TWM618873U - Building, standing board assembly and holder thereof - Google Patents

Building, standing board assembly and holder thereof Download PDF

Info

Publication number
TWM618873U
TWM618873U TW110204298U TW110204298U TWM618873U TW M618873 U TWM618873 U TW M618873U TW 110204298 U TW110204298 U TW 110204298U TW 110204298 U TW110204298 U TW 110204298U TW M618873 U TWM618873 U TW M618873U
Authority
TW
Taiwan
Prior art keywords
plate
groove
horizontal
clamping portion
vertical
Prior art date
Application number
TW110204298U
Other languages
Chinese (zh)
Inventor
方建弘
林嘉政
范念祖
羅文貴
Original Assignee
方建弘
林嘉政
范念祖
羅文貴
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 方建弘, 林嘉政, 范念祖, 羅文貴 filed Critical 方建弘
Priority to TW110204298U priority Critical patent/TWM618873U/en
Publication of TWM618873U publication Critical patent/TWM618873U/en

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

A standing board assembly includes a board and a holder. The board is stood on a reinforcing steel of a horizontal structure by using the holder before grouting the building, and the stand board assembly is embedded in the building and located between the horizontal structure and a vertical structure after grouting the building. The stand board assembly can stop crack in the building extending outwardly and also can prevent wafer from penetrating into the building via the construction joint between the horizontal structure and the vertical structure.

Description

建築結構體、立板組件及其固定件Building structure, vertical board assembly and its fixing parts

本創作關於一種立板組件,特別是一種設置於建築結構體施工縫之立板組件。This creation is about a vertical board component, especially a vertical board component installed in the construction joint of a building structure.

建築物因施工限制須分段澆築,先後澆置的混凝土之間存在一結合面,該結合面被稱為施工縫(construction joint),一般施工縫會規劃在建築物承受較小剪力且方便施工的部位,例如,完成建築物樓板之澆築工程後,再進行牆體之澆築工程,因此施工縫會位於樓板頂面及牆體底面之間,當建築物受力後,施工縫周圍可能產生裂縫並向外延伸,且外部水分可能沿著施工縫滲入建築物,而破壞建築物之結構安全。Buildings must be poured in sections due to construction restrictions. There is a joint surface between the successively poured concrete. This joint surface is called a construction joint. Generally, construction joints are planned to bear small shear forces in the building and are convenient The construction site, for example, after the pouring of the building floor is completed, the wall is poured. Therefore, the construction joint will be located between the top surface of the floor and the bottom surface of the wall. When the building is stressed, construction joints may occur around the construction joints. The cracks extend outward, and external moisture may penetrate into the building along the construction joints and damage the structural safety of the building.

本創作之一目的在於提供一種立板組件,該立板組件用以埋設於一建築結構體中,包含一第一板件及一固定件,該固定件具有一第一夾持部、一第二夾持部及一連接部,該第一夾持部具有一第一本體及一第一凹槽,該第一凹槽凹設於該第一本體,用以容納該第一板件之一下緣,該第二夾持部具有一第二本體及一第二凹槽,該第二凹槽凹設於該第二本體,用以容納該建築結構體之一鋼筋,該第一凹槽及該第二凹槽之開口方向不同,該連接部連接該第一本體及該第二本體。One purpose of this creation is to provide a vertical board assembly, which is used to be embedded in a building structure, and includes a first board and a fixing piece. The fixing piece has a first clamping part and a second fixing part. Two clamping portions and a connecting portion. The first clamping portion has a first body and a first groove. The first groove is recessed in the first body for accommodating a lower part of the first plate. Edge, the second clamping portion has a second body and a second groove, the second groove is recessed in the second body for accommodating a steel bar of the building structure, the first groove and The opening directions of the second groove are different, and the connecting portion connects the first body and the second body.

本創作之另一目的在於提供一種固定件,該固定件用以將一板件固定於一建築結構體之一鋼筋上,包含一第一夾持部、一第二夾持部及一連接部,該第一夾持部具有一第一本體及一第一凹槽,該第一凹槽凹設於該第一本體,用以容納該板件之一下緣,該第二夾持部具有一第二本體及一第二凹槽,該第二凹槽凹設於該第二本體,用以容納該建築結構體之該鋼筋,該第一凹槽及該第二凹槽之開口方向不同,該連接部連接該第一本體及該第二本體。Another purpose of this creation is to provide a fixing member for fixing a plate to a steel bar of a building structure, comprising a first clamping part, a second clamping part and a connecting part , The first clamping portion has a first body and a first groove, the first groove is recessed in the first body for accommodating a lower edge of the plate, and the second clamping portion has a A second body and a second groove, the second groove is recessed in the second body for accommodating the steel bar of the building structure, the first groove and the second groove have different opening directions, The connecting portion connects the first body and the second body.

本創作之另一目的在於提供一種建築結構體,其包含一水平結構、一垂直結構及一立板組件,該水平結構具有複數個第一水平鋼筋及複數個第二水平鋼筋,該些第一水平鋼筋及該些第二水平鋼筋之排列方向不同,該垂直結構形成於該水平結構上,該立板組件具有一板件及一固定件,該板件沿著其中之一該第一水平鋼筋排列,該固定件具有一第一夾持部、一第二夾持部及一連接部,該第一夾持部具有一第一本體及一第一凹槽,該第一凹槽凹設於該第一本體,該第二夾持部具有一第二本體及一第二凹槽,該第二凹槽凹設於該第二本體,該第一凹槽及該第二凹槽之開口方向不同,該連接部連接該第一本體及該第二本體,該第一夾持部設置於該板件之一下緣,使該下緣被夾持該第一凹槽內,該第二夾持部設置於其中之一該第二水平鋼筋上,使該第二水平鋼筋被夾持於該第二凹槽內,當完成該水平結構之混凝土澆築工程後,該板件之該下緣及該固定件被埋設於該水平結構中,當完成該垂直結構之混凝土澆築工程後,該板件之其餘部份被埋設於該垂直結構中。Another purpose of this creation is to provide a building structure, which includes a horizontal structure, a vertical structure and a vertical plate assembly, the horizontal structure has a plurality of first horizontal steel bars and a plurality of second horizontal steel bars, the first The horizontal steel bars and the second horizontal steel bars are arranged in different directions, the vertical structure is formed on the horizontal structure, the vertical plate assembly has a plate and a fixing piece, and the plate is along one of the first horizontal steel bars Arranged, the fixing member has a first clamping portion, a second clamping portion and a connecting portion, the first clamping portion has a first body and a first groove, and the first groove is recessed in The first body and the second clamping portion have a second body and a second groove, the second groove is recessed in the second body, the opening direction of the first groove and the second groove The difference is that the connecting portion connects the first body and the second body, the first clamping portion is disposed on a lower edge of the plate, so that the lower edge is clamped in the first groove, and the second clamping Part is set on one of the second horizontal steel bars so that the second horizontal steel bars are clamped in the second groove. After the concrete pouring project of the horizontal structure is completed, the lower edge of the plate and the The fixing piece is buried in the horizontal structure, and after the concrete pouring project of the vertical structure is completed, the rest of the plate piece is buried in the vertical structure.

本創作藉由該固定件將該板件立於該水平結構之該些水平鋼筋上,當該建築結構體之灌漿工程完成後,該立板組件被埋設於該建築結構體中,且位於該水平結構及該垂直結構之間的施工縫,該立板組件用以避免該建築結構體之裂縫延伸,亦可用以避免水分自施工縫滲入該建築結構體內部。 This creation uses the fixing piece to stand the board on the horizontal steel bars of the horizontal structure. After the grouting of the building structure is completed, the vertical board assembly is embedded in the building structure and is located in the building structure. For the construction joint between the horizontal structure and the vertical structure, the vertical plate assembly is used to prevent the crack extension of the building structure, and also to prevent water from penetrating into the building structure from the construction joint.

請參閱第1圖,本創作揭露一種建築結構體A,其包含一水平結構100、一垂直結構200及一立板組件300,該垂直結構200形成於該水平結構100上,該水平結構100及該垂直結構200經由不同混凝土澆築工程所建造,因此該水平結構100及該垂直結構200之間會產生一施工縫,該立板組件300設置於該施工縫,混凝土澆築工程完成後會被埋設於該建築結構體A中,該立板組件300可防止裂縫延伸,亦可阻擋水分沿著該施工縫滲入該建築結構體A內部。 Please refer to Figure 1. This creation discloses a building structure A, which includes a horizontal structure 100, a vertical structure 200 and a vertical plate assembly 300, the vertical structure 200 is formed on the horizontal structure 100, the horizontal structure 100 and The vertical structure 200 is constructed through different concrete pouring projects, so a construction joint will be formed between the horizontal structure 100 and the vertical structure 200. The vertical slab assembly 300 will be installed in the construction joint. After the concrete pouring project is completed, it will be buried in In the building structure A, the vertical board assembly 300 can prevent cracks from extending, and can also prevent water from penetrating into the building structure A along the construction joint.

請參閱第1及2圖,該水平結構100具有複數個第一水平鋼筋110及複數個第二水平鋼筋120,該些第一水平鋼筋110及該些第二水平鋼筋120之排列方向不同,在本實施例中,該水平結構100為該建築結構體A之一橫梁,該些第一水平鋼筋110為該橫梁之主筋,該些第二水平鋼筋120為該橫梁之箍筋,且該些 第一水平鋼筋110及該些第二水平鋼筋120之排列方向實質上垂直,該垂直結構200為該建築結構體A之一牆體,在其他實施例中,該水平結構100可為該建築結構體A之一樓板,而該垂直結構200可為該建築結構體A之一柱體。 Please refer to Figures 1 and 2. The horizontal structure 100 has a plurality of first horizontal steel bars 110 and a plurality of second horizontal steel bars 120. The first horizontal bars 110 and the second horizontal bars 120 are arranged in different directions. In this embodiment, the horizontal structure 100 is a beam of the building structure A, the first horizontal steel bars 110 are the main beams of the beam, the second horizontal steel bars 120 are the stirrups of the beam, and the The arrangement direction of the first horizontal steel bars 110 and the second horizontal steel bars 120 is substantially vertical. The vertical structure 200 is a wall of the building structure A. In other embodiments, the horizontal structure 100 may be the building structure The body A is a floor slab, and the vertical structure 200 can be a column of the building structure A.

請參閱第1及2圖,該立板組件300具有一第一板件310,該第一板件310之一端具有一第一結合部311,較佳地,該立板組件300另具有一第二板件320,該第二板件320之一端具有一第二結合端321,該第一板件310及該第二板件320沿著其中之一該第一水平鋼筋110依序排列,較佳地,該立板組件300另具有一連接件330,該連接件330設置於該第一結合部311及該第二結合部321,以連接該第一板件310及該第二板件320,在本實施例中,該連接件330套設於該第一結合部311及該第二結合部321,以連接該第一板件310及該第二板件320,並同時遮罩該第一結合部311及該第二結合部321之間的一縫隙,因此可防止水分經由該施工縫及該縫隙滲入該建築結構體A內部,但本創作不以此為限制,該連接件330能以其他方式連接該第一板件310及該第二板件320,此外,本創作不限制該第一板件310、該第二板件320及該連接件330之材質,分別可為鋼鐵、塑膠、橡膠或其他材料。 Please refer to Figures 1 and 2, the vertical plate assembly 300 has a first plate 310, and one end of the first plate 310 has a first joining portion 311. Preferably, the vertical plate assembly 300 has a second Two plates 320. One end of the second plate 320 has a second joining end 321. The first plate 310 and the second plate 320 are arranged in sequence along one of the first horizontal steel bars 110. Preferably, the vertical plate assembly 300 further has a connecting member 330 disposed on the first joining portion 311 and the second joining portion 321 to connect the first plate 310 and the second plate 320 In this embodiment, the connecting member 330 is sleeved on the first joining portion 311 and the second joining portion 321 to connect the first plate 310 and the second plate 320, and at the same time shield the first plate A gap between a joining portion 311 and the second joining portion 321 can prevent moisture from penetrating into the building structure A through the construction joint and the gap. However, this creation is not limited by this. The connector 330 can The first plate 310 and the second plate 320 are connected in other ways. In addition, the present invention does not limit the materials of the first plate 310, the second plate 320, and the connecting piece 330. They can be steel, Plastic, rubber or other materials.

請參閱第3a至3c圖,在其他實施例中,該第一結合部311及該第二結合部321彼此為凹凸配合,以使該第一板件310及該第二板件320相互結合,因此無須使用任何連接件連接該第一板件310及該第二板件320,凹凸配合之該第一結合部311及該第二結合部321可增加水路徑,避免水分滲入該建築結構體A內部。 Please refer to FIGS. 3a to 3c. In other embodiments, the first coupling portion 311 and the second coupling portion 321 are concave-convex mating with each other, so that the first plate 310 and the second plate 320 are combined with each other. Therefore, it is not necessary to use any connecting member to connect the first plate 310 and the second plate 320. The concave-convex mating of the first joint 311 and the second joint 321 can increase the water path and prevent the water from penetrating into the building structure A internal.

請參閱第1及2圖,該立板組件300具有至少一固定件340,該固定件340用以將該第一板件310固定於該建築結構體A之鋼筋上,該固定件340具有 一第一夾持部341、一第二夾持部342及一連接部343,在本實施例中,該固定件340為一體成形,該第一夾持部341具有一第一本體341a及一第一凹槽341b,該第一凹槽341b凹設於該第一本體341a,該第二夾持部342具有一第二本體342a及一第二凹槽342b,該第二凹槽342b凹設於該第二本體342a,該第一凹槽341b及該第二凹槽342b之開口方向不同,該連接部343位於該第一夾持部341及該第二夾持部342之間,用以連接該第一本體341a及該第二本體342a。 Please refer to Figures 1 and 2, the vertical plate assembly 300 has at least one fixing member 340 for fixing the first plate 310 to the steel bar of the building structure A, and the fixing member 340 has A first clamping portion 341, a second clamping portion 342, and a connecting portion 343. In this embodiment, the fixing member 340 is integrally formed, and the first clamping portion 341 has a first body 341a and a A first groove 341b, the first groove 341b is recessed in the first body 341a, the second clamping portion 342 has a second body 342a and a second groove 342b, the second groove 342b is recessed In the second body 342a, the opening directions of the first groove 341b and the second groove 342b are different, and the connecting portion 343 is located between the first clamping portion 341 and the second clamping portion 342 for The first body 341a and the second body 342a are connected.

在本實施例中,該第一凹槽341b為一矩形凹槽,其開口朝向該第一板件310,用以容納該第一板件310之一下緣310a,該第二凹槽342b為一圓形凹槽,其開口朝向該水平結構100,用以容納其中之一該第二水平鋼筋120,因此該第一凹槽341b及該第二凹槽342b之開口方向實質上相反,該固定件340之兩端分別設置於該第一板件310及該第二水平鋼筋120,且緊配合地套設於該第一板件310及該第二水平鋼筋120上,以避免該第一板件310立於該第二水平鋼筋120後傾斜,由於該第二水平鋼筋120為該水平結構100之箍筋,不會因設置該固定件340而減少混凝土與主筋之接觸面積。 In this embodiment, the first groove 341b is a rectangular groove with an opening facing the first plate 310 for receiving a lower edge 310a of the first plate 310, and the second groove 342b is a A circular groove whose opening faces the horizontal structure 100 for accommodating one of the second horizontal steel bars 120. Therefore, the opening directions of the first groove 341b and the second groove 342b are substantially opposite, and the fixing member The two ends of 340 are respectively arranged on the first plate 310 and the second horizontal steel bar 120, and tightly sleeved on the first plate 310 and the second horizontal steel bar 120 to avoid the first plate 310 is inclined after standing on the second horizontal steel bar 120. Since the second horizontal steel bar 120 is a stirrup of the horizontal structure 100, the fixing member 340 will not reduce the contact area between the concrete and the main steel bar.

請參閱第2圖,該第一凹槽341b沿著一第一水平方向L1貫穿該第一本體341a,該第二凹槽342b沿著一第二水平方向L2貫穿該第二本體342a,該第一水平方向L1不同於該第二水平方向L2,在本實施例中,該第一水平方向L1及該第二水平方向L2實質上垂直,未被該第一凹槽341b貫穿之該第一本體341a外表面並非單一平面,且未被該第二凹槽342b貫穿之該第二本體342a外表面並非單一平面,因此可增加該固定件340與混凝土之接觸面積。 Referring to Figure 2, the first groove 341b penetrates the first body 341a along a first horizontal direction L1, the second groove 342b penetrates the second body 342a along a second horizontal direction L2, and the first A horizontal direction L1 is different from the second horizontal direction L2. In this embodiment, the first horizontal direction L1 and the second horizontal direction L2 are substantially vertical, and the first body not penetrated by the first groove 341b The outer surface of 341a is not a single plane, and the outer surface of the second body 342a not penetrated by the second groove 342b is not a single plane, so the contact area between the fixing member 340 and the concrete can be increased.

請參閱第4a圖,在另一實施例中,該連接部343結合於該第一本體341a並樞接於該第二本體342a,因此該第一夾持部341可相對於該第二夾持部342 選擇性旋轉,以因應不同的鋼筋配置,在本實施例中,該連接部343以凹凸配合方式樞接於該第二本體342a,但本創作不限制該連接部343之樞接方式,該連接部343能以其他形式(如螺紋結構)樞接於該第二本體342a。 Please refer to Figure 4a. In another embodiment, the connecting portion 343 is coupled to the first body 341a and pivotally connected to the second body 342a, so the first clamping portion 341 can be clamped relative to the second body 342a. Department 342 It can be selectively rotated to adapt to different rebar configurations. In this embodiment, the connecting portion 343 is pivotally connected to the second body 342a in a concave-convex fit. However, the present invention does not limit the pivoting manner of the connecting portion 343. The connection The portion 343 can be pivotally connected to the second body 342a in other forms (such as a threaded structure).

請參閱第4b圖,在另一實施例中,該連接部343之兩端分別樞接於該第一本體341a及該第二本體342a,該第一夾持部341及該第二夾持部342能以該連接部343為軸心選擇性旋轉,因此可根據不同鋼筋配置調整該第一夾持部341及該第二夾持部342之相對位置,在本實施例中,該連接部343係以凹凸配合方式分別樞接於該第一本體341a及該第二本體342a,但本創作不以此為限制,該連接部343能以其他形式樞接於該第一本體341a及該第二本體342a。 Please refer to Figure 4b. In another embodiment, both ends of the connecting portion 343 are pivotally connected to the first body 341a and the second body 342a, the first clamping portion 341 and the second clamping portion 342 can selectively rotate with the connecting portion 343 as the axis, so the relative positions of the first clamping portion 341 and the second clamping portion 342 can be adjusted according to different steel bar configurations. In this embodiment, the connecting portion 343 It is pivotally connected to the first body 341a and the second body 342a in a concave-convex mating manner, but the present creation is not limited by this. The connecting portion 343 can be pivotally connected to the first body 341a and the second body 341a and the second body in other forms.体342a.

完成該水平結構100之鋼筋綁紮工程後,工程人員將該固定件340之該第一夾持部341設置於該第一板件310之該下緣310a,並將該固定件340之該第二夾持部342設置於其中之一該第二水平鋼筋120上,因此該第一板件310之該下緣310a被夾持於該第一凹槽341b內,該第二水平鋼筋120被夾持於該第二凹槽342b內,接著進行該水平結構100之混凝土澆築工程,使該第一板件310之該下緣310a及該固定件340被埋設於該水平結構100中,待該水平結構100硬固後,進行該垂直結構200之鋼筋綁紮工程及混凝土澆築工程,使該第一板件310之其餘部份被埋設於該垂直結構200中。 After completing the steel bar binding project of the horizontal structure 100, the engineer sets the first clamping portion 341 of the fixing member 340 on the lower edge 310a of the first plate 310, and attaches the second clamping member 340 to the lower edge 310a of the first plate 310. The clamping portion 342 is disposed on one of the second horizontal steel bars 120, so the lower edge 310a of the first plate 310 is clamped in the first groove 341b, and the second horizontal steel bar 120 is clamped In the second groove 342b, the concrete pouring project of the horizontal structure 100 is then carried out, so that the lower edge 310a of the first plate 310 and the fixing member 340 are buried in the horizontal structure 100, waiting for the horizontal structure After the 100 is hardened, the steel bar binding project and the concrete pouring project of the vertical structure 200 are carried out, so that the remaining part of the first plate 310 is buried in the vertical structure 200.

請參閱第2圖,較佳地,該第一板件310具有至少一穿孔312,該穿孔312位於該第一板件310之一上緣310b,該穿孔312沿著該第一板件310之厚度方向貫穿該第一板件310,工程人員可將鐵絲穿過該穿孔312後固定於鄰近的鋼筋上,避免該第一板件310於灌漿過程中傾斜。 Please refer to FIG. 2, preferably, the first plate 310 has at least one through hole 312 located on an upper edge 310b of the first plate 310, and the through hole 312 is along a line of the first plate 310. The thickness direction penetrates the first plate 310, and the engineer can pass the iron wire through the perforation 312 and fix it on the adjacent steel bars to prevent the first plate 310 from tilting during the grouting process.

本創作之保護範圍當視後附之申請專利範圍所界定者為準,任何熟知此項技藝者,在不脫離本創作之精神和範圍內所作之任何變化與修改,均屬於本創作之保護範圍。The scope of protection of this creation shall be subject to the scope of the attached patent application. Any change and modification made by anyone who is familiar with this technique without departing from the spirit and scope of this creation shall belong to the scope of protection of this creation. .

100:水平結構 110:第一水平鋼筋 120:第二水平鋼筋 200:垂直結構 300:立板組件 310:第一板件 310a:下緣 310b:上緣 311:第一結合部 312:穿孔 320:第二板件 321:第二結合部 330:連接件 340:固定件 341:第一夾持部 341a:第一本體 341b:第一凹槽 342:第二夾持部 342a:第二本體 342b:第二凹槽 343:連接部 A:建築結構體 L1:第一水平方向 L2:第二水平方向100: horizontal structure 110: The first level of reinforcement 120: second level steel bar 200: vertical structure 300: Vertical board assembly 310: The first plate 310a: bottom edge 310b: Upper edge 311: The first joint 312: Perforation 320: second plate 321: second joint 330: connector 340: fixed parts 341: The first clamping part 341a: The first body 341b: The first groove 342: The second clamping part 342a: The second body 342b: second groove 343: Connection A: Building structure L1: the first horizontal direction L2: second horizontal direction

第1圖:依據本創作之一實施例,一建築結構體之立體圖。 Figure 1: According to an embodiment of this creation, a three-dimensional view of a building structure.

第2圖:依據本創作之一實施例,一立板組件之立體圖。 Figure 2: A three-dimensional view of a vertical board assembly according to an embodiment of this creation.

第3a至3c圖:依據本創作之另一實施例,該立板組件之一板件之上視圖。 Figures 3a to 3c: According to another embodiment of the present invention, a top view of a plate of the vertical plate assembly.

第4a及4b圖:依據本創作之另一實施例,該立板組件之一固定件之立體分解圖。 Figures 4a and 4b: According to another embodiment of this creation, a three-dimensional exploded view of a fixing member of the vertical plate assembly.

110:第一水平鋼筋 110: The first level of reinforcement

120:第二水平鋼筋 120: second level steel bar

300:立板組件 300: Vertical board assembly

310:第一板件 310: The first plate

310a:下緣 310a: bottom edge

310b:上緣 310b: Upper edge

311:第一結合部 311: The first joint

312:穿孔 312: Perforation

320:第二板件 320: second plate

321:第二結合部 321: second joint

330:連接件 330: connector

340:固定件 340: fixed parts

341:第一夾持部 341: The first clamping part

341a:第一本體 341a: The first body

341b:第一凹槽 341b: The first groove

342:第二夾持部 342: The second clamping part

342a:第二本體 342a: The second body

342b:第二凹槽 342b: second groove

343:連接部 343: Connection

L1:第一水平方向 L1: the first horizontal direction

L2:第二水平方向 L2: second horizontal direction

Claims (16)

一種立板組件,用以埋設於一建築結構體中,該立板組件包含: 一第一板件;以及 一固定件,具有一第一夾持部、一第二夾持部及一連接部,該第一夾持部具有一第一本體及一第一凹槽,該第一凹槽凹設於該第一本體,用以容納該第一板件之一下緣,該第二夾持部具有一第二本體及一第二凹槽,該第二凹槽凹設於該第二本體,用以容納該建築結構體之一鋼筋,該第一凹槽及該第二凹槽之開口方向不同,該連接部連接該第一本體及該第二本體。 A vertical board assembly is used to be buried in a building structure. The vertical board assembly includes: A first plate; and A fixing member has a first clamping portion, a second clamping portion and a connecting portion. The first clamping portion has a first body and a first groove, and the first groove is recessed in the The first body is used for accommodating a lower edge of the first plate, the second clamping portion has a second body and a second groove, and the second groove is recessed in the second body for accommodating A steel bar of the building structure, the first groove and the second groove have different opening directions, and the connecting portion connects the first body and the second body. 如請求項1之立板組件,其中該第一凹槽及該第二凹槽之開口方向實質上相反。Such as the riser assembly of claim 1, wherein the opening directions of the first groove and the second groove are substantially opposite. 如請求項1之立板組件,其中該第一凹槽沿著一第一水平方向貫穿該第一本體,該第二凹槽沿著一第二水平方向貫穿該第二本體,該第一水平方向不同於該第二水平方向。Such as claim 1, wherein the first groove penetrates the first body along a first horizontal direction, the second groove penetrates the second body along a second horizontal direction, and the first horizontal The direction is different from the second horizontal direction. 如請求項3之立板組件,其中該第一水平方向及該第二水平方向實質上垂直。For example, the riser assembly of claim 3, wherein the first horizontal direction and the second horizontal direction are substantially vertical. 如請求項1之立板組件,其中該連接部結合於該第一本體並樞接於該第二本體,使該第一夾持部相對於該第二夾持部選擇性旋轉。Such as the stand plate assembly of claim 1, wherein the connecting portion is coupled to the first body and pivotally connected to the second body, so that the first clamping portion is selectively rotated relative to the second clamping portion. 如請求項1之立板組件,其中該連接部之兩端分別樞接於該第一本體及該第二本體,使該第一夾持部及該第二夾持部以該連接部為軸心選擇性旋轉。Such as the vertical plate assembly of claim 1, wherein both ends of the connecting portion are pivotally connected to the first body and the second body, so that the first clamping portion and the second clamping portion take the connecting portion as an axis Heart selective rotation. 如請求項1之立板組件,其另具有一第二板件及一連接件,該第一板件之一端具有一第一結合部,該第二板件之一端具有一第二結合部,沿著該鋼筋依序排列該第一板件及該第二板件後,該連接件設置於該第一結合部及該第二結合部,使該第一板件及該第二板件彼此連接。For example, the vertical plate assembly of claim 1, which further has a second plate and a connecting piece, one end of the first plate has a first joining portion, and one end of the second plate has a second joining portion, After arranging the first plate and the second plate in sequence along the steel bar, the connecting piece is disposed on the first joining portion and the second joining portion so that the first plate and the second plate are mutually connect. 如請求項1之立板組件,其另具有一第二板件,該第一板件之一端具有一第一結合部,該第二板件之一端具有一第二結合部,該第二結合部與該第一結合部凹凸配合,沿著該鋼筋依序排列該第一板件及該第二板件後,該第一結合部及該第二結合部使該第一板件及該第二板件彼此結合。For example, the vertical plate assembly of claim 1, which further has a second plate, one end of the first plate has a first joining part, one end of the second plate has a second joining part, and the second joining Part and the first joint part are concave-convex matched. After the first plate and the second plate are arranged in sequence along the reinforcing bar, the first joint part and the second joint part make the first plate and the second plate The two plates are combined with each other. 如請求項1之立板組件,其中該第一板件具有至少一穿孔,該穿孔位於該第一板件之一上緣,該穿孔沿著該第一板件之厚度方向貫穿該第一板件。The vertical plate assembly of claim 1, wherein the first plate has at least one perforation located on an upper edge of the first plate, and the perforation penetrates the first plate along the thickness direction of the first plate Pieces. 一種固定件,用以將一板件固定於一建築結構體之一鋼筋,該固定件包含: 一第一夾持部,具有一第一本體及一第一凹槽,該第一凹槽凹設於該第一本體,用以容納該板件之一下緣; 一第二夾持部,具有一第二本體及一第二凹槽,該第二凹槽凹設於該第二本體,用以容納該建築結構體之該鋼筋,該第一凹槽及該第二凹槽之開口方向不同;以及 一連接部,連接該第一本體及該第二本體。 A fixing piece is used to fix a plate to a steel bar of a building structure, and the fixing piece includes: A first clamping portion having a first body and a first groove, the first groove being recessed in the first body for receiving a lower edge of the plate; A second clamping portion has a second body and a second groove. The second groove is recessed in the second body for accommodating the steel bar of the building structure, the first groove and the The opening direction of the second groove is different; and A connecting portion connects the first body and the second body. 如請求項10之固定件,其中該連接部結合於該第一本體並樞接於該第二本體,使該第一夾持部相對於該第二夾持部選擇性旋轉。Such as the fixing member of claim 10, wherein the connecting portion is coupled to the first body and pivotally connected to the second body, so that the first clamping portion is selectively rotated relative to the second clamping portion. 如請求項10之固定件,其中該連接部之兩端分別樞接於該第一本體及該第二本體,使該第一夾持部及該第二夾持部以該連接部為軸心選擇性旋轉。Such as the fixing member of claim 10, wherein both ends of the connecting portion are pivotally connected to the first body and the second body, so that the first clamping portion and the second clamping portion are centered on the connecting portion Selective rotation. 一種建築結構體,其包含: 一水平結構,具有複數個第一水平鋼筋及複數個第二水平鋼筋,該些第一水平鋼筋及該些第二水平鋼筋之排列方向不同; 一垂直結構,形成於該水平結構上;以及 一立板組件,具有一板件及一固定件,該板件沿著其中之一該第一水平鋼筋排列,該固定件具有一第一夾持部、一第二夾持部及一連接部,該第一夾持部具有一第一本體及一第一凹槽,該第一凹槽凹設於該第一本體,該第二夾持部具有一第二本體及一第二凹槽,該第二凹槽凹設於該第二本體,該第一凹槽及該第二凹槽之開口方向不同,該連接部連接該第一本體及該第二本體,該第一夾持部設置於該板件之一下緣,使該下緣被夾持該第一凹槽內,該第二夾持部設置於其中之一該第二水平鋼筋上,使該第二水平鋼筋被夾持於該第二凹槽內,當完成該水平結構之混凝土澆築工程後,該板件之該下緣及該固定件被埋設於該水平結構中,當完成該垂直結構之混凝土澆築工程後,該板件之其餘部份被埋設於該垂直結構中。 A building structure, which contains: A horizontal structure having a plurality of first horizontal steel bars and a plurality of second horizontal steel bars, and the arrangement directions of the first horizontal steel bars and the second horizontal steel bars are different; A vertical structure formed on the horizontal structure; and A vertical plate assembly having a plate and a fixing part arranged along one of the first horizontal steel bars, the fixing part having a first clamping part, a second clamping part and a connecting part , The first clamping portion has a first body and a first groove, the first groove is recessed in the first body, and the second clamping portion has a second body and a second groove, The second groove is recessed in the second body, the opening directions of the first groove and the second groove are different, the connecting portion connects the first body and the second body, and the first clamping portion is provided At a lower edge of the plate, the lower edge is clamped in the first groove, and the second clamping portion is disposed on one of the second horizontal steel bars, so that the second horizontal steel bars are clamped in In the second groove, when the concrete pouring project of the horizontal structure is completed, the lower edge of the slab and the fixing member are buried in the horizontal structure. When the concrete pouring project of the vertical structure is completed, the slab The rest of the piece is buried in the vertical structure. 如請求項13之建築結構體,其中該水平結構為一橫梁,該些第一水平鋼筋為該橫梁之主筋,該些第二水平鋼筋為該橫梁之箍筋。Such as the building structure of claim 13, wherein the horizontal structure is a beam, the first horizontal steel bars are the main reinforcement of the beam, and the second horizontal steel bars are the stirrups of the beam. 如請求項13之建築結構體,其中該水平結構為一樓板。Such as the building structure of claim 13, wherein the horizontal structure is a floor. 如請求項13之建築結構體,其中該垂直結構為一牆體或一柱體。Such as the building structure of claim 13, wherein the vertical structure is a wall or a column.
TW110204298U 2021-04-19 2021-04-19 Building, standing board assembly and holder thereof TWM618873U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW110204298U TWM618873U (en) 2021-04-19 2021-04-19 Building, standing board assembly and holder thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW110204298U TWM618873U (en) 2021-04-19 2021-04-19 Building, standing board assembly and holder thereof

Publications (1)

Publication Number Publication Date
TWM618873U true TWM618873U (en) 2021-11-01

Family

ID=79908148

Family Applications (1)

Application Number Title Priority Date Filing Date
TW110204298U TWM618873U (en) 2021-04-19 2021-04-19 Building, standing board assembly and holder thereof

Country Status (1)

Country Link
TW (1) TWM618873U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI758166B (en) * 2021-04-19 2022-03-11 方建弘 Building, standing board assembly and holder thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI758166B (en) * 2021-04-19 2022-03-11 方建弘 Building, standing board assembly and holder thereof

Similar Documents

Publication Publication Date Title
TWM618873U (en) Building, standing board assembly and holder thereof
KR20180122151A (en) the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same
KR101995497B1 (en) the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same
US4378664A (en) System for constructing a building
TWI758166B (en) Building, standing board assembly and holder thereof
CN108756243A (en) Girder steel and concrete ring beam, the structure-integrated construction of concrete floor
KR101956606B1 (en) Joint part forming apparatus of reinforced concrete and method of placing joint using the same
JP2018053441A (en) Precast concrete floor slab provided with loop-like joint
KR20060079949A (en) Hybrid structure system of precast concrete beam and steel beam, precast concrete beam with bracket for connection with steel beam
KR102180280B1 (en) Hollow Core Slab Joint Structure Using Reinforcement Member
JP3394934B2 (en) Steel reinforced concrete structure
JP2006307568A (en) Structure and method for joining beam and column together
KR100567271B1 (en) Method for constructing joint between precast girder and precast beam
KR102469967B1 (en) Foundation member for wall
JP3392300B2 (en) PC foundation beam structure
JPH09273213A (en) Fixing metal fitting, installation method thereof, and column base foundation joint construction
KR101967786B1 (en) Upper and lower cage connecting structuer of gang form
JPH0215948Y2 (en)
JPH0821011A (en) Connector fittings for building
JPS61229070A (en) Connection of reinforced concrete structure
JPH0464368B2 (en)
TWM645993U (en) External corner formwork
JP3143624B2 (en) Panel mounting method
JPH084029A (en) Precast concrete foundation structure
JP2021173022A (en) Joint metal fitting