UA95510U - METHOD OF DEFORMATION OF STRUCTURES BUILDING, CONSTRUCTION - Google Patents

METHOD OF DEFORMATION OF STRUCTURES BUILDING, CONSTRUCTION

Info

Publication number
UA95510U
UA95510U UAU201407845U UAU201407845U UA95510U UA 95510 U UA95510 U UA 95510U UA U201407845 U UAU201407845 U UA U201407845U UA U201407845 U UAU201407845 U UA U201407845U UA 95510 U UA95510 U UA 95510U
Authority
UA
Ukraine
Prior art keywords
settlements
deformation
construction
foundations
sedimentation
Prior art date
Application number
UAU201407845U
Other languages
Russian (ru)
Ukrainian (uk)
Inventor
Roman Vasyliovych Samchenko
Ivan Dmytrovych Pavlov
Artem Ihorovych Yukhymenko
Ivan Vasyliovych Stepura
Original Assignee
Zaporizhia State Eng Academy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zaporizhia State Eng Academy filed Critical Zaporizhia State Eng Academy
Priority to UAU201407845U priority Critical patent/UA95510U/en
Publication of UA95510U publication Critical patent/UA95510U/en

Links

Abstract

Спосіб усунення деформацій будівель, споруд містить зміну осідань фундаментів, контроль за осіданнями, керування осіданнями. Осідання фундаментів виконують шляхом керування жорсткістю основи частковою виїмкою ґрунту. Максимальний об'єм виїмки ґрунту виконують під перерізами фундаменту із забезпеченням максимального осідання і поступово зменшують виїмку ґрунту в напрямках зменшення осідань за криволінійною залежністю.A method of eliminating deformation of buildings, structures contains alteration of the settlements of foundations, control of settlements, management of settlements. The subsidence of the foundations is done by controlling the rigidity of the substrate by partial excavation. The maximum volume of soil excavation is performed under the cross sections of the foundation with maximum sedimentation and gradually reduce the soil excavation in the direction of decreasing sedimentation by curvilinear dependence.

UAU201407845U 2014-07-11 2014-07-11 METHOD OF DEFORMATION OF STRUCTURES BUILDING, CONSTRUCTION UA95510U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
UAU201407845U UA95510U (en) 2014-07-11 2014-07-11 METHOD OF DEFORMATION OF STRUCTURES BUILDING, CONSTRUCTION

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
UAU201407845U UA95510U (en) 2014-07-11 2014-07-11 METHOD OF DEFORMATION OF STRUCTURES BUILDING, CONSTRUCTION

Publications (1)

Publication Number Publication Date
UA95510U true UA95510U (en) 2014-12-25

Family

ID=52680715

Family Applications (1)

Application Number Title Priority Date Filing Date
UAU201407845U UA95510U (en) 2014-07-11 2014-07-11 METHOD OF DEFORMATION OF STRUCTURES BUILDING, CONSTRUCTION

Country Status (1)

Country Link
UA (1) UA95510U (en)

Similar Documents

Publication Publication Date Title
AR110221A2 (en) SYSTEM FOR CONTROLLING A WORK EQUIPMENT IN SOILS
EP3827134A4 (en) Tower foundation with concrete box girder beams
WO2014131502A3 (en) Connection
CO6990684A2 (en) Construction of retaining wall through the use of site compaction and excavation
EA201891198A1 (en) METHOD OF FORMING A STABLE GROUND FOUNDATION
MX2017003394A (en) Hydraulic noise suppressor and method for handling a hydraulic noise suppressor.
EA201491443A1 (en) WALL BLOCK ELEMENT
EP3913145A4 (en) Packer and pile foundation structure
MX2016010698A (en) Prefabricated footing for wind turbines.
PH12017501962A1 (en) Scour protection for an underwater bottom alongside a quay wall, and method for providing the same
UA95510U (en) METHOD OF DEFORMATION OF STRUCTURES BUILDING, CONSTRUCTION
AR088174A1 (en) PROCEDURE TO PRODUCE A CONSTRUCTION MATERIAL
UA98645U (en) Precast reinforced concrete foundation with anchor farms
Kahkesh et al. Determination of the hole drain position in dams and hydraulic structures in order to reduce the seepage in water structures by Geo studio model
UA115199U (en) METHOD OF REDUCING TECHNOLOGICAL EQUIPMENT AND THE ENVIRONMENT
RU2013122019A (en) REINFORCED CONCRETE PILES
RU2014152176A (en) METHOD FOR DETERMINING THE DISTRIBUTION OF VERTICAL FORCES OF FROZEN BURNING OPERATING ON THE SOIL OF A FROZEN SOIL UNDER FOUNDATIONS AND UNDERGROUND STRUCTURES
CN203855978U (en) Novel strip-shaped foundation crossing old foundation
JP1650407S (en) foundation pile
UA132167U (en) METHOD OF ALIGNMENT OF BUILDINGS, CONSTRUCTION
SG11201903020QA (en) Structure provided with composite underground wall and method for constructing structure provided with composite underground wall
AU2015900177A0 (en) Universal Retaining Panels. Our Universal Retaining Panels are a specially engineered structural retaining wall system, custom made from precast concrete at a size and finish to suit your requirements, built on site. Universal Retaining Panels allow you to make full use of your site, generally requiring less battering than traditional methods of soil retention in cut and fill landscaping, subdivisions and civil projects
CL2015002678A1 (en) Modular method of seismic-resistant construction with timber framework and cement-soil.
PH22014000545Y1 (en) A frustum formwork for caisson or ground chamber formation or excavation
MX2020010046A (en) Geosynthetic reinforced wall panels comprising soil reinforcing hoop members and retaining wall system formed therewith.