US20010001885A1 - Movable safety tunnel for use during bridge maintenance - Google Patents

Movable safety tunnel for use during bridge maintenance Download PDF

Info

Publication number
US20010001885A1
US20010001885A1 US09/752,986 US75298601A US2001001885A1 US 20010001885 A1 US20010001885 A1 US 20010001885A1 US 75298601 A US75298601 A US 75298601A US 2001001885 A1 US2001001885 A1 US 2001001885A1
Authority
US
United States
Prior art keywords
bridge
tunnel
maintenance
safety tunnel
traffic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/752,986
Other versions
US6338175B2 (en
Inventor
Valery Tsimmerman
Antonios Aikaterinidis
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Orah Constructive Tech Inc
Original Assignee
Orah Constructive Tech Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Orah Constructive Tech Inc filed Critical Orah Constructive Tech Inc
Priority to US09/752,986 priority Critical patent/US6338175B2/en
Publication of US20010001885A1 publication Critical patent/US20010001885A1/en
Application granted granted Critical
Publication of US6338175B2 publication Critical patent/US6338175B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/106Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges

Definitions

  • the present invention relates to a movable shield and containment system for the maintenance of existing bridges and, more particularly, to a “safety tunnel” which is movable with respect to the bridge structure to facilitate traffic flow along the roadway of the bridge (and/or under the bridge) while protecting the traffic flow from falling debris during the maintenance work on the bridge.
  • a shield and containment structure (commonly referred to as a “traffic shield”) constructed within or under the bridge, along a given length thereof, and above the deck or roadway of the bridge.
  • This conventional traffic shield together with the roadway, provides a complete enclosure for the traffic flow (which may be vehicular, railway, pedestrian or some combination thereof).
  • the traffic is protected against any falling debris—such as paint chips from the bridge, the materials of shot blasting or sand blasting, and any tools, components or structural elements accidentally dropped by the maintenance workers.
  • the workers are protected against the vehicular or rail traffic. As a result, a complete shut-down of the bridge is avoided, and the traffic flow is substantially unimpeded while the maintenance is being performed.
  • the present invention finds particularly utility for use in connection with a bridge having a roadway for vehicular and/or pedestrian traffic, wherein maintenance is being performed on the bridge, and wherein a safety tunnel is constructed within a respective longitudinal section of the bridge. Accordingly, the traffic flows on the roadway of the bridge substantially uninterrupted while the maintenance is being performed on the respective longitudinal section of the bridge. More specifically, the traffic on the roadway of the bridge is protected against falling debris, such as paint particles, materials for shot blasting or sandblasting, tools, components and the like. At the same time, the workers performing the maintenance are shielded from the traffic flow. Once the maintenance on the respective longitudinal section of the bridge is completed, the traffic shield is normally dismantled and thereafter reconstructed on a next adjacent longitudinal section of the bridge.
  • the traffic shield comprises a safety tunnel which is movable along the length of the bridge.
  • the bridge is sixteen hundred (1600) feet long, and if the conventional traffic shield is one hundred (100) feet long, it will have to be assembled, disassembled and re-assembled approximately sixteen (16) times.
  • the safety tunnel may be rolled from place to place along the bridge without requiring the safety tunnel to be taken apart.
  • rails are constructed on top of the respective parapets running along the respective sides of the deck or roadway of the bridge, and the movable safety tunnel has a trolley system riding on the rails.
  • the trolley system is locked to a respective longitudinal section of the rails as the maintenance is being performed on a corresponding respective length of the bridge; and the trolley system is unlocked from the respective longitudinal section of the rails to enable the safety tunnel to be moved to the next adjacent section of the bridge on which the maintenance is to be performed.
  • the safety tunnel is pushed and/or pulled by a tow truck (or other suitable piece of equipment) to the next adjacent section of the bridge.
  • the trolley system comprises a plurality of respective spaced-apart trolley assemblies.
  • the safety tunnel includes an inverted U-shaped structure having a roof assembly joined to respective sides depending therefrom. These respective sides have lower portions carried by the plurality of trolley assemblies riding on the respective rails.
  • FIGS. 1 - 5 illustrate, schematically, the teachings of the prior art and the disadvantages and deficiencies therein.
  • FIG. 1 is a schematic (pictorial) side elevation of a typical bridge using a stationary traffic shield—heretofore habitually resorted to in the prior art—to facilitate vehicular traffic flow during maintenance operations on a selected section along the length of the bridge.
  • FIG. 2 is a cross-sectional view thereof, taken along the lines 2 - 2 of FIG. 1 and drawn to an enlarged scale.
  • FIG. 3 corresponds substantially to FIG. 1, but shows the prior art stationary traffic shield being dismantled following completion of the maintenance on the respective lengthwise section of the bridge.
  • FIG. 4 corresponds substantially to FIG. 3, but shows the traffic shield being re-assembled on the next adjacent lengthwise section of the bridge.
  • FIG. 5 corresponds substantially to FIG. 4, but shows the traffic shield re-assembled and fixed in place to again resume flow of the vehicular traffic.
  • FIGS. 6 - 9 illustrate, schematically, the improvement of the present invention and its features and advantages.
  • FIG. 6 corresponds substantially to FIG. 1; however, the traffic shield is not fixed or stationary but, rather, constitutes a movable safety tunnel that may be moved along the length of the bridge as progressive sections of the bridge are being worked on and maintained.
  • FIG. 7 is a cross-sectional view thereof taken along the lines 7 - 7 of FIG. 6, drawn to an enlarged scale and corresponding substantially to FIG. 2, and showing the movable safety tunnel having a trolley system riding on rails replaceably mounted on top of the respective parapets at the sides of the roadway—the trolley system being selectively locked and unlocked on the rails— such that the safety tunnel is movable into the next adjacent section of the bridge.
  • FIG. 8 corresponds substantially to FIG. 6, but shows the safety tunnel being moved to the next adjacent section of the bridge.
  • FIG. 9 corresponds substantially to FIG. 8 but shows the safety tunnel locked in place on the next adjacent section of the bridge, thereby enabling the traffic flow to resume as the maintenance is performed on the next adjacent section of the bridge.
  • FIG. 10 is a side elevation of the movable tunnel MT, the bridge being shown schematically.
  • FIG. 11 is a portion of FIG. 10, drawn to an enlarged scale, and showing the construction of the sides of the movable tunnel.
  • FIG. 12 is an end view of the movable tunnel which cooperates with the roadway of the bridge, the remainder of the bridge being omitted for ease of illustration.
  • FIG. 13 is a portion of FIG. 12, drawn to an enlarged scale, and showing one of the trolley assemblies riding on a rail mounted on top of one of the parapets at each side of the roadway of the bridge.
  • FIG. 14 is an elevational view of a portion of one of the rails.
  • FIG. 15 is a top plan view thereof.
  • FIG. 16 is a bottom view thereof.
  • FIG. 17 is a plan view of one of the trolley assemblies within the overall trolley system.
  • FIG. 18 is an elevational view thereof.
  • FIG. 19 is a cross-sectional view thereof, taken along the lines 19 - 19 of FIG. 18 and drawn to an enlarged scale, and showing one of the trolley assemblies.
  • FIG. 20 is a further cross-sectional view thereof, taken along the lines 20 - 20 of FIG. 18 and drawn to an enlarged scale, and showing the J-bolts of the assembly in a locked position on the rail (the broken lines indicating the unlocked portion).
  • FIG. 21 is an elevational view of one of the J-bolts.
  • FIG. 22 is a front elevational view of one of the columns, the lower portion of which is secured to the respective upstanding gusset plates of the trolley assembly.
  • FIG. 23 is a side elevational view of the column of FIG. 22.
  • FIG. 24 is an enlarged portion of the upper portion of the column shown in FIG. 23.
  • FIG. 25 is a top plan view thereof, taken along the lines 25 - 25 of FIG. 24.
  • FIG. 26 is a side elevation of an end portion of the trolley assembly of FIG. 18, drawn to an enlarged scale and detailed.
  • FIG. 27 is an end view thereof, taken along the lines 27 - 27 of FIG. 26.
  • FIG. 28 is a side elevation of the other end of the trolley assembly of FIG. 18 and, again, enlarged in scale and detailed.
  • FIG. 29 is a detailed view thereof, taken along the lines 29 - 29 of FIG. 28.
  • FIG. 30 is a bottom view of the roof panel.
  • FIG. 31 is a longitudinal section view thereof, taken along the lines 31 - 31 of FIG. 30.
  • FIG. 32 is a detail view of one embodiment of the roof panel, drawn to an enlarged scale.
  • FIG. 33 is an end view of the one embodiment of the roof panel; the panel is provided with connection tubes that fit inside the respective columns.
  • FIG. 34 is a detail view of a second embodiment of the roof panel, drawn to an enlarged scale.
  • FIG. 35 is an end view of the second embodiment of the roof panel; and again, the panel is provided with connection tubes that fit inside the respective columns.
  • the workers W are performing maintenance, repair and/or construction operations on a given length L of a bridge B. While this work is being performed, the traffic flow of the vehicles is accommodated by a conventional traffic shield T.
  • the traffic shield T is an inverted U-shaped structure which cooperates with the deck or roadway R of the bridge B to form the tunnel T.
  • the respective length L of the bridge B (being worked on) is enclosed by a suitable tarp or cover C.
  • This cover C is shown broken away in FIGS. 1 and 5, and is omitted in FIG. 4 for ease of illustration.
  • the purpose of the cover C is to assure that the paint chips, the sand for sand-blasting or the steel balls used for shot-blasting, and any other dust and debris that is generated will be wholly confined within the cover C.
  • a truck-mounted vacuum cleaner (not shown) continually removes all of the dust and debris; and where shot-blasting equipment is used, filters out the steel balls for subsequent reuse.
  • suitable catwalks and/or scaffolding (also not shown) are installed for facilitating the maintenance work and ready access for the workers. Again, all of this is well-known in the prior art; hence need not be detailed herein.
  • the tunnel T must be completely dismantled or disassembled, taken to the next adjacent length L′ of the bridge B, and re-assembled therein as shown in FIG. 5 to resume the normal traffic flow.
  • the tunnel T once assembled and installed within the length L (or L′) of the bridge B, is stationary and fixed in place. It is not readily movable. Not only is the traffic flow interrupted for a substantial time period, but excessive construction costs are incurred.
  • the improved tunnel MT of the present invention is movable, not stationary, and this is the key feature of the invention.
  • the movable tunnel MT may be pre-fabricated in sections, taken to the bridge B and installed with use of a crane or other suitable equipment. Final assembly of the tunnel MT may take place on the bridge B.
  • the tunnel MT may have length of around 200 feet.
  • the tunnel MT is movable along the entire length of the bridge (in progressive increments) as the maintenance operations are performed.
  • the tunnel MT has a trolley system (hereinafter described in detail) which rides on specially-built rails on top of parapets on each side of the roadway.
  • the trolley system is locked against movement on the rails; and when the work on that particular section of the bridge B has been completed, the locking mechanism is released, and the entire tunnel MT (being movable as shown in FIG. 8) is pushed or pulled by a fork-lift truck (or other suitable equipment) into the next adjacent, and possibly overlapping, position along the bridge B.
  • the trolley system is again locked against movement of the tunnel MT along the length of the bridge B, so that the maintenance work can be performed on the next section L′ of the bridge B; and the process is repeated until the work on the entire bridge B has been completed.
  • the movable tunnel MT is, of course, moved in the direction in which the maintenance is being performed on the bridge B.
  • the movable tunnel MT is an inverted U-shaped structure including a roof assembly 10 and a pair of parallel side wall assemblies 11 depending therefrom.
  • the roof assembly 10 includes a plurality of individual roof panels 12 connected to respective columns (hereinafter described) and each side assembly 11 includes a plurality of individual side panels 13 connected to respective columns (hereinafter described) thus providing a modular design for construction of the complete movable tunnel MT.
  • the roof panels 12 and the side panels 13 are corrugated steel panels, as shown, but it will be understood by those skilled in the art that any suitable panel, such as marine plywood, could be used if desired.
  • the movable tunnel MT cooperates with an existing deck or roadway 14 of the bridge B to provide a complete enclosure for the traffic flow.
  • the bridge roadway 14 has respective barrier walls or parapets 15 at each side thereof, and a rail 16 is secured to the top of each parapet 15 .
  • Each rail 16 is a closed tube (or box) which, in a preferred embodiment, is 4 ⁇ 4 ⁇ 1 ⁇ 4 inches thick.
  • Spaced-apart transverse flanges 17 are welded to the bottom of each rail 16 , and the flanges 17 extend laterally from the respective sides of the rail 16 , thereby assuring lateral stability of the rail 16 on the parapet 15 .
  • These flanges 17 are spaced approximately four feet apart along the length of the rail 16 .
  • a ⁇ fraction (13/16) ⁇ inch hole is drilled in each flange 17 (and in each bottom wall of the rail 16 ) along the center line of the rail 16 .
  • a 31 ⁇ 4 inch access hole 18 is drilled in the top of the rail 16 along the center line of the respective transverse flange 17 .
  • a suitable concrete anchor bolt 19 passes through each access hole 18 and anchors the rail 16 to the parapet 15 .
  • a trolley assembly 20 rides on each rail 16 (as shown more clearly in FIG. 20).
  • This trolley assembly 20 has a wheel assembly 21 (see FIG. 19) rotatably journaled in sintered oil-impregnated bronze bearings 22 on a central axle or pin 23 .
  • These bearings 22 are more desirable than ball-bearings for a grit-laden or shot-laden environment.
  • the respective ends of the pin 23 are secured in a pair of downwardly-projecting spaced-apart channels 24 provided with stiffeners 25 .
  • These channels 24 are part of a gusset assembly 26 .
  • a plurality of gusset assemblies 26 are provided, being spaced approximately eight feet apart along the length of the trolley assembly 20 .
  • the wheel assembly 21 preferably, consists of a section of a 65 ⁇ 8 inch pipe 27 cut to a length of 41 ⁇ 2 inches and welded between a pair of circular side plates 28 and 29 , respectively.
  • the diameter of these circular side plates 28 , 29 extends beyond the 65 ⁇ 8 inch O.D. of the pipe 27 , such that the radially-extending portions of the circular side plates 28 , 29 straddle the four-inch closed-channel rail 16 , thereby providing lateral stability of the trolley assembly 20 on the rail 16 (even if high winds are encountered).
  • Each gusset assembly 26 has a pair of spaced-apart upwardly-extending gusset plates 30 , and each of the gusset plates 30 is provided with a central transverse stiffener 31 .
  • Each gusset plate 30 further has a pair of spaced-apart ⁇ fraction (15/16) ⁇ inch holes 32 , one on each side of the stiffener 31 .
  • a plurality of columns 33 are provided.
  • Each column 33 comprises a rectangular tube 34 that is split on top and welded to a central plate 35 .
  • a pair of angles 36 depend from the lower end of the column 33 , and the lower portion of each column 33 has a pair of spaced-apart ⁇ fraction (15/16) ⁇ inch holes 37 .
  • These holes 37 on each column 33 align with the holes 32 on the gusset plates 30 , thereby facilitating the bolting of the column 33 to the gusset assemblies 26 (and hence to the trolley assembly 20 which rides on the rail 16 ).
  • the roof assembly 10 is adjustably mounted to the top portions of the respective columns 33 .
  • the roof assembly 10 has a plurality of depending members 38 telescoped within the columns 33 , and each member 38 has a plurality of vertically spaced-apart holes 39 aligned with corresponding holes 40 within the top portions of the respective column 33 for securing the members 38 (and hence the roof assembly 10 ) to the columns 33 .
  • the roof assembly 10 consists of a plurality of corrugated horizontal panels 12 , and the roof assembly 10 is raised or lowered on the columns 33 by suitable hydraulic jacks (not shown). This allows the roof assembly 10 to be lowered to clear the structural elements of the bridge B while rolling the movable tunnel MT into its next position along the bridge B. Once adjusted vertically, a drift pin (not shown) is inserted between the aligned holes 39 and 40 , respectively.
  • each gusset assembly 26 has a pair of J-bolts 41 carrying respective nuts 42 .
  • Each J-bolt 41 may be loosened and then rotated approximately 180° on its axis (see FIG. 20) such that a right-angularly bent portion of each J-bolt 41 is received between the bottom of each rail 16 and its respective parapet 15 .
  • the respective nuts 42 are tightened, the J-bolts 41 are secured against the rail 16 and the trolley assemblies 20 (and hence the movable tunnel MT) are locked against longitudinal movement along the bridge B.
  • Suitable side panels 13 such as corrugated sheeting or marine plywood panels, are secured between the respective columns 33 , thereby completing the movable tunnel MT. This assures that no dust particles, shot blasting or sand blasting material or debris will enter into the movable tunnel MT, thereby protecting the traffic flow therein.
  • the movable safety tunnel MT is one hundred and ninety-eight (198) feet long, and is divided into six (6) sections, each of which is thirty-three (33) feet long. Each section is raised by a crane and lifted in place. In one practical application, the bridge B is over water; and the respective sections of the safety tunnel MT are transported by a barge.
  • One end of each section of the safety tunnel MT has a pair of tongues 44 (see FIG. 26) which cooperate with a pair of plates 45 (see FIG. 27). Holes 46 in the tongues 44 are aligned with holes 47 in the plates 45 , and a pin or bolt (not shown) is received in these aligned holes, thereby assembling the respective sections together to form the complete safety tunnel MT.
  • the portion of bridge B being maintained is approximately eighteen hundred (1800) feet long.
  • the rails 16 are constructed along approximately five hundred (500) feet at one end of that portion of the bridge B.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A movable safety tunnel rides on parapets within a bridge. The safety tunnel is locked in place in a respective section of the bridge while maintenance or other operations are performed on that section of the bridge. This allows the traffic to flow through the safety tunnel and along the bridge, and the safety tunnel shields the traffic from any dust or debris. When the maintenance on that respective section of the bridge has been completed, the safety tunnel is unlocked and pushed (and/or pulled) by suitable equipment to the next adjacent section of the bridge; and the safety tunnel is again locked in place as the maintenance is performed. This procedure continues, progressively, along the bridge. In one embodiment, the safety tunnel has a trolley system riding on respective rails constructed on top of the parapets.

Description

    FIELD OF THE INVENTION
  • The present invention relates to a movable shield and containment system for the maintenance of existing bridges and, more particularly, to a “safety tunnel” which is movable with respect to the bridge structure to facilitate traffic flow along the roadway of the bridge (and/or under the bridge) while protecting the traffic flow from falling debris during the maintenance work on the bridge. [0001]
  • BACKGROUND OF THE INVENTION
  • Existing bridges require substantial maintenance. The maintenance is required at least periodically, if not continuously. For example, it is often necessary to remove the paint (such as a lead-based paint) from the steel structure of a bridge prior to applying a new coating thereto. To remove the paint, conventional sand-blasting or shot-blasting equipment is used. Suitable available measures are taken (as hereinafter discussed) to prevent the debris from falling onto the roadway, or into any water below the bridge, or otherwise polluting the environment. [0002]
  • At the same time, it is also very desirable to facilitate the continuous traffic flow along the roadway, while the maintenance is being performed, and thus avoid a complete shutdown of the traffic flow. While the traffic flow is primarily vehicular or railway traffic, it is also desirable to maintain any pedestrian traffic as well as facilitate access for the maintenance crews. By maintenance, it is understood that any repair or construction on the bridge is contemplated herein. [0003]
  • To maintain the traffic flow while the maintenance is being performed, the prior art has resorted to the use of a shield and containment structure (commonly referred to as a “traffic shield”) constructed within or under the bridge, along a given length thereof, and above the deck or roadway of the bridge. [0004]
  • This conventional traffic shield, together with the roadway, provides a complete enclosure for the traffic flow (which may be vehicular, railway, pedestrian or some combination thereof). Within the traffic shield (or thereunder) the traffic is protected against any falling debris—such as paint chips from the bridge, the materials of shot blasting or sand blasting, and any tools, components or structural elements accidentally dropped by the maintenance workers. By the same token, the workers are protected against the vehicular or rail traffic. As a result, a complete shut-down of the bridge is avoided, and the traffic flow is substantially unimpeded while the maintenance is being performed. [0005]
  • However, when the maintenance has been completed on a given length or section of the bridge, the traffic may be halted for a substantial period of time sufficient to enable the workers to completely dismantle the traffic shield, move its individual components to the next successive section of the bridge, and then re-assemble the traffic shield therein. This is time-consuming, hence expensive, and causes a substantial traffic problem; and a need exists for a more efficient solution to this long-standing problem. [0006]
  • BRIEF SUMMARY OF THE INVENTION
  • Accordingly, it is the primary object of the present invention to alleviate the disadvantages and deficiencies of the prior art by providing a movable safety tunnel within the bridge, thereby resulting in a substantial cost-savings and, concurrently, holding the inconvenience to the motorists to an absolute minimum. [0007]
  • The present invention finds particularly utility for use in connection with a bridge having a roadway for vehicular and/or pedestrian traffic, wherein maintenance is being performed on the bridge, and wherein a safety tunnel is constructed within a respective longitudinal section of the bridge. Accordingly, the traffic flows on the roadway of the bridge substantially uninterrupted while the maintenance is being performed on the respective longitudinal section of the bridge. More specifically, the traffic on the roadway of the bridge is protected against falling debris, such as paint particles, materials for shot blasting or sandblasting, tools, components and the like. At the same time, the workers performing the maintenance are shielded from the traffic flow. Once the maintenance on the respective longitudinal section of the bridge is completed, the traffic shield is normally dismantled and thereafter reconstructed on a next adjacent longitudinal section of the bridge. [0008]
  • In the improvement of the present invention, the traffic shield comprises a safety tunnel which is movable along the length of the bridge. [0009]
  • As a result, the necessity for repeatedly dismantling and reconstructing a conventional traffic shield is eliminated (as the maintenance on the bridge progresses along the length of the bridge). [0010]
  • For example, and in comparison to the prior art, if the bridge is sixteen hundred (1600) feet long, and if the conventional traffic shield is one hundred (100) feet long, it will have to be assembled, disassembled and re-assembled approximately sixteen (16) times. Thus is time-consuming and expensive and a distinct inconvenience, repeatedly, for the vehicular traffic on the bridge. With the present invention, however, the safety tunnel may be rolled from place to place along the bridge without requiring the safety tunnel to be taken apart. [0011]
  • In a preferred embodiment of the present invention, rails are constructed on top of the respective parapets running along the respective sides of the deck or roadway of the bridge, and the movable safety tunnel has a trolley system riding on the rails. [0012]
  • The trolley system is locked to a respective longitudinal section of the rails as the maintenance is being performed on a corresponding respective length of the bridge; and the trolley system is unlocked from the respective longitudinal section of the rails to enable the safety tunnel to be moved to the next adjacent section of the bridge on which the maintenance is to be performed. The safety tunnel is pushed and/or pulled by a tow truck (or other suitable piece of equipment) to the next adjacent section of the bridge. [0013]
  • Preferably, the trolley system comprises a plurality of respective spaced-apart trolley assemblies. [0014]
  • In the preferred embodiment, the safety tunnel includes an inverted U-shaped structure having a roof assembly joined to respective sides depending therefrom. These respective sides have lower portions carried by the plurality of trolley assemblies riding on the respective rails. [0015]
  • These and other objects of the present invention will become apparent from a reading of the following specification taken in conjunction with the enclosed drawings. [0016]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIGS. [0017] 1-5 illustrate, schematically, the teachings of the prior art and the disadvantages and deficiencies therein.
  • FIG. 1 is a schematic (pictorial) side elevation of a typical bridge using a stationary traffic shield—heretofore habitually resorted to in the prior art—to facilitate vehicular traffic flow during maintenance operations on a selected section along the length of the bridge. [0018]
  • FIG. 2 is a cross-sectional view thereof, taken along the lines [0019] 2-2 of FIG. 1 and drawn to an enlarged scale.
  • FIG. 3 corresponds substantially to FIG. 1, but shows the prior art stationary traffic shield being dismantled following completion of the maintenance on the respective lengthwise section of the bridge. [0020]
  • FIG. 4 corresponds substantially to FIG. 3, but shows the traffic shield being re-assembled on the next adjacent lengthwise section of the bridge. [0021]
  • FIG. 5 corresponds substantially to FIG. 4, but shows the traffic shield re-assembled and fixed in place to again resume flow of the vehicular traffic. [0022]
  • FIGS. [0023] 6-9 illustrate, schematically, the improvement of the present invention and its features and advantages.
  • FIG. 6 corresponds substantially to FIG. 1; however, the traffic shield is not fixed or stationary but, rather, constitutes a movable safety tunnel that may be moved along the length of the bridge as progressive sections of the bridge are being worked on and maintained. [0024]
  • FIG. 7 is a cross-sectional view thereof taken along the lines [0025] 7-7 of FIG. 6, drawn to an enlarged scale and corresponding substantially to FIG. 2, and showing the movable safety tunnel having a trolley system riding on rails replaceably mounted on top of the respective parapets at the sides of the roadway—the trolley system being selectively locked and unlocked on the rails— such that the safety tunnel is movable into the next adjacent section of the bridge.
  • FIG. 8 corresponds substantially to FIG. 6, but shows the safety tunnel being moved to the next adjacent section of the bridge. [0026]
  • FIG. 9 corresponds substantially to FIG. 8 but shows the safety tunnel locked in place on the next adjacent section of the bridge, thereby enabling the traffic flow to resume as the maintenance is performed on the next adjacent section of the bridge. [0027]
  • FIG. 10 is a side elevation of the movable tunnel MT, the bridge being shown schematically. [0028]
  • FIG. 11 is a portion of FIG. 10, drawn to an enlarged scale, and showing the construction of the sides of the movable tunnel. [0029]
  • FIG. 12 is an end view of the movable tunnel which cooperates with the roadway of the bridge, the remainder of the bridge being omitted for ease of illustration. [0030]
  • FIG. 13 is a portion of FIG. 12, drawn to an enlarged scale, and showing one of the trolley assemblies riding on a rail mounted on top of one of the parapets at each side of the roadway of the bridge. [0031]
  • FIG. 14 is an elevational view of a portion of one of the rails. [0032]
  • FIG. 15 is a top plan view thereof. [0033]
  • FIG. 16 is a bottom view thereof. [0034]
  • FIG. 17 is a plan view of one of the trolley assemblies within the overall trolley system. [0035]
  • FIG. 18 is an elevational view thereof. [0036]
  • FIG. 19 is a cross-sectional view thereof, taken along the lines [0037] 19-19 of FIG. 18 and drawn to an enlarged scale, and showing one of the trolley assemblies.
  • FIG. 20 is a further cross-sectional view thereof, taken along the lines [0038] 20-20 of FIG. 18 and drawn to an enlarged scale, and showing the J-bolts of the assembly in a locked position on the rail (the broken lines indicating the unlocked portion).
  • FIG. 21 is an elevational view of one of the J-bolts. [0039]
  • FIG. 22 is a front elevational view of one of the columns, the lower portion of which is secured to the respective upstanding gusset plates of the trolley assembly. [0040]
  • FIG. 23 is a side elevational view of the column of FIG. 22. [0041]
  • FIG. 24 is an enlarged portion of the upper portion of the column shown in FIG. 23. [0042]
  • FIG. 25 is a top plan view thereof, taken along the lines [0043] 25-25 of FIG. 24.
  • FIG. 26 is a side elevation of an end portion of the trolley assembly of FIG. 18, drawn to an enlarged scale and detailed. [0044]
  • FIG. 27 is an end view thereof, taken along the lines [0045] 27-27 of FIG. 26.
  • FIG. 28 is a side elevation of the other end of the trolley assembly of FIG. 18 and, again, enlarged in scale and detailed. [0046]
  • FIG. 29 is a detailed view thereof, taken along the lines [0047] 29-29 of FIG. 28.
  • FIG. 30 is a bottom view of the roof panel. [0048]
  • FIG. 31 is a longitudinal section view thereof, taken along the lines [0049] 31-31 of FIG. 30.
  • FIG. 32 is a detail view of one embodiment of the roof panel, drawn to an enlarged scale. [0050]
  • FIG. 33 is an end view of the one embodiment of the roof panel; the panel is provided with connection tubes that fit inside the respective columns. [0051]
  • FIG. 34 is a detail view of a second embodiment of the roof panel, drawn to an enlarged scale. [0052]
  • FIG. 35 is an end view of the second embodiment of the roof panel; and again, the panel is provided with connection tubes that fit inside the respective columns. [0053]
  • DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • With reference to FIGS. [0054] 1-5, the disadvantages and deficiencies of the prior art will become readily apparent.
  • In FIG. 1, the workers W are performing maintenance, repair and/or construction operations on a given length L of a bridge B. While this work is being performed, the traffic flow of the vehicles is accommodated by a conventional traffic shield T. [0055]
  • As shown in FIG. 2, the traffic shield T is an inverted U-shaped structure which cooperates with the deck or roadway R of the bridge B to form the tunnel T. [0056]
  • In the prior art, the respective length L of the bridge B (being worked on) is enclosed by a suitable tarp or cover C. This cover C is shown broken away in FIGS. 1 and 5, and is omitted in FIG. 4 for ease of illustration. The purpose of the cover C is to assure that the paint chips, the sand for sand-blasting or the steel balls used for shot-blasting, and any other dust and debris that is generated will be wholly confined within the cover C. A truck-mounted vacuum cleaner (not shown) continually removes all of the dust and debris; and where shot-blasting equipment is used, filters out the steel balls for subsequent reuse. Between the cover C and the bridge B, suitable catwalks and/or scaffolding (also not shown) are installed for facilitating the maintenance work and ready access for the workers. Again, all of this is well-known in the prior art; hence need not be detailed herein. [0057]
  • Of significance, however, and as shown schematically in FIGS. 3 and 4, once the maintenance work on the respective length L of the bridge B has been completed, the tunnel T must be completely dismantled or disassembled, taken to the next adjacent length L′ of the bridge B, and re-assembled therein as shown in FIG. 5 to resume the normal traffic flow. The tunnel T, once assembled and installed within the length L (or L′) of the bridge B, is stationary and fixed in place. It is not readily movable. Not only is the traffic flow interrupted for a substantial time period, but excessive construction costs are incurred. [0058]
  • With reference to FIGS. [0059] 6-9, the improved tunnel MT of the present invention is movable, not stationary, and this is the key feature of the invention.
  • The movable tunnel MT may be pre-fabricated in sections, taken to the bridge B and installed with use of a crane or other suitable equipment. Final assembly of the tunnel MT may take place on the bridge B. In a preferred embodiment, the tunnel MT may have length of around 200 feet. [0060]
  • The tunnel MT is movable along the entire length of the bridge (in progressive increments) as the maintenance operations are performed. For this purpose, the tunnel MT has a trolley system (hereinafter described in detail) which rides on specially-built rails on top of parapets on each side of the roadway. When a particular section of the bridge B is to be worked on, the trolley system is locked against movement on the rails; and when the work on that particular section of the bridge B has been completed, the locking mechanism is released, and the entire tunnel MT (being movable as shown in FIG. 8) is pushed or pulled by a fork-lift truck (or other suitable equipment) into the next adjacent, and possibly overlapping, position along the bridge B. Thereafter, and as shown in FIG. 9, the trolley system is again locked against movement of the tunnel MT along the length of the bridge B, so that the maintenance work can be performed on the next section L′ of the bridge B; and the process is repeated until the work on the entire bridge B has been completed. [0061]
  • The movable tunnel MT is, of course, moved in the direction in which the maintenance is being performed on the bridge B. [0062]
  • With reference to FIGS. [0063] 10-12, the movable tunnel MT is an inverted U-shaped structure including a roof assembly 10 and a pair of parallel side wall assemblies 11 depending therefrom. The roof assembly 10 includes a plurality of individual roof panels 12 connected to respective columns (hereinafter described) and each side assembly 11 includes a plurality of individual side panels 13 connected to respective columns (hereinafter described) thus providing a modular design for construction of the complete movable tunnel MT. Preferably, the roof panels 12 and the side panels 13 are corrugated steel panels, as shown, but it will be understood by those skilled in the art that any suitable panel, such as marine plywood, could be used if desired.
  • It will also be understood that the movable tunnel MT cooperates with an existing deck or [0064] roadway 14 of the bridge B to provide a complete enclosure for the traffic flow.
  • With reference to FIGS. [0065] 12-21, the bridge roadway 14 has respective barrier walls or parapets 15 at each side thereof, and a rail 16 is secured to the top of each parapet 15. Each rail 16 is a closed tube (or box) which, in a preferred embodiment, is 4×4×¼ inches thick. Spaced-apart transverse flanges 17 are welded to the bottom of each rail 16, and the flanges 17 extend laterally from the respective sides of the rail 16, thereby assuring lateral stability of the rail 16 on the parapet 15. These flanges 17 are spaced approximately four feet apart along the length of the rail 16. A {fraction (13/16)} inch hole is drilled in each flange 17 (and in each bottom wall of the rail 16) along the center line of the rail 16. A 3¼ inch access hole 18 is drilled in the top of the rail 16 along the center line of the respective transverse flange 17. A suitable concrete anchor bolt 19 passes through each access hole 18 and anchors the rail 16 to the parapet 15.
  • A [0066] trolley assembly 20 rides on each rail 16 (as shown more clearly in FIG. 20). This trolley assembly 20 has a wheel assembly 21 (see FIG. 19) rotatably journaled in sintered oil-impregnated bronze bearings 22 on a central axle or pin 23. These bearings 22 are more desirable than ball-bearings for a grit-laden or shot-laden environment. The respective ends of the pin 23 are secured in a pair of downwardly-projecting spaced-apart channels 24 provided with stiffeners 25. These channels 24 are part of a gusset assembly 26. A plurality of gusset assemblies 26 are provided, being spaced approximately eight feet apart along the length of the trolley assembly 20.
  • The [0067] wheel assembly 21, preferably, consists of a section of a 6⅝ inch pipe 27 cut to a length of 4½ inches and welded between a pair of circular side plates 28 and 29, respectively. The diameter of these circular side plates 28, 29 extends beyond the 6⅝ inch O.D. of the pipe 27, such that the radially-extending portions of the circular side plates 28, 29 straddle the four-inch closed-channel rail 16, thereby providing lateral stability of the trolley assembly 20 on the rail 16 (even if high winds are encountered).
  • Each [0068] gusset assembly 26 has a pair of spaced-apart upwardly-extending gusset plates 30, and each of the gusset plates 30 is provided with a central transverse stiffener 31. Each gusset plate 30 further has a pair of spaced-apart {fraction (15/16)} inch holes 32, one on each side of the stiffener 31.
  • A plurality of [0069] columns 33 are provided. Each column 33 comprises a rectangular tube 34 that is split on top and welded to a central plate 35. A pair of angles 36 depend from the lower end of the column 33, and the lower portion of each column 33 has a pair of spaced-apart {fraction (15/16)} inch holes 37. These holes 37 on each column 33 align with the holes 32 on the gusset plates 30, thereby facilitating the bolting of the column 33 to the gusset assemblies 26 (and hence to the trolley assembly 20 which rides on the rail 16).
  • The [0070] roof assembly 10 is adjustably mounted to the top portions of the respective columns 33. The roof assembly 10 has a plurality of depending members 38 telescoped within the columns 33, and each member 38 has a plurality of vertically spaced-apart holes 39 aligned with corresponding holes 40 within the top portions of the respective column 33 for securing the members 38 (and hence the roof assembly 10) to the columns 33. The roof assembly 10 consists of a plurality of corrugated horizontal panels 12, and the roof assembly 10 is raised or lowered on the columns 33 by suitable hydraulic jacks (not shown). This allows the roof assembly 10 to be lowered to clear the structural elements of the bridge B while rolling the movable tunnel MT into its next position along the bridge B. Once adjusted vertically, a drift pin (not shown) is inserted between the aligned holes 39 and 40, respectively.
  • The [0071] trolley assembly 20 is locked against the rails 16, so that the movable tunnel MT does not move while the work is being performed on the particular portion of the bridge B. More specifically, each gusset assembly 26 has a pair of J-bolts 41 carrying respective nuts 42. Each J-bolt 41 may be loosened and then rotated approximately 180° on its axis (see FIG. 20) such that a right-angularly bent portion of each J-bolt 41 is received between the bottom of each rail 16 and its respective parapet 15. When the respective nuts 42 are tightened, the J-bolts 41 are secured against the rail 16 and the trolley assemblies 20 (and hence the movable tunnel MT) are locked against longitudinal movement along the bridge B.
  • [0072] Suitable side panels 13, such as corrugated sheeting or marine plywood panels, are secured between the respective columns 33, thereby completing the movable tunnel MT. This assures that no dust particles, shot blasting or sand blasting material or debris will enter into the movable tunnel MT, thereby protecting the traffic flow therein.
  • In the preferred embodiment of the present invention, the movable safety tunnel MT is one hundred and ninety-eight (198) feet long, and is divided into six (6) sections, each of which is thirty-three (33) feet long. Each section is raised by a crane and lifted in place. In one practical application, the bridge B is over water; and the respective sections of the safety tunnel MT are transported by a barge. One end of each section of the safety tunnel MT has a pair of tongues [0073] 44 (see FIG. 26) which cooperate with a pair of plates 45 (see FIG. 27). Holes 46 in the tongues 44 are aligned with holes 47 in the plates 45, and a pin or bolt (not shown) is received in these aligned holes, thereby assembling the respective sections together to form the complete safety tunnel MT.
  • Moreover, in the practical application, the portion of bridge B being maintained is approximately eighteen hundred (1800) feet long. In that application, the [0074] rails 16 are constructed along approximately five hundred (500) feet at one end of that portion of the bridge B. When the maintenance work is completed on length L of the bridge B, the safety tunnel MT is moved to the remaining length of the rails 16 on the bridge B, and then the rails 16 are taken up in a “leapfrog” fashion, section by section, and re-installed ahead of the safety tunnel MT and so on until the maintenance work on the complete length of the bridge B has been completed. A forklift truck (or other suitable equipment) moves the safety tunnel MT into its next position.
  • Only one lane of the bridge B may be closed off to re-install the [0075] rail 16.
  • All of the components and/or materials of the movable tunnel MT of the present invention are readily available on the market, and the assembly thereof is relatively quick and convenient. Moreover, it will be appreciated by those skilled in the art that the dimensions of the various components disclosed herein are not for purposes of limitation but, rather, for purposes of making a complete disclosure to facilitate a review of the present invention by one skilled in the art and a ready appreciation of the features and advantages of the invention. [0076]
  • Obviously, many modifications may be made without departing from the basic spirit of the present invention. Accordingly, it will be appreciated by those skilled in the art that within the scope of the appended claims, the invention may be practiced other than has been specifically described herein. [0077]

Claims (22)

1. In a bridge having a roadway for vehicular, railway and/or pedestrian traffic, wherein maintenance, repair or construction operations are being performed on the bridge, and wherein a traffic shield is constructed within a respective longitudinal section of the bridge, thereby enabling the traffic to flow on the roadway of the bridge substantially uninterrupted while the maintenance, repair or construction operations are being performed on the respective longitudinal section of the bridge, such that the traffic on the roadway of the bridge is protected against falling debris, such as paint particles, materials for shot blasting or sandblasting, tools, components and the like and, at the same time, the workers performing the maintenance, repair or construction operations are shielded from the traffic flow, and wherein when the operations on the respective longitudinal section of the bridge are completed, the traffic shield is normally dismantled and thereafter reconstructed on a next adjacent longitudinal section of the bridge, the improvement wherein the traffic shield comprises a safety tunnel which is movable along the length of the bridge, thereby eliminating the necessity for repeatedly dismantling and reconstructing the traffic shield as the maintenance, repair or construction operations on the bridge continue progressively along the length of the bridge.
2. The improvement of
claim 1
, wherein the roadway of the bridge has respective sides, each of which is provided with a parapet, and wherein the movable safety tunnel rides on the parapets.
3. The improvement of
claim 2
, further including rails constructed on top of the respective parapets, the safety tunnel having a trolley system riding on the rails.
4. The improvement of
claim 3
, wherein the trolley system is locked to a respective longitudinal section of the rails as the maintenance, repair or construction operations are being performed on a corresponding respective length of the bridge.
5. The improvement of
claim 4
, wherein the trolley system is unlocked from the respective longitudinal section of the rails to enable the safety tunnel to be moved to the next adjacent section of the bridge on which the maintenance, repair or construction operations are to be performed.
6. The improvement of
claim 5
, wherein the safety tunnel is pushed and/or pulled to the next adjacent section of the bridge.
7. The improvement of
claim 3
, wherein the trolley system comprises a plurality of respective spaced-apart trolley assemblies.
8. The improvement of
claim 7
, wherein the safety tunnel comprises an inverted U-shaped structure having a roof assembly joined to respective sides depending therefrom, and wherein the respective sides have lower portions carried by the plurality of trolley assemblies riding on the respective rails.
9. In a bridge having a roadway for vehicular and/or pedestrian traffic, wherein the roadway has respective sides provided with parapets, and wherein maintenance, repair or construction operations are being performed on the bridge, a movable safety tunnel within a respective longitudinal section of the bridge, thereby enabling the traffic to flow on the roadway of the bridge substantially uninterrupted while the maintenance, repair or construction operations are being performed on the respective longitudinal section of the bridge, such that the traffic on the roadway of the bridge is protected against falling debris, the tunnel comprising an inverted U-shaped structure including a roof having respective sides depending therefrom, the sides having lower portions provided with a trolley system riding on rails on top of the respective parapets, wherein the trolley system is locked to a respective longitudinal section of the rails as the maintenance, repair or construction operations are performed on a corresponding respective length of the bridge, and wherein the trolley system is unlocked from the respective longitudinal section of the rails to enable the tunnel to be moved to the next adjacent section of the bridge on which the maintenance, repair or construction operations are to be performed.
10. The improvement of
claim 9
, wherein the trolley system comprises a plurality of respective spaced-apart trolley assemblies.
11. The movable safety tunnel of
claim 10
, wherein each trolley assembly comprises a wheel rotatably journaled in bearings carried by respective spaced-apart channels, and a plate on each side of the wheel, the plates straddling the rail.
12. The movable safety tunnel of
claim 11
, wherein the rail comprises a closed channel rail.
13. The movable safety tunnel of
claim 10
, wherein the trolley assembly includes a gusset assembly having a pair of spaced-apart upwardly-extending gusset plates, and wherein a column has a lower portion secured between the gusset plates.
14. The movable safety tunnel of
claim 13
, wherein the column has an upper portion, and wherein the roof of the tunnel has depending members telescoped within the upper portion of the column and secured thereto.
15. The movable safety tunnel of
claim 14
, wherein the depending members of the roof are adjustable vertically with respect to the columns.
16. The movable safety tunnel of
claim 13
, wherein the sides of the movable safety tunnel comprise a plurality of side panels secured between respective columns.
17. The movable safety tunnel of
claim 11
, wherein each trolley assembly carries J-bolts, one on each side thereof, the J-bolts having respective nuts and further having right-angularly bent portions received below the respective rails, thereby locking the J-bolts to the rails, such that the nuts on the J-bolts may be loosened, and such that the J-bolts may be turned substantially 180° to clear the rails, thereby unlocking the trolley assemblies and assembling the movable safety tunnel to be moved into its next position along the bridge.
18. In the method of maintaining a bridge, the improvement wherein the traffic may flow along the bridge or under the bridge while the maintenance is being performed on the bridge, comprising the steps of providing a movable safety tunnel, and moving the safety tunnel along the bridge as the maintenance on the bridge progresses along the length of the bridge.
19. The method of
claim 18
, wherein the bridge has a roadway, and wherein the movable safety tunnel comprises an inverted U-shaped structure which cooperates with the roadway to form an enclosure for the traffic flow.
20. The method of
claim 19
, wherein the roadway of the bridge has respective parapets, and wherein the movable safety tunnel rides on the parapets.
21. The method of
claim 20
, further comprising the step of securing rails on the respective parapets, and wherein the movable safety tunnel has a trolley system that rides on the rails on the respective parapets.
22. The method of
claim 18
, further including the steps of locking the movable safety tunnel to a first section of the bridge, performing the maintenance on that first section of the bridge, unlocking the movable safety tunnel and moving it to a second section of the bridge, locking the movable safety tunnel to that second section of the bridge, and performing the maintenance thereon.
US09/752,986 1999-09-01 2001-01-02 Movable safety tunnel for use during bridge maintenance Expired - Fee Related US6338175B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US09/752,986 US6338175B2 (en) 1999-09-01 2001-01-02 Movable safety tunnel for use during bridge maintenance

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US09/388,818 US6170106B1 (en) 1999-09-01 1999-09-01 Movable safety tunnel for use during bridge maintenance
US09/752,986 US6338175B2 (en) 1999-09-01 2001-01-02 Movable safety tunnel for use during bridge maintenance

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US09/388,818 Continuation US6170106B1 (en) 1999-09-01 1999-09-01 Movable safety tunnel for use during bridge maintenance

Publications (2)

Publication Number Publication Date
US20010001885A1 true US20010001885A1 (en) 2001-05-31
US6338175B2 US6338175B2 (en) 2002-01-15

Family

ID=23535644

Family Applications (2)

Application Number Title Priority Date Filing Date
US09/388,818 Expired - Fee Related US6170106B1 (en) 1999-09-01 1999-09-01 Movable safety tunnel for use during bridge maintenance
US09/752,986 Expired - Fee Related US6338175B2 (en) 1999-09-01 2001-01-02 Movable safety tunnel for use during bridge maintenance

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US09/388,818 Expired - Fee Related US6170106B1 (en) 1999-09-01 1999-09-01 Movable safety tunnel for use during bridge maintenance

Country Status (1)

Country Link
US (2) US6170106B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7481931B2 (en) 2019-09-03 2024-05-13 東日本高速道路株式会社 Sound insulation wall and sound insulation panel used therein

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW418272B (en) * 2000-01-07 2001-01-11 Jang Chi Guang Advancing stationary shoring system and its construction method
US7076743B2 (en) * 2000-05-04 2006-07-11 I-Lor, Llc Method for adding a plurality of user selectable functions to a hyperlink
US20090210026A1 (en) * 2006-08-17 2009-08-20 Brainsgate Ltd. Spg stimulation for enhancing neurogenesis and brain metabolism
US20080184504A1 (en) * 2007-02-07 2008-08-07 Powers James M Method of rebuilding a viaduct without interrupting service on the old structure
CN108583595B (en) * 2018-05-25 2020-08-14 广州供电局有限公司 Passing equipment of cable tunnel
CN111041974B (en) * 2020-01-14 2021-01-29 安徽水安建设集团股份有限公司 Lap joint bridge for water conservancy ditch
CN113652951B (en) * 2021-07-14 2023-04-07 中国一冶集团有限公司 Construction device for embedded component
CN114395984B (en) * 2022-01-10 2023-12-01 中铁十五局集团有限公司 Girder construction method of bridge-tunnel cooperative construction structure

Family Cites Families (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2067344A (en) * 1936-06-13 1937-01-12 William H Ringe Bridge span inspection and maintenance traveler
US2543348A (en) 1948-12-21 1951-02-27 Todd Shipyards Corp Scaling machine for cleaning the sides of a ship
US3076522A (en) * 1960-10-03 1963-02-05 Harvey L Goodell Bridge scaffold apparatus
US3495286A (en) 1968-01-24 1970-02-17 Charles H Harper Tunnel-like structures
US3630153A (en) * 1969-05-05 1971-12-28 Whoosh Inc Vehicle-enclosed railway transportation system
US3661098A (en) * 1969-08-14 1972-05-09 William M Jaekle Apparatus for shipping automobiles
US3885397A (en) * 1973-11-23 1975-05-27 Taiheiyo Coal Mining Co Ltd Mining shield-supporter
US4061089A (en) * 1975-09-02 1977-12-06 Elbert Morgan Sawyer Personal rapid transit system
US4036146A (en) * 1975-11-19 1977-07-19 Philranzo Tyus Passenger transportation system
US4211504A (en) * 1976-06-24 1980-07-08 Sivachenko Eugene W High strength corrugated metal plate and method of fabricating same
DE2743046A1 (en) * 1977-09-24 1979-04-05 Gewerk Eisenhuette Westfalia LIFTING SIGN FOR DRIVING TUNNELS, CLOUDS OR DGL.
DE2937826A1 (en) * 1979-09-19 1981-04-09 Gewerkschaft Eisenhütte Westfalia, 4670 Lünen SPREAD SHIELD, ESPECIALLY FOR THE ROAD DRIVING IN MINING UNDERGROUND
US4301565A (en) 1980-03-19 1981-11-24 Irwin Weinbaum Method and system for the removal and replacement of a bridge
US4454620A (en) 1982-01-06 1984-06-19 Barkdull Jr Howard L Span construction
GB2133439B (en) * 1982-12-03 1986-03-12 Mitsui Constr Method of enlarging a tunnel
JPS59106695A (en) * 1982-12-08 1984-06-20 三井建設株式会社 Enlargement shield drilling method
DE3745011A1 (en) * 1986-02-17 1991-12-12
US4787179A (en) 1987-08-10 1988-11-29 Lewis Richard E Abrasive blasting containment system
US4873738A (en) 1988-09-29 1989-10-17 Cfc Fabrication Corporation Apparatus for stripping concrete forms from bridge structures
US5011710A (en) 1988-11-10 1991-04-30 Harrison John F Bridge maintenance method and equipment
US5014381A (en) 1989-09-18 1991-05-14 Eddy Jack E Rolling platform assembly
BE1002835A3 (en) * 1989-10-09 1991-06-25 Namotte Sa DEVICE FOR MAINTAINING AND REPAIRING BRIDGE APRON WITHOUT INTERRUPTING TRAFFIC.
US5306099A (en) 1990-10-29 1994-04-26 Caledonian Mining Company Limited Mine tunnel support system
US5105494A (en) 1990-12-03 1992-04-21 Highway Construction Bridge Systems, Inc. Continuously moving highway reconstruction device
NZ242122A (en) * 1991-04-02 1995-01-27 Csr Humes Pty Ltd Bridge or tunnel construction including at least one arch unit formed from plurality of interconnected reinforced concrete segments
US5185968A (en) 1991-06-26 1993-02-16 Corcon (Ohio Corporation) Mobile separation sytem for abrasive blasting material
US5240503A (en) 1992-04-27 1993-08-31 Roni Levy Remote-controlled system for treating external surfaces of buildings
US5291695A (en) 1992-11-04 1994-03-08 Blastco Corporation Scaffolding with enclosed movable work areas sealed against work surfaces
US5481832A (en) 1993-09-23 1996-01-09 Tirikos; Steven M. Bridge sand blasting support apparatus
US5558023A (en) * 1993-12-28 1996-09-24 Senior, Iii; Milnor H. Enclosed transportation system for rider propelled vehicles with pneumatic propulsion assistance
CA2133003A1 (en) * 1994-09-27 1996-03-28 Bridge Vail International Inc. Mobile work station
US5695388A (en) 1994-12-01 1997-12-09 Corcon Industrial Painting Mobile platform recovery system for bridge maintenance
US5823860A (en) 1995-11-13 1998-10-20 Integrated Foam Technologies, Inc. Blasting media containment system
US5885141A (en) 1997-07-25 1999-03-23 United States Filter Corporation Portable blast wheel cleaning machine
US5934198A (en) * 1998-02-25 1999-08-10 Fraser; Michael Monorail transportation system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7481931B2 (en) 2019-09-03 2024-05-13 東日本高速道路株式会社 Sound insulation wall and sound insulation panel used therein

Also Published As

Publication number Publication date
US6338175B2 (en) 2002-01-15
US6170106B1 (en) 2001-01-09

Similar Documents

Publication Publication Date Title
US6338175B2 (en) Movable safety tunnel for use during bridge maintenance
CN110374612B (en) Shield machine receiving platform applied to near-empty state and construction process
JP2006161548A (en) Temporary pier, erection method for temporary pier, carriage used for temporary pier, and pile driving method using temporary pier
CN110847932A (en) Double-layer preliminary bracing construction method based on small clear distance tunnel
CN113123246B (en) Bridge girder erection machine dismantling method
CN113265952A (en) Hoisting method for integral prefabrication of steel cover beam
CN113309330A (en) Auxiliary device for assembling large tank
CN114319159B (en) Ascending ramp dismantling system and construction method
CN103590839B (en) Subway station cast-in-place structural portal support construction technology
CN213235079U (en) Concrete formwork supporting structure for underground excavation tunnel deformation joint post-cast strip
CN216193750U (en) Improved structure of temporary pavement covering plate for subway construction
CN216786894U (en) Upward ramp dismantling system structure
US5634528A (en) Mobile work station
CN115030745A (en) Inclined shaft steep slope thin-wall mid-partition wall construction trolley and construction method thereof
CN212742228U (en) Integrated safety protection platform for bent cap construction
CN209817458U (en) Platform of unloading
CN113944106A (en) Steel trestle bridge channel for upper bridge of land short pier bridge and construction method of steel trestle bridge channel
CN211735084U (en) Split type protective shed frame used during revolving type construction of box girder of viaduct for crossing railways
CN203822330U (en) Supporting system for subway station underground third floor middle plate pouring
CN112761072A (en) Construction method of deep foundation pit steel trestle ramp
CN114109416B (en) Method for replacing TBM main bearing in tunnel
CN218759027U (en) Stride modular protection canopy structure of existing public road steel construction bridge
CN212859947U (en) Annular quick cutting device for tunnel secondary lining concrete dismantling
CN213328635U (en) Rail-crossing trestle
CN218893953U (en) Urban and rural river bridge sectional overturning type metal guardrail structure

Legal Events

Date Code Title Description
FPAY Fee payment

Year of fee payment: 4

REMI Maintenance fee reminder mailed
FPAY Fee payment

Year of fee payment: 8

SULP Surcharge for late payment

Year of fee payment: 7

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20140115