UA24741U - Method for arrangement of superstructure on building - Google Patents

Method for arrangement of superstructure on building Download PDF

Info

Publication number
UA24741U
UA24741U UAU200702899U UAU200702899U UA24741U UA 24741 U UA24741 U UA 24741U UA U200702899 U UAU200702899 U UA U200702899U UA U200702899 U UAU200702899 U UA U200702899U UA 24741 U UA24741 U UA 24741U
Authority
UA
Ukraine
Prior art keywords
floor
superstructure
beams
ceiling
wall panels
Prior art date
Application number
UAU200702899U
Other languages
Ukrainian (uk)
Inventor
Viktor Yevhenovych Troianov
Vladyslav Fedorovych Titenko
Sergii Vladyslavovych Titenko
Original Assignee
Viktor Yevhenovych Troianov
Vladyslav Fedorovych Titenko
Sergii Vladyslavovych Titenko
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Viktor Yevhenovych Troianov, Vladyslav Fedorovych Titenko, Sergii Vladyslavovych Titenko filed Critical Viktor Yevhenovych Troianov
Priority to UAU200702899U priority Critical patent/UA24741U/en
Publication of UA24741U publication Critical patent/UA24741U/en

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

Method for arrangement of superstructure on building relates to building. Technical result of utility model is in formation of method for arrangement of superstructure on building with decreased material consumption, with low labor consumption for works, with provision of decreased mass of structures for arrangement of superstructure on building, with decreased load on walls of existing building, with provision of needed strength and heat insulation of building, with provision of assemblage of superstructure without use of heavy machinery and without moving away people.

Description

Опис винаходуDescription of the invention

Корисна модель відноситься до будівництва і може використовуватися при реконструкції багатоповерхових 2 будівель, а саме до способів надбудови додаткових поверхів, без необхідності виготовлення додаткових опор та фундаментів.The useful model refers to construction and can be used in the reconstruction of multi-storey 2 buildings, namely to methods of superstructure of additional floors, without the need for the manufacture of additional supports and foundations.

Відомий спосіб реконструкції багатоповерхової будівлі описаний в (патенті України Мо59857, опублікованому 15.09.2003р. в бюлетені Мо9, клас МПК ЕО4023/02)Ї. Спосіб включає установку колон та монтаж ригелів з утворенням обвідної рами. Колони виконують із залізобетону із заглибленими в стіну консольними виступами, 70 розташованими з кроком, що дорівнює 0,2...0,5 висоти будівлі міжповерхові металеві ригелі монтують в рівні перекриттів, попередньо навантажуючи їх до величини, не меншої ніж 0,5 значення нормативного опору, верхній ригель виконують із залізобетону і встановлюють з можливістю обпирання його на несучу повздовжню стіну або на конструкцію перекриття, як на проміжну опору, на його рівні на колонах в сторону зовнішнього боку будівлі виконують допоміжні консолі, а зверху отриманої конструкції улаштовують залізобетонне перекриття для 72 зведення додаткових поверхів.A well-known method of reconstruction of a multi-story building is described in (patent of Ukraine Mo59857, published on September 15, 2003 in Mo9 bulletin, class IPC EO4023/02). The method includes the installation of columns and the installation of crossbars with the formation of a circumferential frame. Columns are made of reinforced concrete with cantilever protrusions embedded in the wall, 70 located with a step equal to 0.2...0.5 of the height of the building, inter-floor metal crossbars are mounted at the level of the floors, pre-loading them to a value not less than 0.5 standard support, the upper crossbar is made of reinforced concrete and installed with the possibility of resting it on the load-bearing longitudinal wall or on the floor structure as an intermediate support, at its level on the columns towards the outside of the building, auxiliary consoles are made, and on top of the resulting structure, a reinforced concrete floor is arranged for 72 construction of additional floors.

Загальними ознаками є те, що спосіб стосується зведення додаткових поверхів на існуючий багатоповерховій будівлі.The general features are that the method refers to the construction of additional floors on an existing multi-story building.

Недоліками відомого способу є великі витрати матеріалів та висока трудомісткість виготовлення та встановлення додаткових колон та перекриття з великими прольотами для монтажу додаткових поверхів, до тою ж скрізь стіни будинку пропускають консольні виступи колон та ригелі, всі ці роботи потребують відселення мешканців і капітального ремонту усіх приміщень.The disadvantages of the known method are the high consumption of materials and the high labor cost of manufacturing and installing additional columns and ceilings with large spans for the installation of additional floors, in addition, the cantilever protrusions of the columns and crossbars pass through the walls of the house everywhere, all these works require the relocation of residents and major repairs of all premises.

Найбільш близьким способом по суті, є спосіб надбудови будівлі описаний у (патенті України на корисну модель Мо7587, опублікованому 15.06.2005р., клас МПК ЕО4023/02), що включає виконання монолітної залізобетонної конструкції на стінах поверху, що надбудовують, та зведення на ній каркаса додаткового поверху. Монолітну залізобетонну конструкцію виконують у вигляді пояса навколо покрівлі шляхом стовщення в гребенів, після чого проводять піднімання та вирівнювання покрівлі, при цьому зведення каркаса додаткового поверху проводять шляхом його складання безпосередньо на будівлі без використання важкої техніки, а на каркас укладають перекриття для зведення каркаса наступного поверху або нової покрівлі. Каркас виконують із стандартних профілів із оцинкованого сталевого тонкостінного листа. Під час зведення каркаса прокладають -- труби водо- та газопостачання та електричні кабелі. Одночасно зі зведенням, на плиту перекриття каркаса «І наступного поверху або нової покрівлі проводять внутрішні роботи на нижньому додатковому поверсі. Каркас наступного поверху зводять аналогічно зведенню каркаса додаткового поверху. -The closest method, in fact, is the method of superstructure of the building described in (patent of Ukraine for a utility model Mo7587, published on 15.06.2005, class IPC EO4023/02), which includes the execution of a monolithic reinforced concrete structure on the walls of the superimposed floor and erection on it frame of the additional floor. The monolithic reinforced concrete structure is made in the form of a belt around the roof by thickening it into ridges, after which the roof is lifted and leveled, while the construction of the frame of the additional floor is carried out by assembling it directly on the building without the use of heavy equipment, and the floor is laid on the frame for the construction of the frame of the next floor or a new roof. The frame is made of standard profiles made of galvanized thin-walled steel sheet. During the erection of the frame, water and gas supply pipes and electric cables are laid. Simultaneously with the construction of the next floor or new roof, internal work is carried out on the lower additional floor. The frame of the next floor is built similarly to the construction of the frame of the additional floor. -

Загальними суттєвими ознаками є те, що спосіб стосується зведення додаткових поверхів, по якому зведення /-«ф каркасу надбудови та міжповерхового перекриття виконують безпосередньо на будівлі без використання важкоїThe general essential features are that the method relates to the construction of additional floors, according to which the construction of the frame of the superstructure and the floor covering is performed directly on the building without the use of heavy

Зо техніки, виконують звуко- та теплоізоляційні роботи, прокладають труби та електрокабелі. сFrom engineering, perform sound and heat insulation works, lay pipes and electric cables. with

Недоліками відомого способу є те що, надбудова по контуру стіни навколо покрівлі монолітної залізобетонної конструкції заввишки даху призводить до високих витрат матеріалів, підвищенню трудомісткості робот та додатковому навантаженню на стіни існуючої будівлі, а все одне під час будівництва в дощову погоду « залізобетонна конструкція перекриває стік води і вода попадає на горище, до того ж, коли елементи даху З 70 розбирають, надбудова ускладнює розбирання даху та видалення його елементів, але не захищає від дощу, а с створення технічного поверху призводить до втрати приміщень та залишаються непотрібні і важкі елементи на з» стінах будівлі.The disadvantages of the known method are that the superstructure along the contour of the wall around the roof of a monolithic reinforced concrete structure of the height of the roof leads to high consumption of materials, increased labor intensity of robots and additional load on the walls of the existing building, and all the same during construction in rainy weather "reinforced concrete structure blocks the flow of water and water gets into the attic, in addition, when the elements of the Z 70 roof are disassembled, the superstructure makes it difficult to disassemble the roof and remove its elements, but does not protect against rain, and the creation of a technical floor leads to the loss of premises and unnecessary and heavy elements remain on the walls of the building.

Метою корисної моделі є створення способу надбудови будівлі з зменшеними витратами матеріалів, з невисокою трудомісткістю робіт, з забезпеченням зменшеної маси конструкцій надбудови будівлі, з зниженим навантаження на стіни існуючої будівлі, з забезпеченням необхідної міцності та теплоізоляції надбудови, з ді забезпеченням збирання надбудови без використання важкої техніки та без відселення мешканців. «» Згідно корисної моделі надбудову збирають з окремих балок і панелей обмеженої ваги, для чого на верхівці стін існуючої будівлі виставляють в горизонт та закріпляють контурні балки з композитних матеріалів, як по і зовнішніх стінах, так і внутрішніх опорних стінах, потім на контурних балках установлюють і закріплюють балки ї» 20 міжповерхового перекриття, зашивають плитами низ перекриття, заповнюють порожнини перекриття ізоляцією, зашивають плитами верх перекриття, установлюють і закріплюють стінові панелі по контуру зовнішніх стін та будівлі та контуру стін кімнат, потім встановлюють і з'єднують балки міжповерхового перекриття з верхньою частиною стінових панелей першого поверху надбудови, заводять труби та кабелі у приміщення усередині стінових порожнин, зашивають стінові панелі першого поверху зсередини приміщень, по висоті ребер жорсткості 25 плитами й заповнюють ізоляцією порожнини стінових панелей, зашивають плитами низ міжповерхового с перекриття, що встановлене на стінових панелях першого поверху надбудови, установлюють сходові прольоти, заповнюють ізоляцією порожнини перекриття, зашивають плитами верх міжповерхового перекриття надбудови, потім на ньому установлюють і закріплюють по контуру зовнішніх опорних стін, та контуру стін кімнат стінові панелі наступного поверху надбудови, потім встановлюють і з'єднують балки наступного міжповерхового 60 перекриття з верхньою частиною стінових панелей цього поверху надбудови, заводять у приміщення усередині стінових порожнин труби й кабелі, зашивають стінові панелі цього поверху надбудови зсередини приміщень по висоті ребер жорсткості плитами й заповнюють ізоляцією порожнини, дії повторюють і таким чином збирають необхідну кількість поверхів, а потім закріплюють по верхньому контуру зовнішніх стінових панелей фронтонні балки, закріпляють крокви, стояки, обрешітку й застеляють покриття даху. бо Порожнини перекриття та стін заливають піноізоляцією, яку виготовляють на місці, причому перекриття заповнюють на 30-6095 по висоті перекриття.The purpose of the useful model is to create a method of superstructure of the building with reduced consumption of materials, with low labor intensity, ensuring a reduced mass of structures of the superstructure of the building, reducing the load on the walls of the existing building, ensuring the necessary strength and thermal insulation of the superstructure, and ensuring assembly of the superstructure without the use of heavy equipment and without displacement of residents. "" According to a useful model, the superstructure is assembled from individual beams and panels of limited weight, for which purpose contour beams made of composite materials are placed horizontally on the top of the walls of the existing building and fixed, both on the external walls and on the internal supporting walls, then on the contour beams they are installed and fasten the beams 20 of the interfloor ceiling, sew up the bottom of the floor with slabs, fill the cavities of the floor with insulation, sew up the top of the floor with slabs, install and fasten the wall panels along the contour of the external walls and the building and the contour of the walls of the rooms, then install and connect the beams of the interfloor ceiling with the upper part of the wall panels of the first floor of the superstructure, bring pipes and cables into the room inside the wall cavities, sew up the wall panels of the first floor from the inside of the room, along the height of the stiffeners with 25 plates and fill the cavity of the wall panels with insulation, sew up the bottom of the interfloor ceiling installed on the wall panels with plates pas floors of the first floor of the superstructure, install stair flights, fill the cavity of the superstructure with insulation, sew the top of the interfloor superstructure with slabs, then install and fasten on it the wall panels of the next floor of the superstructure along the contour of the external supporting walls and the contour of the walls of the rooms, then install and connect the beams of the next interfloor 60 overlap with the upper part of the wall panels of this superstructure floor, pipes and cables are brought into the premises inside the wall cavities, the wall panels of this superstructure floor are sewn up from the inside of the premises at the height of the stiffeners with slabs and the cavity is filled with insulation, the actions are repeated and in this way the required number of floors is collected , and then fasten the gable beams along the upper contour of the outer wall panels, fasten the rafters, risers, crate and cover the roof. because the cavities of the floor and walls are filled with foam insulation, which is made on site, and the floor is filled to 30-6095 of the height of the floor.

Кожну стінову панель додатково розкріплюють технологічними розпірками, які знімають після установки балок перекриття наступного поверху.Each wall panel is additionally unfastened with technological spacers, which are removed after the installation of the floor beams of the next floor.

Застосовують стінові панелі, плити яких заздалегідь, в умовах виробництва, обрізають у розмір, та закріплюють на них ребра жорсткості, а на частині панелей виконують прорізи та встановлюють рами для вікон і дверей.Wall panels are used, the slabs of which are cut to size in advance, under production conditions, and stiffeners are attached to them, and slots are made on part of the panels and frames for windows and doors are installed.

Застосовують клеєні двотаврові балки з стінкою з плити ОСБ та полицями з деревини.Glued I-beams with a wall made of OSB board and shelves made of wood are used.

При виконанні надбудови будівель з високим двоскатним дахом, дах послідовно розбирають ділянками 7/0 кратними розміру стінових панелей і забудовують, а в дощову погоду місце між залишками даху та надбудовою захищають тентом.When constructing superstructures of buildings with a high gable roof, the roof is successively dismantled in sections 7/0 times the size of the wall panels and built up, and in rainy weather the space between the remains of the roof and the superstructure is protected by an awning.

Крокви даху виконують з нависанням консолей за межі стін не менше 0,5 метра та виконують на кінцівках наскрізні отвори і облицювання фасаду, установку вікон виконують з використанням монтажних колисок і ручних лебідок із кріпленням тросів колисок до консолей крокв даху, паралельно з лицювальними роботами виконують 7/5 Ддоводочні роботи, що залишилися, - установку інженерного устаткування, внутрішню обробку.Roof rafters are made with consoles overhanging the walls by at least 0.5 meters, and through-holes and facade cladding are performed on the ends, windows are installed using mounting cradles and manual winches with the cradle cables attached to the roof rafter consoles, in parallel with facing work, 7 /5 Additional works remaining - installation of engineering equipment, interior finishing.

Зовнішню обробку фасадів невисоких будівель виконують з будівельних лісів.External finishing of the facades of low-rise buildings is performed from timber.

Відмітними суттєвими ознаками у всіх випадках є те, що надбудову збирають з окремих балок і панелей, для чого на верхівці стін існуючої будівлі виставляють в горизонт та закріпляють контурні балки, як по зовнішніх стінах, так і внутрішніх опорних стінах, потім на контурних балках виставляють і закріплюють балки Міжповерхового перекриття, зашивають плитами низ перекриття, заповнюють порожнини перекриття ізоляцією, зашивають плитами верх перекриття, установлюють і закріплюють стінові панелі по зовнішньому контуру будівлі та контуру стін кімнат, потім встановлюють і з'єднують балки міжповерхового перекриття з верхньою частиною стінових панелей першого поверху надбудови, зашивають стінові панелі першого поверху надбудови зсередини приміщень, по висоті ребер жорсткості плитами й заповнюють ізоляцією порожнини стінових панелей, ге Зашивають плитами низ міжповерхового перекриття, що встановлене на стінових панелях першого поверху надбудови, установлюють сходові прольоти, заповнюють ізоляцією порожнини перекриття, зашивають плитами о, верх міжповерхового перекриття, потім на ньому установлюють і закріплюють, по зовнішньому контуру будівлі та контуру стін кімнат, стінові панелі наступного поверху надбудови, потім встановлюють і з'єднують балки наступного міжповерхового перекриття з верхньою частиною стінових панелей цього поверху надбудови, «- зо зашивають стінові панелі цього поверху надбудови зсередини приміщень по висоті ребер жорсткості плитами й заповнюють ізоляцією порожнини і зашивають плитами низ міжповерхового перекриття, заповнюють ізоляцією - порожнини перекриття, зашивають плитами верх міжповерхового перекриття надбудови, встановлюють ї- конструкцію даху.Distinctive essential features in all cases are that the superstructure is assembled from individual beams and panels, for which contour beams are placed horizontally on top of the walls of the existing building and fixed, both on the outer walls and on the internal supporting walls, then on the contour beams and fix the beams of the interfloor ceiling, sew up the bottom of the ceiling with slabs, fill the cavities of the ceiling with insulation, sew up the top of the ceiling with slabs, install and fix the wall panels along the outer contour of the building and the contour of the walls of the rooms, then install and connect the beams of the interfloor ceiling with the upper part of the wall panels of the first floor superstructures, sew up the wall panels of the first floor of the superstructure from the inside of the premises, along the height of the stiffeners with slabs and fill the cavity of the wall panels with insulation. the floor cavities are sewn up with plates o, the top of the interfloor ceiling, then the wall panels of the next floor of the superstructure are installed and fixed on it, along the outer contour of the building and the contour of the walls of the rooms, then they install and connect the beams of the next interfloor ceiling with the upper part of the wall panels of this floor superstructure, "- the wall panels of this floor of the superstructure are sewn up from the inside of the premises at the height of the stiffeners with plates and fill the cavity with insulation and the bottom of the inter-floor overlap is sewn up with plates, fill the cavity of the floor with insulation, sew the top of the inter-floor overlap of the superstructure with plates, install it - the roof structure.

Відмітними суттєвими ознаками в окремих випадках є те, що повторюють дії і, таким чином, збирають « необхідну кількість поверхів надбудови, а для збирання конструкції даху, закріплюють по верхньому контуру с зовнішніх стінових панелей фронтонні балки, закріпляють крокви, стояки, обрешітку й застеляють покриття даху.Distinctive essential features in some cases are that the actions are repeated and, thus, the necessary number of floors of the superstructure is collected, and to assemble the roof structure, gable beams are fixed along the upper contour from the outer wall panels, rafters, risers, crates are fixed and the covering is laid the roof

Порожнини перекриття та стін заливають піноізоляцією, яку виготовляють на місці, причому перекриття заповнюють на 30-6095 по висоті балок перекриття.The cavities of the floor and walls are filled with foam insulation, which is made on site, and the floors are filled to 30-6095 in height of the floor beams.

Кожну стінову панель додатково розкріплюють технологічними розпірками, які знімають після установки балок « перекриття наступного поверху. в с Застосовують стінові панелі, плити яких заздалегідь, в умовах виробництва, обрізають у розмір, та закріплюють на них ребра жорсткості, а на частині панелей виконують прорізи та встановлюють рами для вікон і з дверей.Each wall panel is additionally unfastened with technological spacers, which are removed after the installation of the beams of the floor of the next floor. in c Wall panels are used, the plates of which are cut to size in advance, under the conditions of production, and stiffeners are attached to them, and on part of the panels, slots are made and frames for windows and doors are installed.

Застосовують клеєні двотаврові балки з стінкою з плити ОСБ та полицями з деревини.Glued I-beams with a wall made of OSB board and shelves made of wood are used.

При виконанні надбудови будівель з високим двоскатним дахом, дах послідовно розбирають ділянкамиWhen constructing superstructures of buildings with a high gable roof, the roof is successively dismantled in sections

ГІ кратними розміру стінових панелей і забудовують, а в дощову погоду місце між залишками даху та надбудовою захищають тентом. ве Крокви даху виконують з нависанням консолей за межі стін не менше 0,5 метра та виконують на кінцівках -І наскрізні отвори і облицювання фасаду, установку вікон виконують з використанням монтажних колисок і ручних лебідок із кріпленням тросів колисок до консолей крокв даху, а паралельно з лицювальними роботами виконують о доводочні роботи, що залишилися, - установку інженерного устаткування, внутрішню обробку. як Зовнішню обробку фасадів виконують з будівельних лісів.GIs are built up in multiples of the size of the wall panels, and in rainy weather, the space between the remains of the roof and the superstructure is protected by an awning. ve Roof rafters are made with consoles overhanging the walls by at least 0.5 meters and are made at the ends - And through-holes and cladding of the facade, installation of windows is carried out using mounting cradles and hand winches with the attachment of cradle cables to the roof rafter consoles, and parallel to finishing works are carried out with the remaining finishing works - installation of engineering equipment, interior finishing. as External decoration of facades is performed from construction timber.

Створення надбудови описаним способом, з використанням елементів конструкції з композитних матеріалів на основі деревини, дозволяє без використання важкої техніки, без відселення мешканців, з зменшеними Витратами матеріалів, з невисокою трудомісткістю робот, в короткі строки виконати всі роботи, не ушкодживши ні будівлю, що реконструюють, ні сусідні будівлі, легка надбудова з ефективною тепло- та шумоізоляцією с забезпечує комфортні умови для мешканців, не перевантажує стіни існуючого базового будинку. Використання обрізаних у розмір з встановленими ребрами жорсткості стінових панелей підвищує швидкість будівництва, та додатково знижує трудомісткість робіт. Виконання робіт при надбудові будівель з високим двоскатним дахом, з бо послідовним розбираням даху дозволяє забезпечити захист приміщень мешканців в дощову погоду без виготовлення складних захисніх тимчасових перекриттів. Використання крокв даху для малої механізації знижує трудомісткість робіт і дозволяє виконати якісно зовнішні роботи на надбудівлі не турбуючи мешканців.The creation of a superstructure in the described way, using structural elements made of wood-based composite materials, allows without the use of heavy machinery, without the displacement of residents, with reduced costs of materials, with a low labor intensity of robots, in a short period of time to complete all the work without damaging the building that is being reconstructed , no neighboring buildings, a light superstructure with effective heat and noise insulation provides comfortable conditions for residents, does not overload the walls of the existing base building. The use of cut-to-size wall panels with installed stiffeners increases the speed of construction, and additionally reduces the labor intensity of the work. Carrying out work on the superstructure of buildings with a high gable roof, with successive dismantling of the roof, allows to ensure the protection of the residents' premises in rainy weather without the production of complex protective temporary coverings. The use of roof rafters for small mechanization reduces the labor intensity of the work and allows you to perform high-quality exterior work on the superstructure without disturbing the residents.

На Фіг.1 показаний головний вид на будівлю;Figure 1 shows the main view of the building;

На Фіг.2 показаний переріз А-А по стіні; 65 На Фіг.3 показаний вид Б.Fig. 2 shows a section AA along the wall; 65 Fig. 3 shows view B.

Для кращого розуміння способу на Фіг.1, 2, З показані основні конструктивні елементи надбудови, в якій використані композитні деревинні матеріали, які найбільш придатні для виконання способу, але можливо використання металевих та пластмасових будівельних конструкцій.For a better understanding of the method, Fig. 1, 2, C show the main structural elements of the superstructure, in which composite wooden materials are used, which are most suitable for the implementation of the method, but it is possible to use metal and plastic building structures.

Існуюча будівля 1, стінові панелі 2 з вікнами З, дах 4, контурні балки 5 які уявляють собою клеєні двотаврові балки з стінкою з ОСБ (058) (деревино-стружечних плит з орієнтованою стружкою) товщиною 10мм та полицями з деревини, висота балок 40бмм, а полиці мають переріз 89х3вмм, кронштейни 6 з сталевого листа, балки перекриття 7 виготовлені з стінкою товщиною 1Омм з плити ОСБ та полицями з деревини, висота балок 40бмм, а полиці мають переріз 89х38мм, зашивка ДВП (деревино волокнисті плити) 8 товщиною 4мм, піноїзоляція 9, верхня зашивка 10 з плити ОСБ товщиною 2О0мм. На плиті 11 товщиною 20мм з ОСБ (058) 70 (деревино-стружечних плит з орієнтованою стружкою) стінових панелей 2 на клею закріплені ребра жорсткості 12, виготовлені з стінкою з плити ОСБ товщиною 1Омм та полицями з деревини, ребра жорсткості виконані висотою 241мм з полицями 38 х6б4мм. Піноізоляція 13, що залита в порожнину стінової панелі 2, яка зашита гіпсокартонними плитами 14. Балки 15 перекриття виготовлені з стінкою з плити ОСБ та полицями з деревини, аналогічно балкам 7. Зашивка ДВП (деревино волокнисті плити) 16, піноїзоляція 17, плита з ОСБ 18, 75 гіпсокартонна зашивка 19, піноізоляція 20, зашивка стелі з гіпсо картонна 21, фронтонні балки 22 виготовлені з стінкою з плити ОСБ (058) (деревино-стружечних плит з орієнтованою стружкою) та полицями з деревини, аналогічно балкам 7, крокви 23 виготовлені з стінкою з плити ОСБ (058) (деревино-стружечних плит з орієнтованою стружкою) та полицями з деревини, аналогічно балкам 7, кронштейни 24 з сталевого листа, а стійки 25 та обрешетка 26 виготовлені з деревини. Цвяхи, шурупи та місця склеювання не показані, так як використовується типова технологія скріплення конструкції з допомогою цих елементів. Плити ОСБ та гіпсокартонні плити виготовляються багатьма фірмами держав світу. Для зовнішніх стін на плитах ОСБ товщиною 20мм закріплюють на клею та шурупах ребра жорсткості висотою 241мм з полицями 38 хб4мм, внутрішні стінові панелі мають товщину плити 1бмм, та ребра жорсткості висотою 100мм.Existing building 1, wall panels 2 with windows C, roof 4, contour beams 5 which are glued I-beams with a wall of OSB (058) (wood chipboard with oriented chips) 10 mm thick and wooden shelves, beam height 40 mm, and the shelves have a cross-section of 89x3mm, brackets 6 are made of steel sheet, ceiling beams 7 are made with a wall 1mm thick from an OSB board and shelves made of wood, the height of the beams is 40mm, and the shelves have a cross-section of 89x38mm, fiberboard stitching (fiberboard) 8, 4mm thick, foam insulation 9, upper seam 10 from an OSB plate with a thickness of 200 mm. Stiffeners 12, made with a wall made of OSB board 1mm thick and wooden shelves, are made with a height of 241mm with shelves on a plate 11 with a thickness of 20mm from OSB (058) 70 (wood-chipboard with oriented chips) of wall panels 2 on glue. 38 x6b4mm. Foam insulation 13, which is poured into the cavity of the wall panel 2, which is sewn with plasterboard plates 14. Beams 15 of the ceiling are made with a wall made of OSB board and shelves made of wood, similar to beams 7. Seam of fiberboard (wood fiber boards) 16, foam insulation 17, board made of OSB 18, 75 plasterboard seam 19, foam insulation 20, plasterboard ceiling seam 21, gable beams 22 are made with a wall of OSB board (058) (wood chipboard with oriented chips) and shelves made of wood, similar to beams 7, rafters 23 are made with a wall of OSB (058) board (wood chipboard with oriented chips) and shelves of wood, similar to beams 7, brackets 24 of steel sheet, and racks 25 and crate 26 are made of wood. Nails, screws and gluing places are not shown, as the typical technology of fastening the structure with the help of these elements is used. OSB boards and plasterboard boards are manufactured by many companies of the world's countries. For external walls, 20 mm thick OSB plates are fixed with glue and screws, 241 mm high stiffeners with 38 x 4 mm shelves, internal wall panels have a plate thickness of 1 mm, and 100 mm high stiffeners.

В якості піноізоляції використовують карбамідний пінопласт, який випускається в Великобританії фірмою "Вармаль ЛТД" під назвою - флотофаум, а в Російській Федерації - під назвою "Пеноизол", але можливо 7 використання і інших видів піноіїзоляції інших виробників, наприклад "ЕКОПЕН", який виготовляється в (Російській Федерації по ТУ 2254-031-21070677-20061.Urea foam is used as foam insulation, which is produced in Great Britain by the company "Varmal LTD" under the name Flotofaum, and in the Russian Federation under the name "Penoizol", but it is also possible to use other types of foam insulation from other manufacturers, for example, "EKOPEN", which is manufactured in (the Russian Federation according to TU 2254-031-21070677-20061.

Для виконання способу на верхівці стін існуючої будівлі 1 встановлюють кронштейни 6, до яких закріпляють, з виверенням горизонту, контурні балки 5, як по зовнішніх стінах, так і внутрішніх опорних стінах будівлі 1. -To perform the method, brackets 6 are installed on the top of the walls of the existing building 1, to which contour beams 5 are attached, aligned with the horizon, both on the external walls and on the internal supporting walls of the building 1. -

Потім на контурних балках установлюють і закріплюють балки 7 міжповерхового перекриття, які мають переріз « аналогічний двотавровому профілю контурних балок 5, зашивають плитами 8 з ДВП (деревино волокнистих плит) низ перекриття, заливають порожнини перекриття піноізоляцією 9 до рівня не менше половини висоти - балок перекриття. Зашивають плитами 10 з ОСБ товщиною 20мм верх перекриття, який є черновою підлогою « приміщення, з використанням цвяхів, шурупів та клею. Установлюють по зовнішньому контуру будівлі та контуру стін кімнат, розкріплюють технологічними розпірками, а потім закріплюють шурупами, цвяхами та клеєм стінові с панелі 2. Застосовують кілька типорозмірів стінових панелей плити яких 11 заздалегідь, в умовах виробництва, обрізають у розмір, та встановлюють на них на клею ребра жорсткості 12. Частину панелей виконують з вирізами та рамами під вікна та двері, а частина панелей не мають вирізів. Потім встановлюють і з'єднують балки 15 « наступного міжповерхового перекриття з верхньою частиною стінових панелей 2 першого поверху надбудови, заводять труби та кабелі у приміщення усередині стінових порожнин, демонтують технологічне розкріплення - с панелей, зашивають стінові панелі першого поверху зсередини приміщень гіпсокартонними плитами 14, по и висоті ребер жорсткості й заливають піноізоляцією 13 порожнини стінових панелей. Зашивають плитами 16 з ,» ДВП низ міжповерхового перекриття, що встановлене на стінових панелях першого поверху надбудови, установлюють сходові прольоти, заливають піноізоляцією 17 порожнини перекриття, зашивають плитами 18 зThen, on the contour beams, the beams 7 of the inter-floor ceiling are installed and fixed, which have a cross-section similar to the I-beam profile of the contour beams 5, the bottom of the ceiling is sewn up with plates 8 made of fiberboard (fiberboard wood), the ceiling cavities are filled with foam insulation 9 to the level of at least half the height - the ceiling beam . The top of the ceiling, which is the rough floor of the room, is sewn up with plates 10 from OSB with a thickness of 20 mm, using nails, screws and glue. They are installed along the outer contour of the building and the contour of the walls of the rooms, unfastened with technological struts, and then fixed with screws, nails and glue to the wall panels 2. Several standard sizes of wall panels are used, the plates of which are cut to size in advance, under production conditions, and installed on them on glue stiffeners 12. Some panels are made with cutouts and frames for windows and doors, and some panels do not have cutouts. Then install and connect the beams 15" of the next interfloor overlap with the upper part of the wall panels 2 of the first floor of the superstructure, bring pipes and cables into the room inside the wall cavities, dismantle the technological separation - from the panels, sew up the wall panels of the first floor from the inside of the room with plasterboard plates 14, along the height of the stiffeners and fill 13 cavities of the wall panels with foam insulation. The bottom of the interfloor ceiling, which is installed on the wall panels of the first floor of the superstructure, is sewn up with slabs 16 from , "DVP

ОСББ верх міжповерхового перекриття надбудови. Потім на ньому установлюють і закріплюють стінові панелі ко наступного поверху надбудови, заводять у приміщення усередині стінових порожнин труби й кабелі, зашивають їх стінові панелі цього поверху надбудови зсередини приміщень по висоті ребер жорсткості гіпсокартонними плитами 19 й заливають піноїзоляцією 20 порожнини. Зашивають гіпсокартонними плитами 21 стелю -і приміщення. їх 50 Повторюючи описані дії збирають необхідну кількість поверхів, а потім закріплюють по верхньому контуру зовнішніх стінових панелей фронтонні балки 22, закріпляють крокви 23 кронштейнами 24 до фронтонних балок - 22, встановлюють стояки 25, обрешітку 26 й застеляють покриття даху плитами 27 з ОСБ. Крокви 23 даху виконують з нависанням консолей за межі стін на 0,6 метра та з наскрізними отворами і облицювання фасаду, установку вікон З виконують з використанням монтажних колисок і ручних лебідок із кріпленням тросів колисок до консолей крокв даху, паралельно з лицювальними роботами виконують доводочні роботи, що залишилися, с установку інженерного устаткування, внутрішню обробку. Але якщо надбудову виконують на одно або двуповерхових будівлях то зовнішню обробку фасадів виконують з будівельних лісів.Condominium top of the interfloor overlap of the superstructure. Then the wall panels for the next floor of the superstructure are installed and fixed on it, pipes and cables are brought into the premises inside the wall cavities, the wall panels of this superstructure floor are sewn up from the inside of the premises at the height of the stiffeners with plasterboard plates 19 and the cavity is filled with foam insulation 20. 21 ceilings and rooms are sewn up with plasterboard plates. 50 of them Repeating the described actions, collect the necessary number of floors, and then fasten the gable beams 22 along the upper contour of the outer wall panels, fasten the rafters 23 with brackets 24 to the gable beams - 22, install the risers 25, the crate 26 and cover the roof with slabs 27 of OSB. Roof rafters 23 are made with consoles overhanging the walls by 0.6 meters and with through-holes and facing the facade, the installation of windows C is carried out using mounting cradles and hand winches with the attachment of cradle cables to the roof rafter consoles, finishing works are carried out in parallel with the facing work , which remained, with the installation of engineering equipment, interior finishing. But if the superstructure is performed on one- or two-story buildings, then the external decoration of the facades is performed from construction timber.

При виконанні надбудови будівель не з плоским дахом, а з високим двоскатним дахом, дах послідовно розбирають ділянками кратними розміру стінових панелей і забудовують, а в дощову погоду місце між бо залишками даху та надбудовою захищають тентами, що накривають частину даху існуючої будівлі і, при необхідності, надбудову. Зашите плитами ОСБ міжповерхове перекриття будь якого поверху надійно захищає нижчерозташовані поверхи. веWhen constructing superstructures of buildings not with a flat roof, but with a high gable roof, the roof is successively dismantled in sections multiples of the size of the wall panels and built up, and in rainy weather the space between the remains of the roof and the superstructure is protected by awnings that cover part of the roof of the existing building and, if necessary , superstructure. The inter-floor overlap of any floor, sewn with OSB plates, reliably protects the floors below. ve

Claims (9)

Формула винаходуThe formula of the invention 1.Спосіб надбудови будівлі, по якому зведення каркаса надбудови та міжповерхового перекриття виконують безпосередньо на будівлі без використання важкої техніки, виконують звуко- та теплоізоляційні роботи, прокладають труби та електрокабелі, який відрізняється тим, що надбудову збирають з окремих балок і панелей, для чого на верхівці стін існуючої будівлі виставляють в горизонт та закріпляють контурні балки, як по зовнішніх стінах, так і внутрішніх опорних стінах, потім на контурних балках виставляють і закріплюють балки міжповерхового перекриття, зашивають плитами низ перекриття, заповнюють порожнини перекриття ізоляцією, зашивають плитами верх перекриття, установлюють і закріплюють стінові панелі по зовнішньому контуру будівлі та контуру стін кімнат, потім встановлюють і з'єднують балки міжповерхового перекриття з 7/0 Верхньою частиною стінових панелей першого поверху надбудови, зашивають стінові панелі першого поверху надбудови зсередини приміщень, по висоті ребер жорсткості плитами й заповнюють ізоляцією порожнини стінових панелей, зашивають плитами низ міжповерхового перекриття, що встановлене на стінових панелях першого поверху надбудови, установлюють сходові марші, заповнюють ізоляцією порожнини перекриття, зашивають плитами верх міжповерхового перекриття, потім на ньому установлюють і закріплюють, по 7/5 Зовнішньому контуру будівлі та контуру стін кімнат, стінові панелі наступного поверху надбудови, потім встановлюють і з'єднують балки наступного міжповерхового перекриття з верхньою частиною стінових панелей цього поверху надбудови, зашивають стінові панелі цього поверху надбудови зсередини приміщень по висоті ребер жорсткості плитами й заповнюють ізоляцією порожнини і зашивають плитами низ міжповерхового перекриття, заповнюють ізоляцією порожнини перекриття, зашивають плитами верх міжповерхового перекриття 2о надбудови, встановлюють конструкцію даху.1. The method of superstructure of the building, according to which the construction of the framework of the superstructure and the floor covering is carried out directly on the building without the use of heavy equipment, sound and heat insulation work is performed, pipes and electric cables are laid, which is distinguished by the fact that the superstructure is assembled from individual beams and panels, for which at the top of the walls of the existing building, contour beams are placed horizontally and fixed, both on the outer walls and internal supporting walls, then the beams of the inter-floor ceiling are placed and fixed on the contour beams, the bottom of the ceiling is sewn up with slabs, the cavities of the ceiling are filled with insulation, the top of the floor is sewn up with slabs, install and fasten the wall panels along the outer contour of the building and the contour of the walls of the rooms, then install and connect the beams of the inter-floor ceiling with 7/0 The upper part of the wall panels of the first floor of the superstructure, sew the wall panels of the first floor of the superstructure from the inside of the premises, along the height of the stiffeners with slabs and fill the cavity of the wall panels with insulation, sew up the bottom of the inter-floor ceiling, which is installed on the wall panels of the first floor of the superstructure, with slabs, install the staircases, fill the cavity of the floor with insulation, sew up the top of the inter-floor ceiling with slabs, then install and fix on it, according to 7/5 External contour of the building and the contour of the walls of the rooms, the wall panels of the next floor of the superstructure, then install and connect the beams of the next interfloor overlap with the upper part of the wall panels of this floor of the superstructure, sew the wall panels of this floor of the superstructure from the inside of the premises at the height of the stiffeners with slabs and fill the cavities with insulation and sew the bottom of the interfloor ceiling with slabs, fill the cavity of the floor with insulation, sew up the top of the interfloor ceiling 2 o the superstructure with slabs, install the roof structure. 2. Спосіб за п. 1, який відрізняється тим, що для збирання конструкції даху закріплюють по верхньому контуру зовнішніх стінових панелей фронтонні балки, закріпляють крокви, стояки, обрешітку й застеляють покриття даху.2. The method according to claim 1, which differs in that for assembling the roof structure, gable beams are fixed along the upper contour of the external wall panels, rafters, risers, crates are fixed and the roof covering is covered. З. Спосіб за п. 1, який відрізняється тим, що порожнини перекриття та стін заливають піноізоляцією, яку ов ВИГОТОВЛЯЮТЬ на місці, причому перекриття заповнюють на 30-60 95 по висоті балок перекриття.C. The method according to claim 1, which differs in that the cavities of the ceiling and walls are filled with foam insulation, which is MANUFACTURED on site, and the ceiling is filled by 30-60 95 to the height of the ceiling beams. 4. Спосіб за п. 1, який відрізняється тим, що кожну стінову панель додатково розкріплюють технологічними т розпірками, які знімають після установки балок перекриття наступного поверху.4. The method according to claim 1, which differs in that each wall panel is additionally unfastened with technological struts, which are removed after installing the floor beams of the next floor. 5. Спосіб за п. 1, який відрізняється тим, що застосовують стінові панелі, плити яких заздалегідь, в умовах виробництва, обрізають у розмір, та закріплюють на них ребра жорсткості, а на частині панелей виконують - де зо прорізи та встановлюють рами для вікон і дверей.5. The method according to claim 1, which is distinguished by the fact that wall panels are used, the plates of which are cut to size in advance, under the conditions of production, and stiffeners are attached to them, and on part of the panels, slots are made and frames for windows are installed and doors б. Спосіб за п. 1, який відрізняється тим, що застосовують клеєні двотаврові балки з стінкою з « деревностружкових плит з орієнтованою стружкою та полицями з деревини. ї-b. The method according to claim 1, which differs in that it uses glued I-beams with a wall made of chipboards with oriented chips and shelves made of wood. uh- 7. Спосіб за п. 1, який відрізняється тим, що, при виконанні надбудови будівель з високим двосхилим дахом, дах послідовно розбирають ділянками, кратними розміру стінових панелей, і забудовують, а в дощову погоду - з5 Місце між залишками даху та надбудовою захищають тентом. с7. The method according to claim 1, which differs in that, when building a superstructure with a high gable roof, the roof is successively disassembled in sections multiples of the size of the wall panels and built up, and in rainy weather - with5 The place between the remains of the roof and the superstructure is protected by an awning. with 8. Спосіб за п. 1, який відрізняється тим, що крокви даху виконують з нависанням консолей за межі стін не менше 0,5 метра, та виконують на кінцях наскрізні отвори і облицювання фасаду, установку вікон виконують з використанням монтажних колисок і ручних лебідок із кріпленням тросів колисок до консолей крокв даху, а паралельно з лицювальними роботами виконують довідні роботи, що залишилися, установку інженерного « устаткування, внутрішню обробку. в с 8. The method according to claim 1, which differs in that the roof rafters are made with overhanging consoles beyond the walls by at least 0.5 meters, and through holes and facade cladding are made at the ends, windows are installed using mounting cradles and manual winches with fasteners cradle cables to the roof rafter consoles, and in parallel with the facing works, the remaining reference works, installation of engineering equipment, interior finishing are performed. in the village 9. Спосіб за п. 1, який відрізняється тим, що зовнішню обробку фасадів виконують з будівельних риштувань. ;» іме) щ» -І їз 50 - с 60 б59. The method according to claim 1, which differs in that the external finishing of the facades is performed from scaffolding. ;" ime) sh» -I iz 50 - s 60 b5
UAU200702899U 2007-03-19 2007-03-19 Method for arrangement of superstructure on building UA24741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
UAU200702899U UA24741U (en) 2007-03-19 2007-03-19 Method for arrangement of superstructure on building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
UAU200702899U UA24741U (en) 2007-03-19 2007-03-19 Method for arrangement of superstructure on building

Publications (1)

Publication Number Publication Date
UA24741U true UA24741U (en) 2007-07-10

Family

ID=38469605

Family Applications (1)

Application Number Title Priority Date Filing Date
UAU200702899U UA24741U (en) 2007-03-19 2007-03-19 Method for arrangement of superstructure on building

Country Status (1)

Country Link
UA (1) UA24741U (en)

Similar Documents

Publication Publication Date Title
CA2757563C (en) Building and method of constructing a building
WO2017041517A1 (en) Movable aluminum alloy house
RU86608U1 (en) WOODEN HOUSING
EP3047078B1 (en) A construction system of wooden load-bearing structures for buildings and a structure thus obtained
KR101213504B1 (en) Tailor-Made Type Korean House Manufacturing Method for Furniture-style Buildings and Tailor-Made Type Korean House Structure
RU86634U1 (en) BUILDING FRAME MODULE
PL178641B1 (en) Covering panel structure based on alatticework and method of mounting same
RU131752U1 (en) ENERGY EFFICIENT BUILDING
EP4079984B1 (en) Panel and self-supporting modular facade cladding system including said panel
RU2582155C2 (en) Frame-panel building
RU55804U1 (en) RESIDENTIAL FRAME BUILDING, BUILDING FRAME AND BUILDING WALL
WO2006016120A1 (en) Building construction kit with storey high wall panels
KR101292748B1 (en) Tailor-Made Manufacturing Method for Furniture-style Buildings and Traditional Korean-style Structure
RU124274U1 (en) MONOLITHIC CONSTRUCTION DESIGN OF THE BUILDING OR STRUCTURE "GENESIS-RUS" - "VEFT"
UA24741U (en) Method for arrangement of superstructure on building
RU74932U1 (en) FENCING DESIGN FOR BUILDING A BUILDING
EP3404155A1 (en) A balcony or an attached terrace
RU158881U1 (en) BUILDING CONSTRUCTION FROM MULTILAYER PANELS
RU2759464C1 (en) Method for building the upper floor of a building
Chen et al. Design and construction of a two-story modern bamboo house
JP3023280U (en) Wooden house consisting of frame and frame
JP2009215750A (en) Chamber unit reinforcing structure of wooden house
RU139830U1 (en) MONOLITHIC BUILDING DESIGN OF A BUILDING OR CONSTRUCTION
RU2609035C2 (en) Carcass unit for modular construction of buildings and system of such blocks
EA045524B1 (en) WOODEN PANEL ELEMENT, METHOD OF MANUFACTURING WOODEN PANEL ELEMENT AND APPLICATION OF WOODEN PANEL ELEMENT