WO2020132266A1 - Methods and apparatuses for constructing a concrete structure - Google Patents

Methods and apparatuses for constructing a concrete structure Download PDF

Info

Publication number
WO2020132266A1
WO2020132266A1 PCT/US2019/067517 US2019067517W WO2020132266A1 WO 2020132266 A1 WO2020132266 A1 WO 2020132266A1 US 2019067517 W US2019067517 W US 2019067517W WO 2020132266 A1 WO2020132266 A1 WO 2020132266A1
Authority
WO
WIPO (PCT)
Prior art keywords
column
structure according
floor section
cast
cap
Prior art date
Application number
PCT/US2019/067517
Other languages
French (fr)
Inventor
Bryant ZAVITZ
Kevin KIRKLEY
Original Assignee
Tindall Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tindall Corporation filed Critical Tindall Corporation
Publication of WO2020132266A1 publication Critical patent/WO2020132266A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/22Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material with parts being prestressed
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/43Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0645Shear reinforcements, e.g. shearheads for floor slabs

Definitions

  • Natural gas is becoming a greater and greater share of the U.S. energy supply due to advances in hydraulic fracking. Natural gas is generally sent through a pipeline to a terminal, where it is compressed to liquefied natural gas (LNG) before loading it into tanks for transport.
  • LNG liquefied natural gas
  • This terminal generally includes a platform to support four to seven compressors, each of which weighs several tons. Due to the increased supply of natural gas, additional terminals are needed to process the supply. However, the terminals are presently constructed by pouring concrete in place for all of the structure, which can take on the order of six months.
  • a structure includes a pre-cast concrete component having at least one post-tensioning duct, a post-tensioning tendon extending through the post-tensioning duct, and a poured in place concrete body disposed above and coupled to the pre-cast concrete component.
  • the structure has isotropic load-bearing strengths.
  • the pre-cast concrete component is a column. In some implementations, the pre-cast concrete component is a cap disposed on a top of a column.
  • the pre-cast concrete component is a floor section that is coupled to a cap disposed on top of a column.
  • the poured in place concrete body is directly coupled to a floor section by one or more reinforcement members that extend through at least a portion of the floor section and into the poured in place concrete body.
  • the floor section has a perimeter
  • the cap has a support member that includes an alignment projection that extends upwardly from a portion of an upper surface of the support member.
  • the alignment projection has an outer perimeter
  • the upper surface of the support member has an outer perimeter.
  • the poured in place concrete body comprises a first stage composite pour and a second stage composite pour.
  • the first stage composite pour is coupled to a portion of the perimeter of the floor section, the outer perimeter of the alignment projection, and a portion of the upper surface of the support member.
  • the second stage composite pour is coupled to the first stage composite pour and an upper surface of the floor section.
  • the floor section includes the plurality of reinforcement members extending from the upper surface of the floor section, and the plurality of reinforcement members are coupled to the second stage composite pour.
  • the poured in place concrete body is directly coupled to the pre-cast component by one or more reinforcement members that extend through at least a portion of the pre cast component and into the poured in place concrete body.
  • the pre-cast concrete component is a floor section.
  • the poured in place concrete body defines one or more apertures that extend through the concrete body.
  • Other various implementations include a method for making a structure including: (1) providing a plurality of pre-cast concrete columns, (2) placing a pre-cast concrete column cap on each of the columns, (3) placing a floor section with a post-tensioning duct on a support member of each column cap, (4) tensioning a post-tensioning tendon running through a post-tensioning duct, and (5) pouring a poured in place concrete body on the floor sections. At least one of the floor sections comprises the post-tensioning duct.
  • the poured in place concrete body defines a plurality of apertures that extend through the concrete body.
  • the floor sections are pre-cast concrete floor sections.
  • At least one column cap includes a post-tensioning duct
  • the method further includes tensioning a second post-tensioning tendon running through the post tensioning duct in the column cap.
  • the post-tensioning tendon and the second post-tensioning tendon are arranged perpendicularly to each other as viewed from an upper surface of the floor section and column cap.
  • a structure in various implementations, includes a pre-cast concrete column, a pre-cast concrete cap disposed above a top surface of the column, a pre-cast concrete floor section that is disposed above the pre-cast concrete cap, a post-tensioning tendon extending through the post tensioning duct, and a poured in place concrete body disposed on the floor section.
  • the pre-cast concrete cap includes at least one post-tensioning duct.
  • the poured in place concrete body defines one or more apertures that extend through the concrete body.
  • the cap is disposed on the top surface of the column, the floor section is disposed on the cap, and the poured in place concrete body is disposed on the floor section.
  • the column has a first end, a second end opposite and spaced apart from the first end, and a central axis extending between the first end and the second end.
  • the first end defines an opening extending axially toward the second end.
  • the opening extends to the second end.
  • the structure further includes a poured in place concrete portion disposed within the opening.
  • the volume of the opening defined by the column is 1/4 to 3/4 of the total of the volume of the pre-cast column and the volume of the opening.
  • the volume of the opening defined by the column is 2/3 of the total volume of the pre-cast column and the volume of the opening.
  • the floor section includes two or more hangar brackets.
  • Each of the two or more hanger brackets has a first portion and a second portion opposite and spaced apart from the first portion of the hanger bracket.
  • the first portion of each of the two or more hanger brackets is coupled to an upper surface of the floor section, and the second portion of the two or more hanger brackets extends from a perimeter of the floor section.
  • the second portion of each of the two or more hanger brackets is disposed on an upper surface of the cap.
  • FIGS. 1-8 illustrate a process for making a concrete structure according to one
  • FIG. 9 illustrates several views of a column and a column cap according to the
  • FIGS. 10 and 11 illustrate perspective views of the column cap with floor sections stacked thereon according to the implementation shown in FIGS. 3-8.
  • FIG. 12 illustrates a top view of the floor sections supported by the column cap according to the implementation shown in FIGS. 3-8.
  • FIGS. 13 and 14 show side views of the floor sections supported by the column cap according to the implementation shown in FIGS. 3-8.
  • FIG. 15 shows a perspective cutaway view of the floor sections supported by the column cap according to the implementation shown in FIGS. 3-8.
  • FIG. 16 shows close up side section views of the floor sections supported by the column cap according to the implementation shown in FIGS. 3-8.
  • FIG. 17 illustrates a top view of the floor sections according to the implementation shown in FIGS. 3-8.
  • FIG. 18 illustrates a cross-sectional view of a portion of the concrete structure according to the implementation shown in FIG. 17 as viewed from the 1-1 line.
  • FIG. 19 illustrates a cross-sectional view of a portion of the concrete structure with vertical rods according to the implementation shown in FIG. 17 as viewed from the 2-2 line.
  • FIG. 20 illustrates a cross-sectional view of a portion of the concrete structure according to the implementation shown in FIG. 17 as viewed from the 3-3 line.
  • FIG. 21 illustrates a cross-sectional view of the concrete structure according to the implementation shown in FIG. 17 as viewed from the 4-4 line.
  • FIG. 22 illustrates a cross-sectional view of the concrete structure according to the implementation shown in FIG. 17 as viewed from the 5-5 line.
  • FIG. 23 illustrates a cross-sectional view of a portion of the concrete structure with vertical rods according to the implementation shown in FIG. 17 as viewed from the 6-6 line.
  • FIG. 24 illustrates a close-up view of a joint between two floor sections according to the implementation shown in FIG. 17 as viewed from detail view 7.
  • FIG. 25 illustrates a close-up view of a portion of the concrete structure with vertical rods according to the implementation shown in FIG. 17 as viewed from detail 8.
  • FIG. 26 illustrates a top view of a portion of the concrete structure according to the implementation shown in FIGS. 6-8.
  • FIG. 27 illustrates a side view of a portion of the concrete structure according to the implementation shown in FIG. 26.
  • FIGS. 28A-E illustrate cross-sectional and detail views of portions of the concrete structure according to the implementation shown in FIGS. 26 and 27.
  • FIGS. 29A-C illustrate cross-sectional and detail views of portions of the concrete structure according to the implementation shown in FIGS. 26 and 27.
  • FIGS. 30A-F illustrate cross-sectional and detail views of portions of the concrete structure according to the implementation shown in FIGS. 26 and 27.
  • FIG. 31 illustrates a side view of a concrete column, according to another implementation.
  • FIG. 32 shows a cross-sectional view of the concrete column according to the implementation shown in FIG. 31.
  • FIG. 33 illustrates a top view of a concrete structure according to another implementation.
  • FIG. 34 illustrates a side view of a portion of the concrete structure according to the implementation shown in FIG. 33.
  • FIGS. 1-8 show example process steps for constructing a structure 10 according to one implementation, and FIGS. 9-27 illustrate details of each component and how the components are coupled together according to various implementations.
  • FIG. 8 shows the final structure 10 according to one implementation.
  • Structure 10 includes columns 20 to support a main body 50.
  • the main body 50 supports one or more compressors used to compress the LNG, according to some implementations.
  • Main body 50 defines one or more apertures 52A, 52B, and 52C. These apertures allow pipes (not shown) to access the compressors from below the main body 50. These pipes may link the compressors to each other, as the compression is done in stages.
  • the pipes may also connect to storage tanks to pull off components of the natural gas that liquefy during a particular compression stage.
  • the compression process compresses the natural gas from approximately 5-20 psi to approximately 1,700 psi.
  • Natural gas is mostly methane, but does include other hydrocarbons.
  • the two left-most compressors on the first section 12 of the main body 50 need three apertures to provide the piping necessary for their compression stage, while the other four compressors to be disposed on the second section 14 and the third section 16 only need two apertures.
  • other implementations may include any number of stages and access apertures.
  • FIG. 1 shows that the first step includes placing columns 20.
  • the columns 20 in FIGS. 1-9 are shown as having a rectangular cross-sectional shape, but in other implementations, the columns can have any suitable cross sectional shape (e.g., circular, ovular, hexagonal, or other suitable closed shape).
  • the columns 20 are coupled to the foundation 11 (e.g., as shown in FIGS. 1-8 and 27-28B), to another vertically adjacent column 20 (e.g., as shown in FIGS. 28C-28D), or directly to the ground (not shown).
  • the columns 20 coupled to the foundation 11 (or ground) are horizontally spaced apart from each other in an array.
  • the columns 20 are aligned in adjacent rows and columns. However, in other implementations, the columns in one row may be offset from the columns in adjacent rows.
  • Example columns 20 are shown in FIGS. 9-11, 13-16, 18-23, and 25 and are described below.
  • FIGS. 31 and 32 show another implementation of a pre-cast concrete column 20’ having a first end 24’ and a second end 26’ opposite and spaced apart from the first end 24’.
  • the column 20’ has a central axis B-B that extends between the ends 24’ , 26’ .
  • FIG. 31 shows a side view of the column 20’
  • FIG. 32 shows a cross-sectional view of the column 20’ shown in FIG. 31 along line A- A.
  • the column 20’ shown in FIGS. 31 and 32 is similar to the column 20 shown in FIG. 1.
  • first end 24’ of the column 20’ of FIGS. 31 and 32 defines an opening 28’ extending axially to the second end 26’ .
  • Steel reinforcement members 22a’ are pre-cast within the column 20’and extend axially through the column 20’ and the ends 24’, 26’.
  • the volume of the opening 28’ defined by the column 20’ is 1/4 to 3/4 of the total volume of the column 20’, which includes the pre cast volume of the column 20’ and the volume of the opening 28’ defined by the pre-cast volume.
  • the volume of the opening 28’ is 2/3 of the total volume of the column 20’ .
  • steel reinforcement members 22b’ are coupled to a wire mesh 30’ .
  • the wire mesh 30’ is disposed within the opening 28’ of the column 20’ once columns 20’ are placed, such as described above with reference to column 20.
  • the wire mesh 30’ is disposed in the opening 28’ such that the members 22b’ extend axially within the opening 28’ and through planes that include the ends 24’, 26’.
  • poured in place concrete 29’ is filled into the opening 28’ and surrounds the mesh 30’ and members 22b’.
  • the column 20’ can be used in combination with any other components, as disclosed herein with reference to column 20, to form a structure 10.
  • the opening 28’ does not extend all of the way to the second end 26’ .
  • Column caps 30 are then placed on the columns as shown in FIG. 2.
  • the column caps 30 in FIGS. 1-9 are shown as having a rectangular cross sectional shape, but in other implementations, the column caps can also have any suitable cross sectional shape (e.g., circular, ovular, hexagonal, or other suitable closed shape).
  • FIG. 9 shows a column 20 and column cap 30 in greater detail.
  • FIGS. 11-20 and 23-24 also show details of the column cap 30, which are described below.
  • FIG. 3 shows side sections 42 and floor sections 40 placed on the column caps 20.
  • the side sections 42 are disposed adjacent at least one perimeter edge of the floor section 40 as shown in FIGS. 20-22.
  • FIGS. 9-24, 27, and 30B-30F show details of the floor sections 40 and side sections 42, which are described below.
  • FIG. 4 shows the side sections 42 and floor sections 40 assembled for the first third 12 of the structure 10.
  • the floor sections 40 define two or more apertures, such as apertures 52A, 52B, and 52C.
  • FIG. 5 concrete is then poured to create the main body 50 for the first third 12 of the structure 10. These pours may be done incrementally, for example breaking each third of the structure into five pours each, as shown in FIGS. 5 and 7.
  • FIGS. 6 and 7 show the middle 14 and final third 16 of the structure 10 being constructed in a similar manner as the first third 12.
  • FIG. 8 shows the completed structure 10.
  • FIGS. 9-16 show additional details of the pre-cast components 20, 30, 40 and 42.
  • Columns 20 include steel reinforcement members 22 that extend between the foundation 11 and the column 20 and/or stacked columns 20, as shown in FIGS. 27-28E.
  • each column cap 30 also includes a support member 32 and an alignment projection 34.
  • the alignment projection 34 extends upwardly from a portion of an upper surface 33 of the support member 32.
  • the alignment projection 34 has an outer perimeter 37 that is spaced inwardly from an outer perimeter 31 of the upper surface 33 of the support member 32.
  • alignment projection 34 has four corner protrusions 34a that extend horizontally and in a diagonal direction from each corner of the projection 34.
  • the floor sections 40 are continuous pre-cast concrete slabs. When assembled, at least two opposite and spaced apart edges of the lower surface 43 of the floor section 40 abut respective support portions 32a of the support members 32 of adjacent column caps 30.
  • the respective support portion 32a is defined between the outer perimeter 37 of the alignment projection 34 and the outer perimeter 31 of the upper surface 33 of the respective support member 32.
  • the outer perimeters 37 of the alignment projections 34 are adjacent to the perimeter 41 of the floor section 40.
  • the alignment projections 34 lock the floor sections 40 into place (e.g., prevent horizontal shifting of the floor sections 40) between two or more column caps 30 prior to pouring the main body 50 and provide rigid support (e.g., more thickness as measured in a vertical direction) to the support members 32.
  • the rigid support provided by the alignment projections 34 allows for thinner support members 32, which provides more clearance for pipes and equipment below the column caps 30.
  • FIG. 15 shows a perspective view of a single column cap 30 with multiple floor sections 40 supported by support member 32 and aligned by alignment projection 34
  • FIG. 16 shows a side cross sectional view of two of the floor sections 40 being supported by support member 32.
  • each floor section defines a central opening having a perimeter, and the perimeter of the central opening is greater than the outer perimeter 37 of the alignment projection 34 but less than the outer perimeter 31 of the upper surface 33 of the support member 32.
  • the portion of the support member 32 between the outer perimeter 37 of the alignment projection 34 and the outer perimeter 31 of the upper surface 33 of the support member 32 abuts a portion of the lower surface of the floor section that is stacked onto the upper surface 33 of the support member 32 of the column cap 30, and the alignment projection 34 of the column cap 30 extends into the central opening.
  • the alignment projections 34 serve the purpose of locking the floor sections into place on the column caps 30 prior to pouring the main body 50.
  • the alignment projections 34 provide rigid support to the support members 32, which allows for thinner support members 32 and more clearance for pipes and equipment below the column caps 30.
  • FIGS. 33 and 34 show another implementation of a concrete structure 110 similar to the concrete structure 10 shown in FIGS. 1-20 and 23, but in FIGS. 33 and 34, the column caps 130 do not include a support member for supporting the perimeters 141 of the floor sections 140. Instead, the floor sections 140 shown in FIGS. 33 and 34 include hanger brackets 170 that support the floor sections 140 laterally adjacent to the column caps 130 prior to being permanently coupled together by a first stage composite pour 148. Each hanger bracket 170 has a first portion 172 and a second portion 174 opposite and spaced apart from the first portion 172. The first portion 172 is coupled to an upper surface 145 of the floor section 140, and the second portion 174 extends from the perimeter 141 of the floor section 140.
  • a first portion of a rebar segment 176 extends through the hanger bracket 170, and a second portion of rebar segment 176 extends into the floor section 140 to couple the hanger bracket 170 to the floor section 140.
  • the floor sections 140 and column caps each include post-tensioning ducts 160 that are aligned with each other, and post-tensioning tendons 161 extend through the aligned post- tensioning ducts 160.
  • each column cap 130 extends along the tops of two columns 120 to provide increased stability of the column caps 130.
  • the column caps 130 extend parallel to each other.
  • the floor sections 140 are disposed between adjacent column caps 130, and the second portions 174 of the hanger brackets 170 abut the upper surface 133 of the column cap 130 adjacent to the hanger brackets 170 to support the floor sections 140 on the column caps 130.
  • each floor section 140 shown in FIGS. 33 and 34 include four hanger brackets 170, in other implementations, each floor section includes two or more hanger brackets.
  • the hanger brackets 170 shown in FIGS. 33 and 34 are steel tubing, but in other implementations, the hanger brackets are made from any suitable material for supporting the floor section and are any suitable shape capable of supporting the floor sections on the column caps.
  • the column caps 130 shown in FIGS. 33 and 34 extend along the tops of two columns 120, but in other implementations, the column caps only abut the top of one column or extend along the tops of three or more columns.
  • FIGS. 1-20 and 23 show column 20 with lower surfaces 43 of each floor section 40 abutting column caps 30 or 30’ .
  • a column 20 is supporting an edge of a floor section 40 along the outer edge of the structure 10.
  • no column cap 30 or 30’ is used.
  • the column 20 is taller than the columns 20 with column caps and the lower surface 43 of the floor section 40 directly abuts the column 20 instead of a cap 30 or 30’, as shown in FIGS. 21 and 22.
  • the columns along the outer edges of the structure may have the same height as the columns inward of the edges, but the top portion of the inward columns are embedded in a portion of the cap such that the upper surface of the cap on which the floor section rests is level with the top of the columns at the edges.
  • Each floor section 40 may also include steel reinforcement members 44 that extend through at least a portion of the floor section 40 and out of an upper surface of the floor section 40, as shown in FIG. 15. Horizontally adjacent floor sections 40 are coupled to each other. Various implementations for coupling the floor sections 40 to the caps 30’ and each other and to the main body 50 are described below in relation to FIGS. 17-30.
  • Pre-cast and/or pre-stressed column caps 30’ are erected on either pre-cast or cast in place concrete columns 20.
  • the caps 30’ are fastened to the column using vertical rods 35 (see, e.g., FIG. 23) that extend from the column 20, through the column cap 30’, and into a form for pouring the main body 50 such that the vertical rods 35 extend into the main body 50.
  • vertical rods 35 see, e.g., FIG. 23
  • Pre-cast and/or pre-stressed floor sections 40 are erected on the previously placed column caps 30’ (see, e.g., FIGS. 1-17, 18, 26 and 27).
  • the perimeters 46 of floor sections 40 (or central opening in the floor section 40), the upper surface 33 of the support portion 32, and the surfaces of the alignment projection 34 of the cap 30 define a volume for receiving a first stage composite pour 48.
  • the first stage composite pour 48 in one implementation comprises a cementitious material such as concrete or grout.
  • an advancing bar connector and grouted joint 49 is established between the edges of adjacent floor sections 40, which allows for a mild flexural reinforcement across floor sections 40.
  • the grouted joint 49 comprises a cementitious grout material, according to one implementation.
  • column caps 30 are spaced apart from each other.
  • column caps 30’ are elongated such that an edge of each column cap 30’ abuts an edge of the horizontally adjacent column caps 30’ in one direction, forming a continuous line of column caps 30’.
  • FIGS. 17 and 24 show detailed views of the column cap 30’ to column cap 30’ finger joint 38 that transfers force between horizontally adjacent column caps 30’ . Both shear and moment are transferred between the column caps 30’ using grout only in the finger joint 38. No special connectors are required. As is described above in relation to FIGS. 1-16, portions of the lower surface 43 of the floor sections 40 that are adjacent the outer perimeter of the floor section 40 abut the upper surface 33 of the support members 32 of the column caps 30’ .
  • Post-tensioning ducts 60 (see, e.g., FIGS. 18, 23, and 26) cast into the column caps 30’ and the floor sections 40 form a two-directional grid of connected ducts 60 to receive post-tensioning tendons 61.
  • the ducts 60 in the column caps 30’ and the ducts 60 in the floor sections 40 are arranged perpendicularly to each other as viewed from the upper surfaces of the floor section 40 and the cap 30’, as shown in FIGS. 11 and 12.
  • the post tensioning tendons 61 extend from a side section 42 on one side of the structure 10, through contiguously aligned post-tensioning ducts
  • the first composite pour 48 is poured as described above and then a second stage composite pour 51 of concrete is poured onto the first composite pour 48 and the upper surface of the floor section 40 between side sections 42.
  • this second stage concrete pour 51 covers the ends of rods 35 and steel reinforcement members 44, which are embedded in the main body 50 (see FIG. 23).
  • a plug apparatus 53 (See FIGS. 29A-C) is disposed in the space where each aperture is to be defined during the pour and removed after the concrete is dry enough to hold its molded shape.
  • the plug apparatus 53 includes at least one sidewall that forms the inner side(s) of each aperture.
  • the at least one sidewall forms the shape of each aperture 52A, 52B, 52C, and the shape of the outer perimeter of the at least one sidewall is maintained by one or more pipes that extend between inner surfaces of opposite sides of the at least one sidewall.
  • the plug apparatuses shown in FIGS. 29A and 29B each have four side walls, and pipes 53a extend between two opposite sidewalls 53b, 53c.
  • the plug apparatus may be a hollow cylinder having one sidewall, and one or more pipes extend between inner surfaces of the hollow cylinder.
  • the plug apparatuses 53 act as braces within the apertures 52A, 52B, 52C to provide stability of the structure prior to and during erection and during the second stage composite concrete pour 51 of the main body 50.
  • Other apparatuses for defining the apertures during pouring may also be used and are within the scope of the claims.
  • pre-cast components typically are not isotropic, pre-cast components have not been used to support these types of compressors before.
  • Typical pre-cast components can support four to five times the load in a primary direction as opposed to the load that can be borne in secondary directions.
  • pre cast bridge components typically can support four to five times as much load in the traffic direction as compared to the transverse direction.
  • the disclosed composite structure can support approximately the same load in all directions. Because the gross cross-sectional properties in each orthogonal direction are the same and the general spacing of support columns are relatively the same, the structure disclosed herein allows for equal capacity in each direction (i.e.
  • the composite structure provides relatively the same amount of reinforcement in both orthogonal directions.
  • the combination of reinforced pre-cast components with a partial poured in place body creates a composite structure that has the isotropic properties to support the compressors and can be constructed using much less time and labor than conventional poured in place structures.

Abstract

Various implementations comprise methods and apparatuses for constructing a concrete structure. An apparatus according to one implementation includes a structure comprising a pre-cast concrete component that includes at least one post-tensioning duct, a post-tensioning tendon extending through the post-tensioning duct, and a poured in place concrete surface disposed above and coupled to the pre-cast concrete component.

Description

METHODS AND APPARATUSES FOR CONSTRUCTING A CONCRETE STRUCTURE
BACKGROUND
Natural gas is becoming a greater and greater share of the U.S. energy supply due to advances in hydraulic fracking. Natural gas is generally sent through a pipeline to a terminal, where it is compressed to liquefied natural gas (LNG) before loading it into tanks for transport. This terminal generally includes a platform to support four to seven compressors, each of which weighs several tons. Due to the increased supply of natural gas, additional terminals are needed to process the supply. However, the terminals are presently constructed by pouring concrete in place for all of the structure, which can take on the order of six months.
Thus, there is a need for more efficient apparatuses and methods of constructing a concrete structure.
SUMMARY
Various implementations include methods and apparatuses for constructing a concrete structure. For example, in various implementations, a structure includes a pre-cast concrete component having at least one post-tensioning duct, a post-tensioning tendon extending through the post-tensioning duct, and a poured in place concrete body disposed above and coupled to the pre-cast concrete component.
In some implementations, the structure has isotropic load-bearing strengths.
In some implementations, the pre-cast concrete component is a column. In some implementations, the pre-cast concrete component is a cap disposed on a top of a column.
In some implementations, the pre-cast concrete component is a floor section that is coupled to a cap disposed on top of a column. In some implementations, the poured in place concrete body is directly coupled to a floor section by one or more reinforcement members that extend through at least a portion of the floor section and into the poured in place concrete body. In some implementations, the floor section has a perimeter, and the cap has a support member that includes an alignment projection that extends upwardly from a portion of an upper surface of the support member. The alignment projection has an outer perimeter, and the upper surface of the support member has an outer perimeter. The outer perimeter of the upper surface of the support member is spaced apart from the outer perimeter of the alignment projection, and a portion of a lower surface of the floor section adjacent the perimeter of the floor section abuts the upper surface of the support member of the cap such that the alignment projection of the cap extends upwardly along a portion of the perimeter of the floor section. In some implementations, the poured in place concrete body comprises a first stage composite pour and a second stage composite pour. The first stage composite pour is coupled to a portion of the perimeter of the floor section, the outer perimeter of the alignment projection, and a portion of the upper surface of the support member. The second stage composite pour is coupled to the first stage composite pour and an upper surface of the floor section.
In some implementations, the floor section includes the plurality of reinforcement members extending from the upper surface of the floor section, and the plurality of reinforcement members are coupled to the second stage composite pour.
In some implementations, the poured in place concrete body is directly coupled to the pre-cast component by one or more reinforcement members that extend through at least a portion of the pre cast component and into the poured in place concrete body.
In some implementations, the pre-cast concrete component is a floor section.
In some implementations, the poured in place concrete body defines one or more apertures that extend through the concrete body.
Other various implementations include a method for making a structure including: (1) providing a plurality of pre-cast concrete columns, (2) placing a pre-cast concrete column cap on each of the columns, (3) placing a floor section with a post-tensioning duct on a support member of each column cap, (4) tensioning a post-tensioning tendon running through a post-tensioning duct, and (5) pouring a poured in place concrete body on the floor sections. At least one of the floor sections comprises the post-tensioning duct.
In some implementations, the poured in place concrete body defines a plurality of apertures that extend through the concrete body.
In some implementations, the floor sections are pre-cast concrete floor sections.
In some implementations, at least one column cap includes a post-tensioning duct, and the method further includes tensioning a second post-tensioning tendon running through the post tensioning duct in the column cap.
In some implementations, the post-tensioning tendon and the second post-tensioning tendon are arranged perpendicularly to each other as viewed from an upper surface of the floor section and column cap.
In various implementations, a structure includes a pre-cast concrete column, a pre-cast concrete cap disposed above a top surface of the column, a pre-cast concrete floor section that is disposed above the pre-cast concrete cap, a post-tensioning tendon extending through the post tensioning duct, and a poured in place concrete body disposed on the floor section. The pre-cast concrete cap includes at least one post-tensioning duct. In some implementations, the poured in place concrete body defines one or more apertures that extend through the concrete body. In some implementations, the cap is disposed on the top surface of the column, the floor section is disposed on the cap, and the poured in place concrete body is disposed on the floor section.
In some implementations, the column has a first end, a second end opposite and spaced apart from the first end, and a central axis extending between the first end and the second end. The first end defines an opening extending axially toward the second end. In some implementations, the opening extends to the second end. In some implementations, the structure further includes a poured in place concrete portion disposed within the opening. In some implementations, the volume of the opening defined by the column is 1/4 to 3/4 of the total of the volume of the pre-cast column and the volume of the opening. In some implementations, the volume of the opening defined by the column is 2/3 of the total volume of the pre-cast column and the volume of the opening.
In some implementations, the floor section includes two or more hangar brackets. Each of the two or more hanger brackets has a first portion and a second portion opposite and spaced apart from the first portion of the hanger bracket. The first portion of each of the two or more hanger brackets is coupled to an upper surface of the floor section, and the second portion of the two or more hanger brackets extends from a perimeter of the floor section. The second portion of each of the two or more hanger brackets is disposed on an upper surface of the cap.
BRIEF DESCRIPTION OF THE DRAWINGS
Example features and implementation are disclosed in the accompanying drawings. However, the present disclosure is not limited to the arrangements and instrumentalities shown. Furthermore, various features may not be drawn to scale.
FIGS. 1-8 illustrate a process for making a concrete structure according to one
implementation.
FIG. 9 illustrates several views of a column and a column cap according to the
implementation shown in FIGS. 2-8.
FIGS. 10 and 11 illustrate perspective views of the column cap with floor sections stacked thereon according to the implementation shown in FIGS. 3-8.
FIG. 12 illustrates a top view of the floor sections supported by the column cap according to the implementation shown in FIGS. 3-8.
FIGS. 13 and 14 show side views of the floor sections supported by the column cap according to the implementation shown in FIGS. 3-8.
FIG. 15 shows a perspective cutaway view of the floor sections supported by the column cap according to the implementation shown in FIGS. 3-8.
FIG. 16 shows close up side section views of the floor sections supported by the column cap according to the implementation shown in FIGS. 3-8.
FIG. 17 illustrates a top view of the floor sections according to the implementation shown in FIGS. 3-8.
FIG. 18 illustrates a cross-sectional view of a portion of the concrete structure according to the implementation shown in FIG. 17 as viewed from the 1-1 line.
FIG. 19 illustrates a cross-sectional view of a portion of the concrete structure with vertical rods according to the implementation shown in FIG. 17 as viewed from the 2-2 line. FIG. 20 illustrates a cross-sectional view of a portion of the concrete structure according to the implementation shown in FIG. 17 as viewed from the 3-3 line.
FIG. 21 illustrates a cross-sectional view of the concrete structure according to the implementation shown in FIG. 17 as viewed from the 4-4 line.
FIG. 22 illustrates a cross-sectional view of the concrete structure according to the implementation shown in FIG. 17 as viewed from the 5-5 line.
FIG. 23 illustrates a cross-sectional view of a portion of the concrete structure with vertical rods according to the implementation shown in FIG. 17 as viewed from the 6-6 line.
FIG. 24 illustrates a close-up view of a joint between two floor sections according to the implementation shown in FIG. 17 as viewed from detail view 7.
FIG. 25 illustrates a close-up view of a portion of the concrete structure with vertical rods according to the implementation shown in FIG. 17 as viewed from detail 8.
FIG. 26 illustrates a top view of a portion of the concrete structure according to the implementation shown in FIGS. 6-8.
FIG. 27 illustrates a side view of a portion of the concrete structure according to the implementation shown in FIG. 26.
FIGS. 28A-E illustrate cross-sectional and detail views of portions of the concrete structure according to the implementation shown in FIGS. 26 and 27.
FIGS. 29A-C illustrate cross-sectional and detail views of portions of the concrete structure according to the implementation shown in FIGS. 26 and 27.
FIGS. 30A-F illustrate cross-sectional and detail views of portions of the concrete structure according to the implementation shown in FIGS. 26 and 27.
FIG. 31 illustrates a side view of a concrete column, according to another implementation.
FIG. 32 shows a cross-sectional view of the concrete column according to the implementation shown in FIG. 31.
FIG. 33 illustrates a top view of a concrete structure according to another implementation.
FIG. 34 illustrates a side view of a portion of the concrete structure according to the implementation shown in FIG. 33.
DETAILED DESCRIPTION
FIGS. 1-8 show example process steps for constructing a structure 10 according to one implementation, and FIGS. 9-27 illustrate details of each component and how the components are coupled together according to various implementations. FIG. 8 shows the final structure 10 according to one implementation. Structure 10 includes columns 20 to support a main body 50. For example, the main body 50 supports one or more compressors used to compress the LNG, according to some implementations. Main body 50 defines one or more apertures 52A, 52B, and 52C. These apertures allow pipes (not shown) to access the compressors from below the main body 50. These pipes may link the compressors to each other, as the compression is done in stages. The pipes may also connect to storage tanks to pull off components of the natural gas that liquefy during a particular compression stage.
In the implementation shown in FIG. 8, there are six stages to the LNG compression process. Thus, there are six sets of apertures 52A, 52B, and 52C (e.g., each set having two or more apertures). The compression process compresses the natural gas from approximately 5-20 psi to approximately 1,700 psi. Natural gas is mostly methane, but does include other hydrocarbons. Thus, there are other components of the natural gas that liquefy before the methane does. Accordingly, some of the compressors are designed to pull off these other components as the natural gas is compressed. For example, in the implementation shown in FIG. 8, the two left-most compressors on the first section 12 of the main body 50 need three apertures to provide the piping necessary for their compression stage, while the other four compressors to be disposed on the second section 14 and the third section 16 only need two apertures. However, other implementations may include any number of stages and access apertures.
FIG. 1 shows that the first step includes placing columns 20. The columns 20 in FIGS. 1-9 are shown as having a rectangular cross-sectional shape, but in other implementations, the columns can have any suitable cross sectional shape (e.g., circular, ovular, hexagonal, or other suitable closed shape). In addition, the columns 20 are coupled to the foundation 11 (e.g., as shown in FIGS. 1-8 and 27-28B), to another vertically adjacent column 20 (e.g., as shown in FIGS. 28C-28D), or directly to the ground (not shown). The columns 20 coupled to the foundation 11 (or ground) are horizontally spaced apart from each other in an array. In FIG. 1, the columns 20 are aligned in adjacent rows and columns. However, in other implementations, the columns in one row may be offset from the columns in adjacent rows. Example columns 20 are shown in FIGS. 9-11, 13-16, 18-23, and 25 and are described below.
FIGS. 31 and 32 show another implementation of a pre-cast concrete column 20’ having a first end 24’ and a second end 26’ opposite and spaced apart from the first end 24’. The column 20’ has a central axis B-B that extends between the ends 24’ , 26’ . FIG. 31 shows a side view of the column 20’, and FIG. 32 shows a cross-sectional view of the column 20’ shown in FIG. 31 along line A- A. The column 20’ shown in FIGS. 31 and 32 is similar to the column 20 shown in FIG. 1.
However, the first end 24’ of the column 20’ of FIGS. 31 and 32 defines an opening 28’ extending axially to the second end 26’ . Steel reinforcement members 22a’ are pre-cast within the column 20’and extend axially through the column 20’ and the ends 24’, 26’. The volume of the opening 28’ defined by the column 20’ is 1/4 to 3/4 of the total volume of the column 20’, which includes the pre cast volume of the column 20’ and the volume of the opening 28’ defined by the pre-cast volume. For example, the volume of the opening 28’ is 2/3 of the total volume of the column 20’ .
In addition, steel reinforcement members 22b’ are coupled to a wire mesh 30’ . The wire mesh 30’ is disposed within the opening 28’ of the column 20’ once columns 20’ are placed, such as described above with reference to column 20. The wire mesh 30’ is disposed in the opening 28’ such that the members 22b’ extend axially within the opening 28’ and through planes that include the ends 24’, 26’. After the wire mesh 30’ is disposed within the opening 28’, poured in place concrete 29’ is filled into the opening 28’ and surrounds the mesh 30’ and members 22b’. The column 20’ can be used in combination with any other components, as disclosed herein with reference to column 20, to form a structure 10. In other implementations, the opening 28’ does not extend all of the way to the second end 26’ . Column caps 30 are then placed on the columns as shown in FIG. 2. The column caps 30 in FIGS. 1-9 are shown as having a rectangular cross sectional shape, but in other implementations, the column caps can also have any suitable cross sectional shape (e.g., circular, ovular, hexagonal, or other suitable closed shape). FIG. 9 shows a column 20 and column cap 30 in greater detail. FIGS. 11-20 and 23-24 also show details of the column cap 30, which are described below.
FIG. 3 shows side sections 42 and floor sections 40 placed on the column caps 20. The side sections 42 are disposed adjacent at least one perimeter edge of the floor section 40 as shown in FIGS. 20-22. FIGS. 9-24, 27, and 30B-30F show details of the floor sections 40 and side sections 42, which are described below.
FIG. 4 shows the side sections 42 and floor sections 40 assembled for the first third 12 of the structure 10. The floor sections 40 define two or more apertures, such as apertures 52A, 52B, and 52C. As shown in FIG. 5, concrete is then poured to create the main body 50 for the first third 12 of the structure 10. These pours may be done incrementally, for example breaking each third of the structure into five pours each, as shown in FIGS. 5 and 7. FIGS. 6 and 7 show the middle 14 and final third 16 of the structure 10 being constructed in a similar manner as the first third 12. Finally, FIG. 8 shows the completed structure 10.
Because the column, column cap, floor section, and side section are pre-cast components, construction can be completed much faster than a structure made of poured in place concrete. The method described above in relation to FIGS. 1-8 minimizes the use of poured in place concrete, allowing dramatic time savings over current construction techniques.
FIGS. 9-16 show additional details of the pre-cast components 20, 30, 40 and 42. Columns 20 include steel reinforcement members 22 that extend between the foundation 11 and the column 20 and/or stacked columns 20, as shown in FIGS. 27-28E.
Column caps 30 include steel reinforcement members 36, which are shown in FIG. 13. As shown in FIG. 9, each column cap 30 also includes a support member 32 and an alignment projection 34. The alignment projection 34 extends upwardly from a portion of an upper surface 33 of the support member 32. The alignment projection 34 has an outer perimeter 37 that is spaced inwardly from an outer perimeter 31 of the upper surface 33 of the support member 32. In addition, alignment projection 34 has four corner protrusions 34a that extend horizontally and in a diagonal direction from each corner of the projection 34. As shown in FIGS. 1-16, the floor sections 40 are continuous pre-cast concrete slabs. When assembled, at least two opposite and spaced apart edges of the lower surface 43 of the floor section 40 abut respective support portions 32a of the support members 32 of adjacent column caps 30. The respective support portion 32a is defined between the outer perimeter 37 of the alignment projection 34 and the outer perimeter 31 of the upper surface 33 of the respective support member 32. The outer perimeters 37 of the alignment projections 34 are adjacent to the perimeter 41 of the floor section 40. The alignment projections 34 lock the floor sections 40 into place (e.g., prevent horizontal shifting of the floor sections 40) between two or more column caps 30 prior to pouring the main body 50 and provide rigid support (e.g., more thickness as measured in a vertical direction) to the support members 32. The rigid support provided by the alignment projections 34 allows for thinner support members 32, which provides more clearance for pipes and equipment below the column caps 30. The diagonal shape of the corner projections 34a extending from the alignment projections 34 provide additional rigid support to the corners of the support members 32 and are less likely to interfere with any reinforcements protruding from adjacent floor sections 40. FIG. 15 shows a perspective view of a single column cap 30 with multiple floor sections 40 supported by support member 32 and aligned by alignment projection 34, and FIG. 16 shows a side cross sectional view of two of the floor sections 40 being supported by support member 32.
In other implementations (not shown), each floor section defines a central opening having a perimeter, and the perimeter of the central opening is greater than the outer perimeter 37 of the alignment projection 34 but less than the outer perimeter 31 of the upper surface 33 of the support member 32. When assembled, the portion of the support member 32 between the outer perimeter 37 of the alignment projection 34 and the outer perimeter 31 of the upper surface 33 of the support member 32 abuts a portion of the lower surface of the floor section that is stacked onto the upper surface 33 of the support member 32 of the column cap 30, and the alignment projection 34 of the column cap 30 extends into the central opening. In this implementation, the alignment projections 34 serve the purpose of locking the floor sections into place on the column caps 30 prior to pouring the main body 50. As in the previous implementation, the alignment projections 34 provide rigid support to the support members 32, which allows for thinner support members 32 and more clearance for pipes and equipment below the column caps 30.
FIGS. 33 and 34 show another implementation of a concrete structure 110 similar to the concrete structure 10 shown in FIGS. 1-20 and 23, but in FIGS. 33 and 34, the column caps 130 do not include a support member for supporting the perimeters 141 of the floor sections 140. Instead, the floor sections 140 shown in FIGS. 33 and 34 include hanger brackets 170 that support the floor sections 140 laterally adjacent to the column caps 130 prior to being permanently coupled together by a first stage composite pour 148. Each hanger bracket 170 has a first portion 172 and a second portion 174 opposite and spaced apart from the first portion 172. The first portion 172 is coupled to an upper surface 145 of the floor section 140, and the second portion 174 extends from the perimeter 141 of the floor section 140. A first portion of a rebar segment 176 extends through the hanger bracket 170, and a second portion of rebar segment 176 extends into the floor section 140 to couple the hanger bracket 170 to the floor section 140. The floor sections 140 and column caps each include post-tensioning ducts 160 that are aligned with each other, and post-tensioning tendons 161 extend through the aligned post- tensioning ducts 160.
As seen in FIG. 33, each column cap 130 extends along the tops of two columns 120 to provide increased stability of the column caps 130. The column caps 130 extend parallel to each other. The floor sections 140 are disposed between adjacent column caps 130, and the second portions 174 of the hanger brackets 170 abut the upper surface 133 of the column cap 130 adjacent to the hanger brackets 170 to support the floor sections 140 on the column caps 130.
Although each of the floor sections 140 shown in FIGS. 33 and 34 include four hanger brackets 170, in other implementations, each floor section includes two or more hanger brackets. The hanger brackets 170 shown in FIGS. 33 and 34 are steel tubing, but in other implementations, the hanger brackets are made from any suitable material for supporting the floor section and are any suitable shape capable of supporting the floor sections on the column caps. The column caps 130 shown in FIGS. 33 and 34 extend along the tops of two columns 120, but in other implementations, the column caps only abut the top of one column or extend along the tops of three or more columns.
FIGS. 1-20 and 23 show column 20 with lower surfaces 43 of each floor section 40 abutting column caps 30 or 30’ . However, where a column 20 is supporting an edge of a floor section 40 along the outer edge of the structure 10, no column cap 30 or 30’ is used. Where no column cap 30 or 30’ is used, the column 20 is taller than the columns 20 with column caps and the lower surface 43 of the floor section 40 directly abuts the column 20 instead of a cap 30 or 30’, as shown in FIGS. 21 and 22. In other implementations, the columns along the outer edges of the structure may have the same height as the columns inward of the edges, but the top portion of the inward columns are embedded in a portion of the cap such that the upper surface of the cap on which the floor section rests is level with the top of the columns at the edges.
Each floor section 40 may also include steel reinforcement members 44 that extend through at least a portion of the floor section 40 and out of an upper surface of the floor section 40, as shown in FIG. 15. Horizontally adjacent floor sections 40 are coupled to each other. Various implementations for coupling the floor sections 40 to the caps 30’ and each other and to the main body 50 are described below in relation to FIGS. 17-30. Once the main body 50 is cast over the floor sections 40 and steel reinforcement members 44, all of the components are locked together by the pouring and setting of the main body 50.
The details of example implementations of the connections between the pre-cast components are shown in FIGS. 17-30. Pre-cast and/or pre-stressed column caps 30’ are erected on either pre-cast or cast in place concrete columns 20. The caps 30’ are fastened to the column using vertical rods 35 (see, e.g., FIG. 23) that extend from the column 20, through the column cap 30’, and into a form for pouring the main body 50 such that the vertical rods 35 extend into the main body 50. Once the column caps 30’ are placed on the tops of the columns 20, washers and nuts are fastened to the end portions of the vertical rods 35 to form a temporary stability connection between the columns 20 and column caps 30’ for the remaining erection of the structural pieces.
Pre-cast and/or pre-stressed floor sections 40 are erected on the previously placed column caps 30’ (see, e.g., FIGS. 1-17, 18, 26 and 27). The perimeters 46 of floor sections 40 (or central opening in the floor section 40), the upper surface 33 of the support portion 32, and the surfaces of the alignment projection 34 of the cap 30 define a volume for receiving a first stage composite pour 48. The first stage composite pour 48 in one implementation comprises a cementitious material such as concrete or grout. In addition, an advancing bar connector and grouted joint 49 (see FIGS. 30B, 30C, and 30E) is established between the edges of adjacent floor sections 40, which allows for a mild flexural reinforcement across floor sections 40. The grouted joint 49 comprises a cementitious grout material, according to one implementation.
In the implementation shown in FIGS. 1-9, column caps 30 are spaced apart from each other. However, in the implementation shown in FIG. 17, column caps 30’ are elongated such that an edge of each column cap 30’ abuts an edge of the horizontally adjacent column caps 30’ in one direction, forming a continuous line of column caps 30’. FIGS. 17 and 24 show detailed views of the column cap 30’ to column cap 30’ finger joint 38 that transfers force between horizontally adjacent column caps 30’ . Both shear and moment are transferred between the column caps 30’ using grout only in the finger joint 38. No special connectors are required. As is described above in relation to FIGS. 1-16, portions of the lower surface 43 of the floor sections 40 that are adjacent the outer perimeter of the floor section 40 abut the upper surface 33 of the support members 32 of the column caps 30’ .
Post-tensioning ducts 60 (see, e.g., FIGS. 18, 23, and 26) cast into the column caps 30’ and the floor sections 40 form a two-directional grid of connected ducts 60 to receive post-tensioning tendons 61. As shown in FIG. 22, the ducts 60 in the column caps 30’ and the ducts 60 in the floor sections 40 are arranged perpendicularly to each other as viewed from the upper surfaces of the floor section 40 and the cap 30’, as shown in FIGS. 11 and 12. The post tensioning tendons 61 extend from a side section 42 on one side of the structure 10, through contiguously aligned post-tensioning ducts
60 in the floor sections 40 and column caps 30’ , to a side section 42 on an opposite side of the structure 10. After the first stage composite pour 48 (see, e.g., FIG. 18) and joint grouting 49 are completed, the two way grid of post-tensioning tendons 61 are stressed. The stressing of the tendons
61 places all joints between elements into a compressed condition. This state of biaxial compression overcomes any tendency for these joints to go into a tensile condition and favorable structural performance under static and vibratory loading.
To form the main body 50 of the platform, the first composite pour 48 is poured as described above and then a second stage composite pour 51 of concrete is poured onto the first composite pour 48 and the upper surface of the floor section 40 between side sections 42. As previously noted, this second stage concrete pour 51 covers the ends of rods 35 and steel reinforcement members 44, which are embedded in the main body 50 (see FIG. 23). Further, to define the apertures 52A, 52B, 52C through body 50 during the pour, a plug apparatus 53 (See FIGS. 29A-C) is disposed in the space where each aperture is to be defined during the pour and removed after the concrete is dry enough to hold its molded shape. The plug apparatus 53 includes at least one sidewall that forms the inner side(s) of each aperture. The at least one sidewall forms the shape of each aperture 52A, 52B, 52C, and the shape of the outer perimeter of the at least one sidewall is maintained by one or more pipes that extend between inner surfaces of opposite sides of the at least one sidewall. For example, the plug apparatuses shown in FIGS. 29A and 29B each have four side walls, and pipes 53a extend between two opposite sidewalls 53b, 53c. In other implementations, the plug apparatus may be a hollow cylinder having one sidewall, and one or more pipes extend between inner surfaces of the hollow cylinder. The plug apparatuses 53 act as braces within the apertures 52A, 52B, 52C to provide stability of the structure prior to and during erection and during the second stage composite concrete pour 51 of the main body 50. Other apparatuses for defining the apertures during pouring may also be used and are within the scope of the claims.
The compressors used to compress the natural gas cause a reciprocating load on the supporting structure, which requires a support with isotropic load-bearing properties. As pre-cast components typically are not isotropic, pre-cast components have not been used to support these types of compressors before. Typical pre-cast components can support four to five times the load in a primary direction as opposed to the load that can be borne in secondary directions. For example, pre cast bridge components typically can support four to five times as much load in the traffic direction as compared to the transverse direction. In contrast, the disclosed composite structure can support approximately the same load in all directions. Because the gross cross-sectional properties in each orthogonal direction are the same and the general spacing of support columns are relatively the same, the structure disclosed herein allows for equal capacity in each direction (i.e. 2-way spanning slab). Thus, the composite structure provides relatively the same amount of reinforcement in both orthogonal directions. The combination of reinforced pre-cast components with a partial poured in place body creates a composite structure that has the isotropic properties to support the compressors and can be constructed using much less time and labor than conventional poured in place structures.
The present written description uses examples to disclose the present subject matter and to enable any person skilled in the art to practice the subject matter claimed, including making and using any devices or systems and performing any incorporated and/or associated methods. While the present subject matter has been described in detail with respect to specific implementations thereof, it will be appreciated that those skilled in the art, upon attaining an understanding of the foregoing may readily produce alterations to, variations of, and equivalents to such implementations. Accordingly, the scope of the present disclosure is by way of example rather than by way of limitation, and the subject disclosure does not preclude inclusion of such modifications, variations and or additions to the present subject matter as would be readily apparent to one of ordinary skill in the art. For instance, features illustrated or described as part of one embodiment can be used with another embodiment to yield a still further embodiment. Thus, it is intended that the present subject matter covers such modifications and variations as come within the scope of the disclosure and equivalents thereof.

Claims

CLAIMS:
1. A structure comprising:
a pre-cast concrete component including at least one post-tensioning duct;
a post-tensioning tendon extending through the post-tensioning duct; and
a poured in place concrete body disposed above and coupled to the pre-cast concrete component.
2. The structure according to claim 1, wherein the apparatus has isotropic load-bearing strengths.
3. The structure according to claim 1, wherein the pre-cast concrete component is a column.
4. The structure according to claim 1, wherein the pre-cast concrete component is a cap disposed on a top of a column.
5. The structure according to claim 1, wherein the pre-cast concrete component is a floor section that is coupled to a cap disposed on top of a column.
6. The structure according to claim 5, wherein the poured in place concrete body is directly coupled to the floor section by one or more reinforcement members that extend through at least a portion of the floor section and into the poured in place concrete body.
7. The structure according to claim 6, wherein the floor section has a perimeter, and the cap comprises a support member that includes an alignment projection that extends upwardly from a portion of an upper surface of the support member, the alignment projection having an outer perimeter and the upper surface of the support member having an outer perimeter, wherein the outer perimeter of the upper surface of the support member is spaced apart from the outer perimeter of the alignment projection, and a portion of a lower surface of the floor section adjacent the perimeter of the floor section abuts the upper surface of the support member of the cap such that the alignment projection of the cap extends upwardly along a portion of the perimeter of the floor section.
8. The structure according to claim 7, wherein the poured in place concrete body comprises a first stage composite pour and a second stage composite pour, the first stage composite pour is coupled to a portion of the perimeter of the floor section, the outer perimeter of the alignment projection, and a portion of the upper surface of the support member, and the second stage composite pour is coupled to the first stage composite pour and an upper surface of the floor section.
9. The structure according to claim 8, wherein the floor section comprises the plurality of reinforcement members extending from the upper surface of the floor section, and the plurality of reinforcement members are coupled to the second stage composite pour.
10. The structure according to claim 1, wherein the poured in place concrete body is directly coupled to the pre-cast component by one or more reinforcement members that extend through at least a portion of the pre-cast component and into the poured in place concrete body.
11. The structure according to claim 1, wherein the pre-cast concrete component is a floor section.
12. The structure according to claim 1, wherein the poured in place concrete body defines one or more apertures that extend through the concrete body.
13. A method for making a structure comprising:
providing a plurality of pre-cast concrete columns;
placing a pre-cast concrete column cap on each of the columns;
placing a floor section on a support member of each column cap, at least one of the floor sections comprising a post-tensioning duct;
tensioning a post-tensioning tendon running through the at least one post-tensioning duct; and pouring a poured in place concrete body on the floor sections.
14. The method according to claim 13, wherein the poured in place concrete body defines a plurality of apertures that extend through the concrete body.
15. The method according to claim 13, wherein the floor sections are pre-cast concrete floor sections.
16. The method according to claim 13, wherein at least one column cap comprises a post tensioning duct, and the method further comprises tensioning a second post-tensioning tendon running through the post-tensioning duct in the column cap.
17. The method according to claim 13, wherein the post-tensioning tendon and the second post tensioning tendon are arranged perpendicularly to each other as viewed from upper surfaces of the floor section and the column cap.
18. A structure comprising:
a pre-cast concrete column;
a pre-cast concrete cap disposed above a top surface of the column, the pre-cast concrete cap including at least one post-tensioning duct;
a pre-cast concrete floor section that is disposed above the pre-cast concrete cap;
a post-tensioning tendon extending through the post-tensioning duct; and
a poured in place concrete body disposed above and coupled to the floor section.
19. The structure according to claim 18, wherein the poured in place concrete body defines one or more apertures that extend through the concrete body.
20. The structure according to claim 18, wherein the cap is disposed on the top surface of the column, the floor section is disposed on the cap, and the poured in place concrete body is disposed on the floor section.
21. The structure according to claim 3, wherein the column has a first end, a second end opposite and spaced apart from the first end, and a central axis extending between the first end and the second end, and the first end defines an opening extending axially toward the second end.
22. The structure according to claim 21, wherein the opening extends to the second end.
23. The structure according to claim 21, further comprising a poured in place concrete portion disposed within the opening.
24. The structure according to claim 21, wherein the volume of the opening defined by the column is 1/4 to 3/4 of the total of the volume of the pre-cast column and the volume of the opening.
25. The structure according to claim 24, wherein the volume of the opening defined by the column is 2/3 of the total volume of the pre-cast column and the volume of the opening.
26. The method according to claim 13, wherein the column has a first end, a second end opposite and spaced apart from the first end, and a central axis extending between the first end and the second end, and the first end defines an opening extending axially toward the second end.
27. The method according to claim 26, wherein the opening extends to the second end.
28. The method according to claim 26, further comprising pouring a poured in place concrete portion in the opening.
29. The method according to claim 26, wherein the volume of the opening defined by the column is 1/4 to 3/4 of the total of the volume of the pre-cast column and the volume of the opening.
30. The structure according to claim 29, wherein the volume of the opening defined by the column is 2/3 of the total volume of the pre-cast column and the volume of the opening.
31. The structure according to claim 18, wherein the column has a first end, a second end opposite and spaced apart from the first end, and a central axis extending between the first end and the second end, and the first end defines an opening extending axially toward the second end.
32. The structure according to claim 31, wherein the opening extends to the second end.
33. The structure according to claim 31, further comprising a poured in place concrete portion disposed within the opening.
34. The structure according to claim 31, wherein the volume of the opening defined by the column is 1/4 to 3/4 of the total of the volume of the pre-cast column and the volume of the opening.
35. The structure according to claim 34, wherein the volume of the opening defined by the column is 2/3 of the total volume of the pre-cast column and the volume of the opening.
36. The structure according to claim 5, wherein the floor section includes two or more hangar brackets, each hanger bracket having a first portion and a second portion opposite and spaced apart from the first portion of the hanger bracket, the first portion of each hanger bracket being coupled to an upper surface of the floor section and the second portion of each hanger bracket extends from a perimeter of the floor section, wherein the second portion of each hanger bracket is disposed on an upper surface of the cap.
PCT/US2019/067517 2018-12-20 2019-12-19 Methods and apparatuses for constructing a concrete structure WO2020132266A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201862782748P 2018-12-20 2018-12-20
US62/782,748 2018-12-20

Publications (1)

Publication Number Publication Date
WO2020132266A1 true WO2020132266A1 (en) 2020-06-25

Family

ID=71100920

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2019/067517 WO2020132266A1 (en) 2018-12-20 2019-12-19 Methods and apparatuses for constructing a concrete structure

Country Status (1)

Country Link
WO (1) WO2020132266A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022223800A1 (en) * 2021-04-22 2022-10-27 Elastic Potential, S.L. Concrete beam and system that comprises said beam

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3613325A (en) * 1969-07-10 1971-10-19 Yee Alfred A Concrete construction
US8800229B2 (en) * 2007-06-22 2014-08-12 Diversakore Holdings, Llc Framing structure
KR101492812B1 (en) * 2013-07-26 2015-02-23 한국교통대학교산학협력단 Hollowed Precast Column And Constructure Method Thereof
US20160230386A1 (en) * 2015-02-10 2016-08-11 Tindall Corporation Method and apparatus for constructing a concrete structure
US20170159294A1 (en) * 2014-07-09 2017-06-08 Elastic Potential ,S.L Pillar for supporting a modular structure, beam intended to be supported on pillars of this type, and structure comprising said pillars and beams

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3613325A (en) * 1969-07-10 1971-10-19 Yee Alfred A Concrete construction
US8800229B2 (en) * 2007-06-22 2014-08-12 Diversakore Holdings, Llc Framing structure
KR101492812B1 (en) * 2013-07-26 2015-02-23 한국교통대학교산학협력단 Hollowed Precast Column And Constructure Method Thereof
US20170159294A1 (en) * 2014-07-09 2017-06-08 Elastic Potential ,S.L Pillar for supporting a modular structure, beam intended to be supported on pillars of this type, and structure comprising said pillars and beams
US20160230386A1 (en) * 2015-02-10 2016-08-11 Tindall Corporation Method and apparatus for constructing a concrete structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022223800A1 (en) * 2021-04-22 2022-10-27 Elastic Potential, S.L. Concrete beam and system that comprises said beam

Similar Documents

Publication Publication Date Title
US10557264B2 (en) Methods and apparatuses for constructing a concrete structure
US20210180310A1 (en) Building construction system with split precast horizontal floor supports
US10518440B2 (en) Pre-stressed box culvert and methods for assembly thereof
JP2018505981A (en) PC truss wall structure and construction method thereof
WO2009011516A2 (en) Form with reinforcing bars, non-support form system and non-support construction method using the same
US10106973B1 (en) Precast concrete building elements and assemblies thereof, and related methods
CA2331237C (en) Partially prefabricated waffle slab
US3209510A (en) Method of constructing a column or frame
KR101013235B1 (en) Manufacturing method of rainwater storage bath
KR100911148B1 (en) Lightened Coping for bridge
JP3635004B2 (en) Bridge cantilever construction method
WO2020132266A1 (en) Methods and apparatuses for constructing a concrete structure
KR101582599B1 (en) Bridge construction method for forming continuous point part of pier using copping for connecting girder
KR20140125754A (en) Bridge construction method for forming continuous point part of pier using copping for connecting girder
US3049785A (en) Apparatus for making hyperbolic-paraboloidal thin shell building units
CN115229680B (en) Method for constructing super-long sleeve with interlayer
Brzev et al. Precast concrete construction
KR100622449B1 (en) Hybrid pier and continuity execution method using the hybrid pier
JPH11172964A (en) Tower-shaped structure construction method
KR102354464B1 (en) Multi-rib PC slab having welded wire mesh and method for manufacturing and construction of the multi-rib PC slab
KR102453791B1 (en) PC double pannel using plate
JPH05306526A (en) Precast concrete block base for unit type building
JPS63272862A (en) Formwork support for executing arch concrete
JP2659329B2 (en) Construction method of PC structure
JPH066823B2 (en) Precast structural members

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19899706

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19899706

Country of ref document: EP

Kind code of ref document: A1