US20080302536A1 - Multi-Deployable Subsea Stack System - Google Patents
Multi-Deployable Subsea Stack System Download PDFInfo
- Publication number
- US20080302536A1 US20080302536A1 US12/134,958 US13495808A US2008302536A1 US 20080302536 A1 US20080302536 A1 US 20080302536A1 US 13495808 A US13495808 A US 13495808A US 2008302536 A1 US2008302536 A1 US 2008302536A1
- Authority
- US
- United States
- Prior art keywords
- blowout preventer
- package
- additional
- stack
- subsea
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005553 drilling Methods 0.000 claims abstract description 51
- 238000000034 method Methods 0.000 claims abstract description 23
- 230000008878 coupling Effects 0.000 claims abstract description 3
- 238000010168 coupling process Methods 0.000 claims abstract description 3
- 238000005859 coupling reaction Methods 0.000 claims abstract description 3
- 239000012530 fluid Substances 0.000 claims description 2
- 230000008901 benefit Effects 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/06—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
- E21B33/061—Ram-type blow-out preventers, e.g. with pivoting rams
- E21B33/062—Ram-type blow-out preventers, e.g. with pivoting rams with sliding rams
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/06—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
- E21B33/064—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers specially adapted for underwater well heads
Definitions
- the present invention relates generally to the configuration and deployment of pressure control equipment used in drilling subsea wells. More particularly, the present invention relates to subsea blowout preventer stack systems.
- the riser which provides a plurality of parallel fluid conduits between the drilling rig at the surface and the blowout preventer (BOP) stack coupled to the wellhead at the seafloor.
- BOP blowout preventer
- the riser is usually constructed by connecting a number of joints that are generally less than fifty feet in length. The riser is “run” by connecting a joint of riser to the BOP stack, lowering the riser-connected BOP stack a short distance, and then connecting another joint of riser to the uppermost end of the riser string. This process continues until the BOP stack is lowered to the wellhead at the seafloor.
- One common way to improve the time a BOP stack can stay on the wellhead is to increase the number of useable ram BOP cavities in the BOP stack to the point of having a “primary” and “secondary” ram BOP cavity for each size installed. In this way, the time that a BOP stack can remain operational on the wellhead would be effectively doubled.
- simply increasing the number of ram BOP cavities in a subsea BOP stack presents its own set of new challenges, such as increasing the size and weight of the BOP stack.
- Drilling in deep water has often utilized subsea BOP stacks having four to six ram BOP cavities. Increasing the number of ram BOP cavities, such as to eight or ten cavities would increase the weight of the BOP stack, in some cases to a million pounds or more. Many existing rigs do not have the capacity to handle and operate such a BOP stack. In order to safely operate such a system, enhancements would be required to not only the BOP stack handling equipment on the rig, but also to the drill floor equipment, the drawworks and other hoisting equipment, the rotary table, the derrick, and the riser. Enhancing all of this equipment would likely require expanding the basic rig design to allow it to carry the additional weight of all the enhanced equipment systems and provide room for handling and storing the BOP stack.
- the embodiments of the present invention are directed toward methods for deploying a subsea blowout preventer stack system comprising a lower marine riser package, a blowout preventer stack with a first ram blowout preventer, and an additional blowout preventer package releasably coupled to the blowout preventer stack and comprising a second ram blowout preventer.
- the subsea blowout preventer stack assembly can be deployed by coupling a drilling riser to the lower marine riser package that is releasably connected to the blowout preventer stack.
- the lower marine riser package and blowout preventer stack are then lowered toward a subsea wellhead and landed on the additional blowout preventer package that is already in place on the subsea wellhead.
- neither a drilling rig nor the drilling riser is used to deploy and land the first additional blowout preventer package on the subsea wellhead.
- the ram blowout preventers in the first additional blowout preventer package can be used as the primary blowout preventers, leaving the ram blowout preventers in the blowout preventer stack unused.
- a first additional blowout preventer package is deployed on a first wellhead and a second additional blowout preventer package is deployed on a second subsea wellhead.
- the BOP stack is landed on the first additional blowout preventer package and drilling operations performed through the first wellhead using the ram blowout preventers of the first additional blowout preventer package as the primary blowout preventers.
- the blowout preventer stack is disconnected from the first additional blowout preventer package landed on the second additional blowout preventer package.
- the blowout preventer stack can stay subsea while drilling several wells using more than one additional blowout preventer package.
- a second additional blowout preventer package is deployed to a subsea parking pile.
- the blowout preventer stack is disconnected from the first additional blowout preventer package and landed on the second additional blowout preventer package.
- the first additional blowout preventer package is then disconnected from the subsea wellhead and retrieved to the surface while the blowout preventer stack and the second additional blowout preventer package are landed on the subsea wellhead.
- the blowout preventer stack can remain subsea with minimal disruption to the drilling program while the additional blowout preventer packages are retrieved and maintained.
- the present invention comprises a combination of features and advantages that enable it to overcome various problems of prior devices.
- the various characteristics described above, as well as other features, will be readily apparent to those skilled in the art upon reading the following detailed description of the preferred embodiments of the invention, and by referring to the accompanying drawings.
- FIG. 1 is an elevation view of a blowout preventer stack system constructed in accordance with embodiments of the present invention
- FIG. 2 is an isometric view of a blowout preventer stack system constructed in accordance with embodiments of the present invention
- FIGS. 3A and 3B illustrate the deployment and utilization of a blowout preventer stack system constructed in accordance with embodiments of the present invention with a single wellhead;
- FIG. 4 illustrates the deployment and utilization of a blowout preventer stack system constructed in accordance with embodiments of the present invention with a single wellhead and a parking pile;
- FIGS. 5A-5C illustrate the deployment and utilization of a blowout preventer stack system constructed in accordance with embodiments of the present invention with a plurality of wellheads.
- subsea BOP stack system 10 comprises lower marine riser package (LMRP) 12 , BOP stack 14 , and additional BOP package (ABP) 16 .
- Stack system 10 is shown in FIG. 1 landed on subsea wellhead 18 .
- LMRP 12 comprises a flex joint/riser connector 20 , annular BOP 22 , wellbore connector 23 , control pods 24 , and choke/kill line connectors 26 .
- BOP stack 14 comprises annular BOP 22 , ram BOP's 28 , choke/kill line connectors 26 , choke/kill valves 30 , wellbore connector 32 , and auxiliary control pods 34 .
- ABP 16 comprises ram BOP's 28 , choke/kill valves 30 , and wellbore connector 32 .
- LMRP 12 and BOP stack 14 are coupled together by wellbore connector 23 that is engaged with a corresponding mandrel on the upper end of stack 14 .
- BOP stack 14 is similarly coupled to ABP 16 by connector 32 that engages mandrel 33 on ABP 16 .
- Both LMRP 12 and BOP stack 14 comprise re-entry and alignment systems 40 that allow the LMRP 12 /BOP stack 14 and stack 14 /ABP 16 connections to be made subsea with all the auxiliary connections (i.e. control pods, choke/kill lines) aligned.
- Choke/kill line connectors 26 interconnect choke/kill lines 36 and choke/kill valves 30 on stack 14 and ABP 16 to choke/kill lines 38 on riser connector 20 .
- Control pods 24 of LMRP 12 provide control signals to BOP stack 14 while auxiliary control pods 34 on BOP stack 14 provide control signals to ABP 16 .
- ram BOP's 28 in ABP 16 are controlled by auxiliary control pods 34 , which may be communicatively linked to control pods 24 via umbilical jumpers or some other releasable connection.
- the control functions for ram BOP's 28 of ABP 16 (as well as control functions for other equipment) may be integrated into control pods 24 on LMRP 12 , thus eliminating the need for auxiliary control pods 34 .
- ABP 16 is operated with BOP stack 14 , hydraulic accumulator bottles 42 mounted on the BOP stack can be used to support operation of the ABP.
- ABP 16 may also comprise a remotely operated vehicle (ROV) panel 44 that provides control of the ABP functions by an ROV 46 .
- ROV remotely operated vehicle
- LMRP 12 and BOP stack 14 are similar to, and can operate as, a convention two-component stack assembly.
- ABP 16 is installed between wellhead 18 and BOP stack 14 and provides additional ram BOP's 28 to provide redundancy and increase effective service life.
- ABP 16 will not be lowered from the rig to the wellhead on a conventional riser with the rest of the BOP stack but will be deployed separately. This separate deployment can be accomplished on drill pipe, heavy wireline, or any other means, either from the drilling rig if it has a dual activity derrick, from another rig (perhaps of lesser drilling capabilities), or from a heavy duty workboat or tender vessel.
- the ABP 16 could be stored and serviced by a vessel other than the drilling rig, thus eliminating the need for additional storage space and handling capacity on the drilling rig.
- a single ABP 16 can be landed on wellhead 18 via drill string, wireline, or other non-riser system by service vessel 48 prior to drilling rig 50 arriving on site.
- Drilling rig 50 would then run the BOP stack 14 and LMRP 12 assembly on conventional drilling riser and land the stack on ABP 16 .
- Normal drilling operations could utilize the ram BOP's of ASP 16 until their useful life was reached. At that point, drilling could continue with the ram BOP's of BOP stack 14 without disturbing the stack assembly, thus increasing drilling time before having to bring the stack to the surface for maintenance.
- a drilling site may comprise a wellhead 18 and a parking pile 52 .
- Parking pile 52 provides a location for the subsea storage of an additional ABP 16 .
- a first ABP 16 can be run as described above in reference to FIG. 3A by service vessel 48 .
- BOP stack 14 and LMRP 16 can then be run by a drilling rig and drilling operations performed using the ram BOP's in ABP 16 .
- a replacement ABP 16 A can be run by a service vessel and landed on parking pile 52 .
- stack 14 and LMRP 12 can be disconnect from the ASP but remain subsea.
- replacement ABP 16 A can be disconnected form parking pile 52 and landed on wellhead 18 .
- Replacement ABP 16 A can be moved from parking pile 52 to wellhead 18 by drilling rig 50 by landing BOP stack 14 on ABP 16 A and then moving the entire assembly together.
- Replacement ABP 16 A can also be moved onto wellhead 18 by a service vessel as BOP stack 14 is supported by the drilling rig.
- multiple ABP systems 16 A- 16 B can be used to drill multiple wells on a plurality of wellheads 18 A- 18 C.
- a first ABP 16 A can be deployed onto wellhead 18 A with BOP stack 14 and LMRP 12 being run and landed atop ABP 16 A and drilling operations commenced. While the first well is being drilled, a second ABP 16 B is deployed and landed onto the next wellhead 18 B.
- the BOP stack 14 and LMRP 12 can simply be unlatched, lifted, relocated the second wellhead 18 B and landed on second ABP 16 B.
- the first ABP 16 A can be retrieved from the first wellhead 18 A and moved to a third wellhead 18 C, or brought back to the surface for maintenance or repair.
- the ram BOP cavities in the ABP can be considered the primary cavities while the ram BOP cavities in the BOP stack would then be considered the secondary cavities.
- the primary BOP cavities in the ABP could be retrieved to the surface and maintained while the BOP stack and LMRP were drilling atop another ABP.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Stackable Containers (AREA)
Abstract
Description
- This application claims benefit of U.S. provisional application Ser. No. 60/933,934 filed Jun. 8, 2007, and entitled “Multi-Deployable Subsea Stack System,” which is hereby incorporated herein by reference in its entirety for all purposes.
- Not Applicable.
- The present invention relates generally to the configuration and deployment of pressure control equipment used in drilling subsea wells. More particularly, the present invention relates to subsea blowout preventer stack systems.
- As drilling rigs venture into ever increasing water depths and encounter new challenges, well control has become increasingly problematic. As costs of floating mobile offshore drilling units escalate, traditional time-intensive operations are constantly being re-evaluated in an effort to reduce overall non-drilling time, thereby increasing the drilling efficiency of the rig.
- One of the most time-intensive operations is running the riser, which provides a plurality of parallel fluid conduits between the drilling rig at the surface and the blowout preventer (BOP) stack coupled to the wellhead at the seafloor. In order to facilitate handling of the riser on the rig, the riser is usually constructed by connecting a number of joints that are generally less than fifty feet in length. The riser is “run” by connecting a joint of riser to the BOP stack, lowering the riser-connected BOP stack a short distance, and then connecting another joint of riser to the uppermost end of the riser string. This process continues until the BOP stack is lowered to the wellhead at the seafloor.
- In water depths in excess of 5,000 ft., running the riser generally takes several days to complete. Thus, minimizing the number of times the riser must be run is critical to minimizing the time needed to drill and complete a well. Since the BOP stack is installed at the very bottom of the riser, attempts to increase the amount of time that the BOP stack can stay on the wellhead are being explored. One factor limiting the time a BOP stack can stay on the wellhead is for maintenance of the ram BOP packer seals. Ram BOP packer seals have a limited useful life and once that limit is reached the ram BOP cannot be used until the seals have been replaced.
- One common way to improve the time a BOP stack can stay on the wellhead is to increase the number of useable ram BOP cavities in the BOP stack to the point of having a “primary” and “secondary” ram BOP cavity for each size installed. In this way, the time that a BOP stack can remain operational on the wellhead would be effectively doubled. However, simply increasing the number of ram BOP cavities in a subsea BOP stack presents its own set of new challenges, such as increasing the size and weight of the BOP stack.
- Drilling in deep water has often utilized subsea BOP stacks having four to six ram BOP cavities. Increasing the number of ram BOP cavities, such as to eight or ten cavities would increase the weight of the BOP stack, in some cases to a million pounds or more. Many existing rigs do not have the capacity to handle and operate such a BOP stack. In order to safely operate such a system, enhancements would be required to not only the BOP stack handling equipment on the rig, but also to the drill floor equipment, the drawworks and other hoisting equipment, the rotary table, the derrick, and the riser. Enhancing all of this equipment would likely require expanding the basic rig design to allow it to carry the additional weight of all the enhanced equipment systems and provide room for handling and storing the BOP stack.
- Thus, there remains a need to develop methods and apparatus for allowing improved redundancy and operational times of subsea BOP stacks in order to overcome some of the foregoing difficulties while providing more advantageous overall results.
- The embodiments of the present invention are directed toward methods for deploying a subsea blowout preventer stack system comprising a lower marine riser package, a blowout preventer stack with a first ram blowout preventer, and an additional blowout preventer package releasably coupled to the blowout preventer stack and comprising a second ram blowout preventer. The subsea blowout preventer stack assembly can be deployed by coupling a drilling riser to the lower marine riser package that is releasably connected to the blowout preventer stack. The lower marine riser package and blowout preventer stack are then lowered toward a subsea wellhead and landed on the additional blowout preventer package that is already in place on the subsea wellhead. In certain embodiments, neither a drilling rig nor the drilling riser is used to deploy and land the first additional blowout preventer package on the subsea wellhead. During drilling operations, the ram blowout preventers in the first additional blowout preventer package can be used as the primary blowout preventers, leaving the ram blowout preventers in the blowout preventer stack unused.
- In one deployment method, a first additional blowout preventer package is deployed on a first wellhead and a second additional blowout preventer package is deployed on a second subsea wellhead. The BOP stack is landed on the first additional blowout preventer package and drilling operations performed through the first wellhead using the ram blowout preventers of the first additional blowout preventer package as the primary blowout preventers. Once drilling is complete at the first wellhead, the blowout preventer stack is disconnected from the first additional blowout preventer package landed on the second additional blowout preventer package. In this method, the blowout preventer stack can stay subsea while drilling several wells using more than one additional blowout preventer package.
- In some deployment methods, a second additional blowout preventer package is deployed to a subsea parking pile. Once the useful life of the first additional blowout preventer package has been reached the blowout preventer stack is disconnected from the first additional blowout preventer package and landed on the second additional blowout preventer package. The first additional blowout preventer package is then disconnected from the subsea wellhead and retrieved to the surface while the blowout preventer stack and the second additional blowout preventer package are landed on the subsea wellhead. Thus, the blowout preventer stack can remain subsea with minimal disruption to the drilling program while the additional blowout preventer packages are retrieved and maintained.
- Thus, the present invention comprises a combination of features and advantages that enable it to overcome various problems of prior devices. The various characteristics described above, as well as other features, will be readily apparent to those skilled in the art upon reading the following detailed description of the preferred embodiments of the invention, and by referring to the accompanying drawings.
- For a more detailed description of the preferred embodiment of the present invention, reference will now be made to the accompanying drawings, wherein:
-
FIG. 1 is an elevation view of a blowout preventer stack system constructed in accordance with embodiments of the present invention; -
FIG. 2 is an isometric view of a blowout preventer stack system constructed in accordance with embodiments of the present invention; -
FIGS. 3A and 3B illustrate the deployment and utilization of a blowout preventer stack system constructed in accordance with embodiments of the present invention with a single wellhead; -
FIG. 4 illustrates the deployment and utilization of a blowout preventer stack system constructed in accordance with embodiments of the present invention with a single wellhead and a parking pile; and -
FIGS. 5A-5C illustrate the deployment and utilization of a blowout preventer stack system constructed in accordance with embodiments of the present invention with a plurality of wellheads. - Referring now to
FIG. 1 , subseaBOP stack system 10 comprises lower marine riser package (LMRP) 12,BOP stack 14, and additional BOP package (ABP) 16.Stack system 10 is shown inFIG. 1 landed onsubsea wellhead 18.LMRP 12 comprises a flex joint/riser connector 20,annular BOP 22,wellbore connector 23,control pods 24, and choke/kill line connectors 26.BOP stack 14 comprisesannular BOP 22, ram BOP's 28, choke/killline connectors 26, choke/killvalves 30,wellbore connector 32, andauxiliary control pods 34.ABP 16 comprises ram BOP's 28, choke/killvalves 30, andwellbore connector 32. -
LMRP 12 andBOP stack 14 are coupled together bywellbore connector 23 that is engaged with a corresponding mandrel on the upper end ofstack 14. As is shown inFIG. 2 ,BOP stack 14 is similarly coupled toABP 16 byconnector 32 that engagesmandrel 33 onABP 16. BothLMRP 12 and BOP stack 14 comprise re-entry andalignment systems 40 that allow theLMRP 12/BOP stack 14 and stack 14/ABP 16 connections to be made subsea with all the auxiliary connections (i.e. control pods, choke/kill lines) aligned. Choke/kill line connectors 26 interconnect choke/kill lines 36 and choke/kill valves 30 onstack 14 andABP 16 to choke/killlines 38 onriser connector 20. -
Control pods 24 ofLMRP 12 provide control signals toBOP stack 14 whileauxiliary control pods 34 onBOP stack 14 provide control signals toABP 16. In certain embodiments, ram BOP's 28 in ABP 16 are controlled byauxiliary control pods 34, which may be communicatively linked tocontrol pods 24 via umbilical jumpers or some other releasable connection. In certain embodiments, the control functions for ram BOP's 28 of ABP 16 (as well as control functions for other equipment) may be integrated intocontrol pods 24 onLMRP 12, thus eliminating the need forauxiliary control pods 34. BecauseABP 16 is operated withBOP stack 14,hydraulic accumulator bottles 42 mounted on the BOP stack can be used to support operation of the ABP.ABP 16 may also comprise a remotely operated vehicle (ROV) panel 44 that provides control of the ABP functions by an ROV 46. -
LMRP 12 andBOP stack 14 are similar to, and can operate as, a convention two-component stack assembly.ABP 16 is installed betweenwellhead 18 andBOP stack 14 and provides additional ram BOP's 28 to provide redundancy and increase effective service life. In certain embodiments,ABP 16 will not be lowered from the rig to the wellhead on a conventional riser with the rest of the BOP stack but will be deployed separately. This separate deployment can be accomplished on drill pipe, heavy wireline, or any other means, either from the drilling rig if it has a dual activity derrick, from another rig (perhaps of lesser drilling capabilities), or from a heavy duty workboat or tender vessel. In addition to being run, theABP 16 could be stored and serviced by a vessel other than the drilling rig, thus eliminating the need for additional storage space and handling capacity on the drilling rig. - Referring now to
FIGS. 3A and 3B , asingle ABP 16 can be landed onwellhead 18 via drill string, wireline, or other non-riser system byservice vessel 48 prior todrilling rig 50 arriving on site.Drilling rig 50 would then run theBOP stack 14 andLMRP 12 assembly on conventional drilling riser and land the stack onABP 16. Normal drilling operations could utilize the ram BOP's ofASP 16 until their useful life was reached. At that point, drilling could continue with the ram BOP's ofBOP stack 14 without disturbing the stack assembly, thus increasing drilling time before having to bring the stack to the surface for maintenance. - Referring now to
FIG. 4 , a drilling site may comprise awellhead 18 and aparking pile 52.Parking pile 52 provides a location for the subsea storage of anadditional ABP 16. Afirst ABP 16 can be run as described above in reference toFIG. 3A byservice vessel 48.BOP stack 14 andLMRP 16 can then be run by a drilling rig and drilling operations performed using the ram BOP's inABP 16. Before the useful life of the ram BOP's inABP 16 is reached, areplacement ABP 16A can be run by a service vessel and landed onparking pile 52. When thefirst ABP 16 needs to be serviced, stack 14 andLMRP 12 can be disconnect from the ASP but remain subsea. OnceABP 16 is pulled to the surface for servicing,replacement ABP 16A can be disconnectedform parking pile 52 and landed onwellhead 18.Replacement ABP 16A can be moved fromparking pile 52 towellhead 18 bydrilling rig 50 by landingBOP stack 14 onABP 16A and then moving the entire assembly together.Replacement ABP 16A can also be moved ontowellhead 18 by a service vessel asBOP stack 14 is supported by the drilling rig. - Referring now to
FIGS. 5A-5C ,multiple ABP systems 16A-16B can be used to drill multiple wells on a plurality ofwellheads 18A-18C. Afirst ABP 16A can be deployed ontowellhead 18A withBOP stack 14 andLMRP 12 being run and landed atopABP 16A and drilling operations commenced. While the first well is being drilled, asecond ABP 16B is deployed and landed onto thenext wellhead 18B. When the first well is completed, theBOP stack 14 andLMRP 12 can simply be unlatched, lifted, relocated thesecond wellhead 18B and landed onsecond ABP 16B. While the second well is being completed, thefirst ABP 16A can be retrieved from thefirst wellhead 18A and moved to athird wellhead 18C, or brought back to the surface for maintenance or repair. - Under any of the uses of an ABP as described above, the ram BOP cavities in the ABP can be considered the primary cavities while the ram BOP cavities in the BOP stack would then be considered the secondary cavities. This would allow the BOP stack and LMRP to stay down almost indefinitely because the secondary cavities in the BOP stack would only be utilized after the primary cavities in the ABP were rendered inoperable. And the primary BOP cavities in the ABP could be retrieved to the surface and maintained while the BOP stack and LMRP were drilling atop another ABP.
- While preferred embodiments of this invention have been shown and described, modifications thereof can be made by one skilled in the art without departing from the scope or teaching of this invention. The embodiments described herein are exemplary only and are not limiting. Many variations and modifications of the system and apparatus are possible and are within the scope of the invention. For example, the relative dimensions of various parts, the materials from which the various parts are made, and other parameters can be varied, so long as the override apparatus retain the advantages discussed herein. Accordingly, the scope of protection is not limited to the embodiments described herein, but is only limited by the claims that follow, the scope of which shall include all equivalents of the subject matter of the claims.
Claims (20)
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/134,958 US7921917B2 (en) | 2007-06-08 | 2008-06-06 | Multi-deployable subsea stack system |
BRPI0812466-3A2A BRPI0812466A2 (en) | 2007-06-08 | 2008-06-09 | SUBMARINE MULTIPLE DISTRIBUTION SAFETY VALVE ASSEMBLY SYSTEM |
PCT/US2008/066314 WO2008154486A2 (en) | 2007-06-08 | 2008-06-09 | Multi-deployable subsea stack system |
EP08770496.1A EP2165042B1 (en) | 2007-06-08 | 2008-06-09 | Multi-deployable subsea stack system |
NO08770496A NO2165042T3 (en) | 2007-06-08 | 2008-06-09 | |
US13/043,660 US8365830B2 (en) | 2007-06-08 | 2011-03-09 | Multi-deployable subsea stack system |
US13/733,477 US8640775B2 (en) | 2007-06-08 | 2013-01-03 | Multi-deployable subsea stack system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US93393407P | 2007-06-08 | 2007-06-08 | |
US12/134,958 US7921917B2 (en) | 2007-06-08 | 2008-06-06 | Multi-deployable subsea stack system |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/043,660 Continuation US8365830B2 (en) | 2007-06-08 | 2011-03-09 | Multi-deployable subsea stack system |
Publications (2)
Publication Number | Publication Date |
---|---|
US20080302536A1 true US20080302536A1 (en) | 2008-12-11 |
US7921917B2 US7921917B2 (en) | 2011-04-12 |
Family
ID=40094790
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/134,958 Active 2029-04-23 US7921917B2 (en) | 2007-06-08 | 2008-06-06 | Multi-deployable subsea stack system |
US13/043,660 Expired - Fee Related US8365830B2 (en) | 2007-06-08 | 2011-03-09 | Multi-deployable subsea stack system |
US13/733,477 Expired - Fee Related US8640775B2 (en) | 2007-06-08 | 2013-01-03 | Multi-deployable subsea stack system |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/043,660 Expired - Fee Related US8365830B2 (en) | 2007-06-08 | 2011-03-09 | Multi-deployable subsea stack system |
US13/733,477 Expired - Fee Related US8640775B2 (en) | 2007-06-08 | 2013-01-03 | Multi-deployable subsea stack system |
Country Status (5)
Country | Link |
---|---|
US (3) | US7921917B2 (en) |
EP (1) | EP2165042B1 (en) |
BR (1) | BRPI0812466A2 (en) |
NO (1) | NO2165042T3 (en) |
WO (1) | WO2008154486A2 (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090194290A1 (en) * | 2007-08-09 | 2009-08-06 | Dtc International, Inc. | Control system for blowout preventer stack |
US20110100637A1 (en) * | 2009-10-29 | 2011-05-05 | Hydril Usa Manufacturing Llc | Safety Mechanism for Blowout Preventer |
WO2011128690A1 (en) * | 2010-04-13 | 2011-10-20 | Managed Pressure Operations Pte. Limited | Blowout preventer assembly |
WO2012012648A1 (en) | 2010-07-21 | 2012-01-26 | Marine Well Containment Company | Marine well containment system and method |
US20120090850A1 (en) * | 2010-07-15 | 2012-04-19 | Botich Leon A | Apparatuses and methods for closing and reopening a pipe |
US20120241160A1 (en) * | 2010-12-20 | 2012-09-27 | Joe Spacek | Oil well improvement system |
US20130020086A1 (en) * | 2011-04-13 | 2013-01-24 | Bp Exploration Operating Company Limited | Systems and methods for capping a subsea well |
WO2013062421A1 (en) * | 2011-10-27 | 2013-05-02 | Subsea Solutions As | Method and device for extending lifetime of a wellhead |
US8485261B2 (en) | 2010-07-15 | 2013-07-16 | Deep Sea Innovations, Llc | Apparatuses and methods for closing and reopening a pipe |
CN103477024A (en) * | 2011-02-02 | 2013-12-25 | 萨博西解决方案有限公司 | Method and device for extending at least the lifetime of a christmas tree or an umbilical |
US9187973B2 (en) | 2013-03-15 | 2015-11-17 | Cameron International Corporation | Offshore well system with a subsea pressure control system movable with a remotely operated vehicle |
CN105971547A (en) * | 2016-06-25 | 2016-09-28 | 中国石油大学(华东) | Blowout rescue device and method for clustered well head of marine drilling platform |
US9976375B2 (en) | 2011-11-10 | 2018-05-22 | Cameron International Corporation | Blowout preventer shut-in assembly of last resort |
US11280137B2 (en) * | 2019-06-17 | 2022-03-22 | Nabors Drilling Technologies Usa, Inc. | Dual mast rig with independently adjustable platforms |
Families Citing this family (38)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7921917B2 (en) * | 2007-06-08 | 2011-04-12 | Cameron International Corporation | Multi-deployable subsea stack system |
US20090044950A1 (en) * | 2007-08-13 | 2009-02-19 | Boudreau Paul R | Buoyancy tensioning systems for offshore marine risers and methods of use |
US8322429B2 (en) * | 2008-05-29 | 2012-12-04 | Hydril Usa Manufacturing Llc | Interchangeable subsea wellhead devices and methods |
WO2010053812A2 (en) * | 2008-10-29 | 2010-05-14 | Christopher Scott Clark | Control package container |
BR112012007460B1 (en) * | 2009-10-01 | 2019-05-21 | Enovate Systems Limited | WELL CONTAINMENT SYSTEM |
WO2011150378A1 (en) | 2010-05-28 | 2011-12-01 | David Randolph Smith | Method and apparatus to control fluid flow subsea wells |
US8881829B2 (en) * | 2010-10-07 | 2014-11-11 | David B. Redden | Backup wellhead blowout prevention system and method |
US8403053B2 (en) * | 2010-12-17 | 2013-03-26 | Hydril Usa Manufacturing Llc | Circuit functional test system and method |
EP2665887A2 (en) * | 2011-01-18 | 2013-11-27 | Noble Drilling Services, Inc. | Method for capping a well in the event of subsea blowout preventer failure |
US9416797B2 (en) | 2011-04-14 | 2016-08-16 | Shell Oil Company | Capping stack and method for controlling a wellbore |
US8720580B1 (en) * | 2011-06-14 | 2014-05-13 | Trendsetter Engineering, Inc. | System and method for diverting fluids from a damaged blowout preventer |
US9033051B1 (en) * | 2011-06-14 | 2015-05-19 | Trendsetter Engineering, Inc. | System for diversion of fluid flow from a wellhead |
US9670755B1 (en) * | 2011-06-14 | 2017-06-06 | Trendsetter Engineering, Inc. | Pump module systems for preventing or reducing release of hydrocarbons from a subsea formation |
US9080411B1 (en) | 2011-06-14 | 2015-07-14 | Trendsetter Engineering, Inc. | Subsea diverter system for use with a blowout preventer |
US9970287B2 (en) | 2012-08-28 | 2018-05-15 | Cameron International Corporation | Subsea electronic data system |
US9045959B1 (en) * | 2012-09-21 | 2015-06-02 | Trendsetter Engineering, Inc. | Insert tube for use with a lower marine riser package |
CN106014322A (en) * | 2012-11-12 | 2016-10-12 | 卡梅伦国际有限公司 | Blowout preventer system |
US9428981B2 (en) * | 2013-03-15 | 2016-08-30 | Stanley Hosie | Subsea test adaptor for calibration of subsea multi-phase flow meter during initial clean-up and test and methods of using same |
US11156053B2 (en) * | 2013-03-15 | 2021-10-26 | Safestack Technology L.L.C. | Riser disconnect package for lower marine riser package, and annular-release flex-joint assemblies |
US20150233202A1 (en) * | 2013-03-15 | 2015-08-20 | Safestack Technology L.L.C. | Riser disconnect package for lower marine riser package, and annular-release flex-joint assemblies |
US9650855B2 (en) * | 2013-03-15 | 2017-05-16 | Safestack Technology L.L.C. | Riser disconnect package for lower marine riser package, and annular-release flex-joint assemblies |
CA2926404C (en) | 2013-10-07 | 2022-05-10 | Transocean Innovation Labs, Ltd. | Manifolds for providing hydraulic fluid to a subsea blowout preventer and related methods |
US9140091B1 (en) | 2013-10-30 | 2015-09-22 | Trendsetter Engineering, Inc. | Apparatus and method for adjusting an angular orientation of a subsea structure |
US9309740B2 (en) * | 2014-07-18 | 2016-04-12 | Onesubsea Ip Uk Limited | Subsea completion with crossover passage |
US10196871B2 (en) | 2014-09-30 | 2019-02-05 | Hydril USA Distribution LLC | Sil rated system for blowout preventer control |
US10876369B2 (en) | 2014-09-30 | 2020-12-29 | Hydril USA Distribution LLC | High pressure blowout preventer system |
US10048673B2 (en) * | 2014-10-17 | 2018-08-14 | Hydril Usa Distribution, Llc | High pressure blowout preventer system |
KR102471843B1 (en) * | 2014-09-30 | 2022-11-28 | 하이드릴 유에스에이 디스트리뷰션 엘엘씨 | Safety integrity levels(sil) rated system for blowout preventer control |
USD749644S1 (en) * | 2014-10-28 | 2016-02-16 | David B. Redden | Subsea dual housing assembly |
WO2016176724A1 (en) * | 2015-05-01 | 2016-11-10 | Kinetic Pressure Control Limited | Choke and kill system |
US10132135B2 (en) * | 2015-08-05 | 2018-11-20 | Cameron International Corporation | Subsea drilling system with intensifier |
US9670732B1 (en) * | 2016-01-14 | 2017-06-06 | Chevron U.S.A. Inc. | Batch drilling using multiple mudline closure devices |
US10392892B2 (en) | 2016-06-01 | 2019-08-27 | Trendsetter Engineering, Inc. | Rapid mobilization air-freightable capping stack system |
KR102475017B1 (en) | 2016-09-16 | 2022-12-06 | 하이드릴 유에스에이 디스트리뷰션 엘엘씨 | Configurable BOP stack |
WO2019108572A1 (en) * | 2017-11-28 | 2019-06-06 | Schlumberger Technology Corporation | Blow-out preventer assembly and handling device |
US11808113B2 (en) | 2022-01-14 | 2023-11-07 | Saudi Arabian Oil Company | Mud saver and metal collector bell nipple |
US11933130B2 (en) | 2022-02-22 | 2024-03-19 | Saudi Arabian Oil Company | Installing a shooting nipple on a rotating control device |
US11824682B1 (en) | 2023-01-27 | 2023-11-21 | Schlumberger Technology Corporation | Can-open master redundancy in PLC-based control system |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4116272A (en) * | 1977-06-21 | 1978-09-26 | Halliburton Company | Subsea test tree for oil wells |
US4624318A (en) * | 1983-05-26 | 1986-11-25 | Chevron Research Company | Method and means for storing a marine riser |
US4626135A (en) * | 1984-10-22 | 1986-12-02 | Hydril Company | Marine riser well control method and apparatus |
US5146990A (en) * | 1991-04-30 | 1992-09-15 | Shell Offshore Inc. | Anchoring structure for marine riser assembly |
US5676209A (en) * | 1995-11-20 | 1997-10-14 | Hydril Company | Deep water riser assembly |
US5875848A (en) * | 1997-04-10 | 1999-03-02 | Reading & Bates Development Co. | Weight management system and method for marine drilling riser |
US6227300B1 (en) * | 1997-10-07 | 2001-05-08 | Fmc Corporation | Slimbore subsea completion system and method |
US6422315B1 (en) * | 1999-09-14 | 2002-07-23 | Quenton Wayne Dean | Subsea drilling operations |
US6968902B2 (en) * | 2002-11-12 | 2005-11-29 | Vetco Gray Inc. | Drilling and producing deep water subsea wells |
US7063157B2 (en) * | 2002-08-22 | 2006-06-20 | Fmc Technologies, Inc. | Apparatus and method for installation of subsea well completion systems |
US7134498B2 (en) * | 2003-09-24 | 2006-11-14 | Cameron International Corporation | Well drilling and completions system |
US7216714B2 (en) * | 2004-08-20 | 2007-05-15 | Oceaneering International, Inc. | Modular, distributed, ROV retrievable subsea control system, associated deepwater subsea blowout preventer stack configuration, and methods of use |
US20070163782A1 (en) * | 2005-12-22 | 2007-07-19 | Transocean Offshore Deepwater Drilling Inc | Dual-bop and common riser system |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3409084A (en) * | 1966-03-04 | 1968-11-05 | Exxon Production Research Co | Blowout control apparatus for wells |
US4825953A (en) * | 1988-02-01 | 1989-05-02 | Otis Engineering Corporation | Well servicing system |
FR2631653B1 (en) * | 1988-05-19 | 1990-08-17 | Schlumberger Prospection | METHOD FOR INSERTING A TOOL IN A PRESSURE WELL |
GB0100565D0 (en) * | 2001-01-10 | 2001-02-21 | 2H Offshore Engineering Ltd | Operating a subsea well |
US7215715B2 (en) | 2001-02-06 | 2007-05-08 | Maxim Integrated Products, Inc. | System and method of signal wave shaping for spectrum control of an OFDM signal |
US7779917B2 (en) * | 2002-11-26 | 2010-08-24 | Cameron International Corporation | Subsea connection apparatus for a surface blowout preventer stack |
NO319621B1 (en) * | 2003-05-28 | 2005-09-05 | Fmc Kongsberg Subsea As | Device by lubricator |
EP1519003B1 (en) * | 2003-09-24 | 2007-08-15 | Cooper Cameron Corporation | Removable seal |
NO322519B1 (en) * | 2004-09-20 | 2006-10-16 | Fmc Kongsberg Subsea As | Device by joint |
US7921917B2 (en) * | 2007-06-08 | 2011-04-12 | Cameron International Corporation | Multi-deployable subsea stack system |
-
2008
- 2008-06-06 US US12/134,958 patent/US7921917B2/en active Active
- 2008-06-09 NO NO08770496A patent/NO2165042T3/no unknown
- 2008-06-09 EP EP08770496.1A patent/EP2165042B1/en not_active Not-in-force
- 2008-06-09 BR BRPI0812466-3A2A patent/BRPI0812466A2/en not_active IP Right Cessation
- 2008-06-09 WO PCT/US2008/066314 patent/WO2008154486A2/en active Application Filing
-
2011
- 2011-03-09 US US13/043,660 patent/US8365830B2/en not_active Expired - Fee Related
-
2013
- 2013-01-03 US US13/733,477 patent/US8640775B2/en not_active Expired - Fee Related
Patent Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4116272A (en) * | 1977-06-21 | 1978-09-26 | Halliburton Company | Subsea test tree for oil wells |
US4624318A (en) * | 1983-05-26 | 1986-11-25 | Chevron Research Company | Method and means for storing a marine riser |
US4626135A (en) * | 1984-10-22 | 1986-12-02 | Hydril Company | Marine riser well control method and apparatus |
US5146990A (en) * | 1991-04-30 | 1992-09-15 | Shell Offshore Inc. | Anchoring structure for marine riser assembly |
US5676209A (en) * | 1995-11-20 | 1997-10-14 | Hydril Company | Deep water riser assembly |
US5875848A (en) * | 1997-04-10 | 1999-03-02 | Reading & Bates Development Co. | Weight management system and method for marine drilling riser |
US6715554B1 (en) * | 1997-10-07 | 2004-04-06 | Fmc Technologies, Inc. | Slimbore subsea completion system and method |
US6227300B1 (en) * | 1997-10-07 | 2001-05-08 | Fmc Corporation | Slimbore subsea completion system and method |
US6408947B1 (en) * | 1997-10-07 | 2002-06-25 | Fmc Corporation | Subsea connection apparatus |
US6422315B1 (en) * | 1999-09-14 | 2002-07-23 | Quenton Wayne Dean | Subsea drilling operations |
US6622799B2 (en) * | 1999-09-14 | 2003-09-23 | Quenton Wayne Dean | Method for subsea pod retrieval |
US7143830B2 (en) * | 2002-08-22 | 2006-12-05 | Fmc Technologies, Inc. | Apparatus and method for installation of subsea well completion systems |
US7063157B2 (en) * | 2002-08-22 | 2006-06-20 | Fmc Technologies, Inc. | Apparatus and method for installation of subsea well completion systems |
US6968902B2 (en) * | 2002-11-12 | 2005-11-29 | Vetco Gray Inc. | Drilling and producing deep water subsea wells |
US7134498B2 (en) * | 2003-09-24 | 2006-11-14 | Cameron International Corporation | Well drilling and completions system |
US7216714B2 (en) * | 2004-08-20 | 2007-05-15 | Oceaneering International, Inc. | Modular, distributed, ROV retrievable subsea control system, associated deepwater subsea blowout preventer stack configuration, and methods of use |
US7216715B2 (en) * | 2004-08-20 | 2007-05-15 | Oceaneering International, Inc. | Modular, distributed, ROV retrievable subsea control system, associated deepwater subsea blowout preventer stack configuration, and methods of use |
US7222674B2 (en) * | 2004-08-20 | 2007-05-29 | Oceaneering International, Inc. | Modular, distributed, ROV retrievable subsea control system, associated deepwater subsea blowout preventer stack configuration, and methods of use |
US7690433B2 (en) * | 2004-08-20 | 2010-04-06 | Oceeaneering International, Inc. | Modular, distributed, ROV retrievable subsea control system, associated deepwater subsea blowout preventer stack configuration, and methods of use |
US20070163782A1 (en) * | 2005-12-22 | 2007-07-19 | Transocean Offshore Deepwater Drilling Inc | Dual-bop and common riser system |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8820410B2 (en) * | 2007-08-09 | 2014-09-02 | Dtc International, Inc. | Control system for blowout preventer stack |
US20090194290A1 (en) * | 2007-08-09 | 2009-08-06 | Dtc International, Inc. | Control system for blowout preventer stack |
US20110100637A1 (en) * | 2009-10-29 | 2011-05-05 | Hydril Usa Manufacturing Llc | Safety Mechanism for Blowout Preventer |
US8770298B2 (en) * | 2009-10-29 | 2014-07-08 | Hydril Usa Manufacturing Llc | Safety mechanism for blowout preventer |
WO2011128690A1 (en) * | 2010-04-13 | 2011-10-20 | Managed Pressure Operations Pte. Limited | Blowout preventer assembly |
US9212532B2 (en) | 2010-04-13 | 2015-12-15 | Managed Pressure Operations PTE, Limited | Blowout preventer assembly |
US8485261B2 (en) | 2010-07-15 | 2013-07-16 | Deep Sea Innovations, Llc | Apparatuses and methods for closing and reopening a pipe |
US8826990B2 (en) * | 2010-07-15 | 2014-09-09 | Deep Sea Innovations, Llc | Apparatuses and methods for closing and reopening a pipe |
US20120090850A1 (en) * | 2010-07-15 | 2012-04-19 | Botich Leon A | Apparatuses and methods for closing and reopening a pipe |
EP2596207A4 (en) * | 2010-07-21 | 2017-02-22 | Marine Well Containment Company | Marine well containment system and method |
US20120018165A1 (en) * | 2010-07-21 | 2012-01-26 | Marine Well Containment Company | Marine Well Containment System and Method |
WO2012012648A1 (en) | 2010-07-21 | 2012-01-26 | Marine Well Containment Company | Marine well containment system and method |
US9004176B2 (en) * | 2010-07-21 | 2015-04-14 | Marine Well Containment Company | Marine well containment system and method |
US20150204156A1 (en) * | 2010-07-21 | 2015-07-23 | Marine Well Containment Company | Marine well containment system and method |
US20120241160A1 (en) * | 2010-12-20 | 2012-09-27 | Joe Spacek | Oil well improvement system |
US9085950B2 (en) * | 2010-12-20 | 2015-07-21 | Joe Spacek | Oil well improvement system |
CN103477024A (en) * | 2011-02-02 | 2013-12-25 | 萨博西解决方案有限公司 | Method and device for extending at least the lifetime of a christmas tree or an umbilical |
US9605504B2 (en) | 2011-03-23 | 2017-03-28 | Managed Pressure Operations Pte Ltd | Sealing assembly |
US9488031B2 (en) | 2011-03-23 | 2016-11-08 | Managed Pressure Operations Pte. Ltd. | Blow out preventer |
US20130020086A1 (en) * | 2011-04-13 | 2013-01-24 | Bp Exploration Operating Company Limited | Systems and methods for capping a subsea well |
US9033053B2 (en) | 2011-10-27 | 2015-05-19 | Subsea Solutions As | Method and device for extending lifetime of a wellhead |
CN103930644A (en) * | 2011-10-27 | 2014-07-16 | 萨博西解决方案有限公司 | Method and device for extending lifetime of a wellhead |
WO2013062421A1 (en) * | 2011-10-27 | 2013-05-02 | Subsea Solutions As | Method and device for extending lifetime of a wellhead |
US9976375B2 (en) | 2011-11-10 | 2018-05-22 | Cameron International Corporation | Blowout preventer shut-in assembly of last resort |
GB2511004B (en) * | 2011-11-10 | 2018-07-04 | Cameron Int Corp | Blowout preventer shut-in assembly of last resort |
US9187973B2 (en) | 2013-03-15 | 2015-11-17 | Cameron International Corporation | Offshore well system with a subsea pressure control system movable with a remotely operated vehicle |
US9574426B2 (en) | 2013-03-15 | 2017-02-21 | Cameron International Corporation | Offshore well system with a subsea pressure control system movable with a remotely operated vehicle |
CN105971547A (en) * | 2016-06-25 | 2016-09-28 | 中国石油大学(华东) | Blowout rescue device and method for clustered well head of marine drilling platform |
US11280137B2 (en) * | 2019-06-17 | 2022-03-22 | Nabors Drilling Technologies Usa, Inc. | Dual mast rig with independently adjustable platforms |
Also Published As
Publication number | Publication date |
---|---|
EP2165042A2 (en) | 2010-03-24 |
WO2008154486A2 (en) | 2008-12-18 |
WO2008154486A3 (en) | 2009-03-05 |
US8640775B2 (en) | 2014-02-04 |
BRPI0812466A2 (en) | 2014-12-02 |
NO2165042T3 (en) | 2018-01-06 |
EP2165042B1 (en) | 2017-08-09 |
US20110155386A1 (en) | 2011-06-30 |
EP2165042A4 (en) | 2015-12-23 |
US20130126764A1 (en) | 2013-05-23 |
US7921917B2 (en) | 2011-04-12 |
US8365830B2 (en) | 2013-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7921917B2 (en) | Multi-deployable subsea stack system | |
US9085951B2 (en) | Subsea connection apparatus for a surface blowout preventer stack | |
US6352114B1 (en) | Deep ocean riser positioning system and method of running casing | |
US9976375B2 (en) | Blowout preventer shut-in assembly of last resort | |
US9574426B2 (en) | Offshore well system with a subsea pressure control system movable with a remotely operated vehicle | |
US20110127040A1 (en) | Assembly and method for subsea well drilling and intervention | |
US10450802B2 (en) | Mobile offshore drilling unit, a method of using such a unit and a system comprising such a unit | |
US20140190701A1 (en) | Apparatus and method for subsea well drilling and control | |
US20170058632A1 (en) | Riserless well systems and methods | |
NO20160250A1 (en) | Device for enabling removal or installation of a horizontal Christmas tree and methods thereof | |
US20190376350A1 (en) | Method for assembling and disassembling marine riser and auxiliary lines and well pressure control system | |
Childers et al. | Slim riser an alternate method for deepwater drilling | |
Humphrey et al. | North Sea Marginal Fields: The Subsea Completions Option |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: CAMERON INTERNATIONAL CORPORATION, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KOTRLA, JOHNNIE E.;WHITBY, MELVYN F.;MCWHORTER, DAVID J.;AND OTHERS;REEL/FRAME:021245/0123;SIGNING DATES FROM 20080630 TO 20080715 Owner name: CAMERON INTERNATIONAL CORPORATION, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KOTRLA, JOHNNIE E.;WHITBY, MELVYN F.;MCWHORTER, DAVID J.;AND OTHERS;SIGNING DATES FROM 20080630 TO 20080715;REEL/FRAME:021245/0123 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
FPAY | Fee payment |
Year of fee payment: 4 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 8 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1553); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 12 |