UA95289U - METHOD OF VERTICAL PLANNING OF A LOCAL EARTH PLOT - Google Patents

METHOD OF VERTICAL PLANNING OF A LOCAL EARTH PLOT

Info

Publication number
UA95289U
UA95289U UAU201311455U UAU201311455U UA95289U UA 95289 U UA95289 U UA 95289U UA U201311455 U UAU201311455 U UA U201311455U UA U201311455 U UAU201311455 U UA U201311455U UA 95289 U UA95289 U UA 95289U
Authority
UA
Ukraine
Prior art keywords
soil
plot
planning
squares
find
Prior art date
Application number
UAU201311455U
Other languages
Russian (ru)
Ukrainian (uk)
Inventor
Radomyr Oleksiiovych Timchenko
Dmytro Anatoliiovych Krishko
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to UAU201311455U priority Critical patent/UA95289U/en
Publication of UA95289U publication Critical patent/UA95289U/en

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

Спосіб вертикального планування локальної земельної ділянки включає в себе розділення ділянки планувальною сіткою на квадрати, знаходження існуючих відміток в кутах квадратів. Потім знаходять середню планувальну відмітку призначення проектних висотних відміток в кутах квадратів в залежності від заданих проектних ухилів, знаходять лінію з нульовою різницею між існуючими та проектними відмітками. Здійснюють підрахунок об'ємів земляних мас, розбивку ділянки, розпушення ґрунту, зняття необхідного шару ґрунту, його переміщення у місця насипу, ущільнення ґрунту, кінцеве планування ділянки. Після знаходження середньої планувальної відмітки проектні відмітки знаходять з урахуванням критерію мінімуму земляних робіт у залежності від положення проектної площини. Потім знаходять положення нульової лінії, підраховують об'єм земляних мас, виконують розбивку ділянки, розпушують ґрунт, знімають необхідний шар ґрунту, переміщують його у місця насипу, ущільнюють ґрунт та виконують кінцеве планування майданчика.The method of vertical planning of the local land plot involves dividing the plot with a grid into squares, finding existing markers in the corners of the squares. Then find the average planning mark of the design elevation in the corners of the squares, depending on the given design biases, find a line with zero difference between the existing and design marks. Carry out the calculation of the volume of earth masses, the breakdown of the plot, loosening the soil, removing the required layer of soil, moving it to the place of the embankment, compacting the soil, the final planning of the site. After finding the average planning mark, the design marks are found with the criterion of minimum excavation depending on the position of the project plane. Then they find the positions of the zero line, calculate the volume of earth masses, perform the partition of the plot, loosen the soil, remove the necessary layer of soil, move it to the place of the embankment, compact the soil and perform the final layout of the site.

UAU201311455U 2013-09-27 2013-09-27 METHOD OF VERTICAL PLANNING OF A LOCAL EARTH PLOT UA95289U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
UAU201311455U UA95289U (en) 2013-09-27 2013-09-27 METHOD OF VERTICAL PLANNING OF A LOCAL EARTH PLOT

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
UAU201311455U UA95289U (en) 2013-09-27 2013-09-27 METHOD OF VERTICAL PLANNING OF A LOCAL EARTH PLOT

Publications (1)

Publication Number Publication Date
UA95289U true UA95289U (en) 2014-12-25

Family

ID=52680495

Family Applications (1)

Application Number Title Priority Date Filing Date
UAU201311455U UA95289U (en) 2013-09-27 2013-09-27 METHOD OF VERTICAL PLANNING OF A LOCAL EARTH PLOT

Country Status (1)

Country Link
UA (1) UA95289U (en)

Similar Documents

Publication Publication Date Title
CL2019002017A1 (en) Land conditioning set for earthmoving work teams. (divisional request 201702058)
AR110220A2 (en) SYSTEM FOR CONTROLLING A WORK EQUIPMENT IN SOILS
BR112014019185A8 (en) method and apparatus for estimating soil formation kerogen porosity
PH12018550061A1 (en) Method for forming a stable foundation ground
BR112017017657A2 (en) METHOD FOR PREMOLDED BLOCK CONTAINMENT WALL TO PREVENT EARTH DEMORONATION
CL2015000769A1 (en) Method to produce a reinforced structure in the ground.
BRPI0800009A2 (en) Method and system for modeling a soil trench
AR097027A1 (en) COMPOSITIONS FOR WELL SERVICE AND METHODS FOR THEIR DEVELOPMENT AND USE
LT2014085A (en) Telescopic formwork device for dotted dug up dig and manner of use
UA95289U (en) METHOD OF VERTICAL PLANNING OF A LOCAL EARTH PLOT
HUE044288T2 (en) Boring and concreting equipment for producing a concrete pile in the ground, and corresponding method
PL403284A1 (en) Method for performing the excavation of the pavement and complex devices to perform excavation of the pavement
CHEN et al. Impacts of Rainfall and Land Use on Urban Surface Runoff: A Case Study of Area Surrounding the North Moat in Beijing, China
CO2017009098A2 (en) Method of building a road
ITUA20161500A1 (en) EXCAVATION METHOD IN UNDERGROUND FORMATIONS
UA116696U (en) METHOD OF PROTECTION OF ROAD, AIRPORTS FROM DESTRUCTIVE VIBRATION-WAVE OSCILLATIONS
UA117629U (en) METHOD OF RECLUSION OF LAND DISTURBED BY OPEN WORKING WORKS
CN204251410U (en) A kind of sewage soil infiltration device
UA86637U (en) Method for arrangement of embankment on muds
UA90151U (en) Method for strengthening a concrete underlay
Gong Solution and Analysis for Ecological Remediation of the Damaged Mountains in Jinan, China
Zadbar et al. HAZARD ZONATION AND ASSESSMENT OF URBAN FLOOD DAMAGE USINGMATHEMATICAL MODELS, HEC-RAS, HEC-FDA AND GEOGRAPHIC INFORMATION SYSTEMS (GIS)
PL407461A1 (en) Manhole cover for underground pipe wells and chambers
UA100885U (en) METHOD OF CREATED SPACE RECOVERY
UA85566U (en) Method for determination of effect of underground pipeline on horizontal shifts of the surface of earth at underground extraction of coal