UA21372U - Method for blast treatment of productive beds - Google Patents
Method for blast treatment of productive beds Download PDFInfo
- Publication number
- UA21372U UA21372U UAU200609871U UAU200609871U UA21372U UA 21372 U UA21372 U UA 21372U UA U200609871 U UAU200609871 U UA U200609871U UA U200609871 U UAU200609871 U UA U200609871U UA 21372 U UA21372 U UA 21372U
- Authority
- UA
- Ukraine
- Prior art keywords
- charge
- productive
- detonation
- explosive
- well
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 239000002360 explosive Substances 0.000 claims description 14
- 238000005474 detonation Methods 0.000 claims description 8
- 239000007788 liquid Substances 0.000 claims description 4
- 230000000737 periodic effect Effects 0.000 claims description 2
- 230000004913 activation Effects 0.000 abstract 1
- 230000015572 biosynthetic process Effects 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 241000566515 Nedra Species 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 238000005336 cracking Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005284 excitation Effects 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
Landscapes
- Artificial Fish Reefs (AREA)
Abstract
Description
Опис винаходуDescription of the invention
Корисна модель відноситься до засобів обробки пласта і призначена для збудження видобувних свердловин. 2 Найбільш близьким технічним вирішенням до запропонованого є спосіб вибухової обробки продуктивних пластів, що включає розкриття продуктивного пласта свердловиною і підривання у рідині в свердловині в інтервалі залягання продуктивного пласта заряду вибухової речовини |1). Недоліки такого способу заключаються в недостатньому зростанні продуктивності видобувної свердловини і в його недовгочасній дії. Завданням, на вирішення якої направлена корисна модель, є підвищення ефективності вибухової обробки масиву у привибійній 710 зоні продуктивного пласта.The useful model refers to means of processing the formation and is intended for the excitation of production wells. 2 The closest technical solution to the proposed one is the method of explosive processing of productive layers, which includes the opening of the productive layer with a well and detonation in the liquid in the well in the interval of occurrence of the productive layer of the explosive charge |1). Disadvantages of this method are insufficient growth of production well productivity and its short-term effect. The task to be solved by the useful model is to increase the efficiency of explosive treatment of the massif in the near-hole 710 zone of the productive layer.
Очікуваним від застосування винаходу технічним результатом є розширення зони штучної тріщинуватості, створеної в процесі вибухового навантаження на продуктивний пласт.The technical result expected from the application of the invention is the expansion of the zone of artificial fracture created in the process of explosive loading on the productive layer.
В основу корисної моделі поставлена задача створення в процесі підривання заряду такої вибухової дії на геофізичне середовище продуктивного пласта, коли забезпечується повторення однакових імпульсних 72 навантажень, що походять із однієї і тієї ж свердловини. При такому режимі підривання однакових частин заряду максимум переданої масиву енергії буде формуватися на частоті повторення імпульсного навантаження, яку необхідно вибирати такою, щоб забезпечити максимальну передачу енергії масиву і достатню інтенсивність навантажень у віддалених точках. Максимальна передача енергії вибухового навантаження масиву відбувається ух при виконанні УМОВИ роб з гввО, Дер РаВ - щільність породи масиву і вибухової речовини, відповідно; ор іо - швидкість розповсюдження повздовжньої хвилі в породі масиву і швидкість детонації вибухової речовини, відповідно (21.The basis of a useful model is the task of creating such an explosive effect on the geophysical environment of a productive layer during the detonation process, when the repetition of the same impulse 72 loads originating from the same well is ensured. With this mode of detonation of the same parts of the charge, the maximum of the energy transferred to the array will be formed at the repetition frequency of the pulse load, which must be chosen in such a way as to ensure the maximum energy transfer of the array and sufficient intensity of loads at remote points. The maximum transfer of the energy of the explosive load of the massif occurs uh when the CONDITION works with gvvO, Der RaV - the density of the rock of the massif and the explosive substance, respectively; or io - the speed of longitudinal wave propagation in the massif rock and the speed of detonation of the explosive substance, respectively (21.
Здійснення корисної моделі проілюстровано фігурою і досягається наступним чином. В свердловину 1 з рідиною 2 на геофізичному кабелі З опускають заряд вибухової речовини, що складається із кількох однакових частин 4, з'єднаних між собою однаковими відрізками детонуючого шнура 6. Після розміщення заряду у свердловині в інтервалі продуктивного пласта 5 здійснюють підривання однакових частин заряду зверху вниз 8 таким чином, щоб створити періодичне повторення однакових імпульсних навантажень на продуктивний пласт в процесі підривання частин заряду і відрізків детонуючого шнура. Формування максимуму переданої масиву енергії на частоті повторення імпульсу відбувається тим виразніше, чим більша кратність повторення імпульсного навантаження. При такому режимі імпульсного навантаження масиву у віддалені точки масиву сч передається більше енергії, що супроводжується підвищенням напружень у віддалених точках масиву. -The implementation of the utility model is illustrated in the figure and is achieved as follows. An explosive charge, consisting of several identical parts 4, connected to each other by identical sections of the detonating cord 6, is lowered into the well 1 with liquid 2 on the geophysical cable Z. After placing the charge in the well in the interval of the productive layer 5, identical parts of the charge are detonated from above down 8 in such a way as to create a periodic repetition of the same impulse loads on the productive layer in the process of detonating parts of the charge and sections of the detonating cord. The formation of the maximum of the energy transmitted to the array at the pulse repetition frequency is more pronounced, the higher the repetition frequency of the pulse load. In this mode of pulse loading of the array, more energy is transferred to remote points of the array, which is accompanied by an increase in stresses in remote points of the array. -
Досягнення технічного результату від застосування корисної моделі обумовлюється завдяки розширенню області штучної тріщинуватості, створеної в масиві в процесі вибухового навантаження, в результаті чого Шк ефективність вибухової обробки масиву підвищується на 20-25965. -The achievement of the technical result from the application of the useful model is due to the expansion of the area of artificial cracking created in the massif in the process of explosive loading, as a result of which Shk the efficiency of the massif explosive treatment increases by 20-25965. -
На кресленні (Фіг.) приведена схема розташування заряду у свердловині. На кресленні позначено: 1 -The diagram (Fig.) shows the arrangement of the charge in the well. The following are marked on the drawing: 1 -
Зо свердловина; 2 - рідина; З - геофізичний кабель; 4 - однакові частини заряду; 5 - продуктивний пласт, 6 - с відрізки детонуючого шнура.From the well; 2 - liquid; C - geophysical cable; 4 - identical parts of the charge; 5 - productive layer, 6 - sections of the detonating cord.
Дана заявка на деклараційний патент України на корисну модель частково підготовлена в рамках проектуThis application for a declaratory patent of Ukraine for a utility model was partially prepared within the framework of the project
Мо3138 Науково-технологічного центру в Україні (УНТЦ). «Mo3138 of the Scientific and Technological Center in Ukraine (UNTC). "
Список використаної літератури З7З 70 1. Усачев П.М. Гидравлический разрьв пласта. - М.: Недра, 1986, с. 122-124. с 2. Мосинец В.Н. Дробящее и сейсмическое действие взрьва в горньїх породах. -М.: Недра, 1976, с. 38-39.List of used literature Z7Z 70 1. Usachev P.M. Hydraulic fracturing of the formation. - M.: Nedra, 1986, p. 122-124. p 2. Mosynets V.N. Crushing and seismic action of an explosion in rocks. - M.: Nedra, 1976, p. 38-39.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UAU200609871U UA21372U (en) | 2006-09-15 | 2006-09-15 | Method for blast treatment of productive beds |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UAU200609871U UA21372U (en) | 2006-09-15 | 2006-09-15 | Method for blast treatment of productive beds |
Publications (1)
Publication Number | Publication Date |
---|---|
UA21372U true UA21372U (en) | 2007-03-15 |
Family
ID=37952401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
UAU200609871U UA21372U (en) | 2006-09-15 | 2006-09-15 | Method for blast treatment of productive beds |
Country Status (1)
Country | Link |
---|---|
UA (1) | UA21372U (en) |
-
2006
- 2006-09-15 UA UAU200609871U patent/UA21372U/en unknown
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9062545B2 (en) | High strain rate method of producing optimized fracture networks in reservoirs | |
RU2593285C1 (en) | Open development method of coal beds group with gross explosive loosening of overburden rocks | |
US20130327529A1 (en) | Far field fracturing of subterranean formations | |
CN101782355A (en) | Method for blasting big boulder in artificially dug pile | |
UA21372U (en) | Method for blast treatment of productive beds | |
RU2012129943A (en) | METHOD FOR LARGE-SCALE EXPLOSIVE DESTRUCTION OF MOUNTAIN ARRAYS OF COMPLEX STRUCTURE FOR SELECTIVE DIGGING OF USEFUL FOSSIL IN OPEN WORKS | |
RU2634597C1 (en) | Method for developing mine workings and conducting stoping operations | |
RU2691794C1 (en) | Method for increasing reservoir recovery by dynamic formation action | |
RU2604074C1 (en) | Method for performing blasting operations | |
CN114165209B (en) | Method for constructing complex seam network of coal seam step by step | |
RU2539083C1 (en) | Openworking with explosion effects on mineral bed | |
RU2766994C1 (en) | Method of rock blasting and borehole charge for its implementation | |
EA017030B1 (en) | Hard mineral resource mining method | |
RU2445459C1 (en) | Method for underground development of high-ore deposits | |
CN207797897U (en) | The soft or hard blast hole loading structure for being mingled with beded rock mass Long-hole Bench Blasting | |
UA90639U (en) | Section torpedo for explosive treatment of productive bed | |
UA32810U (en) | Method for blast treatment of production seams | |
RU2521096C1 (en) | Protection of development entries | |
UA17053U (en) | Appliance for blast treatment of productive beds | |
UA116511U (en) | WELL CHARGE | |
Chen et al. | High-efficiency cut blasting with shell radial shaped charge in laboratory-scale blasting | |
UA135668U (en) | METHOD OF FORMATION OF BODY CHARGE OF EXPLOSIVE SUBSTANCE DURING MASS EXPLOSIONS | |
RU172681U1 (en) | DEVICE FOR PROCESSING THE BOREHING ZONE OF THE STRING | |
UA20523U (en) | Torpedo for blast treatment of bed | |
UA120870C2 (en) | METHOD OF FORMATION OF WELL CHARGES |