TWM445598U - Desilting and silt disturbance apparatus of reservoir overflow weir, spillway, desilting and flood-carrying tunnel - Google Patents

Desilting and silt disturbance apparatus of reservoir overflow weir, spillway, desilting and flood-carrying tunnel Download PDF

Info

Publication number
TWM445598U
TWM445598U TW101213943U TW101213943U TWM445598U TW M445598 U TWM445598 U TW M445598U TW 101213943 U TW101213943 U TW 101213943U TW 101213943 U TW101213943 U TW 101213943U TW M445598 U TWM445598 U TW M445598U
Authority
TW
Taiwan
Prior art keywords
discharge
reservoir
silt
spillway
sediment
Prior art date
Application number
TW101213943U
Other languages
Chinese (zh)
Inventor
an-ran Xu
Original Assignee
an-ran Xu
Wu Shu Duan
Xu ying yi
Xu wei yi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by an-ran Xu, Wu Shu Duan, Xu ying yi, Xu wei yi filed Critical an-ran Xu
Priority to TW101213943U priority Critical patent/TWM445598U/en
Publication of TWM445598U publication Critical patent/TWM445598U/en
Priority to CN2013201330118U priority patent/CN203222771U/en

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Barrages (AREA)
  • Treatment Of Sludge (AREA)

Description

水庫溢流堰、溢洪道、排沙排洪隧道之排沙與淤泥擾動裝置Sand discharge and silt disturbance device for reservoir overflow weir, spillway and sediment discharge tunnel

本創作係有關於一種在水庫溢流堰、溢洪道之水面下壁面或排沙排洪隧道等水庫水工構造物之適當位置上安裝至少一座固定沉水式水刀射流淤泥擾動裝置;尤指一種在水庫溢洪或洩洪、排洪、排沙之水工構造物上,選擇合適地點,設置水刀射流等水工機械裝置,並以管線電源延伸至上方陸地控制室,當水庫需要洩洪或溢洪、排洪、排沙時,配合啟動本創作,將聚積在溢流堰、溢洪道、排沙排洪隧道前庭及水庫洩溢洪、排洪、排沙時所呈現立體流線化流態區帶內之淤泥,以高壓水柱及高速攪拌器等高壓設備擾動沖擊破碎裂解,藉溢洪道、排沙排洪隧道等前庭具有之特殊空間功能-中和稀釋水力吸排作用,將水庫溢洪、排沙設施前庭附近庫床固結之沉泥裂解,藉著自由流、重力流之排洪流速、流量挾帶,濃濃渾水泥漿持續順著洪流而下注入溢洪道、排沙排洪隧道安全無害排放,達到壩前及重點區域淤泥有效擾動排除,並可在水庫洩溢洪時所呈現立體流線化流態區帶內,延伸在淤積面佈置壓力水管向下向淤泥高壓射流;亦可連結錨定工作浮台垂掛本裝置作業,擴大排沙區域;利用洪流、利用洩放水量同步進行排沙、有效降低壩前淤積高程。The creation department is directed to installing at least one fixed submersible water jet jet mud disturbance device at a suitable position of a reservoir hydraulic structure such as a reservoir overflow raft, a spillway surface or a sediment discharge tunnel; On the hydraulic structures of reservoir spill or flood discharge, flood discharge, and sediment discharge, select suitable locations, set up hydraulic machinery such as waterjet jets, and extend the pipeline power supply to the upper land control room. When the reservoir needs flood discharge or overflow When flooding, flood discharge, and sediment discharge, in conjunction with the initiation of this creation, the three-dimensional streamlined fluidic zone will be accumulated in the overflow raft, the spillway, the vestibule of the sediment discharge tunnel and the reservoir discharge, flood discharge and sediment discharge. The sludge in the belt is disturbed by high-pressure equipment such as high-pressure water column and high-speed agitator, and the special turmoil of the spillway, sediment discharge tunnel and other vestibules has the special space function - neutralization and dilution hydraulic suction and discharge, and the reservoir overflows and discharges sand. The silt cracking of the consolidation of the reservoir bed near the vestibule of the facility, through the free flow, gravity flow discharge flow rate, flow sling, thick slag cement slurry continues to flow down the torrent and into the spillway, sand discharge The flood discharge tunnel is safely and harmlessly discharged, and the effective disturbance of sludge in front of the dam and the key areas is eliminated. It can be placed in the three-dimensional streamlined flow zone when the reservoir overflows, and the pressure water pipe is arranged on the silt surface to the sludge high pressure. The jet can also be connected to the anchoring work pontoon to hang the device to expand the sand discharge area; use the torrent, use the effluent water to simultaneously discharge the sand, and effectively reduce the siltation elevation before the dam.

固定在溢洪堰、溢洪道、排沙排洪隧道水工結構體水面下之本創作裝置操作安全性高,可在最惡劣的天候下全天候作業。裝置平台可依各水庫環境設施個別選定適合位置裝設、操控之管線電源延管可延伸至岸上控制室內,以遙控按鈕操作。The original creation device, which is fixed under the surface of the hydraulic structure of the spillway, spillway and sediment discharge tunnel, has high operational safety and can be operated all day in the worst weather. The platform of the device can be selected according to the environmental facilities of each reservoir. The pipeline power extension tube suitable for installation and operation can be extended to the shore control room and operated by remote control buttons.

本創作最主要技術知識領域:(一)為本創作水庫溢洪堰、溢洪道、排沙排洪隧道排沙工法與淤泥擾動(高壓沉水幫浦及高速攪拌器等高壓設備)裝置,固定在水面下水庫溢洪、溢流、排沙、 排洪水工構造物適當位置;以高壓耐磨沉水幫浦反向安裝,將出水壓力水管向下延伸佈設至淤泥目標區,以高壓水柱直接對準堆積在前庭之淤泥,並輔以攪拌器等高壓設備攪揚,將淤泥沖擊攪動破碎裂解渾化上浮,結合溢流堰、溢洪道、排沙排洪隧道放水時具有之自由流、重力流特殊空間功能,將淤泥中和稀釋瞬間全部挾帶吸排,不會污染水體,不會漂浮水面,不會回積庫底,設備裝置固定在水面下之溢洪道導流牆或溢流堰豎面前緣下方、排沙道排洪道適當位置、操控線路延管設於陸上按鈕遙控,設施及操作人員安全性提高,可在最惡劣之颱風豪雨情況下仍可安全作業。(二)利用水庫內溢洪洩洪時,水流受環境地形、出水口位置影響所呈現立體流線化流態(意即水體流槽順序向下游溢水口、排沙口、放流口漂流之特性)在此區帶內1.於水面下淤積面佈設壓力水管、射流口、造成噴射高壓水柱。2.於水面上架設工作浮台、利用流態特性以本裝置吊掛操作,同步進行清淤排淤擴大排沙效果。(三)利用水庫水力排沙良機,於水庫淤泥堆積區域以傳統抽泥,水面、庫底、輸泥管輸泥方式、於水庫排洪排沙時,將淤泥導管出口端導入排洪排沙設施前庭,增加水力排沙之含沙容量,利用上述設施排沙放水時具有之重力流、自由流、管口流等水力特殊空間功能,將淤泥中和稀釋順間挾帶吸排。The main technical knowledge areas of this creation: (1) The equipment for the drainage and flood discharge of the reservoir, the spillway tunnel, the sediment discharge method and the silt disturbance (high-pressure submersible pump and high-speed agitator, etc.) Spillway, overflow, sand discharge, The appropriate position of the flooding structure; the reverse installation of the high-pressure wear-resistant submerged pump, the downward distribution of the outlet pressure water pipe to the target area of the sludge, and the high-pressure water column directly aligned with the sludge accumulated in the vestibule, supplemented by a stirrer When the high-pressure equipment is stirred, the silt impact stirrer will be crushed, cracked, and floated. Combined with the free-flow and gravity-flow special space functions of the overflow weir, the spillway, and the sediment discharge tunnel, all the silt will be neutralized and diluted. Suction and discharge, will not pollute the water body, will not float the water surface, will not return to the bottom of the reservoir, the equipment device is fixed under the water surface of the spillway diversion wall or the vertical front edge of the overflow weir, the appropriate position of the drainage channel of the sand discharge channel, the control line The extension is installed on the land button remote control, the safety of the facilities and operators is improved, and it can be safely operated under the worst typhoon and heavy rain. (2) When using the spillway and flood discharge in the reservoir, the water flow is affected by the environmental topography and the position of the water outlet, which presents a three-dimensional streamlined flow state (meaning that the water flow trough is sequentially drifting to the downstream overflow, discharge, and discharge). In this zone, 1. Place a pressure water pipe and a jet port on the silt surface under the surface of the water to cause a jet of high-pressure water. 2. Set up the working floating platform on the water surface, use the flow characteristics to hang the device, and simultaneously carry out the dredging and sedimentation to expand the sand discharge effect. (3) Using the hydraulic drainage mechanism of the reservoir to introduce the outlet end of the silt conduit into the flood discharge and sediment discharge in the reservoir silt accumulation area by traditional mud pumping, water surface, bottom of the reservoir, mud transporting method, and flood discharge of the reservoir. The vestibule of the facility increases the sediment carrying capacity of the hydrological sedimentation, and uses the special hydraulic functions such as gravity flow, free flow, and nozzle flow when the above-mentioned facilities discharge water and discharge water, and the sludge is neutralized and diluted.

按目前台灣之水庫壩堰的中下部位均設有小型取排水工、作為平時或汎期之運轉操作之用,兼作為微量排放渾水之用,但並無在水庫底部設置專用之大型排沙通道,如曾文、石門、霧社、烏山頭水庫;致水庫營運幾十年來庫底泥沙來漸漸淤高,甚至已高過取排水口,故目前僅能藉由既設的取排水口閘門機動的調控操作;單純的放水目的兼具的水力排沙效果有其極限,僅能勉強 保持取排水口前喇叭口極小限度、極小區塊之淨空、但如遇超大颱風豪雨,則缺乏危機緊急應變之能力,可能一夕之間壩前即淤積5~6公尺,屆時進水口則有可能被淤泥樹枝阻塞、導致水庫無法正常操作放水、風險極大。According to the current middle and lower parts of the reservoir dam in Taiwan, there are small drainage workers, which are used for normal or flooding operation, and also used as a micro-discharge drowning water. However, there is no large-scale platoon dedicated to the bottom of the reservoir. Sand passages, such as Zengwen, Shimen, Wushe, Wushantou Reservoir; the reservoir has been silt up for decades since the reservoir was operated, and it has even been higher than the water intake. Therefore, it can only be used by the existing water intake and outlet. The regulation and operation of the gate maneuvering; the simple effect of water discharge has the limit of hydraulic drainage, and it can only be reluctant Keep the minimum opening of the bell mouth before the drain, and the clearance of the pole block. However, in case of heavy typhoon and heavy rain, there is a lack of emergency response capability. It may be deposited 5-6 meters in front of the dam, and then the water inlet will be It may be blocked by silt branches, causing the reservoir to fail to operate properly and releasing water, which is extremely risky.

雖然以配合水刀、空壓機及潛水裝備、人員水下作業,以擾動進水口前淤泥方式,雖可以改善進水口前之閘門夾雜木竹垃圾清除問題,但以石門水庫目前之技術、經驗,如需要清除洞口前淤泥尚有多處前述盲點無法克服;如裝備動員復原費時,高危險、高單價、操作不便、小量、間歇、斷續、複雜難行,徒然浪費寶貴水資源,此水下作業工法受限水面風雨浪濤環境,勉強只能應用於水庫運轉操作設備緊急搶救應變,並非經濟有效、操作方便、大量持續、簡易可行之水庫壩前區域進水口前庭清淤良法;至於自然溢流之溢流堰、有閘門啟閉之溢洪道、以及排洪隧道、排沙閘門前庭之聚積淤泥任其累積,如何有效清除,迄今尚無人提及。Although it is used to cooperate with waterjets, air compressors and diving equipment, and personnel to operate underwater, to disturb the silt before the water inlet, although it can improve the problem of removing the wood and bamboo garbage in front of the water inlet, the current technology and experience of Shimen Reservoir If there is a need to clear the mud before the hole, there are still many blind spots that cannot be overcome; if the equipment mobilizes recovery costs, high risk, high unit price, inconvenient operation, small amount, intermittent, intermittent, complicated and difficult, waste valuable water, this Underwater operation method is limited to the surface of the water and storm, and can only be applied to the emergency rescue of the operation and operation of the reservoir. It is not economical, efficient, easy to operate, and a large number of continuous, simple and feasible reservoirs in front of the dam. The overflow overflow of the overflow, the spillway with the gate opening and closing, and the accumulated silt of the flood discharge tunnel and the vestibule of the drainage gate are allowed to be accumulated. How to effectively remove it has not been mentioned so far.

本創作人從事水庫運轉操作數十年,在台灣水庫面臨嚴重淤積,但卻苦無有效清淤對策之此刻,多元清淤排沙之構思應運而起,以南化水庫為例,該水庫是自然溢流排洪之水庫,當颱風豪雨滾滾泥流置入水庫,而溢流而出的卻是淡淡微渾之清水,水庫變成一個典型的大型沉沙池;然而每次洪水來臨時,約有6-10天的自然溢洪,一年平均約有56天左右之溢洪機會,如能有效利用把握這寶貴之自然溢洪時機,將沉積在壩前溢洪道、排沙排洪隧道前庭之巨積淤泥擾動揚起上浮,形成高濃度之渾水型態,隨著溢流水力之巨大流速流量挾帶而出,達到高效清除水庫淤積之目的,所謂的人工加值效率的水力排渾概念,即是本創作之思考創見鑽研之著眼點。The creator engaged in the operation of the reservoir for several decades. At the moment when the reservoir in Taiwan faced serious siltation, but there was no effective siltation countermeasure, the concept of multiple dredging and sediment removal should be brought up. Take the Nanhua Reservoir as an example. The reservoir is Natural overflow flood discharge reservoir, when the typhoon torrential rain and mud flow into the reservoir, but overflowing is a faint light water, the reservoir becomes a typical large sedimentation pond; however, each time the flood comes, There are natural floods of 6-10 days, and an average of about 56 days of flooding opportunities per year. If you can effectively use this precious natural spillover opportunity, it will be deposited in the vestibule of the spillway and sand discharge tunnel in front of the dam. The massive mud disturbs up and rises, forming a high-concentration type of water, with the huge flow velocity of the overflow hydraulic force flowing out, achieving the purpose of efficiently removing reservoir siltation, the so-called artificial value-added efficiency of hydraulic drainage concept That is the focus of thinking about the creation of this creation.

緣是,本創作之主要目的係於水庫、堰埧施行水力排沙之前端配套工法,裝置一固定沉水式(水刀射流)淤泥攪動裝置,係擷取浮台、船舶型潛水水下作業及虹吸式清淤、吸揚式抽泥船,與參考污水廠沉澱池等各式清淤之優點,並改良其缺點,應用創新提供在水庫溢流堰、溢洪道、排洪排沙隧道(混凝土結構設施)之適當位置、設置固定式沉水式(水刀射流)淤泥擾動裝置,配合水庫在溢洪、洩洪或排沙排洪隧道排沙時,可同時按鈕啟動本裝置,可依設定旋動方式自動操作,以高壓水柱及高速攪拌器等高壓設備,對準溢流堰、溢洪道、排洪排沙道前庭淤泥目標區,將堆積之淤泥面打破擾動,使之碎裂揚起,藉溢流堰、溢洪道、排沙排洪隧道具有自由流或重力流之特殊空間功能-將擾動之淤泥,依中和稀釋原理及水力吸排作用,把溢洪道、排沙排洪隧道、壩前淤泥所形成之渾水潭瞬間全部排放,並可在上述設施前端及水庫排洪排沙時所呈現立體流線化流態區帶內,在淤積面層延管鋪設出水壓力水管、噴水口向下產生高壓噴射水流、擾動淤泥,亦可以錨定浮動工作平台吊掛本裝備作業,擴大溢排沙區域,確保進水口永遠不會被淤泥阻塞,不會污濁水庫水體,可在任一最佳排沙時機隨時操作,增加排沙量、保障排沙作業人員及設備之安全,簡易操作、節省投資、省料省工等優點。The reason is that the main purpose of this creation is to support the construction method of the front and the bottom of the reservoir for water drainage, and to install a fixed submersible (waterjet jet) silt agitation device, which is a floating platform and a submersible underwater operation. And the advantages of various types of dredging, such as siphon dredging, suction dredger, and reference sewage plant sedimentation tank, and improve their shortcomings. Application innovations are provided in reservoir overflow weirs, spillways, flood discharge tunnels (concrete Appropriate position of structure and facilities, set fixed submersible (water jet jet) silt disturbance device, when the reservoir is in the flood discharge, flood discharge or sediment discharge tunnel, the device can be activated at the same time by button. Automatic operation, with high-pressure water column and high-speed agitator and other high-pressure equipment, aiming at the target area of the vestibule silt in the overflow weir, spillway and flood discharge channel, breaking the silt surface of the accumulated silt, causing it to break up and borrow The overflow weir, the spillway, and the sediment discharge tunnel have the special space function of free flow or gravity flow - the disturbed sludge, the neutralization and dilution principle and the hydraulic suction and discharge function, the spillway, the sediment discharge tunnel, and the dam front The puddles formed by the silt are all discharged instantaneously, and can be placed in the three-dimensional streamlined flow zone at the front end of the above-mentioned facility and the reservoir for flood discharge and sediment discharge. The water pressure water pipe and the water spout are laid down in the silt surface. Produce high-pressure jet water flow, disturb the sludge, and also anchor the floating work platform to hang the equipment, expand the spilled sand area, ensure that the water inlet will never be blocked by mud, and will not pollute the reservoir water body, which can be used in any best sand discharge. Timing operation at any time, increasing the amount of sand discharged, ensuring the safety of sand-discharging operators and equipment, easy operation, saving investment, saving materials and labor.

本創作工法及裝置以水庫自然溢洪或洩洪時,或排沙排洪隧道放水排沙時、同時操作兼顧增益排沙需要,將成為中高年水庫-淤積嚴重水庫,有效清淤,水門設備保全之必要裝備之一。The creative method and installations will be used in the natural flooding or flood discharge of the reservoir, or in the discharge and discharge of sand discharge tunnels, and at the same time, taking into account the need for gaining sand. It will become a medium-high-year reservoir-sludged serious reservoir, effectively dredging, and the water gate equipment is preserved. One of the necessary equipment.

為了讓 貴審查委員對本創作有更進一步的了解,茲佐以圖式詳細說明本創作如下:In order to let your review board have a better understanding of this creation, Zize elaborated on the creation as follows:

請參閱第一圖至第十四圖所示,本創作係於水庫排洪排沙水工構造物(即溢流堰、水庫排洪、排沙工程設施)10之前緣下方11,安裝設置至少一座沉水式(水刀射流)淤泥擾動裝置20,該沉水式淤泥擾動裝置20前端設置至少一延管26至前庭淤泥堆積區30與水庫溢流、洩洪、排沙排洪時所呈現立體流線化流態區帶25,以產生噴射流、高壓螺旋波。另沿水庫排洪排沙水工構造物10之前緣下方11,裝設操控之管線電源延管12,連接至岸上控制室13內,以遙控按鈕啟用操作。並以水庫排洪排殺水工構造物10為中心,配合第一圖、第二圖及第八圖所示,以隨水位自動升降浮標浮索延管14及垂直固定錨座15來配合工作平台16吊掛沉水式淤泥擾動裝置20,以遠距定線17擴大排沙作業區域至前庭淤泥堆積區30及立體流線化液態區帶25。Please refer to the first figure to the fourteenth figure. The creation is at least 11 below the front edge of the reservoir drainage and sediment discharge hydraulic structures (ie, overflow weir, reservoir flood discharge, and sediment discharge engineering facilities). A submersible (water jet jet) silt disturbing device 20, the front end of which is provided with at least one extension pipe 26 to the vestibular silt accumulation zone 30 and a three-dimensional appearance when the reservoir overflows, floods, discharges and discharges The stream zone zone 25 is streamlined to produce jets, high pressure spirals. In addition, along the front edge of the reservoir drainage and drainage structure 10, the pipeline power supply pipe 12 is installed and connected to the shore control room 13 to be operated by a remote control button. With the reservoir drainage and killing hydraulic structure 10 as the center, with the first figure, the second figure and the eighth figure, the water level automatic lifting buoy float cable extension pipe 14 and the vertical fixed anchor seat 15 work together. The platform 16 suspends the submerged mud disturbing device 20, and expands the sand discharging operation area to the vestibular silt accumulation area 30 and the three-dimensional streamlined liquid zone 25 by the remote alignment line 17.

請參閱第五圖、第六圖所示,本創作係於水庫排洪排沙水工構造物(即水庫排洪、排沙隧道口)10排洪排沙道口附近前緣下方11適當位置處,安裝設置至少一座沉水式淤泥擾動裝置20,其出水管出水口可直接噴射流至洞口前庭淤泥堆積區30,亦可延管佈設至離洞口較遠之前庭淤泥堆積區30及立體流線化流態區帶25,產生高壓噴射流、高壓螺旋波。另沿排洪排沙隧道口沉水式淤泥擾動裝置20,裝設操控之管線電源延管12,運轉至岸上控制室13內遙控按鈕操作。並以水庫排洪排沙水工構造物10之隧道口為中心。在前庭淤泥堆積區30及立體流線化液態區帶25區域內配合工作平台16,以吊掛沉水式淤泥擾動裝置20擴大排沙區域。Please refer to the fifth and sixth figures. This creation is at the appropriate position below the front edge of the 10 flood discharge sandway of the reservoir for flood discharge and sedimentation of hydraulic structures (ie, reservoir flood discharge and drainage tunnel entrance). At least one submerged mud disturbance device 20 is installed and installed, and the outlet pipe outlet can be directly sprayed to the vestibule sludge accumulation area 30 of the hole, or can be extended to the vestibular silt accumulation area 30 and the three-dimensional streamline far from the hole. The fluidized zone zone 25 produces a high pressure jet stream and a high pressure spiral wave. In addition, along the flood discharge sand tunnel mouth, the submerged mud disturbance device 20 is equipped with a pipeline power supply extension pipe 12 for operation, and is operated to a remote control button operation in the onshore control room 13. It is centered on the tunnel opening of the reservoir drainage and drainage structure. The working platform 16 is fitted in the vestibular silt accumulation zone 30 and the three-dimensional streamlined liquid zone 25 to suspend the submerged mud disturbance device 20 to expand the sand discharge area.

如第八圖所示,垂直固定錨座15下方係以垂直固定主鋼(纜)索151及垂直固定副鋼(纜)索152分別吊掛固定錨垂153於淤積泥沙18上方;而隨水位自動升降浮標浮索延管14下方吊掛有隨 水位自動升降之浮標141。As shown in the eighth figure, the vertical fixed anchor seat 15 is vertically fixed with the main steel (cable) cable 151 and the vertical fixed auxiliary steel (cable) cable 152 respectively suspended and fixed anchoring 153 above the silt 18; Water level automatic lifting buoy float cable extension tube 14 hanging below The water level is automatically raised and lowered by the buoy 141.

如第一圖至第六圖所示,當水庫自然溢洪或洩洪時,或排洪、排沙道排沙作業時,配合啟動沉水式淤泥擾動裝置20,將積聚在水庫排洪排沙設施前庭之淤積泥沙18以高壓水柱及擾拌器19強力擾動、破碎、裂解、渾化及揚起之泥漿21,所呈現立體流線化液態區帶25,藉溢洪道、溢流堰、排沙排洪隧道具有之特殊空間功能-中和稀釋及水力吸排作用22,集中注入溢流堰、溢洪道、排洪隧道、排沙隧道閘門23,將高濃度之泥沙渾水持續挾帶注入水庫排洪排沙水工構造物10以排洪排沙道瞬間排出24。As shown in the first to sixth figures, when the reservoir is naturally flooded or flooded, or when the flood discharge and sediment discharge operations are carried out, the submersible silt disturbance device 20 will be activated to accumulate in the reservoir for flood discharge and sediment discharge. The silt 18 of the vestibule of the facility is strongly disturbed, crushed, cracked, deuterated and raised by the high-pressure water column and the stirrer 19, and the three-dimensional streamlined liquid zone 25 is presented, and the spillway, overflow weir, row The special drainage function of the sand drainage tunnel - neutralization dilution and hydraulic suction and discharge 22, centralized injection of overflow weir, spillway, flood discharge tunnel, sand discharge tunnel gate 23, continuous injection of high concentration sediment and water into the reservoir The flood discharge and drainage hydraulic structure 10 is instantaneously discharged 24 by the flood discharge and drainage channel.

參閱第十五圖至第十八圖所示,傳統式人為抽泥、輸泥管輸泥注入排洪排沙設施之立面示意圖,將在水庫1內抽取之淤積泥沙18,以沉水式淤泥擾動裝置20抽取後,以水面管路26從水面或淤積面導排至水庫排洪排沙水工構造物10前庭。Referring to Figures 15 to 18, the façade of the traditional man-made mud and mud pipe for injection into the flood discharge and sediment discharge facilities will deposit the sediment 18 in the reservoir 1 to sink the water. After the sludge disturbance device 20 is extracted, the water surface pipe 26 is discharged from the water surface or the deposition surface to the vestibule of the reservoir drainage and drainage hydraulic structure 10.

再者,本創作係一種水庫溢流堰、溢洪道、排沙排洪隧道清淤排沙創新工法與裝置;係利用水庫設施洪水期間操作放水、排沙模式,藉溢流堰、溢洪道、排沙排洪隧道具有自由流、重力流之特殊空間功能,以在溢流堰、溢洪道、排沙排洪隧道適當位置安設本裝置或以抽泥輸泥,注入前庭方式,即可簡便又充分利用藉多餘需要排洪之水量精準有效排除前庭淤泥,並可擴大排沙區域,增進排沙效果。Furthermore, this creation is a new method and device for dredging and sediment removal of reservoir overflow weirs, spillways and sediment discharge tunnels; it is used to operate water discharge and sediment discharge mode during flooding of reservoir facilities, and to overflow overflow, spillway and sediment discharge. The flood discharge tunnel has the special space function of free flow and gravity flow. It can be easily and fully utilized by installing the device at the appropriate position of the overflow weir, spillway and sediment discharge tunnel or by pumping mud and injecting into the vestibule. The excess amount of water required for flood discharge can accurately and effectively eliminate the vestibular silt, and can expand the sand discharge area to improve the sand discharge effect.

以南化水庫為例:假設每一颱風豪雨事件,當水庫滿水時,設置之溢流堰則開始自然溢流,清水或淡淡渾水自然排出;但如為兼作排沙之用時,可配合啟動本系統裝置,假設每一颱風豪雨事件約有8天溢流。年平均約有7次颱風豪雨事件,依設施能量、清淤效率概算如下:日清淤排淤量60,000m3 。每次清淤排淤量 60,000m3 ×8日=480,000 m3 。每年清淤排淤量480,000 m3 ×7次=3,360,000m3Take the Nanhua Reservoir as an example: assuming that every typhoon event occurs, when the reservoir is full of water, the set overflow weir will begin to overflow naturally, and the clear water or faint water will be naturally discharged; but if it is used for sand discharge, In conjunction with the start-up of the system, it is assumed that there will be an overflow of about 8 days for each stormy event. There are about 7 typhoon torrential rain events per year. The estimated energy and dredging efficiency are as follows: the daily siltation and discharge volume is 60,000 m 3 . Dredging sludge discharge amount per 60,000m 3 × 8 Day = 480,000 m 3. The annual siltation and discharge volume is 480,000 m 3 × 7 times = 3,360,000 m 3 .

以南化水庫為例:溢流堰排洪量約5~100CMS以上,含沙量約占百分之二,本工法裝置數量可依溢洪量隨機調整,含沙濃度約100,000ppm,濁度約74,000NTU,此數值在下游河川豪雨排洪其容許之含沙量範圍以內。Take the Nanhua Reservoir as an example: the flood discharge of the overflow weir is about 5~100CMS, and the sediment concentration is about 2%. The quantity of the method can be adjusted randomly according to the flood discharge. The sediment concentration is about 100,000ppm and the turbidity is about 74,000. NTU, this value is within the allowable sediment concentration range of the downstream rivers and rivers.

1、本創作工法及淤泥擾動裝置,係直接設置在水庫水面下之溢流堰、溢洪道導流牆及排洪隧道、排沙隧道等水工結構物上,設備及人員安全,操作簡便,只要在陸上控制室內按鈕遠端遙控操作即可。1. The creative method and the silt disturbing device are directly installed on the hydraulic structures such as the overflow weir, the spillway diversion wall, the flood discharge tunnel and the sand discharge tunnel under the water surface of the reservoir. The equipment and personnel are safe and easy to operate, as long as The remote control operation of the button on the land control room can be performed.

2、本創作裝置固定,係架設其出水管向下對準目標區域(可依設計自動迴轉、角度可調)也可延管至前庭等較遠距之淤泥堆積區域,可輕易作業以高壓水柱、攪拌器等直接觸動沖擊淤泥,免除平台船舶無法或不易錨定、無法接近對準洞口,必須水下作業,以及工作危險、工作時間短促之大缺點。2. The creation device is fixed, and the outlet pipe is erected downwardly to the target area (can be automatically rotated according to the design, the angle is adjustable), and can be extended to a long distance silt accumulation area such as the vestibule, and can be easily operated with a high pressure water column. Straight contact with impact mud, such as agitator, exempts the platform ship from being unable or difficult to anchor, unable to access the hole, must work underwater, and has the disadvantages of work hazard and short working hours.

3、本創作水刀射流裝置,可依目的需求一組或多組設置,也可選擇單項、多項、單獨、多組或同時啟動之操作。3. The waterjet jet device of the present invention can be set in one or more groups according to the purpose, and can also be operated by single item, multiple items, single, multiple groups or simultaneous startup.

4、本創作可視需求添置高壓空氣壓縮機嚗氣,強化泥沙上浮,增進排沙效率。4. This creation can add high-pressure air compressor helium to the needs of the creation, strengthen the sediment and improve the efficiency of sand discharge.

5、把握在最壞的天候下-颱風豪雨來襲時也是最佳排沙時機,仍然可以安全執行排沙作業。5, grasp the worst weather - typhoon rain is also the best time to arrange sand, you can still safely perform sand discharge operations.

6、如無本創作、單獨自然溢洪或溢洪道閘門操作洩洪、或單獨開啟排洪、排沙閘門進行排洪、排沙作業時,排沙效果極其有限,畢竟水庫就好像是一座超大型的沉沙池,洪水一來,入庫泥沙大部分在中上游都沉澱了,排沙隧道也只能排除排沙道口附近小量淤泥、但如配合添加本創作作業,積極性的 配合前庭水力沖淤及水力排渾、利用多餘就要洩放的大水量,挾排泥沙,就可大幅增加排砂濃度提高排沙效率。6. If there is no creation, separate natural flood or spillway gate operation flood discharge, or separate flood discharge and sand discharge gate for flood discharge and sand discharge operation, the sediment discharge effect is extremely limited. After all, the reservoir is like a super large one. In the sand-sinking pool, most of the sediments in the sediments have been deposited in the middle and upper reaches of the flood. The sand-discharging tunnels can only eliminate a small amount of silt near the sand-discharging roadway, but if it is added to the creative operation, it is enthusiasm. In combination with the vestibular hydraulic sluicing and hydraulic drainage, the use of excess water to be vented, and the discharge of sediment, the sand concentration can be greatly increased to improve the efficiency of sediment removal.

7、設備費用節省,可以省去平台船舶設備高昂費用及拖吊與錨定等施工難度。7. Equipment cost savings can save the construction cost of platform ship equipment and the difficulty of construction such as towing and anchoring.

8、本創作-經安裝後可以隨時24小時待命、連續操作機動性高,不需要平台船舶設備動員、復原費時、以及水面、水下專業高危險工作群人力。8. This creation - after installation, it can be on standby 24 hours a day, with high maneuverability for continuous operation, no need for platform ship equipment mobilization, recovery time-consuming, and high-risk work group of water surface and underwater professional work.

9、可以配合現地需求,依溢、洩洪道、排沙排洪隧道為中心,在水庫洩溢洪時所呈現立體流線化流態區帶內,可在水下淤積面佈設壓力水管進行噴射流沖淤、亦可以隨水位自動升降之垂直錨座及浮台浮標配合工作平台、吊掛本裝置以遠距定線定點等進行多機同步作業,亦可以人為傳統抽泥、輸泥管遠距輸泥注入設施前庭方式,擴大溢流堰、溢洪道、排洪道、排沙道之排沙區域與排沙效率。9. It can cooperate with the local demand, centering on the spillway, spillway and sand discharge tunnel, and presenting a three-dimensional streamlined fluid zone in the reservoir flood discharge, which can be sprayed on the underwater silt surface. The flow can be scoured and silted, and the vertical anchor seat and the floating table buoy can be automatically lifted and lowered with the water level to cooperate with the working platform, and the hanging device can be synchronously operated by long-distance fixed-point positioning, etc., and can also be artificially pumped and transported. The vestibule method of the mud injection facility expands the drainage area and sediment discharge efficiency of the overflow weir, spillway, drainage channel and sedimentation channel.

10、本創作已把以往水面浮台、船舶型抽泥船、深水潛水作業裝置所有缺點全部摒除克服並加以改良精進。10. This creation has eliminated all the shortcomings of the previous surface floating platform, ship type mud dredger and deep water diving operation device and improved it.

11、本創作有水庫蓄水範圍使用管理辦法第23條之適用,可以隨時裝設施行,不需費時之環境評估作業。11. This creation has the application of Article 23 of the Management Measures for the Use of Reservoir Water Storage Range. It can be installed at any time without any time-consuming environmental assessment.

綜合以上所述,本創作之水庫溢流堰、溢洪道、排沙排洪隧道排沙工法及設置固定沉水式水刀射流淤泥擾動裝置,係為加強溢流堰、溢洪道、排沙排洪隧道水力排沙之人為配套機械通沙設施,將傳統現有水庫在自然溢洪或人工操作閘門洩洪時,只是單純的洩水排洪或在排沙排洪隧道進行排洪、排沙作業,任其只是自然排水、排沙被動消極之思維,改變為增加機械、水力輔助沖淤排渾的強烈積極意念、增益水力排沙效率。爰於水庫溢洪洩洪、排沙排洪隧道等混凝土水工構造物於水面下適當位置裝設固定載 台,以大型高壓力與高流量同時俱備之沉水高壓抽水機(耐砂耐磨型反向安裝)或高壓射水機所形成之高壓水柱射流擾動沖擊溢流堰、溢洪道、排沙排洪隧道前庭淤積體,並輔以渦旋攪拌器加速粉碎渾化揚起,瞬間藉水力重力等作用等排沙,並可在水庫洩溢洪時所呈現立體流線化流態區帶內延伸設置壓力水管產生噴射流,擴大溢流堰、溢洪道、排沙排洪隧道前庭排沙區域,不論水庫水位升降,不受颱風暴雨天候環境影響,隨時可依水庫管理單位指令即時配合清淤排沙運轉操作,擴大排沙效果,增益排沙效率,節省時間、把握排洪排沙時機空間、效率費用、操作費用,節約能源與利用多餘水資源清淤排渾之功能及操作安全簡便效率之目標。其實用功效當無庸置疑,特別是應用於溢流堰與排洪、排沙隧道者,其功效更形顯著。而本創作又從未公諸於市或已見於其他刊物,且為全國水庫受困已久殷切期盼,企求水庫正常運轉,活化更新改善永續經營之必要設施,實符專利法之規定,爰依法提出專利申請之。Based on the above, the reservoir overflow weir, spillway, sediment discharge tunnel and the fixed submersible water jet jet silt disturbing device are used to strengthen the overflow weir, spillway and sediment discharge tunnel. The people who are engaged in water drainage are equipped with mechanical sand-passing facilities. When the traditional existing reservoirs are flooded by natural floods or manually operated gates, they simply discharge water and discharge floods or discharge flood discharge and discharge operations in the sand discharge tunnels. It is only the passive and passive thinking of natural drainage and sand discharge, which is changed to increase the strong positive idea of mechanical and hydraulic assistance for scouring and silting, and to improve the efficiency of water drainage. Concrete hydraulic structures such as spillway flood discharge, sediment discharge tunnels, etc. are installed at appropriate locations under the water surface. Taiwan, a high-pressure water jet formed by a large-scale high-pressure and high-flow submersible high-pressure water pump (sand-resistant wear-resistant reverse installation) or a high-pressure water jet is used to disturb the overflow weir, spillway, and sediment discharge tunnel. The vestibular silt body is supplemented by a vortex mixer to accelerate the smashing of the smashing, and the sand is instantaneously discharged by the action of hydraulic gravity, etc., and the pressure can be extended in the three-dimensional streamlined flow zone when the reservoir overflows the flood. The water pipe generates jet flow, expands the overflow raft, spillway, and the vestibule sand discharge area of the sand discharge flood control tunnel. No matter the water level rise and fall of the reservoir, it is not affected by the typhoon and rain weather environment, and can be immediately matched with the dredging and sediment discharge operation according to the instructions of the reservoir management unit. It will expand the effect of sand discharge, gain efficiency in sand discharge, save time, grasp the time and space of flood discharge and sand discharge, efficiency cost, operation cost, save energy and utilize the function of water resources for dredging and draining, and the goal of safe, convenient and efficient operation. Its practical effect is undoubted, especially for those who are used in overflow weirs, flood discharge and sand discharge tunnels. However, this creation has never been publicized in the city or has been seen in other publications, and it has long been eagerly awaited by the national reservoirs. It is necessary to seek the normal operation of the reservoir, activate and update the necessary facilities for sustainable operation, and the provisions of the Patent Law.提出 Submit a patent application according to law.

(1)‧‧‧水庫(1) ‧ ‧ reservoir

(10)‧‧‧水庫排洪排沙水工構造物(10) ‧ ‧ reservoir drainage and sediment discharge hydraulic structures

(11)‧‧‧前緣下方(11) ‧‧‧ Below the leading edge

(12)‧‧‧管線電源延管(12)‧‧‧ Pipeline power extension

(13)‧‧‧控制室(13)‧‧‧Control room

(14)‧‧‧隨水位自動升降浮標浮索延管(14) ‧‧‧Automatic lifting buoys with water level

(141)‧‧‧浮標(141) ‧ ‧ buoys

(15)‧‧‧垂直固定錨座(15)‧‧‧Vertical fixed anchor

(151)‧‧‧垂直固定主鋼(纜)索(151)‧‧‧Vertically fixed main steel (cable) cable

(152)‧‧‧垂直固定副鋼(纜)索(152) ‧‧‧Vertically fixed secondary steel (cable) cable

(153)‧‧‧固定錨垂(153)‧‧‧Fixed anchorage

(16)‧‧‧工作平台(16)‧‧‧Working platform

(17)‧‧‧遠距定線(17) ‧‧‧ Remote alignment

(18)‧‧‧淤積泥沙(18)‧‧‧Sludged sediment

(19)‧‧‧高壓水柱及攪拌器(19)‧‧‧High pressure water column and agitator

(20)‧‧‧沉水式淤泥擾動裝置(20) ‧‧‧Submersible silt disturbance device

(21)‧‧‧泥漿(21)‧‧‧ mud

(22)‧‧‧中和稀釋及水力吸排作用(22) ‧‧‧Neutral dilution and hydraulic suction

(23)‧‧‧集中注入溢流堰、溢洪道、排洪隧道、排沙隧道閘門(23)‧‧‧Concentrated injection of overflow weirs, spillways, flood drainage tunnels, sand drain gates

(24)‧‧‧瞬間排出(24) ‧ ‧ ‧ instant discharge

(25)‧‧‧立體流線化流態區帶(25) ‧‧‧Three-dimensional streamlined fluid zone

(26)‧‧‧水面管路(26)‧‧‧Water surface pipeline

(30)‧‧‧淤泥堆積區(30)‧‧‧Sludge accumulation area

第一圖:係本創作水庫溢流堰排沙與淤泥擾動裝置之平面示意圖。The first picture is a schematic plan view of the drainage and sediment disturbance device of the reservoir.

第二圖:係本創作水庫溢流堰排沙與淤泥擾動裝置之立面示意圖。The second picture is a schematic diagram of the elevation of the overflow rafting and silt disturbance device of the reservoir.

第三圖:係本創作水庫溢洪道排沙與淤泥擾動裝置之平面示意圖。The third picture is a schematic plan view of the sand discharge and silt disturbance device of the reservoir spillway.

第四圖:係本創作水庫溢洪道排沙與淤泥擾動裝置之立面示意圖。Figure 4: Schematic diagram of the elevation of the sand discharge and silt disturbance device of the reservoir spillway.

第五圖:係本創作水庫排沙排洪隧道排沙與淤泥擾動裝置之平面示意圖。Figure 5: A schematic plan view of the sand discharge and silt disturbance device of the sediment discharge tunnel of the present reservoir.

第六圖:係水庫排沙排洪隧道排沙與淤泥擾動裝置之立面示意圖。Figure 6: Schematic diagram of the elevation of the sand discharge and silt disturbance device of the reservoir discharge tunnel.

第七圖:係本創作水庫溢洪、洩洪、排沙排洪時所呈現立體流線化流態區帶平面圖。Figure 7: A plan view of the three-dimensional streamlined flow zone presented by the reservoir during flood discharge, flood discharge, and sediment discharge.

第八圖:係本創作垂直固定錨座及水位自動升降浮標浮索延管之示意圖。Figure 8: This is a schematic diagram of the vertical fixed anchor seat and the water level automatic lifting buoy float cable extension tube.

第九圖:係本創作水庫排洪排沙設施之排沙與淤泥擾動裝置出水壓力水管延管佈設平面示意A圖。The ninth picture: the plane A and the distribution of the water discharge pressure pipe of the drainage and sediment disturbance device of the reservoir for the creation of the reservoir.

第十圖:係本創作水庫排洪排沙設施之排沙與淤泥擾動裝置出水壓力水管延管佈設立面示意A圖。The tenth picture shows the A picture of the surface of the water discharge pressure pipe extension pipe set by the sand discharge and silt disturbance device of the reservoir flood discharge and sand discharge facilities.

第十一圖:係本創作水庫排洪排沙設施之排沙與淤泥擾動出水壓力水管延管佈設平面示意B圖。Figure 11: Figure B shows the plane layout of the discharge pipe and the silt disturbed discharge pressure pipe of the reservoir for flood discharge and sediment discharge.

第十二圖:係本創作水庫排洪排沙設施之排沙與淤泥擾動出水壓力水管延管佈設立面示意B圖。Twelfth picture: Figure B shows the surface of the drainage and water pipe of the flood discharge and sediment discharge facilities of the reservoir.

第十三圖:係本創作水庫排洪排沙設施之排沙與淤泥擾動出水壓力水管延管佈設平面示意C圖。The thirteenth picture: the plane diagram C of the drainage pipe and the silt disturbed discharge pressure pipe of the water discharge and sediment discharge facilities of the reservoir.

第十四圖:係本創作水庫排洪排沙設施之排沙與淤泥擾動出水壓力水管延管佈設立面示意C圖。Figure 14: Figure C shows the surface of the sand discharge and silt disturbance of the flood discharge and sand discharge facilities of the reservoir.

第十五圖:係傳統式人為抽泥、輸泥管輸泥注入排洪排沙設施立面示意A圖。The fifteenth figure: A picture of the facade of the traditional man-made mud pumping and mud conveying mud injection into the flood discharge and sand discharging facilities.

第十六圖:係傳統式人為抽泥、輸泥管輸泥注入排洪排沙設施立面示意B圖。Figure XVI: B-picture of the facade of the traditional man-made mud pumping and mud conveying mud injection into the flood discharge and sand discharging facilities.

第十七圖:係傳統式人為抽泥、輸泥管輸泥注入排洪排沙設施平面示意C圖。Figure 17: Plane C diagram of the traditional man-made mud pumping and mud pipe infusion of flood discharge and sediment discharge facilities.

第十八圖:係傳統式人為抽泥、輸泥管輸泥注入排洪排沙設施立面示意D圖。Figure 18: D-picture of the facade of the traditional man-made mud pumping and mud conveying mud injection into the flood discharge and sand discharging facilities.

(10)‧‧‧水庫排洪排沙水工構造物(10) ‧ ‧ reservoir drainage and sediment discharge hydraulic structures

(11)‧‧‧前緣下方(11) ‧‧‧ Below the leading edge

(12)‧‧‧管線電源延管(12)‧‧‧ Pipeline power extension

(13)‧‧‧控制室(13)‧‧‧Control room

(14)‧‧‧隨水位自動升降浮標浮索延管(14) ‧‧‧Automatic lifting buoys with water level

(15)‧‧‧垂直固定錨座(15)‧‧‧Vertical fixed anchor

(16)‧‧‧工作平台(16)‧‧‧Working platform

(19)‧‧‧高壓水柱及攪拌器(19)‧‧‧High pressure water column and agitator

(20)‧‧‧沉水式淤泥擾動裝置(20) ‧‧‧Submersible silt disturbance device

(25)‧‧‧立體流線化流態區帶(25) ‧‧‧Three-dimensional streamlined fluid zone

(26)‧‧‧水面管路(26)‧‧‧Water surface pipeline

(30)‧‧‧淤泥堆積區(30)‧‧‧Sludge accumulation area

Claims (5)

一種水庫溢流堰、溢洪道、排沙排洪隧道之排沙與淤泥擾動裝置,係在水庫排洪排沙水工構造物設置至少一座沉水式淤泥攪動裝置,其中沉水式淤泥攪動裝置前端設置至少一延管至前庭淤泥堆積區,沿水庫排洪排沙水工構造物之前緣下方裝設操控之管線電源延管,該管線電源延管連接至岸上控制室內,以遙控按鈕啟用操作;當水庫溢洪、洩洪或實施排沙時,岸上遙控啟動沉水式淤泥擾動裝置,將積聚在水庫溢流堰、溢洪道、排沙排洪隧道前庭之淤泥以高壓水柱及攪拌器等設備強力擾動、破碎、裂解、渾化及揚起之淤泥,並藉著上述排洪排沙水工構造物之特殊空間中和稀釋及水力吸排作用,自動清除溢流堰、溢洪道、排沙排洪隧道前庭淤泥之排沙裝置者。 A sedimentation and silt disturbing device for a reservoir overflow weir, a spillway, a sediment discharge tunnel, and at least one submerged silt agitating device for the reservoir drainage and sedimentation hydraulic structure, wherein the front end of the submerged silt agitating device At least one extension pipe is arranged to the vestibular silt accumulation area, and a pipeline power supply pipe is arranged under the front edge of the reservoir drainage and drainage hydraulic structure, and the pipeline power extension pipe is connected to the shore control room, and the remote button is used to enable the operation; When the reservoir overflows, floods or implements sediment discharge, the submersible remotely activates the submersible silt disturbance device to strongly accumulate the sludge accumulated in the vestibule of the reservoir overflow weir, spillway and sediment discharge tunnel with high-pressure water column and agitator. , crushing, cracking, smashing and lifting the silt, and by means of the special space of the above-mentioned flood discharge and drainage hydraulic structures, and the dilution and hydraulic suction and discharge function, automatically remove the overflow raft, spillway, sand discharge tunnel vestibule Silt sand discharge device. 如申請專利範圍第1項所述之水庫溢流堰、溢洪道、排沙排洪隧道之排沙與淤泥擾動裝置,其中為擴大排沙區域,將本裝置之出水端順著庫床延伸佈設壓力水管至上述設施前庭及水庫洩溢洪時所呈現立體流線化流態區帶內,以沉水式高壓水柱及渦旋水流等設備強力沖淤,將沉澱水庫底之固結粉泥翻轉揚起,瞬間經取溢流堰、溢洪道、排沙排洪隧道強力吸排自動將淤泥排出者。 For example, in the reservoir overflow weir, spillway, and sediment discharge tunnel, the sand discharge and silt disturbance device, in order to expand the sand discharge area, the outlet end of the device is extended along the bed. The water pipe is in the three-dimensional streamlined flow zone where the vestibule and the reservoir of the above-mentioned facilities are discharged from the flood. The submerged high-pressure water column and the vortex water flow are used to smash the silt, and the consolidated silt at the bottom of the sedimentation reservoir is turned upside down. From the moment, the dredging, spillway, and sediment discharge tunnels will be used to automatically discharge the sludge. 如申請專利範圍第1項所述之水庫溢流堰、溢洪道、排沙排洪隧道之排沙與淤泥擾動裝置,其中在水庫、攔河堰埧內溢流堰、溢洪道、排沙排洪隧道等水工設施前庭,以及水庫洩溢洪時所呈現立體流線化流態區帶內,亦可利用垂直固定錨座及隨水位自動升降浮標浮索延管做整體規劃配置吊掛本裝置,作為水庫堰埧沖淤清淤排沙作業者。 For example, the sand discharge and silt disturbance devices of the reservoir overflow weir, the spillway and the sediment discharge tunnel mentioned in the first paragraph of the patent application, in which the overflow weir, the spillway and the sediment discharge tunnel in the reservoir and the weir In the vestibule of the hydraulic facilities and the three-dimensional streamlined fluid zone in the reservoir flood discharge, the vertical fixed anchor seat and the automatic lifting buoy float cable with the water level can be used as the overall planning and configuration of the hanging device. As a reservoir smashing silt dredging and sedimentation operators. 如申請專利範圍第1項所述之水庫溢流堰、溢洪道、排沙排洪隧道之排沙與淤泥擾動裝置,其中在水庫、攔河堰埧內,以傳統人為抽泥、輸泥管輸泥注入水工設施前庭方式,增加前庭含沙濃度,利用上述水工構造物之特殊空間中和稀釋及水力吸排作用挾帶排出,進行排洪排沙作業者。 For example, the sand discharge and silt disturbance devices of the reservoir overflow weir, spillway and sediment discharge tunnel mentioned in the first paragraph of the patent application area, in which the traditional man is used for mud pumping and mud transport in the reservoir and river weir. The mud is injected into the vestibular mode of the hydraulic facility to increase the sediment concentration in the vestibule, and to use the special space of the above-mentioned hydraulic structure to neutralize the dilution and hydraulic suction and discharge to carry out the flood discharge and sand discharge operation. 如申請專利範圍第1項所述之水庫溢流堰、溢洪道、排沙排洪隧道之排沙與淤泥擾動裝置,其中在水庫、攔河堰埧內溢流堰、溢洪道、排沙排洪隧道等水工設施前庭,以及水庫洩溢洪時所呈現立體流線化流態區帶內,以人為、機械、設備、外力擾動淤泥、增加排沙含量,利用水庫排水、溢洪、洩洪、排沙通道設施作為排水排沙二者效益更形兼具之通道者。 For example, the sand discharge and silt disturbance devices of the reservoir overflow weir, the spillway and the sediment discharge tunnel mentioned in the first paragraph of the patent application, in which the overflow weir, the spillway and the sediment discharge tunnel in the reservoir and the weir Waiting for the vestibule of the hydraulic facilities and the three-dimensional streamlined flow zone in the discharge of the reservoir, disturbing the silt with man-made, machinery, equipment and external forces, increasing the sediment content, using the reservoir drainage, flood discharge, flood discharge, drainage The sand channel facilities serve as a channel for both benefits of drainage and sediment removal.
TW101213943U 2012-07-19 2012-07-19 Desilting and silt disturbance apparatus of reservoir overflow weir, spillway, desilting and flood-carrying tunnel TWM445598U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
TW101213943U TWM445598U (en) 2012-07-19 2012-07-19 Desilting and silt disturbance apparatus of reservoir overflow weir, spillway, desilting and flood-carrying tunnel
CN2013201330118U CN203222771U (en) 2012-07-19 2013-03-22 Sand and sludge discharge disturbance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW101213943U TWM445598U (en) 2012-07-19 2012-07-19 Desilting and silt disturbance apparatus of reservoir overflow weir, spillway, desilting and flood-carrying tunnel

Publications (1)

Publication Number Publication Date
TWM445598U true TWM445598U (en) 2013-01-21

Family

ID=48091269

Family Applications (1)

Application Number Title Priority Date Filing Date
TW101213943U TWM445598U (en) 2012-07-19 2012-07-19 Desilting and silt disturbance apparatus of reservoir overflow weir, spillway, desilting and flood-carrying tunnel

Country Status (2)

Country Link
CN (1) CN203222771U (en)
TW (1) TWM445598U (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104032709B (en) * 2014-06-20 2015-10-28 中建五局第三建设有限公司 Urban river bend silt prevention method
CN105839586B (en) * 2016-03-31 2018-01-30 马向前 A kind of reservoir silt reduction and cleaning facility and its operation method
CN107787906A (en) * 2017-11-24 2018-03-13 湖州西荡漾生态农业开发有限公司 A kind of high-efficient solid aquaculture system
CN110284457B (en) * 2019-07-02 2021-04-02 河海大学 Method for treating river sediment

Also Published As

Publication number Publication date
CN203222771U (en) 2013-10-02

Similar Documents

Publication Publication Date Title
CN104196047B (en) A kind of high-lift siphon drainge system of self-recoverage side slope and water discharge method of exempting from the reverse setting-out of power
CN103410185B (en) Hydrocone type reservoir desilting and screening plant and using method thereof
CN204185871U (en) A kind of high-lift siphon drainge system of self-recoverage side slope of exempting from the reverse setting-out of power
Su-Chin et al. Sediment removal efficiency of siphon dredging with wedge-type suction head and float tank
TWM445598U (en) Desilting and silt disturbance apparatus of reservoir overflow weir, spillway, desilting and flood-carrying tunnel
CA3090490A1 (en) Device for a sediment transfer in waters, and also a method for a transfer of sediment in waters
Rawn et al. Diffusers for disposal of sewage in sea water
CN101289842A (en) Underwater dredging conveyer way along the way
CN105887755A (en) Reservoir sand pumping system
CN206680943U (en) A kind of water conservancy mud early warning sewage disposal apparatus
CN111519682A (en) Unpowered sand suction device and method
CN206418579U (en) A kind of integrated form coal sewage lifting pump station
CN205776125U (en) Spillway gate recess ice breaker in winter
CN208830387U (en) Accrete clearing device is dug in small punching in the scouring type river bottom mud waterpower that drops
CN104963383B (en) A kind of pressure conduit inverted siphon hydraulic automatism erosion and deposition device
CN201746822U (en) Desilting and sludge disturbing device at water extraction port of reservoir
CN102912761B (en) Wind force dredging method for river
US10876265B2 (en) Modular hydropower unit
CN103334756B (en) Tailings recovery equipment and method
CN107761819B (en) A kind of LNG water intake pumping station does not prevent and reduce silting-up under halt condition device and operation method
JP5731243B2 (en) Fixed dam construction method
CN108149644B (en) Hydraulic automatic silt-reducing system in front of rolling dam and construction method
TW201132827A (en) Sand removal and sediment and sunk log perturbation device for reservoir intake
CN217399850U (en) Discrete water outlet structure
CN212317023U (en) Unpowered sand suction device

Legal Events

Date Code Title Description
MK4K Expiration of patent term of a granted utility model