US20090032304A1 - Mud level sensing system - Google Patents

Mud level sensing system Download PDF

Info

Publication number
US20090032304A1
US20090032304A1 US11/833,374 US83337407A US2009032304A1 US 20090032304 A1 US20090032304 A1 US 20090032304A1 US 83337407 A US83337407 A US 83337407A US 2009032304 A1 US2009032304 A1 US 2009032304A1
Authority
US
United States
Prior art keywords
mud
signal
receiver
emitter
cuttings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/833,374
Inventor
Douglas A. Groh
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OHMART/VEGA CORP
Original Assignee
OHMART/VEGA CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OHMART/VEGA CORP filed Critical OHMART/VEGA CORP
Priority to US11/833,374 priority Critical patent/US20090032304A1/en
Assigned to OHMART/VEGA CORPORATION reassignment OHMART/VEGA CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GROH, DOUGLAS A.
Priority to PCT/US2008/071949 priority patent/WO2009032454A1/en
Publication of US20090032304A1 publication Critical patent/US20090032304A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/01Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F1/00Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow
    • G01F1/05Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow by using mechanical effects
    • G01F1/52Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow by using mechanical effects by measuring the height of the fluid level due to the lifting power of the fluid flow
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F1/00Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow
    • G01F1/74Devices for measuring flow of a fluid or flow of a fluent solid material in suspension in another fluid

Definitions

  • the present invention relates to determining the level of drilling mud in the return line from an oil drilling apparatus.
  • An oil drilling apparatus typically uses a drill bit at the end of a long pipe. This pipe supplies fluid to the bit to keep it cool and to flush away the cuttings and bring them to the surface.
  • the slurry-like liquid passed to the bit is referred to as mud.
  • the mud is prepared on the surface and pumped down the center of the pipe and out the drill bit where it travels back to the surface while being in contact with the sides of the drilled hole.
  • the liquid carries with it the cuttings from the bottom of the hole, and any material in the surrounding earth that may flow into and join the mud.
  • the liquid can also be lost into fissures in the surrounding earth. The rate of the flow of liquid can be suddenly increased by contact with a pressure pocket in the earth.
  • the quantity of returning mud is most immediately measured in the return line from the drilling apparatus back to the storage pit. This has advantages over simply measuring the height of the mud in the storage pit that contains both newly added mud and mud returning from the hole.
  • the method used to measure the quantity traveling in the return line has usually required a device such as a paddle or a wheel that contacts and extends into the flow. By nature, such contact devices have been susceptible to clogging, sticking, and wear. Clogging is especially a problem when the materials suspended in the returning mud are of a type that clump together, eventually forming large pieces that are unable to flow past the contact devices placed in the mud return pipe.
  • Non-contact methods avoid the problems with clogging, sticking, and wear just described.
  • U.S. Pat. No. 4,228,530 to Bergey is an example of a non-contact gauge that makes use of sound waves.
  • sound waves are affected by off-gasses, condensation, steam, and other process parameters that influence the propagation of an ultrasonic signal.
  • Microwaves as used in an embodiment of the present invention, are not affected by these conditions.
  • the method of mounting and directing the beam of a non-contact device is important in its overall long-term success in accomplishing the task for which it was designed, while avoiding the rigors of being in an oil drilling environment.
  • the microwave device of the present method has been mounted and protected in ways that contribute to its long term success when compared to the prior art.
  • the invention features a non-contact level sensing system for measuring an attribute of mud and cutting flow returning from an oil-drilling hole including a mounting connectable to a conduit, such as a pipe, that is connected to the oil-drilling hole and contains the flowing mud and cuttings.
  • the system includes an electromagnetic signal emitter and an electromagnetic signal receiver, and a housing adapted to hold them and mount them on a mounting. Circuitry is included within the housing for processing signals from the receiver to generate a measure of the height of the mud and cutting flow inside the pipe or conduit.
  • the invention features a non-contact system for measuring an attribute of mud and cutting flow returning from an oil-drilling hole, wherein the system includes a signal emitter and a signal receiver and a housing adapted to hold them and mount on a mounting, and the mounting includes a signal reflector in the path of the signal emitted by the signal emitter for reflecting signals from the signal emitter toward the mud and cuttings.
  • FIG. 1 is a schematic view of a mounting and gauge on a mud return line in an oil drilling system.
  • FIG. 2 is a cross sectional view of a mounting and gauge connected to the return line with mud and cuttings flowing through it.
  • FIG. 3 is an exploded perspective view of the mounting and the gauge.
  • FIG. 4 is an embodiment of the gauge on an alternate embodiment of a mounting.
  • FIG. 1 shows an oil drilling system 10 with a non-contact mud and cutting flow level sensing system 12 (shown larger than its surroundings) as in one embodiment of the present invention. It is best described in the order that the mud circulates through the system.
  • Drilling mud 14 is stored in a pit 16 or a similar container. The drilling mud 14 has most likely traveled through a closed loop cycle as will be described, or alternatively it has been recently mixed and added into the pit 16 , or is a combination of the two.
  • a mud pump 18 pumps the mud 14 through a supply line 20 to the rotary drilling apparatus 22 , where it travels down the center of the drill string piping 24 connected to the drill bit 26 .
  • the mud 14 so that it can perform its lubricating, cooling, and flushing functions, exits through the rotating drill bit 26 where the earth 30 is being cut. Once out of the drill bit 26 , the mud 14 is in contact with the surrounding earth 30 that is being drilled. Recently cut earth 30 and rock, as well as any gasses or liquids, will mix into the mud 14 increasing the overall volume. Mud 14 can also escape into the surrounding subterranean layers through fractures or voids that may be present, thus decreasing the volume.
  • the mud 14 travels upwardly through the annulus 32 between the drill string pipe 24 and the surrounding earth 30 . It continues to travel upwardly through the larger annulus 34 between the drill string pipe 24 and the concrete casing 36 which often lines the upper regions of the hole.
  • the mud 14 exits the side of the drilling apparatus 22 to flow in a mud return pipe or conduit 38 , which is usually angled downward to assist the flow.
  • the return pipe 38 is open to atmospheric pressure and sized so that the flow does not fill the entire cross-section of the pipe 38 . Instead, the pipe 38 contains the mud 14 and cuttings in its lower portion, and air in its upper portion. Sitting on the exterior of a generally top surface of the pipe 38 is the non-contact measuring system 12 . This system, and the area of pipe local to it, will be explained in much greater detail with reference to later figures.
  • the mud return pipe 38 terminates at a particle and mud processing area 40 that is well known in the art.
  • FIG. 2 shows a cross section of the non-contact measurement system 12 and the section of mud return pipe 38 on which it is mounted. Three major portions to be described are the pipe 38 and its contents, a gauge 54 , and a mounting 52 that goes between the two.
  • the pipe 38 has a mud and cutting flow 44 that contains debris and clumps 44 a traveling in the direction shown by the arrows.
  • An air gap 46 is above the mud and cuttings.
  • the upper surface of the pipe has an aperture 48 , and bolted or otherwise attached in line with this aperture is the flange or saddle 50 of the mounting 52 specifically engineered to fit on the pipe 38 and hold a gauge 54 in the correct orientation.
  • the attachment between the mounting 52 and the pipe 38 may be airtight, such as by including a gasket (not shown) or by welding, or it may be loosely fitting since the system normally has only air in the upper portion of the pipe 38 .
  • the mounting 52 is made of heavy gauge sheet metal or other suitable materials, and its shape is engineered to accommodate certain difficult operational conditions found in the oil industry.
  • the costly portion, the gauge 54 is kept in a low profile to the pipe 38 by positioning it at an end 56 rather than a top 58 of the mounting 52 . This is to avoid it being bumped and damaged. Protection from damage is necessary in the oil industry because heavy equipment and pipes are often being moved about in close proximity to where the gauge 54 is used.
  • the lower profile will serve to minimize contact and damage if the mounting 52 and gauge 54 are left installed on the pipe 38 .
  • the mounting 52 will make contact with the ground or another section of pipe 38 before the gauge 54 does.
  • the gauge 54 is located on the upstream side of the flow direction, rather than the downstream side, so that if a malfunction should occur that temporarily fills the interior space 60 of the mounting 52 with mud and cuttings, the gauge 54 would be the last object to be reached by the mud. Ideally, the gauge 54 would not be reached, so long as the drill operators quickly correct the condition.
  • the upstream angled surface 62 is on a negative slope from the gauge 54 so that any mud and cuttings that splash on the angled surface drain back into the pipe.
  • the other angled interior surface is a reflective surface 64 that is angled for at least two reasons.
  • the second reason is that the approximately 45-degree angle of surface 64 relative to the gauge 54 and the mud and cuttings surface 66 allows the surface 64 to function as a reflector of the signal from gauge 54 when it is mounted as shown. This will be explained further when describing the operation of gauge 54 .
  • Other aspects of the mounting include a second flange 68 , for the purpose of mounting the gauge 54 . This flange 68 has holes to accept the fasteners 70 passing through the mating flange 72 of the gauge.
  • a protective cap 74 Welded to or otherwise solidly a part of the flange 68 is a protective cap 74 , to further protect the gauge 54 . There is a cutout 76 in the cap 74 to allow the necessary connections 77 to be made. Examples of likely connections are power and signal output. The cap 74 has cutouts 75 to allow wrench access to the installation fasteners 70 .
  • the gauge 54 is a microwave emitting gauge part number VEGAPULS 62 sold by the assignee of the present application, although other similar non-contact gauges could be used. Gauges using pulsed or continuous radar (e.g., frequency modulated continuous wave (FMCW)) or other electromagnetic, ultrasonic or other non-contact methodologies are suitable for use in connection with embodiments of the invention.
  • VEGAPULS 62 microwave emitting gauge part number
  • FMCW frequency modulated continuous wave
  • the gauge's housing 78 Within the gauge's housing 78 is an emitter 80 and a receiver 82 (both represented conceptually with hidden lines) and circuitry to interpret the reflective signal captured by the receiver 82 . Both emitter 80 and receiver 82 are behind a protective plug of material, such as PTFE, that is transparent with respect to the signal sent and received by the gauge 54 .
  • the microwave signal pulse 84 is generated and emitted from the emitter 80 .
  • the signal is directed toward reflective surface 64 .
  • the reflective surface 64 is made of a material, such as steel, chosen to efficiently reflect the microwaves.
  • the reflective surface 64 can be a structural member of the mounting 52 , as is shown, or it can be an added surface or reflective coating.
  • the surface or reflective coating can be further coated (such as for corrosion protection, or to repel dirt) as long as the protective coatings do not interfere with the signal.
  • PTFE or epoxy paints are both examples of protective coatings.
  • the reflective surface 64 directs the signal to the mud and cuttings flow surface 66 in a generally perpendicular orientation.
  • the signal When the signal reaches the surface 66 , it is reflected back as reflected signal 86 to the reflective surface 64 and back to the gauge 54 .
  • the receiver 82 in the gauge 54 receives the reflected signal 86 .
  • Circuitry (not shown) in the gauge processes the time lapse from when the signal was emitted to when it was received.
  • the time lapse determined by the circuitry is a function of the height of the mud in the pipe, which is an attribute of the flow of mud and cuttings traveling through the pipe.
  • the gauge output provides an attribute of the flow rate of the mud and cuttings. This attribute of the flow is displayed for operators of the oil drilling system 10 . This information may then be used while controlling the drilling process.
  • FIG. 3 shows many of the aspects described in FIG. 2 in an exploded perspective view, with selected numbers, already explained with reference to FIG. 2 , again shown in FIG. 3 .
  • FIG. 4 shows another embodiment of the invention.
  • the gauge 54 is mounted on a mounting 152 that is mounted to a pipe 38 .
  • This mounting 152 does not contain a reflective surface 64 and therefore the gauge 54 must be mounted in direct sight of the surface of the mud and cutting flow 66 . This leaves the gauge 54 at a higher profile and less protected than the gauge of FIG. 2 . However, effective contact free level measurement may be performed in this orientation as well.
  • the procedures and equipment take into consideration several circumstances. Since a condition of zero flow and high flow can both have the same mud and cutting flow height within the pipe, the oil-drilling system is designed so that the operator knows the difference between the two. One way that this is may be done is by sloping the pipe sufficiently so that the substantial portion of the mud and cuttings cannot remain stationary in the pipe. During a time of zero flow, the pipe 38 would automatically empty. Another way is by interlocking or coordinating the interpretation of the gauge signal with other known parameters, such as pressure.
  • Another operational fault condition is the unintended shrinking of the available pipe cross section that would be caused by surfaces of the pipe accumulating caked on mud and cuttings. If the pipe's surfaces are caked with material, the air/mud interface in the pipe will rise closer to the reflective surface 64 than would be the case in a clean pipe for the same amount of flow. The higher air/mud interface in turn would decrease the travel time of the signal, and a higher than actual flow rate would be reported. A sharply sloped pipe and scheduled maintenance are some of the practices to limit accumulated caked on mud and cuttings.

Landscapes

  • Fluid Mechanics (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geology (AREA)
  • General Physics & Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Earth Drilling (AREA)

Abstract

A non-contact measuring system using emitted and received electromagnetic radiation or microwaves is mounted on the return line carrying oil drilling mud and cuttings from an oil drilling apparatus. The system measures the height and flow of the mud and cuttings in the pipe. In one embodiment, it is mounted to the pipe in a low profile manner to protect it, and it uses a reflective surface to reflect the signal to the flow being measured.

Description

    TECHNICAL FIELD
  • The present invention relates to determining the level of drilling mud in the return line from an oil drilling apparatus.
  • BACKGROUND
  • An oil drilling apparatus typically uses a drill bit at the end of a long pipe. This pipe supplies fluid to the bit to keep it cool and to flush away the cuttings and bring them to the surface. The slurry-like liquid passed to the bit is referred to as mud. The mud is prepared on the surface and pumped down the center of the pipe and out the drill bit where it travels back to the surface while being in contact with the sides of the drilled hole. The liquid carries with it the cuttings from the bottom of the hole, and any material in the surrounding earth that may flow into and join the mud. The liquid can also be lost into fissures in the surrounding earth. The rate of the flow of liquid can be suddenly increased by contact with a pressure pocket in the earth. Operators of oil-drilling apparatus frequently perform quantitative and qualitative analysis of the quantity of mud and other materials returning to the surface to obtain information of what is happening in the hole. The quantity of returning mud is most immediately measured in the return line from the drilling apparatus back to the storage pit. This has advantages over simply measuring the height of the mud in the storage pit that contains both newly added mud and mud returning from the hole. The method used to measure the quantity traveling in the return line has usually required a device such as a paddle or a wheel that contacts and extends into the flow. By nature, such contact devices have been susceptible to clogging, sticking, and wear. Clogging is especially a problem when the materials suspended in the returning mud are of a type that clump together, eventually forming large pieces that are unable to flow past the contact devices placed in the mud return pipe.
  • Non-contact methods avoid the problems with clogging, sticking, and wear just described. One example, U.S. Pat. No. 4,228,530 to Bergey, is an example of a non-contact gauge that makes use of sound waves. However sound waves are affected by off-gasses, condensation, steam, and other process parameters that influence the propagation of an ultrasonic signal. Microwaves, as used in an embodiment of the present invention, are not affected by these conditions. Also, the method of mounting and directing the beam of a non-contact device is important in its overall long-term success in accomplishing the task for which it was designed, while avoiding the rigors of being in an oil drilling environment. The microwave device of the present method has been mounted and protected in ways that contribute to its long term success when compared to the prior art.
  • SUMMARY
  • In a first aspect, the invention features a non-contact level sensing system for measuring an attribute of mud and cutting flow returning from an oil-drilling hole including a mounting connectable to a conduit, such as a pipe, that is connected to the oil-drilling hole and contains the flowing mud and cuttings. The system includes an electromagnetic signal emitter and an electromagnetic signal receiver, and a housing adapted to hold them and mount them on a mounting. Circuitry is included within the housing for processing signals from the receiver to generate a measure of the height of the mud and cutting flow inside the pipe or conduit. In a second aspect, the invention features a non-contact system for measuring an attribute of mud and cutting flow returning from an oil-drilling hole, wherein the system includes a signal emitter and a signal receiver and a housing adapted to hold them and mount on a mounting, and the mounting includes a signal reflector in the path of the signal emitted by the signal emitter for reflecting signals from the signal emitter toward the mud and cuttings.
  • Knowledge of the measure of height and the cross sectional size of the conduit and the way in which the mud pumping and reclamation system work, allows the calculation of the flow of the returning mud and cuttings, including any liquids that they may carry with them from the surrounding earth.
  • The above and other objects and advantages of the present invention will be made apparent from the accompanying drawings and the description thereof.
  • BRIEF DESCRIPTION OF THE FIGURES
  • The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and, together with a general description of the invention given above, and the detailed description of the embodiments given below, serve to explain the principles of the invention.
  • FIG. 1 is a schematic view of a mounting and gauge on a mud return line in an oil drilling system.
  • FIG. 2 is a cross sectional view of a mounting and gauge connected to the return line with mud and cuttings flowing through it.
  • FIG. 3 is an exploded perspective view of the mounting and the gauge.
  • FIG. 4 is an embodiment of the gauge on an alternate embodiment of a mounting.
  • DETAILED DESCRIPTION
  • FIG. 1 shows an oil drilling system 10 with a non-contact mud and cutting flow level sensing system 12 (shown larger than its surroundings) as in one embodiment of the present invention. It is best described in the order that the mud circulates through the system. Drilling mud 14 is stored in a pit 16 or a similar container. The drilling mud 14 has most likely traveled through a closed loop cycle as will be described, or alternatively it has been recently mixed and added into the pit 16, or is a combination of the two. A mud pump 18 pumps the mud 14 through a supply line 20 to the rotary drilling apparatus 22, where it travels down the center of the drill string piping 24 connected to the drill bit 26. The mud 14, so that it can perform its lubricating, cooling, and flushing functions, exits through the rotating drill bit 26 where the earth 30 is being cut. Once out of the drill bit 26, the mud 14 is in contact with the surrounding earth 30 that is being drilled. Recently cut earth 30 and rock, as well as any gasses or liquids, will mix into the mud 14 increasing the overall volume. Mud 14 can also escape into the surrounding subterranean layers through fractures or voids that may be present, thus decreasing the volume. The mud 14 travels upwardly through the annulus 32 between the drill string pipe 24 and the surrounding earth 30. It continues to travel upwardly through the larger annulus 34 between the drill string pipe 24 and the concrete casing 36 which often lines the upper regions of the hole.
  • The mud 14, carrying with it cuttings and any other liquids, gases, or solids that have mixed in, exits the side of the drilling apparatus 22 to flow in a mud return pipe or conduit 38, which is usually angled downward to assist the flow. The return pipe 38 is open to atmospheric pressure and sized so that the flow does not fill the entire cross-section of the pipe 38. Instead, the pipe 38 contains the mud 14 and cuttings in its lower portion, and air in its upper portion. Sitting on the exterior of a generally top surface of the pipe 38 is the non-contact measuring system 12. This system, and the area of pipe local to it, will be explained in much greater detail with reference to later figures. The mud return pipe 38 terminates at a particle and mud processing area 40 that is well known in the art. At this area the cuttings and debris are removed to the degree that is practical and disposed of in a reserve pit 42 so they may be later buried or disposed of elsewhere. The mud 14 is reconditioned and supplemented as needed and returned to the mud pit 16 for another trip through the process just described.
  • FIG. 2 shows a cross section of the non-contact measurement system 12 and the section of mud return pipe 38 on which it is mounted. Three major portions to be described are the pipe 38 and its contents, a gauge 54, and a mounting 52 that goes between the two.
  • The pipe 38 has a mud and cutting flow 44 that contains debris and clumps 44 a traveling in the direction shown by the arrows. An air gap 46 is above the mud and cuttings. The upper surface of the pipe has an aperture 48, and bolted or otherwise attached in line with this aperture is the flange or saddle 50 of the mounting 52 specifically engineered to fit on the pipe 38 and hold a gauge 54 in the correct orientation. The attachment between the mounting 52 and the pipe 38 may be airtight, such as by including a gasket (not shown) or by welding, or it may be loosely fitting since the system normally has only air in the upper portion of the pipe 38.
  • The mounting 52 is made of heavy gauge sheet metal or other suitable materials, and its shape is engineered to accommodate certain difficult operational conditions found in the oil industry. For example, the costly portion, the gauge 54, is kept in a low profile to the pipe 38 by positioning it at an end 56 rather than a top 58 of the mounting 52. This is to avoid it being bumped and damaged. Protection from damage is necessary in the oil industry because heavy equipment and pipes are often being moved about in close proximity to where the gauge 54 is used. In addition, when the drilling apparatus is disassembled and moved to another site, the lower profile will serve to minimize contact and damage if the mounting 52 and gauge 54 are left installed on the pipe 38. If the pipe 38 were to be placed on the ground and allowed to roll, the mounting 52 will make contact with the ground or another section of pipe 38 before the gauge 54 does. The gauge 54 is located on the upstream side of the flow direction, rather than the downstream side, so that if a malfunction should occur that temporarily fills the interior space 60 of the mounting 52 with mud and cuttings, the gauge 54 would be the last object to be reached by the mud. Ideally, the gauge 54 would not be reached, so long as the drill operators quickly correct the condition. For the same reason, the upstream angled surface 62 is on a negative slope from the gauge 54 so that any mud and cuttings that splash on the angled surface drain back into the pipe. The other angled interior surface is a reflective surface 64 that is angled for at least two reasons. One reason again has to do with drainage of unwanted mud and cuttings. The negative slope will cause any cuttings 44 b reaching it, to glance off and stay low, rather than to be piled high into the interior space 60. The second reason is that the approximately 45-degree angle of surface 64 relative to the gauge 54 and the mud and cuttings surface 66 allows the surface 64 to function as a reflector of the signal from gauge 54 when it is mounted as shown. This will be explained further when describing the operation of gauge 54. Other aspects of the mounting include a second flange 68, for the purpose of mounting the gauge 54. This flange 68 has holes to accept the fasteners 70 passing through the mating flange 72 of the gauge. Welded to or otherwise solidly a part of the flange 68 is a protective cap 74, to further protect the gauge 54. There is a cutout 76 in the cap 74 to allow the necessary connections 77 to be made. Examples of likely connections are power and signal output. The cap 74 has cutouts 75 to allow wrench access to the installation fasteners 70.
  • In this embodiment, the gauge 54 is a microwave emitting gauge part number VEGAPULS 62 sold by the assignee of the present application, although other similar non-contact gauges could be used. Gauges using pulsed or continuous radar (e.g., frequency modulated continuous wave (FMCW)) or other electromagnetic, ultrasonic or other non-contact methodologies are suitable for use in connection with embodiments of the invention. Within the gauge's housing 78 is an emitter 80 and a receiver 82 (both represented conceptually with hidden lines) and circuitry to interpret the reflective signal captured by the receiver 82. Both emitter 80 and receiver 82 are behind a protective plug of material, such as PTFE, that is transparent with respect to the signal sent and received by the gauge 54.
  • In operation, the microwave signal pulse 84 is generated and emitted from the emitter 80. The signal is directed toward reflective surface 64. The reflective surface 64 is made of a material, such as steel, chosen to efficiently reflect the microwaves. The reflective surface 64 can be a structural member of the mounting 52, as is shown, or it can be an added surface or reflective coating. The surface or reflective coating can be further coated (such as for corrosion protection, or to repel dirt) as long as the protective coatings do not interfere with the signal. PTFE or epoxy paints are both examples of protective coatings. The reflective surface 64 directs the signal to the mud and cuttings flow surface 66 in a generally perpendicular orientation. When the signal reaches the surface 66, it is reflected back as reflected signal 86 to the reflective surface 64 and back to the gauge 54. The receiver 82 in the gauge 54 receives the reflected signal 86. Circuitry (not shown) in the gauge processes the time lapse from when the signal was emitted to when it was received. The time lapse determined by the circuitry is a function of the height of the mud in the pipe, which is an attribute of the flow of mud and cuttings traveling through the pipe. Thus, the gauge output provides an attribute of the flow rate of the mud and cuttings. This attribute of the flow is displayed for operators of the oil drilling system 10. This information may then be used while controlling the drilling process.
  • FIG. 3 shows many of the aspects described in FIG. 2 in an exploded perspective view, with selected numbers, already explained with reference to FIG. 2, again shown in FIG. 3.
  • FIG. 4 shows another embodiment of the invention. The gauge 54 is mounted on a mounting 152 that is mounted to a pipe 38. This mounting 152 does not contain a reflective surface 64 and therefore the gauge 54 must be mounted in direct sight of the surface of the mud and cutting flow 66. This leaves the gauge 54 at a higher profile and less protected than the gauge of FIG. 2. However, effective contact free level measurement may be performed in this orientation as well.
  • In use, the procedures and equipment take into consideration several circumstances. Since a condition of zero flow and high flow can both have the same mud and cutting flow height within the pipe, the oil-drilling system is designed so that the operator knows the difference between the two. One way that this is may be done is by sloping the pipe sufficiently so that the substantial portion of the mud and cuttings cannot remain stationary in the pipe. During a time of zero flow, the pipe 38 would automatically empty. Another way is by interlocking or coordinating the interpretation of the gauge signal with other known parameters, such as pressure.
  • Another operational fault condition is the unintended shrinking of the available pipe cross section that would be caused by surfaces of the pipe accumulating caked on mud and cuttings. If the pipe's surfaces are caked with material, the air/mud interface in the pipe will rise closer to the reflective surface 64 than would be the case in a clean pipe for the same amount of flow. The higher air/mud interface in turn would decrease the travel time of the signal, and a higher than actual flow rate would be reported. A sharply sloped pipe and scheduled maintenance are some of the practices to limit accumulated caked on mud and cuttings.
  • While the present invention has been illustrated by a description of various embodiments and while these embodiments have been described in considerable detail, it is not the intention of the applicants to restrict or in any way limit the scope of the appended claims to such detail. Additional advantages and modifications will readily appear to those skilled in the art. The invention in its broader aspects is therefore not limited to the specific details, representative apparatus and method, and illustrative example shown and described. Accordingly, departures may be made from such details without departing from the spirit or scope of applicant's general inventive concept.

Claims (11)

1. A non-contact level sensing system for measuring an attribute of mud and: cutting flow returning from an oil-drilling hole comprising:
a mounting connectable to a conduit that is connected to the oil-drilling hole and contains the flowing mud and cuttings;
an electromagnetic signal emitter and an electromagnetic signal receiver,
a housing adapted to hold said emitter and said receiver and to mount on said mounting; and
circuitry within said housing for processing signals from said receiver to generate a measure of said attribute.
2. The system of claim 1 wherein the signal emitter and the signal receiver are a microwave emitter and receiver.
3. A level sensing system for measuring an attribute of mud and cutting flow returning from an oil-drilling hole comprising:
a mounting connectable to a conduit that is connected to the oil-drilling hole and contains the flowing mud and cuttings;
a signal emitter and a signal receiver,
a housing adapted to hold said emitter and said receiver and to mount on said mounting;
circuitry within said housing for processing signals from said receiver to generate a measure of said attribute, and
wherein the emitter and the receiver do not send or receive signals in a straight line path to or from the mud and cutting flow being measured.
4. The system of claim 3 wherein the signal emitter and the signal receiver are an electromagnetic emitter and receiver.
5. The system of claim 3 wherein the signal emitter and the signal receiver are a microwave emitter and receiver.
6. An oil drilling system with a non-contact gauge for measuring an attribute of mud and cuttings flow returning from an oil-drilling hole comprising:
a system for supplying pumped mud;
a drill bit delivering the pumped mud into the bottom of the oil-drilling hole;
a return system including a conduit that carries the mud and cuttings flow from the oil-drilling hole;
a mounting that is connected to said conduit;
an electromagnetic signal emitter emitting signals that reach the mud and cuttings in said conduit;
an electromagnetic signal receiver that receives reflected signals from the mud and cuttings in said conduit;
a housing adapted to hold said signal emitter and said signal receiver and to mount on said mounting such that the signal emitter and the signal receiver are in reflective contact with said mud and cuttings; and
circuitry to process said reflected signals into an attribute of a measurement of flow.
7. The oil drilling system of claim 6 wherein the signal emitter and the signal receiver are a microwave emitter and receiver.
8. A non-contact method for measuring an attribute of mud and cuttings flow returning from an oil-drilling hole comprising:
emitting an electromagnetic signal that reaches and reflects off of said mud and cuttings in the form of a reflected signal;
receiving the reflected signal; and
processing the reflected signal to arrive at an attribute of mud and cuttings flow.
9. The method of claim 8 wherein said reflected signal is a microwave signal.
10. The method of claim 8 wherein said emitted and reflected signals do not follow a straight-line path to or from the mud and cutting flow.
11. The method of claim 10 wherein said signals are microwave signals.
US11/833,374 2007-08-03 2007-08-03 Mud level sensing system Abandoned US20090032304A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US11/833,374 US20090032304A1 (en) 2007-08-03 2007-08-03 Mud level sensing system
PCT/US2008/071949 WO2009032454A1 (en) 2007-08-03 2008-08-01 Mud level sensing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/833,374 US20090032304A1 (en) 2007-08-03 2007-08-03 Mud level sensing system

Publications (1)

Publication Number Publication Date
US20090032304A1 true US20090032304A1 (en) 2009-02-05

Family

ID=40337070

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/833,374 Abandoned US20090032304A1 (en) 2007-08-03 2007-08-03 Mud level sensing system

Country Status (2)

Country Link
US (1) US20090032304A1 (en)
WO (1) WO2009032454A1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012021693A1 (en) * 2010-08-11 2012-02-16 Safekick Limited Arrangement and method for detecting fluid influx and/or loss in a well bore
WO2011110835A3 (en) * 2010-03-12 2012-03-01 Des19N Limited Determination of the flow rate and the presence of impurities in waste water from the reflections of a microwave signal from the waste water
US20120297801A1 (en) * 2010-01-28 2012-11-29 Youhong Sun Forced cooling circulation system for drilling mud
KR101467606B1 (en) * 2010-12-06 2014-12-01 현대중공업 주식회사 Drill Ship with Mud System and Brine System
NO20151376A1 (en) * 2015-10-12 2017-04-13 Cameron Int Corp Flow sensor assembly
US20170138168A1 (en) * 2015-11-13 2017-05-18 Baker Hughes Incorporated Apparatus and related methods to determine hole cleaning, well bore stability and volumetric cuttings measurements
CN107218936A (en) * 2017-07-28 2017-09-29 张志坤 A kind of connection survey device
US10267663B2 (en) 2014-11-26 2019-04-23 Able Instruments & Controls Ltd Mass flow measurement apparatus and method
US10605711B2 (en) 2014-12-12 2020-03-31 General Electric Company Ultrasonic measuring method and system for measuring particle size and mass concentration
US10822895B2 (en) 2018-04-10 2020-11-03 Cameron International Corporation Mud return flow monitoring

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4228530A (en) * 1978-05-19 1980-10-14 Bergey Taylor G Mud level monitor
US4282939A (en) * 1979-06-20 1981-08-11 Exxon Production Research Company Method and apparatus for compensating well control instrumentation for the effects of vessel heave
US5475309A (en) * 1994-01-21 1995-12-12 Atlantic Richfield Company Sensor in bit for measuring formation properties while drilling including a drilling fluid ejection nozzle for ejecting a uniform layer of fluid over the sensor
US6220371B1 (en) * 1996-07-26 2001-04-24 Advanced Coring Technology, Inc. Downhole in-situ measurement of physical and or chemical properties including fluid saturations of cores while coring
US6357536B1 (en) * 2000-02-25 2002-03-19 Baker Hughes, Inc. Method and apparatus for measuring fluid density and determining hole cleaning problems
US6672155B2 (en) * 2000-10-14 2004-01-06 Endress + Hauser Gmbh + Co. Apparatus for determining the filling level of a filling material in a container

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4228530A (en) * 1978-05-19 1980-10-14 Bergey Taylor G Mud level monitor
US4282939A (en) * 1979-06-20 1981-08-11 Exxon Production Research Company Method and apparatus for compensating well control instrumentation for the effects of vessel heave
US5475309A (en) * 1994-01-21 1995-12-12 Atlantic Richfield Company Sensor in bit for measuring formation properties while drilling including a drilling fluid ejection nozzle for ejecting a uniform layer of fluid over the sensor
US6220371B1 (en) * 1996-07-26 2001-04-24 Advanced Coring Technology, Inc. Downhole in-situ measurement of physical and or chemical properties including fluid saturations of cores while coring
US6357536B1 (en) * 2000-02-25 2002-03-19 Baker Hughes, Inc. Method and apparatus for measuring fluid density and determining hole cleaning problems
US6672155B2 (en) * 2000-10-14 2004-01-06 Endress + Hauser Gmbh + Co. Apparatus for determining the filling level of a filling material in a container

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120297801A1 (en) * 2010-01-28 2012-11-29 Youhong Sun Forced cooling circulation system for drilling mud
US9062509B2 (en) * 2010-01-28 2015-06-23 Jilin University Forced cooling circulation system for drilling mud
US9588062B2 (en) 2010-03-12 2017-03-07 Des19N Limited Waste water assessment
WO2011110835A3 (en) * 2010-03-12 2012-03-01 Des19N Limited Determination of the flow rate and the presence of impurities in waste water from the reflections of a microwave signal from the waste water
US9341581B2 (en) 2010-03-12 2016-05-17 Des19N Limited Waste water assessment
WO2012021693A1 (en) * 2010-08-11 2012-02-16 Safekick Limited Arrangement and method for detecting fluid influx and/or loss in a well bore
KR101467606B1 (en) * 2010-12-06 2014-12-01 현대중공업 주식회사 Drill Ship with Mud System and Brine System
US10267663B2 (en) 2014-11-26 2019-04-23 Able Instruments & Controls Ltd Mass flow measurement apparatus and method
US10605711B2 (en) 2014-12-12 2020-03-31 General Electric Company Ultrasonic measuring method and system for measuring particle size and mass concentration
NO20151376A1 (en) * 2015-10-12 2017-04-13 Cameron Int Corp Flow sensor assembly
NO342709B1 (en) * 2015-10-12 2018-07-23 Cameron Tech Ltd Flow sensor assembly
US10072470B2 (en) 2015-10-12 2018-09-11 Cameron International Corporation Flow sensor assembly
US20170138168A1 (en) * 2015-11-13 2017-05-18 Baker Hughes Incorporated Apparatus and related methods to determine hole cleaning, well bore stability and volumetric cuttings measurements
CN107218936A (en) * 2017-07-28 2017-09-29 张志坤 A kind of connection survey device
US10822895B2 (en) 2018-04-10 2020-11-03 Cameron International Corporation Mud return flow monitoring

Also Published As

Publication number Publication date
WO2009032454A1 (en) 2009-03-12

Similar Documents

Publication Publication Date Title
US20090032304A1 (en) Mud level sensing system
US8601875B2 (en) Device and method to assess impairment of pipeline wall strength
US8988969B2 (en) Detection of cross bores involving buried utilities
US11506562B2 (en) Monitoring of fluid pipes
US10151160B2 (en) Drilling fluid measurement system
US10822895B2 (en) Mud return flow monitoring
US20180038179A1 (en) Mud flow monitoring devices and methods
Fiedler An overview of pipeline leak detection technologies
RU2645127C2 (en) Probe for monitoring surface level of fluid inside vessel and method for installing probe in vessel
CN102230812B (en) Device and method for measuring return flow of L-shaped communicating pipe drilling liquid
CN108915673A (en) A kind of downhole pump monitoring device for coal bed gas water pumping gas production
KR102192225B1 (en) Sediment Slime Alert System for Jeju Type Closed Ground Heat Exchangers
KR20040027820A (en) dreg sludge height and flow rate measurement system using pressure gauge and sewage water level and velocity gauge
US20130036588A1 (en) Method and Apparatus for Installing a Device at a Storage Vessel
JPH06201534A (en) Device and method for detecting blocked position inside pipe and method for controlling amount of unloaded oil
Onuoha et al. Process Improvements in Direct Assessment Programs
CN106872489A (en) A kind of survey blocking method of use microwave Doppler detection principle, device and purposes
AU2022204222B2 (en) Non-linear ultrasound method and apparatus for quantitative detection of materials
Mondal et al. Latest Trends in Pig Detection System
JPH11142136A (en) Inspection method for buried pipe
JP2001133303A (en) Flow measuring device
Surbled A monitoring management strategy in tribocorrosion: Application to erosion-corrosion in oil and gas exploration-production
EA042711B1 (en) NONLINEAR ULTRASONIC METHOD AND DEVICE FOR QUANTITATIVE DETERMINATION OF MATERIALS (LIQUIDS, GAS, PLASMA)
Drangsholt et al. Before It's Too Late! Development of a Force Main Prioritization and Inspection Model
JPH08270381A (en) Facing stabilizing method of muddy water type shield construction method

Legal Events

Date Code Title Description
AS Assignment

Owner name: OHMART/VEGA CORPORATION, OHIO

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:GROH, DOUGLAS A.;REEL/FRAME:019785/0681

Effective date: 20070719

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION