US20050153647A1 - Flues for industrial chimneys - Google Patents

Flues for industrial chimneys Download PDF

Info

Publication number
US20050153647A1
US20050153647A1 US10/756,512 US75651204A US2005153647A1 US 20050153647 A1 US20050153647 A1 US 20050153647A1 US 75651204 A US75651204 A US 75651204A US 2005153647 A1 US2005153647 A1 US 2005153647A1
Authority
US
United States
Prior art keywords
flue
titanium
sections
flues
cylindrical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/756,512
Inventor
Roger Thomas
Cary Veith
James Grauman
Rick Glitz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Titanium Metals Corp
Original Assignee
Titanium Metals Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Titanium Metals Corp filed Critical Titanium Metals Corp
Priority to US10/756,512 priority Critical patent/US20050153647A1/en
Assigned to TITANIUM METALS CORPORATION reassignment TITANIUM METALS CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: THOMAS, ROGER O., GRAUMAN, JAMES S., GLITZ, RICK W., VEITH, CARY A.
Priority to PCT/US2004/042362 priority patent/WO2005071317A1/en
Priority to TW093140829A priority patent/TW200525114A/en
Publication of US20050153647A1 publication Critical patent/US20050153647A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J13/00Fittings for chimneys or flues 
    • F23J13/02Linings; Jackets; Casings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J2213/00Chimneys or flues
    • F23J2213/20Joints; Connections
    • F23J2213/202Joints; Connections between duct or stack sections
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J2213/00Chimneys or flues
    • F23J2213/20Joints; Connections
    • F23J2213/204Sealing arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J2213/00Chimneys or flues
    • F23J2213/30Specific materials
    • F23J2213/303Specific materials metallic

Definitions

  • the subject invention is directed to a novel design and implementation of chimney flue sections comprised of titanium and its alloys to provide a combination of lower weight, corrosion resistance and flexibility in varied operating environments.
  • Power station and other industrial boiler chimneys typically consist of an approximately cylindrical concrete windshield 15 to 20 m diameter and 50-300 m tall, within which are one or more approximately cylindrical flues.
  • the gas is fed directly from the boiler to the flue it is warm (100° C. to 200° C.) and dry, and a conventional mild steel flue shows insignificant corrosion during operation under these conditions.
  • flue gas desulfurization is required. This is to minimize the release of sulfur-containing and nitrogen-containing oxides into the environment, and hence minimize the formation of acid rain.
  • FGD flue gas desulfurization
  • water is sprayed into the flue gas stream, and the resulting sulfur-containing acid-rich solution is neutralized with lime or limestone.
  • the resulting gas stream is cooler (0° C. to 100° C.) and carries moisture and residual acid, which can rapidly corrode mild steel flues, particularly if the dew point is reached under various adverse circumstances.
  • linings In order to protect the steel structure, a variety of linings have been employed. These include borosilicate brick, fibre reinforced polymer (FRP) coatings, nickel alloy linings, or titanium linings. Systems with low (50° C.) flue gas temperatures have alternatively been fitted with replacement flues constructed of factory built FRP cylinders, which are stacked in place to form the new flue.
  • FRP fibre reinforced polymer
  • the metallic linings have a useful life of about 15 years, and a reputation for robust and trouble-free operation and low maintenance, given appropriate alloy selection and installation.
  • the nickel alloys used for lining flues have an advantage of simplicity of installation, since they can be welded directly onto an existing steel flue structure. Titanium alloys should not be welded to steel structures and thus another installation method is required.
  • the invention relates to a flue for use in industrial chimneys to provide corrosion resistance to the passage of corrosive gas through the chimneys.
  • the flue comprises a plurality of formed sections hung from the top of a chimney. These sections may comprise commercially pure titanium or a titanium-base alloy. These sections are connected to each other to form an integral flue.
  • the plurality of formed and connected sections may include cylindrical sections.
  • Each cylindrical section may include butt welded edges for completion thereof.
  • the cylindrical sections may be joined end-to-end to form the flue. This may be achieved by welding.
  • each section may include flanges connected by bolts to adjacent sections using a gasket between the sections for sealing off corrosive gas.
  • the titanium-base alloy may be a high-strength titanium alloy.
  • flue foundations are prepared and then a hoist is installed at the top of the concrete windshield.
  • the topmost section of the flue with as much lining as possible in place, is then placed on the flue foundation, then hoisted up to sufficient height to allow the next highest section to be placed underneath it.
  • the top section is then lowered onto the second section and secured to it, e.g., by bolting flanges or welding together. This process is repeated until the flue reaches the required height.
  • the hoist is then disconnected, leaving the flue substantially freestanding, with some braces to minimize lateral movement.
  • the flue is to be designed to be substantially suspended from a device resting on, and transferring load to, the top of the concrete windshield. This could be described as a ‘Chinese Lantern’ design.
  • Design of the flue is to be made up of cylindrical sections that can be prefabricated in a workshop. The fabrication method is envisaged to uncoil titanium strip from a coil, and form it into cylinders of the flue diameter, with a butt weld to complete each cylinder. Seam welds are to be made between these cylinders in order to build up master cylinders of a height approximately equal to the flue diameter. A ring rolled titanium section is installed by welding it to the top and bottom of each master cylinder to act as a flange and facilitate assembly of the master cylinders to form the flue.
  • low density insulation is installed onto the outside of the master cylinders to minimize heat loss of the flue gas during operation and facilitate inspection of the chimney.
  • All metallic parts retaining insulation are to be made of titanium to eliminate galvanic (metal-to-metal)
  • the flue is installed by either bolting the flanges of the spool piece “cylinders” together or welding the spool piece cylinders together under an argon atmosphere using known TiG welding techniques for titanium. This approach leaves the flue under top tension.
  • Side supports can be installed from the inside wall of the windshield to the outside wall of the flue if needed.
  • bellows sections could be incorporated as appropriate to accommodate expansion and contraction as the flue heats and cools. This might include roll forming a shallow angle down the centreline of some titanium strips, making each master cylinder a ‘fold in the Chinese lantern’.
  • titanium alloys could be utilized in different locations in the flue to minimize the cost and maximize the durability. For example, higher strength alloys would be used near the top of the flue where the load is greatest and Pd or Ru bearing grades would be used where the corrosion conditions are predicted to be most severe.
  • the method of seam welding could be by TIG; Plasma; laser; etc. Alternatively, it may be adequate for some seams to use lock seam joints, as used in the installation of sheet metal roofing.
  • the above method of flue design and construction could be used for other metallic or non-metallic materials, or a combination of both. Titanium does offer particular advantages in both corrosion resistance and lower density than other metals.
  • the flue spool piece section approach also works well.
  • the flue sections should be pre-fabricated to about an 8 m tall ‘can’ in 2-4 cylindrical segments (depending on transportation issues) and constructed with small flanges directed in towards the inside of the cylindrical flue sections.
  • a Teflon gasket can be inserted between the flanges of two adjacent sections to provide a seal. All the holes could be pre-drilled so that assembly of the flue would go quickly when attaching and fastening nut and bolt fasteners. Since there would be the brick for support, the flange could be formed integrally or welded onto the cylindrical ‘can’.
  • the flanges at the top and bottom also are directed inward towards the inside of the cylinder.
  • Pre-made expansion joints are installed between the bottom flange of one can and the top flange of the other can that bridge the offset in the brick. This is similar to the above design for new construction, except the flange would be on the inside of the cylindrical sections instead of on the outside.
  • the expansion joint could be fabricated from titanium or another suitable inert material such as Teflon on-site.
  • FIG. 1 is an elevation view in partial cross-section showing the assembly sequence for the construction of a flue in accordance with the invention
  • FIG. 2 is an elevation view in partial cross-section showing an assembled flue in accordance with the assembly sequence of FIG. 1 ;
  • FIG. 3 is a view showing joined sections in accordance with the assembly of the flue in accordance with the invention and shown in FIG. 2 ;
  • FIG. 4 is an enlarged view of a portion of the joined sections of FIG. 3 .
  • Each 8 m can fabricated from 1.5 mm strip would weigh just over 2,300 lbs (for a 6 m diameter flue).
  • the flanges can be welded onto the parts of the cylindrical sections of the flue in the workshop and a final titanium weldment can be made on-site to complete the fabrication of a single cylindrical spool piece section.
  • the flanges can be bolted together on-site as the upper section is lowered onto the lower section. It might also be possible to rest each individual can or spool piece cylinder on the concrete support coming out from the chimney, thereby eliminating almost any hanging stresses and would make each brick/titanium segment a single unit.
  • the total installed cost of the titanium flue should be lower than that of a steel flue lined to resist wet FGD conditions using borosilicate bricks or nickel alloys.
  • the high corrosion resistance of titanium under these conditions, and the low maintenance required will ensure advantageous life cycle costs. In the event of a small leak of flue gas through a minor fabrication defect there will be no corrosion damage to the structure since the flue is made entirely of titanium.
  • a flue in accordance with the invention, designated generally as 10 is formed of a plurality of titanium cylindrical sections 12 , which are joined and hung from the top portion of the chimney 14 from hanger 16 .
  • the resulting flue structure is as shown in FIG. 2 .
  • cylindrical sections 12 may be provided with a gasket 18 .
  • each cylinder 12 to be joined may be provided with a flange 20 to result in the mating flange structure shown in FIG. 4 .
  • a bolt 22 may connect these flanges, as shown in FIG. 4 , to complete the joining of the cylindrical sections 12 .
  • high strength titanium alloys as used herein is defined as a titanium alloy containing additive elements to increase tensile strength to that above the tensile strength of ASTM B265 Grade 2. Examples include Ti Grade 9 and Ti Grade 12.

Abstract

A novel flue design using titanium sections, affording rapid construction, corrosion resistance for low maintenance and inertness over a wide range of operating conditions. The lower density of titanium versus steel or nickel alloys makes this flue design structurally possible and results in lower cost flues compared to flues of other alloys.

Description

    DESCRIPTION OF THE INVENTION
  • 1. Field of the Invention
  • The subject invention is directed to a novel design and implementation of chimney flue sections comprised of titanium and its alloys to provide a combination of lower weight, corrosion resistance and flexibility in varied operating environments.
  • 2. Background of the Invention
  • Power station and other industrial boiler chimneys typically consist of an approximately cylindrical concrete windshield 15 to 20 m diameter and 50-300 m tall, within which are one or more approximately cylindrical flues. When the gas is fed directly from the boiler to the flue it is warm (100° C. to 200° C.) and dry, and a conventional mild steel flue shows insignificant corrosion during operation under these conditions.
  • If the boiler is burning medium to high (1% or more) sulfur coal, or high sulfur oil, flue gas desulfurization (FGD) is required. This is to minimize the release of sulfur-containing and nitrogen-containing oxides into the environment, and hence minimize the formation of acid rain. In the most common form of FGD, water is sprayed into the flue gas stream, and the resulting sulfur-containing acid-rich solution is neutralized with lime or limestone. The resulting gas stream is cooler (0° C. to 100° C.) and carries moisture and residual acid, which can rapidly corrode mild steel flues, particularly if the dew point is reached under various adverse circumstances.
  • In order to protect the steel structure, a variety of linings have been employed. These include borosilicate brick, fibre reinforced polymer (FRP) coatings, nickel alloy linings, or titanium linings. Systems with low (50° C.) flue gas temperatures have alternatively been fitted with replacement flues constructed of factory built FRP cylinders, which are stacked in place to form the new flue.
  • The metallic linings have a useful life of about 15 years, and a reputation for robust and trouble-free operation and low maintenance, given appropriate alloy selection and installation. The nickel alloys used for lining flues have an advantage of simplicity of installation, since they can be welded directly onto an existing steel flue structure. Titanium alloys should not be welded to steel structures and thus another installation method is required.
  • From 1984 to 1998, resistance brazing titanium claddings to steel backing sheets or batten bars was used for flue installations. These batten bars or sheets can be welded directly to the steel flue structure. Titanium strips are then welded in place to cover gaps between the titanium liner sheets where the steel is exposed. This is considered to be a disadvantage with respect to this practice of the method, since the extensive on-site requires specialist trained personnel, and slows down the installation.
  • An alternative method was used in the 1990's, where existing brick lined flues were lined with titanium directly, being held in place by a combination of bolts into the brick and mastic between the titanium and the brick. This method requires that the pre-existing brick lining to the flue to be in good condition, and is comparatively slow and laborious.
  • SUMMARY OF THE INVENTION
  • The invention relates to a flue for use in industrial chimneys to provide corrosion resistance to the passage of corrosive gas through the chimneys. The flue comprises a plurality of formed sections hung from the top of a chimney. These sections may comprise commercially pure titanium or a titanium-base alloy. These sections are connected to each other to form an integral flue.
  • The plurality of formed and connected sections may include cylindrical sections.
  • Each cylindrical section may include butt welded edges for completion thereof.
  • The cylindrical sections may be joined end-to-end to form the flue. This may be achieved by welding.
  • Alternately, each section may include flanges connected by bolts to adjacent sections using a gasket between the sections for sealing off corrosive gas.
  • The titanium-base alloy may be a high-strength titanium alloy.
  • When a new or replacement flue is being installed irrespective of material used, flue foundations are prepared and then a hoist is installed at the top of the concrete windshield. The topmost section of the flue, with as much lining as possible in place, is then placed on the flue foundation, then hoisted up to sufficient height to allow the next highest section to be placed underneath it. The top section is then lowered onto the second section and secured to it, e.g., by bolting flanges or welding together. This process is repeated until the flue reaches the required height. The hoist is then disconnected, leaving the flue substantially freestanding, with some braces to minimize lateral movement.
  • In order to obtain the advantages of the corrosion resistance and light weight of titanium alloy flue linings, while avoiding the installation and quality assurance issues associated with titanium linings, one must design a flue constructed solely from titanium alloys. The flue is to be designed to be substantially suspended from a device resting on, and transferring load to, the top of the concrete windshield. This could be described as a ‘Chinese Lantern’ design.
  • If appropriate, the design could utilize cables or tie rods running between the flanges to bear the weight of the flue, rather than carrying the load through the sheet metal walls. Design of the flue is to be made up of cylindrical sections that can be prefabricated in a workshop. The fabrication method is envisaged to uncoil titanium strip from a coil, and form it into cylinders of the flue diameter, with a butt weld to complete each cylinder. Seam welds are to be made between these cylinders in order to build up master cylinders of a height approximately equal to the flue diameter. A ring rolled titanium section is installed by welding it to the top and bottom of each master cylinder to act as a flange and facilitate assembly of the master cylinders to form the flue.
  • As part of the workshop manufacture, low density insulation is installed onto the outside of the master cylinders to minimize heat loss of the flue gas during operation and facilitate inspection of the chimney. All metallic parts retaining insulation are to be made of titanium to eliminate galvanic (metal-to-metal)
  • The flue is installed by either bolting the flanges of the spool piece “cylinders” together or welding the spool piece cylinders together under an argon atmosphere using known TiG welding techniques for titanium. This approach leaves the flue under top tension. Side supports can be installed from the inside wall of the windshield to the outside wall of the flue if needed.
  • Other design variations are possible to increase the load bearing capacity of the flue such as using corrugated titanium sheets or titanium bars or rods as stiffeners in either the axial or circumferential directions. By these methods it should be possible for the flue to withstand sub-atmospheric pressure within the flue.
  • It may be found desirable to use standard steel cables and fittings to bear the load of the flue. These would run from flange to flange down the outside of the flue, and be tensioned to bear the load. In this case a plastic sleeve or coating may be required to protect the steel cables, and a non-metallic fitting would be used to prevent direct contact between the steel fittings and the titanium flanges. For new chimneys, additional fixtures in the height of the chimney could be utilized to transfer the weight of the flue to the concrete windshield.
  • Additionally, bellows sections could be incorporated as appropriate to accommodate expansion and contraction as the flue heats and cools. This might include roll forming a shallow angle down the centreline of some titanium strips, making each master cylinder a ‘fold in the Chinese lantern’.
  • Various titanium alloys could be utilized in different locations in the flue to minimize the cost and maximize the durability. For example, higher strength alloys would be used near the top of the flue where the load is greatest and Pd or Ru bearing grades would be used where the corrosion conditions are predicted to be most severe.
  • The method of seam welding could be by TIG; Plasma; laser; etc. Alternatively, it may be adequate for some seams to use lock seam joints, as used in the installation of sheet metal roofing. In principle, the above method of flue design and construction could be used for other metallic or non-metallic materials, or a combination of both. Titanium does offer particular advantages in both corrosion resistance and lower density than other metals.
  • For retrofit chimneys, the flue spool piece section approach also works well. When the segments between vertical brick overlaps inside the chimney is about 9 m spacing, the flue sections should be pre-fabricated to about an 8 m tall ‘can’ in 2-4 cylindrical segments (depending on transportation issues) and constructed with small flanges directed in towards the inside of the cylindrical flue sections. A Teflon gasket can be inserted between the flanges of two adjacent sections to provide a seal. All the holes could be pre-drilled so that assembly of the flue would go quickly when attaching and fastening nut and bolt fasteners. Since there would be the brick for support, the flange could be formed integrally or welded onto the cylindrical ‘can’. The flanges at the top and bottom also are directed inward towards the inside of the cylinder. Pre-made expansion joints are installed between the bottom flange of one can and the top flange of the other can that bridge the offset in the brick. This is similar to the above design for new construction, except the flange would be on the inside of the cylindrical sections instead of on the outside. The expansion joint could be fabricated from titanium or another suitable inert material such as Teflon on-site.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is an elevation view in partial cross-section showing the assembly sequence for the construction of a flue in accordance with the invention;
  • FIG. 2 is an elevation view in partial cross-section showing an assembled flue in accordance with the assembly sequence of FIG. 1;
  • FIG. 3 is a view showing joined sections in accordance with the assembly of the flue in accordance with the invention and shown in FIG. 2; and
  • FIG. 4 is an enlarged view of a portion of the joined sections of FIG. 3.
  • DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • Each 8 m can fabricated from 1.5 mm strip would weigh just over 2,300 lbs (for a 6 m diameter flue). The flanges can be welded onto the parts of the cylindrical sections of the flue in the workshop and a final titanium weldment can be made on-site to complete the fabrication of a single cylindrical spool piece section. The flanges can be bolted together on-site as the upper section is lowered onto the lower section. It might also be possible to rest each individual can or spool piece cylinder on the concrete support coming out from the chimney, thereby eliminating almost any hanging stresses and would make each brick/titanium segment a single unit.
  • It is estimated that the total installed cost of the titanium flue should be lower than that of a steel flue lined to resist wet FGD conditions using borosilicate bricks or nickel alloys. The high corrosion resistance of titanium under these conditions, and the low maintenance required will ensure advantageous life cycle costs. In the event of a small leak of flue gas through a minor fabrication defect there will be no corrosion damage to the structure since the flue is made entirely of titanium.
  • With reference to the drawings, and for the present to FIG. 1, a flue, in accordance with the invention, designated generally as 10 is formed of a plurality of titanium cylindrical sections 12, which are joined and hung from the top portion of the chimney 14 from hanger 16. When assembly is completed, the resulting flue structure is as shown in FIG. 2.
  • With reference to FIGS. 3 and 4, cylindrical sections 12 may be provided with a gasket 18. As shown in FIG. 4, each cylinder 12 to be joined may be provided with a flange 20 to result in the mating flange structure shown in FIG. 4. A bolt 22 may connect these flanges, as shown in FIG. 4, to complete the joining of the cylindrical sections 12.
  • The term “higher strength titanium alloys” as used herein is defined as a titanium alloy containing additive elements to increase tensile strength to that above the tensile strength of ASTM B265 Grade 2. Examples include Ti Grade 9 and Ti Grade 12.

Claims (8)

1. A flue for use in industrial chimneys to provide corrosion resistance to the passage of corrosive gas through the chimneys, said flue comprising a plurality of formed sections within the chimney, said sections comprising commercially pure titanium or a titanium-base alloy and connected to each other to form an integral flue.
2. The flue of claim 1, wherein the plurality of formed sections are hung from the top of the chimney.
3. The flue of claim 1, wherein said plurality of formed and connected sections include cylindrical sections.
4. The flue of claim 3, wherein each said cylindrical sections include butt welded edges for completion thereof.
5. The flue of claim 4, wherein said cylindrical sections are joined end to end to form said flue.
6. The flue of claim 5, wherein said cylindrical sections are joined end to end by welding.
7. The flue of claim 1, wherein each said section includes flanges connected by bolts to adjacent sections using a gasket between the sections for sealing off the corrosive gas.
8. The flue of claim 1, wherein the titanium-base alloy are higher strength titanium alloys.
US10/756,512 2004-01-14 2004-01-14 Flues for industrial chimneys Abandoned US20050153647A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US10/756,512 US20050153647A1 (en) 2004-01-14 2004-01-14 Flues for industrial chimneys
PCT/US2004/042362 WO2005071317A1 (en) 2004-01-14 2004-12-20 Flues for industrial chimneys
TW093140829A TW200525114A (en) 2004-01-14 2004-12-27 Flues for industrial chimneys

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US10/756,512 US20050153647A1 (en) 2004-01-14 2004-01-14 Flues for industrial chimneys

Publications (1)

Publication Number Publication Date
US20050153647A1 true US20050153647A1 (en) 2005-07-14

Family

ID=34739843

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/756,512 Abandoned US20050153647A1 (en) 2004-01-14 2004-01-14 Flues for industrial chimneys

Country Status (3)

Country Link
US (1) US20050153647A1 (en)
TW (1) TW200525114A (en)
WO (1) WO2005071317A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110136423A1 (en) * 2009-12-04 2011-06-09 Qun Xia Large Diameter FRP Flues In Large Diameter Chimneys
GB2518685A (en) * 2013-09-30 2015-04-01 A1 Sheet Metal Flues Ltd Improvements to the erection of flue systems
CN112676763A (en) * 2020-11-30 2021-04-20 中化二建集团有限公司 Method for repairing lining at steel chimney subsection hoisting interface position

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2272138A (en) * 1942-02-03 staniforth
US2342058A (en) * 1943-04-30 1944-02-15 Charles E Morris Prefabricated stack sections
US3363591A (en) * 1967-01-30 1968-01-16 Richard E. Lawrence Sectionalized expansible insulated smokestack and breeching
US3368506A (en) * 1966-09-16 1968-02-13 Richard E. Lawrence Stack sections with expansion means
US3522767A (en) * 1968-10-07 1970-08-04 Preway Inc Adjustable chimney t
US3782266A (en) * 1972-04-07 1974-01-01 Pullman Inc Apparatus for providing expansible chimneys
US4265166A (en) * 1979-09-10 1981-05-05 Pullman Incorporated Corrosion resistant membrane for chimney liner
US4519303A (en) * 1983-03-24 1985-05-28 Crown Union, Inc. Chimney lining system including frame-supported membrane
US4557297A (en) * 1983-03-07 1985-12-10 Bisco Products, Inc. Flue gas duct assembly
US5630921A (en) * 1995-12-07 1997-05-20 Elsag International N.V. Electrochemical sensor
US5678494A (en) * 1995-03-22 1997-10-21 Ulrich; Gael Biomass-fueled furnace
US6282850B1 (en) * 1995-09-27 2001-09-04 Gary A. Dean Method and apparatus for seismically retrofitting a household chimney

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3606611A (en) * 1968-10-24 1971-09-20 Environmental Control Sales Co Afterburner
IT1042501B (en) * 1977-08-11 1980-01-30 Marinni Battista S P A Impresa CIMINI AND SOUTH MATORO BUILDING THEM
US4467863A (en) * 1983-03-07 1984-08-28 Bisco Products, Inc. Flue gas duct assembly
RU2001351C1 (en) * 1991-05-15 1993-10-15 Хожаев Сергеи Михайлович; Астахов Михаил Владимирович Chimney stack
JPH11166397A (en) * 1997-12-03 1999-06-22 Nippon Steel Corp Covered conduit excellent in corrosion resistance

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2272138A (en) * 1942-02-03 staniforth
US2342058A (en) * 1943-04-30 1944-02-15 Charles E Morris Prefabricated stack sections
US3368506A (en) * 1966-09-16 1968-02-13 Richard E. Lawrence Stack sections with expansion means
US3363591A (en) * 1967-01-30 1968-01-16 Richard E. Lawrence Sectionalized expansible insulated smokestack and breeching
US3522767A (en) * 1968-10-07 1970-08-04 Preway Inc Adjustable chimney t
US3782266A (en) * 1972-04-07 1974-01-01 Pullman Inc Apparatus for providing expansible chimneys
US4265166A (en) * 1979-09-10 1981-05-05 Pullman Incorporated Corrosion resistant membrane for chimney liner
US4557297A (en) * 1983-03-07 1985-12-10 Bisco Products, Inc. Flue gas duct assembly
US4519303A (en) * 1983-03-24 1985-05-28 Crown Union, Inc. Chimney lining system including frame-supported membrane
US4567700A (en) * 1983-03-24 1986-02-04 Rust Chimney Incorporated Frame-supported membrane for chimney
US5678494A (en) * 1995-03-22 1997-10-21 Ulrich; Gael Biomass-fueled furnace
US6282850B1 (en) * 1995-09-27 2001-09-04 Gary A. Dean Method and apparatus for seismically retrofitting a household chimney
US5630921A (en) * 1995-12-07 1997-05-20 Elsag International N.V. Electrochemical sensor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110136423A1 (en) * 2009-12-04 2011-06-09 Qun Xia Large Diameter FRP Flues In Large Diameter Chimneys
GB2518685A (en) * 2013-09-30 2015-04-01 A1 Sheet Metal Flues Ltd Improvements to the erection of flue systems
CN112676763A (en) * 2020-11-30 2021-04-20 中化二建集团有限公司 Method for repairing lining at steel chimney subsection hoisting interface position

Also Published As

Publication number Publication date
WO2005071317A1 (en) 2005-08-04
TW200525114A (en) 2005-08-01

Similar Documents

Publication Publication Date Title
CA2713368C (en) Tower element
US10240690B2 (en) Stationary pipeline support
US20200312470A1 (en) Insulation securement system and associated methods
EP1210398B1 (en) Double-fired horizontal tube heater
US4567700A (en) Frame-supported membrane for chimney
CN114165099B (en) Modularized construction method of large tower
US20050153647A1 (en) Flues for industrial chimneys
CN111550817A (en) Heat-preservation and corrosion-prevention chimney structure
US20140339815A1 (en) Duct Assemblies With Internally Bolted Expansion Joint
US20110136423A1 (en) Large Diameter FRP Flues In Large Diameter Chimneys
RU2244084C2 (en) Chimney
CA2916995C (en) Duct assemblies with internally bolted expansion joint
CN110847688A (en) Self-supporting thin-wall chimney
RU2308588C2 (en) Dome-shaped aluminum closure for reservoir
JP5338494B2 (en) Construction method of the ceiling part of the water type gas holder
JPS609566Y2 (en) double barrel smoke tube
RU214763U1 (en) CORROSION-RESISTANT (STAINLESS) STEEL FIXED SUPPORT
CN219569462U (en) Lining air pipe structure of concrete air shaft
CN109939630B (en) Modularized covering structure and reactor with same
CN213015692U (en) Sectional self-supporting smoke exhaust inner barrel
CN214389561U (en) Mounting structure of direct-discharging anticorrosive steel chimney on top of wet desulphurization tower
RU216413U1 (en) FIXED SUPPORT
CN2694122Y (en) Connecting device for prefabricated double layered stainless steel chimney
JP3216678U (en) Roof structure
CN117927782A (en) Pouring-free replacement method for high-altitude flue gas inlet lining pipeline

Legal Events

Date Code Title Description
AS Assignment

Owner name: TITANIUM METALS CORPORATION, COLORADO

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:THOMAS, ROGER O.;VEITH, CARY A.;GRAUMAN, JAMES S.;AND OTHERS;REEL/FRAME:015210/0082;SIGNING DATES FROM 20040129 TO 20040323

STCB Information on status: application discontinuation

Free format text: EXPRESSLY ABANDONED -- DURING EXAMINATION