US20080302536A1 - Multi-Deployable Subsea Stack System - Google Patents

Multi-Deployable Subsea Stack System Download PDF

Info

Publication number
US20080302536A1
US20080302536A1 US12/134,958 US13495808A US2008302536A1 US 20080302536 A1 US20080302536 A1 US 20080302536A1 US 13495808 A US13495808 A US 13495808A US 2008302536 A1 US2008302536 A1 US 2008302536A1
Authority
US
United States
Prior art keywords
blowout preventer
package
additional
stack
subsea
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US12/134,958
Other versions
US7921917B2 (en
Inventor
Johnnie E. Kotrla
Melvyn F. Whitby
David J. McWhorter
Glenn J. Chiasson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cameron International Corp
Original Assignee
Cameron International Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to US12/134,958 priority Critical patent/US7921917B2/en
Application filed by Cameron International Corp filed Critical Cameron International Corp
Priority to NO08770496A priority patent/NO2165042T3/no
Priority to BRPI0812466-3A2A priority patent/BRPI0812466A2/en
Priority to PCT/US2008/066314 priority patent/WO2008154486A2/en
Priority to EP08770496.1A priority patent/EP2165042B1/en
Assigned to CAMERON INTERNATIONAL CORPORATION reassignment CAMERON INTERNATIONAL CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: WHITBY, MELVYN F., KOTRLA, JOHNNIE E., MCWHORTER, DAVID J., CHIASSON, GLENN J.
Publication of US20080302536A1 publication Critical patent/US20080302536A1/en
Priority to US13/043,660 priority patent/US8365830B2/en
Application granted granted Critical
Publication of US7921917B2 publication Critical patent/US7921917B2/en
Priority to US13/733,477 priority patent/US8640775B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/061Ram-type blow-out preventers, e.g. with pivoting rams
    • E21B33/062Ram-type blow-out preventers, e.g. with pivoting rams with sliding rams
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/035Well heads; Setting-up thereof specially adapted for underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/064Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers specially adapted for underwater well heads

Definitions

  • the present invention relates generally to the configuration and deployment of pressure control equipment used in drilling subsea wells. More particularly, the present invention relates to subsea blowout preventer stack systems.
  • the riser which provides a plurality of parallel fluid conduits between the drilling rig at the surface and the blowout preventer (BOP) stack coupled to the wellhead at the seafloor.
  • BOP blowout preventer
  • the riser is usually constructed by connecting a number of joints that are generally less than fifty feet in length. The riser is “run” by connecting a joint of riser to the BOP stack, lowering the riser-connected BOP stack a short distance, and then connecting another joint of riser to the uppermost end of the riser string. This process continues until the BOP stack is lowered to the wellhead at the seafloor.
  • One common way to improve the time a BOP stack can stay on the wellhead is to increase the number of useable ram BOP cavities in the BOP stack to the point of having a “primary” and “secondary” ram BOP cavity for each size installed. In this way, the time that a BOP stack can remain operational on the wellhead would be effectively doubled.
  • simply increasing the number of ram BOP cavities in a subsea BOP stack presents its own set of new challenges, such as increasing the size and weight of the BOP stack.
  • Drilling in deep water has often utilized subsea BOP stacks having four to six ram BOP cavities. Increasing the number of ram BOP cavities, such as to eight or ten cavities would increase the weight of the BOP stack, in some cases to a million pounds or more. Many existing rigs do not have the capacity to handle and operate such a BOP stack. In order to safely operate such a system, enhancements would be required to not only the BOP stack handling equipment on the rig, but also to the drill floor equipment, the drawworks and other hoisting equipment, the rotary table, the derrick, and the riser. Enhancing all of this equipment would likely require expanding the basic rig design to allow it to carry the additional weight of all the enhanced equipment systems and provide room for handling and storing the BOP stack.
  • the embodiments of the present invention are directed toward methods for deploying a subsea blowout preventer stack system comprising a lower marine riser package, a blowout preventer stack with a first ram blowout preventer, and an additional blowout preventer package releasably coupled to the blowout preventer stack and comprising a second ram blowout preventer.
  • the subsea blowout preventer stack assembly can be deployed by coupling a drilling riser to the lower marine riser package that is releasably connected to the blowout preventer stack.
  • the lower marine riser package and blowout preventer stack are then lowered toward a subsea wellhead and landed on the additional blowout preventer package that is already in place on the subsea wellhead.
  • neither a drilling rig nor the drilling riser is used to deploy and land the first additional blowout preventer package on the subsea wellhead.
  • the ram blowout preventers in the first additional blowout preventer package can be used as the primary blowout preventers, leaving the ram blowout preventers in the blowout preventer stack unused.
  • a first additional blowout preventer package is deployed on a first wellhead and a second additional blowout preventer package is deployed on a second subsea wellhead.
  • the BOP stack is landed on the first additional blowout preventer package and drilling operations performed through the first wellhead using the ram blowout preventers of the first additional blowout preventer package as the primary blowout preventers.
  • the blowout preventer stack is disconnected from the first additional blowout preventer package landed on the second additional blowout preventer package.
  • the blowout preventer stack can stay subsea while drilling several wells using more than one additional blowout preventer package.
  • a second additional blowout preventer package is deployed to a subsea parking pile.
  • the blowout preventer stack is disconnected from the first additional blowout preventer package and landed on the second additional blowout preventer package.
  • the first additional blowout preventer package is then disconnected from the subsea wellhead and retrieved to the surface while the blowout preventer stack and the second additional blowout preventer package are landed on the subsea wellhead.
  • the blowout preventer stack can remain subsea with minimal disruption to the drilling program while the additional blowout preventer packages are retrieved and maintained.
  • the present invention comprises a combination of features and advantages that enable it to overcome various problems of prior devices.
  • the various characteristics described above, as well as other features, will be readily apparent to those skilled in the art upon reading the following detailed description of the preferred embodiments of the invention, and by referring to the accompanying drawings.
  • FIG. 1 is an elevation view of a blowout preventer stack system constructed in accordance with embodiments of the present invention
  • FIG. 2 is an isometric view of a blowout preventer stack system constructed in accordance with embodiments of the present invention
  • FIGS. 3A and 3B illustrate the deployment and utilization of a blowout preventer stack system constructed in accordance with embodiments of the present invention with a single wellhead;
  • FIG. 4 illustrates the deployment and utilization of a blowout preventer stack system constructed in accordance with embodiments of the present invention with a single wellhead and a parking pile;
  • FIGS. 5A-5C illustrate the deployment and utilization of a blowout preventer stack system constructed in accordance with embodiments of the present invention with a plurality of wellheads.
  • subsea BOP stack system 10 comprises lower marine riser package (LMRP) 12 , BOP stack 14 , and additional BOP package (ABP) 16 .
  • Stack system 10 is shown in FIG. 1 landed on subsea wellhead 18 .
  • LMRP 12 comprises a flex joint/riser connector 20 , annular BOP 22 , wellbore connector 23 , control pods 24 , and choke/kill line connectors 26 .
  • BOP stack 14 comprises annular BOP 22 , ram BOP's 28 , choke/kill line connectors 26 , choke/kill valves 30 , wellbore connector 32 , and auxiliary control pods 34 .
  • ABP 16 comprises ram BOP's 28 , choke/kill valves 30 , and wellbore connector 32 .
  • LMRP 12 and BOP stack 14 are coupled together by wellbore connector 23 that is engaged with a corresponding mandrel on the upper end of stack 14 .
  • BOP stack 14 is similarly coupled to ABP 16 by connector 32 that engages mandrel 33 on ABP 16 .
  • Both LMRP 12 and BOP stack 14 comprise re-entry and alignment systems 40 that allow the LMRP 12 /BOP stack 14 and stack 14 /ABP 16 connections to be made subsea with all the auxiliary connections (i.e. control pods, choke/kill lines) aligned.
  • Choke/kill line connectors 26 interconnect choke/kill lines 36 and choke/kill valves 30 on stack 14 and ABP 16 to choke/kill lines 38 on riser connector 20 .
  • Control pods 24 of LMRP 12 provide control signals to BOP stack 14 while auxiliary control pods 34 on BOP stack 14 provide control signals to ABP 16 .
  • ram BOP's 28 in ABP 16 are controlled by auxiliary control pods 34 , which may be communicatively linked to control pods 24 via umbilical jumpers or some other releasable connection.
  • the control functions for ram BOP's 28 of ABP 16 (as well as control functions for other equipment) may be integrated into control pods 24 on LMRP 12 , thus eliminating the need for auxiliary control pods 34 .
  • ABP 16 is operated with BOP stack 14 , hydraulic accumulator bottles 42 mounted on the BOP stack can be used to support operation of the ABP.
  • ABP 16 may also comprise a remotely operated vehicle (ROV) panel 44 that provides control of the ABP functions by an ROV 46 .
  • ROV remotely operated vehicle
  • LMRP 12 and BOP stack 14 are similar to, and can operate as, a convention two-component stack assembly.
  • ABP 16 is installed between wellhead 18 and BOP stack 14 and provides additional ram BOP's 28 to provide redundancy and increase effective service life.
  • ABP 16 will not be lowered from the rig to the wellhead on a conventional riser with the rest of the BOP stack but will be deployed separately. This separate deployment can be accomplished on drill pipe, heavy wireline, or any other means, either from the drilling rig if it has a dual activity derrick, from another rig (perhaps of lesser drilling capabilities), or from a heavy duty workboat or tender vessel.
  • the ABP 16 could be stored and serviced by a vessel other than the drilling rig, thus eliminating the need for additional storage space and handling capacity on the drilling rig.
  • a single ABP 16 can be landed on wellhead 18 via drill string, wireline, or other non-riser system by service vessel 48 prior to drilling rig 50 arriving on site.
  • Drilling rig 50 would then run the BOP stack 14 and LMRP 12 assembly on conventional drilling riser and land the stack on ABP 16 .
  • Normal drilling operations could utilize the ram BOP's of ASP 16 until their useful life was reached. At that point, drilling could continue with the ram BOP's of BOP stack 14 without disturbing the stack assembly, thus increasing drilling time before having to bring the stack to the surface for maintenance.
  • a drilling site may comprise a wellhead 18 and a parking pile 52 .
  • Parking pile 52 provides a location for the subsea storage of an additional ABP 16 .
  • a first ABP 16 can be run as described above in reference to FIG. 3A by service vessel 48 .
  • BOP stack 14 and LMRP 16 can then be run by a drilling rig and drilling operations performed using the ram BOP's in ABP 16 .
  • a replacement ABP 16 A can be run by a service vessel and landed on parking pile 52 .
  • stack 14 and LMRP 12 can be disconnect from the ASP but remain subsea.
  • replacement ABP 16 A can be disconnected form parking pile 52 and landed on wellhead 18 .
  • Replacement ABP 16 A can be moved from parking pile 52 to wellhead 18 by drilling rig 50 by landing BOP stack 14 on ABP 16 A and then moving the entire assembly together.
  • Replacement ABP 16 A can also be moved onto wellhead 18 by a service vessel as BOP stack 14 is supported by the drilling rig.
  • multiple ABP systems 16 A- 16 B can be used to drill multiple wells on a plurality of wellheads 18 A- 18 C.
  • a first ABP 16 A can be deployed onto wellhead 18 A with BOP stack 14 and LMRP 12 being run and landed atop ABP 16 A and drilling operations commenced. While the first well is being drilled, a second ABP 16 B is deployed and landed onto the next wellhead 18 B.
  • the BOP stack 14 and LMRP 12 can simply be unlatched, lifted, relocated the second wellhead 18 B and landed on second ABP 16 B.
  • the first ABP 16 A can be retrieved from the first wellhead 18 A and moved to a third wellhead 18 C, or brought back to the surface for maintenance or repair.
  • the ram BOP cavities in the ABP can be considered the primary cavities while the ram BOP cavities in the BOP stack would then be considered the secondary cavities.
  • the primary BOP cavities in the ABP could be retrieved to the surface and maintained while the BOP stack and LMRP were drilling atop another ABP.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Stackable Containers (AREA)

Abstract

Methods for deploying a subsea blowout preventer stack system comprising a lower marine riser package, a blowout preventer stack with a first ram blowout preventer, and an additional blowout preventer package releasably coupled to the blowout preventer stack and comprising a second ram blowout preventer. The subsea blowout preventer stack assembly can be deployed by coupling a drilling riser to the lower marine riser package that is releasably connected to the blowout preventer stack. The lower marine riser package and blowout preventer stack are then toward a subsea wellhead and then landed on the additional blowout preventer package that is coupled to the subsea wellhead.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application claims benefit of U.S. provisional application Ser. No. 60/933,934 filed Jun. 8, 2007, and entitled “Multi-Deployable Subsea Stack System,” which is hereby incorporated herein by reference in its entirety for all purposes.
  • STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT
  • Not Applicable.
  • BACKGROUND
  • The present invention relates generally to the configuration and deployment of pressure control equipment used in drilling subsea wells. More particularly, the present invention relates to subsea blowout preventer stack systems.
  • As drilling rigs venture into ever increasing water depths and encounter new challenges, well control has become increasingly problematic. As costs of floating mobile offshore drilling units escalate, traditional time-intensive operations are constantly being re-evaluated in an effort to reduce overall non-drilling time, thereby increasing the drilling efficiency of the rig.
  • One of the most time-intensive operations is running the riser, which provides a plurality of parallel fluid conduits between the drilling rig at the surface and the blowout preventer (BOP) stack coupled to the wellhead at the seafloor. In order to facilitate handling of the riser on the rig, the riser is usually constructed by connecting a number of joints that are generally less than fifty feet in length. The riser is “run” by connecting a joint of riser to the BOP stack, lowering the riser-connected BOP stack a short distance, and then connecting another joint of riser to the uppermost end of the riser string. This process continues until the BOP stack is lowered to the wellhead at the seafloor.
  • In water depths in excess of 5,000 ft., running the riser generally takes several days to complete. Thus, minimizing the number of times the riser must be run is critical to minimizing the time needed to drill and complete a well. Since the BOP stack is installed at the very bottom of the riser, attempts to increase the amount of time that the BOP stack can stay on the wellhead are being explored. One factor limiting the time a BOP stack can stay on the wellhead is for maintenance of the ram BOP packer seals. Ram BOP packer seals have a limited useful life and once that limit is reached the ram BOP cannot be used until the seals have been replaced.
  • One common way to improve the time a BOP stack can stay on the wellhead is to increase the number of useable ram BOP cavities in the BOP stack to the point of having a “primary” and “secondary” ram BOP cavity for each size installed. In this way, the time that a BOP stack can remain operational on the wellhead would be effectively doubled. However, simply increasing the number of ram BOP cavities in a subsea BOP stack presents its own set of new challenges, such as increasing the size and weight of the BOP stack.
  • Drilling in deep water has often utilized subsea BOP stacks having four to six ram BOP cavities. Increasing the number of ram BOP cavities, such as to eight or ten cavities would increase the weight of the BOP stack, in some cases to a million pounds or more. Many existing rigs do not have the capacity to handle and operate such a BOP stack. In order to safely operate such a system, enhancements would be required to not only the BOP stack handling equipment on the rig, but also to the drill floor equipment, the drawworks and other hoisting equipment, the rotary table, the derrick, and the riser. Enhancing all of this equipment would likely require expanding the basic rig design to allow it to carry the additional weight of all the enhanced equipment systems and provide room for handling and storing the BOP stack.
  • Thus, there remains a need to develop methods and apparatus for allowing improved redundancy and operational times of subsea BOP stacks in order to overcome some of the foregoing difficulties while providing more advantageous overall results.
  • SUMMARY OF THE PREFERRED EMBODIMENTS
  • The embodiments of the present invention are directed toward methods for deploying a subsea blowout preventer stack system comprising a lower marine riser package, a blowout preventer stack with a first ram blowout preventer, and an additional blowout preventer package releasably coupled to the blowout preventer stack and comprising a second ram blowout preventer. The subsea blowout preventer stack assembly can be deployed by coupling a drilling riser to the lower marine riser package that is releasably connected to the blowout preventer stack. The lower marine riser package and blowout preventer stack are then lowered toward a subsea wellhead and landed on the additional blowout preventer package that is already in place on the subsea wellhead. In certain embodiments, neither a drilling rig nor the drilling riser is used to deploy and land the first additional blowout preventer package on the subsea wellhead. During drilling operations, the ram blowout preventers in the first additional blowout preventer package can be used as the primary blowout preventers, leaving the ram blowout preventers in the blowout preventer stack unused.
  • In one deployment method, a first additional blowout preventer package is deployed on a first wellhead and a second additional blowout preventer package is deployed on a second subsea wellhead. The BOP stack is landed on the first additional blowout preventer package and drilling operations performed through the first wellhead using the ram blowout preventers of the first additional blowout preventer package as the primary blowout preventers. Once drilling is complete at the first wellhead, the blowout preventer stack is disconnected from the first additional blowout preventer package landed on the second additional blowout preventer package. In this method, the blowout preventer stack can stay subsea while drilling several wells using more than one additional blowout preventer package.
  • In some deployment methods, a second additional blowout preventer package is deployed to a subsea parking pile. Once the useful life of the first additional blowout preventer package has been reached the blowout preventer stack is disconnected from the first additional blowout preventer package and landed on the second additional blowout preventer package. The first additional blowout preventer package is then disconnected from the subsea wellhead and retrieved to the surface while the blowout preventer stack and the second additional blowout preventer package are landed on the subsea wellhead. Thus, the blowout preventer stack can remain subsea with minimal disruption to the drilling program while the additional blowout preventer packages are retrieved and maintained.
  • Thus, the present invention comprises a combination of features and advantages that enable it to overcome various problems of prior devices. The various characteristics described above, as well as other features, will be readily apparent to those skilled in the art upon reading the following detailed description of the preferred embodiments of the invention, and by referring to the accompanying drawings.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • For a more detailed description of the preferred embodiment of the present invention, reference will now be made to the accompanying drawings, wherein:
  • FIG. 1 is an elevation view of a blowout preventer stack system constructed in accordance with embodiments of the present invention;
  • FIG. 2 is an isometric view of a blowout preventer stack system constructed in accordance with embodiments of the present invention;
  • FIGS. 3A and 3B illustrate the deployment and utilization of a blowout preventer stack system constructed in accordance with embodiments of the present invention with a single wellhead;
  • FIG. 4 illustrates the deployment and utilization of a blowout preventer stack system constructed in accordance with embodiments of the present invention with a single wellhead and a parking pile; and
  • FIGS. 5A-5C illustrate the deployment and utilization of a blowout preventer stack system constructed in accordance with embodiments of the present invention with a plurality of wellheads.
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • Referring now to FIG. 1, subsea BOP stack system 10 comprises lower marine riser package (LMRP) 12, BOP stack 14, and additional BOP package (ABP) 16. Stack system 10 is shown in FIG. 1 landed on subsea wellhead 18. LMRP 12 comprises a flex joint/riser connector 20, annular BOP 22, wellbore connector 23, control pods 24, and choke/kill line connectors 26. BOP stack 14 comprises annular BOP 22, ram BOP's 28, choke/kill line connectors 26, choke/kill valves 30, wellbore connector 32, and auxiliary control pods 34. ABP 16 comprises ram BOP's 28, choke/kill valves 30, and wellbore connector 32.
  • LMRP 12 and BOP stack 14 are coupled together by wellbore connector 23 that is engaged with a corresponding mandrel on the upper end of stack 14. As is shown in FIG. 2, BOP stack 14 is similarly coupled to ABP 16 by connector 32 that engages mandrel 33 on ABP 16. Both LMRP 12 and BOP stack 14 comprise re-entry and alignment systems 40 that allow the LMRP 12/BOP stack 14 and stack 14/ABP 16 connections to be made subsea with all the auxiliary connections (i.e. control pods, choke/kill lines) aligned. Choke/kill line connectors 26 interconnect choke/kill lines 36 and choke/kill valves 30 on stack 14 and ABP 16 to choke/kill lines 38 on riser connector 20.
  • Control pods 24 of LMRP 12 provide control signals to BOP stack 14 while auxiliary control pods 34 on BOP stack 14 provide control signals to ABP 16. In certain embodiments, ram BOP's 28 in ABP 16 are controlled by auxiliary control pods 34, which may be communicatively linked to control pods 24 via umbilical jumpers or some other releasable connection. In certain embodiments, the control functions for ram BOP's 28 of ABP 16 (as well as control functions for other equipment) may be integrated into control pods 24 on LMRP 12, thus eliminating the need for auxiliary control pods 34. Because ABP 16 is operated with BOP stack 14, hydraulic accumulator bottles 42 mounted on the BOP stack can be used to support operation of the ABP. ABP 16 may also comprise a remotely operated vehicle (ROV) panel 44 that provides control of the ABP functions by an ROV 46.
  • LMRP 12 and BOP stack 14 are similar to, and can operate as, a convention two-component stack assembly. ABP 16 is installed between wellhead 18 and BOP stack 14 and provides additional ram BOP's 28 to provide redundancy and increase effective service life. In certain embodiments, ABP 16 will not be lowered from the rig to the wellhead on a conventional riser with the rest of the BOP stack but will be deployed separately. This separate deployment can be accomplished on drill pipe, heavy wireline, or any other means, either from the drilling rig if it has a dual activity derrick, from another rig (perhaps of lesser drilling capabilities), or from a heavy duty workboat or tender vessel. In addition to being run, the ABP 16 could be stored and serviced by a vessel other than the drilling rig, thus eliminating the need for additional storage space and handling capacity on the drilling rig.
  • Referring now to FIGS. 3A and 3B, a single ABP 16 can be landed on wellhead 18 via drill string, wireline, or other non-riser system by service vessel 48 prior to drilling rig 50 arriving on site. Drilling rig 50 would then run the BOP stack 14 and LMRP 12 assembly on conventional drilling riser and land the stack on ABP 16. Normal drilling operations could utilize the ram BOP's of ASP 16 until their useful life was reached. At that point, drilling could continue with the ram BOP's of BOP stack 14 without disturbing the stack assembly, thus increasing drilling time before having to bring the stack to the surface for maintenance.
  • Referring now to FIG. 4, a drilling site may comprise a wellhead 18 and a parking pile 52. Parking pile 52 provides a location for the subsea storage of an additional ABP 16. A first ABP 16 can be run as described above in reference to FIG. 3A by service vessel 48. BOP stack 14 and LMRP 16 can then be run by a drilling rig and drilling operations performed using the ram BOP's in ABP 16. Before the useful life of the ram BOP's in ABP 16 is reached, a replacement ABP 16A can be run by a service vessel and landed on parking pile 52. When the first ABP 16 needs to be serviced, stack 14 and LMRP 12 can be disconnect from the ASP but remain subsea. Once ABP 16 is pulled to the surface for servicing, replacement ABP 16A can be disconnected form parking pile 52 and landed on wellhead 18. Replacement ABP 16A can be moved from parking pile 52 to wellhead 18 by drilling rig 50 by landing BOP stack 14 on ABP 16A and then moving the entire assembly together. Replacement ABP 16A can also be moved onto wellhead 18 by a service vessel as BOP stack 14 is supported by the drilling rig.
  • Referring now to FIGS. 5A-5C, multiple ABP systems 16A-16B can be used to drill multiple wells on a plurality of wellheads 18A-18C. A first ABP 16A can be deployed onto wellhead 18A with BOP stack 14 and LMRP 12 being run and landed atop ABP 16A and drilling operations commenced. While the first well is being drilled, a second ABP 16B is deployed and landed onto the next wellhead 18B. When the first well is completed, the BOP stack 14 and LMRP 12 can simply be unlatched, lifted, relocated the second wellhead 18B and landed on second ABP 16B. While the second well is being completed, the first ABP 16A can be retrieved from the first wellhead 18A and moved to a third wellhead 18C, or brought back to the surface for maintenance or repair.
  • Under any of the uses of an ABP as described above, the ram BOP cavities in the ABP can be considered the primary cavities while the ram BOP cavities in the BOP stack would then be considered the secondary cavities. This would allow the BOP stack and LMRP to stay down almost indefinitely because the secondary cavities in the BOP stack would only be utilized after the primary cavities in the ABP were rendered inoperable. And the primary BOP cavities in the ABP could be retrieved to the surface and maintained while the BOP stack and LMRP were drilling atop another ABP.
  • While preferred embodiments of this invention have been shown and described, modifications thereof can be made by one skilled in the art without departing from the scope or teaching of this invention. The embodiments described herein are exemplary only and are not limiting. Many variations and modifications of the system and apparatus are possible and are within the scope of the invention. For example, the relative dimensions of various parts, the materials from which the various parts are made, and other parameters can be varied, so long as the override apparatus retain the advantages discussed herein. Accordingly, the scope of protection is not limited to the embodiments described herein, but is only limited by the claims that follow, the scope of which shall include all equivalents of the subject matter of the claims.

Claims (20)

1. A subsea blowout preventer stack deployment method comprising:
coupling a drilling riser to a lower marine riser package that is releasably connected to a blowout preventer stack;
lowering the lower marine riser package and blowout preventer stack toward a subsea wellhead; and
landing the blowout preventer stack on a first additional blowout preventer package that is coupled to the subsea wellhead, wherein the first additional blowout preventer package comprises a ram blowout preventer.
2. The subsea blowout preventer stack deployment method of claim 1, wherein the drilling riser is not used to deploy and land the first additional blowout preventer package on the subsea wellhead.
3. The subsea blowout preventer stack deployment method of claim 2, wherein the first additional blowout preventer package is not deployed by a drilling rig.
4. The subsea blowout preventer stack deployment method of claim 1, wherein the blowout preventer stack comprises a connector that is operable to engage a mandrel disposed on the additional blowout preventer package.
5. The subsea blowout preventer stack deployment method of claim 1, further comprising:
deploying a second additional blowout preventer package on a second subsea wellhead;
disconnecting the blowout preventer stack from the first additional blowout preventer package; and
landing the blowout preventer stack on the second additional blowout preventer package.
6. The subsea blowout preventer stack deployment method of claim 5, wherein the blowout preventer stack is landed on the second additional blowout preventer package without retrieving the blowout preventer stack to the surface.
7. The subsea blowout preventer stack deployment method of claim 1, further comprising:
deploying a second additional blowout preventer package to a subsea parking pile;
disconnecting the blowout preventer stack from the first additional blowout preventer package;
landing the blowout preventer stack on the second additional blowout preventer package;
disconnecting the first additional blowout preventer package from the subsea wellhead and retrieving it to the surface; and
landing the blowout preventer stack and the second additional blowout preventer package on the subsea wellhead.
8. The subsea blowout preventer stack deployment method of claim 7, wherein the drilling riser is not used to deploy the second additional blowout preventer package.
9. The subsea blowout preventer stack deployment method of claim 7, wherein a drilling rig is not used to deploy the second additional blowout preventer package or retrieve the first additional blowout preventer package.
10. A subsea drilling method comprising:
deploying a first additional blowout preventer package to a subsea wellhead, wherein the first additional blowout preventer package comprises a ram blowout preventer;
utilizing a drilling riser to deploy a lower marine riser package and a blowout preventer stack from a drilling rig;
landing the blowout preventer stack on the first additional blowout preventer package; and
performing drilling operations with the drilling rig while utilizing the ram blowout preventer in the first additional blowout preventer package.
11. The subsea drilling method of claim 10, wherein the drilling riser is not used to deploy the first additional blowout preventer package on the subsea wellhead.
12. The subsea drilling method of claim 11, wherein the drilling rig is not used to deploy the first additional blowout preventer package.
13. The subsea drilling method of claim 10, further comprising:
deploying a second additional blowout preventer package on a second subsea wellhead;
disconnecting the blowout preventer stack from the first additional blowout preventer package; and
landing the blowout preventer stack on the second additional blowout preventer package.
14. The subsea drilling method of claim 13, wherein the blowout preventer stack is landed on the second additional blowout preventer package without retrieving the blowout preventer stack to the surface.
15. The subsea drilling method of claim 10, further comprising:
deploying a second additional blowout preventer package to a subsea parking pile;
disconnecting the blowout preventer stack from the first additional blowout preventer package;
landing the blowout preventer stack on the second additional blowout preventer package;
disconnecting the first additional blowout preventer package from the subsea wellhead and retrieving it to the surface; and
landing the blowout preventer stack and the second additional blowout preventer package on the subsea wellhead.
16. The subsea drilling method of claim 15, wherein the drilling rig is not used to deploy the second additional blowout preventer package or retrieve the first additional blowout preventer package.
17. A blowout preventer stack system comprising:
a lower marine riser package comprising a riser connector;
a blowout preventer stack releasably coupled to said lower marine riser package and comprising a first ram blowout preventer; and
an additional blowout preventer package releasably coupled to said blowout preventer stack and comprising a second ram blowout preventer.
18. The blowout preventer stack system of claim 17, further comprising:
a first passive re-entry and alignment system operable to align said lower marine riser package and said blowout preventer stack; and
a second passive re-entry and alignment system operable to align said blowout preventer stack and said additional blowout preventer package.
19. The blowout preventer stack system of claim 17, further comprising:
a primary control pod disposed on said lower marine riser package and operable to actuate the first ram blowout preventer; and
a auxiliary control pod disposed on said blowout preventer stack and operable to actuate the second ram blowout preventer.
20. The blowout preventer stack system of claim 17, further comprising a choke/kill line connector disposed on said blowout preventer stack and providing fluid communication between choke/kill valves disposed on said additional blowout preventer package and said blowout preventer stack.
US12/134,958 2007-06-08 2008-06-06 Multi-deployable subsea stack system Active 2029-04-23 US7921917B2 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
US12/134,958 US7921917B2 (en) 2007-06-08 2008-06-06 Multi-deployable subsea stack system
BRPI0812466-3A2A BRPI0812466A2 (en) 2007-06-08 2008-06-09 SUBMARINE MULTIPLE DISTRIBUTION SAFETY VALVE ASSEMBLY SYSTEM
PCT/US2008/066314 WO2008154486A2 (en) 2007-06-08 2008-06-09 Multi-deployable subsea stack system
EP08770496.1A EP2165042B1 (en) 2007-06-08 2008-06-09 Multi-deployable subsea stack system
NO08770496A NO2165042T3 (en) 2007-06-08 2008-06-09
US13/043,660 US8365830B2 (en) 2007-06-08 2011-03-09 Multi-deployable subsea stack system
US13/733,477 US8640775B2 (en) 2007-06-08 2013-01-03 Multi-deployable subsea stack system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US93393407P 2007-06-08 2007-06-08
US12/134,958 US7921917B2 (en) 2007-06-08 2008-06-06 Multi-deployable subsea stack system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US13/043,660 Continuation US8365830B2 (en) 2007-06-08 2011-03-09 Multi-deployable subsea stack system

Publications (2)

Publication Number Publication Date
US20080302536A1 true US20080302536A1 (en) 2008-12-11
US7921917B2 US7921917B2 (en) 2011-04-12

Family

ID=40094790

Family Applications (3)

Application Number Title Priority Date Filing Date
US12/134,958 Active 2029-04-23 US7921917B2 (en) 2007-06-08 2008-06-06 Multi-deployable subsea stack system
US13/043,660 Expired - Fee Related US8365830B2 (en) 2007-06-08 2011-03-09 Multi-deployable subsea stack system
US13/733,477 Expired - Fee Related US8640775B2 (en) 2007-06-08 2013-01-03 Multi-deployable subsea stack system

Family Applications After (2)

Application Number Title Priority Date Filing Date
US13/043,660 Expired - Fee Related US8365830B2 (en) 2007-06-08 2011-03-09 Multi-deployable subsea stack system
US13/733,477 Expired - Fee Related US8640775B2 (en) 2007-06-08 2013-01-03 Multi-deployable subsea stack system

Country Status (5)

Country Link
US (3) US7921917B2 (en)
EP (1) EP2165042B1 (en)
BR (1) BRPI0812466A2 (en)
NO (1) NO2165042T3 (en)
WO (1) WO2008154486A2 (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090194290A1 (en) * 2007-08-09 2009-08-06 Dtc International, Inc. Control system for blowout preventer stack
US20110100637A1 (en) * 2009-10-29 2011-05-05 Hydril Usa Manufacturing Llc Safety Mechanism for Blowout Preventer
WO2011128690A1 (en) * 2010-04-13 2011-10-20 Managed Pressure Operations Pte. Limited Blowout preventer assembly
WO2012012648A1 (en) 2010-07-21 2012-01-26 Marine Well Containment Company Marine well containment system and method
US20120090850A1 (en) * 2010-07-15 2012-04-19 Botich Leon A Apparatuses and methods for closing and reopening a pipe
US20120241160A1 (en) * 2010-12-20 2012-09-27 Joe Spacek Oil well improvement system
US20130020086A1 (en) * 2011-04-13 2013-01-24 Bp Exploration Operating Company Limited Systems and methods for capping a subsea well
WO2013062421A1 (en) * 2011-10-27 2013-05-02 Subsea Solutions As Method and device for extending lifetime of a wellhead
US8485261B2 (en) 2010-07-15 2013-07-16 Deep Sea Innovations, Llc Apparatuses and methods for closing and reopening a pipe
CN103477024A (en) * 2011-02-02 2013-12-25 萨博西解决方案有限公司 Method and device for extending at least the lifetime of a christmas tree or an umbilical
US9187973B2 (en) 2013-03-15 2015-11-17 Cameron International Corporation Offshore well system with a subsea pressure control system movable with a remotely operated vehicle
CN105971547A (en) * 2016-06-25 2016-09-28 中国石油大学(华东) Blowout rescue device and method for clustered well head of marine drilling platform
US9976375B2 (en) 2011-11-10 2018-05-22 Cameron International Corporation Blowout preventer shut-in assembly of last resort
US11280137B2 (en) * 2019-06-17 2022-03-22 Nabors Drilling Technologies Usa, Inc. Dual mast rig with independently adjustable platforms

Families Citing this family (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7921917B2 (en) * 2007-06-08 2011-04-12 Cameron International Corporation Multi-deployable subsea stack system
US20090044950A1 (en) * 2007-08-13 2009-02-19 Boudreau Paul R Buoyancy tensioning systems for offshore marine risers and methods of use
US8322429B2 (en) * 2008-05-29 2012-12-04 Hydril Usa Manufacturing Llc Interchangeable subsea wellhead devices and methods
WO2010053812A2 (en) * 2008-10-29 2010-05-14 Christopher Scott Clark Control package container
BR112012007460B1 (en) * 2009-10-01 2019-05-21 Enovate Systems Limited WELL CONTAINMENT SYSTEM
WO2011150378A1 (en) 2010-05-28 2011-12-01 David Randolph Smith Method and apparatus to control fluid flow subsea wells
US8881829B2 (en) * 2010-10-07 2014-11-11 David B. Redden Backup wellhead blowout prevention system and method
US8403053B2 (en) * 2010-12-17 2013-03-26 Hydril Usa Manufacturing Llc Circuit functional test system and method
EP2665887A2 (en) * 2011-01-18 2013-11-27 Noble Drilling Services, Inc. Method for capping a well in the event of subsea blowout preventer failure
US9416797B2 (en) 2011-04-14 2016-08-16 Shell Oil Company Capping stack and method for controlling a wellbore
US8720580B1 (en) * 2011-06-14 2014-05-13 Trendsetter Engineering, Inc. System and method for diverting fluids from a damaged blowout preventer
US9033051B1 (en) * 2011-06-14 2015-05-19 Trendsetter Engineering, Inc. System for diversion of fluid flow from a wellhead
US9670755B1 (en) * 2011-06-14 2017-06-06 Trendsetter Engineering, Inc. Pump module systems for preventing or reducing release of hydrocarbons from a subsea formation
US9080411B1 (en) 2011-06-14 2015-07-14 Trendsetter Engineering, Inc. Subsea diverter system for use with a blowout preventer
US9970287B2 (en) 2012-08-28 2018-05-15 Cameron International Corporation Subsea electronic data system
US9045959B1 (en) * 2012-09-21 2015-06-02 Trendsetter Engineering, Inc. Insert tube for use with a lower marine riser package
CN106014322A (en) * 2012-11-12 2016-10-12 卡梅伦国际有限公司 Blowout preventer system
US9428981B2 (en) * 2013-03-15 2016-08-30 Stanley Hosie Subsea test adaptor for calibration of subsea multi-phase flow meter during initial clean-up and test and methods of using same
US11156053B2 (en) * 2013-03-15 2021-10-26 Safestack Technology L.L.C. Riser disconnect package for lower marine riser package, and annular-release flex-joint assemblies
US20150233202A1 (en) * 2013-03-15 2015-08-20 Safestack Technology L.L.C. Riser disconnect package for lower marine riser package, and annular-release flex-joint assemblies
US9650855B2 (en) * 2013-03-15 2017-05-16 Safestack Technology L.L.C. Riser disconnect package for lower marine riser package, and annular-release flex-joint assemblies
CA2926404C (en) 2013-10-07 2022-05-10 Transocean Innovation Labs, Ltd. Manifolds for providing hydraulic fluid to a subsea blowout preventer and related methods
US9140091B1 (en) 2013-10-30 2015-09-22 Trendsetter Engineering, Inc. Apparatus and method for adjusting an angular orientation of a subsea structure
US9309740B2 (en) * 2014-07-18 2016-04-12 Onesubsea Ip Uk Limited Subsea completion with crossover passage
US10196871B2 (en) 2014-09-30 2019-02-05 Hydril USA Distribution LLC Sil rated system for blowout preventer control
US10876369B2 (en) 2014-09-30 2020-12-29 Hydril USA Distribution LLC High pressure blowout preventer system
US10048673B2 (en) * 2014-10-17 2018-08-14 Hydril Usa Distribution, Llc High pressure blowout preventer system
KR102471843B1 (en) * 2014-09-30 2022-11-28 하이드릴 유에스에이 디스트리뷰션 엘엘씨 Safety integrity levels(sil) rated system for blowout preventer control
USD749644S1 (en) * 2014-10-28 2016-02-16 David B. Redden Subsea dual housing assembly
WO2016176724A1 (en) * 2015-05-01 2016-11-10 Kinetic Pressure Control Limited Choke and kill system
US10132135B2 (en) * 2015-08-05 2018-11-20 Cameron International Corporation Subsea drilling system with intensifier
US9670732B1 (en) * 2016-01-14 2017-06-06 Chevron U.S.A. Inc. Batch drilling using multiple mudline closure devices
US10392892B2 (en) 2016-06-01 2019-08-27 Trendsetter Engineering, Inc. Rapid mobilization air-freightable capping stack system
KR102475017B1 (en) 2016-09-16 2022-12-06 하이드릴 유에스에이 디스트리뷰션 엘엘씨 Configurable BOP stack
WO2019108572A1 (en) * 2017-11-28 2019-06-06 Schlumberger Technology Corporation Blow-out preventer assembly and handling device
US11808113B2 (en) 2022-01-14 2023-11-07 Saudi Arabian Oil Company Mud saver and metal collector bell nipple
US11933130B2 (en) 2022-02-22 2024-03-19 Saudi Arabian Oil Company Installing a shooting nipple on a rotating control device
US11824682B1 (en) 2023-01-27 2023-11-21 Schlumberger Technology Corporation Can-open master redundancy in PLC-based control system

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4116272A (en) * 1977-06-21 1978-09-26 Halliburton Company Subsea test tree for oil wells
US4624318A (en) * 1983-05-26 1986-11-25 Chevron Research Company Method and means for storing a marine riser
US4626135A (en) * 1984-10-22 1986-12-02 Hydril Company Marine riser well control method and apparatus
US5146990A (en) * 1991-04-30 1992-09-15 Shell Offshore Inc. Anchoring structure for marine riser assembly
US5676209A (en) * 1995-11-20 1997-10-14 Hydril Company Deep water riser assembly
US5875848A (en) * 1997-04-10 1999-03-02 Reading & Bates Development Co. Weight management system and method for marine drilling riser
US6227300B1 (en) * 1997-10-07 2001-05-08 Fmc Corporation Slimbore subsea completion system and method
US6422315B1 (en) * 1999-09-14 2002-07-23 Quenton Wayne Dean Subsea drilling operations
US6968902B2 (en) * 2002-11-12 2005-11-29 Vetco Gray Inc. Drilling and producing deep water subsea wells
US7063157B2 (en) * 2002-08-22 2006-06-20 Fmc Technologies, Inc. Apparatus and method for installation of subsea well completion systems
US7134498B2 (en) * 2003-09-24 2006-11-14 Cameron International Corporation Well drilling and completions system
US7216714B2 (en) * 2004-08-20 2007-05-15 Oceaneering International, Inc. Modular, distributed, ROV retrievable subsea control system, associated deepwater subsea blowout preventer stack configuration, and methods of use
US20070163782A1 (en) * 2005-12-22 2007-07-19 Transocean Offshore Deepwater Drilling Inc Dual-bop and common riser system

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3409084A (en) * 1966-03-04 1968-11-05 Exxon Production Research Co Blowout control apparatus for wells
US4825953A (en) * 1988-02-01 1989-05-02 Otis Engineering Corporation Well servicing system
FR2631653B1 (en) * 1988-05-19 1990-08-17 Schlumberger Prospection METHOD FOR INSERTING A TOOL IN A PRESSURE WELL
GB0100565D0 (en) * 2001-01-10 2001-02-21 2H Offshore Engineering Ltd Operating a subsea well
US7215715B2 (en) 2001-02-06 2007-05-08 Maxim Integrated Products, Inc. System and method of signal wave shaping for spectrum control of an OFDM signal
US7779917B2 (en) * 2002-11-26 2010-08-24 Cameron International Corporation Subsea connection apparatus for a surface blowout preventer stack
NO319621B1 (en) * 2003-05-28 2005-09-05 Fmc Kongsberg Subsea As Device by lubricator
EP1519003B1 (en) * 2003-09-24 2007-08-15 Cooper Cameron Corporation Removable seal
NO322519B1 (en) * 2004-09-20 2006-10-16 Fmc Kongsberg Subsea As Device by joint
US7921917B2 (en) * 2007-06-08 2011-04-12 Cameron International Corporation Multi-deployable subsea stack system

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4116272A (en) * 1977-06-21 1978-09-26 Halliburton Company Subsea test tree for oil wells
US4624318A (en) * 1983-05-26 1986-11-25 Chevron Research Company Method and means for storing a marine riser
US4626135A (en) * 1984-10-22 1986-12-02 Hydril Company Marine riser well control method and apparatus
US5146990A (en) * 1991-04-30 1992-09-15 Shell Offshore Inc. Anchoring structure for marine riser assembly
US5676209A (en) * 1995-11-20 1997-10-14 Hydril Company Deep water riser assembly
US5875848A (en) * 1997-04-10 1999-03-02 Reading & Bates Development Co. Weight management system and method for marine drilling riser
US6715554B1 (en) * 1997-10-07 2004-04-06 Fmc Technologies, Inc. Slimbore subsea completion system and method
US6227300B1 (en) * 1997-10-07 2001-05-08 Fmc Corporation Slimbore subsea completion system and method
US6408947B1 (en) * 1997-10-07 2002-06-25 Fmc Corporation Subsea connection apparatus
US6422315B1 (en) * 1999-09-14 2002-07-23 Quenton Wayne Dean Subsea drilling operations
US6622799B2 (en) * 1999-09-14 2003-09-23 Quenton Wayne Dean Method for subsea pod retrieval
US7143830B2 (en) * 2002-08-22 2006-12-05 Fmc Technologies, Inc. Apparatus and method for installation of subsea well completion systems
US7063157B2 (en) * 2002-08-22 2006-06-20 Fmc Technologies, Inc. Apparatus and method for installation of subsea well completion systems
US6968902B2 (en) * 2002-11-12 2005-11-29 Vetco Gray Inc. Drilling and producing deep water subsea wells
US7134498B2 (en) * 2003-09-24 2006-11-14 Cameron International Corporation Well drilling and completions system
US7216714B2 (en) * 2004-08-20 2007-05-15 Oceaneering International, Inc. Modular, distributed, ROV retrievable subsea control system, associated deepwater subsea blowout preventer stack configuration, and methods of use
US7216715B2 (en) * 2004-08-20 2007-05-15 Oceaneering International, Inc. Modular, distributed, ROV retrievable subsea control system, associated deepwater subsea blowout preventer stack configuration, and methods of use
US7222674B2 (en) * 2004-08-20 2007-05-29 Oceaneering International, Inc. Modular, distributed, ROV retrievable subsea control system, associated deepwater subsea blowout preventer stack configuration, and methods of use
US7690433B2 (en) * 2004-08-20 2010-04-06 Oceeaneering International, Inc. Modular, distributed, ROV retrievable subsea control system, associated deepwater subsea blowout preventer stack configuration, and methods of use
US20070163782A1 (en) * 2005-12-22 2007-07-19 Transocean Offshore Deepwater Drilling Inc Dual-bop and common riser system

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8820410B2 (en) * 2007-08-09 2014-09-02 Dtc International, Inc. Control system for blowout preventer stack
US20090194290A1 (en) * 2007-08-09 2009-08-06 Dtc International, Inc. Control system for blowout preventer stack
US20110100637A1 (en) * 2009-10-29 2011-05-05 Hydril Usa Manufacturing Llc Safety Mechanism for Blowout Preventer
US8770298B2 (en) * 2009-10-29 2014-07-08 Hydril Usa Manufacturing Llc Safety mechanism for blowout preventer
WO2011128690A1 (en) * 2010-04-13 2011-10-20 Managed Pressure Operations Pte. Limited Blowout preventer assembly
US9212532B2 (en) 2010-04-13 2015-12-15 Managed Pressure Operations PTE, Limited Blowout preventer assembly
US8485261B2 (en) 2010-07-15 2013-07-16 Deep Sea Innovations, Llc Apparatuses and methods for closing and reopening a pipe
US8826990B2 (en) * 2010-07-15 2014-09-09 Deep Sea Innovations, Llc Apparatuses and methods for closing and reopening a pipe
US20120090850A1 (en) * 2010-07-15 2012-04-19 Botich Leon A Apparatuses and methods for closing and reopening a pipe
EP2596207A4 (en) * 2010-07-21 2017-02-22 Marine Well Containment Company Marine well containment system and method
US20120018165A1 (en) * 2010-07-21 2012-01-26 Marine Well Containment Company Marine Well Containment System and Method
WO2012012648A1 (en) 2010-07-21 2012-01-26 Marine Well Containment Company Marine well containment system and method
US9004176B2 (en) * 2010-07-21 2015-04-14 Marine Well Containment Company Marine well containment system and method
US20150204156A1 (en) * 2010-07-21 2015-07-23 Marine Well Containment Company Marine well containment system and method
US20120241160A1 (en) * 2010-12-20 2012-09-27 Joe Spacek Oil well improvement system
US9085950B2 (en) * 2010-12-20 2015-07-21 Joe Spacek Oil well improvement system
CN103477024A (en) * 2011-02-02 2013-12-25 萨博西解决方案有限公司 Method and device for extending at least the lifetime of a christmas tree or an umbilical
US9605504B2 (en) 2011-03-23 2017-03-28 Managed Pressure Operations Pte Ltd Sealing assembly
US9488031B2 (en) 2011-03-23 2016-11-08 Managed Pressure Operations Pte. Ltd. Blow out preventer
US20130020086A1 (en) * 2011-04-13 2013-01-24 Bp Exploration Operating Company Limited Systems and methods for capping a subsea well
US9033053B2 (en) 2011-10-27 2015-05-19 Subsea Solutions As Method and device for extending lifetime of a wellhead
CN103930644A (en) * 2011-10-27 2014-07-16 萨博西解决方案有限公司 Method and device for extending lifetime of a wellhead
WO2013062421A1 (en) * 2011-10-27 2013-05-02 Subsea Solutions As Method and device for extending lifetime of a wellhead
US9976375B2 (en) 2011-11-10 2018-05-22 Cameron International Corporation Blowout preventer shut-in assembly of last resort
GB2511004B (en) * 2011-11-10 2018-07-04 Cameron Int Corp Blowout preventer shut-in assembly of last resort
US9187973B2 (en) 2013-03-15 2015-11-17 Cameron International Corporation Offshore well system with a subsea pressure control system movable with a remotely operated vehicle
US9574426B2 (en) 2013-03-15 2017-02-21 Cameron International Corporation Offshore well system with a subsea pressure control system movable with a remotely operated vehicle
CN105971547A (en) * 2016-06-25 2016-09-28 中国石油大学(华东) Blowout rescue device and method for clustered well head of marine drilling platform
US11280137B2 (en) * 2019-06-17 2022-03-22 Nabors Drilling Technologies Usa, Inc. Dual mast rig with independently adjustable platforms

Also Published As

Publication number Publication date
EP2165042A2 (en) 2010-03-24
WO2008154486A2 (en) 2008-12-18
WO2008154486A3 (en) 2009-03-05
US8640775B2 (en) 2014-02-04
BRPI0812466A2 (en) 2014-12-02
NO2165042T3 (en) 2018-01-06
EP2165042B1 (en) 2017-08-09
US20110155386A1 (en) 2011-06-30
EP2165042A4 (en) 2015-12-23
US20130126764A1 (en) 2013-05-23
US7921917B2 (en) 2011-04-12
US8365830B2 (en) 2013-02-05

Similar Documents

Publication Publication Date Title
US7921917B2 (en) Multi-deployable subsea stack system
US9085951B2 (en) Subsea connection apparatus for a surface blowout preventer stack
US6352114B1 (en) Deep ocean riser positioning system and method of running casing
US9976375B2 (en) Blowout preventer shut-in assembly of last resort
US9574426B2 (en) Offshore well system with a subsea pressure control system movable with a remotely operated vehicle
US20110127040A1 (en) Assembly and method for subsea well drilling and intervention
US10450802B2 (en) Mobile offshore drilling unit, a method of using such a unit and a system comprising such a unit
US20140190701A1 (en) Apparatus and method for subsea well drilling and control
US20170058632A1 (en) Riserless well systems and methods
NO20160250A1 (en) Device for enabling removal or installation of a horizontal Christmas tree and methods thereof
US20190376350A1 (en) Method for assembling and disassembling marine riser and auxiliary lines and well pressure control system
Childers et al. Slim riser an alternate method for deepwater drilling
Humphrey et al. North Sea Marginal Fields: The Subsea Completions Option

Legal Events

Date Code Title Description
AS Assignment

Owner name: CAMERON INTERNATIONAL CORPORATION, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KOTRLA, JOHNNIE E.;WHITBY, MELVYN F.;MCWHORTER, DAVID J.;AND OTHERS;REEL/FRAME:021245/0123;SIGNING DATES FROM 20080630 TO 20080715

Owner name: CAMERON INTERNATIONAL CORPORATION, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KOTRLA, JOHNNIE E.;WHITBY, MELVYN F.;MCWHORTER, DAVID J.;AND OTHERS;SIGNING DATES FROM 20080630 TO 20080715;REEL/FRAME:021245/0123

STCF Information on status: patent grant

Free format text: PATENTED CASE

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 4

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 8

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1553); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 12