US20120076594A1 - Reinforced self-standing earth retaining structure using an arching effect and an underground excavation construction method using the same - Google Patents

Reinforced self-standing earth retaining structure using an arching effect and an underground excavation construction method using the same Download PDF

Info

Publication number
US20120076594A1
US20120076594A1 US13/375,650 US201013375650A US2012076594A1 US 20120076594 A1 US20120076594 A1 US 20120076594A1 US 201013375650 A US201013375650 A US 201013375650A US 2012076594 A1 US2012076594 A1 US 2012076594A1
Authority
US
United States
Prior art keywords
sheet panel
sheet
earth
soldier pile
arching effect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/375,650
Inventor
Gang Ho Park
Jun Kim
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of US20120076594A1 publication Critical patent/US20120076594A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads

Definitions

  • the present invention relates to a reinforced self-standing earth retaining structure using an arching effect and an underground excavation construction method using the same, and more particularly, to a reinforced self-standing earth retaining structure, which uses an arching effect, that supports a back earth pressure generated by vertical excavation.
  • a reinforced self-standing earth retaining structure which uses an arching effect, that is installed in the rear of an excavation space does not interfere with an excavation work and helps an efficient excavation work.
  • a self-standing earth retaining structure may be formed and the self-weight of the self-standing earth retaining structure supports a back earth pressure, which is a new concept of a continuous sheet wall.
  • the reinforced self-standing earth retaining structure since a reinforced self-standing earth retaining structure is installed in the rear of an excavation space, the reinforced self-standing earth retaining structure does not interfere with an excavation work. Accordingly, an excavation space is large so that an excavation work in a limited space such as a downtown area packed with tall buildings is made easy and efficient.
  • connection portion of a sheet panel is firmly fixed by upper and lower fixing devices so as to produce a combined section, not only rigidity is improved, but also the structure of the upper and low fixing devices is simplified so that assembly and disassembly thereof is made easy and also the sheet panel may be easily collected after construction is completed.
  • a conventional temporary earth retaining construction method to prevent collapse of excavated back earth during an excavation construction for an underground structure construction reinforces an insufficient support force of a soldier pile against an excavated back earth pressure.
  • a typical construction method includes a strut construction method and a sheet-pile construction method.
  • a strut construction method is a construction method to excavate the ground in a top-down method while reinforcing an insufficient horizontal support force of a soldier pile 10 against an excavated back earth pressure using a strut 20 (refer to FIG. 1 ).
  • the strut 20 functions as a horizontal member with respect to the soldier pile 10 that is a vertical member.
  • the strict 20 is perpendicular to the soldier pile 10 .
  • the strut 20 is supported at two support points.
  • the two support points of the strut 20 are the soldier piles 10 located at opposite positions. Since the strut 20 is installed between the opposite soldier piles 10 , a strut in a latitudinal direction and a strut in a longitudinal direction are perpendicular to each other on the same plane.
  • the struts in the latitudinal and longitudinal directions are obstacles that decrease a work space for entering equipment for an excavation work and discharging soil to the outside.
  • struts need to be piled more densely for structural safety.
  • the installed struts are sequentially removed at the installation of a permanent structure after an excavation space is prepared.
  • the construction of a permanent structure is performed by stages from the bottom toward the top in a bottom-up method.
  • the removal of struts is performed by stages. For example, assuming that the lowermost level of a permanent building is B 1 , struts installed on the level B 1 are first removed to construct the level B 1 of the permanent building. Even when the struts of the level B 1 are removed, struts of upper levels B 2 , B 3 , B 4 , etc. as installed continue to support earth pressure. The struts removed from the level B 1 need to be removed to the outside of the building. However, the removal of the struts from the level B 1 is prevented by the struts in the latitudinal and longitudinal directions so that the excavation work is hindered.
  • the strut construction method is problematic because the struts installed within an excavation space facing the soldier pile which narrows a work space for an excavation work and a soil discharge work. Also, since the struts are temporary structures, the struts need to be removed by stages during construction of a permanent structure. Thus, the struts remaining above hinder the sequential construction of a permanent structure so that work efficiency may be lowered.
  • Korean Patent Publication No. 2008-45182 which is a related art, discloses
  • FIG. 3 of Korean Patent Publication No. 2008-45182 discloses an invention to address a problem of first and second interlocks 446 and 448 of U.S. Pat. No. 6,715,964 B2, which are illustrated in FIG. 2 .
  • a soil anchor 444 is coupled by the first interlock 446 of a first sheet 440 and the second interlock 448 of a second sheet 442 .
  • a soil failure plane is the maximum tension force line T max -line to which an active earth pressure is applied.
  • An acting force 450 is a tension force applied to a soil destruction plane.
  • the soil anchor 444 resists the tension force.
  • Korean Patent Publication No. 2008-45182 points out that U.S. Pat. No. 6,715,964 B2 has a problem in that a connection portion for coupling a sheet-pile wall sectioning portion to an anchorage receives a very high tension force due to an earth pressure of ground retaining from a surrounding area.
  • the purpose of Korean Patent Publication No. 2008-45182 is to develop a forming body that may endure a very high tension force without disassembly of the connection portion where the first interlock 446 and the second interlock 448 are engaged with each other.
  • the purpose of Korean Patent Publication No. 2008-45182 is to configure a forming body that may endure a very high tension force without disassembly of the connection portion 16 .
  • the forming body is a core structure of the shape and structure of the connection portion 16 .
  • FIG. 3 illustrates a sheet-pile wall sectioning portion 12 , a first anchorage 14 , a connection portion 16 , an open cell 22 , a flat panel type combination body 22 , a support wall 24 , a welding portion 26 , and a double-T carrier 28 .
  • Korean Patent Publication No. 2008-45182 and U.S. Pat. No. 6,715,964 B2 have the same fundamental concept of balance of an earth pressure and a force against the earth pressure.
  • FIG. 4 illustrates a fundamental concept of an earth retaining system using a sheet-pile.
  • FIG. 4 is also illustrated in U.S. Pat. No. 6,715,964 B2 and cited in the present invention. The fundamental concept of an earth retaining system of FIG. 4 is discussed below.
  • a reference numeral 200 denotes a unit cell structure of a typical sheet pile.
  • the unit cell structure 200 has a U shape.
  • a sheet pile 200 of a U shape includes a curved portion 210 and a linear portion 220 .
  • the curved portion 210 is closed and the linear portion 220 is open.
  • the unit cell structure 200 is vertically installed.
  • FIG. 4 is a plan view of the unit cell structure 200 .
  • the unit cell structure 200 is a structure to support a back earth pressure P transferred through earth filling the inside of the unit cell structure 200 .
  • a structure such as a road is built above the unit cell structure 200 .
  • the back earth pressure P is based on a boundary condition of the unit cell structure 200 of a U shape. Referring to FIG. 8 , the back earth pressure P is applied from the back side of the unit cell structure 200 . In FIG. 4 , the back earth pressure P is applied to the curved portion 210 of the sheet pile.
  • the back earth pressure P and the frictional force F having opposite application directions are balanced with each other.
  • N denotes a vertical force acting on the linear portion 220 of the sheet pile.
  • the fundamental concept of the related art of FIG. 4 may be summarized as follows: the back earth pressure P acting on the curved portion 210 of the unit cell structure 200 is balanced with the frictional force F.
  • the present invention provides a reinforced self-standing earth retaining structure of a new concept which forms a lump of self-standing earth of a reinforced earth method using an arching effect generated due to a frictional force between earth particles and a sheet panel and resists an earth pressure applied to an excavation space by using the self-weight of the self-standing earth.
  • the present invention provides a reinforced self-standing earth retaining structure, which uses an arching effect, which is located at the back side of an excavation space so as not to be an obstacle to an excavation work so that a large excavation space may be used. Accordingly, an excavation work in a limited space in a downtown area where tall buildings are densely located may be easily and efficiently performed.
  • the present invention provides a reinforced self-standing earth retaining structure which may increase the rigidity of a connection portion of a group of serial sheet panels using upper and lower fixing devices by making the connection portion of the sheet panel be a combined section, and simultaneously facilitate the assembly and disassembly of the connection portion of the sheet panel due to a simple structure of the upper and lower fixing devices and thus make collection of installed sheet panels easy after construction is completed.
  • a soldier pile integrally formed with a soldier pile insertion portion in a vertical direction in a flange at one end of the soldier pile in which a lagging is inserted is installed at a width B to be perpendicular to the ground
  • a sheet panel protruding portion is inserted in and connected to the soldier pile insertion portion
  • a sheet panel protruding portion is serially inserted in a sheet panel insertion portion
  • a compression support plate protruding portion is inserted in and coupled to the sheet panel insertion portion
  • a connection portion of the soldier pile may include a soldier pile insertion portion or a soldier pine protruding portion, and a connection portion of the sheet panel coupled to the connection portion of the soldier pile may include a sheet panel protruding portion or a sheet panel insertion portion.
  • a compression support plate may include a vertical portion and a horizontal portion and a connection portion of the compression support plate may include a compression support plate protruding portion or a compression support plate insertion portion that is integrally formed with the vertical portion.
  • connection portion of the sheet panel may be firmly fixed by using upper and lower fixing devices, in which the upper fixing device is fixed by a coupling bolt passing through the sheet panel, an attachment pad, and a coupling plate when the attachment pad and the coupling plate are sequentially located at both sides of the connection portion of the sheet panel, the lower fixing device comprises a first cut portion and a second cut portion, an upward inclined surface and a hook step are formed at the first cut portion, and a rotation plate and a spring are formed at the second cut portion, an upper end inclined surface is formed on an upper end of the rotation plate that rotates around a hinge shaft, a lower end rotation groove is formed on a lower end of the rotation plate and a vertical insertion groove is formed on a vertical surface thereof, and the spring inserted in the spring insertion groove is connected and fixed to a spring mounting device.
  • the upper fixing device is fixed by a coupling bolt passing through the sheet panel, an attachment pad, and a coupling plate when the attachment pad and the coupling plate are sequentially located at both sides of the connection portion
  • an upper fixing device may be fixed by a coupling bolt passing through the sheet panel, an attachment pad, and a coupling plate when the attachment pad and the coupling plate are sequentially located at both sides of the connection portion of the sheet panel
  • a lower fixing device may include a first cut portion and a second cut portion, an upward inclined surface and a hook step may be formed at the first cut portion, and a rotation plate and a spring may be formed at the second cut portion, an upper end inclined surface may be formed on an upper end of the rotation plate that rotates around a hinge shaft, a lower end rotation groove may be formed in a lower end of the rotation plate and a vertical insertion groove may be formed in a vertical surface thereof, and the spring inserted in the spring insertion groove may be connected and fixed to a spring mounting device.
  • FIG. 1 is a front view illustrating a top-down type underground excavation according to a conventional strut construction method
  • FIG. 2 is a view illustrating a state of a connection portion of a sheet pile according to a conventional sheet pile method
  • FIG. 3 is a plan view illustrating a connection portion of a sheet pile according to a conventional sheet pile method
  • FIG. 4 is a basic concept view illustrating the relationship between a frictional force and a back earth pressure according to the sheet pile method of FIGS. 2 and 3 ;
  • FIG. 5A and FIG. 5B are views illustrating an arch state due to an arching effect after a predetermined amount of sand filling a box is discharged through a small hole formed in a lower plate of the box;
  • FIG. 6 is a perspective view illustrating a state in which the inside formed by the sheet panels continuously connected between the soldier piles is filled with earth;
  • FIG. 7 is a perspective view illustrating a state in which the earth has been removed from the state of FIG. 6 ;
  • FIG. 8 is a plan view illustrating a state in which a force balancing with the back earth pressure of FIG. 6 is operated;
  • FIG. 9 is a view illustrating a shear stress distribution illustrated in the plan view of FIG. 8 with respect to the back earth pressure, an arching effect according thereto, and a state in which the back earth pressure is not applied to the area A;
  • FIG. 10 is a perspective view illustrating a relationship between the back earth pressure and a lump of earth W formed by the arching effect
  • FIG. 11 illustrates balanced forces of the relationship of FIG. 10 indicated on a 2-dimensional plane
  • FIG. 12 is a cross-sectional view illustrating a shear stress distribution when a lump of earth is not formed
  • FIG. 13 is a perspective view illustrating the shapes of a connection portion of a sheet panel and a soldier pile according to an embodiment of the present invention
  • FIG. 14 is a perspective view illustrating a state in which an upper fixing device is installed at the connection portion of the sheet panel of the present invention.
  • FIG. 15 is a perspective view illustrating the shapes of a connection portion of a sheet panel and a soldier pile according to another embodiment of the present invention.
  • FIG. 16 is a perspective view illustrating a state in which an upper fixing device is installed at the connection portion of FIG. 15 ;
  • FIG. 17 is a perspective view illustrating the shapes of a connection portion of a sheet panel and a soldier pile according to another embodiment of the present invention.
  • FIG. 18 is an exploded perspective view illustrating a lower fixing device that is installed at the connection portion of the sheet panel of the present invention.
  • FIGS. 19 and 20 respectively illustrate a state in which a lower fixing device of the present invention is being installed and a state after the lower fixing device is installed;
  • FIG. 21 is a cross-sectional view illustrating a state in which the soldier pile and the sheet panel of the present invention are installed deeper than a designed ground by an embedded portion Hb so as to receive a passive earth pressure;
  • FIG. 22 illustrates a distribution of shear stress r due to a frictional force F
  • FIG. 23A , FIG. 23B and FIG. 23C illustrate a relationship of stress and deformation of earth
  • FIG. 24 is a graph showing a result of L/B obtained with variables of the internal friction angle D and the adhesive power C.
  • the present invention relates to a reinforced self-standing earth retaining structure using an arching effect
  • a general outline of an arching effect will be first described and then the arching effect in view of geotechnical engineering will be described.
  • the contained sand When the hole of a diameter d is not open, the contained sand is supported by the bottom plate. When the hole of a diameter d is open, the contained sand is discharged due to a self-weight W of the sand to a degree and the discharge is stopped while the sand forms an arch shape of an arc.
  • a phenomenon that the sand is no longer discharged and is supported by the arch shape of an arc even when the self-weight W of the sand exists may be referred to as an arching effect.
  • the arching effect is generated by the balance of a force to discharge the sand through the hole of a diameter d due to the self-weight W of the sand and a force to restrict the discharge of the sand due to a frictional force between the sand and four vertical surfaces of the box.
  • the arching effect may be a state in which the force to discharge the sand through the hole of a diameter d is balanced with the frictional force generated as the sand closely contacts the four vertical surfaces.
  • the arching effect is generated only when the amount of the frictional force and the size of the diameter d are appropriately balanced.
  • the sand is continuously discharged through the hole of a diameter d so that an arching effect may not be generated.
  • a mutual shear stress is generated between the sand to be discharged through the hole of a diameter d and sand particles restricting the sand to be discharged.
  • the mutual shear stress supports the self-weight W of the sand in the arch shape of an arc.
  • the arch shape of an arc is a state in which sand particles are rearranged by shear stress generated between the discharged sand and the sand particles restricting the discharged sand.
  • the arch shape characteristically forms an arc in an upward direction with respect to a direction in which the self-weight W of the sand is applied, as illustrated in FIG. 5B .
  • the self-weight W of the sand is supported by the arch shape of an arc of FIG. 5B .
  • FIG. 8 is a 2-dimensional plan view of an earth retaining structure having the width B and the length L of FIG. 6 . Since an earth pressure P indicates an earth pressure at the same excavation height H, the amount of the earth pressure P is the same. B denotes the width between sheet panels and L denotes the length of the continuously installed sheet panels.
  • the application direction of PO is a vertical direction to the sheet panel.
  • the frictional force F is generated by a back earth pressure p and a shear stress T is distributed as illustrated in FIG. 22 or 9 .
  • the shear stress ⁇ gradually decreases toward a center portion O.
  • the shear stress ⁇ is necessarily applied to a plane other than the principal stress plane, that is, the I-I plane and the III-III plane, in addition to the perpendicular stress ⁇ , as illustrated in FIG. 23B .
  • the shear stress ⁇ and the perpendicular stress ⁇ on an a-a plane inclined counterclockwise by an angle ⁇ from the I-I plane is presented by a ⁇ - ⁇ relationship
  • the shear stress ⁇ and the perpendicular stress ⁇ on an a-a plane is a point “a” of FIG. 23C .
  • the trace of the point a may draw a Mohr's stress circle C having a diameter with both ends of a point I indicating the maximum principal stress ⁇ 1 and a point III indicating the minimum principal stress ⁇ 3 with respect to a point A on an axis ⁇ .
  • a result of obtaining the perpendicular stress ⁇ and the shear stress ⁇ of the point a from the Mohr's stress circle C may be expressed as follows.
  • the arch shape of an arc of FIG. 5B is in a state in which the shear stress ⁇ is 0, that is, a state of receiving only the principal stress.
  • an arch shape line of an arc is formed.
  • a lump of earth existing on the same arch shape line functions as a arch shape crossbeam supporting an earth pressure.
  • the support of the weight W of sand disposed above in the arch shape of an arc in FIG. 5B is based on the above function of the arch shape.
  • a plurality of arch arcs No. 1 , No. 2 , No. 3 , No. 4 , . . . , and No. n indicate arch shapes of an arc indicated at a constant interval.
  • the arch arc No. 1 supports the highest back earth pressure p and a degree of the back earth pressure p decreases as the number increases.
  • No back earth pressure is applied at the arch arc No. n.
  • the back earth pressure p in an area A of the arch arc No. n is 0.
  • the back earth pressure p is not applied to the lagging 30 .
  • the lagging 30 Since the back earth pressure p is not applied to the area A of the lagging 30 , the lagging 30 does not function as a structural member for supporting an earth pressure and functions as a protection member for simply preventing earth from flowing down.
  • the curved portion 210 of the unit cell structure 200 according to the related art that corresponds to the lagging 30 is a structural member for supporting the back earth pressure p unlike the present invention.
  • the curved portion 210 of the unit cell structure 200 and the lagging 30 of the present invention are totally different from each other in terms of structural mechanics.
  • the back earth pressure p decreases from the arch arc No. 1 to the arch arcs No. 2 , No. 3 , No. 4 , . . . , and No. n due to the arching effect. Since the back earth pressure p is necessarily 0 in the area A close to the lagging 30 , earth within the sheet panels arranged parallel to one another forms a lump of earth and the lump of earth functions as a self-standing structure with respect to the back earth pressure p.
  • FIG. 10 illustrates the self-standing structure due to the arching effect.
  • the balance in force between the self-standing structure and the back earth pressure p is similar to reinforced earth. That is, the back earth pressure p is supported by the self-weight W of a lump of earth of the self-standing structure.
  • the concept of the self-standing structure due to the arching effect is a new concept totally different from that of the unit cell structure 200 having a U shape of FIG. 4 .
  • the range that 0.5 ⁇ L/B ⁇ 3.0 may be divided into a range that 0.5 ⁇ L/B ⁇ 1.5 and a range that 1.5 ⁇ L/B ⁇ 3.0.
  • the sheet panel insertion portion 22 a ′ is formed at one end of the sheet panel 20 and the sheet panel protruding portion 22 a is formed at the other end thereof.
  • an S-shaped bent portion 22 b is formed at one end of the sheet panel 20 and a reversed S-shaped bent portion 22 b ′ is formed at the other end thereof.
  • the shape of connection portions of the soldier pile 10 and the compression support plate 40 may vary according to the shape of the connection portion of the sheet panel 20 .
  • the shape of the connection portion of the soldier pile 10 should be the soldier pile insertion portion 14 a and the shape of the connection portion of the compression support plate 40 should be the compression support protruding portion 46 a.
  • the shape of the connection portion of the soldier pile 10 should be a soldier pile protruding portion 14 a ′ and the shape of the connection portion of the compression support plate 40 should be a compression support plate insertion portion 46 a′.
  • the soldier pile protruding portion 14 a ′ and the compression support plate insertion portion 46 a ′ may vary according to the shape of the connection portion of the sheet panel 20 , the illustration of the soldier pile protruding portion 14 a ′ and the compression support plate insertion portion 46 a ′ is omitted in the drawing, and the soldier pile insertion portion 14 a and the compression support plate protruding portion 46 a, which are located at the same positions, are used instead.
  • the shape of the connection portion of the soldier pile 10 should be the reversed S-shaped bent portion 14 b ′ and the shape of the connection portion of the compression support plate 40 should be the S-shaped bent portion 40 b.
  • connection portion of the soldier pile 10 should be the S-shaped bent portion 14 b and the shape of the connection portion of the compression support plate 40 should be the reversed S-shaped bent portion 46 b′.
  • the reversed S-shaped bent portion 14 b ′ varies according to the shape of the connection portion of the sheet panel 20 , the reversed S-shaped bent portion 14 b ′ is omitted from the drawing, and the S-shaped bent portion 14 b, which is located at the same position, is used instead.
  • connection shape of the soldier pile 10 and the compression support plate 40 varies according to the left and right connection shapes of the sheet panel 20
  • the connection shape of the sheet panel protruding portion 22 a and the sheet panel insertion portion 22 a ′ will be described as an example of the connection shape, for convenience of explanation.
  • connection shape of the soldier pile 10 is the soldier pile insertion portion 14 a or the soldier pile protruding portion 14 a ′, or the S-shaped bent portion 14 b or the reversed S-shaped bent portion 14 b ′.
  • the connection shape of the compression support plate 40 is the compression support plate protruding portion 46 a or the compression support plate insertion portion 46 a ′, or the S-shaped bent portion 46 b or the reversed S-shaped bent portion 46 b ′.
  • the S-shaped bent portion 46 b or the reversed S-shaped bent portion 46 b ′ are selected according to the left and right connection shapes of the sheet panel 20 , the illustration of the reversed S-shaped bent portion 46 b ′ is omitted from the drawing, and the S-shaped bent portion 14 b, which is located at the same position, is used instead.
  • the sheet panel connection portion 22 is firmly fixed by upper and lower fixing devices 50 a and 50 b.
  • connection portion 22 of the sheet panel 20 is firmly fixed by the upper and lower fixing devices 50 a and 50 b
  • the upper fixing device 50 a is fixed by a coupling bolt 56 a passing through the sheet panel 20 , an attachment pad 52 a, and a coupling plate 54 a when the attachment pad 52 a and the coupling plate 54 a are sequentially located at both sides of the connection portion 22 of the sheet panel 20 .
  • the lower fixing device 50 b includes a first cut portion 52 b and a second cut portion 56 b.
  • An upward inclined surface 524 b and a hook step 526 b are formed at the first cut portion 52 b and a rotation plate 54 b and a spring 59 b are formed at the second cut portion 56 b.
  • An upper end inclined surface 542 b is formed on an upper end of the rotation plate 54 b that rotates around a hinge shaft 58 b.
  • a lower end rotation groove 546 b is formed in a lower end of the rotation plate 54 b and a vertical insertion groove 544 b is formed in a vertical surface thereof.
  • the spring 59 b inserted in a spring insertion groove 548 b is connected and fixed to a spring mounting device 562 b.
  • the rotation plate 54 b formed in the second cut portion 56 b rotates around the hinge shaft 58 b installed at an, axis point 582 b by an elastic force of the spring 59 b so that the upper end inclined surface 542 b of the rotation plate 54 b is caught by the hook step 526 b of the first cut portion 52 b.
  • the lower end rotation groove 546 b of the rotation plate 54 b is formed to be deep enough for the rotation plate 54 b to smoothly rotate without being caught by the lower end portion of the sheet panel 20 .
  • the lower fixing device 50 b is installed at the connection portion of two adjacent sheet panels 20 and the two adjacent sheet panels 20 are coupled by the first cut portion 52 b and the second cut portion 56 b.
  • the first cut portion 52 b is formed in one sheet panel 20 and the second cut portion 56 b is formed in the other sheet panel 20 .
  • the two adjacent sheet panels 20 are fixed and coupled to each other by the operation of the rotation plate 54 b.
  • the sum P of earth pressures p of the expression (1) is applied to a lump of earth between the continuous sheet panels 20 .
  • the self-weight of the lump of earth is W
  • the self-weight W resists the sum P of earth pressures p.
  • denotes the internal friction angle
  • r denotes the unit weight of earth
  • H denotes the depth of excavation
  • C denotes an adhesive power.
  • the friction force F is as follows.
  • L denotes the length of the continuous sheet panel 20
  • PO denotes the at-rest earth pressure
  • denotes a frictional coefficient
  • C′ is a frictional adhesive power.
  • Equation 5 when F is equal to or greater than P (F ⁇ P), a lump of earth existing in a space defined by the width B and the length L of the continuous sheet panel 20 may stand by itself due to the arching effect, maintaining the self-weight W.
  • the range of L/B is limited to be 0.5 ⁇ L/B ⁇ 3/0.
  • the insufficient length of the continuous sheet panel is compensated for by a passive earth pressure due to an embedded depth Hb of FIG. 21 .
  • the embedded depth Hb is a minimum 1.0 m to improve safety of a wall member and to maintain a freezing depth.
  • the upper fixing device 50 a is coupled and fixed to the upper end of the connection portion of the sheet panel 20 by using the coupling bolt 56 a passing through the sheet panel 20 , the attachment pad 52 a, and the coupling plate 54 a when the attachment pad 52 a and the coupling plate 54 a are sequentially located at both sides of the sheet panel 20 .
  • the lower fixing device 50 b includes the rotation plate 54 b formed in the second cut portion 56 b that rotates around the hinge shaft 58 b by an elastic force of the spring 59 b so that the upper end inclined surface 542 b of the rotation plate 54 b is caught by the hook step 526 b of the first cut portion 52 b.
  • the rotation plate 54 b includes the upper end inclined surface 542 b formed on the upper end of the rotation plate 54 b, the lower end rotation groove 546 b formed in the lower end thereof, and the vertical insertion groove 544 b formed in the vertical surface thereof.
  • the sheet panel 20 is continuously assembled by inserting the sheet panel protruding portion 22 a into the soldier pile insertion portion 14 a installed on the ground (or the reversed S-shaped bent portion 22 b ′ of the sheet panel 20 into the S-shaped bent portion 14 b of the soldier pile 10 ), and then the compression support plate protruding portion 46 a is inserted into the sheet panel insertion portion 22 a′.
  • the lower fixing device 50 b is structurally installed by installing the sheet panel 20 having the second cut portion 56 b formed therein after installing the sheet panel 20 having the first cut portion 52 b formed therein.
  • the removal of the installed sheet panel 20 has the same order as above. That is, after the sheet panel 20 having the first cut portion 52 b is first removed, the sheet panel 20 having the second cut portion 56 b is removed. If the order is reversed, neither the installation nor the removal is possible.
  • the rotation plate 54 b rotating around the hinge shaft 58 b is vertically guided by the sheet panel insertion portion 22 a ′ having a vertical shape so as to be in a vertical state (see FIG. 15 ).
  • the hinge shaft 58 b is inserted into the shaft point 582 b.
  • the rotation plate 54 b maintaining the vertical state meets the first cut portion 52 b, as illustrated in FIG. 16 , the rotation plate 54 b is rotated toward the first cut portion 52 b by the elastic force of the spring 59 b fixed to the spring mounting device 562 b so that the upper end inclined surface 542 b of the rotation plate 54 b is caught by the hook step 526 b of the first cut portion 52 b.
  • the vertical insertion groove 544 b of the rotation plate 54 b inserted in the second cut portion 52 b of the sheet panel 20 and the lower end rotation groove 546 b inserted in the lower end portion of the second cut portion 56 b are respectively released from the second cut portion 52 b and the lower end portion of the second cut portion 56 b, together with the rotation of the rotation plate 54 b.
  • the lower end rotation groove 546 b of the rotation plate 54 b is formed to have a depth such that the rotation thereof is not hindered by the second cut portion 56 b of the sheet panel 20 .
  • the lower fixing device 50 b is firmly fixed in a state that the upper end inclined surface 542 b of the rotation plate 54 b is caught by the hook step 526 b of the first cut portion 52 b.
  • the spring 59 b is inserted into the spring insertion groove 548 b of the rotation plate 54 b and fixed to the spring mounting device 562 b.
  • the rotation plate 54 b hardly interferes with the sheet panel 20 having the first cut portion 52 b so that the disassembly of the sheet panel 20 having the first cut portion 52 b is made easy. Since the lower fixing device 50 b has a simple structure that is easy to be assembled or disassembled, the assembly and disassembly work is efficient and rigidity of the serial sheet panels 20 is improved.
  • a lump of self-standing earth of a reinforced earth type in which a back earth pressure is not applied to a lagging by using an arching effect between earth particles and a sheet panel. Accordingly, the back earth pressure applied to an excavation space may be resisted by the self-weight of the lump of self-standing earth.
  • construction may be efficient and economical, compared to a conventional sheet pile.
  • the reinforced self-standing earth retaining structure using an arching effect is located at the back side of an excavation space, the structure does not interfere with an excavation work so that use of a large excavation space may be possible. Accordingly, an excavation work in a small space in a downtown area where tall buildings are densely arranged is made easy and efficient.
  • connection portion of the sheet panel becomes a combined section by the upper and lower fixing devices, not only rigidity is improved but also the structures of the upper and lower fixing devices are simplified. Accordingly, the assembly and disassembly of the sheet panel connection portion is made easy and the collection of the installed sheet panels after the completion of the construction is made easy, so that construction and collection of sheet panels is efficient and economical.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

In a reinforced self-standing earth retaining structure using an arching effect, a soldier pile integrally formed with a soldier pile insertion portion in a vertical direction in a flange at one end of the soldier pile in which a lagging is inserted is installed at a width B to be perpendicular to the ground. A sheet panel protruding portion is inserted in and connected to the soldier pile insertion portion. A sheet panel protruding portion is serially inserted in a sheet panel insertion portion. A compression support plate protruding portion is inserted in and coupled to the sheet panel insertion portion. A relationship between a length L of a group of serial sheet panels and the width B between two groups of serial sheet panels is 0.5≦L/B≦3.0 in a range of an internal friction angle of earth φ=10˜34° and a range of an adhesive power C=0.0˜5.0 ton/m2 so that a back earth pressure is not applied to the front lagging due to the arching effect.

Description

    CROSS-REFERENCE TO RELATED PATENT APPLICATIONS
  • This application claims the benefit of a PCT International Application No. PCT/KR/2010/008812, filed on Dec. 9, 2010, the disclosure of which is incorporated herein in its entirety by reference.
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • The present invention relates to a reinforced self-standing earth retaining structure using an arching effect and an underground excavation construction method using the same, and more particularly, to a reinforced self-standing earth retaining structure, which uses an arching effect, that supports a back earth pressure generated by vertical excavation.
  • 2. Description of the Related Art
  • A reinforced self-standing earth retaining structure, which uses an arching effect, that is installed in the rear of an excavation space does not interfere with an excavation work and helps an efficient excavation work. In particular, since a back earth pressure is not applied to a lagging inserted in a soldier pile due to an arching effect, a self-standing earth retaining structure may be formed and the self-weight of the self-standing earth retaining structure supports a back earth pressure, which is a new concept of a continuous sheet wall.
  • According to the present invention, since a reinforced self-standing earth retaining structure is installed in the rear of an excavation space, the reinforced self-standing earth retaining structure does not interfere with an excavation work. Accordingly, an excavation space is large so that an excavation work in a limited space such as a downtown area packed with tall buildings is made easy and efficient.
  • Since a connection portion of a sheet panel is firmly fixed by upper and lower fixing devices so as to produce a combined section, not only rigidity is improved, but also the structure of the upper and low fixing devices is simplified so that assembly and disassembly thereof is made easy and also the sheet panel may be easily collected after construction is completed.
  • A conventional temporary earth retaining construction method to prevent collapse of excavated back earth during an excavation construction for an underground structure construction reinforces an insufficient support force of a soldier pile against an excavated back earth pressure. A typical construction method includes a strut construction method and a sheet-pile construction method.
  • A) Strut Construction Method
  • A strut construction method is a construction method to excavate the ground in a top-down method while reinforcing an insufficient horizontal support force of a soldier pile 10 against an excavated back earth pressure using a strut 20 (refer to FIG. 1).
  • An excavated back earth pressure is a horizontal force and the soldier pile is a vertical member. Supporting a horizontal force with only a vertical member and not a horizontal member is impossible in view of structural mechanics. The strut 20 functions as a horizontal member with respect to the soldier pile 10 that is a vertical member. The strict 20 is perpendicular to the soldier pile 10. The strut 20 is supported at two support points. The two support points of the strut 20 are the soldier piles 10 located at opposite positions. Since the strut 20 is installed between the opposite soldier piles 10, a strut in a latitudinal direction and a strut in a longitudinal direction are perpendicular to each other on the same plane.
  • The struts in the latitudinal and longitudinal directions are obstacles that decrease a work space for entering equipment for an excavation work and discharging soil to the outside. In particular, since tall buildings are around an excavation space in the downtown area, struts need to be piled more densely for structural safety.
  • Since the strut is a temporary structure, the installed struts are sequentially removed at the installation of a permanent structure after an excavation space is prepared. The construction of a permanent structure is performed by stages from the bottom toward the top in a bottom-up method.
  • Accordingly, the removal of struts is performed by stages. For example, assuming that the lowermost level of a permanent building is B1, struts installed on the level B1 are first removed to construct the level B1 of the permanent building. Even when the struts of the level B1 are removed, struts of upper levels B2, B3, B4, etc. as installed continue to support earth pressure. The struts removed from the level B1 need to be removed to the outside of the building. However, the removal of the struts from the level B1 is prevented by the struts in the latitudinal and longitudinal directions so that the excavation work is hindered.
  • Also, concrete mortar and steel bars for construction of the level B1 need to be lowered to the level B1 through the struts of the levels B2, B3, B4, etc. The struts installed at an upper level may hinder the supply of materials so that work efficiency may be lowered. Such problems also affect the construction of the levels B2, B3, B4, etc.
  • Thus, the strut construction method is problematic because the struts installed within an excavation space facing the soldier pile which narrows a work space for an excavation work and a soil discharge work. Also, since the struts are temporary structures, the struts need to be removed by stages during construction of a permanent structure. Thus, the struts remaining above hinder the sequential construction of a permanent structure so that work efficiency may be lowered.
  • B) Sheet-Pile Construction Method
  • Korean Patent Publication No. 2008-45182, which is a related art, discloses
  • “Structure of Sheet-Pile Wall Forming Body”. FIG. 3 of Korean Patent Publication No. 2008-45182 discloses an invention to address a problem of first and second interlocks 446 and 448 of U.S. Pat. No. 6,715,964 B2, which are illustrated in FIG. 2. As illustrated in FIG. 2, a soil anchor 444 is coupled by the first interlock 446 of a first sheet 440 and the second interlock 448 of a second sheet 442. A soil failure plane is the maximum tension force line Tmax-line to which an active earth pressure is applied. An acting force 450 is a tension force applied to a soil destruction plane. The soil anchor 444 resists the tension force.
  • Korean Patent Publication No. 2008-45182 points out that U.S. Pat. No. 6,715,964 B2 has a problem in that a connection portion for coupling a sheet-pile wall sectioning portion to an anchorage receives a very high tension force due to an earth pressure of ground retaining from a surrounding area. To address this problem, the purpose of Korean Patent Publication No. 2008-45182 is to develop a forming body that may endure a very high tension force without disassembly of the connection portion where the first interlock 446 and the second interlock 448 are engaged with each other.
  • The purpose of Korean Patent Publication No. 2008-45182 is to configure a forming body that may endure a very high tension force without disassembly of the connection portion 16. The forming body is a core structure of the shape and structure of the connection portion 16.
  • FIG. 3 illustrates a sheet-pile wall sectioning portion 12, a first anchorage 14, a connection portion 16, an open cell 22, a flat panel type combination body 22, a support wall 24, a welding portion 26, and a double-T carrier 28.
  • Korean Patent Publication No. 2008-45182 and U.S. Pat. No. 6,715,964 B2 have the same fundamental concept of balance of an earth pressure and a force against the earth pressure.
  • FIG. 4 illustrates a fundamental concept of an earth retaining system using a sheet-pile. FIG. 4 is also illustrated in U.S. Pat. No. 6,715,964 B2 and cited in the present invention. The fundamental concept of an earth retaining system of FIG. 4 is discussed below.
  • A reference numeral 200 denotes a unit cell structure of a typical sheet pile. The unit cell structure 200 has a U shape. A sheet pile 200 of a U shape includes a curved portion 210 and a linear portion 220. The curved portion 210 is closed and the linear portion 220 is open. The unit cell structure 200 is vertically installed.
  • FIG. 4 is a plan view of the unit cell structure 200. The unit cell structure 200 is a structure to support a back earth pressure P transferred through earth filling the inside of the unit cell structure 200. A structure such as a road is built above the unit cell structure 200.
  • The back earth pressure P is based on a boundary condition of the unit cell structure 200 of a U shape. Referring to FIG. 8, the back earth pressure P is applied from the back side of the unit cell structure 200. In FIG. 4, the back earth pressure P is applied to the curved portion 210 of the sheet pile.
  • In FIG. 4, the balance of forces is a concept that a frictional force F (F=μN) corresponds to the back earth pressure P. The back earth pressure P and the frictional force F having opposite application directions are balanced with each other. N denotes a vertical force acting on the linear portion 220 of the sheet pile. The fundamental concept of the related art of FIG. 4 may be summarized as follows: the back earth pressure P acting on the curved portion 210 of the unit cell structure 200 is balanced with the frictional force F.
  • SUMMARY OF THE INVENTION
  • The present invention provides a reinforced self-standing earth retaining structure of a new concept which forms a lump of self-standing earth of a reinforced earth method using an arching effect generated due to a frictional force between earth particles and a sheet panel and resists an earth pressure applied to an excavation space by using the self-weight of the self-standing earth.
  • The present invention provides a reinforced self-standing earth retaining structure, which uses an arching effect, which is located at the back side of an excavation space so as not to be an obstacle to an excavation work so that a large excavation space may be used. Accordingly, an excavation work in a limited space in a downtown area where tall buildings are densely located may be easily and efficiently performed.
  • The present invention provides a reinforced self-standing earth retaining structure which may increase the rigidity of a connection portion of a group of serial sheet panels using upper and lower fixing devices by making the connection portion of the sheet panel be a combined section, and simultaneously facilitate the assembly and disassembly of the connection portion of the sheet panel due to a simple structure of the upper and lower fixing devices and thus make collection of installed sheet panels easy after construction is completed.
  • According to an aspect of the present invention, in a reinforced self-standing earth retaining structure using an arching effect, a soldier pile integrally formed with a soldier pile insertion portion in a vertical direction in a flange at one end of the soldier pile in which a lagging is inserted is installed at a width B to be perpendicular to the ground, a sheet panel protruding portion is inserted in and connected to the soldier pile insertion portion, a sheet panel protruding portion is serially inserted in a sheet panel insertion portion, a compression support plate protruding portion is inserted in and coupled to the sheet panel insertion portion, and a relationship between a length L of a group of serial sheet panels and the width B between two groups of serial sheet panels is 0.5≦L/B≦3.0 in a range of an internal friction angle of earth φ=10˜34° and a range of an adhesive power C=0.0˜5.0 ton/m2 so that a back earth pressure is not applied to the front lagging due to the arching effect.
  • The relationship of the length L of the continuous sheet panel and the width B between the two groups of sheet panels may be 0.5≦L/B≦1.5 in the ranges of internal friction angle φ=14˜22° and the adhesive power C=0.0˜5.0 (ton/m2).
  • The relationship of the length L of the continuous sheet panel and the width B between the two groups of sheet panels may be 1.5≦L/B≦3.0 in the ranges of internal friction angle φ=10˜14° and the adhesive power C=0.0˜5.0 (ton/m2).
  • A connection portion of the soldier pile may include a soldier pile insertion portion or a soldier pine protruding portion, and a connection portion of the sheet panel coupled to the connection portion of the soldier pile may include a sheet panel protruding portion or a sheet panel insertion portion.
  • A compression support plate may include a vertical portion and a horizontal portion and a connection portion of the compression support plate may include a compression support plate protruding portion or a compression support plate insertion portion that is integrally formed with the vertical portion.
  • The connection portion of the sheet panel may be firmly fixed by using upper and lower fixing devices, in which the upper fixing device is fixed by a coupling bolt passing through the sheet panel, an attachment pad, and a coupling plate when the attachment pad and the coupling plate are sequentially located at both sides of the connection portion of the sheet panel, the lower fixing device comprises a first cut portion and a second cut portion, an upward inclined surface and a hook step are formed at the first cut portion, and a rotation plate and a spring are formed at the second cut portion, an upper end inclined surface is formed on an upper end of the rotation plate that rotates around a hinge shaft, a lower end rotation groove is formed on a lower end of the rotation plate and a vertical insertion groove is formed on a vertical surface thereof, and the spring inserted in the spring insertion groove is connected and fixed to a spring mounting device.
  • According to an aspect of the present invention, an underground excavation construction method using a reinforced self-standing earth retaining structure includes: (a) piling a soldier pile into the ground of a boundary surface to be excavated to have a width B and a vertical depth H that is a depth of a designed ground; (b) inserting a sheet panel protruding portion into a soldier pile insertion portion formed at a flange of the soldier pile to be connected to each other, continuously inserting the sheet panel protruding portion into a sheet panel insertion portion, and inserting a compression support plate protruding portion into the sheet panel insertion portion to be connected to each other, under the condition that a relationship between a length L of a continuous sheet panel and a width B between the sheet panels is 0.5≦L/B≦3.0 in a range of an internal friction angle of earth φ=10˜34° and a range of an adhesive power C=0.0˜5.0 ton/m2; (c) gradually performing underground excavation from the ground to a predetermined depth h1 and then inserting a lagging from the top end of the soldier pile; (d) when the excavation to the predetermined depth h1 is completed, performing further excavation to a predetermined depth h2 and then inserting the lagging from the top end of the soldier pile; and (e) completing the underground excavation by repeating the operations (c) and (d).
  • In the operation (b), a relationship between the length L of the continuous sheet panel and the width B between the sheet panels may be 0.5≦L/B≦1.5 in a range of the internal friction angle of earth φ=14˜22° and a range of the adhesive power C=0.0˜5.0 ton/m2.
  • In the operation (b), a relationship between the length L of the continuous sheet panel and the width B between the sheet panels may be 1.5≦L/B≦3.0 in a range of the internal friction angle of earth φ=10˜14° and a range of the adhesive power C=0.0˜5.0 ton/m2.
  • In the operation (b), an upper fixing device may be fixed by a coupling bolt passing through the sheet panel, an attachment pad, and a coupling plate when the attachment pad and the coupling plate are sequentially located at both sides of the connection portion of the sheet panel, a lower fixing device may include a first cut portion and a second cut portion, an upward inclined surface and a hook step may be formed at the first cut portion, and a rotation plate and a spring may be formed at the second cut portion, an upper end inclined surface may be formed on an upper end of the rotation plate that rotates around a hinge shaft, a lower end rotation groove may be formed in a lower end of the rotation plate and a vertical insertion groove may be formed in a vertical surface thereof, and the spring inserted in the spring insertion groove may be connected and fixed to a spring mounting device.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the attached drawings in which:
  • FIG. 1 is a front view illustrating a top-down type underground excavation according to a conventional strut construction method;
  • FIG. 2 is a view illustrating a state of a connection portion of a sheet pile according to a conventional sheet pile method;
  • FIG. 3 is a plan view illustrating a connection portion of a sheet pile according to a conventional sheet pile method;
  • FIG. 4 is a basic concept view illustrating the relationship between a frictional force and a back earth pressure according to the sheet pile method of FIGS. 2 and 3;
  • FIG. 5A and FIG. 5B are views illustrating an arch state due to an arching effect after a predetermined amount of sand filling a box is discharged through a small hole formed in a lower plate of the box;
  • FIG. 6 is a perspective view illustrating a state in which the inside formed by the sheet panels continuously connected between the soldier piles is filled with earth;
  • FIG. 7 is a perspective view illustrating a state in which the earth has been removed from the state of FIG. 6;
  • FIG. 8 is a plan view illustrating a state in which a force balancing with the back earth pressure of FIG. 6 is operated;
  • FIG. 9 is a view illustrating a shear stress distribution illustrated in the plan view of FIG. 8 with respect to the back earth pressure, an arching effect according thereto, and a state in which the back earth pressure is not applied to the area A;
  • FIG. 10 is a perspective view illustrating a relationship between the back earth pressure and a lump of earth W formed by the arching effect;
  • FIG. 11 illustrates balanced forces of the relationship of FIG. 10 indicated on a 2-dimensional plane;
  • FIG. 12 is a cross-sectional view illustrating a shear stress distribution when a lump of earth is not formed;
  • FIG. 13 is a perspective view illustrating the shapes of a connection portion of a sheet panel and a soldier pile according to an embodiment of the present invention;
  • FIG. 14 is a perspective view illustrating a state in which an upper fixing device is installed at the connection portion of the sheet panel of the present invention;
  • FIG. 15 is a perspective view illustrating the shapes of a connection portion of a sheet panel and a soldier pile according to another embodiment of the present invention;
  • FIG. 16 is a perspective view illustrating a state in which an upper fixing device is installed at the connection portion of FIG. 15;
  • FIG. 17 is a perspective view illustrating the shapes of a connection portion of a sheet panel and a soldier pile according to another embodiment of the present invention;
  • FIG. 18 is an exploded perspective view illustrating a lower fixing device that is installed at the connection portion of the sheet panel of the present invention;
  • FIGS. 19 and 20 respectively illustrate a state in which a lower fixing device of the present invention is being installed and a state after the lower fixing device is installed;
  • FIG. 21 is a cross-sectional view illustrating a state in which the soldier pile and the sheet panel of the present invention are installed deeper than a designed ground by an embedded portion Hb so as to receive a passive earth pressure;
  • FIG. 22 illustrates a distribution of shear stress r due to a frictional force F;
  • FIG. 23A, FIG. 23B and FIG. 23C illustrate a relationship of stress and deformation of earth; and
  • FIG. 24 is a graph showing a result of L/B obtained with variables of the internal friction angle D and the adhesive power C.
  • DETAILED DESCRIPTION OF THE INVENTION
  • The attached drawings for illustrating exemplary embodiments of the present invention are referred to in order to gain a sufficient understanding of the present invention, the merits thereof, and the objectives accomplished by the implementation of the present invention. Hereinafter, the present invention will be described in detail by explaining exemplary embodiments of the invention with reference to the attached drawings. Like reference numerals in the drawings denote like elements.
  • Since the present invention relates to a reinforced self-standing earth retaining structure using an arching effect, a general outline of an arching effect will be first described and then the arching effect in view of geotechnical engineering will be described.
  • A) General Outline of Arching Effect
  • A general outline of an arching effect will be described below with reference to FIGS. 5A and 5B.
  • When sand is contained in a box with an open upper cover plate and a hole of a diameter d formed in the bottom plate of the box is open, the sand is discharged downwardly through the hole of a diameter d (see FIG. 5A).
  • However, even when the hole of a diameter d is still open, the discharge of the sand discontinues. In a state of the sand being no longer discharged, it can be seen that the shape of the sand forms an arch shape of an arc.
  • When the hole of a diameter d is not open, the contained sand is supported by the bottom plate. When the hole of a diameter d is open, the contained sand is discharged due to a self-weight W of the sand to a degree and the discharge is stopped while the sand forms an arch shape of an arc.
  • A phenomenon that the sand is no longer discharged and is supported by the arch shape of an arc even when the self-weight W of the sand exists may be referred to as an arching effect. The arching effect is generated by the balance of a force to discharge the sand through the hole of a diameter d due to the self-weight W of the sand and a force to restrict the discharge of the sand due to a frictional force between the sand and four vertical surfaces of the box. The arching effect may be a state in which the force to discharge the sand through the hole of a diameter d is balanced with the frictional force generated as the sand closely contacts the four vertical surfaces.
  • Thus, the arching effect is generated only when the amount of the frictional force and the size of the diameter d are appropriately balanced. When the size of the diameter d is too greater than the amount of the frictional force, the sand is continuously discharged through the hole of a diameter d so that an arching effect may not be generated.
  • As the hole of a diameter d is open, the self-weight W of the sand is applied through the hole of a diameter d and thus the sand is discharged through the hole of a diameter d by the self-weight W. Nonetheless, the sand is not continuously discharged. While forming an arch shape of an arc as illustrated in FIG. 5B, the sand is no longer discharged and the discharge of the sand is stopped.
  • A mutual shear stress is generated between the sand to be discharged through the hole of a diameter d and sand particles restricting the sand to be discharged. The mutual shear stress supports the self-weight W of the sand in the arch shape of an arc. The arch shape of an arc is a state in which sand particles are rearranged by shear stress generated between the discharged sand and the sand particles restricting the discharged sand.
  • The arch shape characteristically forms an arc in an upward direction with respect to a direction in which the self-weight W of the sand is applied, as illustrated in FIG. 5B. The self-weight W of the sand is supported by the arch shape of an arc of FIG. 5B.
  • B) Arching Effect in View of Geotechnical Engineering
  • An arching effect due to a continuous sheet wall is described in view of geotechnical engineering below with reference to FIG. 8. Although a safety problem of an earth structure is a 3 dimensional matter, the safety problem is typically interpreted in 2 dimensions. This is because a normal earth structure having a long width B and a long length L compared to an excavation height H may have almost a 2-dimensional boundary condition. Even when it is interpreted by 3 dimensions, an active earth pressure is remarkably reduced and a passive earth pressure is rather increased, compared to a 2-dimensional state due to an arching effect, so that a result of more safety is obtained rather than the 2-dimensional interpretation.
  • FIG. 8 is a 2-dimensional plan view of an earth retaining structure having the width B and the length L of FIG. 6. Since an earth pressure P indicates an earth pressure at the same excavation height H, the amount of the earth pressure P is the same. B denotes the width between sheet panels and L denotes the length of the continuously installed sheet panels.
  • A frictional force F equals pPO (F=μPO), where μ denotes a frictional coefficient and PO denotes an at-rest earth pressure. The application direction of PO is a vertical direction to the sheet panel. The frictional force F is generated by a back earth pressure p and a shear stress T is distributed as illustrated in FIG. 22 or 9. The shear stress τ gradually decreases toward a center portion O.
  • Since the arch shape of an arc formed in FIG. 5B is a state in which sand particles are rearranged, the arch shape of an arc will be described in view of geotechnical engineering. When an earth stress-modification problem is handled as a 2-dimensional problem, if stress is applied to one element of earth, as illustrated in FIG. 23A, only normal stress σ1 and σ3 are applied to the element and planes, that is, a I-I plane and a III-III plane, that are two perpendicular planes having shear stress of 0 exist. The normal stress σ1 and σ3 applied to the perpendicular planes, that is, the I-I plane and the plane, are referred to as principal stress. The normal stress σ1 is the maximum principal stress and the normal stress σ3 is the minimum principal stress.
  • The shear stress τ is necessarily applied to a plane other than the principal stress plane, that is, the I-I plane and the III-III plane, in addition to the perpendicular stress σ, as illustrated in FIG. 23B. When the shear stress τ and the perpendicular stress σ on an a-a plane inclined counterclockwise by an angle α from the I-I plane is presented by a τ-α relationship, the shear stress τ and the perpendicular stress σ on an a-a plane is a point “a” of FIG. 23C. When the angle α varies from 0° to 180°, the trace of the point a may draw a Mohr's stress circle C having a diameter with both ends of a point I indicating the maximum principal stress σ1 and a point III indicating the minimum principal stress σ3 with respect to a point A on an axis σ.
  • A result of obtaining the perpendicular stress σ and the shear stress τ of the point a from the Mohr's stress circle C may be expressed as follows.

  • σ=½(σ1+σ3)+½(σ1−σ3)cos 2α  (A)

  • τ=½(σ1−σ3)sin 2α  (B)
  • When α=90°, τ=0 and σ=σ1.
  • When an earth particle is rotated, the shear stress τ of the point a is 0 and the earth particle receives only the principal stress. The arch shape of an arc of FIG. 5B, formed by the rearrangement of sand particles, is in a state in which the shear stress τ is 0, that is, a state of receiving only the principal stress.
  • The arch shape of an arc generated by the operation of the back earth pressure p will be described below with reference to FIG. 9.
  • When the back earth pressure p is applied to the earth particles, the earth particles are rearranged with the principal stress direction rotated by the effect of the frictional force F.
  • When points having continuous principal stress directions are connected in a state in which the shear stress τ=0, that is, only the principal stress is applied, due to the rearrangement of sand particles, as illustrated in FIG. 5B, an arch shape line of an arc is formed. A lump of earth existing on the same arch shape line functions as a arch shape crossbeam supporting an earth pressure. The support of the weight W of sand disposed above in the arch shape of an arc in FIG. 5B is based on the above function of the arch shape.
  • In FIG. 9, a plurality of arch arcs No. 1, No. 2, No. 3, No. 4, . . . , and No. n indicate arch shapes of an arc indicated at a constant interval. The arch arc No. 1 supports the highest back earth pressure p and a degree of the back earth pressure p decreases as the number increases. No back earth pressure is applied at the arch arc No. n. The back earth pressure p in an area A of the arch arc No. n is 0.
  • Since the area A is a place where a lagging 30 is located, the back earth pressure p is not applied to the lagging 30.
  • Since the back earth pressure p is not applied to the area A of the lagging 30, the lagging 30 does not function as a structural member for supporting an earth pressure and functions as a protection member for simply preventing earth from flowing down.
  • In contrast, the curved portion 210 of the unit cell structure 200 according to the related art that corresponds to the lagging 30 is a structural member for supporting the back earth pressure p unlike the present invention. Thus, the curved portion 210 of the unit cell structure 200 and the lagging 30 of the present invention are totally different from each other in terms of structural mechanics.
  • The back earth pressure p decreases from the arch arc No. 1 to the arch arcs No. 2, No. 3, No. 4, . . . , and No. n due to the arching effect. Since the back earth pressure p is necessarily 0 in the area A close to the lagging 30, earth within the sheet panels arranged parallel to one another forms a lump of earth and the lump of earth functions as a self-standing structure with respect to the back earth pressure p. FIG. 10 illustrates the self-standing structure due to the arching effect.
  • Referring to FIG. 10, the balance in force between the self-standing structure and the back earth pressure p is similar to reinforced earth. That is, the back earth pressure p is supported by the self-weight W of a lump of earth of the self-standing structure. The concept of the self-standing structure due to the arching effect is a new concept totally different from that of the unit cell structure 200 having a U shape of FIG. 4.
  • The structure of the reinforced self-standing earth retaining structure using an arching effect will be described below.
  • Referring to FIGS. 13 and 14, the present invention discloses a reinforced self-standing earth retaining structure using an arching effect in which the soldier piles 10 integrally formed with a soldier pile insertion portion 14 a in a vertical direction in a flange 12 at one end of the soldier pile 10 in which the lagging 30 is inserted are installed at a width B to be perpendicular to the ground, a sheet panel protruding portion 22 a is inserted in and connected to the soldier pile insertion portion 14 a, the sheet panel protruding portion 22 a is continuously inserted in a sheet panel insertion portion 22 a′, a compression support plate protruding portion 46 a is inserted in and coupled to the sheet panel insertion portion 22 a′, and the relationship between the length L of continuous sheet panels 20 and the width B between the sheet panels 20 is 0.5≦L/B≦3.0 in a range of an internal friction angle of earth φ=10˜34° and a range of an adhesive power C=0.0˜5.0 ton/m2 so that a back earth pressure is not applied to the front lagging 30 due to the arching effect.
  • The relationship that 0.5≦L/B≦3.0 is calculated by a Rankine earth pressure method with the internal friction angle φ and the adhesive power C and a result thereof is shown in the graph of FIG. 24. When the L/B of 0.5≦L/B≦3.0 exceeds 3.0, the length of the sheet panels 20 increases so that installation of the sheet panels 20 is uneconomical. When an installation place is downtown, a dispute related to a boundary may arise. Also, the collection of the sheet panels 20 is difficult. When the L/B does not reach 0.5, the rigidity of a member such as the sheet panel 20 is reduced so that a member force may be insufficient.
  • Referring to FIG. 24, as the amount of the L/B in a range that 0.5≦L/B≦3.0 decreases, construction is economical. To this end, the range that 0.5≦L/B≦3.0 may be divided into a range that 0.5≦L/B≦1.5 and a range that 1.5≦L/B≦3.0.
  • When the range is 0.5≦L/B≦1.5, the internal friction angle φ of earth is within a range that φ=14˜22° and the adhesive power C is C=0.0˜5.0 ton/m2. When the range is 1.5≦L/B≦3.0, the internal friction angle φ of earth is that φ=10˜14° and the adhesive power C is within a range that C=0.0˜5.0 ton/m2.
  • The sheet panel insertion portion 22 a′ is formed at one end of the sheet panel 20 and the sheet panel protruding portion 22 a is formed at the other end thereof. In another embodiment, an S-shaped bent portion 22 b is formed at one end of the sheet panel 20 and a reversed S-shaped bent portion 22 b′ is formed at the other end thereof.
  • Since the sheet panel 20 is connected between the soldier pile 10 and a compression support plate 40, the shape of connection portions of the soldier pile 10 and the compression support plate 40 may vary according to the shape of the connection portion of the sheet panel 20. For example, when the sheet panel protruding portion 22 a is connected to the soldier pile 10 and the sheet panel insertion portion 22 a′ is connected to the compression support plate 40, the shape of the connection portion of the soldier pile 10 should be the soldier pile insertion portion 14 a and the shape of the connection portion of the compression support plate 40 should be the compression support protruding portion 46 a. In contrast, the shape of the connection portion of the soldier pile 10 should be a soldier pile protruding portion 14 a′ and the shape of the connection portion of the compression support plate 40 should be a compression support plate insertion portion 46 a′.
  • Since the soldier pile protruding portion 14 a′ and the compression support plate insertion portion 46 a′ may vary according to the shape of the connection portion of the sheet panel 20, the illustration of the soldier pile protruding portion 14 a′ and the compression support plate insertion portion 46 a′ is omitted in the drawing, and the soldier pile insertion portion 14 a and the compression support plate protruding portion 46 a, which are located at the same positions, are used instead.
  • Also, when the S-shaped bent portion 22 b of the sheet panel 20 is connected to the soldier pile 10 and the reversed S-shaped bent portion 22 b′ of the sheet panel 20 is connected to the compression support plate 40, the shape of the connection portion of the soldier pile 10 should be the reversed S-shaped bent portion 14 b′ and the shape of the connection portion of the compression support plate 40 should be the S-shaped bent portion 40 b.
  • In contrast, the shape of the connection portion of the soldier pile 10 should be the S-shaped bent portion 14b and the shape of the connection portion of the compression support plate 40 should be the reversed S-shaped bent portion 46 b′.
  • Since the reversed S-shaped bent portion 14 b′ varies according to the shape of the connection portion of the sheet panel 20, the reversed S-shaped bent portion 14 b′ is omitted from the drawing, and the S-shaped bent portion 14 b, which is located at the same position, is used instead.
  • As such, since the connection shape of the soldier pile 10 and the compression support plate 40 varies according to the left and right connection shapes of the sheet panel 20, the connection shape of the sheet panel protruding portion 22 a and the sheet panel insertion portion 22 a′ will be described as an example of the connection shape, for convenience of explanation.
  • The connection shape of the soldier pile 10 is the soldier pile insertion portion 14 a or the soldier pile protruding portion 14 a′, or the S-shaped bent portion 14 b or the reversed S-shaped bent portion 14 b′. The connection shape of the compression support plate 40 is the compression support plate protruding portion 46 a or the compression support plate insertion portion 46 a′, or the S-shaped bent portion 46 b or the reversed S-shaped bent portion 46 b′. Since the S-shaped bent portion 46 b or the reversed S-shaped bent portion 46 b′ are selected according to the left and right connection shapes of the sheet panel 20, the illustration of the reversed S-shaped bent portion 46 b′ is omitted from the drawing, and the S-shaped bent portion 14 b, which is located at the same position, is used instead.
  • To increase the rigidity and a second moment of area I of the sheet panel 20, the sheet panel connection portion 22 is firmly fixed by upper and lower fixing devices 50 a and 50 b.
  • While the connection portion 22 of the sheet panel 20 is firmly fixed by the upper and lower fixing devices 50 a and 50 b, the upper fixing device 50 a is fixed by a coupling bolt 56 a passing through the sheet panel 20, an attachment pad 52 a, and a coupling plate 54 a when the attachment pad 52 a and the coupling plate 54 a are sequentially located at both sides of the connection portion 22 of the sheet panel 20. The lower fixing device 50 b includes a first cut portion 52 b and a second cut portion 56 b. An upward inclined surface 524 b and a hook step 526 b are formed at the first cut portion 52 b and a rotation plate 54 b and a spring 59 b are formed at the second cut portion 56 b. An upper end inclined surface 542 b is formed on an upper end of the rotation plate 54 b that rotates around a hinge shaft 58 b. A lower end rotation groove 546 b is formed in a lower end of the rotation plate 54 b and a vertical insertion groove 544 b is formed in a vertical surface thereof. The spring 59 b inserted in a spring insertion groove 548 b is connected and fixed to a spring mounting device 562 b.
  • The rotation plate 54 b formed in the second cut portion 56 b rotates around the hinge shaft 58 b installed at an, axis point 582 b by an elastic force of the spring 59 b so that the upper end inclined surface 542 b of the rotation plate 54 b is caught by the hook step 526 b of the first cut portion 52 b.
  • The lower end rotation groove 546 b of the rotation plate 54 b is formed to be deep enough for the rotation plate 54 b to smoothly rotate without being caught by the lower end portion of the sheet panel 20.
  • The lower fixing device 50 b is installed at the connection portion of two adjacent sheet panels 20 and the two adjacent sheet panels 20 are coupled by the first cut portion 52 b and the second cut portion 56 b. The first cut portion 52 b is formed in one sheet panel 20 and the second cut portion 56 b is formed in the other sheet panel 20. The two adjacent sheet panels 20 are fixed and coupled to each other by the operation of the rotation plate 54 b.
  • When the upper and lower portions of the connection portion of the sheet panel 20 are firmly fixed by the upper and lower fixing devices 50 a and 50 b, the two adjacent sheet panels 20 become one combined section and rigidity is improved with the second moment of area I.
  • Next, the relationship of the length L of the continuous sheet panel 20 and the width B between the two sheet panels 20 generating an arching effect is described as follows.
  • Assuming a back earth pressure per unit area applied to the width B between the sheet panels 20 is p, a sum P of the earth pressures can be expressed as P=p×B.

  • P=p×B   (1)
  • That is, the sum P of earth pressures p of the expression (1) is applied to a lump of earth between the continuous sheet panels 20. When the self-weight of the lump of earth is W, the self-weight W resists the sum P of earth pressures p.

  • P=r×H×Ka−C×√{square root over (Ka)}  (2)

  • or

  • P=B(r×H×Ka−C×√{square root over (Ka)})   (2′)
  • The sum P of earth pressures p of the expression (2) forms a function relationship of the adhesive power C and the internal friction angle φ. Here, Ka denotes a Rankine active earth pressure coefficient Ka=tan 2(45°−φ/2), φ denotes the internal friction angle, r denotes the unit weight of earth, H denotes the depth of excavation, and C denotes an adhesive power.
  • Assuming that a frictional force between the continuous sheet panel 20 and the lump of earth contacting the continuous sheet panel 20 is F, the friction force F is as follows.

  • F=L(PO×μ×C′)=2×L(r×H×KO×μ+C′)   (3)
  • L denotes the length of the continuous sheet panel 20, PO denotes the at-rest earth pressure, μ denotes a frictional coefficient, and C′ is a frictional adhesive power.
  • Assuming the earth pressure applied to an earth wall is Pt, the relationship of the back earth pressure P and the frictional force F is as follows.

  • Pt=P−F   (4)
  • In Equation 4, since an earth pressure is not applied to the area A of FIG. 24 due to the arching effect, the Pt becomes 0 (Pt=0).

  • P−F=0   (5)
  • In Equation 5, when F is equal to or greater than P (F≧P), a lump of earth existing in a space defined by the width B and the length L of the continuous sheet panel 20 may stand by itself due to the arching effect, maintaining the self-weight W.

  • F≧P   (6)
  • When Equations 3 and 2′ are substituted into Equation 6, a result of the substitution is as follows.

  • 2×L (r×H×Ko×μ+C′)≧B(r×H×Ka−C×√{square root over (Ka)})

  • L/B≧(r×H×Ka−2×C×√{square root over (Ka)})/[2×(r×H×Ko×μ+C′)]  (7)
  • In Expression 7, it may be seen that L/B is a function of the internal friction angle φ and the adhesive power C.
  • Next, when the excavation depth H is 10 m, a lower limit of L/B according to a change in the internal friction angle φ and the adhesive power C is obtained by Expression 7.
  • [Conditions]
  • Excavation Depth H=10 (m), Unit Weight of Lump of Earth r=1.7 (t/m3), Frictional Coefficient μ=[tan(⅔ φ)], Rankine Active Earth Pressure Coefficient Ka=tan 2(45°−φ/2), Rankine Active Earth Pressure Coefficient Kp=tan 2(45°+φ/2)Ka, Adhesive Power C (ton/m2), Frictional Adhesive Power C′=[⅔C] (ton/m2), and At-rest Earth Pressure Ko.
  • A result of calculation of the L/B by Expression 7 using the above conditions and the ranges of the internal friction angle φ=10˜34°, and the adhesive power C=0.0˜5.0 (ton/m2), which are variables, is shown in the graph of FIG. 24. The following results may be obtained from FIG. 24.
  • 1) The maximum value and the minimum value of L/B are expressed between boundaries of the adhesive powers C=0 and C=5.0 (ton/m2).
  • 2) When the L/B exceeds 3 in the ranges of internal friction angle φ=10˜34° and the adhesive power C=0.0˜5.0 (ton/m2), it may be seen that the back earth pressure is not applied to the lagging due to the arching effect.
  • 3) However, when the L/B exceeds 3, the length of the continuous sheet panel needs to be long, which is uneconomical. Also, when the L/B is smaller than 0.5, the rigidity of the sheet panel decreases so that a member force may be insufficient. Thus, in the present invention, the range of L/B is limited to be 0.5≦L/B≦3/0.
  • 4) That is, when the relationship of the length L of the continuous sheet panel 20 and the width B between the two sheet panels 20 is 0.5≦L/B≦3.0 in the ranges of internal friction angle φ=10˜34° and the adhesive power C=0.0˜5.0 (ton/m2), it may be seen that the back earth pressure is not applied to the front lagging due to the arching effect.
  • 5) When the relationship of the length L of the continuous sheet panel 20 and the width B between the two sheet panels 20 is 0.5≦L/B≦1.5 in the ranges of internal friction angle φ=14˜22° and the adhesive power C=0.0˜5.0 (ton/m2), it may be seen that the back earth pressure is not applied to the front lagging due to the arching effect.
  • 6) That is, when the relationship of the length L of the continuous sheet panel 20 and the width B between the two adjacent sheet panels 20 is 1.5≦L/B≦3.0 in the ranges of internal friction angle φ=10˜14° and the adhesive power C=0.0˜5.0 (ton/m2), it may be seen that the back earth pressure is not applied to the front lagging due to the arching effect.
  • Even when the L/B satisfies the range of 0.5≦L/B≦3.0, since a marginal space from a boundary of adjacent territory is insufficient or buildings may not be built continuously in the downtown area, there is a limit in construction so that the length of a continuous sheet panel may not satisfy the above-described range. As a solution to address the above limit in construction, the insufficient length of the continuous sheet panel is compensated for by a passive earth pressure due to an embedded depth Hb of FIG. 21. The embedded depth Hb is a minimum 1.0 m to improve safety of a wall member and to maintain a freezing depth.
  • An underground excavation construction method using a reinforced self-standing earth retaining structure according to the present invention will be described in detail with reference to the accompanying drawings. The method comprises
  • (a) Piling the soldier pile 10 into the ground of a boundary surface to be excavated to have a width B and a vertical depth H that is a designed ground;
  • (b) Inserting the sheet panel protruding portion 22 a into the soldier pile insertion portion 14 a formed at the flange 12 of the soldier pile 10 to be connected to each other, continuously inserting the sheet panel protruding portion 22 a into the sheet panel insertion portion 22 a′, and inserting the compression support plate protruding portion 46 a into the sheet panel insertion portion 22 a′ to be connected to each other, under the condition that a relationship between the length L of the continuous sheet panel 20 and the width B between the sheet panels 20 is 0.5≦L/B≦3.0 in a range of the internal friction angle of earth φ=10˜34° and a range of the adhesive power C=0.0˜5.0 ton/m2;
  • (c) Gradually performing underground excavation from the ground to a predetermined depth h1 and then inserting the lagging 30 from the top end of the soldier pile 10;
  • (d) When the excavation to the predetermined depth h1 is completed, performing further excavation to a predetermined depth h2 and then inserting the lagging 30 from the top end of the soldier pile 10;
  • (e) Completing the underground excavation by repeating the operations (c) and (d).
  • In the operation (b), a relationship between the length L of the continuous sheet panel 20 and the width B between the sheet panels 20 may be 0.5≦L/B≦1.5 in a range of the internal friction angle of earth φ=14˜22° and a range of the adhesive power C=0.0˜5.0 ton/m2. Also, in the operation (b), a relationship between the length L of the continuous sheet panel 20 and the width B between the sheet panels 20 may be 1.5≦L/B≦3.0 in a range of the internal friction angle of earth φ=10˜14° and a range of the adhesive power C=0.0˜5.0 ton/m2.
  • In a downtown area where a marginal space from a boundary of adjacent territory is insufficient or buildings exist one after another, there is a limit in construction so that the length of a continuous sheet panel may not satisfy the above-described range. In this case, as illustrated in FIG. 21, it is preferable to receive a passive earth pressure by installing the embedded portion Hb of the soldier pile 10 and the sheet panel 20 to be deeper than the vertical depth H that is the designed ground. This is to improve safety in relation to the movement and falling down of the reinforced self-standing earth retaining structure. When an appropriate L/B is not satisfied, an earth pressure is applied to the front lagging 30 so that the width B and the length L may be determined by structural calculation.
  • In the operation (b), the upper fixing device 50 a is coupled and fixed to the upper end of the connection portion of the sheet panel 20 by using the coupling bolt 56 a passing through the sheet panel 20, the attachment pad 52 a, and the coupling plate 54 a when the attachment pad 52 a and the coupling plate 54 a are sequentially located at both sides of the sheet panel 20. The lower fixing device 50 b includes the rotation plate 54 b formed in the second cut portion 56 b that rotates around the hinge shaft 58 b by an elastic force of the spring 59 b so that the upper end inclined surface 542 b of the rotation plate 54 b is caught by the hook step 526 b of the first cut portion 52 b. The rotation plate 54 b includes the upper end inclined surface 542 b formed on the upper end of the rotation plate 54 b, the lower end rotation groove 546 b formed in the lower end thereof, and the vertical insertion groove 544 b formed in the vertical surface thereof.
  • The installation and removal of the upper and lower fixing devices 50 a and 50 b are described below.
  • The sheet panel 20 is continuously assembled by inserting the sheet panel protruding portion 22 a into the soldier pile insertion portion 14 a installed on the ground (or the reversed S-shaped bent portion 22 b′ of the sheet panel 20 into the S-shaped bent portion 14 b of the soldier pile 10), and then the compression support plate protruding portion 46 a is inserted into the sheet panel insertion portion 22 a′.
  • The lower fixing device 50 b is structurally installed by installing the sheet panel 20 having the second cut portion 56 b formed therein after installing the sheet panel 20 having the first cut portion 52 b formed therein. The removal of the installed sheet panel 20 has the same order as above. That is, after the sheet panel 20 having the first cut portion 52 b is first removed, the sheet panel 20 having the second cut portion 56 b is removed. If the order is reversed, neither the installation nor the removal is possible.
  • The assembly and disassembly of the lower fixing device 50 b is described as follows.
  • First, in the assembly of the lower fixing device 50 b, when the sheet panel protruding portion 22 a of the sheet panel 20 having the second cut portion 56 b is inserted into the sheet panel insertion portion 22 a′ of the sheet panel 20 having the first cut portion 52 b that is installed underground, the rotation plate 54 b rotating around the hinge shaft 58 b is vertically guided by the sheet panel insertion portion 22 a′ having a vertical shape so as to be in a vertical state (see FIG. 15).
  • The hinge shaft 58 b is inserted into the shaft point 582 b. When the rotation plate 54 b maintaining the vertical state meets the first cut portion 52 b, as illustrated in FIG. 16, the rotation plate 54 b is rotated toward the first cut portion 52 b by the elastic force of the spring 59 b fixed to the spring mounting device 562 b so that the upper end inclined surface 542 b of the rotation plate 54 b is caught by the hook step 526 b of the first cut portion 52 b. The vertical insertion groove 544 b of the rotation plate 54 b inserted in the second cut portion 52 b of the sheet panel 20 and the lower end rotation groove 546 b inserted in the lower end portion of the second cut portion 56 b are respectively released from the second cut portion 52 b and the lower end portion of the second cut portion 56 b, together with the rotation of the rotation plate 54 b.
  • In particular, since the rotation plate 54 b is rotated around the hinge shaft 58 b, the lower end rotation groove 546 b of the rotation plate 54 b is formed to have a depth such that the rotation thereof is not hindered by the second cut portion 56 b of the sheet panel 20. As such, the lower fixing device 50 b is firmly fixed in a state that the upper end inclined surface 542 b of the rotation plate 54 b is caught by the hook step 526 b of the first cut portion 52 b.
  • The spring 59 b is inserted into the spring insertion groove 548 b of the rotation plate 54 b and fixed to the spring mounting device 562 b.
  • In the disassembly of the lower fixing device 50 b, when the upper end inclined surface 542 b of the rotation plate 54 b is caught by the hook step 526 b of the first cut portion 52 b, if the sheet panel 20 having the first cut portion 52 b is first pulled up for disassembly, the rotation plate 54 b is guided to be vertical by the sheet panel insertion portion 22 a′ having a vertical shape so as to be in a vertical state. While the sheet panel 20 having the first cut portion 52 b is pulled up, the rotation plate 54 b maintains a vertical state and the vertical insertion groove 544 b and the lower end rotation groove 546 b of the rotation plate 54 b are inserted again into the second cut portion 56 b of the sheet panel 20. Accordingly, while the sheet panel 20 having the first cut portion 52 b is pulled up, the rotation plate 54 b hardly interferes with the sheet panel 20 having the first cut portion 52 b so that the disassembly of the sheet panel 20 having the first cut portion 52 b is made easy. Since the lower fixing device 50 b has a simple structure that is easy to be assembled or disassembled, the assembly and disassembly work is efficient and rigidity of the serial sheet panels 20 is improved.
  • According to the present invention, a lump of self-standing earth of a reinforced earth type in which a back earth pressure is not applied to a lagging by using an arching effect between earth particles and a sheet panel. Accordingly, the back earth pressure applied to an excavation space may be resisted by the self-weight of the lump of self-standing earth. Thus, construction may be efficient and economical, compared to a conventional sheet pile.
  • Since the reinforced self-standing earth retaining structure using an arching effect is located at the back side of an excavation space, the structure does not interfere with an excavation work so that use of a large excavation space may be possible. Accordingly, an excavation work in a small space in a downtown area where tall buildings are densely arranged is made easy and efficient.
  • Since the connection portion of the sheet panel becomes a combined section by the upper and lower fixing devices, not only rigidity is improved but also the structures of the upper and lower fixing devices are simplified. Accordingly, the assembly and disassembly of the sheet panel connection portion is made easy and the collection of the installed sheet panels after the completion of the construction is made easy, so that construction and collection of sheet panels is efficient and economical.
  • While this invention has been particularly shown and described with reference to exemplary embodiments thereof, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (10)

1. A reinforced self-standing earth retaining structure using an arching effect, wherein a soldier pile integrally formed with a soldier pile insertion portion in a vertical direction in a flange at one end of the soldier pile in which a lagging is inserted is installed at a width B to be perpendicular to the ground, a sheet panel protruding portion is inserted in and connected to the soldier pile insertion portion, a sheet panel protruding portion is serially inserted in a sheet panel insertion portion, a compression support plate protruding portion is inserted in and coupled to the sheet panel insertion portion, and a relationship between a length L of a group of serial sheet panels and the width B between two groups of serial sheet panels is 0.5≦L/B≦3.0 in a range of an internal friction angle of earth φ=10˜34° and a range of an adhesive power C=0.0˜5.0 ton/m2 so that a back earth pressure is not applied to the front lagging due to the arching effect.
2. The reinforced self-standing earth retaining structure using an arching effect of claim 1, wherein the relationship of the length L of the continuous sheet panel and the width B between the two groups of sheet panels is 0.5≦L/B≦1.5 in the ranges of internal friction angle φ=14˜22° and the adhesive power C=0.0˜5.0 (ton/m2).
3. The reinforced self-standing earth retaining structure using an arching effect of claim 1, wherein the relationship of the length L of the continuous sheet panel and the width B between the two groups of sheet panels is 1.5≦L/B≦3.0 in the ranges of internal friction angle φ=10˜14° and the adhesive power C=0.0˜5.0 (ton/m2).
4. The reinforced self-standing earth retaining structure using an arching effect of claim 1, wherein a connection portion of the soldier pile comprises a soldier pile insertion portion or a soldier pine protruding portion, and a connection portion of the sheet panel coupled to the connection portion of the soldier pile comprises a sheet panel protruding portion or a sheet panel insertion portion.
5. The reinforced self-standing earth retaining structure using an arching effect of claim 1, wherein a compression support plate comprises a vertical portion and a horizontal portion and a connection portion of the compression support plate comprises a compression support plate protruding portion or a compression support plate insertion portion that is integrally formed with the vertical portion.
6. The reinforced self-standing earth retaining structure using an arching effect of claim 1, wherein the connection portion of the sheet panel is firmly fixed by using upper and lower fixing devices, wherein the upper fixing device is fixed by a coupling bolt passing through the sheet panel, an attachment pad, and a coupling plate when the attachment pad and the coupling plate are sequentially located at both sides of the connection portion of the sheet panel, the lower fixing device comprises a first cut portion and a second cut portion, an upward inclined surface and a hook step are formed at the first cut portion, and a rotation plate and a spring are formed at the second cut portion, an upper end inclined surface is formed on an upper end of the rotation plate that rotates around a hinge shaft, a lower end rotation groove is formed on a lower end of the rotation plate and a vertical insertion groove is formed on a vertical surface thereof, and the spring inserted in the spring insertion groove is connected and fixed to a spring mounting device.
7. An underground excavation construction method using a reinforced self-standing earth retaining structure, the method comprising:
(a) piling a soldier pile into the ground of a boundary surface to be excavated to have a width B and a vertical depth H that is a depth of a designed ground;
(b) inserting a sheet panel protruding portion into a soldier pile insertion portion formed at a flange of the soldier pile to be connected to each other, continuously inserting the sheet panel protruding portion into a sheet panel insertion portion, and inserting a compression support plate protruding portion into the sheet panel insertion portion to be connected to each other, under the condition that a relationship between a length L of a continuous sheet panel and a width B between the sheet panels is 0.5≦L/B≦3.0 in a range of an internal friction angle of earth φ=10˜34° and a range of an adhesive power C=0.0˜5.0 ton/m2;
(c) gradually performing underground excavation from the ground to a predetermined depth h1 and then inserting a lagging from the top end of the soldier pile;
(d) when the excavation to the predetermined depth h1 is completed, performing further excavation to a predetermined depth h2 and then inserting the lagging from the top end of the soldier pile; and
(e) completing the underground excavation by repeating the operations (c) and (d).
8. The method of claim 7, wherein, in the operation (b), a relationship between the length L of the continuous sheet panel and the width B between the sheet panels is 0.5≦L/B≦1.5 in a range of the internal friction angle of earth φ=14˜22° and a range of the adhesive power C=0.0˜5.0 ton/m2.
9. The method of claim 7, wherein, in the operation (b), a relationship between the length L of the continuous sheet panel and the width B between the sheet panels is 1.5≦L/B≦3.0 in a range of the internal friction angle of earth φ=10˜14° and a range of the adhesive power C=0.0˜5.0 ton/m2.
10. The method of claim 7, wherein, in the operation (b), an upper fixing device is fixed by a coupling bolt passing through the sheet panel, an attachment pad, and a coupling plate when the attachment pad and the coupling plate are sequentially located at both sides of the connection portion of the sheet panel, a lower fixing device comprises a first cut portion and a second cut portion, an upward inclined surface and a hook step are formed at the first cut portion, and a rotation plate and a spring are formed at the second cut portion, an upper end inclined surface is formed on an upper end of the rotation plate that rotates around a hinge shaft, a lower end rotation groove is formed in a lower end of the rotation plate and a vertical insertion groove is formed in a vertical surface thereof, and the spring inserted in the spring insertion groove is connected and fixed to a spring mounting device.
US13/375,650 2010-02-20 2010-12-09 Reinforced self-standing earth retaining structure using an arching effect and an underground excavation construction method using the same Abandoned US20120076594A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
KR1020100015443A KR20110095980A (en) 2010-02-20 2010-02-20 Reinforced massive soil body making use of arching effect and method constructing by it
KR10-2010-0015443 2010-02-20
PCT/KR2010/008812 WO2011102595A2 (en) 2010-02-20 2010-12-09 Reinforced self-supported retaining wall structure making use of the arching effect and a construction method of excavations using the same

Publications (1)

Publication Number Publication Date
US20120076594A1 true US20120076594A1 (en) 2012-03-29

Family

ID=44483433

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/375,650 Abandoned US20120076594A1 (en) 2010-02-20 2010-12-09 Reinforced self-standing earth retaining structure using an arching effect and an underground excavation construction method using the same

Country Status (6)

Country Link
US (1) US20120076594A1 (en)
EP (1) EP2537988A4 (en)
JP (1) JP5501478B2 (en)
KR (1) KR20110095980A (en)
CN (1) CN102713079B (en)
WO (1) WO2011102595A2 (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USD736961S1 (en) * 2013-11-21 2015-08-18 Lite Guard Safety Solutions Pty Ltd Shield panel
USD737474S1 (en) * 2013-11-21 2015-08-25 Lite Guard Safety Solutions Pty Ltd Shield panel
USD755410S1 (en) * 2013-02-21 2016-05-03 Lite Guard Safety Solutions Pty. Shield panel
CN107447769A (en) * 2017-09-15 2017-12-08 浙江大学城市学院 A kind of simple detachable dress drainage curtain for underwater pile inspection and measurement
USD823483S1 (en) * 2016-10-11 2018-07-17 W ENGINEERING GmbH Optimizing element for sheet piles
USD823099S1 (en) * 2016-10-11 2018-07-17 W ENGINEERING GmbH Optimizing element for sheet piles
USD823484S1 (en) * 2016-10-11 2018-07-17 W ENGINEERING GmbH Optimizing element for sheet piles
US10094088B1 (en) * 2017-10-31 2018-10-09 Earth, Inc. Sheet pile retaining wall system
USD837045S1 (en) * 2017-12-12 2019-01-01 Jens Rehhahn Sheet pile
USD863818S1 (en) * 2017-10-16 2019-10-22 Sheen World Technology Corporation Venetian blind slat
CN111090904A (en) * 2019-12-23 2020-05-01 辽宁工程技术大学 Soil pressure calculation method based on generalized double-shear stress yield criterion
CN112049125A (en) * 2020-09-28 2020-12-08 武汉华中岩土工程有限责任公司 Method for enhancing stability of supporting structure
US11293161B2 (en) * 2019-08-07 2022-04-05 Structure Sight LLC Retaining wall
US20230099182A1 (en) * 2021-09-30 2023-03-30 Shandong University Structural engineering dominated geotechnical structured permanent supporting system and design method

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106480880B (en) * 2015-08-28 2018-11-27 上海勘测设计研究院有限公司 Recoverable soil nailing and the construction method for using recoverable soil nail
JP7102228B2 (en) * 2017-05-22 2022-07-19 ジオスター株式会社 How to build concrete sheet pile members, earth retaining walls and earth retaining walls
RU175988U1 (en) * 2017-06-02 2017-12-26 Общество С Ограниченной Ответственностью "Производственная Фирма "Редар" Retaining wall module
JP7077907B2 (en) * 2018-10-16 2022-05-31 日本製鉄株式会社 Abutment reinforcement structure
CN110924401A (en) * 2019-12-13 2020-03-27 武汉武水水利生态工程技术有限公司 Construction foundation pit supporting mode for combined arching and bearing of mixing piles and cast-in-place piles

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US912497A (en) * 1907-07-29 1909-02-16 Frank W Skinner Locking the joints of adjacent units of sheet-piling or other structural elements.
US5406769A (en) * 1988-05-13 1995-04-18 Henri Vidal Joining of a concrete element to a support
US5551808A (en) * 1993-06-02 1996-09-03 Raswill Representative Pte. Ltd. Interlocking joint
US20010009088A1 (en) * 1998-08-13 2001-07-26 Intersil Corporation Sheet piling-supported modular wall system
US6299386B1 (en) * 1999-06-09 2001-10-09 R. John Byrne Method and apparatus for a shoring wall
US6893191B2 (en) * 2002-07-19 2005-05-17 Creative Pultrusions, Inc. Wale and retaining wall system
US20060045631A1 (en) * 2004-08-25 2006-03-02 Irvine John E Apparatus and method for inserting sheet piles into a soil formation
US20090123237A1 (en) * 2005-08-09 2009-05-14 Richard Heindl Arrangement of sheet-pile components

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5854125A (en) * 1981-09-28 1983-03-31 Kunimitsu Yamada Construction method for continuous underground wall
US4674921A (en) * 1984-05-04 1987-06-23 Berger Lawrence E Seawall
DE19526396C2 (en) * 1995-07-19 2000-11-02 Dyckerhoff Ag Construction pit shoring, process for its production and building material mix therefor
JPH09111754A (en) * 1995-10-17 1997-04-28 Marufuji Shiitopairu Kk Soldier pile cut-of wall construction method
JP3072065B2 (en) * 1997-03-31 2000-07-31 株式会社さとうベネック Earth retaining wall
JPH10280396A (en) * 1997-04-09 1998-10-20 Shinetsu Kenko:Kk Construction method of continuos underground water shielding wall with water shielding sheet embedded therein and continuos underground shielding wall structure with water shielding sheet spread therein
US6715964B2 (en) * 2000-07-28 2004-04-06 Peratrovich, Nottingham & Drage, Inc. Earth retaining system such as a sheet pile wall with integral soil anchors
JP4382974B2 (en) * 2000-09-11 2009-12-16 大成建設株式会社 Connection structure of wall and sheet pile member
JP3805342B2 (en) * 2004-01-19 2006-08-02 株式会社竹中工務店 Yamadome wall structure
JP4494157B2 (en) * 2004-10-06 2010-06-30 株式会社奥村組 Earth retaining method using stake pile sheet pile and Messel steel plate
JP4343080B2 (en) * 2004-10-12 2009-10-14 大成建設株式会社 Continuous underground wall
CN101503876A (en) * 2009-03-12 2009-08-12 中船第九设计研究院工程有限公司 Combined steel sheet pile and integrated vertical wall used for bay dock or dock basin
KR20090050042A (en) * 2009-04-29 2009-05-19 한창헌 Connection method h pile and wide sheet pile
KR100978468B1 (en) * 2009-06-12 2010-08-26 박강호 Reinforced massive soil body making use of arching effect and method constructing by it

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US912497A (en) * 1907-07-29 1909-02-16 Frank W Skinner Locking the joints of adjacent units of sheet-piling or other structural elements.
US5406769A (en) * 1988-05-13 1995-04-18 Henri Vidal Joining of a concrete element to a support
US5551808A (en) * 1993-06-02 1996-09-03 Raswill Representative Pte. Ltd. Interlocking joint
US20010009088A1 (en) * 1998-08-13 2001-07-26 Intersil Corporation Sheet piling-supported modular wall system
US6299386B1 (en) * 1999-06-09 2001-10-09 R. John Byrne Method and apparatus for a shoring wall
US6893191B2 (en) * 2002-07-19 2005-05-17 Creative Pultrusions, Inc. Wale and retaining wall system
US20060045631A1 (en) * 2004-08-25 2006-03-02 Irvine John E Apparatus and method for inserting sheet piles into a soil formation
US20090123237A1 (en) * 2005-08-09 2009-05-14 Richard Heindl Arrangement of sheet-pile components

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Bosscher and Gray, "Soil Arching in Sandy Slopes", June 1986, Journal of Geotechnical Engineering, Vol 112, No. 6, pages 626-645 *
Han, "Behaviour of Soldier Piles and Timber Lagging Support Systems", 2002 *
Perko and Boulden, "Lateral Earth Pressure on Lagging in Soldier Pile Wall Systems", November 2008, DFI Journal, Vol 2, No. 1, pages 46-54 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USD755410S1 (en) * 2013-02-21 2016-05-03 Lite Guard Safety Solutions Pty. Shield panel
USD737474S1 (en) * 2013-11-21 2015-08-25 Lite Guard Safety Solutions Pty Ltd Shield panel
USD736961S1 (en) * 2013-11-21 2015-08-18 Lite Guard Safety Solutions Pty Ltd Shield panel
USD823484S1 (en) * 2016-10-11 2018-07-17 W ENGINEERING GmbH Optimizing element for sheet piles
USD823483S1 (en) * 2016-10-11 2018-07-17 W ENGINEERING GmbH Optimizing element for sheet piles
USD823099S1 (en) * 2016-10-11 2018-07-17 W ENGINEERING GmbH Optimizing element for sheet piles
CN107447769A (en) * 2017-09-15 2017-12-08 浙江大学城市学院 A kind of simple detachable dress drainage curtain for underwater pile inspection and measurement
USD863818S1 (en) * 2017-10-16 2019-10-22 Sheen World Technology Corporation Venetian blind slat
US10094088B1 (en) * 2017-10-31 2018-10-09 Earth, Inc. Sheet pile retaining wall system
USD837045S1 (en) * 2017-12-12 2019-01-01 Jens Rehhahn Sheet pile
US11293161B2 (en) * 2019-08-07 2022-04-05 Structure Sight LLC Retaining wall
CN111090904A (en) * 2019-12-23 2020-05-01 辽宁工程技术大学 Soil pressure calculation method based on generalized double-shear stress yield criterion
CN112049125A (en) * 2020-09-28 2020-12-08 武汉华中岩土工程有限责任公司 Method for enhancing stability of supporting structure
US20230099182A1 (en) * 2021-09-30 2023-03-30 Shandong University Structural engineering dominated geotechnical structured permanent supporting system and design method

Also Published As

Publication number Publication date
CN102713079B (en) 2015-01-07
WO2011102595A2 (en) 2011-08-25
KR20110095980A (en) 2011-08-26
CN102713079A (en) 2012-10-03
EP2537988A4 (en) 2015-11-18
JP2013514472A (en) 2013-04-25
WO2011102595A3 (en) 2011-11-10
JP5501478B2 (en) 2014-05-21
EP2537988A2 (en) 2012-12-26

Similar Documents

Publication Publication Date Title
US20120076594A1 (en) Reinforced self-standing earth retaining structure using an arching effect and an underground excavation construction method using the same
CN209975536U (en) Civil construction foundation ditch support device that prevents collapsing
KR101572561B1 (en) Steel assembly for Pile
US20130272800A1 (en) Ground mounting assembly
KR100998253B1 (en) Temporary Structure For Land-Side Protection Wall
WO2014144327A2 (en) Ground mounting assembly
JP6650257B2 (en) Mountain retaining structure and construction method thereof
KR100789210B1 (en) Land-side protection wall using composite pile connected two piles in a body
WO2011036771A1 (en) Wall surface panel
CN102493475B (en) Lattice pile foundation and construction method thereof
KR100978468B1 (en) Reinforced massive soil body making use of arching effect and method constructing by it
JP4906931B2 (en) Civil engineering block
JP4705513B2 (en) Foundation structure
KR100789209B1 (en) Land-side protection wall using composite pile connected two piles in a body
KR101542602B1 (en) Equipment of temporary earth protection for building works
JP5001660B2 (en) Buffer structure for steel frame embankment for sabo and forestry
KR20200006648A (en) An Earth Retaining Wall and Construction Method thereof
KR102075861B1 (en) Front Block for Reinforced Earth Retaining Wall and Reinforced Earth Retaining Wall Structure using the Same
JP4866264B2 (en) Underground box
KR20230035903A (en) Thumb piles introduced with inclined and crossed prestress and construction method for self-supporting temporary retaining using the same
JP6774774B2 (en) Pile foundation structure
JP4491840B1 (en) Protective body support structure
JP5427463B2 (en) Protective levee body and construction method of protective dam body
JP7475097B1 (en) Protective fence
KR102376019B1 (en) Corrugated steel wall

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION