 into a plurality of regions on a horizontal plane. In this embodiment, as shown in FIG. 2 and FIG. 4, the connecting walls 20 are provided so that the tower section 2 is in a shape of a cross viewed in a horizontal cross sectional, and thus the inside of the tower section 2 is divided into four spaces.
  • The vertically adjacent tower sections 2 are connected to each other by frictional joint. Specifically, the tower sections 2 are fastened by use of high-tensile bolts (frictional joint part) 24 so that splice plates (frictional joint part) 22 extending over the connecting walls 20 provided in the vertically adjacent tower sections 2 are brought into close contact with the connecting walls 20 from both the surfaces thereof and pressed onto the connecting walls 20 to cause a frictional force.
  • As shown in FIG. 3, the connecting walls 20 are provided on a lower end side and an upper end side of each tower section 2. A stage 30 formed of a circular planar member is provided below the connecting walls 20 provided in the lower tower section 2 in contact with the junction. An outer edge of the stage 30 is fixed to an inner wall of the tower section 2 by welding. In the fastening operation of the high-tensile bolts 24 for bringing the splice plates 22 into close contact with the connecting walls 20, the operator can ride on the stage 30 to carry out the fastening operation. The stage 30 is provided with an opening that passes a ladder (not shown) or an elevator (not shown) in a tower 3 therethrough. For this reason, the workability is improved, but movement of persons and objects in the tower is not interfered.
  • An operating manhole 32 is formed in a lower portion of the connecting wall 20. Thereby, in operations within the tower sections 2 divided by the connecting walls 20, operator can pass through the connecting walls 20, improving the workability.
  • Although a gap exists between the upper and lower tower sections 2 and between the upper and lower connecting walls 20 in FIG. 3, this gap is exaggeratingly shown in order to facilitate understanding of the connection state.
  • Flanges 34 are provided at both upper and lower ends on the outer wall surface of the tower section 2. The flanges 34 can receive a load caused in stacking the tower sections 2. In order to prevent rain and so on from entering a gap between the tower sections 2, an elastic body such as rubber and resin not shown may be inserted into the gap between the tower sections 2 or may apply a calking agent to the gap. In this embodiment, since a force generated between the tower sections 2 by bending of the tower 3 can be held by the connecting walls 20 and the splice plates 22, the flanges 34 may be omitted.
  • It is preferred that a thickness of the splice plate 22 is, for example, about 50% of a thickness of the wall surface of the tower section 2. The thickness of the wall surface of the tower section 2 becomes larger as it is closer to the bottom of the tower 3, and the thickness of the wall surface in the vicinity of the junction between the lowermost tower sections 2 is about 50 mm. Thus the thickness of the splice plate 22 used in this junction is about several tens of mm (for example, 15 mm).
  • A height of the splice plate 22 can be adjusted according to an installation area of the high-tensile bolts 24 required to obtain the frictional force corresponding to the bending force generated in the tower 3. Since the degree of freedom in installing the high-tensile bolts 24 is high as described above, the number of bolts can be appropriately adjusted and widely circulated and low-cost bolts such as M16 and M20 can be used. Although a hexagonal bolt is generally used as the high-tensile bolt 24, a torque shear type bolt may be used in place of the hexagonal bolt. By using the torque shear type bolt, the construction performance can be further improved.
  • As described above, this embodiment achieve the following effects.
  • Since the connecting walls 20 are provided in the inside of the tower section 20, the fastening operation of the high-tensile bolts 24 can be performed within the tower section 2. For this reason, the fastening operation of the high-tensile bolts 24 in the outside of the tower 3 can be prevented, and touch-up coating of the externally exposed high-tensile bolts 24 can be omitted. This can reduce the amount of the operator's operations at high elevations.
  • Since members in the shapes of flat plates are used as the connecting walls 20, it is possible to reduce a misalignment between the connecting walls 20 butted in connecting the tower sections 2 to each other. Further, by using the members in the shapes of flat plates as the connecting walls 20, the splice plates 22 brought into close contact with the connecting walls 20 can have the shapes of flat plates, and therefore the operation of bringing the connecting walls 20 into close contact with the splice plates 22 is also easily performed, which is excellent in workability. As a result, construction costs can be reduced.
  • Since the connecting walls 20 are provided so as to divide the region in the tower section 2 into a plurality of regions, the section modulus of the tower section 2 can be increased, thereby increasing the rigidity of the tower section 2 itself.
  • As shown in FIG. 1, among the junctions between the upper and lower tower sections 2, at the junction between the tower section 2 a and the tower section 2 b located on the upper side of the tower 3, only flange joint may be used without using the frictional joint, at the junction between the tower section 2 c and the tower section 2 d located on the lower side of the tower 3, only frictional joint shown in FIG. 3 may be used without using flange joint.
  • The bending moment generated in the tower 3 due to the effect of the wind force and so on becomes larger as it is closer to the lower side of the tower 3, that is, the foundation B. As the bending moment is larger, a force necessary for maintaining connection between the tower sections 2 becomes larger. At the junction between the tower sections 2 c and 2 d, which is relatively close to the foundation B of the tower 3, connection using the connecting walls 20 is suitable, and at the junction between the tower sections 2 a and 2 b, which is relatively close to the top of the tower 3, the bending moment becomes relatively small. As a result, the force necessary for maintaining connection between the tower sections 2 becomes small. For this reason, at the junction between the tower sections 2 a and 2 b, which is relatively close to the top of the tower 3, for example, the tower sections 2 may be connected to each other only by conventional flange joint. With such a configuration, since the bolts are arranged along the outer periphery of the tower 3, the number of bolts installed bolts can be minimized. Further, since the connecting walls 20 and the splice plates 22 are not used, the weight of the upper portion of the tower 3 can be reduced and the thickness of the wall surface of the tower 3 can be minimized.
  • As a matter of course, the present invention is not limited to connection between the tower sections only by flange joint or only by frictional joint, and flange joint and frictional joint may be used in combination as needed.
  • Positions of the connecting walls 20 may be changed as follows.
  • FIRST MODIFIED EXAMPLE
  • As shown in FIG. 5, three connecting walls 20 that extend in one direction to have both ends connected to the inner wall of the tower section 2 are arranged in parallel to one another. By arranging the connecting walls 20 in this manner, the rigidity of the junction between the tower sections 2 in a certain direction can be improved. Further, using one connecting walls 20 as a reference, another connecting walls 20 can be positioned. By selecting one connecting wall 20 as a reference, upon connecting between the tower sections 2, a misalignment caused in butting the connecting walls 20 can be minimized. Thus the tower can be easily configured.
  • As represented by a dotted line, the connecting wall 20 orthogonal to the three connecting walls 20 arranged in parallel may be provided. By arranging the fourth connecting wall 20 in this manner, it is possible to increase the rigidity of the junction between the tower sections 2 also in the direction orthogonal to the direction in which the rigidity of the junction is improved by the other three connecting walls 20.
  • SECOND MODIFIED EXAMPLE
  • As shown in FIG. 6, a first connecting wall (first connecting member) 20 that passes the center of the cross section of the tower section 2 in a horizontal plane and that has both ends connected to the inner wall of the tower section 2 is arranged. Another second connecting wall (second connecting member) 20 connected to the substantially midpoint of the first connecting wall 20 so as to form a substantially right angle with the first connecting wall 20 is further arranged in the tower section 2.
  • Since the inner region of the tower section 2 is divided into two by the diameter and no connecting wall 20 exists in one of the divided regions, a relatively large space in the tower section 2 can be ensured. That is, since a large vertically-penetrating space can be ensured, the elevator for transporting the operator and equipment necessary for operating the facility at maintenance or the like can be installed in this space, and when the tower is applied to the wind turbine generator, the wind turbine generator can be operated more easily.
  • THIRD MODIFIED EXAMPLE
  • As shown in FIG. 7, three connecting walls 20 are arranged so as to divide the inner region in the tower section 2 into three substantially equally in a horizontal plane. One end of each of the three connecting walls 20 is connected to the inner wall of the tower section 2. The other ends of the three connecting walls 20 are connected to one another at the center of the cross section of the tower section 20.
  • By arranging the connecting walls 20 in this manner, the shape of the connecting walls 20 can be made uniform, thereby reducing manufacturing costs.
  • FOURTH MODIFIED EXAMPLE
  • As shown in FIG. 8, the connecting walls 20 are arranged as in second Modified Example (refer to FIG. 6), but this example is different from second Modified Example in that the connecting walls 20 do not pass the center (centroid) O of the cross section of the tower section 2.
  • That is, a first connecting wall (first connecting member) 20 a extending in the vertical direction in this figure and a second connecting wall (second connecting member) 20 b extending in the horizontal direction in this figure so as to be orthogonal to the first connecting wall 20 a are provided. The second connecting wall 20 b is offset from the center O toward the first connecting wall 20 a.
  • With such an arrangement, as compared to the case where the connecting walls 20 are connected to each other at the center O of the cross section of the tower section 2, a region containing the center O of the cross section of the tower section 2 can be increased.
  • By providing a space vertically penetrating the tower 3 corresponding to the region, an elevator for transporting the operator and equipment necessary for operating the facility at maintenance or the like can be installed, and when the tower is applied to the wind turbine generator, the wind turbine generator can be operated more easily.
  • FIFTH MODIFIED EXAMPLE
  • As shown in FIG. 9, the connecting walls 20 are arranged as in third Modified Example (refer to FIG. 7), but this example is different from third Modified Example in that the three connecting walls 20 are connected to one another at a point other than the center of the cross section of the tower section 2.
  • That is, a connecting wall 20 c extending in the vertical direction in this figure and connecting walls 20 d and 20 e that are connected to an end (lower end in this figure) of the connecting wall 20 c and extend in diagonal directions in this figure are provided. A connection point of these connecting walls 20 c, 20 d, and 20 e is offset from the center O toward the connecting walls 20 c. With such an arrangement, as compared to the case where the connecting walls 20 are connected to one another at the center O of the cross section of the tower section 2, a region containing the center O of the cross section of the tower section 2 can be increased. By providing a space vertically penetrating the tower 3 in this region, the elevator for transporting the operator and equipment necessary for operating the facility at maintenance or the like can be installed, and when the tower is applied to the wind turbine generator, the wind turbine generator can be operated more easily.
  • SIXTH MODIFIED EXAMPLE
  • As shown in FIG. 10, the connecting walls 20 are arranged so as to form a rectangle (polygon) in contact with the inner surface of the tower section 2.
  • By arranging the connecting walls 20 in this manner, a space can be ensured in the center of the tower 3. By arranging an elevator in this space, equipment and jigs used in the nacelle 6 can be easily transported. Further, a ladder for allowing the operator to move to the nacelle 6 can be provided in the space at the center of the tower 3.
  • SEVENTH MODIFIED EXAMPLE
  • As shown in FIG. 11, the connecting walls 20 are arranged so as to form a triangle (polygon) in contact with the inner surface of the tower section 2.
  • By arranging the connecting walls 20 in this manner, a space can be ensured in the center of the tower 3. By arranging an elevator in this space, equipment and jigs used in the nacelle 6 can be easily transported. Further, a ladder for allowing the operator to move to the nacelle 6 can be provided in the space at the center of the tower 3.
  • Although as the polygon in contact with the inner surface of the tower section, the rectangle is used in sixth Modified Example and the triangle is used in seventh Modified Example, a polygon of pentagon or more can be similarly adopted. The length of sides of the polygon is not necessarily uniform and may be appropriately changed.
  • Further, in the polygons described in these Modified Examples, the connecting wall 20 may be arranged at any position parallel to any side of the polygons.
  • Although the tower applied to the wind turbine generator has been described in the above-mentioned embodiment and Modified Examples, the tower according to the present invention is not necessarily applied to the wind turbine generator. The tower according to the present invention can be preferably applied to tower-like structures such as a lighthouse and a radio tower.
  • Although the connecting member is described as the connecting wall in the shape of a flat plate in this embodiment, the connecting member is not necessarily limited to a flat plate. In addition to the flat plate, for example, the connecting member can be in a shape of a member such as a beam that is lower than the above-mentioned connecting wall in height, or a plate having curvature or irregularity.
  • For example, as shown in FIG. 12, a horizontally long connecting beam 21 that is lower than the connecting wall 20 in FIG. 3 in height may be used.
  • The tower according to the present invention and the wind turbine generator having the tower are not limited to the above-mentioned embodiment and may be appropriately changed so as not to deviate from the subject matter.

Claims (11)

What is claimed is:
1. A tower configured by stacking a plurality of tower sections in a vertical direction and connecting the tower sections to each other, comprising:
a connecting member arranged in the tower section, the connecting member dividing an inside of the tower section into a plurality of regions in a horizontal plane, and having one end connected to an inner wall of the tower section and the other end connected to the inner wall of the tower section or another connecting member; and
a frictional joint part for connecting by frictional joint the connecting member to another connecting member connected to another adjacent tower section.
2. The tower according to claim 1, wherein the connecting member is in a shape of a flat plate.
3. The tower according to claim 2, wherein an operating manhole is formed in the connecting member.
4. The tower according to claim 1, wherein the connecting member extends on a position other than a centroid of a horizontal cross section of the tower section.
5. The tower according to claim 1, wherein:
the tower sections on the lower side of the tower are connected to each other by use of the connecting members; and
the tower sections on the upper side of the tower are connected to each other by use of flanges provided at respective ends.
6. The tower according to claim 1, wherein the connecting members are arranged in a shape of a cross when viewing the tower section in a horizontal plane.
7. The tower according to claim 1, wherein the connecting member includes a plurality of connecting members that extend in one direction to have both ends connected to the inner wall of the tower section and that are in parallel to each other.
8. The tower according to claim 1, wherein
the connecting member includes:
a first connecting member that extends in one direction to have both ends connected to the inner wall of the tower section; and
a second connecting member that has one end connected to the inner wall of the tower section and the other end connected to a midpoint of the first connecting member to form a substantially right angle with the first connecting member.
9. The tower according to claim 1, wherein the connecting member includes a plurality of connecting members that each extend in one direction to have one end connected to the inner wall of the tower section, and that have the other ends, respectively, connected to each other.
10. The tower according to claim 1, wherein:
the connecting members are a plurality of connecting members that extend in one direction to have both ends connected to the inner wall of the tower section; and
the plurality of connecting members are arranged to form a polygonal shape in contact with the inner wall of the tower section when viewing the tower section in a horizontal plane.
11. A wind turbine generator comprising the tower according to claim 1.
US13/398,941 2012-02-17 2012-02-17 Tower and wind turbine generator Abandoned US20130212972A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/398,941 US20130212972A1 (en) 2012-02-17 2012-02-17 Tower and wind turbine generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US13/398,941 US20130212972A1 (en) 2012-02-17 2012-02-17 Tower and wind turbine generator

Publications (1)

Publication Number Publication Date
US20130212972A1 true US20130212972A1 (en) 2013-08-22

Family

ID=48981194

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/398,941 Abandoned US20130212972A1 (en) 2012-02-17 2012-02-17 Tower and wind turbine generator

Country Status (1)

Country Link
US (1) US20130212972A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10041269B2 (en) * 2015-04-02 2018-08-07 Arcelormittal Wind turbine tower section, wind turbine tower and assembly method
WO2020253928A1 (en) * 2019-06-21 2020-12-24 Vestas Wind Systems A/S Improvements relating to reinforcement of wind turbine towers
CN113056607A (en) * 2018-09-28 2021-06-29 通用电气公司 Method for manufacturing wind turbine tower structure based on wind direction

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6957518B1 (en) * 2003-06-17 2005-10-25 Valmont Industries, Inc. Two-plate splice connection assembly
US20060228218A1 (en) * 2005-04-12 2006-10-12 Cone Matthew D Adapter
US20060236648A1 (en) * 2005-04-12 2006-10-26 Grundman Curtis M Means for securing the lower end of a wind turbine tower to a foundation
US20080034675A1 (en) * 2004-11-10 2008-02-14 Vestas Wind System A/S Tower Part for a Wind Turbine, an Aperture Cover System, a Method for Manufacturing a Tower Part and Uses Hereof
US7464512B1 (en) * 2004-03-10 2008-12-16 Perina Mark J Hollow structural member
US20100006710A1 (en) * 2008-07-08 2010-01-14 General Electric Company Cable bridge for a wind turbine tower
US20100071275A1 (en) * 2008-09-25 2010-03-25 General Electric Company Design for flangeless wind tower
US20110138729A1 (en) * 2010-08-25 2011-06-16 Mitsubishi Heavy Industries, Ltd. Wind turbine generator tower
US20120168116A1 (en) * 2009-03-13 2012-07-05 Xemc Darwind B.V. Method of constructing a wind turbine and bottom tower section of wind turbine

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6957518B1 (en) * 2003-06-17 2005-10-25 Valmont Industries, Inc. Two-plate splice connection assembly
US7464512B1 (en) * 2004-03-10 2008-12-16 Perina Mark J Hollow structural member
US20080034675A1 (en) * 2004-11-10 2008-02-14 Vestas Wind System A/S Tower Part for a Wind Turbine, an Aperture Cover System, a Method for Manufacturing a Tower Part and Uses Hereof
US8109061B2 (en) * 2004-11-10 2012-02-07 Vestas Wind Systems A/S Tower part for a wind turbine, an aperture cover system, a method for manufacturing a tower part and uses hereof
US20060236648A1 (en) * 2005-04-12 2006-10-26 Grundman Curtis M Means for securing the lower end of a wind turbine tower to a foundation
US7360340B2 (en) * 2005-04-12 2008-04-22 Grundman Curtis M Means for securing the lower end of a wind turbine tower to a foundation
US7387497B2 (en) * 2005-04-12 2008-06-17 Cone Matthew D Adapter
US20060228218A1 (en) * 2005-04-12 2006-10-12 Cone Matthew D Adapter
US20100006710A1 (en) * 2008-07-08 2010-01-14 General Electric Company Cable bridge for a wind turbine tower
US20100071275A1 (en) * 2008-09-25 2010-03-25 General Electric Company Design for flangeless wind tower
US20120168116A1 (en) * 2009-03-13 2012-07-05 Xemc Darwind B.V. Method of constructing a wind turbine and bottom tower section of wind turbine
US20110138729A1 (en) * 2010-08-25 2011-06-16 Mitsubishi Heavy Industries, Ltd. Wind turbine generator tower
US8196358B2 (en) * 2010-08-25 2012-06-12 Mitsubishi Heavy Industries, Ltd. Wind turbine generator tower

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10041269B2 (en) * 2015-04-02 2018-08-07 Arcelormittal Wind turbine tower section, wind turbine tower and assembly method
CN113056607A (en) * 2018-09-28 2021-06-29 通用电气公司 Method for manufacturing wind turbine tower structure based on wind direction
US11992968B2 (en) 2018-09-28 2024-05-28 Ge Infrastructure Technology Llc Method for manufacturing a wind turbine tower structure based on wind direction
WO2020253928A1 (en) * 2019-06-21 2020-12-24 Vestas Wind Systems A/S Improvements relating to reinforcement of wind turbine towers
CN114207276A (en) * 2019-06-21 2022-03-18 维斯塔斯风力系统有限公司 Improvements relating to reinforcement of wind turbine towers
US20220298820A1 (en) * 2019-06-21 2022-09-22 Vestas Wind Systems A/S Improvements relating to reinforcement of wind turbine towers

Similar Documents

Publication Publication Date Title
US10103680B2 (en) Solar array support structure with a telescopic wind brace
US8443557B2 (en) Tower base section of a wind turbine, a wind turbine and a system for mounting a tower
US10041269B2 (en) Wind turbine tower section, wind turbine tower and assembly method
US9249784B2 (en) Transition structure for a wind turbine tower
AU2020213393B2 (en) Beam system and method of erecting a supporting arch
CN108138510B (en) Tower for a wind power plant made of ring segment-shaped prefabricated concrete parts
US20100024311A1 (en) Wind turbine assembly with tower mount
WO2011077546A1 (en) Monopole tower and wind power generator equipped with monopole tower
EP3134643B1 (en) Method and tool for assembling tower elements
FI2824257T4 (en) Method for preparation and erection of a tubular tower structure
CN103590488A (en) Bolt-assembled double-layer aluminum alloy latticed shell structure
KR20150114073A (en) Modular wind tower
US20110302879A1 (en) Method for erecting a facility for producing electrical energy from wind
US20130205686A1 (en) Tower and wind turbine generator having the same
US20130283722A1 (en) Transition Structure Between Adjacent Tower Structures
US20130212972A1 (en) Tower and wind turbine generator
EP3306079B1 (en) Device for joining a metal section with a concrete section in a hybrid hollow tower
US20210115903A1 (en) Wind turbine mast section, wind turbine mast and assembly method
EP2545231B1 (en) A corner connection, in particular for a wind turbine tower
WO2015049363A1 (en) Mounting method and mounting device of a concrete tower formed with precast pieces
US20220042490A1 (en) Wind turbine tower segment for a wind turbine tower and method
US11674499B2 (en) Coupling device for coupling tower segments of a tower of a wind power installation, tower segment, part of a tower, tower, wind power installation and installation method
JP3160530U (en) Joint structure and structure between pillar and roof bearing
CN109154279B (en) Transition piece for a wind power plant tower, tower with a transition piece and method for the production thereof
KR20120000315A (en) Tower for wind power genera tor and wind power generator using thereof

Legal Events

Date Code Title Description
AS Assignment

Owner name: MITSUBISHI HEAVY INDUSTRIES, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:KAWABATA, MINORU;REEL/FRAME:028118/0616

Effective date: 20120228

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION