US20020023580A1 - Mooring and flowline system - Google Patents

Mooring and flowline system Download PDF

Info

Publication number
US20020023580A1
US20020023580A1 US09/777,606 US77760601A US2002023580A1 US 20020023580 A1 US20020023580 A1 US 20020023580A1 US 77760601 A US77760601 A US 77760601A US 2002023580 A1 US2002023580 A1 US 2002023580A1
Authority
US
United States
Prior art keywords
mooring
vessel
pendant
tanker
flowline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/777,606
Other versions
US6435124B1 (en
Inventor
Ian Williams
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MOORING SYSTEMS Ltd
Lundin International SA
Lundin Netherlands BV
Original Assignee
Brovig RDS Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Brovig RDS Ltd filed Critical Brovig RDS Ltd
Assigned to BROVIG RDS LIMITED reassignment BROVIG RDS LIMITED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: WILLIAMS, IAN
Publication of US20020023580A1 publication Critical patent/US20020023580A1/en
Application granted granted Critical
Publication of US6435124B1 publication Critical patent/US6435124B1/en
Assigned to CRYSTAL PRODUCTION UK LIMITED reassignment CRYSTAL PRODUCTION UK LIMITED CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: BROVIG UK LIMITED
Assigned to LUNDIN INTERNATIONAL SA reassignment LUNDIN INTERNATIONAL SA CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: COPAREX INTERNATIONAL SA
Assigned to BROVIG UK LIMITED reassignment BROVIG UK LIMITED CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: BROVIG RDS LIMITED
Assigned to LUNDIN NETHERLANDS BV reassignment LUNDIN NETHERLANDS BV CHANGE OF NAME OF LICENSE Assignors: COPAREX NETHERLANDS BV
Assigned to ATLANTIS ISIS LTD, IKDAM PRODUCTION SA, COPAREX NETHERLANDS BV, COPAREX INTERNATIONAL SA reassignment ATLANTIS ISIS LTD LICENSE AGREEMENT Assignors: BROVIG RDS LIMITED
Assigned to MOORING SYSTEMS LIMITED reassignment MOORING SYSTEMS LIMITED CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: FIRST TECH LIMITED
Assigned to FIRST TECH LIMITED reassignment FIRST TECH LIMITED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: CRYSTAL PRODUCTION UK LIMITED
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/24Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • E21B17/015Non-vertical risers, e.g. articulated or catenary-type

Definitions

  • This invention relates to a mooring and flowline system for use in floating facilities for handling petroleum and petroleum products.
  • the system is particularly, but not exclusively, applicable to the mooring and loading of floating production ship shaped vessels.
  • Tanker conversions used hitherto have required extensive conversion.
  • a turret mooring which includes a rotary oil flowline joint, and this requires major structural work on the tanker in addition to the complex mooring turret.
  • a flexible riser to the tanker has been used, but has required large quick disconnect (QDC) valves with a physical size and weight requiring installation outboard of the tanker bow on a specially installed and relatively large structure.
  • QDC quick disconnect
  • An object of the present invention is to provide an improved mooring and flowline system which is simple and economical to install. It is also an object of the invention to provide a system which enables conventional tankers to be used as floating production, storage and offtake vessels with a minimum of structural alteration.
  • the present invention provides a mooring and flowline system comprising: means for mooring a floating production and/or storage vessel to the seabed, and one or more flowlines for connection to one or more producing wells or to a facility; the mooring means comprising at least two anchors in the sea bed, a respective anchor riser extending from each of the anchors, each of the anchor risers having one end secured to its anchor and the other end secured to a common mooring node member, and mooring pendant means extending from the node member for connection, in use, to the vessel; each flowline comprising a seabed flowline extending from the direction of the well or facility into the vicinity of the mooring means, and a flexible riser pipe extending from the seabed flowline to the vessel; and in which each flexible riser pipe is a continuous conduit with a single axial rotational coupling and has part of its length secured alongside the mooring pendant means.
  • the riser pipe is suitably held clear of the anchor risers and node member by providing a portion of the riser pipe to be located through a series of guidance collars, these being attached to the mooring chain pendant to control sideways and rotational movement.
  • the node member may be a plain ring, shackle or plate structure.
  • the mooring pendant may comprise two parallel chains, one passing over each bow of the vessel; alternatively the mooring pendant may consist of a single chain.
  • the vessel is a tanker.
  • the single or twin chains are brought inboard of the tanker to standard chain stoppers or to remotely controlled release stoppers, the riser pipe is brought inboard of the tanker over a chute to have its inboard end lying near the tanker deck, and quick disconnect valve means are located near the tanker deck between said riser pipe and a tank manifold of the tanker.
  • FIG. 1 is a schematic side view of one embodiment of the invention in use with a production tanker.
  • FIG. 2 is a plan view corresponding to FIG. 1.
  • FIG. 3 is a view similar to FIG. 1 but showing the system out of use with the tanker removed.
  • FIG. 4 is a schematic plan view of a tanker bow illustrating a suitable arrangement for use in the present invention with a single riser.
  • FIG. 4A is a schematic plan view of an arrangement with multiple risers.
  • FIG. 5 is a side view corresponding to FIG. 4.
  • FIG. 6 is a side view of a chute seen in FIG. 5.
  • FIG. 7 illustrates in more detail part of the oil line seen in FIG. 5.
  • FIG. 8 illustrates part of a multi-riser system in more detail.
  • a floating production tanker 10 is anchored to the sea bed 12 by means of a three-leg anchor system comprising anchors 14 a , 14 b , 14 c connected by risers 16 a , 16 b , 16 c to a node 18 , from which a mooring pendant 20 is secured to the tanker 10 .
  • the mooring is in the vicinity of a wellhead (surface or sea bed) (not seen in the drawings) from which oil is transferred via a flowline.
  • the flowline comprises a seabed portion 22 and a flexible riser pipe 24 .
  • the riser 24 has a mid portion which is provided with flotation collars 26 and is restrained by a riser base 30 outboard of the catenary touchdown envelope.
  • the mooring is set such that a 120° angle may be presented towards the sea bed flowline 22 direction.
  • This geometry together with the flotation of the collars 26 and the restraint by the riser base 30 allows a number of flowlines to be accommodated from different directions, maintaining each riser pipe 24 clear of conflict with each other and the mooring node 18 .
  • the upper part of the riser pipe 24 is secured along the mooring pendant 20 by specifically spaced multi collars 32 that are each rigidly connected to an individual chain link.
  • the riser pipe 24 is taken aboard the tanker 10 via a chute assembly indicated at 34 .
  • the anchors 14 may be any suitable form of conventional mooring anchor.
  • Each of the anchor risers 16 has at least some of its on-bottom length constituted by chain. For water depths up to about 75 meters, the chain can be continuous to the node 18 .
  • the catenary section may be of synthetic rope.
  • the use of rope has several advantages. Principally, it reduces the weight which has to be lifted when the tanker is connecting to the system, as is discussed more fully below. It also makes the departure angle of the riser 16 from the node 18 nearer the horizontal, which increases the horizontal stability of the system, and simplifies stowage on the vessel used to deploy the system. Where rope is used for the catenary section, it is desirable to have the final 30 meters or so nearest the node 18 of chain, to reduce the risk of kinking of the rope.
  • the node 18 may take any suitable form which connects together the three risers 16 and the pendant 20 with adequate mechanical strength.
  • a suitably sized master ring may be used, or a triangular plate arrangement, together with conventional shackles.
  • No swivel is incorporated in the node 18 .
  • a fitting on the node 18 may be used as the lowest of the multi collars 26 .
  • buoyancy may be incorporated in the node 18 or in the anchor risers 16 adjacent to the node 18 .
  • the tanker 10 is a segregated ballast tanker of 600,000 to 750,000 bbl capacity and the mooring is designed to hold the node 18 at a depth of 30 meters, and thus up to about 15 meters beneath the tanker hull.
  • the mooring pendant 20 will require to be of the order of 40 or 50 meters in length.
  • the preferred form for the mooring pendant 20 comprises a single, large-size chain 36 extending from the node 18 and connected to a single chafe chain 38 .
  • the chain For the same order of size of the tanker 10 , it is suitable to have the chain up to 120 mm size, which will fit many standard chain stoppers. This arrangement simplifies the node design and minimizes modification to the tanker.
  • FIGS. 4 and 5 there is shown a suitable tanker bow installation which requires a minimum of modification from standard shipping practice.
  • the chain 38 is held by a standard chain stopper 40 that may be raised above the foc'sle deck 42 on a seating 44 .
  • the incoming chain 38 passes through a fairlead 46 in the bow bulwark 48 aligned with the chain stopper 40 , and the inboard end of the chain is passed to a winch or windlass, via (if necessary) a pedestal fairlead 50 .
  • the chute 34 is a simple structure providing an arcuate guide on two axes for the riser pipe 24 . It is not necessary to have any guidance for the riser 24 below bulwark level, since the riser will be spaced away from the remainder of the vessel's hull by the considerable flare of the foc'sle bulwarks in relation to the lower part of the hull. On some tankers, a short cantilever may be necessary to provide vertical clearance from a bulbous bow.
  • FIG. 5 also indicates the position on the foc'sle deck level of valve gear generally designated at 52 .
  • the valve gear 52 is shown in more detail in FIG. 7, in which it will be seen that the riser pipe 24 is connected to a deck line 54 via a manually operated ball valve 58 , a breakaway cum emergency release unit 66 , a rotational coupling 60 , and a short section of flexible pipe 56 .
  • the breakaway cum emergency release unit 66 is suitably a Gall-Thomson coupling which has bolts which shear at a predetermined axial load, the chute 34 and the short section of flexible pipe 56 ensuring that the load on the coupling is always axial.
  • the breakaway cum emergency release unit 66 also seals the pipe both sides of the unit as the unit breaks apart.
  • the manually operated ball valve 58 would be used to close the connection in normal disconnection routines.
  • the hydraulically or gas pressure activated release system within the breakaway cum emergency release unit 66 can be operated remotely, for example, from the bridge of the vessel, where it is decided to make an emergency disconnection of the tanker.
  • the emergency shutdown valve 68 is included to provide shutdown of flow without disconnection and would normally be part of the tanker's equipment, even if not located close to the release system.
  • the deck line 54 is most conveniently connected with the vessel tankage via a process plant or the midships manifold, subject to the use of the system for production or storage, respectively.
  • the deck line 54 can be provided in the form of steel tubing secured to the deck, or in the case of low pressure usage, as a further length of flowline.
  • the riser pipe 24 must be a flexible hose with sufficient dynamic properties to accept movement of the ship's bow and movement of the touchdown point at the bottom of the catenary. Both unbonded and bonded pipes of a wide variety of sizes and specifications are suitable.
  • FIG. 4A shows a modified arrangement for use with eight riser pipes (not shown). This makes use of eight chutes 34 arranged in parallel on the tanker bow.
  • Each riser pipe is a flexible pipe as before, and each is provided with its own valve assembly 52 as in FIG. 4.
  • FIG. 8 illustrates more detail of an eight riser system as in FIG. 4A, and shows the disposition of the risers passing through nine collars around the mooring pendant chain whose location is marked by a cross. This shows how risers approaching the node from different directions are brought into a parallel array at the vessel's bow.
  • each anchor would be laid using DGPS to a 10 meter tolerance. This has been achieved in depths in excess of 500 meters so is not anticipated a problem in any depth.
  • Each anchor is laid in turn, the cables run back to a common point; each cable as it is laid is buoyed off on a pendant wire. Insurance tensioning of the anchors can be done using the bollard pull of suitable vessels or with the inclusion in the system of a standard chain tensioned.
  • One of the mooring legs includes a standard seabed chain stopper for correct pre-tensioning of the system. When all three have been laid, the anchor handler recovers all three cables over the stem roller.
  • the node point is assembled and deployed over the side with the chafe chain and appropriate buoyancy 70 to maintain proper riser pipe catenary shapes, for example as illustrated in FIG. 3. Correct pre-tensioning for the previously carried out design parameters is then achieved by use of the seabed chain stopper.
  • a pick-up rope 72 is attached to the upper end of the chain pendant.
  • the pick-up rope 72 is recovered, either by the tanker itself or by a support vessel and fired across to the tanker using a compressed air rocket gun.
  • the tanker pulls on the pick-up rope and starts to heave in the chafe chain, securing them in the chain stoppers.
  • the winches of a typical tanker can be supplemented by a block and tackle or a temporary winch to achieve sufficient pull for this application, which may require a pull of up to 90 tonnes.
  • the invention thus provides a mooring and flowline system which can handle one or more flowlines making use of a minimally converted tanker and relatively small, standard components.
  • the present invention may use individual hose swivels each typically 600 mm long, weighing 120 kg and costing about GBP 20,000, made as standard components by manufacturers such as Woodfield.
  • prior art systems require the use of a multi-path (toroidal) flowline swivel which can be up to 10 m high, weigh several tens of tons, and cost GBP 3-4 million.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Loading And Unloading Of Fuel Tanks Or Ships (AREA)
  • Supports For Pipes And Cables (AREA)
  • Removal Of Floating Material (AREA)
  • Earth Drilling (AREA)

Abstract

A seabed flowline is connected to a substantially conventional tanker serving as a floating storage facility by a system comprising a three-leg mooring and a flexible riser. The mooring comprises anchors connected by anchor risers to a common node, and a mooring pendant extending from the node to the tanker. The flexible riser comprises a flexible rubber hose extending from the seabed to the tanker, and a single rotational coupling. The hose has a top section secured along part of the mooring pendant, and an intermediate section provided with buoyancy and restrained by a tether to maintain it clear of the anchor risers.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This application claims priority to a prior Great Britain patent application, No. 0002703.7, filed Feb. 8, 2000. [0001]
  • FEDERALLY SPONSORED RESEARCH
  • Not applicable. [0002]
  • REFERENCE TO MICROFICHE APPENDIX
  • Not applicable. [0003]
  • FIELD OF THE INVENTION
  • This invention relates to a mooring and flowline system for use in floating facilities for handling petroleum and petroleum products. The system is particularly, but not exclusively, applicable to the mooring and loading of floating production ship shaped vessels. [0004]
  • BACKGROUND OF THE INVENTION
  • Production from offshore wells can be exported ashore by subsea pipeline, but this requires a very large capital expenditure. More recently there has been a move to exploiting more marginal fields by the use of a floating production, storage and offtake vessel (FPSO), from which oil is exported periodically by tanker. Commonly, the floating production facility has been provided by conversion of an existing tanker. Such arrangements have worked well, but there is a continuing need for a substantial reduction in installation costs in order to improve the economics of marginal field development and production [0005]
  • Tanker conversions used hitherto have required extensive conversion. In some cases, a turret mooring is used which includes a rotary oil flowline joint, and this requires major structural work on the tanker in addition to the complex mooring turret. In other cases, a flexible riser to the tanker has been used, but has required large quick disconnect (QDC) valves with a physical size and weight requiring installation outboard of the tanker bow on a specially installed and relatively large structure. [0006]
  • An object of the present invention is to provide an improved mooring and flowline system which is simple and economical to install. It is also an object of the invention to provide a system which enables conventional tankers to be used as floating production, storage and offtake vessels with a minimum of structural alteration. [0007]
  • SUMMARY OF THE INVENTION
  • Accordingly, the present invention provides a mooring and flowline system comprising: means for mooring a floating production and/or storage vessel to the seabed, and one or more flowlines for connection to one or more producing wells or to a facility; the mooring means comprising at least two anchors in the sea bed, a respective anchor riser extending from each of the anchors, each of the anchor risers having one end secured to its anchor and the other end secured to a common mooring node member, and mooring pendant means extending from the node member for connection, in use, to the vessel; each flowline comprising a seabed flowline extending from the direction of the well or facility into the vicinity of the mooring means, and a flexible riser pipe extending from the seabed flowline to the vessel; and in which each flexible riser pipe is a continuous conduit with a single axial rotational coupling and has part of its length secured alongside the mooring pendant means. [0008]
  • Preferably, there are at least three anchors in an angular array, three anchors at mutual 120° spacings being particularly preferred. The riser pipe is suitably held clear of the anchor risers and node member by providing a portion of the riser pipe to be located through a series of guidance collars, these being attached to the mooring chain pendant to control sideways and rotational movement. [0009]
  • Preferably also, there is no mooring swivel between the anchors and the vessel; the node member may be a plain ring, shackle or plate structure. [0010]
  • The mooring pendant may comprise two parallel chains, one passing over each bow of the vessel; alternatively the mooring pendant may consist of a single chain. [0011]
  • Preferably, the vessel is a tanker. [0012]
  • In a particularly preferred form the invention, which allows a conventional tanker to be utilized as the production vessel with a minimal amount of conversion, the single or twin chains are brought inboard of the tanker to standard chain stoppers or to remotely controlled release stoppers, the riser pipe is brought inboard of the tanker over a chute to have its inboard end lying near the tanker deck, and quick disconnect valve means are located near the tanker deck between said riser pipe and a tank manifold of the tanker.[0013]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • An embodiment of the invention will now be described, by way of example, with reference to the drawings, in which: [0014]
  • FIG. 1 is a schematic side view of one embodiment of the invention in use with a production tanker. [0015]
  • FIG. 2 is a plan view corresponding to FIG. 1. [0016]
  • FIG. 3 is a view similar to FIG. 1 but showing the system out of use with the tanker removed. [0017]
  • FIG. 4 is a schematic plan view of a tanker bow illustrating a suitable arrangement for use in the present invention with a single riser. [0018]
  • FIG. 4A is a schematic plan view of an arrangement with multiple risers. [0019]
  • FIG. 5 is a side view corresponding to FIG. 4. [0020]
  • FIG. 6 is a side view of a chute seen in FIG. 5. [0021]
  • FIG. 7 illustrates in more detail part of the oil line seen in FIG. 5. [0022]
  • FIG. 8 illustrates part of a multi-riser system in more detail. [0023]
  • DESCRIPTION OF EMBODIMENTS OF THE INVENTION
  • Referring particularly to FIGS. 1 and 2, a [0024] floating production tanker 10 is anchored to the sea bed 12 by means of a three-leg anchor system comprising anchors 14 a, 14 b, 14 c connected by risers 16 a, 16 b, 16 c to a node 18, from which a mooring pendant 20 is secured to the tanker 10. The mooring is in the vicinity of a wellhead (surface or sea bed) (not seen in the drawings) from which oil is transferred via a flowline.
  • The flowline comprises a [0025] seabed portion 22 and a flexible riser pipe 24. The riser 24 has a mid portion which is provided with flotation collars 26 and is restrained by a riser base 30 outboard of the catenary touchdown envelope.
  • As seen in FIG. 2, the mooring is set such that a 120° angle may be presented towards the [0026] sea bed flowline 22 direction. This geometry, together with the flotation of the collars 26 and the restraint by the riser base 30 allows a number of flowlines to be accommodated from different directions, maintaining each riser pipe 24 clear of conflict with each other and the mooring node 18.
  • The upper part of the [0027] riser pipe 24 is secured along the mooring pendant 20 by specifically spaced multi collars 32 that are each rigidly connected to an individual chain link.
  • The [0028] riser pipe 24 is taken aboard the tanker 10 via a chute assembly indicated at 34.
  • The anchors [0029] 14 may be any suitable form of conventional mooring anchor. Each of the anchor risers 16 has at least some of its on-bottom length constituted by chain. For water depths up to about 75 meters, the chain can be continuous to the node 18.
  • In greater water depths up to about 350 meters, it is preferred to have the on-bottom section of chain but the catenary section of wire rope; beyond about 350 meters, the catenary section may be of synthetic rope. The use of rope has several advantages. Principally, it reduces the weight which has to be lifted when the tanker is connecting to the system, as is discussed more fully below. It also makes the departure angle of the riser [0030] 16 from the node 18 nearer the horizontal, which increases the horizontal stability of the system, and simplifies stowage on the vessel used to deploy the system. Where rope is used for the catenary section, it is desirable to have the final 30 meters or so nearest the node 18 of chain, to reduce the risk of kinking of the rope.
  • The [0031] node 18 may take any suitable form which connects together the three risers 16 and the pendant 20 with adequate mechanical strength. A suitably sized master ring may be used, or a triangular plate arrangement, together with conventional shackles. No swivel is incorporated in the node 18. A fitting on the node 18 may be used as the lowest of the multi collars 26.
  • In some circumstances there may be an advantage in reducing the weight of the node and the catenary sections, and to this end, buoyancy (not shown) may be incorporated in the [0032] node 18 or in the anchor risers 16 adjacent to the node 18.
  • In a typical installation, the [0033] tanker 10 is a segregated ballast tanker of 600,000 to 750,000 bbl capacity and the mooring is designed to hold the node 18 at a depth of 30 meters, and thus up to about 15 meters beneath the tanker hull. In these circumstances, the mooring pendant 20 will require to be of the order of 40 or 50 meters in length.
  • The preferred form for the [0034] mooring pendant 20 comprises a single, large-size chain 36 extending from the node 18 and connected to a single chafe chain 38. For the same order of size of the tanker 10, it is suitable to have the chain up to 120 mm size, which will fit many standard chain stoppers. This arrangement simplifies the node design and minimizes modification to the tanker.
  • Referring to FIGS. 4 and 5, there is shown a suitable tanker bow installation which requires a minimum of modification from standard shipping practice. The [0035] chain 38 is held by a standard chain stopper 40 that may be raised above the foc'sle deck 42 on a seating 44. The incoming chain 38 passes through a fairlead 46 in the bow bulwark 48 aligned with the chain stopper 40, and the inboard end of the chain is passed to a winch or windlass, via (if necessary) a pedestal fairlead 50.
  • As will be seen from FIGS. 5 and 6, the [0036] chute 34 is a simple structure providing an arcuate guide on two axes for the riser pipe 24. It is not necessary to have any guidance for the riser 24 below bulwark level, since the riser will be spaced away from the remainder of the vessel's hull by the considerable flare of the foc'sle bulwarks in relation to the lower part of the hull. On some tankers, a short cantilever may be necessary to provide vertical clearance from a bulbous bow.
  • FIG. 5 also indicates the position on the foc'sle deck level of valve gear generally designated at [0037] 52. The valve gear 52 is shown in more detail in FIG. 7, in which it will be seen that the riser pipe 24 is connected to a deck line 54 via a manually operated ball valve 58, a breakaway cum emergency release unit 66, a rotational coupling 60, and a short section of flexible pipe 56. The breakaway cum emergency release unit 66 is suitably a Gall-Thomson coupling which has bolts which shear at a predetermined axial load, the chute 34 and the short section of flexible pipe 56 ensuring that the load on the coupling is always axial. The breakaway cum emergency release unit 66 also seals the pipe both sides of the unit as the unit breaks apart. The manually operated ball valve 58 would be used to close the connection in normal disconnection routines. The hydraulically or gas pressure activated release system within the breakaway cum emergency release unit 66 can be operated remotely, for example, from the bridge of the vessel, where it is decided to make an emergency disconnection of the tanker. The emergency shutdown valve 68 is included to provide shutdown of flow without disconnection and would normally be part of the tanker's equipment, even if not located close to the release system.
  • The [0038] deck line 54 is most conveniently connected with the vessel tankage via a process plant or the midships manifold, subject to the use of the system for production or storage, respectively.
  • The [0039] deck line 54 can be provided in the form of steel tubing secured to the deck, or in the case of low pressure usage, as a further length of flowline.
  • The [0040] riser pipe 24 must be a flexible hose with sufficient dynamic properties to accept movement of the ship's bow and movement of the touchdown point at the bottom of the catenary. Both unbonded and bonded pipes of a wide variety of sizes and specifications are suitable.
  • FIG. 4A shows a modified arrangement for use with eight riser pipes (not shown). This makes use of eight [0041] chutes 34 arranged in parallel on the tanker bow. Each riser pipe is a flexible pipe as before, and each is provided with its own valve assembly 52 as in FIG. 4.
  • It will be appreciated from the foregoing description that the arrangement in operation will cause the riser pipe to helix around the pendant chain. There will, therefore, be a restriction on the number of turns the vessel can make, since turning full circle will effectively twist the fluid riser and the chain around each other. Contrary to previous practice, the present inventors believe and can demonstrate that the limit of this helixing is not a practicable restriction in a floating production situation. It is believed that the weather patterns actually found in practice may make a vessel do complete turns; however, there are more than sufficient lighter weather periods when the tanker can take a turn, back out either using its own engines and rudder, or being pulled round by a tug. [0042]
  • FIG. 8 illustrates more detail of an eight riser system as in FIG. 4A, and shows the disposition of the risers passing through nine collars around the mooring pendant chain whose location is marked by a cross. This shows how risers approaching the node from different directions are brought into a parallel array at the vessel's bow. [0043]
  • Because it uses standard anchors and anchor cable, a normal anchor handling tug supply vessel can install the system. Initially each anchor would be laid using DGPS to a 10 meter tolerance. This has been achieved in depths in excess of 500 meters so is not anticipated a problem in any depth. [0044]
  • Each anchor is laid in turn, the cables run back to a common point; each cable as it is laid is buoyed off on a pendant wire. Insurance tensioning of the anchors can be done using the bollard pull of suitable vessels or with the inclusion in the system of a standard chain tensioned. One of the mooring legs includes a standard seabed chain stopper for correct pre-tensioning of the system. When all three have been laid, the anchor handler recovers all three cables over the stem roller. [0045]
  • The node point is assembled and deployed over the side with the chafe chain and [0046] appropriate buoyancy 70 to maintain proper riser pipe catenary shapes, for example as illustrated in FIG. 3. Correct pre-tensioning for the previously carried out design parameters is then achieved by use of the seabed chain stopper. A pick-up rope 72 is attached to the upper end of the chain pendant.
  • When the tanker is coming onto location, the pick-up [0047] rope 72 is recovered, either by the tanker itself or by a support vessel and fired across to the tanker using a compressed air rocket gun. The tanker pulls on the pick-up rope and starts to heave in the chafe chain, securing them in the chain stoppers. The winches of a typical tanker can be supplemented by a block and tackle or a temporary winch to achieve sufficient pull for this application, which may require a pull of up to 90 tonnes.
  • The invention thus provides a mooring and flowline system which can handle one or more flowlines making use of a minimally converted tanker and relatively small, standard components. In particular, the present invention may use individual hose swivels each typically 600 mm long, weighing 120 kg and costing about GBP 20,000, made as standard components by manufacturers such as Woodfield. In contrast, prior art systems require the use of a multi-path (toroidal) flowline swivel which can be up to 10 m high, weigh several tens of tons, and cost GBP 3-4 million.[0048]

Claims (28)

What is claimed is:
1. A mooring and flowline system comprising:
means for mooring a floating production and/or storage vessel to the seabed, at least one flowline for connection to at least one producing well or to a facility;
the mooring means comprising at least two anchors in the sea bed, a respective anchor riser extending from each of the anchors, each of the anchor risers having one end secured to its anchor and the other end secured to a common mooring node member, and mooring pendant means extending from the node member for connection, in use, to the vessel;
each flowline comprising a seabed flowline extending from the direction of the well or facility into the vicinity of the mooring means, and a flexible riser pipe extending from the seabed flowline to the vessel; and
in which each flexible riser pipe is a continuous conduit with a single axial rotational coupling and has part of its length secured alongside the mooring pendant means.
2. A system according to claim 1, in which there are at least three anchors in an angular array.
3. A system according to claim 2, in which there are three anchors at mutual 120° spacings.
4. A system according to claim 1, in which the riser pipe is of bonded or unbonded rubber construction.
5. A system according to claim 1, in which a portion of the riser pipe is provided with flotation means.
6. A system according to claim 1, in which there is no swivel between the anchors and the vessel.
7. A system according to claim 1, in which the node member comprises a plate structure or one or more plain rings or shackles.
8. A system according to claim 1, in which the mooring pendant comprises one or two parallel chains, passing on to the bow of the vessel.
9. A system according to claim 1, in which the vessel is a tanker.
10. A system according to claim 9, in which the mooring pendant chain or chains are brought inboard of the tanker to standard chain stoppers or to remotely controlled release stoppers.
11. A system according to claim 10, in which the riser pipe is connected to a valve, swivel and quick connect/disconnect assembly, and is then brought inboard of the tanker over a chute to have its inboard end lying near to the tanker deck.
12. A system according to claim 11, in which said valve, swivel and quick connect/disconnect assembly includes a self-sealing breakaway coupling.
13. The combination of a mooring and flowline system in accordance with claim 1, and a vessel, the vessel including stopper means releasably securing the mooring pendant means, fairlead means receiving the mooring pendant means from outboard and guiding it to said stopper means, a petroleum conduit passing through a valve, swivel and quick connect/disconnect assembly over a chute for receiving and guiding the flexible riser which is disposed, in use, between the chute securing means and the mooring pendant means outboard of said fairlead means.
14. The combination of claim 13, said vessel being a tanker ship with said chute and valve means positioned on the foc'sle of the ship, and in which the mooring pendant means comprises a single chain pendant, the fairlead means comprises a single fairlead for the chain pendant and said stopper means comprises a standard chain stopper.
15. A mooring and flowline system comprising:
an apparatus for mooring a floating production and/or storage vessel to the seabed, at least one flowline for connection to at least one producing well or to a facility;
the mooring apparatus comprising at least two anchors in the sea bed, a respective anchor riser extending from each of the anchors, each of the anchor risers having one end secured to its anchor and the other end secured to a common mooring node member, and a mooring pendant mechanism extending from the node member for connection, in use, to the vessel;
each flowline comprising a seabed flowline extending from the direction of the well or facility into the vicinity of the mooring apparatus, and a flexible riserpipe extending from the seabed flowline to the vessel, and
in which each flexible riser pipe is a continuous conduit with a single axial rotational coupling and has part of its length secured alongside the mooring pendant mechanism.
16. A system according to claim 15, in which there are at least three anchors in an angular array.
17. A system according to claim 16, in which there are three anchors at mutual 120° spacings.
18. A system according to claim 15, in which the riser pipe is of bonded or unbonded rubber construction.
19. A system according to claim 15, in which a portion of the riser pipe is provided with a flotation mechanism.
20. A system according to claim 15, in which there is no swivel between the anchors and the vessel.
21. A system according to claim 15, in which the node member comprises a plate structure or one or more plain rings or shackles.
22. A system according to claim 15, in which the mooring pendant comprises one or two parallel chains, passing on to the bow of the vessel.
23. A system according to claim 15, in which the vessel is a tanker.
24. A system according to claim 23, in which the mooring pendant chain or chains are brought inboard of the tanker to standard chain stoppers or to remotely controlled release stoppers.
25. A system according to claim 24, in which the riser pipe is connected to a valve, swivel and quick connect/disconnect assembly, and is then brought inboard of the tanker over a chute to have its inboard end lying near to the tanker deck.
26. A system according to claim 25, in which said valve, swivel and quick connect/disconnect assembly includes a self-sealing breakaway coupling.
27. The combination of a mooring and flowline system in accordance with claim 15, and a vessel, the vessel including a stopper mechanism releasably securing the mooring pendant mechanism, a fairlead apparatus receiving the mooring pendant mechanism from outboard and guiding it to said stopper mechanism, a petroleum conduit passing through a valve, swivel and quick connect/disconnect assembly over a chute for receiving and guiding the flexible riser which is disposed, in use, between the chute securing mechanism and the mooring pendant mechanism outboard of said fairlead apparatus.
28. The combination of claim 27, said vessel being a tanker ship with said chute and valve means positioned on the foc'sle of the ship, and in which the mooring pendant mechanism comprises a single chain pendant, the fairlead apparatus comprises a single fairlead for the chain pendant and said stopper mechanism comprises a standard chain stopper.
US09/777,606 2000-02-08 2001-02-06 Mooring and flowline system Expired - Lifetime US6435124B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
GBGB0002703.7A GB0002703D0 (en) 2000-02-08 2000-02-08 Mooring and flowline system
GB0002703 2000-02-08
GB0002703.7 2000-02-08

Publications (2)

Publication Number Publication Date
US20020023580A1 true US20020023580A1 (en) 2002-02-28
US6435124B1 US6435124B1 (en) 2002-08-20

Family

ID=9885053

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/777,606 Expired - Lifetime US6435124B1 (en) 2000-02-08 2001-02-06 Mooring and flowline system

Country Status (3)

Country Link
US (1) US6435124B1 (en)
GB (2) GB0002703D0 (en)
TN (1) TNSN00040A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009139636A1 (en) * 2008-04-29 2009-11-19 Statoilhydro Asa Assembly of flexible riser systems
WO2013138260A1 (en) * 2012-03-14 2013-09-19 Shell Oil Company System for mooring a production vessel

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005009842A1 (en) * 2002-01-30 2005-02-03 Single Buoy Moorings, Inc. Shallow water riser support
EP1478875B1 (en) * 2002-02-27 2009-07-22 Excelerate Energy Limited Partnership Method and apparatus for the regasification of lng onboard a carrier
US8100077B2 (en) * 2003-09-17 2012-01-24 Ocean Power Delivery Limited Mooring system
GB0321768D0 (en) * 2003-09-17 2003-10-15 Ocean Power Delivery Ltd Mooring system
GB0421795D0 (en) 2004-10-01 2004-11-03 Baross John S Full weathervaning bow mooring and riser inboarding assembly
US7543613B2 (en) * 2005-09-12 2009-06-09 Chevron U.S.A. Inc. System using a catenary flexible conduit for transferring a cryogenic fluid
NO20064900L (en) * 2006-10-26 2008-04-28 Sevan Marine Asa Anchorage system for a loading station
US20080236703A1 (en) * 2007-03-29 2008-10-02 Chevron U.S.A. Inc. System for transferring fluids between floating vessels using flexible conduit and releasable mooring system
FR2916795B1 (en) * 2007-05-29 2010-08-27 Saipem Sa SURFACE BONDING SYSTEM COMPRISING AN ELASTIC DAMPING ARRANGEMENT REPRESENTING THE TENSION OF THE UPPER END OF A RIGID CONDUIT IN SUBSURFACE
FR2916732B1 (en) * 2007-06-04 2009-11-13 Doris Engineering FLOATING DOCK MOORING SYSTEM
GB2467938A (en) 2009-02-20 2010-08-25 Mooring Systems Ltd Deep water and ultra deep water mooring system
ES2547329T3 (en) * 2009-04-17 2015-10-05 Excelerate Energy Limited Partnership LNG transfer from ship to ship at dock
SG185008A1 (en) 2010-05-20 2012-11-29 Excelerate Energy Ltd Partnership Systems and methods for treatment of lng cargo tanks
GB201114291D0 (en) 2011-08-19 2011-10-05 Axis ltd Mooring system
US9758674B2 (en) 2012-04-13 2017-09-12 Ticona Llc Polyarylene sulfide for oil and gas flowlines
WO2014053314A1 (en) * 2012-10-03 2014-04-10 Shell Internationale Research Maatschappij B.V. Floating off-shore hydrocarbon gas processing plant, method of deploying such floating gas processing plant, and method of producing liquefied natural
WO2017176179A1 (en) * 2016-04-06 2017-10-12 Minesto Ab Submersible plant comprising buoyant tether
NO344968B1 (en) * 2017-12-08 2020-08-03 Can Systems As A mooring system

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3077615A (en) * 1961-10-05 1963-02-19 Arnold J Schultz Floating off-shore terminal
GB1031408A (en) * 1963-11-07 1966-06-02 Pusnes Mek Verksted A semi-automatic warping and mooring arrangement
US3735435A (en) * 1970-06-02 1973-05-29 G Mikulicic Rotary hull single buoy offshore loading terminal
US3750723A (en) * 1971-01-04 1973-08-07 Air Logistics Corp Single point mooring system
US3840927A (en) * 1973-04-27 1974-10-15 Imodco Swivel unit for mooring and cargo transfer system
US3863590A (en) * 1974-01-14 1975-02-04 Imodco Automatic mooring system
US3922992A (en) * 1974-05-29 1975-12-02 Texaco Inc Single point vessel mooring system
US3979785A (en) * 1974-08-09 1976-09-14 Exxon Research And Engineering Company Combined catenary and single anchor leg mooring system
US4065822A (en) * 1976-02-27 1978-01-03 Texaco Inc. Single point mooring with strain relief anchoring
FR2473981A1 (en) 1980-01-17 1981-07-24 Elf Aquitaine ANCHORING DEVICE FOR HYDROCARBON PRODUCTION VESSEL
NL8100936A (en) * 1981-02-26 1982-09-16 Single Buoy Moorings MOORING SYSTEM.
US4509448A (en) * 1983-10-13 1985-04-09 Sonat Offshore Drilling Inc. Quick disconnect/connect mooring method and apparatus for a turret moored drillship
US4645467A (en) * 1984-04-24 1987-02-24 Amtel, Inc. Detachable mooring and cargo transfer system
NO318172B1 (en) 1990-01-30 2005-02-14 Advanced Prod & Loading As Loading arrangement for loading fluids in an offshore vessel
US5044297A (en) * 1990-09-14 1991-09-03 Bluewater Terminal Systems N.V. Disconnectable mooring system for deep water
US5316509A (en) 1991-09-27 1994-05-31 Sofec, Inc. Disconnectable mooring system
KR100259313B1 (en) 1991-11-27 2000-06-15 에겔란트 큐욀프 에. A system for rotatably mounting a vessel to a loading buoy
GB2296904B (en) 1995-03-03 1996-12-18 Victoria Oilfield Dev Mooring and Flowline System
US5699822A (en) * 1996-05-06 1997-12-23 Vita International, Inc. Breakaway coupling device
US5944448A (en) 1996-12-18 1999-08-31 Brovig Offshore Asa Oil field installation with mooring and flowline system
US6200180B1 (en) * 1998-09-01 2001-03-13 Nortrans Offshore (S) Pte Ltd Mooring system for tanker vessels
US6279616B1 (en) * 1999-08-16 2001-08-28 Thomas C. Croft Rubber compositions, hose manufactured therefrom, and method of manufacturing hose
US6126501A (en) * 1999-09-15 2000-10-03 Nortrans Offshore(S) Pte Ltd Mooring system for tanker vessels

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009139636A1 (en) * 2008-04-29 2009-11-19 Statoilhydro Asa Assembly of flexible riser systems
WO2013138260A1 (en) * 2012-03-14 2013-09-19 Shell Oil Company System for mooring a production vessel
GB2513076A (en) * 2012-03-14 2014-10-15 Shell Int Research System for mooring a production vessel
CN104203742A (en) * 2012-03-14 2014-12-10 国际壳牌研究有限公司 System for mooring a production vessel
AU2013232402B2 (en) * 2012-03-14 2016-05-19 Shell Internationale Research Maatschappij B.V. System for mooring a production vessel

Also Published As

Publication number Publication date
GB0002703D0 (en) 2000-03-29
US6435124B1 (en) 2002-08-20
GB0102988D0 (en) 2001-03-21
GB2359054A (en) 2001-08-15
TNSN00040A1 (en) 2002-05-30
GB2359054B (en) 2003-04-02

Similar Documents

Publication Publication Date Title
US5944448A (en) Oil field installation with mooring and flowline system
US6435124B1 (en) Mooring and flowline system
EP1796958B1 (en) Offshore vessel mooring and riser inboarding system
JP5591795B2 (en) Separable mooring system with riser support buoy with weight attached
US9032892B2 (en) Mooring system and connector assembly
US6453838B1 (en) Turret-less floating production ship
WO2003076262A2 (en) Disconnectable mooring system and lng transfer system and method
US7997947B2 (en) Deep water hydrocarbon transfer system
EP2576334B1 (en) Floating production unit with disconnectable transfer system
EP0729882B1 (en) Mooring and flowline system
US5065687A (en) Mooring system
EP2398695B1 (en) Deep water and ultra deep water mooring system
WO2000064732A1 (en) System for transferring fluids and methods for installing, modifying and operating the system
CN117622381A (en) Oilfield development facility with mooring and streamline system
Prischi et al. SS-offshore offloading systems and operations bonded flexible oil offloading lines, a cost effective alternative to traditional oil offloading lines
Bensimon et al. Deepwater Installation of a Large Capacity FPSO with Large Number of Risers in the Marlim Field
GB2459739A (en) A counterbalanced cantilever connector assembly for a vessel
Li et al. Horizontal Installation of TLP Tendons
AU2005203655A1 (en) System for managing offshore drilled products

Legal Events

Date Code Title Description
AS Assignment

Owner name: BROVIG RDS LIMITED, UNITED KINGDOM

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:WILLIAMS, IAN;REEL/FRAME:012091/0606

Effective date: 20010430

FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

STCF Information on status: patent grant

Free format text: PATENTED CASE

AS Assignment

Owner name: ATLANTIS ISIS LTD, UNITED KINGDOM

Free format text: LICENSE AGREEMENT;ASSIGNOR:BROVIG RDS LIMITED;REEL/FRAME:014725/0454

Effective date: 20020308

Owner name: BROVIG UK LIMITED, UNITED KINGDOM

Free format text: CHANGE OF NAME;ASSIGNOR:BROVIG RDS LIMITED;REEL/FRAME:014725/0435

Effective date: 20020322

Owner name: COPAREX INTERNATIONAL SA, FRANCE

Free format text: LICENSE AGREEMENT;ASSIGNOR:BROVIG RDS LIMITED;REEL/FRAME:014725/0454

Effective date: 20020308

Owner name: COPAREX NETHERLANDS BV, NETHERLANDS

Free format text: LICENSE AGREEMENT;ASSIGNOR:BROVIG RDS LIMITED;REEL/FRAME:014725/0454

Effective date: 20020308

Owner name: CRYSTAL PRODUCTION UK LIMITED, UNITED KINGDOM

Free format text: CHANGE OF NAME;ASSIGNOR:BROVIG UK LIMITED;REEL/FRAME:014725/0437

Effective date: 20021107

Owner name: IKDAM PRODUCTION SA, FRANCE

Free format text: LICENSE AGREEMENT;ASSIGNOR:BROVIG RDS LIMITED;REEL/FRAME:014725/0454

Effective date: 20020308

Owner name: LUNDIN INTERNATIONAL SA, FRANCE

Free format text: CHANGE OF NAME;ASSIGNOR:COPAREX INTERNATIONAL SA;REEL/FRAME:014725/0491

Effective date: 20021120

Owner name: LUNDIN NETHERLANDS BV, NETHERLANDS

Free format text: CHANGE OF NAME OF LICENSE;ASSIGNOR:COPAREX NETHERLANDS BV;REEL/FRAME:014725/0311

Effective date: 20021112

AS Assignment

Owner name: FIRST TECH LIMITED, UNITED KINGDOM

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:CRYSTAL PRODUCTION UK LIMITED;REEL/FRAME:016334/0512

Effective date: 20030903

Owner name: MOORING SYSTEMS LIMITED, UNITED KINGDOM

Free format text: CHANGE OF NAME;ASSIGNOR:FIRST TECH LIMITED;REEL/FRAME:016334/0532

Effective date: 20031001

FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

FPAY Fee payment

Year of fee payment: 12