Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Open Joint Stock Company KrymefiledCriticalOpen Joint Stock Company Kryme
Priority to UAU200502547UpriorityCriticalpatent/UA6955U/en
Publication of UA6955UpublicationCriticalpatent/UA6955U/en
Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections
(AREA)
Abstract
The proposed device for detecting unaccounted electric power consumption c contains a current transformer with two primary windings. One of the windings is inserted in the phase circuit, and the other winding -in the neutral wire circuit of the power-supply line. To the secondary winding of the transformer, a latched actuator, an indicator, or a slow-operating relay.
UAU200502547U2005-03-212005-03-21Device for detecting unaccounted electric power consumption
UA6955U
(en)