US20090030758A1 - Methods for assessing potentially compromising situations of a utility company - Google Patents
Methods for assessing potentially compromising situations of a utility company Download PDFInfo
- Publication number
- US20090030758A1 US20090030758A1 US12/139,159 US13915908A US2009030758A1 US 20090030758 A1 US20090030758 A1 US 20090030758A1 US 13915908 A US13915908 A US 13915908A US 2009030758 A1 US2009030758 A1 US 2009030758A1
- Authority
- US
- United States
- Prior art keywords
- fly
- operator
- source
- displays
- display
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/40—Testing power supplies
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
- G06F3/0481—Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance
- G06F3/0482—Interaction with lists of selectable items, e.g. menus
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
- G06F3/0484—Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range
- G06F3/04842—Selection of displayed objects or displayed text elements
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
- G06F3/0484—Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range
- G06F3/0486—Drag-and-drop
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/14—Digital output to display device ; Cooperation and interconnection of the display device with other functional units
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/16—Sound input; Sound output
- G06F3/167—Audio in a user interface, e.g. using voice commands for navigating, audio feedback
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T11/00—2D [Two Dimensional] image generation
- G06T11/20—Drawing from basic elements, e.g. lines or circles
- G06T11/206—Drawing of charts or graphs
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T11/00—2D [Two Dimensional] image generation
- G06T11/60—Editing figures and text; Combining figures or text
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T3/00—Geometric image transformation in the plane of the image
- G06T3/40—Scaling the whole image or part thereof
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B23/00—Alarms responsive to unspecified undesired or abnormal conditions
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09G—ARRANGEMENTS OR CIRCUITS FOR CONTROL OF INDICATING DEVICES USING STATIC MEANS TO PRESENT VARIABLE INFORMATION
- G09G5/00—Control arrangements or circuits for visual indicators common to cathode-ray tube indicators and other visual indicators
- G09G5/36—Control arrangements or circuits for visual indicators common to cathode-ray tube indicators and other visual indicators characterised by the display of a graphic pattern, e.g. using an all-points-addressable [APA] memory
- G09G5/37—Details of the operation on graphic patterns
- G09G5/377—Details of the operation on graphic patterns for mixing or overlaying two or more graphic patterns
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/001—Methods to deal with contingencies, e.g. abnormalities, faults or failures
- H02J3/0012—Contingency detection
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/008—Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/04—Processing captured monitoring data, e.g. for logfile generation
- H04L43/045—Processing captured monitoring data, e.g. for logfile generation for graphical visualisation of monitoring data
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/20—Information technology specific aspects, e.g. CAD, simulation, modelling, system security
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
Definitions
- This invention relates generally systems and methods that improve energy management, and more particularly to systems and methods for the utility market
- the modern electric power grid begins as the primary circuit leaves the generating sub-station, is transported via transmission line, distributed via distribution feeders, and ends as the secondary service enters the customers meter socket.
- This invention relates to the management of the transmission system, from a control center, which purpose is to maintain all equipment within operating limits and to ensure the provision of electricity at a reliability rate greater than 99.999%.
- EMS Energy Management Systems
- SCADA Supervisory Control and Data Acquisition system
- the EMS are more sophisticated today with advanced algorithms and increasing volume of data coming from smarter grids that are equipped with intelligent electronic devices (IED).
- IED intelligent electronic devices
- Catastrophic failures of a power system are relatively uncommon, but they are spectacular when they happen. Twenty-five million people in the northeastern United States lost electric power for 12 hours in 1965. Another blackout shut down New York City for several days in 1977. And in 2003, the largest power failure in North American history left 40 million people in an area in the United States stretching from Massachusetts, Connecticut, New York and New Jersey west to Ohio and Michigan, and 10 million people in eastern Canada, without power. The lack of adequate situational awareness at multiple levels was one of the root causes of the Aug. 14, 2003 massive power blackout in North America.
- SA Situation Awareness
- an object of the present invention is to provide methods for assessing potentially compromising situations of a utility company using fly-out or data lensing.
- Another object of the present invention is to provide methods for assessing potentially compromising situations of a utility company using fly-out or data lensing to direct the operator's attention without the operator loosing perspective of the whole power system of the utility company.
- Yet another object of the present invention is to provide methods for assessing potentially compromising situations of a utility company using fly-out or data lensing to allow an operator to generate informational displays without leaving the main overviews.
- a fly-out or data lensing is used to bring forward a portion of the source displays.
- the fly-out or data lensing is used to draw attention to a potentially compromising situation and direct the operator's attention without loosing perspective of a whole power system of the utility company.
- FIG. 1 is a block diagram illustrating one embodiment of an energy management system of the present invention that provides real time awareness of a potential energy management failure.
- FIG. 2 is a block diagram illustrating one embodiment of an energy management system of the present invention which has situational dashboard panels.
- FIG. 3 is a flow chart illustrating one application of the FIG. 2 system.
- FIG. 4 illustrates one embodiment of a custom dashboard of the present invention sourced from three different displays.
- FIG. 5 is a flow chart illustrating one embodiment of a method of the present invention that assesses potentially compromising situations of a utility company.
- FIG. 6 illustrates one embodiment of a fly-out and a pod of the present invention.
- FIG. 7 illustrates one embodiment of a geographical overview with a background layer representing the aerial view of an area of the present invention.
- FIG. 8 is a flow chart illustrating one embodiment of a method of the present invention that creates dynamic lists from selected areas of a power system of a utility company using rubber-banding or lassoing.
- FIG. 9 illustrates one embodiment of area selection that can be used with the flow chart of FIG. 8 .
- FIG. 10 illustrates one embodiment of vital signs for a selected element that can be utilized with the flow chart of FIG. 8 .
- FIG. 11 is a flow chart illustrating one embodiment of a method of the present invention for managing high and low voltage conditions from selected areas of a power system of a utility company.
- FIG. 12 illustrates one embodiment of a MVAR Reserve dashboard that is automatically calculated based on the selected area and can be associated with the FIG. 11 flow chart.
- FIG. 13 illustrates a 3D view of the available MVARs using the positive and negative reactive reserves toolbar buttons, and can be associated with the FIG. 11 flow chart.
- FIG. 14 is a flow chart illustrating one embodiment of a method of the present invention for assessing reliability of a power system of a utility company.
- FIG. 15 is associated with the FIG. 14 flow chart and illustrates that if a new violation appears following the execution of the State Estimator (SE), an alert is displayed of the viewport.
- SE State Estimator
- FIG. 16 is associated with the FIG. 14 flow chart and shows a selected branch.
- FIG. 17 is associated with the FIG. 14 flow chart and shows how markers associated with the monitored elements in post contingency violations are displayed.
- FIG. 18 is associated with the FIG. 14 flow chart and shows that to drill down into a particular violation, the operator can select a violation marker for an Alarm on branch.
- FIG. 19 is associated with the FIG. 14 flow chart and illustrates that when a contingent element creates a violation, a square marker can be provided.
- FIG. 20 is associated with the FIG. 14 flow chart and illustrates that selecting a contingent element marker can cause a display all violations that a particular contingent element creates.
- FIG. 21 is associated with the FIG. 14 flow chart and shows a Contingency Tab in a control panel.
- the present invention provides a system and methods for enhance situational awareness for a control center of a utility company for improved energy management, to drill down on potential conditions that effect the distribution of power, and mitigates these potential conditions before catastrophic failures occur, provide a real time application of advanced graphics to display the current status of a power system of one or more utility companies., and the like.
- the present invention represents a new and improved way to design user interface, independently of the underlying application to display a 3D view of the available MVARs using the positive and negative reactive reserves toolbar buttons, as shown in FIG. 13 .
- the present invention represents a new and improved way to design user interface, independently of the underlying applications, algorithms, or databases.
- the main display is therefore targeted at a specific operator's task which may span several applications. Traditionally, a operator had to navigate among different user interfaces to achieve the same objective, albeit with much less productivity and slower reaction time.
- the present invention is designed for mission critical systems that deal with large volume of data refreshed in real-time every seconds. These information systems cannot fail and must be available at a minimum 99.95% of the time.
- the present invention is also designed to re-use most of the existing software applications already in place within the control center. Low cost of maintenance is achieved with automatic generation of displays and re-use of existing assets (software and hardware).
- the systems and methods of the present invention can be used by utility companies that have a system including but not limited to power systems.
- the present invention can also be used by water management systems, petro-chemical systems, transportations systems, and the like.
- the power system is managed to bring energy to an end user and includes generation, transmission and distribution system.
- satellite maps can be utilized.
- one embodiment of the present invention has an energy management system that includes: a control center at a utility company; logic resources coupled to the power system that provide a real time notice of conditions which effect energy management of the utility company; and at least one user interface at the control center coupled to the logic resources.
- the user interfaces provide real time situation awareness of a potential energy management failure.
- the conditions can be one or more of energy, distribution, generation, transmission and energy market systems.
- a real time notice of conditions can be provided prior to an occurrence of, a catastrophic failure of power delivery, catastrophic power generation, catastrophic transmission and energy market systems and the like.
- Situation awareness is perception and/or comprehension and is auditory and/or visual.
- Situational awareness improves energy management, facilitates drilling down on conditions that can effect energy management, (ii) facilitates distribution of power, generation of power, transmission and energy market systems, (iii) mitigates the effects of conditions that can create failures in energy management and (iv) mitigates conditions that can create failures including but not limited to, delivery of power, generation of power, transmission and energy market systems.
- the logic resources and the user interface are coupled to the power or distribution system of the utility company.
- the logic resources uses an overview of the majority of the utility system and drills down to more detailed views of the utility system.
- the logic resources can be configured to re-use at least a portion of data and configurations from pre-existing software applications already in place in the control center.
- the pre-existing software applications can include information of, system 1 lines, 1 line diagrams and/or asset information.
- the user interfaces provide a specific operator's task that can scan one or several utility company applications without navigating between different user interfaces of the control center.
- the user interfaces include graphics that display one or more of, current status, mitigating factors and recommendations of the power system for one or more utility companies.
- the user interfaces can include advanced graphics that display a current status of power generation, power generation, transmission and/or energy market systems.
- the user interfaces can be independent of an energy management application.
- the user interfaces are automatically generated in response to data and configuration from pre-existing software or pre-existing software applications and also uses its own.
- the user interfaces can be a model driven overview, where the model driven overview combines coordinate system based on a geographical coordinate system including but not limited to GIS and the like.
- One or more context panels can be provided with context data relative to a given situation facing the utility company.
- One or more information systems can also be provided that are refreshed in real-time.
- the information system can be refreshed in a time period of from 1 second to 15 minutes, depending on the information and the situation.
- situational dynamic dashboards are created graphically and dynamically by operators.
- the situational dashboards can be built on-the-fly by combining subsets of, different displays, tabulars, one-lines, regional schematic and/or geographic overviews.
- the logic resources enable the operators to create their own dashboards from large geographical overviews, regional schematic displays and station one-line displays to assist operators in assessing a potentially compromising situation of the electric power system. Portions of the displays that are dropped onto a situational dashboard display can continue to be updated in real-time with live data.
- the potentially compromising situation can be, system violations of type branch, low voltage, high voltage and/or delta voltage, low or high voltage situation in a given area of the system, actual or potential system violations as a result of megawatts or megavars, and the like.
- the situational dashboards can be built on-the-fly by combining subsets of different displays, tabulars, one-lines, schematic, geographic overviews and the like, onto a dashboard area. The dashboards are saveable and reuseable, and are useful for identifying potentially compromising situations.
- a dashboard can be saved and recalled later just as any other display in the system and is refreshed with live data.
- the benefits of a dynamically created dashboard which is created to specifically address a situation, is that it allows the operator to select only the information that is relevant to the situation which the operator is facing. This reduces the workload on the operator since the operator needs to focus only on what is relevant not a collection of displays which have vast amount of information on it which may not be relevant.
- the concept is simple: provide the operator with only the information he needs to do the job, not all the data that the system has and letting the operator constantly review the data and extract what is needed.
- One the dynamic dashboards are created they can be saved and re-used should the situation present itself, thus eliminating setup time.
- projection lines are can be drawn from the source display to the fly-out to maintain reference to the source such that the operator always knows about the reference source of the fly-out.
- the projection lines can be used with multiple fly-outs, and can track multiple situations at the same time. This is important because an operator may be tracking multiple situations at the same time and must be aware of the context of each of the situations from the multiple situations.
- the projection lines provide the operator with an awareness of a context of situations and information about a reference source of the fly-out.
- a pod is a fly-out that has been un-pinned from the source display. Pods can be organized as additional windows to monitor specific information such as overload condition on a power line or a low voltage condition.
- FIG. 6 shows an example of a fly-out and a pod.
- Situation awareness principles can be utilized with the fly-out. The use of a fly-out allows an operator to generate informational displays without ever leaving the main overviews in order to accomplish a goal. This reinforces the goal of providing a use case based application. The operator is provided with only what it needs to the job and nothing else that can distract the operator from the task that the operator has been asked to do.
- FIG. 7 shows an example of a geographical overview with a background layer representing the aerial view of an area.
- Other types of operator selected backgrounds such as jpegs and bitmaps, can be used.
- geographic satellites are used to obtain the geographical overview. The operator can then pan and zoom, with different tiles coming up on the display.
- the corresponding tile for the matching background is obtained from the site. Once it is obtained it is locally cached for performance improvement and displayed as the background layer. As the operator pans and the zooms the display new tiles are retrieved and displayed. For efficiency only, the required tiles are loaded into memory and visible in the background.
- the operator can adjust the opacity of the background image using a dialog which is available for invocation from an icon on the toolbar.
- FIG. 7 also shows a navigation window and a magnifier in use.
- a method for creating dynamic lists from selected areas of the power system of the utility company.
- the energy management system is used to access one or more source displays of a site.
- One or more of the source displays are then rubber-banded or lassoed to create the selected areas from at least a portion of the source displays.
- Lists which can be in tabular form, are dynamically created that display operator defined information for each network element type in a list of network elements from the selected areas that have been rubber-banded or lassoed.
- the network elements can include one or more of, substations, lines, generators, capacitors, loads, transformers, Static Var Compensators and Inductors, and the like. These lists are dynamically created for an operator selected area of the power system to quickly obtain vital signs for the system within the selected area.
- the operator selects an area by rubber-banding or lassoing an area on the display using a device such as a mouse. All the network elements in the selected area of interest are identified.
- the selected area is dragged into a new control panel tab and dropped into the tab.
- the action of “drag and drop” constitutes the creation of a new list of elements the operator wants to obtain vital information for vital signs.
- the new list of elements is created by identifying network elements within a perimeter of the selected area.
- the network elements can be each station and each line within the boundary of the selected area.
- the information, which makes up the vital signs,. is operator definable.
- the vital information can be one or more of, the state of the line, energization status of the lines, MegaWatt flows, MegaVar flows of the line, station load, station generation in MegaWatt and MegaVars and the like.
- the present invention takes care of retrieving, from the energy management system, the most recent data associated with this selection, and automatically keeps it up to date. Once the new list is created it can be saved and recalled for future use.
- FIG. 9 An area selection is shown in FIG. 9 .
- Vital signs for a selected element are shown in FIG. 10 .
- system of the present invention automatically populates the list and receives vital data for all of the elements in this list.
- the custom list can be given a name and saved for future use.
- the control panel can have a special tab, called “Lists,” which contains the names of all the custom-created areas.
- the control panel has a MVAr Reserve tab that contains names of dynamically created MVar Reserve areas for a selected geographic representation of the power system.
- the present invention also provides an operator with knowledge about where and how much VAR Reserves are available. This is particularly useful for operators facing high or low voltage situations. In a such a situation the operator needs to know if there are sufficient Vars in the area where the low or high voltage condition manifests itself so that they can be injected into or removed from the power system.
- a method for managing high or low voltage conditions from selected areas of a power system of a utility company using VAR reserves.
- Selected geographic are rubber banded or lassoed and potential low or high voltage situations are identified.
- the control panel can include a context menu.
- the context menu can be used to show VAR reserves. Once the area is selected, the operator selects the option “Show Reserves” from the context menu to display the MVAR Reserves available within the area. For the selected area, all network elements are identified and a query is generated to obtain the MVAR Reserves associated with the identified network elements.
- Geographic displays are overlayed with superimposed VAR reserves to create overlayed geographic displays that are used to identify potential low or high voltage instances in the selected geographic areas
- voltage contours are used to identify the potential low or high voltage instances.
- the overlayed geographic displays can be used to provide power flow information of the power system which can be in real time as well as to determine available VAR reserves.
- the geographic displays can be used to determine if there are sufficient VARS in portions or all of the selected geographic areas where low or high voltage conditions are manifest.
- the location and amount of available VAR reserves is determined, and real time information relative to location and amount of available VAR reserves can be provided.
- the available VAR reserves can be displayed as a summary for injection into the system and for absorption out of the system by device type, e.g., generation units, capacitor banks, reactor banks, and static Var systems).
- FIG. 12 shows the MVAR Reserve dashboard, which is automatically calculated based on the selected area. A query can be generated to obtain MVAR reserves associated with the identified network elements.
- the injection/absorption reactive reserve is calculated based on the following rules:
- the injection reactive reserve is (MVAR MAX ⁇ MVAR Out) and the absorption reactive reserve is (MVAR Out ⁇ MVAR Min).
- Capacitor Banks Considers only caps that are not removed from the system.
- the injection reactive reserve is the summation of nominal MVAR of caps that are open or disconnected.
- the absorption reactive reserve is the summation of nominal MVAR of caps that are closed.
- the injection reactive reserve is the summation of nominal MVAR of caps that are closed.
- the absorption reactive reserve is the summation of nominal MVAR of caps that are open or disconnected.
- Static VAR Systems Considers only SVS that are not open or removed from the system.
- the injection reactive reserve is (MVAR MAX ⁇ MVAR Out) and the absorption reactive reserve is (MVAR Out ⁇ MVAR).
- a stacked bar chart provides detailed information about the MVARs availability on a per-station basis and on a per-device-type, associated with the station basis.
- the height of the bar above the horizontal axis represents the amount of MVARs available to inject into the system from the station.
- the height of the bar below the horizontal axis represents the amount of MVARs available to absorb (remove) from the system at the station. For each station, the amount of MVARs that can be injected or absorbed is shown below the chart, injected/absorbed.
- the chart is sorted from the station with the most available injection to the station with the least available injection. Clicking on the bar will cause the corresponding substation's one-line display to be called into the dashboard area. The operator can therefore rapidly identify which device needs to be operated on, using a familiar SCADA diagram. (Note: No control actions are allowed, the one-lines are read-only displays.)
- the selected area can be saved in the reserves tab in the control panel and recalled for future use. Once recalled the display is automatically restored to the state when it was saved and the MVAR Reserves are updated throughout the system using the most recent real-time values.
- an operator can detect and analyze a base case violation using a Reliability Assessment module. If a new violation appears following the execution of the State Estimator (SE), an alert is displayed of the viewport, as shown in FIG. 15 .
- SE State Estimator
- the State Estimator has detected one or more new violations.
- the operator selects the Base Case Alert button on the Alert Panel.
- the main Overview display is updated to show violation markers.
- a voltage contour at the highest KV level for which there are voltage violations is displayed.
- the Monitored Elements tab is updated with the list of Monitored Elements in the Alarm, Violation, or Warning State.
- Round Markers are used to represent violations in an overview display.
- the branch violation marker is presented on the center of the branch.
- the voltage violation markers and transformer violation markers are presented on the related substation.
- Red marker with label “0.9N” on white background, representing a voltage alarm for a voltage value that exceeds the normal limit by 0.9% (v ⁇ limit 0.09 ⁇ limit)
- Red marker with no label and white background, representing multiple violations with different violation types and at least one alarm.
- Marker Fill White background for voltage violation and/or multiple violations that have different violation types.
- FIG. 16 shows a selected branch Alarm on the branch DOUGLAS-HANOVER.
- the control panel on the left is automatically open on the list of monitored elements and positioned on this branch.
- the control panel monitored element list shows the vital data related to all violations selected in the overview display. For each monitored element, the name and the highest percent over the limit value being violated is displayed on the top line.
- details for each violation can include:
- an operator can detect and analyze a contingency case violation using a Reliability Assessment module. If a new violation appears following the execution of the Contingency Analysis (CA), an alert is displayed on the top right corner as shown in FIG. 15 . The operator selects the contingency alert button to begin analyzing Post Contingency Violations. Elements in Alarm, Violation, or Warning States as calculated by CA. The Contingent Tab in the Control Panel is updated with the list of contingencies impacting Monitored Elements in violations.
- CA Contingency Analysis
- the operator can drill down the Post Contingency Case violations in both a graphical and a list format.
- markers associated with the monitored elements in post contingency violations are displayed.
- the violation markers associated with the monitored elements on the overview display in the post contingency case have the same meaning as the marker in the base case.
- the operator selects a violation marker, as shown in FIG. 18 below, for the Alarm on branch DOUGLAS-HANOVER.
- the control panel shows the element monitored with the following information:
- a contingent element is a power system element that represents a defined contingency in the CA application.
- a square marker appears on the branch or substation.
- violation markers apply:
- FIG. 21 shows the Contingency Tab in the control panel.
Priority Applications (15)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/139,159 US20090030758A1 (en) | 2007-07-26 | 2008-06-13 | Methods for assessing potentially compromising situations of a utility company |
EP08782097.3A EP2176716B1 (fr) | 2007-07-26 | 2008-07-18 | Procédé d'evaluation de situations compromettantes dans un réseau électrique |
PCT/US2008/070544 WO2009015040A2 (fr) | 2007-07-26 | 2008-07-18 | Procédés pour évaluer des situations potentiellement compromettantes d'une entreprise de service public |
PCT/US2008/070526 WO2009015033A1 (fr) | 2007-07-26 | 2008-07-18 | Système de gestion d'énergie qui permet une prise de connaissance en temps réel d'une situation de panne potentielle de gestion d'énergie |
PCT/US2008/070551 WO2009015043A1 (fr) | 2007-07-26 | 2008-07-18 | Procédés permettant de gérer des conditions de haute et basse tension à partir de zones sélectionnées d'un réseau d'énergie d'une entreprise de services publiques |
PCT/US2008/070537 WO2009015038A1 (fr) | 2007-07-26 | 2008-07-18 | Système de gestion d'énergie fournissant une évaluation en temps réel d'une situation potentiellement compromettante touchant des entreprises de services publics |
EP08782095A EP2176722A4 (fr) | 2007-07-26 | 2008-07-18 | Système de gestion d'énergie fournissant une évaluation en temps réel d'une situation potentiellement compromettante touchant des entreprises de services publics |
PCT/US2008/070552 WO2009015044A1 (fr) | 2007-07-26 | 2008-07-18 | Procédés permettant d'évaluer la fiabilité d'un réseau d'énergie d'une entreprise de services publics |
EP08796327.8A EP2179339B1 (fr) | 2007-07-26 | 2008-07-18 | Procédés pour évaluer des situations potentiellement compromettantes d'une entreprise de service public |
EP08796333.6A EP2183651B1 (fr) | 2007-07-26 | 2008-07-18 | Procédés permettant de gérer des conditions de haute et basse tension à partir de zones sélectionnées d'un réseau d'énergie d'une entreprise de services publiques |
EP08796334A EP2176717A4 (fr) | 2007-07-26 | 2008-07-18 | Procédés permettant d'évaluer la fiabilité d'un réseau d'énergie d'une entreprise de services publics |
EP08782090.8A EP2179340A4 (fr) | 2007-07-26 | 2008-07-18 | Système de gestion d'énergie qui permet une prise de connaissance en temps réel d'une situation de panne potentielle de gestion d'énergie |
PCT/US2008/070547 WO2009015042A1 (fr) | 2007-07-26 | 2008-07-18 | Procédés permettant de créer des listes dynamiques à partir de zones sélectionnées d'un réseau d'énergie d'une entreprise de services publics |
CN200910145993A CN101677192A (zh) | 2008-06-13 | 2009-06-12 | 用于评估电力公司的可能处于险境事态的方法 |
US14/231,387 US9710212B2 (en) | 2007-07-26 | 2014-03-31 | Methods for assessing potentially compromising situations of a utility company |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US95202107P | 2007-07-26 | 2007-07-26 | |
US12/139,159 US20090030758A1 (en) | 2007-07-26 | 2008-06-13 | Methods for assessing potentially compromising situations of a utility company |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/231,387 Division US9710212B2 (en) | 2007-07-26 | 2014-03-31 | Methods for assessing potentially compromising situations of a utility company |
Publications (1)
Publication Number | Publication Date |
---|---|
US20090030758A1 true US20090030758A1 (en) | 2009-01-29 |
Family
ID=40296088
Family Applications (12)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/139,111 Active US8112253B2 (en) | 2007-07-26 | 2008-06-13 | Energy management system that provides real time situation awareness of a potential energy management failure |
US12/139,194 Active 2030-12-27 US8321804B2 (en) | 2007-07-26 | 2008-06-13 | Methods for assessing reliability of a utility company's power system |
US12/139,189 Active 2028-12-18 US8078332B2 (en) | 2007-07-26 | 2008-06-13 | Methods for managing high or low voltage conditions from selected areas of a power system of a utility company |
US12/139,159 Abandoned US20090030758A1 (en) | 2007-07-26 | 2008-06-13 | Methods for assessing potentially compromising situations of a utility company |
US12/139,167 Active 2031-09-13 US8321800B2 (en) | 2007-07-26 | 2008-06-13 | Methods for creating dynamic lists from selected areas of a power system of a utility company |
US12/139,118 Active 2031-04-20 US9367935B2 (en) | 2007-07-26 | 2008-06-13 | Energy management system that provides a real time assessment of a potentially compromising situation that can affect a utility company |
US13/590,321 Active 2030-06-26 US9367936B2 (en) | 2007-07-26 | 2012-08-21 | Methods for assessing reliability of a utility company's power system |
US13/658,489 Active 2030-07-17 US9311728B2 (en) | 2007-07-26 | 2012-10-23 | Methods for creating dynamic lists from selected areas of a power system of a utility company |
US14/231,387 Active 2029-10-22 US9710212B2 (en) | 2007-07-26 | 2014-03-31 | Methods for assessing potentially compromising situations of a utility company |
US15/091,552 Active 2029-04-14 US10846039B2 (en) | 2007-07-26 | 2016-04-05 | Methods for creating dynamic lists from selected areas of a power system of a utility company |
US15/151,984 Expired - Fee Related US10552109B2 (en) | 2007-07-26 | 2016-05-11 | Methods for assessing reliability of a utility company's power system |
US16/742,221 Abandoned US20200218483A1 (en) | 2007-07-26 | 2020-01-14 | Methods for assessing reliability of a utility company's power system |
Family Applications Before (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/139,111 Active US8112253B2 (en) | 2007-07-26 | 2008-06-13 | Energy management system that provides real time situation awareness of a potential energy management failure |
US12/139,194 Active 2030-12-27 US8321804B2 (en) | 2007-07-26 | 2008-06-13 | Methods for assessing reliability of a utility company's power system |
US12/139,189 Active 2028-12-18 US8078332B2 (en) | 2007-07-26 | 2008-06-13 | Methods for managing high or low voltage conditions from selected areas of a power system of a utility company |
Family Applications After (8)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/139,167 Active 2031-09-13 US8321800B2 (en) | 2007-07-26 | 2008-06-13 | Methods for creating dynamic lists from selected areas of a power system of a utility company |
US12/139,118 Active 2031-04-20 US9367935B2 (en) | 2007-07-26 | 2008-06-13 | Energy management system that provides a real time assessment of a potentially compromising situation that can affect a utility company |
US13/590,321 Active 2030-06-26 US9367936B2 (en) | 2007-07-26 | 2012-08-21 | Methods for assessing reliability of a utility company's power system |
US13/658,489 Active 2030-07-17 US9311728B2 (en) | 2007-07-26 | 2012-10-23 | Methods for creating dynamic lists from selected areas of a power system of a utility company |
US14/231,387 Active 2029-10-22 US9710212B2 (en) | 2007-07-26 | 2014-03-31 | Methods for assessing potentially compromising situations of a utility company |
US15/091,552 Active 2029-04-14 US10846039B2 (en) | 2007-07-26 | 2016-04-05 | Methods for creating dynamic lists from selected areas of a power system of a utility company |
US15/151,984 Expired - Fee Related US10552109B2 (en) | 2007-07-26 | 2016-05-11 | Methods for assessing reliability of a utility company's power system |
US16/742,221 Abandoned US20200218483A1 (en) | 2007-07-26 | 2020-01-14 | Methods for assessing reliability of a utility company's power system |
Country Status (3)
Country | Link |
---|---|
US (12) | US8112253B2 (fr) |
EP (6) | EP2176717A4 (fr) |
WO (6) | WO2009015044A1 (fr) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150067497A1 (en) * | 2012-05-09 | 2015-03-05 | Apple Inc. | Device, Method, and Graphical User Interface for Providing Tactile Feedback for Operations Performed in a User Interface |
Families Citing this family (80)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090189774A1 (en) * | 2008-01-28 | 2009-07-30 | Dell Products L.P. | Power Topology Determination |
WO2009117741A1 (fr) * | 2008-03-21 | 2009-09-24 | The Trustees Of Columbia University In The City Of New York | Centres de contrôle d'aide à la décision |
WO2009117742A1 (fr) * | 2008-03-21 | 2009-09-24 | The Trustees Of Columbia University In The City Of New York | Procédés et systèmes de détermination de l’efficacité de projets d’amélioration du capital |
US8121741B2 (en) * | 2008-05-09 | 2012-02-21 | International Business Machines Corporation | Intelligent monitoring of an electrical utility grid |
US10114875B2 (en) * | 2008-06-27 | 2018-10-30 | Microsoft Technology Licensing, Llc | Dashboard controls to manipulate visual data |
WO2010096783A1 (fr) * | 2009-02-20 | 2010-08-26 | The Trustees Of Columbia University In The City Of New York | Système de prévention et d'atténuation de contingence dynamique |
US8560949B2 (en) | 2009-04-17 | 2013-10-15 | Abb Research Ltd. | Power grid visualization |
WO2010121670A1 (fr) * | 2009-04-22 | 2010-10-28 | Abb Research Ltd | Procédé de visualisation de flux de transmission dans un système, terminal opérateur et système de commande de supervision |
US8725625B2 (en) | 2009-05-28 | 2014-05-13 | The Trustees Of Columbia University In The City Of New York | Capital asset planning system |
US8838282B1 (en) * | 2009-11-16 | 2014-09-16 | Comverge, Inc. | Method and system for providing a central controller that can communicate across heterogenous networks for reaching various energy load control devices |
US9497092B2 (en) * | 2009-12-08 | 2016-11-15 | Hand Held Products, Inc. | Remote device management interface |
WO2011106511A1 (fr) | 2010-02-24 | 2011-09-01 | The Trustees Of Columbia University In The City Of New York | Système de surveillance de métriques et de validation financière (m2fvs) pour le suivi des performances du capital, des opérations et des investissements d'entretien dans une infrastructure |
US8371384B2 (en) | 2010-03-31 | 2013-02-12 | Halliburton Energy Services, Inc. | Methods for strengthening fractures in subterranean formations |
US8393394B2 (en) | 2010-03-31 | 2013-03-12 | Halliburton Energy Services, Inc. | Methods for strengthening fractures in subterranean formations |
US8315791B2 (en) * | 2010-06-18 | 2012-11-20 | Nokia Coporation | Method and apparatus for providing smart zooming of a geographic representation |
EP2593844A4 (fr) | 2010-07-16 | 2017-05-31 | The Trustees of Columbia University in the City of New York | Apprentissage automatique pour réseaux électriques |
USD668674S1 (en) | 2010-07-26 | 2012-10-09 | Apple Inc. | Display screen or portion thereof with icon |
US20120245745A1 (en) * | 2010-12-17 | 2012-09-27 | Greenvolts, Inc. | User interface for a mobile computing device |
EP2656155B1 (fr) * | 2010-12-22 | 2015-07-29 | ABB Research Ltd. | Procédé et système de surveillance d'un système industriel mettant en oeuvre un système de suivi oculaire |
US9477932B2 (en) * | 2011-01-17 | 2016-10-25 | General Electric Company | System and method for providing visualization of a parameter on multiple branches of a distribution network |
US8874242B2 (en) * | 2011-03-18 | 2014-10-28 | Rockwell Automation Technologies, Inc. | Graphical language for optimization and use |
US8706454B2 (en) * | 2011-06-29 | 2014-04-22 | Southern Company Services, Inc. | Transmission evaluation |
US9083183B2 (en) * | 2011-08-30 | 2015-07-14 | General Electric Company | Systems and methods for presenting contingency analysis results |
USD667420S1 (en) * | 2011-09-12 | 2012-09-18 | Microsoft Corporation | Display screen with graphical user interface |
USD667421S1 (en) * | 2011-09-12 | 2012-09-18 | Microsoft Corporation | Display screen with graphical user interface |
USD667839S1 (en) * | 2011-09-12 | 2012-09-25 | Microsoft Corporation | Display screen with transitional graphical user interface |
US20130174085A1 (en) * | 2011-11-03 | 2013-07-04 | Joan Elizabeth Pearsall | Interactive online showing |
CN102542122B (zh) * | 2012-02-10 | 2014-03-12 | 宁波电业局 | 一种停电区域渲染方法和装置 |
US10090704B2 (en) * | 2012-02-21 | 2018-10-02 | Hitachi, Ltd. | Display device and display method of electric power system information |
US20130219279A1 (en) * | 2012-02-21 | 2013-08-22 | Ambient Corporation | Aggregating nodes for efficient network management system visualization and operations |
USD715819S1 (en) | 2012-02-23 | 2014-10-21 | Microsoft Corporation | Display screen with graphical user interface |
USD730364S1 (en) | 2012-06-05 | 2015-05-26 | Apple Inc. | Display screen or portion thereof with a graphical user interface |
USD712421S1 (en) * | 2012-06-06 | 2014-09-02 | Apple Inc. | Display screen or portion thereof with graphical user interface |
USD739859S1 (en) | 2012-06-06 | 2015-09-29 | Apple Inc. | Display screen or portion thereof with graphical user interface |
AU346719S (en) | 2012-06-08 | 2013-02-04 | Apple Inc | Display screen for an electronic device |
US9043722B1 (en) | 2012-06-19 | 2015-05-26 | Surfwax, Inc. | User interfaces for displaying relationships between cells in a grid |
US9625887B2 (en) * | 2012-08-03 | 2017-04-18 | Carnegie Mellon University | Contingency screening in multi-control area electrical power systems using coordinated DC power flow |
JP6044641B2 (ja) * | 2012-10-01 | 2016-12-14 | 富士通株式会社 | 配電管理装置、配電管理方法及び配電管理プログラム |
CN103093396B (zh) * | 2013-01-29 | 2016-06-08 | 广东电网公司电力调度控制中心 | 评估电网节点可靠性的方法和系统 |
US20140245160A1 (en) * | 2013-02-22 | 2014-08-28 | Ubiquiti Networks, Inc. | Mobile application for monitoring and controlling devices |
US9240164B2 (en) * | 2013-02-27 | 2016-01-19 | Honeywell International Inc. | Apparatus and method for providing a pan and zoom display for a representation of a process system |
US9985860B2 (en) * | 2013-09-23 | 2018-05-29 | Schweitzer Engineering Laboratories, Inc. | Selection and display of polled and streamed electric power system measurements |
CN103746458A (zh) * | 2014-01-21 | 2014-04-23 | 国家电网公司 | 一种电网运行状况的实时表示方法 |
US9632922B2 (en) * | 2014-02-28 | 2017-04-25 | International Business Machines Corporation | Workload mapper for potential problem areas using modules and defect data |
USD716823S1 (en) | 2014-05-02 | 2014-11-04 | Nike, Inc. | Display screen with graphical user interface |
USD716820S1 (en) | 2014-05-02 | 2014-11-04 | Nike, Inc. | Display screen with graphical user interface |
USD715314S1 (en) | 2014-05-02 | 2014-10-14 | Nike, Inc. | Display screen with color graphical user interface |
USD717812S1 (en) | 2014-05-02 | 2014-11-18 | Nike, Inc. | Display screen with color graphical user interface |
USD715813S1 (en) | 2014-05-02 | 2014-10-21 | Nike, Inc. | Display screen with graphical user interface |
USD714328S1 (en) | 2014-05-02 | 2014-09-30 | Nike, Inc. | Display screen with color graphical user interface |
USD715812S1 (en) | 2014-05-02 | 2014-10-21 | Nike, Inc. | Display screen with color graphical user interface |
USD714326S1 (en) | 2014-05-02 | 2014-09-30 | Nike, Inc. | Display screen with graphical user interface |
USD718319S1 (en) | 2014-05-02 | 2014-11-25 | Nike, Inc. | Display screen with color graphical user interface |
USD714327S1 (en) | 2014-05-02 | 2014-09-30 | Nike, Inc. | Display screen with color graphical user interface |
USD714330S1 (en) | 2014-05-02 | 2014-09-30 | Nike, Inc. | Display screen with graphical user interface |
USD716821S1 (en) * | 2014-05-02 | 2014-11-04 | Nike, Inc. | Display screen with graphical user interface |
USD716822S1 (en) | 2014-05-02 | 2014-11-04 | Nike, Inc. | Display screen with graphical user interface |
USD714329S1 (en) * | 2014-05-02 | 2014-09-30 | Nike, Inc. | Display screen with color graphical user interface |
USD713851S1 (en) | 2014-05-02 | 2014-09-23 | Nike, Inc. | Display screen with graphical user interface |
US10684617B2 (en) | 2014-05-28 | 2020-06-16 | Siemens Aktiengesellschaft | Method and supervisory control device for monitoring an installation |
USD772269S1 (en) | 2015-06-05 | 2016-11-22 | Apple Inc. | Display screen or portion thereof with graphical user interface |
US10534518B2 (en) * | 2015-07-06 | 2020-01-14 | Honeywell International Inc. | Graphical model explorer |
CN106199248A (zh) * | 2016-06-28 | 2016-12-07 | 国网山东省电力公司昌邑市供电公司 | 电网负载可视化实现方法及装置 |
KR101873655B1 (ko) * | 2016-11-30 | 2018-07-02 | 엘에스산전 주식회사 | 모니터링 화면 표시 방법 |
CN108256536B (zh) * | 2016-12-28 | 2021-10-29 | 全球能源互联网研究院 | 一种基于地理位置关系的电力网络态势感知方法和装置 |
US10163242B2 (en) * | 2017-01-31 | 2018-12-25 | Gordon Todd Jagerson, Jr. | Energy grid data platform |
US10579239B1 (en) | 2017-03-23 | 2020-03-03 | Palantir Technologies Inc. | Systems and methods for production and display of dynamically linked slide presentations |
WO2018181598A1 (fr) * | 2017-03-28 | 2018-10-04 | 東芝エネルギーシステムズ株式会社 | Système de surveillance, dispositif de fourniture d'informations d'image, dispositif de commande client, programme de fourniture d'informations d'image et programme de commande client |
US10664553B2 (en) | 2017-10-06 | 2020-05-26 | Schweitzer Engineering Laboratories, Inc. | Generating a representation of high-frequency signal data from an electric power delivery system |
CN108418204B (zh) * | 2018-02-12 | 2020-10-02 | 浙江大学 | 一种基于态势感知的微电网状态评估方法 |
CN108416529B (zh) * | 2018-03-16 | 2021-07-27 | 太原理工大学 | 计及需求响应的风电并网系统节点短期可靠性评估方法 |
US10942952B1 (en) | 2018-08-16 | 2021-03-09 | Palantir Technologies Inc. | Graph analysis of geo-temporal information |
US11222470B1 (en) | 2018-08-21 | 2022-01-11 | Palantir Technologies Inc. | Systems and methods for generating augmented reality content |
CN110162902B (zh) * | 2019-05-28 | 2020-03-27 | 河南城建学院 | 一种基于云计算的配电系统可靠性评估方法 |
USD949159S1 (en) | 2019-06-02 | 2022-04-19 | Apple Inc. | Display screen or portion thereof with graphical user interface |
US11693763B2 (en) | 2019-07-30 | 2023-07-04 | General Electric Company | Resilient estimation for grid situational awareness |
USD949185S1 (en) | 2020-06-21 | 2022-04-19 | Apple Inc. | Display screen or portion thereof with graphical user interface |
CN112235160B (zh) * | 2020-10-14 | 2022-02-01 | 福建奇点时空数字科技有限公司 | 一种基于协议数据深层检测的流量识别方法 |
USD990511S1 (en) | 2021-06-06 | 2023-06-27 | Apple Inc. | Display or portion thereof with graphical user interface |
US11899517B2 (en) | 2021-08-26 | 2024-02-13 | Schweitzer Engineering Laboratories, Inc. | Event analysis and display |
Citations (92)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4078260A (en) * | 1976-05-12 | 1978-03-07 | International Business Machines Corporation | Apparatus for transposition sorting of equal length records in overlap relation with record loading and extraction |
US4455614A (en) * | 1973-09-21 | 1984-06-19 | Westinghouse Electric Corp. | Gas turbine and steam turbine combined cycle electric power generating plant having a coordinated and hybridized control system and an improved factory based method for making and testing combined cycle and other power plants and control systems therefor |
US4804938A (en) * | 1986-10-24 | 1989-02-14 | Sangamo Weston, Inc. | Distribution energy management system |
US5136497A (en) * | 1990-07-12 | 1992-08-04 | Bdm International, Inc. | Material consolidation modeling and control system |
US5185886A (en) * | 1989-06-30 | 1993-02-09 | Digital Equipment Corporation | Multiple record group rebound sorter |
US5384697A (en) * | 1990-01-30 | 1995-01-24 | Johnson Service Company | Networked facilities management system with balanced differential analog control outputs |
US5414640A (en) * | 1991-07-05 | 1995-05-09 | Johnson Service Company | Method and apparatus for adaptive demand limiting electric consumption through load shedding |
US5594659A (en) * | 1994-04-29 | 1997-01-14 | Michigan State University | Method for performing a voltage stability security assessment for a power transmission system |
US5655136A (en) * | 1992-12-22 | 1997-08-05 | Morgan; Michael W. | Method and apparatus for recognizing and performing handwritten calculations |
US5904727A (en) * | 1995-05-17 | 1999-05-18 | Mobile Information Systems, Inc. | Graphical fleet management methods |
US5933355A (en) * | 1995-05-04 | 1999-08-03 | Deb; Anjan Kumar | Object oriented expert power line ampacity system |
US5937414A (en) * | 1997-02-28 | 1999-08-10 | Oracle Corporation | Method and apparatus for providing database system replication in a mixed propagation environment |
US5963457A (en) * | 1994-03-18 | 1999-10-05 | Hitachi, Ltd. | Electrical power distribution monitoring system and method |
US6021402A (en) * | 1997-06-05 | 2000-02-01 | International Business Machines Corporaiton | Risk management system for electric utilities |
US6178362B1 (en) * | 1998-09-24 | 2001-01-23 | Silicon Energy Corp. | Energy management system and method |
US6259972B1 (en) * | 1998-01-16 | 2001-07-10 | Enghouse Systems Usa, Inc. | Method for processing and disseminating utility outage information |
US6289267B1 (en) * | 1998-03-19 | 2001-09-11 | Siemens Energy & Automation, Inc. | Graphical energy information display system having a menu for user selection of energy related information for an AC load control device |
US6313752B1 (en) * | 1998-05-21 | 2001-11-06 | Steven P. Corrigan | System for displaying dynamic on-line operating conditions of an interconnected power transmission network |
US20010045949A1 (en) * | 2000-03-29 | 2001-11-29 | Autodesk, Inc. | Single gesture map navigation graphical user interface for a personal digital assistant |
US6353847B1 (en) * | 1998-03-06 | 2002-03-05 | Fujitsu Limited | System optimization apparatus employing load prediction |
US20020029097A1 (en) * | 2000-04-07 | 2002-03-07 | Pionzio Dino J. | Wind farm control system |
US20020032535A1 (en) * | 1998-03-19 | 2002-03-14 | James O. Alexander | Energy information management method for use with a circuit breaker |
US20020042789A1 (en) * | 2000-10-04 | 2002-04-11 | Zbigniew Michalewicz | Internet search engine with interactive search criteria construction |
US20020085326A1 (en) * | 2000-05-12 | 2002-07-04 | Jeong-Wan Kim | Circuit breaker with display function |
US6528957B1 (en) * | 1999-09-08 | 2003-03-04 | Lutron Electronics, Co., Inc. | Power/energy management control system |
US6549880B1 (en) * | 1999-09-15 | 2003-04-15 | Mcgraw Edison Company | Reliability of electrical distribution networks |
US6577962B1 (en) * | 2000-09-28 | 2003-06-10 | Silicon Energy, Inc. | System and method for forecasting energy usage load |
US20030115306A1 (en) * | 2001-12-19 | 2003-06-19 | Richard Hagarty | Modification of map of storage area network resources |
US6591255B1 (en) * | 1999-04-05 | 2003-07-08 | Netuitive, Inc. | Automatic data extraction, error correction and forecasting system |
US20030158631A1 (en) * | 2000-03-10 | 2003-08-21 | Yoshinobu Masuda | Electricity charge management apparatus and its recording medium |
US20030171851A1 (en) * | 2002-03-08 | 2003-09-11 | Peter J. Brickfield | Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems |
US6620327B2 (en) * | 1998-10-28 | 2003-09-16 | Marvin E. Haddock | Multi-stage engine coolant recycling apparatus and process |
US6681154B2 (en) * | 2000-06-22 | 2004-01-20 | Stonewater Control Systems, Inc. | System and method for monitoring and controlling energy distribution |
US6681156B1 (en) * | 2000-09-28 | 2004-01-20 | Siemens Aktiengesellschaft | System and method for planning energy supply and interface to an energy management system for use in planning energy supply |
US20040093124A1 (en) * | 2002-11-12 | 2004-05-13 | Honeywell International Inc. | Coordination in multilayer process control and optimization schemes |
US6741485B1 (en) * | 1995-04-21 | 2004-05-25 | General Electric Company | Interconnection system for transmitting power between electrical systems |
US20040117330A1 (en) * | 2002-03-28 | 2004-06-17 | Ehlers Gregory A. | System and method for controlling usage of a commodity |
US20040158360A1 (en) * | 2003-02-04 | 2004-08-12 | Charles Garland | System and method of energy management and allocation within an energy grid |
US20050033481A1 (en) * | 2003-08-08 | 2005-02-10 | Budhraja Vikram S. | Real-time performance monitoring and management system |
US20050039787A1 (en) * | 2003-08-20 | 2005-02-24 | New Energy Options, Inc. | Method and system for predicting solar energy production |
US20050055330A1 (en) * | 2001-05-15 | 2005-03-10 | Britton Colin P. | Surveillance, monitoring and real-time events platform |
US20050071124A1 (en) * | 2003-09-29 | 2005-03-31 | Mori Seiki Co., Ltd. | Operating state management system for machine tool |
US6885915B2 (en) * | 2001-06-07 | 2005-04-26 | Abb Research Ltd | Configuration of a part of an electrical power distribution network |
US6901347B1 (en) * | 2000-02-22 | 2005-05-31 | Sun Microsystems, Inc. | Availability, reliability or maintainability index including outage characterization |
US6925385B2 (en) * | 2003-05-16 | 2005-08-02 | Seawest Holdings, Inc. | Wind power management system and method |
US20050169743A1 (en) * | 2002-10-02 | 2005-08-04 | Centripetal Dynamics, Inc. | Method of and apparatus for a multi-stage boundary layer engine and process cell |
US20050197742A1 (en) * | 2003-02-13 | 2005-09-08 | Iso New England Inc. | Methods and systems for the management of a bulk electric power market |
US20050234600A1 (en) * | 2004-04-16 | 2005-10-20 | Energyconnect, Inc. | Enterprise energy automation |
US20050240539A1 (en) * | 2004-04-22 | 2005-10-27 | Thomas Olavson | Method and system for forecasting commodity prices using capacity utilization data |
US20050240381A1 (en) * | 2004-04-26 | 2005-10-27 | Pjm Interconnection, Llc. | Systems and methods for analysis of a commodity transmission network |
US20060005738A1 (en) * | 2001-03-27 | 2006-01-12 | Kumar Ajith K | Railroad vehicle with energy regeneration |
US20060072828A1 (en) * | 1999-10-25 | 2006-04-06 | Silverbrook Research Pty Ltd | Method and system for digitizing freehand graphics with user-selected properties |
US7058522B2 (en) * | 2003-05-13 | 2006-06-06 | Siemens Power Transmission & Distribution, Inc. | Very short term load prediction |
US20060156248A1 (en) * | 2004-06-25 | 2006-07-13 | Chaudhri Imran A | Configuration bar for lauching layer for accessing user interface elements |
US20060167591A1 (en) * | 2005-01-26 | 2006-07-27 | Mcnally James T | Energy and cost savings calculation system |
US20060174209A1 (en) * | 1999-07-22 | 2006-08-03 | Barros Barbara L | Graphic-information flow method and system for visually analyzing patterns and relationships |
US20060200308A1 (en) * | 2005-03-03 | 2006-09-07 | Arutunian Ethan B | Server-based interactive enhanced map imagery engine |
US20060206240A1 (en) * | 2002-05-20 | 2006-09-14 | Tsui Jonah C | System and method for managing and optimizing power use |
US7177727B2 (en) * | 2005-04-08 | 2007-02-13 | Chang Gung University | Method for calculating power flow solution of a power transmission network that includes unified power flow controllers |
US7177728B2 (en) * | 2003-12-30 | 2007-02-13 | Jay Warren Gardner | System and methods for maintaining power usage within a set allocation |
US7194338B2 (en) * | 2003-06-27 | 2007-03-20 | Intellicon, Inc. | Voltage collapse diagnostic and ATC system |
US20070083821A1 (en) * | 2005-10-07 | 2007-04-12 | International Business Machines Corporation | Creating viewports from selected regions of windows |
US20070143046A1 (en) * | 1998-05-29 | 2007-06-21 | Powerweb, Inc. | Multi-utility energy control and facility automation system with dashboard having a plurality of interface gateways |
US20070156291A1 (en) * | 2003-10-06 | 2007-07-05 | Power Monitors, Inc. | System and method for providing remote monitoring of voltage power transmission and distribution devices |
US20070213956A1 (en) * | 2006-03-10 | 2007-09-13 | Edsa Micro Corporation | Systems and methods for real-time protective device evaluation in an electrical power distribution system |
US20070236507A1 (en) * | 2006-04-11 | 2007-10-11 | Idelix Software Inc. | Method and system for transparency adjustment and occlusion resolution for urban landscape visualization |
US7283930B2 (en) * | 2003-01-13 | 2007-10-16 | Arm Limited | Data processing performance control |
US20080077368A1 (en) * | 2006-04-12 | 2008-03-27 | Edsa Micro Corporation | Automatic real-time optimization and intelligent control of electrical power distribution and transmission systems |
US20080167756A1 (en) * | 2007-01-03 | 2008-07-10 | Gridpoint, Inc. | Utility console for controlling energy resources |
US20080174564A1 (en) * | 2007-01-20 | 2008-07-24 | Lg Electronics Inc. | Mobile communication device equipped with touch screen and method of controlling operation thereof |
US20080189656A1 (en) * | 2006-10-31 | 2008-08-07 | Abanami Thamer A | Adaptable Transparency |
US20080263469A1 (en) * | 2006-07-19 | 2008-10-23 | Edsa Micro Corporation | Systems and methods for creation of a schematic user interface for monitoring and predicting the real-time health, reliability and performance of an electrical power system |
US20090062969A1 (en) * | 2007-08-28 | 2009-03-05 | General Electric Company | Hybrid robust predictive optimization method of power system dispatch |
US20090073191A1 (en) * | 2005-04-21 | 2009-03-19 | Microsoft Corporation | Virtual earth rooftop overlay and bounding |
US20090093916A1 (en) * | 2003-10-15 | 2009-04-09 | Ice Energy, Inc. | Utility managed virtual power plant utilizing aggregated thermal energy storage |
US7519438B2 (en) * | 2005-11-09 | 2009-04-14 | Abb Technology Ag | Method and a tool for calculating and displaying fault response tolerances for a power switching device |
US7558703B2 (en) * | 2006-11-01 | 2009-07-07 | Abb Research Ltd. | Electrical substation monitoring and diagnostics |
US20090234511A1 (en) * | 2006-06-28 | 2009-09-17 | Sanyo Electric Co., Ltd. | Demand control device |
US20100076835A1 (en) * | 2008-05-27 | 2010-03-25 | Lawrence Silverman | Variable incentive and virtual market system |
US7689394B2 (en) * | 2003-08-26 | 2010-03-30 | Siemens Industry, Inc. | System and method for remotely analyzing machine performance |
US20100179704A1 (en) * | 2009-01-14 | 2010-07-15 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
US7774307B2 (en) * | 2001-07-24 | 2010-08-10 | Siebel Systems, Inc. | Method and apparatus for synchronizing a database with a third party database |
US20100222935A1 (en) * | 2007-08-28 | 2010-09-02 | Forbes Jr Joseph W | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US20100274402A1 (en) * | 2009-04-27 | 2010-10-28 | Cisco Technology, Inc. | System for utilizing predictive energy consumption |
US20110029142A1 (en) * | 2010-07-02 | 2011-02-03 | David Sun | System tools that provides dispatchers in power grid control centers with a capability to make changes |
US20110029141A1 (en) * | 2010-07-02 | 2011-02-03 | David Sun | Method for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US20110029147A1 (en) * | 2010-07-02 | 2011-02-03 | David Sun | Multi-interval dispatch method for enabling dispatchers in power grid control centers to manage changes |
US20110035071A1 (en) * | 2010-07-02 | 2011-02-10 | David Sun | System tools for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US20110071690A1 (en) * | 2010-07-02 | 2011-03-24 | David Sun | Methods that provide dispatchers in power grid control centers with a capability to manage changes |
US20110202467A1 (en) * | 2010-01-19 | 2011-08-18 | Hilber Del A | Automated load control and dispatch system and method |
US20110231028A1 (en) * | 2009-01-14 | 2011-09-22 | Ozog Michael T | Optimization of microgrid energy use and distribution |
US8222765B2 (en) * | 2009-02-13 | 2012-07-17 | First Solar, Inc. | Photovoltaic power plant output |
Family Cites Families (151)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1156131A (en) | 1913-09-25 | 1915-10-12 | Lamb & Nash Company | Wire-bound article. |
US3932735A (en) | 1970-08-24 | 1976-01-13 | Westinghouse Electric Corporation | Method of controlling supply of power |
US4075699A (en) | 1976-06-24 | 1978-02-21 | Lockheed Electronics Co., Inc. | Power monitoring and load shedding system |
US4125782A (en) | 1977-02-15 | 1978-11-14 | Allen-Bradley Company | Demand/schedule controller |
US4181950A (en) | 1977-09-30 | 1980-01-01 | Westinghouse Electric Corp. | Adaptive priority determination power demand control method |
US4204127A (en) | 1978-04-14 | 1980-05-20 | Westinghouse Electric Corp. | Load regulation as part of an adaptive priority determination power demand control system |
US4347575A (en) | 1979-07-02 | 1982-08-31 | Sangamo Weston, Inc. | System for controlling power distribution to customer loads |
US4264960A (en) | 1979-07-02 | 1981-04-28 | Sangamo Weston, Inc. | System for controlling power distribution to customer loads |
US4341345A (en) | 1980-02-19 | 1982-07-27 | Honeywell Inc. | Method and apparatus for power load shedding |
US4347576A (en) | 1980-04-28 | 1982-08-31 | Honeywell Inc. | Load management control apparatus with improved duty cycle operation |
US4551812A (en) | 1981-06-17 | 1985-11-05 | Cyborex Laboratories, Inc. | Energy controller and method for dynamic allocation of priorities of controlled load curtailment to ensure adequate load sharing |
US4398141A (en) * | 1981-09-15 | 1983-08-09 | Westinghouse Electric Corp. | Static VAR generators |
NL8202812A (nl) | 1982-07-12 | 1984-02-01 | Philips Nv | Voedingsinrichting voor het toevoeren van gelijkstroom aan abonneecircuits. |
JPH0627973B2 (ja) * | 1985-05-16 | 1994-04-13 | 日本電装株式会社 | 地図表示装置 |
US4876854A (en) | 1988-05-27 | 1989-10-31 | Sundstrand Corp. | Solar energy thermally powered electrical generating system |
JP2609744B2 (ja) * | 1989-07-14 | 1997-05-14 | 株式会社日立製作所 | 画像表示方法及び画像表示装置 |
JP2644935B2 (ja) * | 1991-07-25 | 1997-08-25 | 株式会社日立製作所 | 地形情報処理方法および装置 |
US5422561A (en) * | 1992-11-23 | 1995-06-06 | Southern California Edison Company | Automated voltage and VAR control in power transmission and distribution networks |
JPH06236202A (ja) | 1993-02-10 | 1994-08-23 | Hitachi Ltd | プラントの運転方法及び装置 |
US5729731A (en) | 1994-03-18 | 1998-03-17 | Hitachi, Ltd. | Method of retrieving in a database through image information |
US5568019A (en) | 1994-12-05 | 1996-10-22 | The Regents Of University Of California | Multi-gap high impedance plasma opening switch |
US6961641B1 (en) * | 1994-12-30 | 2005-11-01 | Power Measurement Ltd. | Intra-device communications architecture for managing electrical power distribution and consumption |
AU5174396A (en) | 1995-03-31 | 1996-10-16 | Abb Power T & D Company Inc. | System for optimizing power network design reliability |
US5796628A (en) | 1995-04-20 | 1998-08-18 | Cornell Research Foundation, Inc. | Dynamic method for preventing voltage collapse in electrical power systems |
JP3628386B2 (ja) * | 1995-08-08 | 2005-03-09 | 古野電気株式会社 | 監視画像表示装置 |
WO1997046929A2 (fr) | 1996-06-04 | 1997-12-11 | Werbos Paul J | Architecture a trois cerveaux pour systeme intelligent de commande et de decision |
US5974403A (en) | 1997-07-21 | 1999-10-26 | International Business Machines Corporation | Power trading and forecasting tool |
US7343360B1 (en) | 1998-05-13 | 2008-03-11 | Siemens Power Transmission & Distribution, Inc. | Exchange, scheduling and control system for electrical power |
AUPQ363299A0 (en) * | 1999-10-25 | 1999-11-18 | Silverbrook Research Pty Ltd | Paper based information inter face |
US7263667B1 (en) * | 1999-06-09 | 2007-08-28 | Microsoft Corporation | Methods, apparatus and data structures for providing a user interface which facilitates decision making |
JP2001008384A (ja) * | 1999-06-21 | 2001-01-12 | Toshiba Corp | 系統画面表示装置および記録媒体 |
US20020046157A1 (en) | 1999-11-01 | 2002-04-18 | Neal Solomon | System, method and apparatus for demand-initiated intelligent negotiation agents in a distributed network |
US6813525B2 (en) | 2000-02-25 | 2004-11-02 | Square D Company | Energy management system |
US7499453B2 (en) | 2000-05-19 | 2009-03-03 | Cisco Technology, Inc. | Apparatus and methods for incorporating bandwidth forecasting and dynamic bandwidth allocation into a broadband communication system |
US20020019802A1 (en) | 2000-08-07 | 2002-02-14 | Ross Malme | System and methods for aggregation and liquidation of curtailment energy resources |
AUPQ957600A0 (en) | 2000-08-21 | 2000-09-14 | Perera, Anil Lasantha Michael | Method to enable customers to respond to prices in a pool type market |
US6804255B1 (en) | 2000-10-12 | 2004-10-12 | Alcatel | Hardware implementation of channel scheduling algorithms for optical routers with FDL buffers |
US10135253B2 (en) | 2000-12-29 | 2018-11-20 | Abb Schweiz Ag | System, method and computer program product for enhancing commercial value of electrical power produced from a renewable energy power production facility |
US20020084655A1 (en) | 2000-12-29 | 2002-07-04 | Abb Research Ltd. | System, method and computer program product for enhancing commercial value of electrical power produced from a renewable energy power production facility |
US20020198629A1 (en) * | 2001-04-27 | 2002-12-26 | Enerwise Global Technologies, Inc. | Computerized utility cost estimation method and system |
US20040020206A1 (en) | 2001-05-07 | 2004-02-05 | Sullivan Timothy J. | Heat energy utilization system |
US7802287B2 (en) * | 2001-05-08 | 2010-09-21 | At&T Intellectual Property Ii, L.P. | Method and system for generating geographic visual displays of broadband network data |
US6865450B2 (en) | 2001-05-10 | 2005-03-08 | Siemens Westinghouse Power Corporation | Schedule-based load estimator and method for electric power and other utilities and resources |
US20030055776A1 (en) | 2001-05-15 | 2003-03-20 | Ralph Samuelson | Method and apparatus for bundling transmission rights and energy for trading |
US9760235B2 (en) * | 2001-06-12 | 2017-09-12 | Callahan Cellular L.L.C. | Lens-defined adjustment of displays |
US7430534B2 (en) | 2001-06-15 | 2008-09-30 | Abb Ab | System, method and computer program product for risk-minimization and mutual insurance relations in meteorology dependent activities |
US8914300B2 (en) | 2001-08-10 | 2014-12-16 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US20030036820A1 (en) | 2001-08-16 | 2003-02-20 | International Business Machines Corporation | Method for optimizing energy consumption and cost |
US6492801B1 (en) * | 2001-08-21 | 2002-12-10 | Southern Company Services, Inc. | Method, apparatus, and system for real time reactive power output monitoring and predicting |
US7325050B2 (en) | 2001-09-19 | 2008-01-29 | Dell Products L.P. | System and method for strategic power reduction in a computer system |
US7308361B2 (en) | 2001-10-05 | 2007-12-11 | Enis Ben M | Method of coordinating and stabilizing the delivery of wind generated energy |
US6963802B2 (en) | 2001-10-05 | 2005-11-08 | Enis Ben M | Method of coordinating and stabilizing the delivery of wind generated energy |
WO2003031813A1 (fr) | 2001-10-05 | 2003-04-17 | Ben Enis | Procede et dispositif permettant d'utiliser des eoliennes pour la production et la fourniture ininterrompue d'energie a des points de livraison eloignes du reseau de distribution generale |
US6985837B2 (en) * | 2001-11-01 | 2006-01-10 | Moon Dennis A | System presenting meteorological information using a browser interface |
US20040044442A1 (en) | 2001-12-28 | 2004-03-04 | Bayoumi Deia Salah-Eldin | Optimized dispatch planning of distributed resources in electrical power systems |
US20050034023A1 (en) | 2002-12-16 | 2005-02-10 | Maturana Francisco P. | Energy management system |
CA2515159A1 (fr) * | 2003-02-07 | 2004-08-19 | Power Measurement Ltd. | Procede et systeme de calcul et de distribution de couts d'utilite |
US6924628B2 (en) * | 2003-02-24 | 2005-08-02 | Siemens Westinghouse Power Corporation | Method and system for operating a generator using a dynamic capability curve |
JP2004280618A (ja) | 2003-03-18 | 2004-10-07 | Hitachi Ltd | エネルギー管理システム |
US7089089B2 (en) * | 2003-03-31 | 2006-08-08 | Power Measurement Ltd. | Methods and apparatus for retrieving energy readings from an energy monitoring device |
US8620480B2 (en) | 2003-04-25 | 2013-12-31 | George Alexanian | Irrigation water conservation with automated water budgeting and time of use technology |
WO2004097766A1 (fr) * | 2003-04-28 | 2004-11-11 | ST Electronics (Training & Simulation Systems) Pte Ltd. | Procede de prediction de la position d'un aeronef sur la base de ses caracteristiques |
US7689323B2 (en) * | 2003-05-13 | 2010-03-30 | Siemens Aktiengesellschaft | Automatic generation control of a power distribution system |
US7454270B2 (en) | 2003-05-13 | 2008-11-18 | Siemens Power Transmission & Distribution, Inc. | Dynamic economic dispatch for the management of a power distribution system |
US7085660B2 (en) | 2003-05-13 | 2006-08-01 | Siemens Power Transmission & Distribution, Inc. | Energy management system in a power and distribution system |
US7305282B2 (en) | 2003-05-13 | 2007-12-04 | Siemens Power Transmission & Distribution, Inc. | Very short term load prediction in an energy management system |
EA009685B1 (ru) * | 2003-06-05 | 2008-02-28 | Энфо Бродкаст Ас | Способ и система для автоматического регулирования спроса на товары кратковременного пользования |
US7974742B2 (en) | 2003-06-13 | 2011-07-05 | Enis Ben M | Method of coordinating and stabilizing the delivery of wind generated energy |
US6988024B2 (en) | 2003-08-29 | 2006-01-17 | Matsushita Electric Industrial Co., Ltd. | Cogeneration system, operation controller for cogeneration facility, and operation program for cogeneration facility |
US7313465B1 (en) | 2003-09-11 | 2007-12-25 | Dte Energy Technologies, Inc. | System and method for managing energy generation equipment |
US7127327B1 (en) | 2003-09-11 | 2006-10-24 | Dte Energy Technologies, Inc. | System and method for managing energy generation equipment |
US7089125B2 (en) * | 2003-10-27 | 2006-08-08 | Itron, Inc. | Distributed asset optimization (DAO) system and method |
US20050096964A1 (en) | 2003-10-29 | 2005-05-05 | Tsai Roger Y. | Best indicator adaptive forecasting method |
US7827099B1 (en) | 2003-11-25 | 2010-11-02 | Autoalert, Inc. | System and method for assessing and managing financial transactions |
CA2455689A1 (fr) | 2004-01-23 | 2005-07-23 | Stuart Energy Systems Corporation | Systeme de commande de reseau a hydrogene |
JP2007536634A (ja) | 2004-05-04 | 2007-12-13 | フィッシャー−ローズマウント・システムズ・インコーポレーテッド | プロセス制御システムのためのサービス指向型アーキテクチャ |
US7444189B1 (en) | 2004-06-15 | 2008-10-28 | John Joseph Marhoefer | Method and apparatus for simultaneous optimization of distributed generation and hydrogen production |
US8019445B2 (en) | 2004-06-15 | 2011-09-13 | Intelligent Generation Llc | Method and apparatus for optimization of distributed generation |
DE602005014883D1 (de) | 2004-10-05 | 2009-07-23 | 2D2C Inc | Elektrisches stromverteilungssystem |
US7454717B2 (en) * | 2004-10-20 | 2008-11-18 | Microsoft Corporation | Delimiters for selection-action pen gesture phrases |
US9771834B2 (en) | 2004-10-20 | 2017-09-26 | Emerson Process Management Power & Water Solutions, Inc. | Method and apparatus for providing load dispatch and pollution control optimization |
US20060092177A1 (en) * | 2004-10-30 | 2006-05-04 | Gabor Blasko | Input method and apparatus using tactile guidance and bi-directional segmented stroke |
US8078319B2 (en) | 2005-02-16 | 2011-12-13 | Lockheed Martin Corporation | Hierarchical contingency management system for mission planners |
US7349765B2 (en) | 2005-02-18 | 2008-03-25 | General Motors Corporation | System and method for managing utility consumption |
GB2439490B (en) | 2005-03-08 | 2008-12-17 | Radio Usa Inc E | Systems and methods for modifying power usage |
US7610214B1 (en) | 2005-03-24 | 2009-10-27 | Amazon Technologies, Inc. | Robust forecasting techniques with reduced sensitivity to anomalous data |
US20060241859A1 (en) * | 2005-04-21 | 2006-10-26 | Microsoft Corporation | Virtual earth real-time advertising |
US7627453B2 (en) * | 2005-04-26 | 2009-12-01 | Current Communications Services, Llc | Power distribution network performance data presentation system and method |
US7626497B2 (en) | 2005-05-25 | 2009-12-01 | Current Technologies, Llc | Power line communication vegetation management system and method |
US7274975B2 (en) * | 2005-06-06 | 2007-09-25 | Gridpoint, Inc. | Optimized energy management system |
EP1900074A2 (fr) | 2005-06-17 | 2008-03-19 | Optimal Licensing Corporation | Systeme d'alimentation en energie distribue a action rapide pour la transmission et la distribution de charge de systeme, par le biais d'unites de stockage d'energie |
EP1904989B1 (fr) | 2005-06-21 | 2021-12-29 | Centralert Corporation | Système d'alerte intégré |
US20070097143A1 (en) * | 2005-10-28 | 2007-05-03 | Mutsuya Ii | Application of variable opacity (image alpha) to power and probability distributions superimposed on cartographic displays |
FR2893187A1 (fr) | 2005-11-10 | 2007-05-11 | Air Liquide | Installation consommatrice d'energie electrique utilisant une pile a combustible et procede d'alimentation d'une telle installation |
EP1955276A4 (fr) | 2005-11-14 | 2011-02-16 | Sempa Power Systems Ltd | Systeme de gestion d'energie d'une installation |
US20070165050A1 (en) * | 2005-12-02 | 2007-07-19 | Idelix Software Inc. | Method and system for geographically-based and time-based online advertising |
US8131401B2 (en) | 2006-07-19 | 2012-03-06 | Power Analytics Corporation | Real-time stability indexing for intelligent energy monitoring and management of electrical power network system |
US8036872B2 (en) * | 2006-03-10 | 2011-10-11 | Edsa Micro Corporation | Systems and methods for performing automatic real-time harmonics analyses for use in real-time power analytics of an electrical power distribution system |
US20070203860A1 (en) | 2006-02-24 | 2007-08-30 | Gridpoint, Inc. | Energy budget manager |
US20080301565A1 (en) * | 2007-06-01 | 2008-12-04 | Fatdoor, Inc. | Bookmarking and lassoing in a geo-spatial environment |
US20070266332A1 (en) * | 2006-05-11 | 2007-11-15 | General Dynamics Advanced Information Systems, Inc. | System, method and software for displaying visual cues |
US20070282495A1 (en) * | 2006-05-11 | 2007-12-06 | University Of Delaware | System and method for assessing vehicle to grid (v2g) integration |
GB0614193D0 (en) | 2006-07-18 | 2006-08-23 | Martin Energy Ltd | Aggregated management system |
US20080278311A1 (en) * | 2006-08-10 | 2008-11-13 | Loma Linda University Medical Center | Advanced Emergency Geographical Information System |
JP2008054439A (ja) | 2006-08-25 | 2008-03-06 | Toyota Motor Corp | 電力システム |
US7873441B2 (en) | 2006-09-25 | 2011-01-18 | Andreas Joanni Synesiou | System for execution of a load operating plan for load control |
US20080133313A1 (en) | 2006-12-04 | 2008-06-05 | Arash Bateni | Improved methods and systems for forecasting product demand using price elasticity |
US20080154693A1 (en) | 2006-12-20 | 2008-06-26 | Arash Bateni | Methods and systems for forecasting product demand using a causal methodology |
US9020650B2 (en) | 2007-02-13 | 2015-04-28 | General Electric Company | Utility grid, controller, and method for controlling the power generation in a utility grid |
US7653443B2 (en) | 2007-03-01 | 2010-01-26 | Daniel Flohr | Methods, systems, circuits and computer program products for electrical service demand management |
US7509190B2 (en) | 2007-04-03 | 2009-03-24 | Tenaska Power Services Co. | Method for administering an intermittent uncontrollable electric power generating facility |
US7693670B2 (en) | 2007-08-14 | 2010-04-06 | General Electric Company | Cognitive electric power meter |
US7565227B2 (en) | 2007-08-15 | 2009-07-21 | Constellation Energy Group, Inc. | Multi-building control for demand response power usage control |
US20090075663A1 (en) * | 2007-09-19 | 2009-03-19 | Wilson Stephen L | Graphically based representations of equipment status, for example, wireless cell site alarms |
US7831569B2 (en) | 2007-10-10 | 2010-11-09 | International Business Machines Corporation | Preserving a query plan cache |
GB2453927A (en) * | 2007-10-12 | 2009-04-29 | Curtiss Wright Controls Embedded Computing | Method for improving the representation of targets within radar images |
US7826908B2 (en) | 2007-11-02 | 2010-11-02 | Emerson Process Management Power & Water Solutions, Inc. | Variable rate feedforward control based on set point rate of change |
US8000913B2 (en) | 2008-01-21 | 2011-08-16 | Current Communications Services, Llc | System and method for providing power distribution system information |
US8731732B2 (en) | 2008-02-25 | 2014-05-20 | Stanley Klein | Methods and system to manage variability in production of renewable energy |
US8428873B2 (en) * | 2008-03-24 | 2013-04-23 | Google Inc. | Panoramic images within driving directions |
US8195337B2 (en) | 2008-04-14 | 2012-06-05 | Cruickshank Iii Robert F | Method and apparatus for orchestrating utility power supply and demand in real time using a continuous pricing signal sent via a network to home networks and smart appliances |
AU2008355092A1 (en) | 2008-04-21 | 2009-10-29 | Adaptive Computing Enterprises, Inc. | System and method for managing energy consumption in a compute environment |
US20090299537A1 (en) | 2008-06-03 | 2009-12-03 | Rea Andrew R | Method and system for providing energy products |
US8600571B2 (en) | 2008-06-19 | 2013-12-03 | Honeywell International Inc. | Energy optimization system |
CN101478157B (zh) | 2008-10-13 | 2011-05-04 | 宁波电业局 | 自动发电控制系统及其负荷预测自动综合的优化方法 |
US7953519B2 (en) | 2008-10-15 | 2011-05-31 | International Business Machines Corporation | Energy usage monitoring and balancing method and system |
US8041467B2 (en) | 2008-10-31 | 2011-10-18 | General Electric Company | Optimal dispatch of demand side electricity resources |
EP2356496A4 (fr) | 2008-11-13 | 2015-05-27 | Univ Saint Louis | Appareil et procédé pour communiquer des indicateurs environnementaux de prédiction à des responsables d interventions d urgence |
CN101458005B (zh) | 2009-01-15 | 2010-09-01 | 北京航空航天大学 | 太阳能光伏-市电混合驱动蓄冷蓄热型热泵机组 |
US20100191489A1 (en) | 2009-01-28 | 2010-07-29 | Uqm Technologies, Inc. | Distributed Generation Power System |
US8103388B2 (en) | 2009-01-29 | 2012-01-24 | International Business Machines Corporation | System for prediction and communication of environmentally induced power useage limitation |
WO2010088545A2 (fr) | 2009-01-30 | 2010-08-05 | Board Of Regents, The University Of Texas System | Procédés et appareils pour la conception et la gestion d'une interface électronique de puissance multiport pour des sources d'énergie renouvelables |
US20100217651A1 (en) | 2009-02-26 | 2010-08-26 | Jason Crabtree | System and method for managing energy resources based on a scoring system |
US20100217642A1 (en) | 2009-02-26 | 2010-08-26 | Jason Crubtree | System and method for single-action energy resource scheduling and participation in energy-related securities |
US8261206B2 (en) * | 2009-02-27 | 2012-09-04 | International Business Machines Corporation | Digital map having user-defined zoom areas |
US9154721B2 (en) | 2009-03-26 | 2015-10-06 | Dish Network L.L.C. | Apparatus and methods for recording adjacent time slots of television programming on the same channel |
US8013470B2 (en) | 2009-04-07 | 2011-09-06 | Caterpillar Inc. | System and method for supplying power to a power grid |
AU2010245127B2 (en) | 2009-05-05 | 2015-02-05 | Exxonmobil Upstream Research Company | Converting organic matter from a subterranean formation into producible hydrocarbons by controlling production operations based on availability of one or more production resources |
US8068938B2 (en) | 2009-05-15 | 2011-11-29 | General Electric Company | Method and system for managing a load demand on an electrical grid |
US8600574B2 (en) | 2009-05-19 | 2013-12-03 | International Business Machines Corporation | Dynamic specification of power supply sources |
US8626344B2 (en) | 2009-08-21 | 2014-01-07 | Allure Energy, Inc. | Energy management system and method |
US8396572B2 (en) | 2009-09-11 | 2013-03-12 | Siemens Corporation | System and method for energy plant optimization using mixed integer-linear programming |
US8195339B2 (en) | 2009-09-24 | 2012-06-05 | General Electric Company | System and method for scheduling startup of a combined cycle power generation system |
US8471406B2 (en) | 2009-11-02 | 2013-06-25 | General Electric Company | Controllable energy utilization system and associated method |
US8866334B2 (en) | 2010-03-02 | 2014-10-21 | Icr Turbine Engine Corporation | Dispatchable power from a renewable energy facility |
US8924033B2 (en) * | 2010-05-12 | 2014-12-30 | Alstom Grid Inc. | Generalized grid security framework |
US9207993B2 (en) | 2010-05-13 | 2015-12-08 | Microsoft Technology Licensing, Llc | Dynamic application placement based on cost and availability of energy in datacenters |
US8600572B2 (en) | 2010-05-27 | 2013-12-03 | International Business Machines Corporation | Smarter-grid: method to forecast electric energy production and utilization subject to uncertain environmental variables |
JP5874311B2 (ja) | 2011-10-24 | 2016-03-02 | ソニー株式会社 | 電力需要予測装置、電力需要予測方法および電力需要予測システム |
CN105453367B (zh) | 2013-08-13 | 2018-05-01 | 埃森哲环球服务有限公司 | 用于微电网中的综合多能量调度的系统、方法和装置及有形计算机可读介质 |
US9791485B2 (en) | 2014-03-10 | 2017-10-17 | Silver Spring Networks, Inc. | Determining electric grid topology via a zero crossing technique |
-
2008
- 2008-06-13 US US12/139,111 patent/US8112253B2/en active Active
- 2008-06-13 US US12/139,194 patent/US8321804B2/en active Active
- 2008-06-13 US US12/139,189 patent/US8078332B2/en active Active
- 2008-06-13 US US12/139,159 patent/US20090030758A1/en not_active Abandoned
- 2008-06-13 US US12/139,167 patent/US8321800B2/en active Active
- 2008-06-13 US US12/139,118 patent/US9367935B2/en active Active
- 2008-07-18 EP EP08796334A patent/EP2176717A4/fr not_active Withdrawn
- 2008-07-18 WO PCT/US2008/070552 patent/WO2009015044A1/fr active Application Filing
- 2008-07-18 WO PCT/US2008/070526 patent/WO2009015033A1/fr active Application Filing
- 2008-07-18 EP EP08782095A patent/EP2176722A4/fr not_active Withdrawn
- 2008-07-18 EP EP08782090.8A patent/EP2179340A4/fr not_active Withdrawn
- 2008-07-18 WO PCT/US2008/070547 patent/WO2009015042A1/fr active Application Filing
- 2008-07-18 WO PCT/US2008/070551 patent/WO2009015043A1/fr active Application Filing
- 2008-07-18 WO PCT/US2008/070544 patent/WO2009015040A2/fr active Application Filing
- 2008-07-18 EP EP08796333.6A patent/EP2183651B1/fr active Active
- 2008-07-18 WO PCT/US2008/070537 patent/WO2009015038A1/fr active Application Filing
- 2008-07-18 EP EP08782097.3A patent/EP2176716B1/fr active Active
- 2008-07-18 EP EP08796327.8A patent/EP2179339B1/fr active Active
-
2012
- 2012-08-21 US US13/590,321 patent/US9367936B2/en active Active
- 2012-10-23 US US13/658,489 patent/US9311728B2/en active Active
-
2014
- 2014-03-31 US US14/231,387 patent/US9710212B2/en active Active
-
2016
- 2016-04-05 US US15/091,552 patent/US10846039B2/en active Active
- 2016-05-11 US US15/151,984 patent/US10552109B2/en not_active Expired - Fee Related
-
2020
- 2020-01-14 US US16/742,221 patent/US20200218483A1/en not_active Abandoned
Patent Citations (100)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4455614A (en) * | 1973-09-21 | 1984-06-19 | Westinghouse Electric Corp. | Gas turbine and steam turbine combined cycle electric power generating plant having a coordinated and hybridized control system and an improved factory based method for making and testing combined cycle and other power plants and control systems therefor |
US4078260A (en) * | 1976-05-12 | 1978-03-07 | International Business Machines Corporation | Apparatus for transposition sorting of equal length records in overlap relation with record loading and extraction |
US4804938A (en) * | 1986-10-24 | 1989-02-14 | Sangamo Weston, Inc. | Distribution energy management system |
US5185886A (en) * | 1989-06-30 | 1993-02-09 | Digital Equipment Corporation | Multiple record group rebound sorter |
US5598566A (en) * | 1990-01-30 | 1997-01-28 | Johnson Service Company | Networked facilities management system having a node configured with distributed load management software to manipulate loads controlled by other nodes |
US5384697A (en) * | 1990-01-30 | 1995-01-24 | Johnson Service Company | Networked facilities management system with balanced differential analog control outputs |
US5136497A (en) * | 1990-07-12 | 1992-08-04 | Bdm International, Inc. | Material consolidation modeling and control system |
US5414640A (en) * | 1991-07-05 | 1995-05-09 | Johnson Service Company | Method and apparatus for adaptive demand limiting electric consumption through load shedding |
US5655136A (en) * | 1992-12-22 | 1997-08-05 | Morgan; Michael W. | Method and apparatus for recognizing and performing handwritten calculations |
US5963457A (en) * | 1994-03-18 | 1999-10-05 | Hitachi, Ltd. | Electrical power distribution monitoring system and method |
US5594659A (en) * | 1994-04-29 | 1997-01-14 | Michigan State University | Method for performing a voltage stability security assessment for a power transmission system |
US6741485B1 (en) * | 1995-04-21 | 2004-05-25 | General Electric Company | Interconnection system for transmitting power between electrical systems |
US5933355A (en) * | 1995-05-04 | 1999-08-03 | Deb; Anjan Kumar | Object oriented expert power line ampacity system |
US5904727A (en) * | 1995-05-17 | 1999-05-18 | Mobile Information Systems, Inc. | Graphical fleet management methods |
US5937414A (en) * | 1997-02-28 | 1999-08-10 | Oracle Corporation | Method and apparatus for providing database system replication in a mixed propagation environment |
US6021402A (en) * | 1997-06-05 | 2000-02-01 | International Business Machines Corporaiton | Risk management system for electric utilities |
US6259972B1 (en) * | 1998-01-16 | 2001-07-10 | Enghouse Systems Usa, Inc. | Method for processing and disseminating utility outage information |
US6353847B1 (en) * | 1998-03-06 | 2002-03-05 | Fujitsu Limited | System optimization apparatus employing load prediction |
US20020032535A1 (en) * | 1998-03-19 | 2002-03-14 | James O. Alexander | Energy information management method for use with a circuit breaker |
US6289267B1 (en) * | 1998-03-19 | 2001-09-11 | Siemens Energy & Automation, Inc. | Graphical energy information display system having a menu for user selection of energy related information for an AC load control device |
US6313752B1 (en) * | 1998-05-21 | 2001-11-06 | Steven P. Corrigan | System for displaying dynamic on-line operating conditions of an interconnected power transmission network |
US20070143046A1 (en) * | 1998-05-29 | 2007-06-21 | Powerweb, Inc. | Multi-utility energy control and facility automation system with dashboard having a plurality of interface gateways |
US6178362B1 (en) * | 1998-09-24 | 2001-01-23 | Silicon Energy Corp. | Energy management system and method |
US6620327B2 (en) * | 1998-10-28 | 2003-09-16 | Marvin E. Haddock | Multi-stage engine coolant recycling apparatus and process |
US6591255B1 (en) * | 1999-04-05 | 2003-07-08 | Netuitive, Inc. | Automatic data extraction, error correction and forecasting system |
US20060174209A1 (en) * | 1999-07-22 | 2006-08-03 | Barros Barbara L | Graphic-information flow method and system for visually analyzing patterns and relationships |
US6528957B1 (en) * | 1999-09-08 | 2003-03-04 | Lutron Electronics, Co., Inc. | Power/energy management control system |
US6549880B1 (en) * | 1999-09-15 | 2003-04-15 | Mcgraw Edison Company | Reliability of electrical distribution networks |
US20060072828A1 (en) * | 1999-10-25 | 2006-04-06 | Silverbrook Research Pty Ltd | Method and system for digitizing freehand graphics with user-selected properties |
US6901347B1 (en) * | 2000-02-22 | 2005-05-31 | Sun Microsystems, Inc. | Availability, reliability or maintainability index including outage characterization |
US20030158631A1 (en) * | 2000-03-10 | 2003-08-21 | Yoshinobu Masuda | Electricity charge management apparatus and its recording medium |
US20010045949A1 (en) * | 2000-03-29 | 2001-11-29 | Autodesk, Inc. | Single gesture map navigation graphical user interface for a personal digital assistant |
US20020029097A1 (en) * | 2000-04-07 | 2002-03-07 | Pionzio Dino J. | Wind farm control system |
US20020085326A1 (en) * | 2000-05-12 | 2002-07-04 | Jeong-Wan Kim | Circuit breaker with display function |
US6681154B2 (en) * | 2000-06-22 | 2004-01-20 | Stonewater Control Systems, Inc. | System and method for monitoring and controlling energy distribution |
US6681156B1 (en) * | 2000-09-28 | 2004-01-20 | Siemens Aktiengesellschaft | System and method for planning energy supply and interface to an energy management system for use in planning energy supply |
US6577962B1 (en) * | 2000-09-28 | 2003-06-10 | Silicon Energy, Inc. | System and method for forecasting energy usage load |
US20020042789A1 (en) * | 2000-10-04 | 2002-04-11 | Zbigniew Michalewicz | Internet search engine with interactive search criteria construction |
US20060005738A1 (en) * | 2001-03-27 | 2006-01-12 | Kumar Ajith K | Railroad vehicle with energy regeneration |
US20050055330A1 (en) * | 2001-05-15 | 2005-03-10 | Britton Colin P. | Surveillance, monitoring and real-time events platform |
US6885915B2 (en) * | 2001-06-07 | 2005-04-26 | Abb Research Ltd | Configuration of a part of an electrical power distribution network |
US7774307B2 (en) * | 2001-07-24 | 2010-08-10 | Siebel Systems, Inc. | Method and apparatus for synchronizing a database with a third party database |
US20030115306A1 (en) * | 2001-12-19 | 2003-06-19 | Richard Hagarty | Modification of map of storage area network resources |
US20030171851A1 (en) * | 2002-03-08 | 2003-09-11 | Peter J. Brickfield | Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems |
US7343226B2 (en) * | 2002-03-28 | 2008-03-11 | Robertshaw Controls Company | System and method of controlling an HVAC system |
US20040117330A1 (en) * | 2002-03-28 | 2004-06-17 | Ehlers Gregory A. | System and method for controlling usage of a commodity |
US20040139038A1 (en) * | 2002-03-28 | 2004-07-15 | Ehlers Gregory A. | System and method for controlling delivering of a commodity |
US20060206240A1 (en) * | 2002-05-20 | 2006-09-14 | Tsui Jonah C | System and method for managing and optimizing power use |
US7873442B2 (en) * | 2002-05-20 | 2011-01-18 | The Energy Authority, Inc. | System and method for managing and optimizing power use |
US20050169743A1 (en) * | 2002-10-02 | 2005-08-04 | Centripetal Dynamics, Inc. | Method of and apparatus for a multi-stage boundary layer engine and process cell |
US20040093124A1 (en) * | 2002-11-12 | 2004-05-13 | Honeywell International Inc. | Coordination in multilayer process control and optimization schemes |
US7283930B2 (en) * | 2003-01-13 | 2007-10-16 | Arm Limited | Data processing performance control |
US20040158360A1 (en) * | 2003-02-04 | 2004-08-12 | Charles Garland | System and method of energy management and allocation within an energy grid |
US20050197742A1 (en) * | 2003-02-13 | 2005-09-08 | Iso New England Inc. | Methods and systems for the management of a bulk electric power market |
US7058522B2 (en) * | 2003-05-13 | 2006-06-06 | Siemens Power Transmission & Distribution, Inc. | Very short term load prediction |
US6925385B2 (en) * | 2003-05-16 | 2005-08-02 | Seawest Holdings, Inc. | Wind power management system and method |
US7194338B2 (en) * | 2003-06-27 | 2007-03-20 | Intellicon, Inc. | Voltage collapse diagnostic and ATC system |
US20100100250A1 (en) * | 2003-08-08 | 2010-04-22 | Electric Power Group, Llc | Real-time performance monitoring and management system |
US7233843B2 (en) * | 2003-08-08 | 2007-06-19 | Electric Power Group, Llc | Real-time performance monitoring and management system |
US20050033481A1 (en) * | 2003-08-08 | 2005-02-10 | Budhraja Vikram S. | Real-time performance monitoring and management system |
US8280799B2 (en) * | 2003-08-20 | 2012-10-02 | New Virtus Engineering, Inc. | Method and systems for predicting solar energy production |
US20050039787A1 (en) * | 2003-08-20 | 2005-02-24 | New Energy Options, Inc. | Method and system for predicting solar energy production |
US7689394B2 (en) * | 2003-08-26 | 2010-03-30 | Siemens Industry, Inc. | System and method for remotely analyzing machine performance |
US20050071124A1 (en) * | 2003-09-29 | 2005-03-31 | Mori Seiki Co., Ltd. | Operating state management system for machine tool |
US20070156291A1 (en) * | 2003-10-06 | 2007-07-05 | Power Monitors, Inc. | System and method for providing remote monitoring of voltage power transmission and distribution devices |
US20090093916A1 (en) * | 2003-10-15 | 2009-04-09 | Ice Energy, Inc. | Utility managed virtual power plant utilizing aggregated thermal energy storage |
US7177728B2 (en) * | 2003-12-30 | 2007-02-13 | Jay Warren Gardner | System and methods for maintaining power usage within a set allocation |
US20050234600A1 (en) * | 2004-04-16 | 2005-10-20 | Energyconnect, Inc. | Enterprise energy automation |
US20050240539A1 (en) * | 2004-04-22 | 2005-10-27 | Thomas Olavson | Method and system for forecasting commodity prices using capacity utilization data |
US20050240381A1 (en) * | 2004-04-26 | 2005-10-27 | Pjm Interconnection, Llc. | Systems and methods for analysis of a commodity transmission network |
US20060156248A1 (en) * | 2004-06-25 | 2006-07-13 | Chaudhri Imran A | Configuration bar for lauching layer for accessing user interface elements |
US20060167591A1 (en) * | 2005-01-26 | 2006-07-27 | Mcnally James T | Energy and cost savings calculation system |
US20070244604A1 (en) * | 2005-01-26 | 2007-10-18 | Siemens Corporation | Energy and cost savings calculation system |
US20060200308A1 (en) * | 2005-03-03 | 2006-09-07 | Arutunian Ethan B | Server-based interactive enhanced map imagery engine |
US7177727B2 (en) * | 2005-04-08 | 2007-02-13 | Chang Gung University | Method for calculating power flow solution of a power transmission network that includes unified power flow controllers |
US20090073191A1 (en) * | 2005-04-21 | 2009-03-19 | Microsoft Corporation | Virtual earth rooftop overlay and bounding |
US20070083821A1 (en) * | 2005-10-07 | 2007-04-12 | International Business Machines Corporation | Creating viewports from selected regions of windows |
US7519438B2 (en) * | 2005-11-09 | 2009-04-14 | Abb Technology Ag | Method and a tool for calculating and displaying fault response tolerances for a power switching device |
US20070213956A1 (en) * | 2006-03-10 | 2007-09-13 | Edsa Micro Corporation | Systems and methods for real-time protective device evaluation in an electrical power distribution system |
US20070236507A1 (en) * | 2006-04-11 | 2007-10-11 | Idelix Software Inc. | Method and system for transparency adjustment and occlusion resolution for urban landscape visualization |
US20080077368A1 (en) * | 2006-04-12 | 2008-03-27 | Edsa Micro Corporation | Automatic real-time optimization and intelligent control of electrical power distribution and transmission systems |
US20090234511A1 (en) * | 2006-06-28 | 2009-09-17 | Sanyo Electric Co., Ltd. | Demand control device |
US20080263469A1 (en) * | 2006-07-19 | 2008-10-23 | Edsa Micro Corporation | Systems and methods for creation of a schematic user interface for monitoring and predicting the real-time health, reliability and performance of an electrical power system |
US20080189656A1 (en) * | 2006-10-31 | 2008-08-07 | Abanami Thamer A | Adaptable Transparency |
US7558703B2 (en) * | 2006-11-01 | 2009-07-07 | Abb Research Ltd. | Electrical substation monitoring and diagnostics |
US20080167756A1 (en) * | 2007-01-03 | 2008-07-10 | Gridpoint, Inc. | Utility console for controlling energy resources |
US20080174564A1 (en) * | 2007-01-20 | 2008-07-24 | Lg Electronics Inc. | Mobile communication device equipped with touch screen and method of controlling operation thereof |
US20090062969A1 (en) * | 2007-08-28 | 2009-03-05 | General Electric Company | Hybrid robust predictive optimization method of power system dispatch |
US20100222935A1 (en) * | 2007-08-28 | 2010-09-02 | Forbes Jr Joseph W | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US20100076835A1 (en) * | 2008-05-27 | 2010-03-25 | Lawrence Silverman | Variable incentive and virtual market system |
US20100179704A1 (en) * | 2009-01-14 | 2010-07-15 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
US20110231028A1 (en) * | 2009-01-14 | 2011-09-22 | Ozog Michael T | Optimization of microgrid energy use and distribution |
US8222765B2 (en) * | 2009-02-13 | 2012-07-17 | First Solar, Inc. | Photovoltaic power plant output |
US20100274402A1 (en) * | 2009-04-27 | 2010-10-28 | Cisco Technology, Inc. | System for utilizing predictive energy consumption |
US20110202467A1 (en) * | 2010-01-19 | 2011-08-18 | Hilber Del A | Automated load control and dispatch system and method |
US20110029142A1 (en) * | 2010-07-02 | 2011-02-03 | David Sun | System tools that provides dispatchers in power grid control centers with a capability to make changes |
US20110071690A1 (en) * | 2010-07-02 | 2011-03-24 | David Sun | Methods that provide dispatchers in power grid control centers with a capability to manage changes |
US20110035071A1 (en) * | 2010-07-02 | 2011-02-10 | David Sun | System tools for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US20110029147A1 (en) * | 2010-07-02 | 2011-02-03 | David Sun | Multi-interval dispatch method for enabling dispatchers in power grid control centers to manage changes |
US20110029141A1 (en) * | 2010-07-02 | 2011-02-03 | David Sun | Method for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150067497A1 (en) * | 2012-05-09 | 2015-03-05 | Apple Inc. | Device, Method, and Graphical User Interface for Providing Tactile Feedback for Operations Performed in a User Interface |
Also Published As
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20200218483A1 (en) | Methods for assessing reliability of a utility company's power system | |
US20150153716A1 (en) | Decision support control centers | |
CN101676942A (zh) | 用于评估电力公司的电力系统的方法 | |
CN112907157A (zh) | 一种基于气象预警的电网风险可视化方法及系统 | |
CN101676941A (zh) | 用于管理来自电力公司的电力系统的选定区域的高压或低压状况的方法 | |
Sarmiento et al. | Nomograms for assistance in voltage security visualization | |
CN101676940A (zh) | 提供对会影响电力公司的可能处于险境事态的实时评估的能源管理系统 | |
CN101676852A (zh) | 用于从电力公司的电力系统的选定区域建立动态列表的方法 | |
CN101604425A (zh) | 提供对可能的能源管理故障的实时事态认知的能源管理系统 | |
CN101677192A (zh) | 用于评估电力公司的可能处于险境事态的方法 | |
Soonee et al. | Visualization and human factors in electric power system operation | |
CN111079241A (zh) | 基于cim电网模型的沿布图可视化展示方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: AREVA T&D, INC., WASHINGTON Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CASTELLI, GENNARO;HACKETT, MICHAEL;HOWARD, MICHAEL QUINN;AND OTHERS;REEL/FRAME:021345/0601;SIGNING DATES FROM 20080626 TO 20080628 |
|
AS | Assignment |
Owner name: ALSTOM GRID INC., WASHINGTON Free format text: CHANGE OF NAME;ASSIGNOR:AREVA T&D INC.;REEL/FRAME:030783/0488 Effective date: 20110107 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |
|
AS | Assignment |
Owner name: ALSTOM TECHNOLOGY LTD., SWITZERLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:ALSTOM GRID INC.;REEL/FRAME:035109/0236 Effective date: 20150206 |