TWM582950U - Steel buckle barrel hanging rack - Google Patents

Steel buckle barrel hanging rack Download PDF

Info

Publication number
TWM582950U
TWM582950U TW108205723U TW108205723U TWM582950U TW M582950 U TWM582950 U TW M582950U TW 108205723 U TW108205723 U TW 108205723U TW 108205723 U TW108205723 U TW 108205723U TW M582950 U TWM582950 U TW M582950U
Authority
TW
Taiwan
Prior art keywords
hanger
hook
steel buckle
movable hook
lifting
Prior art date
Application number
TW108205723U
Other languages
Chinese (zh)
Inventor
許庭瑋
李錫鵬
王崇豪
陳文杰
Original Assignee
中國鋼鐵股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中國鋼鐵股份有限公司 filed Critical 中國鋼鐵股份有限公司
Priority to TW108205723U priority Critical patent/TWM582950U/en
Publication of TWM582950U publication Critical patent/TWM582950U/en

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本創作為一種鋼扣桶吊架,其包括有兩吊耳、兩對安裝座、兩活動鉤吊件及四個插銷,兩吊耳間隔地設置且相連結;兩對安裝座分別設於兩吊耳;兩活動鉤吊件分別設於兩對安裝座,各活動鉤吊件有二擺臂及一鉤吊板,兩擺臂能擺動地設於其中的一對安裝座,鉤吊板固結於兩擺臂;四插銷分別穿置於兩對安裝座,避免兩活動鉤吊件相對兩對安裝座擺動;本創作設有活動鉤吊件來勾掛鋼扣桶,且設有吊耳供天車的夾具夾取,能解決以鋼索吊掛鋼扣桶的方式,其鋼索易脫出、鋼扣桶易翻落,以及安裝鋼索之繁瑣、耗時的問題,提供一種使用簡便、安全的鋼扣桶吊架。The present invention is a steel buckle bucket hanger, which comprises two lifting ears, two pairs of mounting seats, two movable hook hangers and four latches, two lifting ears are arranged at intervals and connected; two pairs of mounting seats are respectively arranged in two The lifting hooks are respectively arranged on two pairs of mounting seats, each movable hook hanging member has two swing arms and a hook hanging plate, and the two swing arms can swingably set in a pair of mounting seats, and the hook hanging plate is fixed Attached to the two swing arms; the four pins are respectively placed on the two pairs of mounts to avoid swinging the two movable hook hangers relative to the two pairs of mounts; the creation has a movable hook hanger to hook the steel buckle bucket and has a lifting lug The clamp for the crane can solve the problem that the steel cable is suspended by the steel cable, the steel cable is easy to escape, the steel buckle barrel is easy to fall, and the troublesome and time-consuming problem of installing the steel cable provides a simple and safe use. Steel buckle bucket hanger.

Description

鋼扣桶吊架Steel buckle bucket hanger

本創作係涉及一種鋼扣桶的吊掛裝置,尤指一種在使用上簡便且安全的鋼扣桶吊架。The present invention relates to a hanging device for a steel buckle barrel, and more particularly to a steel buckle bucket hanger that is simple and safe to use.

鋼扣桶為鋼鐵業常用於盛裝鋼帶扣的容器,而鋼帶扣為產線包裝鋼捲時使用的元件,每次都需使用天車將鋼扣桶吊掛至產線包裝機旁,以方便進行鋼帶扣的補充作業;在吊掛前,操作人員都必須裝上鋼索吊掛鋼扣桶,再將鋼索以天車吊起,在吊掛、移動鋼扣桶的過程中,鋼索容易脫出,而常有鋼扣桶翻落的情形,因此在執行吊掛作業中,操作人員如果過於靠近鋼扣桶,時有鋼索夾傷或者鋼扣桶碰撞操作人員而造成傷害的意外發生;更何況,鋼扣桶及所承裝的鋼帶扣皆為沉重的物品,若在操作人員的上方掉落,後果將會不堪設想。The steel buckle barrel is used for the steel industry to hold the steel buckle, and the steel buckle is used for the production of the steel coil. Every time you need to use the crane to hang the steel buckle barrel to the production line packaging machine. In order to facilitate the replenishment of the steel buckle; before hanging, the operator must install the steel cable hanging steel buckle barrel, and then lift the steel cable to the crane, in the process of hanging and moving the steel buckle barrel, the steel cable It is easy to pull out, and often there is a situation in which the steel buckle barrel is turned down. Therefore, in the execution of the hanging operation, if the operator is too close to the steel buckle barrel, there is a wire rope pinch or the steel buckle barrel collides with the operator and the injury occurs. Moreover, the steel buckle bucket and the steel buckles it holds are heavy items. If it falls above the operator, the consequences will be unimaginable.

再者,安裝鋼索的過程不僅繁瑣,也耗費不少時間,容易造成產線的進度延誤,增加作業困擾;承上所述,利用天車以鋼索吊掛鋼扣桶的現有鋼扣桶移動方式,在使用上的安全性及實用性尚有改良與進步的空間。Moreover, the process of installing the cable is not only cumbersome, but also takes a lot of time, which is likely to cause delays in the progress of the production line and increase the trouble of the operation; as described above, the existing steel buckle barrel moving method using the crane to hang the steel buckle barrel with the steel cable There is still room for improvement and improvement in the safety and practicality of use.

為了解決以鋼索吊掛鋼扣桶的現有鋼扣桶移動方式,鋼索容易脫出、鋼扣桶容易翻落,以及安裝鋼索的過程繁瑣、耗時的問題。本創作提供一種鋼扣桶吊架,其設有活動鉤吊件勾掛鋼扣桶的支撐板,且設有吊耳供廠房內之天車所裝配的夾具來夾取,提升了使用上的安全性及實用性。In order to solve the existing steel buckle bucket moving mode of hanging the steel buckle barrel by the steel cable, the steel cable is easy to be pulled out, the steel buckle barrel is easy to fall, and the process of installing the steel cable is cumbersome and time consuming. The present invention provides a steel buckle bucket hanger, which is provided with a movable hook hanger to support the steel buckle barrel support plate, and a lifting ear is provided for the clamp assembled by the crane in the factory to be clamped, thereby improving the use. Safety and practicality.

本創作解決技術問題所提出的鋼扣桶吊架,其包括: 二吊耳,兩該吊耳間隔地設置且相連結,各吊耳包括有一吊掛孔,兩該吊耳的兩吊掛孔沿著同一方向貫穿設置; 二對安裝座,兩該對安裝座分別固設於兩該吊耳,且各對安裝座間隔地設置; 二活動鉤吊件,兩該活動鉤吊件分別設於兩該對安裝座,各活動鉤吊件包括有二擺臂及一鉤吊板,兩該擺臂能擺動地設於其中的一該對安裝座,該鉤吊板的相對二端分別固結於兩該擺臂;以及 四插銷,四該插銷分別穿置於兩該對安裝座而能擋止兩該活動鉤吊件的四擺臂,使兩該活動鉤吊件無法相對兩該對安裝座擺動。 This creation solves the technical problem of the steel buckle bucket hanger, which includes:  Two lifting ears, the two lifting ears are arranged and connected at intervals, each lifting ear comprises a hanging hole, and two hanging holes of the lifting ear are arranged along the same direction;  Two pairs of mounting seats, two pairs of mounting seats are respectively fixed on the two lifting ears, and each pair of mounting seats are arranged at intervals;  Two movable hook hangers, two movable hook hangers are respectively disposed on the two pairs of mounts, each movable hook hanger comprises a second swing arm and a hook hanging plate, and the two swing arms are swingably disposed in one of the two For the mount, the opposite ends of the hook plate are respectively fixed to the two swing arms;  Four latches, four pins are respectively placed on the two pairs of mounting seats to block the four swing arms of the movable hook hangers, so that the two movable hook hangers cannot swing relative to the two pairs of mounts.  

所述之鋼扣桶吊架,其中各活動鉤吊件的各擺臂包括有一長孔,該長孔貫設於該擺臂且朝向該活動鉤吊件的鉤吊板延伸,二樞軸分別穿過該活動鉤吊件之兩擺臂的兩長孔而將兩該擺臂能擺動地設於其中的一該對安裝座。The steel buckle bucket hanger, wherein each swing arm of each movable hook hanger comprises a long hole, the long hole is disposed on the swing arm and extends toward the hook hanger of the movable hook hanger, and the two pivots respectively Two pairs of long holes of the swing arm of the movable hook hanger are used to swing the two swing arms to one of the pair of mounts.

所述之鋼扣桶吊架,其中各吊耳貫穿設有二卡掣孔,兩該卡掣孔的位置對應固設於該吊耳之一該對安裝座的位置;各活動鉤吊件的各擺臂包括有一卡掣鉤,各擺臂的卡掣鉤與該活動鉤吊件的鉤吊板位於該擺臂的相對二端,各活動鉤吊件之兩擺臂的兩卡掣鉤能分別與所固設之吊耳的兩卡掣孔相卡掣。The steel buckle bucket hanger, wherein each lifting lure is provided with two card boring holes, and the positions of the two boring holes correspond to the positions of the pair of mounting ears of the lifting lugs; Each swing arm includes a hook hook, and the hook hook of each swing arm and the hook hanging plate of the movable hook hanger are located at opposite ends of the swing arm, and the two hook hooks of the two swing arms of each movable hook hanger can They are respectively engaged with the two card boring holes of the fixed lifting ears.

所述之鋼扣桶吊架,其中各卡掣孔為一長形孔。The steel buckle bucket hanger, wherein each of the card holes is an elongated hole.

所述之鋼扣桶吊架,其中所述之鋼扣桶吊架包括有一導引座,該導引座包括有二導引架,兩該導引架分別固設於兩所述吊耳,且兩該導引架相向地傾斜設置。The steel buckle bucket hanger, wherein the steel buckle bucket hanger comprises a guiding seat, the guiding seat comprises two guiding brackets, and the two guiding brackets are respectively fixed on the two lifting ears. And the two guide frames are inclined to face each other.

所述之鋼扣桶吊架,其中各活動鉤吊件包括有二握把,兩該握把分別結合於該活動鉤吊件的兩擺臂。The steel buckle bucket hanger, wherein each movable hook hanger comprises two grips, and the two grips are respectively coupled to the two swing arms of the movable hook hanger.

所述之鋼扣桶吊架,其中各對安裝座中的各安裝座包括有間隔設置的二樞結板,各樞結板包括有一握把容口,兩該樞結板的兩握把容口朝上,設於該對安裝座之一該活動鉤吊件的握把能容置於該對安裝座之樞結板所設的握把容口。The steel buckle bucket hanger, wherein each of the pair of mounts comprises two spaced apart pivot boards, each pivot board includes a grip receptacle, and the two grips of the pivot board With the mouth facing up, the grip of the movable hook hanger disposed on one of the pair of mounts can accommodate the grip receptacle provided by the pivot plate of the pair of mounts.

所述之鋼扣桶吊架,其中所述之兩活動鉤吊件之擺臂的卡掣鉤朝相反方向設置。In the steel buckle bucket hanger, the hooks of the swing arms of the two movable hook hangers are disposed in opposite directions.

所述之鋼扣桶吊架,其中所述之鋼扣桶吊架包括有一個以上的連接桿,該一個以上的連接桿連結兩該吊耳。The steel buckle bucket hanger, wherein the steel buckle bucket hanger comprises more than one connecting rod, and the one or more connecting rods connect the two lifting lugs.

本創作的技術手段可獲得的功效增進在於: 1.本創作之鋼扣桶吊架,其所設的活動鉤吊件能勾掛鋼扣桶的支撐板,且所設的吊耳能供廠房內天車所裝配的夾具來夾取,能夠節省現有鋼扣桶移動方式所耗費之拆裝鋼索的時間;再者,本創作所設插銷能避免活動鉤吊件相對安裝座擺動,避免活動鉤吊件與鋼扣桶脫離的意外發生,提升本創作在使用上的安全性。 2.本創作設有導引座來對正鋼扣桶吊架與鋼扣桶,除了能夠節省天車吊掛鋼扣桶吊架來回對正鋼扣桶的時間之外,天車吊掛鋼扣桶吊架對正鋼扣桶的過程中,操作人員無須靠近鋼扣桶,沒有遭鋼索夾傷或者鋼扣桶碰撞之虞,提升了本創作吊掛鋼扣桶的效率,以及使用安全。 3. 本創作的吊耳設有卡掣孔與活動鉤吊件之擺臂的卡掣鉤相卡掣,避免活動鉤吊件在下降時,與鋼扣桶的支撐板干涉,使活動鉤吊件無法吊掛鋼扣桶,進一步提升了本創作在使用上的便利性。 The enhancements achieved by the technical means of this creation are:  1. The steel buckle bucket hanger of this creation can be hooked on the support plate of the steel buckle barrel, and the lifting ear can be clamped by the fixture assembled by the crane inside the factory. The time for disassembling the cable for the movement of the existing steel buckle barrel is saved; in addition, the bolt provided in the creation can avoid the swing of the movable hook hanging member relative to the mounting seat, thereby avoiding the accidental occurrence of the separation of the movable hook hanging piece and the steel buckle barrel, and improving The security of this creation is in use.  2. This creation is equipped with a guiding seat to align the steel buckle barrel hanger and the steel buckle barrel, in addition to saving the time when the crane is hanging the steel buckle barrel hanger back and forth to the steel buckle barrel, the crane hanging steel During the process of buckle barrel hanger to the positive steel buckle barrel, the operator does not need to be close to the steel buckle barrel, and there is no steel cable pinch or steel buckle barrel collision, which improves the efficiency of the hanging steel buckle barrel and the safety of use.  3. The lifting lugs of this creation are provided with a snap hole and a hook of the swing arm of the movable hook hanging piece, so as to prevent the movable hook hanging piece from colliding with the support plate of the steel buckle barrel when the hanging hook hanging piece is lowered, so that the movable hook hanging The steel buckle barrel can not be hung, which further enhances the convenience of the creation.  

為能詳細瞭解本創作的技術特徵及實用功效,並可依照創作內容來實現,玆進一步以如圖式所示的較佳實施例,詳細說明如後:In order to understand the technical features and practical functions of the present work in detail, and in accordance with the creative content, the following further describes the preferred embodiment as shown in the following figure:

如圖1及圖2所示,本創作之鋼扣桶吊架係包括有二吊耳10、一個以上的連接桿20、一導引座30、二對安裝座40、二活動鉤吊件50及四插銷60;其中,兩該對安裝座40分別固設於兩該吊耳10,兩該活動鉤吊件50分別結合於兩該對安裝座40。As shown in FIG. 1 and FIG. 2, the steel buckle bucket hanger of the present invention includes two lifting ears 10, one or more connecting rods 20, a guiding seat 30, two pairs of mounting seats 40, and two movable hook hangers 50. And the four latches 60; wherein the two pairs of mounting brackets 40 are respectively fixed to the two lifting lugs 10, and the two movable hooking hangers 50 are respectively coupled to the pair of the mounting brackets 40.

如圖1至圖2所示,兩該吊耳10相互連結且間隔地設置,各吊耳10貫穿設有一吊掛孔11及二卡掣孔12,兩該卡掣孔12間隔地設置,;在本創作的較佳實施例中,兩該吊耳10的兩吊掛孔11沿著同一方向貫穿設置,該一個以上的連接桿20設有兩個,各連接桿20的相對兩端分別連接兩該吊耳10;該導引座30包括有二導引架31,兩該導引架31分別固設於兩該吊耳10的底部,且相向地傾斜設置。As shown in FIG. 1 to FIG. 2, the two lifting ears 10 are connected to each other and spaced apart, and each of the lifting ears 10 is provided with a hanging hole 11 and two clamping holes 12, and the two clamping holes 12 are spaced apart; In the preferred embodiment of the present invention, the two hanging holes 11 of the two lifting ears 10 are arranged in the same direction. The one or more connecting rods 20 are provided with two, and the opposite ends of the connecting rods 20 are respectively connected. Two of the lifting lugs 10; the guiding bracket 30 includes two guiding brackets 31, and the guiding brackets 31 are respectively fixed to the bottoms of the two lifting lugs 10, and are inclined to face each other.

如圖1及圖3所示,兩該對安裝座40分別對應四該卡掣孔12的位置設置,且各對安裝座40間隔地設置,因兩該對安裝座40為相同設計,以下僅就單一該安裝座40說明,該安裝座40包括有二樞結板41,兩該樞結板41分別設於其中一該卡掣孔12的相對兩側,各樞結板41包括有一插孔411、一樞孔、一握把容口413及相對的兩端,各樞結板41的一端連接於其中的一該吊耳10,該插孔411貫穿該樞結板41且鄰近於該樞結板41的另一端,該樞孔貫穿該樞結板41且位於該樞結板41的中間位置,該握把容口413的方向朝上,且設於該插孔411及該樞孔的中間。As shown in FIG. 1 and FIG. 3, the two pairs of the mounting bases 40 are respectively disposed corresponding to the positions of the four latching holes 12, and the pair of mounting brackets 40 are disposed at intervals, because the two pairs of the mounting brackets 40 have the same design, and only the following As for the single mounting seat 40, the mounting base 40 includes two pivoting plates 41. The two pivoting plates 41 are respectively disposed on opposite sides of one of the latching holes 12, and each of the pivoting plates 41 includes a jack. 411, a pivot hole, a grip opening 413 and opposite ends, one end of each pivoting plate 41 is connected to one of the lifting ears 10, the insertion hole 411 extends through the pivoting plate 41 and is adjacent to the pivot The other end of the gusset 41 extends through the pivoting plate 41 and is located at an intermediate position of the pivoting plate 41. The direction of the grip opening 413 is upward, and is disposed at the insertion hole 411 and the pivot hole. intermediate.

如圖3及圖4所示,兩該活動鉤吊件50分別能擺動及滑動地結合於兩該對安裝座40,各活動鉤吊件50包括有二擺臂51、一鉤吊板53及二握把54,各活動鉤吊件50的兩擺臂51分別樞設於其中一吊耳10所固設的一該對安裝座40,因兩該擺臂51為相同設計,以下僅就單一該擺臂51說明,該擺臂51設於兩該樞結板41的中間,且包括有一長孔511、一卡掣鉤512及相對的兩端,該長孔511係對應該樞孔的位置設置,一樞軸貫穿兩該樞結板41的兩樞孔及該擺臂51的長孔511,使該擺臂51能擺動及滑動地結合於兩該樞結板41;該卡掣鉤512設於該擺臂51的其中一端;在本創作的較佳實施例中,兩該擺臂51的兩卡掣鉤512能分別與該吊耳10所設的兩卡掣孔12相卡掣,較佳地,各吊耳10的各卡掣孔12為一長形孔,提供相對應之一該擺臂51活動時所需要的裕度,讓兩該卡掣鉤512能順利地分別與兩該卡掣孔12相卡掣;該鉤吊板53呈長條形,該鉤吊板53的相對二端分別固結於兩該擺臂51的另一端,兩該擺臂51的兩長孔511朝向該鉤吊板53延伸,兩該握把54分別結合於兩該擺臂51,因兩該握把54為相同設計,以下僅就單一該握把54說明,該握把54的輪廓略呈U形,該握把54的兩端固結於該擺臂51;四該插銷60分別插設於兩該對安裝座40的插孔411。在本創作的較佳實施例中,兩該活動鉤吊件50之擺臂51的卡掣鉤512朝相反方向設置。As shown in FIG. 3 and FIG. 4, the two movable hooks 50 are respectively slidably and slidably coupled to the pair of mounting bases 40. Each of the movable hooks 50 includes a second swinging arm 51 and a hooking plate 53. The two grips 54 are respectively pivotally disposed on a pair of mounting brackets 40 of one of the lifting lugs 10, and the two swinging arms 51 are identically designed. The swing arm 51 is disposed at the middle of the two pivot plates 41 and includes a long hole 511, a hook 512 and opposite ends. The long hole 511 is corresponding to the position of the pivot hole. The pivoting member extends through the two pivot holes of the pivot plate 41 and the long hole 511 of the swing arm 51, so that the swing arm 51 can be swingably and slidably coupled to the two pivot plates 41; the latch hook 512 It is disposed at one end of the swing arm 51. In the preferred embodiment of the present invention, the two latching hooks 512 of the swing arm 51 can be respectively engaged with the two latching holes 12 of the lifting lug 10, Preferably, each of the latching holes 12 of each of the lifting lugs 10 is an elongated hole, which provides a corresponding margin required for the swinging arm 51 to move, so that the two latching hooks 512 can smoothly and respectively The card hole The hooking plate 53 has an elongated shape. The opposite ends of the hooking plate 53 are respectively fixed to the other ends of the swinging arms 51. The two long holes 511 of the swinging arms 51 face the hook. The hanging plate 53 extends, and the two grips 54 are respectively coupled to the two swing arms 51. Since the two grips 54 are of the same design, the following description is only for a single grip 54 which has a slightly U-shaped outline. The two ends of the grip 54 are fixed to the swing arm 51; and the four plugs 60 are respectively inserted into the insertion holes 411 of the pair of mounts 40. In the preferred embodiment of the present invention, the latching hooks 512 of the swing arms 51 of the movable hook hangers 50 are disposed in opposite directions.

本創作之兩吊耳10的兩吊掛孔11能以廠房內之天車的夾具直接夾取、吊掛;如圖5所示,本創作的鋼扣桶吊架於一鋼扣桶70的上方緩緩放下,該鋼扣桶70包括有朝向相反方向設置的二支撐板71,如果兩該吊耳10未正對該鋼扣桶70的位置而放下時,該導引座30的導引座30會碰觸該鋼扣桶70的頂部,該導引座30之相向傾斜的兩導引架31將本創作的鋼扣桶吊架快速地導引至正對的位置。The two hanging holes 11 of the two lifting ears 10 of the present invention can be directly clamped and hung by the clamp of the overhead crane in the factory; as shown in FIG. 5, the steel buckle barrel hanger of the present invention is in a steel buckle barrel 70. The steel buckle barrel 70 includes two support plates 71 disposed in opposite directions. If the two lifting ears 10 are not lowered by the position of the steel buckle barrel 70, the guide seat 30 is guided. The seat 30 will touch the top of the steel buckle barrel 70, and the two inclined guide frames 31 of the guide seat 30 quickly guide the steel buckle bucket hanger of the present creation to the right position.

如圖6及圖7所示,現場的操作人員能握持各活動鉤吊件50的兩握把54操作該活動鉤吊件50,讓四該卡掣鉤52脫離四該卡掣孔12後,將兩該活動鉤吊件50往該鋼扣桶70的相反方向滑動,再將兩該活動鉤吊件50往該鋼扣桶70的方向擺動,使兩該活動鉤吊件50的兩鉤吊板53分別移動至該鋼扣桶70的兩支撐板71下方,此時兩該活動鉤吊件50的兩握把54容置於兩對安裝座40之樞結板41所設的握把容口413;接著,如圖8所示,將四該插銷60分別插於四該安裝座40的插孔411,擋止兩該活動鉤吊件50,避免兩該活動鉤吊件50相對兩該對安裝座40任意擺動;當天車升起時,兩該活動鉤吊件50的兩鉤吊板53分別頂抵該鋼扣桶70的兩支撐板71,將該鋼扣桶70吊起;使用時,天車將承裝有鋼扣的鋼扣桶吊至廠房內的手動包紮區供作業人員取用、包裝鋼捲;天車再將空的鋼扣桶吊起、移至鋼扣桶放置區,供作業人員填補鋼扣。As shown in FIG. 6 and FIG. 7, the operator on site can hold the two grips 54 of each movable hook hanger 50 to operate the movable hook hanger 50, so that the four latch hooks 52 are disengaged from the four latching holes 12 And sliding the two movable hook hangers 50 in opposite directions of the steel buckle bucket 70, and then swinging the two movable hook hangers 50 toward the steel buckle bucket 70 to make the two hooks of the movable hook hanger 50 The lifting plates 53 are respectively moved under the two supporting plates 71 of the steel buckle barrel 70. At this time, the two grips 54 of the movable hook lifting members 50 are accommodated in the grips of the pivoting plates 41 of the two pairs of mounting seats 40. a port 413; then, as shown in FIG. 8, the four plug pins 60 are respectively inserted into the insertion holes 411 of the mounting base 40, and the two movable hook hangers 50 are blocked to prevent the two movable hook hangers 50 from being opposite to each other. The pair of mounting brackets 40 are arbitrarily oscillating; when the vehicle is raised, the two hooking plates 53 of the movable hooking members 50 respectively abut against the two supporting plates 71 of the steel buckle barrel 70, and the steel buckle barrels 70 are lifted; When in use, the crane will hoist the steel buckle barrel bearing the steel buckle to the manual dressing area in the factory for the operator to take and package the steel coil; the crane will lift the empty steel buckle barrel and move it to the steel buckle barrel. put Area for workers to fill steel buckle.

與利用天車以鋼索吊掛鋼扣桶的現有鋼扣桶移動方式相比,本創作的鋼扣桶吊架在吊掛鋼扣桶時較不易擺動或晃動,能避免鋼索夾傷或者鋼扣桶碰撞操作人員的意外發生;再者,本創作之鋼扣桶吊架的活動鉤吊件50易於操作,能輕易地勾吊鋼扣桶的支撐板,操作人員無須再拆裝鋼索,節省了拆裝鋼索的時間;最後,本創作的插銷60能避免兩該活動鉤吊件50擺動,不會使該鋼扣桶70在夾取移動時掉落,大幅地增加使用上的安全性。Compared with the existing steel buckle bucket moving method that uses the crane to hang the steel buckle barrel with the steel cable, the steel buckle bucket hanger of the present invention is less likely to swing or sway when hanging the steel buckle barrel, and can avoid the wire rope pinch or the steel buckle. The accident of the barrel collision operator occurs; in addition, the movable hook hanger 50 of the steel buckle bucket hanger of the present invention is easy to operate, and the support plate of the steel buckle barrel can be easily hooked, and the operator does not need to disassemble the steel cable, thereby saving At the time of disassembling the cable; finally, the plug 60 of the present invention can prevent the two hook hangers 50 from swinging, and does not cause the steel buckle barrel 70 to fall during the gripping movement, thereby greatly increasing the safety in use.

10‧‧‧吊耳10‧‧‧ lifting ears

11‧‧‧吊掛孔 12‧‧‧卡掣孔 20‧‧‧連接桿 30‧‧‧導引座 11‧‧‧ hanging hole  12‧‧‧Card hole  20‧‧‧ Connecting rod  30‧‧‧ Guide seat

31‧‧‧導引架 40‧‧‧安裝座 31‧‧‧ Guide frame  40‧‧‧ Mounting

41‧‧‧樞結板 411‧‧‧插孔 41‧‧‧ pivot board  411‧‧‧ jack

413‧‧‧握把容口 50‧‧‧活動鉤吊件 413‧‧‧ grips  50‧‧‧ activity hook hanger

51‧‧‧擺臂 511‧‧‧長孔 51‧‧‧ swing arm  511‧‧‧ long hole

512‧‧‧卡掣鉤 53‧‧‧鉤吊板 512‧‧‧Card hook  53‧‧‧ hook hanging plate

54‧‧‧握把 60‧‧‧插銷 70‧‧‧鋼扣桶 54‧‧‧ grip  60‧‧‧Latch  70‧‧‧ steel buckle barrel

71‧‧‧支撐板 71‧‧‧Support board  

圖1係本創作較佳實施例之前視圖。 圖2係本創作較佳實施例之側視圖。 圖3係本創作較佳實施例之單側的局部前視圖。 圖4係本創作較佳實施例之單側的局部前視圖。 圖5係本創作較佳實施例之前視的使用狀態圖。 圖6係本創作較佳實施例之前視的使用狀態圖。 圖7係本創作較佳實施例之前視的使用狀態圖。 圖8係本創作較佳實施例之單側的局部側視圖。 Figure 1 is a front elevational view of a preferred embodiment of the present invention.  Figure 2 is a side elevational view of a preferred embodiment of the present invention.  Figure 3 is a partial front elevational view of one side of the preferred embodiment of the present invention.  Figure 4 is a partial front elevational view of one side of the preferred embodiment of the present invention.  Figure 5 is a front view of the state of use of the preferred embodiment of the present invention.  Figure 6 is a front view of the state of use of the preferred embodiment of the present invention.  Figure 7 is a front view of the state of use of the preferred embodiment of the present invention.  Figure 8 is a partial side elevational view of one side of the preferred embodiment of the present invention.  

Claims (10)

一種鋼扣桶吊架,其包括:
二吊耳,兩該吊耳間隔地設置且相連結,各吊耳包括有一吊掛孔,兩該吊耳的兩吊掛孔沿著同一方向貫穿設置;
二對安裝座,兩該對安裝座分別固設於兩該吊耳,且各對安裝座間隔地設置;
二活動鉤吊件,兩該活動鉤吊件分別設於兩該對安裝座,各活動鉤吊件包括有二擺臂及一鉤吊板,兩該擺臂能擺動地設於其中的一該對安裝座,該鉤吊板的相對二端分別固結於兩該擺臂;以及
四插銷,四該插銷分別穿置於兩該對安裝座而能擋止兩該活動鉤吊件的四擺臂,使兩該活動鉤吊件無法相對兩該對安裝座擺動。
A steel buckle bucket hanger comprising:
Two lifting ears, the two lifting ears are arranged and connected at intervals, each lifting ear comprises a hanging hole, and two hanging holes of the lifting ear are arranged along the same direction;
Two pairs of mounting seats, two pairs of mounting seats are respectively fixed on the two lifting ears, and each pair of mounting seats are arranged at intervals;
Two movable hook hangers, two movable hook hangers are respectively disposed on the two pairs of mounts, each movable hook hanger comprises a second swing arm and a hook hanging plate, and the two swing arms are swingably disposed in one of the two For the mounting seat, the opposite ends of the hook hanging plate are respectively fixed to the two swing arms; and four latches, and the four plug pins are respectively placed on the two pairs of mounting seats to block the four pendulums of the movable hook hanging members The arms are such that the two movable hook hangers cannot swing relative to the two pairs of mounts.
如請求項1所述之鋼扣桶吊架,其中各活動鉤吊件的各擺臂包括有一長孔,該長孔貫設於該擺臂且朝向該活動鉤吊件的鉤吊板延伸,二樞軸分別穿過該活動鉤吊件之兩擺臂的兩長孔而將兩該擺臂能擺動地設於其中的一該對安裝座。The steel buckle bucket hanger of claim 1, wherein each swing arm of each movable hook hanger comprises a long hole, the long hole is disposed on the swing arm and extends toward the hook hanger of the movable hook hanger. The two pivots respectively pass through the two long holes of the two swing arms of the movable hook hanger to swing the two swing arms to one of the pair of mounts. 如請求項2所述之鋼扣桶吊架,其中各吊耳貫穿設有二卡掣孔,兩該卡掣孔的位置對應固設於該吊耳之一該對安裝座的位置;各活動鉤吊件的各擺臂包括有一卡掣鉤,各擺臂的卡掣鉤與該活動鉤吊件的鉤吊板位於該擺臂的相對二端,各活動鉤吊件之兩擺臂的兩卡掣鉤能分別與所固設之吊耳的兩卡掣孔相卡掣。The steel buckle bucket hanger according to claim 2, wherein each of the lifting lugs is provided with two card boring holes, and the positions of the two boring holes are correspondingly fixed to the position of the pair of mounting ears; Each swing arm of the hook hanger comprises a hook hook, the hook hook of each swing arm and the hook hanging plate of the movable hook hanger are located at opposite ends of the swing arm, and two swing arms of each movable hook hanger The hooks of the hooks can be respectively engaged with the two card holes of the fixed lifting ears. 如請求項3所述之鋼扣桶吊架,其中各卡掣孔為一長形孔。The steel buckle bucket hanger of claim 3, wherein each of the card holes is an elongated hole. 如請求項1至4中任一項所述的鋼扣桶吊架,其中所述的鋼扣桶吊架包括有一導引座,該導引座包括有二導引架,兩該導引架分別固設於兩所述吊耳,且兩該導引架相向地傾斜設置。The steel buckle bucket hanger according to any one of claims 1 to 4, wherein the steel buckle bucket hanger comprises a guiding seat, the guiding seat comprises two guiding frames, and the guiding frame They are respectively fixed on the two lifting ears, and the two guiding frames are inclined to face each other. 如請求項5所述之鋼扣桶吊架,其中各活動鉤吊件包括有二握把,兩該握把分別結合於該活動鉤吊件的兩擺臂。The steel buckle bucket hanger of claim 5, wherein each of the movable hook hangers comprises two grips, and the two grips are respectively coupled to the two swing arms of the movable hook hanger. 如請求項6所述之鋼扣桶吊架,其中各對安裝座中的各安裝座包括有間隔設置的二樞結板,各樞結板包括有一握把容口,兩該樞結板的兩握把容口朝上,設於該對安裝座之一該活動鉤吊件的握把能容置於該對安裝座之樞結板所設的握把容口。The steel buckle bucket hanger of claim 6, wherein each of the pair of mounts comprises two spaced apart pivot plates, each pivot plate including a grip receptacle, and the two pivot plates The handles of the movable hooks of one of the pair of mounts can be accommodated in the grips of the pivot plates of the pair of mounts. 如請求項7所述之鋼扣桶吊架,其中所述的兩活動鉤吊件之擺臂的卡掣鉤朝相反方向設置。The steel buckle bucket hanger of claim 7, wherein the hooks of the swing arms of the two movable hook hangers are disposed in opposite directions. 如請求項8所述之鋼扣桶吊架,其中所述的鋼扣桶吊架包括有一個以上的連接桿,該一個以上的連接桿連結兩該吊耳。The steel buckle bucket hanger of claim 8, wherein the steel buckle bucket hanger comprises more than one connecting rod, and the one or more connecting rods join the two lifting ears. 如請求項2所述之鋼扣桶吊架,其中各吊耳貫穿設有二卡掣孔,兩該卡掣孔的位置對應固設於該吊耳之一該對安裝座的位置,且各卡掣孔為一長形孔;各活動鉤吊件的各擺臂包括有一卡掣鉤,各擺臂的卡掣鉤與該活動鉤吊件的鉤吊板位於該擺臂的相對二端,各活動鉤吊件之兩擺臂的兩卡掣鉤能分別與所固設之吊耳的兩卡掣孔相卡掣。The steel buckle bucket hanger according to claim 2, wherein each of the lifting lugs is provided with two latching holes, and the positions of the two latching holes are correspondingly fixed to one of the pair of lifting lugs, and each The latching hole is an elongated hole; each swinging arm of each movable hook and hanger comprises a latching hook, and the hooking hook of each swinging arm and the hooking and hanging board of the movable hooking hanging member are located at opposite ends of the swinging arm, The two latching hooks of the two swing arms of each movable hook hanger can respectively be engaged with the two latching holes of the fixed lifting lugs.
TW108205723U 2019-05-09 2019-05-09 Steel buckle barrel hanging rack TWM582950U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW108205723U TWM582950U (en) 2019-05-09 2019-05-09 Steel buckle barrel hanging rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW108205723U TWM582950U (en) 2019-05-09 2019-05-09 Steel buckle barrel hanging rack

Publications (1)

Publication Number Publication Date
TWM582950U true TWM582950U (en) 2019-09-01

Family

ID=68620626

Family Applications (1)

Application Number Title Priority Date Filing Date
TW108205723U TWM582950U (en) 2019-05-09 2019-05-09 Steel buckle barrel hanging rack

Country Status (1)

Country Link
TW (1) TWM582950U (en)

Similar Documents

Publication Publication Date Title
TWM582950U (en) Steel buckle barrel hanging rack
CN203284055U (en) H-section steel lifting tool
JP6309224B2 (en) Suspension structure and method of using the suspension structure
CN217921058U (en) Crane sling
CN202116194U (en) Intra-pipe lifting appliance with main hook and auxiliary hooks
CN213865131U (en) Support lift hoist with balance mechanism
CN207451423U (en) A kind of suspender with locking and automatic unhooking function
JP7492845B2 (en) Lifting fixture
CN210418939U (en) A gallows for workbin
CN209338675U (en) It is a kind of to hang the stretching-machine for hanging spring
CN208585950U (en) Hopper handling turnover device
JP2007308289A (en) Block lifting method and device
CN208932790U (en) Material conveys double-hook hanger
CN207209376U (en) A kind of rectangle section of jurisdiction Horizontal clamp
CN205603032U (en) Brake drum hoist
JPH08239191A (en) Hanger
JP4461549B2 (en) Roll stand suspension device and roll changing method
CN217229934U (en) A crane hook for plate hoist and mount
CN220578703U (en) Top hoist
CN201512350U (en) Clamp for hoisting rod-shaped workpiece
CN219860128U (en) Plate overturning lifting appliance
CN214059605U (en) Screw forming die's hoist and mount frock
CN220549893U (en) Fastening clamp for construction engineering hoisting machinery
CN212559124U (en) Reliable clamp for alloy production
JP3105356U (en) Inclined suspension

Legal Events

Date Code Title Description
MM4K Annulment or lapse of a utility model due to non-payment of fees