US20020175432A1 - Method of and apparatus for forming a plastic lined tunnel - Google Patents
Method of and apparatus for forming a plastic lined tunnel Download PDFInfo
- Publication number
- US20020175432A1 US20020175432A1 US09/863,004 US86300401A US2002175432A1 US 20020175432 A1 US20020175432 A1 US 20020175432A1 US 86300401 A US86300401 A US 86300401A US 2002175432 A1 US2002175432 A1 US 2002175432A1
- Authority
- US
- United States
- Prior art keywords
- tube section
- tube
- tunnel
- base wall
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 229920003023 plastic Polymers 0.000 title claims abstract description 35
- 239000004033 plastic Substances 0.000 title claims abstract description 35
- 238000000034 method Methods 0.000 title claims abstract description 22
- 239000011440 grout Substances 0.000 claims abstract description 23
- 239000000463 material Substances 0.000 claims abstract description 10
- 239000011800 void material Substances 0.000 claims abstract description 8
- 230000015572 biosynthetic process Effects 0.000 claims description 14
- 238000005755 formation reaction Methods 0.000 claims description 14
- 230000000295 complement effect Effects 0.000 claims description 7
- 238000005304 joining Methods 0.000 claims description 6
- 238000004804 winding Methods 0.000 claims description 3
- 239000004568 cement Substances 0.000 claims description 2
- 239000012530 fluid Substances 0.000 claims description 2
- 239000003673 groundwater Substances 0.000 claims description 2
- 238000009434 installation Methods 0.000 description 8
- 238000003466 welding Methods 0.000 description 6
- 238000009412 basement excavation Methods 0.000 description 4
- 238000001125 extrusion Methods 0.000 description 4
- 241000239290 Araneae Species 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000002706 hydrostatic effect Effects 0.000 description 2
- 230000013011 mating Effects 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 239000011324 bead Substances 0.000 description 1
- 239000000872 buffer Substances 0.000 description 1
- 238000011437 continuous method Methods 0.000 description 1
- 239000003000 extruded plastic Substances 0.000 description 1
- 230000009969 flowable effect Effects 0.000 description 1
- 229920001903 high density polyethylene Polymers 0.000 description 1
- 230000003137 locomotive effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/383—Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall
Definitions
- This invention relates to a method of and apparatus for forming a plastic lined tunnel.
- drains and tunnels are lined with plastic to provide corrosion resistance and a smooth internal bore so as to minimise pumping losses.
- the plastic liner is typically made by spiral winding ribbed plastic strip onto itself so as to form a spiral wound tube, the strip edges being formed so as to either engage complementary edge portions or to join the edges with a joining strip.
- the plastic strip may be forced into a spiral configuration inside an internal forming means such as illustrated in Australian Patent No. 530251 or it may be wound about a mandrel of the desired diameter such as is illustrated in U.S. Pat. No. 3,606,670.
- a method of forming a plastic lined tunnel including:
- the tube section may be formed of any plastics material which can provide the chemical and physical properties to ensure sufficient corrosion resistance and toughness necessary for the application.
- the tube section is formed with a smooth internal surface and a keyed outer surface for improving the bond between the tube section and the grout.
- the keyed outer surface may simply be a grooving or roughness on that surface.
- the outer surface may have one or more key members thereon for interlocking the tube into the grout placed between the tube section and the tunnel wall.
- a suitable tube section may be formed with a series of encircling flanged ribs about its outer surface for interlocking the tube into a grout placed between the tube section and the tunnel wall.
- it may be formed with a plurality of individual projections tabs or ties about its outer surface for interlocking the tube into a grout.
- the tube section is a spiral wound tube produced from a strip of plastics material having T-shaped ribs extending about its external surface.
- the spiral joint between edges of the strip from which the tube is formed is welded, either internally or externally and preferably internally in a groove formed between the mating edges of the strip. It is also preferred that the strip interlocks along mating edges and each interlocking formation has an external return rib for interlocking with the grout.
- the tube section may be prefabricated and transported to the open end of the tunnel.
- bales of plastic strip which can be formed into the tube sections may be transported to a fabrication unit adjacent the open end of the tunnel where the tube section may be fabricated.
- the tube section is introduced from one end of the tunnel and positioned within the tunnel remote from that one end.
- Subsequent tube sections may be introduced and positioned in abutment with the preceding tube section and the internal form assembly may be moved progressively from tube section to tube section toward that one end.
- the tube section may be positioned in the tunnel portion by any convenient means such as by a rail mounted tube carrier where the rails are located temporarily or permanently fixed to the tunnel.
- the tube carrier may have forks suitable for carrying the tube section, which forks permit fine control over the position and orientation of the tube section to facilitate placement of the tube section within the tunnel portion.
- Abutting tube sections may be joined to one another by any convenient means such as by being adhered, taped or overlapped and mechanically fastened. Most suitably the tube sections are joined to one another by a welding process.
- the exposed end of tube section forming a liner may be provided with locating means such as an external collar to form a socket into which the introduced end of the next tube section may spigot so as to align the abutting tube sections.
- the collar may be continuous or gapped or otherwise formed so as to allow grout to extend into the void between the collar and the keyed outer surface of tube sections formed with interlocking means.
- the internal form assembly suitably may comprise a series of segments including upper segments pivotally connected to one another as the collapsible wall portion which is engageable with a temporary base wall, composed of a segment or segments.
- the collapsible wall portion may be carried on a carriage which may move along the base wall.
- Such a carriage may include transport means which extends beyond a tube section for transporting a base wall segment from beyond one end of a tube section to beyond the other end of the tube section for shifting the base wall segment or segments from a previously lined tunnel portion, through an adjacent lined section into a tube section introduced into an unlined tunnel portion.
- the base wall is formed in segments which may be lifted from one longitudinal edge or for rotation to an upstanding attitude so as to lie alongside the carriage for transport therepast.
- the base wall may be engaged with at least one wall of the tunnel by a locating means which extends beyond the ends of the tube section or through supports extending through the tube section.
- a locating means which extends beyond the ends of the tube section or through supports extending through the tube section.
- the form of the tube section is cylindrical and the base wall is located substantially coaxially with the tunnel.
- the internal form assembly may be erected into an operative condition to conform the tube section to the desired shape by any convenient means.
- the collapsible wall portion comprises hinged segments
- the end segments may be engaged with the base wall and the collapsible wall portion erected by urging the remaining segments into engagement with the remainder of the tube section.
- the ends of segments may be shaped such that once erected the segments hold themselves in the desired shapes. These segments may take the form of overcentre tabs for ease of erection and collapse.
- the grout may be introduced into the space between the outer surface of the tube section and the tunnel wall in any suitable manner so as to substantially fill the void therebetween and to retain the tube section in position.
- the grout is concrete which is pumped into position from a supply tube extending along the top outer surface of the tube sections.
- the hose may have a concertina or other retractable support in the tunnel to which it is retracted after filling the void which may extend about a plurality of tube sections.
- the internal form assembly may be collapse by any convenient means and will generally follow the reverse process to the erection of the internal form assembly.
- a continuous method for forming a plastics lined tunnel whereby the internal form assembly is moved into an adjoining portion of the tunnel into which a tube section has been positioned so as to progressively form a continuous plastic lined tunnel.
- this invention resides broadly in a ribbed plastic strip for forming spiral wound tubing having complementary edge formations which engage to form the spiral wound tube and each edge formation having an projection adapted for interlocking engagement with surrounding grout so as to hold the tube section in position against external pressure such as ground water pressure.
- the projection is a continuous laterally projecting rib extending from the edge formation spaced from the liner wall.
- the edge formations engage so as to form an external groove between the joined edge formations into which bonding material may be placed to bond the strips together.
- the bonding material is deposited by welding.
- this invention resides broadly in a method of forming a mandrel formed spiral wound pipe, including:
- the edges of the spiral wound strip are joined together by welding.
- the edges may also be joined through complementary edge formations or joined with a joining strip.
- the spiral wound strip is a ribbed plastic strip made in accordance with an aspect of this invention as defined above and most suitably the joining weld is deposited in the external groove formed between joined edges.
- FIG. 1 is a side view of the mandrel assembly with a plastic tube part formed thereon;
- FIG. 2 is a cross-sectional plan view of the mandrel assembly illustrated in FIG. 1;
- FIG. 3 is an end view of the tube forming assembly showing the mandrel and its associated strip feed mechanism
- FIG. 4 is a cross-sectional side view showing the installation of the plastic lining in a tunnel
- FIG. 5 is a corresponding view illustrating the relocation of portion of the internal former for the plastic lining
- FIGS. 6, 7 and 8 are a series of views illustrating the relocation of the internal former for the lining
- FIG. 9 illustrates the arrangement for feeding concrete to the annular space between the liner and the tunnel
- FIG. 10 is an end view of the preferred form of plastic strip used to form the tube section
- FIG. 11 illustrates the junction between complementary edge portions of the strip of FIG. 10;
- FIG. 12 is an end view illustrating the formation of a joining weld between tube sections installed in the tunnel
- FIG. 13 illustrates a method of post filling voids created after initial grouting, and
- FIG. 14 illustrates a typical method of aligning one tube section with the next during installation.
- the tunnel is lined to provide smooth plastic lined bore. Since large diameter thin walled plastic pipes or tubes are difficult to handle and transport, the lining tube sections are formed on site as illustrated in FIGS. 1 to 3 utilising extruded plastic strip as illustrated in FIGS. 10 and 11.
- lengths of the plastic extrusion 10 is delivered in the form of wound and strapped bales 11 , each sufficient to form one liner 12 when wound helically.
- Each bale 11 is loaded onto a spool 13 on a travelling frame 14 positioned at the outer end of the forming mandrel 15 .
- the free end of the extrusion 10 is fed through a strip guide, under a bend roller 17 and a nip roller 18 and then clamped into a start end clamp 19 .
- the mandrel 15 will then be rotated slowly, driven by a variable speed hydraulic drive 20 , drawing the strip 10 off the bale 11 and onto the mandrel 15 .
- the purpose of the strip 10 guide is to control the helix angle at which the strip 10 is wound onto the mandrel.
- the bend roller 17 applies a radial force to the strip 10 to bring it into contact with the outer skin of the mandrel and the nip roller 18 pushes the complementary edges 22 and 23 of adjacent strips into engagement so that the inner faces of the coiled strip 10 lie on the mandrel 15 .
- each end of the tube section 30 is trimmed square to the axis of the mandrel 15 .
- the start end clamp 19 is then released and low pressure air is injected into a plenum 28 formed between inner and outer skins 29 and 29 ′ of the mandrel.
- the air escapes from the mandrel through apertures in the outer skin 29 causing the formed plastic tube section 30 to swell slightly so that it is easily removed from the mandrel 15 .
- a cradle is positioned at one end of the mandrel 15 so that as the completed tube section 30 is slid from the mandrel it is seated in a respective cradle.
- the formed tube sections 30 are inspected to ensure that they are free of dirt or any other foreign material and then each is craned to the collar of the shaft using a spreader bar and straps for installation as a liner 12 . Each tube sections 30 is lowered into the tunnel 40 until it is positioned over the top of the tunnel rails 36 and aligned with a tube carrier 37 thereon.
- each tube section 30 is suitably 9 meter long and is transported through the tunnel 40 to its installation point on the rail mounted tube carrier 37 .
- the tube carrier 37 will carry each tube sections 30 on cantilevered forks 42 through the tunnel 40 for positioning adjacent the previously installed liner 12 .
- the forks 42 is able to slew left to right, cross travel, raise and lower and articulate upwards and downward to enable each liner 12 to be aligned and correctly mated to the previously installed tube section 30 .
- Each tube section 30 is supported internally with spiders 32 to prevent it buckling while it is being transported and positioned in the tunnel 40 .
- the leading edge of the tube section 30 is protected by buffers temporarily installed thereon to protect the tube section 30 from touching any part of the excavation on its journey through the tunnel 40 .
- the tube section 30 will then be spigoted into the socket 43 formed about the end of the previously installed liner 12 , as illustrated in FIG. 14 to provide quick and accurate coaxial alignment of the tube sections 30 so as to form a continuous liner 12 through the tunnel 40 .
- the socket is suitably provided with apertures therethrough so as to prevent formation of voids about the installed liner.
- the tube sections 30 are welded at their junction once the concrete has been placed and the internal form assembly 38 removed. Welding is carried out using a rotating welding arm 44 fitted with extrusion welders set at the appropriate radius or biased to the desired proximal position to effect the weld.
- the internal form assembly 38 consists of three base wall panels 39 and a collapsible obvert form assembly 46 which cooperate to provide a cylindrical outer wall when in their interlocked operative position.
- the obvert form assembly 46 may be collapsed by folding at the pivot joints 55 between its panel sections and lifted free from the base wall panels 39 by a mobile form carrier 47 supported on the base wall panels 39 .
- the remote one of the three base wall panels 39 is lifted by an elevated rail 56 of the form carrier, tilted about 90° to the position illustrated in FIG. 6 and then transported to the opposite end of the rail 56 where it is lowered into position in the base of the newly installed tube section 30 , see FIG. 5.
- Two spud bar holes 57 are then formed through the liner 12 using the holes in the invert form segment as a template, to allow the spud bars to locate the invert form and liner 12 to supporting segments 58 installed during excavation.
- the liner 12 Upon installation of the internal form assembly 38 the liner 12 is made rigid whereafter the side and top of the liner 12 is spudded to the excavation so that it is held in its design position while concreting. Typically six spuds will be used around the circumference of the liner 12 every three linear meters.
- a slick line 62 for concrete delivery is installed along the length of the pour in the tunnel crown. It is held in place by brackets 63 each with a roller assembly 64 to enable the slick line 62 to move easily. See FIG. 9.
- Concrete is delivered to a concrete pump 65 on the surface and pumped down a drophole 66 .
- a plurality of dropholes are formed about 300 m apart on the surface along the tunnel 40 .
- the distance between dropholes may vary, depending on surface infrastructure and/or liner 12 installation requirements and the like.
- the slick line 62 underground is supported in a folded manner on a rail mounted scissors type support onto which the slick line is gathered as the pour progressively fills the cavity between the tube sections 30 and the tunnel wall.
- This arrangement has the advantage that it allows a continuous pour for the full length of each installed liner.
- the concrete to be used for the backfill of the tunnel liners will be low shrink, flowable, self compacting, high strength (40 Mpa) and have a low water/cement ratio.
- Such a mix design will allow ease of placement, structural integrity and reduce backfill/proof grout to a minimum.
- spud bar holes are drilled through the liner 12 to extend into the surrounding tunnel wall. This may create voids in the finished concrete grout. These are filled through a grout pipe 70 as illustrated in FIG. 13.
- the pipe 70 provided with internal air bleed/tell tale tube 71 is placed in the spud bar hole and held in place with a thrust leg 72 .
- the air bleed tube 71 is extended to within 20 mm of the top of the hole and as grout is pumped into the void air is expelled through the air bleed tube 71 until the void has been filled, whereupon grout will appear from the tube 71 .
- Grouting at each hole may be repeated to ensure that there has been no grout leakage and any voids have been successfully filled.
- the holes in the liner 12 are capped and welded. On completion of all the welding, spark testing of the completed tunnel 40 will occur.
- the formed lined tunnel will have a smooth cylindrical internal surface with a 2400 mm inside diameter and a liner wall thickness not less than 3 mm.
- the liner will be watertight from both the inside and outside and able to withstand an external hydrostatic pressure when grouted/concreted into the tunnel 40 .
- the strip 10 has a series of equally spaced T shaped ribs 75 formed integrally on its outer surface which interlock with the concrete grout to resist the external hydrostatic pressures which may be applied in use.
- each has a return flange 77 and 78 formed integrally therewith so that the joined edges also interlock with the grout to ensure that the liner has equal resistance to external pressures throughout its length.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
A method of forming a plastic lined tunnel including:
positioning a tube section of plastics material in a tunnel portion to be lined;
positioning a removable wall portion of an internal form assembly in the tube section to provide a temporary base wall wherein the internal form assembly further includes a collapsible wall portion;
engaging the base wall with at least one wall of the tunnel to retain the tube section in position;
transporting the collapsible wall portion along the temporary base wall into position for engagement with the temporary base wall within the tube section;
erecting the internal form assembly into an operative condition within the tube section as to conform the tube section to its desired shape;
introducing grout between the outer surface of the tube section and the tunnel wall so as to substantially fill the void therebetween and to retain the tube section in position;
collapsing the internal form assembly and removing the internal form assembly from the lined tunnel portion.
Description
- This invention relates to a method of and apparatus for forming a plastic lined tunnel.
- Typically, drains and tunnels are lined with plastic to provide corrosion resistance and a smooth internal bore so as to minimise pumping losses.
- For large diameter drains and tunnels, the plastic liner is typically made by spiral winding ribbed plastic strip onto itself so as to form a spiral wound tube, the strip edges being formed so as to either engage complementary edge portions or to join the edges with a joining strip. The plastic strip may be forced into a spiral configuration inside an internal forming means such as illustrated in Australian Patent No. 530251 or it may be wound about a mandrel of the desired diameter such as is illustrated in U.S. Pat. No. 3,606,670.
- Mostly, such plastic linings are utilised for repair of old drains and tunnels and thus it has also been proposed to form the liner directly into the tunnel being repaired so that the liner is advanced through the tunnel as the liner is formed. Such an arrangement is shown in Australian Patent No. 57422/98.
- We have now found a method of and apparatus for forming a plastic lined tunnel which will be efficient and reliable in use.
- According to one aspect of the present invention there is provided a method of forming a plastic lined tunnel including:
- positioning a tube section of plastics material in a tunnel portion to be lined;
- positioning a removable wall portion of an internal form assembly in the tube section to provide a temporary base wall wherein the internal form assembly further includes a collapsible wall portion;
- engaging the base wall with at least one wall of the tunnel to retain the tube section in position;
- transporting the collapsible wall portion along the temporary base wall into position for engagement with the temporary base wall within the tube section;
- erecting the internal form assembly into an operative condition within the tube section as to conform the tube section to its desired shape;
- introducing grout between the outer surface of the tube section and the tunnel wall so as to substantially fill the void therebetween and to retain the tube section in position;
- collapsing the internal form assembly and removing the internal form assembly from the lined tunnel portion.
- Suitably the tube section may be formed of any plastics material which can provide the chemical and physical properties to ensure sufficient corrosion resistance and toughness necessary for the application. When the application requires minimized pumping losses, the tube section is formed with a smooth internal surface and a keyed outer surface for improving the bond between the tube section and the grout. In one embodiment the keyed outer surface may simply be a grooving or roughness on that surface. Alternatively the outer surface may have one or more key members thereon for interlocking the tube into the grout placed between the tube section and the tunnel wall.
- A suitable tube section may be formed with a series of encircling flanged ribs about its outer surface for interlocking the tube into a grout placed between the tube section and the tunnel wall. Alternatively it may be formed with a plurality of individual projections tabs or ties about its outer surface for interlocking the tube into a grout.
- Preferably the tube section is a spiral wound tube produced from a strip of plastics material having T-shaped ribs extending about its external surface. Suitably the spiral joint between edges of the strip from which the tube is formed is welded, either internally or externally and preferably internally in a groove formed between the mating edges of the strip. It is also preferred that the strip interlocks along mating edges and each interlocking formation has an external return rib for interlocking with the grout.
- The tube section may be prefabricated and transported to the open end of the tunnel. Alternatively bales of plastic strip which can be formed into the tube sections may be transported to a fabrication unit adjacent the open end of the tunnel where the tube section may be fabricated. Suitably the tube section is introduced from one end of the tunnel and positioned within the tunnel remote from that one end. Subsequent tube sections may be introduced and positioned in abutment with the preceding tube section and the internal form assembly may be moved progressively from tube section to tube section toward that one end. The tube section may be positioned in the tunnel portion by any convenient means such as by a rail mounted tube carrier where the rails are located temporarily or permanently fixed to the tunnel. The tube carrier may have forks suitable for carrying the tube section, which forks permit fine control over the position and orientation of the tube section to facilitate placement of the tube section within the tunnel portion.
- Abutting tube sections may be joined to one another by any convenient means such as by being adhered, taped or overlapped and mechanically fastened. Most suitably the tube sections are joined to one another by a welding process.
- The exposed end of tube section forming a liner may be provided with locating means such as an external collar to form a socket into which the introduced end of the next tube section may spigot so as to align the abutting tube sections.
- The collar may be continuous or gapped or otherwise formed so as to allow grout to extend into the void between the collar and the keyed outer surface of tube sections formed with interlocking means.
- The internal form assembly suitably may comprise a series of segments including upper segments pivotally connected to one another as the collapsible wall portion which is engageable with a temporary base wall, composed of a segment or segments. The collapsible wall portion may be carried on a carriage which may move along the base wall.
- Suitably such a carriage may include transport means which extends beyond a tube section for transporting a base wall segment from beyond one end of a tube section to beyond the other end of the tube section for shifting the base wall segment or segments from a previously lined tunnel portion, through an adjacent lined section into a tube section introduced into an unlined tunnel portion.
- Suitably the base wall is formed in segments which may be lifted from one longitudinal edge or for rotation to an upstanding attitude so as to lie alongside the carriage for transport therepast.
- The base wall may be engaged with at least one wall of the tunnel by a locating means which extends beyond the ends of the tube section or through supports extending through the tube section. Suitably the form of the tube section is cylindrical and the base wall is located substantially coaxially with the tunnel.
- The internal form assembly may be erected into an operative condition to conform the tube section to the desired shape by any convenient means. Where the collapsible wall portion comprises hinged segments, the end segments may be engaged with the base wall and the collapsible wall portion erected by urging the remaining segments into engagement with the remainder of the tube section. The ends of segments may be shaped such that once erected the segments hold themselves in the desired shapes. These segments may take the form of overcentre tabs for ease of erection and collapse.
- The grout may be introduced into the space between the outer surface of the tube section and the tunnel wall in any suitable manner so as to substantially fill the void therebetween and to retain the tube section in position. Suitably the grout is concrete which is pumped into position from a supply tube extending along the top outer surface of the tube sections. The hose may have a concertina or other retractable support in the tunnel to which it is retracted after filling the void which may extend about a plurality of tube sections.
- The internal form assembly may be collapse by any convenient means and will generally follow the reverse process to the erection of the internal form assembly.
- In a preferred embodiment there is provided a continuous method for forming a plastics lined tunnel whereby the internal form assembly is moved into an adjoining portion of the tunnel into which a tube section has been positioned so as to progressively form a continuous plastic lined tunnel.
- In another aspect this invention resides broadly in a ribbed plastic strip for forming spiral wound tubing having complementary edge formations which engage to form the spiral wound tube and each edge formation having an projection adapted for interlocking engagement with surrounding grout so as to hold the tube section in position against external pressure such as ground water pressure. Suitably the projection is a continuous laterally projecting rib extending from the edge formation spaced from the liner wall. Suitably the edge formations engage so as to form an external groove between the joined edge formations into which bonding material may be placed to bond the strips together. Preferably the bonding material is deposited by welding.
- In yet a further aspect, this invention resides broadly in a method of forming a mandrel formed spiral wound pipe, including:
- spiral winding plastic strip onto a mandrel;
- joining together the adjacent edges of the strip to form a tube;
- ejecting a fluid from the mandrel beneath the formed tube to free the formed tube from the mandrel, and
- sliding the formed tube from the mandrel.
- Suitably the edges of the spiral wound strip are joined together by welding. The edges may also be joined through complementary edge formations or joined with a joining strip. Preferably the spiral wound strip is a ribbed plastic strip made in accordance with an aspect of this invention as defined above and most suitably the joining weld is deposited in the external groove formed between joined edges.
- In order that this invention may be more readily understood and put into practical effect, reference will now be made to the accompanying drawings which illustrate a preferred embodiment of the invention, wherein:
- FIG. 1 is a side view of the mandrel assembly with a plastic tube part formed thereon;
- FIG. 2 is a cross-sectional plan view of the mandrel assembly illustrated in FIG. 1;
- FIG. 3 is an end view of the tube forming assembly showing the mandrel and its associated strip feed mechanism;
- FIG. 4 is a cross-sectional side view showing the installation of the plastic lining in a tunnel;
- FIG. 5 is a corresponding view illustrating the relocation of portion of the internal former for the plastic lining;
- FIGS. 6, 7 and8 are a series of views illustrating the relocation of the internal former for the lining;
- FIG. 9 illustrates the arrangement for feeding concrete to the annular space between the liner and the tunnel;
- FIG. 10 is an end view of the preferred form of plastic strip used to form the tube section;
- FIG. 11 illustrates the junction between complementary edge portions of the strip of FIG. 10;
- FIG. 12 is an end view illustrating the formation of a joining weld between tube sections installed in the tunnel;
- FIG. 13 illustrates a method of post filling voids created after initial grouting, and;
- FIG. 14 illustrates a typical method of aligning one tube section with the next during installation.
- According to this embodiment the tunnel is lined to provide smooth plastic lined bore. Since large diameter thin walled plastic pipes or tubes are difficult to handle and transport, the lining tube sections are formed on site as illustrated in FIGS.1 to 3 utilising extruded plastic strip as illustrated in FIGS. 10 and 11.
- For this purpose lengths of the
plastic extrusion 10 is delivered in the form of wound and strapped bales 11, each sufficient to form one liner 12 when wound helically. Each bale 11 is loaded onto aspool 13 on a travellingframe 14 positioned at the outer end of the formingmandrel 15. - The free end of the
extrusion 10 is fed through a strip guide, under abend roller 17 and anip roller 18 and then clamped into a start end clamp 19. Themandrel 15 will then be rotated slowly, driven by a variable speedhydraulic drive 20, drawing thestrip 10 off the bale 11 and onto themandrel 15. - The purpose of the
strip 10 guide is to control the helix angle at which thestrip 10 is wound onto the mandrel. Thebend roller 17 applies a radial force to thestrip 10 to bring it into contact with the outer skin of the mandrel and thenip roller 18 pushes thecomplementary edges strip 10 lie on themandrel 15. - When one full turn of the
mandrel 15 has been completed aplastic extrusion welder 24 is started to form a weld bead into the formed V-shapedspiral recess 25 formed continuously along the outside of the joined edges 22 and 23. - Several driving
rollers 26 bear on the leadingedge 27 of the formed portion of thetube section 30 and drive the rail mounted travellingframe 14 on which the bale 11 is rotatably mounted for advancement as thetube section 30 is formed. - When the
tube section 30 is fully wound and welded each end of thetube section 30 is trimmed square to the axis of themandrel 15. The start end clamp 19 is then released and low pressure air is injected into aplenum 28 formed between inner andouter skins outer skin 29 causing the formedplastic tube section 30 to swell slightly so that it is easily removed from themandrel 15. - A cradle is positioned at one end of the
mandrel 15 so that as the completedtube section 30 is slid from the mandrel it is seated in a respective cradle. Suitably there are three cradles along the length of thetube section 30 on rails which will allow thetube section 30 to be moved clear of themandrel 15. - To maintain the
tube sections 30 in the form of the liners 12 required, when eachtube section 30 is slid from the mandrel 15 a series of supportingspiders 32 is installed in thetube sections 30, each being aligned with a cradle. A crane with a spreader bar and straps will lift eachtube section 30 to a storage yard. - The formed
tube sections 30 are inspected to ensure that they are free of dirt or any other foreign material and then each is craned to the collar of the shaft using a spreader bar and straps for installation as a liner 12. Eachtube sections 30 is lowered into thetunnel 40 until it is positioned over the top of the tunnel rails 36 and aligned with atube carrier 37 thereon. - In this embodiment, each
tube section 30 is suitably 9 meter long and is transported through thetunnel 40 to its installation point on the rail mountedtube carrier 37. Thetube carrier 37 will carry eachtube sections 30 oncantilevered forks 42 through thetunnel 40 for positioning adjacent the previously installed liner 12. Suitably theforks 42 is able to slew left to right, cross travel, raise and lower and articulate upwards and downward to enable each liner 12 to be aligned and correctly mated to the previously installedtube section 30. - Each
tube section 30 is supported internally withspiders 32 to prevent it buckling while it is being transported and positioned in thetunnel 40. The leading edge of thetube section 30 is protected by buffers temporarily installed thereon to protect thetube section 30 from touching any part of the excavation on its journey through thetunnel 40. - The
tube section 30 will then be spigoted into the socket 43 formed about the end of the previously installed liner 12, as illustrated in FIG. 14 to provide quick and accurate coaxial alignment of thetube sections 30 so as to form a continuous liner 12 through thetunnel 40. The socket is suitably provided with apertures therethrough so as to prevent formation of voids about the installed liner. - The
tube sections 30 are welded at their junction once the concrete has been placed and theinternal form assembly 38 removed. Welding is carried out using arotating welding arm 44 fitted with extrusion welders set at the appropriate radius or biased to the desired proximal position to effect the weld. - As illustrated in FIGS.6 to 8, the
internal form assembly 38 consists of threebase wall panels 39 and a collapsibleobvert form assembly 46 which cooperate to provide a cylindrical outer wall when in their interlocked operative position. Theobvert form assembly 46 may be collapsed by folding at the pivot joints 55 between its panel sections and lifted free from thebase wall panels 39 by amobile form carrier 47 supported on thebase wall panels 39. - After the
tube section 30 has been positioned to form a liner 12, the remote one of the threebase wall panels 39 is lifted by anelevated rail 56 of the form carrier, tilted about 90° to the position illustrated in FIG. 6 and then transported to the opposite end of therail 56 where it is lowered into position in the base of the newly installedtube section 30, see FIG. 5. - Two spud bar holes57 are then formed through the liner 12 using the holes in the invert form segment as a template, to allow the spud bars to locate the invert form and liner 12 to supporting
segments 58 installed during excavation. - This process is repeated until all
base wall panels 39 have been relocated to allow theform carrier 47 to travel thereacross carrying the collapsedobvert form assembly 46 into thenext tube section 30 to be installed where it is extended to cooperate with thebase wall panels 39 to hold thetube section 30 in its designed shape during the concreting operation. As theobvert form assembly 46 andcarrier 47 move forward thetube carrier 37 will retreat and thesupport spiders 32 will be removed and thetube carrier 37 will be transported out to receive another liner. - Upon installation of the
internal form assembly 38 the liner 12 is made rigid whereafter the side and top of the liner 12 is spudded to the excavation so that it is held in its design position while concreting. Typically six spuds will be used around the circumference of the liner 12 every three linear meters. - As the
tube carrier 37 and its locomotive 60 return for another liner 12 the concrete hands will prepare for the next tube section installation by removing the next 9 meters ofexcavation rail track 36 and washing down the walls. - A
slick line 62 for concrete delivery is installed along the length of the pour in the tunnel crown. It is held in place by brackets 63 each with aroller assembly 64 to enable theslick line 62 to move easily. See FIG. 9. - Concrete is delivered to a
concrete pump 65 on the surface and pumped down adrophole 66. Suitably a plurality of dropholes are formed about 300 m apart on the surface along thetunnel 40. The distance between dropholes may vary, depending on surface infrastructure and/or liner 12 installation requirements and the like. - The
slick line 62 underground is supported in a folded manner on a rail mounted scissors type support onto which the slick line is gathered as the pour progressively fills the cavity between thetube sections 30 and the tunnel wall. This arrangement has the advantage that it allows a continuous pour for the full length of each installed liner. - Suitably the concrete to be used for the backfill of the tunnel liners will be low shrink, flowable, self compacting, high strength (40 Mpa) and have a low water/cement ratio. Such a mix design will allow ease of placement, structural integrity and reduce backfill/proof grout to a minimum.
- During installation, spud bar holes are drilled through the liner12 to extend into the surrounding tunnel wall. This may create voids in the finished concrete grout. These are filled through a
grout pipe 70 as illustrated in FIG. 13. Thepipe 70 provided with internal air bleed/telltale tube 71 is placed in the spud bar hole and held in place with athrust leg 72. The air bleedtube 71 is extended to within 20 mm of the top of the hole and as grout is pumped into the void air is expelled through theair bleed tube 71 until the void has been filled, whereupon grout will appear from thetube 71. Grouting at each hole may be repeated to ensure that there has been no grout leakage and any voids have been successfully filled. When routing has been completed, the holes in the liner 12 are capped and welded. On completion of all the welding, spark testing of the completedtunnel 40 will occur. - The formed lined tunnel will have a smooth cylindrical internal surface with a 2400 mm inside diameter and a liner wall thickness not less than 3 mm. The liner will be watertight from both the inside and outside and able to withstand an external hydrostatic pressure when grouted/concreted into the
tunnel 40. - It will be seen from FIGS. 10 and 11 that the
strip 10 has a series of equally spaced T shapedribs 75 formed integrally on its outer surface which interlock with the concrete grout to resist the external hydrostatic pressures which may be applied in use. - Furthermore the
complementary edge formations return flange
Claims (13)
1. A method of forming a plastic lined tunnel comprising:
positioning a tube section of plastics material in a tunnel portion to be lined;
positioning a removable wall portion of an internal form assembly in the tube section to provide a temporary base wall wherein the internal form assembly further includes a collapsible wall portion;
engaging the base wall with at least one wall of the tunnel to retain the tube section in position;
transporting the collapsible wall portion along the temporary base wall into position for engagement with the temporary base wall within the tube section;
erecting the internal form assembly into an operative condition within the tube section as to conform the tube section to its desired shape;
introducing grout between the outer surface of the tube section and the tunnel wall so as to substantially fill the void therebetween and to retain the tube section in position;
collapsing the internal form assembly and removing the internal form assembly from the lined tunnel portion.
2. A method according to claim 1 wherein the tube section is formed with a smooth internal surface and a keyed outer surface for improving the bond between the tube section and the grout.
3. A method according to claim 1 wherein the tube section is a spiral wound tube produced from a strip of plastics material having T-shaped ribs extending about its external surface.
4. A method according to claim 1 wherein tube section forming a liner may be provided with locating means such as an external collar to form a socket into which the introduced end of the next tube section may spigot so as to align the abutting tube sections.
5. A method according to claim 1 wherein the internal form assembly suitably comprise a series of segments including upper segments pivotally connected to one another as the collapsible wall portion which is engageable with a temporary base wall, composed of a segment or segments.
6. A method according to claim 1 wherein the collapsible wall portion may be carried on a carriage which may move along the base wall.
7. A method according to claim 6 wherein the carriage includes transport means which extends beyond a tube section for transporting a base wall segment from beyond one end of a tube section to beyond the other end of the tube section for shifting the base wall segment or segments from a previously lined tunnel portion, through an adjacent lined section into a tube section introduced into an unlined tunnel portion.
8. A method according to claim 1 wherein the base wall is engaged with at least one wall of the tunnel by a locating means which extends beyond the ends of the tube section or through supports extending through the tube section.
9. A method according to claim 1 wherein the grout is cement.
10. A method according to claim 1 wherein the internal form assembly is moved into an adjoining portion of the tunnel into which a tube section has been positioned so as to progressively form a continuous plastic lined tunnel.
11. A ribbed plastic strip for forming spiral wound tubing comprising complementary edge formations which engage to form the spiral wound tube and each edge formation having an projection adapted for interlocking engagement with surrounding grout so as to hold the tube section in position against external pressure such as ground water pressure.
12. A ribbed plastic strip according to claim 11 wherein the edge formations engage so as to form an external groove between the joined edge formations into which bonding material may be placed to bond the strips together.
13. A method of forming a mandrel formed spiral wound pipe, comprising:
spiral winding plastic strip onto a mandrel;
joining together the adjacent edges of the strip to form a tube;
ejecting a fluid from the mandrel beneath the formed tube to free the formed tube from the mandrel; and
sliding the formed tube from the mandrel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/863,004 US20020175432A1 (en) | 2001-05-22 | 2001-05-22 | Method of and apparatus for forming a plastic lined tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/863,004 US20020175432A1 (en) | 2001-05-22 | 2001-05-22 | Method of and apparatus for forming a plastic lined tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
US20020175432A1 true US20020175432A1 (en) | 2002-11-28 |
Family
ID=25339990
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/863,004 Abandoned US20020175432A1 (en) | 2001-05-22 | 2001-05-22 | Method of and apparatus for forming a plastic lined tunnel |
Country Status (1)
Country | Link |
---|---|
US (1) | US20020175432A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016069862A (en) * | 2014-09-29 | 2016-05-09 | 藤森工業株式会社 | Folded waterproof sheet, and fitting method for waterproof sheet |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3606670A (en) * | 1967-10-02 | 1971-09-21 | Dynamit Nobel Ag | Method for forming spiral wound synthetic pipes |
-
2001
- 2001-05-22 US US09/863,004 patent/US20020175432A1/en not_active Abandoned
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3606670A (en) * | 1967-10-02 | 1971-09-21 | Dynamit Nobel Ag | Method for forming spiral wound synthetic pipes |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016069862A (en) * | 2014-09-29 | 2016-05-09 | 藤森工業株式会社 | Folded waterproof sheet, and fitting method for waterproof sheet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU636118B2 (en) | Improvement in method and apparatus for installing a replacement pipe in an existing underground conduit | |
CN112012753B (en) | Shield tunneling machine starting method based on special-shaped extension steel ring | |
CN112096281B (en) | Drilling, pile splicing and pile planting all-in-one machine and construction method thereof | |
EP0613991A1 (en) | Apparatus and for driving pipes into the ground | |
CN113236853A (en) | Equipment and method for installing hole-penetrating pipe in long-distance embankment-penetrating sleeve | |
KR101573706B1 (en) | The Construction Method and Structure of Non-excavation tunnel what Steel pipe position can be substitute with Precast Structure by Extruding | |
GB1597534A (en) | Method for the manufacture of underground pipes or tunnels or large diameter | |
CN110924990A (en) | Advanced supporting structure assembled by corrugated steel pipe sheets and supporting method | |
US4594025A (en) | Tunnelling and tunnel relining equipment | |
US20020175432A1 (en) | Method of and apparatus for forming a plastic lined tunnel | |
KR101162677B1 (en) | The saddle shape branch pipe repairing apparatus and branch pipe repairing method using the same | |
KR102305697B1 (en) | System for installing a plurality of synthetic resin corrugated pipes | |
AU1945900A (en) | A method of and apparatus for forming a plastic lined tunnel | |
JPS6220987A (en) | Lining execution method in underground buried pipe and execution device thereof | |
CN110080679A (en) | Heading equipment and control method thereof | |
CN114634130B (en) | Device and method for transporting, adjusting and installing flexible plastic pipeline in circular-section tunnel | |
CN115898469A (en) | Tunnel secondary lining construction method | |
CN211395752U (en) | Finished product pipe abutting structure of underground pipeline engineering | |
JP4933881B2 (en) | Tube transport carriage and tube laying method | |
CN115012944A (en) | Vertical shaft construction device and construction method | |
CN111441793B (en) | Construction method for subway station headwall in sandy gravel stratum | |
CN211598516U (en) | Novel anti-slide pile pore-forming device | |
CN113982597A (en) | Tunnel excavation construction method suitable for strong-water-permeability unconsolidated formation in karst subsidence area | |
CN217927478U (en) | Hydraulic pipeline installing machine | |
JPS5813898A (en) | Underground constructing method of curved pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: PEABODY MINING SERVICES PTY LIMITED, AUSTRALIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:GOULTER, ROSS HOWARD;REEL/FRAME:012091/0178 Effective date: 20010730 |
|
AS | Assignment |
Owner name: EROC PTY LIMITED, AUSTRALIA Free format text: CHANGE OF NAME;ASSIGNOR:PEABODY MINING SERVICES PTY LIMITED;REEL/FRAME:013054/0179 Effective date: 20010213 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |