US20060185279A1 - Foundations for constructions - Google Patents
Foundations for constructions Download PDFInfo
- Publication number
- US20060185279A1 US20060185279A1 US10/563,239 US56323904A US2006185279A1 US 20060185279 A1 US20060185279 A1 US 20060185279A1 US 56323904 A US56323904 A US 56323904A US 2006185279 A1 US2006185279 A1 US 2006185279A1
- Authority
- US
- United States
- Prior art keywords
- pile
- foundation
- construction
- junction piece
- gap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000010276 construction Methods 0.000 title claims abstract description 37
- 239000000463 material Substances 0.000 claims abstract description 59
- 230000002787 reinforcement Effects 0.000 claims abstract description 19
- 238000000034 method Methods 0.000 claims description 26
- 239000004567 concrete Substances 0.000 claims description 16
- 238000012546 transfer Methods 0.000 claims description 13
- 239000013590 bulk material Substances 0.000 claims description 4
- 125000006850 spacer group Chemical group 0.000 claims description 4
- 230000035508 accumulation Effects 0.000 claims description 2
- 238000009825 accumulation Methods 0.000 claims description 2
- 239000002674 ointment Substances 0.000 claims 1
- 238000009434 installation Methods 0.000 description 21
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 8
- 238000005452 bending Methods 0.000 description 6
- 230000008901 benefit Effects 0.000 description 5
- 238000013461 design Methods 0.000 description 5
- 239000011440 grout Substances 0.000 description 5
- 238000005304 joining Methods 0.000 description 4
- 238000005553 drilling Methods 0.000 description 3
- 238000011010 flushing procedure Methods 0.000 description 3
- 239000004576 sand Substances 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000000295 complement effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000012858 resilient material Substances 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 238000013475 authorization Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000009827 uniform distribution Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/25—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors specially adapted for offshore installation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0091—Offshore structures for wind turbines
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/95—Mounting on supporting structures or systems offshore
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/727—Offshore wind turbines
Definitions
- the present invention relates to a foundation for constructions, such as for example wind power installations.
- the present invention is an advantageous further development of known foundations, since the foundation according to the invention makes it possible to use the available manipulable foundation piles to produce a very rigid and durable construction which reliably transfers the forces which occur.
- filling material should also cover inter alia the function of joining the elements, since in the construction according to the invention the junctions are flexible between pure filling and pure joining and can be covered by one and the same material.
- An embodiment of the invention provides, for example, for the construction of annular accumulations of material on the inner face of the outer tube as well as the outer face of the inner tube (so-called shear keys). This can be achieved, for example, by welding on steel bands or particularly economically only by build-up welding.
- connection of the foundation pile to the rest of the construction preferably takes place by a concrete bond (grouted joint).
- a concrete bond (grouted joint)
- the diameter of a substantially tubular junction piece is chosen so that it can be pushed into the gap between the inner and outer tubes. After alignment of the junction piece, this can then be connected by means of the concrete bond (grouted joint) to the inner and outer tubes, preferably in one operation.
- the invention also relates to a method of dismantling a foundation according to the invention, which is advantageous particularly when the gap between the inner tube and the outer tube has been substantially filled with a free-flowing filling material which is preferably not damaging to the environment.
- the outer tube is then withdrawn so that the filling material escapes downwards onto the seabed.
- this filling material can remain on the seabed.
- the inner tube is then detached in the region of the level of the seabed and withdrawn (possibly after renewed excavation work or flushing out).
- FIG. 1 shows a section through the foundation according to the invention
- FIG. 2 shows a section through the foundation according to a second embodiment of the invention
- FIG. 3 shows a section through the foundation according to a third embodiment of the invention
- FIG. 4 shows a section through the foundation according to a fourth embodiment of the invention.
- FIG. 5 shows a horizontal cross section through an inner tube and outer tube of a fifth embodiment of the invention.
- seals 4 to the inner tube 1 and the outer tube 2 to attached to the lower end of the junction piece 3 on both sides.
- Such seals 4 can for example be rubber seals, also known in the prior art as “grout seals”.
- the junction piece 3 is supported and aligned on the inner tube 1 with the aid of supporting brackets 5 .
- the supporting brackets can also be supported externally on the outer tube 2 , but for reasons of protection against corrosion it makes more sense to attach them on the inner face.
- the remaining gap between the junction piece 3 and the outer tube 2 is sealed in a sensible manner with a permanently resilient material 7 .
- the space between the inner tube 1 and the outer tube 2 can be filled to approximately below the junction piece with inexpensive filling material 10 a (e.g. sand or gravel) which preferably is not damaging to the environment. Only then is the high-grade (and relatively expensive) filling material 10 b for the concrete bonding introduced.
- inexpensive filling material 10 a e.g. sand or gravel
- the high-grade filling material can also be introduced only locally where the loading level is particularly high (e.g. directly above the fixing on the seabed or in the junction region with the junction piece, or also differentially depending upon the main loading direction).
- FIGS. 2, 3 and 4 by way of example three embodiments are illustrated for the arrangement of the outer and inner tubes as well as the junction piece and also for the local introduction of the high-grade filling material into the space between the outer and inner tubes or junction piece respectively.
- FIG. 2 shows an inner tube 21 which is disposed in an outer tube 22 .
- a junction piece 23 is disposed in the space between the inner tube 21 and the outer tube 22 .
- the connection point between the tubes 21 22 and the junction piece 23 is below the surface of the water W. This is practical particularly with regard to use of material which is appropriate to the stress, since as indicated above the maximum bending stress in a pile foundation is frequently situated on the surface of the seabed (somewhat below the seabed in the case of soft ground).
- the outer tube 22 of the duopile is of significantly longer construction than the inner tube 21 .
- the outer tube 22 is rammed in so deep that the centre thereof lies at the level of the maximum bending moment.
- the significantly shorter inner tube 21 is then rammed centrally into the outer tube 22 .
- the junction piece 23 is likewise pushed relatively deep into the space between the outer tube 22 and the inner tube 21 , in fact to such a depth that it extends into the region of the maximum bending moment.
- the seabed should be removed between the two tubes, e.g. with a suction apparatus (suction dredger).
- suction dredger suction apparatus
- the stepping of the arrangements of the inner tube and the outer tube can be varied as a function of different tube parameters (e.g. mass, length and diameter) as well as the available ramming apparatus in order to combine an optimal strength with a simple installation. Therefore the embodiments shown only represent examples of a large number of advantageous variants.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Sustainable Energy (AREA)
- Sustainable Development (AREA)
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
A construction including at least one pile-type device that is anchored in or on the ground and essentially consists of a longitudinal pile element. The pile-type device also includes at least one reinforcement element, which is configured and located in such a way that a gap is formed between the reinforcement element and the pile element. The gap can be filled at least partially with at least one loose and/or free-flowing material.
Description
- The present invention relates to a foundation for constructions, such as for example wind power installations.
- Due to terrific technical development in recent years wind power installations have reached dimensions and weights which are increasingly at the limits of what is technologically feasible. The rotor of such a wind power installation has a diameter which is significantly more than 100 meters, the height of the tower can be up to 130 meters and the mass of a machine housing disposed on the tower can be up to 500 tons. The above-mentioned dimensions and weights nowadays belong to the prior art.
- The tower and the foundation in particular are components in respect of which the size of the component increasingly poses a problem. Thus, for example the road transport of the towers, which are made predominantly of steel tubes, poses problems if the diameter of the tower is to be more than 4.3 meters. In general the headroom of bridges is no longer sufficient to enable a transport laden with the tower or a section of the tower to pass under a bridge.
- Furthermore, the available rolling mills and welding processes limit the wall thickness and also the diameter of the machinable cylindrically rolled steel sheets. In addition the permissible transport weight of currently approximately 100 tons unit weight also limits the dimensions, so that higher unit weights also lead to substantially higher costs.
- The foundation of an installation constitutes a considerable cost factor, particularly with regard to the offshore arrangement of wind power installations, i.e. wind power installations erected in the sea. Apart from the installation and maintenance costs which in any case are already much higher, this cost factor exerts a very strong cost pressure on the offshore use of wind power, and therefore particularly in the case of the cost-intensive foundation attempts are being made to find the most economical solution possible.
- The so-called monopile (single-pile) foundation which is already used singly for land-based wind power installations has hitherto been economical for average water depths. In this case, a pile located in the extension of the tower axis, usually a relatively thick-walled steel tube, is anchored in the seabed. In the case of large wind power installations, this single pile must have substantial dimensions, for example, diameters of more than 5 meters with lengths of more than 30 meters. However, the disadvantage of this known foundation is that it is already foreseeable now that in the near future it will no longer possible to produce piles which are so designed that they can bear the wind power installations which are increasingly becoming larger.
- For the introduction of the monopile into the ground a ramming or pile-driving method is known as the most economical method. In the case of sandy ground, however, it is also known to use a flushing method. Furthermore, in the case of rocky underlying ground a drilling or boring method is known in which, depending upon the nature of the ground, the monopile is then cemented into the hole with a concrete-like mass (grout).
- A similar cemented connection is known for the junction between monopile and tower in the offshore wind power installations. Since the upper face of the monopile is uneven, particularly in the case of the ramming method, it is not possible to use flange connections which are otherwise usual. Therefore, a junction piece, which is provided with a flange at the upper end is turned over the monopile. As a rule, this junction piece is substantially oversized relative to the monopile so that any angle error occurring during introduction of the monopile can be compensated. After alignment of the junction piece, the gap between the junction piece and the monopile is filled with a concrete-like mass (grout). In this case, the filling material serves not only for filling the cavity, but also as a joining material (providing physical adhesion) between the components. This joining which is designated as “concrete bonding” is generally known by the term “grouted joint”.
- In particular, in the very economical ramming method, the dimensions of the monopile are limited both in diameter and in wall thicknesses by the rams available, which naturally have considerable dimensions. Moreover, a high weight of the monopile can lead to unacceptably high expenditure on handling and transport.
- On the other hand, because of the enormous static and dynamic stresses during the 20 year service life of a wind power installation, it is generally desirable from the design point of view to produce the most stable and rigid structure possible. Moreover, the first natural frequency of the construction must often be kept within a permissible frequency window which is predetermined by the design of the wind power installation. Thus, in particular in the case of considerable water depths the frequency requirement can make it become impossible to produce a monopile with the available limiting dimensions.
- Therefore, for considerable water depths the known possibilities for foundations of wind power installations include three-legged foundations (tripod) and so-called jackets (four-legged or multi-legged platforms, usually constructed as a latticework structure, the standard design in petroleum platforms). The “feet” can be anchored for example by means of gravity (concrete) and also by piles anchored in the ground. Because of the considerably higher steel consumption as well as the large number of anchoring points on the seabed which represent considerable expense, however, these foundations are much less economical than the monopile. Furthermore, the spatial extent below the surface of the water constitutes an increased risk of shipping collisions.
- Furthermore, pile-like foundation elements are generally known for foundations of any kind for buildings in yielding ground. Precast piles of reinforced concrete are usual for this purpose. Multi-part piles made from concrete are also known for example from DE 44 39 115, in which at the beginning an outer and an inner driving tube are rammed into the ground. Then, the cavities are filled with fluid concrete. Before the hardening of the concrete, the driving tubes are removed again, so that the concrete flows together in the junction region and forms an integral concrete pile with different regions.
- The object of the invention is a general reduction of the dimensions and weights of the foundation of constructions, in particular wind power installations, in order to facilitate the production, the transport and the introduction into the ground, or at least to improve the cost-effectiveness.
- The foundation according to the invention for a construction has at least one pile-like device which is anchored in or on the ground and basically comprises an elongate pile element. According to the invention, it is provided that the pile-like device also has at least one reinforcement element which is constructed and disposed in such a way that between the reinforcement element and the pile element a gap is formed which is filled at least partially with at least one free-flowing filling material.
- The present invention is an advantageous further development of known foundations, since the foundation according to the invention makes it possible to use the available manipulable foundation piles to produce a very rigid and durable construction which reliably transfers the forces which occur.
- Furthermore, the pile-like device by which the force is transferred into the ground is divided up according to the invention, with the advantage that the necessary structure of the foundation comprises at least two elements which can be manufactured, transported and introduced into the ground individually and only then do they have to be joined to one another by a (or several different) filling or also joining material or materials.
- The term “filling material” should also cover inter alia the function of joining the elements, since in the construction according to the invention the junctions are flexible between pure filling and pure joining and can be covered by one and the same material.
- For economic reasons it is particularly advantageous that once the ram is positioned it can, if need be, drive both elements concentrically one after the other into the ground, where only one borehole in the ground is necessary and both elements can be introduced into the ground from one position.
- In the case of larger constructions or in offshore wind power installations in greater depths of water, the foundation according to the invention can also have more than one pile-like device. Thus the foundation can also be a three-legged or four-legged foundation (tripod, jacket) which is known per se, but in which each leg can be constructed by the principle according to the invention, comprising a pile element and a reinforcement element which are joined to one another by way of a filled gap.
- According to an advantageous embodiment of the invention, the reinforcement element can be constructed as an outer tube in which the pile element is disposed. According to a further advantageous embodiment, the pile element can be constructed as an inner tube which is disposed in the outer tube in such a way that the gap which substantially surrounds the inner tube is formed between them. Naturally, the opposite variant is also conceivable, namely construction of the pile element as the outer tube and the reinforcement element as the inner tube.
- In the case of monopile foundations, it is known to use a tube as the monopile. As already described above, however, the monopile foundation has the disadvantage that corresponding tubes must have very large external dimensions in order to be able to ensure appropriate transfer of force. According to the present embodiment of the invention, it is possible for the wall thickness of the pile-like device to be reduced considerably with the same external dimensions since the outer tube introduced according to the present embodiment of the invention transfers additional forces and has a reinforcing effect. Conversely, it is equally possible to reduce the outer diameter of the pile-like device with a predetermined wall thickness and thus to make it possible to produce it, transport it, or introduce it into the ground (e.g. ramming or drilling).
- Since this new foundation pile according to the embodiment of the invention practically comprises two tubular piles pushed concentrically into one another, the term “duopile” has been chosen for this.
- In a further advantageous embodiment of the invention, the gap between the tubes is filled with a bulk material which preferably does not damage the environment, e.g. sand or gravel, as filling material in order to avoid a relative movement of the tubes in the event of stresses occurring. Since a bulk material does not transfer tensile stress nor shearing stress, in this case the filling material serves exclusively for filling of the gap and thus for fixing of the tubes inside one another, but not for additional increase in the rigidity of the foundation pile. An advantage of this mode of construction is the dismantling of the construction after the service life of the wind power installation has expired, which is very simple in particular in the case of offshore application, as after removal of the construction based on the foundation the outer steel tube is detached and withdrawn in the region of the level of the seabed, the bulk material being simply released to remain on the seabed. In a second operation, the inner tube can be detached and withdrawn.
- A further particularly advantageous embodiment of the invention provides for the use of the filling material in order to increase the rigidity of the entire pile, as according to the sandwich mode of construction which is known from the composite fiber sector the transfer of shear between two load-bearing material layers is ensured. Such a mode of construction can be achieved by the use of a high-strength cement (grout) which is known as a filling material for example from offshore technology.
- In order to ensure a good joining of the filling material and the steel components and also to facilitate the transfer of the shear stress from the elements or steel tubes into the filling material, special measures may be necessary.
- An embodiment of the invention provides, for example, for the construction of annular accumulations of material on the inner face of the outer tube as well as the outer face of the inner tube (so-called shear keys). This can be achieved, for example, by welding on steel bands or particularly economically only by build-up welding.
- In a particularly advantageous embodiment of the invention, in order to improve the connection between filling material, tube fins extending in the longitudinal direction are applied to the outer face of the inner tube. In a complementary fashion, fins extending in the longitudinal direction and directed inwards are likewise attached to the inner face of the outer tube. In this case the arrangement of the fins is chosen in a sensible manner so that in the assembled state fins of the inner tube and the outer tube always alternate along the circumference.
- Furthermore, this arrangement has the crucial advantage that at least three of the fins can be used in order to center the tubes in one another during the assembly operation, the height of the fins being tailored to the inner or outer diameter respectively of the appertaining second tube.
- For further improvement of the connection between filling material and tube it may be sensible to provide openings (holes) in the rib-like components. This provision also ensures a uniform distribution of the filling material during the filling operation.
- In the case of particularly hard ground, it may happen that the longitudinal fins would not withstand the stresses of the ramming process. In this case, a further embodiment of the invention provides that at least three spacers are introduced from above into the gap with the aid of a fixing means (cable, rod or the like). The spacers can be made, for example, from plastic material, metal material or also wood. Depending upon the length of the tubes it may be necessary to introduce spacers at different positions (relative to the longitudinal direction of the piles).
- The connection of the foundation pile to the rest of the construction preferably takes place by a concrete bond (grouted joint). Advantageously, it may be provided that the diameter of a substantially tubular junction piece is chosen so that it can be pushed into the gap between the inner and outer tubes. After alignment of the junction piece, this can then be connected by means of the concrete bond (grouted joint) to the inner and outer tubes, preferably in one operation.
- The junction piece is preferably also equipped with the means explained above for increasing the transfer of shear between the junction piece and the filling material.
- As an alternative, the junction with the rest of the construction can also be produced, for example, by means of flange or clip connections.
- All the said components of the invention are of high economical benefit in particular, but not exclusively, in offshore constructions.
- The invention relates not only to the foundation according to the invention but also to a method for erecting such a foundation.
- For this purpose, it is provided that in a first operation either the pile-like device or the reinforcement element is introduced into the ground first according to choice. In a second operation, the element which is complementary to the first step is then introduced. As required, a complete or partial filling of the gap can now take place.
- In a next operation, the junction piece is then installed which, if both elements are constructed, for example, as tubes disposed inside one another, can in principle be pushed into the inner tube, but in technical terms it is much more sensible to push it externally over the outer tube or even more advantageously to push it between the outer and the inner tubes. In a further operation, the gap(s) between the tube(s) and the junction piece is (are) then filled with a filling material. In a preferred embodiment in which the junction tube is pushed into the gap between the outer and inner tubes, the filling of the two gaps can take place jointly or also in succession (in two part-steps). It may also be sensible to arrange for the filling material in the gap to the inner tube to begin or end in a region other than in the gap to the outer tube. In this way the change in rigidity is reduced at the junction of the pile-like device with the junction piece.
- In a preferred embodiment of the invention the method includes, in addition to the filling of the gap(s) to the junction piece, at least partial filing of the space between the inner and outer tubes with a filling material or also with different filling materials. This filling takes place most advantageously, but not necessarily, between step two and step three of the method described above.
- The permanent sealing of the gap between the foundation pile and the junction piece preferably takes place using a permanently resilient material in a last operation.
- The economical introduction of the “duopile” foundation is preferably carried out using the ramming method so long as the nature of the ground allows for this. Other methods (e.g. drilling) can also be used.
- The method according to the invention is particularly practical for use in offshore constructions, since the logistical requirements there, particularly also with regard to the necessary machines for introducing the piles into the ground, can be met economically.
- The invention also relates to a method of dismantling a foundation according to the invention, which is advantageous particularly when the gap between the inner tube and the outer tube has been substantially filled with a free-flowing filling material which is preferably not damaging to the environment.
- After the construction and preferably also the junction piece have been dismantled, then the dismantling of the foundation takes place. For this purpose, in a first step, for example, the outer tube is detached approximately in the region of the level of the seabed, for example, using known flame-cutting processes suitable for underwater use. Depending upon the requirements of the official building authorization, in the region of the level of the seabed can mean slightly below the seabed (so that first of all excavation work or flushing out has to be carried out) or also up to a few meters below the seabed, where the detachment is to be carried out most simply using the available equipment.
- In a second step, the outer tube is then withdrawn so that the filling material escapes downwards onto the seabed. In particular, in the case of a sand or gravel type of filling material which is not damaging to the environment, this filling material can remain on the seabed. In a third step the inner tube is then detached in the region of the level of the seabed and withdrawn (possibly after renewed excavation work or flushing out).
- Since the foundation according to the invention can be used particularly advantageously in the field of wind power use, a wind power installation with a foundation according to the invention is an explicit part of the present invention.
- The invention is explained in greater detail below for an offshore wind power installation with reference to three embodiments.
-
FIG. 1 shows a section through the foundation according to the invention; -
FIG. 2 shows a section through the foundation according to a second embodiment of the invention; -
FIG. 3 shows a section through the foundation according to a third embodiment of the invention; -
FIG. 4 shows a section through the foundation according to a fourth embodiment of the invention; -
FIG. 5 shows a horizontal cross section through an inner tube and outer tube of a fifth embodiment of the invention. - Two different embodiments A1 and A2 of the invention, which in reality are usually of rotationally symmetrical design, are shown to the left and to the right of the vertical dash-dot line of symmetry. However, in the case of wind power installations which are exposed to high winds or high waves, for economic reasons, it may also be sensible to use different filling material over the circumference of the pile according to the prevailing direction of the high winds or high waves (e.g. inexpensive gravel in the secondary loading direction and high-grade filling material, e.g. grout, in the main loading direction).
- An inner tube 1 and an
outer tube 2 are introduced into the seabed (M). Thejunction piece 3, which is provided at the upper end with a conventional screw flange as connection to the rest of theconstruction 8, is pushed into the gap between the inner tube 1 and theouter tube 2. - In the embodiment A1, on the right-hand side only, the region of the concrete bond to the junction piece is filed with the filling
material 6, and for this reason seals 4 to the inner tube 1 and theouter tube 2 to attached to the lower end of thejunction piece 3 on both sides.Such seals 4 can for example be rubber seals, also known in the prior art as “grout seals”. - In order to avoid a marked change in rigidity in the structure which is structurally unfavourable it may be sensible to dispose one of the two
seals 4, e.g. the inner one, somewhat further down so that the junction is less abrupt. The same applies to the upper level of the filling. Here too, for the stated reasons, it may be sensible, for example, to fill the inner gap to a lower height than the outer one. - During the assembly operation the
junction piece 3 is supported and aligned on the inner tube 1 with the aid of supportingbrackets 5. In principle the supporting brackets can also be supported externally on theouter tube 2, but for reasons of protection against corrosion it makes more sense to attach them on the inner face. After the introduction of the filling material the remaining gap between thejunction piece 3 and theouter tube 2 is sealed in a sensible manner with a permanentlyresilient material 7. - The embodiment A2 (on the left-hand side) shows the
means 9 for improvement of the connection between the fillingmaterial 6 and the inner tube 1, theouter tube 2 and thejunction piece 3, wherein the means are mounted both on the inner tube andouter tube 2 and also on thejunction piece 3 and in this example are of annular design. - If due to the means for increasing the transfer of shear, a construction of the
seals 4 shown in the embodiment A1 is not possible, the space between the inner tube 1 and theouter tube 2 can be filled to approximately below the junction piece with inexpensive filling material 10 a (e.g. sand or gravel) which preferably is not damaging to the environment. Only then is the high-grade (and relatively expensive) fillingmaterial 10 b for the concrete bonding introduced. - Furthermore, in the embodiment A2 a
different filling height 14, 15 of the upper level of the concrete filling is shown in order to avoid the marked changes in rigidity described above. - However, depending upon the requirements of the location of the construction it is also possible as an alternative, as stated above, to provide the filling material as a supporting component of the entire foundation pile (depending upon the type of introduction to the level of the seabed or also to the lower end of the duopile). In this case the lower inexpensive filling material 10 a is emitted, and the entire space is filled with the high-grade filling material.
- However, in further embodiments according to the invention, the high-grade filling material can also be introduced only locally where the loading level is particularly high (e.g. directly above the fixing on the seabed or in the junction region with the junction piece, or also differentially depending upon the main loading direction).
- In
FIGS. 2, 3 and 4, by way of example three embodiments are illustrated for the arrangement of the outer and inner tubes as well as the junction piece and also for the local introduction of the high-grade filling material into the space between the outer and inner tubes or junction piece respectively. - In a completely sectional partial view
FIG. 2 shows aninner tube 21 which is disposed in anouter tube 22. Ajunction piece 23 is disposed in the space between theinner tube 21 and theouter tube 22. In the illustrated embodiment, the connection point between thetubes 21 22 and thejunction piece 23 is below the surface of the water W. This is practical particularly with regard to use of material which is appropriate to the stress, since as indicated above the maximum bending stress in a pile foundation is frequently situated on the surface of the seabed (somewhat below the seabed in the case of soft ground). - Since the bending moment present decreases again between the seabed M and the surface of the water W it is also provided that the
outer tube 22 of the duopile is of significantly longer construction than theinner tube 21. Theouter tube 22 is rammed in so deep that the centre thereof lies at the level of the maximum bending moment. The significantly shorterinner tube 21 is then rammed centrally into theouter tube 22. Thejunction piece 23 is likewise pushed relatively deep into the space between theouter tube 22 and theinner tube 21, in fact to such a depth that it extends into the region of the maximum bending moment. In this case if need be the seabed should be removed between the two tubes, e.g. with a suction apparatus (suction dredger). Thus in the region of maximum stresses three tubes lie inside one another, which are then stepped in a manner appropriate to the stress first of all to two tubes and then only one supporting tube. - However, for the case where the costs for the suction (depending upon the nature of the ground in the individual case) are too high, the arrangement of the concrete bond between the seabed M and the surface of the water W is very advantageous.
- In such a case, for example according to the embodiment shown in
FIG. 3 an outer tube 32 can be rammed very much deeper into the seabed than aninner tube 31. Ajunction piece 33 is pushed so far into the space that a sufficient connection region is achieved between thejunction piece 33 and the outer tube 32 or theinner tube 31 respectively. Due to the stepping of thetubes 31, 32 a material use which is appropriate to the stress is achieved which is adapted to the trend of the bending moment line. For reasons of costs, the filling material is introduced in such a way that aconcrete bond 30 b is provided only between the regions of thejunction piece 33 and outer tube 32 as well as thejunction piece 33 andinner tube 31. The rest of the space substantially between the outer tube 32 and theinner tube 31 is filled with a free-flowing and more cost-effective filling material 30 a. Theconcrete bond 30 b between theinner tube 31 and thejunction piece 33 is limited by backfilling of, for example, gravel to the length which is necessary for reasons of strength. -
FIG. 4 shows a further embodiment of the arrangement of anouter tube 42, an inner tube 41 and ajunction piece 43 relative to one another as well as a local introduction of different filing material. The arrangement corresponds substantially to the arrangement shown inFIG. 2 with the difference that the junction piece does not extend to the maximum bending moment but already ends above it. This offers the advantage that extra seabed does not have to be sucked up, so that costs can be saved. Furthermore the inner tube 41 is rammed deeper into the ground than the outer pile. - The stepping of the arrangements of the inner tube and the outer tube can be varied as a function of different tube parameters (e.g. mass, length and diameter) as well as the available ramming apparatus in order to combine an optimal strength with a simple installation. Therefore the embodiments shown only represent examples of a large number of advantageous variants.
-
FIG. 5 shows a further embodiment of the invention. For better connection of the filling material to the tubes both theinner tube 51 and theouter tube 52 are provided withfins 61. In order to ensure the centring of the 51, 52 during the introduction into thetubes ground centring fins 62 are also provided. - In order to improve the connection to the filling material the
61, 62 can be provided with openings. They can be chamfered at the lower end in order to simplify the introduction into the ground.fins
Claims (28)
1. A foundation for a construction (8) with at least one pile-like device that is anchored in or on the ground (M) and comprises an elongate pile element (1, 21, 31, 41, 51), wherein the pile-like device also has at least one reinforcement element (2, 22, 32, 42, 52) that is constructed and disposed such between the reinforcement element (2, 22, 32, 42, 52) and the pile element (1, 21, 31, 41, 51), a gap is formed, and wherein said gap can be at least partially filled with at least one free-flowing filling material (6, 10 a, 10 b, 30 a, 30 b).
2. The foundation as claimed in claim 1 , wherein the pile element (1, 21, 31, 41, 51) is constructed as an inner tube around which the reinforcement element (2, 22, 32, 42, 52) is disposed.
3. The foundation as claimed in the claim 2 , wherein the pile element (1, 21, 31, 41, 51) is constructed as an inner tube and the reinforcement element is constructed as an outer tube, said inner tube being is disposed in the outer tube such a that the gap which substantially surrounds the inner tube is formed between the inner tube and the outer tube.
4. The foundation as claimed in claim 1 , wherein the foundation comprises one single pile-like device which stands substantially in an extension of a vertical axis of the construction.
5. The foundation as claimed in claim 1 , wherein the foundation has comprises more than two pile-like devices.
6. The foundation as claimed in claim 1 wherein at least a proportion of the filling material (10 a, 30 a) comprises a bulk material which is not damaging to the environment.
7. The foundation as claimed in claim 1 wherein the filling material is a concrete-like mass.
8. The foundation as claimed in claim 1 , wherein, in the region of the gap, the pile element (1, 21, 31, 41, 51) and the reinforcement element (2, 22, 32, 42, 52) have means for increasing transfer of shear between the elements and the filling material.
9. The foundation as claimed in claim 8 , wherein, when the elements are constructed as tubes, means for increasing transfer of shear (9) are disposed on an inner face of an outer tube and on an outer face of an inner tube.
10. The foundation as claimed in claim 8 , wherein the means for increasing transfer of shear comprise annular accumulations of material applied to the tubes.
11. The foundation as claimed in claim 9 , wherein the means for increasing the transfer of shear comprise at least three fins (61) aligned parallel to a longitudinal axis of the pile-like device and connected to one of the tubes.
12. The foundation as claimed in the claim 11 , wherein the fins (62) ensure centering of the inner and outer tubes.
13. The foundation as claimed in claim 1 , wherein at least three spacers are disposed in the gap between the elements by way of connecting means.
14. The foundation as claimed in claim 1 , wherein, between the pile-like device and the construction, a junction piece (3, 23, 33, 43) is disposed which connects them to one another.
15. The foundation as claimed in claim 14 , wherein the junction piece (3, 23, 33, 43) includes a screw flange for connection to the construction.
16. The foundation as claimed in claim 14 , wherein the junction piece (3, 23, 33, 43) is connected to the pile-like device via a concrete bond.
17. The foundation as claimed in claim 14 , wherein a part-region of the junction piece (3, 23, 33, 43) is constructed for arrangement in the gap between the elements.
18. The foundation as claimed in claim 17 , wherein the junction piece is equipped with means for increasing the transfer of shear between the junction piece and the filling material.
19. The foundation as claimed in claim 1 , wherein the construction is an offshore construction.
20. A method for introducing a pile-like device having a pile element (1, 21, 31, 41, 51) into the ground as a foundation of a construction (8), comprising the following method steps:
introducing the pile element (1, 21, 31, 41, 51) into the ground,
disposing over or in the pile-like device a junction piece (3, 23, 33, 43), said *unction piece serving to connect the pile-like device to the construction (8),
connecting the junction piece to the pile-like device, wherein:
before or after the introduction of the pile element (1, 21, 31,41, 51) into the ground, introducing a reinforcement element (2, 22, 32, 42, 52) into the ground, the reinforcement element being constructed and disposed relative to the pile element (1, 21, 31, 41, 51) such that an increase in a strength of the pile-like device is achieved, and
filling, at least partially, gaps between the junction piece and the pile-like device with a filling material.
21. The method as claimed in the claim 20 , wherein the reinforcement element (2, 22, 32, 42, 52) is constructed and disposed relative to the pile element (1, 21, 31, 41, 51) such that a gap is produced therebetween, said gap being at least partially filled with at least one filling material in an additional step.
22. The method as claimed in the claim 21 , wherein the additional step is carried out between the arrangement of the junction piece (3, 23, 33, 43).
23. The method as claimed in claim 22 , wherein, in a further last step, the junction between the pile-like device and the junction piece is sealed with a material that is permanently resilient.
24. The method as claimed in claim 21 , wherein at least one of the two elements is introduced into the ground by means of a ramming method and/or
25. The method as claimed in claim 21 , wherein said method is used in an offshore construction and the pile-like device is introduced into a seabed.
26. A method of dismantling a foundation for a construction (8) with at least one pile-like device that is anchored in or on the ground (M) and comprises an elongate pile element (1, 21, 31, 41, 51), wherein the pile-like device also has at least one reinforcement element (2, 22, 32, 42, 52) that is constructed and disposed such that, between the reinforcement element (2, 22, 32, 42, 52) and the pile element (1, 21, 31, 41, 51), a gap is formed, and wherein said gap can be at least Partially filled with at least one free-flowing filling material (6, 10 a, 10 b, 30 a, 30 b) wherein the pile element is constructed as an inner tube and the reinforcement element is constructed as an outer tube and wherein, after removal of the supported construction, comprising the steps of:
detaching the outer tube in a region of a level of a seabed,
withdrawing the outer tube so that the filling material escapes downwards onto the seabed,
detaching the inner tube in the region of the level of the seabed and then withdrawing the inner tube.
27. The method as claimed in claim 26 , wherein a junction piece between the foundation and the construction is dismantled in an intermediate step performed between detaching the outer tube and withdrawing the outer tube.
28. (canceled)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE10330963.2 | 2003-07-08 | ||
| DE10330963A DE10330963A1 (en) | 2003-07-08 | 2003-07-08 | Foundation for buildings |
| PCT/EP2004/007376 WO2005005752A1 (en) | 2003-07-08 | 2004-07-06 | Foundations for constructions |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20060185279A1 true US20060185279A1 (en) | 2006-08-24 |
Family
ID=33546930
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US10/563,239 Abandoned US20060185279A1 (en) | 2003-07-08 | 2004-07-06 | Foundations for constructions |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20060185279A1 (en) |
| DE (1) | DE10330963A1 (en) |
| GB (1) | GB2418696B (en) |
| WO (1) | WO2005005752A1 (en) |
Cited By (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20110138731A1 (en) * | 2010-08-24 | 2011-06-16 | Mitsubishi Heavy Industries, Ltd. | Wind turbine generator and construction method for wind turbine tower |
| WO2012030220A1 (en) | 2010-09-01 | 2012-03-08 | Ballast Nedam Offshore B.V. | Method for introducing a hollow elongated structure into a water bottom |
| CN102734074A (en) * | 2011-04-11 | 2012-10-17 | 远景能源(丹麦)有限公司 | Offshore wind turbine comprising a support system for interchangeable containers, said support system being combined with a wave run-up deflector |
| WO2013082031A1 (en) * | 2011-11-28 | 2013-06-06 | Keystone Engineering, Inc. | Grouted cylindrical connection utilizing bearing surfaces for offshore monopile foundations |
| US20130202447A1 (en) * | 2010-05-25 | 2013-08-08 | Thomas OESTERGAARD | segmented jacket construction, in particular for a foundation for a wind turbine installation |
| EP2662495A1 (en) | 2012-05-09 | 2013-11-13 | Alstom Wind, S.L.U. | Wind turbine foundation |
| US20130302096A1 (en) * | 2012-05-09 | 2013-11-14 | Arturo Rodríguez Tsouroukdissian | Wind turbine foundation |
| US20150368871A1 (en) * | 2012-12-14 | 2015-12-24 | Senvion Se | Method for anchoring a foundation structure, and foundation structure |
| EP2665931A4 (en) * | 2011-01-21 | 2017-05-17 | General Electric Company (a New York Corporation) | Wind turbine foundation mounting part |
| WO2017178657A1 (en) * | 2016-04-15 | 2017-10-19 | Pur Wind Aps | Gasket for wind turbine |
| EP2185816B1 (en) | 2007-08-29 | 2018-01-31 | MHI Vestas Offshore Wind A/S | Monopile foundation for offshore wind turbine |
| US10590620B2 (en) | 2015-05-27 | 2020-03-17 | Innogy Se | Method for constructing a foundation for a tower structure, and onshore tower structure |
| US10697488B2 (en) | 2014-12-12 | 2020-06-30 | Karlsruher Institut Fuer Technologie | Connection between two joining partners, and method for establishing said connection |
| US11008727B2 (en) | 2017-08-11 | 2021-05-18 | Innogy Se | Offshore structure |
| US20220106757A1 (en) * | 2019-02-07 | 2022-04-07 | Rwe Renewables Gmbh | Method for Forming a Connection Between Two Pipe Segments of Different Widths and a Correspondingly Produced Connection |
| KR20230148271A (en) * | 2021-04-12 | 2023-10-24 | 알더블유이 오프쇼어 윈드 게엠베하 | Method for manufacturing a connection between two tube segments of a tower-like structure |
| WO2024014729A1 (en) * | 2022-07-14 | 2024-01-18 | (주)유주 | Underwater concrete structure for preventing subsidence at seabed soft ground, and construction method therefor |
| US12173794B2 (en) | 2017-10-13 | 2024-12-24 | Rosen 2 Holding Ag | Sealing arrangement for a connection between two connecting elements of an offshore structure and method for producing same |
| US20250122685A1 (en) * | 2021-03-29 | 2025-04-17 | Equinor Energy As | Foundation for an offshore wind turbine |
| US20250326883A1 (en) * | 2022-01-18 | 2025-10-23 | Basf Se | Gasket for a transition piece of a wind turbine and method for mounting such a gasket |
Families Citing this family (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20120107053A1 (en) * | 2010-08-20 | 2012-05-03 | Hilgefort Gmbh Anlagenkomponenten Und Apparatebau | Sandwich base structure for off-shore wind turbines |
| US7367780B2 (en) * | 2005-09-30 | 2008-05-06 | General Electric Company | System and method for driving a monopile for supporting an offshore wind turbine |
| DE202007009474U1 (en) | 2007-07-05 | 2008-11-13 | F & Z Baugesellschaft Mbh | Offshore platform |
| DE102008000382A1 (en) * | 2008-02-22 | 2009-09-03 | Ed. Züblin Ag | Offshore-foundation's e.g. monopole foundation, vertical misalignment correction method for wind energy plant, involves rotating one of partial units around connection surface perpendicular to axis until adjustment of mast is achieved |
| DK2253781T3 (en) | 2009-05-21 | 2013-06-17 | Alstom Wind Sl | Tower section for a wind turbine tower structure |
| DE102010035025A1 (en) * | 2010-08-20 | 2012-02-23 | Hilgefort Gmbh Anlagenkomponenten Und Apparatebau | Sandwich-base structure for erection of wind turbine in off-shore wind farm, has foundation piles comprising wall formed from surface part with inner, outer and intermediate layers, where core material is arranged as intermediate layer |
| DE102010035035A1 (en) * | 2010-08-20 | 2012-02-23 | Hilgefort Gmbh Anlagenkomponenten Und Apparatebau | Sandwich-base structure for erection of wind turbine in off-shore wind farm, has foundation piles comprising wall formed from surface part with inner, outer and intermediate layers, where core material is arranged as intermediate layer |
| US20120167487A1 (en) * | 2010-12-20 | 2012-07-05 | Fluor Technologies Corporation | Locatable and embeddable anchor point covers |
| CN102561354B (en) * | 2012-01-19 | 2014-10-08 | 中国水电顾问集团华东勘测设计研究院 | Grouting and ballast structure for offshore wind power foundation grouting connection |
| CN102644325B (en) * | 2012-03-31 | 2014-07-30 | 中国海洋石油总公司 | Grouting connection node for deepwater floating type platform steel structures |
| EP2772587B1 (en) * | 2013-02-28 | 2015-08-19 | Klaus Schultes | Connection between a foundation post of a structure, in particular an onshore or offshore construction, such as an onshore or offshore wind turbine, comprising in a particular tubular transition piece and method for manufacturing the same |
| DE102013015819A1 (en) * | 2013-09-24 | 2015-03-26 | Rwe Innogy Gmbh | Structural structure, in particular underwater structure of an offshore structure and procedure for establishing an offshore structure |
| DE102013019046B4 (en) | 2013-11-15 | 2015-09-10 | PWS GmbH | Double-walled large pipe, use of a large pipe and method for producing a double-walled large pipe |
| DE102014112787A1 (en) | 2014-09-05 | 2016-03-10 | P.E. Concepts Gmbh | Method for connecting an upper pipe end of a foundation structure with a lower pipe end of a structural element for the construction of an offshore wind turbine |
| CN104805861A (en) * | 2015-04-30 | 2015-07-29 | 黎伟强 | Foot margin cage |
| CN105672320A (en) * | 2016-04-06 | 2016-06-15 | 福州大学 | Seaborne wind generation set foundation grouting sleeve connection structure provided with annular groove and connection method thereof |
| NO344819B1 (en) | 2017-11-17 | 2020-05-04 | Comrod As | Method for creating a clearance for a mast element in a ground. |
| DE102019118997A1 (en) * | 2019-07-12 | 2021-01-14 | Rwe Renewables Gmbh | Floating support structure for a floating offshore wind energy device |
| TWI761999B (en) * | 2019-10-25 | 2022-04-21 | 丹麥商維斯塔斯風力系統有限公司 | Wind-turbine tower facility and method of assembling same |
| CN111379669A (en) * | 2020-03-24 | 2020-07-07 | 国电联合动力技术有限公司 | Reinforcing device and reinforcing method for concrete table column of fan foundation |
| DE102020128293A1 (en) | 2020-10-28 | 2022-04-28 | Rwe Renewables Gmbh | offshore wind energy system |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US415037A (en) * | 1889-11-12 | Metal pile | ||
| US2080406A (en) * | 1933-09-12 | 1937-05-18 | Jack W Allen | Well and method of constructing and cementing same |
| US3793794A (en) * | 1972-09-15 | 1974-02-26 | Arlo Inc | Stacked column |
| US3851483A (en) * | 1972-12-12 | 1974-12-03 | M Holley | Sleeved-pile structure |
| US4257721A (en) * | 1979-04-30 | 1981-03-24 | Haynes Harvey H | System for placement of piles into the seafloor |
| US4406094A (en) * | 1980-02-28 | 1983-09-27 | Messerschmitt-Boelkow-Blohm Gesellschaft Mit Beschraenkter Haftung | Apparatus for anchoring self-supporting, tall structures |
| US4992002A (en) * | 1989-07-11 | 1991-02-12 | Dewitt Wayne | Apparatus for forming in-ground concrete pilings |
| US5228806A (en) * | 1990-05-25 | 1993-07-20 | Petroleo Brasileiro S.A.-Petrobras | Gravity pile for platform foundation and process for its installation |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE4439115A1 (en) | 1994-08-24 | 1996-02-29 | Jossif Dr Ing Ladyshenskij | Foundation pile with reinforcing tube |
-
2003
- 2003-07-08 DE DE10330963A patent/DE10330963A1/en not_active Withdrawn
-
2004
- 2004-07-06 US US10/563,239 patent/US20060185279A1/en not_active Abandoned
- 2004-07-06 GB GB0600165A patent/GB2418696B/en not_active Expired - Fee Related
- 2004-07-06 WO PCT/EP2004/007376 patent/WO2005005752A1/en not_active Ceased
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US415037A (en) * | 1889-11-12 | Metal pile | ||
| US2080406A (en) * | 1933-09-12 | 1937-05-18 | Jack W Allen | Well and method of constructing and cementing same |
| US3793794A (en) * | 1972-09-15 | 1974-02-26 | Arlo Inc | Stacked column |
| US3851483A (en) * | 1972-12-12 | 1974-12-03 | M Holley | Sleeved-pile structure |
| US4257721A (en) * | 1979-04-30 | 1981-03-24 | Haynes Harvey H | System for placement of piles into the seafloor |
| US4406094A (en) * | 1980-02-28 | 1983-09-27 | Messerschmitt-Boelkow-Blohm Gesellschaft Mit Beschraenkter Haftung | Apparatus for anchoring self-supporting, tall structures |
| US4992002A (en) * | 1989-07-11 | 1991-02-12 | Dewitt Wayne | Apparatus for forming in-ground concrete pilings |
| US5228806A (en) * | 1990-05-25 | 1993-07-20 | Petroleo Brasileiro S.A.-Petrobras | Gravity pile for platform foundation and process for its installation |
Cited By (35)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2185816B1 (en) | 2007-08-29 | 2018-01-31 | MHI Vestas Offshore Wind A/S | Monopile foundation for offshore wind turbine |
| US20130202447A1 (en) * | 2010-05-25 | 2013-08-08 | Thomas OESTERGAARD | segmented jacket construction, in particular for a foundation for a wind turbine installation |
| US9366237B2 (en) * | 2010-05-25 | 2016-06-14 | Siemens Aktiengesellschaft | Segmented jacket construction, in particular for a foundation for a wind turbine installation |
| WO2012025985A1 (en) | 2010-08-24 | 2012-03-01 | 三菱重工業株式会社 | Wind turbine device and method for constructing tower for blade wheel |
| US20110138731A1 (en) * | 2010-08-24 | 2011-06-16 | Mitsubishi Heavy Industries, Ltd. | Wind turbine generator and construction method for wind turbine tower |
| WO2012030220A1 (en) | 2010-09-01 | 2012-03-08 | Ballast Nedam Offshore B.V. | Method for introducing a hollow elongated structure into a water bottom |
| EP2665931A4 (en) * | 2011-01-21 | 2017-05-17 | General Electric Company (a New York Corporation) | Wind turbine foundation mounting part |
| US9109581B2 (en) | 2011-04-11 | 2015-08-18 | Envision Energy (Denmark) Aps | Offshore wind turbine having a support system for interchangeable containers, the support system being combined with a wave run-up deflector and method of manufacturing same |
| CN102734074A (en) * | 2011-04-11 | 2012-10-17 | 远景能源(丹麦)有限公司 | Offshore wind turbine comprising a support system for interchangeable containers, said support system being combined with a wave run-up deflector |
| WO2013082031A1 (en) * | 2011-11-28 | 2013-06-06 | Keystone Engineering, Inc. | Grouted cylindrical connection utilizing bearing surfaces for offshore monopile foundations |
| US8888414B2 (en) | 2011-11-28 | 2014-11-18 | Keystone Engineering, Inc. | Grouted cylindrical connection utilizing bearing surfaces for offshore monopile foundations |
| US20130302096A1 (en) * | 2012-05-09 | 2013-11-14 | Arturo Rodríguez Tsouroukdissian | Wind turbine foundation |
| US20150082720A1 (en) * | 2012-05-09 | 2015-03-26 | Alstom Renewable Technologies | Wind turbine foundation |
| CN104302842A (en) * | 2012-05-09 | 2015-01-21 | 西班牙阿尔斯通可再生能源有限公司 | wind turbine base |
| WO2013167650A3 (en) * | 2012-05-09 | 2014-01-23 | Alstom Renovables España, S.L. | Wind turbine foundation |
| WO2013167650A2 (en) | 2012-05-09 | 2013-11-14 | Alstom Renovables España, S.L. | Wind turbine foundation |
| EP2662495A1 (en) | 2012-05-09 | 2013-11-13 | Alstom Wind, S.L.U. | Wind turbine foundation |
| US9574315B2 (en) * | 2012-12-14 | 2017-02-21 | Senvion Se | Method for anchoring a foundation structure, and foundation structure |
| US20150368871A1 (en) * | 2012-12-14 | 2015-12-24 | Senvion Se | Method for anchoring a foundation structure, and foundation structure |
| US10697488B2 (en) | 2014-12-12 | 2020-06-30 | Karlsruher Institut Fuer Technologie | Connection between two joining partners, and method for establishing said connection |
| US10590620B2 (en) | 2015-05-27 | 2020-03-17 | Innogy Se | Method for constructing a foundation for a tower structure, and onshore tower structure |
| US11905922B2 (en) | 2016-04-15 | 2024-02-20 | Pur Wind Aps | Gasket for wind turbine |
| WO2017178657A1 (en) * | 2016-04-15 | 2017-10-19 | Pur Wind Aps | Gasket for wind turbine |
| US11319930B2 (en) | 2016-04-15 | 2022-05-03 | Pur Wind Aps | Gasket for wind turbine |
| US11008727B2 (en) | 2017-08-11 | 2021-05-18 | Innogy Se | Offshore structure |
| US12173794B2 (en) | 2017-10-13 | 2024-12-24 | Rosen 2 Holding Ag | Sealing arrangement for a connection between two connecting elements of an offshore structure and method for producing same |
| US12173465B2 (en) * | 2019-02-07 | 2024-12-24 | Rwe Renewables Gmbh | Method for forming a connection between two pipe segments of different widths and a correspondingly produced connection |
| US20220106757A1 (en) * | 2019-02-07 | 2022-04-07 | Rwe Renewables Gmbh | Method for Forming a Connection Between Two Pipe Segments of Different Widths and a Correspondingly Produced Connection |
| US20250122685A1 (en) * | 2021-03-29 | 2025-04-17 | Equinor Energy As | Foundation for an offshore wind turbine |
| US20240035244A1 (en) * | 2021-04-12 | 2024-02-01 | Rwe Offshore Wind Gmbh | Method of Manufacturing a Connection Between Two Tube Segments of a Tower-Like Structure |
| KR20230148271A (en) * | 2021-04-12 | 2023-10-24 | 알더블유이 오프쇼어 윈드 게엠베하 | Method for manufacturing a connection between two tube segments of a tower-like structure |
| US12209374B2 (en) * | 2021-04-12 | 2025-01-28 | Rwe Offshore Wind Gmbh | Method of manufacturing a connection between two tube segments of a tower-like structure |
| KR102842628B1 (en) | 2021-04-12 | 2025-08-05 | 알더블유이 오프쇼어 윈드 게엠베하 | Method for manufacturing a connection between two tube segments of a tower-shaped structure |
| US20250326883A1 (en) * | 2022-01-18 | 2025-10-23 | Basf Se | Gasket for a transition piece of a wind turbine and method for mounting such a gasket |
| WO2024014729A1 (en) * | 2022-07-14 | 2024-01-18 | (주)유주 | Underwater concrete structure for preventing subsidence at seabed soft ground, and construction method therefor |
Also Published As
| Publication number | Publication date |
|---|---|
| GB0600165D0 (en) | 2006-02-15 |
| DE10330963A1 (en) | 2005-01-27 |
| WO2005005752A1 (en) | 2005-01-20 |
| GB2418696A (en) | 2006-04-05 |
| GB2418696B (en) | 2007-04-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20060185279A1 (en) | Foundations for constructions | |
| EP3695055B1 (en) | Offshore wind energy installation foundation system | |
| US10738436B1 (en) | Tubular foundation for onshore wind turbine generators | |
| CN108316290B (en) | One-column one-pile structure without bearing platform and construction method thereof | |
| CN106609509A (en) | Self-balancing foundation pit enclosure structure and its construction method | |
| US11028551B2 (en) | Foundation for a tower of a wind-turbine | |
| RU2123091C1 (en) | Foundation for metal column, method of foundation construction and alignment | |
| CN110700274A (en) | Mechanically-connected assembled stand column and stand column pile | |
| JP2003232033A (en) | Foundation pile structure | |
| CN210975801U (en) | Steel casing pile reinforcement structure of existing building pile foundation | |
| JP2008208533A (en) | Caisson and its construction method | |
| JP2009019360A (en) | Structure and method for jointing bridge pier and footing | |
| WO2025155995A1 (en) | Wind turbine foundation and construction method thereof | |
| CN109989346B (en) | Bridge large-diameter precast concrete pipe column foundation and its construction method | |
| CN105951863A (en) | Construction device of active assembling type open caisson and construction method using same | |
| CN212656218U (en) | Heavy pile machine load underpinning structure | |
| CN118880797A (en) | A sheet pile dock separated seismic isolation structure and construction method thereof | |
| JP4475116B2 (en) | Vertical shaft structure and its construction method | |
| CN111809615A (en) | Heavy pile machine load underpinning structure and construction method thereof | |
| JP2001262592A (en) | Construction foundation and construction method | |
| CN113431080B (en) | Underwater bolt connecting structure of marine jacket and pile foundation and construction method | |
| CN223423266U (en) | Prefabricated pipe wall mechanism of manual hole digging pile | |
| JP2635934B2 (en) | Shaft construction method | |
| CN223103626U (en) | A reinforced protective hoop cover device for cast-in-place pile casing | |
| KR101504886B1 (en) | Continuos steel pipe pile with different thiknesses |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: REPOWER SYSTEMS AG, GERMANY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:EUSTERBARKEY, CARSTEN;REEL/FRAME:017052/0878 Effective date: 20060117 |
|