TWM660364U - Underground obstacle lifting system - Google Patents
Underground obstacle lifting system Download PDFInfo
- Publication number
- TWM660364U TWM660364U TW113203649U TW113203649U TWM660364U TW M660364 U TWM660364 U TW M660364U TW 113203649 U TW113203649 U TW 113203649U TW 113203649 U TW113203649 U TW 113203649U TW M660364 U TWM660364 U TW M660364U
- Authority
- TW
- Taiwan
- Prior art keywords
- power source
- underground obstacle
- lifting
- underground
- fixed base
- Prior art date
Links
Landscapes
- Earth Drilling (AREA)
Abstract
一種地下障礙物起吊系統,包括一固定基座、一全套管鑽機、一支撐橫樑、一第一起吊動力源及一滑輪組。其中該固定基座係安裝於一施工孔的周圍地面上以連接設置該全套管鑽機,且該全套管鑽機包含一鑽掘套管及一旋轉動力源,用來切削該地下障礙物,該支撐橫樑係鎖固於該鑽掘套管頂端並卡掣於該固定基座,該第一起吊動力源設於該支撐橫樑一側且設有一吊掛鋼纜,並將其繞設於該滑輪組向下延伸進入該施工孔內以連接切削後之該地下障礙物;據而利用該鑽掘套管提供該固定基座所需的承載力而不致下陷,將切削後之該地下障礙物吊鬆以提升施工安全性。 An underground obstacle lifting system includes a fixed base, a full set of pipe drills, a crossbeam, a first lifting power source and a pulley block. The fixed base is installed on the ground around a construction hole to connect the full-tube drill, and the full-tube drill includes a drilling casing and a rotating power source for cutting the underground obstacle. The supporting crossbeam is locked to the top of the drilling casing and clamped to the fixed base. The first lifting power source is arranged on one side of the supporting crossbeam and is provided with a hanging steel cable, which is wound around the pulley block and extends downward into the construction hole to connect the cut underground obstacle. The drilling casing is used to provide the bearing force required by the fixed base without sinking, and the cut underground obstacle is loosened to improve construction safety.
Description
本創作係屬於建築施工設備的領域,特別是指一種地下障礙物起吊系統,供使用於地下障礙物清除工程,而能利用一第一起吊動力源將地下障礙物吊鬆後,再由一第二起吊動力源將其吊出,大幅提昇施工時的安全性者。 This invention belongs to the field of building construction equipment, and specifically refers to an underground obstacle lifting system for use in underground obstacle removal projects. It can use a first lifting power source to loosen the underground obstacle, and then use a second lifting power source to lift it out, greatly improving the safety during construction.
按,近年來,國內因為老舊社區越來越多,經過幾十年的使用及歷經多次的地震侵襲之後,這些舊建築物的結構上或多或少都會出現如:龜裂或是扭曲變形等結構損傷,為避免繼續使用發生危險,目前的都市更新計畫,就是在舊有建築物的基地上重新規劃並建構新的建物,以改善居住品質及提升安全性。實施都市更新計畫最重要的就是將原有的舊建築物拆除,包括了地上建築物的拆除及地下障礙物的清除,由於重新建築必須重新施作地下基礎體,不論原有建築物是否有地下基樁或是地下停車場或是地下室(統稱地下障礙物)都必須拆除清理,一般進行地下障礙物清除多使用套管鑽掘切削工法,其係使用一套管鑽掘機帶動一鑽掘套管,該鑽掘套管底部設有切削齒可供切削地下障礙物,並搭配錘式抓斗將該鑽掘套管內的地下障礙物取出;由於針對都會區的都市更新計畫,其四周可能會有住戶或是工作場所,因此對於施工過程中的低噪音及低震動等環保要求特別高,因此無法以擊碎後夾出的方法進行。 In recent years, there are more and more old communities in the country. After decades of use and multiple earthquakes, these old buildings have more or less suffered structural damage such as cracks or distortions. In order to avoid dangers from continued use, the current urban renewal plan is to replan and construct new buildings on the site of old buildings to improve living quality and enhance safety. The most important thing in implementing the urban renewal plan is to demolish the original old buildings, including the demolition of the above-ground buildings and the removal of underground obstacles. Since the reconstruction must be rebuilt on the underground foundation, whether the original building has underground foundation piles, underground parking lots or basements (collectively referred to as underground obstacles), they must be demolished and cleared. Generally, the casing drilling and cutting method is used to remove underground obstacles. It uses a casing drill to drive a drilling casing. The bottom of the drilling casing is equipped with cutting teeth for cutting underground obstacles, and a hammer grab is used to remove the underground obstacles in the drilling casing. Since the urban renewal plan is aimed at the metropolitan area, there may be residents or workplaces around it, so the environmental protection requirements for low noise and low vibration during the construction process are particularly high, so it is not possible to use the method of crushing and then clamping out.
另外,除了施工時必須注意的環保要求之外,本創作人發現在地下障礙物的清除,要以整塊或分節吊出的方法施工也同樣具有不小的難度,首先,針對地下障礙物要吊出移除時的力學狀況說明,經常出現的有以下二種狀況:第一種狀況是切除地下樓版後要吊出;第二種狀況是將舊基樁、壁樁或連續壁等深基礎切除後,吊出移除。通常在進行地下障礙物清除時,最常見的就是以吊車將切削後的地下障礙物吊出,施工時一般會透過鋼板、鋼環或吊勾等吊掛物與如舊基礎、舊樁等地下障礙物連結後,再使用履帶吊車將這些不要的地下障礙物吊出,但是這個起吊的過程中最危險的狀態就是當該等地下障礙物即將鬆動的時候,因為此時除了自身的重量之外,這些舊樓板、基樁和套管間有可能發生卡住,或是還有土壤塞在縫隙間的摩擦阻力,是故,當上述情況同時發生時是非常危險的,其原因乃是因為起吊一瞬間,地下障礙物的自身重量加上摩擦阻力是非常大的,所以吊車的出力通常都會是最大的,況且摩擦阻力或卡住都是掩埋在土方下方而難以預測的;再者,此時最容易發生如:吊掛點斷裂、吊掛鐵鍊或鋼索拉斷等意外,所以再起吊時發生的意外,不外乎履帶吊車的鋼索及桁架在起吊時發生彈性應變,因保存了巨大的彈性位能,當吊掛點/鋼索斷掉則鋼索及桁架就會因為彈性位能釋放而向後甩,經常導致吊車翻覆及人員傷亡。 In addition, in addition to the environmental protection requirements that must be paid attention to during construction, the author found that the removal of underground obstacles by hoisting out the entire block or in sections is also quite difficult. First of all, the mechanical conditions when lifting out and removing underground obstacles are explained. The following two situations often occur: the first situation is to lift out after cutting off the underground floor slab; the second situation is to lift out and remove after cutting off the deep foundation such as old foundation piles, wall piles or continuous walls. Usually, when removing underground obstacles, the most common method is to use a crane to lift out the cut underground obstacles. During construction, they are usually connected to underground obstacles such as old foundations and old piles through hanging objects such as steel plates, steel rings or hooks, and then these unwanted underground obstacles are lifted out using crawler cranes. However, the most dangerous state in this lifting process is when the underground obstacles are about to loosen, because at this time, in addition to their own weight, these old floor slabs, foundation piles and casings may get stuck, or there is friction resistance from soil stuck in the gaps. Therefore, when the above situations occur at the same time, it is very dangerous. The reason is that at the moment of lifting, the weight of the underground obstacles plus the frictional resistance are very large, so the crane's output is usually the greatest. Moreover, the frictional resistance or jamming is buried under the earth and is difficult to predict. Moreover, accidents such as the breaking of the hanging point, the breaking of the hanging chain or the steel cable are most likely to occur at this time. Therefore, accidents that occur during lifting are nothing more than elastic strain of the steel cables and trusses of the crawler crane during lifting. Because of the huge elastic potential energy stored, when the hanging point/steel cable breaks, the steel cables and trusses will be thrown backwards due to the release of elastic potential energy, often causing the crane to overturn and casualties.
有鑑於此,本創作人根據上揭傳統習用之諸多缺失及未盡完善之處,以其多年從事該鑽掘套管及現場施工的經驗,針對現有的鑽掘套管進行改良設計,進一步設計出本創作之地下障礙物起吊系統,特別適用於都市更新計畫中的地下障礙物清除工程,利用一第一起吊動力源配合全套管鑽機先將地下障礙物吊起後再以一第二起吊動力源將其吊出,其優點是利用舊基礎/舊樁等地下障礙物在起吊(吊鬆)時是荷重最大且最危險的階 段,利用如捲揚機等第一起吊動力源以及一支撐橫樑安裝於該全套管鑽機上,先將舊基礎/舊樁起吊(吊鬆)而去除其摩擦力或是沒有與地層或其他地下障礙物卡住後,再轉換成使用如:吊車等第二起吊動力源再將該地下障礙物吊出,透過用來固定全套管鑽機的固定基座有良好承載力,加上鑽掘套管在土壤中的摩擦力,輕易地提供數百噸的承載力不會下陷。,應注意的是,第一起吊動力源係選用類似工廠天車的結構,但該支撐橫樑寬度大於鑽掘套管並鎖固於其上,以此機構將地下障礙物起吊、吊鬆,簡單又安全,待其吊鬆後才換成第二起吊動力源吊出,大幅提昇其安全性者。 In view of this, the author of this invention has improved the existing drilling casing based on the many shortcomings and imperfections of the traditional practices mentioned above, and has further designed the underground obstacle lifting system of this invention based on his many years of experience in drilling casing and on-site construction. This system is particularly suitable for underground obstacle removal projects in urban renewal projects. It uses a first lifting power source to cooperate with a full-casing drill to first lift the underground obstacle and then use a second lifting power source to lift it out. Its advantage is that it uses old foundations/old piles and other underground obstacles in the lifting ( The stage of lifting (loosening) is the stage with the heaviest load and the most dangerous. The first lifting power source such as a winch and a crossbeam installed on the full-casing pipe drill are used to lift (loosen) the old foundation/old pile to remove its friction or remove it from the ground or other underground obstacles. Then, the second lifting power source such as a crane is used to lift out the underground obstacles. The fixed base used to fix the full-casing pipe drill has good bearing capacity, and the friction of the drilling casing in the soil can easily provide hundreds of tons of bearing capacity without sinking. It should be noted that the first lifting power source is a structure similar to the factory overhead crane, but the supporting crossbeam is wider than the drilling casing and is locked on it. This mechanism is used to lift and loosen underground obstacles. It is simple and safe. After it is loosened, it is switched to the second lifting power source to lift it out, which greatly improves its safety.
本創作之一目的,旨在提供一種地下障礙物起吊系統,俾包括一固定基座、一全套管鑽機、一支撐橫樑、一第一起吊動力源及一滑輪組。其中該固定基座係安裝於一施工孔的周圍地面上以連接設置該全套管鑽機,且該全套管鑽機包含一鑽掘套管及一旋轉動力源,用來切削該地下障礙物,該支撐橫樑係鎖固於該鑽掘套管頂端並卡掣於該固定基座,該第一起吊動力源設於該支撐橫樑一側且設有一吊掛鋼纜,並將其繞設於該滑輪組向下延伸進入該施工孔內以連接切削後之該地下障礙物;據而利用該鑽掘套管提供該固定基座所需的承載力而不致下陷,將切削後之該地下障礙物吊鬆以提升施工安全性等功效。 One purpose of the invention is to provide an underground obstacle lifting system, which includes a fixed base, a full set of pipe drills, a supporting beam, a first lifting power source and a pulley block. The fixed base is installed on the ground around a construction hole to connect the full-tube drill, and the full-tube drill includes a drilling casing and a rotating power source for cutting the underground obstacle. The supporting crossbeam is locked to the top of the drilling casing and clamped to the fixed base. The first lifting power source is arranged on one side of the supporting crossbeam and is provided with a hanging steel cable, which is wound around the pulley block and extends downward into the construction hole to connect the cut underground obstacle. The drilling casing is used to provide the bearing force required by the fixed base without sinking, and the cut underground obstacle is loosened to improve the construction safety and other effects.
為達上述目的,本創作之地下障礙物起吊系統,用來切削該地下障礙物並將其吊起,並於該地下障礙物頂部設有一起吊區,該地下障礙物起吊系統係包括:一固定基座,係由複數骨架縱橫交叉而形成井字形狀結構體,且該固定基座係安裝於一施工孔的周圍地面上;一全套管鑽機,連接設於該固定基座的中心位置,且該全套管鑽機包含一鑽掘套管及一旋轉 動力源,該鑽掘套管底端設有複數切削部,該旋轉動力源係動力銜接該鑽掘套管,以帶動該鑽掘套管產生旋轉向下切削該地下障礙物,經切削後之該地下障礙物係小於該鑽掘套管的內徑,並將該鑽掘套管放置於切削終點的位置;一支撐橫樑,其係鎖固於該鑽掘套管頂端,且該支撐橫樑的寬度大於該鑽掘套管,使該支撐橫樑卡掣於該固定基座上而形成固定;一第一起吊動力源,設於該支撐橫樑一側,且該第一起吊動力源設有一吊掛鋼纜,另該吊掛鋼纜設有一吊掛部供連接該起吊區;及一滑輪組,設於該支撐橫樑的中心,且該吊掛鋼纜係繞設於該滑輪組後,而使該吊掛部向下延伸進入該施工孔內;據而利用該鑽掘套管留置於該施工孔內與地層的摩擦力,提供該固定基座良好的承載力而不致下陷,藉該第一起吊動力源將切削後之該地下障礙物起吊並吊鬆。 To achieve the above-mentioned purpose, the underground obstacle lifting system of the present invention is used to cut the underground obstacle and lift it, and a lifting area is provided on the top of the underground obstacle. The underground obstacle lifting system comprises: a fixed base, which is a tic-tac-toe structure formed by a plurality of frames crossing vertically and horizontally, and the fixed base is installed on the ground around a construction hole; a full set of pipe drilling machines, The whole casing drill includes a drilling casing and a rotary power source. The bottom of the drilling casing is provided with a plurality of cutting parts. The rotary power source is connected to the drilling casing to drive the drilling casing to rotate downward to cut the underground obstacle. The underground obstacle after cutting is smaller than the inner diameter of the drilling casing, and the drilling casing is The invention relates to a first lifting power source, which is arranged on one side of the supporting crossbeam, and the first lifting power source is provided with a hanging steel cable, and the hanging steel cable is provided with a hanging part for connecting the lifting area. ; and a pulley block, which is arranged at the center of the supporting crossbeam, and the hanging steel cable is wound behind the pulley block, so that the hanging part extends downward into the construction hole; and the friction between the drill casing and the ground layer is utilized to provide the fixed base with good bearing capacity without sinking, and the underground obstacle after cutting is lifted and loosened by the first lifting power source.
於一實施例中,本創作之該地下障礙物起吊系統可依據現場狀況而有二種不同的作法,其一、本創作之該地下障礙物起吊系統更具有一第二起吊動力源,其係動力銜接該支撐橫樑,而可將該支撐橫樑、該滑輪組、該第一起吊動力源及該鑽掘套管連同切削後之該地下障礙物一併進行起吊,且該第二起吊動力源係為履帶吊車;其二、本創作之該地下障礙物起吊系統更具有一第二起吊動力源,動力銜接該地下障礙物,先將該支撐橫樑、該滑輪組、該第一起吊動力源及該鑽掘套管移除後,最後使用該第二起吊動力源將切削後之該地下障礙物進行起吊,且該第二起吊動力源係為履帶吊車。根據上述方式,本創作還可利用相同的結構做出一些根據現場施工的變化性,或有更多變化,於此不再贅述。 In one embodiment, the underground obstacle lifting system of the present invention can have two different methods according to the on-site conditions. First, the underground obstacle lifting system of the present invention has a second lifting power source, which is a power connected to the supporting crossbeam, and can lift the supporting crossbeam, the pulley block, the first lifting power source and the drilling casing together with the cut underground obstacle. The second lifting power source is a crawler crane; secondly, the underground obstacle lifting system of this invention has a second lifting power source, which is connected to the underground obstacle. After removing the supporting crossbeam, the pulley block, the first lifting power source and the drilling casing, the second lifting power source is used to lift the cut underground obstacle, and the second lifting power source is a crawler crane. According to the above method, this invention can also use the same structure to make some changes according to the on-site construction, or there are more changes, which will not be repeated here.
應注意的是,本創作所指的該地下障礙物選自如:地下樓板、基樁、壁樁及連續壁等基礎建物其中之一者,亦即都市更新計畫中所有可能會形成地下障礙物的結構,均屬於本創作的適用範圍內。 It should be noted that the underground obstacles referred to in this work can be selected from any of the basic structures such as underground floors, foundation piles, wall piles and continuous walls, that is, all structures that may form underground obstacles in urban renewal plans are within the scope of application of this work.
1:地下障礙物起吊系統 1: Underground obstacle lifting system
11:固定基座 11:Fixed base
111:骨架 111: Skeleton
112:安裝口 112: Installation port
12:全套管鑽機 12: Full set of pipe drilling machines
121:鑽掘套管 121: Drilling casing
1211:切削部 1211: Cutting section
122:旋轉動力源 122: Rotational power source
13:支撐橫樑 13: Supporting crossbeams
14:第一起吊動力源 14: First lifting power source
141:吊掛鋼纜 141: Suspension cable
142:吊掛部 142: Suspension part
15:滑輪組 15: Pulley set
16:第二起吊動力源 16: Second lifting power source
2:地下障礙物 2: Underground obstacles
21:起吊區 21: Lifting area
3:施工孔 3: Construction hole
圖1,為本創作較佳實施例的結構示意圖。 Figure 1 is a schematic diagram of the structure of a preferred embodiment of this invention.
圖2,為本創作較佳實施例操作時的狀態示意圖(一)。 Figure 2 is a schematic diagram of the operation status of the preferred embodiment of this invention (I).
圖3,為本創作較佳實施例操作時的狀態示意圖(二)。 Figure 3 is a schematic diagram of the operation status of the preferred embodiment of this invention (II).
圖4,為本創作較佳實施例操作時的狀態示意圖(三)。 Figure 4 is a schematic diagram of the operation status of the preferred embodiment of this invention (III).
為使 貴審查委員能清楚了解本創作之內容,僅以下列說明搭配圖式,敬請參閱。 In order to enable you, the review committee, to clearly understand the content of this work, please refer to the following description and diagram.
請參閱圖1及圖2~圖4,係為本創作較佳實施例的結構示意圖及其操作時的各個狀態示意圖。如圖中所示,本創作之地下障礙物起吊系統1包括一固定基座11、一全套管鑽機12、一支撐橫樑13、一第一起吊動力源14及一滑輪組15,用來切削該地下障礙物2並將其吊起,並於該地下障礙物2頂部設有一起吊區21,其中,該地下障礙物2選自如:地下樓板、基樁、壁樁及連續壁等基礎建物其中之一者。 Please refer to Figures 1 and 2 to 4, which are schematic diagrams of the structure of the preferred embodiment of the invention and schematic diagrams of various states during operation. As shown in the figure, the underground obstacle lifting system 1 of the invention includes a fixed base 11, a full set of pipe drills 12, a supporting crossbeam 13, a first lifting power source 14 and a pulley block 15, which are used to cut the underground obstacle 2 and lift it, and a lifting area 21 is provided at the top of the underground obstacle 2, wherein the underground obstacle 2 can be selected from one of the basic structures such as underground floor slabs, foundation piles, wall piles and continuous walls.
其中該固定基座11係由複數骨架111縱橫交叉而形成井字形狀結構體,使該固定基座11中心位置對應該全套管鑽機12形成一安裝口112,且該固定基座11係安裝於一施工孔3的周圍地面上。 The fixed base 11 is formed by a plurality of frames 111 intersecting vertically and horizontally to form a tic-tac-toe structure, so that the center position of the fixed base 11 corresponds to the full-casing pipe drill 12 to form an installation opening 112, and the fixed base 11 is installed on the ground around a construction hole 3.
該全套管鑽機12係連接設於該固定基座11中心位置的該安裝口112內,且該全套管鑽機12包含一鑽掘套管121及一旋轉動力源122,該鑽掘套管121底端設有複數切削部1211,該旋轉動力源122係動力銜接該鑽掘套管121,以帶動該鑽掘套管121產生旋轉向下切削該地下障礙物2,經切削後之 該地下障礙物2係小於該鑽掘套管121的內徑,並將該鑽掘套管121放置於切削終點的位置。 The full casing drill 12 is connected to the mounting port 112 at the center of the fixed base 11, and the full casing drill 12 includes a drilling casing 121 and a rotary power source 122. The bottom of the drilling casing 121 is provided with a plurality of cutting parts 1211. The rotary power source 122 is dynamically connected to the drilling casing 121 to drive the drilling casing 121 to rotate downward to cut the underground obstacle 2. After cutting, the underground obstacle 2 is smaller than the inner diameter of the drilling casing 121, and the drilling casing 121 is placed at the cutting end point.
該支撐橫樑13係鎖固於該鑽掘套管121頂端,且該支撐橫樑13的寬度大於該鑽掘套管121,使該支撐橫樑13卡掣於該固定基座11上而形成固定。 The supporting crossbeam 13 is locked to the top end of the drilling casing 121, and the width of the supporting crossbeam 13 is greater than that of the drilling casing 121, so that the supporting crossbeam 13 is locked on the fixed base 11 to form a fixed position.
該第一起吊動力源14設於該支撐橫樑13一側,且該第一起吊動力源14設有一吊掛鋼纜141,另該吊掛鋼纜141設有一吊掛部142供連接該起吊區21。 The first lifting power source 14 is disposed on one side of the supporting crossbeam 13, and the first lifting power source 14 is provided with a hanging steel cable 141, and the hanging steel cable 141 is provided with a hanging portion 142 for connecting to the lifting area 21.
該滑輪組15設於該支撐橫樑13的中心,且該吊掛鋼纜141係繞設於該滑輪組15後,而使該吊掛部142向下延伸進入該施工孔3內,該滑輪組15的配置是用來省力及轉換該吊掛鋼纜141的方向用途;據而利用該鑽掘套管121留置於該施工孔3內與地層的摩擦力,提供該固定基座11良好的承載力而不致下陷,藉該第一起吊動力源14將切削後之該地下障礙物2起吊並吊鬆。 The pulley block 15 is arranged at the center of the supporting crossbeam 13, and the hanging cable 141 is wound behind the pulley block 15, so that the hanging part 142 extends downward into the construction hole 3. The configuration of the pulley block 15 is used to save effort and change the direction of the hanging cable 141; the friction between the drilling casing 121 retained in the construction hole 3 and the ground is utilized to provide the fixed base 11 with good bearing capacity without sinking, and the underground obstacle 2 after cutting is lifted and loosened by the first lifting power source 14.
如圖3所示,本創作之該地下障礙物起吊系統1更具有一第二起吊動力源16,其係用來動力銜接該支撐橫樑13,以將該支撐橫樑13、該滑輪組15、該第一起吊動力源14及該鑽掘套管121連同切削後之該地下障礙物2一併進行起吊,且該第二起吊動力源16係為履帶吊車。 As shown in FIG3 , the underground obstacle lifting system 1 of the present invention further has a second lifting power source 16, which is used to dynamically connect the supporting crossbeam 13 to lift the supporting crossbeam 13, the pulley block 15, the first lifting power source 14 and the drilling casing 121 together with the cut underground obstacle 2, and the second lifting power source 16 is a crawler crane.
於另一實施方式中,如圖4所示,本創作之該地下障礙物起吊系統1之該第二起吊動力源16則是動力銜接該地下障礙物2,並且,先將該支撐橫樑13、該滑輪組15、該第一起吊動力源14及該鑽掘套管121移除後,最後使用該第二起吊動力源16將切削後之該地下障礙物2進行起吊。 In another embodiment, as shown in FIG. 4 , the second lifting power source 16 of the underground obstacle lifting system 1 of the present invention is used to power the underground obstacle 2, and the supporting crossbeam 13, the pulley block 15, the first lifting power source 14 and the drilling casing 121 are first removed, and finally the second lifting power source 16 is used to lift the cut underground obstacle 2.
綜上所述,本創作之該多爪式吊掛裝置2係透過安裝於該施工孔3地面上的該固定基座11,連接設置該全套管鑽機12後,利用該全套管鑽機 12切削該地下障礙物2後,使用該第一起吊動力源14將該地下障礙物2吊鬆之後,解決有可能在起吊過程中發生吊掛點斷裂、吊掛鐵鍊或鋼索拉斷等意外的階段後,再透過該第二起吊動力源16將吊鬆後之該地下障礙物2吊起清除,起吊過程中,還能利用該鑽掘套管121提供該固定基座11所需的承載力而不致下陷,故能夠達到大幅提升施工安全性之目的。 In summary, the multi-claw type hanging device 2 of the invention is connected to the full-casing pipe drill 12 through the fixed base 11 installed on the ground of the construction hole 3. After the full-casing pipe drill 12 is used to cut the underground obstacle 2, the first lifting power source 14 is used to loosen the underground obstacle 2. After solving the possible accidental stages such as the hanging point breaking, the hanging chain or the steel cable breaking during the lifting process, the second lifting power source 16 is used to lift and remove the loosened underground obstacle 2. During the lifting process, the drilling casing 121 can also be used to provide the bearing force required by the fixed base 11 without sinking, so the purpose of greatly improving the construction safety can be achieved.
唯,以上所述者,僅為本創作之較佳實施例而已,並非用以限定本創作實施之範圍,故該所屬技術領域中具有通常知識者,或是熟悉此技術所作出等效或輕易的變化者,在不脫離本創作之精神與範圍下所作之均等變化與修飾,皆應涵蓋於本創作之專利範圍內。 However, the above is only the best implementation example of this creation, and is not used to limit the scope of implementation of this creation. Therefore, those who have common knowledge in the relevant technical field, or those who are familiar with this technology and make equivalent or easy changes, should be covered by the patent scope of this creation without departing from the spirit and scope of this creation.
1:地下障礙物起吊系統 1: Underground obstacle lifting system
11:固定基座 11:Fixed base
111:骨架 111: Skeleton
112:安裝口 112: Installation port
12:全套管鑽機 12: Full set of pipe drilling machines
121:鑽掘套管 121: Drilling casing
1211:切削部 1211: Cutting section
122:旋轉動力源 122: Rotational power source
13:支撐橫樑 13: Supporting crossbeams
14:第一起吊動力源 14: First lifting power source
141:吊掛鋼纜 141: Suspension cable
142:吊掛部 142: Suspension part
15:滑輪組 15: Pulley set
16:第二起吊動力源 16: Second lifting power source
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| TW113203649U TWM660364U (en) | 2024-04-12 | 2024-04-12 | Underground obstacle lifting system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| TW113203649U TWM660364U (en) | 2024-04-12 | 2024-04-12 | Underground obstacle lifting system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| TWM660364U true TWM660364U (en) | 2024-09-11 |
Family
ID=93610362
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| TW113203649U TWM660364U (en) | 2024-04-12 | 2024-04-12 | Underground obstacle lifting system |
Country Status (1)
| Country | Link |
|---|---|
| TW (1) | TWM660364U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| TWI862442B (en) * | 2024-04-12 | 2024-11-11 | 同豐營造工程股份有限公司 | Underground obstacle lifting system |
-
2024
- 2024-04-12 TW TW113203649U patent/TWM660364U/en unknown
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| TWI862442B (en) * | 2024-04-12 | 2024-11-11 | 同豐營造工程股份有限公司 | Underground obstacle lifting system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107119584B (en) | A method of dismantling a concrete rigid frame arch bridge | |
| CN109680716B (en) | Method for double in-situ protection of electric power culvert by adopting upper suspension and lower support | |
| CN110512895A (en) | A kind of high-rise cast-in-place concrete building demolition construction method | |
| CN113174961B (en) | A method of foundation pit slope support | |
| CN101748758B (en) | Timbering method of foundation ditches for reforming on-line equipment foundations in factory buildings | |
| CN106978807A (en) | Existing bridge pile pulling device and construction method are passed through by a kind of weak soil shield driving area | |
| CN113802586A (en) | Tie rod arch bridge dismantling structure and method based on cofferdam | |
| CN104727236A (en) | Whole striding bridge lowering dismounting system based on ground supporting and construction method thereof | |
| CN207934087U (en) | A kind of water mill bores the constructing structure of cooperation manually digging hole | |
| CN110158609A (en) | A kind of mechanization demolition reduction method of reinforced concrete brace in foundation pit | |
| TWI862442B (en) | Underground obstacle lifting system | |
| CN113802478B (en) | An arch bridge deck structure dismantling device based on arch rib support | |
| CN204661211U (en) | The emergent hoisting device of portable earthquake rescue | |
| CN216108572U (en) | Tie rod arch bridge demolishs structure based on cofferdam | |
| CN103806735B (en) | Based on to the electric pole replacing options in electric power pipe network | |
| CN214532072U (en) | Construction structure for cutting and dismantling underground reinforced concrete by rope saw | |
| CN103334433B (en) | A kind of construction method of pile pulling | |
| CN116750615B (en) | A vertical shaft construction hoisting system and its implementation method | |
| CN219430759U (en) | Reinforced concrete support dismantling structure for ultra-deep foundation pit | |
| CN110409325A (en) | The method for dismounting of box beam | |
| CN206753488U (en) | A kind of artificial digging pile reaming auxiliary equipment | |
| CN205932883U (en) | Shaft construction cage | |
| CN116837827A (en) | Construction method for tamping and expanding prestressed hollow pipe pile by long spiral hole guiding static pressure composite carrier | |
| CN113309145B (en) | Method for dismantling through-floor tower crane for large building construction | |
| CN101936011A (en) | Bundle-type connection method of steel box with bayonet joint and construction method using it |