US10763671B2 - Power management apparatus, power management system, power management method, and non-transitory storage medium - Google Patents
Power management apparatus, power management system, power management method, and non-transitory storage medium Download PDFInfo
- Publication number
- US10763671B2 US10763671B2 US15/531,049 US201515531049A US10763671B2 US 10763671 B2 US10763671 B2 US 10763671B2 US 201515531049 A US201515531049 A US 201515531049A US 10763671 B2 US10763671 B2 US 10763671B2
- Authority
- US
- United States
- Prior art keywords
- power
- timing
- unit
- predetermined
- storage system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related, expires
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H02J13/0006—
-
- H02J13/0079—
-
- H02J13/1337—
-
- H02J13/14—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/12—Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0212—Power saving arrangements in terminal devices managed by the network, e.g. network or access point is leader and terminal is follower
- H04W52/0216—Power saving arrangements in terminal devices managed by the network, e.g. network or access point is leader and terminal is follower using a pre-established activity schedule, e.g. traffic indication frame
-
- H02J2105/42—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
- H02J2310/14—The load or loads being home appliances
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/12—Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Definitions
- the present invention relates to a power management apparatus, a power management system, a power management method, and a program.
- Patent Document 1 discloses a technology for suppressing peaks of power low in a system configured by plural loads.
- an operation schedule of the plural loads is generated so that operation time periods of the plural loads are minimized to the necessary levels and overlapping operation time periods of the loads are minimized. Operations of the plural loads are controlled based on the operation schedule.
- Patent Document 1 by appropriately generating the operation schedule, it is possible to prevent inconvenience in which power (W) received from a commercial power supply to be consumed exceeds a predetermined threshold.
- the technology assumes that control is performed such that a sum of power consumption of the plural loads is equal to or less than a threshold of the power received from a commercial power supply and consumed. This assumption burdens users in some cases.
- An object of the invention is to provide a new technology for reducing inconvenience in which power (W) received from a commercial power supply to be consumed exceeds a predetermined threshold.
- a power management apparatus including: a load monitoring unit that specifies a timing, at which power consumption of a predetermined load present in a unit power network exceeds a predetermined value, before the timing; and a power storage system control unit that controls a power storage system supplying power into the unit power network to start power supply before the timing by a predetermined period of time.
- a power management system including: the power management apparatus; and a power storage system that supplies power into a unit power network.
- a power management method executed by a computer, the method including: a load monitoring step of specifying a timing, at which power consumption of a predetermined load present in a unit power network exceeds a predetermined value, before the timing; and a power storage system control step of controlling the power storage system supplying power into the unit power network to start power supply before the timing by a predetermined period of time.
- a program causing a computer to function as: a load monitoring unit that specifies a timing at which power consumption of a predetermined load present in a unit power network exceeds a predetermined value before the timing; and a power storage system control unit that controls a power storage system supplying power into the unit power network to start power supply before the timing by a predetermined period of time.
- FIG. 1 is a diagram conceptually illustrating an example of a hardware configuration of an apparatus according to an exemplary embodiment.
- FIG. 2 is a diagram illustrating an advantageous effect according to the exemplary embodiment.
- FIG. 3 is a diagram illustrating an advantageous effect according to the exemplary embodiment.
- FIG. 4 is a diagram illustrating an advantageous effect according to the exemplary embodiment.
- FIG. 5 is a diagram illustrating an example of an overall picture of a power management system according to the exemplary embodiment.
- FIG. 6 is an exemplary functional block diagram of a power management apparatus according to the exemplary embodiment.
- FIG. 7 is a diagram schematically illustrating an example of information retained by the power management apparatus according to the exemplary embodiment.
- FIG. 8 is a flowchart illustrating an example of the flow of a process of the power management apparatus according to the exemplary embodiment.
- FIG. 9 is an exemplary functional block diagram illustrating the power management apparatus according to the exemplary embodiment.
- FIG. 10 is a diagram schematically illustrating an example of information retained by the power management apparatus according to the exemplary embodiment.
- FIG. 11 is a flowchart illustrating an example of the flow of a process of the power management apparatus according to the exemplary embodiment.
- FIG. 12 is a flowchart illustrating an example of the flow of a process of the power management apparatus according to the exemplary embodiment.
- FIG. 13 is a diagram illustrating an example of a temporal change in power consumption of a predetermined load according to the exemplary embodiment.
- Each unit included in the apparatus according to the present exemplary embodiment is realized by any combination of hardware and software of any computer with a focus on a central processing unit (CPU), a memory, a program loaded on the memory (also including a program which is stored in the memory in advance when shipping out the apparatus and a program which is downloaded from a storage medium such as a compact disc (CD), or a server or the like on the Internet), a storage unit such as a hard disk which stores the program, and an interface for network connection.
- CPU central processing unit
- a memory also including a program which is stored in the memory in advance when shipping out the apparatus and a program which is downloaded from a storage medium such as a compact disc (CD), or a server or the like on the Internet
- CD compact disc
- server or the like a storage unit
- a storage unit such as a hard disk which stores the program
- FIG. 1 is a diagram conceptually illustrating an example of a hardware configuration of the apparatus according to the exemplary embodiment.
- the apparatus according to the exemplary embodiment includes, for example, a CPU 1 A, a random access memory (RAM) 2 A, a read-only memory (ROM) 3 A, a display control unit 4 A, a display 5 A, an operation reception unit 6 A, an operation unit 7 A, a communication unit 8 A, and an auxiliary storage device 9 A connected to each other through a bus 10 A.
- the apparatus may additionally include other elements such as input and output interfaces connected to external apparatuses in a wired manner, a microphone, and a speaker.
- the CPU 1 A controls each element and an entire computer of the apparatus.
- the ROM 3 A includes areas which store a program causing a computer to operate or various application program and various kinds of setting data used when such a program operates.
- the RAM 2 A includes an area which temporarily stores data, such as a work area in which a program operate.
- the auxiliary storage device 9 A is, for example, a hard disk drive (HDD) and can store large-volume data.
- the display 5 A is configured as, for example, a display device (for example, a light emitting diode (LED) display, a liquid crystal display, or an organic electroluminescence (EL) display).
- the display 5 A may be a touch panel display integrated with a touch pad.
- the display control unit 4 A reads data stored in a video RAM (VRAM), executes a predetermined process on the read data, and then transmits the data to the display 5 A to display various screens.
- the operation reception unit 6 A receives various operations through the operation unit 7 A.
- the operation unit 7 A includes an operation key, an operation button, a switch, a jog dial, a touch panel display, and a keyboard.
- the communication unit 8 A is connected to a network such as the Internet or a local area network (LAN) in a wired and/or wireless manner to communicate with other electrical apparatus.
- LAN local area network
- each apparatus is constituted by a single apparatus in the description, but realization methods are not limited thereto. That is, each apparatus may, of course, have a physically divided configuration or a logically divided configuration.
- the same reference numerals are given to the same constituent elements and the description thereof will not be appropriately repeated.
- the present inventor has examined a technology of reducing inconvenience in which power (W) received from a commercial power supply to be consumed exceeds a predetermined threshold (hereinafter referred to as a “commercial power supply threshold” in some cases) using a recently widespread power storage system.
- a commercial power supply threshold a predetermined threshold
- the power (W) received from a commercial power supply to be consumed is simply referred to as “power consumption from a commercial power supply” in some cases.
- total load power consumption a sum of power consumption (W) of plural loads (hereinafter referred to as “total load power consumption” in some cases) is equal to or less than a sum of a “commercial power supply threshold” and “a maximum output of a power storage system”, it is possible to prevent inconvenience in which power consumption from a commercial power supply exceeds a commercial power supply threshold.
- a maximum allowable value of total load power consumption can be set to be high. Therefore, it is possible to suppress occurrence of the inconvenience in which power consumption from a commercial power supply exceeds a commercial power supply threshold.
- the present inventor has newly found the following problem.
- a power amount (Wh) suppliable from a power storage system is finite. Therefore, it is desirable to restrict power supply from the power storage system at an unnecessary timing.
- a remaining amount of the power storage system may decrease to low at an earlier timing. As a result, an inconvenience may occur that at a timing when there is a risk of power consumption from the commercial power supply exceeding the commercial power supply threshold, the remaining amount becomes deficient and thus power may not be supplied from the power storage system.
- the present inventor has examined a technology for supplying power from a power storage system at an appropriate timing, not constantly supplying power. Specifically, the present inventor has examined a technology for supplying power from a power storage system while power consumption of a predetermined load (for example, power consumption is equal to or greater than a predetermined value) exceeds the predetermined value (for example, while a power supply is applied (a power supply is on)).
- a predetermined load for example, power consumption is equal to or greater than a predetermined value
- the power consumption of the load with the power consumption equal to or greater than the predetermined value occupies a large proportion of total load power consumption. Therefore, as illustrated in FIG. 2 , when a predetermined load is on (when the predetermined load is operated), there is a high possibility of the total load power consumption exceeding the commercial power supply threshold.
- the vertical axis of FIG. 2 represents a sum of power consumption of plural loads from a commercial power supply and the horizontal axis represents a time.
- a circled A indicates a timing at which the predetermined load is turned on and X indicates a commercial power supply threshold.
- the present inventor has examined a means for detecting excessive power consumption of a predetermined load over a predetermined value and starting power supply from a power storage system in response to the detection.
- power supply from the power storage system may not be readily available and a sum of the power consumption of the plural loads from the commercial power supply may exceed the commercial power supply threshold.
- t1 is assumed to be a period of time from a timing at which the predetermined load is turned on to a timing at which power consumption of the predetermined load becomes a predetermined value (w1).
- V1 a power consumption rising velocity of the predetermined load from the timing at which the predetermined load is turned on to the timing at which the power consumption becomes the predetermined value (w1) is expressed as w1/t1.
- t2 is assumed to a period of time from a timing at which power supply of the power storage system is started to a timing at which output power thereof becomes the predetermined value (w1).
- V2 an output power rising velocity of the power storage system from the timing at which the power supply is started to the timing at which the output power becomes the predetermined value (w1) is expressed as w1/t2.
- V2 ⁇ V1 is satisfied.
- power supply from the power storage system when power supply from the power storage system is started in response to the detection of the predetermined load being turned on, power supply from the power storage system may not be readily available and a sum of the power consumption of the plural loads from the commercial power supply exceeds the commercial power supply threshold X temporarily in some cases.
- the vertical axis, the horizontal axis, and information indicated by a circle A and X are the same as those of FIG. 2 .
- the vertical axis represents output power of the power storage system (that is, a sum of power consumption of the plural loads from the power storage system) and the horizontal axis represents a time.
- a circled A indicates a timing at which a predetermined load is turned on.
- a power management apparatus is configured to allow such inconvenience to be reduced.
- the power management apparatus specifies a timing, at which power consumption of a predetermined load exceeds a predetermined value (for example, a timing at which power is turned on), before the timing. Then, the power management apparatus according to the exemplary embodiment starts power supply from the power storage system a predetermined time before the timing.
- a predetermined value for example, a timing at which power is turned on
- the power management apparatus according to the exemplary embodiment starts power supply from the power storage system a predetermined time before the timing.
- the inconvenience in which the sum of the power consumption of the plural loads from the commercial power supply exceeds the commercial power supply threshold X is reduced. Note that the vertical axis, the horizontal axis, and information indicated by a circled A and X in FIG. 4 are the same as those of FIG. 3 .
- FIG. 4 power supply from the power storage system is started a predetermined period of time td before an ON timing A at which a predetermined load is turned on. Then, according to the power supply from the power storage system, power consumption from the commercial power supply is lowered (the upper side of FIG. 4 ). Therefore, even in a case where the predetermined load is turned on at the ON timing A and accordingly, power consumption from the commercial power supply increases, it is possible to reduce the inconvenience of the value of the commercial power supply after the increase exceeding threshold X.
- the power management system includes a power management apparatus 1 and a power storage system 2 .
- the power management system may further include at least one of a server 4 and a monitoring apparatus 6 .
- the power management apparatus 1 , the power storage system 2 , and the monitoring apparatus 6 are installed for each predetermined unit that consumes power (hereinafter, a “power consuming unit” in some cases).
- a housing unit for example, a single house unit, or each housing unit such as an apartment
- a facility unit for example, an apartment building unit, a building unit, a factory unit, a store unit, or an amusement facility unit
- a unit in which these units are segmented arbitrarily for example, one floor unit or a unit of plural floors of a building
- a group unit in which these units are combined arbitrarily for example, a collection unit in which plural apartments are collected
- FIG. 5 is a configuration diagram corresponding to one power consuming unit.
- a unit power network 100 is a dedicated power interconnect network installed for each power consuming unit. For example, an interior interconnect installed in each house or a premise interconnect installed in each facility corresponds to the unit power network 100 .
- the unit power network 100 is connected to a commercial power supply through a power reception point. Power is supplied from the commercial power supply to the unit power network 100 through the power reception point.
- the power storage system 2 is connected to the unit power network 100 . Therefore, power is supplied from the power storage system 2 to the unit power network 100 (discharge of the power storage system 2 ) or power is supplied from the unit power network 100 to the power storage system 2 (charge of the power storage system 2 ).
- the load 3 may be an electric household appliance such as an air conditioner, a refrigerator, or a television, may be a commercial product such as a commercial refrigerator or a commercial air conditioner, or a machine used in a factory. Power is supplied from the unit power network 100 to the load 3 to operate the load 3 . Note that power of a current flowing in the unit power network 100 may be supplied to operate at least one of the power management apparatus 1 , the power storage system 2 , and the monitoring apparatus 6 .
- the power management apparatus 1 , the power storage system 2 , and the monitoring apparatus 6 are communicably connected to each other through a communication network 200 configured in a wired and/or a wireless manner.
- the power management apparatus 1 , the power storage system 2 , the server 4 , and the monitoring apparatus 6 are communicably connected to each other through a network 5 such as the Internet. Further, at least some of the loads 3 may be allowed to communicate with the monitoring apparatus 6 in a wired and/or wireless manner.
- the monitoring apparatus 6 monitors a power consumption status in the power consuming unit. For example, the monitoring apparatus 6 communicates with a measurement sensor (not illustrated) installed near the power reception point and monitors an instantaneous value of total power consumption and/or a total consumption current in the power consuming unit.
- a measurement sensor not illustrated
- the monitoring apparatus 6 may monitor and control an operation state of each load 3 .
- the monitoring apparatus 6 may monitor whether each of the plural loads 3 is in a turn-on state or a turn-off state and may generate and store a use record indicating an operation state at each time.
- the monitoring apparatus 6 may monitor an operation mode (for example, a pause mode, an air-cooling (strong) mode, or an air-cooling (weak) mode) of the load 3 in operation as the operation state and may store the operation mode as a use record.
- the use record may be transmitted to the server 4 and the server 4 may store the use record.
- the use record may be stored in association with attributes (for example, a month, a day of week, a date, weather, temperature, and humidity) of the day.
- each load 3 There are various means for monitoring the operation state of each load 3 .
- a measurement sensor may be installed for each predetermined load 3 .
- the monitoring apparatus 6 may specify the operation state of each load based on an instantaneous value of power consumption and/or a consumption current of each load 3 acquired from the measurement sensor. For example, when the instantaneous value is equal to or greater than a predetermined value, the load 3 may be specified to be in a turn-on state. When the instantaneous value is less than the predetermined value, the load 3 may be specified to be in a turn-off state.
- a technology disclosed in Japanese Patent No. 3403368 may be used. In this technology, a feature value of measurement data of each of the plural loads 3 in operation may be retained in advance.
- the load 3 in operation at each point of time is specified by comparing a feature value extracted from the measurement data and feature values arbitrary combining feature values of the plural loads 3 .
- the monitoring apparatus 6 may specify the operation state of each load 3 at a current point of time by acquiring an instruction signal for changing the operation state which is input to each load 3 (for example, an instruction signal for turning on the power supply or an instruction signal for changing the operation mode to an “air-cooling (strong) mode”) from each load 3 .
- the monitoring apparatus 6 may control operation (turn ON/OFF the power supply) of each of the plural loads 3 . That is, the monitoring apparatus 6 may transmit an input of a power ON instruction and an input of a power OFF instruction to the load 3 through wired and/or wireless communication. Then, the load 3 may turn ON/OFF power based on the input of the power ON instruction and the input of the power OFF instruction received from the monitoring apparatus 6 .
- the power management apparatus 1 specifies a timing at which power consumption of the predetermined load 3 exceeds a predetermined value based on, for example, information acquired from at least one of the predetermined load 3 , the server 4 , and the monitoring apparatus 6 or information input from a user to the power management apparatus 1 . Then, the power management apparatus 1 controls the power storage system 2 to start power supply a predetermined time before the timing.
- the timing at which power the consumption of the predetermined load 3 exceeds the predetermined value will be described as a timing at which the predetermined load 3 is turned on (at timing at which a power supply is applied).
- the timing at which power the consumption of the predetermined load 3 exceeds the predetermined value is not limited thereto.
- the predetermined load 3 may select plural operation modes (for example, a pause mode, an air-cooling (strong) mode, and an air-cooling (weak) mode)
- a timing at which the predetermined load selects a predetermined operation mode for example, an air-cooling (strong) mode) out of these modes may be set as the timing at which the power consumption exceeds the predetermined value.
- FIG. 6 is an exemplary functional block diagram illustrating the power management apparatus 1 according to the exemplary embodiment.
- the power management apparatus 1 includes a load monitoring unit 10 and a power storage system control unit 20 .
- the load monitoring unit 10 specifies an ON timing, at which the predetermined load 3 present in the unit power network 100 is turned on, before the ON timing.
- the “predetermined load 3 present in the unit power network 100 ” means that the load 3 that is connected to the unit power network 100 and receives power from the unit power network 100 to operate.
- the “ON timing” is a timing at which the predetermined load 3 starts a normal operation (an operation for achieving a main purpose of the load 3 ) and start of a mode (a standby mode or the like) in which power consumption is less than that of a normal operation is not included in the ON timing.
- the predetermined load 3 is a part of the plural loads 3 present in the unit power network 100 .
- the number of predetermined loads 3 may be one or more.
- the predetermined load 3 may be a load of which power consumption is equal to or greater than a predetermined value.
- power consumption of the predetermined load 3 may be 1/10 or more, 1 ⁇ 5 or more, or 1 ⁇ 3 or more of a commercial power supply threshold.
- the “power consumption of the load 3 ” means power consumption (a representative value of the power consumption in a case in which a value thereof has a width) when the load 3 performs the normal operation (an operation for achieving a main purpose of the load 3 ) unless otherwise mentioned (the same applies below).
- the predetermined loads 3 may be a predetermined number of loads in the order from the largest power consumption among the plural loads 3 present in the unit power network 100 .
- the above-described power consumption rising velocity (V1) may be greater than the above-described output power rising velocity (V2) of the power storage system 2 .
- V1 and V2 are rising velocities of the power consumption and the output power reaching a predetermined value (wd) from 0.
- wd may be determined based on the power consumption of each load 3 .
- wd may be the maximum value of the power consumption potentially consumed by each load 3 immediately after power ON until a predetermined period of time elapses.
- wd may be power consumption when each load 3 performs the normal operation (an operation for achieving a main purpose of the load 3 ), the power consumption being a representative value of the power consumption in a case in which a value has a width.
- the load monitoring unit 10 may store identification information of the predetermined load 3 .
- wd corresponding to each load 3 may be associated with the identification information of the predetermined load 3 .
- the predetermined load 3 may start a preparation mode in which power consumption is less than that of a normal operation and transmit its own identification information and notification of turning on the power to the power management apparatus 1 or the monitoring apparatus 6 . Then, after a predetermined period of time T (seconds) elapses from the reception of the input, the predetermined load 3 may turn on the power to start the normal operation. In a case in which the notification is transmitted from the predetermined load 3 to the monitoring apparatus 6 , the monitoring apparatus 6 transfers the notification to the power management apparatus 1 .
- the load surveillance unit 10 specifies a point of time after the elapse of T ⁇ (seconds) from the reception of the notification as an ON timing at which the predetermined load 3 is turned on.
- ⁇ is any value and is determined in advance in consideration of a period of time during which the notification transmitted from the predetermined load 3 arrives at the load monitoring unit 10 and is processed in the load monitoring unit 10 .
- ⁇ is determined in advance for each predetermined load 3 and may be registered in the load monitoring unit 10 .
- the predetermined load 3 may transmit its own identification information and notification of turning off the power to the power management apparatus 1 or the monitoring apparatus 6 . Then, the predetermined load 3 may subsequently turn off the power. In a case in which the notification is transmitted from the predetermined load 3 to the monitoring apparatus 6 , the monitoring apparatus 6 transfers the notification to the power management apparatus 1 . In this case, based on the notification, the power management apparatus 1 may specify an approximate OFF timing at which the predetermined load 3 is turned off.
- the server 4 for example, a cloud server
- the monitoring apparatus 6 may specify an operation pattern of the predetermined load 3 and generate the operation schedule of the predetermined load 3 , the operation schedule determining at least an ON timing (time) at which the power is turned on and further possibly, an OFF timing (time). Then, based on the operation schedule, the monitoring apparatus 6 may control operation (ON/OFF of power) of the predetermined load 3 .
- the load monitoring unit 10 may acquire the operation schedule of the predetermined load 3 and determine an ON timing (time) at which the predetermined load 3 is turned on and/or an OFF timing (time) based on the operation schedule.
- Some power consumers use the predetermined load 3 always at a fixed time.
- the load 3 such as an air conditioner or a television at a fixed time such as a time immediately after waking up, or returning home and turn off the load 3 at a fixed time such as bedtime or a time at which a user leaves home for work every day.
- a facility such as a factory, there may be power consumers that turn on the load 3 such as a machine a predetermined period of time before a starting time and turn off the load 3 at a finishing time every day.
- the server 4 or the monitoring apparatus 6 may specify the above-described use pattern (a period of time during which each load 3 is turned on and a period of time during which h each load 3 is turned off) and generate an operation schedule for operating the load 3 according to the use pattern. For example, plural past results may be analyzed to specify a period of time during which each load 3 is operated with a predetermined probability (for example, 7 days/10 days) or more. An operation schedule for operating the load 3 during the specified period of time may be generated.
- the use pattern may be changed according to an attribute such as the month, day of the week, weather, season, temperature, or humidity.
- the server 4 or the monitoring apparatus 6 may specify the use pattern for each combination of predetermined attributes.
- the plural past records may be grouped according to attributes and analyzed for each group, and a period of time during which each load 3 is operated with the predetermined probability (for example, 7 days/10 days) or more may be specified.
- an operation schedule in which the load 3 is operated during the specified period of time may be generated.
- the monitoring apparatus 6 extracts the operation schedule which matches the attributes of the day and controls an operation of the load 3 based on the operation schedule.
- the load monitoring unit 10 may specify an ON timing (time) and/or an OFF timing (time) of the predetermined load 3 based on the extracted operation schedule.
- a user may generate an operation schedule of each load 3 in advance and input the operation schedule to at least one of each load 3 , the monitoring apparatus 6 , and the power management apparatus 1 . Then, each load 3 may operate based on the operation schedule. Alternatively, based on the operation schedule, the monitoring apparatus 6 may control an operation of each load 3 . In this case, the power management apparatus 1 may acquire the operation schedule of the predetermined load 3 and specify an ON timing (time) at which the predetermined load 3 is turned on and/or an OFF timing (time) based on the operation schedule.
- a setting temperature of a room, in which the air conditioner is installed at a predetermined period of time is determined in advance (for example, 20° C. at 7:00) and an operation schedule (at least, an ON timing (time) at which power is turned on) of the air conditioner may be determined based on the setting temperature and a temperature of the room in which the air conditioner is installed. Then, the load 3 may be controlled to be turned on/off based on the operation schedule. Technologies related thereto are disclosed in, for example, Japanese Translation of PCT International Application Publication No. 2014-503878, Japanese Translation of PCT International Application Publication No. 2014-501970, and Japanese Translation of PCT International Application Publication No. 2014-507018.
- the load monitoring unit 10 can acquire an operation schedule indicating the On timing or the OFF timing from the system and specify an ON timing (time) at which the predetermined load 3 is turned on and/or an OFF timing (time) based on the operation schedule.
- the timing can be specified before the timing in accordance with the foregoing method.
- the power storage system control unit 20 controls the power storage system 2 supplying power into the unit power network 100 to start power supply the predetermined period of time td before the ON timing specified by the load monitoring unit 10 .
- the predetermined period of time td may be a fixed value which is determined in advance. In this case, whichever predetermined load 3 is turned on, power supply from the power storage system 2 is started the same predetermined period of time td before the ON timing.
- the predetermined period of time td may be determined based on, for example, characteristics of the power storage system 2 . For example, a period of time from when power supply is started to when the power reaches a maximum output of the power storage system 2 or the period of time+ ⁇ (any margin time) may be set as the predetermined period of time td.
- the predetermined period of time td may be registered in advance in the power storage system control unit 20 . When the predetermined period of time td is determined in this way, an output of the power storage system 2 can reach the maximum output between the start of the supply of the power and the ON timing (during the period of time td).
- the predetermined period of time td is, for example, any value equal to or less than 500 milliseconds (the same applies to the following exemplary embodiments).
- the predetermined period of time td may be changed according to the characteristics of the predetermined load 3 of which the power is turned on.
- the change of the predetermined period of time td will be described in the following exemplary embodiment.
- the power storage system control unit 20 may control the power storage system 2 to continue power supply.
- the load monitoring unit 10 may specifies an OFF timing, as described above.
- the power storage system control unit 20 may stop power supply from the power storage system 2 according to the specification of the OFF timing by the load monitoring unit 10 .
- the load monitoring unit 10 monitors the ON timing at which the predetermined load 3 is turned on (S 30 ). Then, the load monitoring unit 10 specifies the ON timing before the ON timing (S 31 ).
- the power storage system control unit 20 controls the power storage system 2 to start power supply from the power storage system 2 the predetermined period of time td before the ON timing (S 32 ).
- power supply from the power storage system 2 can be started the predetermined period of time td before a timing (for example, a timing at which power is turned on) at which the power consumption of the predetermined load 3 exceeds a predetermined value. That is, power consumption from the power storage system 2 can be increased before the timing and power consumption from the commercial power supply can be kept low.
- a timing for example, a timing at which power is turned on
- the exemplary embodiment provides a function of changing the predetermined period of time td for advancing the start of power supply from the power storage system 2 , according to changed power consumption of the predetermined load 3 of which power consumption exceeds a predetermined value (for example, power consumption of the predetermined load 3 after power is turned on).
- a predetermined value for example, power consumption of the predetermined load 3 after power is turned on.
- a timing at which power consumption of the predetermined load 3 exceeds a predetermined value is a timing at which the predetermined load 3 is turned on (a timing at which a power supply is applied) will be described as an example. Note that even in a case in which the timing at which the power consumption of the predetermined load 3 exceeds the predetermined value is another timing other than the timing described in the first exemplary embodiment, the same advantageous effects can be realized in accordance with the same method as the method to be described below.
- FIG. 9 is an exemplary functional block diagram illustrating the power management apparatus 1 according to the exemplary embodiment.
- the power management apparatus 1 includes a load monitoring unit 10 and a power storage system control unit 20 .
- the power storage system control unit 20 includes a specification unit 21 , a determination unit 22 , and a control unit 23 .
- the load monitoring unit 10 specifies the ON timing and specifies the predetermined load 3 which is turned on.
- the load monitoring unit 10 may specify the ON timing in accordance with the method described in the first exemplary embodiment. For example, based on the identification information of the load 3 included in notification acquired from the predetermined load 3 , the load monitoring unit 10 may specify the predetermined load 3 which is turned on. As another example, the load monitoring unit 10 may specify the predetermined load 3 which is turned on, by specifying the ON timing based on the operation schedule of each predetermined load 3 .
- the specification unit 21 specifies power consumption of the predetermined load 3 which is turned on.
- the specification unit 21 acquires information (for example, identification information) for specifying the predetermined load 3 which is turned on, from the load monitoring unit 10 .
- wd associated with the predetermined load 3 is specified as the power consumption described above by referring to the information illustrated in FIG. 7 described in the first exemplary embodiment.
- the information may be information in which power consumption of each of plural possible operation modes of each load 3 is associated with each load 3 .
- the determination unit 22 determines the predetermined period of time td based on the power consumption (wd) specified by the specification unit 21 .
- the determination unit 22 may determine a period of time from when the power storage system 2 starts power supply to when the power reaches the power consumption (wd) specified by the specification unit 21 or this period of time+ ⁇ (any allowance time) as the predetermined period of time td.
- the predetermined period of time td is determined in this way, the output of the power storage system 2 can reach the power consumption (wd) specified by the specification unit 21 between the start of the power supply and the ON timing (during the period of time td). Note that, in this case, the larger power consumption (wd) the specification unit 21 specifies, the longer predetermined period of time the determination unit 22 determines.
- the determination unit 22 may retain association information associating the power consumption (wd) with the predetermined period of time td.
- An example of the association information is illustrated in FIG. 10 .
- the determination unit 22 may extract the predetermined period of time td associated with the power consumption (wd) specified by the specification unit 21 .
- the determination unit 22 may retain a function of calculating the predetermined period of time td from the power consumption (wd) and determine the predetermined period of time td using the function.
- control unit 23 controls the power storage system 2 to start power supply the predetermined period of time td before the ON timing specified by the load monitoring unit 10 , the predetermined period of time td being determined by the determination unit 22 .
- the load monitoring unit 10 monitors the ON timing at which the predetermined load 3 is turned on (S 10 ). Then, the load monitoring unit 10 specifies the predetermined load 3 which is turned on and the ON timing before the ON timing (S 11 ).
- the specification unit 21 specifies the power consumption (wd) of the predetermined load 3 which is turned on (S 12 ). Thereafter, the determination unit 22 determines the predetermined period of time td based on the power consumption (wd) specified by the specification unit 21 (S 13 ).
- control unit 23 controls the power storage system 2 to start power supply the predetermined period of time td before the ON timing specified by the load monitoring unit 10 , the predetermined period of time td being determined by the determination unit 22 (S 14 ).
- the predetermined period of time td for advancing the start of power supply from the power storage system 2 according to changed power consumption of the predetermined load 3 of which power consumption exceeds the predetermined value (for example, power consumption of the predetermined load 3 after power is turned on).
- the period of time from when the power storage system 2 starts the power supply to when power reaches the power consumption (wd) specified by the specification unit 21 or this period of time+ ⁇ can be determined as the predetermined period of time td.
- the output of the power storage system 2 can reach the power consumption (the predetermined value wd) specified by the specification unit 21 between the start of the power supply and the ON timing (during the period of time td). Therefore, it is possible to reduce the inconvenience in which the sum of the power consumption of the plural loads 3 from the commercial power supply exceeds the commercial power supply threshold X. Since the output from the power storage system 2 is not started unnecessarily early, it is possible to suppress unnecessary discharge from the power storage system 2 .
- the power management apparatus 1 determines whether a sum of a power instantaneous value of the unit power network 100 at that point of time and changed power consumption of the predetermined load 3 exceeds a predetermined threshold.
- the sum exceeds the predetermined threshold
- power supply from the power storage system 2 is started the predetermined period of time td before a timing at which the power consumption exceeds a predetermined value, as described in the first and second exemplary embodiments.
- the sum does not exceed the predetermined threshold, power supply from the power storage system 2 is not executed.
- the other remaining configuration is the same as that of the first exemplary embodiment.
- FIG. 6 or 9 An exemplary functional block diagram of the power management apparatus 1 according to the exemplary embodiment is illustrated in FIG. 6 or 9 as in the first and second exemplary embodiments.
- the power storage system control unit 20 determines whether the sum of the instantaneous value of the power consumption in the unit power network 100 and the power consumption of the predetermined load 3 which is turned on exceeds the predetermined threshold.
- the instantaneous value of the power consumption in the unit power network 100 is an instantaneous value a predetermined period of time (for example, 30 seconds, 15 seconds, 5 seconds, or 3 seconds) before the ON timing.
- the power storage system control unit 20 acquires information for specifying the predetermined load 3 which is turned on and the ON timing from the load monitoring unit 10 . Then, referring to the information illustrated in FIG. 7 , the power storage system control unit 20 specifies the power consumption (wd) of the predetermined load 3 which is turned on.
- the power storage system control unit 20 specifies the instantaneous value of the power consumption in the unit power network 100 .
- the instantaneous value may be specified based on information acquired from a measurement sensor installed near the power reception point, the monitoring apparatus 6 , or the like.
- the power storage system control unit 20 determines whether the sum of the instantaneous value and the power consumption (wd) of the predetermined load 3 which is turned on exceeds a predetermined threshold (for example, the commercial power supply threshold X).
- a predetermined threshold for example, the commercial power supply threshold X.
- the power supply from the power storage system 2 is started the predetermined period of time td before the ON timing based on the processes described in the first and second exemplary embodiments.
- the power supply from the power storage system 2 is not executed.
- the load monitoring unit 10 monitors the ON timing at which the predetermined load 3 is turned on (S 20 ). Then, the load monitoring unit 10 specifies the predetermined load 3 which is turned on and the ON timing, before the ON timing (S 21 ).
- the power storage system control unit 20 specifies the power consumption (wd) of the predetermined load 3 which is turned on (S 22 ).
- the power storage system control unit 20 specifies the instantaneous value of the power consumption of the unit power network 100 (S 23 ). Note that the processing order of S 22 and S 23 may be reversed.
- the power storage system control unit 20 determines whether the sum of the instantaneous value and the power consumption (wd) of the predetermined load 3 which is turned on exceeds the predetermined threshold (for example, the commercial power supply threshold X) (S 24 ).
- the process returns to S 20 and the load monitoring unit 10 continues to monitor the ON timing.
- the power storage system control unit 20 determines the predetermined period of time td based on the power consumption (wd) specified in S 22 (S 25 ).
- the power storage system control unit 20 controls the power storage system 2 to start power supply the predetermined period of time td determined in S 25 before the ON timing specified by the load monitoring unit 10 (S 26 ).
- S 25 may be omitted and a process may be performed in S 26 using the predetermined period of time td (fixed value) determined commonly to all the predetermined loads 3 .
- the timing at which the power consumption of the predetermined load 3 exceeds the predetermined value is the timing at which the predetermined load 3 is turned on (the timing at which a power supply is applied) has been described as an example.
- the timing at which the power consumption of the predetermined load 3 exceeds the predetermined value may be another timing other than the timing described in the first exemplary embodiment, the same advantageous effects can be realized in accordance with the same method.
- FIG. 6 or 9 An exemplary functional block diagram according to the exemplary embodiment is illustrated in FIG. 6 or 9 .
- the load monitoring unit 10 specifies an ON timing of each of the plural predetermined loads 3 before the ON timing.
- the other remaining configuration of the load monitoring unit 10 is the same as that of the first to third exemplary embodiment.
- the power storage system control unit 20 performs the same process as that of the first to third exemplary embodiment. In this case, the power storage system control unit 20 performs a process (S 32 of FIG. 8 , S 12 to S 14 of FIG. 11 , or S 22 to S 26 of FIG. 12 ) of starting power supply from the power storage system 2 according to the specification of the ON timing of the certain predetermined load 3 .
- the power storage system control unit 20 continues the power supply from the power storage system 2 .
- the power storage system control unit 20 does not perform a process (S 32 of FIG. 8 , S 12 to S 14 of FIG. 11 , or S 22 to S 26 of FIG. 12 ) of starting power supply from the power storage system 2 according to the specification of the ON timing of the certain predetermined load 3 .
- the power storage system control unit 20 may stop the power supply from the power storage system 2 .
- the power storage system control unit 20 performs a process of stopping the power supply from the power storage system 2 according to the specification of the OFF timing of the certain predetermined load 3 .
- the power storage system control unit 20 may continue the power supply from the power storage system 2 . In this case, the power storage system control unit 20 does not perform the process of stopping the power supply from the power storage system 2 according to the specification of the OFF timing of the certain predetermined load 3 .
- the same advantageous effects as those of the first to third exemplary embodiments can be realized. Even in a case in which there are plural predetermined loads 3 , it is possible to appropriately control the power storage system 2 and reduce inconvenience in which the sum of the power consumption from the commercial power supply exceeds the commercial power supply threshold X. It is possible to suppress unnecessary discharge from the power storage system 2 .
- a timing at which the power consumption of the predetermined load 3 exceeds the predetermined value is a timing at which the predetermined load 3 is turned on (a timing at which a power supply is applied) is described as an example. Even in a case in which the timing at which the power consumption of the predetermined load 3 exceeds the predetermined value is another timing other than the timing described in the first exemplary embodiment, the same advantageous effects can be realized in accordance with the same method as the method to be described below.
- a power management apparatus including:
- a load monitoring unit that specifies a timing, at which power consumption of a predetermined load present in a unit power network exceeds a predetermined value, before the timing;
- a power storage system control unit that controls a power storage system supplying power into the unit power network to start power supply before the timing by a predetermined period of time.
- the power storage system control unit includes
- a specification unit that specifies power consumption or a consumption current of the predetermined load
- a determination unit that determines the predetermined period of time based on the power consumption or the consumption current specified by the specification unit
- control unit that controls the power storage system to start power supply before the timing by the predetermined period of time.
- the determination unit determines a period of time corresponding to the power consumption or the consumption current specified by the specification unit as the predetermined period of time by referring to association information associating a period of time with the power consumption or the consumption current.
- the power storage system control unit controls the power storage system to start power supply before the timing by the predetermined period of time in a case in which a sum of an instantaneous value of power consumption or a consumption current in the unit power network and the power consumption or the consumption current of the predetermined load exceeds a predetermined threshold.
- the predetermined period of time is equal to or less than 500 milliseconds.
- timing is a timing at which power of the predetermined load is applied.
- a power management system including:
- a power storage system that supplies power into a unit power network.
- a power management method executed by a computer including:
- controlling the power storage system to start power supply before the timing by the predetermined period of time.
- step of determining a period of time corresponding to the power consumption or the consumption current specified by the step of specifying is determined as the predetermined period of time by referring to association information associating a period of time with the power consumption or the consumption current.
- the power storage system is controlled to start power supply before the timing by the predetermined period of time in a case in which a sum of an instantaneous value of power consumption or a consumption current in the unit power network and the power consumption or the consumption current of the predetermined load exceeds a predetermined threshold.
- the predetermined period of time is equal to or less than 500 milliseconds.
- timing is a timing at which power of the predetermined load is applied.
- a program causing a computer to function as:
- a load monitoring unit that specifies a timing, at which power consumption of a predetermined load present in a unit power network exceeds a predetermined value, before the timing;
- a power storage system control unit that controls the power storage system supplying power into the unit power network to start power supply before the timing by a predetermined period of time.
- a specification unit that specifies power consumption or a consumption current of the predetermined load
- a determination unit that determines the predetermined period of time based on the power consumption or the consumption current specified by the specification unit
- control unit that controls the power storage system to start power supply before the timing by the predetermined period of time.
- the program causes the determination unit to determine a period of time corresponding to the power consumption or the consumption current specified by the specification unit as the predetermined period of time by referring to association information associating a period of time with the power consumption or the consumption current.
- the program causes the power storage system control unit to control the power storage system to start power supply before the timing by the predetermined period of time in a case in which a sum of an instantaneous value of power consumption or a consumption current in the unit power network and the power consumption or the consumption current of the predetermined load exceeds a predetermined threshold.
- the predetermined period of time is equal to or less than 500 milliseconds.
- timing is a timing at which power of the predetermined load is applied.
- a monitoring apparatus that detects a timing at which power consumption exceeds a predetermined value and transmits the timing to a power management apparatus controlling a power storage system.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Tourism & Hospitality (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Computer Networks & Wireless Communication (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Signal Processing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
- [Patent Document 1] Japanese Patent Application Publication No. 2002-79295
- [Patent Document 2] Japanese Patent No. 3403368
- [Patent Document 3] Japanese Translation of PCT International Application Publication No. 2014-503878
- [Patent Document 4] Japanese Translation of PCT International Application Publication No. 2014-501970
- [Patent Document 5] Japanese Translation of PCT International Application Publication No. 2014-507018
Claims (7)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014-241720 | 2014-11-28 | ||
| JP2014241720 | 2014-11-28 | ||
| PCT/JP2015/083250 WO2016084903A1 (en) | 2014-11-28 | 2015-11-26 | Electric power management device, electric power management system, electric power management method, and program |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| US20180309295A1 US20180309295A1 (en) | 2018-10-25 |
| US10763671B2 true US10763671B2 (en) | 2020-09-01 |
Family
ID=56074453
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/531,049 Expired - Fee Related US10763671B2 (en) | 2014-11-28 | 2015-11-26 | Power management apparatus, power management system, power management method, and non-transitory storage medium |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US10763671B2 (en) |
| JP (1) | JP6677168B2 (en) |
| WO (1) | WO2016084903A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20220194250A1 (en) * | 2020-12-22 | 2022-06-23 | Toyota Jidosha Kabushiki Kaisha | Server and power management method |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107910862B (en) * | 2016-10-20 | 2019-10-08 | 广东电网有限责任公司电力调度控制中心 | Synchronous phasor measurement unit Optimal Configuration Method and system |
| JP6960798B2 (en) * | 2017-08-10 | 2021-11-05 | 清水建設株式会社 | Operation management system and operation management method |
| CN107609661A (en) * | 2017-10-30 | 2018-01-19 | 海南电网有限责任公司信息通信分公司 | Electric power first-aid class dispatches and workform management system, emergency first-aid repair maneuvering platform |
| CN109447840A (en) * | 2018-09-30 | 2019-03-08 | 国网天津市电力公司电力科学研究院 | A kind of determination method of cogeneration units in heat supply period electric load adjustable extent |
| US11490023B2 (en) * | 2020-10-30 | 2022-11-01 | Ford Global Technologies, Llc | Systems and methods for mitigating light-emitting diode (LED) imaging artifacts in an imaging system of a vehicle |
Citations (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002079295A (en) | 2000-09-07 | 2002-03-19 | Toshiba Corp | Livestock excrement disposal system |
| JP3403368B2 (en) | 1999-02-01 | 2003-05-06 | 財団法人電力中央研究所 | Electrical equipment monitoring system and abnormal operation alarm system |
| JP2006067644A (en) | 2004-08-24 | 2006-03-09 | Denso Corp | Dual power supply vehicle power supply device |
| WO2012014474A1 (en) | 2010-07-28 | 2012-02-02 | パナソニック株式会社 | Power supply system, power supply system control device, power supply system operation method and power supply system control method |
| US20120046798A1 (en) * | 2010-08-19 | 2012-02-23 | Heat Assured Systems, Llc | Systems and Methods for Power Demand Management |
| US20120059527A1 (en) * | 2008-11-05 | 2012-03-08 | GreenSmith Energy Management Systems, L.L.C. | Distributed Energy Storage System, and Applications Thereof |
| US20130079937A1 (en) * | 2011-09-26 | 2013-03-28 | Hideyuki Aisu | Power demand and supply scheduling apparatus |
| JP2013143838A (en) | 2012-01-11 | 2013-07-22 | Sanyo Electric Co Ltd | Charge/discharge controller |
| WO2013128731A1 (en) | 2012-02-27 | 2013-09-06 | 株式会社 日立製作所 | Independent power supply system |
| JP2014501970A (en) | 2010-11-19 | 2014-01-23 | ネスト ラブス, インコーポレイテッド | Method and system for exchanging data between a networked thermostat and a cloud-based management server |
| JP2014503878A (en) | 2010-12-31 | 2014-02-13 | ネスト ラブス, インコーポレイテッド | Flexible functional partitioning within an intelligent thermostatically controlled HVAC system |
| JP2014507018A (en) | 2010-11-19 | 2014-03-20 | ネスト ラブス, インコーポレイテッド | User friendly interface for control unit |
| US20150372538A1 (en) * | 2014-06-21 | 2015-12-24 | Microsoft Corporation | Controlled concurrent utilization of multiple power supplies |
| JP2016042360A (en) | 2014-08-15 | 2016-03-31 | 光寶電子(廣州)有限公司 | Power supply arrangement system, power supply arrangement method, and computer readable recording medium |
| JP2016042780A (en) | 2014-08-15 | 2016-03-31 | 光寶電子(廣州)有限公司 | Uninterruptible power supply system, uninterruptible power supply method, and recording medium |
| US20160154716A1 (en) * | 2013-12-31 | 2016-06-02 | Lite-On, Inc. | Power supply failover system and method |
| US9698597B1 (en) * | 2012-11-14 | 2017-07-04 | Atmel Corporation | Adjustable power and system efficiency maximizing scheme using micro-controllers |
-
2015
- 2015-11-26 US US15/531,049 patent/US10763671B2/en not_active Expired - Fee Related
- 2015-11-26 JP JP2016561947A patent/JP6677168B2/en active Active
- 2015-11-26 WO PCT/JP2015/083250 patent/WO2016084903A1/en not_active Ceased
Patent Citations (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3403368B2 (en) | 1999-02-01 | 2003-05-06 | 財団法人電力中央研究所 | Electrical equipment monitoring system and abnormal operation alarm system |
| JP2002079295A (en) | 2000-09-07 | 2002-03-19 | Toshiba Corp | Livestock excrement disposal system |
| JP2006067644A (en) | 2004-08-24 | 2006-03-09 | Denso Corp | Dual power supply vehicle power supply device |
| US20060058897A1 (en) * | 2004-08-24 | 2006-03-16 | Denso Corporation | On-vehicle power supplying apparatus with two power supplies |
| US20120059527A1 (en) * | 2008-11-05 | 2012-03-08 | GreenSmith Energy Management Systems, L.L.C. | Distributed Energy Storage System, and Applications Thereof |
| US20130127249A1 (en) | 2010-07-28 | 2013-05-23 | Panasonic Corporation | Power Supply System, Controller of Power Supply System, Method of Operating Power Supply System, and Method of Controlling Power Supply System |
| WO2012014474A1 (en) | 2010-07-28 | 2012-02-02 | パナソニック株式会社 | Power supply system, power supply system control device, power supply system operation method and power supply system control method |
| US20120046798A1 (en) * | 2010-08-19 | 2012-02-23 | Heat Assured Systems, Llc | Systems and Methods for Power Demand Management |
| JP2014507018A (en) | 2010-11-19 | 2014-03-20 | ネスト ラブス, インコーポレイテッド | User friendly interface for control unit |
| JP2014501970A (en) | 2010-11-19 | 2014-01-23 | ネスト ラブス, インコーポレイテッド | Method and system for exchanging data between a networked thermostat and a cloud-based management server |
| JP2014503878A (en) | 2010-12-31 | 2014-02-13 | ネスト ラブス, インコーポレイテッド | Flexible functional partitioning within an intelligent thermostatically controlled HVAC system |
| US20130079937A1 (en) * | 2011-09-26 | 2013-03-28 | Hideyuki Aisu | Power demand and supply scheduling apparatus |
| JP2013143838A (en) | 2012-01-11 | 2013-07-22 | Sanyo Electric Co Ltd | Charge/discharge controller |
| WO2013128731A1 (en) | 2012-02-27 | 2013-09-06 | 株式会社 日立製作所 | Independent power supply system |
| US9698597B1 (en) * | 2012-11-14 | 2017-07-04 | Atmel Corporation | Adjustable power and system efficiency maximizing scheme using micro-controllers |
| US20160154716A1 (en) * | 2013-12-31 | 2016-06-02 | Lite-On, Inc. | Power supply failover system and method |
| US20150372538A1 (en) * | 2014-06-21 | 2015-12-24 | Microsoft Corporation | Controlled concurrent utilization of multiple power supplies |
| JP2016042360A (en) | 2014-08-15 | 2016-03-31 | 光寶電子(廣州)有限公司 | Power supply arrangement system, power supply arrangement method, and computer readable recording medium |
| JP2016042780A (en) | 2014-08-15 | 2016-03-31 | 光寶電子(廣州)有限公司 | Uninterruptible power supply system, uninterruptible power supply method, and recording medium |
Non-Patent Citations (2)
| Title |
|---|
| Decision to Grant a Patent dated Feb. 12, 2020, by the Japanese Patent Office in counterpart Japanese Patent Application No. JP 2016-561947. |
| Japanese Office Action issued by the Japanese Patent Office in counterpart Japanese Patent Application No. 2016-561947, dated Oct. 29, 2019. |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20220194250A1 (en) * | 2020-12-22 | 2022-06-23 | Toyota Jidosha Kabushiki Kaisha | Server and power management method |
| US12024043B2 (en) * | 2020-12-22 | 2024-07-02 | Toyota Jidosha Kabushiki Kaisha | Server and power management method |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2016084903A1 (en) | 2016-06-02 |
| US20180309295A1 (en) | 2018-10-25 |
| JP6677168B2 (en) | 2020-04-08 |
| JPWO2016084903A1 (en) | 2017-09-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10763671B2 (en) | Power management apparatus, power management system, power management method, and non-transitory storage medium | |
| KR102572697B1 (en) | Apparatus and method for power management of a system comprising a plurality of device | |
| JP5834252B2 (en) | Energy management device, program | |
| EP3099017B1 (en) | A method and a device for controlling a smart home power supply | |
| CN107340014A (en) | Detection method, device and the computer-readable recording medium of multisensor | |
| US20210222899A1 (en) | Method and device for controlling electric heating of air conditioner compressor | |
| US11353232B2 (en) | Control method, control apparatus, and non-transitory computer-readable storage medium for storing program | |
| CN103941871A (en) | Method and equipment for controlling hardware operating state of intelligent terminal | |
| JP2013066268A (en) | Household energy management apparatus and household energy management system | |
| WO2016155552A1 (en) | Information pushing method and apparatus based on smart home system | |
| US9727104B2 (en) | Various PSUs adaptive server and method | |
| WO2014128901A1 (en) | Power source control guidance device, power source control guidance method, and power source control guidance program | |
| JP5264821B2 (en) | Electrical device management apparatus, electrical device management system, electrical device management method, and program | |
| KR20210074919A (en) | Sever and method for controlling the thereof | |
| KR20120111210A (en) | System and method for controlling standby power | |
| WO2016180199A1 (en) | Home appliance control method and apparatus, wireless router apparatus, and home appliance | |
| US20180004542A1 (en) | Electronic device and half-suspend controlling method applied therein | |
| JP6161723B2 (en) | Controller, energy management system, power equipment, energy management method, and program | |
| CN108141396B (en) | Home automation system equipment power optimization | |
| JP6631870B2 (en) | Power management system, power management device, power management method, and program | |
| CN114980289B (en) | Use method of router equipment, router equipment and system | |
| CN108844183A (en) | Energy-saving control method and device and household appliance | |
| KR101902387B1 (en) | System and method for controlling standby power using pattern analysis on consumption of power | |
| JP2014064190A (en) | Management device, apparatus control system, management method, management program, and recording medium | |
| JPWO2017006518A1 (en) | Device control system and program |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: NEC CORPORATION, JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:FUKUNAGA, MASAJIRO;REEL/FRAME:042514/0357 Effective date: 20170414 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
|
| ZAAA | Notice of allowance and fees due |
Free format text: ORIGINAL CODE: NOA |
|
| ZAAB | Notice of allowance mailed |
Free format text: ORIGINAL CODE: MN/=. |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT RECEIVED |
|
| STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
| FEPP | Fee payment procedure |
Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
| LAPS | Lapse for failure to pay maintenance fees |
Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
| STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
| FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20240901 |