Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Виктор Станиславович КоробкинfiledCriticalВиктор Станиславович Коробкин
Priority to UAU201214967UpriorityCriticalpatent/UA81237U/en
Publication of UA81237UpublicationCriticalpatent/UA81237U/en
Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes
(AREA)
Abstract
A girth rail includes a body with rectangular cross section in projection, arranged as monolithic, made of concrete, and reinforcement elements placed in the body in long and in vertical directions along the side facets, connected to each other with formation of spatial frame as reinforcing mesh. The reinforcement elements are arranged in planes of facets of the girth-rail body at right angle, with formation of square or rectangular cells, those vertical and long horizontal reinforcement elements of spatial frame as reinforcing mesh are placed in parallel to the facets of the girth-rail body and at same distances from the outer surfaces of those.