US20090142221A1 - Engine components and methods of forming engine components - Google Patents
Engine components and methods of forming engine components Download PDFInfo
- Publication number
- US20090142221A1 US20090142221A1 US11/948,430 US94843007A US2009142221A1 US 20090142221 A1 US20090142221 A1 US 20090142221A1 US 94843007 A US94843007 A US 94843007A US 2009142221 A1 US2009142221 A1 US 2009142221A1
- Authority
- US
- United States
- Prior art keywords
- metal powder
- gas
- flowing
- sulfur
- threshold value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 52
- 239000000843 powder Substances 0.000 claims abstract description 107
- 239000002184 metal Substances 0.000 claims abstract description 94
- 229910052751 metal Inorganic materials 0.000 claims abstract description 94
- 239000007789 gas Substances 0.000 claims abstract description 79
- NINIDFKCEFEMDL-UHFFFAOYSA-N Sulfur Chemical compound [S] NINIDFKCEFEMDL-UHFFFAOYSA-N 0.000 claims abstract description 50
- 229910052717 sulfur Inorganic materials 0.000 claims abstract description 50
- 239000011593 sulfur Substances 0.000 claims abstract description 50
- 238000007596 consolidation process Methods 0.000 claims abstract description 15
- 239000000463 material Substances 0.000 claims abstract description 14
- 229910000601 superalloy Inorganic materials 0.000 claims abstract description 14
- PXHVJJICTQNCMI-UHFFFAOYSA-N Nickel Chemical compound [Ni] PXHVJJICTQNCMI-UHFFFAOYSA-N 0.000 claims abstract description 12
- 239000001257 hydrogen Substances 0.000 claims abstract description 11
- 229910052739 hydrogen Inorganic materials 0.000 claims abstract description 11
- 229910052759 nickel Inorganic materials 0.000 claims abstract description 6
- 238000001513 hot isostatic pressing Methods 0.000 claims description 11
- RWSOTUBLDIXVET-UHFFFAOYSA-N Dihydrogen sulfide Chemical compound S RWSOTUBLDIXVET-UHFFFAOYSA-N 0.000 claims description 9
- UFHFLCQGNIYNRP-UHFFFAOYSA-N Hydrogen Chemical compound [H][H] UFHFLCQGNIYNRP-UHFFFAOYSA-N 0.000 claims description 9
- 229910000037 hydrogen sulfide Inorganic materials 0.000 claims description 9
- 238000002844 melting Methods 0.000 claims description 7
- 230000008018 melting Effects 0.000 claims description 7
- 238000001125 extrusion Methods 0.000 claims description 5
- 150000002431 hydrogen Chemical class 0.000 claims description 5
- 239000011261 inert gas Substances 0.000 claims description 5
- 239000000203 mixture Substances 0.000 claims description 5
- 238000005242 forging Methods 0.000 claims description 4
- 238000010438 heat treatment Methods 0.000 claims description 3
- 238000003754 machining Methods 0.000 claims 2
- 125000004435 hydrogen atom Chemical class [H]* 0.000 abstract 1
- 229910045601 alloy Inorganic materials 0.000 description 8
- 239000000956 alloy Substances 0.000 description 8
- 238000004663 powder metallurgy Methods 0.000 description 7
- XKRFYHLGVUSROY-UHFFFAOYSA-N Argon Chemical compound [Ar] XKRFYHLGVUSROY-UHFFFAOYSA-N 0.000 description 6
- 238000006477 desulfuration reaction Methods 0.000 description 6
- 230000023556 desulfurization Effects 0.000 description 6
- 238000005056 compaction Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 229910052786 argon Inorganic materials 0.000 description 3
- 238000004891 communication Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000003009 desulfurizing effect Effects 0.000 description 2
- 230000009977 dual effect Effects 0.000 description 2
- 239000012535 impurity Substances 0.000 description 2
- 229910000952 Be alloy Inorganic materials 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- -1 argon Chemical compound 0.000 description 1
- 238000000889 atomisation Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000000356 contaminant Substances 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000002788 crimping Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 239000001307 helium Substances 0.000 description 1
- 229910052734 helium Inorganic materials 0.000 description 1
- SWQJXJOGLNCZEY-UHFFFAOYSA-N helium atom Chemical compound [He] SWQJXJOGLNCZEY-UHFFFAOYSA-N 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000002459 sustained effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B9/00—General processes of refining or remelting of metals; Apparatus for electroslag or arc remelting of metals
- C22B9/14—Refining in the solid state
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22F—WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- B22F1/00—Metallic powder; Treatment of metallic powder, e.g. to facilitate working or to improve properties
- B22F1/14—Treatment of metallic powder
- B22F1/145—Chemical treatment, e.g. passivation or decarburisation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22F—WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- B22F3/00—Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces
- B22F3/12—Both compacting and sintering
- B22F3/1208—Containers or coating used therefor
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C1/00—Making non-ferrous alloys
- C22C1/04—Making non-ferrous alloys by powder metallurgy
- C22C1/0433—Nickel- or cobalt-based alloys
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22F—WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- B22F2998/00—Supplementary information concerning processes or compositions relating to powder metallurgy
- B22F2998/10—Processes characterised by the sequence of their steps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22F—WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- B22F2999/00—Aspects linked to processes or compositions used in powder metallurgy
Definitions
- the inventive subject matter generally relates to engine components, and more particularly relates to methods of forming engine components for use in high temperatures.
- Components such as turbine disks, may be subjected to relatively high temperatures (e.g., temperatures up to about 675° C.). These components may be formed by several manufacturing methods. For example, the components may be formed from a metal powder, such as a nickel-based superalloy material, which is placed in a container that is subsequently evacuated and sealed, and then consolidated to full density at high temperatures (e.g., temperatures greater than about 1150° C.). Consolidation may be performed by techniques known in the art (e.g., by hot isostatic pressing, extrusion and forging) to compact the metal powder to full density. The compacted metal powder may then be machined, or otherwise shaped, to form a turbine component, such as a turbine disk, a hub insert for a dual alloy turbine, or a rotating seal.
- a turbine component such as a turbine disk, a hub insert for a dual alloy turbine, or a rotating seal.
- the above-mentioned alloys are adequate for forming engine components that operate at temperatures up to 675° C., they may be improved.
- the powder metallurgy superalloys used to make the engine components typically have sulfur contents of up to 50 parts per million by weight. The presence of the sulfur in such amounts may contribute to grain boundary fracture under high-temperature sustained-peak low cycle fatigue and creep conditions, which may prevent the alloys from being used to make components for use in temperatures greater than about 675° C.
- Methods are provided for forming high temperature engine components, such as turbine disks.
- the method includes flowing a gas into a can with a metal powder therein, the gas comprising hydrogen, the can configured to be used for a consolidation process, and the metal powder comprising sulfur, removing at least a portion of the gas from the can, determining a sulfur content of the removed gas, and subjecting the can and the metal powder therein to a consolidation process, if a determination is made that a sulfur content of the metal powder is below a threshold value, the threshold value being a value below about 5 parts per million by weight.
- the method includes flowing a gas into a can with a metal powder therein, the gas comprising hydrogen, the can configured to be used for a hot isostatic pressing process, and the metal powder comprising sulfur, removing at least a portion of the gas from the can, determining a sulfur content of the removed gas, after a determination is made that the sulfur content of the metal powder is below a threshold value, the threshold value being below about 1 part per million by weight, subjecting the can and the metal powder therein to the hot isostatic pressing process to form compacted metal powder
- an engine component in still another embodiment, includes a compacted powder material comprising a nickel-based superalloy having less than 5 parts per million sulfur, by weight.
- FIG. 1 is a perspective view of a component, according to an embodiment.
- FIG. 2 is a flow diagram of a method of manufacturing the component, according to an embodiment
- FIG. 3 is a cross-sectional view of a can implemented into a desulfurization treatment system that may be used for the method depicted in FIG. 2 , according to an embodiment
- FIG. 4 is a flow diagram of a method of de-sulfurizing a metal powder, according to an embodiment.
- FIG. 1 is a perspective view of a component 100 , according to an embodiment.
- the component 100 is capable of being subjected to high temperatures (e.g., temperatures greater than about 675° C.) and may be any component that may be used in an engine.
- the component 100 depicted in FIG. 1 may be a dual alloy turbine, which may comprise a hub 102 bonded to a blade ring 104 for use in a turbine section of an engine.
- the hub 102 and the blade ring 104 may or may not comprise the same materials.
- the hub 102 may comprise a compacted powder metallurgy superalloy
- the blade ring 104 may be a cast superalloy blade ring 104 .
- other materials may alternatively be employed.
- the component 100 may be other engine components such as a turbine disk, rotating seal, a compressor or impeller.
- the component 100 alternatively may be used in cooler temperature environments (e.g., temperatures below about 675° C.).
- the component 100 may comprise a powder metallurgy superalloy material.
- the powder metallurgy superalloy material may be a nickel-based powder metallurgy superalloy. Suitable superalloys include, but are not limited to, Alloy 10 (available through Honeywell International, Inc. of Morristown, N.J.).
- the component 100 may include by weight about 5 parts per million of sulfur or less.
- the component 100 may have about one part per million of sulfur.
- the component 100 may be substantially free of sulfur (e.g. less than one part per million of sulfur by weight).
- a method 200 of manufacturing the component 100 depicted in FIG. 2 may be employed.
- a metal powder is disposed in a can, step 202 .
- the can is heated, step 204 .
- the metal powder is de-sulfurized and desulfurizing gas is removed from the can, step 206 .
- the can and the de-sulfurized metal powder are consolidated to form a compacted metal powder, step 208 .
- the compacted metal powder may be machined to form the component, step 210 .
- the can is removed and the compacted metal powder may be heat treated, step 212 .
- the metal powder may be any one of numerous powders that may be suitable for use during a powder metallurgy process.
- the metal powder may be a nickel-base powder metallurgy superalloy, such as Alloy 10.
- the metal powder may include sulfur as an impurity.
- the metal powder may include trace amounts of sulfur (e.g., up to about 50 parts per million by weight of sulfur). In another embodiment, more or less sulfur may alternatively be included in the metal powder.
- FIG. 3 is a cross-sectional view of a can 304 disposed in a desulfurization treatment system 302 , according to an embodiment.
- the can 304 may be made of any one of numerous materials having an incipient melting point that is above that of the metal powder.
- the metal powder comprises Alloy 10
- the can 304 may comprise steel or a nickel-based superalloy.
- the can 304 may be capable of supporting and maintaining a vacuum.
- the can 304 may have walls 316 (e.g., top, bottom, and side walls) that form a cavity 318 to receive the metal powder.
- the cavity 318 may have a cylindrical shape, and an opening 320 may be formed in one of the walls 316 .
- the opening 320 may have a diameter that is suitable for receiving the metal powder and for flowing gas therethrough.
- the diameter of the opening 320 may be between about 0.5 cm and about 5.0 cm.
- the can 304 is completely closed, except for the opening 320 .
- a fill pipe 306 is attached to the opening 320 .
- the fill pipe 306 receives the metal powder and enables gas flow into and out of the cavity 318 when the treatment system 302 is in use.
- the fill pipe 306 has a diameter that is between about 0.5 cm and 5 cm, but in other embodiments, the diameter may be smaller or larger.
- the fill pipe 306 may have a length sufficient to extend outside a heater 334 of the treatment system 302 when the can 304 is disposed therein. In other embodiments, the length of the fill pipe 306 may be shorter or longer.
- the fill pipe 306 has a valve 309 which is capable of maintaining a vacuum within the can 304 or permitting gas flow into or out of the powder filled can 304 .
- the fill pipe 306 may be made of the same or similar material as the can 304 and may also be capable of supporting and maintaining a vacuum.
- the can 304 After the can 304 is filled with the metal powder, it may be evacuated. For example, residual powder atomization gas (e.g., argon) or air impurities may be removed from the can 304 . Following evacuation, the valve 309 in the fill pipe 306 may be closed to prevent entry of air while the powder-filled can 304 is transferred into the desulfurization treatment system 302 .
- residual powder atomization gas e.g., argon
- air impurities may be removed from the can 304 .
- the valve 309 in the fill pipe 306 may be closed to prevent entry of air while the powder-filled can 304 is transferred into the desulfurization treatment system 302 .
- the can 304 may be disposed in the treatment system 302 to de-sulfurize the metal powder.
- the treatment system 302 has a gas source 330 , a vacuum source 332 , and a controller 336 .
- the gas source 330 may be in flow communication with the open end of the fill pipe 306 via a gas connection tube 322 .
- the gas source 330 may be a canister or any other gas storage device that may store hydrogen gas.
- the hydrogen gas may be pure hydrogen gas.
- the hydrogen gas may be mixed with an inert gas. Suitable inert gases include, but are not limited to, argon and helium.
- the vacuum source 332 communicates with the can 304 via a vacuum connection tube 308 .
- the vacuum source 332 may be a vacuum pump or other device capable of pulling a vacuum through the treatment system 302 and may be positioned in any location within the system 302 that is downstream from the gas source 330 .
- the diameter of the vacuum connection tube 308 may be substantially equal to or larger than the diameter of the fill pipe 306 . In other embodiments, the diameter of the vacuum connection tube 308 may be smaller.
- the fill pipe 306 , the gas connection tube 322 , and the vacuum connection tube 308 are connected to a junction fixture 325 .
- the junction fixture 325 is configured to enable communication between the can 304 , the gas source 330 , and the vacuum source 332 .
- one or more valves 309 , 310 , 312 may be included.
- one or more of the valves 309 , 310 , 312 may be vacuum-capable valves capable of opening and closing a flowpath. Suitable valves include, but are not limited to, gate valves.
- a first valve or “fill pipe valve” 309 may be disposed in the fill pipe 306 and may control gas flow into and out of the can 304 .
- a second valve 312 controls gas flow into the vacuum connection tube 308 and may be positioned therein.
- a third valve 310 controls gas flow out of the gas source 330 and may be disposed in the gas connection tube 322 .
- the treatment system 302 may also include a heater 334 .
- the heater 334 may be a furnace, oven, or other device suitably sized to receive and heat the can 304 .
- the controller 336 is adapted to provide commands to and receive data from, either wirelessly or via other transmission means, the gas source 330 , the vacuum source 332 , and the valves 309 , 310 , 312 to control the flow of gas through the system 302 .
- the particular commands from the controller 336 may depend on data related to an amount of sulfur that may be present in the metal powder in the can 304 .
- one or more sensors 338 adapted to detect the amount of hydrogen sulfide in the evacuated gas and to communicate the detected amount to the controller 336 , may be appropriately placed to evaluate gas exposed to the metal powder.
- the sensor 338 may be disposed in the vacuum line 308 , as shown in FIG. 3 .
- the senor 338 may be any suitable sensor capable of detecting a sulfur amount from a volume of gas.
- the sensor 338 may be capable of sensing an amount of sulfur that may be equal to or less than 1 part per million by weight.
- the controller 336 may determine whether to repeat the steps of flowing gas into the can 304 and removing gas from the can 304 .
- the controller 336 may also be adapted to provide commands to the heater 334 to control the rate at which the can 304 will be heated and to what temperature the can 304 will be heated.
- the can 304 is heated to a temperature sufficient to desulfurize the metal powder, step 204 .
- a vacuum may be applied to the can 304 during heating.
- the vacuum source 332 may be used to exhaust gases that may be in the can 304 .
- the can 304 and the metal powder therein may be heated to a predetermined temperature.
- the predetermined temperature may be a temperature that is within 300° C. of the incipient melting temperature of the metal powder. In an embodiment, the temperature is between about 50° C. and about 100° C. lower than the incipient melting point of the metal powder.
- the metal powder may be Alloy 10 and the predetermined temperature may be between about 1150° C. and about 1200° C. The predetermined temperature may be more or less, depending on the particular metal powder in the can 304 .
- FIG. 4 is a flow diagram of a method 400 of de-sulfurizing the metal powder, according to an embodiment.
- gas may be flowed into the can 304 to react with the metal powder therein, step 402 .
- the gas may be a gas mixture, and the gas mixture may be flowed into the can.
- the gas mixture may comprise hydrogen and an inert gas, such as argon, for example.
- valves 309 and 310 may be in an open position and valve 312 may be in a closed position to allow gas to be delivered into the cavity 318 of the can 304 , in an embodiment.
- the valve 310 may be closed.
- the hydrogen in the gas may react with sulfur that may be present on a surface of the metal powder to form H 2 S (hydrogen sulfide) gas.
- the gas may remain in the cavity 318 for a predetermined amount of time.
- the predetermined amount of time may be an amount of time sufficient for the sulfur on the surface of the metal powder to react with the hydrogen.
- the gas may remain in the cavity 318 for between about 1 and about 180 minutes. It will be appreciated that alternatively the gas may remain in the cavity 318 for a longer or shorter period of time.
- the gas may include H 2 S, hydrogen, and, in some embodiments, an inert gas. In an embodiment, substantially all of the gas is removed from the can 304 .
- the valve 312 may be opened and the vacuum source 332 may be activated to remove the gas from the can 304 .
- the steps 402 and 404 may be performed within a particular temperature range.
- the steps may be performed within 300° C. of an incipient melting temperature of the metal powder.
- the steps may be performed in a range of between about 1150° C. and about 1200° C.
- This determination may include establishment of a correlation between the amount of sulfur in the removed gas and the amount of sulfur remaining in the metal powder.
- the sulfur content of the metal powder is calculated based upon data collected from the sensor 338 .
- the sensor 338 may sense the sulfur content in the removed gas.
- the sensor 338 may sense a hydrogen sulfide content of the removed gas.
- the sensor detection capability for sulfur may be about 1 part per million by weight, or may be lower. If the sulfur content is above the desired threshold value for the metal powder, steps 406 and 408 (e.g., the flowing and removing steps) may be repeated.
- each time steps 406 and 408 are repeated, a portion of the remaining sulfur in the metal powder is allowed to diffuse to an exposed surface of the metal powder, the gas flowed into the can 304 can react with the sulfur to form H 2 S gas, and the gas may be removed.
- These steps may be repeated over a time period of between about one hour to twenty hours. The particular time period selected may depend on a quantity of metal powder that may be in the can 304 and/or the amount of sulfur that may have initially been included in the metal powder.
- the can 304 and the metal powder therein is consolidated to thereby form a compacted metal, step 208 .
- substantially all of the gas remaining in the can 304 is removed prior to compaction.
- the can 304 is evacuated and sealed before the consolidation process is performed. For example, once the desulfurization treatment has been completed and the gas has been evacuated from the can 304 , the valve 309 may be closed and the powder-filled can 304 may be cooled to room temperature.
- the fill pipe 306 may then be sealed at a location between the can 304 and the valve 309 (e.g., by crimping the pipe and/or welding).
- the valve 309 may be removed for reuse.
- a chemical analysis sample of powder may be removed from the can 304 to verify that the sulfur content of the metal powder has been reduced to below a desired threshold value (e.g., about 5 parts per million by weight, in an embodiment, or about 1 part per million by weight in other embodiments).
- the consolidation process may be performed on the can 304 and its contents by using particular process parameters that are suitable for forming a compacted solid having negligible porosity (e.g., having a porosity of less than 0.1 percent by volume)
- the consolidation process may be a hot isostatic pressing process in which parameters may include pressure, temperature, and time.
- the hot isostatic pressing process may be performed at parameters where a selected temperature is in a range of between about 1090° C. and 1290° C. and a selected pressure is in a range of between about 15 to 30 ksi.
- the process may be performed for between about 2 to 8 hours.
- the hot isostatic pressing process may be performed at a temperature within a range of between about 1140° C.
- the consolidation process may be an extrusion or forging process.
- the compacted metal powder may be pushed through a die having a cutout of a particular shape to thereby form a particular profile.
- the compacted metal powder may be forged (e.g., plastically deformed) to form the engine component. It will be appreciated that two or more of the aforementioned embodiments may be combined, when performing this step.
- the compacted metal powder may be initially compacted by hot isostatic pressing or extrusion to form a billet.
- all or a portion of the desulfurized metal powder may be transferred to another can for the consolidation process.
- the can 304 and the metal powder may be removed from the treatment system 302 and transferred to a compaction apparatus (not shown).
- the compaction apparatus may be used for hot isostatic pressing, extrusion or forging.
- the powder may be consolidated to form a compacted metal billet or other geometry.
- the can 304 is removed, and the compacted metal powder may be contoured or machined to form the component, step 210 .
- the compacted metal powder may be machined into a predetermined shape to form the component.
- the compacted metal powder may be heat treated to improve properties, step 212 .
- the component is heated treated after it is contoured (machined) in step 210 .
- heat treatment may occur after the powder is consolidated in step 208 , but before the engine component is contoured, in step 210 .
- the components formed by the manufacturing methods above may be capable of being subjected to higher temperatures (e.g., greater than 675° C.).
- de-sulfurizing the metal powder to include less than 5 parts per million sulfur by weight allows very little sulfur from the metal powder material to diffuse to interfaces and/or grain boundaries.
- the substantial absence of sulfur in the alloy may inhibit intergranular cracking and, consequently, improve creep strength and sustained peak low cycle fatigue strength of the component.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Chemical Kinetics & Catalysis (AREA)
- General Chemical & Material Sciences (AREA)
- Powder Metallurgy (AREA)
Abstract
Engine components that include a compacted powder material comprising a nickel-based superalloy having less than five parts per million sulfur, by weight and methods of forming the components are provided. In an embodiment, by way of example only, a method includes flowing a gas into a can with a metal powder therein, the gas comprising hydrogen, the can configured to be used for a consolidation process, and the superalloy comprising sulfur. Gas is flowed into and then removed from the can. A sulfur content of the removed gas is determined during the process. The can and the metal powder therein are subjected to the consolidation process, if a determination is made that the sulfur content of the metal powder is below a threshold value, the threshold value being a value below about 1 part per million by weight.
Description
- The inventive subject matter generally relates to engine components, and more particularly relates to methods of forming engine components for use in high temperatures.
- Components, such as turbine disks, may be subjected to relatively high temperatures (e.g., temperatures up to about 675° C.). These components may be formed by several manufacturing methods. For example, the components may be formed from a metal powder, such as a nickel-based superalloy material, which is placed in a container that is subsequently evacuated and sealed, and then consolidated to full density at high temperatures (e.g., temperatures greater than about 1150° C.). Consolidation may be performed by techniques known in the art (e.g., by hot isostatic pressing, extrusion and forging) to compact the metal powder to full density. The compacted metal powder may then be machined, or otherwise shaped, to form a turbine component, such as a turbine disk, a hub insert for a dual alloy turbine, or a rotating seal.
- Although the above-mentioned alloys are adequate for forming engine components that operate at temperatures up to 675° C., they may be improved. In particular, the powder metallurgy superalloys used to make the engine components typically have sulfur contents of up to 50 parts per million by weight. The presence of the sulfur in such amounts may contribute to grain boundary fracture under high-temperature sustained-peak low cycle fatigue and creep conditions, which may prevent the alloys from being used to make components for use in temperatures greater than about 675° C. Thus, it would be desirable to have a method for forming components that operate at temperatures higher than 675° C. More particularly, it would be desirable to have a method to form components, such as turbine disks, that are capable of operating at temperatures in the 675° C. to 815° C. range.
- Methods are provided for forming high temperature engine components, such as turbine disks.
- In an embodiment, by way of example only, the method includes flowing a gas into a can with a metal powder therein, the gas comprising hydrogen, the can configured to be used for a consolidation process, and the metal powder comprising sulfur, removing at least a portion of the gas from the can, determining a sulfur content of the removed gas, and subjecting the can and the metal powder therein to a consolidation process, if a determination is made that a sulfur content of the metal powder is below a threshold value, the threshold value being a value below about 5 parts per million by weight.
- In another embodiment, the method includes flowing a gas into a can with a metal powder therein, the gas comprising hydrogen, the can configured to be used for a hot isostatic pressing process, and the metal powder comprising sulfur, removing at least a portion of the gas from the can, determining a sulfur content of the removed gas, after a determination is made that the sulfur content of the metal powder is below a threshold value, the threshold value being below about 1 part per million by weight, subjecting the can and the metal powder therein to the hot isostatic pressing process to form compacted metal powder
- In still another embodiment, an engine component is provided. The engine component includes a compacted powder material comprising a nickel-based superalloy having less than 5 parts per million sulfur, by weight.
- The inventive subject matter will hereinafter be described in conjunction with the following drawing figures, wherein like numerals denote like elements, and
-
FIG. 1 is a perspective view of a component, according to an embodiment. -
FIG. 2 is a flow diagram of a method of manufacturing the component, according to an embodiment; -
FIG. 3 is a cross-sectional view of a can implemented into a desulfurization treatment system that may be used for the method depicted inFIG. 2 , according to an embodiment; and -
FIG. 4 is a flow diagram of a method of de-sulfurizing a metal powder, according to an embodiment. - The following detailed description is merely exemplary in nature and is not intended to limit the inventive subject matter or the application and uses of the inventive subject matter. Furthermore, there is no intention to be bound by any theory presented in the preceding background or the following detailed description.
-
FIG. 1 is a perspective view of acomponent 100, according to an embodiment. Thecomponent 100 is capable of being subjected to high temperatures (e.g., temperatures greater than about 675° C.) and may be any component that may be used in an engine. For example, thecomponent 100 depicted inFIG. 1 may be a dual alloy turbine, which may comprise ahub 102 bonded to ablade ring 104 for use in a turbine section of an engine. Thehub 102 and theblade ring 104 may or may not comprise the same materials. In an embodiment, thehub 102 may comprise a compacted powder metallurgy superalloy, and theblade ring 104 may be a castsuperalloy blade ring 104. However, other materials may alternatively be employed. Alternatively, thecomponent 100 may be other engine components such as a turbine disk, rotating seal, a compressor or impeller. In some embodiments, thecomponent 100 alternatively may be used in cooler temperature environments (e.g., temperatures below about 675° C.). - The
component 100 may comprise a powder metallurgy superalloy material. In an embodiment, the powder metallurgy superalloy material may be a nickel-based powder metallurgy superalloy. Suitable superalloys include, but are not limited to, Alloy 10 (available through Honeywell International, Inc. of Morristown, N.J.). To ensure that thecomponent 100 may be capable of operating at high temperatures, thecomponent 100 may include by weight about 5 parts per million of sulfur or less. In some embodiments, thecomponent 100 may have about one part per million of sulfur. In still other embodiments, thecomponent 100 may be substantially free of sulfur (e.g. less than one part per million of sulfur by weight). - To form the above-described
component 100, amethod 200 of manufacturing thecomponent 100 depicted inFIG. 2 may be employed. In an embodiment, a metal powder is disposed in a can,step 202. The can is heated,step 204. Then, the metal powder is de-sulfurized and desulfurizing gas is removed from the can,step 206. Next, the can and the de-sulfurized metal powder are consolidated to form a compacted metal powder,step 208. The compacted metal powder may be machined to form the component,step 210. Following consolidation, the can is removed and the compacted metal powder may be heat treated,step 212. Each of these steps will be discussed in detail below. - As briefly mentioned above, a metal powder is disposed in a can,
step 202. The metal powder may be any one of numerous powders that may be suitable for use during a powder metallurgy process. For example, the metal powder may be a nickel-base powder metallurgy superalloy, such as Alloy 10. In an embodiment, the metal powder may include sulfur as an impurity. In another embodiment, the metal powder may include trace amounts of sulfur (e.g., up to about 50 parts per million by weight of sulfur). In another embodiment, more or less sulfur may alternatively be included in the metal powder. - The can may be configured to contain the metal powder during the desulfurization process. In an embodiment, the can may be configured such that it may be subsequently used in the consolidation process of
step 208.FIG. 3 is a cross-sectional view of acan 304 disposed in adesulfurization treatment system 302, according to an embodiment. Thecan 304 may be made of any one of numerous materials having an incipient melting point that is above that of the metal powder. Thus, for example, if the metal powder comprises Alloy 10, thecan 304 may comprise steel or a nickel-based superalloy. In an embodiment, thecan 304 may be capable of supporting and maintaining a vacuum. - The
can 304 may have walls 316 (e.g., top, bottom, and side walls) that form acavity 318 to receive the metal powder. In an embodiment, thecavity 318 may have a cylindrical shape, and an opening 320 may be formed in one of thewalls 316. The opening 320 may have a diameter that is suitable for receiving the metal powder and for flowing gas therethrough. For example, the diameter of theopening 320 may be between about 0.5 cm and about 5.0 cm. In an embodiment, thecan 304 is completely closed, except for the opening 320. - As shown in
FIG. 3 , in an embodiment, afill pipe 306 is attached to theopening 320. Thefill pipe 306 receives the metal powder and enables gas flow into and out of thecavity 318 when thetreatment system 302 is in use. In an embodiment, thefill pipe 306 has a diameter that is between about 0.5 cm and 5 cm, but in other embodiments, the diameter may be smaller or larger. Thefill pipe 306 may have a length sufficient to extend outside aheater 334 of thetreatment system 302 when thecan 304 is disposed therein. In other embodiments, the length of thefill pipe 306 may be shorter or longer. In any case, thefill pipe 306 has avalve 309 which is capable of maintaining a vacuum within thecan 304 or permitting gas flow into or out of the powder filled can 304. Thefill pipe 306 may be made of the same or similar material as thecan 304 and may also be capable of supporting and maintaining a vacuum. - After the
can 304 is filled with the metal powder, it may be evacuated. For example, residual powder atomization gas (e.g., argon) or air impurities may be removed from thecan 304. Following evacuation, thevalve 309 in thefill pipe 306 may be closed to prevent entry of air while the powder-filled can 304 is transferred into thedesulfurization treatment system 302. - The can 304 may be disposed in the
treatment system 302 to de-sulfurize the metal powder. Generally, as shown inFIG. 3 , thetreatment system 302 has agas source 330, avacuum source 332, and acontroller 336. Thegas source 330 may be in flow communication with the open end of thefill pipe 306 via agas connection tube 322. Thegas source 330 may be a canister or any other gas storage device that may store hydrogen gas. In an embodiment, the hydrogen gas may be pure hydrogen gas. In another embodiment, the hydrogen gas may be mixed with an inert gas. Suitable inert gases include, but are not limited to, argon and helium. Thevacuum source 332 communicates with thecan 304 via avacuum connection tube 308. Thevacuum source 332 may be a vacuum pump or other device capable of pulling a vacuum through thetreatment system 302 and may be positioned in any location within thesystem 302 that is downstream from thegas source 330. In an embodiment, the diameter of thevacuum connection tube 308 may be substantially equal to or larger than the diameter of thefill pipe 306. In other embodiments, the diameter of thevacuum connection tube 308 may be smaller. - In an embodiment, the
fill pipe 306, thegas connection tube 322, and thevacuum connection tube 308 are connected to ajunction fixture 325. Thejunction fixture 325 is configured to enable communication between thecan 304, thegas source 330, and thevacuum source 332. To control flow through thesystem 302, in some embodiments, one ormore valves valves fill pipe 306 and may control gas flow into and out of thecan 304. Asecond valve 312 controls gas flow into thevacuum connection tube 308 and may be positioned therein. Athird valve 310 controls gas flow out of thegas source 330 and may be disposed in thegas connection tube 322. - The
treatment system 302 may also include aheater 334. In an embodiment, theheater 334 may be a furnace, oven, or other device suitably sized to receive and heat thecan 304. - The
controller 336 is adapted to provide commands to and receive data from, either wirelessly or via other transmission means, thegas source 330, thevacuum source 332, and thevalves system 302. The particular commands from thecontroller 336 may depend on data related to an amount of sulfur that may be present in the metal powder in thecan 304. In this regard, one ormore sensors 338, adapted to detect the amount of hydrogen sulfide in the evacuated gas and to communicate the detected amount to thecontroller 336, may be appropriately placed to evaluate gas exposed to the metal powder. In an embodiment, thesensor 338 may be disposed in thevacuum line 308, as shown inFIG. 3 . In any event, thesensor 338 may be any suitable sensor capable of detecting a sulfur amount from a volume of gas. Thesensor 338 may be capable of sensing an amount of sulfur that may be equal to or less than 1 part per million by weight. Based in part on the communications from thesensor 338, thecontroller 336 may determine whether to repeat the steps of flowing gas into thecan 304 and removing gas from thecan 304. In an embodiment, thecontroller 336 may also be adapted to provide commands to theheater 334 to control the rate at which thecan 304 will be heated and to what temperature thecan 304 will be heated. - Referring again to
FIG. 2 , after thecan 304 is suitably incorporated into thetreatment system 302, thecan 304 is heated to a temperature sufficient to desulfurize the metal powder,step 204. In an embodiment, a vacuum may be applied to thecan 304 during heating. For example, thevacuum source 332 may be used to exhaust gases that may be in thecan 304. Next, thecan 304 and the metal powder therein may be heated to a predetermined temperature. The predetermined temperature may be a temperature that is within 300° C. of the incipient melting temperature of the metal powder. In an embodiment, the temperature is between about 50° C. and about 100° C. lower than the incipient melting point of the metal powder. In an embodiment, the metal powder may be Alloy 10 and the predetermined temperature may be between about 1150° C. and about 1200° C. The predetermined temperature may be more or less, depending on the particular metal powder in thecan 304. - The metal powder may then be de-sulfurized, and desulfurizing gas that comprises hydrogen and hydrogen sulfide may be removed from the can, step 206.
FIG. 4 is a flow diagram of amethod 400 of de-sulfurizing the metal powder, according to an embodiment. With additional reference toFIG. 3 , gas may be flowed into thecan 304 to react with the metal powder therein,step 402. As mentioned above, the gas may be a gas mixture, and the gas mixture may be flowed into the can. The gas mixture may comprise hydrogen and an inert gas, such as argon, for example. To flow the gas through thesystem 302, thevalves valve 312 may be in a closed position to allow gas to be delivered into thecavity 318 of thecan 304, in an embodiment. After thecavity 318 is sufficiently filled with gas, thevalve 310 may be closed. When the gas contacts the metal powder, the hydrogen in the gas may react with sulfur that may be present on a surface of the metal powder to form H2S (hydrogen sulfide) gas. In an embodiment, the gas may remain in thecavity 318 for a predetermined amount of time. The predetermined amount of time may be an amount of time sufficient for the sulfur on the surface of the metal powder to react with the hydrogen. For example, the gas may remain in thecavity 318 for between about 1 and about 180 minutes. It will be appreciated that alternatively the gas may remain in thecavity 318 for a longer or shorter period of time. - After the predetermined amount of time has passed, at least a portion of the gas may be removed from the
can 304,step 404. The gas may include H2S, hydrogen, and, in some embodiments, an inert gas. In an embodiment, substantially all of the gas is removed from thecan 304. To remove the gas, thevalve 312 may be opened and thevacuum source 332 may be activated to remove the gas from thecan 304. - In an embodiment, the
steps - A determination is then made as to a sulfur content of the metal powder, step 406. This determination may include establishment of a correlation between the amount of sulfur in the removed gas and the amount of sulfur remaining in the metal powder. In an embodiment, the sulfur content of the metal powder is calculated based upon data collected from the
sensor 338. Thesensor 338 may sense the sulfur content in the removed gas. For example, thesensor 338 may sense a hydrogen sulfide content of the removed gas. The sensor detection capability for sulfur may be about 1 part per million by weight, or may be lower. If the sulfur content is above the desired threshold value for the metal powder, steps 406 and 408 (e.g., the flowing and removing steps) may be repeated. In this way, each time steps 406 and 408 are repeated, a portion of the remaining sulfur in the metal powder is allowed to diffuse to an exposed surface of the metal powder, the gas flowed into thecan 304 can react with the sulfur to form H2S gas, and the gas may be removed. These steps may be repeated over a time period of between about one hour to twenty hours. The particular time period selected may depend on a quantity of metal powder that may be in thecan 304 and/or the amount of sulfur that may have initially been included in the metal powder. - Turning back to
FIGS. 2 and 3 , if a determination is made that the sulfur content is equal to or below a threshold value, thecan 304 and the metal powder therein is consolidated to thereby form a compacted metal,step 208. In an embodiment, substantially all of the gas remaining in thecan 304 is removed prior to compaction. To prevent the metal powder from being exposed to unwanted contaminants, such as to gases or other particles, thecan 304 is evacuated and sealed before the consolidation process is performed. For example, once the desulfurization treatment has been completed and the gas has been evacuated from thecan 304, thevalve 309 may be closed and the powder-filled can 304 may be cooled to room temperature. Thefill pipe 306 may then be sealed at a location between thecan 304 and the valve 309 (e.g., by crimping the pipe and/or welding). In some embodiments, thevalve 309 may be removed for reuse. In other embodiments, prior to sealing thefill pipe 306, a chemical analysis sample of powder may be removed from thecan 304 to verify that the sulfur content of the metal powder has been reduced to below a desired threshold value (e.g., about 5 parts per million by weight, in an embodiment, or about 1 part per million by weight in other embodiments). - The consolidation process may be performed on the
can 304 and its contents by using particular process parameters that are suitable for forming a compacted solid having negligible porosity (e.g., having a porosity of less than 0.1 percent by volume) For example, the consolidation process may be a hot isostatic pressing process in which parameters may include pressure, temperature, and time. In an embodiment, the hot isostatic pressing process may be performed at parameters where a selected temperature is in a range of between about 1090° C. and 1290° C. and a selected pressure is in a range of between about 15 to 30 ksi. The process may be performed for between about 2 to 8 hours. In another embodiment, the hot isostatic pressing process may be performed at a temperature within a range of between about 1140° C. to 1260° C. at a pressure in a range of between about 20 to 30 ksi for between about 2 to 6 hours. The process alternatively may be performed within different temperature and/or pressure ranges, and/or for different time periods, in other embodiments. In other embodiments, the consolidation process may be an extrusion or forging process. In particular, the compacted metal powder may be pushed through a die having a cutout of a particular shape to thereby form a particular profile. In still another embodiment, the compacted metal powder may be forged (e.g., plastically deformed) to form the engine component. It will be appreciated that two or more of the aforementioned embodiments may be combined, when performing this step. For example, the compacted metal powder may be initially compacted by hot isostatic pressing or extrusion to form a billet. - In another embodiment, after desulfurization of the metal powder has been completed, all or a portion of the desulfurized metal powder may be transferred to another can for the consolidation process. For example, the
can 304 and the metal powder may be removed from thetreatment system 302 and transferred to a compaction apparatus (not shown). The compaction apparatus may be used for hot isostatic pressing, extrusion or forging. Using a compaction method, the powder may be consolidated to form a compacted metal billet or other geometry. - After the metal powder is consolidated, the
can 304 is removed, and the compacted metal powder may be contoured or machined to form the component,step 210. In an embodiment, the compacted metal powder may be machined into a predetermined shape to form the component. - The compacted metal powder may be heat treated to improve properties,
step 212. In an embodiment, the component is heated treated after it is contoured (machined) instep 210. In another embodiment, heat treatment may occur after the powder is consolidated instep 208, but before the engine component is contoured, instep 210. - Methods have now been provided for forming components. By employing the above-described method for de-sulfurizing metal powder materials, the components formed by the manufacturing methods above may be capable of being subjected to higher temperatures (e.g., greater than 675° C.). In particular, de-sulfurizing the metal powder to include less than 5 parts per million sulfur by weight allows very little sulfur from the metal powder material to diffuse to interfaces and/or grain boundaries. The substantial absence of sulfur in the alloy may inhibit intergranular cracking and, consequently, improve creep strength and sustained peak low cycle fatigue strength of the component.
- While at least one exemplary embodiment has been presented in the foregoing detailed description of the inventive subject matter, it should be appreciated that a vast number of variations exist. It should also be appreciated that the exemplary embodiment or exemplary embodiments are only examples, and are not intended to limit the scope, applicability, or configuration of the inventive subject matter in any way. Rather, the foregoing detailed description will provide those skilled in the art with a convenient road map for implementing an exemplary embodiment of the inventive subject matter. It being understood that various changes may be made in the function and arrangement of elements described in an exemplary embodiment without departing from the scope of the inventive subject matter as set forth in the appended claims.
Claims (20)
1. A method of forming a component, the method comprising the steps of:
flowing a gas into a can with a metal powder therein, the gas comprising hydrogen, the can configured to be used for a consolidation process, and the metal powder comprising sulfur;
removing at least a portion of the gas from the can; and
subjecting the metal powder therein to the consolidation process, if a determination is made that a sulfur content of the metal powder is below a threshold value, the threshold value being a value below about 5 parts per million by weight.
2. The method of claim 1 , wherein the threshold value is a value less than about 1 part per million by weight.
3. The method of claim 1 , wherein the step of flowing the gas comprises flowing a gas mixture into the can, wherein the gas mixture comprises hydrogen and an inert gas.
4. The method of claim 1 , further comprising determining a sulfur content of the removed gas by sensing a hydrogen sulfide content thereof.
5. The method of claim 1 , wherein the step of subjecting comprises subjecting the metal powder to a consolidation process comprising a process selected from the group of hot isostatic pressing, extrusion, and forging.
6. The method of claim 1 , further comprising the step of repeating the steps of flowing and removing until the sulfur content of the metal powder is below the threshold value.
7. The method of claim 6 , wherein the step of repeating comprises performing the steps of flowing and removing over a time period of between about 1 hour and about 20 hours.
8. The method of claim 1 , wherein the steps of flowing and removing are performed within 300° C. of an incipient melting temperature of the metal powder.
9. The method of claim 1 , wherein the steps of flowing and removing comprises placing the can in a furnace and heating the can to a temperature that is between about 50° C. and about 100° C. lower than an incipient melting point of the metal powder.
10. The method of claim 1 , further comprising the step of transferring at least a portion of the desulfurized powder to another can, before the step of subjecting.
11. A method of forming an engine component, the method comprising the steps of:
flowing a gas into a can with a metal powder therein, the gas comprising hydrogen, the can configured to be used for a hot isostatic pressing process, and the metal powder comprising sulfur;
removing at least a portion of the gas from the can;
determining a sulfur content of the removed gas;
after a determination is made that the sulfur content of the metal powder is below a threshold value, the threshold value being below about 5 parts per million by weight, subjecting the metal powder therein to the hot isostatic pressing process to form compacted metal powder; and
machining the compacted metal powder to form the engine component.
12. The method of claim 11 , wherein the threshold value is a value that is less than about 1 part per million by weight.
13. The method of claim 11 , further comprising the step of repeating the steps of flowing and removing until the sulfur content of the metal powder is below the threshold value.
14. The method of claim 13 , wherein the step of repeating comprises performing the steps of flowing and removing over a time period of between about 1 hour and about 20 hours.
15. The method of claim 11 , wherein the steps of flowing and removing are performed within 300° C. of an incipient melting temperature of the metal powder.
16. The method of claim 11 , further comprising the step of heat treating the compacted metal powder before the step of machining.
17. The method of claim 11 , wherein the step of determining comprises sensing a hydrogen sulfide content of the removed gas.
18. The method of claim 11 , further comprising the step of transferring at least a portion of the desulfurized powder to another can, before the step of subjecting.
19. An engine component comprising:
a compacted powder material, the compacted powder material comprising a nickel-based superalloy having less than 5 parts per million sulfur, by weight.
20. The engine component of claim 19 , wherein the compacted powder material is shaped into a turbine disk.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/948,430 US20090142221A1 (en) | 2007-11-30 | 2007-11-30 | Engine components and methods of forming engine components |
CA002644713A CA2644713A1 (en) | 2007-11-30 | 2008-11-25 | Engine components and methods of forming engine components |
GB0821508A GB2455194A (en) | 2007-11-30 | 2008-11-26 | Processing sulphur contaminated metal powder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/948,430 US20090142221A1 (en) | 2007-11-30 | 2007-11-30 | Engine components and methods of forming engine components |
Publications (1)
Publication Number | Publication Date |
---|---|
US20090142221A1 true US20090142221A1 (en) | 2009-06-04 |
Family
ID=40230785
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/948,430 Abandoned US20090142221A1 (en) | 2007-11-30 | 2007-11-30 | Engine components and methods of forming engine components |
Country Status (3)
Country | Link |
---|---|
US (1) | US20090142221A1 (en) |
CA (1) | CA2644713A1 (en) |
GB (1) | GB2455194A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110038748A1 (en) * | 2009-08-14 | 2011-02-17 | General Electric Company | Powder metal mold |
US20110150693A1 (en) * | 2008-08-26 | 2011-06-23 | Raisson Gerard | Method for preparing a nickel superalloy part, and the part thus obtained |
US8956700B2 (en) | 2011-10-19 | 2015-02-17 | General Electric Company | Method for adhering a coating to a substrate structure |
WO2017029856A1 (en) * | 2015-08-18 | 2017-02-23 | 国立研究開発法人物質・材料研究機構 | Ni-based superalloy part recycling method |
GB2549785A (en) * | 2016-04-29 | 2017-11-01 | Advanced Interactive Mat Science Ltd | Methods and apparatus for hot isostatic pressing |
US11022134B2 (en) * | 2018-05-18 | 2021-06-01 | Hyundai Motor Company | Oil pump of vehicle having inner ring |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3572671A (en) * | 1967-10-03 | 1971-03-30 | Conzinc Riotinto Ltd | Continuous degassing of metals |
US4415527A (en) * | 1980-12-17 | 1983-11-15 | Allegheny Ludlum Steel Corporation | Desulfurization process for ferrous powder |
US4693863A (en) * | 1986-04-09 | 1987-09-15 | Carpenter Technology Corporation | Process and apparatus to simultaneously consolidate and reduce metal powders |
US5009704A (en) * | 1989-06-28 | 1991-04-23 | Allied-Signal Inc. | Processing nickel-base superalloy powders for improved thermomechanical working |
US5346563A (en) * | 1991-11-25 | 1994-09-13 | United Technologies Corporation | Method for removing sulfur from superalloy articles to improve their oxidation resistance |
US5538796A (en) * | 1992-10-13 | 1996-07-23 | General Electric Company | Thermal barrier coating system having no bond coat |
US6042780A (en) * | 1998-12-15 | 2000-03-28 | Huang; Xiaodi | Method for manufacturing high performance components |
US6106765A (en) * | 1998-08-06 | 2000-08-22 | Eramet Marietta Inc. | Purification process for chromium |
US6210630B1 (en) * | 1996-06-13 | 2001-04-03 | Societe Nationale d'Etude et de Construction de Monteurs d'Aviation “Snecma” | Process for manufacturing a hollow turbomachine blade and a multiple-action furnace press for use in said process |
US6228513B1 (en) * | 1997-09-25 | 2001-05-08 | Societe Nationale d'Etude et de Construction de Moteurs d'Aviation “SNECMA” | Method of improving oxidation and corrosion resistance of a superalloy article, and a superalloy article obtained by the method |
US6332937B1 (en) * | 1997-09-25 | 2001-12-25 | Societe Nationale d'Etude et de Construction de Moteurs d'Aviation “SNECMA” | Method of improving oxidation and corrosion resistance of a superalloy article, and a superalloy article obtained by the method |
US6551423B1 (en) * | 1998-09-08 | 2003-04-22 | General Electric Co. | Preparation of low-sulfur platinum and platinum aluminide layers in thermal barrier coatings |
US6656605B1 (en) * | 1992-10-13 | 2003-12-02 | General Electric Company | Low-sulfur article coated with a platinum-group metal and a ceramic layer, and its preparation |
US7261783B1 (en) * | 2004-09-22 | 2007-08-28 | The United States Of America As Represented By The Administrator Of Nasa | Low density, high creep resistant single crystal superalloy for turbine airfoils |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB412808A (en) * | 1933-09-20 | 1934-07-05 | Coalescence Products Company I | Improvements in and relating to processes for removing impurities from metal particles |
GB1001459A (en) * | 1962-11-30 | 1965-08-18 | Sherritt Gordon Mines Ltd | Process for desulphurizing non-ferrous metal and metal alloy particles |
GB1053594A (en) * | 1963-10-21 | |||
CA892488A (en) * | 1968-11-15 | 1972-02-08 | W. Kushnir Bud | Two-phase cobalt-iron alloys prepared by powder metallurgy |
US3862840A (en) * | 1972-12-20 | 1975-01-28 | Airco Inc | Process for manufacture of hard and non-deformable alloys without compacting by sintering in the solid-liquid phase |
GB2234527B (en) * | 1989-08-05 | 1993-10-13 | Mixalloy Ltd | Methods of producing metallic powders and metallic powders produced by such methods |
-
2007
- 2007-11-30 US US11/948,430 patent/US20090142221A1/en not_active Abandoned
-
2008
- 2008-11-25 CA CA002644713A patent/CA2644713A1/en not_active Abandoned
- 2008-11-26 GB GB0821508A patent/GB2455194A/en not_active Withdrawn
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3572671A (en) * | 1967-10-03 | 1971-03-30 | Conzinc Riotinto Ltd | Continuous degassing of metals |
US4415527A (en) * | 1980-12-17 | 1983-11-15 | Allegheny Ludlum Steel Corporation | Desulfurization process for ferrous powder |
US4693863A (en) * | 1986-04-09 | 1987-09-15 | Carpenter Technology Corporation | Process and apparatus to simultaneously consolidate and reduce metal powders |
US5009704A (en) * | 1989-06-28 | 1991-04-23 | Allied-Signal Inc. | Processing nickel-base superalloy powders for improved thermomechanical working |
US5346563A (en) * | 1991-11-25 | 1994-09-13 | United Technologies Corporation | Method for removing sulfur from superalloy articles to improve their oxidation resistance |
US5538796A (en) * | 1992-10-13 | 1996-07-23 | General Electric Company | Thermal barrier coating system having no bond coat |
US6656605B1 (en) * | 1992-10-13 | 2003-12-02 | General Electric Company | Low-sulfur article coated with a platinum-group metal and a ceramic layer, and its preparation |
US6210630B1 (en) * | 1996-06-13 | 2001-04-03 | Societe Nationale d'Etude et de Construction de Monteurs d'Aviation “Snecma” | Process for manufacturing a hollow turbomachine blade and a multiple-action furnace press for use in said process |
US6228513B1 (en) * | 1997-09-25 | 2001-05-08 | Societe Nationale d'Etude et de Construction de Moteurs d'Aviation “SNECMA” | Method of improving oxidation and corrosion resistance of a superalloy article, and a superalloy article obtained by the method |
US6332937B1 (en) * | 1997-09-25 | 2001-12-25 | Societe Nationale d'Etude et de Construction de Moteurs d'Aviation “SNECMA” | Method of improving oxidation and corrosion resistance of a superalloy article, and a superalloy article obtained by the method |
US20020006524A1 (en) * | 1997-09-25 | 2002-01-17 | Societe Nationale D'etude Et De Construction De Moteurs D'aviation "Snecma" | Method of improving oxidation and corrosion resistance of a superalloy article, and a superalloy article obtained by the method |
US6106765A (en) * | 1998-08-06 | 2000-08-22 | Eramet Marietta Inc. | Purification process for chromium |
US6551423B1 (en) * | 1998-09-08 | 2003-04-22 | General Electric Co. | Preparation of low-sulfur platinum and platinum aluminide layers in thermal barrier coatings |
US6355211B1 (en) * | 1998-12-15 | 2002-03-12 | Xiaodi Huang | Method for manufacturing high performance components |
US6042780A (en) * | 1998-12-15 | 2000-03-28 | Huang; Xiaodi | Method for manufacturing high performance components |
US7261783B1 (en) * | 2004-09-22 | 2007-08-28 | The United States Of America As Represented By The Administrator Of Nasa | Low density, high creep resistant single crystal superalloy for turbine airfoils |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110150693A1 (en) * | 2008-08-26 | 2011-06-23 | Raisson Gerard | Method for preparing a nickel superalloy part, and the part thus obtained |
US8889064B2 (en) * | 2008-08-26 | 2014-11-18 | Aubert & Duval | Method for preparing a nickel superalloy part, and the part thus obtained |
US20110038748A1 (en) * | 2009-08-14 | 2011-02-17 | General Electric Company | Powder metal mold |
US8956700B2 (en) | 2011-10-19 | 2015-02-17 | General Electric Company | Method for adhering a coating to a substrate structure |
WO2017029856A1 (en) * | 2015-08-18 | 2017-02-23 | 国立研究開発法人物質・材料研究機構 | Ni-based superalloy part recycling method |
GB2549785A (en) * | 2016-04-29 | 2017-11-01 | Advanced Interactive Mat Science Ltd | Methods and apparatus for hot isostatic pressing |
WO2017187199A1 (en) * | 2016-04-29 | 2017-11-02 | Advanced Interative Materials Science Limited | Containment for hot isostatic pressing and vacuum degassing apparatus |
CN109562449A (en) * | 2016-04-29 | 2019-04-02 | 高级交互材料科学有限公司 | Appearance holder for hot isostatic pressing and vacuum degasser |
US11278961B2 (en) | 2016-04-29 | 2022-03-22 | Sagittite Limited | Containment for hot isostatic pressing and vacuum degassing apparatus |
US11022134B2 (en) * | 2018-05-18 | 2021-06-01 | Hyundai Motor Company | Oil pump of vehicle having inner ring |
Also Published As
Publication number | Publication date |
---|---|
GB0821508D0 (en) | 2008-12-31 |
GB2455194A (en) | 2009-06-03 |
CA2644713A1 (en) | 2009-05-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20090142221A1 (en) | Engine components and methods of forming engine components | |
EP2321440A2 (en) | Method for preparing a nickel superalloy part, and part thus obtained | |
US5453243A (en) | Method for producing titanium aluminide weld rod | |
Reger et al. | High temperature, low cycle fatigue of IN-100 superalloy I: Influence of temperature on the low cycle fatigue behaviour | |
US10760139B2 (en) | Method for repairing defects on hot parts of turbomachines through hybrid hot isostatic pressing (HIP) process | |
Gabb et al. | Effects of high temperature exposures on fatigue life of disk superalloys | |
Schnell et al. | A study of the diffusion brazing process applied to the single crystal superalloy CMSX-4 | |
JPH04505777A (en) | Improved processing method for nickel-based superalloy powders for thermomechanical operations | |
Huron et al. | Control of grain size via forging strain rate limits for R’88DT | |
US11278961B2 (en) | Containment for hot isostatic pressing and vacuum degassing apparatus | |
JP6063140B2 (en) | Filament casting method and apparatus | |
EP2283952A2 (en) | Powder metal mold | |
CN114113194B (en) | Thermal signal testing device, system and thermal signal testing analysis method based on phase change latent heat of solid hydrogen storage and supply material | |
EP1565594A1 (en) | Process for improving the hot workability of a cast superalloy ingot | |
EP1949996A2 (en) | Diffusion braze repair of metal components | |
Wright et al. | Consolidation of Ni3Ai powders by hot isostatic pressing | |
CN105755312B (en) | A kind of preparation method of titanium-base alloy braking automobile disk material | |
JP4585928B2 (en) | Method for treating metal adhering body | |
Rivard et al. | Qualification of hot isostatic pressing processes | |
Stella | Powder metallurgy: investigation of metallurgical and technological aspects and potential applications for critical components of turbomachineries | |
Lukin et al. | Examination of the weldability of superlight Al-Mg-Li alloys | |
Duval et al. | Experimental investigation of blanching effects of typical rocket combustion chamber wall materials | |
JPS6361096B2 (en) | ||
CN117600462A (en) | Passivation method and reaction device for tantalum powder | |
WO2021219988A1 (en) | Processing of swarf |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: HONEYWELL INTERNATIONAL, INC., NEW JERSEY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:STRANGMAN, THOMAS;REEL/FRAME:020182/0308 Effective date: 20071129 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |