US20050149306A1 - Iterative drilling simulation process for enhanced economic decision making - Google Patents
Iterative drilling simulation process for enhanced economic decision making Download PDFInfo
- Publication number
- US20050149306A1 US20050149306A1 US11/032,957 US3295705A US2005149306A1 US 20050149306 A1 US20050149306 A1 US 20050149306A1 US 3295705 A US3295705 A US 3295705A US 2005149306 A1 US2005149306 A1 US 2005149306A1
- Authority
- US
- United States
- Prior art keywords
- drilling
- rig
- simulation
- iterative
- well bore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 450
- 238000004088 simulation Methods 0.000 title claims abstract description 186
- 238000000034 method Methods 0.000 title claims abstract description 95
- 230000008569 process Effects 0.000 title description 32
- 239000011435 rock Substances 0.000 claims abstract description 72
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 65
- 238000011234 economic evaluation Methods 0.000 claims abstract description 52
- 230000035515 penetration Effects 0.000 claims description 12
- 238000004140 cleaning Methods 0.000 claims description 5
- 238000005755 formation reaction Methods 0.000 description 60
- 238000004458 analytical method Methods 0.000 description 39
- 239000012530 fluid Substances 0.000 description 15
- 238000005457 optimization Methods 0.000 description 13
- 238000010586 diagram Methods 0.000 description 12
- 238000004590 computer program Methods 0.000 description 8
- 230000001186 cumulative effect Effects 0.000 description 8
- 238000011156 evaluation Methods 0.000 description 7
- 230000004044 response Effects 0.000 description 7
- 239000004215 Carbon black (E152) Substances 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 6
- 230000005251 gamma ray Effects 0.000 description 6
- 229930195733 hydrocarbon Natural products 0.000 description 6
- 238000012986 modification Methods 0.000 description 6
- 230000004048 modification Effects 0.000 description 6
- 150000002430 hydrocarbons Chemical class 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000005481 NMR spectroscopy Methods 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 230000018109 developmental process Effects 0.000 description 3
- 238000012552 review Methods 0.000 description 3
- 230000003595 spectral effect Effects 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000000052 comparative effect Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012797 qualification Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 210000003813 thumb Anatomy 0.000 description 2
- 235000015076 Shorea robusta Nutrition 0.000 description 1
- 244000166071 Shorea robusta Species 0.000 description 1
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 125000001183 hydrocarbyl group Chemical group 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 208000020442 loss of weight Diseases 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 230000007935 neutral effect Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B12/00—Accessories for drilling tools
- E21B12/02—Wear indicators
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B44/005—Below-ground automatic control systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/003—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by analysing drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/22—Fuzzy logic, artificial intelligence, neural networks or the like
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/10—Nuclear fusion reactors
Definitions
- the present disclosure relates to geology and drilling mechanics, and more particularly to an iterative drilling simulation method and system for enhanced economic decision making.
- Prior drilling prediction methods have included the use of geology and drilling mechanics for selecting an appropriate bit for use in the drilling of a bore hole in a particular formation. For example, with respect to bit selection, a rock strength column characterizes the particular geology. The rock strength column is calculated from well logs. Then, one or more bits are “matched” to the rock strength.
- OASIS OASIS available from Baker Hughes of Houston, Tex.
- a drilling optimization service operates in a manner similar to the way that oil companies have done themselves for determining a drilling optimization, but on a farmed out basis.
- the DROPS drilling simulator drilling optimization service includes reverse engineering a rock strength column from a “geolograph.”
- the geolograph includes a minute-by-minute record of drilling rate from a previous drilled well.
- the DROPS drilling simulator method looks at bit selections that fit the estimated rock strength column.
- An iterative drilling simulation method for enhanced economic decision making includes obtaining characteristics of a rock column in a formation to be drilled, specifying characteristics of at least one drilling rig system; and iteratively simulating the drilling of a well bore in the formation. The method further produces an economic evaluation factor for each iteration of drilling simulation. Each iteration of drilling simulation is a function of the rock column and the characteristics of the at least one drilling rig system according to a prescribed drilling simulation model.
- a recommendation package based upon a given iteration of the simulated drilling of a well bore is produced.
- the recommendation package enables enhanced decision making with respect to an actual drilling in a field containing formations analogous to the rock column.
- An iterative drilling simulation system and computer program are also disclosed.
- FIG. 1 is a block diagram overview of the iterative virtual drilling simulation service according to one embodiment
- FIG. 2 is a block diagram representation of the iterative drilling simulation system according to one embodiment
- FIG. 3 is a block diagram view of an iterative virtual drilling simulation according to an embodiment of the present disclosure
- FIG. 4 is an exemplary output view of a sample iterative virtual drilling simulation for a first geology
- FIG. 5 is an exemplary output view of a sample iterative virtual drilling simulation for a second geology
- FIG. 6 is a flow diagram view of an iterative virtual drilling simulation method according to one embodiment
- FIG. 7 is a block diagram view of an iterative drilling simulator according to another embodiment.
- FIG. 8 is a flow diagram view of an iterative virtual drilling simulation method according to another embodiment.
- the present embodiments provide various drilling simulation models capable of more accurately defining drilling costs as a function of predicted drilling performance than previously known.
- the present embodiments further provide simulation and recommendation information suitable for enabling better economic decisions to be made by rig contractors, oilfield operating companies, and others, as may be appropriate.
- various combinations of drilling rig systems with differing energy input capabilities, bits, and fluid properties are iteratively simulated to produce corresponding virtual drilling scenarios.
- the virtual drilling scenarios are suitable for use in economic decision making.
- the iterative simulator of the present disclosure provides recommendations, including detailed information, sufficient to assist a drilling contractor in making a best decision, in view of available equipment, constraints, and economics, as further discussed herein.
- the iterative drilling simulator method and system of the present disclosure utilizes drilling mechanics software, as a function of prescribed drilling mechanics models, for “drilling” with various computerized bits and comparing their respective predicted performances during the drilling of a well bore in a given formation.
- the present embodiments further include a method of iteratively simulating the drilling of a well bore using alternate drill rig and equipment selections.
- the simulations are requested and performed at the front end of a drilling operator's economics decision making process.
- recommendations are generated as a function of the iterative drilling simulations for a particular geology formation and economic evaluation factors.
- the present embodiments further include a software enabled business process for greatly increasing accuracy and reducing a risk window of high value decision making in the oil and gas business.
- a software enabled business process for greatly increasing accuracy and reducing a risk window of high value decision making in the oil and gas business.
- the simulator includes a system for predicting performance of a drilling system, such as that disclosed in U.S. Pat. No. 6,109,368, incorporated herein by reference.
- the system for predicting performance of a drilling system coupled with financial models and iterative drilling simulations as discussed herein, produces content for inclusion in a recommendation output as a function of economic evaluation factors. Accordingly, the simulator output enables the making of far more accurate and sophisticated decisions, than previously known.
- the present embodiments further includes a business process in which estimated rock columns developed from well logs, or from seismic data, are “drilled” with a software simulator in an iterative manner. Drilling of the estimated rock columns is carried out with varying input parameters, including different drilling rig equipment characteristics, for generating estimates of comparative economics.
- the present embodiments provide a useful tool for assisting in one or more of the following types of significant decision making processes:
- a consulting firm could provide services in accordance with the present embodiments, for assisting with the significant decision making processes to be made by a drilling operator or drilling contractor, further as discussed herein.
- the iterative drilling simulation method includes a virtual drilling simulation service 10 receiving a request for services from an operating company 12 .
- the operating company provides geology data and equipment data 14 , as appropriate, in connection with a proposed drilling of a well bore in a given formation.
- the operating company 12 provides geology data 16 from well log data 18 obtained from a previous well (or wells).
- the iterative drilling simulation method includes obtaining characteristics of a rock column in a formation to be drilled and characteristics of at least one drilling rig system.
- the operating company also specifies the characteristics of at least one drilling rig system for consideration.
- the method further includes iteratively simulating the drilling of a well bore in the formation and producing an economic evaluation factor for each iteration of drilling simulation, generally indicated by reference numeral 20 .
- Each iteration of drilling simulation ( 22 a , 22 b ) is a function of the rock column 24 and the characteristics of the at least one drilling rig system ( 26 a , 26 b ) according to a prescribed drilling simulation model. Additional iterations of drilling simulations are illustrated by “ . . . ”, as indicated by reference numeral 22 c .
- the drilling simulation model includes one or more of a mechanical efficiency model, bit wear model, hole cleaning efficiency model, penetration rate model, and drilling economics model, as discussed further herein.
- the first drilling rig system 26 a is characterized by the properties of drilling rig 28 a , the properties of drilling fluid 30 a , and the properties of drill bit 32 a .
- the second drilling rig system 26 b is characterized by the properties of drilling rig 28 b , the properties of drilling fluid 30 b , and the properties of drill bit 32 b . Additional drilling rig systems can be considered, however, only two have been shown for simplicity of illustration.
- the iterative drilling simulation method further includes producing a drilling economics output 34 for each of the iterative drilling simulations, the drilling economics output corresponding to one or more economic evaluation factor.
- the economic evaluation factor includes a minimum number of hours on bottom to drill a desired well bore.
- the economic evaluation factor may also include a minimum cost amount for drilling the well bore, wherein the minimum cost amount is a function of both a minimum number of hours on bottom to drill the well bore and a cost per day for a respective drilling rig system.
- economic evaluation factors have been discussed herein as including a minimum number of hours on bottom and a minimum cost amount for drilling the well bore, other economic evaluation factors are possible. There is a recognition that other factors effect economics. For example, such other factors include trip time, trouble time, and weather related downtime.
- trip time, trouble time, and weather related down time can be included as economic evaluation factors, as determined according to basic rules of thumb in the field. For example, trip time for an older rig may be 1,000 feet of pipe per hour, whereas trip time for a newer rig may be 1,200 feet of pipe per hour. Utilizing basic rules of thumb, appropriate estimates are added to a total drilling time for the iterative simulated drilling of a well bore, as a function of one or more of trip time, trouble time, or weather related downtime. Percentages of drilling time, tripping time, trouble time, or weather related downtime may be included in a simulation. For example, the total drilling and tripping time may amount to eighty percent (80%) and trouble time may amount to twenty percent (20%) of the total time needed to drill the well bore in the given formation.
- the iterative drilling simulator method and system can more accurately reflect what goes on at the rig in the drilling of a well bore, including, for example, a number of trips expected to be made for replacing a bit, failed motor, etc. Accordingly, the ultimate drilling cost will not only account for time on bottom, but also take into account a rig down time (“trouble time”) based upon a percentage over and above the time needed to drill the well bore. For example, during an iterative drilling simulation, a number of bits may be considered. One iteration may require two fast bits and trip time for replacing the first bit with the second bit. Another iteration may only require a single slow bit that is capable of drilling all the way to the bottom of the well bore.
- the iterative drilling simulator method and system produce an economic evaluation of the iterative simulations that include consideration for one or more of the cost of a trip, trouble time, logistics time, and weather related down time, as part of an overall economic evaluation.
- a suitable multiplication factor proprietary to a given drilling operator can be used to adjust a simulated drilling iteration drill time for a given well bore.
- the proprietary multiplication factor may be seventeen percent (17%).
- the proprietary multiplication factor may be twenty two percent (22%).
- multiplication factors taking into account an operator's own trouble time experience can be factored into an economic evaluation of an iterative drilling simulation.
- Such percentage or percentages can be based upon the experience of a respective operator. For example, an off shore drilling rig may experience a certain percentage of weather related down time, such as during a hurricane season, when all crew members are required to leave the rig for safety concerns. If the off shore rig is planned to drill for a three year period, then some portion of that time will likely include weather related downtime, as well as other factors as noted herein.
- the iterative simulation method and system of the present disclosure provides an economic evaluation output scientifically linked to the geology of the formation in the drilling of a well bore
- the economic evaluation output can be further adjusted to take into account one or more of trouble time, logistics time, or weather related down time.
- the virtual drilling simulation service (at 10 a ) reviews and analyzes the same for producing a recommendation package output, generally indicated by reference numeral 36 , and as further discussed herein.
- the review and analysis may be performed automatically via computer control, manually, or a combination of both, according to prescribed evaluation rules.
- the evaluation rules may include economic rules and/or other rules pertinent to a particular drilling scenario.
- the operating company receives the recommendation package 36 , and in response thereto, renders an enhanced decision on rig equipment and operations, as generally indicated by reference numeral 38 . Accordingly, the method of the present disclosure facilitates enhanced economic decision making with respect to drilling of a well bore in a given formation, further as a function of drilling system characteristics and economic evaluation factors for the particular geology of the formation.
- FIG. 2 is a block diagram representation of the iterative drilling simulation system according to one embodiment.
- the iterative drilling simulation system 50 includes a drilling simulator processor 52 , responsive to inputs ( 54 a , 54 b , 54 c ), for producing an iterative drilling simulation output 56 , as further discussed herein.
- the iterative drilling simulation system 50 is characterized by geology models 58 , drilling mechanics models 60 , and drilling economics models 62 .
- the geology models 58 provide rock column characteristic input 54 a to the drilling simulator processor 52 .
- the characteristics of the rock column include at least one or more of lithology, rock strength, shale plasticity, log data, and porosity. With respect to the characteristics of lithology, rock strength, and shale plasticity, one or more of the respective characteristics may be derived from log data and a respective lithology model, rock strength model, and shale plasticity model.
- Log data 64 can include one or more of well logs, mud logs, core data, and bit records.
- the geology models include those disclosed in co-pending U.S. patent application Ser. No.
- the drilling mechanics models 60 provide drilling rig system characteristic input 54 b to the drilling simulator processor 52 . It is noted that the drilling rig system characteristics can include characteristics of more than one drilling rig system, wherein characteristics for a single drilling rig system are utilized in connection with a respective iteration of drilling simulation. In a preferred embodiment, the drilling mechanics models include those disclosed in co-pending U.S. patent application Ser. No. 09/649,495, entitled “Method and System for Predicting the Performance of a Drilling System for a Given Formation” filed Aug. 8, 2000, which is a continuation-in-part application of Ser. No. 09/192,389, filed Nov. 13, 1998, now U.S. Pat. No. 6,109,368, incorporated herein by reference.
- the characteristics of the drilling rig system can include one or more of the following: rig inputs 66 , drill string and bottom hole assembly inputs 68 , drill bit inputs 70 , and hydraulic properties 72 .
- the rig inputs 66 include one or more of the following: operating constraints, rig costs, maximum weight on bit, top drive torque, table drive torque, top drive minimum RPM (revolutions per minute), table drive minimum RPM, top drive maximum RPM, table drive maximum RPM, maximum GPM (gallons per minute) for pumps, and standpipe maximum PSI (pounds per square inch).
- the drill string and bottom hole assembly (BHA) characteristics 68 include one or more of the following: motor RPM (revolutions per minute), turbine RPM, motor torque, turbine torque, rotary steerable system, PSI (pounds per square inch) loss through BHA, PSI string loss, string torque, string drag, and drill string economics.
- the drill bit inputs 70 include, for example, bit type, bit diameter, bit cutting structure 3 D (three dimensional) model, bit work rating, bit wear rating, bit junk slot area, bit TFA (total flow area), and bit pressure drop.
- the hydraulic properties include one or more of the following: oil, synthetic, water, weight PPG (pounds per gallon), yield point, plastic viscosity, annular velocity, water loss, lost circulation, ECD (equivalent circulating densities), depth in, depth out, maximum ROP (rate of penetration), and fluid costs.
- the iterative drilling simulation system further includes one or more drilling economics model 62 .
- Economic data particular to a given virtual drilling scenario is input at 74 .
- the drilling economics model 64 provides input to the drilling simulator processor 52 at 54 c , for use during an iterative drilling simulation, according to the particular requirements for a given iterative drilling simulation application, as appropriate.
- FIG. 3 is a block diagram view of an iterative virtual drilling simulation according to an embodiment of the present disclosure.
- the iterative drilling simulation 80 includes virtual drilling simulations in response to a request for services, for example, from an operating company.
- the iterative drilling simulation involves both drilling mechanics 82 and geology 84 .
- the drilling simulations include drilling mechanics analyses performed for a first drilling system 86 and a second rig system 88 in connection with rock column 90 of geology 84 .
- the geology data may have been obtained from well log data of a previously drilled well (or wells) for determining the rock column 90 . Accordingly, the rock column 90 characterizes the formation to be drilled.
- equipment data for the Rig A drilling simulation 86 includes Rig A energy inputs 92 , drilling fluid properties 94 , and drill bit inputs 96 .
- the energy inputs 92 include weight, rotary speed, and hydraulic horsepower.
- equipment data for the Rig B drilling simulation 88 includes Rig B energy inputs 98 , drilling fluid properties 100 , and drill bit inputs 102 .
- the simulation of FIG. 3 includes iterative simulations of the drilling of a well bore in the formation characterized by rock column 90 with Rigs A and B.
- the simulation produced drilling simulation economics 104 that comprises at least one economic evaluation factor for each respective iteration of drilling simulation.
- the economic evaluation factor may include a minimum number of hours on bottom to drill a desired well bore.
- the economic evaluation factor may also include a minimum cost amount for drilling the well bore, wherein the minimum cost amount is a function of both a minimum number of hours on bottom to drill the well bore and a cost per day for a respective drilling rig system. Accordingly, economic results, as generally indicated by reference numerals 106 and 108 , respectively, correspond to one or more evaluation factors of a respective iterative drilling simulation.
- Each iteration of drilling simulation is a function of the rock column 90 and the characteristics of the a respective one of the drilling rig systems according to a drilling simulation model.
- the drilling simulation model includes one or more of a mechanical efficiency model, bit wear model, hole cleaning efficiency model, penetration rate model, and drilling economics model, as discussed further herein.
- the drilling mechanics analysis utilizes information that may include one or more of the following: lithology, rock strength, shale plasticity, drilling mechanics optimization, and illustrations of one or more drill bits for use in drilling the well bore. Intervals are specified with a start depth and an end depth.
- well logs are obtained from the operating company or other suitable source.
- the well logs may include one or more of the following: gamma ray, sonic, neutron, density, photoelectric, NMR (nuclear magnetic resonance), spectral gamma ray, and caliper.
- Additional data provided by the operating company, or other suitable source may include mud logs, bit records, or other pertinent information.
- bit data for a proposed well is considered.
- the bit data comprises information for each bit run.
- bit data may include one or more of the following: bit size, bit type, proposed depth in, proposed depth out, ROP, and cost.
- cost refers to a cost per foot analysis based upon an hourly rig cost.
- the drilling mechanics analysis further includes, for a given bit run, specification of one or more of the following for a respective bit: a work rating (expressed in units of ton-mi), a sharp bit slope, a worn bit slope, a friction slope, and bit contact area (initial and final).
- the drilling mechanics analysis still further includes operating constraints for a given bit run.
- the operating constraints include one or more of the following: maximum torque (expressed in units of ft-lbs) for top drive, rotary table, drill pipe, motor, or turbine; minimum RPM (revolutions per minute) for top drive, rotary table, motor, or turbine; maximum RPM for top drive, rotary table, motor, or turbine; maximum WOB (weight on bit) (expressed in units of klbs); and maximum ROP (rate of penetration) (expressed in ft/hr).
- Drill string data includes one or more of the following: drill pipe (OD ⁇ Wt), HWDP (OD ⁇ length), drill collars (OD ⁇ length), and motor (OD ⁇ type).
- the drilling mechanics analysis may also include the use of measured operating parameters for an offset well, along with a request for iterative drilling simulation services.
- the measured operating parameters of the offset well may be provided by an operating company or other suitable source.
- Offset drilling data includes ROP, WOB, and RPM-total.
- the offset drilling data may optionally include one or more of torque, motor RPM, surface RPM.
- the operating parameters are specified for a start depth and end depth each respective section of well bore.
- the simulator of the present disclosure performs a drilling mechanics analysis that includes an analysis of rock mechanics for a given formation.
- the analysis of rock mechanics provides information regarding one or more of lithology, porosity, confined rock strength, unconfined rock strength, and shale plasticity.
- the simulator performs the rock mechanics analysis based upon one or more of the following: well logs, mud logs, bit record(s), and recommended bit(s).
- a gamma ray log and at least one (1) additional log is needed.
- the additional log includes at least one or more of the following logs: nuclear magnetic resonance (NMR), photoelectric (Pe) with neutron density; neutron density, and sonic.
- NMR nuclear magnetic resonance
- Pe photoelectric
- the gamma ray is typically run in combination with the log suites listed above. In general, a more accurate lithology analysis can be obtained when more of the above logs are provided for performing the analysis.
- the additional optional information includes one or more of spectral gamma ray log, caliper log, core porosity, and rock strength.
- the shale plasticity model utilizes data from the spectral gamma ray log.
- the caliper log data is used to evaluate data quality.
- the core porosity and/or rock strength is used to calibrate the logs.
- Mud logs provide a valuable “reality check” for the lithology analysis.
- the mud logs assist in identifying any non-shales contained within the given geology.
- Bit Records provide a valuable “reality check” for the rock strength analysis, especially if the sonic log is the only available porosity log.
- Proposed Bits Information regarding proposed bits, such as photos and specifications, can be included in a recommendation package, as further discussed herein. If a depth interval is established for a proposed bit, the depth interval can be displayed or shown graphically in the recommendation package, also.
- Drilling Mechanics provides an output in the form of a “driller's road map.”
- the drilling mechanics analysis provides predicted performance of a given bit in the drilling of a well bore in a given formation.
- Drilling mechanics information includes one or more of the following: work done by a proposed bit in drilling through rock of known compressive strength; bit wear condition; mechanical efficiency of the bit as a function of rock strength and wear condition; cutting torque and total torque produced by the bit; operating power level as a function of the bit and an corresponding drilling rig; constraint analysis indicating which operating constraint are in effect; optimal operating parameters, including WOB and RPM; predicted ROP, including instantaneous and average; and predicted cost per foot.
- the simulator method and system of the present disclosure perform drilling mechanics analysis with the use of one or more of the following types of information: bit data, rig operating constraints, directional survey data and proposed directional well plan, torque and drag analysis; and measured operating parameters, for performing a history match, as appropriate.
- a bit assembly number can be used to identify the specific bit design.
- a torque-WOB signature can be generated using an appropriate 3-D bit model. Accordingly, predicted performance reflects the specific bit design.
- Operating constraints that define a safe operating window for the driller include one or more of the following: maximum safe operating torque (in units of ft*lb); maximum safe operating WOB; maximum safe operating RPM; minimum safe operating RPM; and maximum allowable ROP. According to the embodiments of the present disclosure, the above operating constraints apply at the bit. Accordingly, the drilling mechanics analysis facilitates an ability to handle a wide variety of drilling situations. The operating constraints are discussed further herein below.
- Torque constraint For a given bit run, the above limits are constraints, except for torque which is variable. For example, suppose the top drive is able to generate a (theoretical) maximum of 10,000 ft*lb of torque according to available information, such as an engineering manual from the equipment manufacturer. However, the toolpusher may indicate that the maximum safe operating torque is 7,000 ft*lb based upon the toolpusher's experience with the rig equipment. Suppose, also, that the proposed bit run is from 5,000 to 10,000 ft measured depth (MD), where measured depth is along the well path.
- MD measured depth
- a standard torque and drag analysis might indicate that 1,000 ft*lb of torque is lost because of friction between the drill string and the bore hole wall at the beginning of the bit run and that 2,000 ft*lb is lost at the end of the bit run. This means that the actual torque transmission to the bit is 6,000 ft*lb maximum at the beginning of the bit run, gradually decreasing to 5,000 ft*lb at the end of the run. If a mud motor is used, then the maximum torque output of the motor would also be needed. Accordingly, when appropriate, the torque capabilities of the drilling rig are included in the drilling rig characteristics for use in a given drilling simulation.
- Torque and Drag Analysis utilize a torque and drag analysis for converting surface torque limits to equivalent limits at the bit.
- a torque and drag analysis is generally available from a drilling engineer of the operating company, since a torque and drag analysis is typically part of a well plan.
- a separate torque and drag analysis may be conducted, however, such an analysis requires a complete description of the drill string and bottom hole assembly.
- TD total depth
- a toolpusher often has information from prior measurements of on-bottom and off-bottom torque. Furthermore, this information is sometimes available on morning reports at various depths or when TD is reached.
- a maximum safe operating WOB depends on the weight of the drill string below the neutral point, and the hook load capacity of the rig. In addition, the maximum safe operating WOB also depends on expected rock strength and bit selection. In conjunction with determining a maximum safe operating WOB, it is advisable to examine the measured WOB from an offset well to get a feel for the historical maximum actually used, as opposed to a theoretical value.
- the maximum safe operating WOB may also include a safety factor.
- the safe operating window for RPM depends on the specific machinery: rotary table, top drive, positive displacement motor, or turbine. Sometimes the safe operating window for RPM is a combination of specific machinery: for example, drilling with a motor in rotary mode, the motor RPM must be added to the surface RPM. In conjunction with determining a safe operating window for RPM, it is advisable to examine the measured RPM from an offset well to get a feel for the historical maximum and minimum RPM actually used, as opposed to the theoretical values alone.
- the safe operating window for RPM may also include a safety factor.
- the ROP constraint reflects the limitations of the drilling fluid system as well as related geologic considerations. For example, an analysis of the hydraulics system may reveal that the rig pumps are capable of cleaning hole properly as long as the penetration rate does not exceed 300 ft/hr. However, a geologic study may reveal that if the penetration rate exceeds 200 ft/hr, the dynamic mud weight will exceed the fracture gradient at the casing shoe. Accordingly, the ROP constraint would be set to the lower of these two limits. A toolpusher would generally be well aware of this constraint.
- the iterative drilling simulation method and system perform a drilling mechanics analysis based upon well logs taken from a nearby offset well for a given formation. However, a drilling mechanics analysis is needed along the proposed well path of the next well to be drilled. Accordingly, this can be accomplished if a directional survey for the offset well, and a directional well plan for the proposed well, are available.
- measured operating parameters from an offset well are very useful in determining what the actual values are for the various operating constraints.
- the measured operating parameters include one or more of the following: weight-on-bit, rotary RPM, penetration rate, and torque-on-bit (ft*lb). Even if torque is unavailable, as is often the case, a history match can still be made with the other operating parameters.
- Measured operating parameters are also used to history-match the particular drill bit to the specific geology and rig. This can significantly increase confidence in the predicted drilling performance results, and the value of the analysis to the driller. Accordingly, measured operating parameters are helpful.
- FIG. 4 an exemplary output 110 of a sample iterative virtual drilling simulation for a first geology formation is illustrated.
- certain rig data and energy input levels are specified for Rig A ( 112 ), Rig B ( 114 ) and Rig C ( 116 ), as indicated by reference numerals 112 a , 114 a , and 116 a , respectively.
- the rig data and energy input levels include cost per day, maximum weight on bit, top drive and table torque, minimum RPM for the top drive and table motor, maximum RPM for the top drive and table motor, and a maximum GPM for pumps.
- the characteristics of a drilling rig system can also include one or more of the following: bit specification, down hole motor, top drive system, rotary table, mud system, mud pump, hydraulics, and operating parameters.
- the operating parameters may include weight-on-bit (WOB), rotary RPM (revolutions per minute), cost per day, rate of penetration (ROP), torque, and pump flow rate.
- the well bore to be drilled includes a plurality of sections 120 of well bore, as illustrated in FIG. 4 .
- an economic evaluation factor includes a minimum number of hours on bottom to drill a respective section of well bore in a geology formation characterized by a given rock column. That is, each section may be characterized by a minimum number of hours ( 122 A1 , 122 A2 , 122 A3 ,) on bottom to drill a respective section of well bore ( 120 A1 , 120 A2 , 120 A3 ).
- the economic evaluation factor may include a cumulative minimum number of hours, indicated by reference numeral 122 in FIG. 4 , on bottom to drill the respective sections of well bore. The cumulative number of minimum hours on bottom to drill the respective sections of well bore in the first geology formation with Rig A amounted to 1082 Hours, as indicated by reference numeral 122 A.
- the iterative virtual drilling simulation output 110 further includes an economic minimum cost 124 for each drilling rig system in the drilling of the well bore in the first geology formation.
- the minimum cost 124 is a function of the cost per day of a respective drilling rig system (converted into cost per hour, as appropriate) multiplied by a corresponding cumulative minimum number of hours to drill the well bore for a respective iterative simulation. For example, using the iterative drilling simulation method of the present disclosure, the total minimum number of hours on bottom to drill the respective sections of well bore with Rig A amounted to 1082 hours.
- the iterative drilling simulation output 110 includes a minimum number of hours on bottom for respective sections of well bore, the cumulative total minimum number of hours on bottom, and a cost for each of the other drilling rig systems Rig B 114 and Rig C 116 , respectively.
- the method generates a simulated well bore drilling performance output for a given iteration of simulated drilling of the well bore.
- the simulated well bore drilling performance output facilitates an enhanced economic decision making with respect to an actual drilling in a field containing formations analogous to the rock column with a respective drilling rig system.
- an operating company can make an enhanced economic decision in the selection of a drilling rig system.
- drilling rig system Rig A 112 provides the best selection over drilling rig system Rig B 114 and Rig C 116 for the drilling of a well bore in a given formation analogous to the rock column.
- the simulated well bore drilling performance output 110 includes one or more of (a) identification of drilling rig system characteristics, the characteristics including at least a drilling rig system economic factor, (b) a representation of at least one section of well bore in the rock column, (c) a minimum duration of time needed on bottom to drill a respective at least one section of well bore, (d) a cumulative duration of time needed to drill all sections of well bore, and (e) a minimum cost amount determined as a function of the cumulative duration of time and the drilling rig system economic factor.
- the simulated well bore drilling performance output may also include a minimum duration of time needed on bottom to drill the well bore, without indicating the same for each section of the well bore.
- FIG. 5 an exemplary output 130 of a sample iterative virtual drilling simulation for a second geology formation is illustrated.
- the iterative virtual drilling simulation output 130 of FIG. 5 is similar to that of FIG. 4 with respect to rig data and energy input levels specified for Rig A ( 112 ), Rig B ( 114 ) and Rig C ( 116 ), as indicated by reference numerals 1124 114 a , and 116 a , respectively.
- the iterative simulated drilling with the drilling rig systems is with respect to a different geology formation. While the rig data and energy input levels of FIG. 5 are similar to those specified in FIG. 4 , the various economic evaluation factors have changed as a result of the simulated drilling in a different rock column.
- the well bore to be drilled includes a plurality of sections 120 of well bore.
- the economic evaluation factor includes a minimum number of hours on bottom to drill a respective section of well bore in a geology formation characterized by the given rock column. Each section is characterized by a minimum number of hours on bottom to drill a respective section of well bore. For example, the minimum number of hours on bottom to drill section two of the well bore with Rig A, Rig B, and Rig C amounted to 886 Hours, 798 Hours, and 605 Hours, respectively.
- the economic evaluation factor includes a cumulative total minimum number of hours (indicated by reference numeral 122 ) on bottom to drill the respective sections of well bore. In FIG.
- the exemplary output 130 of FIG. 5 illustrates drilling rig system Rig C as producing the best economic performance over the drilling rig systems Rig A and Rig B in the simulated drilling of a well bore in the second geology formation.
- the method of iterative drilling simulation includes generating a recommendation package 36 ( FIG. 1 ) of drilling system characteristics for use in an actual drilling of a well bore in the formation as a function of economic evaluation factors.
- the recommendation package provides iterative simulation output content in one or more formats, including, for example, hardcopy, CD ROM, computer readable media, electronic file, holographic projection, compressed time animation, or any combination thereof.
- the recommendation package may include a computer readable medium, as indicated by reference numeral 37 in FIG. 1 .
- the recommendation package facilitates visualization of the simulated drilling of the well bore on a compressed time frame. For example, if the actual time to drill the well bore were thirty (30) days, then with the compressed time animation, the simulated drilling for the entire well could be visually viewed over some fraction of that time by a viewer using compressed time animation.
- Output embodying compressed time animation would give the operator the opportunity to quickly view the wellbore drilling system simulation presented through time.
- Each iteration can include compressed or collapsed time animation of the drilling process for that particular rig, set of system components, and rock column. The operator can review the output of a simulation in a few minutes that represents many hours of actual drilling time on bottom. The operator can also see the changes in the progress of the drilling brought about by changes in system components.
- the compressed time animation could be highly beneficial to an operating company in making a best economic decision for the drilling of a well bore in a given formation.
- the compressed time animation utilizes the geology and mechanics models, as described herein, in the iterative drilling simulations for producing a respective economic evaluation output. Compressed time animation techniques are known in the art, and thus only briefly discussed herein.
- the recommendation package includes at least one economic evaluation factor and at least one recommendation of drilling rig system characteristics for use in an actual drilling of the at least one well bore in the formation as a function of the economic evaluation factors.
- the economic evaluation factor can be derived by the method of (a) obtaining characteristics of a rock column in the formation to be drilled, (b) specifying characteristics of at least one drilling rig system, and (c) iteratively simulating the drilling of the well bore in the formation and producing an economic evaluation factor for each iteration of drilling simulation. Other economic evaluation factors are also possible, as discussed earlier herein.
- each iteration of drilling simulation is a function of the rock column to be drilled and the characteristics of the at least one drilling rig system according to a drilling simulation model, as discussed herein.
- FIG. 6 illustrates a flow diagram view of an iterative virtual drilling simulation method 150 with an iterative virtual drilling simulator 21 ( FIG. 1 ) according to one embodiment of the present disclosure.
- iterative virtual drilling simulator receives a request for a drilling recommendation in connection with facilitating enhanced economic decision making, further with respect to drilling of a well bore in a given formation characterized by a particular rock column.
- the simulator obtains geology characteristics of the formation to be drilled, the geology characteristics including those as discussed earlier herein.
- the simulator obtains drilling equipment characteristics of a drilling system, the drilling equipment characteristics including characteristics as discussed earlier herein.
- step 158 the simulator performs an iterative drilling simulation of the drilling of the well bore in the formation.
- the simulation of step 158 includes the producing of an economic evaluation factor for the respective iterative simulation.
- step 160 the simulator queries whether or not the simulation is optimized, according to a prescribed optimization process and criteria for a given simulated drilling application. If not optimized, the process proceeds to step 162 .
- step 162 the simulator modifies one or more drilling mechanics parameter(s) according to the prescribed optimization process and criteria.
- the process returns to step 158 for performing an iterative drilling simulation as a function of the modified drilling mechanics parameters and the geology characteristics. The process continues as discussed herein with respect to step 158 .
- step 160 the simulation is determined to be optimized
- step 164 the simulator generates a preliminary recommendation as a function of the optimized drilling simulation output for the respective iteration.
- step 166 the simulator queries whether or not there are additional equipment considerations. If additional equipment considerations exist, then the process proceeds to step 168 .
- step 168 the simulator obtains the additional drilling equipment characteristics. The process then returns to step 158 for performing an iterative drilling simulation as a function of the additional drilling system equipment characteristics. The process continues as discussed herein with respect to step 158 .
- step 166 If, in step 166 , there are no additional equipment considerations for the particular iterative drilling simulation process, then the simulator prepares an overall recommendation package at step 170 , as discussed further herein. The process then ends at step 172 .
- FIG. 7 illustrates a block diagram view of an iterative drilling simulator system 180 for performing iterative drilling simulations according to another embodiment of the present disclosure.
- the iterative drilling simulation system provides for enhanced economic decision making, as discussed herein.
- the iterative drilling simulation system 180 includes a simulator 182 .
- the simulator 182 obtains characteristics of a rock column to be drilled via input 184 .
- the characteristics of the rock column include one or more of lithology, rock strength, and shale plasticity. Any one of the rock column characteristics can be derived from log data 186 and a respective lithology model, rock strength model, and shale plasticity model, generally indicated by reference numeral 188 .
- the drilling simulator 182 obtains characteristics of a drilling rig system via drilling rig system input, generally indicated by reference numeral 190 .
- the characteristics of the drilling rig system include one or more characteristics of rig inputs 192 , drill string and bottom hole assembly inputs 194 , drill bit inputs 196 , and hydraulic properties 198 .
- the drilling rig system characteristics may also include characteristics of more than one drilling rig system.
- the rig inputs 192 may include one or more inputs of operating constraints, rig costs, maximum weight on bit, top drive torque, table drive torque, top drive minimum RPM, table drive minimum RPM, top drive maximum RPM, table drive maximum RPM, pumps maximum GPM, and standpipe maximum PSI.
- the drill sting and bottom hole assembly (BHA) characteristics 194 may include characteristics of motor RPM, turbine RPM, motor torque, turbine torque, rotary steerable system, PSI loss through BHA, PSI string loss, string torque, string drag, and drill string economics.
- the drill bit inputs 196 may include one or more inputs of bit type, bit diameter, bit cutting structure 3D model, bit work rating, bit wear rating, bit junk slot area, bit TFA (total flow area), and bit pressure drop.
- the hydraulic properties 198 may include one or more properties of oil, synthetic, water, weight PPG (pounds per gallon), yield point, plastic viscosity, annular velocity, water loss, lost circulation, ECD (equivalent circulating densities), depth in, depth out, maximum ROP, and fluid costs.
- the simulator 182 ( FIG. 7 ) includes a computer system 21 ( FIG. 1 ) for performing the various functions as described herein.
- the various functions as discussed herein can be programmed using programming techniques well known in the art.
- the inputs can include any suitable input, whether analog, digital, optical, sonic, or other form of input, via an input device, such as a keyboard, interface card, or other suitable input device, for communicating the rock column and drilling rig system characteristics to simulator 182 .
- the simulator 182 In response to obtaining characteristics of a rock column in a formation to be drilled and characteristics of at least one drilling rig system, the simulator 182 iteratively simulates the drilling of a well bore in the formation and produces an economic evaluation factor for each iteration of drilling simulation.
- Each iteration of drilling simulation is a function of the rock column and the characteristics of the at least one drilling rig system according to a drilling simulation model.
- the drilling simulation model includes one or more models of mechanical efficiency, bit wear, hole cleaning efficiency, and drilling economics, generally indicated by reference numeral 200 , as discussed further herein.
- the drilling simulation model may also include a penetration rate model 202 , as discussed further herein also.
- the simulator executes another iterative simulation, via 204 .
- the iterative simulation would include a modification of one or more drilling rig system characteristics, prior to running a corresponding iteration, as may be appropriate for a given iterative drilling simulation plan.
- simulator 182 provides the optimum output at 206 . Accordingly, simulator 182 would be finished with the given iterative drilling simulation exercise.
- the simulator 182 In addition to iteratively simulating the drilling of a well bore in the formation, the simulator 182 produces an economic evaluation factor for each iteration of drilling simulation.
- Each iteration of drilling simulation is a function of the rock column and the characteristics of the at least one drilling rig system according to a drilling simulation model.
- the simulator 182 further generates a recommendation package of drilling rig system characteristics as a function of economic evaluation factors.
- the recommendation package information is presented in one or more of the following formats of hardcopy, CD ROM, computer readable media, electronic file, holographic projection, compressed time animation, or any combination thereof. Accordingly, the recommendation package includes information suitable for use in deciding upon equipment and process selections in an actual drilling of a well bore in the formation, as a function of the economic evaluation factors.
- FIG. 8 is a flow diagram view of an iterative drilling simulation method 210 according to another embodiment.
- the iterative drilling simulation method obtains geology characteristic(s) of a desired formation.
- the process includes obtaining parameters of desired drilling equipment.
- the method simulates drilling of a well bore in the geology as a function of the geology and the drilling equipment parameters according to a prescribed drilling simulation model.
- the method generates an economic characteristic as a function of the drilling simulation, the economic characteristic as further discussed herein.
- step 220 the process queries whether or not additional iterations of simulation are to be carried out. If additional iterations of simulations are to be conducted, then the process proceeds to step 222 .
- step 222 the process obtains parameters of additional desired drilling equipment. In response to obtaining the parameters of additional desired drilling equipment, the process returns to step 216 and the simulating of drilling the geology as a function of the geology and drilling equipment characteristics.
- step 220 if no additional simulations are to be conducted, then the process proceeds to step 224 .
- step 224 the process generates a report of the iterative drilling simulations, the report including suitable information for facilitating enhanced economic decision making in conjunction with drilling of a well bore in a given formation with a given drilling rig system, as discussed further herein.
- the process then ends at 226 .
- the embodiments of the present disclosure further include a method for preparing a recommendation package for enhanced economic decision making in connection with drilling at least one well bore in a given formation.
- the method comprises obtaining geology characteristics of the formation to be drilled.
- the geology characteristics include at least a rock column.
- the method further includes specifying equipment characteristics of at least one drilling system.
- the equipment characteristics include drilling mechanics parameters.
- the method includes iteratively simulating the drilling of the well bore in the formation, producing an economic evaluation factor for each respective iterative drilling simulation and modifying drilling mechanics parameters until a desired optimization of the iterative drilling simulation is achieved.
- Each iterative drilling simulation is a function of the geology and drilling system equipment characteristics according to a drilling simulation model.
- the method generates a preliminary recommendation in response to the iterative drilling simulation achieving the desired optimization.
- the method includes, repeating, for any additional equipment considerations, the steps of specifying equipment characteristics of at least one drilling system, iteratively simulating the drilling of the well bore, and generating a preliminary recommendation for any additional equipment considerations.
- An overall recommendation is then generated as a function of the preliminary recommendations of iterative drilling simulations.
- the recommendation package may be generated from the iterative drilling simulations as a function of economic evaluation factors of select ones of respective iterative drilling simulations.
- the overall recommendation comprises one or more of hardcopy, CD ROM, computer readable media, electronic file, holographic projection, compressed time animation, or any combination thereof.
- a computer program product includes a computer readable medium 37 ( FIG. 1 ) having a computer program stored thereon.
- the computer program for execution by the computer enables iterative drilling simulation for enhanced economic decision making.
- the computer program includes instructions processable by the computer system for causing the computer system to obtain characteristics of a rock column in a formation to be drilled, obtain characteristics of at least one drilling rig system, and iteratively simulate the drilling of a well bore in the formation.
- the computer program is further for producing an economic evaluation factor for each iteration of drilling simulation, wherein each iteration of drilling simulation is a function of the rock column and the characteristics of the at least one drilling rig system according to a drilling simulation model.
- the computer program is further processable by the computer system for causing the computer system to generate a simulated well bore drilling performance output for a given iteration of simulated drilling of the well bore, the simulated well bore drilling performance output suitable for facilitating an enhanced economic decision making with respect to an actual drilling with a respective drilling rig system in a field containing formations analogous to the rock column.
- the simulated well bore drilling performance output includes at least one of the following selected from the groups consisting of (a) identification of drilling rig system characteristics, the characteristics including at least a drilling rig system economic factor, (b) a representation of the well bore in the rock column, (c) a minimum duration of time needed on bottom to drill the well bore, and (d) a minimum cost amount determined as a function of the duration of time and the drilling rig system economic factor.
- the computer program is still further processable by the computer system for causing the computer system to generate a simulated well bore drilling performance output for at least one iteration of the simulated drilling of the well bore.
- the simulated well bore drilling performance output facilitates enhanced economic decision making with respect to actual drilling in a field containing formations analogous to the rock column with a respective drilling rig system corresponding to that of the at least one iteration of the simulated well bore drilling performance.
- the simulator iteratively simulates the drilling of the well bore in the formation, produces an economic evaluation factor for each respective iterative drilling simulation, and modifies drilling mechanics parameters until a desired optimization of the iterative drilling simulation is achieved.
- Each iterative drilling simulation is a function of the geology and drilling system equipment characteristics according to a drilling simulation model.
- the simulator further generates a preliminary recommendation in response to the iterative drilling simulation achieving the desired optimization.
- the simulator operates to repeat the specifying of equipment characteristics of at least one drilling system, iteratively simulating the drilling of the well bore, and generating a preliminary recommendation for any additional equipment considerations.
- the simulator generates an overall recommendation as a function of the preliminary recommendations of iterative drilling simulations.
- a system for preparing a recommendation package for enhanced economic decision making in connection with drilling at least one well bore in a given formation comprises a first input, a second input, and a simulator.
- the first input is for obtaining geology characteristics of the formation to be drilled, wherein the geology characteristics include at least a rock column.
- the second input is for specifying equipment characteristics of at least one drilling system, wherein the equipment characteristics include drilling mechanics parameters.
- the simulator is for simulating the drilling of the well bore in the formation, wherein the drilling simulation is a function of the geology and drilling system equipment characteristics according to a drilling simulation model.
- the simulator generates an economic evaluation factor as a function of the drilling simulation.
- the simulator operates to iteratively repeat, for any additional equipment considerations, the specifying of equipment characteristics, simulating the drilling of the well bore, and generating the economic evaluation factor.
- the simulator further generates a recommendation package of the iterative drilling simulations as a function of economic evaluation factors of select ones of respective iterative drilling simulations, as discussed.
- a simulator for enhanced economic decision making in connection with drilling at least one well bore in a given formation comprises a first processor, a second processor, and a third processor.
- the first, second, and third processors may include a single processor for performing the functionality's as discussed herein.
- the first processor responsive to geology characteristics of the formation to be drilled and specified equipment characteristics of at least one drilling system, iteratively simulates the drilling of a well bore in a formation.
- the geology characteristics include at least a rock column and the equipment characteristics include the drilling mechanics parameters.
- the first processor further produces an economic evaluation factor for each respective iterative drilling simulation.
- the first processor also modifies drilling mechanics parameters until a desired optimization of the iterative drilling simulation is achieved.
- Each iterative drilling simulation is a function of the geology and drilling system equipment characteristics according to a prescribed drilling simulation model.
- the second processor responsive to the achievement of the desired optimization by the first processor, generates a preliminary recommendation.
- the first and second processors further operate in response to the geology characteristic and any additional specified equipment characteristics of the at least one drilling system for iteratively simulating the drilling of the well bore and generating a preliminary recommendation for any such additional equipment considerations as a function of one or more economic evaluation factors.
- the third processor Responsive to iterative simulations of drilling and generating of preliminary recommendations for the initial and any additional equipment considerations, the third processor generates an overall recommendation as a function of the preliminary recommendations of iterative drilling simulations.
- the third processor may also generate a recommendation package of the iterative drilling simulations as a function of economic evaluation factors of select ones of respective iterative drilling simulations.
- the overall recommendation package content may be in a format that includes hardcopy, CD ROM, computer readable media, electronic file, holographic projection, compressed time animation, or any combination thereof.
- the geology and drilling mechanics models of the present iterative simulation method and system digest an existing suite of logs.
- the iterative drilling simulation method and system are also characterized by an open architecture that can be readily upgraded to reflect any impact that a new technology may have on the economics of an iterative simulation.
- the iterative drilling simulation method and system includes capabilities for being upgraded to reflect new technology advancements as they are developed and made generally available.
- the iterative drilling simulation method and system can be upgraded to take into account technical advancements in one or more of the rig equipment, torque and drag mitigation equipment, downhole rotary systems, rock destruction tools, drill bit enhancements, and other related technology developments. Accordingly, it is anticipated that as technology advances, the iterative drilling simulation method and system can be modified to reflect any impact of the new technology on the economics of a given iterative simulation.
- the drilling simulator of the present disclosure is useful with respect to rig selection. For example, consider a situation in which a drilling operator has discovered and delineated a new offshore field. The operator now intends to develop the field. The operator has a choice of two available drill rigs to put under contract to accomplish the developmental drilling. A first rig (“Rig One”) is available at $200,000 per day and a second rig (“Rig Two”) is available at $175,000 per day. Rough estimates made by the operator indicate that the operator expects developmental drilling to take three (3) years. Accordingly, the operator seeks to contract a rig for the three (3) year period of time.
- the simulator creates a computerized simulation of each rig and the respective rig's capabilities relative to the particular rock column to be drilled.
- the characteristics of the rock to be drilled are simulated using log data gathered from one or more discovery and/or delineation wells.
- the drilling simulator iteratively produces drilling simulations until an “optimum” drilling approach for the specific rock column for each rig's particular characteristics is determined. These simulations can then be used to allow the operator to make a much better informed decision as to which rig will ultimately provide a best overall economic value in the development of the particular field.
- Drilling rigs are comprised of various components that represent the total energy input capabilities that a respective rig can apply to the drilling of a well bore.
- the rig components include, but are not limited to, the rotary table, top drive, drill string, drilling fluid pumps, bottom hole assembly, and hoisting equipment.
- some of the rig components lose efficiency. For instance, this is especially true of the potential of the drill string to accept rotary input, torque, and weight, and of the drilling fluid pumps to operate at or near the manufacturer's original efficiency rating. Replacing these rig components to reattain their original capabilities with respect to the overall drilling rig system can be an expensive proposition.
- the simulation capabilities provided by the process of the present disclosure enable an analyst to iteratively run through various scenarios of drilling before and after potential rig upgrades or component replacements. Accordingly, the analyst can more effectively determine an economic impact of actually making a corresponding upgrade or replacement, or of delaying doing so.
- the present embodiments can be used for assisting in making a multi-million dollar decision whether or not to replace the drilling tubulars of a given drilling rig with new drilling tubulars.
- a far clearer picture of the economic benefits of the new tubulars versus their cost can be derived.
- a rig contractor may consider using the simulation results to aid in convincing a contracting operator to share in the cost of a new drill string, wherein the operator's ultimate drilling costs would be significantly reduced by the employment of the new system capabilities resulting from the new drill tubulars.
- a simulation can be used to assist in the economic evaluation of an individual prospective asset, such a simulation can by extension be used to make comparisons of the economics of multiple prospective assets. Accordingly, the simulation method of the present disclosure assists in determining which of multiple prospective assets should be developed and in what order they should be developed.
- Drilling system components that provide down hole rotation enhancements and/or directional drilling control methods represent an expensive addition to an overall drilling system.
- the simulation system of the present embodiments make it possible to iteratively compare downhole performance and ultimate economics of the various available down hole rotation and/or directional drilling control drilling system components.
- Exemplary drilling system components may include, for example, down hole motor, rotary steerable system, downhole turbine, or other similar component.
- the simulator enables cross-analyses of the capabilities of some or all of the subject rig fleet to be performed, allowing a contractor to determine which members of a given fleet are best suited for a particular drilling challenge or challenges.
- the contractor can use the simulation outputs for determining appropriate upgrade strategies and upgrade timing decisions. Decisions to build a new rig versus refurbishing an existing rig can also be positively impacted by use of embodiments of the simulator method and apparatus of the present disclosure.
- a rig contractor can use the simulations or simulation data outputs produced by the simulator in contract negotiations with drilling operators to provide further information as to the “fit-for-purpose” nature of a particular rig or rigs.
- the leverage provided by the simulation should allow the contractor an ability to negotiate better financial terms for the lease of the particular rig or rigs.
- the simulator takes into account properties of the drilling fluid to be used in a drilling process, relative to the formation(s) to be drilled. Such a capability allows the simulator output to be used to make decisions on drilling fluids economics, drilling fluids selection and additional hydraulics parameters to be used in a given drilling process.
- the simulator iteratively models drilling efficiencies. That is, the simulator provides opportunities for improved drilling efficiency to be iteratively modeled and analyzed by using various sets of drilling parameter inputs and bit models. The best way forward in the reduction of drilling costs can then be identified and implemented without the ongoing expense of “field trials” to attempt, either successfully or unsuccessfully, to reduce drilling costs.
- Operators use determinations of time to first economic hydrocarbon production to assist them in determining a net present value of a developmental prospect.
- An output of the simulator of the present embodiments provides a more accurate estimate of drilling times than previous estimation methods. The greater accuracy provided by the simulator of the present embodiments allows an operator to generate a better determination as to what an actual time will be to first economic hydrocarbon production.
- Infield drilling is performed to obtain additional production from fields that have previously been producing. Because the field has seen previous drilling, the assumption is generally made that drilling times for the infield drilling will generally be close to the earlier drilling.
- a simulation according to the present embodiments can be carried out to either verify the typical assumption, or to iteratively improve under simulated conditions, valuable drilling efficiencies prior to or early on in the commencement of the infield drilling.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Mechanical Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Earth Drilling (AREA)
Abstract
An iterative drilling simulation method and system for enhanced economic decision making includes obtaining characteristics of a rock column in a formation to be drilled, specifying characteristics of at least one drilling rig system; and iteratively simulating the drilling of a well bore in the formation. The method and system further produce an economic evaluation factor for each iteration of drilling simulation. Each iteration of drilling simulation is a function of the rock column and the characteristics of the at least one drilling rig system according to a prescribed drilling simulation model.
Description
- This application is a divisional of U.S. patent application Ser. No. 10/607,900, entitled “Iterative Drilling Simulation Process for Enhanced Economic Decision Making,” filed Jun. 27, 2003, now U.S. Pat. No. ______, which is a continuation of U.S. patent application Ser. No. 09/820,242 filed Mar. 28, 2001, now U.S. Pat. No. 6,612,382, which is a continuation-in-part application of Ser. No. 09/649,495 filed Aug. 28, 2000, now U.S. Pat. No. 6,408,953 B1, which is a continuation-in-part application of Ser. No. 09/192,389, filed Nov. 13, 1998, now U.S. Pat. No. 6,109,368, which is a continuation-in-part of Ser. No. 09/048,360, filed Mar. 26, 1998, now U.S. Pat. No. 6,131,673, which is a continuation-in-part application of Ser. No. 08/621,411, filed Mar. 25, 1996, now U.S. Pat. No. 5,794,720.
- The present disclosure relates to geology and drilling mechanics, and more particularly to an iterative drilling simulation method and system for enhanced economic decision making.
- Prior drilling prediction methods have included the use of geology and drilling mechanics for selecting an appropriate bit for use in the drilling of a bore hole in a particular formation. For example, with respect to bit selection, a rock strength column characterizes the particular geology. The rock strength column is calculated from well logs. Then, one or more bits are “matched” to the rock strength.
- In another method, referred to as OASIS available from Baker Hughes of Houston, Tex. a drilling optimization service operates in a manner similar to the way that oil companies have done themselves for determining a drilling optimization, but on a farmed out basis.
- In yet another method, referred to as DROPS drilling simulator available from DROPS Technology AS of Norway, the DROPS drilling simulator drilling optimization service includes reverse engineering a rock strength column from a “geolograph.” The geolograph includes a minute-by-minute record of drilling rate from a previous drilled well. The DROPS drilling simulator method then looks at bit selections that fit the estimated rock strength column.
- An iterative drilling simulation method for enhanced economic decision making includes obtaining characteristics of a rock column in a formation to be drilled, specifying characteristics of at least one drilling rig system; and iteratively simulating the drilling of a well bore in the formation. The method further produces an economic evaluation factor for each iteration of drilling simulation. Each iteration of drilling simulation is a function of the rock column and the characteristics of the at least one drilling rig system according to a prescribed drilling simulation model.
- In addition, a recommendation package based upon a given iteration of the simulated drilling of a well bore is produced. The recommendation package enables enhanced decision making with respect to an actual drilling in a field containing formations analogous to the rock column. An iterative drilling simulation system and computer program are also disclosed.
-
FIG. 1 is a block diagram overview of the iterative virtual drilling simulation service according to one embodiment; -
FIG. 2 is a block diagram representation of the iterative drilling simulation system according to one embodiment; -
FIG. 3 is a block diagram view of an iterative virtual drilling simulation according to an embodiment of the present disclosure; -
FIG. 4 is an exemplary output view of a sample iterative virtual drilling simulation for a first geology; -
FIG. 5 is an exemplary output view of a sample iterative virtual drilling simulation for a second geology; -
FIG. 6 is a flow diagram view of an iterative virtual drilling simulation method according to one embodiment; -
FIG. 7 is a block diagram view of an iterative drilling simulator according to another embodiment; and -
FIG. 8 is a flow diagram view of an iterative virtual drilling simulation method according to another embodiment. - The present embodiments provide various drilling simulation models capable of more accurately defining drilling costs as a function of predicted drilling performance than previously known. The present embodiments further provide simulation and recommendation information suitable for enabling better economic decisions to be made by rig contractors, oilfield operating companies, and others, as may be appropriate.
- According to one embodiment of the present disclosure, various combinations of drilling rig systems with differing energy input capabilities, bits, and fluid properties are iteratively simulated to produce corresponding virtual drilling scenarios. The virtual drilling scenarios are suitable for use in economic decision making. The iterative simulator of the present disclosure provides recommendations, including detailed information, sufficient to assist a drilling contractor in making a best decision, in view of available equipment, constraints, and economics, as further discussed herein.
- The iterative drilling simulator method and system of the present disclosure, utilizes drilling mechanics software, as a function of prescribed drilling mechanics models, for “drilling” with various computerized bits and comparing their respective predicted performances during the drilling of a well bore in a given formation.
- The present embodiments further include a method of iteratively simulating the drilling of a well bore using alternate drill rig and equipment selections. According to one embodiment, the simulations are requested and performed at the front end of a drilling operator's economics decision making process. Subsequent to an iterative drilling simulation, recommendations are generated as a function of the iterative drilling simulations for a particular geology formation and economic evaluation factors.
- The present embodiments further include a software enabled business process for greatly increasing accuracy and reducing a risk window of high value decision making in the oil and gas business. Currently in the art, only the roughest of estimates are made as to ultimate drilling costs for a given prospect, such estimates being made without software and iterative drilling simulation such as disclosed herein.
- According to one embodiment of the present disclosure, the simulator includes a system for predicting performance of a drilling system, such as that disclosed in U.S. Pat. No. 6,109,368, incorporated herein by reference. The system for predicting performance of a drilling system, coupled with financial models and iterative drilling simulations as discussed herein, produces content for inclusion in a recommendation output as a function of economic evaluation factors. Accordingly, the simulator output enables the making of far more accurate and sophisticated decisions, than previously known.
- The present embodiments further includes a business process in which estimated rock columns developed from well logs, or from seismic data, are “drilled” with a software simulator in an iterative manner. Drilling of the estimated rock columns is carried out with varying input parameters, including different drilling rig equipment characteristics, for generating estimates of comparative economics. The present embodiments provide a useful tool for assisting in one or more of the following types of significant decision making processes:
-
- Comparative rig selection,
- Rig modification and upgrade valuations,
- Lease asset comparisons,
- Down hole tool economics,
- Contractor pricing and equipment qualification studies,
- Economic impact of drilling fluids selection,
- Estimates of time to first economic hydrocarbon production,
- Estimations of infield drilling economics, and
- Leased and producing property value and drilling cost evaluations.
- Equipped with one or more of the embodiments of the present disclosure, a consulting firm could provide services in accordance with the present embodiments, for assisting with the significant decision making processes to be made by a drilling operator or drilling contractor, further as discussed herein.
- Referring now to
FIG. 1 , a block diagram overview of the iterative virtual drilling simulation method for enhanced economic decision making according to one embodiment is illustrated. The iterative drilling simulation method includes a virtualdrilling simulation service 10 receiving a request for services from an operatingcompany 12. In this example, the operating company provides geology data andequipment data 14, as appropriate, in connection with a proposed drilling of a well bore in a given formation. For example, the operatingcompany 12 providesgeology data 16 fromwell log data 18 obtained from a previous well (or wells). Accordingly, the iterative drilling simulation method includes obtaining characteristics of a rock column in a formation to be drilled and characteristics of at least one drilling rig system. The operating company also specifies the characteristics of at least one drilling rig system for consideration. - The method further includes iteratively simulating the drilling of a well bore in the formation and producing an economic evaluation factor for each iteration of drilling simulation, generally indicated by
reference numeral 20. Each iteration of drilling simulation (22 a, 22 b) is a function of therock column 24 and the characteristics of the at least one drilling rig system (26 a, 26 b) according to a prescribed drilling simulation model. Additional iterations of drilling simulations are illustrated by “ . . . ”, as indicated byreference numeral 22 c. In one embodiment, the drilling simulation model includes one or more of a mechanical efficiency model, bit wear model, hole cleaning efficiency model, penetration rate model, and drilling economics model, as discussed further herein. - As shown in
FIG. 1 , the firstdrilling rig system 26 a is characterized by the properties ofdrilling rig 28 a, the properties of drilling fluid 30 a, and the properties ofdrill bit 32 a. Similarly, the seconddrilling rig system 26 b is characterized by the properties ofdrilling rig 28 b, the properties ofdrilling fluid 30 b, and the properties ofdrill bit 32 b. Additional drilling rig systems can be considered, however, only two have been shown for simplicity of illustration. - The iterative drilling simulation method further includes producing a
drilling economics output 34 for each of the iterative drilling simulations, the drilling economics output corresponding to one or more economic evaluation factor. According to one embodiment, the economic evaluation factor includes a minimum number of hours on bottom to drill a desired well bore. The economic evaluation factor may also include a minimum cost amount for drilling the well bore, wherein the minimum cost amount is a function of both a minimum number of hours on bottom to drill the well bore and a cost per day for a respective drilling rig system. - Although the economic evaluation factors have been discussed herein as including a minimum number of hours on bottom and a minimum cost amount for drilling the well bore, other economic evaluation factors are possible. There is a recognition that other factors effect economics. For example, such other factors include trip time, trouble time, and weather related downtime.
- According to another embodiment, trip time, trouble time, and weather related down time can be included as economic evaluation factors, as determined according to basic rules of thumb in the field. For example, trip time for an older rig may be 1,000 feet of pipe per hour, whereas trip time for a newer rig may be 1,200 feet of pipe per hour. Utilizing basic rules of thumb, appropriate estimates are added to a total drilling time for the iterative simulated drilling of a well bore, as a function of one or more of trip time, trouble time, or weather related downtime. Percentages of drilling time, tripping time, trouble time, or weather related downtime may be included in a simulation. For example, the total drilling and tripping time may amount to eighty percent (80%) and trouble time may amount to twenty percent (20%) of the total time needed to drill the well bore in the given formation.
- The iterative drilling simulator method and system can more accurately reflect what goes on at the rig in the drilling of a well bore, including, for example, a number of trips expected to be made for replacing a bit, failed motor, etc. Accordingly, the ultimate drilling cost will not only account for time on bottom, but also take into account a rig down time (“trouble time”) based upon a percentage over and above the time needed to drill the well bore. For example, during an iterative drilling simulation, a number of bits may be considered. One iteration may require two fast bits and trip time for replacing the first bit with the second bit. Another iteration may only require a single slow bit that is capable of drilling all the way to the bottom of the well bore.
- According to one embodiment, the iterative drilling simulator method and system produce an economic evaluation of the iterative simulations that include consideration for one or more of the cost of a trip, trouble time, logistics time, and weather related down time, as part of an overall economic evaluation. For example, a suitable multiplication factor proprietary to a given drilling operator can be used to adjust a simulated drilling iteration drill time for a given well bore. For one drilling operator, the proprietary multiplication factor may be seventeen percent (17%). For another, the proprietary multiplication factor may be twenty two percent (22%).
- With the embodiments of the present disclosure, multiplication factors taking into account an operator's own trouble time experience can be factored into an economic evaluation of an iterative drilling simulation. Such percentage or percentages can be based upon the experience of a respective operator. For example, an off shore drilling rig may experience a certain percentage of weather related down time, such as during a hurricane season, when all crew members are required to leave the rig for safety concerns. If the off shore rig is planned to drill for a three year period, then some portion of that time will likely include weather related downtime, as well as other factors as noted herein. Accordingly, while the iterative simulation method and system of the present disclosure provides an economic evaluation output scientifically linked to the geology of the formation in the drilling of a well bore, the economic evaluation output can be further adjusted to take into account one or more of trouble time, logistics time, or weather related down time.
- Referring still to
FIG. 1 , equipped withdrilling economics output 34, the virtual drilling simulation service (at 10 a) reviews and analyzes the same for producing a recommendation package output, generally indicated byreference numeral 36, and as further discussed herein. The review and analysis may be performed automatically via computer control, manually, or a combination of both, according to prescribed evaluation rules. The evaluation rules may include economic rules and/or other rules pertinent to a particular drilling scenario. - The operating company (at 12 a) receives the
recommendation package 36, and in response thereto, renders an enhanced decision on rig equipment and operations, as generally indicated byreference numeral 38. Accordingly, the method of the present disclosure facilitates enhanced economic decision making with respect to drilling of a well bore in a given formation, further as a function of drilling system characteristics and economic evaluation factors for the particular geology of the formation. -
FIG. 2 is a block diagram representation of the iterative drilling simulation system according to one embodiment. As illustrated, the iterativedrilling simulation system 50 includes adrilling simulator processor 52, responsive to inputs (54 a, 54 b, 54 c), for producing an iterativedrilling simulation output 56, as further discussed herein. The iterativedrilling simulation system 50 is characterized bygeology models 58,drilling mechanics models 60, anddrilling economics models 62. - The
geology models 58 provide rock columncharacteristic input 54 a to thedrilling simulator processor 52. The characteristics of the rock column include at least one or more of lithology, rock strength, shale plasticity, log data, and porosity. With respect to the characteristics of lithology, rock strength, and shale plasticity, one or more of the respective characteristics may be derived from log data and a respective lithology model, rock strength model, and shale plasticity model. Logdata 64 can include one or more of well logs, mud logs, core data, and bit records. In a preferred embodiment, the geology models include those disclosed in co-pending U.S. patent application Ser. No. 09/649,495, entitled “Method and System for Predicting the Performance of a Drilling System for a Given Formation” filed Aug. 8, 2000, which is a continuation-in-part application of Ser. No. 09/192,389, filed Nov. 13, 1998, now U.S. Pat. No. 6,109,368, incorporated herein by reference. - The
drilling mechanics models 60 provide drilling rig systemcharacteristic input 54 b to thedrilling simulator processor 52. It is noted that the drilling rig system characteristics can include characteristics of more than one drilling rig system, wherein characteristics for a single drilling rig system are utilized in connection with a respective iteration of drilling simulation. In a preferred embodiment, the drilling mechanics models include those disclosed in co-pending U.S. patent application Ser. No. 09/649,495, entitled “Method and System for Predicting the Performance of a Drilling System for a Given Formation” filed Aug. 8, 2000, which is a continuation-in-part application of Ser. No. 09/192,389, filed Nov. 13, 1998, now U.S. Pat. No. 6,109,368, incorporated herein by reference. - The characteristics of the drilling rig system can include one or more of the following:
rig inputs 66, drill string and bottomhole assembly inputs 68,drill bit inputs 70, and hydraulic properties 72. Therig inputs 66 include one or more of the following: operating constraints, rig costs, maximum weight on bit, top drive torque, table drive torque, top drive minimum RPM (revolutions per minute), table drive minimum RPM, top drive maximum RPM, table drive maximum RPM, maximum GPM (gallons per minute) for pumps, and standpipe maximum PSI (pounds per square inch). - The drill string and bottom hole assembly (BHA)
characteristics 68 include one or more of the following: motor RPM (revolutions per minute), turbine RPM, motor torque, turbine torque, rotary steerable system, PSI (pounds per square inch) loss through BHA, PSI string loss, string torque, string drag, and drill string economics. Thedrill bit inputs 70 include, for example, bit type, bit diameter,bit cutting structure 3D (three dimensional) model, bit work rating, bit wear rating, bit junk slot area, bit TFA (total flow area), and bit pressure drop. [0049] With respect to hydraulic properties 72, the hydraulic properties include one or more of the following: oil, synthetic, water, weight PPG (pounds per gallon), yield point, plastic viscosity, annular velocity, water loss, lost circulation, ECD (equivalent circulating densities), depth in, depth out, maximum ROP (rate of penetration), and fluid costs. - The iterative drilling simulation system further includes one or more
drilling economics model 62. Economic data particular to a given virtual drilling scenario is input at 74. Responsive to the economic input data, thedrilling economics model 64 provides input to thedrilling simulator processor 52 at 54 c, for use during an iterative drilling simulation, according to the particular requirements for a given iterative drilling simulation application, as appropriate. -
FIG. 3 is a block diagram view of an iterative virtual drilling simulation according to an embodiment of the present disclosure. Theiterative drilling simulation 80 includes virtual drilling simulations in response to a request for services, for example, from an operating company. The iterative drilling simulation involves both drillingmechanics 82 andgeology 84. The drilling simulations include drilling mechanics analyses performed for afirst drilling system 86 and asecond rig system 88 in connection withrock column 90 ofgeology 84. In this example, the geology data may have been obtained from well log data of a previously drilled well (or wells) for determining therock column 90. Accordingly, therock column 90 characterizes the formation to be drilled. - As shown in
FIG. 3 , equipment data for the RigA drilling simulation 86 includes RigA energy inputs 92,drilling fluid properties 94, anddrill bit inputs 96. Theenergy inputs 92 include weight, rotary speed, and hydraulic horsepower. Similarly, equipment data for the RigB drilling simulation 88 includes RigB energy inputs 98, drillingfluid properties 100, anddrill bit inputs 102. - The simulation of
FIG. 3 , includes iterative simulations of the drilling of a well bore in the formation characterized byrock column 90 with Rigs A and B. The simulation produceddrilling simulation economics 104 that comprises at least one economic evaluation factor for each respective iteration of drilling simulation. In one example, the economic evaluation factor may include a minimum number of hours on bottom to drill a desired well bore. The economic evaluation factor may also include a minimum cost amount for drilling the well bore, wherein the minimum cost amount is a function of both a minimum number of hours on bottom to drill the well bore and a cost per day for a respective drilling rig system. Accordingly, economic results, as generally indicated byreference numerals rock column 90 and the characteristics of the a respective one of the drilling rig systems according to a drilling simulation model. The drilling simulation model includes one or more of a mechanical efficiency model, bit wear model, hole cleaning efficiency model, penetration rate model, and drilling economics model, as discussed further herein. - Drilling Mechanics Analysis
- To assist in greater understanding of the present embodiment, the following discussion relates to exemplary data requirements for a drilling mechanics analysis in connection with the iterative drilling simulation method and system of the present disclosure.
- For each interval of well bore being analyzed, the drilling mechanics analysis utilizes information that may include one or more of the following: lithology, rock strength, shale plasticity, drilling mechanics optimization, and illustrations of one or more drill bits for use in drilling the well bore. Intervals are specified with a start depth and an end depth.
- For an analysis request, well logs are obtained from the operating company or other suitable source. The well logs may include one or more of the following: gamma ray, sonic, neutron, density, photoelectric, NMR (nuclear magnetic resonance), spectral gamma ray, and caliper. Additional data provided by the operating company, or other suitable source, may include mud logs, bit records, or other pertinent information.
- For a given drilling mechanics analysis, bit data for a proposed well is considered. The bit data comprises information for each bit run. Accordingly, bit data may include one or more of the following: bit size, bit type, proposed depth in, proposed depth out, ROP, and cost. In one example, cost refers to a cost per foot analysis based upon an hourly rig cost. The drilling mechanics analysis further includes, for a given bit run, specification of one or more of the following for a respective bit: a work rating (expressed in units of ton-mi), a sharp bit slope, a worn bit slope, a friction slope, and bit contact area (initial and final).
- The drilling mechanics analysis still further includes operating constraints for a given bit run. The operating constraints include one or more of the following: maximum torque (expressed in units of ft-lbs) for top drive, rotary table, drill pipe, motor, or turbine; minimum RPM (revolutions per minute) for top drive, rotary table, motor, or turbine; maximum RPM for top drive, rotary table, motor, or turbine; maximum WOB (weight on bit) (expressed in units of klbs); and maximum ROP (rate of penetration) (expressed in ft/hr).
- Further data for each bit run can include drill string torque losses and/or drill string data. Drill string data includes one or more of the following: drill pipe (OD×Wt), HWDP (OD×length), drill collars (OD×length), and motor (OD×type).
- The drilling mechanics analysis may also include the use of measured operating parameters for an offset well, along with a request for iterative drilling simulation services. The measured operating parameters of the offset well may be provided by an operating company or other suitable source. Offset drilling data includes ROP, WOB, and RPM-total. The offset drilling data may optionally include one or more of torque, motor RPM, surface RPM. For the offset drilling data, the operating parameters are specified for a start depth and end depth each respective section of well bore.
- The simulator of the present disclosure performs a drilling mechanics analysis that includes an analysis of rock mechanics for a given formation. The analysis of rock mechanics provides information regarding one or more of lithology, porosity, confined rock strength, unconfined rock strength, and shale plasticity. The simulator performs the rock mechanics analysis based upon one or more of the following: well logs, mud logs, bit record(s), and recommended bit(s).
- Well Logs. At a minimum, a gamma ray log and at least one (1) additional log is needed. The additional log includes at least one or more of the following logs: nuclear magnetic resonance (NMR), photoelectric (Pe) with neutron density; neutron density, and sonic. The gamma ray is typically run in combination with the log suites listed above. In general, a more accurate lithology analysis can be obtained when more of the above logs are provided for performing the analysis.
- Additional optional information would be useful for the lithology analysis, if available. The additional optional information includes one or more of spectral gamma ray log, caliper log, core porosity, and rock strength. According to one embodiment, the shale plasticity model utilizes data from the spectral gamma ray log. The caliper log data is used to evaluate data quality. In addition, the core porosity and/or rock strength is used to calibrate the logs.
- Mud Logs. Mud logs provide a valuable “reality check” for the lithology analysis. In particular, the mud logs assist in identifying any non-shales contained within the given geology.
- Bit Records. Bit records provide a valuable “reality check” for the rock strength analysis, especially if the sonic log is the only available porosity log.
- Proposed Bits. Information regarding proposed bits, such as photos and specifications, can be included in a recommendation package, as further discussed herein. If a depth interval is established for a proposed bit, the depth interval can be displayed or shown graphically in the recommendation package, also.
- Drilling Mechanics. In one embodiment, the drilling mechanics analysis provides an output in the form of a “driller's road map.” In particular, the drilling mechanics analysis provides predicted performance of a given bit in the drilling of a well bore in a given formation. Drilling mechanics information includes one or more of the following: work done by a proposed bit in drilling through rock of known compressive strength; bit wear condition; mechanical efficiency of the bit as a function of rock strength and wear condition; cutting torque and total torque produced by the bit; operating power level as a function of the bit and an corresponding drilling rig; constraint analysis indicating which operating constraint are in effect; optimal operating parameters, including WOB and RPM; predicted ROP, including instantaneous and average; and predicted cost per foot.
- The simulator method and system of the present disclosure perform drilling mechanics analysis with the use of one or more of the following types of information: bit data, rig operating constraints, directional survey data and proposed directional well plan, torque and drag analysis; and measured operating parameters, for performing a history match, as appropriate.
- With respect to a given bit, a bit assembly number can be used to identify the specific bit design. Upon establishment of a 3-D geometry for a given bit, a torque-WOB signature can be generated using an appropriate 3-D bit model. Accordingly, predicted performance reflects the specific bit design.
- Operating Constraints. Operating constraints that define a safe operating window for the driller include one or more of the following: maximum safe operating torque (in units of ft*lb); maximum safe operating WOB; maximum safe operating RPM; minimum safe operating RPM; and maximum allowable ROP. According to the embodiments of the present disclosure, the above operating constraints apply at the bit. Accordingly, the drilling mechanics analysis facilitates an ability to handle a wide variety of drilling situations. The operating constraints are discussed further herein below.
- Torque constraint. For a given bit run, the above limits are constraints, except for torque which is variable. For example, suppose the top drive is able to generate a (theoretical) maximum of 10,000 ft*lb of torque according to available information, such as an engineering manual from the equipment manufacturer. However, the toolpusher may indicate that the maximum safe operating torque is 7,000 ft*lb based upon the toolpusher's experience with the rig equipment. Suppose, also, that the proposed bit run is from 5,000 to 10,000 ft measured depth (MD), where measured depth is along the well path. A standard torque and drag analysis might indicate that 1,000 ft*lb of torque is lost because of friction between the drill string and the bore hole wall at the beginning of the bit run and that 2,000 ft*lb is lost at the end of the bit run. This means that the actual torque transmission to the bit is 6,000 ft*lb maximum at the beginning of the bit run, gradually decreasing to 5,000 ft*lb at the end of the run. If a mud motor is used, then the maximum torque output of the motor would also be needed. Accordingly, when appropriate, the torque capabilities of the drilling rig are included in the drilling rig characteristics for use in a given drilling simulation.
- Torque and Drag Analysis. The present embodiments utilize a torque and drag analysis for converting surface torque limits to equivalent limits at the bit. Such a torque and drag analysis is generally available from a drilling engineer of the operating company, since a torque and drag analysis is typically part of a well plan. Alternatively, a separate torque and drag analysis may be conducted, however, such an analysis requires a complete description of the drill string and bottom hole assembly. In addition, a reasonable estimate can be made if the drill sting torque losses at total depth (TD) are known. A toolpusher often has information from prior measurements of on-bottom and off-bottom torque. Furthermore, this information is sometimes available on morning reports at various depths or when TD is reached.
- WOB Constraint. According to one embodiment of the present disclosure, for a given simulation recommendation, a maximum safe operating WOB depends on the weight of the drill string below the neutral point, and the hook load capacity of the rig. In addition, the maximum safe operating WOB also depends on expected rock strength and bit selection. In conjunction with determining a maximum safe operating WOB, it is advisable to examine the measured WOB from an offset well to get a feel for the historical maximum actually used, as opposed to a theoretical value. The maximum safe operating WOB may also include a safety factor.
- RPM Constraints. According to one embodiment of the present disclosure, for a given simulation recommendation, the safe operating window for RPM depends on the specific machinery: rotary table, top drive, positive displacement motor, or turbine. Sometimes the safe operating window for RPM is a combination of specific machinery: for example, drilling with a motor in rotary mode, the motor RPM must be added to the surface RPM. In conjunction with determining a safe operating window for RPM, it is advisable to examine the measured RPM from an offset well to get a feel for the historical maximum and minimum RPM actually used, as opposed to the theoretical values alone. The safe operating window for RPM may also include a safety factor.
- ROP Constraint. The ROP constraint reflects the limitations of the drilling fluid system as well as related geologic considerations. For example, an analysis of the hydraulics system may reveal that the rig pumps are capable of cleaning hole properly as long as the penetration rate does not exceed 300 ft/hr. However, a geologic study may reveal that if the penetration rate exceeds 200 ft/hr, the dynamic mud weight will exceed the fracture gradient at the casing shoe. Accordingly, the ROP constraint would be set to the lower of these two limits. A toolpusher would generally be well aware of this constraint.
- Directional Data (optional). According to one embodiment of the present disclosure, the iterative drilling simulation method and system perform a drilling mechanics analysis based upon well logs taken from a nearby offset well for a given formation. However, a drilling mechanics analysis is needed along the proposed well path of the next well to be drilled. Accordingly, this can be accomplished if a directional survey for the offset well, and a directional well plan for the proposed well, are available.
- Measured Operating Parameters. According to one embodiment of the present disclosure, measured operating parameters from an offset well, while optional, are very useful in determining what the actual values are for the various operating constraints. The measured operating parameters include one or more of the following: weight-on-bit, rotary RPM, penetration rate, and torque-on-bit (ft*lb). Even if torque is unavailable, as is often the case, a history match can still be made with the other operating parameters.
- Rig operating constraints provided by a rig operator should be reasonably close to actual field performance. Measured operating parameters from an offset well enable double-checking and confirming that the constraints are correct.
- Measured operating parameters are also used to history-match the particular drill bit to the specific geology and rig. This can significantly increase confidence in the predicted drilling performance results, and the value of the analysis to the driller. Accordingly, measured operating parameters are helpful.
- Turning now to
FIG. 4 , anexemplary output 110 of a sample iterative virtual drilling simulation for a first geology formation is illustrated. In the iterative virtualdrilling simulation output 110 ofFIG. 4 , certain rig data and energy input levels are specified for Rig A (112), Rig B (114) and Rig C (116), as indicated byreference numerals - According to one embodiment of the present disclosure, the well bore to be drilled includes a plurality of
sections 120 of well bore, as illustrated inFIG. 4 . In this embodiment, an economic evaluation factor includes a minimum number of hours on bottom to drill a respective section of well bore in a geology formation characterized by a given rock column. That is, each section may be characterized by a minimum number of hours (122 A1, 122 A2, 122 A3,) on bottom to drill a respective section of well bore (120 A1, 120 A2, 120 A3). In addition, the economic evaluation factor may include a cumulative minimum number of hours, indicated byreference numeral 122 inFIG. 4 , on bottom to drill the respective sections of well bore. The cumulative number of minimum hours on bottom to drill the respective sections of well bore in the first geology formation with Rig A amounted to 1082 Hours, as indicated byreference numeral 122A. - The iterative virtual
drilling simulation output 110 further includes an economicminimum cost 124 for each drilling rig system in the drilling of the well bore in the first geology formation. Theminimum cost 124 is a function of the cost per day of a respective drilling rig system (converted into cost per hour, as appropriate) multiplied by a corresponding cumulative minimum number of hours to drill the well bore for a respective iterative simulation. For example, using the iterative drilling simulation method of the present disclosure, the total minimum number of hours on bottom to drill the respective sections of well bore with Rig A amounted to 1082 hours. The minimum cost of Rig Ain the drilling of the well bore amounted to $5.64 million dollars ((1082(Hours)/24(Hours/Day))×125,000($/Day)=$5.64 MM), as indicated by reference numeral 124A. Similarly, the iterativedrilling simulation output 110 includes a minimum number of hours on bottom for respective sections of well bore, the cumulative total minimum number of hours on bottom, and a cost for each of the other drilling rigsystems Rig B 114 andRig C 116, respectively. - As discussed herein, according to one embodiment of the iterative simulation method of the present disclosure, the method generates a simulated well bore drilling performance output for a given iteration of simulated drilling of the well bore. As illustrated in the
example output 110 ofFIG. 4 , the simulated well bore drilling performance output facilitates an enhanced economic decision making with respect to an actual drilling in a field containing formations analogous to the rock column with a respective drilling rig system. For example, from theoutput 110 ofFIG. 4 , an operating company can make an enhanced economic decision in the selection of a drilling rig system. From an economic standpoint, drilling rigsystem Rig A 112 provides the best selection over drilling rigsystem Rig B 114 andRig C 116 for the drilling of a well bore in a given formation analogous to the rock column. - As illustrated in the example of
FIG. 4 , the simulated well boredrilling performance output 110 includes one or more of (a) identification of drilling rig system characteristics, the characteristics including at least a drilling rig system economic factor, (b) a representation of at least one section of well bore in the rock column, (c) a minimum duration of time needed on bottom to drill a respective at least one section of well bore, (d) a cumulative duration of time needed to drill all sections of well bore, and (e) a minimum cost amount determined as a function of the cumulative duration of time and the drilling rig system economic factor. The simulated well bore drilling performance output may also include a minimum duration of time needed on bottom to drill the well bore, without indicating the same for each section of the well bore. - Referring now to
FIG. 5 , anexemplary output 130 of a sample iterative virtual drilling simulation for a second geology formation is illustrated. The iterative virtualdrilling simulation output 130 ofFIG. 5 is similar to that ofFIG. 4 with respect to rig data and energy input levels specified for Rig A (112), Rig B (114) and Rig C (116), as indicated by reference numerals 1124 114 a, and 116 a, respectively. However, the iterative simulated drilling with the drilling rig systems is with respect to a different geology formation. While the rig data and energy input levels ofFIG. 5 are similar to those specified inFIG. 4 , the various economic evaluation factors have changed as a result of the simulated drilling in a different rock column. - As illustrated in
FIG. 5 , the well bore to be drilled includes a plurality ofsections 120 of well bore. In this embodiment, the economic evaluation factor includes a minimum number of hours on bottom to drill a respective section of well bore in a geology formation characterized by the given rock column. Each section is characterized by a minimum number of hours on bottom to drill a respective section of well bore. For example, the minimum number of hours on bottom to drill section two of the well bore with Rig A, Rig B, and Rig C amounted to 886 Hours, 798 Hours, and 605 Hours, respectively. In addition, the economic evaluation factor includes a cumulative total minimum number of hours (indicated by reference numeral 122) on bottom to drill the respective sections of well bore. InFIG. 5 , the cumulative total number of minimum hours on bottom to drill respective sections of well bore in the second geology formation with Rig A, Rig B, and Rig C amounted to 1748 Hours, 1488 Hours, and 1139 Hours, respectively. Accordingly, theexemplary output 130 ofFIG. 5 illustrates drilling rig system Rig C as producing the best economic performance over the drilling rig systems Rig A and Rig B in the simulated drilling of a well bore in the second geology formation. - According to another embodiment, the method of iterative drilling simulation includes generating a recommendation package 36 (
FIG. 1 ) of drilling system characteristics for use in an actual drilling of a well bore in the formation as a function of economic evaluation factors. The recommendation package provides iterative simulation output content in one or more formats, including, for example, hardcopy, CD ROM, computer readable media, electronic file, holographic projection, compressed time animation, or any combination thereof. For example, the recommendation package may include a computer readable medium, as indicated byreference numeral 37 inFIG. 1 . - With respect to compressed time animation, the recommendation package facilitates visualization of the simulated drilling of the well bore on a compressed time frame. For example, if the actual time to drill the well bore were thirty (30) days, then with the compressed time animation, the simulated drilling for the entire well could be visually viewed over some fraction of that time by a viewer using compressed time animation. Output embodying compressed time animation would give the operator the opportunity to quickly view the wellbore drilling system simulation presented through time. Each iteration can include compressed or collapsed time animation of the drilling process for that particular rig, set of system components, and rock column. The operator can review the output of a simulation in a few minutes that represents many hours of actual drilling time on bottom. The operator can also see the changes in the progress of the drilling brought about by changes in system components.
- Accordingly, the compressed time animation could be highly beneficial to an operating company in making a best economic decision for the drilling of a well bore in a given formation. According to one embodiment, the compressed time animation utilizes the geology and mechanics models, as described herein, in the iterative drilling simulations for producing a respective economic evaluation output. Compressed time animation techniques are known in the art, and thus only briefly discussed herein.
- In one embodiment, the recommendation package includes at least one economic evaluation factor and at least one recommendation of drilling rig system characteristics for use in an actual drilling of the at least one well bore in the formation as a function of the economic evaluation factors. The economic evaluation factor can be derived by the method of (a) obtaining characteristics of a rock column in the formation to be drilled, (b) specifying characteristics of at least one drilling rig system, and (c) iteratively simulating the drilling of the well bore in the formation and producing an economic evaluation factor for each iteration of drilling simulation. Other economic evaluation factors are also possible, as discussed earlier herein. In addition, each iteration of drilling simulation is a function of the rock column to be drilled and the characteristics of the at least one drilling rig system according to a drilling simulation model, as discussed herein.
- Turning now to
FIG. 6 ,FIG. 6 illustrates a flow diagram view of an iterative virtualdrilling simulation method 150 with an iterative virtual drilling simulator 21 (FIG. 1 ) according to one embodiment of the present disclosure. Instep 152, iterative virtual drilling simulator receives a request for a drilling recommendation in connection with facilitating enhanced economic decision making, further with respect to drilling of a well bore in a given formation characterized by a particular rock column. Instep 154, the simulator obtains geology characteristics of the formation to be drilled, the geology characteristics including those as discussed earlier herein. Instep 156, the simulator obtains drilling equipment characteristics of a drilling system, the drilling equipment characteristics including characteristics as discussed earlier herein. - In
step 158, the simulator performs an iterative drilling simulation of the drilling of the well bore in the formation. The simulation ofstep 158 includes the producing of an economic evaluation factor for the respective iterative simulation. Instep 160, the simulator queries whether or not the simulation is optimized, according to a prescribed optimization process and criteria for a given simulated drilling application. If not optimized, the process proceeds to step 162. Instep 162, the simulator modifies one or more drilling mechanics parameter(s) according to the prescribed optimization process and criteria. Upon a modification of the one or more drilling mechanics parameters instep 162, the process returns to step 158 for performing an iterative drilling simulation as a function of the modified drilling mechanics parameters and the geology characteristics. The process continues as discussed herein with respect to step 158. - If, in
step 160, the simulation is determined to be optimized, then the process proceeds to step 164. Instep 164, the simulator generates a preliminary recommendation as a function of the optimized drilling simulation output for the respective iteration. Instep 166, the simulator queries whether or not there are additional equipment considerations. If additional equipment considerations exist, then the process proceeds to step 168. Instep 168, the simulator obtains the additional drilling equipment characteristics. The process then returns to step 158 for performing an iterative drilling simulation as a function of the additional drilling system equipment characteristics. The process continues as discussed herein with respect to step 158. - If, in
step 166, there are no additional equipment considerations for the particular iterative drilling simulation process, then the simulator prepares an overall recommendation package atstep 170, as discussed further herein. The process then ends atstep 172. - Turning now to
FIG. 7 ,FIG. 7 illustrates a block diagram view of an iterativedrilling simulator system 180 for performing iterative drilling simulations according to another embodiment of the present disclosure. The iterative drilling simulation system provides for enhanced economic decision making, as discussed herein. The iterativedrilling simulation system 180 includes asimulator 182. Thesimulator 182 obtains characteristics of a rock column to be drilled viainput 184. The characteristics of the rock column include one or more of lithology, rock strength, and shale plasticity. Any one of the rock column characteristics can be derived fromlog data 186 and a respective lithology model, rock strength model, and shale plasticity model, generally indicated byreference numeral 188. - Referring still to
FIG. 7 , thedrilling simulator 182 obtains characteristics of a drilling rig system via drilling rig system input, generally indicated byreference numeral 190. The characteristics of the drilling rig system include one or more characteristics ofrig inputs 192, drill string and bottomhole assembly inputs 194,drill bit inputs 196, andhydraulic properties 198. The drilling rig system characteristics may also include characteristics of more than one drilling rig system. - The
rig inputs 192 may include one or more inputs of operating constraints, rig costs, maximum weight on bit, top drive torque, table drive torque, top drive minimum RPM, table drive minimum RPM, top drive maximum RPM, table drive maximum RPM, pumps maximum GPM, and standpipe maximum PSI. The drill sting and bottom hole assembly (BHA)characteristics 194 may include characteristics of motor RPM, turbine RPM, motor torque, turbine torque, rotary steerable system, PSI loss through BHA, PSI string loss, string torque, string drag, and drill string economics. - The
drill bit inputs 196 may include one or more inputs of bit type, bit diameter,bit cutting structure 3D model, bit work rating, bit wear rating, bit junk slot area, bit TFA (total flow area), and bit pressure drop. - The
hydraulic properties 198 may include one or more properties of oil, synthetic, water, weight PPG (pounds per gallon), yield point, plastic viscosity, annular velocity, water loss, lost circulation, ECD (equivalent circulating densities), depth in, depth out, maximum ROP, and fluid costs. - According to one embodiment, the simulator 182 (
FIG. 7 ) includes a computer system 21 (FIG. 1 ) for performing the various functions as described herein. The various functions as discussed herein can be programmed using programming techniques well known in the art. The inputs can include any suitable input, whether analog, digital, optical, sonic, or other form of input, via an input device, such as a keyboard, interface card, or other suitable input device, for communicating the rock column and drilling rig system characteristics tosimulator 182. - In response to obtaining characteristics of a rock column in a formation to be drilled and characteristics of at least one drilling rig system, the
simulator 182 iteratively simulates the drilling of a well bore in the formation and produces an economic evaluation factor for each iteration of drilling simulation. Each iteration of drilling simulation is a function of the rock column and the characteristics of the at least one drilling rig system according to a drilling simulation model. According to one embodiment, the drilling simulation model includes one or more models of mechanical efficiency, bit wear, hole cleaning efficiency, and drilling economics, generally indicated byreference numeral 200, as discussed further herein. The drilling simulation model may also include apenetration rate model 202, as discussed further herein also. - As illustrated in
FIG. 7 , if an output of thepenetration rate model 200 is not optimized, the simulator executes another iterative simulation, via 204. The iterative simulation would include a modification of one or more drilling rig system characteristics, prior to running a corresponding iteration, as may be appropriate for a given iterative drilling simulation plan. On the other hand, if an output of thepenetration rate model 204 were satisfactory according to a given optimization criteria, thensimulator 182 provides the optimum output at 206. Accordingly,simulator 182 would be finished with the given iterative drilling simulation exercise. - In addition to iteratively simulating the drilling of a well bore in the formation, the
simulator 182 produces an economic evaluation factor for each iteration of drilling simulation. Each iteration of drilling simulation is a function of the rock column and the characteristics of the at least one drilling rig system according to a drilling simulation model. - The
simulator 182 further generates a recommendation package of drilling rig system characteristics as a function of economic evaluation factors. The recommendation package information is presented in one or more of the following formats of hardcopy, CD ROM, computer readable media, electronic file, holographic projection, compressed time animation, or any combination thereof. Accordingly, the recommendation package includes information suitable for use in deciding upon equipment and process selections in an actual drilling of a well bore in the formation, as a function of the economic evaluation factors. -
FIG. 8 is a flow diagram view of an iterativedrilling simulation method 210 according to another embodiment. Instep 212, the iterative drilling simulation method obtains geology characteristic(s) of a desired formation. Instep 214, the process includes obtaining parameters of desired drilling equipment. Instep 216, the method simulates drilling of a well bore in the geology as a function of the geology and the drilling equipment parameters according to a prescribed drilling simulation model. Instep 218, the method generates an economic characteristic as a function of the drilling simulation, the economic characteristic as further discussed herein. - In
step 220, the process queries whether or not additional iterations of simulation are to be carried out. If additional iterations of simulations are to be conducted, then the process proceeds to step 222. Instep 222, the process obtains parameters of additional desired drilling equipment. In response to obtaining the parameters of additional desired drilling equipment, the process returns to step 216 and the simulating of drilling the geology as a function of the geology and drilling equipment characteristics. - In
step 220, if no additional simulations are to be conducted, then the process proceeds to step 224. Instep 224, the process generates a report of the iterative drilling simulations, the report including suitable information for facilitating enhanced economic decision making in conjunction with drilling of a well bore in a given formation with a given drilling rig system, as discussed further herein. The process then ends at 226. - The embodiments of the present disclosure further include a method for preparing a recommendation package for enhanced economic decision making in connection with drilling at least one well bore in a given formation. The method comprises obtaining geology characteristics of the formation to be drilled. The geology characteristics include at least a rock column. The method further includes specifying equipment characteristics of at least one drilling system. The equipment characteristics include drilling mechanics parameters. Lastly, the method includes iteratively simulating the drilling of the well bore in the formation, producing an economic evaluation factor for each respective iterative drilling simulation and modifying drilling mechanics parameters until a desired optimization of the iterative drilling simulation is achieved.
- Each iterative drilling simulation is a function of the geology and drilling system equipment characteristics according to a drilling simulation model. The method generates a preliminary recommendation in response to the iterative drilling simulation achieving the desired optimization. Still further, the method includes, repeating, for any additional equipment considerations, the steps of specifying equipment characteristics of at least one drilling system, iteratively simulating the drilling of the well bore, and generating a preliminary recommendation for any additional equipment considerations.
- An overall recommendation is then generated as a function of the preliminary recommendations of iterative drilling simulations. For example, the recommendation package may be generated from the iterative drilling simulations as a function of economic evaluation factors of select ones of respective iterative drilling simulations. In one embodiment, the overall recommendation comprises one or more of hardcopy, CD ROM, computer readable media, electronic file, holographic projection, compressed time animation, or any combination thereof.
- According to another embodiment, computer system 21 (
FIG. 1 ) is programmed for performing functions as described herein, using programming techniques known in the art. In one embodiment, a computer program product includes a computer readable medium 37 (FIG. 1 ) having a computer program stored thereon. The computer program for execution by the computer enables iterative drilling simulation for enhanced economic decision making. The computer program includes instructions processable by the computer system for causing the computer system to obtain characteristics of a rock column in a formation to be drilled, obtain characteristics of at least one drilling rig system, and iteratively simulate the drilling of a well bore in the formation. The computer program is further for producing an economic evaluation factor for each iteration of drilling simulation, wherein each iteration of drilling simulation is a function of the rock column and the characteristics of the at least one drilling rig system according to a drilling simulation model. - The computer program is further processable by the computer system for causing the computer system to generate a simulated well bore drilling performance output for a given iteration of simulated drilling of the well bore, the simulated well bore drilling performance output suitable for facilitating an enhanced economic decision making with respect to an actual drilling with a respective drilling rig system in a field containing formations analogous to the rock column. The simulated well bore drilling performance output includes at least one of the following selected from the groups consisting of (a) identification of drilling rig system characteristics, the characteristics including at least a drilling rig system economic factor, (b) a representation of the well bore in the rock column, (c) a minimum duration of time needed on bottom to drill the well bore, and (d) a minimum cost amount determined as a function of the duration of time and the drilling rig system economic factor.
- The computer program is still further processable by the computer system for causing the computer system to generate a simulated well bore drilling performance output for at least one iteration of the simulated drilling of the well bore. In one example, the simulated well bore drilling performance output facilitates enhanced economic decision making with respect to actual drilling in a field containing formations analogous to the rock column with a respective drilling rig system corresponding to that of the at least one iteration of the simulated well bore drilling performance.
- According to another embodiment, the simulator iteratively simulates the drilling of the well bore in the formation, produces an economic evaluation factor for each respective iterative drilling simulation, and modifies drilling mechanics parameters until a desired optimization of the iterative drilling simulation is achieved. Each iterative drilling simulation is a function of the geology and drilling system equipment characteristics according to a drilling simulation model. The simulator further generates a preliminary recommendation in response to the iterative drilling simulation achieving the desired optimization. The simulator operates to repeat the specifying of equipment characteristics of at least one drilling system, iteratively simulating the drilling of the well bore, and generating a preliminary recommendation for any additional equipment considerations. Lastly, the simulator generates an overall recommendation as a function of the preliminary recommendations of iterative drilling simulations.
- According to another embodiment, a system for preparing a recommendation package for enhanced economic decision making in connection with drilling at least one well bore in a given formation comprises a first input, a second input, and a simulator. The first input is for obtaining geology characteristics of the formation to be drilled, wherein the geology characteristics include at least a rock column. The second input is for specifying equipment characteristics of at least one drilling system, wherein the equipment characteristics include drilling mechanics parameters. Lastly, the simulator is for simulating the drilling of the well bore in the formation, wherein the drilling simulation is a function of the geology and drilling system equipment characteristics according to a drilling simulation model.
- The simulator generates an economic evaluation factor as a function of the drilling simulation. In addition, the simulator operates to iteratively repeat, for any additional equipment considerations, the specifying of equipment characteristics, simulating the drilling of the well bore, and generating the economic evaluation factor. The simulator further generates a recommendation package of the iterative drilling simulations as a function of economic evaluation factors of select ones of respective iterative drilling simulations, as discussed.
- According to another embodiment, a simulator for enhanced economic decision making in connection with drilling at least one well bore in a given formation comprises a first processor, a second processor, and a third processor. In one embodiment, the first, second, and third processors may include a single processor for performing the functionality's as discussed herein.
- The first processor, responsive to geology characteristics of the formation to be drilled and specified equipment characteristics of at least one drilling system, iteratively simulates the drilling of a well bore in a formation. The geology characteristics include at least a rock column and the equipment characteristics include the drilling mechanics parameters. The first processor further produces an economic evaluation factor for each respective iterative drilling simulation. The first processor also modifies drilling mechanics parameters until a desired optimization of the iterative drilling simulation is achieved. Each iterative drilling simulation is a function of the geology and drilling system equipment characteristics according to a prescribed drilling simulation model.
- The second processor, responsive to the achievement of the desired optimization by the first processor, generates a preliminary recommendation. The first and second processors further operate in response to the geology characteristic and any additional specified equipment characteristics of the at least one drilling system for iteratively simulating the drilling of the well bore and generating a preliminary recommendation for any such additional equipment considerations as a function of one or more economic evaluation factors.
- Responsive to iterative simulations of drilling and generating of preliminary recommendations for the initial and any additional equipment considerations, the third processor generates an overall recommendation as a function of the preliminary recommendations of iterative drilling simulations. The third processor may also generate a recommendation package of the iterative drilling simulations as a function of economic evaluation factors of select ones of respective iterative drilling simulations. The overall recommendation package content may be in a format that includes hardcopy, CD ROM, computer readable media, electronic file, holographic projection, compressed time animation, or any combination thereof.
- As discussed herein, the geology and drilling mechanics models of the present iterative simulation method and system digest an existing suite of logs. The iterative drilling simulation method and system are also characterized by an open architecture that can be readily upgraded to reflect any impact that a new technology may have on the economics of an iterative simulation. In addition to the above discussion, the iterative drilling simulation method and system includes capabilities for being upgraded to reflect new technology advancements as they are developed and made generally available. For example, the iterative drilling simulation method and system can be upgraded to take into account technical advancements in one or more of the rig equipment, torque and drag mitigation equipment, downhole rotary systems, rock destruction tools, drill bit enhancements, and other related technology developments. Accordingly, it is anticipated that as technology advances, the iterative drilling simulation method and system can be modified to reflect any impact of the new technology on the economics of a given iterative simulation.
- The following description provides various illustrative examples of applicability with respect to the embodiments of the present disclosure.
- Rig Selection
- According to one embodiment, the drilling simulator of the present disclosure is useful with respect to rig selection. For example, consider a situation in which a drilling operator has discovered and delineated a new offshore field. The operator now intends to develop the field. The operator has a choice of two available drill rigs to put under contract to accomplish the developmental drilling. A first rig (“Rig One”) is available at $200,000 per day and a second rig (“Rig Two”) is available at $175,000 per day. Rough estimates made by the operator indicate that the operator expects developmental drilling to take three (3) years. Accordingly, the operator seeks to contract a rig for the three (3) year period of time.
- Traditional decision making methods used to determine which rig to contract involve estimating or approximating which rig will be most effective through various macro observations of horsepower, pumping power, and weight handling capability relative to the daily cost. From these estimates, a contractor decides which rig to contract.
- Using the simulation method of the present disclosure, according to one embodiment, the simulator creates a computerized simulation of each rig and the respective rig's capabilities relative to the particular rock column to be drilled. The characteristics of the rock to be drilled are simulated using log data gathered from one or more discovery and/or delineation wells. With respect to each rig's particular characteristics, the drilling simulator iteratively produces drilling simulations until an “optimum” drilling approach for the specific rock column for each rig's particular characteristics is determined. These simulations can then be used to allow the operator to make a much better informed decision as to which rig will ultimately provide a best overall economic value in the development of the particular field.
- In the above example, the difference of $25,000 per day over the projected 3 year life of the rig contract equals $27,375,000. Accordingly, the potential economic implications of the decision are clearly significant.
- Rig Modification/Upgrade Valuations
- Drilling rigs are comprised of various components that represent the total energy input capabilities that a respective rig can apply to the drilling of a well bore. The rig components include, but are not limited to, the rotary table, top drive, drill string, drilling fluid pumps, bottom hole assembly, and hoisting equipment. As a given rig ages, some of the rig components lose efficiency. For instance, this is especially true of the potential of the drill string to accept rotary input, torque, and weight, and of the drilling fluid pumps to operate at or near the manufacturer's original efficiency rating. Replacing these rig components to reattain their original capabilities with respect to the overall drilling rig system can be an expensive proposition.
- The simulation capabilities provided by the process of the present disclosure enable an analyst to iteratively run through various scenarios of drilling before and after potential rig upgrades or component replacements. Accordingly, the analyst can more effectively determine an economic impact of actually making a corresponding upgrade or replacement, or of delaying doing so.
- For example, the present embodiments can be used for assisting in making a multi-million dollar decision whether or not to replace the drilling tubulars of a given drilling rig with new drilling tubulars. By modeling the loss of weight and torque capabilities of an existing drill string in a proposed drilling environment versus the higher weight and torque capabilities of a new drill string, a far clearer picture of the economic benefits of the new tubulars versus their cost can be derived. For a specific drilling campaign, a rig contractor may consider using the simulation results to aid in convincing a contracting operator to share in the cost of a new drill string, wherein the operator's ultimate drilling costs would be significantly reduced by the employment of the new system capabilities resulting from the new drill tubulars.
- Asset Comparisons/Field Economics
- Operating companies make decisions on whether or not to develop a hydrocarbon bearing prospect based on a simulation of the reservoir, value of the hydrocarbon to be produced, logistics costs, and an estimate of drilling costs. The present invention, allowing for a scientifically based simulation of the drilling system and it's respective efficiencies, provides the operator with a much more reliable way of factoring the economic aspects of drilling costs into the decision making process.
- Specifically, by using a simulation according to the present embodiments rather than an estimation, a decision could swing to developing a field, rather than abandoning its development as not being economically feasible.
- Given that a simulation, according to the present embodiments, can be used to assist in the economic evaluation of an individual prospective asset, such a simulation can by extension be used to make comparisons of the economics of multiple prospective assets. Accordingly, the simulation method of the present disclosure assists in determining which of multiple prospective assets should be developed and in what order they should be developed.
- DHM (Down Hole Motor) vs Rotary Steerable vs Turbine Evaluations
- Drilling system components that provide down hole rotation enhancements and/or directional drilling control methods represent an expensive addition to an overall drilling system. The simulation system of the present embodiments make it possible to iteratively compare downhole performance and ultimate economics of the various available down hole rotation and/or directional drilling control drilling system components. Exemplary drilling system components may include, for example, down hole motor, rotary steerable system, downhole turbine, or other similar component.
- From an operator's viewpoint, having a simulation makes it possible to arrive at the best possible system for the drilling project ahead, prior to an initial developmental well. The simulation also enables avoiding the expense of “field testing” of various systems to eventually reach a preferred method, wherein the method of “field testing” may or may not produce an optimum method.
- Contractor Pricing/Qualification Consulting
- Rig contractors manage fleets of drilling rigs of various ratings, capabilities, and wear conditions. According to one embodiment of the present disclosure, the simulator enables cross-analyses of the capabilities of some or all of the subject rig fleet to be performed, allowing a contractor to determine which members of a given fleet are best suited for a particular drilling challenge or challenges. In addition, the contractor can use the simulation outputs for determining appropriate upgrade strategies and upgrade timing decisions. Decisions to build a new rig versus refurbishing an existing rig can also be positively impacted by use of embodiments of the simulator method and apparatus of the present disclosure.
- With access to the embodiments of the present disclosure, a rig contractor can use the simulations or simulation data outputs produced by the simulator in contract negotiations with drilling operators to provide further information as to the “fit-for-purpose” nature of a particular rig or rigs. The leverage provided by the simulation should allow the contractor an ability to negotiate better financial terms for the lease of the particular rig or rigs.
- Drilling Fluids Selection and Economic Impact
- According to another embodiment, the simulator takes into account properties of the drilling fluid to be used in a drilling process, relative to the formation(s) to be drilled. Such a capability allows the simulator output to be used to make decisions on drilling fluids economics, drilling fluids selection and additional hydraulics parameters to be used in a given drilling process.
- Drilling Parameter Recommendations
- If during the course of a developmental drilling campaign, an operator determines that drilling costs are unacceptably high, then there is a likelihood that steps will be taken to reduce drilling costs. One basic approach to reduce drilling costs (as well as reduce overall cost) is to improve drilling efficiency.
- According to another embodiment of the present disclosure, the simulator iteratively models drilling efficiencies. That is, the simulator provides opportunities for improved drilling efficiency to be iteratively modeled and analyzed by using various sets of drilling parameter inputs and bit models. The best way forward in the reduction of drilling costs can then be identified and implemented without the ongoing expense of “field trials” to attempt, either successfully or unsuccessfully, to reduce drilling costs.
- Time to First Economic Production Evaluations
- Operators use determinations of time to first economic hydrocarbon production to assist them in determining a net present value of a developmental prospect. An output of the simulator of the present embodiments provides a more accurate estimate of drilling times than previous estimation methods. The greater accuracy provided by the simulator of the present embodiments allows an operator to generate a better determination as to what an actual time will be to first economic hydrocarbon production.
- Infield Drilling Economics
- Infield drilling is performed to obtain additional production from fields that have previously been producing. Because the field has seen previous drilling, the assumption is generally made that drilling times for the infield drilling will generally be close to the earlier drilling. A simulation according to the present embodiments can be carried out to either verify the typical assumption, or to iteratively improve under simulated conditions, valuable drilling efficiencies prior to or early on in the commencement of the infield drilling.
- Lease and Drilling Cost Evaluations
- Nations from time to time offer leased mineral rights to properties for hydrocarbon exploration. Operators evaluate the properties based on seismic analyses to determine if the properties are of interest and for developing a bid price that the operator will offer for a corresponding lease or leases. Operators may also offer lease rights, that they already hold, to others from time to time. With use of the simulator embodiments of the present disclosure, a more accurate estimate of likely drilling costs for a given lease can be made. Accordingly, the present embodiments assist an operator in determining an appropriate bid price to offer for a given lease or leases.
- Although only a few exemplary embodiments of this invention have been described in detail above, those skilled in the art will readily appreciate that many modifications are possible in the exemplary embodiments without materially departing from the novel teachings and advantages of this invention. Accordingly, all such modifications are intended to be included within the scope of this invention as defined in the following claims. In the claims, means-plus-function clauses are intended to cover the structures described herein as performing the recited function and not only structural equivalents, but also equivalent structures.
Claims (3)
1. An iterative drilling simulation method for enhanced economic decision making comprising:
obtaining characteristics of a rock column in a formation to be drilled, wherein the characteristics of the rock column include at least one of the following selected from the group consisting of lithology, rock strength, and shale plasticity, wherein a respective characteristic is derived from log data and a respective lithology model, rock strength model, and shale plasticity model, further wherein the log data includes at least one of the following selected from the group consisting of well logs, mud logs, core data, and bit records;
specifying characteristics of at least one drilling rig system, wherein the characteristics of the at least one drilling rig system include rig inputs wherein the rig inputs include at least one of the following selected from the group consisting of: operating constraints, rig costs, maximum weight on bit, top drive torque, table drive torque, top drive minimum RPM, table drive minimum RPM, top drive maximum RPM, table drive maximum RPM, pumps maximum GPM, and standpipe maximum PSI;
iteratively simulating the drilling a well bore in the formation and producing an economic evaluation factor for each iteration or drilling simulation, wherein each iteration of drilling simulation is a function of the rock column and the characteristics of the at least one drilling rig system according to a prescribe drilling simulation model, wherein the drilling simulation model includes at least one of the following selected from the group consisting of a mechanical efficiency model, bit wear model, hole cleaning efficiency model, penetration rate model, and drilling economics model; and
generating a recommendation package of drilling rig system characteristics for use in a drilling of a wellbore in the formation as a function of the economic evaluation factors.
2. The method of claim 1 , wherein the produced economic evaluation factor includes a minimum number of hours on bottom to drill the well bore.
3. The method of claim 1 , wherein the produced economic evaluation factor includes a minimum cost amount for drilling the well bore, and wherein the minimum cost amount is a function of both a minimum number of hours on bottom to drill the well bore and a cost per day for a respective drilling rig system.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/032,957 US20050149306A1 (en) | 1996-03-25 | 2005-01-11 | Iterative drilling simulation process for enhanced economic decision making |
US12/179,221 US8949098B2 (en) | 1996-03-25 | 2008-07-24 | Iterative drilling simulation process for enhanced economic decision making |
Applications Claiming Priority (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US08/621,411 US5794720A (en) | 1996-03-25 | 1996-03-25 | Method of assaying downhole occurrences and conditions |
US09/048,360 US6131673A (en) | 1996-03-25 | 1998-03-26 | Method of assaying downhole occurrences and conditions |
US09/192,389 US6109368A (en) | 1996-03-25 | 1998-11-13 | Method and system for predicting performance of a drilling system for a given formation |
US09/649,495 US6408953B1 (en) | 1996-03-25 | 2000-08-28 | Method and system for predicting performance of a drilling system for a given formation |
US09/820,242 US6612382B2 (en) | 1996-03-25 | 2001-03-28 | Iterative drilling simulation process for enhanced economic decision making |
US10/607,900 US7085696B2 (en) | 1996-03-25 | 2003-06-27 | Iterative drilling simulation process for enhanced economic decision making |
US11/032,957 US20050149306A1 (en) | 1996-03-25 | 2005-01-11 | Iterative drilling simulation process for enhanced economic decision making |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/607,900 Division US7085696B2 (en) | 1996-03-25 | 2003-06-27 | Iterative drilling simulation process for enhanced economic decision making |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/179,221 Continuation US8949098B2 (en) | 1996-03-25 | 2008-07-24 | Iterative drilling simulation process for enhanced economic decision making |
Publications (1)
Publication Number | Publication Date |
---|---|
US20050149306A1 true US20050149306A1 (en) | 2005-07-07 |
Family
ID=25230283
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/820,242 Expired - Lifetime US6612382B2 (en) | 1996-03-25 | 2001-03-28 | Iterative drilling simulation process for enhanced economic decision making |
US10/607,900 Expired - Lifetime US7085696B2 (en) | 1996-03-25 | 2003-06-27 | Iterative drilling simulation process for enhanced economic decision making |
US11/032,957 Abandoned US20050149306A1 (en) | 1996-03-25 | 2005-01-11 | Iterative drilling simulation process for enhanced economic decision making |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/820,242 Expired - Lifetime US6612382B2 (en) | 1996-03-25 | 2001-03-28 | Iterative drilling simulation process for enhanced economic decision making |
US10/607,900 Expired - Lifetime US7085696B2 (en) | 1996-03-25 | 2003-06-27 | Iterative drilling simulation process for enhanced economic decision making |
Country Status (7)
Country | Link |
---|---|
US (3) | US6612382B2 (en) |
BR (1) | BR0200873A (en) |
CA (1) | CA2369669C (en) |
FR (2) | FR2823581B1 (en) |
GB (1) | GB2378017B (en) |
NL (3) | NL1020253C2 (en) |
NO (2) | NO333726B1 (en) |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040211596A1 (en) * | 2000-10-11 | 2004-10-28 | Sujian Huang | Simulating the dynamic response of a drilling tool assembly and its application to drilling tool assembly design optimization and drilling performance optimization |
US20050273302A1 (en) * | 2000-03-13 | 2005-12-08 | Smith International, Inc. | Dynamically balanced cutting tool system |
US20050273304A1 (en) * | 2000-03-13 | 2005-12-08 | Smith International, Inc. | Methods for evaluating and improving drilling operations |
US20060047527A1 (en) * | 2004-08-30 | 2006-03-02 | Caveny William J | Determining, pricing, and/or providing well servicing treatments and data processing systems therefor |
US7020597B2 (en) | 2000-10-11 | 2006-03-28 | Smith International, Inc. | Methods for evaluating and improving drilling operations |
US20060173625A1 (en) * | 2005-02-01 | 2006-08-03 | Smith International, Inc. | System for optimizing drilling in real time |
US20060195307A1 (en) * | 2000-03-13 | 2006-08-31 | Smith International, Inc. | Dynamic vibrational control |
US20070185696A1 (en) * | 2006-02-06 | 2007-08-09 | Smith International, Inc. | Method of real-time drilling simulation |
WO2007100703A2 (en) * | 2006-02-27 | 2007-09-07 | Schlumberger Canada Limited | Well planning system and method |
US20070272407A1 (en) * | 2006-05-25 | 2007-11-29 | Halliburton Energy Services, Inc. | Method and system for development of naturally fractured formations |
WO2008039523A1 (en) * | 2006-09-27 | 2008-04-03 | Halliburton Energy Services, Inc. | Monitor and control of directional drilling operations and simulations |
US20080314641A1 (en) * | 2007-06-20 | 2008-12-25 | Mcclard Kevin | Directional Drilling System and Software Method |
US20090076873A1 (en) * | 2007-09-19 | 2009-03-19 | General Electric Company | Method and system to improve engineered system decisions and transfer risk |
WO2009058635A2 (en) * | 2007-10-30 | 2009-05-07 | Bp Corporation North America Inc. | An intelligent drilling advisor |
US20090132458A1 (en) * | 2007-10-30 | 2009-05-21 | Bp North America Inc. | Intelligent Drilling Advisor |
US20090319241A1 (en) * | 2008-06-24 | 2009-12-24 | Landmark Graphics Corporation, A Halliburton Company | Systems and Methods for Modeing Wellbore Trajectories |
US20100259415A1 (en) * | 2007-11-30 | 2010-10-14 | Michael Strachan | Method and System for Predicting Performance of a Drilling System Having Multiple Cutting Structures |
US20110174541A1 (en) * | 2008-10-03 | 2011-07-21 | Halliburton Energy Services, Inc. | Method and System for Predicting Performance of a Drilling System |
US20140214476A1 (en) * | 2013-01-31 | 2014-07-31 | Halliburton Energy Services, Inc. | Data initialization for a subterranean operation |
CN104933922A (en) * | 2015-01-22 | 2015-09-23 | 中国石油技术开发公司 | Drilling rig installation and simulation system |
WO2016073356A1 (en) * | 2014-11-04 | 2016-05-12 | Schlumberger Canada Limited | Methods and systems for designing bottomhole assemblies |
US9359882B2 (en) | 2006-09-27 | 2016-06-07 | Halliburton Energy Services, Inc. | Monitor and control of directional drilling operations and simulations |
TWI626622B (en) * | 2017-07-04 | 2018-06-11 | System and method for stereoscopic imaging of underground rock formation characteristics | |
US10808517B2 (en) | 2018-12-17 | 2020-10-20 | Baker Hughes Holdings Llc | Earth-boring systems and methods for controlling earth-boring systems |
US11098573B2 (en) * | 2018-03-13 | 2021-08-24 | Nabors Drilling Technologies Usa, Inc. | Systems and methods for estimating drill bit rotational velocity using top drive torque and rotational velocity |
US11346215B2 (en) | 2018-01-23 | 2022-05-31 | Baker Hughes Holdings Llc | Methods of evaluating drilling performance, methods of improving drilling performance, and related systems for drilling using such methods |
Families Citing this family (172)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6612382B2 (en) * | 1996-03-25 | 2003-09-02 | Halliburton Energy Services, Inc. | Iterative drilling simulation process for enhanced economic decision making |
US7032689B2 (en) * | 1996-03-25 | 2006-04-25 | Halliburton Energy Services, Inc. | Method and system for predicting performance of a drilling system of a given formation |
US5794720A (en) * | 1996-03-25 | 1998-08-18 | Dresser Industries, Inc. | Method of assaying downhole occurrences and conditions |
US7693695B2 (en) * | 2000-03-13 | 2010-04-06 | Smith International, Inc. | Methods for modeling, displaying, designing, and optimizing fixed cutter bits |
CA2340547C (en) * | 2000-03-13 | 2005-12-13 | Smith International, Inc. | Method for simulating drilling of roller cone bits and its application to roller cone bit design and performance |
US9482055B2 (en) * | 2000-10-11 | 2016-11-01 | Smith International, Inc. | Methods for modeling, designing, and optimizing the performance of drilling tool assemblies |
US8589124B2 (en) * | 2000-08-09 | 2013-11-19 | Smith International, Inc. | Methods for modeling wear of fixed cutter bits and for designing and optimizing fixed cutter bits |
US6527068B1 (en) * | 2000-08-16 | 2003-03-04 | Smith International, Inc. | Roller cone drill bit having non-axisymmetric cutting elements oriented to optimize drilling performance |
US7284623B2 (en) * | 2001-08-01 | 2007-10-23 | Smith International, Inc. | Method of drilling a bore hole |
US7027968B2 (en) * | 2002-01-18 | 2006-04-11 | Conocophillips Company | Method for simulating subsea mudlift drilling and well control operations |
DE10225274A1 (en) * | 2002-06-07 | 2003-12-18 | Hilti Ag | Method and system for providing a decision aid for users for the selection of drilling and / or cutting elements to be used in a building material region |
US7334222B2 (en) * | 2002-09-11 | 2008-02-19 | International Business Machines Corporation | Methods and apparatus for dependency-based impact simulation and vulnerability analysis |
US6675101B1 (en) | 2002-11-14 | 2004-01-06 | Schlumberger Technology Corporation | Method and system for supplying well log data to a customer |
US7026950B2 (en) * | 2003-03-12 | 2006-04-11 | Varco I/P, Inc. | Motor pulse controller |
US8185365B2 (en) * | 2003-03-26 | 2012-05-22 | Smith International, Inc. | Radial force distributions in rock bits |
US7835893B2 (en) | 2003-04-30 | 2010-11-16 | Landmark Graphics Corporation | Method and system for scenario and case decision management |
US6760665B1 (en) * | 2003-05-21 | 2004-07-06 | Schlumberger Technology Corporation | Data central for manipulation and adjustment of down hole and surface well site recordings |
FR2855633B1 (en) * | 2003-06-02 | 2008-02-08 | Inst Francais Du Petrole | METHOD FOR AIDING DECISION-MAKING FOR THE MANAGEMENT OF A PETROLEUM DEPOSITION UNDER UNCERTAIN TECHNICAL AND ECONOMIC PARAMETERS |
WO2005008021A1 (en) * | 2003-07-09 | 2005-01-27 | Smith International, Inc. | Methods for modeling wear of fixed cutter bits and for designing and optimizing fixed cutter bits |
NO20050200L (en) * | 2004-01-13 | 2005-07-14 | Weatherford Lamb | System for evaluating over- and under-balanced drilling operations |
US7434632B2 (en) * | 2004-03-02 | 2008-10-14 | Halliburton Energy Services, Inc. | Roller cone drill bits with enhanced drilling stability and extended life of associated bearings and seals |
US7630914B2 (en) * | 2004-03-17 | 2009-12-08 | Schlumberger Technology Corporation | Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties |
US7548873B2 (en) * | 2004-03-17 | 2009-06-16 | Schlumberger Technology Corporation | Method system and program storage device for automatically calculating and displaying time and cost data in a well planning system using a Monte Carlo simulation software |
US7546884B2 (en) * | 2004-03-17 | 2009-06-16 | Schlumberger Technology Corporation | Method and apparatus and program storage device adapted for automatic drill string design based on wellbore geometry and trajectory requirements |
US7258175B2 (en) * | 2004-03-17 | 2007-08-21 | Schlumberger Technology Corporation | Method and apparatus and program storage device adapted for automatic drill bit selection based on earth properties and wellbore geometry |
US7653563B2 (en) * | 2004-03-17 | 2010-01-26 | Schlumberger Technology Corporation | Method and apparatus and program storage device adapted for automatic qualitative and quantitative risk assessment based on technical wellbore design and earth properties |
GB2413403B (en) * | 2004-04-19 | 2008-01-09 | Halliburton Energy Serv Inc | Field synthesis system and method for optimizing drilling operations |
EP1745612A4 (en) * | 2004-05-11 | 2011-03-16 | Trimble Planning Solutions Pty Ltd | Path analysis system |
GB2417966A (en) | 2004-08-16 | 2006-03-15 | Halliburton Energy Serv Inc | Roller cone drill bits with optimized bearing structure |
GB0419588D0 (en) | 2004-09-03 | 2004-10-06 | Virtual Well Engineer Ltd | "Design and control of oil well formation" |
GB2419202B (en) * | 2004-10-12 | 2006-10-25 | Smith International | A method of manufacturing a drill bit and a drill bit |
US7412331B2 (en) * | 2004-12-16 | 2008-08-12 | Chevron U.S.A. Inc. | Method for predicting rate of penetration using bit-specific coefficient of sliding friction and mechanical efficiency as a function of confined compressive strength |
US7555414B2 (en) * | 2004-12-16 | 2009-06-30 | Chevron U.S.A. Inc. | Method for estimating confined compressive strength for rock formations utilizing skempton theory |
US20060167668A1 (en) * | 2005-01-24 | 2006-07-27 | Smith International, Inc. | PDC drill bit with cutter design optimized with dynamic centerline analysis and having dynamic center line trajectory |
US7954559B2 (en) * | 2005-04-06 | 2011-06-07 | Smith International, Inc. | Method for optimizing the location of a secondary cutting structure component in a drill string |
US8209202B2 (en) | 2005-04-29 | 2012-06-26 | Landmark Graphics Corporation | Analysis of multiple assets in view of uncertainties |
CA2625012C (en) * | 2005-08-08 | 2016-05-03 | Halliburton Energy Services, Inc. | Methods and systems for design and/or selection of drilling equipment based on wellbore drilling simulations |
US7860696B2 (en) | 2005-08-08 | 2010-12-28 | Halliburton Energy Services, Inc. | Methods and systems to predict rotary drill bit walk and to design rotary drill bits and other downhole tools |
US7860693B2 (en) | 2005-08-08 | 2010-12-28 | Halliburton Energy Services, Inc. | Methods and systems for designing and/or selecting drilling equipment using predictions of rotary drill bit walk |
US7603364B2 (en) * | 2005-10-25 | 2009-10-13 | Ods-Petrodata, Inc. | System for acquiring rights to lease a floating production system |
US7599943B2 (en) * | 2005-10-25 | 2009-10-06 | Ods-Petrodata, Inc. | System for acquiring rights to lease a drilling rig |
US7603295B2 (en) * | 2005-10-25 | 2009-10-13 | Ods-Petrodata, Inc. | Method for acquiring rights to lease a drilling rig |
US7599940B2 (en) * | 2005-10-25 | 2009-10-06 | Ods-Petrodata, Inc. | System for acquiring rights to lease an offshore support vessel |
US8065238B2 (en) * | 2005-12-02 | 2011-11-22 | Lincoln Global, Inc. | Performing robust cost analysis of a gas laser application |
US7599797B2 (en) * | 2006-02-09 | 2009-10-06 | Schlumberger Technology Corporation | Method of mitigating risk of well collision in a field |
US7650267B1 (en) | 2006-03-31 | 2010-01-19 | Rockwell Automation Technologies, Inc. | Distribution of DES replications in a simulation |
GB0613540D0 (en) * | 2006-07-07 | 2006-08-16 | Tauro Peter F | Virtual reality holographic drilling (vr-hd) |
US8670963B2 (en) | 2006-07-20 | 2014-03-11 | Smith International, Inc. | Method of selecting drill bits |
US7778859B2 (en) * | 2006-08-28 | 2010-08-17 | Schlumberger Technology Corporation | Method for economic valuation in seismic to simulation workflows |
US7472022B2 (en) * | 2006-08-31 | 2008-12-30 | Schlumberger Technology Corporation | Method and system for managing a drilling operation in a multicomponent particulate system |
US7857047B2 (en) * | 2006-11-02 | 2010-12-28 | Exxonmobil Upstream Research Company | Method of drilling and producing hydrocarbons from subsurface formations |
WO2008070829A2 (en) * | 2006-12-07 | 2008-06-12 | Nabors Global Holdings Ltd. | Automated mse-based drilling apparatus and methods |
US7823655B2 (en) * | 2007-09-21 | 2010-11-02 | Canrig Drilling Technology Ltd. | Directional drilling control |
US11725494B2 (en) | 2006-12-07 | 2023-08-15 | Nabors Drilling Technologies Usa, Inc. | Method and apparatus for automatically modifying a drilling path in response to a reversal of a predicted trend |
US8672055B2 (en) | 2006-12-07 | 2014-03-18 | Canrig Drilling Technology Ltd. | Automated directional drilling apparatus and methods |
US8346695B2 (en) * | 2007-03-29 | 2013-01-01 | Schlumberger Technology Corporation | System and method for multiple volume segmentation |
US8285531B2 (en) * | 2007-04-19 | 2012-10-09 | Smith International, Inc. | Neural net for use in drilling simulation |
US7996327B2 (en) * | 2007-09-28 | 2011-08-09 | Diversey, Inc. | Product efficiency calculator system and method |
US20110161133A1 (en) * | 2007-09-29 | 2011-06-30 | Schlumberger Technology Corporation | Planning and Performing Drilling Operations |
WO2009079575A2 (en) * | 2007-12-17 | 2009-06-25 | Schlumberger Canada Limited | Optimizing drilling performance using a selected drilling fluid |
WO2009086094A1 (en) * | 2007-12-21 | 2009-07-09 | Nabors Global Holdings, Ltd. | Integrated quill position and toolface orientation display |
US8099267B2 (en) | 2008-01-11 | 2012-01-17 | Schlumberger Technology Corporation | Input deck migrator for simulators |
US20090198505A1 (en) * | 2008-02-05 | 2009-08-06 | Peter Gipps | Interactive path planning with dynamic costing |
US8803878B2 (en) * | 2008-03-28 | 2014-08-12 | Schlumberger Technology Corporation | Visualizing region growing in three dimensional voxel volumes |
US8301383B2 (en) * | 2008-06-02 | 2012-10-30 | Schlumberger Technology Corporation | Estimating in situ mechanical properties of sediments containing gas hydrates |
WO2010002975A1 (en) * | 2008-07-01 | 2010-01-07 | Services Petroliers Schlumberger | Effective hydrocarbon reservoir exploration decision making |
US20100078216A1 (en) * | 2008-09-25 | 2010-04-01 | Baker Hughes Incorporated | Downhole vibration monitoring for reaming tools |
MY158618A (en) | 2008-11-03 | 2016-10-31 | Schlumberger Technology Bv | Methods and apparatus for planning and dynamically updating sampling operations while drilling in a subterranean formation |
US8510081B2 (en) * | 2009-02-20 | 2013-08-13 | Canrig Drilling Technology Ltd. | Drilling scorecard |
US8528663B2 (en) * | 2008-12-19 | 2013-09-10 | Canrig Drilling Technology Ltd. | Apparatus and methods for guiding toolface orientation |
GB2466812B (en) * | 2009-01-08 | 2011-10-19 | Schlumberger Holdings | Drillstring dynamics |
US8082104B2 (en) * | 2009-01-23 | 2011-12-20 | Varel International Ind., L.P. | Method to determine rock properties from drilling logs |
NO338750B1 (en) | 2009-03-02 | 2016-10-17 | Drilltronics Rig Systems As | Method and system for automated drilling process control |
US11157883B2 (en) * | 2009-09-29 | 2021-10-26 | The Boeing Company | Step analysis process steps within a fleet performance optimization tool |
CN101702273B (en) * | 2009-11-10 | 2011-08-17 | 成都盛特石油装备模拟技术开发有限公司 | Portable drilling simulation system |
IN2012DN05167A (en) | 2010-02-12 | 2015-10-23 | Exxonmobil Upstream Res Co | |
CN101761328B (en) * | 2010-03-03 | 2013-01-02 | 北京科技大学 | Stratum geology interface instrument drilling induction recognition system |
CA2786584C (en) | 2010-03-12 | 2017-07-18 | Exxonmobil Upstream Research Company | Dynamic grouping of domain objects via smart groups |
US9086348B2 (en) | 2010-04-06 | 2015-07-21 | Varel Europe S.A.S. | Downhole acoustic emission formation sampling |
US8322217B2 (en) | 2010-04-06 | 2012-12-04 | Varel Europe S.A.S. | Acoustic emission toughness testing for PDC, PCBN, or other hard or superhard material inserts |
US8596124B2 (en) | 2010-04-06 | 2013-12-03 | Varel International Ind., L.P. | Acoustic emission toughness testing having smaller noise ratio |
US9297731B2 (en) | 2010-04-06 | 2016-03-29 | Varel Europe S.A.S | Acoustic emission toughness testing for PDC, PCBN, or other hard or superhard material inserts |
US8397572B2 (en) | 2010-04-06 | 2013-03-19 | Varel Europe S.A.S. | Acoustic emission toughness testing for PDC, PCBN, or other hard or superhard materials |
US8365599B2 (en) | 2010-04-06 | 2013-02-05 | Varel Europe S.A.S. | Acoustic emission toughness testing for PDC, PCBN, or other hard or superhard materials |
EA025004B1 (en) * | 2010-06-18 | 2016-11-30 | Лэндмарк Грэфикс Корпорейшн | Computer-implemented method for wellbore optimization and program carrier device having computer executable instructions for optimization of a wellbore |
US8332155B2 (en) | 2010-09-13 | 2012-12-11 | Chevron U.S.A. Inc. | System and method for hydrocarbon gas pay zone characterization in a subterranean reservoir |
EP2668641B1 (en) | 2011-01-26 | 2020-04-15 | Exxonmobil Upstream Research Company | Method of reservoir compartment analysis using topological structure in 3d earth model |
US20120272174A1 (en) * | 2011-04-21 | 2012-10-25 | National Oilwell Varco, L.P. | System and method for drilling a borehole using streaming reference data |
US8749549B2 (en) * | 2011-06-10 | 2014-06-10 | Schlumberger Technology Corporation | Prospect assessment and play chance mapping tools |
US8902221B2 (en) * | 2011-06-10 | 2014-12-02 | Schlumberger Technology Corporation | Prospect assessment and play chance mapping tools |
US10227857B2 (en) | 2011-08-29 | 2019-03-12 | Baker Hughes, A Ge Company, Llc | Modeling and simulation of complete drill strings |
US9593567B2 (en) | 2011-12-01 | 2017-03-14 | National Oilwell Varco, L.P. | Automated drilling system |
US9157309B1 (en) | 2011-12-22 | 2015-10-13 | Hunt Advanced Drilling Technologies, LLC | System and method for remotely controlled surface steerable drilling |
US8210283B1 (en) | 2011-12-22 | 2012-07-03 | Hunt Energy Enterprises, L.L.C. | System and method for surface steerable drilling |
US11085283B2 (en) | 2011-12-22 | 2021-08-10 | Motive Drilling Technologies, Inc. | System and method for surface steerable drilling using tactical tracking |
US9297205B2 (en) | 2011-12-22 | 2016-03-29 | Hunt Advanced Drilling Technologies, LLC | System and method for controlling a drilling path based on drift estimates |
US9404356B2 (en) | 2011-12-22 | 2016-08-02 | Motive Drilling Technologies, Inc. | System and method for remotely controlled surface steerable drilling |
US8596385B2 (en) | 2011-12-22 | 2013-12-03 | Hunt Advanced Drilling Technologies, L.L.C. | System and method for determining incremental progression between survey points while drilling |
CN102562052B (en) * | 2012-02-26 | 2016-02-03 | 中国石油天然气集团公司 | Method for recognizing harm bodies of casing failure of shallow layer of close well spacing |
WO2013148362A1 (en) | 2012-03-27 | 2013-10-03 | Exxonmobil Upstream Research Company | Designing a drillstring |
US9249059B2 (en) | 2012-04-05 | 2016-02-02 | Varel International Ind., L.P. | High temperature high heating rate treatment of PDC cutters |
US9057258B2 (en) | 2012-05-09 | 2015-06-16 | Hunt Advanced Drilling Technologies, LLC | System and method for using controlled vibrations for borehole communications |
US8517093B1 (en) | 2012-05-09 | 2013-08-27 | Hunt Advanced Drilling Technologies, L.L.C. | System and method for drilling hammer communication, formation evaluation and drilling optimization |
US9982532B2 (en) | 2012-05-09 | 2018-05-29 | Hunt Energy Enterprises, L.L.C. | System and method for controlling linear movement using a tapered MR valve |
US9465140B2 (en) | 2012-06-22 | 2016-10-11 | Exxonmobil Upstream Research Company | Petrophysical method for predicting shear strength anisotropy in fine-grained rock formations |
AU2013286817B2 (en) | 2012-07-06 | 2017-01-05 | Technological Resources Pty Ltd | A method of, and a system for, drilling to a position relative to a geological boundary |
US9411071B2 (en) | 2012-08-31 | 2016-08-09 | Exxonmobil Upstream Research Company | Method of estimating rock mechanical properties |
US9309747B2 (en) * | 2012-09-14 | 2016-04-12 | Baker Hughes Incorporated | System and method for generating profile-based alerts/alarms |
US9022140B2 (en) | 2012-10-31 | 2015-05-05 | Resource Energy Solutions Inc. | Methods and systems for improved drilling operations using real-time and historical drilling data |
US9290995B2 (en) | 2012-12-07 | 2016-03-22 | Canrig Drilling Technology Ltd. | Drill string oscillation methods |
WO2014121147A1 (en) * | 2013-01-31 | 2014-08-07 | Betazi, Llc | Production analysis and/or forecasting methods, apparatus, and systems |
EP3008281A2 (en) | 2013-06-10 | 2016-04-20 | Exxonmobil Upstream Research Company | Interactively planning a well site |
EP2816194A1 (en) * | 2013-06-19 | 2014-12-24 | Siemens Aktiengesellschaft | Method for performing a deep drilling process |
US10920576B2 (en) | 2013-06-24 | 2021-02-16 | Motive Drilling Technologies, Inc. | System and method for determining BHA position during lateral drilling |
US8818729B1 (en) | 2013-06-24 | 2014-08-26 | Hunt Advanced Drilling Technologies, LLC | System and method for formation detection and evaluation |
US8996396B2 (en) | 2013-06-26 | 2015-03-31 | Hunt Advanced Drilling Technologies, LLC | System and method for defining a drilling path based on cost |
US10180045B2 (en) | 2013-09-06 | 2019-01-15 | Smith International, Inc. | System and method of selecting a drill bit and modifying a drill bit design |
US9864098B2 (en) | 2013-09-30 | 2018-01-09 | Exxonmobil Upstream Research Company | Method and system of interactive drill center and well planning evaluation and optimization |
EP3055716B1 (en) | 2013-10-08 | 2018-06-06 | Exxonmobil Upstream Research Company | Automatic dip picking from wellbore azimuthal image logs |
EP3039230A4 (en) * | 2013-10-08 | 2018-02-28 | Landmark Graphics Corporation | Predefining elements of a cemented wellbore |
CN105518251B (en) * | 2013-10-21 | 2018-11-20 | 哈利伯顿能源服务公司 | The drilling automation realized using Stochastic Optimal Control |
US20150185363A1 (en) * | 2013-12-26 | 2015-07-02 | Baker Hughes Incorporated | Data visualization in borehole systems |
US9556728B2 (en) | 2014-01-13 | 2017-01-31 | Varel Europe S.A.S. | Methods and systems of analyzing wellbore drilling operations |
CA2934451C (en) * | 2014-01-30 | 2020-08-25 | Landmark Graphics Corporation | Smart grouping legend |
AU2014380350B2 (en) * | 2014-01-30 | 2017-11-30 | Landmark Graphics Corporation | Depth range manager for drill string analysis |
WO2015126423A1 (en) | 2014-02-24 | 2015-08-27 | Landmark Graphics Corporation | Total asset modeling with integrated asset models and persistent asset models |
US10062044B2 (en) * | 2014-04-12 | 2018-08-28 | Schlumberger Technology Corporation | Method and system for prioritizing and allocating well operating tasks |
US9428961B2 (en) | 2014-06-25 | 2016-08-30 | Motive Drilling Technologies, Inc. | Surface steerable drilling system for use with rotary steerable system |
US11106185B2 (en) | 2014-06-25 | 2021-08-31 | Motive Drilling Technologies, Inc. | System and method for surface steerable drilling to provide formation mechanical analysis |
US10612307B2 (en) * | 2014-08-28 | 2020-04-07 | Schlumberger Technology Corporation | Method and system for directional drilling |
WO2016032530A1 (en) * | 2014-08-29 | 2016-03-03 | Landmark Graphics Corporation | Directional driller quality reporting system and method |
CA3031827C (en) * | 2014-10-02 | 2020-11-10 | Motive Drilling Technologies, Inc. | Surface steerable drilling system for use with rotary steerable system |
US9890633B2 (en) | 2014-10-20 | 2018-02-13 | Hunt Energy Enterprises, Llc | System and method for dual telemetry acoustic noise reduction |
CN106795753A (en) | 2014-11-20 | 2017-05-31 | 哈利伯顿能源服务公司 | Earth formation break-up model |
US10094209B2 (en) | 2014-11-26 | 2018-10-09 | Nabors Drilling Technologies Usa, Inc. | Drill pipe oscillation regime for slide drilling |
US9784035B2 (en) | 2015-02-17 | 2017-10-10 | Nabors Drilling Technologies Usa, Inc. | Drill pipe oscillation regime and torque controller for slide drilling |
CN104806226B (en) * | 2015-04-30 | 2018-08-17 | 北京四利通控制技术股份有限公司 | intelligent drilling expert system |
WO2016183172A1 (en) | 2015-05-11 | 2016-11-17 | Smith International, Inc. | Method of designing and optimizing fixed cutter drill bits using dynamic cutter velocity, displacement, forces and work |
WO2017027068A1 (en) * | 2015-08-07 | 2017-02-16 | Schlumberger Technology Corporation | Well management on cloud computing system |
US10787887B2 (en) | 2015-08-07 | 2020-09-29 | Schlumberger Technology Corporation | Method of performing integrated fracture and reservoir operations for multiple wellbores at a wellsite |
WO2017027340A1 (en) | 2015-08-07 | 2017-02-16 | Schlumberger Technology Corporation | Method integrating fracture and reservoir operations into geomechanical operations of a wellsite |
US10215001B1 (en) | 2015-09-28 | 2019-02-26 | Hongfeng Bi | High pressure high temperature drilling simulator |
CA2915802A1 (en) * | 2015-12-18 | 2017-06-18 | Objectivity.Ca | Explorative sampling of natural mineral resource deposits |
US10482202B2 (en) | 2016-06-30 | 2019-11-19 | The Procter & Gamble Company | Method for modeling a manufacturing process for a product |
GB2566403B (en) * | 2016-07-07 | 2021-12-22 | Nat Oilwell Varco Norway As | Systems and methods for managing fluid pressure in a borehole during drilling operations |
US11933158B2 (en) | 2016-09-02 | 2024-03-19 | Motive Drilling Technologies, Inc. | System and method for mag ranging drilling control |
EP3552125B1 (en) * | 2016-12-07 | 2023-09-20 | Safekick Americas LLC | Automated model-based drilling |
US10378282B2 (en) | 2017-03-10 | 2019-08-13 | Nabors Drilling Technologies Usa, Inc. | Dynamic friction drill string oscillation systems and methods |
US10875209B2 (en) | 2017-06-19 | 2020-12-29 | Nuwave Industries Inc. | Waterjet cutting tool |
US10968730B2 (en) * | 2017-07-25 | 2021-04-06 | Exxonmobil Upstream Research Company | Method of optimizing drilling ramp-up |
US10502043B2 (en) * | 2017-07-26 | 2019-12-10 | Nabors Drilling Technologies Usa, Inc. | Methods and devices to perform offset surveys |
CN107288562B (en) * | 2017-07-26 | 2019-04-19 | 武汉轻工大学 | Gas lift reverse circulation borehole cleaning experiment simulator |
AU2018313280B8 (en) | 2017-08-10 | 2023-09-21 | Motive Drilling Technologies, Inc. | Apparatus and methods for automated slide drilling |
US10830033B2 (en) | 2017-08-10 | 2020-11-10 | Motive Drilling Technologies, Inc. | Apparatus and methods for uninterrupted drilling |
WO2019036122A1 (en) | 2017-08-14 | 2019-02-21 | Exxonmobil Upstream Research Company | Methods of drilling a wellbore within a subsurface region and drilling control systems that perform the methods |
US20190138970A1 (en) * | 2017-11-07 | 2019-05-09 | General Electric Company | Contextual digital twin |
CN109812236B (en) * | 2017-11-22 | 2021-01-29 | 中国石油化工股份有限公司 | Method for determining well cleaning effect in special-shaped well |
US10570707B2 (en) * | 2017-12-21 | 2020-02-25 | Exebenus AS | Method and system for archiving a plurality of individual data files from an oil well in an indexed manner |
WO2019144040A2 (en) | 2018-01-19 | 2019-07-25 | Motive Drilling Technologies, Inc. | System and method for analysis and control of drilling mud and additives |
US12055028B2 (en) | 2018-01-19 | 2024-08-06 | Motive Drilling Technologies, Inc. | System and method for well drilling control based on borehole cleaning |
WO2019226149A1 (en) | 2018-05-21 | 2019-11-28 | Newpark Drilling Fluids Llc | System for simulating in situ downhole drilling conditions and testing of core samples |
WO2020046512A1 (en) * | 2018-08-31 | 2020-03-05 | Halliburton Energy Services, Inc. | Autonomous directional drilling directional tendency estimation |
RU2697988C1 (en) * | 2019-01-29 | 2019-08-21 | Общество с ограниченной ответственностью "ВНИИБТ-Буровой инструмент" (ООО "ВНИИБТ-Буровой инструмент") | Method and system for automated control of well drilling |
US11313217B2 (en) * | 2019-02-12 | 2022-04-26 | Helmerich & Payne Technologies, Llc | Systems and methods of iterative well planning for optimized results |
US11466556B2 (en) | 2019-05-17 | 2022-10-11 | Helmerich & Payne, Inc. | Stall detection and recovery for mud motors |
WO2020236232A1 (en) | 2019-05-21 | 2020-11-26 | Schlumberger Technology Corporation | Drilling control |
US11663542B2 (en) * | 2019-11-07 | 2023-05-30 | Clay Rankin | Electronic knowledge creation and management visual transformation tool |
US11867054B2 (en) | 2020-05-11 | 2024-01-09 | Saudi Arabian Oil Company | Systems and methods for estimating well parameters and drilling wells |
US11521266B2 (en) * | 2020-08-11 | 2022-12-06 | Hitachi, Ltd. | Supply and demand matching within an exchange market for anticipative demand from early signals |
US12071844B2 (en) * | 2020-11-12 | 2024-08-27 | Schlumberger Technology Corporation | Multi-agent drilling decision system and method |
US11753926B2 (en) * | 2021-07-01 | 2023-09-12 | Saudi Arabian Oil Company | Method and system for predicting caliper log data for descaled wells |
US11885212B2 (en) | 2021-07-16 | 2024-01-30 | Helmerich & Payne Technologies, Llc | Apparatus and methods for controlling drilling |
Citations (86)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US703289A (en) * | 1900-04-30 | 1902-06-24 | Moore Electrolytic Company | Process of producing caustic. |
US1209299A (en) * | 1914-12-30 | 1916-12-19 | Sharp Hughes Tool Company | Rotary boring-drill. |
US1263802A (en) * | 1917-08-13 | 1918-04-23 | Clarence Edw Reed | Boring-drill. |
US1394769A (en) * | 1920-05-18 | 1921-10-25 | C E Reed | Drill-head for oil-wells |
US3593807A (en) * | 1969-12-11 | 1971-07-20 | Frank J Klima | Drilling apparatus |
US3660649A (en) * | 1970-09-28 | 1972-05-02 | Tenneco Oil Co | Apparatus and method for computing drilling costs |
US3752966A (en) * | 1971-05-28 | 1973-08-14 | Santa Fe Int Corp | Drill bit utilization optimizer |
US3761701A (en) * | 1971-07-14 | 1973-09-25 | Amoco Prod Co | Drilling cost indicator |
US3971449A (en) * | 1973-10-09 | 1976-07-27 | Oy Tampella Ab | Procedure for controlling a rock drill and rock drill for carrying out the procedure |
US4056153A (en) * | 1975-05-29 | 1977-11-01 | Dresser Industries, Inc. | Rotary rock bit with multiple row coverage for very hard formations |
US4064749A (en) * | 1976-11-11 | 1977-12-27 | Texaco Inc. | Method and system for determining formation porosity |
US4096385A (en) * | 1976-02-25 | 1978-06-20 | Schlumberger Technology Corporation | Clay content determination by natural gamma ray spectrometry |
US4195699A (en) * | 1978-06-29 | 1980-04-01 | United States Steel Corporation | Drilling optimization searching and control method |
US4354233A (en) * | 1972-05-03 | 1982-10-12 | Zhukovsky Alexei A | Rotary drill automatic control system |
US4407017A (en) * | 1978-09-06 | 1983-09-27 | Zhilikov Valentin V | Method and apparatus for controlling drilling process |
US4479176A (en) * | 1981-03-11 | 1984-10-23 | Metalogic Control Limited | Adaptive control of a dynamic system or process |
US4617825A (en) * | 1985-09-12 | 1986-10-21 | Halliburton Company | Well logging analysis methods for use in complex lithology reservoirs |
US4627276A (en) * | 1984-12-27 | 1986-12-09 | Schlumberger Technology Corporation | Method for measuring bit wear during drilling |
US4646240A (en) * | 1982-02-02 | 1987-02-24 | Oberto Serra | Method and apparatus for determining geological facies |
US4685329A (en) * | 1984-05-03 | 1987-08-11 | Schlumberger Technology Corporation | Assessment of drilling conditions |
US4694686A (en) * | 1984-06-18 | 1987-09-22 | Borg-Warner Corporation | Cutting tool wear monitor |
US4718011A (en) * | 1982-11-01 | 1988-01-05 | Western Atlas International, Inc. | Well logging data acquisition, telemetry and control method and system |
US4794535A (en) * | 1986-08-18 | 1988-12-27 | Automated Decisions, Inc. | Method for determining economic drill bit utilization |
US4794534A (en) * | 1985-08-08 | 1988-12-27 | Amoco Corporation | Method of drilling a well utilizing predictive simulation with real time data |
US4793421A (en) * | 1986-04-08 | 1988-12-27 | Becor Western Inc. | Programmed automatic drill control |
US4845628A (en) * | 1986-08-18 | 1989-07-04 | Automated Decisions, Inc. | Method for optimization of drilling costs |
US4852399A (en) * | 1988-07-13 | 1989-08-01 | Anadrill, Inc. | Method for determining drilling conditions while drilling |
US4875530A (en) * | 1987-09-24 | 1989-10-24 | Parker Technology, Inc. | Automatic drilling system |
US4876886A (en) * | 1988-04-04 | 1989-10-31 | Anadrill, Inc. | Method for detecting drilling events from measurement while drilling sensors |
US4903527A (en) * | 1984-01-26 | 1990-02-27 | Schlumberger Technology Corp. | Quantitative clay typing and lithological evaluation of subsurface formations |
US4914591A (en) * | 1988-03-25 | 1990-04-03 | Amoco Corporation | Method of determining rock compressive strength |
US4916616A (en) * | 1986-12-08 | 1990-04-10 | Bp Exploration, Inc. | Self-consistent log interpretation method |
US4926686A (en) * | 1987-09-17 | 1990-05-22 | Institut Francais Du Petrole | Method for determining the wear of the cutting means of a tool during drilling a rocky formation |
US4928521A (en) * | 1988-04-05 | 1990-05-29 | Schlumberger Technology Corporation | Method of determining drill bit wear |
US4966950A (en) * | 1986-01-29 | 1990-10-30 | E. I. Du Pont De Nemours & Co. | Oriented polymeric tape |
US4981037A (en) * | 1986-05-28 | 1991-01-01 | Baroid Technology, Inc. | Method for determining pore pressure and horizontal effective stress from overburden and effective vertical stresses |
US5010789A (en) * | 1989-02-21 | 1991-04-30 | Amoco Corporation | Method of making imbalanced compensated drill bit |
US5012674A (en) * | 1988-10-31 | 1991-05-07 | Amoco Corporation | Method of exploration for hydrocarbons |
US5042596A (en) * | 1989-02-21 | 1991-08-27 | Amoco Corporation | Imbalance compensated drill bit |
US5205164A (en) * | 1990-08-31 | 1993-04-27 | Exxon Production Research Company | Methods for determining in situ shale strengths, elastic properties, pore pressures, formation stresses, and drilling fluid parameters |
US5216612A (en) * | 1990-07-16 | 1993-06-01 | R. J. Reynolds Tobacco Company | Intelligent computer integrated maintenance system and method |
US5216917A (en) * | 1990-07-13 | 1993-06-08 | Schlumberger Technology Corporation | Method of determining the drilling conditions associated with the drilling of a formation with a drag bit |
US5239467A (en) * | 1990-05-21 | 1993-08-24 | Amoco Corporation | Method for enhancing geophysical data by nonlinear compression of the dynamic range |
US5251286A (en) * | 1992-03-16 | 1993-10-05 | Texaco, Inc. | Method for estimating formation permeability from wireline logs using neural networks |
US5282384A (en) * | 1992-10-05 | 1994-02-01 | Baroid Technology, Inc. | Method for calculating sedimentary rock pore pressure |
US5305836A (en) * | 1992-04-08 | 1994-04-26 | Baroid Technology, Inc. | System and method for controlling drill bit usage and well plan |
US5318136A (en) * | 1990-03-06 | 1994-06-07 | University Of Nottingham | Drilling process and apparatus |
US5330016A (en) * | 1993-05-07 | 1994-07-19 | Barold Technology, Inc. | Drill bit and other downhole tools having electro-negative surfaces and sacrificial anodes to reduce mud balling |
US5334833A (en) * | 1991-06-14 | 1994-08-02 | Schlumberger Technology Corporation | Sensitivity function technique for modeling nuclear tools |
US5369507A (en) * | 1991-09-03 | 1994-11-29 | Konica Corporation | Image processing apparatus and method capable of discriminating between character/photograph areas by finding blank-stripe zones and dividing the areas into blocks |
US5416697A (en) * | 1992-07-31 | 1995-05-16 | Chevron Research And Technology Company | Method for determining rock mechanical properties using electrical log data |
US5415030A (en) * | 1992-01-09 | 1995-05-16 | Baker Hughes Incorporated | Method for evaluating formations and bit conditions |
US5442950A (en) * | 1993-10-18 | 1995-08-22 | Saudi Arabian Oil Company | Method and apparatus for determining properties of reservoir rock |
US5449047A (en) * | 1994-09-07 | 1995-09-12 | Ingersoll-Rand Company | Automatic control of drilling system |
US5458207A (en) * | 1991-04-25 | 1995-10-17 | Tamrock Oy | Method and an equipment for adjusting rock drilling |
US5461562A (en) * | 1991-10-21 | 1995-10-24 | Schlumberger Technology Corporation | Method and apparatus for detecting and quantifying hydrocarbon bearing laminated reservoirs on a workstation |
US5474142A (en) * | 1993-04-19 | 1995-12-12 | Bowden; Bobbie J. | Automatic drilling system |
US5539704A (en) * | 1995-06-23 | 1996-07-23 | Western Atlas International, Inc. | Bayesian sequential Gaussian simulation of lithology with non-linear data |
US5608162A (en) * | 1993-11-12 | 1997-03-04 | Ho; Hwa-Shan | Method and system of trajectory prediction and control using PDC bits |
US5660239A (en) * | 1989-08-31 | 1997-08-26 | Union Oil Company Of California | Drag analysis method |
US5704436A (en) * | 1996-03-25 | 1998-01-06 | Dresser Industries, Inc. | Method of regulating drilling conditions applied to a well bit |
US5767399A (en) * | 1996-03-25 | 1998-06-16 | Dresser Industries, Inc. | Method of assaying compressive strength of rock |
US5794720A (en) * | 1996-03-25 | 1998-08-18 | Dresser Industries, Inc. | Method of assaying downhole occurrences and conditions |
US5845258A (en) * | 1995-06-16 | 1998-12-01 | I2 Technologies, Inc. | Strategy driven planning system and method of operation |
US5963910A (en) * | 1996-09-20 | 1999-10-05 | Ulwick; Anthony W. | Computer based process for strategy evaluation and optimization based on customer desired outcomes and predictive metrics |
US5965810A (en) * | 1998-05-01 | 1999-10-12 | Baroid Technology, Inc. | Method for determining sedimentary rock pore pressure caused by effective stress unloading |
US6021859A (en) * | 1993-12-09 | 2000-02-08 | Baker Hughes Incorporated | Stress related placement of engineered superabrasive cutting elements on rotary drag bits |
US6026912A (en) * | 1998-04-02 | 2000-02-22 | Noble Drilling Services, Inc. | Method of and system for optimizing rate of penetration in drilling operations |
US6044327A (en) * | 1997-11-13 | 2000-03-28 | Dresser Industries, Inc. | Method for quantifying the lithologic composition of formations surrounding earth boreholes |
US6052649A (en) * | 1998-05-18 | 2000-04-18 | Dresser Industries, Inc. | Method and apparatus for quantifying shale plasticity from well logs |
US6109368A (en) * | 1996-03-25 | 2000-08-29 | Dresser Industries, Inc. | Method and system for predicting performance of a drilling system for a given formation |
US6155357A (en) * | 1997-09-23 | 2000-12-05 | Noble Drilling Services, Inc. | Method of and system for optimizing rate of penetration in drilling operations |
US6169967B1 (en) * | 1998-09-04 | 2001-01-02 | Dresser Industries, Inc. | Cascade method and apparatus for providing engineered solutions for a well programming process |
US6233498B1 (en) * | 1998-03-05 | 2001-05-15 | Noble Drilling Services, Inc. | Method of and system for increasing drilling efficiency |
US6276465B1 (en) * | 1999-02-24 | 2001-08-21 | Baker Hughes Incorporated | Method and apparatus for determining potential for drill bit performance |
US6349595B1 (en) * | 1999-10-04 | 2002-02-26 | Smith International, Inc. | Method for optimizing drill bit design parameters |
US6389360B1 (en) * | 1999-01-13 | 2002-05-14 | Vermeer Manufacturing Company | Automated bore planning method and apparatus for horizontal directional drilling |
US6408953B1 (en) * | 1996-03-25 | 2002-06-25 | Halliburton Energy Services, Inc. | Method and system for predicting performance of a drilling system for a given formation |
US6424919B1 (en) * | 2000-06-26 | 2002-07-23 | Smith International, Inc. | Method for determining preferred drill bit design parameters and drilling parameters using a trained artificial neural network, and methods for training the artificial neural network |
US20020120401A1 (en) * | 2000-09-29 | 2002-08-29 | Macdonald Robert P. | Method and apparatus for prediction control in drilling dynamics using neural networks |
US6516293B1 (en) * | 2000-03-13 | 2003-02-04 | Smith International, Inc. | Method for simulating drilling of roller cone bits and its application to roller cone bit design and performance |
US6612382B2 (en) * | 1996-03-25 | 2003-09-02 | Halliburton Energy Services, Inc. | Iterative drilling simulation process for enhanced economic decision making |
US6785641B1 (en) * | 2000-10-11 | 2004-08-31 | Smith International, Inc. | Simulating the dynamic response of a drilling tool assembly and its application to drilling tool assembly design optimization and drilling performance optimization |
US20040182606A1 (en) * | 1996-03-25 | 2004-09-23 | Halliburton Energy Services, Inc. | Method and system for predicting performance of a drilling system for a given formation |
US6879947B1 (en) * | 1999-11-03 | 2005-04-12 | Halliburton Energy Services, Inc. | Method for optimizing the bit design for a well bore |
US7003439B2 (en) * | 2001-01-30 | 2006-02-21 | Schlumberger Technology Corporation | Interactive method for real-time displaying, querying and forecasting drilling event and hazard information |
Family Cites Families (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3972966A (en) * | 1975-01-21 | 1976-08-03 | Universal Oil Products Company | Apparatus for producing pulsed liquid flow in a distillation column |
EP0066255A1 (en) | 1981-05-29 | 1982-12-08 | Wankel GmbH | External-axis rotary-piston blower |
DE3207012C2 (en) | 1982-02-26 | 1984-08-30 | Valentin V. Malachovka Moskovskaja oblast' Žilikov | Method for controlling the drilling process when drilling in rock and device for carrying out the method |
US4733733A (en) | 1986-02-11 | 1988-03-29 | Nl Industries, Inc. | Method of controlling the direction of a drill bit in a borehole |
GB2188354B (en) | 1986-03-27 | 1989-11-22 | Shell Int Research | Rotary drill bit |
FR2611804B1 (en) | 1987-02-27 | 1989-06-16 | Forex Neptune Sa | METHOD FOR CONTROLLING WELL DRILLING OPERATIONS |
CA1333282C (en) | 1989-02-21 | 1994-11-29 | J. Ford Brett | Imbalance compensated drill bit |
GB2241266A (en) | 1990-02-27 | 1991-08-28 | Dresser Ind | Intersection solution method for drill bit design |
US5369570A (en) | 1991-11-14 | 1994-11-29 | Parad; Harvey A. | Method and system for continuous integrated resource management |
CA2246466A1 (en) | 1997-09-04 | 1999-03-04 | Smith International, Inc. | Cutter element with expanded crest geometry |
WO2000012859A2 (en) * | 1998-08-31 | 2000-03-09 | Halliburton Energy Services, Inc. | Force-balanced roller-cone bits, systems, drilling methods, and design methods |
WO2000012860A2 (en) * | 1998-08-31 | 2000-03-09 | Halliburton Energy Services, Inc. | Roller-cone bits, systems, drilling methods, and design methods with optimization of tooth orientation |
US6345673B1 (en) | 1998-11-20 | 2002-02-12 | Smith International, Inc. | High offset bits with super-abrasive cutters |
GB2332227B (en) * | 1999-03-03 | 1999-11-10 | Peter Richard Paul Cunningham | Optimising well numbers in oil and gas fields |
DE19946850A1 (en) * | 1999-09-30 | 2001-04-05 | Hella Kg Hueck & Co | Lighting equipment for vehicles |
GB2354852B (en) | 1999-10-01 | 2001-11-28 | Schlumberger Holdings | Method for updating an earth model using measurements gathered during borehole construction |
CA2340547C (en) | 2000-03-13 | 2005-12-13 | Smith International, Inc. | Method for simulating drilling of roller cone bits and its application to roller cone bit design and performance |
GB2370060B (en) | 2000-03-13 | 2002-12-11 | Smith International | Method for simulating drilling of roller cone bits and its application to roller cone bit design and performance |
US6601660B1 (en) | 2000-06-08 | 2003-08-05 | Smith International, Inc. | Cutting structure for roller cone drill bits |
GB2371321B (en) | 2000-06-08 | 2002-12-11 | Smith International | Cutting structure for roller cone drill bits |
US6637527B1 (en) | 2000-06-08 | 2003-10-28 | Smith International, Inc. | Cutting structure for roller cone drill bits |
US6612384B1 (en) | 2000-06-08 | 2003-09-02 | Smith International, Inc. | Cutting structure for roller cone drill bits |
US6530441B1 (en) | 2000-06-27 | 2003-03-11 | Smith International, Inc. | Cutting element geometry for roller cone drill bit |
US6527068B1 (en) | 2000-08-16 | 2003-03-04 | Smith International, Inc. | Roller cone drill bit having non-axisymmetric cutting elements oriented to optimize drilling performance |
GB2371366B (en) * | 2000-08-28 | 2004-05-26 | Halliburton Energy Serv Inc | Method and system for predicting performance of a drilling system for a given formation |
-
2001
- 2001-03-28 US US09/820,242 patent/US6612382B2/en not_active Expired - Lifetime
-
2002
- 2002-01-29 CA CA2369669A patent/CA2369669C/en not_active Expired - Fee Related
- 2002-03-18 GB GB0206350A patent/GB2378017B/en not_active Expired - Fee Related
- 2002-03-19 BR BR0200873-4A patent/BR0200873A/en not_active Application Discontinuation
- 2002-03-26 NO NO20021513A patent/NO333726B1/en not_active IP Right Cessation
- 2002-03-26 NL NL1020253A patent/NL1020253C2/en not_active IP Right Cessation
- 2002-03-28 FR FR0203948A patent/FR2823581B1/en not_active Expired - Fee Related
-
2003
- 2003-06-27 US US10/607,900 patent/US7085696B2/en not_active Expired - Lifetime
-
2004
- 2004-04-01 NL NL1025862A patent/NL1025862C2/en not_active IP Right Cessation
-
2005
- 2005-01-11 US US11/032,957 patent/US20050149306A1/en not_active Abandoned
-
2007
- 2007-04-17 NL NL1033703A patent/NL1033703C/en not_active IP Right Cessation
-
2009
- 2009-01-19 FR FR0950309A patent/FR2930359A1/en not_active Withdrawn
-
2013
- 2013-07-24 NO NO20131030A patent/NO20131030L/en not_active Application Discontinuation
Patent Citations (91)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US703289A (en) * | 1900-04-30 | 1902-06-24 | Moore Electrolytic Company | Process of producing caustic. |
US1209299A (en) * | 1914-12-30 | 1916-12-19 | Sharp Hughes Tool Company | Rotary boring-drill. |
US1263802A (en) * | 1917-08-13 | 1918-04-23 | Clarence Edw Reed | Boring-drill. |
US1394769A (en) * | 1920-05-18 | 1921-10-25 | C E Reed | Drill-head for oil-wells |
US3593807A (en) * | 1969-12-11 | 1971-07-20 | Frank J Klima | Drilling apparatus |
US3660649A (en) * | 1970-09-28 | 1972-05-02 | Tenneco Oil Co | Apparatus and method for computing drilling costs |
US3752966A (en) * | 1971-05-28 | 1973-08-14 | Santa Fe Int Corp | Drill bit utilization optimizer |
US3761701A (en) * | 1971-07-14 | 1973-09-25 | Amoco Prod Co | Drilling cost indicator |
US4354233A (en) * | 1972-05-03 | 1982-10-12 | Zhukovsky Alexei A | Rotary drill automatic control system |
US3971449A (en) * | 1973-10-09 | 1976-07-27 | Oy Tampella Ab | Procedure for controlling a rock drill and rock drill for carrying out the procedure |
US4056153A (en) * | 1975-05-29 | 1977-11-01 | Dresser Industries, Inc. | Rotary rock bit with multiple row coverage for very hard formations |
US4096385A (en) * | 1976-02-25 | 1978-06-20 | Schlumberger Technology Corporation | Clay content determination by natural gamma ray spectrometry |
US4064749A (en) * | 1976-11-11 | 1977-12-27 | Texaco Inc. | Method and system for determining formation porosity |
US4195699A (en) * | 1978-06-29 | 1980-04-01 | United States Steel Corporation | Drilling optimization searching and control method |
US4407017A (en) * | 1978-09-06 | 1983-09-27 | Zhilikov Valentin V | Method and apparatus for controlling drilling process |
US4479176A (en) * | 1981-03-11 | 1984-10-23 | Metalogic Control Limited | Adaptive control of a dynamic system or process |
US4646240A (en) * | 1982-02-02 | 1987-02-24 | Oberto Serra | Method and apparatus for determining geological facies |
US4718011A (en) * | 1982-11-01 | 1988-01-05 | Western Atlas International, Inc. | Well logging data acquisition, telemetry and control method and system |
US4903527A (en) * | 1984-01-26 | 1990-02-27 | Schlumberger Technology Corp. | Quantitative clay typing and lithological evaluation of subsurface formations |
US4685329A (en) * | 1984-05-03 | 1987-08-11 | Schlumberger Technology Corporation | Assessment of drilling conditions |
US4694686A (en) * | 1984-06-18 | 1987-09-22 | Borg-Warner Corporation | Cutting tool wear monitor |
US4627276A (en) * | 1984-12-27 | 1986-12-09 | Schlumberger Technology Corporation | Method for measuring bit wear during drilling |
US4794534A (en) * | 1985-08-08 | 1988-12-27 | Amoco Corporation | Method of drilling a well utilizing predictive simulation with real time data |
US4617825A (en) * | 1985-09-12 | 1986-10-21 | Halliburton Company | Well logging analysis methods for use in complex lithology reservoirs |
US4966950A (en) * | 1986-01-29 | 1990-10-30 | E. I. Du Pont De Nemours & Co. | Oriented polymeric tape |
US4793421A (en) * | 1986-04-08 | 1988-12-27 | Becor Western Inc. | Programmed automatic drill control |
US4981037A (en) * | 1986-05-28 | 1991-01-01 | Baroid Technology, Inc. | Method for determining pore pressure and horizontal effective stress from overburden and effective vertical stresses |
US4845628A (en) * | 1986-08-18 | 1989-07-04 | Automated Decisions, Inc. | Method for optimization of drilling costs |
US4794535A (en) * | 1986-08-18 | 1988-12-27 | Automated Decisions, Inc. | Method for determining economic drill bit utilization |
US4916616A (en) * | 1986-12-08 | 1990-04-10 | Bp Exploration, Inc. | Self-consistent log interpretation method |
US4926686A (en) * | 1987-09-17 | 1990-05-22 | Institut Francais Du Petrole | Method for determining the wear of the cutting means of a tool during drilling a rocky formation |
US4875530A (en) * | 1987-09-24 | 1989-10-24 | Parker Technology, Inc. | Automatic drilling system |
US4914591A (en) * | 1988-03-25 | 1990-04-03 | Amoco Corporation | Method of determining rock compressive strength |
US4876886A (en) * | 1988-04-04 | 1989-10-31 | Anadrill, Inc. | Method for detecting drilling events from measurement while drilling sensors |
US4928521A (en) * | 1988-04-05 | 1990-05-29 | Schlumberger Technology Corporation | Method of determining drill bit wear |
US4852399A (en) * | 1988-07-13 | 1989-08-01 | Anadrill, Inc. | Method for determining drilling conditions while drilling |
US5012674A (en) * | 1988-10-31 | 1991-05-07 | Amoco Corporation | Method of exploration for hydrocarbons |
US5042596A (en) * | 1989-02-21 | 1991-08-27 | Amoco Corporation | Imbalance compensated drill bit |
US5010789A (en) * | 1989-02-21 | 1991-04-30 | Amoco Corporation | Method of making imbalanced compensated drill bit |
US5660239A (en) * | 1989-08-31 | 1997-08-26 | Union Oil Company Of California | Drag analysis method |
US5318136A (en) * | 1990-03-06 | 1994-06-07 | University Of Nottingham | Drilling process and apparatus |
US5239467A (en) * | 1990-05-21 | 1993-08-24 | Amoco Corporation | Method for enhancing geophysical data by nonlinear compression of the dynamic range |
US5216917A (en) * | 1990-07-13 | 1993-06-08 | Schlumberger Technology Corporation | Method of determining the drilling conditions associated with the drilling of a formation with a drag bit |
US5216612A (en) * | 1990-07-16 | 1993-06-01 | R. J. Reynolds Tobacco Company | Intelligent computer integrated maintenance system and method |
US5205164A (en) * | 1990-08-31 | 1993-04-27 | Exxon Production Research Company | Methods for determining in situ shale strengths, elastic properties, pore pressures, formation stresses, and drilling fluid parameters |
US5458207A (en) * | 1991-04-25 | 1995-10-17 | Tamrock Oy | Method and an equipment for adjusting rock drilling |
US5334833A (en) * | 1991-06-14 | 1994-08-02 | Schlumberger Technology Corporation | Sensitivity function technique for modeling nuclear tools |
US5369507A (en) * | 1991-09-03 | 1994-11-29 | Konica Corporation | Image processing apparatus and method capable of discriminating between character/photograph areas by finding blank-stripe zones and dividing the areas into blocks |
US5461562A (en) * | 1991-10-21 | 1995-10-24 | Schlumberger Technology Corporation | Method and apparatus for detecting and quantifying hydrocarbon bearing laminated reservoirs on a workstation |
US5415030A (en) * | 1992-01-09 | 1995-05-16 | Baker Hughes Incorporated | Method for evaluating formations and bit conditions |
US5251286A (en) * | 1992-03-16 | 1993-10-05 | Texaco, Inc. | Method for estimating formation permeability from wireline logs using neural networks |
US5305836A (en) * | 1992-04-08 | 1994-04-26 | Baroid Technology, Inc. | System and method for controlling drill bit usage and well plan |
US5416697A (en) * | 1992-07-31 | 1995-05-16 | Chevron Research And Technology Company | Method for determining rock mechanical properties using electrical log data |
US5282384A (en) * | 1992-10-05 | 1994-02-01 | Baroid Technology, Inc. | Method for calculating sedimentary rock pore pressure |
US5474142A (en) * | 1993-04-19 | 1995-12-12 | Bowden; Bobbie J. | Automatic drilling system |
US5330016A (en) * | 1993-05-07 | 1994-07-19 | Barold Technology, Inc. | Drill bit and other downhole tools having electro-negative surfaces and sacrificial anodes to reduce mud balling |
US5442950A (en) * | 1993-10-18 | 1995-08-22 | Saudi Arabian Oil Company | Method and apparatus for determining properties of reservoir rock |
US5608162A (en) * | 1993-11-12 | 1997-03-04 | Ho; Hwa-Shan | Method and system of trajectory prediction and control using PDC bits |
US6021859A (en) * | 1993-12-09 | 2000-02-08 | Baker Hughes Incorporated | Stress related placement of engineered superabrasive cutting elements on rotary drag bits |
US5449047A (en) * | 1994-09-07 | 1995-09-12 | Ingersoll-Rand Company | Automatic control of drilling system |
US5845258A (en) * | 1995-06-16 | 1998-12-01 | I2 Technologies, Inc. | Strategy driven planning system and method of operation |
US5539704A (en) * | 1995-06-23 | 1996-07-23 | Western Atlas International, Inc. | Bayesian sequential Gaussian simulation of lithology with non-linear data |
US6109368A (en) * | 1996-03-25 | 2000-08-29 | Dresser Industries, Inc. | Method and system for predicting performance of a drilling system for a given formation |
US6374926B1 (en) * | 1996-03-25 | 2002-04-23 | Halliburton Energy Services, Inc. | Method of assaying downhole occurrences and conditions |
US7085696B2 (en) * | 1996-03-25 | 2006-08-01 | Halliburton Energy Services, Inc. | Iterative drilling simulation process for enhanced economic decision making |
US7035778B2 (en) * | 1996-03-25 | 2006-04-25 | Halliburton Energy Services, Inc. | Method of assaying downhole occurrences and conditions |
US5767399A (en) * | 1996-03-25 | 1998-06-16 | Dresser Industries, Inc. | Method of assaying compressive strength of rock |
US20040182606A1 (en) * | 1996-03-25 | 2004-09-23 | Halliburton Energy Services, Inc. | Method and system for predicting performance of a drilling system for a given formation |
US20040059554A1 (en) * | 1996-03-25 | 2004-03-25 | Halliburton Energy Services Inc. | Method of assaying downhole occurrences and conditions |
US6612382B2 (en) * | 1996-03-25 | 2003-09-02 | Halliburton Energy Services, Inc. | Iterative drilling simulation process for enhanced economic decision making |
US5704436A (en) * | 1996-03-25 | 1998-01-06 | Dresser Industries, Inc. | Method of regulating drilling conditions applied to a well bit |
US6131673A (en) * | 1996-03-25 | 2000-10-17 | Dresser Industries, Inc. | Method of assaying downhole occurrences and conditions |
US6408953B1 (en) * | 1996-03-25 | 2002-06-25 | Halliburton Energy Services, Inc. | Method and system for predicting performance of a drilling system for a given formation |
US5794720A (en) * | 1996-03-25 | 1998-08-18 | Dresser Industries, Inc. | Method of assaying downhole occurrences and conditions |
US5963910A (en) * | 1996-09-20 | 1999-10-05 | Ulwick; Anthony W. | Computer based process for strategy evaluation and optimization based on customer desired outcomes and predictive metrics |
US6155357A (en) * | 1997-09-23 | 2000-12-05 | Noble Drilling Services, Inc. | Method of and system for optimizing rate of penetration in drilling operations |
US6044327A (en) * | 1997-11-13 | 2000-03-28 | Dresser Industries, Inc. | Method for quantifying the lithologic composition of formations surrounding earth boreholes |
US6233498B1 (en) * | 1998-03-05 | 2001-05-15 | Noble Drilling Services, Inc. | Method of and system for increasing drilling efficiency |
US6026912A (en) * | 1998-04-02 | 2000-02-22 | Noble Drilling Services, Inc. | Method of and system for optimizing rate of penetration in drilling operations |
US5965810A (en) * | 1998-05-01 | 1999-10-12 | Baroid Technology, Inc. | Method for determining sedimentary rock pore pressure caused by effective stress unloading |
US6052649A (en) * | 1998-05-18 | 2000-04-18 | Dresser Industries, Inc. | Method and apparatus for quantifying shale plasticity from well logs |
US6169967B1 (en) * | 1998-09-04 | 2001-01-02 | Dresser Industries, Inc. | Cascade method and apparatus for providing engineered solutions for a well programming process |
US6389360B1 (en) * | 1999-01-13 | 2002-05-14 | Vermeer Manufacturing Company | Automated bore planning method and apparatus for horizontal directional drilling |
US6276465B1 (en) * | 1999-02-24 | 2001-08-21 | Baker Hughes Incorporated | Method and apparatus for determining potential for drill bit performance |
US6349595B1 (en) * | 1999-10-04 | 2002-02-26 | Smith International, Inc. | Method for optimizing drill bit design parameters |
US6879947B1 (en) * | 1999-11-03 | 2005-04-12 | Halliburton Energy Services, Inc. | Method for optimizing the bit design for a well bore |
US6516293B1 (en) * | 2000-03-13 | 2003-02-04 | Smith International, Inc. | Method for simulating drilling of roller cone bits and its application to roller cone bit design and performance |
US6424919B1 (en) * | 2000-06-26 | 2002-07-23 | Smith International, Inc. | Method for determining preferred drill bit design parameters and drilling parameters using a trained artificial neural network, and methods for training the artificial neural network |
US20020120401A1 (en) * | 2000-09-29 | 2002-08-29 | Macdonald Robert P. | Method and apparatus for prediction control in drilling dynamics using neural networks |
US6785641B1 (en) * | 2000-10-11 | 2004-08-31 | Smith International, Inc. | Simulating the dynamic response of a drilling tool assembly and its application to drilling tool assembly design optimization and drilling performance optimization |
US7003439B2 (en) * | 2001-01-30 | 2006-02-21 | Schlumberger Technology Corporation | Interactive method for real-time displaying, querying and forecasting drilling event and hazard information |
Cited By (51)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050273302A1 (en) * | 2000-03-13 | 2005-12-08 | Smith International, Inc. | Dynamically balanced cutting tool system |
US20050273304A1 (en) * | 2000-03-13 | 2005-12-08 | Smith International, Inc. | Methods for evaluating and improving drilling operations |
US7464013B2 (en) | 2000-03-13 | 2008-12-09 | Smith International, Inc. | Dynamically balanced cutting tool system |
US20060195307A1 (en) * | 2000-03-13 | 2006-08-31 | Smith International, Inc. | Dynamic vibrational control |
US7251590B2 (en) | 2000-03-13 | 2007-07-31 | Smith International, Inc. | Dynamic vibrational control |
US20040211596A1 (en) * | 2000-10-11 | 2004-10-28 | Sujian Huang | Simulating the dynamic response of a drilling tool assembly and its application to drilling tool assembly design optimization and drilling performance optimization |
US7020597B2 (en) | 2000-10-11 | 2006-03-28 | Smith International, Inc. | Methods for evaluating and improving drilling operations |
US20060149518A1 (en) * | 2000-10-11 | 2006-07-06 | Smith International, Inc. | Method for evaluating and improving drilling operations |
US7899658B2 (en) | 2000-10-11 | 2011-03-01 | Smith International, Inc. | Method for evaluating and improving drilling operations |
US7139689B2 (en) | 2000-10-11 | 2006-11-21 | Smith International, Inc. | Simulating the dynamic response of a drilling tool assembly and its application to drilling tool assembly design optimization and drilling performance optimization |
US20070055536A1 (en) * | 2004-08-30 | 2007-03-08 | Caveny William J | Methods of treating subterranean formations using well characteristics |
US20060047527A1 (en) * | 2004-08-30 | 2006-03-02 | Caveny William J | Determining, pricing, and/or providing well servicing treatments and data processing systems therefor |
US7664654B2 (en) | 2004-08-30 | 2010-02-16 | Halliburton Energy Services, Inc. | Methods of treating subterranean formations using well characteristics |
US7636671B2 (en) | 2004-08-30 | 2009-12-22 | Halliburton Energy Services, Inc. | Determining, pricing, and/or providing well servicing treatments and data processing systems therefor |
US20070061081A1 (en) * | 2005-02-01 | 2007-03-15 | Smith International, Inc. | System for Optimizing Drilling in Real Time |
US7142986B2 (en) | 2005-02-01 | 2006-11-28 | Smith International, Inc. | System for optimizing drilling in real time |
US20060173625A1 (en) * | 2005-02-01 | 2006-08-03 | Smith International, Inc. | System for optimizing drilling in real time |
US20070185696A1 (en) * | 2006-02-06 | 2007-08-09 | Smith International, Inc. | Method of real-time drilling simulation |
WO2007100703A2 (en) * | 2006-02-27 | 2007-09-07 | Schlumberger Canada Limited | Well planning system and method |
WO2007100703A3 (en) * | 2006-02-27 | 2007-11-08 | Schlumberger Ca Ltd | Well planning system and method |
US8812334B2 (en) | 2006-02-27 | 2014-08-19 | Schlumberger Technology Corporation | Well planning system and method |
EA013660B1 (en) * | 2006-02-27 | 2010-06-30 | Лоджинд Б.В. | Well planning system and method |
US20070272407A1 (en) * | 2006-05-25 | 2007-11-29 | Halliburton Energy Services, Inc. | Method and system for development of naturally fractured formations |
US9915139B2 (en) | 2006-09-27 | 2018-03-13 | Halliburton Energy Services, Inc. | Monitor and control of directional drilling operations and simulations |
US9359882B2 (en) | 2006-09-27 | 2016-06-07 | Halliburton Energy Services, Inc. | Monitor and control of directional drilling operations and simulations |
GB2457604A (en) * | 2006-09-27 | 2009-08-26 | Halliburton Energy Serv Inc | Monitor and control of directional drilling operations and simulations |
US9103195B2 (en) | 2006-09-27 | 2015-08-11 | Halliburton Energy Services, Inc. | Monitor and control of directional drilling operations and simulations |
US20100133008A1 (en) * | 2006-09-27 | 2010-06-03 | Halliburton Energy Services, Inc | Monitor and control of directional drilling operations and simulations |
WO2008039523A1 (en) * | 2006-09-27 | 2008-04-03 | Halliburton Energy Services, Inc. | Monitor and control of directional drilling operations and simulations |
GB2457604B (en) * | 2006-09-27 | 2011-11-23 | Halliburton Energy Serv Inc | Monitor and control of directional drilling operations and simulations |
US20080314641A1 (en) * | 2007-06-20 | 2008-12-25 | Mcclard Kevin | Directional Drilling System and Software Method |
GB2453219A (en) * | 2007-09-19 | 2009-04-01 | Gen Electric | Improving operational decisions and allocating financial risk or reward in an engineered system |
US20090076873A1 (en) * | 2007-09-19 | 2009-03-19 | General Electric Company | Method and system to improve engineered system decisions and transfer risk |
US20090132458A1 (en) * | 2007-10-30 | 2009-05-21 | Bp North America Inc. | Intelligent Drilling Advisor |
WO2009058635A3 (en) * | 2007-10-30 | 2009-06-18 | Bp Corp North America Inc | An intelligent drilling advisor |
US8121971B2 (en) | 2007-10-30 | 2012-02-21 | Bp Corporation North America Inc. | Intelligent drilling advisor |
WO2009058635A2 (en) * | 2007-10-30 | 2009-05-07 | Bp Corporation North America Inc. | An intelligent drilling advisor |
US8274399B2 (en) | 2007-11-30 | 2012-09-25 | Halliburton Energy Services Inc. | Method and system for predicting performance of a drilling system having multiple cutting structures |
US20100259415A1 (en) * | 2007-11-30 | 2010-10-14 | Michael Strachan | Method and System for Predicting Performance of a Drilling System Having Multiple Cutting Structures |
US8862436B2 (en) * | 2008-06-24 | 2014-10-14 | Landmark Graphics Corporation | Systems and methods for modeling wellbore trajectories |
US20090319241A1 (en) * | 2008-06-24 | 2009-12-24 | Landmark Graphics Corporation, A Halliburton Company | Systems and Methods for Modeing Wellbore Trajectories |
US9249654B2 (en) | 2008-10-03 | 2016-02-02 | Halliburton Energy Services, Inc. | Method and system for predicting performance of a drilling system |
US20110174541A1 (en) * | 2008-10-03 | 2011-07-21 | Halliburton Energy Services, Inc. | Method and System for Predicting Performance of a Drilling System |
US20140214476A1 (en) * | 2013-01-31 | 2014-07-31 | Halliburton Energy Services, Inc. | Data initialization for a subterranean operation |
WO2016073356A1 (en) * | 2014-11-04 | 2016-05-12 | Schlumberger Canada Limited | Methods and systems for designing bottomhole assemblies |
US10920536B2 (en) | 2014-11-04 | 2021-02-16 | Schlumberger Technology Corporation | Methods and systems for designing drilling systems |
CN104933922A (en) * | 2015-01-22 | 2015-09-23 | 中国石油技术开发公司 | Drilling rig installation and simulation system |
TWI626622B (en) * | 2017-07-04 | 2018-06-11 | System and method for stereoscopic imaging of underground rock formation characteristics | |
US11346215B2 (en) | 2018-01-23 | 2022-05-31 | Baker Hughes Holdings Llc | Methods of evaluating drilling performance, methods of improving drilling performance, and related systems for drilling using such methods |
US11098573B2 (en) * | 2018-03-13 | 2021-08-24 | Nabors Drilling Technologies Usa, Inc. | Systems and methods for estimating drill bit rotational velocity using top drive torque and rotational velocity |
US10808517B2 (en) | 2018-12-17 | 2020-10-20 | Baker Hughes Holdings Llc | Earth-boring systems and methods for controlling earth-boring systems |
Also Published As
Publication number | Publication date |
---|---|
NO20131030L (en) | 2002-09-30 |
US20040000430A1 (en) | 2004-01-01 |
GB0206350D0 (en) | 2002-05-01 |
NL1025862C2 (en) | 2007-05-02 |
NL1033703C (en) | 2010-04-22 |
CA2369669C (en) | 2014-05-27 |
NO333726B1 (en) | 2013-09-02 |
FR2823581B1 (en) | 2009-04-24 |
US7085696B2 (en) | 2006-08-01 |
FR2823581A1 (en) | 2002-10-18 |
NL1020253A1 (en) | 2002-10-03 |
BR0200873A (en) | 2003-12-02 |
CA2369669A1 (en) | 2002-09-28 |
NO20021513D0 (en) | 2002-03-26 |
US6612382B2 (en) | 2003-09-02 |
NL1025862A1 (en) | 2004-07-28 |
NL1020253C2 (en) | 2004-04-20 |
US20010042642A1 (en) | 2001-11-22 |
GB2378017A (en) | 2003-01-29 |
GB2378017B (en) | 2005-03-16 |
NL1033703A1 (en) | 2007-06-06 |
FR2930359A1 (en) | 2009-10-23 |
NO20021513L (en) | 2002-09-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8949098B2 (en) | Iterative drilling simulation process for enhanced economic decision making | |
US6612382B2 (en) | Iterative drilling simulation process for enhanced economic decision making | |
US7258175B2 (en) | Method and apparatus and program storage device adapted for automatic drill bit selection based on earth properties and wellbore geometry | |
EP2948618B1 (en) | Constrained optimization for well placement planning | |
CA2794094C (en) | Methods and systems for improved drilling operations using real-time and historical drilling data | |
US7653563B2 (en) | Method and apparatus and program storage device adapted for automatic qualitative and quantitative risk assessment based on technical wellbore design and earth properties | |
US9022140B2 (en) | Methods and systems for improved drilling operations using real-time and historical drilling data | |
CA2560275C (en) | Method and system for automatic well planning | |
US8229880B2 (en) | Evaluation of acid fracturing treatments in an oilfield | |
US20050211468A1 (en) | Method and apparatus and program storage device adapted for automatic drill string design based on wellbore geometry and trajectory requirements | |
US20120203525A1 (en) | Three-dimensional modeling of parameters for oilfield drilling | |
CA2530371A1 (en) | Method and apparatus and program storage device including an integrated well planning workflow control system with process dependencies | |
US11640012B2 (en) | Virtual high-density well survey | |
NL2004563C2 (en) | ITERATIVE DRILL SIMULATION METHOD FOR IMPROVED ECONOMIC DECISION-MAKING. | |
US20240200436A1 (en) | Equipment health monitor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: HALLIBURTON ENERGY SERVICES, INC., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:KING, WILLIAM W.;REEL/FRAME:017472/0129 Effective date: 20010326 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |