US20050163572A1 - Floating semi-submersible oil production and storage arrangement - Google Patents
Floating semi-submersible oil production and storage arrangement Download PDFInfo
- Publication number
- US20050163572A1 US20050163572A1 US10/505,139 US50513905A US2005163572A1 US 20050163572 A1 US20050163572 A1 US 20050163572A1 US 50513905 A US50513905 A US 50513905A US 2005163572 A1 US2005163572 A1 US 2005163572A1
- Authority
- US
- United States
- Prior art keywords
- oil
- tank
- chambers
- chamber
- fluid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4413—Floating drilling platforms, e.g. carrying water-oil separating devices
Definitions
- the oil industry frequently makes use of floating production and storage systems for developing small remote oil fields. These generally use a converted crude oil tanker moored to a purpose built mooring buoy. To minimize the wave, current and wind forces on the tanker, the mooring is designed to allow the vessel to weathervane around the buoy under the influence of the resultant environmental force. Processing equipment is mounted on the deck of the vessel.
- Oil production from the reservoir is via one or more sub sea wellheads, through a flexible flowline from each wellhead to the mooring buoy and from the buoy to the vessel.
- the system also incorporates lines to carry gas and/or water from the vessel to the wellheads. Also incorporated are hydraulic and electrical lines from the vessel to allow control of the sub sea wellheads. Since the vessel must be free to rotate around the buoy, the numerous fluid flow paths through the buoy result in the need for a complicated and expensive device known as a swivel. This is a precision-engineered piece of equipment subject to high pressure, high temperature corrosive fluids from the reservoir and hence must be manufactured faultlessly if high maintenance costs are to be avoided.
- a further disadvantage of floating production systems that employ oil tankers is that they are highly susceptible to pitching, rolling and heaving. Since the separation of the oil, water and gas which comprise the fluid stream from the reservoir is effected by means of gravity separation in large pressure vessels, the sloshing of the liquids caused by the ship's motion can cause serious inefficiencies in the separation process.
- a semi-submersible vessel comprises a deck 1 supported above the waterline (OWL) on a number of columns 30 .
- the columns extend from the deck to (typically) two flotation pontoons 31 located some distance below the water line.
- the advantages of a semi-submersible over a ship-shaped vessel are two-fold. Firstly, the area exposed to the waves at the water line is less for a semi-submersible than for a ship-shaped vessel and hence the horizontal wave forces are reduced. Secondly, because the pontoons which provide the buoyancy are much further below the water line than the underside of a ship, the vertical forces are much less. (This is because the effects of a wave rapidly decrease as one moves deeper into the water.)
- SSFP systems Semi-submersible floating production systems
- SSFP systems have two disadvantages. Firstly, there is no significant capability for storage of the produced oil. This means that they can only be utilized where a pipeline is provided to carry the produced oil to an onshore storage/processing facility or where a dedicated moored tanker ship is provided adjacent to the SSFP vessel.
- the second disadvantage is that the amount of processing equipment which can be fitted on deck is limited because the centre of gravity of the SSFP vessel is raised as weight is added to the deck. This reduces the resistance to overturning of the vessel. This resistance to overturning is quantified in a property of the vessel known as the metacentric height (usually designated GM).
- GM metacentric height
- a number of oil fields have been developed using a SSFP vessel which have used a converted second hand semi-submersible drilling vessel. Where the produced oil is viscous and needs large pressure vessels for separation or where gas injection or water injection equipment is required, new larger semi-submersibles are required to accommodate the equipment.
- an oil storage assembly for a semi-submersible oil production vessel comprising a deck structure, at least two underwater pontoons for providing buoyancy to said deck structure, and a plurality of columns connecting said deck structure to said pontoons, characterised in that a concrete tank is attached below said pontoons, said concrete tank being subdivided into a plurality of chambers for storing fluid.
- An arrangement for the storage of oil in accordance with the invention has the advantage that it provides a system for storing large quantities of oil which is not as susceptible to extreme environmental conditions, does not decrease, and in fact may be configured to increase the resistance to overturning of a rig with which it is used, and is easily maintained in situ.
- the present invention preferably provides a semi-submersible, floating production, storage and offloading system for the development of offshore oil and gas fields comprising a drilling vessel, an oil storage assembly according to the invention attached to the base of the drilling vessel, means for utilizing the drilling vessel's ballast pumps to add or remove water from the bottom of each chamber of the tank and means for directing produced oil into or out of the top of each chamber.
- the present invention further provides a method of storing oil in an offshore floating oil production facility comprising the steps of attaching to the bottom of a pontoon structure a concrete tank, which is subdivided into a plurality of chambers, filling said chambers with at least one fluid to adjust the buoyancy of the production facility, and displacing said fluid from said chambers by pumping produced oil thereinto in a controlled fashion such that the mass of the tank and its contents is maintained substantially constant.
- the concrete tank is divided into a number of chambers, in particularly, by a plurality of fluid tight bulk heads, at least one of which chamber is located substantially centrally of the tank and is open at the top and bottom so as to provide a through opening in the tank.
- a rig can carry out drilling or workover operations with the tank attached.
- each chamber of the tank is maintained full of at least one fluid at all times so as to control the ballast of the arrangement.
- the fluids used in this way may, for example, be sea water, oil, natural gas or a mixture of two or more of these.
- At least some of the chambers preferably include a first inlet/outlet pipe which terminated substantially at the bottom of the chamber and a second inlet/outlet pipe which terminated substantially at the top of the chamber.
- at least some of the chambers preferably include a water inlet/outlet pipe and an oil inlet/outlet pipe.
- Each such chamber is then at least partially filled with water prior to commencement of oil production, that water being displaced from the chamber through the water pipe as oil is added to the chamber by means of the oil pipe.
- oil may be evacuated from the tank for example to a tank for transport to shore, by displacement using water injected through the water pipe.
- the water pipe advantageously terminates close to the bottom of the chamber, since sea water is normally denser than oil, and preferably has a diffuser pipe on the end thereof so as to minimize the mixing of oil and water as water is pumped into the chamber.
- the oil pipe then preferably terminates at the inner face of the upper surface of the chamber, which arrangement has the advantage that it avoids the possibility of a gas pocket building up in the tank.
- each of the second plurality of chambers is preferably provided with a first pipe which terminates proximate to the bottom of the chamber and a second pipe which terminates proximate to the top of the chamber, wherein as oil is produced it is pumped into the chamber through said first pipe, displacing gas already in the chamber out through the second pipe.
- said second plurality of chambers are arranged in a cascade arrangement with each second pipe extending from proximate to the top of one chamber to the bottom of the next chamber in the cascade so as to form the first pipe for said next chamber.
- This arrangement has the advantage that the chambers of the cascade are filled or emptied in sequence rather than simultaneously, i.e. once the first chamber in the cascade is filled, it then overflows into the second.
- only one of said second plurality of chamber contains a mixture of oil and gas—the rest being either filled with gas or with oil, thereby reducing the free liquid surfaces within the arrangement.
- the first plurality of chamber constitute substantially 80% of the chambers and the second plurality substantially 20% oil being fed or extracted from said first and second chambers simultaneously, preferably with substantially 80% of the flow being directed to said first plurality of chambers and substantially 20% to said second plurality.
- This has the advantage that, because the density of crude oil is substantially 80% that of sea water, a constant mass is maintained in the tank as oil is loaded or unloaded from the arrangement whilst at the same time the free surfaces of the fluids within the chambers is minimized, which is beneficial to the stability of the arrangement.
- each chamber includes, in addition to said first and second inlet/outlet pipes, a third inlet/outlet pipe which terminates part way down the chamber, at a distance from the top of the chamber of substantially 20% of the height of the chamber.
- the first pipe provides an inlet/outlet for sea water, the second an inlet/outlet for gas and the third an inlet/outlet for oil, all chambers of the arrangement being equipped with an identical piping arrangement and being fed simultaneously.
- each chamber being 80% filled with water with gas thereabove when no oil is present, the volume of gas within each chamber being varied as oil is added/removed therefrom so as to ensure that the volume of water displaced by the oil as it is pumped in is only 80% of the volume of oil. In this way, the overall mass of the arrangement is kept constant.
- FIG. 1 shows a typical semi-submersible floating production system
- FIG. 2 shows in perspective a semi-submersible drilling rig with a concrete tank attached in accordance with the present invention
- FIG. 3 shows a sectional elevation of the drilling rig of FIG. 2 ;
- FIG. 4 is a schematic diagram of the layout of the connection between the chambers of the concrete tank of FIGS. 2 and 3 ;
- FIGS. 5 and 6 are further schematic diagrams showing how the chambers are connected
- FIG. 7 shows additional detail of the drilling rig of FIGS. 2 and 3 ;
- FIG. 8 shows an alternative gas/oil/water loading/offloading arrangement.
- the drilling rig 1 has a concrete tank 2 attached below columns 30 and the pontoons 31 .
- the concrete tank is segmented by fluid tight bulk heads in the form of internal concrete walls 3 .
- At least one cell in the centre of the tank is constructed to be open at top and bottom to create a hole through the centre of the tank whereby the rig can carry out drilling or workover operations with the tank attached.
- FIGS. 3 and 5 for one chamber are the water inlet/outlet pipe 4 and the oil inlet/outlet pipe 5 .
- the water pipe terminates in a diffuser pipe 6 close to the bottom of the chamber which minimizes mixing of the oil and water as water is pumped in.
- the oil pipe terminates at the inner face of the upper surface to avoid the possibility of build-up of a gas pocket. To maintain the mass of the tank and contents constant as oil is produced or offloaded only 4 ⁇ 5 of the chambers operate on the oil over water principle shown in FIG. 3 .
- FIG. 5 shows a piping arrangement which ensures longitudinal stability of the tank by ensuring the centre of mass remains suitably stationary during the loading/unloading process of the oil over water chambers.
- the remaining 1 ⁇ 5 of the chambers utilize a gas over oil scheme employing piping as shown in FIG. 6 .
- Oil enters the first chamber A through oil pipe 9 .
- natural gas is vented via pipe 10 to chamber B.
- chamber A is full, oil will then travel through pipe 10 to chamber B, displacing, in turn, the gas, via the link line into chamber C, and so on until all the chambers are full of oil and the gas has been vented from the final gas vent pipe 11 .
- FIG. 4 shows an example layout for the chambers with those operating a gas over oil scheme arranged in a line along the centre of the tank and those operating a water over oil scheme being arranged symmetrically on either side so as to ensure lateral stability during the loading/unloading process.
- FIG. 8 An alternative arrangement to achieve this mass balance is shown in FIG. 8 .
- the loading system is identical for all chambers.
- Sea water inlet/outlet pipes are provided at the bottom of the chambers
- oil inlet/outlet pipes are provided at 4 ⁇ 5 of the height of the chamber
- natural gas inlet pipes are provided in the upper surface of the chambers.
- every chamber is filled 4 ⁇ 5 with sea water with natural gas above.
- oil is produced it enters via oil pipe 26 and sea water is displaced via water pipe 25 .
- natural gas is released via the gas inlet/outlet pipe 27 to ensure that the volume of water displaced by the oil is only 4 ⁇ 5 of the volume of oil entering.
- the invention is further characterised by the fact that the mass of tank and contents is slightly greater than the buoyancy of the tank. This means that to bring the combined semi-submersible/tank structure to the same draft that the semi-submersible normally operates uncombined, some ballast water must be removed from the semi-submersible causing a further improvement in the metacentric height of the combined vessel. This arrangement creates a tensile force between the tank and rig.
- a further characterization of the invention is that this tensile force can be changed to a compressive force which is beneficial to the fatigue life of the vessel by eliminating any gap between the underside of the semi-submersible pontoons and the upper surface of the tank.
- the centre of gravity of the tank and contents is slightly below the centre of buoyancy of the tank. This increases the metacentric height of the vessel allowing an increased payload to be added to the deck of the semi-submersible.
- each chamber may be filled at least partially with gas, for example air, so as to reduce the total mass of the tank including its contents and hence reduce its draught so as to facilitate maintenance.
- gas for example air
- each oil-over-water chamber is connected to a breaktank 12 located inside a column of the semi-submersible as shown in FIG. 7 .
- This breaktank is located below the elevation of the operating water level (OWL).
- OWL operating water level
- the breaktank is vented to atmosphere 13 and the water level in the breaktank is maintained by level switches 14 and 15 acting on the semi-submersible's seawater ballast pump 16 and control valve 17 to add or remove water as necessary.
- the oil inlet/outlet is vented to atmosphere at a safe location 18 .
- NPSH net positive suction head
- FIG. 7 Also shown in FIG. 7 are an oil export meter 20 , a ballast water cleanup device 21 , an oil in water alarm 22 and a gas/oil/water separator 23 .
- the invention is also characterised by the fact that all necessary valving, pumps and instrumentation for the seawater system can be located inside the columns of the semi-submersible where they are in a dry, benign environment and can be easily accessed for maintenance.
- the invention requires no pipes or fittings protruding from the bottom of the tank. This allows easy construction onshore, skidding of the tank into the ocean, setting the tank on a suitable seabed for fitting to the semi-submersible.
- the invention is also characterised by the ability to construct the connection between the tank and the semi-submersible rig in the dry even though this connection is underwater during normal operation. Once constructed the tank will be set on the seabed with a few metres of water above it. The semi-submersible at its minimum draft will be floated over the tank and deballasted down on to the top of the tank. The tank is then deballasted sufficient to lift the semi-submersible clear of the water allowing the permanent connection to be constructed in the dry.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Earth Drilling (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
An arrangement for the storage of marketable quantities of crude oil at a semi-submersible floating production vessel. The storage is achieved by hanging a segmented reinforced concrete tank to the underside of the semi-submersible vessel. The semi-submersible vessel can be an existing semi-submersible drilling rig. By maintaining the mass of the tank and contents slightly greater than the displacement of the tank and by arranging the centre of gravity of the tank below its centre of buoyancy, the metacentric height of the semi-submersible vessel is approved. The storage arrangement for the oil provides the necessary maintenance of mass by either storing approximately ⅘ of the oil in oil-over-water chambers and approximately ⅕ in gas-over-oil chambers or by using a gas-over-oil-over-water arrangement in all the chambers. The piping arrangements minimize the free surface of liquids in the tank.
Description
- The oil industry frequently makes use of floating production and storage systems for developing small remote oil fields. These generally use a converted crude oil tanker moored to a purpose built mooring buoy. To minimize the wave, current and wind forces on the tanker, the mooring is designed to allow the vessel to weathervane around the buoy under the influence of the resultant environmental force. Processing equipment is mounted on the deck of the vessel.
- Oil production from the reservoir is via one or more sub sea wellheads, through a flexible flowline from each wellhead to the mooring buoy and from the buoy to the vessel. The system also incorporates lines to carry gas and/or water from the vessel to the wellheads. Also incorporated are hydraulic and electrical lines from the vessel to allow control of the sub sea wellheads. Since the vessel must be free to rotate around the buoy, the numerous fluid flow paths through the buoy result in the need for a complicated and expensive device known as a swivel. This is a precision-engineered piece of equipment subject to high pressure, high temperature corrosive fluids from the reservoir and hence must be manufactured faultlessly if high maintenance costs are to be avoided.
- A further disadvantage of floating production systems that employ oil tankers is that they are highly susceptible to pitching, rolling and heaving. Since the separation of the oil, water and gas which comprise the fluid stream from the reservoir is effected by means of gravity separation in large pressure vessels, the sloshing of the liquids caused by the ship's motion can cause serious inefficiencies in the separation process.
- An alternative type of floating production system which eliminates these problems is use of a semi-submersible vessel. Semi-submersible vessels have been used in the offshore industry for a number of years as mobile drilling vessels, crane barges, pipelaying vessels and dedicated floating production vessels. As shown in
FIG. 1 , a semi-submersible vessel comprises adeck 1 supported above the waterline (OWL) on a number ofcolumns 30. The columns extend from the deck to (typically) twoflotation pontoons 31 located some distance below the water line. The advantages of a semi-submersible over a ship-shaped vessel are two-fold. Firstly, the area exposed to the waves at the water line is less for a semi-submersible than for a ship-shaped vessel and hence the horizontal wave forces are reduced. Secondly, because the pontoons which provide the buoyancy are much further below the water line than the underside of a ship, the vertical forces are much less. (This is because the effects of a wave rapidly decrease as one moves deeper into the water.) - The results of these advantages are that semi-submersible production vessels can be moored in the ocean without the need to provide weather vaning and that the sloshing of liquids in vessels on the deck is reduced.
- Semi-submersible floating production systems (SSFP systems) however have two disadvantages. Firstly, there is no significant capability for storage of the produced oil. This means that they can only be utilized where a pipeline is provided to carry the produced oil to an onshore storage/processing facility or where a dedicated moored tanker ship is provided adjacent to the SSFP vessel.
- The second disadvantage is that the amount of processing equipment which can be fitted on deck is limited because the centre of gravity of the SSFP vessel is raised as weight is added to the deck. This reduces the resistance to overturning of the vessel. This resistance to overturning is quantified in a property of the vessel known as the metacentric height (usually designated GM). A high GM means a high resistance to overturning.
- A number of oil fields have been developed using a SSFP vessel which have used a converted second hand semi-submersible drilling vessel. Where the produced oil is viscous and needs large pressure vessels for separation or where gas injection or water injection equipment is required, new larger semi-submersibles are required to accommodate the equipment.
- A number of attempts have been made to provide oil storage in a semi-submersible (British Patent Applications GB22116849, GB2207892, GB2188291 for example). However, these allow storage of only a relatively small quantity of oil. These systems still require a dedicated moored tanker to store a marketable quantity of oil. The storage provided in the semi-submersible vessel only provides storage of a few days production to allow the storage tanker to travel to a nearby refinery for offloading.
- According to one aspect of the present invention there is provided an oil storage assembly for a semi-submersible oil production vessel comprising a deck structure, at least two underwater pontoons for providing buoyancy to said deck structure, and a plurality of columns connecting said deck structure to said pontoons, characterised in that a concrete tank is attached below said pontoons, said concrete tank being subdivided into a plurality of chambers for storing fluid.
- An arrangement for the storage of oil in accordance with the invention has the advantage that it provides a system for storing large quantities of oil which is not as susceptible to extreme environmental conditions, does not decrease, and in fact may be configured to increase the resistance to overturning of a rig with which it is used, and is easily maintained in situ.
- More particularly, the present invention preferably provides a semi-submersible, floating production, storage and offloading system for the development of offshore oil and gas fields comprising a drilling vessel, an oil storage assembly according to the invention attached to the base of the drilling vessel, means for utilizing the drilling vessel's ballast pumps to add or remove water from the bottom of each chamber of the tank and means for directing produced oil into or out of the top of each chamber.
- The present invention further provides a method of storing oil in an offshore floating oil production facility comprising the steps of attaching to the bottom of a pontoon structure a concrete tank, which is subdivided into a plurality of chambers, filling said chambers with at least one fluid to adjust the buoyancy of the production facility, and displacing said fluid from said chambers by pumping produced oil thereinto in a controlled fashion such that the mass of the tank and its contents is maintained substantially constant.
- Preferably, the concrete tank is divided into a number of chambers, in particularly, by a plurality of fluid tight bulk heads, at least one of which chamber is located substantially centrally of the tank and is open at the top and bottom so as to provide a through opening in the tank. In this way, a rig can carry out drilling or workover operations with the tank attached.
- Preferably, each chamber of the tank is maintained full of at least one fluid at all times so as to control the ballast of the arrangement. The fluids used in this way may, for example, be sea water, oil, natural gas or a mixture of two or more of these.
- At least some of the chambers preferably include a first inlet/outlet pipe which terminated substantially at the bottom of the chamber and a second inlet/outlet pipe which terminated substantially at the top of the chamber. In particular, at least some of the chambers preferably include a water inlet/outlet pipe and an oil inlet/outlet pipe. Each such chamber is then at least partially filled with water prior to commencement of oil production, that water being displaced from the chamber through the water pipe as oil is added to the chamber by means of the oil pipe. In the same way, oil may be evacuated from the tank for example to a tank for transport to shore, by displacement using water injected through the water pipe. The water pipe advantageously terminates close to the bottom of the chamber, since sea water is normally denser than oil, and preferably has a diffuser pipe on the end thereof so as to minimize the mixing of oil and water as water is pumped into the chamber. The oil pipe then preferably terminates at the inner face of the upper surface of the chamber, which arrangement has the advantage that it avoids the possibility of a gas pocket building up in the tank.
- It has been found to be particularly advantageous for maintaining the mass of the tank and contents substantially constant as oil is produced or offloaded if a first plurality of chambers operate this oil over water storage arrangement, and a second plurality of the chambers operate with either oil, natural gas or a mixture thereof stored therein. In particular, each of the second plurality of chambers is preferably provided with a first pipe which terminates proximate to the bottom of the chamber and a second pipe which terminates proximate to the top of the chamber, wherein as oil is produced it is pumped into the chamber through said first pipe, displacing gas already in the chamber out through the second pipe. Preferably, then, said second plurality of chambers are arranged in a cascade arrangement with each second pipe extending from proximate to the top of one chamber to the bottom of the next chamber in the cascade so as to form the first pipe for said next chamber. This arrangement has the advantage that the chambers of the cascade are filled or emptied in sequence rather than simultaneously, i.e. once the first chamber in the cascade is filled, it then overflows into the second. As a result, at any time only one of said second plurality of chamber contains a mixture of oil and gas—the rest being either filled with gas or with oil, thereby reducing the free liquid surfaces within the arrangement.
- Preferably, the first plurality of chamber constitute substantially 80% of the chambers and the second plurality substantially 20% oil being fed or extracted from said first and second chambers simultaneously, preferably with substantially 80% of the flow being directed to said first plurality of chambers and substantially 20% to said second plurality. This has the advantage that, because the density of crude oil is substantially 80% that of sea water, a constant mass is maintained in the tank as oil is loaded or unloaded from the arrangement whilst at the same time the free surfaces of the fluids within the chambers is minimized, which is beneficial to the stability of the arrangement.
- In an alternative embodiment, each chamber includes, in addition to said first and second inlet/outlet pipes, a third inlet/outlet pipe which terminates part way down the chamber, at a distance from the top of the chamber of substantially 20% of the height of the chamber. In this embodiment, the first pipe provides an inlet/outlet for sea water, the second an inlet/outlet for gas and the third an inlet/outlet for oil, all chambers of the arrangement being equipped with an identical piping arrangement and being fed simultaneously. A mixture of water and gas is then used to ballast each chamber, each chamber being 80% filled with water with gas thereabove when no oil is present, the volume of gas within each chamber being varied as oil is added/removed therefrom so as to ensure that the volume of water displaced by the oil as it is pumped in is only 80% of the volume of oil. In this way, the overall mass of the arrangement is kept constant.
- Some embodiments of the invention will now be described by way of example with reference to the accompanying drawings in which:
-
FIG. 1 shows a typical semi-submersible floating production system; -
FIG. 2 shows in perspective a semi-submersible drilling rig with a concrete tank attached in accordance with the present invention; -
FIG. 3 shows a sectional elevation of the drilling rig ofFIG. 2 ; -
FIG. 4 is a schematic diagram of the layout of the connection between the chambers of the concrete tank ofFIGS. 2 and 3 ; -
FIGS. 5 and 6 are further schematic diagrams showing how the chambers are connected; -
FIG. 7 shows additional detail of the drilling rig ofFIGS. 2 and 3 ; and -
FIG. 8 shows an alternative gas/oil/water loading/offloading arrangement. - Referring first to
FIG. 2 , thedrilling rig 1 has aconcrete tank 2 attached belowcolumns 30 and thepontoons 31. - As shown in
FIG. 3 , the concrete tank is segmented by fluid tight bulk heads in the form of internalconcrete walls 3. At least one cell in the centre of the tank is constructed to be open at top and bottom to create a hole through the centre of the tank whereby the rig can carry out drilling or workover operations with the tank attached. - Also shown in
FIGS. 3 and 5 for one chamber are the water inlet/outlet pipe 4 and the oil inlet/outlet pipe 5. The water pipe terminates in a diffuser pipe 6 close to the bottom of the chamber which minimizes mixing of the oil and water as water is pumped in. The oil pipe terminates at the inner face of the upper surface to avoid the possibility of build-up of a gas pocket. To maintain the mass of the tank and contents constant as oil is produced or offloaded only ⅘ of the chambers operate on the oil over water principle shown inFIG. 3 . -
FIG. 5 shows a piping arrangement which ensures longitudinal stability of the tank by ensuring the centre of mass remains suitably stationary during the loading/unloading process of the oil over water chambers. The remaining ⅕ of the chambers utilize a gas over oil scheme employing piping as shown inFIG. 6 . Oil enters the first chamber A through oil pipe 9. As chamber A fills with oil, natural gas is vented viapipe 10 to chamber B. When chamber A is full, oil will then travel throughpipe 10 to chamber B, displacing, in turn, the gas, via the link line into chamber C, and so on until all the chambers are full of oil and the gas has been vented from the finalgas vent pipe 11. This process proceeds at the same time that ⅘ of the oil is being directed to the oil over water chambers. Because the density of crude oil is approximately {fraction (4/5)} that of sea water this arrangement maintains a constant mass in the tank as oil is loaded or offloaded. These arrangements minimize the free surfaces of liquids inside the chambers which is beneficial to the stability of the vessel.FIG. 4 shows an example layout for the chambers with those operating a gas over oil scheme arranged in a line along the centre of the tank and those operating a water over oil scheme being arranged symmetrically on either side so as to ensure lateral stability during the loading/unloading process. - An alternative arrangement to achieve this mass balance is shown in
FIG. 8 . In this arrangement the loading system is identical for all chambers. Sea water inlet/outlet pipes are provided at the bottom of the chambers, oil inlet/outlet pipes are provided at ⅘ of the height of the chamber and natural gas inlet pipes are provided in the upper surface of the chambers. When no oil is on board, every chamber is filled ⅘ with sea water with natural gas above. As oil is produced it enters viaoil pipe 26 and sea water is displaced via water pipe 25. At the same time, natural gas is released via the gas inlet/outlet pipe 27 to ensure that the volume of water displaced by the oil is only ⅘ of the volume of oil entering. - The invention is further characterised by the fact that the mass of tank and contents is slightly greater than the buoyancy of the tank. This means that to bring the combined semi-submersible/tank structure to the same draft that the semi-submersible normally operates uncombined, some ballast water must be removed from the semi-submersible causing a further improvement in the metacentric height of the combined vessel. This arrangement creates a tensile force between the tank and rig.
- A further characterization of the invention is that this tensile force can be changed to a compressive force which is beneficial to the fatigue life of the vessel by eliminating any gap between the underside of the semi-submersible pontoons and the upper surface of the tank.
- By constructing the base of the tank of a material of greater density than the roof, the centre of gravity of the tank and contents is slightly below the centre of buoyancy of the tank. This increases the metacentric height of the vessel allowing an increased payload to be added to the deck of the semi-submersible.
- The volume of the tank is sufficiently large such that when the tank is empty, with the drilling rig attached above it, the upper surface of the tank is a considerable distance above the water line. Accordingly, each chamber may be filled at least partially with gas, for example air, so as to reduce the total mass of the tank including its contents and hence reduce its draught so as to facilitate maintenance. This allows access to the piping above the upper tank surface, to the manholes in the tank for internal inspections, to the tank-to-semi-submersible connections and to all external parts of the semi-submersible. This allows the inspections required by classification societies to be carried out without the vessel needing to go to dry dock. The only parts of the vessel not inspectable in the dry are the underside and lower walls of the tank. Since the tank is constructed of concrete, periodic visual inspection by divers or remote underwater vehicle is considered sufficient.
- Concrete as a structural material behaves best when loaded in compression. Tensile forces must be resisted by reinforcing steel embedded in the concrete. The required quantity of reinforcing steel can be minimized by maintaining the external pressure on the tank greater than the internal pressure. To achieve this the water outlet line from each oil-over-water chamber is connected to a
breaktank 12 located inside a column of the semi-submersible as shown inFIG. 7 . This breaktank is located below the elevation of the operating water level (OWL). The breaktank is vented toatmosphere 13 and the water level in the breaktank is maintained bylevel switches seawater ballast pump 16 andcontrol valve 17 to add or remove water as necessary. To ensure that the oil system cannot overpressure the tank, the oil inlet/outlet is vented to atmosphere at asafe location 18. - Large
centrifugal pumps 19 are required to offload the stored oil into shuttle tankers. Such pumps require a net positive suction head (NPSH) on their suction side in order to function effectively. Normally this is achieved by locating the pumps at a lower elevation than the bottom of the storage tank. The arrangement of the present invention allows the pumps to be located above the top of the tanks in a caisson attached to one of the semi-submersible columns where they can easily be removed by one of the rig cranes for maintenance but still be provided with a net positive suction head. - Also shown in
FIG. 7 are anoil export meter 20, a ballastwater cleanup device 21, an oil inwater alarm 22 and a gas/oil/water separator 23. - The invention is also characterised by the fact that all necessary valving, pumps and instrumentation for the seawater system can be located inside the columns of the semi-submersible where they are in a dry, benign environment and can be easily accessed for maintenance.
- The invention requires no pipes or fittings protruding from the bottom of the tank. This allows easy construction onshore, skidding of the tank into the ocean, setting the tank on a suitable seabed for fitting to the semi-submersible.
- The invention is also characterised by the ability to construct the connection between the tank and the semi-submersible rig in the dry even though this connection is underwater during normal operation. Once constructed the tank will be set on the seabed with a few metres of water above it. The semi-submersible at its minimum draft will be floated over the tank and deballasted down on to the top of the tank. The tank is then deballasted sufficient to lift the semi-submersible clear of the water allowing the permanent connection to be constructed in the dry.
- It will, of course, be understood that the proportion of 80% used above is connected to the relative density of sea water to crude oil and is therefore only an approximate value. Furthermore, in the event that the arrangement is utilized with liquids other than oil and/or water, the relative displacement quantities and/or the relative numbers of the first and second pluralities of chambers will then be in accordance with the relative densities of the actual liquids used.
Claims (31)
1. An oil storage assembly for a semi-submersible oil production vessel comprising a deck structure, at least two underwater pontoons for providing buoyancy to said deck structure, and a plurality of columns connecting said deck structure to said pontoons, comprising a concrete tank is attached below said pontoons, said concrete tank being subdivided into a plurality of chambers for storing fluid.
2. An oil storage assembly according to claim 1 , wherein the tank is subdivided into a plurality of vertical chambers which form a matrix cross the tank, at least one of said chambers being open at the top and bottom so as to provide a through opening in the tank through which oil production operates can be carried out.
3. An oil storage assembly according to claim 2 , wherein the tank is subdivided by means of a plurality of fluid tight bulkheads.
4. An oil storage assembly according to any of claims 1 to 3 , wherein at least some of the chambers of the tank include a first inlet/outlet conduit located proximate to the bottom of the chamber and a second inlet/outlet conduit located within substantially the upper 20% of the chamber.
5. An oil storage assembly according to claim 4 , wherein a first plurality of said at least some chambers are arranged in a cascade arrangement with the second inlet/outlet conduit of one of said plurality of chambers connecting to the first inlet/outlet conduit of the next chamber in the cascade.
6. An oil storage assembly according to claim 5 , wherein the first inlet/outlet conduit of the first chamber in the cascade connects to an oil pipe and the second inlet/outlet conduit of the last chamber in the cascade connects to a gas pipe.
7. An oil storage assembly according to any of claim 6 , wherein a second plurality of said chambers have their first inlet/outlet conduit connected to a fluid supply pipe and their second inlet/outlet conduit connected to an oil pipe, fluid being stored in said second plurality of chambers using an oil over a suitable fluid scheme.
8. An oil storage assembly according to claim 7 , wherein the fraction of said at least some chambers which form said second plurality is substantially equal to the ratio of the density of oil to the density of the fluid over which it is stored in said second plurality of chambers, and the fraction of said at least some chambers which forms said first plurality of chambers is substantially equal to 1 minus the proportion which form said second plurality.
9. An oil storage assembly according to claim 8 , wherein oil is stored over water in said second plurality of chambers, said first plurality of chambers constituting 20% and said second plurality of chambers 80% of said at least some chambers.
10. An oil storage assembly according to claim 4 , wherein said second inlet/outlet conduit is located substantially at the top of each said chamber.
11. An oil storage assembly according to claim 4 , said second inlet/outlet conduit is located at a distance from the top of the chamber substantially equal to one fifth of the height of the chamber.
12. An oil storage assembly according to claim 11 , wherein each of said at least some chambers includes a third inlet/outlet conduit located substantially at the top of the chamber.
13. An oil storage assembly according to claim 12 , wherein said first inlet/outlet conduit connects to a water pipe, said second inlet/outlet conduit to an oil pipe and said third inlet/outlet conduit to a gas pipe.
14. An oil storage assembly according to claim 4 , wherein each said first inlet/outlet conduit has a diffuser assembly provided on its end so as to minimise the mixing of fluids within each chamber.
15. An oil storage assembly according to claim 1 , wherein the tank is constructed of varying density materials such that the centre of gravity of the tank and its contents is always lower than its centre of buoyancy, thereby causing an increase in the metacentric height of the assembly.
16. An oil storage assembly according to any claim 1 , wherein the volume of the tank is such that when it is at least partially empty, its buoyancy is sufficient to maintain the production vessel at an elevation relative to the water at which the upper surface of the tank is above the waterline.
17. An oil storage assembly according to claim 1 , further including an atmospherically vented break tank located inside the vessel at an elevation below the operating water level by means of which the internal pressure within the tank is maintained lower than the external pressure.
18. An oil storage assembly according to claim 17 , wherein one break tank is located inside a column of the vessel.
19. An oil storage assembly according to claim 17 or 18, wherein the fluid level in the break tank is controllable by a level controller which activates seawater ballast pumps to remove water and activates a control valve to allow addition of sea water from the ocean.
20. An oil storage assembly according to claim 1 , wherein a pump is provided to discharge oil to a tanker, said pump being located inside one of said columns above the tank elevation.
21. An oil storage assembly according to claim 1 , wherein the tank is constructed of reinforced and/or prestressed concrete.
22. A semi-submersible, floating production, storage and offloading system for the development of offshore oil and gas fields comprising a drilling vessel, an oil storage assembly according to claim 1 , attached to the base of the drilling vessel, means for utilising the drilling vessel's ballast pumps to add or remove water from the bottom of each chamber of the tank and means for directing produced oil into or out of the top of each chamber.
23. A method of storing oil in an offshore floating oil production facility comprising the steps of attaching to the bottom of a pontoon structure a concrete tank, which is subdivided into a plurality of chambers, filling said chambers with at least one fluid to adjust the buoyancy of the production facility, and displacing said fluid from said chambers by pumping produced oil thereinto in a controlled fashion such that the mass of the tank and its contents is maintained substantially constant.
24. A method according to claim 23 , comprising the further steps of adjusting the buoyancy of the facility by filing a first plurality of said chambers with a first fluid and a second plurality of said chambers with a second fluid, pumping a first proportion of produced oil into said first plurality of chambers so as to displace said first fluid therefrom, and pumping a second proportion of said produced oil into said second plurality of chambers so as to displace said second fluid therefrom, said first and second proportions being calculated based on the relative densities of the produced oil and said first and second fluids so as to maintain a substantially constant mass of fluid in said tank.
25. A method according to claim 24 , comprising the further step of emptying oil from said tank by pumping said first fluid back into said first plurality of chambers and pumping said second fluid back into said second plurality of chambers in relative amounts such that said first proportion of oil is displaced from said first plurality of chambers and said second proportion of oil is displaced from said second plurality of chambers, wherein the mass of the tank and its contents is maintained substantially constant during off-loading of the produced oil.
26. A method according to claim 24 or claim 25 , wherein said first fluid is water and said second fluid is gas, said first plurality of chambers constituting substantially 80% of the volume of the tank and receiving substantially 80% of the produced oil, and said second plurality of chambers constituting substantially 20% of the volume of the tank and receiving substantially 20% of the produced oil.
27. A method according to claim 24 , comprising the further steps of connecting said second plurality of chambers in a cascade fashion such that fluid displaced from one chamber enters the next chamber in the cascade.
28. A method according to claim 23 , comprising the further steps providing a water inlet/outlet conduit substantially at the bottom of each chamber, providing a gas inlet/outlet conduit substantially at the top of each chamber, and providing an oil inlet/outlet conduit substantially ⅕ of the height of the chamber from the top, filling each chamber of said tank with a mixture of water and gas in order to adjust the buoyancy of the facility, pumping produced oil into each chamber by means of said oil conduit to displace said water and gas so as to maintain each chamber full of fluid and thereby minimise the free liquid surface therein, and controlling the relative proportions of water and gas displaced from said chamber by said oil in order to maintain the total mass of the tank and its contents substantially constant.
29. A method according to claim 28 , wherein oil is off-loaded from the tank by pumping water and gas back into each chamber in relative proportions such that the total mass of the tank and its contents remains substantially constant.
30. A method according to claim 28 or claim 29 , wherein said proportions in which said water and said gas are displaced from and/or pumped into each chamber are 80% water and 20% gas.
31. A method according to claim 23 , comprising the further steps of at least partially filling each chamber of said tank with gas so as to reduce the total mass of said tank including its contents and hence reducing its draught so as to facilitate maintenance.
Applications Claiming Priority (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0203997.2 | 2002-02-20 | ||
GB0203997A GB0203997D0 (en) | 2002-02-20 | 2002-02-20 | Floating semi-submersible oil production and storage arrangement |
GB0210978A GB0210978D0 (en) | 2002-05-14 | 2002-05-14 | Floating semi-submersible oil production and storage arrangement |
GB0210978.3 | 2002-05-14 | ||
GB0214699.1 | 2002-06-26 | ||
GB0214699A GB0214699D0 (en) | 2002-06-26 | 2002-06-26 | Floating semi-submersible oil production & storage arrangement |
PCT/GB2003/000585 WO2003070562A1 (en) | 2002-02-20 | 2003-02-11 | Floating semi-submersible oil production and storage arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
US20050163572A1 true US20050163572A1 (en) | 2005-07-28 |
Family
ID=27256381
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/505,139 Abandoned US20050163572A1 (en) | 2002-02-20 | 2003-02-11 | Floating semi-submersible oil production and storage arrangement |
Country Status (11)
Country | Link |
---|---|
US (1) | US20050163572A1 (en) |
EP (1) | EP1476351A1 (en) |
CN (1) | CN1646362A (en) |
AU (1) | AU2003208405A1 (en) |
BR (1) | BR0307983A (en) |
GB (1) | GB2385564B (en) |
MA (1) | MA26406A1 (en) |
NO (1) | NO20043560L (en) |
NZ (1) | NZ534878A (en) |
TN (1) | TNSN04157A1 (en) |
WO (1) | WO2003070562A1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010144187A1 (en) * | 2009-06-11 | 2010-12-16 | Exxonmobil Upstream Research Company | Subsea hydrocarbon recovery systems and methods |
US20110013989A1 (en) * | 2008-03-26 | 2011-01-20 | Zhirong Wu | Liquid Storage, Loading and Offloading System |
US20110146803A1 (en) * | 2008-09-05 | 2011-06-23 | Zhirong Wu | Multifunctional offshore base with liquid displacement system |
WO2011149669A2 (en) | 2010-05-27 | 2011-12-01 | Helix Energy Solutions Group, Inc. | Floating production unit with disconnectable transfer system |
US20150041142A1 (en) * | 2012-08-07 | 2015-02-12 | Jin Wang | Vertical Oil Storage System and Its Method For Deepwater Drilling and Production |
US11052978B2 (en) * | 2017-05-16 | 2021-07-06 | Tangshan Removable Island Marine Heavy Industry Co., Ltd. | Floating structure, and basic module of floating structure |
CN115140256A (en) * | 2022-03-29 | 2022-10-04 | 广东海洋大学 | Semi-submersible offshore oil production platform |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BRPI0601273B1 (en) * | 2006-04-17 | 2019-02-12 | Petróleo Brasileiro S.A. - Petrobras | MONO-COLUMN FPSO |
BRPI0816185A2 (en) * | 2007-09-03 | 2015-04-14 | Single Buoy Moorings | Offshore Structure, Floating Structure, and Method for Installing an Offshore Structure |
WO2010025361A2 (en) * | 2008-08-29 | 2010-03-04 | Horton Deepwater Development Systems, Inc. | Floating oil storage system and method |
CN102358403B (en) * | 2011-08-18 | 2015-12-09 | 烟台中集来福士海洋工程有限公司 | For anti-system and the semi-submerged platform of toppling of semi-submerged platform |
CN102756794B (en) * | 2012-06-07 | 2015-01-07 | 中国海洋石油总公司 | Semi-submersible type production platform of reservoir oil positioned below water surface |
WO2014047926A1 (en) * | 2012-09-29 | 2014-04-03 | Wu Zhirong | Offshore liquid depot |
GB2507370B (en) * | 2013-05-15 | 2014-10-15 | Atkins Ltd | Compact floating production, storage and offloading facility |
CN103466052A (en) * | 2013-09-12 | 2013-12-25 | 中国船舶重工集团公司第七○二研究所 | Integral-floating-box-type semi-submersible platform |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3880102A (en) * | 1974-02-19 | 1975-04-29 | Offshore Technology Corp | Method and apparatus for offshore submersible oil storage and drilling |
US4059065A (en) * | 1977-02-07 | 1977-11-22 | Mobil Oil Corporation | Semisubmersible loading mooring and storage facility |
US4060995A (en) * | 1975-03-26 | 1977-12-06 | Sea Tank Co. S.A. | Immersion of an offshore weight-structure having two compartments |
US4168673A (en) * | 1976-01-26 | 1979-09-25 | Preussag Aktiengessellschaft | Floating island for extracting or processing gas |
US4960347A (en) * | 1989-07-31 | 1990-10-02 | Strange Booth B | Ship-borne emergency oil containment system and method |
US5292207A (en) * | 1993-02-15 | 1994-03-08 | Allen Bradford Resources, Inc. | Ice crush resistant caisson for arctic offshore oil well drilling |
US5791819A (en) * | 1994-01-21 | 1998-08-11 | Kaerner As | Buoyant platform |
US5899637A (en) * | 1996-12-11 | 1999-05-04 | American Oilfield Divers, Inc. | Offshore production and storage facility and method of installing the same |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1225003A (en) * | 1959-02-11 | 1960-06-28 | Chantiers De Latlantique | Method and installation for handling liquid cargoes on board ships |
NO773076L (en) * | 1977-09-06 | 1979-03-07 | Moss Rosenberg Verft As | FLOATING SYSTEMS FOR OFF-SHORE FLOATING, INTERMEDIATE STORAGE AND LOADING OF LNG |
NO165631B (en) | 1985-07-03 | 1990-12-03 | Aker Eng As | DEVICE FOR HALF SUBMITTABLE PLATFORM CONSTRUCTION. |
SE458519B (en) | 1987-08-12 | 1989-04-10 | Goetaverken Arendal Ab | FORCE STRENGTH OF SHIPPING FOR OFF-SHORE WORK |
-
2003
- 2003-02-11 EP EP03706693A patent/EP1476351A1/en not_active Withdrawn
- 2003-02-11 AU AU2003208405A patent/AU2003208405A1/en not_active Abandoned
- 2003-02-11 CN CNA038082829A patent/CN1646362A/en active Pending
- 2003-02-11 WO PCT/GB2003/000585 patent/WO2003070562A1/en not_active Application Discontinuation
- 2003-02-11 GB GB0303109A patent/GB2385564B/en not_active Expired - Fee Related
- 2003-02-11 BR BR0307983-0A patent/BR0307983A/en not_active Application Discontinuation
- 2003-02-11 US US10/505,139 patent/US20050163572A1/en not_active Abandoned
- 2003-02-11 NZ NZ534878A patent/NZ534878A/en unknown
-
2004
- 2004-08-18 TN TNP2004000157A patent/TNSN04157A1/en unknown
- 2004-08-26 NO NO20043560A patent/NO20043560L/en not_active Application Discontinuation
- 2004-09-16 MA MA27862A patent/MA26406A1/en unknown
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3880102A (en) * | 1974-02-19 | 1975-04-29 | Offshore Technology Corp | Method and apparatus for offshore submersible oil storage and drilling |
US4060995A (en) * | 1975-03-26 | 1977-12-06 | Sea Tank Co. S.A. | Immersion of an offshore weight-structure having two compartments |
US4168673A (en) * | 1976-01-26 | 1979-09-25 | Preussag Aktiengessellschaft | Floating island for extracting or processing gas |
US4059065A (en) * | 1977-02-07 | 1977-11-22 | Mobil Oil Corporation | Semisubmersible loading mooring and storage facility |
US4960347A (en) * | 1989-07-31 | 1990-10-02 | Strange Booth B | Ship-borne emergency oil containment system and method |
US5292207A (en) * | 1993-02-15 | 1994-03-08 | Allen Bradford Resources, Inc. | Ice crush resistant caisson for arctic offshore oil well drilling |
US5791819A (en) * | 1994-01-21 | 1998-08-11 | Kaerner As | Buoyant platform |
US5899637A (en) * | 1996-12-11 | 1999-05-04 | American Oilfield Divers, Inc. | Offshore production and storage facility and method of installing the same |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110013989A1 (en) * | 2008-03-26 | 2011-01-20 | Zhirong Wu | Liquid Storage, Loading and Offloading System |
US8292546B2 (en) * | 2008-03-26 | 2012-10-23 | Zhirong Wu | Liquid storage, loading and offloading system |
US20110146803A1 (en) * | 2008-09-05 | 2011-06-23 | Zhirong Wu | Multifunctional offshore base with liquid displacement system |
US8678711B2 (en) * | 2008-09-05 | 2014-03-25 | Zhirong Wu | Multifunctional offshore base with liquid displacement system |
WO2010144187A1 (en) * | 2009-06-11 | 2010-12-16 | Exxonmobil Upstream Research Company | Subsea hydrocarbon recovery systems and methods |
WO2011149669A2 (en) | 2010-05-27 | 2011-12-01 | Helix Energy Solutions Group, Inc. | Floating production unit with disconnectable transfer system |
US8491350B2 (en) | 2010-05-27 | 2013-07-23 | Helix Energy Solutions Group, Inc. | Floating production unit with disconnectable transfer system |
US20150041142A1 (en) * | 2012-08-07 | 2015-02-12 | Jin Wang | Vertical Oil Storage System and Its Method For Deepwater Drilling and Production |
US9327805B2 (en) * | 2012-08-07 | 2016-05-03 | China National Offshore Oil Corporation | Vertical oil storage system and its method for deepwater drilling and production |
US11052978B2 (en) * | 2017-05-16 | 2021-07-06 | Tangshan Removable Island Marine Heavy Industry Co., Ltd. | Floating structure, and basic module of floating structure |
CN115140256A (en) * | 2022-03-29 | 2022-10-04 | 广东海洋大学 | Semi-submersible offshore oil production platform |
Also Published As
Publication number | Publication date |
---|---|
EP1476351A1 (en) | 2004-11-17 |
GB0303109D0 (en) | 2003-03-19 |
TNSN04157A1 (en) | 2007-03-12 |
GB2385564A (en) | 2003-08-27 |
MA26406A1 (en) | 2004-12-01 |
WO2003070562A8 (en) | 2003-12-24 |
WO2003070562A1 (en) | 2003-08-28 |
CN1646362A (en) | 2005-07-27 |
AU2003208405A1 (en) | 2003-09-09 |
NZ534878A (en) | 2006-03-31 |
GB2385564B (en) | 2005-08-17 |
BR0307983A (en) | 2004-12-07 |
NO20043560L (en) | 2004-09-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6244785B1 (en) | Precast, modular spar system | |
US6817809B2 (en) | Seabed oil storage and tanker offtake system | |
US7448404B2 (en) | Seabed located storage | |
CN101980917B (en) | Liquid storing and offloading device and drilling and production installations on sea based thereon | |
KR101449691B1 (en) | Offshore platform using guide pile and method of installing the same | |
US20050163572A1 (en) | Floating semi-submersible oil production and storage arrangement | |
US4059065A (en) | Semisubmersible loading mooring and storage facility | |
WO1998021415A9 (en) | Precast, modular spar system | |
US20150246770A1 (en) | Large scale subsea storage tank and method for constructing and installing the same | |
CN101544272A (en) | Liquid underwater storage, loading and ex-unloading device | |
US4007700A (en) | Multiple seafloor storage and supply system | |
US3472033A (en) | Fluid storage apparatus | |
US5885028A (en) | Floating systems and method for storing produced fluids recovered from oil and gas wells | |
CN103171743A (en) | Butting octagonal frustum pyramid type floating production and oil storage system | |
US3408971A (en) | Submerged oil storage vessel and oil loading facility for offshore wells | |
CN1104358C (en) | Offshore production and storage facility and method of installing same | |
WO2008129292A2 (en) | Improvements relating to oil and gas production | |
US3621662A (en) | Underwater storage structure and method of installation | |
US20190106854A1 (en) | Systems, apparatuses, and methods for removing fixed offshore platforms | |
US5901656A (en) | Watercraft with stacked wing ballast tanks | |
US6899049B2 (en) | Apparatus and method of constructing offshore platforms | |
GB2253813A (en) | Production buoy | |
US20160347419A1 (en) | Floating production system and method | |
CN206126372U (en) | A reject platform for boats and ships cargo transfer | |
KR20010033309A (en) | Offshore production and storage facility and method of installing the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: PS COSMTEK LTD., GREAT BRITAIN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:KERON, NEIL ALEXANDER;REEL/FRAME:016419/0041 Effective date: 20050309 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |