US20090158682A1 - Screed Rail - Google Patents
Screed Rail Download PDFInfo
- Publication number
- US20090158682A1 US20090158682A1 US12/158,823 US15882306A US2009158682A1 US 20090158682 A1 US20090158682 A1 US 20090158682A1 US 15882306 A US15882306 A US 15882306A US 2009158682 A1 US2009158682 A1 US 2009158682A1
- Authority
- US
- United States
- Prior art keywords
- plate member
- plate
- screed rail
- rail according
- members
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 239000010432 diamond Substances 0.000 claims description 3
- 230000002401 inhibitory effect Effects 0.000 abstract description 2
- 239000004677 Nylon Substances 0.000 description 4
- 229920001778 nylon Polymers 0.000 description 4
- 238000005755 formation reaction Methods 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 239000004033 plastic Substances 0.000 description 2
- 229920003023 plastic Polymers 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 1
- 229910003460 diamond Inorganic materials 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005764 inhibitory process Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000565 sealant Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/02—Arrangement or construction of joints; Methods of making joints; Packing for joints
- E01C11/04—Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
- E01C11/08—Packing of metal
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/02—Arrangement or construction of joints; Methods of making joints; Packing for joints
- E01C11/04—Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
- E01C11/06—Methods of making joints
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/02—Arrangement or construction of joints; Methods of making joints; Packing for joints
- E01C11/04—Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
- E01C11/14—Dowel assembly ; Design or construction of reinforcements in the area of joints
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/12—Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
- E04F15/14—Construction of joints, e.g. dividing strips
Definitions
- This invention relates to screed rails of the leave-in-place type, intended in use to constitute the boundary between adjacent concrete floor slabs especially of large buildings such as warehouses where the floor is required to be essentially flat over a large area and capable of supporting loads exerted typically by racking with goods stored thereon, fork trucks and the like.
- a conventional leave-in-place screed rail or formwork is supported by leg members which, in use, are placed on the ground so that the screed rail is in an upright position and adjusted in height relative to the feet such that the upper edge is horizontal and the upper edges of adjacent rails, whether in longitudinal alignment or defining a slab corner, are in the same plane. Concrete is then cast in the areas defined by the screed rails, up to the level of the upper edges, and allowed to cure. As curing takes place, the concrete shrinks in volume and, as a result, gaps are formed between adjacent slabs.
- the screed rails prefferably provide protection to the arriss or upper edge corners of the slabs, to prevent them from being fractured under load in use, and also for the screed rails to be formed in two parts, arranged initially with their front or outer faces together but adapted to separate and move apart as the concrete cures. It is also desirable for the screed rails to carry horizontal dowels or plates to provide load transfer between adjacent slabs or bays of the overall floor area.
- the present invention provides a screed rail comprising first and second elongate plate members arranged in face-to-face configuration, the first plate member being attached to leg members by height-adjustable lock means and the second plate member being attached to the first plate member by frangible joining means with the upper edges of the plate members in registration.
- upper edges in registration is meant that the upper edges of the plate members are parallel and in the same plane, substantially orthogonal to the plane of the plate members themselves whereby, in use and with the screed rails arranged vertically, the upper edges thereof will be in a common horizontal plane.
- the first plate member is attached to the leg members and by independent frangible connections to the second plate member, whereby the plate members can separate laterally as the concrete cures without the attachment of the leg members inhibiting movement of the second plate member relative to the first.
- the second plate member is the same length as the first plate member but is shallower in depth, whereby the lower edge of the second plate member is disposed above the lock means which attach the leg members to the first plate member.
- the screed rail is cheaper to manufacture since it uses less material than a screed rail in which both plate members are of the same depth and there are no potential inhibitions to separation of the plate members as the concrete cures other than the frangible connections.
- height adjustment of the first plate member is provided by vertical slotted apertures through which the lock means pass, the second plate member being out of contact with the lock means.
- Vertical adjustment of the first plate member relative to the leg members, when laying the screed rail in place, thus effects vertical adjustment of the second plate through the frangible joining means, the lack of contact between the releasable lock means and the second plate member permitting the plate members to move apart as the concrete cures following breakage of the frangible joining means.
- the plates include means for accommodating laterally-disposed dowels or plates for providing load transfer between adjacent slabs; preferably, the dowels or plates are encased on one side of the screed rail with a sleeve member to allow the dowel or plate to move in the horizontal plane relative to the sleeve member and to the concrete of the floor slab in which it becomes buried as the edges of the floor slabs move apart on curing of the concrete, but to prevent relative vertical movement of the dowel or plate within the sleeve member.
- the plates are in the form of diamonds or trapezoidal plates and the sleeves are adapted to accommodate sideways movement of the plates as well as horizontal movement orthogonal to the screed rail.
- the plates themselves may have essentially flat upper and lower surfaces or may be corrugated or otherwise configured to increase the strength thereof.
- the means for securing together the first plate member and the leg members comprise bolts and wing nuts; the wing nuts may be tightened against a flange member attached to the foot members, vertical adjustment being accommodated by virtue of the slotted aperture in the first plate member.
- the frangible securing means may comprise bolts with nylon or other plastics lock nuts the threads of which will strip under shrinking forces as the concrete cures.
- the plate members are provided or formed with at least the upper edges being turned over to define a substantially horizontal (in use) planar upper face and a return or downwardly-extending lip, to add strength and rigidity to the plate members and, in use, to lock the members against the edge of the cured concrete slab.
- the horizontal upper-facing surfaces are formed with apertures, which may extend partially to the vertical or main part of the member and/or to the lip, to allow release of entrapped air as concrete is poured and rises within the turned-over region.
- the lower edge of the first plate member is also preferably formed with a similar turned-over region comprising a flange or an upwardly-extending return lip to impart enhanced longitudinal stiffness to the plate member.
- the plate members have a plain straight upper edge without a turned-over region.
- the first plate member is preferably formed with at least one groove or channel formation extending from one face, preferably from that face against which the second plate member is attached, to add strength and rigidity to the first plate member.
- the second plate member is preferably formed, along its lower part, with a laterally-extending, preferably angled, skirt region for embedding in the concrete, preferably having an array of spaced-apart longitudinally-disposed apertures formed therein for additional keying with the concrete.
- the plate members may additionally be provided with laterally-extending studs or other connectors or formations on one or both sides to provide enhanced keying with and arriss protection of the concrete, especially for use in heavy-duty applications.
- the first and second plate members may be joined together in a longitudinally offset relationship, to provide an end lap on one plate member for attachment to a corresponding lap on the other plate member when joining the members in end-to-end relationship.
- FIG. 1 is an end elevation of one embodiment of the invention
- FIG. 2 is an end elevation of a further embodiment of the invention.
- FIG. 3 is a perspective view showing the embodiment of FIG. 1 .
- the screed rail assembly consists essentially of a main or principal screed rail plate 10 and a subsidiary plate 11 joined together by nylon nuts and bolts 12 .
- the upper edges of the respective plates are turned over to provide co-planar horizontal surfaces 13 , 14 and downwardly-extending lips 15 , 16 .
- the lower edge of plate 10 is also turned over to provide a horizontal lower surface 17 and an upturned lip 18 .
- Studs 19 , 20 are welded to the respective plates at locations intermediate the nylon bolts 12 and, in use, become embedded in the concrete, the upper surface of which is flush with co-planar horizontal surfaces 13 , 14 of the plate members.
- Plate 10 is supported on the ground by leg bracket 21 formed at its lower region with foot member 22 .
- Leg bracket 21 is formed with an extending flange or plate 23 , (see, in particular, FIG. 3 ) which, in extending beyond the end of the screed rail plate 10 , serves the dual purpose of attachment to the plate 10 and also attachment to a further plate member 10 arranged in end-to-end relationship thereto, when constructing formwork on site.
- Attachment of the flange to the plate is by virtue of bolts and wing nuts 24 which engage the plate through vertical slots to allow for height adjustment.
- the bolts and wing nuts 24 serve only to attach the leg bracket to the first plate; the second plate is attached to the first plate by virtue only of the nuts and bolts 12 .
- a flat dowel plate 25 for example of diamond configuration, is engaged through a horizontal slot formed in the first plate 10 and, on the other side thereof, extends into sleeve 26 . Lateral movement of the dowel plate within the sleeve is thus permitted in two lateral mutually-orthogonal directions as the concrete shrinks on curing, without compromising the ability of the dowel or plate to reinforce the edge of the set concrete against vertical stresses, but vertical movement of the dowel plate within the sleeve is inhibited or prevented altogether.
- the assembly as illustrated in FIG. 2 is similar to that of FIG. 1 except that the first and second plates are not provided with turned-over upper edges but, instead, have co-planar straight upwardly-facing edges 31 , 32 .
- the first plate is provided with a longitudinal grooved deformation 33 disposed above the point of attachment of the leg brackets 21 , for the purpose of increased strength and rigidity in the absence of the turned-over upper edge region.
- the second plate is provided with a lower angularly-extending skirt portion 34 which, in the case of the embodiment of FIG. 2 , conveniently is adjacent to and lies in contact with the upper wall of groove 33 .
- the first and second plates are disposed in offset relationship to provide end lap regions for attachment to other plates in end-to-end relationship.
- the upper surfaces 13 , 14 of the plates are provided with apertures 35 , 36 and the lower skirt portion of plate 11 is also formed with an array of apertures 37 , for keying with the concrete.
- the studs 19 are not shown.
- the upper edges 31 , 32 of the plates may optionally be arranged to lie below the ultimate intended level of the upper surface of the concrete and be fitted with a plastics strip having downwardly-depending legs which engage astride and grip the plates, the upper edge of the strip coinciding with the intended concrete level.
- the strip may either be left in place or removed and the gap filled with a proprietary joint sealant compound.
- screed rails according to the invention can be used with tie bars, round dowels or square dowels and may carry appropriate apertures formed therein for the purpose of receiving such dowels, as appropriate for the on-site circumstances.
- concrete may be poured on both sides of the screed rail at the same time and allowed to cure.
- concrete may be poured initially or that side which includes the sleeves 26 and allowed to cure. The sleeves thus becomes embedded in and bonded to the concrete.
- Concrete is then poured on the other side to encase the dowel plates 25 and, as the concrete cures, the plates are permitted to move horizontally within the sleeves as the threads of the nuts and bolts 12 shear, to allow the principal plate 10 and subsidiary plate 11 to move apart as the concrete of the second slab cures.
- the continuing engagement of the dowel plates within the sleeves, with no effective vertical movement being permitted, provides for load transfer between the slabs.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Road Paving Structures (AREA)
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
Abstract
Description
- This invention relates to screed rails of the leave-in-place type, intended in use to constitute the boundary between adjacent concrete floor slabs especially of large buildings such as warehouses where the floor is required to be essentially flat over a large area and capable of supporting loads exerted typically by racking with goods stored thereon, fork trucks and the like.
- A conventional leave-in-place screed rail or formwork is supported by leg members which, in use, are placed on the ground so that the screed rail is in an upright position and adjusted in height relative to the feet such that the upper edge is horizontal and the upper edges of adjacent rails, whether in longitudinal alignment or defining a slab corner, are in the same plane. Concrete is then cast in the areas defined by the screed rails, up to the level of the upper edges, and allowed to cure. As curing takes place, the concrete shrinks in volume and, as a result, gaps are formed between adjacent slabs. It is thus desirable firstly for the screed rails to provide protection to the arriss or upper edge corners of the slabs, to prevent them from being fractured under load in use, and also for the screed rails to be formed in two parts, arranged initially with their front or outer faces together but adapted to separate and move apart as the concrete cures. It is also desirable for the screed rails to carry horizontal dowels or plates to provide load transfer between adjacent slabs or bays of the overall floor area.
- The requirement for vertical adjustment of the screed rails implies that, in a face-to-face arrangement, the two parts must be held together, but this requirement conflicts with the need for the parts to be separable as the concrete cures. It is therefore conventional to use frangible connectors such as nylon bolts or nuts the threads of which will strip under tensile load, but the leg members require stronger connections which still causes a problem with separation of the rails.
- It is an object of the present invention to provide a leave-in-place screed rail which overcomes the problem as set out above.
- In one aspect, the present invention provides a screed rail comprising first and second elongate plate members arranged in face-to-face configuration, the first plate member being attached to leg members by height-adjustable lock means and the second plate member being attached to the first plate member by frangible joining means with the upper edges of the plate members in registration.
- By “upper edges in registration” is meant that the upper edges of the plate members are parallel and in the same plane, substantially orthogonal to the plane of the plate members themselves whereby, in use and with the screed rails arranged vertically, the upper edges thereof will be in a common horizontal plane.
- In screed rails according to the invention, the first plate member is attached to the leg members and by independent frangible connections to the second plate member, whereby the plate members can separate laterally as the concrete cures without the attachment of the leg members inhibiting movement of the second plate member relative to the first.
- In a preferred arrangement, the second plate member is the same length as the first plate member but is shallower in depth, whereby the lower edge of the second plate member is disposed above the lock means which attach the leg members to the first plate member. In such an arrangement, the screed rail is cheaper to manufacture since it uses less material than a screed rail in which both plate members are of the same depth and there are no potential inhibitions to separation of the plate members as the concrete cures other than the frangible connections.
- Preferably, height adjustment of the first plate member is provided by vertical slotted apertures through which the lock means pass, the second plate member being out of contact with the lock means. Vertical adjustment of the first plate member relative to the leg members, when laying the screed rail in place, thus effects vertical adjustment of the second plate through the frangible joining means, the lack of contact between the releasable lock means and the second plate member permitting the plate members to move apart as the concrete cures following breakage of the frangible joining means.
- Preferably, the plates include means for accommodating laterally-disposed dowels or plates for providing load transfer between adjacent slabs; preferably, the dowels or plates are encased on one side of the screed rail with a sleeve member to allow the dowel or plate to move in the horizontal plane relative to the sleeve member and to the concrete of the floor slab in which it becomes buried as the edges of the floor slabs move apart on curing of the concrete, but to prevent relative vertical movement of the dowel or plate within the sleeve member. Preferably, the plates are in the form of diamonds or trapezoidal plates and the sleeves are adapted to accommodate sideways movement of the plates as well as horizontal movement orthogonal to the screed rail. The plates themselves may have essentially flat upper and lower surfaces or may be corrugated or otherwise configured to increase the strength thereof.
- Conveniently, the means for securing together the first plate member and the leg members comprise bolts and wing nuts; the wing nuts may be tightened against a flange member attached to the foot members, vertical adjustment being accommodated by virtue of the slotted aperture in the first plate member. The frangible securing means may comprise bolts with nylon or other plastics lock nuts the threads of which will strip under shrinking forces as the concrete cures.
- Preferably, the plate members are provided or formed with at least the upper edges being turned over to define a substantially horizontal (in use) planar upper face and a return or downwardly-extending lip, to add strength and rigidity to the plate members and, in use, to lock the members against the edge of the cured concrete slab. Preferably, the horizontal upper-facing surfaces are formed with apertures, which may extend partially to the vertical or main part of the member and/or to the lip, to allow release of entrapped air as concrete is poured and rises within the turned-over region. The lower edge of the first plate member is also preferably formed with a similar turned-over region comprising a flange or an upwardly-extending return lip to impart enhanced longitudinal stiffness to the plate member.
- In an alternative embodiment, the plate members have a plain straight upper edge without a turned-over region. In this embodiment, the first plate member is preferably formed with at least one groove or channel formation extending from one face, preferably from that face against which the second plate member is attached, to add strength and rigidity to the first plate member. The second plate member is preferably formed, along its lower part, with a laterally-extending, preferably angled, skirt region for embedding in the concrete, preferably having an array of spaced-apart longitudinally-disposed apertures formed therein for additional keying with the concrete. The plate members may additionally be provided with laterally-extending studs or other connectors or formations on one or both sides to provide enhanced keying with and arriss protection of the concrete, especially for use in heavy-duty applications.
- The first and second plate members may be joined together in a longitudinally offset relationship, to provide an end lap on one plate member for attachment to a corresponding lap on the other plate member when joining the members in end-to-end relationship.
- Embodiments of the invention will now be described by way of example with reference to the accompanying drawings, of which:
-
FIG. 1 is an end elevation of one embodiment of the invention; -
FIG. 2 is an end elevation of a further embodiment of the invention; and -
FIG. 3 is a perspective view showing the embodiment ofFIG. 1 . - With reference firstly to
FIG. 1 , the screed rail assembly consists essentially of a main or principal screedrail plate 10 and asubsidiary plate 11 joined together by nylon nuts andbolts 12. The upper edges of the respective plates are turned over to provide co-planarhorizontal surfaces lips plate 10 is also turned over to provide a horizontallower surface 17 and anupturned lip 18. -
Studs nylon bolts 12 and, in use, become embedded in the concrete, the upper surface of which is flush with co-planarhorizontal surfaces -
Plate 10 is supported on the ground byleg bracket 21 formed at its lower region withfoot member 22.Leg bracket 21 is formed with an extending flange orplate 23, (see, in particular,FIG. 3 ) which, in extending beyond the end of thescreed rail plate 10, serves the dual purpose of attachment to theplate 10 and also attachment to afurther plate member 10 arranged in end-to-end relationship thereto, when constructing formwork on site. Attachment of the flange to the plate is by virtue of bolts andwing nuts 24 which engage the plate through vertical slots to allow for height adjustment. As can be seen fromFIGS. 1 and 2 , the bolts andwing nuts 24 serve only to attach the leg bracket to the first plate; the second plate is attached to the first plate by virtue only of the nuts andbolts 12. - A
flat dowel plate 25, for example of diamond configuration, is engaged through a horizontal slot formed in thefirst plate 10 and, on the other side thereof, extends intosleeve 26. Lateral movement of the dowel plate within the sleeve is thus permitted in two lateral mutually-orthogonal directions as the concrete shrinks on curing, without compromising the ability of the dowel or plate to reinforce the edge of the set concrete against vertical stresses, but vertical movement of the dowel plate within the sleeve is inhibited or prevented altogether. - The assembly as illustrated in
FIG. 2 is similar to that ofFIG. 1 except that the first and second plates are not provided with turned-over upper edges but, instead, have co-planar straight upwardly-facingedges grooved deformation 33 disposed above the point of attachment of theleg brackets 21, for the purpose of increased strength and rigidity in the absence of the turned-over upper edge region. In both embodiments, the second plate is provided with a lower angularly-extendingskirt portion 34 which, in the case of the embodiment ofFIG. 2 , conveniently is adjacent to and lies in contact with the upper wall ofgroove 33. - As seen more clearly in
FIG. 3 , the first and second plates are disposed in offset relationship to provide end lap regions for attachment to other plates in end-to-end relationship. Additionally, theupper surfaces apertures plate 11 is also formed with an array ofapertures 37, for keying with the concrete. InFIG. 3 , thestuds 19 are not shown. - In the embodiment of
FIG. 2 , theupper edges - Although described particularly with reference to diamond-shaped dowels and corresponding sleeves, screed rails according to the invention can be used with tie bars, round dowels or square dowels and may carry appropriate apertures formed therein for the purpose of receiving such dowels, as appropriate for the on-site circumstances.
- In use, concrete may be poured on both sides of the screed rail at the same time and allowed to cure. Alternatively, concrete may be poured initially or that side which includes the
sleeves 26 and allowed to cure. The sleeves thus becomes embedded in and bonded to the concrete. Concrete is then poured on the other side to encase thedowel plates 25 and, as the concrete cures, the plates are permitted to move horizontally within the sleeves as the threads of the nuts andbolts 12 shear, to allow theprincipal plate 10 andsubsidiary plate 11 to move apart as the concrete of the second slab cures. The continuing engagement of the dowel plates within the sleeves, with no effective vertical movement being permitted, provides for load transfer between the slabs.
Claims (13)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0526060.9 | 2005-12-21 | ||
GB0526060A GB2421049B (en) | 2005-12-21 | 2005-12-21 | Screed rail |
PCT/GB2006/004813 WO2007071995A1 (en) | 2005-12-21 | 2006-12-20 | Screed rail |
Publications (1)
Publication Number | Publication Date |
---|---|
US20090158682A1 true US20090158682A1 (en) | 2009-06-25 |
Family
ID=35840912
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/158,823 Abandoned US20090158682A1 (en) | 2005-12-21 | 2006-12-20 | Screed Rail |
Country Status (8)
Country | Link |
---|---|
US (1) | US20090158682A1 (en) |
EP (1) | EP1963578A1 (en) |
CN (1) | CN101370984A (en) |
AU (1) | AU2006328116A1 (en) |
GB (1) | GB2421049B (en) |
RU (1) | RU2008128314A (en) |
WO (1) | WO2007071995A1 (en) |
ZA (1) | ZA200805928B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120102862A1 (en) * | 2010-10-28 | 2012-05-03 | Underwood Companies Holdings Pty Ltd. | Metal edging for concrete slabs |
US9045869B2 (en) * | 2011-07-11 | 2015-06-02 | Andrzej R. Biernacki | Screed system |
US10066408B2 (en) * | 2015-01-22 | 2018-09-04 | Florcon Limited | Edge protector adapted to be cast into the edge of a concrete floor slab |
US20220243459A1 (en) * | 2019-07-15 | 2022-08-04 | China Construction Science And Industry Corporation Ltd. | Connection member, alc batten mounting node structure, and prefabricated mounting method |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB0409216D0 (en) * | 2004-04-24 | 2004-05-26 | Metaform Ltd | Multi purpose screed rail, formwork and joint protection mechanism |
GB0817445D0 (en) * | 2008-09-23 | 2008-10-29 | Permaban Ltd | Alpha slide joint |
GB0902724D0 (en) * | 2009-02-17 | 2009-04-01 | Permaban Ltd | Anti-spalling edge |
GB201115940D0 (en) | 2011-09-14 | 2011-10-26 | Permaban Ltd | Movement joint |
AU2013202091B2 (en) * | 2012-03-30 | 2016-06-09 | Illinois Tool Works Inc. | Method of joint assembly and joint release mechanism |
GB2511729B (en) * | 2013-01-18 | 2019-04-03 | Anthony Spurrell Shaun | Floor joint apparatus |
AU2018226393B2 (en) | 2017-10-13 | 2024-09-26 | Illinois Tool Works Inc. | Edge protection system with intersection module |
AU2018226391B2 (en) | 2017-10-13 | 2024-10-10 | Illinois Tool Works Inc. | Edge protection system having support foot |
AU2018226394B2 (en) | 2017-10-13 | 2024-09-12 | Illinois Tool Works Inc. | Edge protection system having clip retainment |
AU2018226390B2 (en) | 2017-10-13 | 2024-09-19 | Illinois Tool Works Inc. | Edge protection system having retaining clip |
AU2018226392B2 (en) | 2017-10-13 | 2024-10-10 | Illinois Tool Works Inc. | Edge protection system having dowel plate |
AU2018226389B2 (en) | 2017-10-13 | 2024-09-12 | Illinois Tool Works Inc. | Edge protection system having bridging pins |
CN108330768A (en) * | 2018-04-09 | 2018-07-27 | 浙江乔兴建设集团有限公司 | Concrete extension joint joint filling device |
AU2019264633A1 (en) | 2018-11-19 | 2020-06-04 | Illinois Tool Works Inc. | Support bracket |
AU2021204995A1 (en) | 2021-07-12 | 2023-02-02 | Illinois Tool Works Inc. | An edge protection system – joint orientation marker |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT410332B (en) * | 1999-11-08 | 2003-03-25 | Tci Produktions Und Vertriebs | JOINT RAIL |
US6775952B2 (en) * | 2001-08-01 | 2004-08-17 | Permaban North America, Inc. | System of protecting the edges of cast-in-place concrete slab on ground, construction joints |
EP1584746A3 (en) * | 2002-08-16 | 2005-10-19 | Permaban Products Limited | Concrete floor slab |
GB0409216D0 (en) * | 2004-04-24 | 2004-05-26 | Metaform Ltd | Multi purpose screed rail, formwork and joint protection mechanism |
BE1016053A4 (en) * | 2004-05-19 | 2006-02-07 | Coredis S A | Seal metal lightweight concrete surface. |
-
2005
- 2005-12-21 GB GB0526060A patent/GB2421049B/en not_active Expired - Fee Related
-
2006
- 2006-12-20 EP EP06820598A patent/EP1963578A1/en not_active Withdrawn
- 2006-12-20 US US12/158,823 patent/US20090158682A1/en not_active Abandoned
- 2006-12-20 RU RU2008128314/03A patent/RU2008128314A/en not_active Application Discontinuation
- 2006-12-20 AU AU2006328116A patent/AU2006328116A1/en not_active Abandoned
- 2006-12-20 WO PCT/GB2006/004813 patent/WO2007071995A1/en active Application Filing
- 2006-12-20 CN CNA2006800526400A patent/CN101370984A/en active Pending
-
2008
- 2008-01-01 ZA ZA200805928A patent/ZA200805928B/en unknown
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120102862A1 (en) * | 2010-10-28 | 2012-05-03 | Underwood Companies Holdings Pty Ltd. | Metal edging for concrete slabs |
US8713877B2 (en) * | 2010-10-28 | 2014-05-06 | Underwood Companies Holdings Pty Ltd | Metal edging for concrete slabs |
US9045869B2 (en) * | 2011-07-11 | 2015-06-02 | Andrzej R. Biernacki | Screed system |
US10066408B2 (en) * | 2015-01-22 | 2018-09-04 | Florcon Limited | Edge protector adapted to be cast into the edge of a concrete floor slab |
US20220243459A1 (en) * | 2019-07-15 | 2022-08-04 | China Construction Science And Industry Corporation Ltd. | Connection member, alc batten mounting node structure, and prefabricated mounting method |
US12098539B2 (en) * | 2019-07-15 | 2024-09-24 | China Construction Science And Industry Corporation Ltd. | Connection member, ALC batten mounting node structure, and prefabricated mounting method |
Also Published As
Publication number | Publication date |
---|---|
RU2008128314A (en) | 2010-01-27 |
WO2007071995A1 (en) | 2007-06-28 |
ZA200805928B (en) | 2009-08-26 |
GB2421049B (en) | 2006-11-22 |
GB0526060D0 (en) | 2006-02-01 |
CN101370984A (en) | 2009-02-18 |
AU2006328116A1 (en) | 2007-06-28 |
GB2421049A (en) | 2006-06-14 |
EP1963578A1 (en) | 2008-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20090158682A1 (en) | Screed Rail | |
WO2009153604A1 (en) | Screed rail apparatus | |
CA2975117C (en) | Bearing pad | |
US7832163B2 (en) | Screed rail | |
CA2131866C (en) | Trench forming assemblies having enhanced anchoring means | |
US20060186391A1 (en) | Handrail System Stanchion | |
WO2010034987A2 (en) | Apparatus for defining the edges of adjacent concrete floor slabs | |
KR101681079B1 (en) | Apparatus for preventing masonry-infilled wall from falling sideward by out-of-plane force on wall | |
US7448171B1 (en) | Joist support structure adapted to be embedded into a foundation wall | |
AU2012200336A1 (en) | Screed Rail | |
US11608629B2 (en) | Support bracket | |
KR102457875B1 (en) | Precast Retaining Wall Structure | |
AU2011221391A1 (en) | Screed Rail | |
JP4293126B2 (en) | Foamed resin block with planar material for embankment and lightweight embankment structure using the same | |
CA2085536A1 (en) | Interconnecting edge beams for concrete forming panels | |
KR102112551B1 (en) | Earthquake reinforcement device of masonry partition wall | |
US10808411B2 (en) | Formwork assembly with interlocking side frame members | |
KR20200100730A (en) | Removable floor structure | |
CN217128665U (en) | Floor structure for building engineering construction | |
SK286511B6 (en) | Building stone | |
KR101769245B1 (en) | Reclamation structure for load support and construction method therof | |
JPH04141B2 (en) | ||
JPH0412207Y2 (en) | ||
KR20230155676A (en) | Precast concrete panel contiuous structure for road pavement and construction method thereof | |
AU732664B2 (en) | Termite barrier joint and system utilising the joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: PERMABAN LIMITED,UNITED KINGDOM Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:ARNOLD, MALCOLM RODNEY;REEL/FRAME:021605/0940 Effective date: 20080904 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |
|
AS | Assignment |
Owner name: ILLINOIS TOOL WORKS INC., ILLINOIS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:P.N.A. CONSTRUCTION TECHNOLOGIES, INC.;REEL/FRAME:034390/0453 Effective date: 20140820 Owner name: ILLINOIS TOOL WORKS INC., ILLINOIS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:PARKES, NIGEL K.;REEL/FRAME:034394/0723 Effective date: 20140818 Owner name: ILLINOIS TOOL WORKS INC., ILLINOIS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BOXALL, RUSSELL;REEL/FRAME:034397/0594 Effective date: 20140820 |