UA116861C2 - METHOD OF CEMENTING OF BORINGS IN THE CONDITIONS OF FULL ABSORPTION - Google Patents

METHOD OF CEMENTING OF BORINGS IN THE CONDITIONS OF FULL ABSORPTION

Info

Publication number
UA116861C2
UA116861C2 UAA201705392A UAA201705392A UA116861C2 UA 116861 C2 UA116861 C2 UA 116861C2 UA A201705392 A UAA201705392 A UA A201705392A UA A201705392 A UAA201705392 A UA A201705392A UA 116861 C2 UA116861 C2 UA 116861C2
Authority
UA
Ukraine
Prior art keywords
volume
interval
cement
formation
well
Prior art date
Application number
UAA201705392A
Other languages
Ukrainian (uk)
Inventor
Ярослав Семенович Білецький
Микола Володимирович Сенюшкович
Олег Богданович Марцинків
Іван Іванович Витвицький
Володимир Миколайович Сенюшкович
Original Assignee
Ярослав Семенович Білецький
Микола Володимирович Сенюшкович
Олег Богданович Марцинків
Іван Іванович Витвицький
Володимир Миколайович Сенюшкович
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ярослав Семенович Білецький, Микола Володимирович Сенюшкович, Олег Богданович Марцинків, Іван Іванович Витвицький, Володимир Миколайович Сенюшкович filed Critical Ярослав Семенович Білецький
Priority to UAA201705392A priority Critical patent/UA116861C2/en
Publication of UA116861C2 publication Critical patent/UA116861C2/en

Links

Abstract

Винахід належить до нафтогазової галузі, зокрема стосується спорудження нафтових і газових свердловин, та призначений для забезпечення цементування обсадних колон в умовах повного поглинання розчину і формування їх якісного кріплення. Спосіб цементування свердловин, що передбачає промивання свердловини способом зворотної циркуляції і закачування у заколонний простір першої порції буферної рідини, і за нею - порції бурового розчину, об'ємом, що дорівнює внутрішньому об'єму обсадної колони, та другої порції буферної рідини, і закачування після цього розрахункового об'єму цементного розчину. Згідно з пропонованим винаходом першу порцію буферної рідини закачують прямим способом через внутрішню порожнину обсадної колони і за нею першу порцію цементного розчину, об'ємом, що дорівнює об'єму кільцевого простору у інтервалі від башмака колони до підошви поглинаючого горизонту, після чого процес цементування зупиняють для формування цементного каменю у цьому інтервалі. По закінченні формування цементного каменю у кільцевий простір свердловини зворотним способом закачують другу порцію буферної рідини і за нею другу порцію цементного розчину, об'ємом, що дорівнює об'єму інтервалу від підошви поглинаючого горизонту до висоти стовпа цементного розчину, гідростатичний тиск якого урівноважує тиск поглинання, після чого процес цементування знову зупиняють для формування цементного каменю у цьому інтервалі. По закінченні формування цементного каменю у кільцевий простір свердловини, знову зворотним способом закачують третю порцію цементного розчину, об'ємом, що дорівнює об'єму інтервалу від покрівлі сформованого цементного каменю до устя свердловини, після чого процес цементування завершують і свердловину залишають для формування цементного каменю у цьому інтервалі. Пропонований спосіб цементування свердловин забезпечує формування якісного і надійного кріплення свердловини в умовах повного поглинання розчину та економію витрат на заходи, пов'язані з необхідністю ліквідації поглинання і, відповідно, зниження собівартості спорудження свердловин.The invention relates to the field of oil and gas, in particular relates to the construction of oil and gas wells, and is intended to provide cementation of casing in the conditions of complete absorption of the solution and the formation of their high-quality fastening. A method of cementing wells, which involves the flushing of the well by the method of reverse circulation and pumping into the enclosed space of the first portion of the buffer fluid, and after it - portions of the drilling fluid, a volume equal to the inner volume of the casing, and the second portion of the buffer fluid, and injection after this estimated volume of cement mortar. In accordance with the present invention, the first portion of the buffer fluid is pumped in a direct way through the inner cavity of the casing and after it the first portion of cement mortar, a volume equal to the volume of the annular space in the interval from the shoe of the column to the sole of the absorbing horizon, and then process for the formation of cement in this interval. At the end of the formation of cement stone in the annular space of the well in the reverse way pump the second portion of the buffer fluid and the second portion of cement mortar, a volume equal to the volume of the interval from the sole of the absorbing horizon to the height of the column of cement mortar , after which the cementing process is stopped again to form a cement stone in this interval. At the end of the formation of cement stone in the annular space of the well, again in the reverse way injected a third portion of cement mortar, a volume equal to the volume of the interval from the roof of the formed cement stone to the well mouth, after which the cementing process is completed and left in this interval. The proposed method of cementing the wells provides the formation of high-quality and reliable fastening of the well in terms of complete absorption of the solution and saving costs for measures associated with the need to eliminate the absorption and, consequently, reduce the cost of construction of wells.

UAA201705392A 2017-06-01 2017-06-01 METHOD OF CEMENTING OF BORINGS IN THE CONDITIONS OF FULL ABSORPTION UA116861C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
UAA201705392A UA116861C2 (en) 2017-06-01 2017-06-01 METHOD OF CEMENTING OF BORINGS IN THE CONDITIONS OF FULL ABSORPTION

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
UAA201705392A UA116861C2 (en) 2017-06-01 2017-06-01 METHOD OF CEMENTING OF BORINGS IN THE CONDITIONS OF FULL ABSORPTION

Publications (1)

Publication Number Publication Date
UA116861C2 true UA116861C2 (en) 2018-05-10

Family

ID=62090929

Family Applications (1)

Application Number Title Priority Date Filing Date
UAA201705392A UA116861C2 (en) 2017-06-01 2017-06-01 METHOD OF CEMENTING OF BORINGS IN THE CONDITIONS OF FULL ABSORPTION

Country Status (1)

Country Link
UA (1) UA116861C2 (en)

Similar Documents

Publication Publication Date Title
EA201892027A1 (en) CEMENT FLUID FOR WASHING WELLS, METHODS OF MANUFACTURE AND METHODS OF APPLICATION
EA200970748A1 (en) SILICATE-BASED SOLUTION FOR WELLS AND STABILIZATION METHODS FOR UNAUTHORIZED FORMATIONS
EA201892024A1 (en) SOLUTIONS FOR CEMENT SEPARATION IN WELLS, METHODS OF MANUFACTURE AND APPLICATIONS
RU2460875C1 (en) Carbonate formation hydraulic fracturing method
RU2490442C1 (en) Method for well completion
EA200701034A1 (en) METHOD OF CEMENTING EXPANDABLE CLEANING COLUMN WELLS
AR109342A1 (en) CEMENTATION OF WELLS WITH WATER BASED LIQUID ADDITIVES
MX2020011784A (en) Cement pulsation for subsea wellbore.
CN105822252A (en) Well cementation pipe column combination and well cementation method
UA116861C2 (en) METHOD OF CEMENTING OF BORINGS IN THE CONDITIONS OF FULL ABSORPTION
RU2363841C1 (en) Procedure for selective isolation and restraint of water production into horizontal wells
RU2011135865A (en) METHOD FOR INSULATING FLOOR WATER FLOW IN DEPTH AND HORIZONTAL WELLS
RU2527446C1 (en) Method of well abandonment
CN203783536U (en) High-pressure gas injection and deep pumping integrated pipe column for ultra-deep well
RU2345212C1 (en) Casting method of cementing
RU2335618C2 (en) Method of cementing of wells
RU2534373C1 (en) Method for shutoff of stratal water influx
RU2008132763A (en) DRILLING AND COMPLETION OF WELLS WITH SMALL LATERAL BARKS
RU2004108014A (en) METHOD FOR INSULATING WATER FLOW IN AN UNBEATABLE HORIZONTAL AREA OF AN EXTREME WELL
RU2361062C1 (en) Method of elimination of behind-casing flow in wells of small diametre
RU2415258C1 (en) Procedure for treatment of bottomhole zone of producer
RU2008106565A (en) METHOD FOR RINSING A PROPANTA BOND IN A GAS OR GAS-CONDENSATE WELL AFTER COMPLETING A HYDRAULIC GROUND Rupture
CN205370504U (en) Shutoff technology tubular column suitable for little sleeve pipe well cementation under horizontal well
RU2532494C1 (en) Horizontal well construction method
CN104975819A (en) Side tracking casing pipe blockage oil enhancing device