Methods and apparatuses for constructing a concrete structure Download PDFInfo
- Publication number
- US10557264B2 US10557264B2 US16/031,871 US201816031871A US10557264B2 US 10557264 B2 US10557264 B2 US 10557264B2 US 201816031871 A US201816031871 A US 201816031871A US 10557264 B2 US10557264 B2 US 10557264B2
- Authority
- US
- United States
- Prior art keywords
- floor section
- cast
- post
- perimeter
- stage composite
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/43—Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/29—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
- E04C3/293—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
- E04C5/06—Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
- E04C5/0645—Shear reinforcements, e.g. shearheads for floor slabs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
- E04B5/38—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/08—Members specially adapted to be used in prestressed constructions
- E04C5/10—Ducts
Definitions
- Natural gas is becoming a greater and greater share of the U.S. energy supply due to advances in hydraulic fracking. Natural gas is generally sent through a pipeline to a terminal, where it is compressed to liquefied natural gas (LNG) before loading it into tanks for transport.
- LNG liquefied natural gas
- This terminal generally includes a platform to support four to seven compressors, each of which weighs several tons. Due to the increased supply of natural gas, additional terminals are needed to process the supply. However, the terminals are presently constructed by pouring concrete in place for all of the structure, which can take on the order of six months.
- a structure includes a pre-cast concrete component having at least one post-tensioning duct, a post-tensioning tendon extending through the post-tensioning duct, and a poured in place concrete body disposed above and coupled to the pre-cast concrete component.
- the structure has isotropic load-bearing strengths.
- the pre-cast concrete component is a column. In some implementations, the pre-cast concrete component is a cap disposed on a top of a column.
- the pre-cast concrete component is a floor section that is coupled to a cap disposed on top of a column.
- the poured in place concrete body is directly coupled to a floor section by one or more reinforcement members that extend through at least a portion of the floor section and into the poured in place concrete body.
- the floor section has a perimeter
- the cap has a support member that includes an alignment projection that extends upwardly from a portion of an upper surface of the support member.
- the alignment projection has an outer perimeter
- the upper surface of the support member has an outer perimeter.
- the poured in place concrete body comprises a first stage composite pour and a second stage composite pour.
- the first stage composite pour is coupled to a portion of the perimeter of the floor section, the outer perimeter of the alignment projection, and a portion of the upper surface of the support member.
- the second stage composite pour is coupled to the first stage composite pour and an upper surface of the floor section.
- the floor section includes the plurality of reinforcement members extending from the upper surface of the floor section, and the plurality of reinforcement members are coupled to the second stage composite pour.
- the poured in place concrete body is directly coupled to the pre-cast component by one or more reinforcement members that extend through at least a portion of the pre-cast component and into the poured in place concrete body.
- the pre-cast concrete component is a floor section.
- the poured in place concrete body defines one or more apertures that extend through the concrete body.
- Other various implementations include a method for making a structure including: (1) providing a plurality of pre-cast concrete columns, (2) placing a pre-cast concrete column cap on each of the columns, (3) placing a floor section with a post-tensioning duct on a support member of each column cap, (4) tensioning a post-tensioning tendon running through a post-tensioning duct, and (5) pouring a poured in place concrete body on the floor sections. At least one of the floor sections comprises the post-tensioning duct.
- the poured in place concrete body defines a plurality of apertures that extend through the concrete body.
- the floor sections are pre-cast concrete floor sections.
- At least one column cap includes a post-tensioning duct
- the method further includes tensioning a second post-tensioning tendon running through the post-tensioning duct in the column cap.
- the post-tensioning tendon and the second post-tensioning tendon are arranged perpendicularly to each other as viewed from an upper surface of the floor section and column cap.
- a structure in various implementations, includes a pre-cast concrete column, a pre-cast concrete cap disposed above a top surface of the column, the pre-cast concrete cap including at least one post-tensioning duct, a pre-cast concrete floor section that is disposed above the pre-cast concrete cap, a post-tensioning tendon extending through the post-tensioning duct, and a poured in place concrete body disposed on the floor section.
- the poured in place concrete body defines one or more apertures that extend through the concrete body.
- the cap is disposed on the top surface of the column, and the floor section is disposed on the cap.
- FIGS. 1-8 illustrate a process for making a concrete structure according to one implementation.
- FIG. 9 illustrates several views of a column and a column cap according to the implementation shown in FIGS. 2-8 .
- FIGS. 10 and 11 illustrate perspective views of the column cap with floor sections stacked thereon according to the implementation shown in FIGS. 3-8 .
- FIG. 12 illustrates a top view of the floor sections supported by the column cap according to the implementation shown in FIGS. 3-8 .
- FIGS. 13 and 14 show side views of the floor sections supported by the column cap according to the implementation shown in FIGS. 3-8 .
- FIG. 15 shows a perspective cutaway view of the floor sections supported by the column cap according to the implementation shown in FIGS. 3-8 .
- FIG. 16 shows close up side section views of the floor sections supported by the column cap according to the implementation shown in FIGS. 3-8 .
- FIG. 17 illustrates a top view of the floor sections according to the implementation shown in FIGS. 3-8 .
- FIG. 18 illustrates a cross-sectional view of a portion of the concrete structure according to the implementation shown in FIG. 17 as viewed from the 1-1 line.
- FIG. 19 illustrates a cross-sectional view of a portion of the concrete structure with vertical rods according to the implementation shown in FIG. 17 as viewed from the 2-2 line.
- FIG. 20 illustrates a cross-sectional view of a portion of the concrete structure according to the implementation shown in FIG. 17 as viewed from the 3-3 line.
- FIG. 21 illustrates a cross-sectional view of the concrete structure according to the implementation shown in FIG. 17 as viewed from the 4-4 line.
- FIG. 22 illustrates a cross-sectional view of the concrete structure according to the implementation shown in FIG. 17 as viewed from the 5-5 line.
- FIG. 23 illustrates a cross-sectional view of a portion of the concrete structure with vertical rods according to the implementation shown in FIG. 17 as viewed from the 6-6 line.
- FIG. 24 illustrates a close-up view of a joint between two floor sections according to the implementation shown in FIG. 17 as viewed from detail view 7 .
- FIG. 25 illustrates a close-up view of a portion of the concrete structure with vertical rods according to the implementation shown in FIG. 17 as viewed from detail 8 .
- FIG. 26 illustrates a top view of a portion of the concrete structure according to the implementation shown in FIGS. 6-8 .
- FIG. 27 illustrates a side view of a portion of the concrete structure according to the implementation shown in FIG. 26 .
- FIGS. 28A-E illustrate cross-sectional and detail views of portions of the concrete structure according to the implementation shown in FIGS. 26 and 27 .
- FIGS. 29A-C illustrate cross-sectional and detail views of portions of the concrete structure according to the implementation shown in FIGS. 26 and 27 .
- FIGS. 30A-F illustrate cross-sectional and detail views of portions of the concrete structure according to the implementation shown in FIGS. 26 and 27 .
- FIGS. 1-8 show example process steps for constructing a structure 10 according to one implementation, and FIGS. 9-27 illustrate details of each component and how the components are coupled together according to various implementations.
- FIG. 8 shows the final structure 10 according to one implementation.
- Structure 10 includes columns 20 to support a main body 50 .
- the main body 50 supports one or more compressors used to compress the LNG, according to some implementations.
- Main body 50 defines one or more apertures 52 A, 52 B, and 52 C. These apertures allow pipes (not shown) to access the compressors from below the main body 50 .
- These pipes may link the compressors to each other, as the compression is done in stages.
- the pipes may also connect to storage tanks to pull off components of the natural gas that liquefy during a particular compression stage.
- the compression process compresses the natural gas from approximately 5-20 psi to approximately 1,700 psi.
- Natural gas is mostly methane, but does include other hydrocarbons.
- the two left-most compressors on the first section 12 of the main body 50 need three apertures to provide the piping necessary for their compression stage, while the other four compressors to be disposed on the second section 14 and the third section 16 only need two apertures.
- other implementations may include any number of stages and access apertures.
- FIG. 1 shows that the first step includes placing columns 20 .
- the columns 20 in FIGS. 1-9 are shown as having a rectangular cross-sectional shape, but in other implementations, the columns can have any suitable cross sectional shape (e.g., circular, ovular, hexagonal, or other suitable closed shape).
- the columns 20 are coupled to the foundation 11 (e.g., as shown in FIGS. 1-8 and 27-28B ), to another vertically adjacent column 20 (e.g., as shown in FIGS. 28C-28D ), or directly to the ground (not shown).
- the columns 20 coupled to the foundation 11 (or ground) are horizontally spaced apart from each other in an array.
- the columns 20 are aligned in adjacent rows and columns. However, in other implementations, the columns in one row may be offset from the columns in adjacent rows.
- Example columns 20 are shown in FIGS. 9-11, 13-16, 18-23, and 25 and are described below.
- FIG. 2 Column caps 30 are then placed on the columns as shown in FIG. 2 .
- the column caps 30 in FIGS. 1-9 are shown as having a rectangular cross sectional shape, but in other implementations, the column caps can also have any suitable cross sectional shape (e.g., circular, ovular, hexagonal, or other suitable closed shape).
- FIG. 9 shows a column 20 and column cap 30 in greater detail.
- FIGS. 11-20 and 23-24 also show details of the column cap 30 , which are described below.
- FIG. 3 shows side sections 42 and floor sections 40 placed on the column caps 20 .
- the side sections 42 are disposed adjacent at least one perimeter edge of the floor section 40 as shown in FIGS. 20-22 .
- FIGS. 9-24, 27, and 30B-30F show details of the floor sections 40 and side sections 42 , which are described below.
- FIG. 4 shows the side sections 42 and floor sections 40 assembled for the first third 12 of the structure 10 .
- the floor sections 40 define two or more apertures, such as apertures 52 A, 52 B, and 52 C.
- FIG. 5 concrete is then poured to create the main body 50 for the first third 12 of the structure 10 . These pours may be done incrementally, for example breaking each third of the structure into five pours each, as shown in FIGS. 5 and 7 .
- FIGS. 6 and 7 show the middle 14 and final third 16 of the structure 10 being constructed in a similar manner as the first third 12 .
- FIG. 8 shows the completed structure 10 .
- FIGS. 9-16 show additional details of the pre-cast components 20 , 30 , 40 and 42 .
- Columns 20 include steel reinforcement members 22 that extend between the foundation 11 and the column 20 and/or stacked columns 20 , as shown in FIGS. 27-28E .
- each column cap 30 includes steel reinforcement members 36 , which are shown in FIG. 13 .
- each column cap 30 also includes a support member 32 and an alignment projection 34 .
- the alignment projection 34 extends upwardly from a portion of an upper surface 33 of the support member 32 .
- the alignment projection 34 has an outer perimeter 37 that is spaced inwardly from an outer perimeter 31 of the upper surface 33 of the support member 32 .
- alignment projection 34 has four corner protrusions 34 a that extend horizontally and in a diagonal direction from each corner of the projection 34 .
- the floor sections 40 are continuous pre-cast concrete slabs. When assembled, at least two opposite and spaced apart edges of the lower surface 43 of the floor section 40 abut respective support portions 32 a of the support members 32 of adjacent column caps 30 .
- the respective support portion 32 a is defined between the outer perimeter 37 of the alignment projection 34 and the outer perimeter 31 of the upper surface 33 of the respective support member 32 .
- the outer perimeters 37 of the alignment projections 34 are adjacent to the perimeter 41 of the floor section 40 .
- the alignment projections 34 lock the floor sections 40 into place (e.g., prevent horizontal shifting of the floor sections 40 ) between two or more column caps 30 prior to pouring the main body 50 and provide rigid support (e.g., more thickness as measured in a vertical direction) to the support members 32 .
- the rigid support provided by the alignment projections 34 allows for thinner support members 32 , which provides more clearance for pipes and equipment below the column caps 30 .
- the diagonal shape of the corner projections 34 a extending from the alignment projections 34 provide additional rigid support to the corners of the support members 32 and are less likely to interfere with any reinforcements protruding from adjacent floor sections 40 .
- FIG. 15 shows a perspective view of a single column cap 30 with multiple floor sections 40 supported by support member 32 and aligned by alignment projection 34
- FIG. 16 shows a side cross sectional view of two of the floor sections 40 being supported by support member 32 .
- each floor section defines a central opening having a perimeter, and the perimeter of the central opening is greater than the outer perimeter 37 of the alignment projection 34 but less than the outer perimeter 31 of the upper surface 33 of the support member 32 .
- the portion of the support member 32 between the outer perimeter 37 of the alignment projection 34 and the outer perimeter 31 of the upper surface 33 of the support member 32 abuts a portion of the lower surface of the floor section that is stacked onto the upper surface 33 of the support member 32 of the column cap 30 , and the alignment projection 34 of the column cap 30 extends into the central opening.
- the alignment projections 34 serve the purpose of locking the floor sections into place on the column caps 30 prior to pouring the main body 50 .
- the alignment projections 34 provide rigid support to the support members 32 , which allows for thinner support members 32 and more clearance for pipes and equipment below the column caps 30 .
- FIGS. 1-20 and 23 show column 20 with lower surfaces 43 of each floor section 40 abutting column caps 30 or 30 ′.
- a column 20 is supporting an edge of a floor section 40 along the outer edge of the structure 10 .
- no column cap 30 or 30 ′ is used.
- the column 20 is taller than the columns 20 with column caps and the lower surface 43 of the floor section 40 directly abuts the column 20 instead of a cap 30 or 30 ′, as shown in FIGS. 21 and 22 .
- the columns along the outer edges of the structure may have the same height as the columns inward of the edges, but the top portion of the inward columns are embedded in a portion of the cap such that the upper surface of the cap on which the floor section rests is level with the top of the columns at the edges.
- Each floor section 40 may also include steel reinforcement members 44 that extend through at least a portion of the floor section 40 and out of an upper surface of the floor section 40 , as shown in FIG. 15 .
- Horizontally adjacent floor sections 40 are coupled to each other.
- Various implementations for coupling the floor sections 40 to the caps 30 ′ and each other and to the main body 50 are described below in relation to FIGS. 17-30 .
- Pre-cast and/or pre-stressed column caps 30 ′ are erected on either pre-cast or cast in place concrete columns 20 .
- the caps 30 ′ are fastened to the column using vertical rods 35 (see, e.g., FIG. 23 ) that extend from the column 20 , through the column cap 30 ′, and into a form for pouring the main body 50 such that the vertical rods 35 extend into the main body 50 .
- Pre-cast and/or pre-stressed floor sections 40 are erected on the previously placed column caps 30 ′ (see, e.g., FIGS. 1-17, 18, 26 and 27 ).
- the perimeters 46 of floor sections 40 (or central opening in the floor section 40 ), the upper surface 33 of the support portion 32 , and the surfaces of the alignment projection 34 of the cap 30 define a volume for receiving a first stage composite pour 48 .
- the first stage composite pour 48 in one implementation comprises a cementitious material such as concrete or grout.
- an advancing bar connector and grouted joint 49 is established between the edges of adjacent floor sections 40 , which allows for a mild flexural reinforcement across floor sections 40 .
- the grouted joint 49 comprises a cementitious grout material, according to one implementation.
- column caps 30 are spaced apart from each other.
- column caps 30 ′ are elongated such that an edge of each column cap 30 ′ abuts an edge of the horizontally adjacent column caps 30 ′ in one direction, forming a continuous line of column caps 30 ′.
- FIGS. 17 and 24 show detailed views of the column cap 30 ′ to column cap 30 ′ finger joint 38 that transfers force between horizontally adjacent column caps 30 ′. Both shear and moment are transferred between the column caps 30 ′ using grout only in the finger joint 38 . No special connectors are required. As is described above in relation to FIGS. 1-16 , portions of the lower surface 43 of the floor sections 40 that are adjacent the outer perimeter of the floor section 40 abut the upper surface 33 of the support members 32 of the column caps 30 ′.
- Post-tensioning ducts 60 (see, e.g., FIGS. 18, 23, and 26 ) cast into the column caps 30 ′ and the floor sections 40 form a two-directional grid of connected ducts 60 to receive post-tensioning tendons 61 .
- the ducts 60 in the column caps 30 ′ and the ducts 60 in the floor sections 40 are arranged perpendicularly to each other as viewed from the upper surfaces of the floor section 40 and the cap 30 ′, as shown in FIGS. 11 and 12 .
- the post tensioning tendons 61 extend from a side section 42 on one side of the structure 10 , through contiguously aligned post-tensioning ducts 60 in the floor sections 40 and column caps 30 ′, to a side section 42 on an opposite side of the structure 10 .
- the two way grid of post-tensioning tendons 61 are stressed.
- the stressing of the tendons 61 places all joints between elements into a compressed condition. This state of biaxial compression overcomes any tendency for these joints to go into a tensile condition and favorable structural performance under static and vibratory loading.
- the first composite pour 48 is poured as described above and then a second stage composite pour 51 of concrete is poured onto the first composite pour 48 and the upper surface of the floor section 40 between side sections 42 .
- this second stage concrete pour 51 covers the ends of rods 35 and steel reinforcement members 44 , which are embedded in the main body 50 (see FIG. 23 ).
- a plug apparatus 53 (See FIGS. 29A-C ) is disposed in the space where each aperture is to be defined during the pour and removed after the concrete is dry enough to hold its molded shape.
- the plug apparatus 53 includes at least one sidewall that forms the inner side(s) of each aperture.
- the at least one sidewall forms the shape of each aperture 52 A, 52 B, 52 C, and the shape of the outer perimeter of the at least one sidewall is maintained by one or more pipes that extend between inner surfaces of opposite sides of the at least one sidewall.
- the plug apparatuses shown in FIGS. 29A and 29B each have four side walls, and pipes 53 a extend between two opposite sidewalls 53 b , 53 c .
- the plug apparatus may be a hollow cylinder having one sidewall, and one or more pipes extend between inner surfaces of the hollow cylinder.
- the plug apparatuses 53 act as braces within the apertures 52 A, 52 B, 52 C to provide stability of the structure prior to and during erection and during the second stage composite concrete pour 51 of the main body 50 .
- Other apparatuses for defining the apertures during pouring may also be used and are within the scope of the claims.
- pre-cast components typically are not isotropic, pre-cast components have not been used to support these types of compressors before.
- Typical pre-cast components can support four to five times the load in a primary direction as opposed to the load that can be borne in secondary directions.
- pre-cast bridge components typically can support four to five times as much load in the traffic direction as compared to the transverse direction.
- the disclosed composite structure can support approximately the same load in all directions. Because the gross cross-sectional properties in each orthogonal direction are the same and the general spacing of support columns are relatively the same, the structure disclosed herein allows for equal capacity in each direction (i.e.
- the composite structure provides relatively the same amount of reinforcement in both orthogonal directions.
- the combination of reinforced pre-cast components with a partial poured in place body creates a composite structure that has the isotropic properties to support the compressors and can be constructed using much less time and labor than conventional poured in place structures.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (19)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/031,871 US10557264B2 (en) | 2017-07-10 | 2018-07-10 | Methods and apparatuses for constructing a concrete structure |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201762530319P | 2017-07-10 | 2017-07-10 | |
US16/031,871 US10557264B2 (en) | 2017-07-10 | 2018-07-10 | Methods and apparatuses for constructing a concrete structure |
Publications (2)
Publication Number | Publication Date |
---|---|
US20190010695A1 US20190010695A1 (en) | 2019-01-10 |
US10557264B2 true US10557264B2 (en) | 2020-02-11 |
Family
ID=64904088
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/031,871 Active US10557264B2 (en) | 2017-07-10 | 2018-07-10 | Methods and apparatuses for constructing a concrete structure |
Country Status (4)
Country | Link |
---|---|
US (1) | US10557264B2 (en) |
CA (1) | CA3029226A1 (en) |
MX (1) | MX2019000165A (en) |
WO (1) | WO2019014256A1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20200123768A1 (en) * | 2016-12-21 | 2020-04-23 | Electricite De France | Permanent Concrete Formwork And Method For Manufacturing A Metal-Concrete Composite Structure Using Such A Formwork |
US10876282B1 (en) * | 2019-09-21 | 2020-12-29 | Qingdao university of technology | Fabricated limiting-reinforced steel-wood frosted sleeve composite joint |
US10907343B1 (en) * | 2019-02-27 | 2021-02-02 | Qingdao university of technology | Prefabricated steel-wood composite joint |
US10914061B1 (en) * | 2019-09-04 | 2021-02-09 | Qingdao university of technology | Assembled slab steel-wood composite joint and assembly method thereof |
US11072925B2 (en) * | 2018-12-12 | 2021-07-27 | Dalian University Of Technology | Rapid construction method for flush assembly of the prefabricated steel beam and the floor slab |
US20230407636A1 (en) * | 2022-06-16 | 2023-12-21 | ICF Building Systems LLC | Concrete form systems, devices, and related methods |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10513858B2 (en) * | 2014-07-31 | 2019-12-24 | Pgpi—Marcas E Patentes, S.A | Construction process of structures with empty segments and construction system of structures with empty segments |
WO2022094007A1 (en) * | 2020-11-02 | 2022-05-05 | Tindall Corporation | Apparatuses and methods for constructing a concrete structure using precast concrete components |
CN113789898B (en) * | 2021-09-28 | 2022-11-11 | 中能建西北城市建设有限公司 | Construction method of large-span slow-bonding prestressed floor slab |
US20240044134A1 (en) * | 2022-08-04 | 2024-02-08 | Tate Access Floors, Inc. | Service access floor panel |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US915421A (en) * | 1908-07-06 | 1909-03-16 | Theodore Augustus Eisen | Construction of buildings. |
US3613325A (en) * | 1969-07-10 | 1971-10-19 | Yee Alfred A | Concrete construction |
US3918222A (en) * | 1974-06-03 | 1975-11-11 | Bahram Bahramian | Prefabricated modular flooring and roofing system |
US4081935A (en) * | 1976-07-26 | 1978-04-04 | Johns-Manville Corporation | Building structure utilizing precast concrete elements |
US4505087A (en) * | 1983-03-14 | 1985-03-19 | U.S. Filigree Wideslab, Inc. | Method of construction of concrete decks with haunched supporting beams |
US5161340A (en) * | 1988-08-09 | 1992-11-10 | Pce Group Holdings Limited, A British Company | Precast concrete structures |
US5390464A (en) * | 1992-09-18 | 1995-02-21 | West; Mark | Method of forming a concrete column capital in a standard flat plate concrete slab |
US5507124A (en) * | 1991-09-17 | 1996-04-16 | The Board Of Regents Of The University | Concrete framing system |
US5809712A (en) * | 1996-06-06 | 1998-09-22 | Simanjuntak; Johan Hasiholan | System for joining precast concrete columns and slabs |
US8800229B2 (en) | 2007-06-22 | 2014-08-12 | Diversakore Holdings, Llc | Framing structure |
US20160230386A1 (en) * | 2015-02-10 | 2016-08-11 | Tindall Corporation | Method and apparatus for constructing a concrete structure |
US20170159294A1 (en) | 2014-07-09 | 2017-06-08 | Elastic Potential ,S.L | Pillar for supporting a modular structure, beam intended to be supported on pillars of this type, and structure comprising said pillars and beams |
US9683361B2 (en) * | 2013-05-08 | 2017-06-20 | Kt-India, Llc | Method and system for rapid construction of structurally reinforced concrete structures using prefabricated assemblies and method of making the same |
US10094101B1 (en) * | 2017-12-29 | 2018-10-09 | Mohammad Omar A. Jazzar | Precast concrete system with rapid assembly formwork |
US10106973B1 (en) * | 2017-03-30 | 2018-10-23 | Nandy Sarda | Precast concrete building elements and assemblies thereof, and related methods |
-
2018
- 2018-07-10 MX MX2019000165A patent/MX2019000165A/en unknown
- 2018-07-10 US US16/031,871 patent/US10557264B2/en active Active
- 2018-07-10 CA CA3029226A patent/CA3029226A1/en active Pending
- 2018-07-10 WO PCT/US2018/041493 patent/WO2019014256A1/en active Application Filing
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US915421A (en) * | 1908-07-06 | 1909-03-16 | Theodore Augustus Eisen | Construction of buildings. |
US3613325A (en) * | 1969-07-10 | 1971-10-19 | Yee Alfred A | Concrete construction |
US3918222A (en) * | 1974-06-03 | 1975-11-11 | Bahram Bahramian | Prefabricated modular flooring and roofing system |
US4081935A (en) * | 1976-07-26 | 1978-04-04 | Johns-Manville Corporation | Building structure utilizing precast concrete elements |
US4505087A (en) * | 1983-03-14 | 1985-03-19 | U.S. Filigree Wideslab, Inc. | Method of construction of concrete decks with haunched supporting beams |
US5161340A (en) * | 1988-08-09 | 1992-11-10 | Pce Group Holdings Limited, A British Company | Precast concrete structures |
US5507124A (en) * | 1991-09-17 | 1996-04-16 | The Board Of Regents Of The University | Concrete framing system |
US5390464A (en) * | 1992-09-18 | 1995-02-21 | West; Mark | Method of forming a concrete column capital in a standard flat plate concrete slab |
US5809712A (en) * | 1996-06-06 | 1998-09-22 | Simanjuntak; Johan Hasiholan | System for joining precast concrete columns and slabs |
US8800229B2 (en) | 2007-06-22 | 2014-08-12 | Diversakore Holdings, Llc | Framing structure |
US9683361B2 (en) * | 2013-05-08 | 2017-06-20 | Kt-India, Llc | Method and system for rapid construction of structurally reinforced concrete structures using prefabricated assemblies and method of making the same |
US20170159294A1 (en) | 2014-07-09 | 2017-06-08 | Elastic Potential ,S.L | Pillar for supporting a modular structure, beam intended to be supported on pillars of this type, and structure comprising said pillars and beams |
US20160230386A1 (en) * | 2015-02-10 | 2016-08-11 | Tindall Corporation | Method and apparatus for constructing a concrete structure |
US10106973B1 (en) * | 2017-03-30 | 2018-10-23 | Nandy Sarda | Precast concrete building elements and assemblies thereof, and related methods |
US10094101B1 (en) * | 2017-12-29 | 2018-10-09 | Mohammad Omar A. Jazzar | Precast concrete system with rapid assembly formwork |
Non-Patent Citations (1)
Title |
---|
International Search Report and Written Opinion issued for Application No. PCT/US2018/041493, dated Oct. 30, 2018. |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20200123768A1 (en) * | 2016-12-21 | 2020-04-23 | Electricite De France | Permanent Concrete Formwork And Method For Manufacturing A Metal-Concrete Composite Structure Using Such A Formwork |
US11072925B2 (en) * | 2018-12-12 | 2021-07-27 | Dalian University Of Technology | Rapid construction method for flush assembly of the prefabricated steel beam and the floor slab |
US10907343B1 (en) * | 2019-02-27 | 2021-02-02 | Qingdao university of technology | Prefabricated steel-wood composite joint |
US10914061B1 (en) * | 2019-09-04 | 2021-02-09 | Qingdao university of technology | Assembled slab steel-wood composite joint and assembly method thereof |
US10876282B1 (en) * | 2019-09-21 | 2020-12-29 | Qingdao university of technology | Fabricated limiting-reinforced steel-wood frosted sleeve composite joint |
US20230407636A1 (en) * | 2022-06-16 | 2023-12-21 | ICF Building Systems LLC | Concrete form systems, devices, and related methods |
Also Published As
Publication number | Publication date |
---|---|
CA3029226A1 (en) | 2019-01-10 |
MX2019000165A (en) | 2019-06-20 |
WO2019014256A1 (en) | 2019-01-17 |
US20190010695A1 (en) | 2019-01-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10557264B2 (en) | Methods and apparatuses for constructing a concrete structure | |
US10518440B2 (en) | Pre-stressed box culvert and methods for assembly thereof | |
US20210180310A1 (en) | Building construction system with split precast horizontal floor supports | |
US8341788B2 (en) | Method for constructing precast coping for bridge | |
JP2018505981A (en) | PC truss wall structure and construction method thereof | |
KR101440434B1 (en) | Construction Method for Composite Type Rahmen Bridge | |
KR100924746B1 (en) | Method for constructing precast coping by using multi-step tensioning | |
US20160230386A1 (en) | Method and apparatus for constructing a concrete structure | |
CA2331237C (en) | Partially prefabricated waffle slab | |
US3209510A (en) | Method of constructing a column or frame | |
KR101013235B1 (en) | Manufacturing method of rainwater storage bath | |
JP2005097946A (en) | Construction method of bridge pier | |
KR100911148B1 (en) | Lightened Coping for bridge | |
WO2020132266A1 (en) | Methods and apparatuses for constructing a concrete structure | |
CN114215091A (en) | Prefabricated UHPC bearing platform template and construction method thereof | |
KR20140125754A (en) | Bridge construction method for forming continuous point part of pier using copping for connecting girder | |
JP2004324164A (en) | Method of constructing corrugated steel web pc bridge closure section | |
KR102244268B1 (en) | Composite girder with concrete girders at both ends and manufacturing method there of for civil structure | |
KR101518433B1 (en) | The water-storage tank of assembly type | |
KR100622449B1 (en) | Hybrid pier and continuity execution method using the hybrid pier | |
CN214738731U (en) | Assembled corrugated steel shed tunnel and shed tunnel building | |
JPH05306526A (en) | Precast concrete block base for unit type building | |
CN210049464U (en) | Superposed beam | |
JP2659329B2 (en) | Construction method of PC structure | |
JPS63272862A (en) | Formwork support for executing arch concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FEPP | Fee payment procedure |
Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
AS | Assignment |
Owner name: TINDALL CORPORATION, SOUTH CAROLINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ZAVITZ, BRYANT;KIRKLEY, KEVIN;REEL/FRAME:046889/0738 Effective date: 20180326 |
|
AS | Assignment |
Owner name: TINDALL CORPORATION, SOUTH CAROLINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ZAVITZ, BRYANT;KIRKLEY, KEVIN;REEL/FRAME:047818/0811 Effective date: 20181218 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 4 |