TWM241406U - Rotatable sling - Google Patents

Rotatable sling Download PDF

Info

Publication number
TWM241406U
TWM241406U TW92215404U TW92215404U TWM241406U TW M241406 U TWM241406 U TW M241406U TW 92215404 U TW92215404 U TW 92215404U TW 92215404 U TW92215404 U TW 92215404U TW M241406 U TWM241406 U TW M241406U
Authority
TW
Taiwan
Prior art keywords
sling
main
chain
car
component
Prior art date
Application number
TW92215404U
Other languages
Chinese (zh)
Inventor
Yan-Liang Yin
Original Assignee
Runhorn Pretech Eng Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Runhorn Pretech Eng Co Ltd filed Critical Runhorn Pretech Eng Co Ltd
Priority to TW92215404U priority Critical patent/TWM241406U/en
Publication of TWM241406U publication Critical patent/TWM241406U/en

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

M241406 捌、新型說明: 【新型所屬之技術領域】 本創作係為一種自轉吊具,可隶 」運到以吊具之機制控制擬吊 装構件至定位,可不需依由下而上之工序吊裝,避免工地因一構 件之失誤,«待其紅猶核繼續崎上方工程之困擾,可 使下方構件失社修正與_建築物其他工程施工之進行同步, 具有施工省時且方便的優點。 【先前技術】 A 八即相昇鋼骨或預鑄構造 “法’於施工中必需將構件分別以吊車吊至定位,即 可完成建築物結構體的吊裝作業,但是,上述構造於實際 使用時,卻具有如后的缺點,有待改善: 施工費時且不便:尤直去 /tL 〇 尤八田奴將一構件吊至已吊裝完成 冓件的正下方時,會造成不便,其原因在於: ^吊裝餐正上方’而為防止㈣裝構衫位點上方被已 吊裝完成的構件播住時,不能從由上而下方向,由已吊裳 完成構件的正下方進行定位吊裝,故其構件吊裝工序—定' :依由下而上之順序吊裝。因此建築物之其他工程亦需配 =料構件吊裝完成後才可續行。造成整體建築物工時浪 費及冗長,實有加以改善的必要。 【新型内容】 本創作者有鑑於前述習用結構於實際使用上仍秋 其缺點存在而予以重新設計’主要係設計—種自轉吊 M241406 具。M241406 新型 Description of the new model: [Technical field to which the new model belongs] This creation is a self-rotating spreader, which can be transported to the position to be controlled by the mechanism of the spreader, and can be hoisted without the need of a bottom-up process. Avoiding the construction site due to the failure of a component, «waiting for the Red Jade Nuclear to continue the trouble of the upper part of the project, it can synchronize the correction of the dislocation of the lower part and other constructions of the building, which has the advantages of time-saving and convenient construction. [Previous technology] A Eighth, the phase-rise steel frame or concrete structure "method" In the construction, the components must be hoisted to the positioning respectively to complete the hoisting operation of the building structure, but the above structure is used in actual use However, it has the following shortcomings and needs to be improved: Construction is time-consuming and inconvenient: You go straight to / tL 〇 You Yatiannu will cause inconvenience when lifting a component directly below the completed lifting file, the reason is: ^ Lifting Just above the meal ', in order to prevent the upper part of the outfitting structure shirt site from being broadcasted by the hoisted components, the hoisting process cannot be performed from the top to the bottom, and the hoisting components are directly below the hoisted components. —Defined ': Hoisting in the order of bottom to top. Therefore, other works of the building also need to be completed after the hoisting of the material components is completed. It can cause waste and tedious man-hours of the entire building, and it is necessary to improve it. [New content] In view of the fact that the aforementioned conventional structure still has its shortcomings in practical use, the creator has redesigned it's mainly a design-a kind of rotating crane M241406.

本創作之主要目的係為提供—種自轉吊具,使用時, 第一吊索之掛勾端掛置於擬吊裝構件上並控制主吊索使主吊架移 至預擬吊裝構件定位點上方後,將第三吊索之掛勾跨過已吊裝完 :讀件’並掛置第三吊索於擬吊裝構件上,再藉遙控器控制鍵 滑車令第二、第三吊索相對收索使副吊架轉動。可使擬吊裝構件 ^至已吊裝完成構件的正下方,使副吊架呈水平狀態,再將擬吊 ^構件吊至定位點即可完成。以達到可不需依由下而上之工序吊 又避免工地因一構件之失誤,則需待其修正過後才能繼續進行 上方工程之_,此創作可使下方構件失誤之修正與後續建築物 其他工程施卫之進行同步,具有施方便的優點。 為了可達到前述的創作目的,本創作所運用的技名 段係在於提供一種自轉吊具,由吊車下方設置主吊索’ =吊索下端設一主吊架’主吊架兩端分別設置副吊架,)The main purpose of this creation is to provide a kind of self-rotating spreader. In use, the hook end of the first sling is hung on the intended lifting member and the main suspension is controlled to move the main hanger above the positioning point of the intended lifting member. After that, the hook of the third sling has been hoisted: Read the article, and hang the third sling on the component to be hoisted, and then use the remote control control key pulley to make the second and third slings relatively retract. Turn the secondary hanger. The component to be hoisted can be directly below the completed component, the auxiliary hanger can be leveled, and the component to be hoisted to the positioning point can be completed. In order to achieve that it is not necessary to suspend the process from the bottom to the top and to avoid the mistake of a component at the construction site, it must be corrected before it can continue the above project. This creation can make the correction of the errors of the lower components and other subsequent projects. Shi Weizhi's synchronization has the advantage of convenience. In order to achieve the aforementioned creative purpose, the technical section used in this creation is to provide a self-rotating sling. A main sling is set under the crane '= a main suspender is set at the lower end of the sling. Hanger,)

=架-側τ端設—具適當長度的第—吊索與㈣ ::側下端設鏈滑車,鏈滑車上設第二吊索,鏈滑車下言; 大於=與掛勾’第二吊索加上鏈滑車及第三吊索的長肩 、弟一吊索的長度。 【實施方式】 有; 本創作係-種自轉吊具,請參閱第一圖中所示,包括 5 M241406 分別設置一金屬製副吊架(丄4 ); 各金屬製副吊架(1 4 ) 一 -isii -Γ 择一 側下端設有一具有適當長 X的第一吊索(20),第一吊 勾(2 2 ); 京(2 0 )下部設置一掛 各金屬副吊架(1 4 )另側下端μ古组 而。又有第二吊索(3 2 ), 其下銜接設一鏈滑車(3 0 ) (# ^, 〇 、鏈/月車(3 〇 )為習知構 造,不再資述),鏈滑車(30)下部設置第三吊索(3 4),第三吊“34)下部設-掛勾(36),第三吊 索(34)可於鏈滑車(3〇)内部相對收索或放索’第 —吊索(32)、鍵滑車(30)及第三吊索(34)的 總長度大於第-吊索(2())的長度(如第二圖中所示), 藉兩掛勾(2 2 ) ( 3 6 )分別可供勾置擬«構件(4 0 )上端前、後位置,達可不需依由下而上之工序吊裝,並利 可同步進行賴物其他4社,具有施4時且方便的優點。 如第二圖中所示,建築工 %她工需要吊置擬吊裝構 件(4 0 )時,以掛勾(p S M m N U 2 )吊掛於擬吊裝構件(4 〇), 並利用主吊索(1 〇 )移動验姐兄壯j ㈣將擬吊裝構件(4 G )移置於定 位點上側方。第二吊+ r q 〇、 巾索(3 2)、鏈滑車(3〇)加 三吊索(34)的長产女机位 v ^ 乐 又大於弟一吊索(2 0 )的長度,建 築工人(50)可將掛逐 (2 2 ) ~過已吊裝完成構 0)再掛吊於擬吊裝構件 b 騎(4 0 )上,並藉遙控器 遙控鏈滑車(3 〇 ) f a * 0 ^ ; (如第三圖中所示),使鏈滑車(3 6 ^241406 〇)令弟二吊索(32)、第三 〇)内部相對收索(如第四圖中所34)於鏈滑車(3 可令副吊架(1 4 )以、” ” ’由於總長度變短’ 第-吊索(20)、第 =向轉動,使副吊架(“)、 與苐三吊索(3 4)及擬吊裝構件)m 3 0) 空間(4 2 ),使已吊裝完成構0 )之間所形成的 2),再使鍵滑車(3Q) G)置於該空間(4 索(34)相對收索,可使:吊:::丨32)、第三吊 吊裝完成構件(6 Q )的正 〇 )被吊至已 掛吊,再將各掛勾(22)々(如第五圖中所示)定位 取下之後(如第六圖中所示)=擬吊裝構件(4〇) 〇)的吊裝作業,可達到不需贫由元成擬吊褒構件(4 _行建築物其他工::下一^ 【圖式簡單說明】 纟有施1時且方便的優點。 (一)圖式部分 第-圖係本創作之立體外觀圖。 第二圖係本創作之平面示意動作(―)圖 第三圖係本創作之平面示意動作(二)圖 第四圖係本創作之平面示意動作(三)圖 第五圖係本創作之平面示意動作(四)圖 第六圖係本創作之平面示意動作(五)圖 (二)元件代表符號 Θ M241406 (1 Ο )主吊索 (1 4)副吊架 (2 2)掛勾 (3 2 )第二吊索 (3 6)掛勾 (4 2)空間 (5 2)遙控器 (1 2)主吊架 (2 0)第一吊索 (3 0)鏈滑車 (3 4)第三吊索 (4 0)擬吊裝構件 (5 0)建築工人 (60)已吊裝完成構件= Frame-side τ end set—the first sling with appropriate length and ㈣ :: chain block on the lower end of the side, a second sling on the chain block, and the chain block is below; greater than = and hanging hook 'second sling Add the long shoulder of the chain pulley and the third sling, and the length of the first sling. [Embodiment] Yes; this creative department is a kind of self-rotating sling, please refer to the first picture, including 5 M241406, each with a metal auxiliary hanger (; 4); each metal auxiliary hanger (1 4) A -isii -Γ is provided with a first sling (20) having a proper length X and a first hook (2 2) at the lower end of one side; each metal auxiliary hanger (1 4 ) On the other side of the μ ancient group. There is also a second sling (3 2), and a chain pulley (30) (# ^, 〇, chain / monthly vehicle (30)) is a conventional structure, which is no longer described, and a chain pulley ( 30) A third sling (34) is set in the lower part, and a hook (36) is set in the lower part of the third sling "34". The third sling (34) can be relatively retracted or released inside the chain block (30). 'The total length of the first sling (32), the key block (30), and the third sling (34) is greater than the length of the-sling (2 ()) (as shown in the second figure). The hooks (2 2) (3 6) can be used to set the front and rear positions of the upper part of the proposed «component (40), respectively. It has the advantage of being convenient at 4 o'clock. As shown in the second figure, when the construction worker needs to suspend the to-be-lifted member (40), he uses the hook (p SM m NU 2) to hang on the to-be-lifted member. (4 〇), and use the main sling (1 〇) to move the test brother and sister Z j to move the quasi-lifting member (4 G) to the upper side of the positioning point. The second sling + rq 〇, towel (3 2) The long-birth woman's seat with chain pulley (30) and three slings (34) v ^ More than the length of the sling (2 0), the construction worker (50) can suspend (2 2) ~ 0 after the hoisting is completed and then hang it on the rigging member b (4 0), and borrow The remote control chain pulley (30) fa * 0 ^; (as shown in the third picture), so that the chain pulley (36 6 241241 〇) makes the second sling (32), the third 30) relatively closed. Rope (as indicated by 34 in the fourth picture) on the chain block (3 can make the auxiliary hanger (1 4) with "" because the total length is shortened. " 2) between the hanger ("), the three slings (3 4) and the intended lifting member m 3 0) space (4 2) so that the completed lifting structure 0), and then the key block ( 3Q) G) Placed in this space (4 ropes (34) are relatively retracted, so that: hoisting ::: 丨 32), the third hoisting completed component (6 Q) is directly hoisted to 0), After the hooks (22) 々 (as shown in the fifth picture) are positioned and removed (as shown in the sixth picture) = the hoisting member (4〇) 〇), the lifting operation can be achieved without poverty. Yucheng's pseudo-condolence member (4 _ row building other workers :: next ^ [Schematic description]】 It has the advantages of 1 time and convenience. (1) The first part of the diagram is the three-dimensional appearance of the creation. The second picture is the schematic action of the creation (―) The third picture is the schematic action of the creation. (2) The fourth picture is the schematic action of the creation (three) The fifth picture is the schematic action of the creation (d) The sixth picture is the schematic action of the creation (five) The (two) component Representative symbol Θ M241406 (1 〇) Main sling (1 4) Sub hanger (2 2) Hook (3 2) Second sling (3 6) Hook (4 2) Space (5 2) Remote control ( 1 2) The main hanger (20), the first sling (30), the chain block (34), the third sling (40), the component to be hoisted (50), and the component (60) has been hoisted.

Claims (1)

玫、申請專利範圍: 1種自轉吊具,包括有: 主吊索,主吊索下方設置-主吊芊,主吊 別設置—副吊架; i币木主吊 各副吊架—側 _掛勾; ^弟巾索,第一吊 各副吊架另側下端兮右楚v 車,鏈、而。又有弟二吊索,其下銜接 鏈β車下部設置第三吊 1+L > 一中寒苐二吊索下部設 曰勾分別勾置—構件的上端前、後位置。 二吊I、:申專利範圍第1項所述之自轉吊具 度。’、'月車及第三吊索的總長度大於第一 拾、囷式: 如次頁 架 索 兩端分 下部設 —鏈滑 掛勾, 其中第 索的長Mei, scope of patent application: 1 type of self-rotating spreader, including: main sling, under the main sling-main sling, main sling type-auxiliary hangers; i-coin wood main crane, each auxiliary hanger-side_ Hanging hooks; ^ brother towel, the first lower side of each side of the auxiliary hangers are right and right v car, chain, and. There is another second sling. The third lower sling 1 + L is set at the lower part of the chain β car. The lower part of the second sling of the middle cold house is hooked separately—the front and rear positions of the upper end of the component. Second crane I: Rotation spreader as described in item 1 of the scope of patent application. The total length of the moon car and the third sling is longer than the first pick-and-place style: as in the next page, the two ends of the rope are set at the lower part—chain slide hook, where the length of the first rope
TW92215404U 2003-08-26 2003-08-26 Rotatable sling TWM241406U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW92215404U TWM241406U (en) 2003-08-26 2003-08-26 Rotatable sling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW92215404U TWM241406U (en) 2003-08-26 2003-08-26 Rotatable sling

Publications (1)

Publication Number Publication Date
TWM241406U true TWM241406U (en) 2004-08-21

Family

ID=34077825

Family Applications (1)

Application Number Title Priority Date Filing Date
TW92215404U TWM241406U (en) 2003-08-26 2003-08-26 Rotatable sling

Country Status (1)

Country Link
TW (1) TWM241406U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI402208B (en) * 2010-03-23 2013-07-21 Wobben Aloys Lifting unit for lifting a rotor of a wind power installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI402208B (en) * 2010-03-23 2013-07-21 Wobben Aloys Lifting unit for lifting a rotor of a wind power installation

Similar Documents

Publication Publication Date Title
CN103981857A (en) Method for hoisting L-shaped steel reinforcement cage of underground diaphragm wall
CN102733608B (en) Construction method for spray head layer of granulation tower
TWM241406U (en) Rotatable sling
CN112027893B (en) Hoisting accessory that assembled wall body hoist and mount were used based on BIM
CN210914933U (en) Horizontal hoisting assembly for prefabricated wall panel
CN201574507U (en) Soft film ceiling mounting structure
CN203783171U (en) Assembled-type overhanging protective canopy for high-rise building construction
CN107366393A (en) A kind of food stuff refrigerated storage roofing colored steel Alley Oop formula hanging method
CN200971610Y (en) Guide lifting platform device for chimney
CN205932940U (en) Hang various steel sheet tripod
CN207330117U (en) Pre-install stair suspender
CN207030735U (en) Prefabricated balcony lifts servicing unit
CN207312995U (en) One kind self-control bridge-collision-avoidance wall form hanging device
CN206844643U (en) Post-cast strip independence braced wing support combination unit
CN207986526U (en) A kind of cladding panel hoisting structure
CN2494860Y (en) Outrigger supporting type lifting scaffold
CN210763925U (en) Tire mold side plate hoisting and overturning support
CN206624556U (en) One kind is used for tire-mold Special hoisting mechanism
CN210636659U (en) Plane steel bar truss building carrier plate based on rapid Assembly formula
CN202017347U (en) Externally-hung discharging platform device
CN207774724U (en) A kind of architectural engineering hanging apparatus
CN201962894U (en) Suspension structure for building wall
CN212503649U (en) Horizontal hoisting auxiliary hanging bracket for prefabricated laminated slab
CN206157983U (en) Solve rigid casing pipe of furred ceiling burden wind pressure
CN106629383B (en) A kind of suspension hook for hoisting board

Legal Events

Date Code Title Description
MK4K Expiration of patent term of a granted utility model