US20120111007A1 - Steam power plant with steam turbine unit and process steam consumer, and method for operating a steam power plant with steam turbine unit and process steam consumer - Google Patents

Steam power plant with steam turbine unit and process steam consumer, and method for operating a steam power plant with steam turbine unit and process steam consumer Download PDF

Info

Publication number
US20120111007A1
US20120111007A1 US13/383,292 US201013383292A US2012111007A1 US 20120111007 A1 US20120111007 A1 US 20120111007A1 US 201013383292 A US201013383292 A US 201013383292A US 2012111007 A1 US2012111007 A1 US 2012111007A1
Authority
US
United States
Prior art keywords
steam
power plant
consumer
turbine unit
desuperheater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/383,292
Inventor
Tilman Früh
Carsten Graeber
Mike Rost
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Assigned to SIEMENS AKTIENGESELLSCHAFT reassignment SIEMENS AKTIENGESELLSCHAFT ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: FRUEH, TILMAN, GRAEBER, CARSTEN, ROST, MIKE
Publication of US20120111007A1 publication Critical patent/US20120111007A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K17/00Using steam or condensate extracted or exhausted from steam engine plant
    • F01K17/02Using steam or condensate extracted or exhausted from steam engine plant for heating purposes, e.g. industrial, domestic
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/14Combined heat and power generation [CHP]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/32Direct CO2 mitigation

Definitions

  • the invention refers to a steam power plant with steam turbine unit and process steam consumer, especially a separator for carbon dioxide as the process steam consumer.
  • the invention also refers to a method for operating a steam power plant with a steam turbine unit and a process steam consumer.
  • Steam power plants (SPP) for generating electric power essentially comprise a steam turbine unit and a fired boiler, or, in the configuration as a gas and steam turbine power plant (CCPP), comprise a gas turbine unit with downstream heat recovery steam generator and steam turbine unit. Steam or power for secondary processes, which are not directly associated with the electric power generation, are customarily extracted from power plants of these types at corresponding points.
  • a flue gas scrubbing plant for example a carbon dioxide separator, which is connected downstream to the power plant, is operated with process steam which is extracted from the steam turbine unit at an intermediate stage of the steam turbine unit.
  • a further example of process steam extraction from the steam turbine unit is district heating supply.
  • the quantity of extracted steam in this case is dependent upon the mode of operation of the process steam consumer or of the separator for carbon dioxide.
  • the extracted quantity of steam in this case leads to a reduction of the mass flow of steam which is absent from the following turbine stages of the steam turbine unit after the extraction.
  • process steam consumers such as a carbon dioxide separator, require process steam at a corresponding pressure and temperature level.
  • the object of the invention which is focused upon a steam power plant is achieved with a steam power plant with at least one steam turbine unit and a process steam consumer, wherein the process steam consumer comprises a heat exchanger, and the steam turbine unit is connected via a bleed line to the heat exchanger, wherein a desuperheater is connected into the bleed line on the primary side.
  • the invention in this case is based on the idea of achieving a conditioning of a process steam, which is extracted from the steam turbine unit, for the process steam consumer by means of a desuperheater.
  • the desuperheater By means of the desuperheater, it is possible to bring the process steam to a temperature level which is optimized for the process steam consumer.
  • the desuperheater enables a further use of the energy which is extracted from the process steam.
  • Desuperheaters of this type can be designed as heat exchangers, the desuperheater absorbing energy on the primary side and transferring it to a medium on the secondary side in the process.
  • the invention therefore enables use of the energy which is extracted by means of the desuperheater during simultaneous conditioning of the process steam for the downstream process steam consumer, as a result of which the overall efficiency of the steam power plant is appreciably increased.
  • the invention can also be realized, moreover, with shorter piping routes compared with known interconnections, as a result of which costs for the steam power plant are reduced.
  • the steam power plant furthermore comprises a water-steam cycle with a main condensate line and a return condensate line, wherein the desuperheater is connected into the return condensate line on the secondary side.
  • This type of interconnection advantageously enables use of the energy which is drawn from the process steam by means of the desuperheater for preheating a condensate in the water-steam cycle of the steam power plant.
  • a preheater for condensate preheating which is connected downstream to the desuperheater on the secondary side, is unloaded.
  • the bled steam from the steam turbine unit which is required for this preheater can be reduced, as a result of which the portion of operating steam in the steam turbine unit is increased.
  • a larger quantity of steam becomes necessary for feeding into the desuperheater in order to be able to provide the same amount of heat, in the form of process steam, for the process steam consumer. Therefore, by using the desuperheater, a shift of the steam quantities especially takes place, but since the bled steam which is at higher pressure, and therefore of higher quality, is reduced, an efficiency enhancement of the steam power plant results from this.
  • the process steam consumer is a separator for carbon dioxide from a flue gas.
  • Carbon dioxide separators of this type require a large quantity of thermal energy which inevitably is extracted from the water-steam cycle of the steam turbine power plant in the form of process steam.
  • the extracted process steam in this case is required particularly for the desorption or regeneration of a solvent.
  • a process requirement of the flue gas scrubbing is a minimum temperature level, as a result of which, in the case of heat transfer by condensation according to current knowledge, a minimum pressure of the process steam of between 2 and 4 bar results. At this pressure level, the steam, during a normal power plant process with reheating and high steam temperatures, is still highly superheated.
  • the energy of the superheated steam can be used only unsatisfactorily in a desorption process without upstream desuperheating since only the saturated steam level of the process steam is relevant for the transfer of heat.
  • the bleed line is advantageously connected to the crossover line of the steam turbine unit.
  • the crossover line connects the intermediate-pressure turbine to the low-pressure turbine.
  • An extraction of process steam at the crossover line is constructionally simpler to realize than the extraction of process steam between the stages of the steam turbines.
  • the object of the invention which is focused upon a method is achieved by means of a steam power plant with a steam turbine unit and process steam consumer, wherein superheated steam is extracted from the steam turbine unit at a first process stage, and at a second process stage the superheated steam is desuperheated, wherein heat is extracted from the superheated steam and slightly superheated steam is formed, and wherein the slightly superheated steam is fed to the process steam consumer.
  • the invention is based in this case on the consideration of providing for the process steam consumer a conditioned steam, in the form of slightly superheated steam, which was previously extracted in a first process stage from the steam turbine unit in the form of superheated steam and which was desuperheated in a second process stage.
  • the steam power plant furthermore comprises a water-steam cycle, wherein the heat which is extracted from the superheated steam is fed to the condensate of the water-steam cycle of the steam power plant.
  • the energy which is drawn from the desuperheater can be used for preheating a condensate in the water-steam cycle of the steam power plant.
  • a preheater for condensate preheating which is connected downstream to the desuperheater on the secondary side, is unloaded. The necessary bled steam from the steam turbine unit can be reduced for this preheater, as a result of which the portion of operating steam in the steam turbine unit is increased.
  • the slightly superheated or conditioned steam is used in the process steam consumer for the separation of carbon dioxide.
  • the conditioned steam in this case is used especially for the desorption or regeneration of a solvent.
  • the superheated steam is advantageously extracted from the steam turbine unit from the crossover line between the intermediate-pressure stage and the low-pressure stage.
  • An extraction of the process steam at the crossover line is constructionally simpler to realize than the extraction of process steam between the stages of the steam turbines.
  • the steam power plant 1 which is shown in FIG. 1 essentially shows a steam turbine unit 2 and a process steam consumer 3 and also a desuperheater 6 .
  • the steam turbine unit 2 shows an intermediate-pressure turbine 9 and a low-pressure turbine 10 , which are interconnected via a crossover line 11 .
  • superheated steam leaving the intermediate-pressure turbine 9 can therefore be transferred into the low-pressure turbine 10 .
  • the bleed line 5 is connected to the crossover line 11 . Some of the superheated steam can be branched off from the crossover line 11 through the bleed line 5 .
  • the bleed line 5 is furthermore connected to the desuperheater 6 on the primary feed side.
  • the desuperheater 6 On the primary discharge side, the desuperheater 6 is connected to the process steam consumer 3 .
  • heat is extracted from superheated steam which is guided in the bleed line 5 . Slightly superheated steam leaves the desuperheater on the primary discharge side.
  • the process steam consumer 3 in this case is shown only schematically.
  • An essential interface point of the process steam consumer 3 with the steam turbine unit is especially a heat exchanger 4 which comprises the process steam consumer 3 .
  • the saturated steam which is formed in the desuperheater 6 as a result of heat extraction, is fed to the heat exchanger 4 of the process steam consumer 3 . In so doing, heat from the saturated steam is transferred to the process steam consumer, wherein the saturated steam condenses.
  • the return condensate from the process steam consumer 3 is now fed via the return condensate line 13 to the desuperheater 6 on the secondary feed side.
  • the condensate is heated and discharged from the desuperheater 6 on the secondary side.
  • the discharging in this case is carried out into the main condensate line 8 of the water-steam cycle 7 of the steam power plant 1 .
  • the condensate is provided for re-evaporation and reintroduction into the steam turbine unit 2 .
  • the preheater 12 a As a result of heating the condensate from the process steam consumer 3 in the desuperheater 6 , the preheater 12 a is unloaded. As a result of unloading the preheater 12 a, less steam has to be extracted from the steam turbine unit 2 for preheating the condensate. Consequently, the portion of operating steam in the steam turbine unit 2 is increased, from which results an efficiency enhancement of the steam power plant 1 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
  • Control Of Turbines (AREA)

Abstract

A steam power plant having at least one steam turbine unit and a process steam consumer is provided. The process steam consumer includes a heat exchanger. The steam turbine unit is connected to a heat exchanger by means of a extraction steam line, and a desuperheater is connected in the primary side of the extraction steam line, so that process steam extracted through the extraction steam line of the turbine system may be conditioned by the desuperheater to the process conditions of the process steam consumer, and the heat energy removed in the desuperheater can be fed back into the steam power plant system.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This application is the US National Stage of International Application No. PCT/EP2010/058517, filed Jun. 17, 2010 and claims the benefit thereof. The International Application claims the benefits of European Patent Office application No. 09165561. EP filed Jul. 15, 2009. All of the applications are incorporated by reference herein in their entirety.
  • FIELD OF INVENTION
  • The invention refers to a steam power plant with steam turbine unit and process steam consumer, especially a separator for carbon dioxide as the process steam consumer. The invention also refers to a method for operating a steam power plant with a steam turbine unit and a process steam consumer.
  • BACKGROUND OF INVENTION
  • Steam power plants (SPP) for generating electric power essentially comprise a steam turbine unit and a fired boiler, or, in the configuration as a gas and steam turbine power plant (CCPP), comprise a gas turbine unit with downstream heat recovery steam generator and steam turbine unit. Steam or power for secondary processes, which are not directly associated with the electric power generation, are customarily extracted from power plants of these types at corresponding points. Thus, for example a flue gas scrubbing plant, for example a carbon dioxide separator, which is connected downstream to the power plant, is operated with process steam which is extracted from the steam turbine unit at an intermediate stage of the steam turbine unit.
  • A further example of process steam extraction from the steam turbine unit is district heating supply. The quantity of extracted steam in this case is dependent upon the mode of operation of the process steam consumer or of the separator for carbon dioxide. The extracted quantity of steam in this case leads to a reduction of the mass flow of steam which is absent from the following turbine stages of the steam turbine unit after the extraction. As a rule, process steam consumers, such as a carbon dioxide separator, require process steam at a corresponding pressure and temperature level.
  • For current concepts of separators for carbon dioxide, a large quantity of thermal energy is required, for the process steam has to be extracted from the water-steam cycle of the power plant. The thermal energy is introduced into the desorption unit of the separator for carbon dioxide as a result of condensation of the process steam. A minimum pressure, which lies between 2 and 4 bar, for the process steam results from this. At this pressure level, the steam in modern power plants with reheating and high steam temperatures, however, is more highly superheated. The energy of such highly superheated steam can be used only unsatisfactorily during normal heat transfer in heat exchangers.
  • Therefore, in known power plants the extracted process steam is reduced in temperature level, and consequently slightly superheated, by injecting water. In the case of the injected water, as a rule it is condensate from the water-steam cycle of the power plant. For the desorption process, no advantages emerge as a result. In particular, the energy which lies in the superheating of the steam not being optimally utilized is disadvantageous to this known method. Also, the extraction of condensate from the water-steam cycle of the power plant for injecting into the highly superheated steam as cooling medium is costly.
  • Flow losses, which arise because of high-quality process steam, for example highly superheated steam, being extracted from the steam turbine unit, are a general disadvantage to steam power plants with process steam consumers which are known from the prior art, although slightly superheated steam is sufficient for the process steam consumers.
  • SUMMARY OF INVENTION
  • It is therefore an object of the invention to propose a steam power plant with steam turbine unit and process steam consumer, in which the steam which is extracted from the turbine unit can be used in an energetically advantageous and largely comprehensive manner. It is a further object of the invention to propose a method for operating a steam power plant with steam turbine unit and process steam consumer, in which the process steam which is extracted from the steam power plant process is conditioned in an energetically advantageous manner for the process steam consumer.
  • The object of the invention which is focused upon a steam power plant is achieved with a steam power plant with at least one steam turbine unit and a process steam consumer, wherein the process steam consumer comprises a heat exchanger, and the steam turbine unit is connected via a bleed line to the heat exchanger, wherein a desuperheater is connected into the bleed line on the primary side.
  • The invention in this case is based on the idea of achieving a conditioning of a process steam, which is extracted from the steam turbine unit, for the process steam consumer by means of a desuperheater. By means of the desuperheater, it is possible to bring the process steam to a temperature level which is optimized for the process steam consumer. In this case, the desuperheater enables a further use of the energy which is extracted from the process steam. Desuperheaters of this type can be designed as heat exchangers, the desuperheater absorbing energy on the primary side and transferring it to a medium on the secondary side in the process. By using a desuperheater, moreover, other measures for adjustment of the temperature level, such as injecting water or condensate, can theoretically be dispensed with. The invention therefore enables use of the energy which is extracted by means of the desuperheater during simultaneous conditioning of the process steam for the downstream process steam consumer, as a result of which the overall efficiency of the steam power plant is appreciably increased. The invention can also be realized, moreover, with shorter piping routes compared with known interconnections, as a result of which costs for the steam power plant are reduced.
  • In an advantageous development of the steam power plant, the steam power plant furthermore comprises a water-steam cycle with a main condensate line and a return condensate line, wherein the desuperheater is connected into the return condensate line on the secondary side. This type of interconnection advantageously enables use of the energy which is drawn from the process steam by means of the desuperheater for preheating a condensate in the water-steam cycle of the steam power plant. As a result of the contribution of the desuperheater for preheating the condensate, a preheater for condensate preheating, which is connected downstream to the desuperheater on the secondary side, is unloaded. As a result, the bled steam from the steam turbine unit which is required for this preheater can be reduced, as a result of which the portion of operating steam in the steam turbine unit is increased. However, as a result of cooling the process steam in the desuperheater, a larger quantity of steam becomes necessary for feeding into the desuperheater in order to be able to provide the same amount of heat, in the form of process steam, for the process steam consumer. Therefore, by using the desuperheater, a shift of the steam quantities especially takes place, but since the bled steam which is at higher pressure, and therefore of higher quality, is reduced, an efficiency enhancement of the steam power plant results from this. By using the condensate as cooling medium for the desuperheater, a costly extraction of main condensate in the water-steam cycle as cooling medium can furthermore be avoided. As a result, the number of interfacing points is reduced and the process-engineering integration is simplified.
  • In a special development of the steam power plant, the process steam consumer is a separator for carbon dioxide from a flue gas. Carbon dioxide separators of this type require a large quantity of thermal energy which inevitably is extracted from the water-steam cycle of the steam turbine power plant in the form of process steam. The extracted process steam in this case is required particularly for the desorption or regeneration of a solvent. A process requirement of the flue gas scrubbing is a minimum temperature level, as a result of which, in the case of heat transfer by condensation according to current knowledge, a minimum pressure of the process steam of between 2 and 4 bar results. At this pressure level, the steam, during a normal power plant process with reheating and high steam temperatures, is still highly superheated. The energy of the superheated steam can be used only unsatisfactorily in a desorption process without upstream desuperheating since only the saturated steam level of the process steam is relevant for the transfer of heat.
  • The bleed line is advantageously connected to the crossover line of the steam turbine unit. The crossover line connects the intermediate-pressure turbine to the low-pressure turbine. An extraction of process steam at the crossover line is constructionally simpler to realize than the extraction of process steam between the stages of the steam turbines.
  • By means of the invention, it is possible to extract the steam which is required for a process steam consumer from a favorable point of the steam turbine unit, and to feed the steam to a process steam consumer in an energetically advantageous manner. A resulting superheated portion of the process steam can be advantageously used at another point of the steam power plant as a result of the desuperheater according to the invention.
  • The object of the invention which is focused upon a method is achieved by means of a steam power plant with a steam turbine unit and process steam consumer, wherein superheated steam is extracted from the steam turbine unit at a first process stage, and at a second process stage the superheated steam is desuperheated, wherein heat is extracted from the superheated steam and slightly superheated steam is formed, and wherein the slightly superheated steam is fed to the process steam consumer.
  • The invention is based in this case on the consideration of providing for the process steam consumer a conditioned steam, in the form of slightly superheated steam, which was previously extracted in a first process stage from the steam turbine unit in the form of superheated steam and which was desuperheated in a second process stage.
  • In an advantageous further development, the steam power plant furthermore comprises a water-steam cycle, wherein the heat which is extracted from the superheated steam is fed to the condensate of the water-steam cycle of the steam power plant. As a result, the energy which is drawn from the desuperheater can be used for preheating a condensate in the water-steam cycle of the steam power plant. As a result of the contribution of the desuperheater towards the preheating of the condensate, a preheater for condensate preheating, which is connected downstream to the desuperheater on the secondary side, is unloaded. The necessary bled steam from the steam turbine unit can be reduced for this preheater, as a result of which the portion of operating steam in the steam turbine unit is increased.
  • In a particular further development of the steam power plant process, the slightly superheated or conditioned steam is used in the process steam consumer for the separation of carbon dioxide. The conditioned steam in this case is used especially for the desorption or regeneration of a solvent.
  • The superheated steam is advantageously extracted from the steam turbine unit from the crossover line between the intermediate-pressure stage and the low-pressure stage. An extraction of the process steam at the crossover line is constructionally simpler to realize than the extraction of process steam between the stages of the steam turbines.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The exemplary embodiments of the invention are subsequently explained in more detail with reference to an attached schematic drawing.
  • DETAILED DESCRIPTION OF INVENTION
  • The steam power plant 1 which is shown in FIG. 1 essentially shows a steam turbine unit 2 and a process steam consumer 3 and also a desuperheater 6.
  • The steam turbine unit 2 shows an intermediate-pressure turbine 9 and a low-pressure turbine 10, which are interconnected via a crossover line 11. During operation of the steam power plant 1, superheated steam leaving the intermediate-pressure turbine 9 can therefore be transferred into the low-pressure turbine 10. The bleed line 5 is connected to the crossover line 11. Some of the superheated steam can be branched off from the crossover line 11 through the bleed line 5.
  • The bleed line 5 is furthermore connected to the desuperheater 6 on the primary feed side. On the primary discharge side, the desuperheater 6 is connected to the process steam consumer 3. By means of the desuperheater 6, heat is extracted from superheated steam which is guided in the bleed line 5. Slightly superheated steam leaves the desuperheater on the primary discharge side.
  • The process steam consumer 3 in this case is shown only schematically. An essential interface point of the process steam consumer 3 with the steam turbine unit is especially a heat exchanger 4 which comprises the process steam consumer 3. The saturated steam, which is formed in the desuperheater 6 as a result of heat extraction, is fed to the heat exchanger 4 of the process steam consumer 3. In so doing, heat from the saturated steam is transferred to the process steam consumer, wherein the saturated steam condenses.
  • The return condensate from the process steam consumer 3 is now fed via the return condensate line 13 to the desuperheater 6 on the secondary feed side. In this case, the condensate is heated and discharged from the desuperheater 6 on the secondary side. The discharging in this case is carried out into the main condensate line 8 of the water-steam cycle 7 of the steam power plant 1. The condensate is provided for re-evaporation and reintroduction into the steam turbine unit 2.
  • As a result of heating the condensate from the process steam consumer 3 in the desuperheater 6, the preheater 12 a is unloaded. As a result of unloading the preheater 12 a, less steam has to be extracted from the steam turbine unit 2 for preheating the condensate. Consequently, the portion of operating steam in the steam turbine unit 2 is increased, from which results an efficiency enhancement of the steam power plant 1.

Claims (9)

1-8. (canceled)
9. A steam power plant, comprising:
a steam turbine unit;
a desuperheater; and
a process steam consumer, comprising:
a heat exchanger,
wherein the steam turbine unit is connected via a bleed line to the heat exchanger, and
wherein the desuperheater is connected into the bleed line on the primary side.
10. The steam power plant as claimed in claim 9, further comprising a water-steam cycle with a main condensate line and a return condensate line, and
wherein the desuperheater is connected into the return condensate line on the secondary side.
11. The steam power plant as claimed in claim 9, wherein the process steam consumer is a separator for carbon dioxide from a flue gas.
12. The steam power plant as claimed in claim 9,
wherein the steam turbine unit comprises a intermediate-pressure turbine and a low-pressure turbine,
wherein the intermediate-pressure turbine is connected to the low-pressure turbine via a crossover line, and
wherein the bleed line branches off from the crossover line.
13. A method for operating a steam power plant with a steam turbine unit and a process steam consumer, comprising:
extracting superheated steam from the steam turbine unit at a first process stage;
desuperheating the superheated steam at a second process stage wherein heat is extracted from the superheated steam and slightly superheated steam is formed; and
feeding the conditioned steam to the process steam consumer.
14. The method as claimed in claim 13, wherein the steam power plant comprises a water-steam cycle and the heat which is extracted from the superheated steam is fed to the condensate of the water-steam cycle of the steam power plant.
15. The method as claimed in claim 13, wherein in the process steam consumer the conditioned steam is used for a carbon dioxide separating process.
16. The method as claimed in claim 13, wherein the superheated steam is extracted from the steam turbine unit from a crossover line between an intermediate-pressure stage and a low-pressure stage.
US13/383,292 2009-07-15 2010-06-17 Steam power plant with steam turbine unit and process steam consumer, and method for operating a steam power plant with steam turbine unit and process steam consumer Abandoned US20120111007A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP09165561A EP2290200A1 (en) 2009-07-15 2009-07-15 Steam plant assembly with steam turbine unit, process steam consumer and method for operating same with steam turbine unit and process steam consumer
EP09165561.3 2009-07-15
PCT/EP2010/058517 WO2011006728A1 (en) 2009-07-15 2010-06-17 Steam power plant having a steam turbine unit and a process steam consumer and a method for operating a steam power plant having a steam turbine unit and a process steam consumer

Publications (1)

Publication Number Publication Date
US20120111007A1 true US20120111007A1 (en) 2012-05-10

Family

ID=42718241

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/383,292 Abandoned US20120111007A1 (en) 2009-07-15 2010-06-17 Steam power plant with steam turbine unit and process steam consumer, and method for operating a steam power plant with steam turbine unit and process steam consumer

Country Status (5)

Country Link
US (1) US20120111007A1 (en)
EP (2) EP2290200A1 (en)
CN (1) CN102472117A (en)
RU (1) RU2542725C2 (en)
WO (1) WO2011006728A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130173178A1 (en) * 2011-12-30 2013-07-04 Spirax-Sarco Limited Apparatus and Method for Monitoring a Steam Plant
US20130205781A1 (en) * 2010-06-28 2013-08-15 Pramurtta Shourjya Majumdar Steam Turbine and Steam Generator System and Operation Thereof
US20140366537A1 (en) * 2013-06-17 2014-12-18 Alstom Technology Ltd Steam power plant turbine and control method for operating at low load
US20150323179A1 (en) * 2014-05-08 2015-11-12 Alstom Technology Ltd Oxy boiler power plant oxygen feed system heat integration
US20150330628A1 (en) * 2014-05-08 2015-11-19 Alstom Technology Ltd Oxy boiler power plant with a heat integrated air separation unit
US9915424B2 (en) 2014-05-08 2018-03-13 General Electric Technology Gmbh Coal fired Oxy plant with Flue Gas Heat Recovery
US10006634B2 (en) 2014-05-08 2018-06-26 General Electric Technology Gmbh Coal fired oxy plant with air separation unit including parallel coupled heat exchanger

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104061027B (en) * 2014-07-11 2016-01-06 中国电力工程顾问集团华东电力设计院有限公司 The high temperature steam-extracting cooling system of Double reheat steam turbine thermodynamic system
CN104100309B (en) * 2014-07-11 2016-03-23 中国电力工程顾问集团华东电力设计院有限公司 Single reheat steam turbine high-temperature steam-extracting cooling system
US9637575B2 (en) 2014-12-31 2017-05-02 W. R. Grace & Co. -Conn. Catalyst system, olefin polymerization catalyst components comprising at least an internal electron donor compound, and methods of making and using the same

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2991620A (en) * 1956-06-11 1961-07-11 Nekolny Jaroslav Desuperheater arrangements for steam turbines
US4328675A (en) * 1978-10-13 1982-05-11 Linde Aktiengesellschaft Method of recovering power in a counterpressure-steam system
US20060248890A1 (en) * 2005-02-07 2006-11-09 Mitsubishi Heavy Industries, Ltd. Carbon dioxide recovery and power generation
WO2008119784A2 (en) * 2007-03-30 2008-10-09 Siemens Aktiengesellschaft Arrangement with a steam turbine and a condenser
US20090158737A1 (en) * 2005-12-15 2009-06-25 Ineos Usa Llc Power Recovery Process

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH399493A (en) * 1960-02-05 1965-09-30 Siemens Ag Steam power plant
SU920241A1 (en) * 1979-02-23 1982-04-15 Институт ядерной энергетики АН БССР Closed power plant operation method
GB2069615B (en) * 1980-02-13 1983-04-20 Linde Ag Method of producing power
US4352270A (en) * 1980-06-26 1982-10-05 Westinghouse Electric Corp. Method and apparatus for providing process steam of desired temperature and pressure
SU1477907A1 (en) * 1986-04-15 1989-05-07 Одесский Политехнический Институт Method of operation of power plant with working fluid containing mixture of chemically active and inert substances with respect to the plant structure materials

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2991620A (en) * 1956-06-11 1961-07-11 Nekolny Jaroslav Desuperheater arrangements for steam turbines
US4328675A (en) * 1978-10-13 1982-05-11 Linde Aktiengesellschaft Method of recovering power in a counterpressure-steam system
US20060248890A1 (en) * 2005-02-07 2006-11-09 Mitsubishi Heavy Industries, Ltd. Carbon dioxide recovery and power generation
US20090158737A1 (en) * 2005-12-15 2009-06-25 Ineos Usa Llc Power Recovery Process
WO2008119784A2 (en) * 2007-03-30 2008-10-09 Siemens Aktiengesellschaft Arrangement with a steam turbine and a condenser

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130205781A1 (en) * 2010-06-28 2013-08-15 Pramurtta Shourjya Majumdar Steam Turbine and Steam Generator System and Operation Thereof
US20130173178A1 (en) * 2011-12-30 2013-07-04 Spirax-Sarco Limited Apparatus and Method for Monitoring a Steam Plant
US20140366537A1 (en) * 2013-06-17 2014-12-18 Alstom Technology Ltd Steam power plant turbine and control method for operating at low load
US9617874B2 (en) * 2013-06-17 2017-04-11 General Electric Technology Gmbh Steam power plant turbine and control method for operating at low load
US20150323179A1 (en) * 2014-05-08 2015-11-12 Alstom Technology Ltd Oxy boiler power plant oxygen feed system heat integration
US20150330628A1 (en) * 2014-05-08 2015-11-19 Alstom Technology Ltd Oxy boiler power plant with a heat integrated air separation unit
US9915424B2 (en) 2014-05-08 2018-03-13 General Electric Technology Gmbh Coal fired Oxy plant with Flue Gas Heat Recovery
US10001279B2 (en) * 2014-05-08 2018-06-19 General Electric Technology Gmbh Oxy boiler power plant with a heat integrated air separation unit
US10006634B2 (en) 2014-05-08 2018-06-26 General Electric Technology Gmbh Coal fired oxy plant with air separation unit including parallel coupled heat exchanger
US10203112B2 (en) * 2014-05-08 2019-02-12 General Electric Technology Gmbh Oxy boiler power plant oxygen feed system heat integration

Also Published As

Publication number Publication date
EP2290200A1 (en) 2011-03-02
EP2454453A1 (en) 2012-05-23
CN102472117A (en) 2012-05-23
WO2011006728A1 (en) 2011-01-20
RU2012105280A (en) 2013-08-20
RU2542725C2 (en) 2015-02-27
EP2454453B1 (en) 2015-08-19

Similar Documents

Publication Publication Date Title
US20120111007A1 (en) Steam power plant with steam turbine unit and process steam consumer, and method for operating a steam power plant with steam turbine unit and process steam consumer
JP5674922B2 (en) Energy recovery and steam supply for increased power output in combined cycle power systems
CN101403322B (en) Supercritical steam combined cycle and method
KR101594323B1 (en) Power plant with integrated fuel gas preheating
US7900431B2 (en) Process and plant for power generation
US6497102B2 (en) Method for supplementing a saturated steam generation system having at least one steam turbine set, and steam power plant supplemented using the method
CN101713339A (en) Apparatus for steam attemperation using fuel gas heater water discharge to reduce feedwater pump size
US10288279B2 (en) Flue gas heat recovery integration
US20160273406A1 (en) Combined cycle system
US10914202B2 (en) Combined cycle power plant and method for operating such a combined cycle power plant
CN106968732B (en) Method for operating a steam power plant steam power plant for carrying out said method
AU2010299977B2 (en) Steam power plant
AU2015201753A1 (en) Oxy boiler power plant with a heat integrated air separation unit
US20150027121A1 (en) Method to integrate regenerative rankine cycle into combined cycle applications
US20180171827A1 (en) Method to integrate regenerative rankine cycle into combined cycle applications using an integrated heat recovery steam generator
CN106062319A (en) Flash tank design
US20160123192A1 (en) Process and plant for power generation

Legal Events

Date Code Title Description
AS Assignment

Owner name: SIEMENS AKTIENGESELLSCHAFT, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:FRUEH, TILMAN;GRAEBER, CARSTEN;ROST, MIKE;REEL/FRAME:027508/0174

Effective date: 20111205

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION