Bulkheads Adapted To Foundation Construction
(AREA)
Abstract
Method of expansion of precast reinforced concrete piles, including making piles with an extended upper part of the factory along its length lay up being done with periodically distributed along its length Canal ramifications that go their ends in a groove, which covers the entire pile length, except extended its parts and is designed as a spiral groove, which cover before driving piles ribbon with malomitsnoho material that has a mount to the hull reinforced concrete piles in the bottom of the end and at the top in the extended part of the reinforced concrete piles and which also has rims-face, adjacent to the side walls of the groove. After driving piles into the soil through internal channels stir around reinforced concrete piles under high pressure cement, forming a wide ґruntobetonnyy layer rigid connection with the case where reinforced concrete pile after curing cement is carried out thanks to the spiral groove.
UAU201410490U2014-09-252014-09-25Method of expansion of precast reinforced concrete piles
UA98711U
(en)
Precast reinforced concrete sheet-pile; procedure for construction of sheet-pilewall using said sheet-piles; road structure built on the top of said sheet-pile wall
Shuttering element, arrangement of the shuttering element and method for forming at least a part of a shuttering for a concrete part with the shuttering element