UA18856A - Power unit - Google Patents

Power unit

Info

Publication number
UA18856A
UA18856A UA4896555A UA4896555A UA18856A UA 18856 A UA18856 A UA 18856A UA 4896555 A UA4896555 A UA 4896555A UA 4896555 A UA4896555 A UA 4896555A UA 18856 A UA18856 A UA 18856A
Authority
UA
Ukraine
Prior art keywords
boiler
compressor
turbine
additional
gas turbine
Prior art date
Application number
UA4896555A
Other languages
Russian (ru)
Ukrainian (uk)
Inventor
Вячеслав Іванович Пеньков
Вячеслав Иванович Пеньков
Дмитро Микитович Грінченко
Дмитрий Никитович Гринченко
Михайло Павлович Кулик
Михаил Павлович Кулик
Original Assignee
Львівський Політехнічний Інститут
Львовский политехнический институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Львівський Політехнічний Інститут, Львовский политехнический институт filed Critical Львівський Політехнічний Інститут
Priority to UA4896555A priority Critical patent/UA18856A/en
Publication of UA18856A publication Critical patent/UA18856A/en

Links

Abstract

The invention relates to heat-power engineering. A power plant has steam-turbine unit comprising boiler with main furnace and additional one arranged with wraparound cooling jacket and steam turbine, as well as gas-turbine unit with gas turbine connected by exhaust to boiler, compressor and generator. Output of compressor is connected to gas turbine through cooling jacket of additional furnace. It is additionally equipped with membrane air separator with nitrogen gasholder. The compressor is made with at least two sequential compression stages, and membrane separator is installed between stages, at that exhaust of gas turbine is connected to boiler through additional furnace.
UA4896555A 1990-11-11 1990-11-11 Power unit UA18856A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
UA4896555A UA18856A (en) 1990-11-11 1990-11-11 Power unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
UA4896555A UA18856A (en) 1990-11-11 1990-11-11 Power unit

Publications (1)

Publication Number Publication Date
UA18856A true UA18856A (en) 1997-12-25

Family

ID=74538793

Family Applications (1)

Application Number Title Priority Date Filing Date
UA4896555A UA18856A (en) 1990-11-11 1990-11-11 Power unit

Country Status (1)

Country Link
UA (1) UA18856A (en)

Similar Documents

Publication Publication Date Title
UA5927A1 (en) Semi-peak electric power plant
EP1044321B1 (en) Gas turbine engines connected in series
WO1994028285A3 (en) Steam-augmented gas turbine
ATE149633T1 (en) COMBINED GAS/STEAM POWER PLANT
RU2009389C1 (en) Gas-distributing station with power plant
ATE34201T1 (en) COMBINED GAS AND STEAM TURBINE POWER PLANT.
NO163152C (en) COMBINED GAS TURBIN DAMP TURBIN INSTALLATION WITH CONNECTED COAL GASING EQUIPMENT.
WO2000012871A3 (en) High power density combined cycle power plant system and method
GB1448652A (en) Combined gas turbine and steam power plants
ES2034180T3 (en) POWER CENTER BASED ON GAS TURBINE WITH FUEL CONTAINING WATER.
UA27727C2 (en) Gas- and steam-turbine unit
KR950019077A (en) Coal Gasification Combined Cycle
UA18856A (en) Power unit
EP0319699A3 (en) Steam injected engine with auxillary high pressure steam turbine
UA18407A (en) Power unit
UA18855A (en) Power unit
SU407066A1 (en) STEAM GAS INSTALLATION
SU918727A1 (en) Power plant for producing heat and solid carbon dioxide
RU2101528C1 (en) Combined-cycle plant
SE8900384D0 (en) SET TO INCREASE THE EFFECTIVENESS OF A PFBC POWER PLANT
RU2054561C1 (en) Combined steam-gas plant
SU1573219A1 (en) Steam-gas unit for blast furnace production
GB568087A (en) A process for the generation of power using turbines
GB617871A (en) Improvements in or relating to power generating systems
SE9504428D0 (en) power plant