US20010008060A1 - Process of waterproofing construction surface and slit of construction surface - Google Patents

Process of waterproofing construction surface and slit of construction surface Download PDF

Info

Publication number
US20010008060A1
US20010008060A1 US09/798,513 US79851301A US2001008060A1 US 20010008060 A1 US20010008060 A1 US 20010008060A1 US 79851301 A US79851301 A US 79851301A US 2001008060 A1 US2001008060 A1 US 2001008060A1
Authority
US
United States
Prior art keywords
construction surface
slits
synthetic asphalt
asphalt
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/798,513
Other versions
US6769216B2 (en
Inventor
Chia-Lung Lu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US09/798,513 priority Critical patent/US6769216B2/en
Publication of US20010008060A1 publication Critical patent/US20010008060A1/en
Application granted granted Critical
Publication of US6769216B2 publication Critical patent/US6769216B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6809Reverse side strips
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions

Definitions

  • the present invention relates generally to the waterproofing of a construction surface, and more particularly to a process of waterproofing a construction surface under construction and a slit of the construction surface in use.
  • a horizontal reinforced screen support 12 is mounted on a horizontal molding plate 11 . Thereafter, The horizontal molding plate 11 is filled with an appropriate thickness of a cement concrete 13 , as shown in FIG. 2. As the cement concrete 13 is dry, the molding plate 11 is removed, thereby resulting in formation of the horizontal surface 10 .
  • a vertical reinforced screen support 14 is mounted on the horizontal surface 10 for building the vertical surface 10 ′.
  • a vertical molding plate 11 ′ is mounted on each of two sides of the vertical reinforced screen support 14 .
  • the cement concrete 13 is poured into the space located between the two vertical molding plates 11 ′, as shown in FIG. 4.
  • the two vertical molding plates 11 ′ are removed, thereby resulting in formation of the vertical surface 10 ′.
  • a slit 15 is apt to form at the juncture between the horizontal surface 10 and the vertical surface 10 ′, as shown in FIG. 5.
  • the horizontal surface 10 and the vertical surface 10 are not waterproof.
  • a surface crack 16 is often formed on the surface of the cement concrete after the cement concrete is dried and hardened. The formation of the surface crack 16 is often brought about by an incident in which a vibration takes place during the construction, or by an incident in which the cement is mixed with an inaccurate amount of water by the construction worker. The water may find its way into the structure via the surface crack 16 .
  • a plurality of cavities 17 may be formed in the process of removing the molding plates 11 and 11 ′, as shown in FIG. 5.
  • the cement concrete 13 and the horizontal reinforced screen support 12 are different in nature such that they expand and contract differently in response to the changes in climatic elements, thereby resulting in formation of an interstice 18 between the horizontal reinforced screen support 12 and the cement concrete 13 .
  • the horizontal surface 10 may contain water pipe, has pipe, ventilation pipe of septic tank, conductor of lightning arrester, etc., and that a hap 19 may be formed between the cement concrete 13 and these pipes P. The water may find its way into the structure via the gap 19 .
  • the surface of the cement concrete surface 20 is paved with a mixture layer 21 which is formed of cement, sand and water.
  • the surface of the mixture layer 21 is then paved with a waterproof material R, as shown in FIG. 8.
  • the waterproof material R has a tensile strength, a tear strength, and an expansibility.
  • the waterproof material may be a polymer material, a waterproof blanket, a waterproof board, an oiled felt, a polyvinyl chloride film, etc.
  • the surface of the mixture layer 21 is paved with a waterproof layer 22 .
  • the surface of the waterproof layer 22 is paved with a surface layer 23 which is formed of a mortar and a plurality of bricks.
  • the waterproof layer 22 serves to prevent the water from finding its way into the structure.
  • the mixture layer 21 is apt to separate from the cement concrete surface 20 , thereby resulting in formation of a gap 24 between the mixture layer 21 and the cement concrete surface 20 , as shown in FIG. 10.
  • the cement concrete surface 20 is subject to displacement in the course of expansion and contraction, thereby resulting in formation of a reflection crock 211 in the mixture layer 21 .
  • the waterproof material R of the waterproof layer 22 and the mixture layer 21 are made of different materials and are therefore different from each other in heat expansion coefficient.
  • the waterproof material R of the waterproof layer 22 is apt to become separated from the mixture layer 21 , thereby resulting in formation of a peeled-off area “D” at the wall corners.
  • a slit 24 is thus formed between the cement concrete surface 20 and the mixture layer 21 .
  • the process involves a first step in which the construction surface is dried by heating such that the capillary pores of the construction surface and the slit are opened up to facilitate the permeating of a synthetic asphalt into the capillary pores.
  • the synthetic asphalt is securely implanted in the capillary pores of the construction surface and the slit of the construction surface.
  • the construction surface is provided with a soft interface which is formed of the synthetic asphalt and is securely anchored to the construction surface.
  • the soft interface is not apt to peel off from the construction surface and is effective in preventing the water from finding its way into the structure via the construction surface.
  • the soft interface provides the construction surface with protection against weathering.
  • the process involves the formation of a soft interface on the construction surface.
  • the soft interface is formed of a synthetic asphalt and is intended to replace the mixture layer of the conventional process.
  • the surface of the soft interface of the present invention may be paved with a synthetic turf, road bricks. Insulation bricks, landscape pebbles, etc.
  • the process of the present invention involves the forming of a soft interface, on which a plurality of waterproof layers are paved.
  • FIG. 1 shows a schematic view of the conventional process for building a horizontal construction surface.
  • FIG. 2 shows another schematic view of the conventional process for forming the horizontal construction surface.
  • FIG. 3 shows a schematic view of the conventional process for building a vertical construction surface on the horizontal construction surface.
  • FIG. 4 shows another schematic view of the conventional process for building the vertical construction surface on the horizontal construction surface.
  • FIG. 5 shows a schematic view of the slit, the surface cracks and the cavities of the horizontal construction surface and the vertical construction surface of the conventional process.
  • FIG. 6 shows an enlarged sectional view taken along a line A-A as shown in FIG. 5.
  • FIG. 7 shows a schematic view of the conventional process for waterproofing a cement concrete surface.
  • FIG. 8 shows another schematic view of the conventional process for waterproofing the cement concrete surface.
  • FIG. 9 shows still another schematic view of the conventional process for waterproofing the cement concrete surface.
  • FIG. 10 shows an enlarged schematic view of the slits and the reflection crack of the conventional process.
  • FIG. 11 shows a schematic view of the heating of the cracked surface by a process of the present invention.
  • FIG. 12 shows a sectional schematic view of the slit which is filled with a synthetic asphalt of the process of the present invention.
  • FIG. 13 shows a schematic view of the heating of the heating of a pitted surface by the process of the present invention.
  • FIG. 14 shows a schematic view of the filling of the cavities with the synthetic asphalt of the process of the present invention.
  • FIG. 15 shows a sectional schematic view of the process of the present invention providing a waterproof cloth on the synthetic asphalt and on the synthetic asphalt concrete.
  • FIG. 16 shows a schematic view of a paving layer on the synthetic asphalt of the process of the present invention.
  • FIG. 17 shows a sectional schematic view of the waterproofing of an expansion slit of the top floor surface by the process of the present invention.
  • a synthetic asphalt 30 of the process of the present invention is formed of a straight asphalt and a blown asphalt, which are prepared in an appropriate ratio.
  • the molten synthetic asphalt 30 is capable of permeating into the capillary pores so as to seal off the slit or crack.
  • the synthetic asphalt 30 of the present invention is capable of adhering the waterproof cloth and the construction material. At the normal temperature, the synthetic asphalt 30 is resilient, repellent to water, and resistant to corrosion.
  • the process of the present invention involves a first step in which a construction surface 40 and a slit 41 are dried by heating, so as to open up the capillary holes of the construction surface 40 and the slits 41 .
  • a second step involves the coating of the dried construction surface 40 and the dried slits 41 with the synthetic asphalt 31 .
  • a third step involves the heating of the synthetic asphalt 30 which is spread on the surface 40 and the slits 41 . The molten synthetic asphalt 30 is diffused into the capillary pores of the surface 40 and the slits 41 , as illustrated in FIG. 12.
  • the slits 41 referred to in the above first step are second construction slits 411 and surface cracks 412 . If the construction surface of the first step is provided with bricks, foam concrete, paint protective layer, or insulation bricks, they should be removed In addition, if the construction surface 40 is coated with a conventional waterproof layer or polishing layer, they should be completely removed. If the construction surface has cavities 42 , as shown in FIG. 13 and FIG. 14, prior to the first step, the cavities 42 must be heated. Thereafter, the cavities 42 are filled with a synthetic asphalt concrete 50 , which is formed of fine sand, stone powder, and the synthetic asphalt 30 . Now referring to FIG.
  • the synthetic asphalt 30 of the slits 41 and the synthetic asphalt concrete 50 of the cavities 42 are provided with a waterproof plastic cloth 43 attached thereto. Thereafter, the waterproof plastic cloth 43 is paved with the hot synthetic asphalt 30 so as to enhance the waterproof effect. As a result, the water is prevented from finding its way into the construction surface 40 via the slits 41 and the cavities 42 .
  • the construction surface 40 is paved with the synthetic asphalt 30 forming a soft interface on which artificial turfs, road bricks, insulation bricks, or landscape pebbles, are matted without the use of any additional paving material.
  • the slits 41 of the construction surface 40 is dried by heating.
  • the capillary pores of the slits 41 of the construction surface 40 are opened up to facilitate the permeating of the molten synthetic asphalt 30 into the capillary pores of the construction surface 40 and the slits 41 .
  • the construction surface 40 and the slits 41 are provided with a soft interface which cannot be peeled off in the wake of the expansion-contraction effect.
  • the synthetic asphalt 30 is securely implanted in the slits 41 , In light of the protective effect of the soft interface, the service life span of the construction surface 40 if effectively prolonged.
  • the construction surface 40 is not subject to weathering.
  • the process of the present invention is employed to waterproof an expansion slit 61 located between two cement concrete surfaces 60 .
  • the process includes a first step in which the cement concrete surfaces 60 located at two sides of the expansion lit 61 are ground and smoothed. Thereafter, the smooth surfaces 60 are paved with an appropriated amount of the synthetic asphalt 30 , which is then heated to cause the synthetic asphalt 30 to permeate into the capillary pores of the smooth surfaces 60 .
  • a waterproof plastic cloth 43 is subsequently attached to the synthetic asphalt 30 such that an expansion space is provided.
  • the waterproof plastic cloth 43 is paved with a hot molten synthetic asphalt 30 ′ such that the waterproof plastic cloth 43 is securely held between the two synthetic asphalts 30 and 30 ′
  • Another waterproof plastic cloth 43 ′ is then attached to the surface of the second synthetic asphalt 30 ′.
  • This second waterproof plastic cloth 43 ′ is paved with another second synthetic asphalt 30 ′ and is therefore held securely between the two synthetic asphalts 30 ′ such that an expansion space is provided.
  • the expansion slit 61 is provided in two sides with a plurality of waterproof bricks 62 attached thereto for enhancing the waterproof effect and for pressing the first waterproof cloth 43 and the second waterproof cloth 43 ′.
  • the interstices of the waterproof bricks 62 are filled with sand and fine pebbles to complete the process.
  • the expansion slit 61 is provided in two sides there of with the synthetic asphalt 30 on which the first waterproof plastic cloth 30 or the second waterproof plastic cloth 30 ′ is held. As a result, the expansion slit 61 is securely waterproof such that water is prevented from finding its way into the space between the two cement concrete surface 60 via the expansion slit 61 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

A process for waterproofing a construction surface and slits of the construction surface comprises a first step in which the construction surface and the slits of the construction surface are dried by heating, so as to open up capillary pores of the construction surface and the slits of the construction surface. Thereafter, an appropriate amount of a synthetic asphalt is paved on the construction surface and the slits of the construction surface. The synthetic asphalt is then heated to permeate into the capillary pores of the construction surface and the slits of the construction surface.

Description

    CROSS REFERENCE OF RELATED APPLICATION
  • This is a Continuation-In-Part Application of a non-provisional application, application Ser. No. 09/419,631, filed Oct. 18, 1999. [0001]
  • FIELD OF THE PRESENT INVENTION
  • The present invention relates generally to the waterproofing of a construction surface, and more particularly to a process of waterproofing a construction surface under construction and a slit of the construction surface in use. [0002]
  • BACKGROUND OF THE PRESENT INVENTION
  • With reference to FIGS. [0003] 1 to FIG. 4, the conventional methods for constructing a horizontal surface 10 and a vertical surface 10′ of a structure of cement concrete are described hereinafter.
  • As shown in FIG. 1, a horizontal reinforced [0004] screen support 12 is mounted on a horizontal molding plate 11. Thereafter, The horizontal molding plate 11 is filled with an appropriate thickness of a cement concrete 13, as shown in FIG. 2. As the cement concrete 13 is dry, the molding plate 11 is removed, thereby resulting in formation of the horizontal surface 10.
  • As shown in FIG. 3, a vertical reinforced [0005] screen support 14 is mounted on the horizontal surface 10 for building the vertical surface 10′. A vertical molding plate 11′ is mounted on each of two sides of the vertical reinforced screen support 14. Thereafter, the cement concrete 13 is poured into the space located between the two vertical molding plates 11′, as shown in FIG. 4. Upon completion of the drying and the hardening of the cement concrete 13, the two vertical molding plates 11′ are removed, thereby resulting in formation of the vertical surface 10′.
  • As described above, the [0006] horizontal surface 10 and the vertical surface 10′ are not built simultaneously. As a result, a slit 15 is apt to form at the juncture between the horizontal surface 10 and the vertical surface 10′, as shown in FIG. 5. In light of the slit 15, the horizontal surface 10 and the vertical surface 10, are not waterproof. In addition, a surface crack 16 is often formed on the surface of the cement concrete after the cement concrete is dried and hardened. The formation of the surface crack 16 is often brought about by an incident in which a vibration takes place during the construction, or by an incident in which the cement is mixed with an inaccurate amount of water by the construction worker. The water may find its way into the structure via the surface crack 16. Moreover, a plurality of cavities 17 may be formed in the process of removing the molding plates 11 and 11′, as shown in FIG. 5.
  • As shown in FIG. 6, the [0007] cement concrete 13 and the horizontal reinforced screen support 12 are different in nature such that they expand and contract differently in response to the changes in climatic elements, thereby resulting in formation of an interstice 18 between the horizontal reinforced screen support 12 and the cement concrete 13. It is likely that the horizontal surface 10 may contain water pipe, has pipe, ventilation pipe of septic tank, conductor of lightning arrester, etc., and that a hap 19 may be formed between the cement concrete 13 and these pipes P. The water may find its way into the structure via the gap 19.
  • As long as the [0008] slit 15, the surface crack 16, the interstice 18, and the gap 19 remain, the surface of the concrete is subject to weathering. The reinforced structures are also subject to corrosion. As a result, the service life span of the structure is seriously undermined.
  • With reference to FIGS. [0009] 7 to FIG. 9, the conventional method for waterproofing a cement concrete surface 20 is described hereinafter.
  • As shown in FIG. 7, the surface of the [0010] cement concrete surface 20 is paved with a mixture layer 21 which is formed of cement, sand and water. The surface of the mixture layer 21 is then paved with a waterproof material R, as shown in FIG. 8. The waterproof material R has a tensile strength, a tear strength, and an expansibility. The waterproof material may be a polymer material, a waterproof blanket, a waterproof board, an oiled felt, a polyvinyl chloride film, etc. In other words, the surface of the mixture layer 21 is paved with a waterproof layer 22.
  • As shown in FIG. 9, the surface of the [0011] waterproof layer 22 is paved with a surface layer 23 which is formed of a mortar and a plurality of bricks.
  • The [0012] waterproof layer 22 serves to prevent the water from finding its way into the structure. In light of the mixture layer 21 and the cement concrete surface 20 being different from each other in terms of expansion coefficient, the mixture layer 21 is apt to separate from the cement concrete surface 20, thereby resulting in formation of a gap 24 between the mixture layer 21 and the cement concrete surface 20, as shown in FIG. 10. In addition, the cement concrete surface 20 is subject to displacement in the course of expansion and contraction, thereby resulting in formation of a reflection crock 211 in the mixture layer 21. In addition, the waterproof material R of the waterproof layer 22 and the mixture layer 21 are made of different materials and are therefore different from each other in heat expansion coefficient. As a result, the waterproof material R of the waterproof layer 22 is apt to become separated from the mixture layer 21, thereby resulting in formation of a peeled-off area “D” at the wall corners. A slit 24 is thus formed between the cement concrete surface 20 and the mixture layer 21. Such a conventional method as described above is not cost-effective at best in view of the fact that the waterproof layer 22 must be replaced with new one every three or five years.
  • SUMMARY OF THE PRESENT INVENTION
  • It is the primary objective of the present invention to provide a process for waterproofing a construction surface and a slit of the construction surface. The process involves a first step in which the construction surface is dried by heating such that the capillary pores of the construction surface and the slit are opened up to facilitate the permeating of a synthetic asphalt into the capillary pores. Upon completion of the cooling process, the synthetic asphalt is securely implanted in the capillary pores of the construction surface and the slit of the construction surface. As a result, the construction surface is provided with a soft interface which is formed of the synthetic asphalt and is securely anchored to the construction surface. The soft interface is not apt to peel off from the construction surface and is effective in preventing the water from finding its way into the structure via the construction surface. In addition, the soft interface provides the construction surface with protection against weathering. [0013]
  • It is another objective of the present invention to provide a process for waterproofing a construction surface and a slit of the construction surface. The process involves the formation of a soft interface on the construction surface. The soft interface is formed of a synthetic asphalt and is intended to replace the mixture layer of the conventional process. The surface of the soft interface of the present invention may be paved with a synthetic turf, road bricks. Insulation bricks, landscape pebbles, etc. [0014]
  • It is still another objective of the present invention to provide a process for waterproofing a construction surface and a slit of the construction surface. The process of the present invention involves the forming of a soft interface, on which a plurality of waterproof layers are paved. [0015]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 shows a schematic view of the conventional process for building a horizontal construction surface. [0016]
  • FIG. 2 shows another schematic view of the conventional process for forming the horizontal construction surface. [0017]
  • FIG. 3 shows a schematic view of the conventional process for building a vertical construction surface on the horizontal construction surface. [0018]
  • FIG. 4 shows another schematic view of the conventional process for building the vertical construction surface on the horizontal construction surface. [0019]
  • FIG. 5 shows a schematic view of the slit, the surface cracks and the cavities of the horizontal construction surface and the vertical construction surface of the conventional process. [0020]
  • FIG. 6 shows an enlarged sectional view taken along a line A-A as shown in FIG. 5. [0021]
  • FIG. 7 shows a schematic view of the conventional process for waterproofing a cement concrete surface. [0022]
  • FIG. 8 shows another schematic view of the conventional process for waterproofing the cement concrete surface. [0023]
  • FIG. 9 shows still another schematic view of the conventional process for waterproofing the cement concrete surface. [0024]
  • FIG. 10 shows an enlarged schematic view of the slits and the reflection crack of the conventional process. [0025]
  • FIG. 11 shows a schematic view of the heating of the cracked surface by a process of the present invention. [0026]
  • FIG. 12 shows a sectional schematic view of the slit which is filled with a synthetic asphalt of the process of the present invention. [0027]
  • FIG. 13 shows a schematic view of the heating of the heating of a pitted surface by the process of the present invention. [0028]
  • FIG. 14 shows a schematic view of the filling of the cavities with the synthetic asphalt of the process of the present invention. [0029]
  • FIG. 15 shows a sectional schematic view of the process of the present invention providing a waterproof cloth on the synthetic asphalt and on the synthetic asphalt concrete. [0030]
  • FIG. 16 shows a schematic view of a paving layer on the synthetic asphalt of the process of the present invention. [0031]
  • FIG. 17 shows a sectional schematic view of the waterproofing of an expansion slit of the top floor surface by the process of the present invention. [0032]
  • DETAILED DESCRIPTIONS OF THE PRESENT INVENTION
  • A [0033] synthetic asphalt 30 of the process of the present invention is formed of a straight asphalt and a blown asphalt, which are prepared in an appropriate ratio. The molten synthetic asphalt 30 is capable of permeating into the capillary pores so as to seal off the slit or crack. In addition, the synthetic asphalt 30 of the present invention is capable of adhering the waterproof cloth and the construction material. At the normal temperature, the synthetic asphalt 30 is resilient, repellent to water, and resistant to corrosion.
  • As shown in FIG. 11, the process of the present invention involves a first step in which a [0034] construction surface 40 and a slit 41 are dried by heating, so as to open up the capillary holes of the construction surface 40 and the slits 41. A second step involves the coating of the dried construction surface 40 and the dried slits 41 with the synthetic asphalt 31. A third step involves the heating of the synthetic asphalt 30 which is spread on the surface 40 and the slits 41. The molten synthetic asphalt 30 is diffused into the capillary pores of the surface 40 and the slits 41, as illustrated in FIG. 12.
  • The [0035] slits 41 referred to in the above first step are second construction slits 411 and surface cracks 412. If the construction surface of the first step is provided with bricks, foam concrete, paint protective layer, or insulation bricks, they should be removed In addition, if the construction surface 40 is coated with a conventional waterproof layer or polishing layer, they should be completely removed. If the construction surface has cavities 42, as shown in FIG. 13 and FIG. 14, prior to the first step, the cavities 42 must be heated. Thereafter, the cavities 42 are filled with a synthetic asphalt concrete 50, which is formed of fine sand, stone powder, and the synthetic asphalt 30. Now referring to FIG. 15, after the third step, the synthetic asphalt 30 of the slits 41 and the synthetic asphalt concrete 50 of the cavities 42 are provided with a waterproof plastic cloth 43 attached thereto. Thereafter, the waterproof plastic cloth 43 is paved with the hot synthetic asphalt 30 so as to enhance the waterproof effect. As a result, the water is prevented from finding its way into the construction surface 40 via the slits 41 and the cavities 42. As shown in FIG. 16, the construction surface 40 is paved with the synthetic asphalt 30 forming a soft interface on which artificial turfs, road bricks, insulation bricks, or landscape pebbles, are matted without the use of any additional paving material.
  • In the first step of the process of the present invention, the [0036] slits 41 of the construction surface 40 is dried by heating. As a result, the capillary pores of the slits 41 of the construction surface 40 are opened up to facilitate the permeating of the molten synthetic asphalt 30 into the capillary pores of the construction surface 40 and the slits 41. Upon completion of the cooling of the synthetic asphalt 30, the construction surface 40 and the slits 41 are provided with a soft interface which cannot be peeled off in the wake of the expansion-contraction effect. The synthetic asphalt 30 is securely implanted in the slits 41, In light of the protective effect of the soft interface, the service life span of the construction surface 40 if effectively prolonged. In addition, the construction surface 40 is not subject to weathering.
  • As shown in FIG. 17, the process of the present invention is employed to waterproof an expansion slit [0037] 61 located between two cement concrete surfaces 60, The process includes a first step in which the cement concrete surfaces 60 located at two sides of the expansion lit 61 are ground and smoothed. Thereafter, the smooth surfaces 60 are paved with an appropriated amount of the synthetic asphalt 30, which is then heated to cause the synthetic asphalt 30 to permeate into the capillary pores of the smooth surfaces 60. A waterproof plastic cloth 43 is subsequently attached to the synthetic asphalt 30 such that an expansion space is provided. The waterproof plastic cloth 43 is paved with a hot molten synthetic asphalt 30′ such that the waterproof plastic cloth 43 is securely held between the two synthetic asphalts 30 and 30′ Another waterproof plastic cloth 43′ is then attached to the surface of the second synthetic asphalt 30′. This second waterproof plastic cloth 43′ is paved with another second synthetic asphalt 30′ and is therefore held securely between the two synthetic asphalts 30′ such that an expansion space is provided. The expansion slit 61 is provided in two sides with a plurality of waterproof bricks 62 attached thereto for enhancing the waterproof effect and for pressing the first waterproof cloth 43 and the second waterproof cloth 43′. The interstices of the waterproof bricks 62 are filled with sand and fine pebbles to complete the process.
  • As described above, the expansion slit [0038] 61 is provided in two sides there of with the synthetic asphalt 30 on which the first waterproof plastic cloth 30 or the second waterproof plastic cloth 30′ is held. As a result, the expansion slit 61 is securely waterproof such that water is prevented from finding its way into the space between the two cement concrete surface 60 via the expansion slit 61.

Claims (14)

What is claimed is:
1. A process for waterproofing a construction surface and slits of the construction surface, said process comprising the steps of:
(a) drying the construction surface and the slits of the construction surface by heating, so as to open up capillary pores of the construction surface and the silts of the construction surface;
(b) paving an appropriate amount of a synthetic asphalt on the construction surface and the slits of the construction surface; and
(c) heating the synthetic asphalt to cause the synthetic asphalt to permeate into the capillary pores of the construction surface and the slits of the construction surface.
2. A process for waterproofing a construction surface and slits of the construction surface, as recited in
claim 1
, wherein said the slits of the step (a) are second construction slits and surface cracks.
3. A process for waterproofing a construction surface and slits of the construction surface, as recited in
claim 1
, wherein said construction surface of the step (a) is provided with bricks, foam concrete, paint protective layer, or insulation bricks, they should be removed.
4. A process for waterproofing a construction surface and slits of the construction surface, as recited in
claim 1
, wherein said construction surface of the step (a) is coated with a conventional waterproof layer or polishing layer, they should be completely removed.
5. A process for waterproofing a construction surface and slits of the construction surface, as recited in
claim 2
, wherein said construction surface of the step (a) is coated with a conventional waterproof layer or polishing layer, they should be completely removed.
6. A process for waterproofing a construction surface and slits of the construction surface, as recited in
claim 1
, wherein said construction surface of the step (a) has cavities, the cavities must be heated. Thereafter, the cavities are filled with a synthetic asphalt concrete, which is formed of fine sand, stone powder, and the synthetic asphalt.
7. A process for waterproofing a construction surface and slits of the construction surface, as recited in one of
claim 1
to
claim 5
, wherein after the step (c), said synthetic asphalt of the slits and the synthetic asphalt concrete of the cavities are provided with a waterproof plastic cloth attached thereto. Thereafter, the waterproof plastic cloth is paved with the hot synthetic asphalt so as to enhance the waterproof effect.
8. A process for waterproofing a construction surface and slits of the construction surface, as recited in
claim 6
, wherein after the step (c), said synthetic asphalt concrete of the cavities are provided with a waterproof plastic cloth attached thereto. Thereafter, the waterproof plastic cloth is paved with the hot synthetic asphalt so as to enhance the waterproof effect.
9. A process for waterproofing a construction surface and slits of the construction surface, as recited in
claim 1
, wherein said construction surface of after the step (c) is paved with the synthetic asphalt forming a soft interface on which artificial turfs, road bricks, insulation bricks, or landscape pebbles, are matted without the use of any additional paving material.
10. A process for waterproofing a construction surface and slits of the construction surface, as recited in
claim 7
, wherein said construction surface of after the step (c) is paved with the synthetic asphalt forming a soft interface on which artificial turfs, road bricks, insulation bricks, or landscape pebbles, are matted without the use of any additional paving material.
11. A process for waterproofing a construction surface and slits of the construction surface, as recited in
claim 8
, wherein said construction surface of after the step (c) is paved with the synthetic asphalt forming a soft interface on which artificial turfs, road bricks, insulation bricks, or landscape pebbles, are matted without the use of any additional paving material.
12. A process for waterproofing a construction surface and slits of the construction surface, as recited in one of
claim 1
to
claim 8
, wherein said synthetic asphalt of the process a straight asphalt and a blown asphalt, which are prepared in an appropriate ratio. The molten synthetic asphalt is capable of permeating into the capillary pores so as to seal off the slit or crack. In addition, the synthetic asphalt is capable of adhering the waterproof cloth and the construction material. At the normal temperature, the synthetic asphalt is resilient, repellent to water, and resistant to corrosion.
13. A process for waterproof an expansion slit located between two cement concrete surfaces, said process comprising the steps of:
(a) grounding the cement concrete surfaces located at two sides of the expansion lit;
(b) paving an appropriated amount of the synthetic asphalt, which is then heated to cause the synthetic asphalt permeate into the capillary pores of the smooth surfaces;
(c) providing a first waterproof plastic cloth attached to the synthetic asphalt such that an expansion space is provided;
(d) paving a hot molten synthetic asphalt such that the first waterproof plastic cloth is securely held between the two synthetic asphalts;
(e) attaching the second waterproof plastic cloth to the surface of the second synthetic asphalt;
(f) Paving said second waterproof plastic cloth with the second synthetic asphalt and is therefore held securely between the two synthetic asphalts such that an expansion space is provided; and
(g) providing in two sides of the expansion slit with a plurality of waterproof bricks attached thereto for enhancing the waterproof effect and for pressing the first waterproof plastic cloth and the second waterproof plastic cloth, The interstices of the waterproof bricks are filled with sand and fine pebbles to complete the process.
14. A process for waterproofing a construction surface and slits of the construction surface, as recited in
claim 13
, wherein said synthetic asphalt of the process a straight asphalt and a blown asphalt, which are prepared in an appropriate ratio. The molten synthetic asphalt is capable of permeating into the capillary pores so as to seal off the slit or crack. In addition, the synthetic asphalt is capable of adhering the waterproof cloth and the construction material. At the normal temperature, the synthetic asphalt is resilient, repellent to water, and resistant to corrosion.
US09/798,513 1999-10-18 2001-03-02 Process of waterproofing construction surface and slit of construction surface Expired - Fee Related US6769216B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US09/798,513 US6769216B2 (en) 1999-10-18 2001-03-02 Process of waterproofing construction surface and slit of construction surface

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US41963199A 1999-10-18 1999-10-18
US09/798,513 US6769216B2 (en) 1999-10-18 2001-03-02 Process of waterproofing construction surface and slit of construction surface

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US41963199A Continuation-In-Part 1999-10-18 1999-10-18

Publications (2)

Publication Number Publication Date
US20010008060A1 true US20010008060A1 (en) 2001-07-19
US6769216B2 US6769216B2 (en) 2004-08-03

Family

ID=23663061

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/798,513 Expired - Fee Related US6769216B2 (en) 1999-10-18 2001-03-02 Process of waterproofing construction surface and slit of construction surface

Country Status (1)

Country Link
US (1) US6769216B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014098777A1 (en) * 2012-12-20 2014-06-26 Cemalettin Kaya Non-earthquake building system on fault line
ITMI20130560A1 (en) * 2013-04-09 2014-10-10 Carpi Tech Bv METHOD AND WATERPROOF COVERAGE DEVICE FOR JOINTS IN HYDRAULIC WORKS
CN105604341A (en) * 2015-12-31 2016-05-25 陕西师范大学 High sand content earth relic solidification method
CN112252492A (en) * 2020-09-24 2021-01-22 中建四局第六建设有限公司 Construction method and structure of anti-crack structure reinforcing belt for concrete building
CN115182389A (en) * 2022-07-20 2022-10-14 华北水利水电大学 Subway Cheng Xin old concrete structure junction anti-seepage structure and construction process
CN115262654A (en) * 2022-08-26 2022-11-01 中国五冶集团有限公司 Impermeable soil post-pouring belt and construction method thereof

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040123541A1 (en) * 2002-12-27 2004-07-01 Jewett Scott E. Reinforced wall structure for blast protection
US20060204332A1 (en) * 2005-03-11 2006-09-14 Guy Boudreau Method for repairing holes in pavement
US20070000199A1 (en) * 2005-06-29 2007-01-04 Siefken John R Method to bond concrete slab to metal
CN106088458B (en) * 2016-06-12 2019-03-15 吉林建筑大学 The good quality froth concrete precast floor of high waterproofness
CN106906793A (en) * 2017-02-04 2017-06-30 北京交通大学 Pitch core-wall cracking method of closing
CN110195474A (en) * 2019-06-12 2019-09-03 中建七局第四建筑有限公司 The quick paving technology of cement penetrant crystalline combination TPZ series wet-laying coiled material
CN111287339A (en) * 2020-03-03 2020-06-16 中国十七冶集团有限公司 Construction method for preventing and controlling rigid and flexible water leakage of brick-concrete structure

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1958871A (en) * 1931-09-09 1934-05-15 Paraffine Co Inc Waterproof membrane
US2294247A (en) * 1941-05-05 1942-08-25 Walter J Smith Surface covering
US2672793A (en) * 1951-01-04 1954-03-23 Bonafide Mills Inc Floor structure and method of making the same
US2798822A (en) * 1955-03-28 1957-07-09 Ther Mo Roof Inc Method of forming a surface covering
US3932051A (en) * 1974-09-03 1976-01-13 Sumaspcae Limited Highway construction
US4151025A (en) * 1977-06-06 1979-04-24 Triram Corporation Method for waterproofing bridge decks and the like
US4392335A (en) * 1982-04-12 1983-07-12 Astro-Steel Grip International, Inc. Flexible cementitious coatings
US4556338A (en) * 1983-07-11 1985-12-03 Tar Heel Technologies, Inc. Method for reinforcing pavement
US4684288A (en) * 1986-01-22 1987-08-04 Xavier Chapa Asphaltic pavement tiles
US5660498A (en) * 1996-01-16 1997-08-26 Freeman; Roger Patching system and method for repairing roadways

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014098777A1 (en) * 2012-12-20 2014-06-26 Cemalettin Kaya Non-earthquake building system on fault line
ITMI20130560A1 (en) * 2013-04-09 2014-10-10 Carpi Tech Bv METHOD AND WATERPROOF COVERAGE DEVICE FOR JOINTS IN HYDRAULIC WORKS
WO2014166996A1 (en) 2013-04-09 2014-10-16 Carpi Tech B.V. Method and device for covering and waterproofing joints in hydraulic works
CN105121746A (en) * 2013-04-09 2015-12-02 卡皮科技私人有限公司 Method and device for covering and waterproofing joints in hydraulic works
JP2016519730A (en) * 2013-04-09 2016-07-07 カルピ、テック、ベスローテン、フェンノートシャップCarpi Tech B.V. Method and device for waterproofing over seams of structures subject to water pressure
AU2014253178B2 (en) * 2013-04-09 2018-06-07 Carpi Tech B.V. Method and device for covering and waterproofing joints in hydraulic works
EA031236B1 (en) * 2013-04-09 2018-12-28 Карпи Тех Б.В. Method and device for covering and waterproofing joints in hydraulic works
CN105604341A (en) * 2015-12-31 2016-05-25 陕西师范大学 High sand content earth relic solidification method
CN112252492A (en) * 2020-09-24 2021-01-22 中建四局第六建设有限公司 Construction method and structure of anti-crack structure reinforcing belt for concrete building
CN115182389A (en) * 2022-07-20 2022-10-14 华北水利水电大学 Subway Cheng Xin old concrete structure junction anti-seepage structure and construction process
CN115262654A (en) * 2022-08-26 2022-11-01 中国五冶集团有限公司 Impermeable soil post-pouring belt and construction method thereof

Also Published As

Publication number Publication date
US6769216B2 (en) 2004-08-03

Similar Documents

Publication Publication Date Title
US6769216B2 (en) Process of waterproofing construction surface and slit of construction surface
CN101743365B (en) Composite cement panel
US3411256A (en) Roof construction and method thereof
US5335466A (en) Wide vertical joint seal
JP5989870B2 (en) Waterproof sheet construction method
KR101710604B1 (en) Method for waterproofing slab of building rooftop using urethane resin
CN110080473B (en) Flat roof waterproof and heat-insulating system and construction method thereof
CN101283149A (en) Composite cement-foam panel and roof deck system
KR102049494B1 (en) Roof leakage prevention structure and leakage prevention method
USRE31007E (en) Roof construction and method thereof
KR101381084B1 (en) Construction method for waterproof and insulation
JP7114098B2 (en) Eco-friendly insulation structural blocks and structures
CN109537743A (en) A kind of toilet floor heating leakage preventing construction technique
US20080193778A1 (en) Isolation Material
WO2003060235A1 (en) Process of waterproofing construction surface and slit of construction surface
KR100542380B1 (en) Structure of Expansion Joint Filler for Concrete Slab, and Method for Carrying Out Thereof
US6491472B1 (en) Construction method for protecting the airplane runway surface from being cracked to spit out crush stones
US2191522A (en) Flat roof
KR100216397B1 (en) Water proof structure of building
US5119611A (en) Unitary foam gravel roof covering
CN215716628U (en) Double-prevention light-weight assembled three-dimensional modified asphalt shingle roof waterproof system
TW305906B (en) Construction method of roofs having characteristics of weather resistance
KR0179941B1 (en) Construction for roof floor
TW201706482A (en) Acrylic wear-resistant waterproof layer structure and construction method thereof able to solve problems of time-consuming and occurrence of new water seepage points encountered in the existing construction methods
CA2961765C (en) Concrete slab system

Legal Events

Date Code Title Description
FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

SULP Surcharge for late payment

Year of fee payment: 7

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation