US20100077823A1 - Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips - Google Patents
Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips Download PDFInfo
- Publication number
- US20100077823A1 US20100077823A1 US12/527,495 US52749508A US2010077823A1 US 20100077823 A1 US20100077823 A1 US 20100077823A1 US 52749508 A US52749508 A US 52749508A US 2010077823 A1 US2010077823 A1 US 2010077823A1
- Authority
- US
- United States
- Prior art keywords
- rolling
- phase
- phases
- duration
- sum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B39/00—Arrangements for moving, supporting, or positioning work, or controlling its movement, combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B39/00—Arrangements for moving, supporting, or positioning work, or controlling its movement, combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B39/004—Transverse moving
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D8/00—Modifying the physical properties by deformation combined with, or followed by, heat treatment
- C21D8/02—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D8/00—Modifying the physical properties by deformation combined with, or followed by, heat treatment
- C21D8/02—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
- C21D8/0221—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips characterised by the working steps
- C21D8/0226—Hot rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/22—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
- B21B1/30—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process
- B21B1/32—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process in reversing single stand mills, e.g. with intermediate storage reels for accumulating work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2201/00—Special rolling modes
- B21B2201/06—Thermomechanical rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B39/00—Arrangements for moving, supporting, or positioning work, or controlling its movement, combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B39/02—Feeding or supporting work; Braking or tensioning arrangements, e.g. threading arrangements
- B21B39/12—Arrangement or installation of roller tables in relation to a roll stand
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B45/00—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B45/02—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
- B21B45/0203—Cooling
- B21B45/0209—Cooling devices, e.g. using gaseous coolants
- B21B45/0215—Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes
- B21B45/0218—Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes for strips, sheets, or plates
Definitions
- the invention relates to the general field of thermo-mechanical controlled rolling of metal slabs to plates or strips in a rolling mill, in particular to a technique known as interleaving and an apparatus for performing that technique.
- Thermo-mechanical controlled rolling involves the rolling of metal-slabs, plates or strips at specific temperatures in order to achieve specific metallurgical microstructures and mechanical properties. It typically involves two or more rolling phases. Between two successive rolling phases the plates or strips are allowed to cool down during a cooling phase to the specific temperature which is desired for the next rolling phase. For example, when two rolling phases are performed first a number of passes are rolled at a high temperature during the first rolling phase, and then the obtained plate or strip is allowed to cool down to a specific temperature in a cooling phase before the second rolling phase starts. Analogously, in three phase rolling two cooling phases take place, a first one between rolling phase 1 and rolling phase 2 , and a second one between rolling phase 2 and rolling phase 3 .
- the interleaving technique is employed. It consists in concurrently processing more than one metal slab, plate or strip in the rolling mill.
- the interleave depth is a characteristic parameter for thermo-mechanical controlled rolling according to interleaving technique.
- a special rolling pattern is applied on each slab of the batch to be processed.
- the rolling pattern is the sequence and duration of all rolling phases and cooling phases which are applied when processing a slab to a plate or strip.
- Such a rolling pattern comprises at least two rolling phases, and cooling phases between successive rolling phases.
- interleave depth is defined as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of the longest rolling phase down to a whole number.
- interleave depth is defined as the integer number of the obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of a rolling phase down to a whole number.
- the smallest value is 1.95.
- 1.95 rounded down to a whole number is 1.
- the interleave depth is 1. If the smallest value is a whole number the integer number defining the interleave depth is equal to that whole number.
- the interleave depth is defined as the integer number which is the quotient of the duration of the cooling phase and the duration of a rolling phase rounded down to a whole number.
- FIGS. 1-6 Such a technique is illustrated in FIGS. 1-6 for two phase rolling of plates with an interleave depth of two on a simplified plan view of a single stand rolling mill.
- a first slab to be rolled is heated in the furnace 1 and then discharged onto the roller table 2 and transported to the rolling mill stand 3 where a number of reversing rolling passes are carried out until its rolling phase 1 is completed.
- the thereby obtained plate 5 is then moved down the roller table 4 to a storage position 6 where plate 5 is stored during its cooling phase.
- FIG. 1 shows plate 5 in storage position 6 .
- FIG. 2 shows plate 7 in storage position 8 .
- FIG. 3 shows plate 9 after completion of rolling phase 1 .
- FIG. 4 shows the position of plates 5 , 7 and 9 when rolling phase 2 starts for plate 5 .
- FIG. 5 illustrates the situation after the penultimate rolling pass of rolling phase 2 of plate 5 .
- FIG. 6 illustrates the situation after the last pass of plate 5 .
- a disadvantage of storing plates during their cooling phases on the same roller tables that are used for rolling is the additional length of the roller tables, and of the building housing the roller tables, that is required in comparison to thermo-mechanical rolling without interleaving technique.
- the interleave depth is two and the roller table 2 on the entry side of the rolling mill stand 3 needs to have at least a length which is equal to twice the length of plates after rolling phase 1 plus the length of a plate after the penultimate pass of rolling phase 2 .
- the roller table 4 on the exit side of the rolling mill stand 3 needs to have a length which is at least equal to the larger one of the two following two values: three times the length of plates after rolling phase 1 , length of plates after rolling phase 2 .
- interleave depth can be up to twelve or even more.
- the roller table on the entry side of a rolling mill stand would need to have at least a length which is equal to twelve times the length of the plates after rolling phase 1 plus the length of the plate on the penultimate pass of rolling phase 2 .
- GB1396946 discloses side-shift roller table sections which can be moved transversely out of the rolling line.
- a plate is positioned on one of the side-shift roller tables and then moved transversely off-line into a storage position.
- This transverse movement of the side-shift roller table either brings a cooled plate ready for the next rolling phase into the rolling line or it brings an empty side-shift roller table back into the rolling line. Since the plates are not stored in a row but side by side, the required length of roller tables and building is significantly reduced. However, to cope with an interleave depth of twelve would require twelve side-shifting roller tables which would take up a very large transverse area that would not fit into a standard rolling mill building.
- Another known solution to the problem of storing large numbers of plates during their cooling phases is to use one or more storing roller tables which run parallel with the mill line roller tables and moving-equipment to move plates between the mill line and the holding line. After rolling phase 1 is finished a moving-equipment moves the plates onto the storing roller tables. When the cooling period is finished the plate is moved back into the mill line for rolling phase 2 .
- a storing roller table parallel to the mill-line roller table would still need to be around 120 metres long.
- To use two or more storing tables with moving-equipment in order to shorten the required length of each individual additional table would increase the complexity of the equipment and need more transverse space.
- FIG. 7 schematically shows the timing diagram of the rolling pattern of an example of a two phase rolling prior art interleaving method with interleave depth two and equal duration of the rolling phases, the cooling phase being twice as long as a rolling phase, on a rolling mill with one rolling mill stand.
- a timing diagram depicts the chronological relation of the rolling phases and cooling phases applied on different slabs and the plates or strips derived from these slabs.
- the processed batch contains 6 slabs which yield plates 1 - 6 .
- rolling pattern in FIG. 7 for the first three slabs rolling phase 1 starts within a period of time equal to twice the duration of a rolling phase.
- a period of time which is the sum of the durations of rolling phase 1 , of the cooling phase, and of rolling phase 2 , elapses until rolling phase 1 of the fourth slab starts. That means that the furnace has to discharge the first three slabs within a short period of time, and then has to wait a long time until the next three slabs are discharged within a short period of time.
- furnace discharge pattern would consist of thirteen slab discharges at intervals of the duration of a rolling phase followed by a gap of the duration of fourteen rolling phases.
- the object of the present invention is to provide a method and an apparatus for thermo-mechanical controlled rolling by interleaving technique which permit the application of a more even furnace discharge pattern and require less space and equipment than the prior art.
- thermo-mechanical controlled rolling a batch of metal slabs to plates or strips on a rolling mill comprising at least one rolling mill stand according to a rolling pattern comprising at least two rolling phases of at least one rolling pass and cooling phases between successive rolling phases, which rolling pattern is applied on each slab of the batch, characterized in that, during rolling the batch, on at least one rolling mill stand it occurs several times that a rolling phase applied to one slab or plate or strip is succeeded by a different rolling phase applied on another slab or plate or strip, and that for two successively rolled slabs the time gap between the starts of their rolling phases 1 is always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern.
- This method permits the application of a furnace discharge pattern that is more even than in the prior art.
- the time gap between the starts of rolling phases 1 of two consecutively rolled slabs is at least once equal to the sum of the duration of all rolling phases and all cooling phases of the rolling pattern when batches larger than the rolling pattern's interleave depth are processed. Since the time gap between starts of rolling phases 1 for consecutively rolled slabs governs the discharge of slabs from the furnace, a smaller time gap permits a more even furnace discharge pattern.
- this is the case for batches larger than interleave depth plus one, the interleave depth of the method's rolling pattern,
- the number of rolling phases is two, namely rolling phase 1 and rolling phase 2 , which are separated by one cooling phase.
- thermo-mechanical controlled rolling methods with rolling patterns with an even numbered interleave depth and equal durations of the rolling phases where the duration of the cooling phase is equal to the sum of
- the maximum time gap between the starts of their rolling phases 1 is up to the sum of twice the duration of one rolling phase and the remainder time.
- the whole number is the integer of the quotient of cooling phase duration and duration of one rolling phase.
- thermo-mechanical controlled rolling methods with rolling patterns with an even numbered interleave depth and unequal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- the maximum time gap between the starts of their rolling phases 1 is up to the sum of twice the duration of the longest rolling phase and the remainder time.
- the whole number is the integer of the quotient of cooling phase duration and duration of the longest rolling phase.
- thermo-mechanical controlled rolling methods with rolling patterns with an uneven numbered interleave depth and equal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- the maximum time gap between the starts of their rolling phases 1 is up to the sum of thrice the duration of one rolling phase and the remainder time.
- the whole number is the integer of the quotient of cooling phase duration and duration of one rolling phase.
- thermo-mechanical controlled rolling methods with rolling patterns with an uneven numbered interleave depth and unequal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- the maximum time gap between the starts of their rolling phases 1 is up to the sum of thrice the duration of the longest rolling phase and the remainder time.
- the whole number is the integer of the quotient of cooling phase duration and duration of the longest rolling phase.
- thermo-mechanical controlled rolling methods with rolling patterns with equal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- the whole number is the integer of the quotient of cooling phase duration and duration of one rolling phase.
- the first plate or strip of the batch rolling phase 1 alternates with rolling phase 2 during rolling the batch at an interval which is up to the sum of interleave depth times duration of the longest rolling phase and the remainder time.
- the whole number is the integer of the quotient of cooling phase duration and duration of the longest rolling phase.
- thermo-mechanical controlled rolling methods with rolling patterns with unequal durations of the rolling phases and a duration of the cooling phase that is equal to or longer than the sum of the durations of both rolling phases, or a whole number times that sum
- rolling phase 1 is performed as often as rolling phase 2 .
- the whole number is the integer of the quotient of cooling phase duration and the sum of the durations of both rolling phases, i.e. in mathematical terms
- thermo-mechanical controlled rolling methods with rolling patterns with unequal durations of the rolling phases and a duration of the cooling phase that is equal to or longer than the sum of
- the amount of rolling phases 1 performed is equal to the amount of rolling phases 2 performed plus 1 or minus 1.
- the whole number is the integer of the quotient of cooling phase duration and the sum of the durations of both rolling phases and the duration of either rolling phase 1 or rolling phase 2 , i.e. in mathematical terms
- the number of rolling phases is three, namely rolling phase 1 , rolling phase 2 and rolling phase 3 , rolling phase 1 and rolling phase 2 being separated by cooling phase 1 , and rolling phase 2 and rolling phase 3 being separated by cooling phase 2 .
- thermo-mechanical controlled rolling methods with rolling patterns where the duration of cooling phase 1 is equal to the sum of
- the maximum time gap between the starts of their rolling phases 1 is up to the sum of the durations of the three rolling phases plus the greater of remainder time 1 and remainder time 2 .
- the whole number A is the integer of the quotient of the duration of cooling phase 1 and the sum of the durations of all three rolling phases
- the whole number B is the integer of the quotient of the duration of cooling phase 2 and the sum of the durations of all three rolling phases.
- thermo-mechanical controlled rolling methods with rolling patterns where the duration of cooling phase 1 is equal to the sum of
- the maximum time gap between the starts of their rolling phases 1 is up to the sum of the three rolling phase times plus the greater of remainder time 3 and remainder time 4 .
- the whole number C is the integer of the quotient of the duration of cooling phase 1 and the sum of the durations of all three rolling phase plus the duration of rolling phase 3
- the whole number D is the integer of the quotient of the duration of cooling phase 2 and the sum of the durations of all three rolling phases plus the duration of rolling phase 1 .
- thermo-mechanical controlled rolling methods that during rolling the batch, from after completion of rolling the first plate or strip of the batch until the beginning of rolling phase 3 of the last plate or strip of the batch,
- a rolling phase 1 is always succeeded by a rolling phase 2
- a rolling phase 2 is always succeeded by a rolling phase 3
- a rolling phase 3 is always succeeded by a rolling phase 1 .
- This pattern makes a very even furnace discharge pattern possible.
- thermo-mechanical controlled rolling methods that during rolling the batch, from after completion of rolling the first plate or strip of the batch until the beginning of rolling phase 3 of the last plate or strip of the batch,
- a rolling phase 1 is always succeeded by a rolling phase 3
- a rolling phase 3 is always succeeded by a rolling phase 2
- a rolling phase 2 is always succeeded by a rolling phase 1 .
- This pattern makes a very even furnace discharge pattern possible.
- thermo-mechanical controlled rolling methods that during a period of time equal to the duration of a cooling phase 1
- rolling phase 1 , rolling phase 2 and rolling phase 3 are performed equally often.
- rolling phase 2 and rolling phase 3 are performed unequally often. More preferably, during a period of time equal to the duration of a cooling phase 1 the number of rolling phases 3 performed is greater than the number of rolling phases 1 performed and greater than the number of rolling phases 2 performed,
- the number of rolling phases 1 performed is greater than the number of rolling phases 2 performed and greater than the number of rolling phases 3 performed.
- the resulting plates or strips are transferred from a rolling line of the rolling mill to a storage position outside the rolling line by at least one moving-equipment, and afterwards are transferred from the storage position to the rolling line after completion of the cooling phase by the moving equipment.
- the batch during rolling the batch it occurs at least once that while one plate or strip is transferred to its storage position or to the rolling line another plate or strip is simultaneously transferred to the rolling line or to its storage position by the same moving-equipment.
- the rolling mill stand comprising at least one rolling mill stand, a rolling line, storage positions outside the rolling line, and at least one moving-equipment for moving plates or strips from the rolling line to the storage positions, characterized in that the number of storage positions is half of the interleave depth of the performed rolling pattern rounded up to a whole number.
- the moving-equipment may be for example a side-shift roller table, lifting roller tables or cranes.
- the storage positions may be situated for example on one or more side-shift roller tables, lifting roller tables, or storing roller tables which may be parallel to the rolling line. In case of several parallel storing roller tables these may be staggered.
- At least one moving-equipment can simultaneously transfer one plate or strip to the rolling line or to a storage position and another plate or strip to a storage position or the rolling line.
- FIGS. 1-6 show the course of a prior art interleaving method for two phase rolling of with an interleave depth of two on a simplified plan view of a single stand rolling mill.
- FIG. 7 schematically shows the timing diagram of the rolling pattern of an example of a two phase rolling prior art interleaving method with interleave depth two and equal duration of the rolling phases, the cooling phase being twice as long as a rolling phase, on a rolling mill with one rolling mill stand.
- FIGS. 8-16 refer to an embodiment of the invention and show a simplified plan view of a single stand rolling mill comprising 2 side-shift roller tables with two transverse positions during the performance of a two phase rolling method with an interleave depth of four and equal duration of the rolling phases.
- FIG. 17 shows the timing diagram of the rolling pattern described in FIGS. 8-16 .
- FIG. 18 shows the timing diagram of a prior art rolling pattern for an interleave depth of four.
- FIG. 19 shows a timing diagram of a two phase rolling pattern according to the present invention with an interleave depth of 3 and rolling phases of equal length.
- FIG. 20 shows a prior art timing diagram for a two phase rolling pattern with different durations of the rolling phases and interleave depth 1 .
- FIG. 21 shows a timing diagram of a two phase rolling pattern according to the present invention with different durations of the rolling phases and interleave depth 1 .
- FIG. 22 shows a timing diagram of a prior art two phase rolling pattern with interleave depth 3 and different durations of the rolling phases.
- FIG. 23 shows a timing diagram of a two phase rolling pattern according to the present invention with interleave depth 3 and different durations of the rolling phases.
- FIG. 24 shows a timing diagram of a three phase rolling pattern according to the present invention with different durations and interleave depth 2 .
- FIG. 7 shows two rolling phases and one cooling phase.
- the sequence of rolling phase 1 and rolling phase 2 is 1 - 1 - 1 - 2 - 2 - 2 - 1 - 1 - 1 - 2 - 2 - 2 .
- the time gap between the starts of the rolling phases 1 of two successively rolled slabs is not always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern.
- the time gap is equal to the sum of the duration of the two rolling phases and the cooling phase of the rolling pattern.
- FIG. 8 shows a simplified plan view of a rolling mill apparatus for thermo-mechanical controlled rolling with one rolling mill stand 3 , a rolling line consisting of the roller tables 2 and 4 , a furnace 1 for heating the slabs prior to rolling, and two side-shift roller tables 10 and 11 which are located on the exit side of the rolling mill stand 3 in roller table 4 .
- Each side-shift roller table can moved between two positions.
- FIG. 8 shows the moment when the first slab of the batch to be processed has finished rolling phase 1 and the resulting plate 12 is transported onto side-shift roller table 10 which is in its down position. After that, side-shift roller table 10 is moved into its up position, thereby removing plate 12 from the rolling line and transferring it into its storage position.
- FIG. 9 shows plate 12 in its storage position.
- FIG. 10 shows plate 13 on side-shift roller table 11 in its down position.
- FIG. 11 shows plate 12 in its storage position.
- FIG. 12 shows plate 14 on side-shift roller table 10 in its up position.
- FIG. 13 shows plates 12 and 14 on side-shift roller table 10 in its down position. After that, rolling phase 2 starts for plate 12 .
- FIG. 14 shows plate 12 after completion of its rolling phase 2 .
- plate 12 clears the rolling mill rolling phase 1 starts for a fourth slab 15 , which is also shown in FIG. 14 , resulting in plate 16 .
- plate 16 completes phase 1 rolling it is moved to side-shift roller table 11 which is in its up position.
- FIG. 15 shows plate 16 on side-shift roller table 11 in its up position. After that, side-shift roller table 11 is moved in its down position, thereby removing plate 16 from the rolling line and transferring it into its storage position, and simultaneously transferring plate 13 from its storage position to the rolling line.
- FIG. 16 shows plates 13 and 16 on side-shift roller table 11 in its down position. Then, rolling phase 2 begins for plate 13 .
- FIG. 17 shows the timing diagram of the rolling pattern described in FIGS. 8-16 .
- FIG. 18 For comparison the timing diagram of a prior art rolling pattern for an interleave depth of four is shown in FIG. 18 .
- FIG. 17 shows two rolling phases and one cooling phase.
- the sequence of rolling phase 1 and rolling phase 2 is 1 - 1 - 1 - 2 - 1 - 2 - 1 - 2 - 1 - 2 - 2 - 2 .
- the time gap between the starts of the rolling phases 1 of two successively rolled slabs is always smaller than the sum of the duration of rolling phase 1 , rolling phase 2 and the cooling phase of the rolling pattern.
- FIG. 18 shows two rolling phases and one cooling phase.
- the sequence of rolling phase 1 and rolling phase 2 is 1 - 1 - 1 - 1 - 1 - 1 - 2 - 2 - 2 - 2 - 1 .
- the time gap between the starts of the rolling phases 1 of two successively rolled slabs is not always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern.
- the time gap is equal to the sum of the duration of the two rolling phases and the cooling phase of the rolling pattern.
- FIGS. 8-17 reduces the number of side-shift movements that are required because all the side-shift movements after the first two simultaneously transfer one plate into a storage position and another plate back to the rolling line. In the prior art as shown in FIG. 18 no such simultaneous transfer takes place.
- the invention as outlined in FIGS. 8-17 allows a more even furnace discharge pattern, since after the completion, i.e. the end, of a rolling phase 1 of one slab a new slab starts its rolling phase 1 always after a period of time which is equal to the duration of one rolling phase.
- the furnace discharge pattern can be even, too.
- the first five rolling phases 1 start one after another without time gap between the end of rolling phase 1 of one slab and the start of rolling phase 1 of the successively rolled slab, followed by a long time gap between start of rolling phase 1 of the fifth slab and start of rolling phase 1 of the sixth slab. That long time gap lasts for a time period which is equal to the sum of the durations of all rolling phases and the cooling phase.
- the advantage of the present invention is that compared to the prior art it provides a possibility to use more even furnace discharge patterns, to reduce the number of storage positions needed, and to reduce the number of movements of the moving-equipment which transfers plates from the rolling line to storage positions and back.
- FIGS. 8-17 refer to a two phase rolling pattern on a rolling mill with one mill stand with interleave depth four, the abovementioned advantages can also be achieved for rolling patterns with more rolling phases, and for rolling patterns with different interleave depths, and for rolling mills with more than one mill stand.
- An inventive two phase rolling pattern with an interleave depth of 3 and rolling phases of equal length is illustrated in the timing diagram of FIG. 19 .
- the maximum time gap between starts of successive rolling phases 1 is a time period equal to the duration of three rolling phases, whereas in the interleaving pattern of the prior art for an interleave depth of 3 the maximum time gap would be equal to equal to the duration of five rolling phases.
- two side shift table would suffice whereas for a prior art rolling pattern three side shift tables would be necessary.
- FIG. 20 shows a prior art timing diagram for a two phase rolling pattern with different durations of the rolling phases and interleave depth 1 .
- that rolling pattern it takes a period of time equal to eight times the duration of rolling phase 1 to produce 2 plates, and during that time the mill is only rolling for a period of time equal to six times the duration of rolling phase 1 .
- FIG. 21 shows a timing diagram for an inventive rolling pattern with the same durations of the rolling phases and the cooling phase, and thereby the same interleave depth, as the prior art rolling pattern of FIG. 20 .
- inventive pattern of FIG. 21 after rolling phase 2 of the first plate has been completed, the mill is operating without pause and 1 plate is produced after thrice the duration of rolling phase 1 .
- the throughput is therefore 33% greater than is achieved by the pattern shown in FIG. 20 .
- FIGS. 22 and 23 A similar improvement in throughput is illustrated by FIGS. 22 and 23 for a two phase rolling pattern with interleave depth 3 .
- the duration of the cooling phase is 6 times the duration of rolling phase 1 and the duration of rolling phase 2 is twice the duration of rolling phase 1 .
- the prior art rolling pattern illustrated in FIG. 22 four plates are produced in a period of time equal to 15 times the duration of rolling phase 1 , and during that time the mill is operating for a period of time equal to 12 times the duration of rolling phase 1 .
- the inventive rolling pattern illustrated in FIG. 23 the mill operates continuously after the first two plates and one plate is produced after thrice the duration of rolling phase 1 .
- FIG. 24 shows a three phase rolling pattern with equal durations of the rolling phases, different durations of the cooling phases and interleave depth 2 .
- timing diagrams are only shown for small batches to be processed. If the batches were larger, the timing diagrams would continue in the same regular manner as shown for the small batches.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Crystallography & Structural Chemistry (AREA)
- Thermal Sciences (AREA)
- Physics & Mathematics (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Metal Rolling (AREA)
- Control Of Metal Rolling (AREA)
- Pressure Welding/Diffusion-Bonding (AREA)
- Laminated Bodies (AREA)
Abstract
Method for thermo-mechanical controlled rolling of metal slabs to plates or strips, in which for two successively rolled slabs the time gap between the starts of their rolling phases 1 is always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern, and in which during rolling the batch it occurs on at least one rolling mill stand several times that a rolling phase applied to one slab or plate or strip is succeeded by a different rolling phase applied on another slab or plate or strip. In the apparatus for thermo-mechanical rolling according to that method the number of storage positions is half the interleave depth of the performed rolling pattern rounded up to an integer.
Description
- The invention relates to the general field of thermo-mechanical controlled rolling of metal slabs to plates or strips in a rolling mill, in particular to a technique known as interleaving and an apparatus for performing that technique.
- Thermo-mechanical controlled rolling involves the rolling of metal-slabs, plates or strips at specific temperatures in order to achieve specific metallurgical microstructures and mechanical properties. It typically involves two or more rolling phases. Between two successive rolling phases the plates or strips are allowed to cool down during a cooling phase to the specific temperature which is desired for the next rolling phase. For example, when two rolling phases are performed first a number of passes are rolled at a high temperature during the first rolling phase, and then the obtained plate or strip is allowed to cool down to a specific temperature in a cooling phase before the second rolling phase starts. Analogously, in three phase rolling two cooling phases take place, a first one between rolling
phase 1 and rollingphase 2, and a second one between rollingphase 2 and rollingphase 3. - To increase a thermo-mechanical controlled rolling mill's throughput the interleaving technique is employed. It consists in concurrently processing more than one metal slab, plate or strip in the rolling mill.
- When no interleaving technique is employed in thermo-mechanical controlled rolling, the rolling of a plate or strip has to be completed, i.e. the plate or strip has to have passed all rolling phases, before rolling of another, new slab can start. While a plate or strip cools down between two rolling phases during a cooling phase the rolling mill is completely idle. Contrary to that, according to the interleaving technique rolling of new slabs already starts while a plate or strip previously subjected to rolling
phase 1 cools down during a cooling phase. Thereby, the rolling mill is not always completely idle during the cooling phases of one plate or strip since it is processing other plates or strips meanwhile. Hence, the rolling mill's throughput is considerably enhanced by application of the interleaving technique. The interleave depth is a characteristic parameter for thermo-mechanical controlled rolling according to interleaving technique. In order to obtain a special product by thermo-mechanical rolling via interleaving technique, a special rolling pattern is applied on each slab of the batch to be processed. The rolling pattern is the sequence and duration of all rolling phases and cooling phases which are applied when processing a slab to a plate or strip. Such a rolling pattern comprises at least two rolling phases, and cooling phases between successive rolling phases. For rolling patterns with unequal durations of the rolling phases interleave depth is defined as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of the longest rolling phase down to a whole number. For rolling patterns with equal durations of the rolling phases interleave depth is defined as the integer number of the obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of a rolling phase down to a whole number. - For example, in a group of values consisting of 2.30, 1.98 and 1.95 the smallest value is 1.95. 1.95 rounded down to a whole number is 1. Hence, the interleave depth is 1. If the smallest value is a whole number the integer number defining the interleave depth is equal to that whole number.
- For example, for two phase rolling with equal durations of the rolling phases the interleave depth is defined as the integer number which is the quotient of the duration of the cooling phase and the duration of a rolling phase rounded down to a whole number.
- In the most common method for interleaving the plates or strips are stored during their cooling phases on the same roller tables that are used for rolling.
- Such a technique is illustrated in
FIGS. 1-6 for two phase rolling of plates with an interleave depth of two on a simplified plan view of a single stand rolling mill. A first slab to be rolled is heated in thefurnace 1 and then discharged onto the roller table 2 and transported to the rollingmill stand 3 where a number of reversing rolling passes are carried out until itsrolling phase 1 is completed. The thereby obtainedplate 5 is then moved down the roller table 4 to astorage position 6 whereplate 5 is stored during its cooling phase.FIG. 1 shows plate 5 instorage position 6. - Then a second slab is discharged from the
furnace 1 and rolled in the same way as the first slab until itsrolling phase 1 is completed. The thereby obtainedplate 7 is then moved down the roller table 4 to astorage position 8 whereplate 7 is stored during its cooling phase.FIG. 2 shows plate 7 instorage position 8. - Then a third slab is discharged from the
furnace 1 and rolled until itsrolling phase 1 is completed to yieldplate 9.FIG. 3 shows plate 9 after completion ofrolling phase 1. - Then all three plates are transported by the roller tables 4 and 2 back to the entry side of
rolling mill stand 3 and rollingphase 2 with a number of reversing rolling passes starts forplate 5.FIG. 4 shows the position ofplates phase 2 starts forplate 5. -
FIG. 5 illustrates the situation after the penultimate rolling pass of rollingphase 2 ofplate 5.FIG. 6 illustrates the situation after the last pass ofplate 5. - A disadvantage of storing plates during their cooling phases on the same roller tables that are used for rolling is the additional length of the roller tables, and of the building housing the roller tables, that is required in comparison to thermo-mechanical rolling without interleaving technique. In the example illustrated in
FIG. 5 the interleave depth is two and the roller table 2 on the entry side of the rollingmill stand 3 needs to have at least a length which is equal to twice the length of plates after rollingphase 1 plus the length of a plate after the penultimate pass of rollingphase 2. The roller table 4 on the exit side of therolling mill stand 3 needs to have a length which is at least equal to the larger one of the two following two values: three times the length of plates after rollingphase 1, length of plates after rollingphase 2. - Modern plate grades often require very long cooling times, hence interleave depth can be up to twelve or even more. In analogy with the example shown in
FIGS. 1-6 , for an interleave depth of twelve the roller table on the entry side of a rolling mill stand would need to have at least a length which is equal to twelve times the length of the plates after rollingphase 1 plus the length of the plate on the penultimate pass ofrolling phase 2. With a plate length of about ten metres after rollingphase 1, of up to 48 metres after the penultimate pass ofrolling phase 2, and of up to 50 metres after rollingphase 2, handling an interleave depth of twelve would require a roller table length of approximately 170 metres on the entry side and of 120 metres on the exit side of a rolling mill stand, while about 50 metres on each side would be sufficient when thermo-mechanical controlled rolling is performed without interleaving technique. - A solution to store plates during their cooling phases in a shorter overall length of a rolling mill is shown in GB1396946 which discloses side-shift roller table sections which can be moved transversely out of the rolling line. At the start of a cooling phase a plate is positioned on one of the side-shift roller tables and then moved transversely off-line into a storage position. This transverse movement of the side-shift roller table either brings a cooled plate ready for the next rolling phase into the rolling line or it brings an empty side-shift roller table back into the rolling line. Since the plates are not stored in a row but side by side, the required length of roller tables and building is significantly reduced. However, to cope with an interleave depth of twelve would require twelve side-shifting roller tables which would take up a very large transverse area that would not fit into a standard rolling mill building.
- Another known solution to the problem of storing large numbers of plates during their cooling phases is to use one or more storing roller tables which run parallel with the mill line roller tables and moving-equipment to move plates between the mill line and the holding line. After rolling
phase 1 is finished a moving-equipment moves the plates onto the storing roller tables. When the cooling period is finished the plate is moved back into the mill line forrolling phase 2. - However, to handle an interleave depth of twelve according to the example described above, a storing roller table parallel to the mill-line roller table would still need to be around 120 metres long. To use two or more storing tables with moving-equipment in order to shorten the required length of each individual additional table would increase the complexity of the equipment and need more transverse space.
- Another known solution to the he problem of storing large numbers of plates during their cooling phases is to lift the plates up above the mill line roller table. This works similarly to the use of the side-shift roller tables, except that the movement is vertical instead of horizontal. Again, to handle large interleave depths would increase the complexity of the necessary equipment as well as the dimensions of rolling mill's housing.
- Another disadvantage of the interleaving methods of the prior art is that their furnace discharge pattern of slabs is not ideal.
-
FIG. 7 schematically shows the timing diagram of the rolling pattern of an example of a two phase rolling prior art interleaving method with interleave depth two and equal duration of the rolling phases, the cooling phase being twice as long as a rolling phase, on a rolling mill with one rolling mill stand. A timing diagram depicts the chronological relation of the rolling phases and cooling phases applied on different slabs and the plates or strips derived from these slabs. - The processed batch contains 6 slabs which yield plates 1-6. According to the rolling pattern in
FIG. 7 for the first threeslabs rolling phase 1 starts within a period of time equal to twice the duration of a rolling phase. After the start of the third slab's rolling phase 1 a period of time, which is the sum of the durations of rollingphase 1, of the cooling phase, and of rollingphase 2, elapses until rollingphase 1 of the fourth slab starts. That means that the furnace has to discharge the first three slabs within a short period of time, and then has to wait a long time until the next three slabs are discharged within a short period of time. Hence, the furnace discharge pattern ofFIG. 7 consists of three discharges at intervals of the duration of a rolling phase followed by a gap of the duration of four rolling phases during which no slabs are discharged and then another three slab discharges at intervals of the duration of a rolling phase. In the case of an interleave depth of twelve and equal durations of the rolling phases the furnace discharge pattern would consist of thirteen slab discharges at intervals of the duration of a rolling phase followed by a gap of the duration of fourteen rolling phases. - The discharge of a large group of slabs at short intervals followed by a long gap causes problems with the slab temperature control and the furnace temperature control. Due to an irregular, uneven furnace discharge pattern some slabs will stay longer in the furnace than others, uneven staying times causing different temperatures for different slabs and thereby affecting metallurgy and yield negatively.
- The object of the present invention is to provide a method and an apparatus for thermo-mechanical controlled rolling by interleaving technique which permit the application of a more even furnace discharge pattern and require less space and equipment than the prior art.
- This object is solved by a method for thermo-mechanical controlled rolling a batch of metal slabs to plates or strips on a rolling mill comprising at least one rolling mill stand according to a rolling pattern comprising at least two rolling phases of at least one rolling pass and cooling phases between successive rolling phases, which rolling pattern is applied on each slab of the batch, characterized in that, during rolling the batch, on at least one rolling mill stand it occurs several times that a rolling phase applied to one slab or plate or strip is succeeded by a different rolling phase applied on another slab or plate or strip, and that for two successively rolled slabs the time gap between the starts of their rolling
phases 1 is always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern. - This method permits the application of a furnace discharge pattern that is more even than in the prior art. As can be seen in
FIG. 7 , in the prior art the time gap between the starts of rollingphases 1 of two consecutively rolled slabs is at least once equal to the sum of the duration of all rolling phases and all cooling phases of the rolling pattern when batches larger than the rolling pattern's interleave depth are processed. Since the time gap between starts of rollingphases 1 for consecutively rolled slabs governs the discharge of slabs from the furnace, a smaller time gap permits a more even furnace discharge pattern. - Preferably, after the first rolling phase of the first slab of the batch has been completed until the beginning of the last rolling phase of the last plate or strip there is always at least one other plate or strip in its cooling phase.
- More preferably, this is the case for batches larger than interleave depth plus one, the interleave depth of the method's rolling pattern,
- being defined
- for rolling patterns with unequal durations of the rolling phases as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of the longest rolling phase down to a whole number, and
- for rolling patterns with equal durations of the rolling phases as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of a rolling phase down to a whole number.
- In an embodiment of the invention the number of rolling phases is two, namely rolling
phase 1 and rollingphase 2, which are separated by one cooling phase. - It is preferred for two-phase thermo-mechanical controlled rolling methods with rolling patterns with an even numbered interleave depth and equal durations of the rolling phases where the duration of the cooling phase is equal to the sum of
-
- a whole number times the duration of a rolling phase
- and a remainder time,
- that for successively rolled slabs the maximum time gap between the starts of their rolling
phases 1 is up to the sum of twice the duration of one rolling phase and the remainder time. In this case the whole number is the integer of the quotient of cooling phase duration and duration of one rolling phase. - Expressed in mathematical terms this is:
-
Tg≦(2·Drp)+Rt -
Cpd=(Wn·Drp)+Rt -
- Tg . . . maximum time gap between the starts of rolling
phases 1 of successively rolled slabs - Drp . . . duration rolling phase
- Rt . . . remainder time
- Cpd . . . cooling phase duration
- Wn . . . whole number, which is the integer of (Cpd/Drp)
- Tg . . . maximum time gap between the starts of rolling
- By limiting the maximum time gap between the starts of the rolling phases 1 of successively rolled slabs to this value a more even furnace discharge pattern becomes possible.
- It is preferred for two-phase thermo-mechanical controlled rolling methods with rolling patterns with an even numbered interleave depth and unequal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
-
- a whole number times the duration of the longest rolling phase
- and a remainder time,
- that for successively rolled slabs the maximum time gap between the starts of their rolling
phases 1 is up to the sum of twice the duration of the longest rolling phase and the remainder time. In this case the whole number is the integer of the quotient of cooling phase duration and duration of the longest rolling phase. - Expressed in mathematical terms this is:
-
Tg≦(2·Dlp)+Rt -
Cpd=(Wn·Dlp)+Rt -
- Tg . . . maximum time gap between the starts of rolling
phases 1 of successively rolled slabs - Dlp . . . duration longest rolling phase
- Rt . . . remainder time
- Cpd . . . cooling phase duration
- Wn . . . whole number, which is the integer of (Cpd/Dlp)
- Tg . . . maximum time gap between the starts of rolling
- By limiting the maximum time gap between the starts of the rolling phases 1 of successively rolled slabs to this value a more even furnace discharge pattern becomes possible.
- It is preferred for two-phase thermo-mechanical controlled rolling methods with rolling patterns with an uneven numbered interleave depth and equal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
-
- a whole number times the duration of a rolling phase
- and a remainder time,
- that for successively rolled slabs the maximum time gap between the starts of their rolling
phases 1 is up to the sum of thrice the duration of one rolling phase and the remainder time. In this case the whole number is the integer of the quotient of cooling phase duration and duration of one rolling phase. - Expressed in mathematical terms this is:
-
Tg≦(3·Drp)+Rt -
Cpd=(Wn·Drp)+Rt -
- Tg . . . maximum time gap between the starts of rolling
phases 1 of successively rolled slabs - Drp . . . duration rolling phase
- Rt . . . remainder time
- Cpd . . . cooling phase duration
- Wn . . . whole number, which is the integer of (Cpd/Drp)
- Tg . . . maximum time gap between the starts of rolling
- By limiting the maximum time gap between the starts of the rolling phases 1 of successively rolled slabs to this value a more even furnace discharge pattern becomes possible.
- It is preferred for two-phase thermo-mechanical controlled rolling methods with rolling patterns with an uneven numbered interleave depth and unequal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
-
- a whole number times the duration of the longest rolling phase
- and a remainder time,
- that for successively rolled slabs the maximum time gap between the starts of their rolling
phases 1 is up to the sum of thrice the duration of the longest rolling phase and the remainder time. In this case the whole number is the integer of the quotient of cooling phase duration and duration of the longest rolling phase. - Expressed in mathematical terms this is:
-
Tg≦(3·Dlp)+Rt -
Cpd=(Wn·Dlp)+Rt -
- Tg . . . maximum time gap between the starts of rolling
phases 1 of successively rolled slabs - Dlp . . . duration longest rolling phase
- Rt . . . remainder time
- Cpd . . . cooling phase duration
- Wn . . . whole number, which is the integer of (Cpd/Dlp)
- Tg . . . maximum time gap between the starts of rolling
- By limiting the maximum time gap between the starts of the rolling phases 1 of successively rolled slabs to this value a more even furnace discharge pattern becomes possible.
- It is preferred for two-phase thermo-mechanical controlled rolling methods with rolling patterns with equal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
-
- a whole number times the duration of a rolling phase
- and a remainder time,
- that after completion of rolling the first plate or strip of the
batch rolling phase 1 alternates with rollingphase 2 during rolling the batch at an interval which is up to the sum of interleave depth times duration of a rolling phase and the remainder time. - In this case the whole number is the integer of the quotient of cooling phase duration and duration of one rolling phase.
- Expressed in mathematical terms this is:
-
Int≦(Id·Drp)+Rt -
Cpd=(Wn·Drp)+Rt -
- Int . . . interval at which rolling
phase 1 alternates with rollingphase 2 during rolling the batch - Id . . . interleave depth
- Drp . . . duration rolling phase
- Rt . . . remainder time
- Cpd . . . cooling phase duration
- Wn . . . whole number, which is the integer of (Cpd/Drp)
- Int . . . interval at which rolling
- For two-phase thermo-mechanical controlled rolling methods with rolling patterns with unequal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
-
- a whole number times the duration of the longest rolling phase
- and a remainder time,
- it is preferred that after completion of rolling the first plate or strip of the
batch rolling phase 1 alternates with rollingphase 2 during rolling the batch at an interval which is up to the sum of interleave depth times duration of the longest rolling phase and the remainder time. - In this case the whole number is the integer of the quotient of cooling phase duration and duration of the longest rolling phase.
- Expressed in mathematical terms this is:
-
Int≦(Id·Dlp)+Rt -
Cpd=(Wn·Drp)+Rt -
- Int . . . interval at which rolling
phase 1 alternates with rollingphase 2 during rolling the batch - Id . . . interleave depth
- Dlp . . . duration longest rolling phase
- Rt . . . remainder time
- Cpd . . . cooling phase duration
- Wn . . . whole number, which is the integer of (Cpd/Drp)
- Int . . . interval at which rolling
- For two-phase thermo-mechanical controlled rolling methods with rolling patterns with unequal durations of the rolling phases and a duration of the cooling phase that is equal to or longer than the sum of the durations of both rolling phases, or a whole number times that sum,
- it is preferred that, after completion of rolling the first plate or strip of the batch, during a period of time equal to the duration of the cooling
phase rolling phase 1 is performed as often as rollingphase 2. - In this case the whole number is the integer of the quotient of cooling phase duration and the sum of the durations of both rolling phases, i.e. in mathematical terms
-
- Drp1 . . .
duration rolling phase 1 - Drp2 . . .
duration rolling phase 2 - Cpd . . . cooling phase duration
- Wn . . . whole number, which is the integer of (Cpd/(Drp1+Drp2))
- Drp1 . . .
- For two-phase thermo-mechanical controlled rolling methods with rolling patterns with unequal durations of the rolling phases and a duration of the cooling phase that is equal to or longer than the sum of
-
- the durations of both rolling phases
- and the duration of either rolling
phase 1 or rollingphase 2,
- or a whole number times that sum,
- it is preferred that during the duration of the cooling phase the amount of rolling
phases 1 performed is equal to the amount of rollingphases 2 performedplus 1 orminus 1. - In this case the whole number is the integer of the quotient of cooling phase duration and the sum of the durations of both rolling phases and the duration of either rolling
phase 1 or rollingphase 2, i.e. in mathematical terms -
- Drp1 . . .
duration rolling phase 1 - Drp2 . . .
duration rolling phase 2 - Cpd . . . cooling phase duration
- Wn . . . whole number, which is the integer of (Cpd/(Drp1+Drp2+(either Drp1 or Drp2)))
- Drp1 . . .
- In another embodiment of the invention the number of rolling phases is three, namely rolling
phase 1, rollingphase 2 and rollingphase 3, rollingphase 1 and rollingphase 2 being separated by coolingphase 1, and rollingphase 2 and rollingphase 3 being separated by coolingphase 2. - It is preferred for three-phase thermo-mechanical controlled rolling methods with rolling patterns where the duration of
cooling phase 1 is equal to the sum of -
- a whole number A times the sum of the durations of the three rolling phases
- and a
remainder time 1,
- and where the duration of
cooling phase 2 is equal to the sum of -
- a whole number B times the sum of the durations of the three rolling phases
- and a
remainder time 2,
- that for successively rolled slabs the maximum time gap between the starts of their rolling
phases 1 is up to the sum of the durations of the three rolling phases plus the greater ofremainder time 1 andremainder time 2. - In this case the whole number A is the integer of the quotient of the duration of
cooling phase 1 and the sum of the durations of all three rolling phases, and the whole number B is the integer of the quotient of the duration ofcooling phase 2 and the sum of the durations of all three rolling phases. - Expressed in mathematical terms this is:
-
Tg≦Sdr+(the greater of Rt1 and Rt2) -
Cpd1=(WnA·Sdr)+Rt1 -
Cpd2=(WnB·Sdr)+Rt2 -
- Tg . . . maximum time gap between the starts of rolling
phases 1 of successively rolled slabs - Drp1 . . .
duration rolling phase 1 - Drp2 . . .
duration rolling phase 2 - Drp3 . . .
duration rolling phase 3 - Rt1 . . .
remainder time 1 - Rt2 . . .
remainder time 2 - Cpd1 . . . duration of
cooling phase 1 - Cpd2 . . . duration of
cooling phase 2 - Sdr . . . sum of the durations of all three rolling phases, (Drp1+Drp2+Drp3)
- WnA . . . whole number A, which is the integer of (Cpd1/Sdr)
- WnB . . . whole number B, which is the integer of (Cpd2/Sdr)
- Tg . . . maximum time gap between the starts of rolling
- By limiting the maximum time gap between the starts of the rolling phases 1 of successively rolled slabs to this value a more even furnace discharge pattern becomes possible.
- It is preferred for three-phase thermo-mechanical controlled rolling methods with rolling patterns where the duration of
cooling phase 1 is equal to the sum of -
- a whole number C times the sum of
- the durations of the three rolling phases
- and the duration of rolling
phase 3,
- and a
remainder time 3,
- a whole number C times the sum of
- and where the duration of
cooling phase 2 is equal to the sum of -
- a whole number D times the sum of
- the durations of the three rolling phases
- and the duration of rolling
phase 1,
- and a
remainder time 4,
- a whole number D times the sum of
- that for successively rolled slabs the maximum time gap between the starts of their rolling
phases 1 is up to the sum of the three rolling phase times plus the greater ofremainder time 3 andremainder time 4. - In this case the whole number C is the integer of the quotient of the duration of
cooling phase 1 and the sum of the durations of all three rolling phase plus the duration of rollingphase 3, and the whole number D is the integer of the quotient of the duration ofcooling phase 2 and the sum of the durations of all three rolling phases plus the duration of rollingphase 1. - Expressed in mathematical terms this is:
-
Tg≦Sdr+(the greater of Rt1 and Rt2) -
Cpd1=(WnC·(Sdr+Drp3))+Rt3 -
Cpd2=(WnD·(Sdr+Drp1))+Rt4 -
- Tg . . . maximum time gap between the starts of rolling
phases 1 of successively rolled slabs - Drp1 . . .
duration rolling phase 1 - Drp2 . . .
duration rolling phase 2 - Drp3 . . .
duration rolling phase 3 - Rt3 . . .
remainder time 3 - Rt4 . . .
remainder time 4 - Cpd1 . . . duration of
cooling phase 1 - Cpd2 . . . duration of
cooling phase 2 - Sdr . . . sum of the durations of all three rolling phases, (Drp1+Drp2+Drp3)
- WnC . . . whole number C, which is the integer of (Cpd1/(Sdr+Drp3))
- WnD . . . whole number D, which is the integer of (Cpd2/(Sdr+Drp1))
- Tg . . . maximum time gap between the starts of rolling
- By limiting the maximum time gap between the starts of the rolling phases 1 of successively rolled slabs to this value a more even furnace discharge pattern becomes possible.
- It is preferred for three-phase thermo-mechanical controlled rolling methods that during rolling the batch, from after completion of rolling the first plate or strip of the batch until the beginning of rolling
phase 3 of the last plate or strip of the batch, - a
rolling phase 1 is always succeeded by arolling phase 2, and arolling phase 2 is always succeeded by arolling phase 3, and arolling phase 3 is always succeeded by arolling phase 1. - This pattern makes a very even furnace discharge pattern possible.
- It is also preferred for three-phase thermo-mechanical controlled rolling methods that during rolling the batch, from after completion of rolling the first plate or strip of the batch until the beginning of rolling
phase 3 of the last plate or strip of the batch, - a
rolling phase 1 is always succeeded by arolling phase 3, and arolling phase 3 is always succeeded by arolling phase 2, and arolling phase 2 is always succeeded by arolling phase 1. - This pattern makes a very even furnace discharge pattern possible.
- It is preferred for three-phase thermo-mechanical controlled rolling methods that during a period of time equal to the duration of a
cooling phase 1 - rolling
phase 1, rollingphase 2 and rollingphase 3 are performed equally often. - In another preferred embodiment of three-phase thermo-mechanical controlled rolling methods during a period of time equal to the duration of a
cooling phase 1rolling phase 1, rollingphase 2 and rollingphase 3 are performed unequally often. More preferably, during a period of time equal to the duration of acooling phase 1 the number of rollingphases 3 performed is greater than the number of rollingphases 1 performed and greater than the number of rollingphases 2 performed, - and during a period of time equal to the duration of
cooling phase 2 the number of rollingphases 1 performed is greater than the number of rollingphases 2 performed and greater than the number of rollingphases 3 performed. - It is further preferred that after completion of a rolling phase which is succeeded by a cooling phase the resulting plates or strips are transferred from a rolling line of the rolling mill to a storage position outside the rolling line by at least one moving-equipment, and afterwards are transferred from the storage position to the rolling line after completion of the cooling phase by the moving equipment.
- Since thereby the plates or strips do not remain on the rolling line during their cooling phases, the length of the rolling line required for performing the interleaving method is reduced.
- In an especially preferred embodiment, during rolling the batch it occurs at least once that while one plate or strip is transferred to its storage position or to the rolling line another plate or strip is simultaneously transferred to the rolling line or to its storage position by the same moving-equipment.
- In this case two plates or strips are transferred by one movement of the moving-equipment. Thereby, the required number of movements of the moving-equipment during rolling the batch is reduced, which results in less need for supervision as well as less wearing down. In addition, less moving-equipment is needed.
- The object of the invention is further solved by an apparatus for thermo-mechanical controlled rolling according to a method as claimed in
claims 1 to 22, - comprising at least one rolling mill stand, a rolling line, storage positions outside the rolling line, and at least one moving-equipment for moving plates or strips from the rolling line to the storage positions, characterized in that the number of storage positions is half of the interleave depth of the performed rolling pattern rounded up to a whole number.
- Compared to the prior art, where the number of storage positions required for the rolling pattern of an interleaving method is equal to the interleave depth of the rolling pattern, according to the present invention less storage positions are necessary. This results in diminished need for space and maintenance and in a less complex apparatus for thermo-mechanical controlled rolling.
- The moving-equipment may be for example a side-shift roller table, lifting roller tables or cranes. The storage positions may be situated for example on one or more side-shift roller tables, lifting roller tables, or storing roller tables which may be parallel to the rolling line. In case of several parallel storing roller tables these may be staggered.
- In a preferred embodiment at least one moving-equipment can simultaneously transfer one plate or strip to the rolling line or to a storage position and another plate or strip to a storage position or the rolling line.
- This is for example the case for side-shift roller tables, which allow to transfer one plate or strip into the rolling line while simultaneously moving another plate or strip to a storage position.
- The invention will now be described solely by way of example and with reference to the accompanying drawings in which:
-
FIGS. 1-6 show the course of a prior art interleaving method for two phase rolling of with an interleave depth of two on a simplified plan view of a single stand rolling mill. -
FIG. 7 schematically shows the timing diagram of the rolling pattern of an example of a two phase rolling prior art interleaving method with interleave depth two and equal duration of the rolling phases, the cooling phase being twice as long as a rolling phase, on a rolling mill with one rolling mill stand. -
FIGS. 8-16 refer to an embodiment of the invention and show a simplified plan view of a single stand rolling mill comprising 2 side-shift roller tables with two transverse positions during the performance of a two phase rolling method with an interleave depth of four and equal duration of the rolling phases. -
FIG. 17 shows the timing diagram of the rolling pattern described inFIGS. 8-16 . -
FIG. 18 shows the timing diagram of a prior art rolling pattern for an interleave depth of four. -
FIG. 19 shows a timing diagram of a two phase rolling pattern according to the present invention with an interleave depth of 3 and rolling phases of equal length. -
FIG. 20 shows a prior art timing diagram for a two phase rolling pattern with different durations of the rolling phases and interleavedepth 1. -
FIG. 21 shows a timing diagram of a two phase rolling pattern according to the present invention with different durations of the rolling phases and interleavedepth 1. -
FIG. 22 shows a timing diagram of a prior art two phase rolling pattern withinterleave depth 3 and different durations of the rolling phases. -
FIG. 23 shows a timing diagram of a two phase rolling pattern according to the present invention withinterleave depth 3 and different durations of the rolling phases. -
FIG. 24 shows a timing diagram of a three phase rolling pattern according to the present invention with different durations and interleavedepth 2. -
FIG. 7 shows two rolling phases and one cooling phase. InFIG. 7 the sequence of rollingphase 1 and rollingphase 2 is 1-1-1-2-2-2-1-1-1-2-2-2. Hence, while it occurs 3 times that one type of rolling phase is succeeded by another type of rolling phase, the time gap between the starts of the rolling phases 1 of two successively rolled slabs is not always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern. Between the start of rollingphase 1 ofslab number 3 and ofslab number 4 the time gap is equal to the sum of the duration of the two rolling phases and the cooling phase of the rolling pattern. -
FIG. 8 shows a simplified plan view of a rolling mill apparatus for thermo-mechanical controlled rolling with onerolling mill stand 3, a rolling line consisting of the roller tables 2 and 4, afurnace 1 for heating the slabs prior to rolling, and two side-shift roller tables 10 and 11 which are located on the exit side of the rollingmill stand 3 in roller table 4. Each side-shift roller table can moved between two positions.FIG. 8 shows the moment when the first slab of the batch to be processed has finished rollingphase 1 and the resultingplate 12 is transported onto side-shift roller table 10 which is in its down position. After that, side-shift roller table 10 is moved into its up position, thereby removingplate 12 from the rolling line and transferring it into its storage position.FIG. 9 showsplate 12 in its storage position. When a period of time equal to the duration of one rolling phase has elapsed since the end of rollingphase 1 ofplate 12, rollingphase 1 of a second slab starts. The resultingplate 13 is transported onto side-shift roller table 11 which is in its down position.FIG. 10 showsplate 13 on side-shift roller table 11 in its down position. - After that, side-shift roller table 11 is moved into its up position, thereby removing
plate 13 from the rolling line and transferring it into its storage position.FIG. 11 showsplate 12 in its storage position. When a period of time equal to the duration of one rolling phase has elapsed since the end of rollingphase 1 ofplate 13, rollingphase 1 of a third slab starts. The resultingplate 14 is transported onto side-shift roller table 10 which is in its up position.FIG. 12 showsplate 14 on side-shift roller table 10 in its up position. After that, side-shift roller table 10 is moved in its down position, thereby removingplate 14 from the rolling line and transferring it into its storage position, and simultaneously transferringplate 12 from its storage position to the rolling line.FIG. 13 shows plates phase 2 starts forplate 12.FIG. 14 showsplate 12 after completion of itsrolling phase 2. Whenplate 12 clears the rollingmill rolling phase 1 starts for afourth slab 15, which is also shown inFIG. 14 , resulting inplate 16. Whenplate 16 completesphase 1 rolling it is moved to side-shift roller table 11 which is in its up position.FIG. 15 showsplate 16 on side-shift roller table 11 in its up position. After that, side-shift roller table 11 is moved in its down position, thereby removingplate 16 from the rolling line and transferring it into its storage position, and simultaneously transferringplate 13 from its storage position to the rolling line.FIG. 16 shows plates phase 2 begins forplate 13. - If the batch of metal slabs to be processed is larger than 4, another slab will start its
rolling phase 1 whenplate 13 clears the rolling mill, effectively repeating the situation which is shown inFIG. 14 . The resulting plate would be processed in analogy toFIGS. 15 and 16 . Also for each further slab the pattern shown inFIGS. 14 to 16 would be repeated analogously. - In the example with an interleave depth of four outlined in
FIGS. 8-16 only two side-shift roller tables are required. -
FIG. 17 shows the timing diagram of the rolling pattern described inFIGS. 8-16 . For comparison the timing diagram of a prior art rolling pattern for an interleave depth of four is shown inFIG. 18 . -
FIG. 17 shows two rolling phases and one cooling phase. InFIG. 17 the sequence of rollingphase 1 and rollingphase 2 is 1-1-1-2-1-2-1-2-1-2-2-2. Hence, it occurs 7 times that one type of rolling phase is succeeded by another type of rolling phase. The time gap between the starts of the rolling phases 1 of two successively rolled slabs is always smaller than the sum of the duration of rollingphase 1, rollingphase 2 and the cooling phase of the rolling pattern. - According to
FIG. 18 , for an interleave depth of four a total of four side-shift roller tables would be required to remove the first four plates from the rolling line before rollingphase 1 of the fifth slab starts. Hence, the present invention reduces the number of side-shift roller tables required.FIG. 18 shows two rolling phases and one cooling phase. InFIG. 18 the sequence of rollingphase 1 and rollingphase 2 is 1-1-1-1-1-2-2-2-2-2-1. Hence, while it occurs 2 times that one type of rolling phase is succeeded by another type of rolling phase, the time gap between the starts of the rolling phases 1 of two successively rolled slabs is not always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern. Between the start of rollingphase 1 ofslab number 5 and ofslab number 6 the time gap is equal to the sum of the duration of the two rolling phases and the cooling phase of the rolling pattern. - In addition the invention as outlined in
FIGS. 8-17 reduces the number of side-shift movements that are required because all the side-shift movements after the first two simultaneously transfer one plate into a storage position and another plate back to the rolling line. In the prior art as shown inFIG. 18 no such simultaneous transfer takes place. - In addition the invention as outlined in
FIGS. 8-17 allows a more even furnace discharge pattern, since after the completion, i.e. the end, of arolling phase 1 of one slab a new slab starts itsrolling phase 1 always after a period of time which is equal to the duration of one rolling phase. When the rolling phases 1 start evenly, the furnace discharge pattern can be even, too. In the prior art as shown inFIG. 18 the first five rollingphases 1 start one after another without time gap between the end of rollingphase 1 of one slab and the start of rollingphase 1 of the successively rolled slab, followed by a long time gap between start of rollingphase 1 of the fifth slab and start of rollingphase 1 of the sixth slab. That long time gap lasts for a time period which is equal to the sum of the durations of all rolling phases and the cooling phase. - Hence, the advantage of the present invention is that compared to the prior art it provides a possibility to use more even furnace discharge patterns, to reduce the number of storage positions needed, and to reduce the number of movements of the moving-equipment which transfers plates from the rolling line to storage positions and back.
- While
FIGS. 8-17 refer to a two phase rolling pattern on a rolling mill with one mill stand with interleave depth four, the abovementioned advantages can also be achieved for rolling patterns with more rolling phases, and for rolling patterns with different interleave depths, and for rolling mills with more than one mill stand. - An inventive two phase rolling pattern with an interleave depth of 3 and rolling phases of equal length is illustrated in the timing diagram of
FIG. 19 . The maximum time gap between starts of successive rolling phases 1 is a time period equal to the duration of three rolling phases, whereas in the interleaving pattern of the prior art for an interleave depth of 3 the maximum time gap would be equal to equal to the duration of five rolling phases. Furthermore, for the inventive rolling pattern two side shift table would suffice whereas for a prior art rolling pattern three side shift tables would be necessary. - Another advantage of the invention is illustrated by
FIGS. 20 and 21 .FIG. 20 shows a prior art timing diagram for a two phase rolling pattern with different durations of the rolling phases and interleavedepth 1. In that rolling pattern it takes a period of time equal to eight times the duration of rollingphase 1 to produce 2 plates, and during that time the mill is only rolling for a period of time equal to six times the duration of rollingphase 1. -
FIG. 21 shows a timing diagram for an inventive rolling pattern with the same durations of the rolling phases and the cooling phase, and thereby the same interleave depth, as the prior art rolling pattern ofFIG. 20 . With the inventive pattern ofFIG. 21 , after rollingphase 2 of the first plate has been completed, the mill is operating without pause and 1 plate is produced after thrice the duration of rollingphase 1. The throughput is therefore 33% greater than is achieved by the pattern shown inFIG. 20 . - In practice operation of the rolling mill without pause cannot be achieved because the cooling time is not necessarily an exact multiple of the duration of the rolling phases and some time is required to move the plates to and fro their storage positions.
- A similar improvement in throughput is illustrated by
FIGS. 22 and 23 for a two phase rolling pattern withinterleave depth 3. In these figures the duration of the cooling phase is 6 times the duration of rollingphase 1 and the duration of rollingphase 2 is twice the duration of rollingphase 1. With the prior art rolling pattern illustrated inFIG. 22 four plates are produced in a period of time equal to 15 times the duration of rollingphase 1, and during that time the mill is operating for a period of time equal to 12 times the duration of rollingphase 1. With the inventive rolling pattern illustrated inFIG. 23 the mill operates continuously after the first two plates and one plate is produced after thrice the duration of rollingphase 1. -
FIG. 24 shows a three phase rolling pattern with equal durations of the rolling phases, different durations of the cooling phases and interleavedepth 2. After the completion of rollingphase 3 of the first plate according to this rollingpattern 4 plates are produced in every period of time equal to 13 times the duration of a rolling phase. A conventional interleaving pattern of the prior art would produce 3 plates in every 11 periods so the interleaving pattern of the invention results in a 13% increase in throughput. - In
FIGS. 17-24 timing diagrams are only shown for small batches to be processed. If the batches were larger, the timing diagrams would continue in the same regular manner as shown for the small batches.
Claims (27)
1. A method for thermo-mechanical controlled rolling of a batch of metal slabs to plates or strips on a rolling mill comprising at least one rolling mill stand,
the method comprising:
using a rolling pattern applied on each slab of the batch, the rolling pattern comprising at least two rolling phases, each rolling phase comprising applying at least one rolling pass to each slab and the rolling pattern further comprising applying a cooling phase to each slab after applying the rolling phase to the slab and between successive rolling phases on the slab, during rolling of the batch, on the at least one rolling mill stand and during several time periods, applying a rolling phase to one slab, or plate or strip and thereafter applying a different rolling phase on another slab, or plate or strip, and
for two successively rolled slabs, spacing the start times of their respective rolling phases so that there is a time gap between the successive rolling phases that is always smaller than the sum of the duration of all the rolling phases and all the cooling phases of the rolling pattern.
2. The method according to claim 1 , wherein after completion of the first rolling phase of the first slab of the batch until beginning of the last rolling phase of the last plate or strip, at least one other plate or strip is in its cooling phase.
3. (canceled)
4. The method according to claim 26 , comprising
two of the rolling phases, including a first one of the rolling phases and a second one of the rolling phases, which are separated by the one cooling phase.
5. The method according to claim 4 , wherein
for one of the rolling patterns with an even numbered interleave depth and equal durations of the respective rolling phases of the rolling pattern,
selecting a duration of the cooling phase of the one rolling pattern as equal to the sum of
a whole number times the duration of the rolling phase
and a remainder time,
for successively rolled slabs, providing a maximum time gap between the starts of the respective first rolling phases wherein the time gap is up to the sum of twice the duration of one of the rolling phases and the remainder time.
6. The method according to claim 4 , wherein,
for one of the rolling patterns with an even numbered interleave depth and unequal durations of the respective rolling phases of the rolling pattern,
selecting a duration of the cooling phase of the one rolling pattern as equal to the sum of
a whole number times the duration of the longest duration of one of the rolling phases
and a remainder time,
for successively rolled slabs, providing a maximum time gap between the starts of the respective first rolling phases wherein the time gap is up to the sum of twice the duration of the longest one of rolling phases and the remainder time.
7. The method according to claim 4 , wherein
for one of the rolling patterns with an uneven numbered interleave depth and equal durations of the respective rolling phases of the rolling pattern,
selecting a duration of the cooling phase of the one of the rolling patterns as equal to the sum of
a whole number times the duration of one of the rolling phases
and a remainder time,
for successively rolled slabs, providing a maximum time gap between the starts of the respective first rolling phases wherein the time gap is up to the sum of thrice the duration of one of the rolling phases and the remainder time.
8. The method according to claim 4 , wherein
for one of the rolling patterns with an uneven numbered interleave depth and unequal durations of the respective rolling phases of the rolling pattern,
selecting a duration of the cooling phase of the one of the rolling patterns as equal to the sum of
a whole number times the duration of the longest rolling phase
and a remainder time,
for successively rolled slabs, providing a maximum time gap between the starts of the respective first rolling phases wherein the time gap is up to the sum of thrice the duration of the longest one of the rolling phases and the remainder time.
9. The method according to claim 4 , wherein
after completion of rolling the first plate or strip of the batch,
for one of the rolling patterns with equal durations of the rolling phases,
selecting a duration of the cooling phase of the one of the rolling patterns to be equal to the sum of
a whole number times the duration of one of the rolling phases
and a remainder time,
alternating a first one of the rolling phases with a second one of the rolling phases during rolling the batch at an interval between the first and the second one of the rolling phases wherein the time gap is up to the sum of the interleave depth times the duration of a rolling phase and the remainder time.
10. The method according to claim 4 , wherein
after completion of rolling the first plate or strip of the batch,
for one of the rolling patterns with unequal durations of the rolling phases,
selecting a duration of the cooling phase as equal to the sum of
a whole number times the duration of a longest one of the rolling phases
and a remainder time,
alternating a first one of the rolling phases with a second one of the rolling phases during rolling the batch at an interval which is up to the sum of the interleave depth times a duration of the longest rolling phase and the remainder time.
11. The method according to claim 4 , wherein
for one of the rolling patterns with unequal durations of the rolling phases and a duration of the cooling phase that is equal to or longer than the sum of the durations of both rolling phases, or of a whole number times that sum,
after completion of rolling the first plate or strip of the batch,
during a period of time equal to the duration of the cooling phase,
performing the first rolling phase as often as performing the second rolling phase.
12. The method according to claim 4 , wherein
for one of the rolling patterns with unequal durations of the rolling phases and a duration of the cooling phase that is equal to or longer than the sum of
the durations of both rolling phases
and the duration of either the first or the second rolling phase,
or a whole number times that sum,
during the duration of the cooling phase, performing an amount of the first rolling phase equal to the amount of the second rolling phase performed plus 1 or minus 1.
13. The method according to claim 1 , comprising performing three of the rolling phases, comprising a first, a second and a third rolling phase, wherein the first and second rolling phases are separated by a first of the cooling phases, and the second and third rolling phases are separated by a second of the cooling phases.
14. The method according to claim 13 , wherein
for one of the rolling patterns where the duration of the first one of cooling phases is equal to the sum of
a first whole number times the sum of the durations of the first, second and third rolling phases
and a first remainder time,
and where the duration of the second cooling phase is equal to the sum of
a second whole number times the sum of the durations of the first, second and third rolling phases
and a second remainder time,
for successively rolled slabs, providing the maximum time gap between the starts of the respective first rolling phases as up to the sum of the durations of the first, second and third rolling phases plus the greater of the first remainder time and the second remainder time.
15. The method according to claim 13 , wherein
for one of the rolling patterns where the duration of the first cooling phase is equal to the sum of
a first whole number times the sum
of the durations of the first, second and third rolling phases and the duration of the third rolling phase,
and a third remainder time,
and where the duration of the second cooling phase is equal to the sum of
a second whole number times the sum
of the durations of the first, second and third rolling phases and the duration of the first rolling phase,
and a fourth remainder time,
for successively rolled slabs, providing the maximum time gap between the starts of the respective first rolling phases as to the sum of the durations of the first, second and third rolling phases plus the greater of the third remainder time and the fourth remainder time.
16. The method according to claim 13 , wherein
during rolling of the batch,
from after completion of rolling the first plate or strip of the batch until the beginning of the third rolling phase of the last plate or strip of the batch,
causing a first rolling phase to always be succeeded by a second rolling phase, and causing a second rolling phase to always be succeeded by a third rolling phase, and causing a third rolling phase to always be succeeded by a first rolling phase.
17. The method according to claim 13 , wherein
during rolling of the batch,
from after completion of rolling the first plate or strip of the batch until the beginning of the third rolling phase of the last plate or strip of the batch,
causing a first rolling phase to always be succeeded by a third rolling phase, and causing a third rolling phase to always be succeeded by a second rolling phase, and causing a second rolling phase to always be succeeded by a first rolling phase.
18. The method according to claim 14 , wherein
during a period of time equal to the duration of the first cooling phase, causing all of a first rolling phase, a second rolling phase and a third rolling phase to be performed equally often.
19. The method according to claim 15 , wherein
during a period of time equal to the duration of the first cooling phase, causing a first rolling phase, a second rolling phase and a third rolling phase to be performed unequally often.
20. The method according to claim 19 , wherein
during a period of time equal to the duration of the first cooling phase, performing a number of third rolling phases that is greater than a number of first rolling phases performed and greater than a number of second rolling phases performed,
and that during a period of time equal to the duration of a second cooling phase, performing a number of first rolling phases that is greater than a number of second rolling phases performed and greater than a number of third rolling phases performed.
21. The method according to claim 1 , further comprising
after completion of a rolling phase which is succeeded by a cooling phase along a rolling line, transferring resulting plates or strips from the rolling line of the rolling mill to a storage position outside the rolling line by use of moving equipment, and afterwards transferring the resulting plates or strips by the moving equipment from the storage position to the rolling line after completion of the cooling phase.
22. The method according to claim 21 , further comprising
during rolling the batch, at least once while one plate or strip is transferred to its storage position or to the rolling line, simultaneously transferring another plate or strip to the rolling line or to its storage position by a same moving equipment.
23. (canceled)
24. The apparatus according to claim 27 , wherein the
at least one moving equipment is configured and operable to simultaneously transfer one plate or strip to one of the rolling line or to a storage position and another plate or strip to the other of a storage position or the rolling line.
25. (canceled)
26. A method according to claim 1 , wherein the rolling pattern has at least two successive rolling phases and each two successive rolling phases are separated by a cooling phase, the method further comprising
selecting an interleave depth for a particular slab, which comprises
selecting a rolling pattern having at least a first rolling phase of a first duration, a subsequent second rolling phase of a second duration and a cooling phase of a third duration between the first and the second rolling phases;
determining a quotient by dividing the third duration of the cooling phase by a longest one of the first and the second durations of the rolling phases;
selecting a smallest value from the quotients, wherein for rolling patterns with unequal durations of the rolling phases thereof, the smallest value is selected from among the quotients and for rolling patterns with equal duration of the rolling phases thereof, the smallest value is any of the quotients,
rounding the selected smallest value down to the next whole number to define the interleave depth, using the interleave depth to set the number of slabs to be passed through one of the rolling phases of one of the rolling patterns during a third duration of a cooling phase of the rolling pattern;
for batches of slabs larger in number than the interleave depth plus one, after the first rolling phase of the first slab of the batch has been completed until the beginning of the last rolling phase of the last plate or strip, placing at least one other plate or strip in its cooling phase.
27. Apparatus for thermo-mechanical controlled rolling of a batch of metal slabs to plates or strips, the apparatus comprising
at least one rolling mill stand configured to define a rolling line for the slabs, plates and strips,
at least one storage position located outside the rolling line, at least one moving equipment for moving plates or strips from the rolling line to the storage positions,
the rolling stand is configured and operable to provide at least one rolling pattern having at least two successive rolling phases and each two successive rolling phases is separated by a cooling phase, the rolling stand being configured to operate using an interleave depth selected for a particular slab, the interleave depth comprising a selected rolling pattern having at least a first rolling phase of a first duration, a subsequent second rolling phase of a second duration and a cooling phase of a third duration between the first and the second rolling phases, wherein a quotient is determined by dividing the third duration of the cooling phase by a longest one of the first and the second durations of the rolling phases and
a smallest value is selected from the quotients, wherein for rolling patterns with unequal durations of the rolling phases thereof, the smallest value is selected from among the quotients and for rolling patterns with equal duration of the rolling phases thereof, the smallest value is any of the quotients, and
wherein the selected value is rounded down to the next whole number to define the interleave depth, wherein the interleave depth is used to set the number of slabs to be passed through one of the rolling phases of one of the rolling patterns during a third duration of a cooling phase of the rolling pattern; and
a quantity of the storage positions is half of the interleave depth of the performed rolling pattern rounded up to a whole number.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP07270012 | 2007-02-16 | ||
EP07270012A EP1958711A1 (en) | 2007-02-16 | 2007-02-16 | Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips |
PCT/EP2008/000976 WO2008098709A1 (en) | 2007-02-16 | 2008-02-08 | Method and apparatus for themo-mechanical controlled rolling of metal plates and strips |
Publications (1)
Publication Number | Publication Date |
---|---|
US20100077823A1 true US20100077823A1 (en) | 2010-04-01 |
Family
ID=38098602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/527,495 Abandoned US20100077823A1 (en) | 2007-02-16 | 2008-02-08 | Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips |
Country Status (10)
Country | Link |
---|---|
US (1) | US20100077823A1 (en) |
EP (2) | EP1958711A1 (en) |
JP (1) | JP2010517787A (en) |
KR (1) | KR101178348B1 (en) |
AT (1) | ATE533573T1 (en) |
BR (1) | BRPI0807923A2 (en) |
DK (1) | DK2111309T3 (en) |
PL (1) | PL2111309T3 (en) |
RU (1) | RU2434699C2 (en) |
WO (1) | WO2008098709A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150122375A1 (en) * | 2012-04-26 | 2015-05-07 | Siemens Aktiengesellschaft | Thermomechanical rolling of an aluminum plate |
US20160243602A1 (en) * | 2013-10-04 | 2016-08-25 | Danieli & C. Officine Meccaniche S.P.A. | Steel plant for the production of long metal products and corresponding production method |
US9506194B2 (en) | 2012-09-04 | 2016-11-29 | Ocv Intellectual Capital, Llc | Dispersion of carbon enhanced reinforcement fibers in aqueous or non-aqueous media |
CN115090669A (en) * | 2022-05-07 | 2022-09-23 | 江苏沙钢集团淮钢特钢股份有限公司 | Efficient bar controlled rolling method |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT514079B1 (en) * | 2013-05-21 | 2014-10-15 | Siemens Vai Metals Tech Gmbh | Method and device for rapid removal of heavy plates from a rolling mill |
CN112387791B (en) * | 2020-12-03 | 2022-11-18 | 北京首钢自动化信息技术有限公司 | Method and system for determining rolling temperature of cold-rolled strip steel |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5235840A (en) * | 1991-12-23 | 1993-08-17 | Hot Rolling Consultants, Ltd. | Process to control scale growth and minimize roll wear |
US6185972B1 (en) * | 1999-03-11 | 2001-02-13 | Morgan Construction Company | Rolling mill finishing section |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2137915B2 (en) * | 1971-07-23 | 1979-10-04 | Mannesmann Ag, 4000 Duesseldorf | Rolling mill for rolling out slabs |
JPS5939405A (en) * | 1982-08-30 | 1984-03-03 | Sumitomo Metal Ind Ltd | Rolling line for thick plate |
JPS5961504A (en) * | 1982-09-30 | 1984-04-07 | Nippon Kokan Kk <Nkk> | Rolling method of thick plate |
JPS60180604A (en) * | 1984-02-28 | 1985-09-14 | Sumitomo Metal Ind Ltd | Rolling method of thick steel plate |
DE19725434C2 (en) * | 1997-06-16 | 1999-08-19 | Schloemann Siemag Ag | Process for rolling hot wide strip in a CSP plant |
JP4151298B2 (en) * | 2002-04-08 | 2008-09-17 | Jfeスチール株式会社 | How to determine rolling procedure |
DE102005052815A1 (en) * | 2004-12-18 | 2006-06-29 | Sms Demag Ag | Device for producing metallic goods by rolling |
-
2007
- 2007-02-16 EP EP07270012A patent/EP1958711A1/en not_active Withdrawn
-
2008
- 2008-02-08 AT AT08707621T patent/ATE533573T1/en active
- 2008-02-08 RU RU2009134523/02A patent/RU2434699C2/en not_active IP Right Cessation
- 2008-02-08 KR KR1020097019186A patent/KR101178348B1/en not_active IP Right Cessation
- 2008-02-08 EP EP08707621A patent/EP2111309B1/en not_active Revoked
- 2008-02-08 WO PCT/EP2008/000976 patent/WO2008098709A1/en active Application Filing
- 2008-02-08 PL PL08707621T patent/PL2111309T3/en unknown
- 2008-02-08 DK DK08707621.2T patent/DK2111309T3/en active
- 2008-02-08 US US12/527,495 patent/US20100077823A1/en not_active Abandoned
- 2008-02-08 BR BRPI0807923-4A2A patent/BRPI0807923A2/en not_active IP Right Cessation
- 2008-02-08 JP JP2009549371A patent/JP2010517787A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5235840A (en) * | 1991-12-23 | 1993-08-17 | Hot Rolling Consultants, Ltd. | Process to control scale growth and minimize roll wear |
US6185972B1 (en) * | 1999-03-11 | 2001-02-13 | Morgan Construction Company | Rolling mill finishing section |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150122375A1 (en) * | 2012-04-26 | 2015-05-07 | Siemens Aktiengesellschaft | Thermomechanical rolling of an aluminum plate |
US10131979B2 (en) * | 2012-04-26 | 2018-11-20 | Primetals Technologies Germany Gmbh | Thermomechanical rolling of an aluminum plate |
US9506194B2 (en) | 2012-09-04 | 2016-11-29 | Ocv Intellectual Capital, Llc | Dispersion of carbon enhanced reinforcement fibers in aqueous or non-aqueous media |
US20160243602A1 (en) * | 2013-10-04 | 2016-08-25 | Danieli & C. Officine Meccaniche S.P.A. | Steel plant for the production of long metal products and corresponding production method |
US10343200B2 (en) * | 2013-10-04 | 2019-07-09 | Danieli & C. Officine Meccaniche S.P.A. | Steel plant for the production of long metal products and corresponding production method |
CN115090669A (en) * | 2022-05-07 | 2022-09-23 | 江苏沙钢集团淮钢特钢股份有限公司 | Efficient bar controlled rolling method |
Also Published As
Publication number | Publication date |
---|---|
JP2010517787A (en) | 2010-05-27 |
EP2111309B1 (en) | 2011-11-16 |
PL2111309T3 (en) | 2012-03-30 |
EP1958711A1 (en) | 2008-08-20 |
RU2009134523A (en) | 2011-03-27 |
EP2111309A1 (en) | 2009-10-28 |
ATE533573T1 (en) | 2011-12-15 |
BRPI0807923A2 (en) | 2014-06-24 |
KR101178348B1 (en) | 2012-08-29 |
KR20090111348A (en) | 2009-10-26 |
DK2111309T3 (en) | 2012-03-05 |
WO2008098709A1 (en) | 2008-08-21 |
RU2434699C2 (en) | 2011-11-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20100077823A1 (en) | Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips | |
RU2372158C2 (en) | Method and process line to fabricate metal strips from copper or copper alloys | |
KR101456765B1 (en) | Hot-rolled steel sheet manufacturing method and manufacturing device | |
RU2497612C2 (en) | Method of rolling and rolling unit | |
KR102018370B1 (en) | Process and apparatus for preparing steel stock before hot rolling | |
RU2008121977A (en) | METHOD AND LINE OF CLEAR ROLLING FOR HOT ROLLING OF SOURCE MATERIAL | |
CN102686751A (en) | Process to manufacture grain-oriented electrical steel strip and grain-oriented electrical steel produced thereby | |
JP2009540113A (en) | Method and apparatus for producing hot strip rolled material made of silicon steel based on thin slabs | |
WO2007090455A1 (en) | Roller hearth furnace for heating and/or temperature equalisation of steel or steel alloy continuous cast products and arrangement thereof before a hot strip final rolling mill | |
CN108906888A (en) | Stainless-steel cold-rolling strip production equipment | |
JP3686700B2 (en) | Method and equipment for producing hot wide strips | |
KR980008368A (en) | Finishing contour rolling method from preliminary contour | |
US3852989A (en) | Method of apparatus for cooling high-temperature metal bars | |
CN101590488B (en) | Rolling technical skill of hot strip rough rolling process | |
JP2005095926A (en) | Continuous casting and hot-rolling apparatus, and continuous casting and hot-rolling method | |
JP2002126814A (en) | Hot rolling method | |
CN101001706A (en) | Device for producing a hot-rolled thermal strip, especially made of strip-type continuous casting material | |
JP4079098B2 (en) | Manufacturing method and manufacturing apparatus for hot-rolled steel sheet | |
CN101631630A (en) | The hot mechanical controlled rolling method and the device of metallic plate and band | |
JPS5976615A (en) | Method and device for descaling steel material in low pressure | |
JP2002361314A (en) | Apparatus and method for continuous heat treatment of hot-rolled plate of grain oriented silicon steel | |
RU2254183C2 (en) | Rolling mill for making thin hot rolled strip | |
WO2011040836A1 (en) | Method for producing hot-rolled strips in a continuous casting machine and wide strip mill metalworking complex | |
SU1152673A1 (en) | Method of hot rolling of plate steel | |
JP2008212956A (en) | Use method of descaling device in hot rolling and hot-rolling method using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SIEMENS VAI METALS TECHNOLOGIES LTD.,UNITED KINGDO Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CHAMPION, NICK;CLARK, MICHAEL TREVOR;SCHMIDT, BIRGER;AND OTHERS;SIGNING DATES FROM 20090731 TO 20090806;REEL/FRAME:023169/0417 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |