US20080099633A1 - Method and apparatus for sounding horn on a train - Google Patents
Method and apparatus for sounding horn on a train Download PDFInfo
- Publication number
- US20080099633A1 US20080099633A1 US11/555,083 US55508306A US2008099633A1 US 20080099633 A1 US20080099633 A1 US 20080099633A1 US 55508306 A US55508306 A US 55508306A US 2008099633 A1 US2008099633 A1 US 2008099633A1
- Authority
- US
- United States
- Prior art keywords
- train
- horn
- speed
- signal
- location
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L25/00—Recording or indicating positions or identities of vehicles or vehicle trains or setting of track apparatus
- B61L25/02—Indicating or recording positions or identities of vehicles or vehicle trains
- B61L25/021—Measuring and recording of train speed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L25/00—Recording or indicating positions or identities of vehicles or vehicle trains or setting of track apparatus
- B61L25/02—Indicating or recording positions or identities of vehicles or vehicle trains
- B61L25/025—Absolute localisation, e.g. providing geodetic coordinates
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L2205/00—Communication or navigation systems for railway traffic
- B61L2205/04—Satellite based navigation systems, e.g. GPS
Definitions
- the Federal Railroad Administration promulgates regulations for the operation of railroads in the United States.
- the FRA has promulgated regulations for the sounding of locomotive horns at grade crossings.
- the regulations which can be found at 49 C.F.R. ⁇ 222.21, require the locomotive horn to be sounded in a particular pattern, sometimes referred to as a “15L” pattern.
- the pattern may be described generally as two long horn blows followed by one short horn blow followed by one long horn blow.
- the regulations further require that only one iteration of this pattern be sounded when passing a grade crossing.
- the regulations still further require that the pattern begin no more than one quarter mile (1,320 feet) prior to the grade crossing.
- This location is marked by a “whistle board” to inform the engineer when the location has been reached.
- the regulations require the engineer to start blowing the horn in the aforementioned pattern at the whistle board (those of skill in the art will recognize that one quarter of a mile will be traveled in 20 seconds at a speed of 45 mph).
- the engineer is required to blow the horn 15-20 seconds before reaching the grade crossing, but not prior to the whistle board.
- Horn sequencers have been developed to help engineers comply with these regulations.
- Horn sequencers are devices that, when activated, will produce a single iteration of the horn pattern mentioned above. These devices ensure that the durations of the one and off periods of the pattern are correct.
- An example of such as device is the 54000 series event recorder sold by Bach-Simpson. However, these devices do not help the engineer determine when to start the pattern. When the train is traveling at speeds below 45 mph, the engineer must estimate when the train is 15-20 seconds from the grade crossing and then activate the horn sequencer.
- a method and apparatus in which the speed of the train is used to determine a delay which precedes the start of a horn sequence such that the horn sequence complies with all applicable regulations.
- an engineer enters a command, such as by pushing a button, to start a horn sequence when a predetermined distance (e.g., as indicated by a whistle board) from a grade crossing is reached.
- a processor or other device determines the speed of the train from a device such as a tachometer. The speed is used to determine how long it will take to reach the grade crossing.
- this calculation is repeated at a rapid rate (e.g., every quarter second) until the time to reach the grade crossing is within the range at which the horn sequence must be started.
- the processor or other device then causes the horn to sound in the required pattern.
- Such embodiments have the advantage of simplicity and a corresponding low cost, but rely on the operator to enter the command at the predetermined distance.
- a combination of a global positioning system and a database that contains locations of the predetermined distances is used to determine when the predetermined distance has been reached.
- FIG. 1 is a block diagram of a horn activation system according to one embodiment.
- FIG. 2 is a flowchart of the processing performed by the system of FIG. 1 .
- FIG. 3 is a block diagram of a horn activation system according to a second embodiment.
- the present invention is believed to be particularly well suited for use in the railroad industry and hence will be discussed primarily in that context herein.
- the present invention should not be understood to be so limited and may be used in any situation at which it is necessary to sound a horn or other warning device on a vehicle at a predetermined location and/or in a predetermined sequence.
- a system 100 includes a processor 110 connected to a switch 120 .
- the processor 110 may be any type of logic unit, including hard wired logic units and programmable logic units (e.g., microprocessors) and may include one or more input and/or output ports (which may be separate physical ports or logical ports implemented as a single physical port) for connection to external devices.
- the switch 120 is preferably of the momentarily closed variety and preferably takes the form of a button that an operator may press. When the system 100 is installed on a train, the switch 120 is preferably installed on or near a control panel in the cab of a lead locomotive. Also connected to the processor 110 is a tachometer 130 .
- the tachometer 130 outputs a signal indicative of the speed of the train.
- the specific device used to indicate the train's speed is not important and a device other than a tachometer is used in other embodiments.
- the voltage across a DC traction motor or the frequency driving an AC traction motor on a locomotive is used to determine the speed of the train.
- a horn 140 is also connected to the processor 110 .
- the horn 140 is typically an air horn and is suitable to produce an audible sound sufficient to warn motorists and pedestrians of the train as it approaches a grade crossing.
- a flowchart 200 of the operations performed by the system 100 in some embodiments is illustrated in FIG. 2 .
- the processor 110 determines whether the switch 120 has been depressed at step 202 . If no switch depression has been detected at step 202 , the step is repeated until a switch depression is detected. (Those of skill in the art will recognize this implementation as employing a polled technique and will readily understand that implementation as an interrupt service routine or other implementations are also possible). As discussed above, an operator of the train will be instructed to depress the switch 120 when the train reaches a location one quarter mile away from the grade crossing as indicated by a whistle board. Thus, the detection of a switch depression at step 202 signifies to the processor 110 that the train is now one quarter of a mile from the grade crossing.
- the processor 110 next obtains the speed of the train and the current time at step 204 .
- the speed may be obtained from the tachometer 130 or any other device on the train that is capable of reporting speed.
- the time may be obtained from a clock maintained in the processor 110 . If the speed is greater than 45 mph at step 206 , the processor starts the “15L” horn sequence at step 212 .
- the processor 110 is connected to activate the horn 140 directly (those of skill in the art will recognize that a relay may be present between the processor 110 and the horn 140 ) and therefore the processor 110 outputs a signal having a time varying pattern corresponding to the “15L” pattern.
- a horn sequencer 141 may be present between the processor 110 and the horn 140 .
- the processor 110 need only output a start signal to the horn sequencer 141 , and the horn sequencer 141 generates a driver signal having the “15L” pattern to drive the horn 140 .
- the processor 110 calculates at step 208 the time in which the train will reach the grade crossing using the train speed obtained in step 204 . If the time is less than a threshold corresponding to a time at which horn sequence is to start (e.g., 17.5 seconds) at step 210 , the horn sequence is started at step 212 and the process ends when the horn sequence has completed.
- a threshold corresponding to a time at which horn sequence is to start e.g., 17.5 seconds
- the processor 110 then delays for a short period of time (e.g., a quarter of a second) at step 214 .
- the processor 110 calculates a new train position at step 216 .
- the new position of the train is calculated by calculating the difference between the current time and the time obtained at which the previous train position was calculated, and multiplying the difference in time by the current speed of the train as reported by the tachometer 130 .
- the delay period of step 216 is short relative to the maximum possible acceleration/deceleration of the train.
- Step 208 is then repeated using the updated position and time from step 214 .
- the embodiment described above relies on a train operator or some other personnel onboard the train to activate the switch 120 to signal to the processor 110 that the train has reached a location one quarter of a mile in advance of the grade crossing.
- Such embodiments while advantageous in that they minimize necessary additional onboard and wayside equipment suffer from the drawback of reliance on a human being.
- wayside equipment such as a transponder or an axle detector may be used to send a signal to the processor 110 to indicate that the train has reached the quarter mile location.
- Such embodiments have increased reliability, but also require additional wayside and onboard equipment (i.e., a receiver to receive the signal from the wayside equipment) and a corresponding increase in cost.
- an onboard position system such as a global positioning system (GPS) receiver is used to determine the train's position and a database that contains positions of grade crossings is used to determine when the train has reached a location a quarter mile prior to the grade crossing.
- GPS global positioning system
- the GPS receiver may also be used to determine speed, but a tachometer is generally more accurate.
- the lengths of the long horn blasts are the same throughout the “15L” pattern.
- the last long blast is slightly longer than the first two long horn blasts to increase the likelihood that the horn will be sounding at the moment the locomotive reaches the grade crossing.
- there is a minimum speed below which the system will not sound at all which relies on the operator to sound the horn in accordance with the situation. For example, if a train is traveling extremely slowly (e.g., 1 mph), sounding the horn 20 seconds before the grade crossing is reached will result in the horn blowing for the first time when the train is very close to the grade crossing, which may startle a motorist or pedestrian in the grade crossing.
Abstract
Description
- The Federal Railroad Administration (FRA) promulgates regulations for the operation of railroads in the United States. The FRA has promulgated regulations for the sounding of locomotive horns at grade crossings. The regulations, which can be found at 49 C.F.R. § 222.21, require the locomotive horn to be sounded in a particular pattern, sometimes referred to as a “15L” pattern. The pattern may be described generally as two long horn blows followed by one short horn blow followed by one long horn blow. The regulations further require that only one iteration of this pattern be sounded when passing a grade crossing. The regulations still further require that the pattern begin no more than one quarter mile (1,320 feet) prior to the grade crossing. This location is marked by a “whistle board” to inform the engineer when the location has been reached. When the train is traveling greater than 45 mph, the regulations require the engineer to start blowing the horn in the aforementioned pattern at the whistle board (those of skill in the art will recognize that one quarter of a mile will be traveled in 20 seconds at a speed of 45 mph). However, when the train is traveling less than 45 mph, the engineer is required to blow the horn 15-20 seconds before reaching the grade crossing, but not prior to the whistle board.
- Engineers have had difficulty complying with these regulations. Engineers sometimes miss the whistle board and fail to sound the horn at all or sound the horn late. Even when the engineer is aware of the whistle board, it has proven difficult for the engineer to ensure that the sequence starts 15-20 seconds before the crossing is reached and continues until the lead locomotive has passed through the grade crossing while maintaining the proper duration for all on and off portions of the pattern.
- Engineers sometimes blow the horn excessively to ensure that the horn is sounding through the grade crossing as a matter of safety. This is perhaps a result of litigation in which engineers and the railroads that employ them have been accused of causing accidents at grade crossings due to alleged failures to sound the horn or to sound the horn in a manner that provided sufficient notice of the approach of the train. However, excessive horn blowing has led to many noise complaints from residents in the area of the grade crossings. In response to these complaints, the FRA has imposed fines for excessive horn blowing that does not comply with the aforementioned regulations.
- Horn sequencers have been developed to help engineers comply with these regulations. Horn sequencers are devices that, when activated, will produce a single iteration of the horn pattern mentioned above. These devices ensure that the durations of the one and off periods of the pattern are correct. An example of such as device is the 54000 series event recorder sold by Bach-Simpson. However, these devices do not help the engineer determine when to start the pattern. When the train is traveling at speeds below 45 mph, the engineer must estimate when the train is 15-20 seconds from the grade crossing and then activate the horn sequencer.
- The aforementioned issues are addressed to a great extent by a method and apparatus in which the speed of the train is used to determine a delay which precedes the start of a horn sequence such that the horn sequence complies with all applicable regulations. In one embodiment, an engineer enters a command, such as by pushing a button, to start a horn sequence when a predetermined distance (e.g., as indicated by a whistle board) from a grade crossing is reached. A processor or other device then determines the speed of the train from a device such as a tachometer. The speed is used to determine how long it will take to reach the grade crossing. Preferably, this calculation is repeated at a rapid rate (e.g., every quarter second) until the time to reach the grade crossing is within the range at which the horn sequence must be started. The processor or other device then causes the horn to sound in the required pattern. Such embodiments have the advantage of simplicity and a corresponding low cost, but rely on the operator to enter the command at the predetermined distance. In other embodiments, rather than relying on an operator to enter a command to inform the system that the predetermined distance, a combination of a global positioning system and a database that contains locations of the predetermined distances is used to determine when the predetermined distance has been reached.
- The aforementioned advantages and features of the present invention will be more readily understood with reference to the following detailed description and the accompanying drawings in which:
-
FIG. 1 is a block diagram of a horn activation system according to one embodiment. -
FIG. 2 is a flowchart of the processing performed by the system ofFIG. 1 . -
FIG. 3 is a block diagram of a horn activation system according to a second embodiment. - In the following detailed description, a plurality of specific details, such as specific regulations for horn activation, are set forth in order to provide a thorough understanding of the embodiments discussed below. The details discussed in connection with these embodiments should not be understood to limit the present invention. Furthermore, for ease of understanding, certain method steps are delineated as separate steps; however, these steps should not be construed as necessarily distinct nor order dependent in their performance.
- The present invention is believed to be particularly well suited for use in the railroad industry and hence will be discussed primarily in that context herein. The present invention should not be understood to be so limited and may be used in any situation at which it is necessary to sound a horn or other warning device on a vehicle at a predetermined location and/or in a predetermined sequence.
- Referring now to
FIG. 1 , asystem 100 according to one embodiment includes aprocessor 110 connected to aswitch 120. Theprocessor 110 may be any type of logic unit, including hard wired logic units and programmable logic units (e.g., microprocessors) and may include one or more input and/or output ports (which may be separate physical ports or logical ports implemented as a single physical port) for connection to external devices. Theswitch 120 is preferably of the momentarily closed variety and preferably takes the form of a button that an operator may press. When thesystem 100 is installed on a train, theswitch 120 is preferably installed on or near a control panel in the cab of a lead locomotive. Also connected to theprocessor 110 is atachometer 130. Thetachometer 130 outputs a signal indicative of the speed of the train. The specific device used to indicate the train's speed is not important and a device other than a tachometer is used in other embodiments. For example, in some embodiments, the voltage across a DC traction motor or the frequency driving an AC traction motor on a locomotive is used to determine the speed of the train. Ahorn 140 is also connected to theprocessor 110. Thehorn 140 is typically an air horn and is suitable to produce an audible sound sufficient to warn motorists and pedestrians of the train as it approaches a grade crossing. - A flowchart 200 of the operations performed by the
system 100 in some embodiments is illustrated inFIG. 2 . Theprocessor 110 determines whether theswitch 120 has been depressed atstep 202. If no switch depression has been detected atstep 202, the step is repeated until a switch depression is detected. (Those of skill in the art will recognize this implementation as employing a polled technique and will readily understand that implementation as an interrupt service routine or other implementations are also possible). As discussed above, an operator of the train will be instructed to depress theswitch 120 when the train reaches a location one quarter mile away from the grade crossing as indicated by a whistle board. Thus, the detection of a switch depression atstep 202 signifies to theprocessor 110 that the train is now one quarter of a mile from the grade crossing. - The
processor 110 next obtains the speed of the train and the current time atstep 204. The speed may be obtained from thetachometer 130 or any other device on the train that is capable of reporting speed. The time may be obtained from a clock maintained in theprocessor 110. If the speed is greater than 45 mph atstep 206, the processor starts the “15L” horn sequence atstep 212. In the embodiment shown inFIG. 1 , theprocessor 110 is connected to activate thehorn 140 directly (those of skill in the art will recognize that a relay may be present between theprocessor 110 and the horn 140) and therefore theprocessor 110 outputs a signal having a time varying pattern corresponding to the “15L” pattern. In alternative embodiments such as thesystem 300 shown inFIG. 3 , ahorn sequencer 141 may be present between theprocessor 110 and thehorn 140. In such embodiments, theprocessor 110 need only output a start signal to thehorn sequencer 141, and thehorn sequencer 141 generates a driver signal having the “15L” pattern to drive thehorn 140. - Referring now back to
FIG. 2 , if the speed of the train is less than 45 mph atstep 206, theprocessor 110 calculates atstep 208 the time in which the train will reach the grade crossing using the train speed obtained instep 204. If the time is less than a threshold corresponding to a time at which horn sequence is to start (e.g., 17.5 seconds) atstep 210, the horn sequence is started atstep 212 and the process ends when the horn sequence has completed. - If the time in which the train will reach the grade crossing is greater than the threshold at
step 210, theprocessor 110 then delays for a short period of time (e.g., a quarter of a second) atstep 214. Next, theprocessor 110 calculates a new train position atstep 216. The new position of the train is calculated by calculating the difference between the current time and the time obtained at which the previous train position was calculated, and multiplying the difference in time by the current speed of the train as reported by thetachometer 130. Preferably, the delay period ofstep 216 is short relative to the maximum possible acceleration/deceleration of the train. Step 208 is then repeated using the updated position and time fromstep 214. - The embodiment discussed above in connection with
FIG. 2 employs a relatively simple algorithm that is simple to implement but suffers from a somewhat decreased accuracy. Those of skill in the art will recognize that more sophisticated algorithms that determine and account for train acceleration may also be employed. - Those of skill in the art will also recognize that the embodiment described above relies on a train operator or some other personnel onboard the train to activate the
switch 120 to signal to theprocessor 110 that the train has reached a location one quarter of a mile in advance of the grade crossing. Such embodiments, while advantageous in that they minimize necessary additional onboard and wayside equipment suffer from the drawback of reliance on a human being. In some other embodiments, wayside equipment such as a transponder or an axle detector may be used to send a signal to theprocessor 110 to indicate that the train has reached the quarter mile location. Such embodiments have increased reliability, but also require additional wayside and onboard equipment (i.e., a receiver to receive the signal from the wayside equipment) and a corresponding increase in cost. - In other embodiments, an onboard position system such as a global positioning system (GPS) receiver is used to determine the train's position and a database that contains positions of grade crossings is used to determine when the train has reached a location a quarter mile prior to the grade crossing. Such a system is described in commonly owned U.S. Pat. No. 6,609,049, the contents of which are hereby incorporated by reference herein. The GPS receiver may also be used to determine speed, but a tachometer is generally more accurate.
- In some of the embodiments discussed above, the lengths of the long horn blasts are the same throughout the “15L” pattern. In other embodiments, the last long blast is slightly longer than the first two long horn blasts to increase the likelihood that the horn will be sounding at the moment the locomotive reaches the grade crossing. In still other embodiments, there is a minimum speed below which the system will not sound at all, which relies on the operator to sound the horn in accordance with the situation. For example, if a train is traveling extremely slowly (e.g., 1 mph), sounding the horn 20 seconds before the grade crossing is reached will result in the horn blowing for the first time when the train is very close to the grade crossing, which may startle a motorist or pedestrian in the grade crossing.
- Various embodiments of methods and systems for activating a warning device on a train have been discussed above. It should be understood that the detailed description set forth above is not intended to limit the present invention and that numerous modifications and changes to the specific embodiments set forth above can be made without departing from the spirit and scope of the invention. Rather, the present invention is only limited by the following claims.
- Further, the purpose of the Abstract of the Disclosure is to enable the U.S. Patent and Trademark Office and the public generally, and especially the scientists, engineers and practitioners in the art who are not familiar with patent or legal terms or phraseology, to determine quickly from a cursory inspection the nature and essence of the technical disclosure of the application. The Abstract of the Disclosure is not intended to be limiting as to the scope of the present invention in any way.
Claims (17)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/555,083 US20080099633A1 (en) | 2006-10-31 | 2006-10-31 | Method and apparatus for sounding horn on a train |
MX2009004589A MX2009004589A (en) | 2006-10-31 | 2007-09-14 | Method and apparatus for sounding horn on a train. |
PCT/US2007/078500 WO2008054932A2 (en) | 2006-10-31 | 2007-09-14 | Method and apparatus for sounding horn on a train |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/555,083 US20080099633A1 (en) | 2006-10-31 | 2006-10-31 | Method and apparatus for sounding horn on a train |
Publications (1)
Publication Number | Publication Date |
---|---|
US20080099633A1 true US20080099633A1 (en) | 2008-05-01 |
Family
ID=39328966
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/555,083 Abandoned US20080099633A1 (en) | 2006-10-31 | 2006-10-31 | Method and apparatus for sounding horn on a train |
Country Status (3)
Country | Link |
---|---|
US (1) | US20080099633A1 (en) |
MX (1) | MX2009004589A (en) |
WO (1) | WO2008054932A2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090115633A1 (en) * | 2007-11-02 | 2009-05-07 | Lawry Brian D | Methods and systems for automated warning device |
US20120095627A1 (en) * | 2010-10-19 | 2012-04-19 | New York Air Brake Corporation | Method of alerting horn rule timing |
CN106997671A (en) * | 2017-05-15 | 2017-08-01 | 东南大学 | A kind of raising control method for vehicle of the tramcar signal junction by efficiency |
US20210261178A1 (en) * | 2016-01-21 | 2021-08-26 | Transportation Ip Holdings, Llc | Vehicle control system |
Citations (64)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4181943A (en) * | 1978-05-22 | 1980-01-01 | Hugg Steven B | Speed control device for trains |
US4459668A (en) * | 1980-03-31 | 1984-07-10 | Japanese National Railways | Automatic train control device |
US4561057A (en) * | 1983-04-14 | 1985-12-24 | Halliburton Company | Apparatus and method for monitoring motion of a railroad train |
US4711418A (en) * | 1986-04-08 | 1987-12-08 | General Signal Corporation | Radio based railway signaling and traffic control system |
US5072900A (en) * | 1989-03-17 | 1991-12-17 | Aigle Azur Concept | System for the control of the progression of several railway trains in a network |
US5129605A (en) * | 1990-09-17 | 1992-07-14 | Rockwell International Corporation | Rail vehicle positioning system |
US5177685A (en) * | 1990-08-09 | 1993-01-05 | Massachusetts Institute Of Technology | Automobile navigation system using real time spoken driving instructions |
US5332180A (en) * | 1992-12-28 | 1994-07-26 | Union Switch & Signal Inc. | Traffic control system utilizing on-board vehicle information measurement apparatus |
US5340062A (en) * | 1992-08-13 | 1994-08-23 | Harmon Industries, Inc. | Train control system integrating dynamic and fixed data |
US5364047A (en) * | 1993-04-02 | 1994-11-15 | General Railway Signal Corporation | Automatic vehicle control and location system |
US5394333A (en) * | 1991-12-23 | 1995-02-28 | Zexel Usa Corp. | Correcting GPS position in a hybrid naviation system |
US5398894A (en) * | 1993-08-10 | 1995-03-21 | Union Switch & Signal Inc. | Virtual block control system for railway vehicle |
US5533695A (en) * | 1994-08-19 | 1996-07-09 | Harmon Industries, Inc. | Incremental train control system |
US5541981A (en) * | 1993-12-21 | 1996-07-30 | Microlog Corporation | Automated announcement system |
US5620155A (en) * | 1995-03-23 | 1997-04-15 | Michalek; Jan K. | Railway train signalling system for remotely operating warning devices at crossings and for receiving warning device operational information |
US5699986A (en) * | 1996-07-15 | 1997-12-23 | Alternative Safety Technologies | Railway crossing collision avoidance system |
US5740547A (en) * | 1996-02-20 | 1998-04-14 | Westinghouse Air Brake Company | Rail navigation system |
US5751569A (en) * | 1996-03-15 | 1998-05-12 | Safetran Systems Corporation | Geographic train control |
US5803411A (en) * | 1996-10-21 | 1998-09-08 | Abb Daimler-Benz Transportation (North America) Inc. | Method and apparatus for initializing an automated train control system |
US5828979A (en) * | 1994-09-01 | 1998-10-27 | Harris Corporation | Automatic train control system and method |
US5867122A (en) * | 1996-10-23 | 1999-02-02 | Harris Corporation | Application of GPS to a railroad navigation system using two satellites and a stored database |
US5944768A (en) * | 1995-10-30 | 1999-08-31 | Aisin Aw Co., Ltd. | Navigation system |
US5950966A (en) * | 1997-09-17 | 1999-09-14 | Westinghouse Airbrake Company | Distributed positive train control system |
US5978718A (en) * | 1997-07-22 | 1999-11-02 | Westinghouse Air Brake Company | Rail vision system |
US5995881A (en) * | 1997-07-22 | 1999-11-30 | Westinghouse Air Brake Company | Integrated cab signal rail navigation system |
US6049745A (en) * | 1997-02-10 | 2000-04-11 | Fmc Corporation | Navigation system for automatic guided vehicle |
US6081769A (en) * | 1998-02-23 | 2000-06-27 | Wabtec Corporation | Method and apparatus for determining the overall length of a train |
US6102340A (en) * | 1997-02-07 | 2000-08-15 | Ge-Harris Railway Electronics, Llc | Broken rail detection system and method |
US6112142A (en) * | 1998-06-26 | 2000-08-29 | Quantum Engineering, Inc. | Positive signal comparator and method |
US6135396A (en) * | 1997-02-07 | 2000-10-24 | Ge-Harris Railway Electronics, Llc | System and method for automatic train operation |
US6179252B1 (en) * | 1998-07-17 | 2001-01-30 | The Texas A&M University System | Intelligent rail crossing control system and train tracking system |
US6218961B1 (en) * | 1996-10-23 | 2001-04-17 | G.E. Harris Railway Electronics, L.L.C. | Method and system for proximity detection and location determination |
US20010029411A1 (en) * | 1998-09-11 | 2001-10-11 | New York Air Brake Corporation | Method of optimizing train operation and training |
US6311109B1 (en) * | 2000-07-24 | 2001-10-30 | New York Air Brake Corporation | Method of determining train and track characteristics using navigational data |
US6322025B1 (en) * | 1999-11-30 | 2001-11-27 | Wabtec Railway Electronics, Inc. | Dual-protocol locomotive control system and method |
US20010056544A1 (en) * | 1998-06-18 | 2001-12-27 | Walker Richard C. | Electrically controlled automated devices to operate, slow, guide, stop and secure, equipment and machinery for the purpose of controlling their unsafe, unattended, unauthorized, unlawful hazardous and/or legal use, with remote control and accountability worldwide |
US6345233B1 (en) * | 1997-08-18 | 2002-02-05 | Dynamic Vehicle Safety Systems, Ltd. | Collision avoidance using GPS device and train proximity detector |
US6371416B1 (en) * | 2000-08-01 | 2002-04-16 | New York Air Brake Corporation | Portable beacons |
US6373403B1 (en) * | 1997-03-03 | 2002-04-16 | Kelvin Korver | Apparatus and method for improving the safety of railroad systems |
US6374184B1 (en) * | 1999-09-10 | 2002-04-16 | Ge-Harris Railway Electronics, Llc | Methods and apparatus for determining that a train has changed paths |
US6377877B1 (en) * | 2000-09-15 | 2002-04-23 | Ge Harris Railway Electronics, Llc | Method of determining railyard status using locomotive location |
US6397147B1 (en) * | 2000-06-06 | 2002-05-28 | Csi Wireless Inc. | Relative GPS positioning using a single GPS receiver with internally generated differential correction terms |
US20020070879A1 (en) * | 2000-12-12 | 2002-06-13 | Gazit Hanoch Amatzia | "On-board" vehicle safety system |
US6421587B2 (en) * | 1999-12-30 | 2002-07-16 | Ge Harris Railway Electronics, Llc | Methods and apparatus for locomotive consist determination |
US6456937B1 (en) * | 1999-12-30 | 2002-09-24 | General Electric Company | Methods and apparatus for locomotive tracking |
US6459965B1 (en) * | 2000-11-22 | 2002-10-01 | Ge-Harris Railway Electronics, Llc | Method for advanced communication-based vehicle control |
US6459964B1 (en) * | 1994-09-01 | 2002-10-01 | G.E. Harris Railway Electronics, L.L.C. | Train schedule repairer |
US6487478B1 (en) * | 1999-10-28 | 2002-11-26 | General Electric Company | On-board monitor for railroad locomotive |
US6494408B2 (en) * | 2000-04-03 | 2002-12-17 | Matthew A. Katzer | Model train control system |
US6519512B1 (en) * | 2001-11-28 | 2003-02-11 | Motorola, Inc. | Method and apparatus for providing enhanced vehicle detection |
US6609049B1 (en) * | 2002-07-01 | 2003-08-19 | Quantum Engineering, Inc. | Method and system for automatically activating a warning device on a train |
US6701228B2 (en) * | 2002-05-31 | 2004-03-02 | Quantum Engineering, Inc. | Method and system for compensating for wheel wear on a train |
US6845953B2 (en) * | 2002-10-10 | 2005-01-25 | Quantum Engineering, Inc. | Method and system for checking track integrity |
US6853888B2 (en) * | 2003-03-21 | 2005-02-08 | Quantum Engineering Inc. | Lifting restrictive signaling in a block |
US6863246B2 (en) * | 2002-12-31 | 2005-03-08 | Quantum Engineering, Inc. | Method and system for automated fault reporting |
US6865454B2 (en) * | 2002-07-02 | 2005-03-08 | Quantum Engineering Inc. | Train control system and method of controlling a train or trains |
US20050110628A1 (en) * | 2003-05-14 | 2005-05-26 | Wabtec Holding Corporation | Operator warning system and method for improving locomotive operator vigilance |
US6903658B2 (en) * | 2003-09-29 | 2005-06-07 | Quantum Engineering, Inc. | Method and system for ensuring that a train operator remains alert during operation of the train |
US6915191B2 (en) * | 2003-05-19 | 2005-07-05 | Quantum Engineering, Inc. | Method and system for detecting when an end of train has passed a point |
US6957131B2 (en) * | 2002-11-21 | 2005-10-18 | Quantum Engineering, Inc. | Positive signal comparator and method |
US6970774B2 (en) * | 2002-05-31 | 2005-11-29 | Quantum Engineering, Inc. | Method and system for compensating for wheel wear on a train |
US20050284987A1 (en) * | 2004-06-29 | 2005-12-29 | General Electric Company | Electronically controlled grade crossing gate system and method |
US6996461B2 (en) * | 2002-10-10 | 2006-02-07 | Quantum Engineering, Inc. | Method and system for ensuring that a train does not pass an improperly configured device |
US7096096B2 (en) * | 2003-07-02 | 2006-08-22 | Quantum Engineering Inc. | Method and system for automatically locating end of train devices |
-
2006
- 2006-10-31 US US11/555,083 patent/US20080099633A1/en not_active Abandoned
-
2007
- 2007-09-14 WO PCT/US2007/078500 patent/WO2008054932A2/en active Application Filing
- 2007-09-14 MX MX2009004589A patent/MX2009004589A/en unknown
Patent Citations (68)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4181943A (en) * | 1978-05-22 | 1980-01-01 | Hugg Steven B | Speed control device for trains |
US4459668A (en) * | 1980-03-31 | 1984-07-10 | Japanese National Railways | Automatic train control device |
US4561057A (en) * | 1983-04-14 | 1985-12-24 | Halliburton Company | Apparatus and method for monitoring motion of a railroad train |
US4711418A (en) * | 1986-04-08 | 1987-12-08 | General Signal Corporation | Radio based railway signaling and traffic control system |
US5072900A (en) * | 1989-03-17 | 1991-12-17 | Aigle Azur Concept | System for the control of the progression of several railway trains in a network |
US5177685A (en) * | 1990-08-09 | 1993-01-05 | Massachusetts Institute Of Technology | Automobile navigation system using real time spoken driving instructions |
US5129605A (en) * | 1990-09-17 | 1992-07-14 | Rockwell International Corporation | Rail vehicle positioning system |
US5394333A (en) * | 1991-12-23 | 1995-02-28 | Zexel Usa Corp. | Correcting GPS position in a hybrid naviation system |
US5340062A (en) * | 1992-08-13 | 1994-08-23 | Harmon Industries, Inc. | Train control system integrating dynamic and fixed data |
US5452870A (en) * | 1992-08-13 | 1995-09-26 | Harmon Industries, Inc. | Fixed data transmission system for controlling train movement |
US5332180A (en) * | 1992-12-28 | 1994-07-26 | Union Switch & Signal Inc. | Traffic control system utilizing on-board vehicle information measurement apparatus |
US5364047A (en) * | 1993-04-02 | 1994-11-15 | General Railway Signal Corporation | Automatic vehicle control and location system |
US5398894B1 (en) * | 1993-08-10 | 1998-09-29 | Union Switch & Signal Inc | Virtual block control system for railway vehicle |
US5398894A (en) * | 1993-08-10 | 1995-03-21 | Union Switch & Signal Inc. | Virtual block control system for railway vehicle |
US5541981A (en) * | 1993-12-21 | 1996-07-30 | Microlog Corporation | Automated announcement system |
US5533695A (en) * | 1994-08-19 | 1996-07-09 | Harmon Industries, Inc. | Incremental train control system |
US6459964B1 (en) * | 1994-09-01 | 2002-10-01 | G.E. Harris Railway Electronics, L.L.C. | Train schedule repairer |
US5828979A (en) * | 1994-09-01 | 1998-10-27 | Harris Corporation | Automatic train control system and method |
US5620155A (en) * | 1995-03-23 | 1997-04-15 | Michalek; Jan K. | Railway train signalling system for remotely operating warning devices at crossings and for receiving warning device operational information |
US5944768A (en) * | 1995-10-30 | 1999-08-31 | Aisin Aw Co., Ltd. | Navigation system |
US5740547A (en) * | 1996-02-20 | 1998-04-14 | Westinghouse Air Brake Company | Rail navigation system |
US5751569A (en) * | 1996-03-15 | 1998-05-12 | Safetran Systems Corporation | Geographic train control |
US5699986A (en) * | 1996-07-15 | 1997-12-23 | Alternative Safety Technologies | Railway crossing collision avoidance system |
US5803411A (en) * | 1996-10-21 | 1998-09-08 | Abb Daimler-Benz Transportation (North America) Inc. | Method and apparatus for initializing an automated train control system |
US6218961B1 (en) * | 1996-10-23 | 2001-04-17 | G.E. Harris Railway Electronics, L.L.C. | Method and system for proximity detection and location determination |
US5867122A (en) * | 1996-10-23 | 1999-02-02 | Harris Corporation | Application of GPS to a railroad navigation system using two satellites and a stored database |
US6102340A (en) * | 1997-02-07 | 2000-08-15 | Ge-Harris Railway Electronics, Llc | Broken rail detection system and method |
US6135396A (en) * | 1997-02-07 | 2000-10-24 | Ge-Harris Railway Electronics, Llc | System and method for automatic train operation |
US6049745A (en) * | 1997-02-10 | 2000-04-11 | Fmc Corporation | Navigation system for automatic guided vehicle |
US6373403B1 (en) * | 1997-03-03 | 2002-04-16 | Kelvin Korver | Apparatus and method for improving the safety of railroad systems |
US5978718A (en) * | 1997-07-22 | 1999-11-02 | Westinghouse Air Brake Company | Rail vision system |
US5995881A (en) * | 1997-07-22 | 1999-11-30 | Westinghouse Air Brake Company | Integrated cab signal rail navigation system |
US6345233B1 (en) * | 1997-08-18 | 2002-02-05 | Dynamic Vehicle Safety Systems, Ltd. | Collision avoidance using GPS device and train proximity detector |
US5950966A (en) * | 1997-09-17 | 1999-09-14 | Westinghouse Airbrake Company | Distributed positive train control system |
US6081769A (en) * | 1998-02-23 | 2000-06-27 | Wabtec Corporation | Method and apparatus for determining the overall length of a train |
US20010056544A1 (en) * | 1998-06-18 | 2001-12-27 | Walker Richard C. | Electrically controlled automated devices to operate, slow, guide, stop and secure, equipment and machinery for the purpose of controlling their unsafe, unattended, unauthorized, unlawful hazardous and/or legal use, with remote control and accountability worldwide |
US6112142A (en) * | 1998-06-26 | 2000-08-29 | Quantum Engineering, Inc. | Positive signal comparator and method |
US6179252B1 (en) * | 1998-07-17 | 2001-01-30 | The Texas A&M University System | Intelligent rail crossing control system and train tracking system |
US20010029411A1 (en) * | 1998-09-11 | 2001-10-11 | New York Air Brake Corporation | Method of optimizing train operation and training |
US6374184B1 (en) * | 1999-09-10 | 2002-04-16 | Ge-Harris Railway Electronics, Llc | Methods and apparatus for determining that a train has changed paths |
US6487478B1 (en) * | 1999-10-28 | 2002-11-26 | General Electric Company | On-board monitor for railroad locomotive |
US6322025B1 (en) * | 1999-11-30 | 2001-11-27 | Wabtec Railway Electronics, Inc. | Dual-protocol locomotive control system and method |
US6456937B1 (en) * | 1999-12-30 | 2002-09-24 | General Electric Company | Methods and apparatus for locomotive tracking |
US6421587B2 (en) * | 1999-12-30 | 2002-07-16 | Ge Harris Railway Electronics, Llc | Methods and apparatus for locomotive consist determination |
US6494408B2 (en) * | 2000-04-03 | 2002-12-17 | Matthew A. Katzer | Model train control system |
US6397147B1 (en) * | 2000-06-06 | 2002-05-28 | Csi Wireless Inc. | Relative GPS positioning using a single GPS receiver with internally generated differential correction terms |
US6311109B1 (en) * | 2000-07-24 | 2001-10-30 | New York Air Brake Corporation | Method of determining train and track characteristics using navigational data |
US6371416B1 (en) * | 2000-08-01 | 2002-04-16 | New York Air Brake Corporation | Portable beacons |
US6377877B1 (en) * | 2000-09-15 | 2002-04-23 | Ge Harris Railway Electronics, Llc | Method of determining railyard status using locomotive location |
US6459965B1 (en) * | 2000-11-22 | 2002-10-01 | Ge-Harris Railway Electronics, Llc | Method for advanced communication-based vehicle control |
US20020070879A1 (en) * | 2000-12-12 | 2002-06-13 | Gazit Hanoch Amatzia | "On-board" vehicle safety system |
US6519512B1 (en) * | 2001-11-28 | 2003-02-11 | Motorola, Inc. | Method and apparatus for providing enhanced vehicle detection |
US6701228B2 (en) * | 2002-05-31 | 2004-03-02 | Quantum Engineering, Inc. | Method and system for compensating for wheel wear on a train |
US6970774B2 (en) * | 2002-05-31 | 2005-11-29 | Quantum Engineering, Inc. | Method and system for compensating for wheel wear on a train |
US20040015276A1 (en) * | 2002-07-01 | 2004-01-22 | Kane Mark Edward | Method and system for automatically activating a warning device on a train |
US6824110B2 (en) * | 2002-07-01 | 2004-11-30 | Quantum Engineering, Inc. | Method and system for automatically activating a warning device on a train |
US6609049B1 (en) * | 2002-07-01 | 2003-08-19 | Quantum Engineering, Inc. | Method and system for automatically activating a warning device on a train |
US6865454B2 (en) * | 2002-07-02 | 2005-03-08 | Quantum Engineering Inc. | Train control system and method of controlling a train or trains |
US6845953B2 (en) * | 2002-10-10 | 2005-01-25 | Quantum Engineering, Inc. | Method and system for checking track integrity |
US6996461B2 (en) * | 2002-10-10 | 2006-02-07 | Quantum Engineering, Inc. | Method and system for ensuring that a train does not pass an improperly configured device |
US6957131B2 (en) * | 2002-11-21 | 2005-10-18 | Quantum Engineering, Inc. | Positive signal comparator and method |
US6863246B2 (en) * | 2002-12-31 | 2005-03-08 | Quantum Engineering, Inc. | Method and system for automated fault reporting |
US6853888B2 (en) * | 2003-03-21 | 2005-02-08 | Quantum Engineering Inc. | Lifting restrictive signaling in a block |
US20050110628A1 (en) * | 2003-05-14 | 2005-05-26 | Wabtec Holding Corporation | Operator warning system and method for improving locomotive operator vigilance |
US6915191B2 (en) * | 2003-05-19 | 2005-07-05 | Quantum Engineering, Inc. | Method and system for detecting when an end of train has passed a point |
US7096096B2 (en) * | 2003-07-02 | 2006-08-22 | Quantum Engineering Inc. | Method and system for automatically locating end of train devices |
US6903658B2 (en) * | 2003-09-29 | 2005-06-07 | Quantum Engineering, Inc. | Method and system for ensuring that a train operator remains alert during operation of the train |
US20050284987A1 (en) * | 2004-06-29 | 2005-12-29 | General Electric Company | Electronically controlled grade crossing gate system and method |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090115633A1 (en) * | 2007-11-02 | 2009-05-07 | Lawry Brian D | Methods and systems for automated warning device |
US20120095627A1 (en) * | 2010-10-19 | 2012-04-19 | New York Air Brake Corporation | Method of alerting horn rule timing |
US20210261178A1 (en) * | 2016-01-21 | 2021-08-26 | Transportation Ip Holdings, Llc | Vehicle control system |
US11691656B2 (en) * | 2016-01-21 | 2023-07-04 | Transportation Ip Holdings, Llc | Vehicle control system |
CN106997671A (en) * | 2017-05-15 | 2017-08-01 | 东南大学 | A kind of raising control method for vehicle of the tramcar signal junction by efficiency |
Also Published As
Publication number | Publication date |
---|---|
WO2008054932A3 (en) | 2008-12-04 |
MX2009004589A (en) | 2009-05-28 |
WO2008054932A2 (en) | 2008-05-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6609049B1 (en) | Method and system for automatically activating a warning device on a train | |
US6519512B1 (en) | Method and apparatus for providing enhanced vehicle detection | |
US9019115B2 (en) | Warning horn control system, radar system, and method | |
US20070159311A1 (en) | Vehicle separation warning device | |
CN201296207Y (en) | Alarm for preventing automobile rear end collisions | |
JP2003523590A (en) | Apparatus for transmitting hazard warnings to vehicle drivers wirelessly | |
US20120095646A1 (en) | Intersection vehicle collision avoidance system | |
JPH1081238A (en) | Radio railroad-crossing alarm system | |
CA2210270A1 (en) | Railway crossing collision avoidance system | |
CN105857277A (en) | Traffic light control device for electric vehicle and use method of traffic light control device | |
CN201166707Y (en) | Vehicle-mounted distance-finding system base on GPS | |
CN203623585U (en) | ARM-based automatic distance measurement and grading early warning system for automobile safety driving | |
CN103794072A (en) | Method for warning a driver of a vehicle about exceeding of a speed limit, and vehicle | |
JP2008276327A (en) | Vehicular warning apparatus | |
CN203381585U (en) | Automobile safety driving distance maintenance and control system based on ARM | |
US20090115633A1 (en) | Methods and systems for automated warning device | |
JP2017033507A (en) | Drive evaluation device | |
JP2015009599A (en) | Running control device and running control method for vehicle | |
US20080099633A1 (en) | Method and apparatus for sounding horn on a train | |
CN105513422A (en) | Vehicle-mounted early warning system and implementation method | |
CN208429049U (en) | To anticollision automatic early-warning horn system before a kind of vehicle | |
US6386486B1 (en) | Method and apparatus for indicating the presence of a train at a railroad crossing | |
WO2008156378A1 (en) | Pedestrian warning system | |
CN202063101U (en) | Safety prewarning device for preventing automobile from rear collision | |
JP6105239B2 (en) | ATS equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: QUANTUM ENGINEERING, INC., FLORIDA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KANE, MARK EDWARD;BRADY, JAMES;REEL/FRAME:018542/0415;SIGNING DATES FROM 20061113 TO 20061114 |
|
AS | Assignment |
Owner name: INVENSYS RAIL CORPORATION,KENTUCKY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:QUANTUM ENGINEERING, INC.;REEL/FRAME:024128/0423 Effective date: 20100101 Owner name: INVENSYS RAIL CORPORATION, KENTUCKY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:QUANTUM ENGINEERING, INC.;REEL/FRAME:024128/0423 Effective date: 20100101 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |