US20120031114A1 - Method and system for producing clear ice - Google Patents

Method and system for producing clear ice Download PDF

Info

Publication number
US20120031114A1
US20120031114A1 US13/194,257 US201113194257A US2012031114A1 US 20120031114 A1 US20120031114 A1 US 20120031114A1 US 201113194257 A US201113194257 A US 201113194257A US 2012031114 A1 US2012031114 A1 US 2012031114A1
Authority
US
United States
Prior art keywords
water
conductivity
sump
predetermined
water level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/194,257
Inventor
Lee Gerard Mueller
Daryl G. Erbs
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Emerson Automation Solutions GmbH
Original Assignee
Manitowoc Foodservice Companies LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Manitowoc Foodservice Companies LLC filed Critical Manitowoc Foodservice Companies LLC
Priority to US13/194,257 priority Critical patent/US20120031114A1/en
Assigned to MANITOWOC FOODSERVICE COMPANIES, LLC reassignment MANITOWOC FOODSERVICE COMPANIES, LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ERBS, DARYL G., MUELLER, LEE GERARD
Publication of US20120031114A1 publication Critical patent/US20120031114A1/en
Assigned to JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT reassignment JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: APPLIANCE SCIENTIFIC, INC., CLEVELAND RANGE, LLC, ENODIS CORPORATION, FRYMASTER L.L.C., GARLAND COMMERCIAL INDUSTRIES LLC, MANITOWOC FOODSERVICE COMPANIES, LLC, THE DELFIELD COMPANY, LLC
Assigned to GARLAND COMMERCIAL INDUSTRIES LLC, APPLIANCE SCIENTIFIC, INC., MANITOWOC FOODSERVICE COMPANIES, LLC, ENODIS CORPORATION, THE DELFIELD COMPANY, LLC, CLEVELAND RANGE, LLC, FRYMASTER L.L.C. reassignment GARLAND COMMERCIAL INDUSTRIES LLC RELEASE OF SECURITY INTEREST IN UNITED STATES PATENTS Assignors: JPMORGAN CHASE BANK, N.A.
Assigned to PENTAIR FLOW SERVICES AG reassignment PENTAIR FLOW SERVICES AG ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ENODIS CORPORATION, MANITOWOC FOODSERVICE COMPANIES, LLC, MANITOWOC FSG OPERATIONS, LLC, WELBILT (CHINA) FOODSERVICE CO., LTD., Welbilt (Halesowen) Limited, WELBILT FSG U.S. HOLDING, LLC, WELBILT, INC.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C1/00Producing ice
    • F25C1/18Producing ice of a particular transparency or translucency, e.g. by injecting air
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F23/00Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
    • G01F23/22Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by measuring physical variables, other than linear dimensions, pressure or weight, dependent on the level to be measured, e.g. by difference of heat transfer of steam or water
    • G01F23/24Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by measuring physical variables, other than linear dimensions, pressure or weight, dependent on the level to be measured, e.g. by difference of heat transfer of steam or water by measuring variations of resistance of resistors due to contact with conductor fluid
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F23/00Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
    • G01F23/22Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by measuring physical variables, other than linear dimensions, pressure or weight, dependent on the level to be measured, e.g. by difference of heat transfer of steam or water
    • G01F23/24Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by measuring physical variables, other than linear dimensions, pressure or weight, dependent on the level to be measured, e.g. by difference of heat transfer of steam or water by measuring variations of resistance of resistors due to contact with conductor fluid
    • G01F23/241Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by measuring physical variables, other than linear dimensions, pressure or weight, dependent on the level to be measured, e.g. by difference of heat transfer of steam or water by measuring variations of resistance of resistors due to contact with conductor fluid for discrete levels
    • G01F23/242Mounting arrangements for electrodes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C2400/00Auxiliary features or devices for producing, working or handling ice
    • F25C2400/14Water supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C2600/00Control issues
    • F25C2600/04Control means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C2700/00Sensing or detecting of parameters; Sensors therefor
    • F25C2700/04Level of water

Definitions

  • the present disclosure generally relates to a method and system for producing clear ice by monitoring the conductivity of water (e.g., Total Dissolved Solids (TDS)) in an ice machine and adding additional water when conductivity exceeds a predetermined level, thereby reducing the TDS level of the water and enabling the formation of clear ice.
  • TDS Total Dissolved Solids
  • the present disclosure provides for the formation of clear or clearer ice by monitoring or detecting the conductivity of water to ensure that the TDS level of the water is maintained below a predetermined level during the freeze cycle by the addition of fresh water from the water source.
  • TDS water-borne dissolved minerals commonly referred to as TDS, measured in parts per million (ppm).
  • ppm water-borne dissolved minerals commonly referred to as TDS, measured in parts per million (ppm).
  • Unacceptably large concentrations of TDS interfere with machine operation while in solution, and form deposits of unwanted scale when the water changes phase. Scaling in ice makers can also result in increased level of difficulty in harvesting ice cubes, as they will often become stuck to the evaporator plate, and eventually may damage the evaporator plate.
  • Another drawback of conventional ice making equipment is that the rate of scale buildup varies with the varying TDS concentration in different types of water sources, the level of water treatment, and the geographic region.
  • the present inventors have developed a unique method and system for formation of clear ice, which does not have to dump water to maintain the TDS level.
  • the present disclosure monitors the conductivity level (e.g., TDS level) during the freeze cycle and when the TDS level exceed a predetermined level, the pump valve is energized so that fresh water is introduced into the ice making machine during the freeze cycle to ensure that the TDS level remains below the predetermined level during a substantial portion of the freeze cycle so that ice clear or substantially clear ice is produced. This reduces the amount of water used and also produces consistently clear ice during each freeze/harvest cycle, which is not possible using the monitoring and discharge systems disclosed in the prior art.
  • a method for making clear ice comprising: filling a water sump to a predetermined level; contacting a refrigerant to an evaporator; circulating water from the sump over the evaporator to form ice on the evaporator; monitoring the water level in the sump; and monitoring the conductivity of the water in the sump to determine if the conductivity of the water is equal to or greater than a predetermined conductivity valve, (i) if the conductivity is not equal to or greater than the predetermined conductivity valve and if the water level reaches a predetermined lower water level, then complete the ice making cycle and initiate to the harvest cycle; or (ii) if the conductivity is equal to or greater than the predetermined conductivity valve and if the water level has not reached a predetermined lower water level, then add additional water to the water sump.
  • the step of monitoring the water level is via a water level probe comprising a first probe for detecting a high water level and second and third probes for detecting a low water level.
  • the water level probe measures the conductivity of the water by determining the conductivity difference between the second and third probes, wherein the third probe is a reference probe.
  • the predetermined conductivity value is about 30 GPH.
  • a system for producing clear ice comprising: a water supply; a water sump; an evaporator; a water inlet valve disposed between the water supply and the water sump; a pump for circulating water from the sump to the evaporate during an ice making cycle; a controller that monitors the water level in the sump and the conductivity of the water in the sump to determine if the conductivity of the water is equal to or greater than a predetermined conductivity valve, (i) if the conductivity is not equal to or greater than the predetermined conductivity valve and if the water level reaches a predetermined lower water level, then complete the ice making cycle and initiate the harvest cycle; or (ii) if the conductivity is equal to or greater than the predetermined conductivity valve and if the water level has not reached a predetermined lower water level, then add additional water to the water sump.
  • FIG. 1 is a schematic representation of a water level probe function of the present disclosure
  • FIG. 2 is a block diagram of the water system flow according to the present disclosure.
  • FIG. 3 is logic diagram of the TDS sensing process and water fill used to form clear ice according to the present disclosure.
  • a system for making ice while controlling the water inlet and outlet based on the water conductivity in the sump trough The water inlet valve is energized to bring all of the water in at one time prior to initiating the freeze cycle. Preferably, the amount of water is sufficient make a single batch of ice through one freeze and harvest cycle. And a conductivity measurement is made and depending upon the measurement the water valve may be energized again throughout the ice making or freezing cycle, as is necessary to maintain the conductivity or TDS level at or below a predetermined amount. During the freeze cycle, sensor readings are periodically taken of the water in the sump to determine if additional water needs to be added to reduce the TDS level, thereby producing substantially clear ice.
  • the system measures TDS of the supply water in the sump as water enters the system. If TDS is below the lower limit of normal, then no more water is brought into the sump and ice is made with that minimal amount of water. That is, the sump is initially filled until water contacts the lower level sensor which allows measurements of TDS. If the TDS measurement is between the lower and upper limit of normal, then an additional quantity of water is added to the sump by filling the sump until water contacts the upper level sensor and ice is continued to be made with that total water quantity. If TDS is above the upper limit of normal, then an additional quantity of water is added to the sump by filling the sump until water contacts the upper level sensor during the course of the ice making cycle.
  • FIG. 1 is block diagram of water system 1 used in the system of the present disclosure.
  • System 1 initiates the ice making process via control board 3 which sends output signals via electrical conduits 5 and 7 to energize water inlet valve 9 and de-energize water dump valve 11 , respectively.
  • control board 3 sends output signals via electrical conduits 5 and 7 to energize water inlet valve 9 and de-energize water dump valve 11 , respectively.
  • water inlet valve 9 energized, water from water supply 13 passes through water inlet valve 9 via conduit 15 into water sump trough 17 where it is pump via pump 19 into conduit 21 and thereafter to water distributor 23 .
  • Water from water distributor 23 is then distributed over evaporator 25 where it is formed into ice. Water that does not freeze onto evaporator 25 is then returned to water sump trough 17 for recycling to water distributor 23 .
  • a water level probe 27 is capable of measuring the water level in water sump trough 17 , as well as detecting the conductivity of the water in water sump trough 17 , so that the TDS level of the water can be monitored by control board 3 .
  • FIG. 1 depicts water level probe 27 , wherein probe ‘A’ is disposed at the level of water needed to for the ice making cycle to make a desired quantity of ice. Probes ‘B’ and ‘C’ are both disposed at the low level and measure conductivity of the water. As the water level drops during the ice making cycle from level ‘A’ where is registered low TDS or low conductivity toward levels ‘B’ and ‘C’, then conductivity tends to increase.
  • control board 3 opens water inlet valve 9 so that fresh or additional water from water supply 13 passes through conduit 15 into water sump trough 17 . This additional water is then pumped to water distributor 23 via pump 19 and conduit 21 so that the ice being formed on evaporator 25 remains substantially clear. If additional water is not added when the conductivity or TDS level reaches an undesirably high level, then the ice being formed would tend to get cloudy which is not appealing to consumers. See Table 1 below:
  • FIG. 1 is a diagram showing the relative probe location.
  • the high level probe is identified as “A” in this figure and is used to determine the high water level of the water sump.
  • Probes “B” and “C” are low water level probes and are used to identify the low water sump level, as well as to measure the conductivity of the water present in the sump.
  • FIG. 3 is a logic diagram that depicts the ice making method of the present disclosure.
  • the user will initiate the start of the ice cycle 31 .
  • the system then check to see if ice cycle is beginning 33 . If the ice cycle does not begin, then the system returns to 31 . If the ice cycle does begin, then the conductivity of the water in sump trough 17 is measured 35 by water level probe 27 and control board 3 .
  • Control board 3 compares 37 measured conductivity (M) to preset conductivities (H,N,L).
  • Conductivity is a measurement of a materials ability to conduct electricity.
  • the water level probe is also measuring the conductivity of the water in the water sump.
  • the resistance between the probes indicates the water's concentration of total dissolved solids (TDS) and scale.
  • TDS total dissolved solids
  • the table in FIG. 1 describes the threshold levels for low to high levels of TDS and scale.
  • the controller measures the conductivity of the water via probes “B” and “C” ( FIG. 1 ) and compares the measurement to a stored value resident in the controller.
  • M measured conductivity
  • the system determines if the measured conductivity (M) is high 49 , i.e., M ⁇ H preset valve. If the measured conductivity is not high, then the system returns to compare measured M to preset (H,N,L) 37 . If the measured conductivity is high where M ⁇ H, then control board 3 energize water inlet 9 such that additional or fresh water is supplied to water sump trough 17 via water supply 13 during the freeze cycle 51 and then ends the ice formation 47 . End of ice Formation 47 means that the machine operates until it is signaled from the Ice Thickness Probe (ITP) at which point the machine enters into harvest cycle and ultimately the completion of the complete cycle.
  • ITP Ice Thickness Probe
  • control board 3 energizes the water dump valve 11 , such that all of the water in sump trough 17 is dumped at the end of the ice making cycle 53 and then the freeze cycle is ended 43 .
  • the Ice Thickness Probe determines when the machine is to enter into the harvest mode. When the ice forms on the evaporator to a point where the individual cubes are interconnected (bridged) the ice contacts the ITP and a signal is sent to the control board which initiates harvest. That is, the system continues its' normal freeze cycle and is terminated when the Ice Thickness Probe (ITP) signals the controller.

Abstract

A method for making clear ice comprising: filling a water sump to a predetermined level; contacting a refrigerant to an evaporator; circulating water from the sump over the evaporator to form ice on the evaporator; monitoring the water level in the sump; and monitoring the conductivity of the water in the sump to determine if the conductivity of the water is equal to or greater than a predetermined conductivity valve, (i) if the conductivity is not equal to or greater than the predetermined conductivity valve and if the water level reaches a predetermined lower water level, then complete the ice making cycle and initiate the harvest cycle; or (ii) if the conductivity is equal to or greater than the predetermined conductivity valve and if the water level has not reached a predetermined lower water level, then add additional water to the water sump.

Description

    CROSS-REFERENCED APPLICATIONS
  • This application claims priority to U.S. Provisional Application No. 61/370,422, filed on Aug. 3, 2010, which is incorporated herein by reference in its entirety.
  • BACKGROUND
  • 1. Field
  • The present disclosure generally relates to a method and system for producing clear ice by monitoring the conductivity of water (e.g., Total Dissolved Solids (TDS)) in an ice machine and adding additional water when conductivity exceeds a predetermined level, thereby reducing the TDS level of the water and enabling the formation of clear ice. In particular, the present disclosure provides for the formation of clear or clearer ice by monitoring or detecting the conductivity of water to ensure that the TDS level of the water is maintained below a predetermined level during the freeze cycle by the addition of fresh water from the water source.
  • 2. Discussion of the Background Art
  • It is know in the ice making industry that excessive TDS concentrations in water can prevent the formation of ice cubes and also product undesirable cloudy appearing ice cubes. In addition, once of the causes for equipment failure in ice making and steaming equipment is water-borne dissolved minerals commonly referred to as TDS, measured in parts per million (ppm). Unacceptably large concentrations of TDS interfere with machine operation while in solution, and form deposits of unwanted scale when the water changes phase. Scaling in ice makers can also result in increased level of difficulty in harvesting ice cubes, as they will often become stuck to the evaporator plate, and eventually may damage the evaporator plate.
  • Furthermore, as TDS builds up in an icemaker, the pH of the water also increases, which decreases the ability of minerals to stay in solution. Thus, left unchecked, the scale forms progressively faster.
  • Conventional icemakers address the problem of TDS buildup by periodically flushing the water lines and other components during the harvest phase of the cube formation cycle. In addition, the storage sump, which retains a supply of chilled water recirculated to form ice cubes, is also emptied at this time, either partially or totally.
  • Other attempts to decrease TDS and scaling in the water supply of ice makers, steamers and other water phase changing devices include the use of more effective filters and the addition of feed phosphates or acidulates to stop the buildup of minerals. Although filtration is effective in substantially reducing suspended particles, the ionic particles in solution in the water are not significantly reduced. The addition of phosphates or acid to filtered water has also been found to further prolong the service interval as compared to filtration alone. The chemical additives assist in maintaining the ionic particles in solution longer. However, users of such equipment have still been forced to dump excessive amounts of chilled water from their units.
  • Another drawback of conventional ice making equipment is that the rate of scale buildup varies with the varying TDS concentration in different types of water sources, the level of water treatment, and the geographic region.
  • The problem with periodically flushing the water lines and water in the sump is that it costs additional money in terms of sewage disposal and new filtered water. This problem was addressed in U.S. Pat. No. 5,527,470 (Suda) which is directed to a method for monitoring and controlling an ice machine by monitoring the TDS concentration of the recirculating water in the machine. If the TDS has been determined to exceed a predetermined level, then after the harvest cycle has been completed, the system will discharge all or a portion of the water from the sump and then introduce new water. Rather than discharging all of the water, as in some of the earlier attempts to regulated TDS in ice making water, Suda attempts to discharge only a portion and then adds only enough refresh water to insure that the sump water is below the predetermined TDS level. Unfortunately, this is still wasteful, results in cloudy ice and not ecologically desirable. That is, once the ice making machine of Suda initiates the freeze cycle is utilizes whatever water is presently in the sump to make ice regardless of its TDS level during the freeze cycle. However, as the ice begins to form, the present inventors have discovered that the TDS level in the sump increases and may exceed the predetermined TDS level and, thus, causes the formation of cloudy ice.
  • Contrary to either of the prior art processes seeking to reduce TDS levels as discussed above, the present inventors have developed a unique method and system for formation of clear ice, which does not have to dump water to maintain the TDS level. To the contrary, the present disclosure monitors the conductivity level (e.g., TDS level) during the freeze cycle and when the TDS level exceed a predetermined level, the pump valve is energized so that fresh water is introduced into the ice making machine during the freeze cycle to ensure that the TDS level remains below the predetermined level during a substantial portion of the freeze cycle so that ice clear or substantially clear ice is produced. This reduces the amount of water used and also produces consistently clear ice during each freeze/harvest cycle, which is not possible using the monitoring and discharge systems disclosed in the prior art.
  • The present disclosure also provides many additional advantages, which shall become apparent as described below.
  • SUMMARY
  • A method for making clear ice comprising: filling a water sump to a predetermined level; contacting a refrigerant to an evaporator; circulating water from the sump over the evaporator to form ice on the evaporator; monitoring the water level in the sump; and monitoring the conductivity of the water in the sump to determine if the conductivity of the water is equal to or greater than a predetermined conductivity valve, (i) if the conductivity is not equal to or greater than the predetermined conductivity valve and if the water level reaches a predetermined lower water level, then complete the ice making cycle and initiate to the harvest cycle; or (ii) if the conductivity is equal to or greater than the predetermined conductivity valve and if the water level has not reached a predetermined lower water level, then add additional water to the water sump.
  • If the ice making cycle has ended and the conductivity of the water in the sump is not equal to or greater than the predetermined valve, adding additional water to the sump before initiating another ice making cycle.
  • If the ice making cycle has ended and the conductivity of the water in the sump is equal to or greater than the predetermined conductivity valve, dumping the water in the sump and adding freeze water to the sump before initiating another ice making cycle.
  • The step of monitoring the water level is via a water level probe comprising a first probe for detecting a high water level and second and third probes for detecting a low water level.
  • The water level probe measures the conductivity of the water by determining the conductivity difference between the second and third probes, wherein the third probe is a reference probe. The predetermined conductivity value is about 30 GPH.
  • A system for producing clear ice, the system comprising: a water supply; a water sump; an evaporator; a water inlet valve disposed between the water supply and the water sump; a pump for circulating water from the sump to the evaporate during an ice making cycle; a controller that monitors the water level in the sump and the conductivity of the water in the sump to determine if the conductivity of the water is equal to or greater than a predetermined conductivity valve, (i) if the conductivity is not equal to or greater than the predetermined conductivity valve and if the water level reaches a predetermined lower water level, then complete the ice making cycle and initiate the harvest cycle; or (ii) if the conductivity is equal to or greater than the predetermined conductivity valve and if the water level has not reached a predetermined lower water level, then add additional water to the water sump.
  • Further objects, features and advantages of the present disclosure will be understood by reference to the following drawings and detailed description.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a schematic representation of a water level probe function of the present disclosure;
  • FIG. 2 is a block diagram of the water system flow according to the present disclosure; and
  • FIG. 3 is logic diagram of the TDS sensing process and water fill used to form clear ice according to the present disclosure.
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
  • A system for making ice while controlling the water inlet and outlet based on the water conductivity in the sump trough. The water inlet valve is energized to bring all of the water in at one time prior to initiating the freeze cycle. Preferably, the amount of water is sufficient make a single batch of ice through one freeze and harvest cycle. And a conductivity measurement is made and depending upon the measurement the water valve may be energized again throughout the ice making or freezing cycle, as is necessary to maintain the conductivity or TDS level at or below a predetermined amount. During the freeze cycle, sensor readings are periodically taken of the water in the sump to determine if additional water needs to be added to reduce the TDS level, thereby producing substantially clear ice.
  • The system measures TDS of the supply water in the sump as water enters the system. If TDS is below the lower limit of normal, then no more water is brought into the sump and ice is made with that minimal amount of water. That is, the sump is initially filled until water contacts the lower level sensor which allows measurements of TDS. If the TDS measurement is between the lower and upper limit of normal, then an additional quantity of water is added to the sump by filling the sump until water contacts the upper level sensor and ice is continued to be made with that total water quantity. If TDS is above the upper limit of normal, then an additional quantity of water is added to the sump by filling the sump until water contacts the upper level sensor during the course of the ice making cycle.
  • The present disclosures can best be described by referring to the attached drawings, wherein FIG. 1 is block diagram of water system 1 used in the system of the present disclosure. System 1 initiates the ice making process via control board 3 which sends output signals via electrical conduits 5 and 7 to energize water inlet valve 9 and de-energize water dump valve 11, respectively. With water inlet valve 9 energized, water from water supply 13 passes through water inlet valve 9 via conduit 15 into water sump trough 17 where it is pump via pump 19 into conduit 21 and thereafter to water distributor 23. Water from water distributor 23 is then distributed over evaporator 25 where it is formed into ice. Water that does not freeze onto evaporator 25 is then returned to water sump trough 17 for recycling to water distributor 23.
  • A water level probe 27 is capable of measuring the water level in water sump trough 17, as well as detecting the conductivity of the water in water sump trough 17, so that the TDS level of the water can be monitored by control board 3. FIG. 1 depicts water level probe 27, wherein probe ‘A’ is disposed at the level of water needed to for the ice making cycle to make a desired quantity of ice. Probes ‘B’ and ‘C’ are both disposed at the low level and measure conductivity of the water. As the water level drops during the ice making cycle from level ‘A’ where is registered low TDS or low conductivity toward levels ‘B’ and ‘C’, then conductivity tends to increase. When the water's conductivity reaches a predetermined level, i.e., an undesirable TDS level, control board 3 opens water inlet valve 9 so that fresh or additional water from water supply 13 passes through conduit 15 into water sump trough 17. This additional water is then pumped to water distributor 23 via pump 19 and conduit 21 so that the ice being formed on evaporator 25 remains substantially clear. If additional water is not added when the conductivity or TDS level reaches an undesirably high level, then the ice being formed would tend to get cloudy which is not appealing to consumers. See Table 1 below:
  • TABLE 1
    TDS/CONDUCTIVITY
    SCALE B/C READING FUNCTION
    High (30-45 GPH) high If B/C probe readings are within this range, fill
    conductivity (low to level A, when water drops to B/C refill to A
    resistance) again for additional water and dump every
    cycle
    Normal (15-29 GPH) If B/C level is within this range, fill to level A
    and dump every cycle
    Low (0-14 GPH) low If B/C level is within this range, fill to level A
    conductivity (high and do not dump every cycle
    resistance)
  • FIG. 1 is a diagram showing the relative probe location. The high level probe is identified as “A” in this figure and is used to determine the high water level of the water sump. Probes “B” and “C” are low water level probes and are used to identify the low water sump level, as well as to measure the conductivity of the water present in the sump.
  • FIG. 3 is a logic diagram that depicts the ice making method of the present disclosure. The user will initiate the start of the ice cycle 31. The system then check to see if ice cycle is beginning 33. If the ice cycle does not begin, then the system returns to 31. If the ice cycle does begin, then the conductivity of the water in sump trough 17 is measured 35 by water level probe 27 and control board 3. Control board 3, then compares 37 measured conductivity (M) to preset conductivities (H,N,L). Conductivity is a measurement of a materials ability to conduct electricity. In this present disclosure the water level probe is also measuring the conductivity of the water in the water sump. The resistance between the probes indicates the water's concentration of total dissolved solids (TDS) and scale. The table in FIG. 1 describes the threshold levels for low to high levels of TDS and scale. The controller measures the conductivity of the water via probes “B” and “C” (FIG. 1) and compares the measurement to a stored value resident in the controller.
  • Control board 3 will then determine if the measured conductivity is equal or less than a preset or predetermined conductivity valve L≦Preset Value 39. If the conductivity is low and value L≦Preset Value then end ice formation 41 and end of ice making cycle 43. This again refers to the block diagram “end of ice formation” which is the completion of the ice freeze cycle. If L is greater than the Preset Value, then the system checks to see if measured conductivity (M) is NORMAL 45 (15-29 GPH), i.e., M=N. If conductivity is NORMAL, then end of ice formation 47. If conductivity is not NORMAL, then the system determines if the measured conductivity (M) is high 49, i.e., M≧H preset valve. If the measured conductivity is not high, then the system returns to compare measured M to preset (H,N,L) 37. If the measured conductivity is high where M≧H, then control board 3 energize water inlet 9 such that additional or fresh water is supplied to water sump trough 17 via water supply 13 during the freeze cycle 51 and then ends the ice formation 47. End of ice Formation 47 means that the machine operates until it is signaled from the Ice Thickness Probe (ITP) at which point the machine enters into harvest cycle and ultimately the completion of the complete cycle. If the system has measured high conductivity, then after the freeze cycle has been completed, control board 3 energizes the water dump valve 11, such that all of the water in sump trough 17 is dumped at the end of the ice making cycle 53 and then the freeze cycle is ended 43.
  • In normal operation, the Ice Thickness Probe (ITP) determines when the machine is to enter into the harvest mode. When the ice forms on the evaporator to a point where the individual cubes are interconnected (bridged) the ice contacts the ITP and a signal is sent to the control board which initiates harvest. That is, the system continues its' normal freeze cycle and is terminated when the Ice Thickness Probe (ITP) signals the controller.
  • While we have shown and described several embodiments in accordance with our invention, it is to be clearly understood that the same may be susceptible to numerous changes apparent to one skilled in the art. Therefore, we do not wish to be limited to the details shown and described but intend to show all changes and modifications that come within the scope of the appended claims.

Claims (12)

1. A method for making clear ice comprising:
filling a water sump to a predetermined level;
contacting a refrigerant to an evaporator;
circulating water from said sump over said evaporator to form ice on said evaporator;
monitoring the water level in said sump; and
monitoring the conductivity of the water in said sump to determine if the conductivity of said water is equal to or greater than a predetermined conductivity valve,
if the conductivity is not equal to or greater than said predetermined conductivity valve and if the water level reaches a predetermined lower water level, then complete the ice making cycle and initiate the harvest cycle; or
if the conductivity is equal to or greater than said predetermined conductivity valve and if the water level has not reached a predetermined lower water level, then add additional water to said water sump.
2. The method according to claim 1, if the ice making cycle has ended and the conductivity of said water in said sump is not equal to or greater than said predetermined valve, adding additional water to said sump before initiating another ice making cycle.
3. The method according to claim 1, if the ice making cycle has ended and the conductivity of the water in said sump is equal to or greater than said predetermined conductivity valve, dumping said water in said sump and adding freeze water to said sump before initiating another ice making cycle.
4. The method according to claim 1, wherein step of monitoring said water level is via a water level probe comprising a first probe for detecting a high water level and second and third probes for detecting a low water level.
5. The method according to claim 4, wherein said water level probe measures said conductivity of said water by determining the conductivity difference between said second and third probes, wherein said third probe is a reference probe.
6. The method according to claim 1, wherein said predetermined conductivity value is about 30 GPH.
7. A system for producing clear ice, said system comprising:
a water supply;
a water sump;
an evaporator
a water inlet valve disposed between said water supply and said water sump;
a pump for circulating water from said sump to said evaporate during an ice making cycle;
a controller that monitors the water level in said sump and the conductivity of the water in said sump to determine if the conductivity of said water is equal to or greater than a predetermined conductivity valve,
if the conductivity is not equal to or greater than said predetermined conductivity valve and if the water level reaches a predetermined lower water level, then complete the ice making cycle and initiate the harvest cycle; or
if the conductivity is equal to or greater than said predetermined conductivity valve and if the water level has not reached a predetermined lower water level, then add additional water to said water sump.
8. The system according to claim 7, if the ice making cycle has ended and the conductivity of said water in said sump is not equal to or greater than said predetermined valve, said water inlet valve is energized by said controller such that additional water from said water supply is added to said sump.
9. The system according to claim 7, further comprising a water dump valve such that if the ice making cycle has ended and the conductivity of the water in said sump is equal to or greater than said predetermined conductivity valve, said water dump valve is energized by said controller such that said water in said sump is dumped from the system before initiating another ice making cycle.
10. The system according to claim 7, wherein said controller further includes a water level probe comprising a first probe for detecting a high water level and second and third probes for detecting a low water level.
11. The system according to claim 10, wherein said water level probe measures said conductivity of said water by determining the conductivity difference between said second and third probes, wherein said third probe is a reference probe.
12. The system according to claim 7, wherein said predetermined conductivity value is about 30 GPH.
US13/194,257 2010-08-03 2011-07-29 Method and system for producing clear ice Abandoned US20120031114A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/194,257 US20120031114A1 (en) 2010-08-03 2011-07-29 Method and system for producing clear ice

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US37042210P 2010-08-03 2010-08-03
US13/194,257 US20120031114A1 (en) 2010-08-03 2011-07-29 Method and system for producing clear ice

Publications (1)

Publication Number Publication Date
US20120031114A1 true US20120031114A1 (en) 2012-02-09

Family

ID=45544851

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/194,257 Abandoned US20120031114A1 (en) 2010-08-03 2011-07-29 Method and system for producing clear ice

Country Status (7)

Country Link
US (1) US20120031114A1 (en)
EP (1) EP2600959A1 (en)
JP (1) JP5650842B2 (en)
CN (2) CN202149657U (en)
BR (1) BR112013002564A2 (en)
MX (1) MX2013001370A (en)
WO (1) WO2012018686A1 (en)

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120031115A1 (en) * 2010-08-03 2012-02-09 Manitowoc Foodservice Companies, Llc Low pressure control for signaling a time delay for ice making cycle start up
WO2014117111A1 (en) * 2013-01-25 2014-07-31 True Manufacturing Co., Inc. Ice maker with slide out slump
US20160290697A1 (en) * 2015-04-06 2016-10-06 True Manufacturing Co., Inc. Ice maker with automatic descale and sanitize feature
US20160370061A1 (en) * 2015-06-19 2016-12-22 Manitowoc Foodservice Companies, Llc Method and apparatus for sanitation of ice production and dispensing system
US10092359B2 (en) 2010-10-11 2018-10-09 Ecole Polytechnique Federale De Lausanne Mechanical manipulator for surgical instruments
WO2018189329A1 (en) * 2017-04-12 2018-10-18 Wli Trading Limited A cooling bath for cooling a liquid
US10265129B2 (en) 2014-02-03 2019-04-23 Distalmotion Sa Mechanical teleoperated device comprising an interchangeable distal instrument
US10325072B2 (en) 2011-07-27 2019-06-18 Ecole Polytechnique Federale De Lausanne (Epfl) Mechanical teleoperated device for remote manipulation
US10357320B2 (en) 2014-08-27 2019-07-23 Distalmotion Sa Surgical system for microsurgical techniques
US10363055B2 (en) 2015-04-09 2019-07-30 Distalmotion Sa Articulated hand-held instrument
US10413374B2 (en) 2018-02-07 2019-09-17 Distalmotion Sa Surgical robot systems comprising robotic telemanipulators and integrated laparoscopy
IT201800006580A1 (en) * 2018-06-22 2019-12-22 ICE MAKING DEVICE AND PROCEDURE FOR USING IT
US10548680B2 (en) 2014-12-19 2020-02-04 Distalmotion Sa Articulated handle for mechanical telemanipulator
US10568709B2 (en) 2015-04-09 2020-02-25 Distalmotion Sa Mechanical teleoperated device for remote manipulation
US10646294B2 (en) 2014-12-19 2020-05-12 Distalmotion Sa Reusable surgical instrument for minimally invasive procedures
US10786272B2 (en) 2015-08-28 2020-09-29 Distalmotion Sa Surgical instrument with increased actuation force
US10864052B2 (en) 2014-12-19 2020-12-15 Distalmotion Sa Surgical instrument with articulated end-effector
US10864049B2 (en) 2014-12-19 2020-12-15 Distalmotion Sa Docking system for mechanical telemanipulator
US11039820B2 (en) 2014-12-19 2021-06-22 Distalmotion Sa Sterile interface for articulated surgical instruments
US11058503B2 (en) 2017-05-11 2021-07-13 Distalmotion Sa Translational instrument interface for surgical robot and surgical robot systems comprising the same
US20220065515A1 (en) * 2018-08-03 2022-03-03 Hoshizaki America, Inc. Ice machine
US20230139820A1 (en) * 2021-10-31 2023-05-04 Thomas Joseph Francl Portable And Environmentally Friendly Ice Maker Configured To Deliver Ice On-Demand
US11662129B2 (en) 2021-11-03 2023-05-30 Haier Us Appliance Solutions, Inc. Method and apparatus for making clear ice
US11844585B1 (en) 2023-02-10 2023-12-19 Distalmotion Sa Surgical robotics systems and devices having a sterile restart, and methods thereof

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102679657A (en) * 2012-06-08 2012-09-19 小天鹅(荆州)电器有限公司 Ice machine and refrigerator
US20170176079A1 (en) * 2015-12-16 2017-06-22 Emerson Climate Technologies, Inc. Ice machine including vapor-compression system
CN106123994A (en) * 2016-08-30 2016-11-16 芜湖美的厨卫电器制造有限公司 Air purifier and for its humidification disk condensate tank of dehumidifier and method
CN106382966A (en) * 2016-09-12 2017-02-08 莱克电气绿能科技(苏州)有限公司 System applied to water shortage detection of water tank
US10641535B2 (en) 2018-03-19 2020-05-05 Emerson Climate Technologies, Inc. Ice maker and method of making and harvesting ice
CN112254388B (en) * 2020-10-26 2022-04-22 哈尔滨海威艾斯制冷设备有限公司 System and method for producing large-volume transparent ice

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3741683A (en) * 1971-07-02 1973-06-26 Fmc Corp Liquid level control system
US4975154A (en) * 1987-03-10 1990-12-04 Pure Water, Inc. Water purification method and apparatus with conductivity sensing controls
US5527470A (en) * 1994-11-16 1996-06-18 Everpure Inc. Water quality monitoring and control system for an ice maker
US20050044875A1 (en) * 2003-08-29 2005-03-03 Manitowoc Foodservice Companies, Inc. Low-volume ice making machine
JP2008232602A (en) * 2007-03-23 2008-10-02 Hoshizaki Electric Co Ltd Operating method of automatic ice-making machine

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4182363A (en) * 1976-11-29 1980-01-08 Fuller Mark W Liquid level controller
JPS61287405A (en) * 1985-06-14 1986-12-17 Sharp Corp Water purifying device utilizing freezing of water
JPH06129745A (en) * 1992-10-19 1994-05-13 Mitsubishi Electric Corp Refrigerator
JPH10122935A (en) * 1996-10-16 1998-05-15 Shimizu Corp Observation method and observation device for underground water level and underground water quality
JP3213289B2 (en) * 1999-05-18 2001-10-02 東西化学産業株式会社 Treatment method for cold storage water for ice storage
JP2002206827A (en) * 2001-01-12 2002-07-26 Fuji Electric Co Ltd Ice machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3741683A (en) * 1971-07-02 1973-06-26 Fmc Corp Liquid level control system
US4975154A (en) * 1987-03-10 1990-12-04 Pure Water, Inc. Water purification method and apparatus with conductivity sensing controls
US5527470A (en) * 1994-11-16 1996-06-18 Everpure Inc. Water quality monitoring and control system for an ice maker
US20050044875A1 (en) * 2003-08-29 2005-03-03 Manitowoc Foodservice Companies, Inc. Low-volume ice making machine
JP2008232602A (en) * 2007-03-23 2008-10-02 Hoshizaki Electric Co Ltd Operating method of automatic ice-making machine

Cited By (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9217597B2 (en) * 2010-08-03 2015-12-22 Manitowoc Foodservice Companies, Llc Low pressure control for signaling a time delay for ice making cycle start up
US20120031115A1 (en) * 2010-08-03 2012-02-09 Manitowoc Foodservice Companies, Llc Low pressure control for signaling a time delay for ice making cycle start up
US10092359B2 (en) 2010-10-11 2018-10-09 Ecole Polytechnique Federale De Lausanne Mechanical manipulator for surgical instruments
US11076922B2 (en) 2010-10-11 2021-08-03 Ecole Polytechnique Federale De Lausanne (Epfl) Mechanical manipulator for surgical instruments
US10325072B2 (en) 2011-07-27 2019-06-18 Ecole Polytechnique Federale De Lausanne (Epfl) Mechanical teleoperated device for remote manipulation
US11200980B2 (en) 2011-07-27 2021-12-14 Ecole Polytechnique Federale De Lausanne (Epfl) Surgical teleoperated device for remote manipulation
US10510447B2 (en) 2011-07-27 2019-12-17 Ecole Polytechnique Federale De Lausanne (Epfl) Surgical teleoperated device for remote manipulation
WO2014117111A1 (en) * 2013-01-25 2014-07-31 True Manufacturing Co., Inc. Ice maker with slide out slump
US10265129B2 (en) 2014-02-03 2019-04-23 Distalmotion Sa Mechanical teleoperated device comprising an interchangeable distal instrument
US10357320B2 (en) 2014-08-27 2019-07-23 Distalmotion Sa Surgical system for microsurgical techniques
US11039820B2 (en) 2014-12-19 2021-06-22 Distalmotion Sa Sterile interface for articulated surgical instruments
US11478315B2 (en) 2014-12-19 2022-10-25 Distalmotion Sa Reusable surgical instrument for minimally invasive procedures
US11571195B2 (en) 2014-12-19 2023-02-07 Distalmotion Sa Sterile interface for articulated surgical instruments
US10864049B2 (en) 2014-12-19 2020-12-15 Distalmotion Sa Docking system for mechanical telemanipulator
US10548680B2 (en) 2014-12-19 2020-02-04 Distalmotion Sa Articulated handle for mechanical telemanipulator
US10864052B2 (en) 2014-12-19 2020-12-15 Distalmotion Sa Surgical instrument with articulated end-effector
US10646294B2 (en) 2014-12-19 2020-05-12 Distalmotion Sa Reusable surgical instrument for minimally invasive procedures
US20160290697A1 (en) * 2015-04-06 2016-10-06 True Manufacturing Co., Inc. Ice maker with automatic descale and sanitize feature
US10317122B2 (en) * 2015-04-06 2019-06-11 True Manufacturing Co., Inc. Ice maker with automatic descale and sanitize feature
US10982893B2 (en) 2015-04-06 2021-04-20 True Manufacturing Co., Inc. Ice maker with automatic descale and sanitize feature
US10363055B2 (en) 2015-04-09 2019-07-30 Distalmotion Sa Articulated hand-held instrument
US10568709B2 (en) 2015-04-09 2020-02-25 Distalmotion Sa Mechanical teleoperated device for remote manipulation
US11179487B2 (en) * 2015-06-19 2021-11-23 Manitowoc Foodservice Companies, Llc Method and apparatus for sanitation of ice production and dispensing system
US10300161B2 (en) * 2015-06-19 2019-05-28 Manitowoc Foodservice Companies, Llc Method and apparatus for sanitation of ice production and dispensing system
US20160370061A1 (en) * 2015-06-19 2016-12-22 Manitowoc Foodservice Companies, Llc Method and apparatus for sanitation of ice production and dispensing system
US10786272B2 (en) 2015-08-28 2020-09-29 Distalmotion Sa Surgical instrument with increased actuation force
US11944337B2 (en) 2015-08-28 2024-04-02 Distalmotion Sa Surgical instrument with increased actuation force
US11337716B2 (en) 2015-08-28 2022-05-24 Distalmotion Sa Surgical instrument with increased actuation force
WO2018189329A1 (en) * 2017-04-12 2018-10-18 Wli Trading Limited A cooling bath for cooling a liquid
US11609041B2 (en) 2017-04-12 2023-03-21 Wli Trading Limited Cooling bath for cooling a liquid
US11058503B2 (en) 2017-05-11 2021-07-13 Distalmotion Sa Translational instrument interface for surgical robot and surgical robot systems comprising the same
US10413374B2 (en) 2018-02-07 2019-09-17 Distalmotion Sa Surgical robot systems comprising robotic telemanipulators and integrated laparoscopy
US11510745B2 (en) 2018-02-07 2022-11-29 Distalmotion Sa Surgical robot systems comprising robotic telemanipulators and integrated laparoscopy
EP3588020A1 (en) * 2018-06-22 2020-01-01 CASTEL MAC S.p.A. Device and method for producing ice
IT201800006580A1 (en) * 2018-06-22 2019-12-22 ICE MAKING DEVICE AND PROCEDURE FOR USING IT
US20220065515A1 (en) * 2018-08-03 2022-03-03 Hoshizaki America, Inc. Ice machine
US11953250B2 (en) * 2018-08-03 2024-04-09 Hoshizaki America, Inc. Ice machine
US20230139820A1 (en) * 2021-10-31 2023-05-04 Thomas Joseph Francl Portable And Environmentally Friendly Ice Maker Configured To Deliver Ice On-Demand
US11662129B2 (en) 2021-11-03 2023-05-30 Haier Us Appliance Solutions, Inc. Method and apparatus for making clear ice
US11844585B1 (en) 2023-02-10 2023-12-19 Distalmotion Sa Surgical robotics systems and devices having a sterile restart, and methods thereof

Also Published As

Publication number Publication date
BR112013002564A2 (en) 2016-06-07
JP2013535652A (en) 2013-09-12
CN202149657U (en) 2012-02-22
CN102345953A (en) 2012-02-08
CN102345953B (en) 2014-04-23
MX2013001370A (en) 2013-05-20
WO2012018686A1 (en) 2012-02-09
EP2600959A1 (en) 2013-06-12
JP5650842B2 (en) 2015-01-07

Similar Documents

Publication Publication Date Title
US20120031114A1 (en) Method and system for producing clear ice
US5527470A (en) Water quality monitoring and control system for an ice maker
US10376854B2 (en) Solution making system and method
US6457852B1 (en) Apparatus and method for supplying chemicals
CA2616972A1 (en) Solution making system and method
CN109667741B (en) Metering pump for dispensing scale inhibitor into membrane-based water treatment system
US6811710B2 (en) Large water reservoir management system
US9523526B2 (en) Ice making apparatus and process of reducing scale buildup and flushing the apparatus
CN109704440B (en) Method for operating a water softening plant and water softening plant
US5071567A (en) Installation and process for filtration of a machining liquid in a continuous supply circuit
EP2502541B1 (en) Method for operating a metering pump and metering pump
KR102383466B1 (en) Temperature contorl method for detaching ice of ice maker
US20180045194A1 (en) Pump monitoring method
JP5129021B2 (en) Sherbet ice manufacturing apparatus and sherbet ice manufacturing method
US20230219507A1 (en) Grey water reclamation for recreational vehicles
CN101111179A (en) Method for controlling and managing the water flow to a coffee machine provided with a water softener device of ion exchange resin type, and coffee machine for implementing the method
JP2007003064A (en) Control of ipf (ice packing factor) of sherbet ice
CN114264189B (en) Automatic pollution discharge control device and method for cooling tower
RU2719807C2 (en) System and method of producing heat-stable chemical solutions
JP2019000804A (en) Membrane separator
JP2795169B2 (en) Method for detecting salt water supply and rehydration in salt water tank of water softener
JP2003004618A (en) Method and equipment for detecting concentration of brine in soft water system
JPH08257310A (en) Sedimentation apparatus
US3827450A (en) Automatic control for debrining relish stock and other materials
CN110953780A (en) Method and device for detecting failure of ice making device, and storage medium

Legal Events

Date Code Title Description
AS Assignment

Owner name: MANITOWOC FOODSERVICE COMPANIES, LLC, WISCONSIN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:MUELLER, LEE GERARD;ERBS, DARYL G.;REEL/FRAME:026674/0010

Effective date: 20110509

AS Assignment

Owner name: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT, ILLINOIS

Free format text: SECURITY INTEREST;ASSIGNORS:APPLIANCE SCIENTIFIC, INC.;CLEVELAND RANGE, LLC;THE DELFIELD COMPANY, LLC;AND OTHERS;REEL/FRAME:038263/0001

Effective date: 20160303

Owner name: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT, IL

Free format text: SECURITY INTEREST;ASSIGNORS:APPLIANCE SCIENTIFIC, INC.;CLEVELAND RANGE, LLC;THE DELFIELD COMPANY, LLC;AND OTHERS;REEL/FRAME:038263/0001

Effective date: 20160303

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION

AS Assignment

Owner name: FRYMASTER L.L.C., LOUISIANA

Free format text: RELEASE OF SECURITY INTEREST IN UNITED STATES PATENTS;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:061053/0411

Effective date: 20220728

Owner name: MANITOWOC FOODSERVICE COMPANIES, LLC, FLORIDA

Free format text: RELEASE OF SECURITY INTEREST IN UNITED STATES PATENTS;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:061053/0411

Effective date: 20220728

Owner name: GARLAND COMMERCIAL INDUSTRIES LLC, FLORIDA

Free format text: RELEASE OF SECURITY INTEREST IN UNITED STATES PATENTS;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:061053/0411

Effective date: 20220728

Owner name: ENODIS CORPORATION, FLORIDA

Free format text: RELEASE OF SECURITY INTEREST IN UNITED STATES PATENTS;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:061053/0411

Effective date: 20220728

Owner name: THE DELFIELD COMPANY, LLC, MICHIGAN

Free format text: RELEASE OF SECURITY INTEREST IN UNITED STATES PATENTS;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:061053/0411

Effective date: 20220728

Owner name: CLEVELAND RANGE, LLC, OHIO

Free format text: RELEASE OF SECURITY INTEREST IN UNITED STATES PATENTS;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:061053/0411

Effective date: 20220728

Owner name: APPLIANCE SCIENTIFIC, INC., FLORIDA

Free format text: RELEASE OF SECURITY INTEREST IN UNITED STATES PATENTS;ASSIGNOR:JPMORGAN CHASE BANK, N.A.;REEL/FRAME:061053/0411

Effective date: 20220728

AS Assignment

Owner name: PENTAIR FLOW SERVICES AG, SWITZERLAND

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:WELBILT, INC.;MANITOWOC FOODSERVICE COMPANIES, LLC;MANITOWOC FSG OPERATIONS, LLC;AND OTHERS;REEL/FRAME:061432/0350

Effective date: 20220728