TWM630687U - Improved structure of precast drainage ditch - Google Patents

Improved structure of precast drainage ditch Download PDF

Info

Publication number
TWM630687U
TWM630687U TW111202384U TW111202384U TWM630687U TW M630687 U TWM630687 U TW M630687U TW 111202384 U TW111202384 U TW 111202384U TW 111202384 U TW111202384 U TW 111202384U TW M630687 U TWM630687 U TW M630687U
Authority
TW
Taiwan
Prior art keywords
ditch
bodies
drainage ditch
improved structure
groove
Prior art date
Application number
TW111202384U
Other languages
Chinese (zh)
Inventor
林金生
Original Assignee
國鎰不銹鋼製品有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 國鎰不銹鋼製品有限公司 filed Critical 國鎰不銹鋼製品有限公司
Priority to TW111202384U priority Critical patent/TWM630687U/en
Publication of TWM630687U publication Critical patent/TWM630687U/en

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)
  • Sewage (AREA)

Abstract

一種預鑄式排水溝之改良結構, 主要係為包含複數之溝體及複數結合於該溝體之蓋體。其中,該溝體係設有底壁,以及連接該底壁之側壁,以形成一容置空間,於該側壁頂緣設有嵌置部;該蓋體係設有一槽部,以供放置大理石等板材,槽部側緣係設有複數之定位片及固定桿。俾於施工時,將該等溝體相互連接埋設於地面,以供連接不同之排水管,並將該等蓋體蓋合於該等溝體上方,使該等蓋體側緣與地面間形成適當空隙,以供排放雨水及污水,使排水溝的施工更具效率且更為美觀。An improved structure of a 預葄-type drainage ditch is mainly composed of a plurality of ditch bodies and a plurality of cover bodies combined with the ditch bodies. Wherein, the groove system is provided with a bottom wall and a side wall connected to the bottom wall to form an accommodating space, and an embedded portion is provided on the top edge of the side wall; the cover system is provided with a groove portion for placing marble and other plates , The side edge of the groove is provided with a plurality of positioning pieces and fixed rods. During construction, the trenches are connected to each other and buried in the ground for connecting different drain pipes, and the covers are covered above the trenches, so that the side edges of the covers and the ground are formed. Appropriate gaps are provided for the drainage of rainwater and sewage, which makes the construction of the drainage ditch more efficient and more beautiful.

Description

預鑄式排水溝之改良結構The Improved Structure of the Drainage Ditch

本創作係有關一種預鑄式排水溝之改良結構,尤指一種施工更具效率,且施工後更為美觀之排水溝結構。This creation relates to an improved structure of a 預葄-type drainage ditch, especially a drainage ditch structure that is more efficient in construction and more beautiful after construction.

按;一般建築物周圍供排放雨水及污水之排水溝,通常係在開挖地面後,再以板模及鋼筋架設在溝內,然後再以混凝土進行灌漿,待混凝土凝固後再將板模拆除。此種施工方式不但作業進度緩慢,且施工過程常受氣候影響,導致施工成本增加。According to: Generally, the drainage ditch around the building for discharging rainwater and sewage is usually tied to the ground after excavation, and then erected in the ditch with formwork and steel bars, and then grouted with concrete. After the concrete is solidified, the formwork is removed. . This construction method not only slows down the operation progress, but also is often affected by the climate during the construction process, resulting in increased construction costs.

而基於前述傳統施工法的缺失,現階段的排水溝有些採用預鑄方式施工,該種施工方式得以於地面開挖後,可直接將預鑄式的排水溝放入。其雖可縮短工期且適度的降低施工成本,惟習知的預鑄式排水溝同樣係以混凝土製,完成後須再搬運到施工地點,搬運上相當不方便,且搬運過程中極易造成破損,是以仍存在搬運及安裝施工上的缺失。且習知混凝土製預鑄式排水溝因結構的設計,於施工完成後其上方所搭配之蓋體較為簡陋,使得整個排水溝難以達到美觀要求。尤其如設於較高級建築物的周圍更顯突兀。申請人有鑑於此,經不斷研究、實驗,遂萌生設計一種預鑄排水溝之改良結構,使排水溝的施工更具效率,且施工後更為美觀。Due to the lack of the above-mentioned traditional construction method, some drainage ditches at the current stage are constructed by the shovel method. After the ground is excavated, the shovel-style drainage ditch can be directly put in. Although it can shorten the construction period and moderately reduce the construction cost, but the conventional Pingxuan-type drainage ditch is also made of concrete. After completion, it must be transported to the construction site, which is quite inconvenient to transport, and it is very easy to cause damage during the transport process. , so there are still deficiencies in handling and installation construction. In addition, the conventional concrete drainage ditch is designed with a structure, and the cover above it is relatively simple after the construction is completed, making it difficult for the entire drainage ditch to meet the aesthetic requirements. Especially if it is located around higher-level buildings, it is more abrupt. In view of this, the applicant, after continuous research and experimentation, came up with the idea of designing an improved structure for the drainage ditch, which makes the construction of the drainage ditch more efficient and more beautiful after construction.

本創作之主要目的,即在提供一種預鑄式排水溝之改良結構,使排水溝的施工更具效率,且於施工完成後得以更為美觀。The main purpose of this creation is to provide an improved structure of the shovel-type drainage ditch, so that the construction of the drainage ditch is more efficient and more beautiful after the construction is completed.

前述之預鑄式排水溝之改良結構,係為包含複數之溝體及複數結合於該溝體之蓋體。其中,該等溝體係設有底壁,以及連接該底壁之側壁,以形成一容置空間,於該側壁頂緣設有嵌置部;該等蓋體係設有一槽部,以供放置大理石等板材,槽部側緣係設有複數之定位片及固定桿。俾於施工時,將該等溝體相互連接埋設於地面,以供連接不同之排水管,並將該等蓋體蓋合於該等溝體上方,使該等蓋體側緣與地面間形成適當空隙,以供排放雨水及污水,使排水溝的施工更具效率且更為美觀。The improved structure of the above-mentioned Ping-Xuan-type drainage ditch is composed of a plurality of ditch bodies and a plurality of cover bodies combined with the ditch bodies. Wherein, the groove systems are provided with a bottom wall and a side wall connected to the bottom wall to form an accommodating space, and an embedded portion is provided on the top edge of the side wall; the cover systems are provided with a groove portion for placing marbles Equal plates, the side edge of the groove is provided with a plurality of positioning pieces and fixing rods. During construction, the trenches are connected to each other and buried in the ground for connecting different drain pipes, and the covers are covered above the trenches, so that the side edges of the covers and the ground are formed. Appropriate gaps are provided for the drainage of rainwater and sewage, which makes the construction of the drainage ditch more efficient and more beautiful.

前述之預鑄式排水溝之改良結構,其中該等溝體之側壁的頂緣係於水平、垂直連續拗折後,形成階狀之嵌置部;該等蓋體的定位片係於外緣下方設有一斜狀缺口,以構成斜狀之卡合部,使蓋體之卡合部卡合於嵌置部以構成定位。In the improved structure of the above-mentioned Chuan-type drainage ditch, the top edges of the side walls of the ditch bodies are folded horizontally and vertically to form a stepped embedded part; the positioning pieces of the cover bodies are attached to the outer edges. The lower part is provided with an oblique notch to form an oblique engaging portion, so that the engaging portion of the cover body is engaged with the embedded portion to form positioning.

前述之預鑄式排水溝之改良結構,其中該等溝體之底壁係設為適當傾斜角度之斜坡狀,使複數之溝體連接後,該等底壁得以形成一長斜坡,以利於污水的流動、排放。The improved structure of the above-mentioned Pingxuan drainage ditch, wherein the bottom walls of the ditch bodies are set as slopes with appropriate inclination angles, so that after a plurality of ditch bodies are connected, the bottom walls can form a long slope to facilitate sewage flow and discharge.

前述之預鑄式排水溝之改良結構,其中該蓋體之固定桿係連接該等定位片,與槽部及定位片外緣構成適當之間距,俾供雨水由該間隙流入溝體內排放。In the improved structure of the above-mentioned Pengxuan drainage ditch, the fixing rod of the cover is connected to the positioning pieces, and forms a proper distance from the groove and the outer edge of the positioning piece, so that the rainwater can be discharged into the ditch through the gap.

請參閱圖1,係為本創作之立體分解圖。如圖所示,本創作係為包含複數之溝體1及結合於該等溝體1之複數蓋體2。其中,該等溝體1係設有底壁11,以及連接該底壁之側壁12,以形成一容置空間。其中,該底壁11係設為適當傾斜角度之斜坡狀,且依照排列順序,使前、後溝體1的傾斜角度相對應(如:前一溝體1傾斜角度為0〜3度,則後一溝體1的傾斜角度為3〜6度,依序排列);該側壁12的頂緣係於水平、垂直連續拗折後,形成階狀之嵌置部121。於本實施例,該等溝體1為預先於工廠製作所成形,其材質係為金屬、合金較佳。Please refer to Figure 1, which is an exploded perspective view of this creation. As shown in the figure, the present invention includes a plurality of groove bodies 1 and a plurality of cover bodies 2 combined with the groove bodies 1 . The groove bodies 1 are provided with a bottom wall 11 and a side wall 12 connected to the bottom wall to form an accommodating space. Wherein, the bottom wall 11 is set as a slope with an appropriate inclination angle, and according to the arrangement sequence, the inclination angles of the front and rear groove bodies 1 are corresponding (for example: the inclination angle of the former groove body 1 is 0~3 degrees, then The inclination angle of the latter groove body 1 is 3 to 6 degrees, which are arranged in sequence); the top edge of the side wall 12 is connected to the horizontal and vertical continuous bending to form a stepped embedded portion 121. In this embodiment, the grooves 1 are pre-fabricated and formed in a factory, and their material is preferably metal or alloy.

該蓋體2係設有一概呈U狀之槽部21,以供放置大理石等板材,槽部21的側緣係設有複數之定位片22及固定桿23。其中,該等定位片22係於外緣下方設有一斜狀缺口,以構成斜狀之卡合部24;該固定桿23係連接該等定位片22,與槽部21及定位片22外緣構成適當之間距。The cover body 2 is provided with a generally U-shaped groove portion 21 for placing marble and other plates. The side edge of the groove portion 21 is provided with a plurality of positioning pieces 22 and fixing rods 23 . Wherein, the positioning pieces 22 are provided with an oblique notch below the outer edge to form an inclined engaging portion 24; Form appropriate spacing.

藉由前述構件的組合,於施工時,將該等溝體1相互連接埋設於地面,以供連接不同之排水管,並將該等蓋體2蓋合於該等溝體1上方,使該等蓋體2側緣與地面間形成適當空隙,以供排放雨水及污水,使排水溝的施工更具效率且更為美觀。 Through the combination of the aforementioned components, during construction, the trenches 1 are connected to each other and buried in the ground for connecting different drainage pipes, and the lids 2 are covered above the trenches 1, so that the An appropriate gap is formed between the side edge of the cover body 2 and the ground for discharging rainwater and sewage, so that the construction of the drainage ditch is more efficient and more beautiful.

請參閱圖2,係為本創作之溝體組合施工狀態圖。如圖所示,本創作於施工時,係依施工現場之面積、長度將複數之溝體1相互連接埋設於地面。其中,由於該等溝體1的底壁11係設為適當傾斜角度之斜坡狀,且係依照排列順序,使前、後溝體1的傾斜角度相對應,俾當複數之溝體1連接後,底壁11將會形成一適當角度之長斜坡,以利於污水的流動、排放。 Please refer to Figure 2, which is the construction state diagram of the trench-body combination of this creation. As shown in the figure, during the construction of this work, a plurality of trenches 1 are connected to each other and buried in the ground according to the area and length of the construction site. Among them, since the bottom walls 11 of the groove bodies 1 are set as slopes with appropriate inclination angles, and in accordance with the arrangement order, the inclination angles of the front and rear groove bodies 1 correspond to each other, so that when a plurality of groove bodies 1 are connected, , the bottom wall 11 will form a long slope with an appropriate angle to facilitate the flow and discharge of sewage.

請參閱圖3,係為本創作之蓋體組合施工狀態圖。敬請配合圖1,如圖所示,本創作於前述之溝體1埋設完成為適當長度後,係可分別將該等蓋體2蓋合嵌置於溝體1上。其中,該等蓋體2兩側係設有卡合部24,使該等卡合部24卡合於該等溝體1之嵌置部121,進而使該等蓋體2分別固定於連接排列之該等溝體1上,以構成一排水溝A。 Please refer to Figure 3, which is the construction state diagram of the cover assembly of this creation. Please refer to FIG. 1 . As shown in the figure, after the above-mentioned trenches 1 are embedded to an appropriate length, the cover bodies 2 can be covered and embedded on the trenches 1 respectively. Wherein, the two sides of the cover bodies 2 are provided with engaging portions 24, so that the engaging portions 24 are engaged with the embedded portions 121 of the groove bodies 1, so that the cover bodies 2 are respectively fixed in the connection arrangement On these ditch bodies 1, a drainage ditch A is formed.

請參閱圖4,係為本創作之施工完成立體圖。敬請配合圖2,如圖所示,本創作於溝體1埋設完成並將該等蓋體2蓋合嵌置於溝體1上,完成為一排水溝A後,係可於溝體1的U狀之槽部21,放置大理石3等板材,使整條排水溝A更為美觀,且可配合建築物的外觀,選擇不同型式、花樣色彩之石材,進而可提升建築物周圍之觀瞻。而由於蓋體2之固定桿23係連接該等定位片22,與槽部21及定位片22外緣構成適當之間距,因此,完成施工後之排水溝A的兩側係構成適當之間隙,俾供雨水由該間隙流入溝體1內排放。Please refer to Figure 4, which is a three-dimensional view of the completed construction of this creation. Please cooperate with FIG. 2. As shown in the figure, the present invention is completed after the ditch body 1 is buried and the cover bodies 2 are covered and embedded on the ditch body 1. The U-shaped groove portion 21 of the trough is placed with marble 3 and other plates, so that the entire drainage ditch A is more beautiful, and it can match the appearance of the building, and choose different types, patterns and colors of stone, which can enhance the view around the building. Since the fixing rods 23 of the cover body 2 are connected to the positioning pieces 22 and form an appropriate distance between the grooves 21 and the outer edges of the positioning pieces 22, the two sides of the drainage ditch A after the construction is completed form an appropriate gap. In order for rainwater to flow into the ditch body 1 through the gap to be discharged.

而在前述施工過程中,係於連接之溝體1的側壁12連接不同管徑之排水管4,使該等排水管4供連接於不同之設備(如水槽等),以供排放污水,而最末端的溝體1則於封閉後,設有一排水口5,以供將污水排放至下水道。且由於該等溝體1的底壁11係設為適當傾斜角度之斜坡狀,且係依照排列順序,使前、後溝體1的傾斜角度相對應,排水溝A底壁11將會形成一適當角度之長斜坡,以利於污水的流動、排放。In the aforementioned construction process, the side walls 12 of the connected ditch 1 are connected to the drainage pipes 4 of different diameters, so that the drainage pipes 4 can be connected to different equipment (such as sinks, etc.) for discharging sewage, and After the ditch body 1 at the end is closed, a drain port 5 is provided for discharging sewage to the sewer. And since the bottom walls 11 of the ditch bodies 1 are set as slopes with a proper inclination angle, and the inclination angles of the front and rear ditch bodies 1 correspond to each other according to the arrangement sequence, the bottom wall 11 of the drainage ditch A will form a slope. A long slope with an appropriate angle to facilitate the flow and discharge of sewage.

請參閱圖5,係為本創作之施工完成剖視圖。如圖所示,本創作於施工完成後,該等溝體1係相互連接,而該等蓋體2則嵌置固定於該等溝體1上方。其中,該等溝體1係於側壁12頂緣設有階狀之嵌置部121,使蓋體2之卡合部24卡合於嵌置部121以構成定位,且可較方便將蓋體2撬開拿起,以利日後清理溝體1內部。Please refer to Figure 5, which is a sectional view of the completed construction of this creation. As shown in the figure, after the construction of this work is completed, the ditch bodies 1 are connected to each other, and the cover bodies 2 are embedded and fixed above the ditch bodies 1 . The grooves 1 are provided with stepped embedded portions 121 on the top edges of the side walls 12 , so that the engaging portions 24 of the cover 2 are engaged with the embedded portions 121 to form positioning, and the cover can be positioned more easily. 2. Pry it open and pick it up, so as to clean up the inside of the ditch body 1 in the future.

請參閱圖6,係為本創作之施工完成俯視圖。敬請配合圖1,如圖所示,本創作於施工完成排水溝A後,其中央將會構成一長形之走道,兩側則為可供排放雨水之間隙,配合置於蓋體2槽部21之石材,使整條排水溝A得以更為美觀,且可配合建築物本體選擇搭配之石材,以提升建築物周圍之觀瞻。Please refer to Figure 6, which is a top view of the completed construction of this creation. Please cooperate with Figure 1. As shown in the figure, after the construction of the drainage ditch A is completed, a long walkway will be formed in the center, and the two sides will be the gaps for rainwater drainage. The stone in section 21 makes the entire drainage ditch A more beautiful, and the matching stone can be selected with the building body to enhance the view around the building.

前述實施例,僅為說明本創作之較佳實施方式,而非限制本創作之範圍,凡經由些微修飾、變更,仍不失本創作之要義所在,亦不脫本創作之精神範疇。The foregoing examples are only to illustrate the preferred implementations of the present creation, rather than limiting the scope of the present creation. All modifications and changes are made without losing the essence of the present creation, nor deviating from the spirit of the present creation.

綜上所述,本創作以設有嵌置部之複數溝體,配合可供放置不同石材之蓋體,構成預鑄式排水溝之改良結構。使排水溝的施工更具效率,且於施工完成後得以更為美觀。為一實用之設計,誠屬一俱新穎性之創作,爰依法提出專利之申請,祈  鈞局予以審查,早日賜准專利,至感德便。To sum up, in this work, a plurality of ditch bodies with embedded parts and a cover body that can be placed with different stone materials are used to form an improved structure of the Pingxuan-type drainage ditch. It makes the construction of the drainage ditch more efficient and more beautiful after the construction is completed. It is a practical design, and it is a creation of novelty. I should file a patent application in accordance with the law, and I pray that the bureau will review it and grant the patent as soon as possible.

1:溝體 11:底壁 12:側壁 121:嵌置部 2:蓋體 21:槽部 22:定位片 23:固定桿 24:卡合部 3:大理石 4:排水管 5:排水口 A:排水溝 1: groove body 11: Bottom wall 12: Sidewall 121: Embedded part 2: cover 21: Groove 22: Positioning piece 23: Fixed rod 24: Engagement part 3: Marble 4: Drain pipe 5: drain A: drain

圖1係本創作之立體分解圖。 圖2係本創作之溝體組合施工狀態圖。 圖3係本創作之蓋體組合施工狀態圖。 圖4係本創作之施工完成立體圖。 圖5係本創作之施工完成剖視圖。 圖6係本創作之施工完成俯視圖。 Figure 1 is an exploded perspective view of this creation. Figure 2 is the construction state diagram of the trench-body combination of this creation. Figure 3 is the construction state diagram of the cover assembly of this creation. Figure 4 is a three-dimensional view of the completed construction of this creation. Figure 5 is a sectional view of the completed construction of this creation. Figure 6 is a top view of the completed construction of this creation.

1:溝體 1: groove body

11:底壁 11: Bottom wall

12:側壁 12: Sidewall

2:蓋體 2: cover

21:槽部 21: Groove

22:定位片 22: Positioning piece

23:固定桿 23: Fixed rod

3:大理石 3: Marble

4:排水管 4: Drain pipe

5:排水口 5: drain

A:排水溝 A: drain

Claims (5)

一種預鑄式排水溝之改良結構,包含: 複數之溝體,係供相互連接埋設於地面,其設有底壁以及連接該底壁之側壁,以形成一容置空間,該側壁的頂緣係設有嵌置部; 複數之蓋體,係供蓋合於該等溝體,以構成一供排放污水之排水溝,其設有一概呈U狀之槽部,以供放置大理石等板材,該槽部的側緣係設有複數之定位片及固定桿,該等定位片係於外緣下方設有一卡合部,以供卡合於該等溝體之該嵌置部構成定位。 An improved structure of a shovel-type drainage ditch, comprising: A plurality of groove bodies are used to be connected to each other and buried in the ground, and are provided with a bottom wall and a side wall connected to the bottom wall to form an accommodating space, and the top edge of the side wall is provided with an embedded portion; A plurality of lids are used to cover these grooves to form a drainage ditch for discharging sewage. It is provided with a U-shaped groove for placing marble and other plates. The side edge of the groove is A plurality of positioning pieces and fixing rods are provided, and the positioning pieces are provided with an engaging portion below the outer edge, so as to be engaged with the embedded portion of the grooves to form positioning. 如請求項1所述之預鑄式排水溝之改良結構,其中,該等溝體之該側壁的頂緣係於水平、垂直連續拗折後,形成階狀之該嵌置部;該等蓋體之該定位片,係於外緣下方設有一斜狀缺口,構成斜狀之卡合部,以利卡合於該嵌置部構成定位。The improved structure of the Drainage type drainage ditch as claimed in claim 1, wherein the top edges of the side walls of the ditch bodies are continuously folded horizontally and vertically to form the stepped embedded portion; the covers The positioning piece of the body is provided with an oblique-shaped notch below the outer edge to form an oblique-shaped engaging portion, which is easily engaged with the embedded portion to form positioning. 如請求項1所述之預鑄式排水溝之改良結構,其中,該等溝體之底壁係設為適當傾斜角度之斜坡狀,使複數之該等溝體連接後,該等底壁得以形成一長斜坡,以利於污水的流動、排放。The improved structure of the Pisan-type drainage ditch as claimed in claim 1, wherein the bottom walls of the ditch bodies are set as slopes with an appropriate inclination angle, so that after a plurality of the ditch bodies are connected, the bottom walls can be A long slope is formed to facilitate the flow and discharge of sewage. 如請求項1所述之預鑄式排水溝之改良結構,其中,該等蓋體之該固定桿係連接該定位片,與該槽部及該定位片外緣構成適當之間距,以供雨水流入溝體排放。The improved structure of the Pingxuan-type drainage ditch as claimed in claim 1, wherein the fixing rods of the covers are connected to the positioning piece, and form an appropriate distance from the groove and the outer edge of the positioning piece for rainwater supply. into the ditch for discharge. 如請求項1所述之預鑄式排水溝之改良結構,其中,該等溝體及該等蓋體之材質係以金屬或合金為較佳。According to the improved structure of the Pisen-type drainage ditch according to claim 1, the material of the ditch body and the cover body is preferably metal or alloy.
TW111202384U 2022-03-09 2022-03-09 Improved structure of precast drainage ditch TWM630687U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW111202384U TWM630687U (en) 2022-03-09 2022-03-09 Improved structure of precast drainage ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW111202384U TWM630687U (en) 2022-03-09 2022-03-09 Improved structure of precast drainage ditch

Publications (1)

Publication Number Publication Date
TWM630687U true TWM630687U (en) 2022-08-11

Family

ID=83783058

Family Applications (1)

Application Number Title Priority Date Filing Date
TW111202384U TWM630687U (en) 2022-03-09 2022-03-09 Improved structure of precast drainage ditch

Country Status (1)

Country Link
TW (1) TWM630687U (en)

Similar Documents

Publication Publication Date Title
KR101281070B1 (en) Wall structure for the water-storage tank and its constructing method
CN106759462A (en) A kind of prefabricated piping lane and its construction method suitable for narrow construction site
US5114274A (en) Sewage tank system and method of construction
CN208395826U (en) Foundation pit wall surface bracing reinforcement connection structure
KR101278547B1 (en) The precast concrete wall for the water-storage construct
CN110359470A (en) Bellows intercepting ditch construction technology
TWM630687U (en) Improved structure of precast drainage ditch
CN210288282U (en) Prefabricated ditch
CN206376872U (en) A kind of multi-functional sump chamber
CN115324249A (en) Whole pouring construction method for fully prefabricated kitchen and toilet floor and inverted ridge
US5248219A (en) Sewage tank system and method of construction
CN106988345A (en) A kind of excavation method of reverse construction foundation ditch
JP2010116715A (en) Retaining wall construction method
KR100744408B1 (en) Coupling device of composition infrastructure concrete block
KR102346248B1 (en) mathod for installing faucet field of concrete
KR100378702B1 (en) Drain filter ditch
JP2001003376A (en) L-shaped retaining wall block and its execution method
CN212689131U (en) Module combined water supply and drainage system
CN114232601B (en) Construction method of lower building envelope wall of pipeline
CN217500292U (en) Prefabricated brick moulding bed used as retaining wall
JPH0885956A (en) Drain constructing method at minor step on slope face, draining structure, and block to constitute it
CN115787744A (en) Box-type foundation basement advanced water stop structure
CN210013081U (en) Municipal administration road gutter
KR100380621B1 (en) Precast Block for Trench and Method of Constructing Trench Thereby
CN207144112U (en) Gutter